Loading...
HomeMy WebLinkAboutPermit 0508-M - BOEING #7-1130508-M 91-076 BOEING #7-113 HVAC 455 ANDOVER PARK EAST . :;:; :.C9DE COMPilANGE : .:; : : : ; : :: ......... •. _; • •:: FIRE PRQTECTION: Detectors © N/A _ CONDITIONS (other than noted on or attach- • to permit/plans): VALUE OF WORK: $ 1, 939.00 TYPE OF WORK: C) New /Addition (D Modifications I APPROVED FOR I ` / . J BUILDING ISSUANCE BY: f; I ,�, OFFICIAL DATE: • S - ,7 - I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. SIGNATURE: DATE: - C3 • `( PRINT NAME: T61/11 '`C COMPANY: Uri 1 • l7 S' S r jti4- .; ; ..:: ,: : ::<•> ARQIJECT < NFORMATIOIV .....:..... .....:.; .:.. ,;:::: >::. >: >< >:::> <:: < < <, SITE ADDRESS: 4 Andover Pk E SUITE NO. PROJECT NAME/T N�1NT: Boeing #7 - 113 PHONE43 -9604 VALUE OF WORK: $ 1, 939.00 TYPE OF WORK: C) New /Addition (D Modifications ( ) Repair Other: DESCRIPTION OF WORK: HVAC modifications. United Systems Inc. [PHONE: 442 -9454 •ID; • • . ; : • , PROPERTY OWNER: K & M PHONE43 -9604 ADDRESS: 88 Virginia 417, Seattle, WA ZIr: 98101 CONTRACTOR: United Systems Inc. [PHONE: 442 -9454 •ID; • • . ; : • , _ 1 First Avenue South, Seattle 9 WA ZIP: 98134 k k • k • I. a EXPIRATION DATE: 11 -08 -91 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 MECHANICAL PERMIT NO. OS o ' S - 1Y DATE ISSUED: DATE REQUIRED INSPECTIONS PHONE NO. _APPROVED F 1 • Rough- inNents /Ducts 431 -3670 ID 2 - Fire Final 3 - Planning Final 431 -3680 ID 4 575 -4407 x 5 • Mechanical Final 4p -3670 MECHAF4ICAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) MMTWITNITTI111111 . :. 15.00 ISMVISMI G G111 Mil NEM AMOUNT? RE EIP.T'# DATE Qther TOTAL Plan Check No.: 91 -076 -M ;41 AIL • . ;1 . .•.: ! . c•. _ t , •. •J 1 >` . . t 1 > •11 !,x DATE(S) INSPECTOR CORRECTION NOTICE ISSUED OTHER AGENCIES: Plumbing/Gas Piping • King County Health Department (296 -4732) Electrical - Washington State Department of Labor and Industries (277 -7272) This permit shall become null and void if the work is not commenced within 180 days from the date o issuance, or if th • :wodc is suspended or abandoned for a period of 180 days from the last inspection. PERMIT NO. CONTACTED DATE NOTIFIED - m Q 5 - -7 - (i 1 BY: 4 DATE READY PERMIT EXPIRES 2nd NOTIFICATION _ �1 ROUTED BY: (MU AMOUNT OWING , cDs) 3RD NOTIFICATION I R R CTION: (§prInklers ( I Detectors BY: (snit.) :{•:.::} ::................:....... .....•...:..:�" ..:: r:: ri.; } } :•: }:•:•:• }. }: <. }:: {• • } :i.;:i• }•ti: i s {• }:.: :: •: :;::::::::.�:. r:::.:.:.�:: •.`•• {:: { {. {:: •:::::: ::::. ..i }:•'r} : ..:.s i r :•i4:i;; �q . . �. .': •:::. . ......:........... r.::.};:•':{.' r; 4 ' r'+;• i•;:{^;{• Yi :: ....... ,n „ „ {.::....... .. .:•1: X40;:$ ... r: r....::........ ....:.,:..., .............:::: r >. .. ; +: ...{.}:....:..r BUILDING - initial review !Ai _ �1 ROUTED CONSULTANT: Date Sent - Data Approved - I R R CTION: (§prInklers ( I Detectors ( ) N/A O FIRE FIRE DEPT. LETTER DATED: INSPECTOR: INIT: O PLANNING ZONING: BAR/LAND USE CONDITIONS? • Yes No SCREENING REQUIRED? Yea No INIT: REFERENCE FLE NOS.: O OTHER UMC EDITION (year): INR. S `j-.' I BUILDING - fil i final ravAw • `' I t C r OS INIT: �t.�,. PROJECT NAME f5O-e i r * -1-115 SITE ADDRESS LOS hrz1ov P e SUITE NO. PLAN CHECK NUMBER cfl 01 (0 C MECHANICF_ PERMIT APPLICATION TRACKING INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" In box indicates which departments need to review the project. REVIEW COMPLETED 0111710 ROPERTY OWNER 4- l / r JHONE /� _ q6a �� p < ADDRESS �5 l`rv�c rl� «7 It' P 6' t�l'd1 CONTRACTOR (, Ai I Tc D (! - 1 I Yn c I AI ( PHONE Li 0, . ct �(5 11 ADDRESS 'n `/, i 1 /) E JO ZIP qa oi WA. ST. CONTRACTOR'S LICENSE # u t1 i 1 F7,. Z ` i h it i EXP. DATE 11. ?. i . DESCRIPTION • . >:: AMOUNT • RCPT * DATE.:.:. 7 BASIC PERMIT FEE :: $15.00: UNIT(S)' FEE DCi `: PLAN CHECK , FEE OTHER. TOTAL; '33 t' b :' . PLAN NUMBER cif C> - /1/ CITY OF TUKWILA Department of Community Development - Building 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 APPLICATION MUST BE FILLED OUT COMPLETELY SITE ADDRESS 4 PROJECT NAME/TENANT TYPE OF WORK: 0 New /Addition Modifications 0 Repair 0 Other: DESCRIBE WORK TO BE DONE: �+ !fi 5r Fr n F V /9 v i , i I/4( BUILDING USE (offices warehouse, etc.) NATURE OF BUSINESS: BUILDING OWNER OR AUTHORIZED AGENT SUITE # A i'iUi)Vrj\ i-r\ P .v . WILL THERE BE A CHANGE IN USE? No 0 Yes IF YES, EXPLAIN: NATURE DATE APPLICATION ACCEPTED I -- 91 INT NAME / re L- lv it P MECHAi.CAL PERMIT APPLICATION Mechanical Fee Worksheet must also be filled out and attached to this : ; /!cation. FEES (for staff use only) VALUE OF TNSTRUCTION - $ 3 ° • o0 WILL THERE rSTORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No 0 Yes IF YES, EXPLAIN: >) H ;. EW1. F.(THA...f 1(E >R AQ'AN 4 it E.t RRE.Glt:r /'1ND I AM R'IfiT OR1 rf:. .SIG I DATE PHONE LI 2 _ c ' y, CITY /ZIP S s ADDRESS 3 Z 3 / i 7)- / /!.L CONTACT PERSO ' c , l • APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for Plan review. BUILDING OWNER I AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.- The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. PHONE t,I /Z DATE APPLICATION EXPIRES //—/•-• 7 / 08/18/90 Sl�3MITTAL CHECIIST MECHANICAL Completed mechanical permit application (one for each structure or tenant) El Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations ri Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) Note: Hood and duct systems require a building permit for the duct shaft. DESCRIPTION UNIT COST NO OF UNITS X TOTAL COST BASIC FEE $15.00 SUPPLEMENT PERMIT FEE $4.50 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h. $9.00 X 2 Installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 x 3 Installation or relocation of each floor furnace, including vent. $9.00 X 4 Installation or relocation of each suspended heater, recessed wall heater or floor - mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not Included in an appliance permit. $4,50 x 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 I X i C 7 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9.00 X 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 X 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu/h. $22.50 X 10 installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 x 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 X 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air - handling unit over 10,000 cfm. $11.00 x 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 X 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which Is served by mechanical exhaust, including the ducts for such hood. 56.50 X 18 Installation or relocation of each commercial or industrial -type incinerator. $11.00 X 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 X 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee is listed in this code. $6.50 X 0611W90 SUBTOTAL 01 . o a PLAN CHECK FEE subtotal) . QQ GRAND TOTAL $7 20 ,OD CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. MECHAi ,,AL PERMIT FEE WORKSHEET INSTRUCTIONS » C o leis the worksh • indicating► tine num r of units bcln in Stii*t in each categ 'At time;; sub mittal, staff w ill calcula*Mk fed CITY OF TUKWILA 6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91- 076 -M: Boeing #7 -113 455 Andover Pk E PIIONE N (2061433.1800 THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 5. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 6. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Gary I.. VanDusrn, Mayor PROJECT: e", ? -7, :7 - // 3 � ; PERMIT NO. 0, cc92 --. ( DATE CALLED: DATE WANTED: • a n . SITE ADDRESS: I TYPE OF INSPECTION: `-'1, - , _ J SPECIAL INSTRUCTIONS: REQUESTER:„ h _ PHONE NO.: ,7-7€ — *•e7 INSPECTION RESULTS /COMMENTS: J INSPECTOR: r® ,/ -n DATE: , c 2-2. --cf J . ........... «.. «.,n, «.a...saa vw„K:owrtlu:tanntirw CITY OF TUKW/u Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTIONS RECORD i ! 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 PROJECT: iyb - CA-/YM -- II# PERMIT NO. SITE ADDRESS: 4 5 / V) E DATE CALLED: 9 — ci TYPE OF INSPECTION: (1/V4 - r I DATE WANTED: --- 2 ) — l 1 SPECIAL INSTRUCTIONS: REQUESTER: 'PVCX.,fr\-k PHONE NO.: 442-- .9 47- INSPECTION RESULTS/COMMENTS: / .■• ...I .. ■•••• 40 AO' A 62.1.4■WAW. 1 : . 1 7.. 221 • .., ./ .• - •_...- roar ' Al ,-. - . 2d41, I ANL _ _ INSPECTOR: .„,,,_ , ,.,,,, DATE: • v44 0:4 44., 4.. . • CRY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431-3670 .4111`0, INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 DATE PROJECT NAME g E.? n16 7 - l( 3 TYPE OF REVISION: CITY OF TUKWILA 6300 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 * * REVISION SUBMITTAL ADDRESS 5` A a Do v tin P' r <K €'y9 s r CONTACT PERSON TO 1 IQ L ,CCU Y PHONE L t y Z- 4 15 9 PERMIT NUMBER d 5� 0 /\ (If previously issued) PLAN CHECK NUMBER // d 76 - M 77z A.45 r 19f w 171# FIRE - DfrJ t'ck. Iv!~!:vt put 7o l. L= W IN?ikL L /1'l vu T . 1-o 6417 nni PL-'N 15' , N 4 Frre c RA T ,) wit iL , SHEET NUMBER(S) "Cloud" or highlight all areas of revisions and date revisions. SUBMITTED TO: 5 / +v A/0,( an/ i FCL AN REVIEW COMMENTS Plan Check No.: C i 1 " . ° 7 M Project: Zoe.' 7-113 REQUIRED INSPECTIONS d No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. `l:% Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296.4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it Is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be Issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab/Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening 11.. 12. 13. 14. Fire Final 15. Planning Final 16. Public Works Final V 17. Building Final i FCL AN REVIEW COMMENTS Plan Check No.: C i 1 " . ° 7 M Project: Zoe.' 7-113 REQUIRED INSPECTIONS d No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. `l:% Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296.4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it Is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be Issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. PARTIAL FLOOR PLAN SCOPE OF WORK KEY PLAN VICINITY MAP US BOEING BUILDING 7-113