Loading...
HomeMy WebLinkAboutPermit 0525-M - BOEING #9-120.30525-M 91-084 BOEING #9-120.3 HVAC 9725 EAST MARGINAL WAY SOUTH . TO:' FROM: DATE: SUBJECT: City of Tukwila Please refund $26.40 permit was cancelled refund of 80 percent transaction was June 6200 Southcenter Boulevard • Tukwila, Washington 98188 Kim Hart, Finance Shellie Bates, Permit Center January 30, 1992 Refund to The Boeing Co. and the building of the mechanical 12, 1991, Receipt John W. Rants, Mayor (C /O Terry Bennett). The official is authorizing a permit fee. The original #9539 for $41.25. Please return the check to me and . I will forward to the applicant. Phone: (206) 433.1800 . City ' all Fax. `(206) 433.1833 T. L. Bennett Permits Administrator 9 -4316 46 -87 544 -2975 GOEYA/G 9- 4316- TLB -92 -018 January 28, 1992 Boeing Defense & Space Group Military Airplanes Division P,O. Box 3707 Seattle, WA 98124 -2207 RECEIVED CITY OFTUKWILA JAN 3 0 1992 PERMIT CENTER City of Tukwila Permit Division 6200 Southcenter Boulevard Tukwila, WA • 98188 Subject: Mechanical Permit No. 0525 -M Boeing Defense & Space Group has made the decision to . cancel the project at the 9 -120.3 Building on Application No. 91 -084M. Thank you for your assistance on this project. Please let us know if htere are any charges for your time and return check if refund is applicable. Sincerely yours, BOEING DEFENSE.,& SPACE GROUP PROPERTY OWNER: Boeing UMC EDITION (YEAR : 1988 PROJECT NAME/T NANT: Boeing 119 1 VALUE OF WORK: $ 2,972.00 FIRE PROTECTION: ( )Sprinklers (lDetectors (X)N /A DESCRIPTION OF WORK: Provide heat /vent to new egress corridor from existing HVAC. CONDITIONS (other than noted on or attached to permit /plans): CONTRACTOR: Boeing 11 l APPROVED FOR ISSUANCE BY: / t2. -t BUILDING d /_e1, , 7i , -(, /- . j? ,�, OFFICIAL � . DATE: r, • - // WA. ST. CONTRACTOR'S LICENSE NO. N/A I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. SIGNATURE: / -vrtil. -7-7 DATE: o 'r /,iZ `7/ PRINT NAME: 7- `r f= ir/iL /� � COMPANY: 6- -eG % / /'II�GG i r PROPERTY OWNER: Boeing SITE ADDRESS: 9725 E Marginal Wy S SUITE NO. PROJECT NAME/T NANT: Boeing 119 1 VALUE OF WORK: $ 2,972.00 TYPE OF WORK: (X) New /Addition ( ) Modifications C Repair Other: DESCRIPTION OF WORK: Provide heat /vent to new egress corridor from existing HVAC. ZIP: 98124 - 2207 PROPERTY OWNER: Boeing PHONE: 544 - 2975 ADDRESS: P.O. Box 3707, M/S 46 - 87, Seattle, WA ZIP: 98124 - 2207 CONTRACTOR: Boeing (PHONE: 544 - 2975 ADDRESS: P.O. Box 3707, M/S 46 -87, Seattle, WA (ZIP: 98124-2207 WA. ST. CONTRACTOR'S LICENSE NO. N/A (EXPIRATION DATE: N/A CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 MECHANICAL PERMIT NO. DATE ISSUED: 05a5 in (r j_C(j MECHAI CAL PERMIT (POST WITH PLANS IN A CONSPICUOUS. LOCATION) BasIc Permit Unit Fee Plan Check No.: !•:AMOUNT: RECEIPT ># 91 -084 -M DATE DATE(S) APPROVED INSPECTOR CORRECTION NOTICE ISSUED REQUIRED INSPECTIONS PHONE NO. 1 - Rough - inNents /Ducts 2 - Fire Final 3 - Planning Final 4- 5 - Mechanical Final 431 -3670 575 -4407 431 -3680 431 -3670 OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296 -4732) Electrical - Washington State Department of Labor and Industries (277 -7272) Is permit become null void if the work Is not commenced within 80►`days from the date?' :is or work is suspended or: abandoned fora period Df : 180 days from. the last.lnspecth PERMIT NO. CONTACTED L y -�,�,, ::}:{< i{:.'+ ti:•i } ' ? {: } } }:• $n:.::: .. �}:}$$i; r,::: r.... .:: $ }$$: }$: }�.. ... . . . . ' ; } v}}}; iLr,• :.?i? 4 } i i + • ::., $'•'..:: $:•::. i}} ri• •?}: }• Fry } �' { .r.. •.J.? :.. ..h •,. }:+r:. . . : ; {4i: {+ ¢ {! .. r f i; n +:} '. ' '�: {{ .. ; : { ' r,?•:• �'• i:.; .;r. {: {iry:f {...... n.....: : ..$:. > :+ ?•:• };i$p; $$: : ::: : : : :•:i:w.. {•; }::.max:, f DATE READY DATE NOTIFIED q 1 :�'.4,, BY: ,.pip PERMIT EXPIRES 2nd NOTIFICATION 4 :BY: (ink.) AMOUNT OWING a 3RD NOTIFICATION BY: Ink ;• } }} . }:• }' ..... .. :: r:: Si }'• ::. :} } } }: tRI BUILDING - review ..... .... .; ..: • }ii. : •• •is4 ...+. .. .. � .. . ���� -� � ::.:...:.: r ! $ >, {:.;.} �.{:•::$ <. : .. } • ... :..:..:: .:. {..; .v:...... •:.• • gin ? _ �w� �+ ROUTED ::}:{< i{:.'+ ti:•i } ' ? {: } } }:• $n:.::: .. �}:}$$i; r,::: r.... .:: $ }$$: }$: }�.. ... . . . . ' ; } v}}}; iLr,• :.?i? 4 } i i + • ::., $'•'..:: $:•::. i}} ri• •?}: }• Fry } �' { .r.. •.J.? :.. ..h •,. }:+r:. . . : ; {4i: {+ ¢ {! .. r f i; n +:} '. ' '�: {{ .. ; : { ' r,?•:• �'• i:.; .;r. {: {iry:f {...... n.....: : ..$:. > :+ ?•:• };i$p; $$: : ::: : : : :•:i:w.. {•; }::.max:, }:• }}' ^:• }: }':' +ik:•�: :: " { + ,.r {., %:4':4 /I::C'•$. . {• }: S } ,f(::. : :: ..: ,.... —.: •:. NNSU LT TANT: Date Sant - Date Approved - O FIRE P'• P. CTION: • S • ticklers S Detectors S N/A FIRE DEPT. LETTER DATED: INSPECTOR: INIT: O PLANNING ZONING: ISAR/LAND USE CONDITIONS? flYes [ No SCREENING REQUIRED? f Yes f No INIT: REFERENCE FLE NOS.: O OTHER INIT: BUILDING - 05 r final raviaw -�� r Yr ' "�` (Year): ict e3 INR: � SUITE NO. PLAN CHECK NUMBER Ql — u kr l REVIEW COMPLETED SITE ADDRESS MECHANIC.. PERMIT APPLICATION TRACKING INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. 05117//0 PROPERTY OWNER. BOEING MILITARY AIRPLANES PHONE (206) 544 -2975 ADDRESS . P.O.BOX 3707, M/S 46 -87, SEATTLE, WA. ZIP 98124 -2207 CONTRACTOR BOEING MILITARY AIRPLANES . P PHONE • • , - • ADDRESS ZIP •: 4 i - • :•e s u : : mom , :. WA. ST. CONTRACTOR'S LICENSE # • • EXP, DATE ARCHITECT RnF.Trr MTT,TTARY ATRPr.AtvFS PHONE ( 206) 544 -2975 ADDRESS P.O. BOX 3707, M/46-87, SEATTLE, WA. I 98124-2207 ,,,14hf. R `; . ,,� u : „,� „�• r Y.,'�� ; , : �, .:. >HI�:. �'�.QN. , ETQ.y� , . Miff •' ry ,!� -�7:, „�f: .r,F�. r i:: � ;C ..3i�:ays'.. 03:<•r Y" .',..: .z: .. :: F.'iz 3saf<,':1'r ..C tV1+/iV.\i! �+V.li•3;•��**�� ' : L f! � , ,S ^ r `x.,•jry ( i•• -;,^ �Z>• :f.'r l •. : f. ry:% i .. i. :.• e a " { `.,'{.¢•ii.e � � � FWt . � . .t'1UT � �'IZEis �:I?L: ,. ::•V . $ #: ' , 1 . , . P�� � t.. :�.33 >� 3�i� ��wr.,'•?� �a3.�f B�,si o:s:{L�5'.s @r.•s. >Y�'�. {Etx91� BUILDING OWNER AUTHORIZED AGENT SIGNATURE /_ / DATE PRINT NAME TERRY RFNN1 TI, PHONE (204 ) 544 -2975 ADDRESS P.O. BOX 3707, M/S 46 - 87, SEATTLE,WA, CITY /ZIP 98124 - 2207 PHONE (206) 544 -2975 CONTACT PERSON TERRY BE TT 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433-1849 BEROSIK JOB 11907011 -02 f11 7lad:1riiL•7;> :. + I • I t,. . :<* :~'f .• • ' , BASIC' °PERM {sF ���� �� Ip' g� t � �': P .� , '' . t t�' ~>�`'<f�'�:'�'fi�x`•s�, !' . ;.s. :rA. . >� "�x'� } PLAN CHECK NUMBER - 0"'&1--1-711) ��///� /1V/) �l ' • ! UN ITLSpFEE4:161M '� V:: $ ,k ... Of V i t "r:`l° WO MIWI P <.,_.,� I AN 'CHE�fC1 " r 1 F ' e.: ' i • f 3 , f. = C5 .Aut ',,r : ' =a , iii w. �:., $;,;:S�v.3Y04: ' 'i ' ?; , 0 0 t iE 0 �RV'rt3lW Jr i!:c .4,1 ~i' • ER!' � >: f< :�'�`'' z�1 �'f� , '�;:�3.��'v.•::���'��v�n� ; s { APPLICATION MUST BE FILLED OUT COMPLETELY sss#' {'c >? c1 >110NTOTALrr ;4 a. ' t ; a<` MI f;. AO.i9is i SiTE ADDRESS SUITE # 9725 E. MARGINAL WAY SO, BLDG. 119 -120.3 VALUE OF CONSTRUCTION - $ 2,972 . p 0 ' PROJECT NAME/ TENANT BOEING MILITARY AIRPLANES TYPE OF WORK: (KNew /Addition 0 Modifications 0 Repair 0 Other: . DESCRIBE WORK TO BE DONE: • PROVIDE HEAT /VENT TO NEW EGRESS CORRIDOR FROM EXISTING HVAC ..., �::....r:• r: i:r'�"`:, :::, }. :. <'. ; }.•....r:!i: iii. :, i •. y :r {r .r T.i�:il;{i��': {.. M "i! :f EY:•rt •••S•+ •�.. : z ,k...... :;;r.. ":': {,•:,F:i: ?� . 5 . . .^,fir :. <' <• +.. o:.%'� .. r....Y r:{;•.,•:: r:.....:£r.�r:, ':.• #i. ,. {:' +.:. :..i +•.i:Y `• :• fi: ���••� ,.p: >,..a: -;.� .'T1fp ..,.' .....:; j�AT1NG /61ZE............f........ •; >. .,.:.;� ;��r.r:,.�N 4F�i`'OF`U(�ITs,fi..,. ��.3� . FIRE DAMPERS BUILDING USE (office, warehouse, etc.) OFFICE • NATURE OF BUSINESS: AIRPLANES • WILL THERE BE A CHANGE IN USE? No Yes IF YES, EXPLAIN: WILL THERE BE STO&AGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? la No U Yes IF YES, EXPLAIN: CITY OF TUKWILA . Department of Community Development - Building, Division ' MECHANICAL PERMIT APPLICATION Mechanical Fee Worksheet must also be filled out and attached to this • , •l!cation. FEES (for staff use only) APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. • A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed Information on application and plan submittal requirements. Application and - - ulane'•fnusi bu coniotute' in' sidur iu tie a ;eared for alas review. BUILDING OWNER / AUTHORIZED AGENT If the applicant Is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent • to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled In by the applicant. This figure is used for budget reporting purposes only and not to calculate your lees, EXPIRATION OF PLAN REVIEW Applications for which no permit is Issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 433-1849. DATE APPLICATION ACCEPTED (t • •\ 1 DATE APPLICATION EXPIRES (t l - 6 1 CITYOF TllKWILA Department of Community Development - Building Division . 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. : >;.::< :.::: IN9TRU lnd icatin lrt e41ch`aate� . '' h0n t <:;;;:: < ::.:::::: :: >;' :;. : :':::;;.::; ';:;,�: ;.:.: .. ; Complete'the worksheet, : th9 umber of units 00410. lrisralled dry nX0f0110 by the ilitcost :tslly t subtocat'cotumn highlighted at bottom of the wor ks h eet. At` time of: !lltcal!ufata the emalnlnp;lee►. :' DESCRIPTION UNIT COST NO. OF UNITS X TOTAL COST BASIC FEE $15.00 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu /h. $9.00 2 Installation or relocation of each forced -air or gravity -type furnace or burner, Including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 X 3 Installation or relocation of each floor furnace, Including vent. • $9.00 x 4 Installation or relocation of each suspended heater, recessed wall heater or, floor - mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. $4.50 X 6 • Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 X /6 7 installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9.00 X 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu/h. $16.50 X 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,750,000 Btu /h. $22.50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 x 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h. $56.00 X 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air - handling unit over 10,000 cfm. $11.00 X 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 x 16 Each ventilation system which is not a portion of any heating or air- conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6,50 X 18 Installation or relocation of each commercial or industrial -type incinerator. $11.00 X 19 Installation or relocation of each commercial or industrial -type Incinerator. $45.00 x 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee Is listed in this code. . $6.50 X • • . SUBTOTAL (unit fie) .00 PLAN CHECK FEE ;u= `E • �5 GRAND TOTAL $141-a5 MECHANIf:AL PERMIT FEE WORKSHEET CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91- 084 -M: Boeing #9 -120.3 9725 E Marginal Wy S PHONE 11 (206) 433.1800 Cary L. VanDasen, Mayor THE FOLLOWING COMMENTS APPLY TO AND BECOME P Al OF HE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER . 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 5. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 6. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. PROJECT: li,/;_ _ _ ■ e -" /0 a- PERMIT NO. �M -� J SITE ADDRESS:/ - J D 6 (G ." / l I) a / 3 Q4 3 ` DATE CALLED: 7� / r q / TYPE OF INSPECTION: DATE WANTED: as .. . p • SPECIAL INSTRUCTIONS: g: 00 21- 2r�e. -_ �71— " REQUESTER: a _-2- -> /c "71', PHONE NO.: 7 ?/ / INSPECTION RESULTS /COMMENTS: /%� ` � p �J � /"LCD- { .S / DATE: 6 :32;14 1 INSPECTOR: f/(/ti(� �G�4V1^ CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD Vre 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: �r�_ ._ ∎�.� • PERMIT NO. SITE ADDRESS: r 4 �L , ,i ��- DATE CALLED: i TYPE OF INSPECTION: A / . . , A / ., , 1M_ DATE WANTED: — / D - m -- SPECIAL INSTRUCTIONS: I , .. . . r� I - REQUESTER: � • � i ! PHONE NO.: '7 c 14 --• 1 0 INSPECTION RESULTS /COMMENTS: , yL " _ ∎ _ �_ _I INSPECTOR: , , ■ j /y-, DATE: e--(2....„6, .. iftitggalt iA±gVCINAZi intMkvCSVbfraam avonto 4m is .....cr..samswvlonranit.Mtriit zOlAri 1'Tzl At 0 CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 VS 4 1.+ :riVt0.is14ft' INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 Permit No, a5 Date ....w.aw�. « ,yugw�M..wrn�swweaeun.:.,,swdw.• aa�+' 7s. Y. b„f nv., r,- ,.�c.�.7. »,,...m,.�,:.�.,, «�:.. {....,......nom ... CITY OF TUKWILA Building Division 6200 Southcentor Blvd. Tukwila, WA 98188 433.1845 8-1 2- t 1 Job Add �Z S S-� 4 4g; )- 74 , e Signed uildIng OtfIclai /Inspector., .r.w• . n.v CORRECTION NOTICE The following items are found to be in violation of Ordinance .4/,,e,fe.C.... and shall be corrected. ---4g4t2/2-44 'DATE 1- 0 -9/ PROJECT NAME ADDRESS CONTACT PERSON g72 ARCHITECT OR ENGINEER SUBMITTED TO: CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD TUKWILA, WA 98188 (206) 433 -1851 * *REVISION SUBMITTAL ** PHONE PERMIT NUMBER (If previously issued) PLAN CHECK NUMBER 2f Q TYPE OF REVISION: �� ./0/Y/4 n � �T ^ � A 7`j4 9/ '7 0 7 - 662 SE? 5 1991 Ult. LNG ,a / S'"-'p 1 SHEET NUMBER ( S ) l "Cloud" or highlight all /areas of revisions and date revisions. • cI FI1101tilA 5EP 41 `t y► PERMIT CENTER 1991 August 16, 1991 L- 6210 -EJC -168 Boeing Defense & Space Group Military Airplanes Division P.O. Box 3707 Seattle, WA 98124 -2207 RECEIVED ' CITY OF TI JKWILA AUG 2 0 1991 PERMIT CENTER Mr. R. Benedicto City of Tukwila Department of Community Development 6300 Southcenter Boulevard Tukwila, Washington 98188 Subject: 9 -120 Construction Project Permit #91199BPA/6636, Mech Permit 91084M/05251n During my conversation on August 15, 1991, with Dave Larsen, City of Tukwila Building Inspector, we agreed that the openings for supply air grilles and return air transfer grilles, in the rated corridor will be closed. Mr. Larsen agreed the City would then authorize Boeing to use and occupy this area. Boeing will continue to work to resolve the code conflicts arising from these opening and any repairs or alterations we make to the corridor will be done in a manner that will not endanger area occupants. Thank you for your help on this project. Sincerely, J. Carri - cilities L -6210 46 544 -2861 chanical Engineering Supervisor D. Larsen' S. PAN REVIEW COMMETS P Plan Check No.: qi. 654 M Project: 13 0El 1..1 L - 3 REQUIRED INSPECTIONS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296-4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. X .'" All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit, The Issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation , 3. Slab /Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening >( r ^4 12. 13. 14. Fire Final 15. Planning Final 16. Public Works Final X 17. Building Final PAN REVIEW COMMETS P Plan Check No.: qi. 654 M Project: 13 0El 1..1 L - 3 REQUIRED INSPECTIONS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296-4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. X .'" All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit, The Issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit.