HomeMy WebLinkAboutCOW 2014-06-09 Item 4A - Resolution - 2015-2020 Transportation Improvement ProgramTO: City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: Cyndy Knighton, Senior Program Manager DATE: May 23. 2014 SUBJECT: Resolution for Six -Year Transportation Improvement Program (2015 -2020) ISSUE Resolution to adopt the annual update of the Six -Year Transportation Improvement Program for 2015 -2020. BACKGROUND The Transportation Improvement Program (TIP) is updated annually as required by the Revised Code of Washington (RCW). The TIP is adopted by resolution after a public hearing at the local agency level and incorporated into regional and state TIPs. The TIP is primarily a financial planning document for projects competing for grants. Any project submitted for federal grant funding must be included in the local, regional and state adopted TIPs. The TIP is a rolling plan showing various funding sources: grants, developer and local funds. Projects "roll" as funds or stages occur (design report, final design and construction). Tukwila's TIP and Capital Improvement Program (CIP) list many of the same transportation- related projects. The TIP generally lists only those transportation- related projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. The City's CIP lists transportation projects planned in the next six years and beyond, as well as water, sewer, surface water. and capital facilities projects. The TIP is required to be adopted by June 30 on an annual basis, while the CIP is prepared during Summer /Fall in conjunction with the City's budget preparation. Differences between the two may be due to priority changes, funding availability changes, or other factors which normally occur during the time between adoptions of each document. ANALYSIS The attached spreadsheet is the "Draft" 2015 - 2020 TIP and was created by modifying the 2014 - 2019 TIP to add or remove projects and adjust project costs. No prioritization was assigned and the list of projects is presented in alphabetical order. Prioritization of projects is reflected in the CIP. Added: 53rd Avenue 5 (CIP Page 6), Completed: Andover Park W Widening (CIP Page 17), Cascade View Safe Routes to School (CIP Page 3), Interurban Avenue S (CIP Page 14), 5 1781 Street Realignment, Thorndyke Safe Routes to School (CIP Page 4), Tukwila Manufacturing Industrial Center "Street Smart" Non - motorized Project (CIP Page 26), Tukwila Urban Center Transit Center (CIP Page 16) In Beyond: Minkler Blvd, S 168th St, S 180 "h St/Andover Park W Intersection, Southcenter Blvd, Traffic Signal Interconnect Program, Tukwila International Boulevard Phase IV, Tukwila International BoulevardfS 11 6th Way/SR 599 Intersection Deleted: Nelsen Place Modified: Cascade View Safe Routes to School Phase II RECOMMENDATION Council is being asked to approve the Resolution for the 2015 -2020 Six -Year Transportation Improvement Program and consider this item at the June 9, 2014 Committee of the Whole with a Public Hearing and subsequent June 16, 2014 Regular Meeting. Attachments: Draft Resolution 2015 — 2020 'Draft' Transportation Improvement Program Current Adopted 2014 — 2019 TIP W:IPW Eng1PRCJECTS'A- RW & RS Projects\TIPVnfo Memo TIP 2 ©15 5 -2B -14 gl.docx 3 Rd FT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM (2015- 2020), AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as amended, the City Council of the City of Tukwila has previously adopted a Transportation Improvement Program and thereafter periodically modified said Transportation Improvement Program by resolution; and WHEREAS, the City Council has reviewed the work accomplished under said program, determined current and future City street and arterial needs and, based upon these findings, has prepared a Six -Year Transportation Improvement Program for the ensuing six calendar years (2015- 2020); and WHEREAS, on June 9, 2014, a public hearing was held regarding the City's Six - Year Transportation Improvement Program; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. A six -year Transportation Improvement Program for the calendar years 2015 -2020 is hereby adopted. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Transportation Improvement Board of the State of Washington. W: \Word Processing\Resolutions \TIP 2015 -2020 5 -19 -14 CK:bjs Page 1 of 2 5 PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of , 2014. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk De'Sean Quinn, Council President APPROVED AS TO FORM BY: Filed with the City Clerk: Passed by the City Council: Resolution Number: Shelley M. Kerslake, City Attorney Exhibit: City of Tukwila Six -Year Transportation Improvement Program from 2015 to 2020 W: \Word Processing \Resolutions \TIP 2015 -2020 5 -19 -14 CK:bjs 6 Page 2 of 2 DRAFT 2015 - 2020 TIP SUMMARY 2015 -2020 2014 CIP TIP PROJECT TITLE Page No. 2015 2016 2017 2018 2019 2020 TOTAL ve t t- 44th t .r .Ir r 1 r 4 21 63 63 63 63 63 63 378 23 0 0 0 0 0 575 575 24 0 0 0 0 0 622 622 10 270 270 270 335 335 335 1,815 15 1,550 1,560 1,650 1,670 1,725 1.725 9,880 13 0 0 0 0 0 13,750 13,750 11 8.828 2,243 0 0 0 0 11,070 3 0 0 0 839 0 0 839 27 0 0 0 0 0 3,300 3,300 29 0 0 0 0 0 610 610 41 50 0 0 0 0 280 330 28 0 0 0 0 0 630 630 0 0 0 0 0 1.219 1,219 19 1,480 0 0 0 0 0 1.480 31 0 0 0 0 0 33,150 33,150 0 0 0 0 0 1,080 1,080 12 7,485 0 0 0 0 0 7,485 30 140 0 0 0 0 0 140 0 0 0 0 0 630 630 25 0 0 U 0 0 1,032 1,U32 Project Costs in Thousands of Dollars 2 ADA Improvements 3 APEllndustry Dr Intersection 4 APE/Minkler Blvd Intersection 5 Annual Bridge Inspections and Repairs 6 Annual Overlay and Repair Program 7 BNSF Intermodal Facility Access 8 Boeing Access Rd Bridge Rehabilitation 9 Cascade View Safe Routes to School Phase 2 10 E Marginal Way (BAR - S 112 St) 11 Macadam Rd & S 144 St Intersection 12 Multipurpose Trails 13 S 133 StISR599 Intersection 14 S 144th St Bridge - Sidewalks 15 S 144th St Phase II (42 Ave S - TI B) 16 Strander Blvd /SW 27th St Extension 17 TUCITOD Pedestrian Improvements 18 TUC - Pedestrian /Bicycle Bridge 19 Walk & Roll Program 20 West Valley Hwy (1-405 - Strander Blvd) 21 W Valley Hwy/ S 156 St Intersection May 21, 2014 FUNDING SOURCES Federal State/TIB Developer Unsecured City 111 378 575 622 1,815 9,880 11,763 1.988 8,805 2,265 750 89 1,300 2,000 610 330 460 170 975 244 1,000 480 0 5,000 27.000 1,150 500 580 6,000 1,485 140 630 44U 592, TOTAL ' PROJECTS REVISED FROM 2014 -2019 TIP 20,117 4,736 2,583 2,907 2,123 59,001 91,466 13,805 7,000 480 44,188 25,993 New 53rd Avenue S (S 137th St - S 144th St) Modified: Cascade View Safe Routes to School Phase II Deleted' Andover Park W (Tuk Pkwy - Strander) Cascade View Safe Routes to School Interurban Avenue S Minkler Blvd (APW -SIC Pkwy) Nelsen Place S 168th St (SIC Pkwy -APE) S 178th Street Realignment S 180th St/Andover Park W Intersection Southcenter Blvd (I -5 -61st Ave Bridge) Thorndyke Safe Routes to School Traffic Signal interconnect Program Tukwila Int'I Blvd Phase IV Tukwila Int'I BIvdIS 116th Wy /SR599 Tukwila MIC "Street Smart" Non - motorized Protect Tukwila Urban Center Transit Center alnts Washington State W, Oopartenent of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside m ?+ Priority Number A. PIN/Project No. B. STIP ID C. Protect Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m a, coo Adopted n' m e3 x ON uognlosaa Improvement Type M , i7 6 Total Length Environmental Type 73 �: C a 17 Local Funds WA -06601 53rd Avenue S S 137th St to S 144th Si Design and construcl urban residential street improvements that include curb, gutter, sidewalk and illumination. Street portion will coordinate with Water and Surface Water capital improvement program projects. 06/09/14 06116114 2015 04 C G 0 P S TW 0.420 CE No Funding Status Phase Phase Start Year (YYYYj Federal Fund Code Federal Funds ' State Fund Code State Funds Local Funds Total Funds S PE 2015 0 0 251,000 251.000 P CN 2016 0 Tie 1,000.000 200,000 1,200.000 Totals 0 1,000,000 451,000 1,451,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 251.000 0 0 0 0 CN 0 600,000 600,000 0 0 Totals 251.000 600,000 600,000 0 0 Report Date: May 21. 2014 Page 1 Washington State �r IXepartmen: of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC V Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside a, m 0 atn . Priority Number A,, PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID ,g. 0 Adopted Amendment. Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA- 05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/09/14 06/16114 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds ' State Fund Code State Funds Local Funds Total Funds S ALL 2015 0 0 375,000 378,000 Totals 0 370,000 378.000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & fith ALL 63.000 63,000 63,000 63,000 126.000 Totals 63,000 63,600 63,000 63,000 126,900 Report Date: May 21, 2014 Page 2 Washington State r' Department of Transportation Agency: Tukwila County: King MPO/RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Functional Class Priority Number A. PIN1Froject No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID m m Adopted m ' 3 A. A 'rig C a Improvement Type = o N Total Length Environmental Type A e m e, a 16 WA -03766 Andover Park. E /industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and Intersection improvements 06/09/14 06/15/14 05 CG O P S TW 0.190 CE No Funding Status Phase Phase Start Year {YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Locat Funds Total Funds P CN 2020 0 0 575,000 575,000 Totals 0 0 575,000 575,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 0 0 0 0 575,000 Totals o 0 0 0 575,000 Report Date: May 21, 2014 Page 3 i Washington State �� Department of Transportation Agency: Tukwila County: King MPOIRTPO: SRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside -r, c Priority N A. PINIProject No. B. STIP ID C. Project Title Phase Start Year {YYYY) Federal Fund Code n m ,it w /mproveme Local Funds Total Length m 6 3 PE », 4th - - D. Road Name or Number m o e, o` P n E .Q iu 3 E. Begin & End Termini m ^0 3 ' 0 o 622,000 E. m m F. Project Description G. Structure ID m' a ' o 0 0 o. 16 WA -03784 08109f14 06/16/14 03 0190 CE No Andover Park E /Minkler Blvd. Intersection Andover Park E Minkler Blvd to Design and construct intersection and traffic signal Improvements and widening for left turn pockets funding Status Phase Phase Start Year {YYYY) Federal Fund Code Federal Funds State Fund Cod, State Funds Local Funds Total Funds P PE 2020 4th - - 0 5th & 6th 0 20,000 20,000 P CN 2020 0 0 602,000 602,000 Totals 0 0 0' 622,000 622 „000 Expenditure Schedule Phase 1st 2nd 3rd 4th - - - 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 602,000 Totals 0 0 0 0 622,000 Report Date: May 21, 2014 Page 4 Washington State �, YeparG ingtnen: of Tvansportatiort Agency: Tukwila County: King MPO /RTPO: PSRC Six Year Transportation Improvement Program From 2015 to 2020 Y Inside N Outside 14 iegturiN A. PIN /Project No, C. Protect Title 13, Road Name or Number E. Begin & End Termini F. Project Description Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 0. STIP ID G. Structure ID WA -03731 law puawv 06109114 05/16/14 Funding Status i Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code 0 adA j yuawanoJdwl fi 0 m RW Required z Environmental Type Total Length State Funds Lac al Funds Total Funds 5 ALL 2015 1,815,000 1,815,000 Total 1,815,000 1,815,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 270,000 270,000 270,000 335,000 670,000 Totals 270,000 270,000 270,000 335,000 870,000 Report Date: May 21, 2014 Page 5 i Washington State 7N/ Departntert: of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2015 to 2020 Y Inside N Outside agwnN ApJoud A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description 16 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate. and overlay City streets as needed in an annual' program B. ST1P ID G. Structure ID WA -03733 a 0 Q uawpuawq 0 v 1 0 3 0 n N 4iaual I�lob paJinDaH Mai 06109/14 06/16114 06 C°. G O P S TW No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds 5 ALL 2015 9,660,000 Total Funds 9.880,000 Totals 9,680,000 9,880,000 Expenditure Schedule Phase ALL 1st 1,550,000 2nd 1.580.000 3rd 1.650,000 4th 1,670,000 5th & 6th 3,450,000 Totals 1,550,040 1,560,000 1,650,000 1,670,000 3.,450,000 Report Date: May 21, 2014 Page 6 ,tlwlr. Washington State �; DoparRI -no : of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside z 3 c A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 00 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center. relocating the 900+ daily truck trips tram residential streets In Allentown. WA -05408 06109114 06/16f14 m a. a = z. a 9 Improvement Type Utility Codes Total Length m B a -I 'e m 3j t -• a State Funds Local Funds 08 P PE EIS No Funding Status Phase Phase Start Year iYYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 FMSIB 950,000 5th 8 6th 0 300,000 1250,000 P CN 2020 FMSIB 10,812,500 0 1,687,500 12.500,000 Totals 11,762,500 0 9 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 0 0 0 0 1,250,000 CN 0 0 0 0 12,500,000 Totals 0 0 0 0 13,750,000 Report Date: May 21, 2014 Page 7 O) i Washington State �, O.partrnent of Transportation Agency: Tukwila County: King MPOIRTPO; PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N qu ?side m a 3 a a w ° Priority Number A. PINIProject No. B. STIP ID C. Project Title D. Road Name or Humber E. Begin & End Termini F. Prefect Description G. Structure ID x ,' m . p -o , n a E ? o oo' a b 3 ,� 0' Utility Codes Total Length Environmental Type n e, a 14 STP(BR) 11300(003) TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing Boeing Access Roed bridge structure over the Burlington Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge sub - structure, seismic retrofit, and construction of a new bridge deck including pedestrian bicycle amenities. 08109114 00116114 45,000 224.500 14 CN 0.2100 ❑C E Yes Funding Status Phase Phase Start Year (YYVY} Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2015 STP(BR) 179,500 0 45,000 224.500 5 CN 2015 STP(BR) 8,625,600. 0 2,220,100 10,845.700 Totals 8,505,100 0 2,265,100 11,070,200 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 224,500 0 0 0 0 f;N 8,003,000 2,242.700 0 0 0 Totals 8,827,500 2,242,700 0 0 0 Report Date May 21, 2014 Page 8 Washington State vair DeRartrnetl: of Tratrsportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside -n 2 n °� w m Priority Number, A. PIN/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted 2 a roil "o e' v z o is 3 m 3 ,K Utility Codes Total Length m 3 sr RW Required 19 WA -03795 Cascade View Safe Routes to School Phase 2 5 140th St/33rd Ave 5 to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the Intersection of 33rd Ave S and 5 140th Street. 06/09/14 05/18114 69,000 839,000 28 0 0.190 CE No 839,400 Funding Status Phase Phase Start Year {YYYY} Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2018 0 WSDOT 750.000 69,000 839,000 Totals 0 0 750.000 89.000 839,400 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 8th ALL 0 0 839,000 0 0 Totals 0 0 839,000 0 0 Report date: May 21, 2014 Page 9 Aik Washington State r, Department of Transportation Agency: Tukwila County: King MPO /RTPO, PSRC Six Year Transportation Improvement Program From 2015 to 2020 Y Inside N Outside c w m 16 urnN Ryuatad A. PIN /Project No. C. Project Title 0. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID East Marginal Way E Marginal Way Boeing Access Road to S 112th St Design and construct widening to 3 lanes including curb & gutter, sidewalks. drainage, landscaping, and utility undergrounding. WA -03770 06109/14 0 v m o. 06/16114 3 a 0 0 Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required State Funds Local Funds 03 PSTW 0.280 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 4th 0 5th & fith ❑ 170,000 170,000 P RW 2020 0 0 700.000 700,000 P CN 2020 STP 1.300.000 0 1,130,000 2,430000 Totals 1,300,000 0 2,000,0001 1300,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & fith PE 0 0 0 0 170.000 RW 0 0 0 0 700.000 CN 0 0 0 0 2,430.000 Totals 0 0 0 0 3,300,000 Report Date: May 21. 2014 Page 10 11/71 Washington State Oepartmen: of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Oulside 17 A. PIN/Project No C. Protect Title D. Road Name or Number E. Begin & End Termini F. Project Description 8. STIP ID G. Structure ID Macadam Roed/S 144th S1 Intersection Macadam Road $ 1441h Street to Widen Macadam Road to add a northbound left turn lane WA-03763 06109/14 06/16/14 Amendment 'p a Improvement Type c -a2= 0 0 ® 1 o , R m S Environmental Type WV Required 03 0.190 CE No Funding Start Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds ocal Funds Total Funds P PE 2020 0,000 90,000 P RW 2020 0 0 90,000 90,000 CN 2020 0 0 430,000 430,000 Total 610,000 610,000 Expenditure Schedule Phase 1st 2nd Ord 4th 5th & 6th PE 0 0 0 90.000 RW 0 0 0 90,000 CN 0 0 430,000 Totals 0 0 Report Date: May 21, 2014 c 0 0 610,000 Page 11 Washington State Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside c rtin m 4C , 00 JagwnH µuo!Jd A. PIN/Project No. C. Project Title 0. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID a lvawpuawy a C adAj luawanaJdwi c N ;Jai inu®wutmnu3 paAnbag Ma Multipurpose Trails to Design and construct safe connections to public trails to prornoste pedestrian and bicycle modes of transportation in Ileu of motorized vehicles WA -03783 96/09/14 06/16114 28 CE No Funding Status P P Phase Phase Start Year (YYYY) Federal Fund Code Federal Funda State Fund Code State Funds PE CN 2015 0 0 Luca! Funds 50,000 2020 0 0 280,000 Total Funds 50,000 280,000 Totals 330,000 330,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 5th PE 50.000 0 ALL 0 9 0 0 280.000 Totals 50,000 280,000 Report Date: May 21, 2014 Page 12 Albs • Washington State Pepartmen:. of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2015 to 2020 Y Inside N Outside 0 3 A. PIN/Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B, STIP ID ti. Structure ID uawpuawq •o 3 e -1 3 16 5 133rd St/SR 599 SO Ramps Intersection 5 133rd Street SR 599 SE Ramps to Design and construct intersection improvements Including a new traffic signal. WA -03769 061091 14 05116/14 06 CGOPS TW 90 CE 4d c 0. No Funding Status P Phase PE Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds 2020 0 0 60,000 60,000 P CN 2020 STP 460,000 0 110,000 570,000 Totals 460,000 0 170,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 60,000 CN 0 0 0 0 670,000 Totals 0 Report Date: May 21, 2014 0 0' 630,000 Page 13 Washington State r/ Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code ad Local Funds Utility Codes P ALL m 'o STP(BR) Fun city N A. PIN/Project No. C. Protect Title B. STIY ID 1,219,000 y Ame c veme El,. ;n 1,219,000 g D. Road Name or Number r a. o r C .0 E Begin & End Termini a° ' a —i c F. Project Description G. Structure ID �' Z. o ro 5 m 17 WA -03782 06/09/14 06/16/14 28 0.250 CE No S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over I.5 between 51st Ave S and 53rd Ave S Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2020 STP(BR) 975,200 0 243,800 1,219,000 Totals 975,200 0 243,800 1,219,000 Expenditure Schedule Phase 1st 2nd 3rd 4 h & 6th ALL 0 1.219,000' Totals 0 1,219,000 Report Date: May 21, 2014 Page 14 - Washington State War Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside o 41 a" m : m Priority Number A. P8N/Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing y a •°0 a n a 3 ry o• ' a Improvement Type n o Total Length Environmental Type RW Required 77 WA- 03762 S 144th St Phase 2 S 1441h SRreet 42nd Ave S to Tukwila International Blvd Design and construct paving, curb & gutter, sidewalks. drainage, illumination, and utility undergrounding. Coordinate with Tukwila Village development. May include on- street parking and bike lanes 06109!14 06116115 480.000 1,480,000 03 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds 5 CN 2015 0 TIB 1,000,000 480.000 1,480,000 Totals 0 1,000,000 400,040 1,480,400 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 1,480;000 0 0 0 0 Totals 1,480,000 D 0 0 0 Report Date: May 21, 2014 Page 15 i' Washington State Oopartment of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC JagwnN IC1IJo!Jd 16 Six Year Transportation Improvement Program From 2015 to 2020 Y Inside N Outside A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STEP ID G. Structure ID m .5 a 0. ;uauapuawy WA -05410 Strander Blvd /SW 27th St Phase III Strand& Boulevard E City Limits lo West Valley Hwy/SR 181 Design and construct 5-7 lane facility over /under BNSF and LiPRR, extending the current terminus of SW 271h 5t at the east City limits to West Valley Highway, including access into the permanent Sound Transit train station 06/00/14 Funding Status s P Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds 06/16/14 n an 01 C) m 0 r I0 EIS State Fund Code State Funds Local Funds ALL 2020 FMSIB ALL 2020 TIGER IV Totals 5,000.000 27000,000 32,000,000 0 n 0 n s Total Funds 0 1,150,000 1,150,000 33,150,000 5,000,000 28.150,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 33,150,000 Totals 0 0 0 0 33,150,000 Report date: May 21, 2014 Page 16 Washington State �r Department of Transportation Agency: Tukwila County: King MPO!RTPO: PSRC Y In Six Year Transportation Improvement Program From 2015 to 2020 N Outside s. doing Priorit A. PIN/Project No. B. STIP ID Federal Fund Code Adapted State Fund Code xt n Local Funds C o PE i m 0 73 0 C. Project Title 280,000 280,000 ,� � m —' iu' 0 100,000 100.000 P D. Road Name or Number 2020 m ' a• A 200,000 r Totals 500,000 m 0 580,000 E. Begin & End Termini F. Project Description G. Structure ID to 3 ' a 1st o H °= 4th 0 0, o. 17 0 0 WA- 0377216/09/14 280.000, 06118!14 0 0 28 0 100.000 0.750 CE Yes 0 0 TUCITOD Pedestrian Improvements Totals 0 0 0 0 1,080,000 Baker Blvd (if extended) Andover Park W to E City Limits Design and construct bike and pedestrian connection between the Tukwila Urban Center and the Commuter Rall Stetlon/TQD area. Connection may include an underpass under the UPRR line. s. doing Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE i 2020 0 0 280,000 280,000 P RW 2020 0 0 100,000 100.000 P CN 2020 STP {Ej 500,000 0 200,000 700,000 Totals 500,000 0 580,000 1,080,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th S 6th PE 0 0 0 0 280.000, RW 0 0 0 0 100.000 CN 0 0 0 0 700,000 Totals 0 0 0 0 1,080,000 Report Date: May 21. 2014 Page 17 . ■ ▪ Washington State V! Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside m e n n 0. m m Priority Number A. PIN1Project No, B. STIP ID C. Project Title Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID tq Adopted a' 3 , 0 ,a? Resolution No, Improvement Type Utility Codes o 1 Environmental Type 00 2015 / 4320 {002) TUK -50 06109114 06/16/14 6,000,000 1,485,000 28 Totals 0.640 DCE 6,000,000 1,485,000 Tukwila Urban Center Pedestrian/Bicycle Bridge over Green River Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN New bridge over the Green River, approximately between Baker Blvd (II extended) and Longacres Way (if extended) 0 0 0 0 Totals 7,485,084 0 0 0 0' Near Riverside office complex to Best Western hotel 15901 WVHwy Development of a new pedestrian/bicycle bridge across the Green River. connecting the Tukwila Urban Center 'core' to the Sounder Commuter Roll /Amtrak Station and surrounding neighborhood of transit - oriented development. The project, a pedestrian/bicycle bridge across the Green River, will form the backbone of a pedestnan corridor connecting the compact land uses and high ridership bus stop in the core of the urban center, with the Sounder Commuter Rail/Amtrak Station and ils surrounding transit - oriented development. This will improve public access to the station from all parts of the center, and provide a direct, sate and enjoyable walking experience. The high level of urban level amenity will attract the types and densities of uses envisioned in a regional center. Funding Status Phase Phase Start Year tYYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds 5 CN 2015 0 OTHER 6,000,000 1,485,000 7,485,000 Totals 0 6,000,000 1,485,000 7,485,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 7,485,000 0 0 0 0 Totals 7,485,084 0 0 0 0' Report bate: May 21. 2014 Yes Page 18 Washington State !,r Department oI Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2015 to 2020 Y Inside 14 Outside JaqulnN A1Papd A. PIN /Project No. C. Project Tllle D. Road Name or Number E. Begin & End Termini F. Project Description 17 Walk & Roll Plan (Nonmotonzed Transportation Plan Various City Streets to Select, design, and construct non- motorized projects including bike lanes, sidewalks and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S; sidewalk on S 130th 8t, TIB to S 130th St; sidewalk/bike lanes on Macadam, S 144th St to S 150th St. B. STIP ID Structure ID WA -03761 m 0 uauipuawy a 06109/14 06. +16115 B 0 m 28 c a No Funding Status Phase Phase Stan Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds 5 PE 2015 0 0 140,000 Total Funds 140,000 Totals 0 0 140,000 140,000 Expenditure Schedule Phase 1st 2nd 3rd 4th PE 140, ❑00 Totals 140,000 0 0 0 0 5th & 6th ❑ 0 0 0 Report Date: May 21, 2014 Page 19 - Washington State WS Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2015 to 2020 N Outside Funding Status A. PIN /Project No. B. STIP IDI Phaag Start Year (YYYY) Federal Fund Code t. R Improvement Type Local Funds Total Funds m o PE c Y� C. Project Title D 3 ° — C ° a 0 n ^_. D. Road Name or Number 570.000 570,000 a o "` r- o 0 ,z 0 Expenditure Schedule E. Begin & End Termini Phase 1st 3 3rd 0 5th & 6th y c N m 0 F. Project Description G. Structure ID 60,000 CN 0 0 �, `° s 'm o. 14 0 WA -03779 06109114 06/19110 03 0.500 CE No West Valley Highway SR 181IWest Valley Highway 1-406 to Standar Blond 1 Design and costruct widening to 7 lanes including curb 8 gutter, sidewalks, illumination, drainage, and traffic control Funding Status Phase Phaag Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2020 - 0 D 50.000 60,000 P _ CN 2020 0 0 570.000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th P f- 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: May 21, 2014 Page 20 i IVWashington State DoBailment of Trttnaportatior+ Agency; Tukwila County: King MPOIRTPO: PSRC 14 Y Inside A. PIN/Project No. C. Project Title . Road Name or Number E. Begin & End Termini F. Project Description Six Year Transportation Improvement Program From 2015 to 2020 N Outside B. STIP ID . Structure ID WA-03765 5 06109/14 06/16115 West Valley Highway /S 156th St SR181tWest Valley Highway Southcenter Blvd to 5 158th SI Construct additional northbound leit tum lanes at S 156th Street for northbound H0V to northbound 1-405 adAi yuawano1dw� 03 OPSTW a 0 Yes Funding Status P P Phase PE CN Phase Start Year IYYYY) 2020 Federal Fund Code Federal Funds 0 State Fund Code State Funds 0 Local Funds 50,000 Total Funds 50,000 2020 CMAO Totals Expandlture Schedule Phase st 2nd 440,000 440,000 0 0 3rd 4th 5th & 6th PE 0 0 0 ON 0 0 0 0 Totals 0 Report Date: May 21, 2014 0 0 0 50,000 982, 000 1,032,000 542,000 592,090 982,000 1,032,000 Grand Totals for Tukwila Federal Funds ,242,800 State Funds 8,750,009 Local Funds 26,473,400 Total Funds 91,466,200 Page 21 i Washington State W Department of Wan. orta Lion Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside m c ri r�_. N g m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 WA -05405 Americans with Disabilities Act (ADA) Improvements Various locations to Design and construct ADA compliant upgrades to City infrastructure in conjunction with a City developed plan. 06/10/13 06/17/13 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2014 0 0 541,000 541,000 Totals 0 0 541,000 541,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th ALL 63,000 63,000 63,000 63,000 126,000 Totals 63,000 63,000 63,000 63,000 126,000 Report Date: May 31, 2013 Page 1 AIL Washington $tats V% Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03766 Andover Park E /Industry Drive Signal Andover Park E Industry Drive to Design and construct a traffic signal and intersection improvements 06/10/13 06/17/13 05 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 100,000 100,000 P CN 2018 0 0 575,000 575,000 Totals 0 0 675,000 675,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 100,000 0 0 0 0 CN 0 0 0 575,000 0 Totals 100,000 0 0 575,000 0 Report Date: May 31, 2013 Page 2 Washington State 7% Department of Tra naportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside JagwnN Afuoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description B. STIP ID G. Structure ID 2 d 0 D o. -o G tuewpuewy ON uogniosaa adAj luawanoidwo a 0 o N 1 m r 0 adAl Iguawuonnu3 m .0 G 16 Andover Park E /Minkler Blvd. Intersection Andover Park E Minkler Blvd to Design and construct intersection and traffic signal improvements and widening for left turn pockets WA -03764 06/10/13 06/17/13 03 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 120,000 120,000 P PE 2019 0 0 20,000 20,000 P CN 2018 0 0 602,000 602,000 Totals 0 0 742,000 742,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 75,000 45,000 0 0 20,000 CN 0 0 0 0 602,000 Totals 75,000 45,000 0 0 622,000 Report Date: May 31, 2013 Page 3 washington state :r% Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing o v a Amendment' Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03760 Andover Park West Widening Andover Park West Strander Blvd to Tukwila Pkwy Complete widening for center turn pockets and landscape median for access control, widen sidewalks, upgrade ADA facilities, modify signal operation, upgrade street lighting, install pedestrian lighting. 06/10/13 06/17/13 04 COOPS TW 0.400 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2014 0 TIB 1,420,000 339,000 1,759,000 Totals 0 1,420,000 339,000 1,759,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th CN 1,050,000 0 0 0 0 Totals 1,050,000 0 0 0 0 Report Date: May 31, 2013 Page 4 AIL Washington Stato 7' Department of Wensportattan Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n m c n n _. m g m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03731 Annual Bridge Inspections and Repairs Various City Street to Perform load ratings and bi- annual inspections as well as construct necessary repairs and maintenance 06/10/13 06/17/13 06 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2014 0 0 1,555,000 1,555,000 Totals 0 0 1,555,000 1,555,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th ALL 270,000 270,000 270,000 270,000 670,000 Totals 270,000 270,000 270,000 270,000 670,000 Report Date: May 31, 2013 Page 5 Washington State WAIF Department of ?bartsportlation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n c n c-) _. N g m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No.' Improvement Type Utility Codes Total Length Environmental Type RW Required 16 4th WA -03733 Annual Overlay and Repair Program Various City Streets to Repair, rehabilitate, and overlay City streets as needed in an annual program 06/10/13 06/17/13 9,655,000 9,655,000 06 C G O P S TW 1,550,000 0 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2014 4th 0 5th & 6th 0 9,655,000 9,655,000 Totals 0 1,550,000 0 9,655,000 9,655,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 1,500,000 1,550,000 1,560,000 1,650,000 3,395,000 Totals 1,500,000 1,550,000 1,560,000 1,650,000 3,395,000 Report Date: May 31, 2013 Page 6 r Washington State 7 f 'Department at fianspartatton Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8. End Termini F. Project Description G. Structure ID = A 02 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 4th WA -05409 BNSF Regional Center Access New Facility to Construct a new access to the BNSF Regional Distribution Center, relocating the 900+ daily truck trips from residential streets in Allendtown. 06/10/13 06/17/13 08 0 EIS No 0 Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 FMSIB 950,000 0 0 300,000 1,250,000 P CN 2019 FMSIB 10,812,500 0 1,687,500 12,500,000 Totals 11,762,500 0 1,987,500 13,750,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8, 6th PE 0 0 0 0 1,250,000 CN 0 0 0 . 0 12,500,000 Totals 0 0 0 0 13,750,000 Report Date: May 31, 2013 Page 7 Washington State Wi A Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID ,x d m. Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 TUK -52 Boeing Access Road Bridge Rehabilitation Boeing Access Road Interstate 5 to Airport Way South Rehabilitate the existing Boeing Access Road bridge structure over the Burlington Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge sub - structure, seismic retrofit, and construction of a new bridge deck including pedestrian /bicycle amenities. 06/10/13 06/17/13 14 0.200 DCE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 BR 800,000 0 200,000 1,000,000 S CN 2014 BR 8,880,000 0 2,220,000 11,100,000 Totals 9,680,000 0 2,420,000 12,100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 1,000,000 0 0 0 0 CN 2,100,000 9,000,000 0 0 0 Totals 3,100,000 9,000,000 0 0 0 Report Date: May 31, 2013 Page 8 i Washington Slate 7w 'Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03795 Cascade View Safe Routes to School S 140th St/33rd Ave S to Construct an off - street paved shard use path, sidewalks, and a traffic circle at the intersection of 33rd Ave S and S 140th Street. 06/10/13 06/17/13 ALL 28 0.190 CE No 0 Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P ALL 2018 839,000 0 WSDOT 750,000 89,000 839,000 Totals 0 750,000 89,000 839,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th ALL 0 0 0 839,000 0 Totals 0 0 0 839,000 0 Report Date: May 31, 2013 Page 9 i Washington State 7; Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project TItIe D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID e3 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03770 East Marginal Way E Marginal Way Boeing Access Road to S 112th St Design and construct widening to 3 lanes including curb & gutter, sidewalks, drainage, landscaping, and utility undergrounding. 06/10/13 06/17/13 03 P S T W 0.280 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 50,000 50,000 P PE 2019 0 0 170,000 170,000 P RW 2019 0 0 700,000 700,000 P CN 2019 STP 1,300,000 0 1,130,000 2,430,000 Totals 1,300,000 0 2,050,000 3,350,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8, 6th PE 50,000 0 0 0 170,000 RW 0 0 0 0 700,000 CN 0 0 0 0 2,430,000 Totals 50,000 0 0 0 3,300,000 Report Date: May 31, 2013 Page 10 Washington State Ir4 Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 TUK -40 Interurban Avenue South (S 143 St to Fort Dent Way) Interurban Avenue South S 143 St to Fort Dent Way Reconstruct and overlay the existing roadway and construct curb and gutter, drainage, sidewalk, landscaping, illumination, utility burying, channelization, signing, and signal interconnect. 06/10/13 06/17/13 06 0.900 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2014 STP(U) 2,145,954 TIB 5,000,000 3,554,046 10,700,000 Totals 2,145,954 5,000,000 3,554,046 10,700,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th CN 10,700,000 0 0 0 0 Totals 10,700,000 0 0 0 0 Report Date: May 31, 2013 Page 11 ■ Washington State 7� Department of TtaInsportatton Agency: Tukwila County: King MPO RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside n », E N m d Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing D o .o ea Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 Local Funds WA -03763 Macadam Road /S 144th St Intersection Macadam Road S 144th Street to Widen Macadam Road to add a northbound left turn lane 06/10/13 06/17/13 2014 03 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 17,000 17,000 P PE 2018 0 0 90,000 90,000 P RW 2018 0 0 90,000 90,000 P CN 2018 0 0 430,000 430,000 Totals 0 0 627,000 627,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 17,000 0 0 0 90,000 RW 0 0 0 0 90,000 CN 0 0 0 0 430,000 Totals 17,000 0 0 0 610,000 Report Date: May 31, 2013 Page 12 r Washington State 7% 'Department of 1lnsportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 17 WA -03773 Minkler Blvd Minkler Blvd Southcenter Pkwy to Andover Park W Construct widening for 3 lanes including curb & gutter, sidewalk, drainage and landscaping 06/10/13 06/17/13 03 P S T W 0.400 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2018 0 0 75,000 75,000 P CN 2018 0 0 865,000 865,000 Totals 0 0 940,000 940,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 75,000 CN 0 0 0 0 865,000 Totals 0 0 0 0 940,000 Report Date: May 31, 2013 Page 13 i Washington State V/ Department of Transportation Agency: Tukwila County: King MPOIRTPO: PSRC Six Year Transportation Improvement Program From 2014 to 2019 Y Inside N Outside Jagwnry Aluoud A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0. 0. 0 0. luawpuawy A m 0 c 0 Z 0 adAj luewanojdwI C 0 0. 5 1 w 0 co adAj ieluawuoiinu3 pannbaa M2J 00 Multipurpose Trails to Design and construct safe connections to public trails to promoste pedestrian and bicycle modes of transportation in lieu of motorized vehicles WA -03783 06/10/13 06/17/13 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2015 0 0 50,000 50,000 P CN 2019 0 0 280,000 280,000 Totals 0 0 330,000 330,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 50,000 0 0 0 CN 0 0 0 280,000 0 Totals 0 50,000 280,000 0 Report Date: May 31, 2013 Page 14 i Washington Slate Or Department of Wanspsrtatlon Agency: Tukwila County: King MPO RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID A 2 f'o Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 19 WA -03780 Nelsen Place Nelsen Place S 156th St to S 158th St Design and construct paving, curb & gutter, sidewalks, drainage, and illumination 06/10/13 06/17/13 05 0.110 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 20,000 20,000 P CN 2019 0 0 180,000 180,000 Totals 0 0 200,000 200,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 20,000 CN 0 0 0 0 180,000 Totals 0 0 0 0 200,000 Report Date: May 31, 2013 Page 15 i Washington State v% Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n c n n _. Ig uNi m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03769 S 133rd St/SR 599 SB Ramps Intersection S 133rd Street SR 599 SB Ramps to Design and construct intersection improvements including a new traffic signal. 06/10/13 06/17/13 06 C G O P S TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 20,000 20,000 P PE 2018 0 0 60,000 60,000 P CN 2018 STP 460,000 0 110,000 570,000 Totals 460,000 0 190,000 650,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 20,000 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 20,000 0 0 0 630,000 Report Date: May 31, 2013 Page 16 AM. Washington State W% 1N 'Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n m 0 n m o m m Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type a n o. m Total Length Environmental Type A a c, a. 17 WA -03782 S 144th St Bridge Sidewalks S 144th Street 51st Ave S to 53rd Ave S Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S 06/10/13 06/17/13 Total Funds P 28 0.250 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 100,000 100,000 Totals 0 0 100,000 100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 100,000 Totals 0 0 0 0 100,000 Report Date: May 31, 2013 Page 17 i VFasthington State 7 ; Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Z 3 c A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID d f0 o. a G luewpuewy •ory uopniosaa ad. j ;uawanoJdwl adlq le ;uawuonnu3 0 c G 17 S 144th St Phase 2 S 144th Street 42nd Ave S to Tukwila International Blvd Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and utility undergrounding. Coordinate with Tukwila Village development. May include on- street parking and bike lanes WA -03762 06/10/13 06/17/13 03 CGOPS TW 0.190 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 68,000 68,000 P PE 2018 0 0 230,000 230,000 P RW 2018 0 0 40,000 40,000 P CN 2018 0 TIB 1,000,000 480,000 1,480,000 Totals 0 1,000,000 818,000 1,818,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 68,000 0 0 0 230,000 RW 0 0 0 40,000 CN 0 0 0 0 1,480,000 Totals 68,000 0 0 0 1,750,000 Report Date: May 31, 2013 Page 18 i Washington State 7% Department of Transportation Agency: Tukwila County: King MPO RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = l'. f'o D e v a D a 3 Dom, A ^ M ? o 3 v 0 m 1 c n o m i 8 m ' 0 3 E - m xi E. a 00 WA -03778 S 168th St S 168th St Southcenter Pkwy to Andover Park E Design and construct new roadway including curb 8 gutter, sidewalk, drainiage, illumination, on- street parking, landscaping, and underground utilities. 06/10/13 06/17/13 01 GO P W 0.800 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 1,372,000 1,372,000 P RW 2019 0 0 7,500,000 7,500,000 P CN 2019 0 0 14,372,000 14,372,000 Totals 0 0 23,244,000 23,244,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 1,372,000 RW 0 0 0 0 7,500,000 CN 0 0 0 0 14,372,000 Totals 0 0 0 0 23,244,000 Report Date: May 31, 2013 Page 19 warstttrtgtort Mare 'Mr Department at Ilranapart'atiom Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID m Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -03784 S 178th St Realignment S 178th St Southcenter Pkwy to W City Limits Realign S 178th St from current intersection of Southcenter Pkwy /S 180th St to intersect with Segale Park Dr C and add a new traffic signal at the new intersection. 06/10/13 06/17/13 01 0.400 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2014 0 0 9,472,000 9,472,000 Totals 0 0 9,472,000 9,472,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th ALL 9,382,000 0 0 0 0 Totals 9,382,000 0 0 0 0 Report Date: May 31, 2013 Page 20 i Wat *tington spate Oepar e t of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID Hearing Adopted! Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 Local Funds WA -03781 S 180th St/Andover Park W Intersection S 180th Street Andover Park W to Widen for north /south left turn pockets 06/10/13 06/17/13 2019 03 0.200 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 35,000 35,000 P RW 2019 0 0 15,000 15,000 P CN 2019 0 0 160,000 160,000 Totals 0 0 210,000 210,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 0 0 0 0 35,000 RW 0 0 0 0 15,000 CN 0 0 0 0 160,000 Totals 0 0 0 0 210,000 Report Date: May 31, 2013 Page 21 NA Washington State T/ Department of rr n3port ton Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description B. STIP ID G. Structure ID 2 m 30 0. -o 0. 3 G 3 0 ON uognIosaa ad,(l ;uawanoidwI 1 m 30 aditl IeyuawuoJ!Au3 o a 14 Southcenter Blvd Widening Southcenter Blvd 1 -5 to 61st Ave S Widen Southcenter Blvd and the 61st Avenue Bridge to add a lane for future traffic growth. WA -03776 06/10/13 06/17/13 03 CGOPS TW CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 1,700,000 1,700,000 P RW 2019 0 0 1,400,000 1,400,000 P CN 2019 0 0 16,900,000 16,900,000 Totals 0 0 20,000,000 20,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 1,700,000 RW 0 0 0 1,400,000 CN 0 0 0 0 16,900,000 Totals 0 0 0 0 20,000,000 Report Date: May 31, 2013 Page 22 Washington State 7% Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description 1 P G. Structure ID Hearing c Ix m a Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 16 WA -05410 Strander Blvd /SW 27th St Phase III Strander Boulevard E City Limits to West Valley Hwy /SR 181 Design and construct 5 -7 lane facility over /under BNSF and UPRR, extending the current terminus of SW 27th St at the east City limits to West Valley Highway, including access into the permanent Sound Transit train station 06/10/13 06/17/13 01 EIS No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S ALL 2019 FMSIB 5,000,000 0 0 5,000,000 P ALL 2019 TIGER IV 27,000,000 0 1,148,800 28,148,800 Totals 32,000,000 0 1,148,800 33,148,800 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th ALL 0 0 0 0 33,148,800 Totals 0 0 0 0 33,148,800 Report Date: May 31, 2013 Page 23 i Washington State 7%I ;Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID Hearing Adopted Amendment o a z 3 v 3 CD -i v m E. o m m 0 m 3 m 3 tv ZI v m A A m gr 'm 0. 19 WA -03796 Thorndyke Safe Routes to School S 150th St Tukwila International Blvd to 42nd Ave S Construction of roadway improvements including a new sidewalk on the north side of S 150th St and a new crosswalk in front of Thorndyke Elementary School. Education, enforcement and encouragement elements are included after the construction as part of the Safe Routes to Schools program. 06/10/13 06/17/13 28 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2014 0 WSDOT 90,000 0 90,000 P CN 2014 0 WSDOT 367,000 255,000 622,000 Totals 0 457,000 255,000 712,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 28,000 14,000 0 0 0 CN 622,000 0 0 0 0 Totals 650,000 14,000 0 0 0 Report Date: May 31, 2013 Page 24 ink Washington State Department at 1 a* portantion Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code Improvement Type Local Funds Total Funds m PE Funs riority N A. PIN /Project No. B. STIP ID C. Project Title 0 Ame Resole _ 0 o iu' m STP 1,200,000 D. Road Name or Number E. Begin 8 End Termini 1,500,000 2,700,000 Totals 1,200,000 0 o E 1 a c, F. Project Description G. Structure ID Phase 1st 2nd 0. 2 MI 5 (D a 16 0 WA -03775 06/10/13 06/17/13 300,000 24 0 0 0 No 2,700,000 Traffic Signal Interconnect Program 0 0 0 0 3,000,000 Various City Streets to Design and install hard wire interconnect system between traffic signals and the Traffic Operations Center Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 300,000 300,000 P CN 2019 STP 1,200,000 0 1,500,000 2,700,000 Totals 1,200,000 0 1,800,000 3,000,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 300,000 CN 0 0 0 0 2,700,000 Totals 0 0 0 0 3,000,000 Report Date: May 31, 2013 Page 25 r WI;Washington State Department at Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n c 0 ^., m 0 0i m u Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID ipl 0 Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length S RW Required 17 WA -03772 TUC/TOD Pedestrian Improvements Baker Blvd (if extended) Andover Park W to E City Limits Design and construct bike and pedestrian connection between the Tukwila Urban Center and the Commuter Rail Station /TOD area. Connection may include an underpass under the UPRR line. 06/10/13 06/17/13 20,000 20,000 28 PE 0.750 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 20,000 20,000 P PE 2019 0 0 280,000 280,000 P RW 2019 0 0 100,000 100,000 P CN 2019 STP(E) 500,000 0 200,000 700,000 Totals 500,000 0 600,000 1,100,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 20,000 0 0 0 280,000 RW 0 0 0 0 100,000 CN 0 0 0 0 700,000 Totals 20,000 0 0 0 1,080,000 Report Date: May 31, 2013 Page 26 (on State V% Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside JagwnN IGuoud 14 A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description B. STIP ID G. Structure ID D 0. a 0. .oN uogniosed adA1 luawanojdwi c n 0 N N ed (1 leluewuonnu3 paJinbaa Mb WA -03774 Tukwila International Blvd (Phase 4) Tukwila International Blvd Boeing Access Road to S 116th St Design and construct widening including paving, curb & gutter, sidewalk, drainage, illumination, landscaping, and utility undergrounding. 06/10/13 06/17/13 03 OPSW 0.700 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 271,000 271,000 P CN 2019 0 TIB 3,500,000 820,000 4,320,000 Totals 0 3,500,000 1,091,000 4,591,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 0 0 0 0 271,000 CN 0 0 0 0 4,320,000 Totals 0 0 0 0 4,591,000 Report Date: May 31, 2013 Page 27 Washington Slate � r % Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside -n 0 no' d 14 0 z 3 0 A. PIN /Project No. C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description B. STIP ID G. Structure ID 0 5 to luawpuawy 0 0 z 0 ad Ai luawanoidwi c n 0 T N ID 5 ad Ai ie;uewuoiinu3 pannbaa Mil WA -03777 Tukwila International Blvd /S 116th St/SR 599 On -ramp Tukwila International Blvd S 116th St/SR 599 On -ramp to Design and construct southbound left turn lane, pedestrian signalization and lighting 06/10/13 06/17/13 03 P 0.400 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P P PE 2019 0 0 450,000 450,000 CN 2019 STP 1,900, 000 0 2,325,000 4,225,000 Totals 1,900,000 0 2,775,000 4,675,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 450,000 CN 0 0 0 0 4,225,000 Totals 0 0 0 0 4,675,000 Report Date: May 31, 2013 Page 28 Washington State 7W (Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Funding Priority Number Status Phase Phase Start Year (YYYY) v Federal Funds State Fund Code m 5. State Funds Fi A. PIN /Project No. B. STIP ID Local Funds Total Funds D XI 2.; m c 1 . , C. Project Title 24,240 3 ° 3 2015 CMAQ 445,824 D. Road Name or Number 0 a . o T ? m m 0 E. Begin 8 End Termini F. Project Description G. Structure ID ,'o v° . 3 3. o 1 m o g s CD a a 14 1st WA -03798 06/10/13 06/17/13 5th 8 6th 28 PE 121,200 CE No 0 Tukwila Manufacturing Industrial Center "Street Smart" Non - motorized Project 0 CN 0 557,280 0 0 0 Totals 121,200 Various City Streets to 0 0 0 1. Planning study of non - motorized improvement options along Boeing Access Road, to provide safe bicycle and pedestrian travel alternatives. 2. PE & CN of bike facilities on E Marginal Way S between Boeing Access Road and SR 599. 3. PE & CN of bike lanes and shared use path on Airport Way from Boeing Access Road /E Marginal Way S to the northern City limit. Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 CMAQ 96,960 0 24,240 121,200 S CN 2015 CMAQ 445,824 0 111,456 557,280 Totals 542,784 0 135,696 678,480 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 121,200 0 0 0 0 CN 0 557,280 0 0 0 Totals 121,200 557,280 0 0 0 Report Date: May 31, 2013 Page 29 r Washington Stag / � Department et Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = n 2 Adopted Amendment Resolution No. Improvement Type c a 2 Total Length Environmental Type RW Required 16 WA -03734 Tukwila Urban Center - Transit Center Andover Park W Strander Blvd to Tukwila Pkwy Design and construct a transit center 06/10/13 06/17/13 23 C G O P S TW CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S CN 2014 5309(Bus) 1,400,000 WSDOT 4,735,000 79,000 6,214,000 Totals 1,400,000 4,735,000 79,000 6,214,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th CN 2,500,000 0 0 0 0 Totals 2,500,000 0 0 0 0 Report Date: May 31, 2013 Page 30 Washington State ;% Department at 1<Yarlsportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside - 0 n _. I m d Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID Hearing Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 00 / 1320(002) TUK -50 Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River New bridge over the Green River, approximately between Baker Blvd (if extended) and Longacres Way (if extended) Near Riverside office complex to Best Western hotel 15901 WVHwy Design and preliminary engineering of a new pedestrian /bicycle bridge across the Green River, connecting the Tukwila Urban Center 'core' to the Sounder Commuter Rail /Amtrak Station and surrounding neighborhood of transit - oriented development. 06/10/13 06/17/13 28 0.640 CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 CMAQ 1,496,000 0 137,000 1,633,000 P RW 2014 0 WSDOT 870,000 230,000 1,100,000 P CN 2014 0 WSDOT 6,000,000 1,485,000 7,485,000 Totals 1,496,000 6,870,000 1,852,000 10,218,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th 8 6th PE 250,000 0 0 0 0 RW 1,100,000 0 0 0 0 CN 3,743,000 3,742,000 0 0 0 Totals 5,093,000 3,742,000 0 0 0 Report Date: May 31, 2013 Page 31 i Was iIngton State .6-7z % Department of ttanspot tatdon Agency: Tukwila County: King MPO /RTPO: PSRC V Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title 0. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID 2 a v° a 3 a 3 0 c . ? v 3 DR 1 a CD _ F 0 m o 5 m 5. E -' m m E. a 17 WA -03761 Walk & Roll Plan (Nonmotorized Transportation Plan Various City Streets to Select, design, and construct non - motorized projects including bike lanes, sidewalks and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S; sidewalk on S 130th St, TIB to S 130th St; sidewalk/bike lanes on Macadam, S 144th St to S 150th St. 06/10/13 06/17/13 28 No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2015 0 0 140,000 140,000 Totals 0 0 140,000 140,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 140,000 0 0 0 Totals 0 140,000 0 0 0 Report Date: May 31, 2013 Page 32 i Mhasfiington State 7' Department of Transportation Agency: Tukwila County: King MPO /RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin & End Termini F. Project Description G. Structure ID = m isi Adopted Amendment Resolution No. Improvement Type Utility Codes Total Length Environmental Type RW Required 14 WA -03779 West Valley Highway SR 181/West Valley Highway 1 -405 to Strander Blvd Design and costruct widening to 7 lanes including curb & gutter, sidewalks, illumination, drainage, and traffic control 06/10/13 06/17/13 03 0.500 CE No Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds P PE 2019 0 0 60,000 60,000 P CN 2019 0 0 570,000 570,000 Totals 0 0 630,000 630,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 0 0 0 0 60,000 CN 0 0 0 0 570,000 Totals 0 0 0 0 630,000 Report Date: May 31, 2013 Page 33 i Washington State 'Department of TPtanspertatton Agency: Tukwila County: King MPO RTPO: PSRC Y Inside Six Year Transportation Improvement Program From 2014 to 2019 N Outside Functional Class Priority Number A. PIN /Project No. B. STIP ID C. Project Title D. Road Name or Number E. Begin 8 End Termini F. Project Description G. Structure ID m ° Adopted Amendment Resolution No. 3 v o' m 3 a m = 0 m c g m 5. 'o el m —1 c, a 14 WA -03765 West Valley Highway /S 156th St SR181/West Valley Highway Southcenter Blvd to S 158th St Construct additional northbound left turn lanes at S 156th Street for northbound HOV to northbound 1-405 06/10/13 06/17/13 03 O P S T W CE Yes Funding Status Phase Phase Start Year (YYYY) Federal Fund Code Federal Funds State Fund Code State Funds Local Funds Total Funds S PE 2014 0 0 75,000 75,000 P PE 2018 0 0 50,000 50,000 P CN 2018 CMAQ 440,000 0 542,000 982,000 Totals 440,000 0 667,000 1,107,000 Expenditure Schedule Phase 1st 2nd 3rd 4th 5th & 6th PE 75,000 0 0 0 50,000 CN 0 0 0 0 982,000 Totals 75,000 0 0 0 1,032,000 Federal Funds State Funds Local Funds Total Funds Grand Totals for Tukwila 64,827,238 23,732,000 90,912,042 179,471,280 Report Date: May 31, 2013 Page 34 Transportation Committee Minutes Mav 27, 2014 — Page 2 D. Construction Management Supplement: 2014 Overlay and Repair Program Staff is seeking Council approval of Supplement No. 1 to Contract 13 -193 with KPG, Inc. in the amount of $168,729.49 for construction management of the 2014 Overlay and Repair Program. KPG was chosen from five firms due to their unique knowledge and experience with the City. This annual program provides for the construction of asphalt and concrete pavement overlays of certain streets, and the 2014 construction management budget is $175,000. Staff noted that the 2013 project map was inadvertently included and will replace it with the update prior to Council action. UNANIMOUS APPROVAL. FORWARD TO JUNE 2, 2014 REGULAR CONSENT AGENDA. E. Interurban Avenue South (South 143rd Street to Fort Dent Way) Staff is seeking Council approval of the following items relating to the construction of the pedestrian improvements on Interurban Avenue South (S. 143rd Street to Fort Dent Way) Project: 1. Contract with Anchor QEA in the amount of $1,078,720.00 for construction management services; and 2. Supplement No. 2 with KPG, Inc. in the amount of $357,973.00 for on -call design support services. If these contracts are approved, the project cost will be $10,499,201.39, which is under the budget of $10,795,000.00 There are several potential utility conflicts in the project area requiring additional coordination, and KPG will assist with this coordination if the agreement is approved. UNANIMOUS APPROVAL. FORWARD TO JUNE 2, 2014 REGULAR CONSENT AGENDA. F. Resolution: Declaring an Emergency in Response to Landslide above Klickitat Drive. Staff is seeking Council approval of a resolution that would declare an emergency due to damages caused by the March 2014 landslide above the Klickitat Drive retaining wall, which caused damage to the elevated timber walkway. Federal Emergency Relief funds became available after Governor Inslee's declaration of an emergency, and the City is partnering with WSDOT in order to stablilize the slope and repair the walkway simultaneously. Work is expected to be completed this summer. The City's 13.5% match of $8,501.00 will come from the Annual Bridge Program. UNANIMOUS APPROVAL. FORWARD TO JUNE 2, 2014 REGULAR CONSENT AGENDA. G. Resolution: Adoption of the Six -Year Transportation Improvement Program (2015 -2020) Staff is seeking Council approval of a resolution that would adopt the annual update of the Six - Year Transportation Improvement Program (TIP) for 2015 -2010. The TIP, updated annually as required by the RCW, is a compilation of transportation projects planned within the next six years that are deemed regionally significant or that have grant funding awarded or expected. Committee members and staff reviewed the list of projects. Several projects were deleted from this TIP update due to their completion, because they are no longer deemed necessary, or because they are not expected to occur until after 2020. The Committee requested that staff include the reasons for each project's deletion in the information that is provided to the Committee of the Whole. UNANIMOUS APPROVAL. FORWARD TO JUNE 9, 2014 COMMITTEE OF THE WHOLE, INCLUDING PUBLIC HEARING. III. SOUTH COUNTY AREA TRANSPORTATION BOARD (SCATBD) Meeting The April 15, 2014 Meeting Summary and May 20, 2014 Agenda were included in the packet. The Committee agreed to discuss a potential Council statement on oil train traffic at a future meeting date. The Council Analyst will assist with this. 65