Loading...
HomeMy WebLinkAboutPermit 0490-M - BOEING #9-960490-m 91-062 boeing #9-96 9725 east marginal way south . °ROPERTY OWNER: UMC EDITION (YEAR11: 1988 FIRE PROTECTION` ( )Sprinklers ODetectors (x) N/A CO.NO_MQNSiather_ibilLacmi on or attached to penn/t /plans): PHONE: 544 - 2175 SUITE NO. PROJECT NAME/TEN/ANT: Boeing #9 - 96 • . :.. 1 ■ . - : eat - APPROVED FOR .__ • \)\, • BUILDING ISSUANCE BY: • \ �, �1 \ -\ r \N- :.A.•ti.- OFFICIAL DATE: L (.-1 - 1 I (I Repair J V ' I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. SIGNATURE: c :-A .,( ,4 — ,r / DATE: _ "' f PRINT NAME: l r A .7 E tz"- COMPANY: M4 1)DSvc �jFC • °ROPERTY OWNER: :::F: <:::;:; SITE ADDRESS: 9725 E Marginal Wy S PHONE: 544 - 2175 SUITE NO. PROJECT NAME/TEN/ANT: Boeing #9 - 96 • . :.. 1 ■ . - : eat - VALUE OF WORK: $ 15,000.00 TYPE OF WORK: (x) New /Addition Cl Modificatlor:s (I Repair Other: ,pESCRiPTION OE WORK add one A/C unit includin: • i. in: . PHONE: 6 -6200 °ROPERTY OWNER: Boeing PHONE: 544 - 2175 Apo; • . :.. 1 ■ . - : eat - I ZIP: 98124 rQNTRACTOR: rlarktne Mechanical Construction PHONE: 6 -6200 ADDRESS: 21491 2 Wear ` Edmnndj. WA ZIP: 9802Q A . • k 1 ; . k • : . . • A •DONE 1 282 EXPIRATION DATE: 5 -21 -91 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 • MECHANICAL PERMIT NO. oid_qpiy DATE ISSUED: inal • DATE(S) INSPECTOR CORRECTION NOTICE I SUED DATE REQUIRED INSPECTIONS PHONE NO. APPROVED 1 - Rou + h- InNsnts/Ducts 3 - Planning Final 4- 5 - Mechanical Final 431 -3670 575-4407 431 -3880 MECHAkCAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) PriirriMMEM ririMESEMS Mrtn ....AMOUNT; 65 5.38 IMEUMMENIENI MEE RE PT #t DATE Other :;:;TOTAL Plan Check No.: 26. >: >: 91 -062 -M • OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296 -4732) Electrical - Washington State Department of Labor and Industries (277.7272) This permit shall become null and void if the work Is not commenced within 180 days from.the date o issuance,, or if the work /r 'nded Or abandoned for period of 180 days. from me fast insp ection; miAUM PERMIT NO. CONTACTED DATE READY DATE NOTIFIED 1-4 5- Gl I " B u .) , ` PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING D D</ 3RD NOTIFICATION BY: Init T LAN CHECK NUMBER I cI i - wain BUILDING - 3 -CSI (4-S.41 k initial review _JROUTED) O FIRE O PLANNING O OTHER tg BUILDING - final raviaw REVIEW COMPLETED PROJECT SITE ADDRESS NAME INIT: INIT: INIT: MECHANICS PERMIT APPLICATION TRACKING So-221 n 4 c1 - 90 ala5 E- mocyl nil Wy INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N/A ". DEPARTMENTAL REVIEW "X" In box indicates which departments need to review the project. S • ...3.....:. Sine. « . . ............................... !�.�.......... S }� CONSULTANT: Date Sent - • } }i•} : isJ}:; i :ij }y ii:i•'i' } y:t:r . ; n :%:'iy' : ++,.'A }:'•:if:::ii ?:,y•. r. r. r' r` yii��: r' r'' r' iLirrii •i:5i.iii:'r��.r ZONING: FIRE P •TEC FIRE DEPT. LETTER DATED: SCREENING REQUIRED? fYaa fl No REFERENCE FLE NOS.: INIT: 77 1 (y•ar): 1 S . rin are SUITE NO. Data Approved - INSPECTOR: N/A IBARILAND USE CONDITIONS? (WYas [ 1 No SITE ADDRESS SUITE # 7'7/ s //////to:/, C G Sv VALUE OF CONSTRUCTION - $ I 000 ,00 PROJECT NAME/TENANT TYPE OF WORK: ,J New /Addition ❑ Modifications ❑ Repair 0 Other: DESCRIBE WORK TO BE DONE: AP/ i c :<:Ra1 ING/ .N 8t»R PHONE s /y su s _ MISM _ C 20 a ADDRESS , 0 30 3 BUILDING NG USE (office, warehouse, etc.) NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? ' No ❑ Yes IF YES, EXPLAIN: WILL THERE 13,g �STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? (_°1"No ❑ Yes IF YES, EXPLAIN: PROPERTY OWNER : / -.c T ,TT .. 0 ASIC: PERMIT FEE 1S.' PHONE s /y su s _ MISM _ C 20 a ADDRESS , 0 30 3 d - • C - i - ec / CONTRACTOR 4 /A / c - ,� , mac, .- PHONE ADDRESS a i , _-- arle•.wo/ Ll/. • ZIP WA. ST. CONTRACTOR'S LICENSE # ` 3 _ .. EXP. DATE _ /y_ r, : RI ... T ,TT .. 0 ASIC: PERMIT FEE 1S.' i UNITS) FEE: .r >> PLAN HE K FEE? 5 a . .: 0 THE R: . : —TOTAL 'S (o - ' CITY OF TUKWILA Department of Community Development - Building 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER - 01 APPLICATION MUST BE FILLED OUT COMPLETELY MECHAI .4CAL PERMIT APPLICATION Mechanical Fie Worksheet must also be filled out and attached to this application. FEES (for staff use only) BUILDING OWNER OR AUTHORIZED AGENT CONTACT PERSON APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accented for plan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. • The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431-3670. DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES 06/19/90 SMITTAL CHECI&IST • r• MECHANICAL E Completed mechanical permit application (one for each structure or tenant) Two (2) sets of mechanical plans, which include: • Floor plan •'System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations Note: Hood and duct systems require a building permit for the duct shaft. E Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) DESCRIPTION UNIT COST UNITS x COST $15.00 $4.50 BASIC FEE SUPPLEMENT PERMIT FEE 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu /h. $9.00 x 2 Installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 X 3 Installation or relocation of each floor furnace, including vent. $9.00 X 4 Installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included In an appliance permit. $4.50 x 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 X 7 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9,00 x 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 x 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu/h. $22.50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 x 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 X 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air - handling unit over 10,000 cfm. $11.00 x 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 X 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6.50 x 18 Installation or relocation of each commercial or industrial -type incinerator. $11,00 x 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 t6 .50 x X t_g 0 20 i Each appliance or piece of equipment regulated by the code but not cl in other appliance categories, or for which no other fee is listed in this code. 0W1WO0 SUBTOTAL D1 a) PLAN CHECK FEE lam% or •uaa•q 5 . 3` GRAND TOTAL SVC . Vg 1 CiTY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. MECHANICAL PERMIT FEE IkORKSHEET CITY OF TUKWILA 6200 SOUTIICb NTE/ 11OULKVAkV. TUKII'IL %. 11'ASI1INGTON 98118 Plan Check #91- 062 -M: Boeing #9 -96 9725 E Marginal Wy S I'IIONE # (206) 433.1800 THE FOLLOWING COMMENTS P PLANS UNDER UKWILA MECHANICAL PERMIT NUMBER C)T 11 Q ( E APPROVED 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 4. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 5. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 6. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Gary I.. VanDnsen. Mayor PROJECT: An n , , 9_9 6 PERMIT NO. 0 AA SITE ADDRESS: , "` . A —a .� _ , DATE CALLED: -- — TYPE OF INSPECTION: �� DATE WANTED: REQUESTER: Z a - SPECIAL INSTRUCTIONS: PHONE NO.: INSPECTION RESULTS /COMMENTS: . 7 �)-, INSPECTOR: l' _4/, _ .4.-2ryr/I, DATE: —'2.)-7-ell } fJl: i:' R�J57n J!i.'!'1fYh4.ifbM✓✓ 4W. .4101 ur pax+ .m... »,.+....,...w.»...... ......,.,+ , n.;..w 4u>. u4u.4 .. r- .1.�.•.��c. ». * :�..sv. CITY OF TUKWILA Dept of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 'J 6300 Southcenter Boulevard - #100 Tukwila • Washington 98188 PROJECT: 4 P_ t_ ., .. IL (a L r, PERMIT NO. a' q -- M SITE ADDRESS: �) : . • a/ a -t DATE CALLED: V / 7 97 TYPE OF INSPECTION: SPECIAL INSTRUCTIONS: � _ _ DATE WANTED: - - — q a. REQUESTER: j j yI d i ) ( x 4 PHONE NO.: INSPECTION RESULTS /COMMENTS: /(//, / e;). 4 A, ,, ,47,-00.,-,,- , i -. _ �i - - - _, ) , • / F L fr a' $ C of t' c,4 INSPECTOR: 4 / .r.� U"Z-, DATE: 41"/7 4e/ CY' 1 I Zrvi CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 H . . K% p' wfiSM Y't tdXlnlelM'. om..^ n:n Yr wW. i:%. �Jrh<+ DXi!' 4f' N. li:' Mf ti+ lN•. <:tYU'e..rYU�ro�VUU.n�ri> %Txnw.w �nnrs »r.w.+Mwnna'y,n.i INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PLAN CHECK # PROJECT ( ECe-1t 1(� -1 c, L� REQUIRED INSPECTIONS PLAN REVIEW COMMENT O All structural concrete to be special inspected (Sec. 308, UBC). O AU structural welding to be done by WA.B.O. certified welder and special inspected (Sec. 308, UBC). 11. Ler 15. Subgrade preparation Including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the Bolls report prior to final Inspection (sea attached procedure). 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans end requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 1 e, ��� ✓"``- -- W No changes will be made to the plane unless approved by the Architect and the ���� Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, Including all gas piping (298- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and industries and all electrical work will be Inspected by that agency (277 - 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shell be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit numbor of the project being inspected. All high-strength bolting to be special inspected (Sec. 308, UBC). Any new ceiling grid and light fixture Installation Is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet In length. Readily accessible access to roof mounted equipment is required. Englneereed truss drawings and calculations shall be on site and available to the building Inspector for Inspection purposes. Documents shell bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing materiel to have Flame Spread Rating of 25 or less, and material shall bear IdentHlcation showing the lire performance rating thereof. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 298.4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, It Is the contractor's responsibility to have a set of plans approved by that agency on the Job site. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for Inspection at the factory, v Notify the City of Tukwila Building Division prior to placing any concrete. This procedure Is In addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.C, Standard No. 43-8, shall be special Inspected. All wood to remain In placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the Jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 1 Footings 2 Foundation 3 Slab /Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening 11 12 13 14 FIRE FINAL 15 PLANNING FINAL 16 PUBLIC WORKS FINAL 11 >< 17 BUILDING FINAL PLAN CHECK # PROJECT ( ECe-1t 1(� -1 c, L� REQUIRED INSPECTIONS PLAN REVIEW COMMENT O All structural concrete to be special inspected (Sec. 308, UBC). O AU structural welding to be done by WA.B.O. certified welder and special inspected (Sec. 308, UBC). 11. Ler 15. Subgrade preparation Including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the Bolls report prior to final Inspection (sea attached procedure). 0 A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans end requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 1 e, ��� ✓"``- -- W No changes will be made to the plane unless approved by the Architect and the ���� Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, Including all gas piping (298- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and industries and all electrical work will be Inspected by that agency (277 - 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shell be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit numbor of the project being inspected. All high-strength bolting to be special inspected (Sec. 308, UBC). Any new ceiling grid and light fixture Installation Is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet In length. Readily accessible access to roof mounted equipment is required. Englneereed truss drawings and calculations shall be on site and available to the building Inspector for Inspection purposes. Documents shell bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing materiel to have Flame Spread Rating of 25 or less, and material shall bear IdentHlcation showing the lire performance rating thereof. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 298.4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, It Is the contractor's responsibility to have a set of plans approved by that agency on the Job site. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for Inspection at the factory, v Notify the City of Tukwila Building Division prior to placing any concrete. This procedure Is In addition to any requirements for special inspection. 0 All spray applied fireproofing as required by U.B.C, Standard No. 43-8, shall be special Inspected. All wood to remain In placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the Jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. piping plan construction notes