HomeMy WebLinkAboutPermit 0503-M - FIBERCHEM0503-M 91-071
FIBERCHEM 1120 ANDOVER PARK EAST #200
.
. <.: ::>: >�;: >i <: � <_:< >> ';: � >� >:: _' >:<::: �`:`CQO� � CQMP 'IANGS•; >': � < >:: <::: ; >.<: >: •:!:::<::<� ....... . . . .::. ::::::. <:: : <: •:::::. . • >: >:::: •:;::. >; >: •:: :
UMC EDITION (YEAR): 1988
FIRE PROTECTION: ( )Sprinklers (x)Detectors ( ) N/A
ADDRESS:
CONDITIONS (other than noted on or attached to permit /plans):
Island,
WA ZIP: 98040
CONTRACTOR:
APPROVED FOR
ISSUANCE BY: OW 1 )-. k
) BUILDING
),rye, OFFICIAL
DATE: /- - 7, - 1
��
[ADDRESS:
7707 Detroit S.W.. Seattle, WA
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATURE: c
DATE: "', 7 ( 7 c
, __,C/1
PRINT NAME: �.: , C
COMPANY: \\J\ LT t n Q l,��l
fBOPERTY OWNER:
Donald W. Leuthold
(PHONE: 232 -7402
ADDRESS:
3205 84th Place S.P., Mercer
Island,
WA ZIP: 98040
CONTRACTOR:
Mac Donald Miller
(PHONE: 767 -7995
[ADDRESS:
7707 Detroit S.W.. Seattle, WA
98106
4 - 01 - 92
WA. ST. CONTRACTOR'S LICENSE NO. MAC.DOMS 147MN
__[ ZIP:
(EXPIRATION DATE:
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
MECHANICAL
PERMIT NO. OS O'D m
DATE ISSUED:
MECHAICCAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
6 00
MEM
ft
>TC
Plan Check No.:
AMOUNT:: < :::RECEIPT
»; aCKD0
91 -071 -M
R �ET�'►F MT
SITE ADDRESS:
1120 Andover Pk E
SUITE NO. 200
PROJECT NAM N Fiberchem 1 VALUE OF WORK: $ 8,200.00
TYPE OF WORK: New /Addition ( ) Modifications C) Repair x Other: Replacement
DESCRIPTION OF WORK: Replace Chrysler /Airtemp 7.5 ton A/C unit with new.
INSPECT :.I
:. ::.......:.; .:.:........::. :.:. lc C7�ON< R�C4R� !:��� <i�all::far >lnape�ctlana s! es
REQUIRED INSPECTIONS
1 - Rough- inNents /Ducts
2 - Fire Final
3 - Planning Final
4-
5 - Mechanical Final
DATE
PHONE NO. APPROVED
431 -3670
575 -4407
431 -3680
4 1
DATE(S)
INSPECTOR CORRECTION NOTICE ISSUED
OTHER AGENCIES:
Plumbing/Gas Piping - King County Health Department (296 -4732)
Electrical - Washington State Department of Labor and Industries (277 -7272)
This permit shall become null and void if the work is not commenced within i80 days: from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT NO.
iq��A"1rilt!•:IiN.
CONTACTED
Ea
p < i:}'•; ?:, + u %:i:!;::r,.. i:•: {'n,6:'r'• { iii.; {�:,
i: % /.•:•: Yv:...•.•: Ve
BUILDING -
initial review
LI_I� a �
DATE READY
DATE NOTIFIED
L
BY :
ep
q (
PERMIT EXPIRES
r�
2nd NOTIFICATION
FIRE PROTECTION: [ ] Sprinklers (7 etectors
( N/A
BY:
( BY: )
FIRE DEPT. LETTER DATED: V. -73- ( INSPECTOR:
AMOUNT OWING
• O b
3RD NOTIFICATION
ZON : I ► OMITSE �DITONS?
(
n No
...�1►T1.:�.f�f��.i:•....
iq��A"1rilt!•:IiN.
r.: {.:... ...
i
/. }.::. ?v:: �:'.•r •:•::•:.'•.•: ':'! .!: : ..:
4Y:i +..:x: +::..:1. { }: n; { ?'•::: :!. v:: �
p < i:}'•; ?:, + u %:i:!;::r,.. i:•: {'n,6:'r'• { iii.; {�:,
i: % /.•:•: Yv:...•.•: Ve
BUILDING -
initial review
LI_I� a �
1.I_0/ (
ROUTED)
coNSUL etc+ ant - ate rove
FIRE
�.- 2D
r�
f
FIRE PROTECTION: [ ] Sprinklers (7 etectors
( N/A
FIRE DEPT. LETTER DATED: V. -73- ( INSPECTOR:
57 Z
INIT:
ZON : I ► OMITSE �DITONS?
• Yes
n No
O PLANNING
SCREENING REQUIRED? nYes n No
INIT:
REFERENCE FLE NOS.:
O OTHER
INIT:
0 BUILDING -
final rAViAw
L1-2 -pZ I
UMC EDITION (year):
/ S
INIT:C. ,
MECHANICS. PERMIT
APPLICATION TRACKING
PROJECT NAME
PLAN CHECK
NUMBER
q -
REVIEW COMPLETED
SITE ADDRESS
i b-Q ch.-e r
MtioUPY Pk E
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" In box indicates which departments need to review the project.
0111171110
PROPERTY OWNER ..0 L . LO
`0T ;;
PHONE23z _ 740a,
ZI' _LSO4Q
ADDRESS ;� •. Se k& t5
.11.12iNSENNOM
CONTRACTOR .����� k, L,Le'Z --
i0n
farilMa=iligneriin
PHONE 7 -
ADDRESS
77 n7 e � '�" ..,..„
''TOTAL:
Zi (
WA. ST. CONTRACTOR'S LICENSE # go ...000 1, '1.
WO.)
! EXP. DATE diff "O( -5 .2-
.0 = 1'
`0T ;;
W
: ASI.pERMIT PERM
.11.12iNSENNOM
UNIT S FEE :,
i0n
farilMa=iligneriin
PLAN CHE FEE :::
0THER'
''TOTAL:
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER
1 Lin
APPLICATION MUST BE FILLED OUT COMPLETELY
SITE 2 0 ADDRESS 1� ►f ��. "Pt. C SUITE SO VAI, C O ACTION - $
PROJECT NAME/TENANT
TYPE OF WORK: 0 New /Addition 0 Modifications 0 Repair Other:
DESCRIBE WORK TO BE DONE:
<=
I
IZE
>` NUMHER e'�FitJNiT$
BUILDING USE (office, warehouse, etc.)
NATUF>IE OF BUS
WILL THERE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? No 0 Yes IF YES, EXPLAIN:
BUILDING OWNER
OR
AUTHORIZED
AGENT
DATE APPLIC TI N ACCEPT 4D
MECHAaCAL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out
and attached to this application.
FEES (for staff use only)
0 Yes IF YES, EXPLAIN:
DATE APPLICATION EXPIRES
CI
L
T
DATE e,• 9
PHONE - 01 • 7 S_
ADDRESS11 Y7 we:'� r . CITY /ZIPC / 0�
CONTACT PERSON � '� 'z ��+` PHONE 7 (.-t 7 q,q S
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to till
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
Plans must be complete in order to be accented for elan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
09118/90
St,BMITTAL CHECkLIST
MECHANICAL
❑ Completed mechanical permit application (one for each structure or tenant)
Two (2) sets of mechanical plans, which include:
• Floor plan
• System layout
• Elevations (for roof mounted equipment)
• Heat Loss Calculations
Structural calculations stamped by a Washington State licensed engineer may be
required if structural work is to be done (2 sets)
Note: Hood and duct systems require a building permit for the duct shaft.
DESCRIPTION
UNIT COST
NO OF
UNITS
X
TOTAL
COST
$15.00
BASIC FEE
SUPPLEMENT PERMIT FEE
$4.50
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu/h.
$9.00
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
x
3
Installation or relocation of each floor furnace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
x
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
8�
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9,00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu/h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
X
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
13
Each air - handling unit over 10,000 cfm.
$11.00
X
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
X
16
Each ventilation system which Is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
17
installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.00
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
X
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed In
this code.
$6.50
X
06/1W90
SUBTOTAL
t. .13c)
PLAN CHECK FEE (ass a :q
(p .00
GRAND TOTAL
$30.00
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHAWY^AL PERMIT
FEE WORKSHEET
CITY OF TUKWILA
6:100SU1'TUCI•:NIRR TUKIVII.A, Weltil INGTON981KK
Plan Check #91- 071 -M: Fiberchem
1120 Andover Pk E #200
!V/ k ( l K Gun. l.. I l/q/)usi n"1G
THE FOLLOWING COMMENTS APPLY TO AND BECOME P T F HE APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER A �' [ fl
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. Readily accessible access to roof mounted equipment is
required.
5. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
6. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
7. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
*ALA
4 sc. City of Tukwila
79
Os
Fire Department Review
Control #91 -071M
(512)
Re: Fiberchem - 1120 Andover Park East, Suite #200
Dear Sir:
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575-4404
Gary L. VanDusen, Mayor
April 23, 1991
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. H.V.A.C. units rated at 2,000 cfm require
auto - shutdown devices. These devices shall be separately
zoned in the alarm panel and local U.L. Central Station
supervision is required.
All modifications to fire alarm systems shall have the
written approval of the Tukwila Fire Department. No
work shall commence without approved drawings. (City
Ordinance #1327) (UFC 10.301)
Remote indicator lights are required on all above
ceiling smoke detectors. (UFC 10.301)
Call the Tukwila Fire Department at 575 -4404 for
approval of any system shut down. Have job site
address, name, and the Tukwila Fire Department Job
Number available to confirm shut down approval. (UFC
10.301)
Any overlooked hazardous condition and /or violation of the
adopted Fire or Building Codes does not imply approval of
such condition or violation.
•
Author49d Signature
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188-7661
(206) 575-4404
f
Sprinklers:
Fire Alarm:
Hood & Duct:
Halon:
Monitor:
Pre-Fire:
Permits:
TUKWILA FIRE DEPARTMENT
FINAL APPROVAL FORM
Project Name / f.,
Address .,,.
Retain current inspection schedule
Needs shift inspection
Approved without correction notice
„."'Approved with correction notice issued
P/‘
Gary L. VanDusen, Mayor
Control No. „ /41
Permit No.
Suite #
Date
FINALAPP.FRM T.F.D. Form F.P. 85
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431-3670
INSPECTIOk RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PERMIT NO.
(9 3 —41
PROJECT: /'' `l2e, c_G, . L.V.-1
SITE ADDRESS: / /X /h,, PC
.5 r
DATE CALLED:
DATE WANTED:
REQUESTER:
...f - - 3 D —47 /
,
TYPE OF INSPECTION: eli`i ,. 2 c
SPECIAL INSTRUCTIONS: .litlage=i
'�'_
NE NO.:
2 -c .PI 9 1..
--
INSPECTION RESULTS /COMMENTS: , ,-
INSPECTOR: Z .�_ , .r , h
DATE:
r-r. 3/ —9/
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431-3670
INSPECTIOk RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
n , NORTHWEST
z
MacDonald - Miller Co.
7717 Detroit SW
Seattle, WA 98106 -1903
Attention; Ed Harris '
Reference: Fiberchem - Tukwila
Ed;
The enclosed calculation . shows that this replacement unit
will over - stress the present roof by only 28 %. This is
within acceptable engineering tolerance.
E NGINEERS, NORTHWEST, INC. RS. • CONSULTING!N3)NeERe
Woopy∎ IN SEATTLE, WA 91115 (ROI)1217510;: MX (101),15291N
8699 - IS3MH1.elON S2133WIJN3 ze ee.
RECEIVED
CITY QFTI IKWILA -
APR
PERMIT
Sincerely.
413 NO, - JOB NAME
SUBJECT /'. /G'� CGdr� �► kc T
ENO 10EERS- NORTHWES1 INC. RS.
d9 WOODLAWN AVE. N.E. - SUITE 205 • SEATTLE, WA 98115 - (206) 525 -7560 - FAX # (206) 522 - 6696
40"
gle
cpe
u
24 7.
•
4 E P
:.z
ai
DATE 4 2 4 -// 4 /5;
SHEET Or
BY —
4 $
8699 -22S 1.63M1-1
S3MHlaON S213314,T9143 EE :80 16‘ 8ti add
PLAN REVIEW COMMENT
PLAN CHECK #►C(I` C)ZI M PROJECT y F1'Iper Givewl
REQUIRED INSPECTIONS
er0'
11.
13.
15.
No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health Department
and plumbing will be Inspected by that agency, Including all gas piping (296-
4722).
Electrical permit shall be obtained through the Washington State Division of Labor
and Industries and all electrical work will be inspected by that agency (277.7272).
All mechanical work shall be under separate permit through the City of Tukwila.
All permits, inspection records, and approved plane shall be posted at the job site
prior to the start of any construction.
When special inspection Is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the Inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being inspected.
All structural concrete to be special Inspected (Sec. 308, UBC).
All structural welding to be done by WA.B.O. certified welder and special
Inspected (Sec. 308, UBC).
All high-strength bolting to be special inspected (Sec. 308, UBC).
Any new calling grid and light fixture installation is required to meet lateral bracing
requirements for Seismic Zone 3.
Partition walls attached to ceiling grid must be laterally braced If over eight (8) feet
In length.
( J / Readily accessible access to roof mounted equipment is required.
Engineereed truss drawings and calculations shall be on site and available to the
building inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer,
Any exposed Insulations backing material to have Flame Spread Rating of 25 or
less, and material shall bear identification showing the fire performance rating
thereof.
Subgrade preparation including drainage, excavation, compaction, and fill
requirements shall conform strictly with recommendations given in the soils report
prior to final inspection (see attached procedure).
A statement from the roofing contractor verifying fire retardency of roof will be
required prior to final Inspection (see attached procedure).
All construction to be done in conformance with approved plans and requirements
of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988
Edition), Washington Slate Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
All food preparation establishments must have King County Health Department
sign-off prior to opening or doing any food processing. Arrangements for final
Health Department Inspection should be made by calling King County Health
Department, 296 -4787, at least three working days prior to desire inspection date.
On work requiring Health Department approval, it Is the contractor's responsibility
to have a set of plans approved by that agency on the lob site,
Fire retardant treated wood shall have a flame spread of not over 25. All materials
shall bear Identification showing the fire performance rating thereof. Such
identification shall be issued by an approved agency having a service for
Inspection at the factory.
Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure Is in addition to any requirements for special inspection.
All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special Inspected.
All wood to remain in placed concrete shall be treated wood.
All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7.
Validity of Permit. The Issuance of a permit or approval of plans, specifications
and computations shall not be construed to be a permit ter , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or vioiate or cancel the
provisions of this code shall be valid.
1 Footings
2 Foundation
3 Slab /Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
7 Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
X
11 (
12
13
14 FIRE FINAL
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
17 BUILDING FINAL
PLAN REVIEW COMMENT
PLAN CHECK #►C(I` C)ZI M PROJECT y F1'Iper Givewl
REQUIRED INSPECTIONS
er0'
11.
13.
15.
No changes will be made to the plans unless approved by the Architect and the
Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health Department
and plumbing will be Inspected by that agency, Including all gas piping (296-
4722).
Electrical permit shall be obtained through the Washington State Division of Labor
and Industries and all electrical work will be inspected by that agency (277.7272).
All mechanical work shall be under separate permit through the City of Tukwila.
All permits, inspection records, and approved plane shall be posted at the job site
prior to the start of any construction.
When special inspection Is required either the owner, architect or engineer shall
notify the Tukwila Building Division of appointment of the Inspection agencies
prior to the first building inspection. Copies of all special inspection reports shall
be submitted to the Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being inspected.
All structural concrete to be special Inspected (Sec. 308, UBC).
All structural welding to be done by WA.B.O. certified welder and special
Inspected (Sec. 308, UBC).
All high-strength bolting to be special inspected (Sec. 308, UBC).
Any new calling grid and light fixture installation is required to meet lateral bracing
requirements for Seismic Zone 3.
Partition walls attached to ceiling grid must be laterally braced If over eight (8) feet
In length.
( J / Readily accessible access to roof mounted equipment is required.
Engineereed truss drawings and calculations shall be on site and available to the
building inspector for inspection purposes. Documents shall bear the seal and
signature of a Washington State Professional Engineer,
Any exposed Insulations backing material to have Flame Spread Rating of 25 or
less, and material shall bear identification showing the fire performance rating
thereof.
Subgrade preparation including drainage, excavation, compaction, and fill
requirements shall conform strictly with recommendations given in the soils report
prior to final inspection (see attached procedure).
A statement from the roofing contractor verifying fire retardency of roof will be
required prior to final Inspection (see attached procedure).
All construction to be done in conformance with approved plans and requirements
of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988
Edition), Washington Slate Energy Code (1990 Edition), and Washington State
Regulations for Barrier Free Facility (1990 Edition).
All food preparation establishments must have King County Health Department
sign-off prior to opening or doing any food processing. Arrangements for final
Health Department Inspection should be made by calling King County Health
Department, 296 -4787, at least three working days prior to desire inspection date.
On work requiring Health Department approval, it Is the contractor's responsibility
to have a set of plans approved by that agency on the lob site,
Fire retardant treated wood shall have a flame spread of not over 25. All materials
shall bear Identification showing the fire performance rating thereof. Such
identification shall be issued by an approved agency having a service for
Inspection at the factory.
Notify the City of Tukwila Building Division prior to placing any concrete. This
procedure Is in addition to any requirements for special inspection.
All spray applied fireproofing as required by U.B.C. Standard No. 43-8, shall be
special Inspected.
All wood to remain in placed concrete shall be treated wood.
All structural masonry shall be special Inspected per U.B.C. Section 308 (a) 7.
Validity of Permit. The Issuance of a permit or approval of plans, specifications
and computations shall not be construed to be a permit ter , or an approval of,
any violation of any of the provisions of this code or of any other ordinance of the
jurisdiction. No permit presuming to give authority or vioiate or cancel the
provisions of this code shall be valid.
DATE:
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
PROJECT: V N M
ADDRESS:
PLAN REVIEW
RI-o
1 Amav ea 'P K e..
PLAN CHECK
NUMBER
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
z
Z)11s 1 , D EM 2 465 VIAQ
I 7 c S
rPt �. 'Revt..W M D C. 0 to,MaST
Prepared by:
OFFICE PLAN EQUIPMENT LIST
EQUIPMENT SCHEDULE
CONTROL DIAGRAM
SECTION
FLOOR PLAN
MACDONALD MILLER COMPANY