HomeMy WebLinkAboutPermit 0526-M - BOEING #9-120.30526-M 91-098 BOEING #9-120.3 HVAC
9725 EAST MARGINAL WAY SOUTH
BDE/1■16
* 12045
::; :::. ::.:>:;:::;;>::<::::::;::: ;::::< <:::.:RRO:IECTMNFORMAT O ... ... .. .
u D • 1988
PROJECT NAME/T NANT: Boeing 1/9 - 120.3 LVALUE OF WORK: $ 24, 235.00
FIRE PROTECTION: Sprinklers C )Detectors (X) N/A
DESCRIPTION OF WQRK; Install two chilled water A/C and one chilled water coil.
CONDITIONS (other than noted on or attached to permit /
M/S 46 - 87,
Seattle, WA 1ZIP: 98124 - 2207
CONTRACTOR:
APPROVED FOR Q , ' BUILDING
ISSUANCE BY: 4,, ' . , . ` OFFICIAL
DATE: C' -' %/
PHONE: 544 - 2975
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATURE:`'�/� �/� -ce
DATE: -- /,2 — 9/ •
!
PRINT NAME: - % -- /�,c�.� 4/ , t= /l/i(J/ /�
V
COMPANY: �'` G � ?4!
::; :::. ::.:>:;:::;;>::<::::::;::: ;::::< <:::.:RRO:IECTMNFORMAT O ... ... .. .
SITE ADDRESS: 9725 B Marginal Wy S SUITE NO.
PROJECT NAME/T NANT: Boeing 1/9 - 120.3 LVALUE OF WORK: $ 24, 235.00
TYPE OF WORK: X New /Addition 0 Modifications ( Repair ( j Other:
DESCRIPTION OF WQRK; Install two chilled water A/C and one chilled water coil.
P.O. Box 3707,
PROPERTY OWNER:
Boeing
PHONE: 544 - 2975
ADDRESS:
P.O. Box 3707,
M/S 46 - 87,
Seattle, WA 1ZIP: 98124 - 2207
CONTRACTOR:
Boeing
PHONE: 544 - 2975
ADDRESS:
P.O. Box 3707,
MIS 46 - 87,
Seattle, WA IZIP: 98124 - 2207
WA. ST. CONTRACTOR'S LICENSE NO. 9EINc 29.4ML
EXPIRATION DATE: 1 - 01 - 93
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
MECHANICAL
PERMIT NON 05D C/ir\
DATE ISSUED:
MECHANCAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
irkleRP2.553101
Basic Permit Fee!<<< >'
i
Othe
Plan Check No.:
? TAL .
AMOU NT> ' '> RECEIP
91 -098 -M
A Y A %: A.t :A® X. Y
1 - Rough - inNents /Ducts
2 - Fire Final
3 - Planning Final
4-
5 - Mechanical Final
DATE(S)
REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE ISSUED
431 -3670
575 -4407
431 -3680
4 1
DATE
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296 -4732)
Electrical - Washington State Department of Labor and Industries (277 -7272)
ris permit s hall become null,and v oidtf th w ork is not commenced within 180 days from the date
issuance, orlf the work is sus ended or abandoned for a period of 180 da s from the last::ins uctio
fr
PERMIT NO.
CONTACTED
�-r
DATE READY
DATE NOTIFIED
6 "'
BY:
(init.) ro
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(Init.)
AMOUNT OWING
r 1, r ^ r�
l( J t�
3RD NOTIFICATION
BY:
(init.)
f - MECHANICAL: PERMIT
APPLICATION TRACKING
PLAN CHECK
NUMBER
C U — C51
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
BUILDING - 00 4 �
initial review
O FIRE
O PLANNING
O OTHER
6Q BUILDING - / �� ��
final rAviAw (�
REVIEW COMPLETED
PROJECT NAME
r)o-e 1 y q- i� .3
SITE ADDRESS SUITE NO.
E 11\043
;APPROVE
(ROUT D
INIT:
INIT:
INIT:
6-61 cit
INIT:
ZONING':
U1REME
FIRE DEPT. LETTER DATED:
SCREENING REQUIRED? ( ( No
REFERENCE FILE NOS.:
UMC EDITION (year):
M OB
CONSULTANT: Date Sent - Date Approved -
FIRE PROTECTION: Sprinklers Detectors N/A
INSPECTOR:
BAR/LAND USE CONDITIONS? Yes No
08/17/90
6200 Southcenter Boulevard, Tukwila WA 98188
206 433 - 1849 BEROSIK JOB #91 -03
<, » DEsOHIPTIo ,>4s;: �'
',.. AMOUNT:
RCI?'1r >w
>x : ?:.1�A'YEM
SICPER Nl T• ' FEE r:
B A'
` "s4 �_.,
" " '`
7axtx'I;. : {: ';:
:
'` J' ° ;'
" "' "•``
ADDRESS • • ;.. I u a . —: d WWII
r> <. ' :;'`,
:,�, > ,r,...; : ,,
,::,•.., :f;,�. .
UNITES) : FEEY: .;t;.fK:ri ;
PLAN CHECK
NUMBER
�. 0 q t
PHONE (206) 544-2975
/'k F.4'I ;y !.
PL AN' C EC EEs pi a <:txl:J
•
v is f> (
?s l ; ::I
f < "•. S % %t:'`
t4.. r: om.::.Wr.
ti y 'PA ` %'
• : i,u:d'...r :g
• i�l >�. g :�: , . ,:.. •,.,. ;f 4t r•. ; �
T ER! .a . < < ,s:?►�::..;.:1<. ^.evi �i::,:,!�
:t. s til•;!'?�,:a.T' "!'a:f.• `�: �. ,r.• . � �
�•`f:l! s 4:�i.�`.rre AT ;
' :
.�� ` • ,•.,� .• ,.
:;i:i�:vr;.ttz��t>".fi'
APPLICATION MUST BE FILLED OUT COMPLETELY
;. 'ti ��• >� ?:: ":" ?: :.::.��,;<f :;},<;:!:•� = •4� � TOTAL .rw:.:;% y "
';';'; :s
,;: ::,:� ::: ,� -`. > x
'. i ••
3'%!3;i #: L ii : a'.:
ty..,; :
<,: :N'1
t >s:
.iw,, a1114`t: :•: :.y�L,:,= R�w`
`SITE ADDRESS SUITE 4
;9725 E. MARGINAL WAY SO. BLDG. #9 - 120.3
VALUE OF CONSTRUCTION - $ 24,235,
•
PROJECT NAME/TENANT
BOEING MILITARY AIRPLANES
TYPE OF WORK: a New /Addition 0 Modifications 0 Repair 0 Other: •
DESCRIBE WORK TO BE DONE:
• - ,_ A e►IO • II ,a : •
... .. . ...•...: . :: .....: .::.'. ,: >: Vi i ::'. 1 W I : ' : : : :.� '4:S`�I • ' :
.. J , } :v i
..: :... ... �.,.. �. �... .. ....:.,•:.......,......., ...:.. . ... : �,: , .... ... .. . � Y pp
Utz ..
ALf IINTT 5,rinn CFM 2
WATFR rn 1I ( 1
BUILDING USE (office, warehouse, etc.)
OFFICE /LAB •
NATURE OF BUSINESS:
AIRPLANES •
WILL THERE BE A CHANGE iN USE? GO No 0 Yes IF YES, EXPLAIN:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? ® No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER, BOEING MILITARY AIRPLANES
PHONE 206 544 -2975
ADDRESS . P,O.BOX 3707 M S 46 -87 SEATTLE
WA.
ZIP 98124 - ?. ?.
CONTRACTOR BOEING MILITARY 'A • • ia.
PHONE • -
ADDRESS • • ;.. I u a . —: d WWII
, d
ZIP
WA, ST. CONTRACTOR'S LICENSE # BOEING - 29 M.
EXP. DATE _ -
ARCHITECT
PHONE (206) 544-2975
CITY OF TUKWILA
Dep artment of Community Development - Building, Division
ADDRESS
EFIE Y`;QER9I
0E
BUILDING OWNER
OR
AUTHORIZED
AGENT
P.O. BOX 3707 M S 46 -87 SEATTLE WA
:HA: •> A.
•T
Crs't°AND. •1
SIGNATURE
HOR1Z
)f i l�!111
MECHANICAL PERMIT
APPMATION
Mechanical Fee Worksheet must also be filled out and attached to this = • •!;cation.
M P•
fl
FEES (for staff use only)
ZIP
<� O
� t ••A.N[�: KN
QW TH.E..SAME.T .,.Bf;.
' `'E a:: �::C; ::i <F•e•`:: ':i l•b4;:•:$.• Sat' 2;:EfiJ;i•iY ??�ai.1,:5Ci::RY.:> < .RG(;• 5:;.. :;� �;:,'y
the .1'::1.'f, . il.�>j� ' .• ;f :,.
DATE
05 - 30 - 91
:CONTACT PERSON
: APPLICATION ACCEPTED
PRINT NAME TERRY BENUE=
ADDRESS P.O. BOX 3707, M/S 46 -87 SEATTLE, WA.
_ TERRY BENNETT
DATE APPLICATION EXPIRES
PHONE
(206) 544 -2975
CITY/ZIP 98124 -2207
PHONE (206) 544 -2975
A PPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make surd to IIII
out the application completely and follow the plan submittal checklist on the reverse side of this form. ' A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
ulalls'Inuyt be c o'riiulete in• Alec iu "uv au:eoted for clan review.
i UILDING OWNER / AUTHORIZED AGENT If the applicant Is other than the owner, registered architect/engineer, or
contractor licensed by the Sta %o of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
ALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled In by the
applicant. This figure Is used for budget 'reporting purposes only and not to calculate your lees.
XPIRATION OF PLAN REVIEW Applications for which no permit Is issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined In Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 433 -1849.
til 1 T Vr / UAVVILH
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 - 1849
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
INSTRUCTIONS - Complete the worksheet,
Indicating the number of units being installed
in each category, multiplied by the unit cost.
Then tally the subtotal column highlighted at
the bottom of the worksheet. At time of
submittal, staff will calculate the remaining fees.
DESCRIPTION
UNIT COST
NO. OF
UNITS
X
TOTAL
COST
BASIC FEE
$15.00
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$9,00
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, Including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
X
3
Installation or relocation of each floor furnace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
X
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
1
j
X
'7
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9,00
X
8
Installation or relocation of each boiler,or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
, 9
Installation or relocation of each boiler or compressor over 15
horsepower to and Including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu /h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
X
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
X
12
Each air - handling unit to and Including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
2 Cr
13
13
Each air - handling unit over 10,000 cfm.
$11.00
X
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
X
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.00
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
X
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
SUBTOTAL (unit fee)
3700
PLAN CHECK FEE ;ub fell
q. a5
GRAND TOTAL
$4(0,0
MECHANI AL PERMIT
FEE WAKSHEET
CITY OF TUKWILA
6200 SOUTHCGNTER BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91- 098 -M: Boeing #9 -120.3
9725 E Marginal Wy S
PHONE # (206) 433.1800 Gary L. VanDusen, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART F THE APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER Q� (p'1
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County
Health Department and plumbing will be inspected by that
agency, including all gas piping (296 - 4722).
3. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
4. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
5. Readily accessible access to roof mounted equipment is
required.
6. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
7. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
8. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
PROJECT: � �� -`�'0
PERMIT NO. n
I � �,� _.- � y'
DATE CALLED: j ^ -I - ?/
SITE ADDRESS: , ,r.:r sii_ 471 Vii// 4
TYPE OF INSPEC • MO f I
DATE WANTED: • c° c' - -- G/ /
REQUESTER: // �� �
�`
PHONE NO.: • ` ? /i&
a m
S D7nt,
SPECIAL INSTRUCTIONS: - � ,.C,( l�/J,P1 C
• 11
hi .. ( 4 _.
..L.'
INSPECTION RESULTS /COMMENT - . i _
INSPECTOR: Cii .O DATE: & --'
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
....•. w....�.n.»+....,..,,w....n�.a,n x,rw..ix01Ifir eil<v.,55r.a0 ∎144"tI A;":0,..4 er, mrs. W+: nsir,...+ axnn.> H. awrw w..« ,.r..nr......vs «.�.....
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT: A q --0
PERMIT NO. 05 a Co --
M
DATE CALLED: ;r -' d —' q
SITE ADDRESS: ' + ,, rd . 1 i g I f
TYPE OF INSPECTION: L .L.0 � /
DATE WANTED: g r / a- ---q 1
' •
-SPECIAL INSTRUCTIONS: 1 L , , , .. f
I
1
REQUESTER: A Cl c% '
0A- 44m
PHONE NO.: " 7 (p `7 . 7 //
6,
INSPECTION RESULTS/COMMENTS: Apv „ 4
_ 4 . , _ ,� ,, _,
It-1 14- (
,
INSPECTOR: "•4.--- /144✓"'1
DATE: G- : el
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT: /'5 ®jeA q-/,,,c).
PERMIT NO. 06 �o
SITE ADDRESS: q' g- / / /ca , / /
S .
DATE CALLED:
-/g 9/
TYPE OF INSPECTION: / ,,/ /4 , , ��
DATE WANTED:
GJ
/
SPECIAL INSTRUCTIONS:
REQUESTER:
�y , I i, / c 1
PHONE NO.:
76. f 7/1 /
INSPECTION RESULTS /COMMENTS: (.94
T,,
/y, ice /,,�
,
` � '
INSPECTOR: errp ,��/
DATE:
�.7 /f= y/
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
s r..o : At Ion
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PAN REVIEW COMME■TS
Plan Check No.: " Oct 's M Project: 150E.11.4( - 1 2.0 . ?j
REQUIRED INSPECTIONS
X No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277 - 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
X Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should bo made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shalt have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
• (a) 7.
X Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1. Footings
2. Foundation
3. Slab/Slab Insulation
4. Shear Wall Nailing
5. Roof Sheathing Nailing
6. Masonry Chimney
7. Framing
8. Insulation
9. Suspended Ceiling
10. Wall Board Fastening
k
11.
12.
13.
14. Fire Final
15. Planning Final
16. Public Works Final
17. Building Final
PAN REVIEW COMME■TS
Plan Check No.: " Oct 's M Project: 150E.11.4( - 1 2.0 . ?j
REQUIRED INSPECTIONS
X No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277 - 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
X Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should bo made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shalt have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
• (a) 7.
X Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
A IS Ef�TA431UTY
THIS DE9GN ANO�oR
SPECUTCATIoN IS APPROVED
DRAWING INDEX
SHEET
N0.
SHEET TITLE
SHE E1
NU.
SHEET TITLE
M -1
TITLE. SHEET
DATE .
6130 -D- -120- 7.33 PARTIAL FLOOR PLAN
4100 -M2
4519-M1
4519 - -M2
PARTIAL FLOOR PLAN
Al
PARTIAL_ FLOOR PLAN
DETAILS & SECTIONS
APPROVE!) BY
DEPT.
4s R-. -N\\ PE PAOU TtoNt
E 4?"
+ stat , s"- ,
22 BAR 91
Tint
_
MECHANICAL MASTER
D.C.
,6,,,
::::
A IS Ef�TA431UTY
THIS DE9GN ANO�oR
SPECUTCATIoN IS APPROVED
DRAYd BY
S. REYNOLDS
DATE
12-20-90
SUBTITLE
T) -� L F { .T.
LAST REVS3ON
SY1dBDl
DATE .
CHECKED
SHEET
I V
Al
APPROVE!) BY
DEPT.
DATE
E 4?"
+ stat , s"- ,
22 BAR 91
Tint
_
MECHANICAL MASTER
D.C.
,6,,,
::::
917007-02 & -� 03
�
��•M
DWD NO.
OR DASH # --02 & -03
99
r 14 —M ]
[... PROJECT
SITE
7 -127
KING COUNTY
AIRPORT OFFICE
CENTER (FAA)
99
FROM SEATTLE - TACOMA AIRPORT
F ♦ j 4t+ Y -l Y Y C ✓wt
✓ ers3Ya�i�? 1w G J r �. ... fQ .rf �•y.5r af'
BOENG
LDG
VICINITY MAP
FR I DOWNTOWN SEATTLE
EAST MARGINAL WAY
CORPORATE PARK
599
TUKWILA
900
EXIT
157 --
EXIT
158
DEVELOPMENTAL CENTER
I I IILLIl IIIIiIIIIIIIII .IIIII�;`I. 'I1II'1III1,1,�� t,
le THS INCH I
0 1 2 3
0 c 6 86 LZ 9 SZ 4 7Z ` CZ.
( 11111111I 111I11II)ILII ialIIILIIII I1fIf1111i�LiiI jl11111!I
r r
1E11III11111 111111 1 1I1I111I111 1111111111 111 III 1111111 III
4 5 6 7
NOTE: If the microfilmed _ .._.
. document is less clear
notice, 16 is due to the quality of the original
ZZ LZ 0? 61. Qt
II II, 1 If!II IIIIIIIIII! IIIIII!
III
8
than this
document.
;,t 9t St +/t et Zt • tt 01, 6 8 L
11 1 1 !I!II I IIii l ili! 1 11 ! 1 � 1 1111 111111111 1 11 1 11ilil llilliif 11111! l! IIII�Iillli !flllIIIfIIfIIIIillll!IIIIIIti If
• �, .!� '';;.R /�.... /��'�,f �. G',i" P .. ..( `%F�F�1; .K 1fJ F, S'Z �l �.i:� i�l"' t. f.
s e t WW0
I !IIIiI!IIIIIII111111IIIIIf1 111111111 IIiIIIIIIIIIIIII
FROM KENT
& AUBURN
—EXIT
157
900
NO SCALE
S
L
3RD IR
EDNG
725 E S
TUKWIL
Y
BLDG. ADDRESS:
9725 E. NARGINAI WAY S.
iUKWILA,WASHINGTON
AREA MAP
TM
PROJECT
SITE
9 -120 BUILDING LOCAITON
IASEratElAlig
FACILITIES DEPARTMENT
ARK
NO SCALE
PMENT
RGON W
SHINGT N
W'i�r ^' -iwti4.
ig.S.,a....wN.L.le�.+ren:�. :::...1., i. m * R..�ci;mn -...0 ;;
t BRIEF PROJECT NARRATIVE
C I AUBURN, WA.
❑ EVERETT, WA.
Li KENT, WA.
C; PORTLAND, OR.
D REN TON, WA.
N SEATTLE, WA.
98002
98201
98031
97220
98055
98124
NES c SEAT'
GENERAL NOTES
CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED LAY CITY OF TUKWILA MUST
BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT
ABOVE MENTIONED SET OF DOCUMENTS.
1. VERIFY ALL DIMENSIONS AND CONNECTIONS BEEORE ANY WORK.
2. NOTIFY FACILITY ENGINEERS SHOULD EXISTING CONDITIONS REQUIRE DESIGN REVISIONS.
3. COORDINATE WORK WITH OTHER CRAFTS.
4, RETURN THIS SAME SET TO TERRY BENNETT AT BLOC. 9 -51 COL N /1, AFTER COMPLETION
OF THIS CONSTRUCTION,
PROJECT CHECKLIST
❑ ENGINEERING CALCULATIONS ( IF APPLICABLE )
CI ROOMS LABELED PER OCCUPANCY PER U.B.C. TABLE 33-A.
13 BUILDING FLOOR NUMBER ON PRINT FOR AREA OF CONSTRUCTION.
NUMBER OF PRINTS REQUIRED FOR PERMIT PACKAGE:
❑ 1. GENERAL ( PERMIT SHELL & C ORE)
6 SETS OF ENERGY CALCULATIONS
2 SETS OF CIVIL DRA4MNGS WITH UTILITIES
2 SETS SOILS REPORTS, STAMPED BY GEOTECHNICAL ENGINEER
2 SETS STRUCTURAL CALCULATIONS
2 SETS PROJECT CONSTRUCTION SPECIFICATIONS
2 SETS TOPOGRAPHICAL SURVEY
2 COPIES OF LEGAL DESCRIPTION
2 SETS OF WORKING DRAWINGS
0 2. TENANT IMPROVEMENTS, 2 COMPLETE SETS
El 3. MECHANICAL, 2 COMPLETE SETS
❑ 4. FIRE PROTECTION /SPRINKLERS, 2 COMPLETE SETS
0
CENTER
SOLDT�I
c'ACE
iBI THESE DRAWINGS CONFORM TO THE 1988 U.B.C., U.F.C., U.P.C,, AND THE 1990 BARRIER
FREE CODE AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH
CITY OF TUKWILA ZONING.
MECHANICAL IMPROVEMENTS ON THIS JOB CONSIST OF THE FOLLOWING:
1. INS TALL (2) 12 TON COOLING UNITS IN NEW LAB SPACE. .
2. REPLACE EXISTING HEATING COIL WITH COOLING COIL IN REFURBISHED DUCT BRANCH.
3. DI iC1ING COOLED AIR DOWN THROUGH NEW SUSPENDED CEILING.
4. RELATED TRADES TO BE PERFORMED WITH THIS PROJECT: ARCHITECTURAL,
Ef. ECTRICAL AND FIRE PROTECTION.
LAND USE CODE
BUILDING CODES
REV
OCCUPANCY GROUP
CONSTRUCTION TYPE
FLOOR AREAS:
BUILDING FOOTPRIN1
BUILDING CROSS
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
BUILDING HEIGHT
STORIES
OCCUPANT LOAD:
HANDICAPPED REQUIRE - MEN IS
FIRE PROTECTION
SEISMIC ZONE
SEPNRRT
PERK
APPRO J
REQ111P,9
Si
CODE SUMMARY
181,826
181,826
74,362
75,530
31,710
224
54 FT
4
NO CHANGES
eLeCI IC
,y w
NS
TUKWILA
1988 UBC, WASHINGTON STATE ENERGY CODE, WASHINGTON
STATE BARRIER FREE CODE AND ADDITIONS PER CITY OF TUKWILA
GROUP B, DIVISION 2, OFFICE & FACTORY
TYPE II, N
BARRIER FREE
FULLY AUTOMATIC, F/S CLASS 1 SPRINKLERS `THROUGHOUT
7
I understand that the Plan Check approvals are
subject to errors and omissions and approval of
p:;ff!c does not authorize the violation of any
adopted code or ordinance. Receipt of con-
tractor's copy of approved plans acknowledged.
By ;�-
Dete /?.
Permit No.
RECEIVED
are OF TUKWILA
are
MAY 30 1991
PERMIT CENTER
ror
AUSTIN ASSOCIATES
KEY PLAN
DETAILS
CONSTRUCTION NOTES
AIR CONDITIONING
PLAN
APPROVED
DRAWN (sY
APPROVED
REVISION
APPROVED
WATER, WASTE 81 VENT LINES
- CAULK /WOUND WINIDO1A/3 OF
FUNNEL DR.AIN5 IN AREA.
--FUNNEL R.ELOCATED
FROM NEAR COL. B.G
FUNNEL DRAIN ELEVATION DETAIL
MASTER DRAWING OF UTILITIES
3RD FLOOR BLDG. 9.120
WOOD TOP WITH 1-40LE5
FOR THE TWO PIPES ONLY.
VENT LINE
TO RRICER-- 11
'<
RECEIVED
CITY (1FTIIKWII_A
MAY 3 0 1991
PERMITCENTEP
HEY PLAN
BU/LOING 3•12c)
FUNNEL.
TO SINK DR/1N
LAST REVISION
SHEET
JOS NO.
( 1110 1. )
DWG N° ' 09 12 0 - 4100
0
rr
„,,,;;;;;,„
' 4
BALCONY
SMOKE
FIRESTAT FIRE DAMF
12/ FIRE DAMPER
CONTROL
RANGE
-SMOKE
BALCONY
FACILITIES DEPARTMENT
ACCEPTABILITY
THIS DESIGN ANDS
SPECIFICATION IS APPROVED
I s ALL DUCTWORK( SHALL BE INSTALLED W t TH BOTTOM OF DUCT LEVEL
2. FOR TYPICAL RADIATION INSTALLATION SEE DRAWING 6130-D-12.0-Z09
3. FOF TYPICAL AHU ELEVATION AND DETAILS SEE DRAWING 6130- D-120 -216
4. FOR AHU CONTROL DIAGRAMS SEE DRAWING 61307 -D -120 -22-5
5. FOR REL i EF DAMPER CONTROL DIAGRAMS SEE DRAWING 6130 -D- 120 -224
G. KEY TO RADIATION
-
NUMBER OF TIERS
MBH
LINEAL FT. (BASED ON SPECIFIED RADIATION)
T, THIS DRAWING SUPERSEDES DRAWING 6130- - D- I20-
NOTES
CONSTRUCTION NOTES
SCALE: I
3RD FLOOR HVAC PLAN
KEY PLAN
RECEIVED
CITY OF TUKWILA
PERMIT CENTER
PERMIT CENTER
REVISION
Eal APPROVED
DATE
REVISION
BY
APPROVED
DATE
FACILITIES DEPARTMENT
A CCEPTABILITY
TNIS DESIGN SUBTITLE
SECTION DETAILS LAST REVISION
SYMBOL
DATE
_
APPROVED BY
DEPT
APPROVED
HEAD PRESSURE
LIMIT SWITCHES
EXPANSION VALVE
REFRIGERANT PIPING DIAGRAM
AIR
12
CONSTRUCTION NOTES
ROOF
ANTENNA
RANGE
12=0"
HAWN .R ECIK I,M.ION FAN
DETAIL /if
RECEIVED
BALCONY
( - (I ) 4 SECTION
6/25 FIRESTIIT FIRE OAMPL
(NOIMALLY CLOSED
BALCONY
2. FOR Typ:cAL RADIATION It\ISTALLATiON DR.AkAil i\IG
.3. FOR T'Y'PI CAL. Al--1(J ELEVATION AND L2E:TAIL5 DRAWING 1)42O-ZIG
44 FOR AHU CONTROL DIAGRAMS SEE ORAWINK, 61.30-1)-1a0- Z2..5
5. FOR RE A I EF DAMPER CONTROL IAA GR'Alvi]) 5EE DRAWING 6130 /20 4
KEY TO RADIATION
LINEAL FT. (13A5ED ON 5PECI F I ED RADIATI'ON)
7. TH I 5 DRAW1 SJ6 SUPERSEDES DRAWING (-; I 30 -0 -120 -Z10