HomeMy WebLinkAboutPermit 0507-M - BOEING #2-800507-M 91-075
BOEING #2-80 HVAC
7755 EAST MARGINAL WAY SOUTH
10E,1
AK,R ZO
..• ......:.............. ................. �. . ,.. . PROIJEC.T /NFDRMAT/ON... .. .::..:.;
UMC EDITION (YEAR : 1988
SITE ADDRESS: 7755 E Marginal Wy S
FIR P •T I • , : X S . rinklers Detectors • N/A
SUITE NO.
CONDIr1ONS (other than noted on or attached to �(IIt�p s):
Repair
VALUE OF WORKS 2, 500.00
Other:
TYPE OF WORK: �) New /Addition Q Modifications
APPROVED FOR - BUILDING
ISSUANCE BY: 4 _ 4 OFFICIAL
l DATE: WO ` 7/
I hereby certify that I have read and examined this permit and know the same to be two and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construct or the performance of work. I am authorized to sign for and obtain this mechanical permit.
/
DATE: v` ,� �
-�
SIGNATURE. .��' Il ' t -107
PRINT NAME: -,-)ii) /5� e‹.4/
COMPANY: '' c91/41E" '
..• ......:.............. ................. �. . ,.. . PROIJEC.T /NFDRMAT/ON... .. .::..:.;
..:.::,....
SITE ADDRESS: 7755 E Marginal Wy S
WA 'ZIP:
PHONE:
SUITE NO.
PROJECTjIAMEITENANT: Boeing ,2.80
Repair
VALUE OF WORKS 2, 500.00
Other:
TYPE OF WORK: �) New /Addition Q Modifications
DESCRIPTION OF WORK: ' Install HVAC equipment.
(EXP IRATION DATE:
PROPERTY OWNER: Boeing
PHONE: 655 - 9923
ADDRESS: 7755 East Marginal Way South, Seattle
WA 'ZIP:
PHONE:
98124
CONTRACTOR: In house
ADAM
1ZIP:
ANA. ST. CONTRACTOR'S LICENSE NO. __ __,
(EXP IRATION DATE:
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
70
(206) 431 -36
MECHANICAL
PERMIT NO.
DATE ISSUED:
CY:53
5 %-co
MECHAIC CAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
Basic Permit Fee
Unit
Plait Check
Plan Check No.:
AMOUNT > RECEIPTS DATE
91 - 075 - M
REQUIRED INSPECTIONS
1 - Rouoh- in/Vents /Ducts
2 - Fire Final
3 - Planning Final
4-
5 - Mechanical Final
SPECTION RECORP
PHONE NO.
431-3670
575 -4407
431 -3680
431 -3670
josh' for Inspactians at lase 24 hours h "advance
DATE
AppROVED
DATE(S)
INSPECTOR CORRECTION NOTICE ISSUED
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296 -4732)
Electrical - Washington State Department of Labor and Industries (277.7272)
This permit shall become null and void if the work is not commenced within 180 days from the date of
Issuance, or if the work Is suspended, or abandoned for a period of 180 days from the last Inspection.
07117110
PERMIT NO.
r .......
� +: :2•Y
". :: i:;
•
CONTACTED
}: {2:nY: •. :.... :::• 2{+ 2. 4? rT 2• Y}: Y:{ Y' Y: 4• {:24: {YntiY4 ? } :i {2 {.YY:2 {5 ?: }:•'in• lr•
... .... { .. n. 2:222•TT }T:•TT:.,T. y....:: •
4 S•r. r:: . . {:•'• � 't55n .. ,
• :.• : . ,; ... Vi } •: �
....... ....... .. ....... { }:} n ?:: } {": '4$ S +.v$$:•$$: ti; ?'r::
}
..........:. } ..: ...:..:......::...r ,., :.....::} 2rv......,.. •:: •.......... r............,.; �. } ?:•;SS {2 •:.v.::•::::
CONSULTANT: Date Sent ate Approved -
c4 BUILDING
_ initial review
5�. l_al
52°ti
ROUTED
s t j / 1
DATE READY
FIRE
DATE NOTIFIED
2nd NOTIFICATION
. q
I BY: J A3
(init.)
BY:
(init.)
PERMIT EXPIRES
0 PLANNING
AMOUNT OWING
0 ` c 6 Z•
3RD NOTIFICATION
BY:
(Ink.)
....::,::•.•:•:•:',..,•:;::•:::'•••••`•• . ... ..... . � ::::::.:: : •.
.;;...
..... : . :• }Yi:•
r .......
� +: :2•Y
". :: i:;
•
::
.�:: : ::: •l.:4 ?Y: .
•
•2. > ?: •:� +:: r:....:
:2 :4: 2 .......r
}: {2:nY: •. :.... :::• 2{+ 2. 4? rT 2• Y}: Y:{ Y' Y: 4• {:24: {YntiY4 ? } :i {2 {.YY:2 {5 ?: }:•'in• lr•
... .... { .. n. 2:222•TT }T:•TT:.,T. y....:: •
4 S•r. r:: . . {:•'• � 't55n .. ,
• :.• : . ,; ... Vi } •: �
....... ....... .. ....... { }:} n ?:: } {": '4$ S +.v$$:•$$: ti; ?'r::
}
..........:. } ..: ...:..:......::...r ,., :.....::} 2rv......,.. •:: •.......... r............,.; �. } ?:•;SS {2 •:.v.::•::::
CONSULTANT: Date Sent ate Approved -
c4 BUILDING
_ initial review
5�. l_al
52°ti
ROUTED
s t j / 1
PROTECTION - Sprinklers J ) Detectors (-- ] N/A
FIRE
-
5 ��
FIRE DEPT. LETTER DATED: V;/0/ INSPECTOR: _.%-'/
l
INIT:
0 PLANNING
•.l "c :7N-TIM , I - 1 JO" I it • es No
SCREENING REQUIRED? f Yes fl No
INIT:
REFERENCE FLE NOS.:
O OTHER
UMC EDITION ()rate):
INIT:
5- I
0 BUILDING -
final rAviAw
q v
5 5
//
INIT :4._
SITE ADDRESS
E YYNgi r \ t),/y
SUITE NO.
PLAN CHECK
NUMBER
"off &in
MECHANIC PERMIT
APPLICATION TRACKING
PR ECT NAME
j
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
REVIEW COMPLETED
SITE ADDRESS SUITE #
77- - /W-,./t/(1 - e- (vy S.
VALUE OF CONSTRUCTION - $
3
PROJECT NAME/TENANT
6'x-21 r1 Q ;O
TYPE OF WORK: 0 New /Addition ` Modifications 0 Repair Other:
DESCRIBE WORK TO BE DONE:
_(,iq
ZIPCK I Q
ADDRESS 7 1 S5
/,q /NV1 --G..
Lc�,4- y
.s - .
CONTRACTOR / / /ou J
PHONE
ADDRESS
BUILDING USE (office, warehouse, etc.)
ZIP
NATURE OF BUSINESS:
//
WILL THERE BE A CHANGE IN USE? ErINIo 0 Yes
IF YES, EXPLAIN:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? 0 No IIM Yes IF YES, EXPLAIN: c- .ei6si.✓d
l lLc� /2::) F_- ,9 /el'- 42TeDL . f,Qe�q l c, !c >.-Fu 5 . -
PROPERTY OWNER pz-74/ 2,_
er,,iy,D4 .at,y/
PHONE (
_(,iq
ZIPCK I Q
ADDRESS 7 1 S5
/,q /NV1 --G..
Lc�,4- y
.s - .
CONTRACTOR / / /ou J
PHONE
ADDRESS
ZIP
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER
APPLICATION MUST BE FILLED OUT COMPLETELY
MECHALUCAL PERMIT
APPLICATION
Mechanical Foe Worksheet must also be filled out
and attached to this application.
FEES (for staff use only)
IC PERMIT,FEE >:; >::
BUILDING OWNER
OR
AUTHORIZED
AGENT
PRINT NAME
ADDRESS
DATE APPLICATION ACCEP
DATE
PHONE
7 7515- , I � ' e y 5. CITY /ZIP
CONTACT PERSON � 2e, PHONE
DATE APPLICATION IXPIT6
r/
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
plans must be complete in order to be accented for Plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. - The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
08118/00
S6a MITrAL CHEClIST
•
MECHANICAL
Completed mechanical permit application (one for each structure or tenant)
El Two (2) sets of mechanical plans, which include:
• Floor plan
• System layout
• Elevations (for roof mounted equipment)
• Heat Loss Calculations -
Note: Hood and duct systems require a building permit for the duct shaft.
1 Structural calculations stamped by a Washington State licensed engineer may be
required if structural work is to be done (2 sets)
DESCRIPTION
UNIT COST
NO OF
UNITS
x
TOTAL
COST
$15.00
$4.50
BASIC FEE
SUPPLEMENT PERMIT FEE
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu/h.
$9.00
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11,00
x
3
Installation or relocation of each floor furnace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not Included in an appliance permit.
$4.50
x
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9,00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu/h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory - assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
13
Each air - handling unit over 10,000 cfm.
$11.00
X
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
X
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
t
X
��
17
Installation of each hood which Is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.00
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
X
20
Each appliance or piece of equipment regulated by the code but not
classed In other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
06,101603
SUBTOTAL
@I. S . o
PLAN CHECK FEE (25% of
5..3%
GRAND TOTAL
$ ((p , `6.S.
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHANICAL PERMIT
FEE WORKSHEET
9te'the o1*
rotunits; bed
tltm
culate the f
CITY OF T UKWILA
1 ;300 SOUTIICENTER BOULEVARD, TUti WILA, WASHINGTON 98188
Plan Check #91- 075 -M: Boeing #2 -80
7755 E Marginal Wy S
PHONE a (2(1 ;1 433.1800 Gary L. Van Damn. Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF ' E PROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. Readily accessible access to roof mounted equipment is
required.
5. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
6. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
7. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
r
Dear Sir:
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Fire Department Review
Control #91 -075M
(512)
Gary L. VanDusen, Mayor
May 3, 1991
Re: Boeing Company - 7755 East Marginal Way South
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. Sprinklers or other fire - protection devices shall be
installed within ducts having a cross - section dimension
exceeding 10 inches, when the duct conveys flammable vapor
or fumes. Sprinklers shall be installed at 12 foot
intervals in horizontal ducts and at changes in direction.
In vertical runs, sprinklers shall be installed at the top
and at alternate floor levels. (U.M.C. 1106(g))
All modifications to sprinkler systems shall have the
written approval of the Washington Survey & Rating
Bureau, Factory Mutual Engineering or Industrial Risk
Insurers, then by the Fire Department. No sprinkler
work shall commence without approved drawings. (City
Ordinance #1528) (NFPA 13, 1 -9.1) (UFC 10.307)
All sprinkler drawings shall be prepared by companies
licensed to perform this type of work. Drawings shall
first be approved by the Washington Survey & Rating
Bureau, Factory Mutual Engineering or Industrial Risk
Insurers, then by the Tukwila Fire Department. No
sprinkler work shall commence without approved
drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1)
(UFC 10.305)
Contact the Tukwila Fire Department, Fire Prevention
Bureau to witness all required inspections and tests,
(NFPA 13, 1 -10.2) (UFC 10.305(b))
f
*ILA
f
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Gary L. VanDusen, Mayor
Any overlooked hazardous condition and /or violation of the.
adopted Fire or Building Codes does not imply approval of
such condition or violation.
1177 77r7rM70177
77 7.71 :,' \ 7,7,'
A
/908
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188-7661
(206) 575-4404
Project Name
Address
Needs shift inspection
Sprinklers: .5
Fire Alarm: A.
Hood & Duct: /./..,
Halon: 4/'
Monitor: 4
Pre-Fire: .4../
Permits:
TUKWILA FIRE DEPARTMENT
FINAL APPROVAL FORM
ed,
A etain current inspection schedule
•• • . • . • - , • -••••
./Approved without correction notice
Approved with correction notice issued
Gary L. VanDusen, Mayor
Control No.
Permit No. 4 SO 7 - ,y9
Suite #
r 5 / e' —53
Authorized Signature
Date
FINALAPP.FRM T.F.D. Form F.P. 85
•
Project: A � P i
yppe o ns Q
j, — /�.)i
Address:
Date Called: R
74/
Special ru Ions: /
� nst G ° i!'� Gale f/ ��fi � -
0 rev /V.
q • ,
Date Wanted:
/2'
,/
(OR m
Requester:
h �
Phone No,:
INSPECTION NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
❑ Approved per applicable codes.
COMMENTS: '
l ` i44 Yt'1"�,'r sfm..*rIrtcp ' '' , ! ` ` o rvr-v- -
INSPECTION RECORD (-
Retain a copy with permit
❑ Corrections required prior to approval.
32.---
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
4 ?/
paid at
PERMIT N4.
(206) 431 -3670
PROJECT: 1. - , ,
PERMIT NO. ` c- _ (
SITE ADDRESS: 7 7 ' - ' LCc.«• _
/
DATE CALLED: 0
DATE WANTED: /Q.-- �j._.crf
REQUESTER :- ✓)-‘.�
TYPE OF INSPECTION: /rile 4 /c� -
;- S
' SPECIAL ' L INSTRUCTIONS: L f // - ` y ,
_,:Gilt) . ,b--ig
PHONE NO.: (,,SS- cl fi 2.-3
INSPECTION RESULTS / COMMENTS: Vl w
F -0. G.., 1 6;..s.), fr1 &w.a41
�.m , Cc}..
V. (—A . _ (s c.x, J'J s. 4 I T -t'k
Aak3-r -ry P w c" l ►.) , 0 1 I 1.j
(
1� e3L`) R-- Ft Q /3v1 Vr
-. c,. I -t ..1C
G�� Iv IV ��� fJ
� roL. 1105Ct.)
11-06W-)-t 1^n - • �Y� 1� 1A,1 I
• r1 ► r►• I.1 S S tz w . .. u- P
4 air
Gl. •-4 •S 64- - 1-1-.R k..,v.
c-- c. .rA ar-r .
61,4.4..-
_
I- 1 k. 9t'- JXL,,r
-ktrel -4 .
INSPECTOR: Z.......--S....12-5L---
DATE: k '1---
"
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT: $L At /; :i .. `- ; b
� ; 1 ,
PERMIT NO. 0501 — M
SITE ADDRESS: '1 641 1
TYPE OF INSPECTION: , A A e .
/, �,
I
DATE CALLED: j D-- 4---q I
DATE WANTED:
a --- " T '-
` —
i SPECIAL INSTRUCTIONS:
REQUESTER: `
PHONE NO.:
A t 1
` -- i f 0
I
INSPECTION RESULTS /COMMENTS: ,..
,,_ ` 0 _
i
INSPECTOR:. /it_.. IVY?
DATE: /(
—7"!�/
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
i
4 0 o G 2 -07
2 -11 2 -12
2-02
2 -10
2-181= 2-09
2 -32
2 -16
�.. 2 -26 2-28
2 -29
2.30— - o-
2.108
2 -75 ° "- 2 -74
-----/ 72% O 2.70 - - . ..
2
2,71 ��0� 2 -80
.78
2.77 /' X2.86
2 -28 ;� �
2.82
2.95 2.84 I. 2 -87 RECEIVED
2.106 2.17 116 -, o /
2 -110 rtITYnF TUKWILA
2•97 2 . MAY 1 1991
• 2-9A z -Sg i 2.1
2-91 PERMIT CENTER
2.10d
•
GATE 13.72
GATE asa
0
PLANT 2
12.23 ro c o
> r.
y G °
4-- as
cz c
a ro • Q. °
0.
ro ° 4 ro
ti
C W C
4 ,C ) <
C v ;
• c
• ° o f
.5. 0
t0 • y O 0
•3 • p C a >
ti O Cll
'ts n w o
c
z cn
GATE 13.18 r ct.,
e-i -
2-57 � �;�'p1•�; - �
a, o �- '�� - ' 1 2 -61 wV '«T
~,� 2-68 _ r r
21
c 2-02
2-10
GATE B-72
2 - 05 GATE B.60
T
cS 2-16 „1
2-26 2-28
a 2-29
2-1812 2-09 2 -30-- = a
2 -32
GATE B-3,
L 2-23
2-110
2 -109
2 -24
PLANT 2
2.108 I 2 -66 2-65 -6 2.63 GATE e!18 r
cv 2-_,....a0.57 ckp74 r”"
2-75 _
- ` �• - — Q ���2.61 p h i wa � �l�o
2 74 2:72 O 2 . —2.69 2 -6 g ✓6'�'«rr4.
71 ��� 2-80 i
,-78 � 4 2.86
z -zsz �-,
2.82
2.95 2.84
2-106 //
2.117
2 -97
2-116
2.9A \ \
2-91 2.89
2.100Q
nay OF T, RECEIVED
MAY 1 1991
PERMIT CENTER
21
PUSH
FOR
FAN
SECURE TO
ROOF FRAM I PICA
BUTTON
EXHAUST
I
I
2-#1Z 1- #1 i'/`L" C
VIAY 1 1991
PERMIT CENTER
s umer d rup 1310 111111 how 111.
*MC 141
PO. •• iM
a •w••w• ?Soo s+wwwr+wrwNNS
FRAMING IN
ROOF
,✓- -3'x3' SNT METAL
HOOD - FIELD
LOCATE OVER
WELD &TATIOIJ
I I
ROOF MOUN D
W LD RE
1 HR . FIRE WALL
CEILING
CABLE TRAY
8 "XC, "y Le ENCLOSURE
W /TIMER RELAY INSIDE
FOR ROOF EXHAUST FAN
PANEL.0 -18 - REMOVE 3P, 70 A BREAKER, C I RCU1T5 38, 40,42 .
REPLACE W /3-EA t P) ZO A BREAKERS FROM PNL. E -17
CIRCUITS ZLo, O. REINSTALL 3P 70A BREAKER
PM.. P. E-17Jk8ITS ZLo ,Z8 30,
ITV OF TI IKWILA
50E 1 MCA - PLANT Z
DUX,. 2.-80
WELDING AREA VENTILATION
8Y: MLW CH KID: R 5
QATE: 422 -91 SKETCH 40246-5K 2
\/a
aa;
MAW=
a • w- • rr: w, • • I • w 11111011r0rra
WELD
AREA
PANEL GIB
MTV RECEIVED II.P
t�AY 1 1991
PERMIT CENTER
NEW
ENTILAT1ON HOOD
U
EX137lWG AIR CLEANER
PANEL. E -17
rPO � �1�N� D
APP
MA°/ , 6 1991
. 5OE1.NG - PLANT Z
. 5L DG. Z-80
WELQINGLAREA VENTILATION
WI: MAWS. CNK!D: R5E
•
Sverdrup C
JOB NO
4.0 a
DATE
- I I
WI 1 4.-1. --
ILiJi
• • - 14[ 17 o'f
F‘' HV.1.27.r"*
• 1-1p "
.=:2+;tevi
4 7a , 4 Gee P
rrr
v l
E//J'2 - a
/40
—
1 3/›.4- 3 4-122P , 1%1' 4- r*
J J1i7t2 17 1 ,---11< 1 . 1 SIZ:■
RECEIVED
nFTIIKWILA
1' 1991
PERMITCENTER
SHEET
OF
..5,264-fd "00 c
/2.01.40;d.5
14 V o 1.) )
• 1
r•-■ :
Sverdrup
JOB NO,
40248
DATE
Bv ���
c,I�c
,go - �� 2
w /d am- ;A ✓ - /4 e-; C
SHEET
OF
Gy�t 38 , Pr�N V G -18
RECEIVED
V'ITV OF TI IKWI1_A
MAY 1 1991
PERMIT CENTER
12, Gar -J 1)011
1Jar2� -1,�,
�iUlz - Fi ►�- 1aJ�1'(EI.
G,/rAe1► e=71-.-J ;
Sverdrup (j
JOB NO.
402. 68
DATE /
2Z /,/
BY
,ge) — /A,
-tn.) ;
(3 ( v/a . '770
• .
• c,,\,k -W1\v, .
\I\V%k • •••Vc:.:
•C°S\°‘\‘
•
t
0.- I
• 4.4 •••••••
/II N-111 ‘", !I 1 1---1
eg, ‹e
4Pie- : kJb1. bo.1 ttte.. =•‘.7
v0 -
SHEET 5-
OF
2%2- f A 4V 1
e
• .-••••••
JfLAJ - -1 14",
,.J/ 4.1 uoi,J u :J 044
, •'
I7i o I I . d
• b-( ei;
— (4" 14 l/-
47 .1 11 rac, •-yrAt-J12/-?<tz-Q
ts..)-1 rsi 4Ar.
r\A
41 NA - J °/eP,' "14 d
e71 J e-70 1\-i1A1-1 /64-j1.417
0012et al - - z.o •
J St:
1.)‘22 1 1.A` - r
• b.- Ac :61-.1eA-ae--7u • ' PI' ).4 4, z_4
e2L.J.1..slrit%)61 ' • IAJPL
• L# S 171 42 0=.ced „ ; 13ri
RECEIVED •
• • I i2er., r 47\ • • • C " OF TO 'KW LA • •
•
MAY 1 1991
' 'Sverdrup
i9 1'
JOB NO
4-0 68
BY G (N
DATE 4 / 2 2 9/ CHAD
_. (4.., 7 .- Z-
2
SHEET 6
OF
U r J61 ; J. r .i - J{ 1`J : rte � ' / k : ,
F 1 MA O u 1;
l7 K; ( 7t2-
d i A ss
>�• i ‘7a I 2 L. 1911
RECEIVED
nrry nc TI II(WI1
MAY .. 1 1991
PERMIT CENTER
fr- P I
p<K2T WAI.L.*cloit9 •
riad■IlrX.
aLwa —
4\.)ivg. ZMIJ
227P7 aLf•
H orat.I
le6i11:16i
T 17EL(
*Litv1*RQ9E celLtt.lem 5x11
4 pgLeid
oVIVE L H.
=aoLosuig, .
.X1 M.U. 6. WALL
4 ivklz fkre:r
R.L.1kJ c..01.1T2L117 To
evF.E
u
(s2 2- 57
PLAN REVIEW COMMENTS
q 1 075 NA P roject: �It■C� 44- -&
Plan Check No.: Project:
REQUIRED INSPECTIONS
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division,
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and aN electrical work will be Inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given In the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 298 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
' This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 - 8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
X . Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the Jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1. Footings
2. Foundation
3. Slab/Slab Insulation
4. Shear Wall Nailing
5. Roof Sheathing Nailing
6. Masonry Chimney
7. Framing
8. Insulation
9. Suspended Ceiling
10. Wall Board Fastening
)(
11 ROU4\A .-TX\
12.
13.
K
14. Fire Final
15. Planning Final
16. Public Works Final
17. Building Final
PLAN REVIEW COMMENTS
q 1 075 NA P roject: �It■C� 44- -&
Plan Check No.: Project:
REQUIRED INSPECTIONS
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division,
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and aN electrical work will be Inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given In the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 298 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
' This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 - 8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
X . Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the Jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
PLAN CHECK
NUMBER
r`1 ?S iv.
CITY OF 7UKW/u
Dept. of Community Development - Building Division
Phone: (206) 43 1.3670
ZCet (S,\L . 2-50
PLAN REVILW
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT:
ADDRESS: 7 75s- E - AA A KQ 14L L .,A Y .S
DATE:
(V\ AY 2 .c1,
N AOsT POOH g t-too scp . mot: W ��
-P f
12e, - eAs c .Q'ts∎ .s A. Nzb C O AAAk IZ 7
Prepared by: