Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 0515-M - BOEING #9-120.2
0515-m boeing #9-120.2 9725 east marginal way south 91-089 hvac 150E1 �f G 4V Uo :>::»::>::::::::»:».::;<:;::. �:::<:: ;<:;<:::::�::;:<:.:: >::<;:::;:. :::«<•:::::: .: >:: >:<::•: >•::.:::::��::.:�PR E •T•:��'�r r? fifi�w710N < >:::� ><:: < "�•:: > <�'.> :<�:. » » >: .:::`.::::::' °::: UMC EDITION ,� 1988 PROJECT NAME/TEN L Boeing 19 - 120.2 VALUE OF WORK: $ 8,000.00 FIRE PROTECTION: Sprinklers (Detectors © N/A DESCRIPTION OF WORK: Install new spot cooler (chilled water) in telephone room. • D • • h: h : • :. • • r : : h ;• • • : rml /plans): P.O. Box 3707, M/S 46 -87, APPROVED FOR Z ISSUANCE BY: ,, _ _I), • ./ '' / r ‘ 1 , BUILDING ..,..`, OFFICIAL , c; DATE: • - 3_;_a PHONE: 544 - 2975 ADDRESS: I hereby certify that I have read and examined of law and ordinances governing this work will this permit does not presume to give authority regulating construction or the performance of this permit and know the same to be true and correct. All provisions be complied with, whether specified herein or not. The granting of to violate or cancel the provisions of any other state or local laws work. I am authorized to sign for and obtain this mechanical permit. SIGNATURE: ,,e ...e,, sr - yca, / PATE: / COMPANY: ,_ � �i' t e•G.- �GC 'i" '� .7 PRINT NAME: / i=- 47- V: n.'.t.'4 - 7 :>::»::>::::::::»:».::;<:;::. �:::<:: ;<:;<:::::�::;:<:.:: >::<;:::;:. :::«<•:::::: .: >:: >:<::•: >•::.:::::��::.:�PR E •T•:��'�r r? fifi�w710N < >:::� ><:: < "�•:: > <�'.> :<�:. » » >: .:::`.::::::' °::: SITE ADDRESS: 9725 E Marginal Wy S SUITE NO. PROJECT NAME/TEN L Boeing 19 - 120.2 VALUE OF WORK: $ 8,000.00 TYPE OF WORK: 0_0 New /Addition Cl Modifications fl Repair U Other: DESCRIPTION OF WORK: Install new spot cooler (chilled water) in telephone room. ADDRESS: PROPERTY OWNER: Boeing 'PHONE: 544 -2975 ADDRESS: P.O. Box 3707, M/S 46 -87, Seattle, WA 1Z:7: 98124 -2207 CONTRACTOR: Boeing PHONE: 544 - 2975 ADDRESS: P.O. Box 3707. M/S 46 -87, Seattle, WA IZIP: 98124 -2207 • ■ ; • • ; r • ■ ; EXPIRATION DATE: N A CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 MECHANICAL PERMIT NO. DATE ISSUED: OSIS-n 5 - 30-a 1 MECHANLAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) FEEg' Basic Perrpif Fee%> Unit Fee:' Plan Check Fee Other. :AMOUNT :.:RECEIPT' t 6.50 Plan Check No.: 91 -089 -M /110t100 DATE DATE(S) REQUIRED INSPECTIONS PHONE NO. AppROVED INSPECTOR CORRECTION NOTICE ISSUED Oa 1 - Rough- in/Vents /Ducts 431 -3670 ID 2 - Fire Final 575 -4407 • 3 - Planning Final 431 -3680 11,4 x 5 - Mechanical Final 431 -3670 OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296 -4732) Electrical - Washington State Department of Labor and Industries (277 -7272) This permit shall become null and void of the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT NO. CONTACTED DATE READY DATE NOTIFIED . / t�- (� �t BY: (init. } -!� ,�p{� PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING a fCR 3RD NOTIFICATION BY: ) MECHANICAL" PERMIT APPLICATION TRACKING PLAN CHECK NUMBER CV O PLANNING O OTHER REVIEW COMPLETED PROJECT NAME SITE ADDRESS O-21 5 - Gl" (W. a INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. DI^ PARTNl COMMENT, BUILDING - 5 initial review (ROUTED) 0 FIRE FIRE PROTECTION: FIRE DEPT. LETTER DATED: INIT: INIT: INIT: CONSULTANT: Date Sent ZONING: SCREENING REQUIRED? fYos (1 No REFERENCE FILE NOS.: UMC EDITION (year): BUILDING - G 1 ¢� final raviaw S t UIREME SUITE NO. Date Approved - INSPECTOR: IBAR/LAND USE CONDITIONS? ]Yes Cl No OB/17 /On 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 MACK JOB X907011 -01 :; >dEsoRipTtoN:: <s;,;r<''•'.:: >(AMOUNP� 4• ROPT ?M• r .DATE , r A ".n,0;.' BSIC°PER . rIF EE 'Tkil � tr 'r ". . " . � : ykv'•F i f %'ft'; ' :y . :•,,50;;; r•i.%: ,., — •}= :�vF i 1, ' ,, : � �,,:��1�: �:�: j•`j �;�lf�t.;::l.. " t V ; ?r. ; ;�, ; "�z1.;a3.,. ",., ;'r PLAN CHECK NUMBER q 0%Ct i 1 \ 1,.4 UNIT�SFEE�:�:sl: �.r} ,.;:v.: «.� >> ;, P IANi'CIIEGK�.�FEE' <:• .. > ,�J -. t:> :Ey. A >iti :x� � ; ,.t::....• <•��f�;,�; .r,'d'c "'s.'•:' > ,f ; .... ;, �•, ,:: , �: r�;i:�'� ., {•f .: t qtt. ':t 7 "th't,:} ��� .; . .: ;::::t:::#c 'K7 `'�' I t . i11'F t!.2J,�.�t'9t��� a}2: <: > ;;r 7 • y : { >:Y:<, rr,L,, ; ,Y ; i:...i.,. fY " {� .L N{t a• •.� : ': a;t <: •. APPLICATION MUST BE FILLED OUT COMPLETELY G i: •.., ., i�.a wAF� <:.g�r,. , <2; •• :,: ,:�r:.....0 ,• :4Vi; TOTAL. :' ,:< 'SITE ADDRESS SUITE It 9725 E.MARGINAL WAY SO. BLDG. 419 -120.2 VALUE OF CONSTRUCTION - $ 8, 000.t0 PROJECT NAME/TENANT i3OE 1N:3 MILITARY AIRPLANES TYPE OF WORK: ( Now /Addition 0 Modifications 0 Repair 0 Other: , DESCRIBE WORK TO BE DONE: INSTALL . S - OT COOLER CHILLED WATER IN TELEPHONE ROOM _ .... ......•:TYPE.:.,. ::.:.,. : RAT1NG181ZE::;:;:.:::.:.::<.: :;: ;. : >: >' >;••;.. :: ........ Mf3EB OFUNfTs °`.. AIR CONDITIONER 1HP 1 300 CFM 1 BUILDING USE (office, warehouse, etc.) OFFICE NATURE OF BUSINESS: , _, WILL THERE BE A CHANGE IN USE? 6 No • Yes IF YES, EXPLAIN: • WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? ga No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER BOEING MILITARY AIRPLANES PHONE (206) 544 -2975 ADDRESS P,O.BOX 3707, M/S 46 -87, SEATTLE, WA. ZIP 98124 -2207 CONTRACTOR BOEING MILITARY AIRPLANES PHONE i 2 2 6 J 544_2975 ZIP 98174 -22x)7 ADDRESS TT,WA P.O,ROX 3707 MIS 46 -87 SRATr,F WA. ST. CONTRACTOR'S LICENSE # BOE I NC -294ML EXP. DATE (11-01-9'i ARCHITECT Rr1FJN(; MTi.I'TAT3Y ATRPT,ANRS PHONE ( 206) 544 -2975 ADDRESS P.O. BOX 3707, MiS 46 -87, SEATTLE, WA, 12IP 9824 -2707 CITY OF TUKWILA Department of Community Development - Building Division MECHANICAL PERMIT APPLICATION Mechanical Fee Worksheet must also be filled out and attached to this = • •l;cation. FEES (lot staff use only) SIGNATURE PRINT NAME PHONE 20 CiTY /ZiP 05 -22 -91 PHONE 206 544 -2975 TERRY BENNETT ADDRESS P.O. BOX 3707 M S 46 -87 SEATTLE WA. ;. :£sx:•i.zz : <dw;3 ?izf�;.'•.::..i fir,.: ;.prk:;:. ' 3 ' �; ii:i <2l.`•.'�o:il�C:::,A..a'�5p t.�r: :f.J.> .:i? BUILDING OWNER OR AUTHORIZED AGENT ;;ONTACT PERSON :IMPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to IIII out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed Information on application and plan submittal requirements. Application and • u(aiis lriusi b coriiulete 'nudes' iu•u6 a :eoted for plan review, • ; UILDING OWNER / AUTHORIZED AGENT If the applicant Is other than the owner, registered architecUengineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. ALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled In by the applicant. This figure Is used for budget reporting purposes only and not to calculate your fees, >;PIRATION OF PLAN REVIEW Applications for which no permit is Issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined In Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. It you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 433-1849. ATE APPLICATION ACCEPTED a sAl • DATE APPLICATION E� � o„zwOta (i1I T Y I VRW /LA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 - 1849 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. INSTRUCTIONS - Complete the worksheet, indicating the number of units being installed in each category, multiplied by the unit cost. Then tally the subtotal column highlighted at the bottom of the worksheet. At time of submittal, staff will calculate the remaining fees. DESCRIPTION UNIT COST NO. OF UNITS X TOTAL COST BASIC FEE $15.00 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu /h. $9.00 2 Installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 X 3 Installation or relocation of each floor furnace, including vent. $9.00 4 Installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not Included in an appliance permit. $4.50 X 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 X Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9.00 X Installation or relocation of each boiler,or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 X Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu /h. $22.50 X Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 X 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 X 12 Each air - handling unit to and Including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air- handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 4 S -4 " 13 Each air - handling unit over 10,000 cf m. $11.00 X 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 X 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6.50 18 Installation or relocation of each commercial or industrial -type incinerator. $11.00 X 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 X 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee Is listed in this code. $6.50 X � SUBTOTAL (unit fee) -50 PLAN CHECK FEE :u17:11 ,-5'z GRAND GRAND TOTAL 1r10.O MECHANICAL PERMIT FEE W RKSHEET CITY OF TUKWILA 6200 SOUTFICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91- 089 -M: Boeing #9 -120.2 9725 E Marginal Wy S PHONE # (20!;) 433.1800 THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER (y--( (r\ 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 5. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 6. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Gary L. VanDnsen, Mayor 0. (, INSPECTION RECORD C Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 Approved per applicable codes. ❑ Corrections required prior to approval. COM ME T � 1 ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Recept No.: Date: PAN REVIEW COMMENTS Plan Check No.: 9 1 `°" CY A ` Project: SC)1=11•4 1 2..0 • 2 REQUIRED INSPECTIONS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, including all gas piping (296-4722). X Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be'special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. 1 . Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shah have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab/Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wail Board Fastening )( 1 1 rA tot ` I1 12. 13. 14. Fire Final 15. Planning Final 16. Public Works Final ('v 17. Building Final PAN REVIEW COMMENTS Plan Check No.: 9 1 `°" CY A ` Project: SC)1=11•4 1 2..0 • 2 REQUIRED INSPECTIONS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be Inspected by that agency, including all gas piping (296-4722). X Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be'special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. 1 . Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shah have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. REVISION APPROVED BY 4VAMEOF BOEING Ai R PLAN1QMRA NY OWNER austin associates key plan general notes construction notes second floor