HomeMy WebLinkAboutPermit 0519-M - BOEING #80519-m boeing building 8 hvac
635 andover park west
.
PROPERTY OWNER: T C W
u _ • • I, -
1988
ADDRESS: 400 S . Hope ST
FIRE PROTECTION:
IMMEIMODetectors • N/A
[PHONE: 442-7454
CONDITIONS (other thanAigodonoutifichetiopktmagans);
ADDRESS: 3231 1st A V S
Seattle WA 1ZIP:
ik
APPROVED FOR BUILDING
ISSUANCE BY: Mil ....., 1 OFFICIAL
DATE: ) (
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATURE: --( e-Y---7-1.....--
DATE: 6 /s
PRINT NAME: - r - vo. L 1 i10,-,44_
/ 7,,iir 7 -7
COMPANY: (j1,,it ...) • Tans _I—A-) c,,
PROPERTY OWNER: T C W
PHONE: 89- 9804
90071
ADDRESS: 400 S . Hope ST
L . A , CA IZIP:
CONTRACTOR: United Systems
[PHONE: 442-7454
98134
ADDRESS: 3231 1st A V S
Seattle WA 1ZIP:
WA ST, CONTRACTOR'S LICENSE NO, UNITES176RB
IEXPIRATION DATE: 11-8-91
CITY OF TUKWILA
Department of Community Development - Building
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
1 ...
MECHANICAL
PERMIT NO.
DATE ISSUED:
0519 in
Division
SITE ADDRESS: 635 Andover Park W SUITE NO.
DESCRIPTION OF WORK:
MECHANnAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
Unit Fee 13 50
Fee
TA
Plan Check No.:
91-090 - Ni
Boein. Buildin 8 VALUE OF WORK: $ 3,600
New/Addition t Modifications • Re air • Other:
Revise Existing ducting routing including new exhaust
Fan on Roof.
REQUIRED INSPECTIONS
1 - Rough-inNents/Ducts
) 2- Fire Final
3 - Planning Final
4 -
5 - Mechanical Final
PHONE NO.
431-3670
575-4407
431-3680
431-3670
DATE DATE(S)
APPROVED INSPECTOR CORRECTION NOTICE ISSUED
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and Industries (277-7272)
This permit shall become null and void if the work is not commenced within 180 days from the date of
issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT NO.
CONTACTED
•
DATE READY 5_,31,..9 1 +
DATE NOTIFIED
( y0 D "� — 5, n I
B • (init.).
e
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING 4 5 , (
3RD NOTIFICATION
BY:
(Init.)
PLAN CHECK
NUMBER
q i -ogo-m
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
M
P.�►RT NT
BUILDING -
initial review
SITE ADDRESS
(os c And o u-PL Pk l/)
5-aa -c ) � 1
(ROUTED
FIRE - 4)11! {I FIRE PROTECTION: (jSprinklers Detectors N/A
0 PLANNING ZONING:
0 OTHER
REVIEW COMPLETED
INIT:
INIT:
BUILDING - � � -`1(
final review
MECHANICAL PERMIT
APPLICATION TRACKING
CONSULTANT: Date Sent - Date Approved -
SCREENING REQUIRED? fl Yes ❑ No
REFERENCE FILE NOS.:
UMC EDITION (year):
X66
SUITE NO.
U.I 'COM.ME.`.: :
BAR/LAND USE CONDITIONS? fYes
08/17/90
SITE ADDRESS SUITE #
( , r ' ' , : A. r‘ r ti A v i R t i, i< +f - ( s T` e3 1-- D6. 8)
VALUE OF CONSTRUCTION - $
3, G v o , co
PROJECT NAME/TENANT
(q ore i i 7 l Jf' fy f•'C f :L-1)6 a, GDi: Mt 6 HOPE 0 c c5on re.oM
TYPE OF WORK: O New /Addition Modifications O Repair O Other:
DESCRIBE WORK TO BE DONE:
R t . v n : f i -, (, J/.. (; (f ? u+'± 1-''f ( l' i );,i / 1 t. /(_, //Jc:. tez-7//6 /(C , Yi E//'/."; F of.) 1. :,o;'
>;!! >?<M'E € > <!?> > < ><: >i » °> <» < > «> :<> > >: <> > »<> : >:t l�4TlNGYS .
IZE
ZIP 70o7 1
CONTRACTOR (.i N l Ti. r- 5 y1 s T 1_= I' 5
PHONE c/V 2 . ? q s-v
ADDRESS ; 'l ''. I 1 s' A V('
BUILDING USE ( (bffic , warehouse, etc.)
NATURE OF BUSINESS: __ _-- ___._,
WILL THERE BE A CHANGE IN USE? %No 0 Yes IF YES, EXPLAIN:
WILL THERE ICE- STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? U No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER — y. tki
PHONE 05c1 _ eve/
ADDRESS qoo S . Tip p S 'r -( ' t t T` %, /1 . ((lc,/ r,
ZIP 70o7 1
CONTRACTOR (.i N l Ti. r- 5 y1 s T 1_= I' 5
PHONE c/V 2 . ? q s-v
ADDRESS ; 'l ''. I 1 s' A V('
COOri( c'EE!-) rTLC.
tiJ(4)
ZIP 78 i ? y
WA. ST. CONTRACTOR'S LICENSE #
il ry i T L S I "1 & R 13
EXP. DATE /1 - 8 el
ARCHITECT -==�
PHONE -,-
ADDRESS -''
ZIP -E9-
I'
CITY OF TUKWILA
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
PLAN CHECK
NUMBER
�( I -OHO m
APPLICATION MUST BE FILLED OUT COMPLETELY
SIGNATURE
ADDRESS 32. 7,
PRINT NAME To w1
............................ .
CITY/ZIP S 161 Sy
BUILDING OWNER
' AUTHORIZED
C AGENT
CONTACT PERSON
DATE APPLICATION ACCEPT
7-4i/11 i? t o v r.
MECHA ;AL PERMIT
APP !CATION
Mechanical Fee Worksheet must also be filled out and attached to this application.
BASIC ::PERMIT ` FEE?
UNIT(S) FEE
PLAN'CHECK° FEE
OTHER:::...;,.,:
FEES (for staff use only)
DATE APPLICATION EXPIRES
2i 9
PHONE L i g • 7t /5 (
PHONE L/. -i
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checkiist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed infoirnation on application and plan submittal requirements. Application and
plans must be complete in order to be accepted for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architectengineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. - The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 433 -1849.
o3Isweo
S6BMITTAL CHECK ST
MECHANICAL
❑ Completed mechanical permit application (one for each structure or tenant)
O Two (2). sets of mechanical plans, which include:
• Floor plan
• System layout
• Elevations (for roof mounted equipment)
El Structural calculations stamped by a Washington State licensed engineer may be
required if structural work is to be done (2 sets)
Note: Hood and duct systems require a building permit for the duct shaft.
Id I r yr Iunn11..M
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
INSTRUCTIONS - Complete the workshe
indlcat, the number of units:being Installed
!n each category, nvltlplled;by the unit cost
Then t4lly the :subtotal ' column hf�hlrghted a t
the bottom of; the worksheet At time of
:.. s ubmlttof gaff Will calculate the 'remaining. fees
f!
DESCRIPTION
UNIT COST
NO. OF
UNITS
X
TOTAL
COST
BASIC FEE
$15.00
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$9.00
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
X
3
Installation or relocation of each floor furnace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
X
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
'r.......,
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9,00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and Including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu/h to and including 1,750,000 Btu /h.
$22.50
X
1 0
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu/h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
13
Each air - handling unit over 10,000 cfm.
$11.00
•
X
14
Each evaporative cooler other than a portable type.
$6.5_
X
15
Each ventilation fan connected to a single duct.
$4.50
1� ,
X
X
1
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
installation or relocation of each commercial or industrial -type incinerator.
$11.00
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
X
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
SUBTOTAL (unit foe)
: .
PLAN CHECK FEE ( 11
'"]. 13
GRAND TOTAL
S5, (0
•
MECHAN' fAL PERMIT
FEE WORKSHEET
CITY OF TUKWILA
6200 SOUT /!CENTER IIOUI.EVARD, TUKWILA, WASHINGTON 98188
Plan Check #91- 090 -M: Boeing BLDG 8
635 Andover Park W
PIIONE # (206) 433.1800 Gary I.. Vanbnsen, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART F THE APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER Au .
1. No changes will be made to the plans unless
approved by the Architect and the Tukwila
Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (872-
6363).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
5. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washignton State Energy Code (1989 Edition), and
Washington State Regulations for Barrier Free Facility
(1989 Edition).
6. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
Yours'. truly,
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Fire Department Review
Control #91 -090 -M
Re: Boeing Company Building #8 635 Andover Park West
Dear Sir:
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. H.V.A.C. units rated at 2,000 cfm require
auto - .shutdown devices.. These devices shall be separately
zoned .in the alarm panel and local U.L. Central Station
supervision is required.
2. Remote indicator lights are required for HVAC
detectors.
3.. A fire alarm system is required to be installed: and
functionally tested. (UFC 10.301)
e - i dL/ez4—
May 29, 1991
Gary L. VanDusen, Mayor
PROJECT: ,(3,, ,S /,.,/ ) 3
PERMIT NO. a ,S' / 9 --,2A
SITE ADDRESS: 4 � " �$ i,,, ,, /°'1 6je
DATE CALLED: ,4--4, -- q'/
TYPE OF INSPECTION: /S/IP c�� f.�.m -, „ Y �. �,
ATE WANTED:
DATE C � — $'/
SPECIAL INSTRUCTIONS: 3.- Co 0
REQUESTER: ZL ,1 4
PHONE NO.:
_ -
_
INSPECTION RESULTS /COMMENTS:
// �!
Fr
INSPECTOR: ifili. ,,,,ML
DATE:
1 MEt :479':r7.bMtiY.'�1yj7,1i
CITY OF TUKW1u
Dept. of Community Development - Building Division
Phone: (206) 431-3670
+arw ++w.wn +vrr�wralw+.wrux!! » yN. WnMNU) w�SfSGtYJtH) Ya+: �y'. r•' N1 !'; 4.4tI rue r..rt...LYen ry vM+l�n:.e..xn.wwv.slnu.
INSPECTION RECORD \/.
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PLAN CHECK
NUMBER
9i -o=ioM
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
PROJECT:
SOet t\A.
C
PLAN REVIEW
ADDRESS: Gas A w b QL 1›k ‘A)
DATE:
8
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
TT/W' 'p Easy gevte\AJ AtQcb cc>na.uawT ,
Prepared by:
C.
PAN REVIEW COMMETS
Plan Check No.: 6 1 (` OctO M Project: f C!) SLD6
REQUIRED INSPECTIONS
X No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296-4722).
N! Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
Ify All permits, inspection records, and approved plans shall be posted at the
Job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
>< All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
X Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1. Footings
2. Foundation
3. Slab/Slab insulation
4. Shear Wall Nailing
5. Roof Sheathing Nailing
6. Masonry Chimney
7. Framing
8. Insulation
9. Suspended Ceiling
10. Wall Board Fastening
V
11. R u • zoi
12. �u
13.
14. Fire Final
15. Planning Final
16. Public Works Final
17. Building Final
PAN REVIEW COMMETS
Plan Check No.: 6 1 (` OctO M Project: f C!) SLD6
REQUIRED INSPECTIONS
X No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296-4722).
N! Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
Ify All permits, inspection records, and approved plans shall be posted at the
Job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
>< All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
X Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
LAN REVIEW COMMECWS
Plan Check No.: q ( " d t & M Project: Sne(14(c)
REQUIRED INSPECTIONS
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, Including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
A r: All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296-4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the Job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
# Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid,
25. A Certificate of Occupancy will be required for this permit.
1.
Footings
2.
Foundation
3.
Slab /Slab Insulation
4.
Shear Wall Nailing
5.
Roof Sheathing Nailing
6.
Masonry Chimney
7.
Framing
8.
Insulation
9.
Suspended Ceiling
10. Wall Board Fastening
1 2.
c„)
13.
V
14.
Fire Final
15.
Planning Final
16.
Public Works Final
I;
17. Building Final
LAN REVIEW COMMECWS
Plan Check No.: q ( " d t & M Project: Sne(14(c)
REQUIRED INSPECTIONS
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, Including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
A r: All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296-4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the Job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
# Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid,
25. A Certificate of Occupancy will be required for this permit.
first floor hvac plan
Fa COP'S
- heck approvals are
t hat the approval e
understand Plan errors omission,: and pp at �
s j to erCA and r the vic►I�tinn
does not authorize v o t of c+ ;
.lens or ordinance
8 p�8 �
a dopted r r plan s
tractor's S �p � of approved � >>����
£Q utPMEW' . lots
760 GFM 0 1/2-s UPe •r ex 1.1 , FAW
t V PHA 5c, 1to+}PMLT"JR
G OOK Isdain ,.. 1 V 2$
260 CF
270 C,F�Ni
270 CFM''
(O "+
270 CFM
trio A.
50e, CFM
CPM
TkoiNe •� T41 . faug g W ' ' . r : An
m 1$ ,. too. f f \ y Ada € , 7 5 " i. e
260 G FM
2 6FM
111111111111I111111111 111111111111111111114[1:11 1 11 1111
0 16?H8INfH 1 2 3
i
1 III 1 1 III 1 111111 1 11 1 1 1 1
4 5 6 7 e
NOTE: If the microfilmed document is less clear than this
notice, it is due to the quality of the priginai document.
oc 6G Be !,Z 9z sz +7z CZ zz rz 03 61 81 cr 91 51 47r Y l er z<
1IIJII ii1� h iiiiiI � iiii!iii � I I fII I JI 1I�i11 IIIhIP1!iiilIiiii!i1 1i�ii1l1�i � i1i I 1i 1
:> ✓df<11f4 ti 11 Z [ r
1 111111 11111111111111111111111) 111111111111111111
9 10 11 12
f 1 .3�1'ti.l�i
. •r'— •
,
pr