COUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared b)
review
Council review
06/09/14
BG -Mg
Supplemental
1.V\
06/16/14
BG
06/09/14
11
Motion
Date 06/16/14
I Resolution
ID Ordinance
AN Date
0 Bid Award
Mtg Date
I Public Hearing
ID Other
Mtg Date
A1 tg Date
Mtg
ITEM INFORMATION
ITEM No.
4.C.
89
STAFF SPONSOR: BOB GIBERSON
ORIGINAL AGENDA DATE: 06/09/14
AGENDA TEM TITLE Water Comprehensive
Plan - Carollo
Engineers
Supplemental
Agreement
No. 7
CATEGoRy 11 Discussion
06/09/14
11
Motion
Date 06/16/14
I Resolution
ID Ordinance
AN Date
0 Bid Award
Mtg Date
I Public Hearing
ID Other
Mtg Date
A1 tg Date
Mtg
Mtg Date
Mg Date
SPONSOR El Council fl Mayor HR Ei DCD Finance El Fire IT El P&R Police 174 P IF
SpoNs()R's Carollo Engineers is currently the consultant for the update to the Water Comprehensive
Su MMARY Plan. As a result of review comments from the State of Washington's Department of Health
and King County Utilities Technical Review Committee, the Water Comprehensive Plan had
to be updated. This supplement will also include printing costs. As budget funding has been
exhausted, the Ending Fund Balance in the Water Fund will be utilized. Council is being
asked to approve Supplement No. 7 with Carollo Engineers for $19,768.00.
REVIEWED BY
0 COW Mtg.
E CA&P Cmte F&S Cmte El Transportation Cmte
Cmte Arts Comm. El Parks Comm. El Planning Comm.
COMMITTEE CHAIR: KATE KRULLER
r1 Utilities
DATE: 06/02/14
RECOMMENDATIONS:
SPoNsoR/ADmiN.
CoMMITTEE
Public Works Department
Unanimous Approval; Forward to Committee of the Whole
COST IMPACT / FUND SOURCE
ExpENDITuRE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$19,768.00 $0.00 $19,768.00
Fund Source: 401 WATER FUND'S ENDING FUND BALANCE
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
06/09/14
06/16/14
MTG. DATE
ATTACHMENTS
06/09/14
Informational Memorandum dated 05/30/14
Supplemental Agreement No. 7 to Contract No. 10-055
Minutes from the Utilities Committee meeting of 06/02/14
06/16/14
89
90
City of Tukwila
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Utilities Committee
FROM: Bob Giberson, Public Works Director
BY: Mike Cusick, Senior Program Manager
DATE: May 30, 2014
SUBJECT: Water and Sewer Comprehensive Plans
Project No. 91040101, Contract No. 10-055
Supplemental Agreement No. 7
Jim Haggerton, Mayor
ISSUE
Approve Supplemental Agreement No. 7 with Caro llo Engineers to revise the Comprehensive Water Plan.
BACKGROUND
In 2010 the City contracted with Caro llo Engineers to update the Water Comprehensive Plan.
DISCUSSION
As a result of review comments on the draft Water Comprehensive Plan from the State of Washington Department
of Health (DOH) and King County Utilities Technical Review Committee (UTRC) the Consultant's time to complete
these revisions have taken longer than anticipated. The Water Comprehensive Plan will be updated to include
responses to those comments and the final Plan, including 10 copies for distribution, will be developed and issued
for Council and Agency review and approval.
FINANCIAL IMPACT
Supplemental Agreement No. 7 will provide funding for addressing the reviewing agencies' comments and printing
costs. Funding for the additional work will come from the Water Fund's Ending Fund balance.
EXPENDITURES
Original contract
Supplement No. 1
Supplement No. 2
Supplement No. 3-6**
Supplement No, 7
Total
$291,000.00
12,662.00
21,721.50
16,250.00
19 768.00
$361,401.50
** Supplement Nos. 4-6 did not change the contract amount.
Funding Budget
Water Comp Plan
Sewer Comp Plan
Interurban Water Reuse (2013)
APE Water Line
Ending Fund Balance
$160,000.00
143,000.00
25,000.00
16,000.00
19,768.00
$363,768.00
RECOMMENDATION
Council is being asked to approve Supplemental Agreement No. 7 to Contract No. 10-055 with Caro llo Engineers
for $19,768.00 for the Water Comprehensive Plan and consider this item at the June 9, 2014 Committee of the
Whole and subsequent June 16, 2014 Regular Meeting.
Attachments: Supplement No. 7
W:\PW Eng \PROJECTS \A- WT Projects\Water Comprehensive Plan -Water (91040101)\ Info Memo Water Comp Plan Sup #7 5-30-14.docx
91
92
SUPPLEMENTAL AGREEMENT NUMBER 7
to
CONSULTANT AGREEMENT NUMBER 10 -055
THIS SUPPLEMENTAL AGREEMENT is entered into between the City of Tukwila, Washington,
herein -after referred to as "the City ", and Carollo Engineers hereinafter referred to as "the Consultant ", in
consideration of the mutual benefits, terms, and conditions hereinafter specified.
The City desires to supplement the agreement entered into with the Consultant and executed on, May 19,
2010, and identified as Agreement No. 10 -055. All provisions in the basic agreement remain in effect
except as expressly modified by this supplement.
The changes to the agreement are described as follows:
i
1. The following is a scope of work for Amendment 2 of the Comprehensive Water Plan
(Plan) for the City of Tukwila. This purpose of this amendment is to add new tasks to
respond to Agency comments.
As a result of comments on the draft Plan from the State of Washington Department of
Health (DOH) and King County Utilities Technical Review Committee (UTRC), the
storage analysis will be revised. This change requires extensive edits to the text, analysis
tables, and figures throughout the Plan. Analysis revisions will also result in
modifications to the capital improvements program (CIP). The Plan will be updated to
include responses to comments. A Final Plan will be developed and issued for Council
and Agency review and approval.
SCOPE OF SERVICES AND TASKS
The scope of services for the project will consist of the following tasks:
Task 1: Project Coordination
Consultant will provide the project management services necessary to meet the proposed
scope of services, budget, and timeline. This includes three meetings with City. Monitor
progress against projected schedule, scope of service, and budget and administer monthly
invoicing. Communicate internally and with City staff regarding the project progress, any
issues of concern, project requirements, periodic reviews, and overall project schedule.
DELIVERABLES:
1. Meeting 1 and 2 — Review Agency comments and proposed responses to Plan.
2. Meeting 3 — Deliver and review Final Plan to City for Agency approval.
Task 2: Incorporate Responses from Agency Comments
• Add optimal service range to Table 1.5.
• Updated Coliform Monitoring Plan to be added to Appendix I. To include letter from
SPU, a schematic of specific sample sites, and sample collection SOPs.
93
• Summarize results from 2012 SPU Residential Sampling and add to Appendix K.
• Add physical and contractual obligations from Cascade and SPU contracts for supply
stations to Table 4.2. Include statement in text indicating inclusion.
• Storage Analysis was revised to mitigate deficiencies in storage. DOH comment states
current recommendation of contacting adjacent purveyors regarding willingness to
provide storage for the City to meet requirements is unacceptable. Plan text to be
revised and CIP modified.
• City to develop water shortage response plan and Consultant to review and update as
necessary. Water shortage response plan will replace Appendix H.
• Update Appendix M
• Add Consistency Statement to Appendix B.
• Add SEPA documents to Appendix A.
Add Adjacent Purveyor comments to Appendix B.
• Revise text to state that current King County Zoning was mapped and used within the
future water demand project for service area in unincorporated King County.
• Add Reclaimed Water Evaluation checklist to Appendix N and stat in Plan text.
• Revised text to state WUE goal is consistent with Municipal Water Law.
• Add Duty to Server policy to Chapter 1.
• Modify all figures to reflect revised RWSA.
Assumptions
• City to provide water shortage response plan for review.
• City to provide response or documentation on Coliform Monitoring routine collection
sites.
Task 3: Plan Amendment Development
Include the compilation of all previous tasks mentioned in this Scope of Services. Carollo
will incorporate all updated chapters and prepare the Final Plan.
Prepare revised Cover Sheet, Table of Contents, and Executive Summary. Compile Chapters
and Appendices. Prepare Final Plan PDF for City review and incorporate comments into the
Final Stamped Plan.
Modifications to the plan include:
Executive Summary
• Pg ES -4, Section ES.3
• Figure ES 1
• Figure ES 2
94
Chapter 1
• Pg 1 -8, Table 1.5
• Pg 1 -12, Section 1.8
• Pg 1 -14, Table 1.8
• Pg 1 -15, Section 1.9
Chapter 2
• Pg 2 -7, Table 2.2
• Figure 2.1
• Figure 2.2
• Pg 2 -17, Section 2.10
Chapter 3
• Replace entire chapter
o New Figure 3.3
Chapter 4
• Pg 4 -5, Section 4.3.5
• Pg 4 -6, Section 4.3.5
• Pg 4 -7, Section 4.3.5
Chapter 5
• Figure 5.1
• Figure 5.2
Chapter 6
• Pg 6 -5, Section 6.3.1.2
• Pg 6 -7, Multiple
• Pg 6 -8, Section 6.3.2
• Pg 6 -9, Table 6.5
• Pg 6 -11, Table 6.3.3
• Figure 6.8
• Figure 6.9
• Figure 6.10
• Figure 6.11
•
Chapter 7
95
• Pg 7 -8, Section 7.5
• Pg 7 -12, Section 7.10
Chapter 8
• No changes
Chapter 9
• Replace Entire chapter
o Corrections on over 50% of pages.
DELIVERABLES:
1. Two (2) signed and stamped Pull- Replacement Packages for DOH and King County.
2. Ten (10) signed and stamped Binders, one Final camera -ready copy, and one PDF of
the Final Comprehensive Water Plans for the City.
2. Payment, shall be amended as follows:
Payment for the work provided by the Consultant as part of this supplement shall be
made for an additional $19,768.00. The total amount for the Consultant for this contact
shall not exceed $361.401.50 without express written modification of the Agreement
signed by the City.
3. Time for Performance shall be amended as follows:
Change the number of calendar days for completion of the work to read an additional 41 days for
a total of 1,471 days, making the completion date May 30, 2014.
DATED this
day of , 2014.
CITY OF TUKWILA CONSULTANT
By: !j uri,. *a� L
Jim Haggerton, Mayor
96
Printed Name:
Title: VICe,4'*'Mecit
TASK !DESCRIPTION
PM Asst. PM GIS WP
Kammereck Reisinger Dunn Varies
Total
Hours
Carollo Labor
Cost
OTHER DIRECT COSTS
TOTAL COST
PECE
Travel and
Printing
$9.00 Total ODC
Total Labor Rate $ 189.00 $ 150.00 $ 125.00 $ 81.00
Task 1
1.1
- Project Coordination
Meeting No. 1 - Agency Comments Review
4 2 0 0
6
$ -
$ 50
$ 54
$ 54
$ 104
$ 104
1.2
Meeting No. 2 - Proposed Plan Revisions
4 2 0 0
6
$ -
$ -
$ 54
$ 54
1.3
Meeting No. 3 - Final Plan Delivery
2
2 0 0
4
$ -
$ -
$ 36
$ 36
$ 36
Subtotal Task 1
10
6 0 0
16
$ 2,790
50
$ 144
$ 194
$ 2,984
Task 2
.._ ..�- �.�,
- Incorporate Responses from Agency
10
A
24
40 \ t, _.
16 4
' - ..
���:.. \'mac
�
.�
�
$ -
� \�.,x�
ad "s.
$ 2,916
'� .- >`
$ 2,916
� .
.. �, .�
Subtotal - Task 2
10
24 16 4
54
$ 7,814
$ -
$ 2,916
$ 2,916
$ 10,730
-Al
Task 3
.,�..,..,__..Y_�.... �r ti. >. -.. �� **% ----*1
- Plan Amendment Development
efl t*:*, 'sue
2
;, a`�...: .
2
�.. *,� ..._ „�.�y >�*
0 16
\ � .a.� ....
* *1*\1...
�;\�.
$ 3,000
, \*t*,.
$ 1,080
. \.
_,., - -� -..* \
....�
$ 4,080
_.�...
i
Subtotal Task 3
2 2
0 16
20
$ 1,974
$ 3,000
$ 1,080
$ 4,080
$ 6,054
_� .
'a•t - U.:E�� \ =�` -.` �4 �
::�� n*V
.
Y�S'fi:w
TOTAL
22
32
16 20
90
$ 12,578
$ 3,050
$ 4,140
$ 7,190
$ 19,768
98
UTILITIES COMMITTEE
Meeting Minutes
June 2, 2014 — 5:15 p.m. — Foster Conference Room, 6300 Building
City ^�
Y�����7 of Tukwila
Utilities Committee
PRESENT
Councilmembers: Kate Kruller, Chair; Allan Ekberg, Kathy Hougardy
Staff: David C|ine, Bob Giberson, Ryan Lorson, Fnank|hmrte. Mike Cusick, Greg
ViUaDUev@, Pat Brodin, Laurel Humphrey
CALL TO ORDER: Committee Chair Kruller called the meeting to order at 5:20 p.m.
I. PRESENTATIONS
U. BUSINESS AGENDA
A. Supplemental Agreement: East Marginal VVoySouth Storm Pipe Replacement
Staff is seeking Council approval of Supplement No. 3 to Contract No. 13-036 with KPG, Inc. in
the amount of $45.885.87 for design of the East Marginal Way Pipe Replacement Project. An
alternate alignment was identified after soil contaminants were discovered along the original
project alignment where the existing pipe is located. This supplement will cover the additional field
work and design needed to accommodate this change to the project scope. The total cost for
design including this supplement is $223,439.76, which is under budget. The alternate alignment
will reduce construction costs by allowing the existing pipe to be used during cOn3truction,
eliminating bypass pumping, avoiding contaminated soils, and reducing utility conflicts.
UNANIMOUS APPROVAL. FORWARD TO JUNE 16, 2014 REGULAR CONSENT AGENDA.
B. Interagency Agreement: NPDES Regional Stormwater Monitoring Program
Staff is seeking Council approval of Interagency Agreement No. VVAHO4-544 vvith the Department
of Ecology for funding and conducting Tukwila's share of the Regional Stormwater Monitoring
Program (RSMP). The City's NPDES Phase || Municipal Stormwater Permit requires that the City
either monitor stormwater systesms for water quality effectiveness or participate in the RSMP. The
City notified [}[)E of its decision to participate in November 2013, and this interagency agreement
sets the terms for Tukwila's share of the collective funding. The total fee for the four year
monitoring agreement is$5O.144.8O. with $12'536.0O due annually until the permit expires in 2018.
UNANIMOUS APPROVAL. FORWARD TO JUNE 16, 2014 REGULAR CONSENT AGENDA.
Supplemental Aqreement: Water Comprehensive PIan
Staff is seeking Council approval of Supplement No. 7 to Contract No. 10-055 with Carollo
Engineers in the amount of $19.768.00 for revisions to the Water Comprehensive Plan. The
Washington Department of Health (DOH) and King County Utilities Technical Review Committee
provided comments on the draft Plan that impact the amount of time needed to complete
responsive revisions. Funding for this supplement will come from the Water Fund's Ending Fund
Balance. UNANIMOUS APPROVAL. FORWARD TO JUNE 9, 2014 COMMITTEE OF THE
WHOLE.