Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 0501-M - MUNICIPALITY OF METROPOLITAN SEATTLE - HVAC
0501-m 91-069 king county metro 12100 east marginal way south . f PROPERTVOWNER: SITE ADDRESS: 12100 E Marginal Wy S SUITE NO. FIREJ'ROTEQTION: Sprinklers Detectors x N/A CONDITIONS (other than noted on or attached to penult /plank• DESCRIPTION OF WORK: Exhaust fan for new weld shop. new exhaust hood and fan for existing brake shop. APPROVED FOR VII , BUILDING ISSUANCE BY: . 7 '4_ , . :. G : �..,.„,.., OFFICIAL DATE: /_ . .J 4- '1/ Westvent A L I (hereby certify that 1 have read and examined this permit and know the same to be true and correct. AU provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. 1 am authorized to sign for and obtain this mechanical permit. • SIGNATURE: ,, i./4 , (2 t • DATE: /,9 S PRINT NAME: c C : I 6 � �i �� ((S C OMPANY: / /1 ( K /!�I c ��f-G%' c./ ( ,) , f PROPERTVOWNER: SITE ADDRESS: 12100 E Marginal Wy S SUITE NO. - ; • 1. ■ ,l I : ► • e ro VALUE OF WORK: • 7 500.00 `a7 RIM New /Addition $ Modifications • 'zi m• Other: DESCRIPTION OF WORK: Exhaust fan for new weld shop. new exhaust hood and fan for existing brake shop. f PROPERTVOWNER: )! i aality of Metropolitan Sea ttle PHONE: -2100 ADDRESS: 871 Second Avenue. Seattle. WA (- . '8104 CONTRACTOR: Westvent A Inc. [PHONE: 67 -5005 ADDRESS: P.O. Box 94967. Seattle. WA � Z'P: 98124 WA. ST. CONTRACTOR'S LICENSE NO. WESTVI *121RF (EXPIRATION DATE: 9 - 01 - 91 CITY OF TUKWILA Department of Community Development - Building Division 3300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 MECHANCAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) 15.00 arvilffel MI Mil Plan Check No.: 91 - 069 - •AMOU d DATE NT '> `RECEI 3 - Planning Final 4 5 Mechanical Final 575 -4407 431 -3680 <: >< >1NSPE RECORQ IC�II: to t ,' t ` 4: In �hd f;TlOJIt Inspect ens a Ieest 2 hours brae DATE • DATE(S) REQUIRED INSPECTIONS PHONE NO APPROVED INSPECTOR CORRECTION NOTICE ISSUED 1 - Rough- inNents/Ducts 431 -3670 2 - Fire Final OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732) Electrical - Washington State Department of Labor and industries (277 -7272) This permit shall become null and void if the work Is not commenced within 180 days from the date of • issuance, or if the war - uspended or abandoned for a period of 180 days from the last inspects /11117101/ PERMIT NO. ... ...: }:i�A'I'E ?<IN ..: ;• {:::. ..:.:.. }.:.... :gin ' . { �( CONTACTED BUILDING - initial review yy15 � 1g �� (ROUTED) CONSULTANT: Dais Sant - Date Approved - DATE READY 4 FIRE l.l_ �' DATE NOTIFIED LI -a . _ ` BY: (init.)-- Q PERMIT EXPIRES 2nd NOTIFICATION SCREENING REQUIRED? YenJ No INIT: BY: (Ink.) O OTHER AMOUNT OWING 3g. • 0 3RD NOTIFICATION BUILDING - final rnviAw I I ` BY: (Ink.) 1c[6t5 ::::. :::::.:•::. :.}:. L'l A�' t" IiNE�'•:4i:.:.i ... ...: }:i�A'I'E ?<IN ..: ;• {:::. ..:.:.. }.:.... :gin ' . { �( •.i;. • v . . ;.. ........:..........: ■ ' : }.: : ,::• } ::i::� } Yi:•:•'. ir .yi}j;:i }} } �� ::•:, } < }::.:;: }. }:�':vn » > }:'::: . a (;�(� BUILDING - initial review yy15 � 1g �� (ROUTED) CONSULTANT: Dais Sant - Date Approved - 4 FIRE l.l_ �' '���� FIRE PROTECTION: (- ) Sprinklers Detectors (j N/A FIRE DEPT. LETTER DATED: ,C - 23 -9 INSPECTOR: r] /7 I rr: .. O PLANNING 20,4040: ISARA.AND USE CONDITIONS? [ ]Yes fl No SCREENING REQUIRED? YenJ No INIT: REFERENCE FILE NOS.: O OTHER UM EDITION (year): INIT: BUILDING - final rnviAw I I ` �. S_� 1c[6t5 INIT:(-- MECHANICS'_ PERMIT APPLICATION TRACKING PLAN CHECK NUMBER 3110.i2 REVIEW COMPLETED PROJECT NAME fr o SITE ADDRESS ( @loo E SUITE NO. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. PROPERTY OWNER agx C•ZkuZ ox fil‘r/TD/e1.rTi91i 77l_ PHONE ( L c . 7J ♦ Q ADDRESS g a iSD 4 V ,�t 5E� 777.4 I P 7 q CONTRACTOR wk5 r zN c ! I PHONE 7 X313 ADDRESSQC,.4. 0 7 a �7 5 -TT EXP. DATE PHONE ZIP qg t ii 7c q .. l9/ WA. ST. CONTRACTOR'S LICENSE noes j OC. ARCHITECT ADDRESS ZIP " CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 PLAN CHECK NUMBER cI 10(09 Nl APPLICATION MUST BE FILLED OUT COMPLETELY SITE ADDRESS SUITE # 01 e. M A 'C . it)M' se, PROJECT NAME/TENANT Menlo .. sir 14$6. Wei TYPE OF WORK: New /Addition lit Modifications MECHA r }CAL PERMIT APPLICATION Mechanical Fee Worksheet must also be lilted out and attached to this application. NIT ASIC: PERMIT: FEE >< >< 1e PLAN CHECK< FEE :. TH TOTAL►!! FEES (for staff use only) DESCRIBE WORK TO BE DONE: Ex$4.4k4s r ft1 Ex asr g DATE APPLICATIQN ACCEPTED S—q 1 E X > s t - QR.') shore *wow FA&. —64Atet sig.,) G,oa - l� iyf�lnt7 Et ,z ni ss �� Y o rj g VALUE OF CONSTRUCTION - $ 7 S cr) ! w 0 Repair 0 Other: ^1644J u)41.4 .stiovo, r t s BUILDING US(office, warehouse, etc.) � M4* - t Slitaos NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? OF Mei lff ,i tcL s Yes IF YES, EXPLAIN: WILL THERE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No 0 Yes IF YES, EXPLAIN: BUILDING OWNER OR AUTHORIZED AGENT APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed Information on application and plan submittal requirements. Application and plans must be complete in order to be accented for plan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal, VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. • The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, lease contact the De • artment of Communit Develo • ment at 433 -1849. DATE APPLICATION XPIRES o — � a O 3/2YA 11 • CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433-1849 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. SP.:.:9: . . atmmenumperorporreoeing . .004 Wth elinit • . Th on at • eiiitiWth&iiorkihieV;:Atlinie'ot :,,,,.:: ... , : . : .: In 01;;:"iitiitf reiiiiiiiii ' 00: DESCRIPTION UNIT COST NO. OF UNITS X TOTAL COST BASIC FEE $15.00 1 Installation or relocation of each forced-air gravity-type furnace or bumer, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h. .., $9.00 2 • Installation or relocation of each forced-air or gravity-type furnace or bumer, including ducts and vents attached to such appliance over 100,000 Btu/h. $11.00 3 Installation or relocation of each floor furnace, including vent. $9.00 4 Installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater. $9.00 . 5 Installation, relocation or replacement of each appliance vent Installed and not Included in an appliance permit. $4.50 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 , X 7 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h. $9.00 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu* and including 500,000 Btu/h. $16.50 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,750,000 Btu/h. $22.50 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h. $33.50 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h. $56.00 X 12 Each air-handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere In this code.) $6.50 . 13 Each air-handling unit over 10,000 cfm. 01.00 14 Bach evaporative cooler other than a portable type. $6 50 X 15 Each ventilation fan connected to a single duct. $4.50 X 4 CD UMPMEMIMOMP 16 Each ventilation system which is not a portion of any heating or . air-conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which Is served by mechanical exhaust, including the ducts for such hood. $6.50 X 18 Installation or relocation of each commercial or industrial-type incinerator. $11.00 19 installation or relocation of each commercial or industrial-type incinerator. $45.00 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other tee is listed In this code. $6.50 SUBTOTAL (unit foe) 41/ OC) .eup......„ PLAN CHECK FEE (215" mib letall (o 50 GRAND TOTAL • MECHANI!AL PERMIT FEE INURKSHEET CITY OF TUKWILA i;2im SOVrnchNTER 11011LE'VAIiL, T('KH'IIil, 11',4SII!NG7'ON98188 Plan Check #91- 069 -.M: Metro 12100 E Marginal Wy S PHONE. # (2061 Gury L. VanIasen, %lnynr THE FOLLOWING COMMENTS APPLY TO AND BECOME P F H PROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER A I i 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. Readily accessible access to roof mounted equipment is required. 5. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 6. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Fire. Department Review Control #91 -069M (512) Re: Metro - 12100 East Marginal Way South Dear Sir: City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575-4404 Gary L. VanDusen, Mayor April 23, 1991 The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. H.V.A.C. units rated at 2,000 cfm require auto- shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. Central Station supervision is required. All modifications to fire alarm systems shall have the written approval of the Tukwila Fire Department. No work shall commence without approved drawings. (City Ordinance #1327) (UFC 10.301) Remote indicator lights are required on all above ceiling smoke detectors. (UFC 10.301) Call the Tukwila Fire Department at 575 -4404 for approval of any system shut down. Have job site address, name, and the Tukwila Fire Department Job Number available to confirm shut down approval. (UFC 10.301) Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 5 Zc r PROJECT: '1 ? PERMIT NO. (' I" ON SITE ADDRESS: l Z &. DATE CALLED: DATE WANTED: a•m• D•M• TYPE OF INSPECTION: (� ri,9ti- SPECIAL INSTRUCTIONS: REQUESTER: PHONE NO.: INSPECTION RESULTS /COMMENTS: CL- I WOOF MIND • ( . J L. -~' nATF• (rD e j/2.."' ! f jLth."+ a. 3'. 'ti- 4W a gs :.spo utes»iwwa a�w.x V.Wnaalr. 1mt CITY OF TUKWILA Dept of Community Development - Building Division Phone: (206) 431 -3670 !r:¢ U, ru INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: `7 . d o , a e PERMIT NO. © 0 (- Al _ SITE ADDRESS: /a. Or ,I /t „i „i : /4, DATE CALLED: --� . -- q / TYPE OF INSPECTION: Air , �/ � . m DATE WANTED: , �j -- e7 / ,,,. SPECIAL INSTRUCTIONS: REQUESTER: _ PHONE NO.: 76 7-- 50P 51''fl t INSPECTION RESULTS /COMMENTS: (,A) (MA vJ 7 ill i‹ ( S o P IS A PP4 - - 7lc ._. LO i. ' fS�`c.+3,--s b 0E 1 -14 € * l, V -&-k s e '' 3^i L . ,,p-i\ A e P a.i, IJ' SE ( V'c e ► C ill. R (t.ie )9Am P lc' ( ! j SA C Icy oNz -11.4 ►.SM�. Pas ct--w•1 INSPECTOR: C - 5 --f --C--- DATE: �' � al - 1 N ��s d[C4 1(.:1 A dtuatlMeiewau.. tv�thw ..u..waw....•.,�w.u�u.ay.a�,oea n ir:.: vtVA idUHA Vnl. 4hN: d614.t/ i! f:+ E:: U, rtr:: M,' N' d'. S' LSiQU1. ytr�M3JiTrY....'. CYfrrinY :tllLV \':t'iN ?•Y.rvY[xy�Dn: '. 4t:' t: 4;} s+ Y�1tN: Y F+. kVAik' at= tA, 1,5,4 4..• a..t. mrva+rawxwwtt.mww »,•w,,ltt.GwrM.w CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard — *100 Tukwila Washington 98188 FILE COPY I understand that the Plan Check approvals are • Ubtect to errors and omissions and approval of j • yt, violation o+ any ;,; V1$ does not aut�ior':'' aciupted code or • ord1r,3(CE' , (ecE3is)t of con- tractor's copy of approved plan3 a knowledged. detail machine shop plan section approved sections weld shop plan approvedmetro south base mezzanine plan DETAIL DOOR ON ROUND DUCT DUCT SUPPORT IN BRAKE SHOP BRAKE SHOP FAN EF-1 FLEX CONNECTION DETAIL APPROVED CONCRETE ROOF HANGER MACHINE SHOP DUCT DETAILS PLAN REVIEW COMMENT( PLAN CHECK #91 b6%\ PROJECT REQUIRED INSPECTIONS TP 15. MEND No changes will be mode to the plans unless approved by the Architect and the Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, including all gas piping (298- 4722). Electrical permit shell be obtained through the Washington State Division of Labor and Industries and all electrical work will be lnepected by that agency (277- 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the lob site prior to the start of any construction. When special Inspection Is required either the owner, architect or engineer shell notify the Tukwila Building Division of appointment of tho Inspection agencies prior to the first building Inspection. Copies of all special inspection reports shall be submitted to the Building Division In a timely manner. Reports shell contain address, protect name and permit number of the project being lnepected. All structural concrete to be special Inspected (See. 308, UBC). All structural welding to be done by WAB.O. certified welder and special lnepected (Sec. 308, UBC). All high- strength botting to be special lnepected (Sec. 306, UBC). Any new ceiling grid and light fixture Installation Is required to meet lateral bracing requirements for Seismic Zone 3. Partition wells attached to ceiling grid must be laterally braced 11 over eight (8) feet In length. Readily accessible access to roof mounted equipment is required. Englneereed trues drawings and calculations shall be on site and available to the building inspector for Inspection purposes, Documents shall bear the Beal and signature of a Washington State Professional Engineer. Any exposed Insulations backing material to have Flame Spread Rating of 25 or less, and materiel shall bear Identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and 1111 requirements shall conform strictly with recommendations given In the Bolls report prior to final inspection (see attached procedure). A statement from the roofing contractor verifying fire retardency of roof will be required prior to final Inspection (see attached procedure). Ail construction to be done In conformance with approved plena and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296-4787, at least three working days prior to desire Inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. Fire retardant treated wood shell have • flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be Issued by an approved agency having a service for Inspection at the factory. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure 1• in addition to any requirements for special Inspection. All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special lnepected. All wood to remain In placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 308 (e) 7. Validity of Permit. The Issuance of a permit or approval of plans, specifications end computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 1 Footings 2 Foundation 3 Slab /Slab Insulation 4 Shear Well Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Nall Board Fastening y 11 'g V il\ 12 ( //J 13 14 FIRE FINAL 15 PLANING FINAL 16 PUBLIC WORKS FINAL 17 BUILDING FINAL PLAN REVIEW COMMENT( PLAN CHECK #91 b6%\ PROJECT REQUIRED INSPECTIONS TP 15. MEND No changes will be mode to the plans unless approved by the Architect and the Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, including all gas piping (298- 4722). Electrical permit shell be obtained through the Washington State Division of Labor and Industries and all electrical work will be lnepected by that agency (277- 7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, Inspection records, and approved plans shall be posted at the lob site prior to the start of any construction. When special Inspection Is required either the owner, architect or engineer shell notify the Tukwila Building Division of appointment of tho Inspection agencies prior to the first building Inspection. Copies of all special inspection reports shall be submitted to the Building Division In a timely manner. Reports shell contain address, protect name and permit number of the project being lnepected. All structural concrete to be special Inspected (See. 308, UBC). All structural welding to be done by WAB.O. certified welder and special lnepected (Sec. 308, UBC). All high- strength botting to be special lnepected (Sec. 306, UBC). Any new ceiling grid and light fixture Installation Is required to meet lateral bracing requirements for Seismic Zone 3. Partition wells attached to ceiling grid must be laterally braced 11 over eight (8) feet In length. Readily accessible access to roof mounted equipment is required. Englneereed trues drawings and calculations shall be on site and available to the building inspector for Inspection purposes, Documents shall bear the Beal and signature of a Washington State Professional Engineer. Any exposed Insulations backing material to have Flame Spread Rating of 25 or less, and materiel shall bear Identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and 1111 requirements shall conform strictly with recommendations given In the Bolls report prior to final inspection (see attached procedure). A statement from the roofing contractor verifying fire retardency of roof will be required prior to final Inspection (see attached procedure). Ail construction to be done In conformance with approved plena and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296-4787, at least three working days prior to desire Inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. Fire retardant treated wood shell have • flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be Issued by an approved agency having a service for Inspection at the factory. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure 1• in addition to any requirements for special Inspection. All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special lnepected. All wood to remain In placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 308 (e) 7. Validity of Permit. The Issuance of a permit or approval of plans, specifications end computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. PLAN CHECK NUMBER 9l -(wit M CITY OF TUKWILA Department of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: MSrRo OCCUPANCY GROUP TYPE OF CONSTRUCTION LOCATION ON PROPERTY BUILDING HEIGHT /3 OF STORIES FLOOR AREA OCCUPANT LOAD EXITING REQUIREMENTS IQ 'LEASE `fie V(Gv4 d DETAILED REQUIREMENTS OCCUPANCY TYPE OF CONSTRUCTION PART V, CHAPTER 23, U.B.C. W.S.E.C. CHAPTER 51 -10, W.A.C. NOTES PREPARED BY: - ‘400TM r � PLAN REVIEW 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 rRbp sa 1.1ek3 W EL^bl'W Cn DATE: L — ici.4/