Loading...
HomeMy WebLinkAboutPermit 0503-M - FIBERCHEM0503-M 91-071 FIBERCHEM 1120 ANDOVER PARK EAST #200 . . <.: ::>: >�;: >i <: � <_:< >> ';: � >� >:: _' >:<::: �`:`CQO� � CQMP 'IANGS•; >': � < >:: <::: ; >.<: >: •:!:::<::<� ....... . . . .::. ::::::. <:: : <: •:::::. . • >: >:::: •:;::. >; >: •:: : UMC EDITION (YEAR): 1988 FIRE PROTECTION: ( )Sprinklers (x)Detectors ( ) N/A ADDRESS: CONDITIONS (other than noted on or attached to permit /plans): Island, WA ZIP: 98040 CONTRACTOR: APPROVED FOR ISSUANCE BY: OW 1 )-. k ) BUILDING ),rye, OFFICIAL DATE: /- - 7, - 1 �� [ADDRESS: 7707 Detroit S.W.. Seattle, WA I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. SIGNATURE: c DATE: "', 7 ( 7 c , __,C/1 PRINT NAME: �.: , C COMPANY: \\J\ LT t n Q l,��l fBOPERTY OWNER: Donald W. Leuthold (PHONE: 232 -7402 ADDRESS: 3205 84th Place S.P., Mercer Island, WA ZIP: 98040 CONTRACTOR: Mac Donald Miller (PHONE: 767 -7995 [ADDRESS: 7707 Detroit S.W.. Seattle, WA 98106 4 - 01 - 92 WA. ST. CONTRACTOR'S LICENSE NO. MAC.DOMS 147MN __[ ZIP: (EXPIRATION DATE: CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 MECHANICAL PERMIT NO. OS O'D m DATE ISSUED: MECHAICCAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) 6 00 MEM ft >TC Plan Check No.: AMOUNT:: < :::RECEIPT »; aCKD0 91 -071 -M R �ET�'►F MT SITE ADDRESS: 1120 Andover Pk E SUITE NO. 200 PROJECT NAM N Fiberchem 1 VALUE OF WORK: $ 8,200.00 TYPE OF WORK: New /Addition ( ) Modifications C) Repair x Other: Replacement DESCRIPTION OF WORK: Replace Chrysler /Airtemp 7.5 ton A/C unit with new. INSPECT :.I :. ::.......:.; .:.:........::. :.:. lc C7�ON< R�C4R� !:��� <i�all::far >lnape�ctlana s! es REQUIRED INSPECTIONS 1 - Rough- inNents /Ducts 2 - Fire Final 3 - Planning Final 4- 5 - Mechanical Final DATE PHONE NO. APPROVED 431 -3670 575 -4407 431 -3680 4 1 DATE(S) INSPECTOR CORRECTION NOTICE ISSUED OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296 -4732) Electrical - Washington State Department of Labor and Industries (277 -7272) This permit shall become null and void if the work is not commenced within i80 days: from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT NO. iq��A"1rilt!•:IiN. CONTACTED Ea p < i:}'•; ?:, + u %:i:!;::r,.. i:•: {'n,6:'r'• { iii.; {�:, i: % /.•:•: Yv:...•.•: Ve BUILDING - initial review LI_I� a � DATE READY DATE NOTIFIED L BY : ep q ( PERMIT EXPIRES r� 2nd NOTIFICATION FIRE PROTECTION: [ ] Sprinklers (7 etectors ( N/A BY: ( BY: ) FIRE DEPT. LETTER DATED: V. -73- ( INSPECTOR: AMOUNT OWING • O b 3RD NOTIFICATION ZON : I ► OMITSE �DITONS? ( n No ...�1►T1.:�.f�f��.i:•.... iq��A"1rilt!•:IiN. r.: {.:... ... i /. }.::. ?v:: �:'.•r •:•::•:.'•.•: ':'! .!: : ..: 4Y:i +..:x: +::..:1. { }: n; { ?'•::: :!. v:: � p < i:}'•; ?:, + u %:i:!;::r,.. i:•: {'n,6:'r'• { iii.; {�:, i: % /.•:•: Yv:...•.•: Ve BUILDING - initial review LI_I� a � 1.I_0/ ( ROUTED) coNSUL etc+ ant - ate rove FIRE �.- 2D r� f FIRE PROTECTION: [ ] Sprinklers (7 etectors ( N/A FIRE DEPT. LETTER DATED: V. -73- ( INSPECTOR: 57 Z INIT: ZON : I ► OMITSE �DITONS? • Yes n No O PLANNING SCREENING REQUIRED? nYes n No INIT: REFERENCE FLE NOS.: O OTHER INIT: 0 BUILDING - final rAViAw L1-2 -pZ I UMC EDITION (year): / S INIT:C. , MECHANICS. PERMIT APPLICATION TRACKING PROJECT NAME PLAN CHECK NUMBER q - REVIEW COMPLETED SITE ADDRESS i b-Q ch.-e r MtioUPY Pk E SUITE NO. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" In box indicates which departments need to review the project. 0111171110 PROPERTY OWNER ..0 L . LO `0T ;; PHONE23z _ 740a, ZI' _LSO4Q ADDRESS ;� •. Se k& t5 .11.12iNSENNOM CONTRACTOR .����� k, L,Le'Z -- i0n farilMa=iligneriin PHONE 7 - ADDRESS 77 n7 e � '�" ..,..„ ''TOTAL: Zi ( WA. ST. CONTRACTOR'S LICENSE # go ...000 1, '1. WO.) ! EXP. DATE diff "O( -5 .2- .0 = 1' `0T ;; W : ASI.pERMIT PERM .11.12iNSENNOM UNIT S FEE :, i0n farilMa=iligneriin PLAN CHE FEE ::: 0THER' ''TOTAL: CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER 1 Lin APPLICATION MUST BE FILLED OUT COMPLETELY SITE 2 0 ADDRESS 1� ►f ��. "Pt. C SUITE SO VAI, C O ACTION - $ PROJECT NAME/TENANT TYPE OF WORK: 0 New /Addition 0 Modifications 0 Repair Other: DESCRIBE WORK TO BE DONE: <= I IZE >` NUMHER e'�FitJNiT$ BUILDING USE (office, warehouse, etc.) NATUF>IE OF BUS WILL THERE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No 0 Yes IF YES, EXPLAIN: BUILDING OWNER OR AUTHORIZED AGENT DATE APPLIC TI N ACCEPT 4D MECHAaCAL PERMIT APPLICATION Mechanical Fee Worksheet must also be filled out and attached to this application. FEES (for staff use only) 0 Yes IF YES, EXPLAIN: DATE APPLICATION EXPIRES CI L T DATE e,• 9 PHONE - 01 • 7 S_ ADDRESS11 Y7 we:'� r . CITY /ZIPC / 0� CONTACT PERSON � '� 'z ��+` PHONE 7 (.-t 7 q,q S APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to till out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and Plans must be complete in order to be accented for elan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. 09118/90 St,BMITTAL CHECkLIST MECHANICAL ❑ Completed mechanical permit application (one for each structure or tenant) Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) Note: Hood and duct systems require a building permit for the duct shaft. DESCRIPTION UNIT COST NO OF UNITS X TOTAL COST $15.00 BASIC FEE SUPPLEMENT PERMIT FEE $4.50 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h. $9.00 2 Installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 x 3 Installation or relocation of each floor furnace, including vent. $9.00 X 4 Installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. $4.50 x 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 8� 7 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9,00 X 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 X 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu/h. $22.50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 X 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air - handling unit over 10,000 cfm. $11.00 X 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 X 16 Each ventilation system which Is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6.50 X 18 Installation or relocation of each commercial or industrial -type incinerator. $11.00 X 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 X 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee is listed In this code. $6.50 X 06/1W90 SUBTOTAL t. .13c) PLAN CHECK FEE (ass a :q (p .00 GRAND TOTAL $30.00 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. MECHAWY^AL PERMIT FEE WORKSHEET CITY OF TUKWILA 6:100SU1'TUCI•:NIRR TUKIVII.A, Weltil INGTON981KK Plan Check #91- 071 -M: Fiberchem 1120 Andover Pk E #200 !V/ k ( l K Gun. l.. I l/q/)usi n"1G THE FOLLOWING COMMENTS APPLY TO AND BECOME P T F HE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER A �' [ fl 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. Readily accessible access to roof mounted equipment is required. 5. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 6. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. *ALA 4 sc. City of Tukwila 79 Os Fire Department Review Control #91 -071M (512) Re: Fiberchem - 1120 Andover Park East, Suite #200 Dear Sir: FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661 (206) 575-4404 Gary L. VanDusen, Mayor April 23, 1991 The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. H.V.A.C. units rated at 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. Central Station supervision is required. All modifications to fire alarm systems shall have the written approval of the Tukwila Fire Department. No work shall commence without approved drawings. (City Ordinance #1327) (UFC 10.301) Remote indicator lights are required on all above ceiling smoke detectors. (UFC 10.301) Call the Tukwila Fire Department at 575 -4404 for approval of any system shut down. Have job site address, name, and the Tukwila Fire Department Job Number available to confirm shut down approval. (UFC 10.301) Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. • Author49d Signature City of Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188-7661 (206) 575-4404 f Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire: Permits: TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Project Name / f., Address .,,. Retain current inspection schedule Needs shift inspection Approved without correction notice „."'Approved with correction notice issued P/‘ Gary L. VanDusen, Mayor Control No. „ /41 Permit No. Suite # Date FINALAPP.FRM T.F.D. Form F.P. 85 CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 INSPECTIOk RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PERMIT NO. (9 3 —41 PROJECT: /'' `l2e, c_G, . L.V.-1 SITE ADDRESS: / /X /h,, PC .5 r DATE CALLED: DATE WANTED: REQUESTER: ...f - - 3 D —47 / , TYPE OF INSPECTION: eli`i ,. 2 c SPECIAL INSTRUCTIONS: .litlage=i '�'_ NE NO.: 2 -c .PI 9 1.. -- INSPECTION RESULTS /COMMENTS: , ,- INSPECTOR: Z .�_ , .r , h DATE: r-r. 3/ —9/ CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 INSPECTIOk RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 n , NORTHWEST z MacDonald - Miller Co. 7717 Detroit SW Seattle, WA 98106 -1903 Attention; Ed Harris ' Reference: Fiberchem - Tukwila Ed; The enclosed calculation . shows that this replacement unit will over - stress the present roof by only 28 %. This is within acceptable engineering tolerance. E NGINEERS, NORTHWEST, INC. RS. • CONSULTING!N3)NeERe Woopy∎ IN SEATTLE, WA 91115 (ROI)1217510;: MX (101),15291N 8699 - IS3MH1.elON S2133WIJN3 ze ee. RECEIVED CITY QFTI IKWILA - APR PERMIT Sincerely. 413 NO, - JOB NAME SUBJECT /'. /G'� CGdr� �► kc T ENO 10EERS- NORTHWES1 INC. RS. d9 WOODLAWN AVE. N.E. - SUITE 205 • SEATTLE, WA 98115 - (206) 525 -7560 - FAX # (206) 522 - 6696 40" gle cpe u 24 7. • 4 E P :.z ai DATE 4 2 4 -// 4 /5; SHEET Or BY — 4 $ 8699 -22S 1.63M1-1 S3MHlaON S213314,T9143 EE :80 16‘ 8ti add PLAN REVIEW COMMENT PLAN CHECK #►C(I` C)ZI M PROJECT y F1'Iper Givewl REQUIRED INSPECTIONS er0' 11. 13. 15. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, Including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277.7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plane shall be posted at the job site prior to the start of any construction. When special inspection Is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the Inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. All structural concrete to be special Inspected (Sec. 308, UBC). All structural welding to be done by WA.B.O. certified welder and special Inspected (Sec. 308, UBC). All high-strength bolting to be special inspected (Sec. 308, UBC). Any new calling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced If over eight (8) feet In length. ( J / Readily accessible access to roof mounted equipment is required. Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer, Any exposed Insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). A statement from the roofing contractor verifying fire retardency of roof will be required prior to final Inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington Slate Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department Inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, it Is the contractor's responsibility to have a set of plans approved by that agency on the lob site, Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear Identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for Inspection at the factory. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure Is in addition to any requirements for special inspection. All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special Inspected. All wood to remain in placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7. Validity of Permit. The Issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit ter , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or vioiate or cancel the provisions of this code shall be valid. 1 Footings 2 Foundation 3 Slab /Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening X 11 ( 12 13 14 FIRE FINAL 15 PLANNING FINAL 16 PUBLIC WORKS FINAL 17 BUILDING FINAL PLAN REVIEW COMMENT PLAN CHECK #►C(I` C)ZI M PROJECT y F1'Iper Givewl REQUIRED INSPECTIONS er0' 11. 13. 15. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, Including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277.7272). All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plane shall be posted at the job site prior to the start of any construction. When special inspection Is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the Inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. All structural concrete to be special Inspected (Sec. 308, UBC). All structural welding to be done by WA.B.O. certified welder and special Inspected (Sec. 308, UBC). All high-strength bolting to be special inspected (Sec. 308, UBC). Any new calling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. Partition walls attached to ceiling grid must be laterally braced If over eight (8) feet In length. ( J / Readily accessible access to roof mounted equipment is required. Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer, Any exposed Insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). A statement from the roofing contractor verifying fire retardency of roof will be required prior to final Inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington Slate Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). All food preparation establishments must have King County Health Department sign-off prior to opening or doing any food processing. Arrangements for final Health Department Inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire inspection date. On work requiring Health Department approval, it Is the contractor's responsibility to have a set of plans approved by that agency on the lob site, Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear Identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for Inspection at the factory. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure Is in addition to any requirements for special inspection. All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be special Inspected. All wood to remain in placed concrete shall be treated wood. All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7. Validity of Permit. The Issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit ter , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or vioiate or cancel the provisions of this code shall be valid. DATE: CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: V N M ADDRESS: PLAN REVIEW RI-o 1 Amav ea 'P K e.. PLAN CHECK NUMBER 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 z Z)11s 1 , D EM 2 465 VIAQ I 7 c S rPt �. 'Revt..W M D C. 0 to,MaST Prepared by: OFFICE PLAN EQUIPMENT LIST EQUIPMENT SCHEDULE CONTROL DIAGRAM SECTION FLOOR PLAN MACDONALD MILLER COMPANY