Loading...
HomeMy WebLinkAboutPermit 0526-M - BOEING #9-120.30526-M 91-098 BOEING #9-120.3 HVAC 9725 EAST MARGINAL WAY SOUTH BDE/1■16 * 12045 ::; :::. ::.:>:;:::;;>::<::::::;::: ;::::< <:::.:RRO:IECTMNFORMAT O ... ... .. . u D • 1988 PROJECT NAME/T NANT: Boeing 1/9 - 120.3 LVALUE OF WORK: $ 24, 235.00 FIRE PROTECTION: Sprinklers C )Detectors (X) N/A DESCRIPTION OF WQRK; Install two chilled water A/C and one chilled water coil. CONDITIONS (other than noted on or attached to permit / M/S 46 - 87, Seattle, WA 1ZIP: 98124 - 2207 CONTRACTOR: APPROVED FOR Q , ' BUILDING ISSUANCE BY: 4,, ' . , . ` OFFICIAL DATE: C' -' %/ PHONE: 544 - 2975 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. SIGNATURE:`'�/� �/� -ce DATE: -- /,2 — 9/ • ! PRINT NAME: - % -- /�,c�.� 4/ , t= /l/i(J/ /� V COMPANY: �'` G � ?4! ::; :::. ::.:>:;:::;;>::<::::::;::: ;::::< <:::.:RRO:IECTMNFORMAT O ... ... .. . SITE ADDRESS: 9725 B Marginal Wy S SUITE NO. PROJECT NAME/T NANT: Boeing 1/9 - 120.3 LVALUE OF WORK: $ 24, 235.00 TYPE OF WORK: X New /Addition 0 Modifications ( Repair ( j Other: DESCRIPTION OF WQRK; Install two chilled water A/C and one chilled water coil. P.O. Box 3707, PROPERTY OWNER: Boeing PHONE: 544 - 2975 ADDRESS: P.O. Box 3707, M/S 46 - 87, Seattle, WA 1ZIP: 98124 - 2207 CONTRACTOR: Boeing PHONE: 544 - 2975 ADDRESS: P.O. Box 3707, MIS 46 - 87, Seattle, WA IZIP: 98124 - 2207 WA. ST. CONTRACTOR'S LICENSE NO. 9EINc 29.4ML EXPIRATION DATE: 1 - 01 - 93 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 MECHANICAL PERMIT NON 05D C/ir\ DATE ISSUED: MECHANCAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) irkleRP2.553101 Basic Permit Fee!<<< >' i Othe Plan Check No.: ? TAL . AMOU NT> ' '> RECEIP 91 -098 -M A Y A %: A.t :A® X. Y 1 - Rough - inNents /Ducts 2 - Fire Final 3 - Planning Final 4- 5 - Mechanical Final DATE(S) REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE ISSUED 431 -3670 575 -4407 431 -3680 4 1 DATE OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296 -4732) Electrical - Washington State Department of Labor and Industries (277 -7272) ris permit s hall become null,and v oidtf th w ork is not commenced within 180 days from the date issuance, orlf the work is sus ended or abandoned for a period of 180 da s from the last::ins uctio fr PERMIT NO. CONTACTED �-r DATE READY DATE NOTIFIED 6 "' BY: (init.) ro PERMIT EXPIRES 2nd NOTIFICATION BY: (Init.) AMOUNT OWING r 1, r ^ r� l( J t� 3RD NOTIFICATION BY: (init.) f - MECHANICAL: PERMIT APPLICATION TRACKING PLAN CHECK NUMBER C U — C51 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. BUILDING - 00 4 � initial review O FIRE O PLANNING O OTHER 6Q BUILDING - / �� �� final rAviAw (� REVIEW COMPLETED PROJECT NAME r)o-e 1 y q- i� .3 SITE ADDRESS SUITE NO. E 11\043 ;APPROVE (ROUT D INIT: INIT: INIT: 6-61 cit INIT: ZONING': U1REME FIRE DEPT. LETTER DATED: SCREENING REQUIRED? ( ( No REFERENCE FILE NOS.: UMC EDITION (year): M OB CONSULTANT: Date Sent - Date Approved - FIRE PROTECTION: Sprinklers Detectors N/A INSPECTOR: BAR/LAND USE CONDITIONS? Yes No 08/17/90 6200 Southcenter Boulevard, Tukwila WA 98188 206 433 - 1849 BEROSIK JOB #91 -03 <, » DEsOHIPTIo ,>4s;: �' ',.. AMOUNT: RCI?'1r >w >x : ?:.1�A'YEM SICPER Nl T• ' FEE r: B A' ` "s4 �_., " " '` 7axtx'I;. : {: ';: : '` J' ° ;' " "' "•`` ADDRESS • • ;.. I u a . —: d WWII r> <. ' :;'`, :,�, > ,r,...; : ,, ,::,•.., :f;,�. . UNITES) : FEEY: .;t;.fK:ri ; PLAN CHECK NUMBER �. 0 q t PHONE (206) 544-2975 /'k F.4'I ;y !. PL AN' C EC EEs pi a <:txl:J • v is f> ( ?s l ; ::I f < "•. S % %t:'` t4.. r: om.::.Wr. ti y 'PA ` %' • : i,u:d'...r :g • i�l >�. g :�: , . ,:.. •,.,. ;f 4t r•. ; � T ER! .a . < < ,s:?►�::..;.:1<. ^.evi �i::,:,!� :t. s til•;!'?�,:a.T' "!'a:f.• `�: �. ,r.• . � � �•`f:l! s 4:�i.�`.rre AT ; ' : .�� ` • ,•.,� .• ,. :;i:i�:vr;.ttz��t>".fi' APPLICATION MUST BE FILLED OUT COMPLETELY ;. 'ti ��• >� ?:: ":" ?: :.::.��,;<f :;},<;:!:•� = •4� � TOTAL .rw:.:;% y " ';';'; :s ,;: ::,:� ::: ,� -`. > x '. i •• 3'%!3;i #: L ii : a'.: ty..,; : <,: :N'1 t >s: .iw,, a1114`t: :•: :.y�L,:,= R�w` `SITE ADDRESS SUITE 4 ;9725 E. MARGINAL WAY SO. BLDG. #9 - 120.3 VALUE OF CONSTRUCTION - $ 24,235, • PROJECT NAME/TENANT BOEING MILITARY AIRPLANES TYPE OF WORK: a New /Addition 0 Modifications 0 Repair 0 Other: • DESCRIBE WORK TO BE DONE: • - ,_ A e►IO • II ,a : • ... .. . ...•...: . :: .....: .::.'. ,: >: Vi i ::'. 1 W I : ' : : : :.� '4:S`�I • ' : .. J , } :v i ..: :... ... �.,.. �. �... .. ....:.,•:.......,......., ...:.. . ... : �,: , .... ... .. . � Y pp Utz .. ALf IINTT 5,rinn CFM 2 WATFR rn 1I ( 1 BUILDING USE (office, warehouse, etc.) OFFICE /LAB • NATURE OF BUSINESS: AIRPLANES • WILL THERE BE A CHANGE iN USE? GO No 0 Yes IF YES, EXPLAIN: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? ® No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER, BOEING MILITARY AIRPLANES PHONE 206 544 -2975 ADDRESS . P,O.BOX 3707 M S 46 -87 SEATTLE WA. ZIP 98124 - ?. ?. CONTRACTOR BOEING MILITARY 'A • • ia. PHONE • - ADDRESS • • ;.. I u a . —: d WWII , d ZIP WA, ST. CONTRACTOR'S LICENSE # BOEING - 29 M. EXP. DATE _ - ARCHITECT PHONE (206) 544-2975 CITY OF TUKWILA Dep artment of Community Development - Building, Division ADDRESS EFIE Y`;QER9I 0E BUILDING OWNER OR AUTHORIZED AGENT P.O. BOX 3707 M S 46 -87 SEATTLE WA :HA: •> A. •T Crs't°AND. •1 SIGNATURE HOR1Z )f i l�!111 MECHANICAL PERMIT APPMATION Mechanical Fee Worksheet must also be filled out and attached to this = • •!;cation. M P• fl FEES (for staff use only) ZIP <� O � t ••A.N[�: KN QW TH.E..SAME.T .,.Bf;. ' `'E a:: �::C; ::i <F•e•`:: ':i l•b4;:•:$.• Sat' 2;:EfiJ;i•iY ??�ai.1,:5Ci::RY.:> < .RG(;• 5:;.. :;� �;:,'y the .1'::1.'f, . il.�>j� ' .• ;f :,. DATE 05 - 30 - 91 :CONTACT PERSON : APPLICATION ACCEPTED PRINT NAME TERRY BENUE= ADDRESS P.O. BOX 3707, M/S 46 -87 SEATTLE, WA. _ TERRY BENNETT DATE APPLICATION EXPIRES PHONE (206) 544 -2975 CITY/ZIP 98124 -2207 PHONE (206) 544 -2975 A PPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make surd to IIII out the application completely and follow the plan submittal checklist on the reverse side of this form. ' A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and ulalls'Inuyt be c o'riiulete in• Alec iu "uv au:eoted for clan review. i UILDING OWNER / AUTHORIZED AGENT If the applicant Is other than the owner, registered architect/engineer, or contractor licensed by the Sta %o of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. ALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled In by the applicant. This figure Is used for budget 'reporting purposes only and not to calculate your lees. XPIRATION OF PLAN REVIEW Applications for which no permit Is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined In Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 433 -1849. til 1 T Vr / UAVVILH Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 - 1849 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. INSTRUCTIONS - Complete the worksheet, Indicating the number of units being installed in each category, multiplied by the unit cost. Then tally the subtotal column highlighted at the bottom of the worksheet. At time of submittal, staff will calculate the remaining fees. DESCRIPTION UNIT COST NO. OF UNITS X TOTAL COST BASIC FEE $15.00 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu /h. $9,00 X 2 Installation or relocation of each forced -air or gravity -type furnace or burner, Including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 X 3 Installation or relocation of each floor furnace, including vent. $9.00 X 4 Installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. $4.50 X 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 1 j X '7 7 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9,00 X 8 Installation or relocation of each boiler,or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 X , 9 Installation or relocation of each boiler or compressor over 15 horsepower to and Including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu /h. $22.50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 X 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 X 12 Each air - handling unit to and Including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 2 Cr 13 13 Each air - handling unit over 10,000 cfm. $11.00 X 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 X 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6.50 X 18 Installation or relocation of each commercial or industrial -type incinerator. $11.00 X 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 X 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee is listed in this code. $6.50 X SUBTOTAL (unit fee) 3700 PLAN CHECK FEE ;ub fell q. a5 GRAND TOTAL $4(0,0 MECHANI AL PERMIT FEE WAKSHEET CITY OF TUKWILA 6200 SOUTHCGNTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91- 098 -M: Boeing #9 -120.3 9725 E Marginal Wy S PHONE # (206) 433.1800 Gary L. VanDusen, Mayor THE FOLLOWING COMMENTS APPLY TO AND BECOME PART F THE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER Q� (p'1 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4722). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). 4. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 5. Readily accessible access to roof mounted equipment is required. 6. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 7. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 8. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. PROJECT: � �� -`�'0 PERMIT NO. n I � �,� _.- � y' DATE CALLED: j ^ -I - ?/ SITE ADDRESS: , ,r.:r sii_ 471 Vii// 4 TYPE OF INSPEC • MO f I DATE WANTED: • c° c' - -- G/ / REQUESTER: // �� � �` PHONE NO.: • ` ? /i& a m S D7nt, SPECIAL INSTRUCTIONS: - � ,.C,( l�/J,P1 C • 11 hi .. ( 4 _. ..L.' INSPECTION RESULTS /COMMENT - . i _ INSPECTOR: Cii .O DATE: & --' CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 ....•. w....�.n.»+....,..,,w....n�.a,n x,rw..ix01Ifir eil<v.,55r.a0 ∎144"tI A;":0,..4 er, mrs. W+: nsir,...+ axnn.> H. awrw w..« ,.r..nr......vs «.�..... INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: A q --0 PERMIT NO. 05 a Co -- M DATE CALLED: ;r -' d —' q SITE ADDRESS: ' + ,, rd . 1 i g I f TYPE OF INSPECTION: L .L.0 � / DATE WANTED: g r / a- ---q 1 ' • -SPECIAL INSTRUCTIONS: 1 L , , , .. f I 1 REQUESTER: A Cl c% ' 0A- 44m PHONE NO.: " 7 (p `7 . 7 // 6, INSPECTION RESULTS/COMMENTS: Apv „ 4 _ 4 . , _ ,� ,, _, It-1 14- ( , INSPECTOR: "•4.--- /144✓"'1 DATE: G- : el CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: /'5 ®jeA q-/,,,c). PERMIT NO. 06 �o SITE ADDRESS: q' g- / / /ca , / / S . DATE CALLED: -/g 9/ TYPE OF INSPECTION: / ,,/ /4 , , �� DATE WANTED: GJ / SPECIAL INSTRUCTIONS: REQUESTER: �y , I i, / c 1 PHONE NO.: 76. f 7/1 / INSPECTION RESULTS /COMMENTS: (.94 T,, /y, ice /,,� , ` � ' INSPECTOR: errp ,��/ DATE: �.7 /f= y/ CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 s r..o : At Ion INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PAN REVIEW COMME■TS Plan Check No.: " Oct 's M Project: 150E.11.4( - 1 2.0 . ?j REQUIRED INSPECTIONS X No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277 - 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. X Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should bo made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shalt have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 • (a) 7. X Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab/Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening k 11. 12. 13. 14. Fire Final 15. Planning Final 16. Public Works Final 17. Building Final PAN REVIEW COMME■TS Plan Check No.: " Oct 's M Project: 150E.11.4( - 1 2.0 . ?j REQUIRED INSPECTIONS X No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277 - 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. X Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should bo made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shalt have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 • (a) 7. X Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. A IS Ef�TA431UTY THIS DE9GN ANO�oR SPECUTCATIoN IS APPROVED DRAWING INDEX SHEET N0. SHEET TITLE SHE E1 NU. SHEET TITLE M -1 TITLE. SHEET DATE . 6130 -D- -120- 7.33 PARTIAL FLOOR PLAN 4100 -M2 4519-M1 4519 - -M2 PARTIAL FLOOR PLAN Al PARTIAL_ FLOOR PLAN DETAILS & SECTIONS APPROVE!) BY DEPT. 4s R-. -N\\ PE PAOU TtoNt E 4?" + stat , s"- , 22 BAR 91 Tint _ MECHANICAL MASTER D.C. ,6,,, :::: A IS Ef�TA431UTY THIS DE9GN ANO�oR SPECUTCATIoN IS APPROVED DRAYd BY S. REYNOLDS DATE 12-20-90 SUBTITLE T) -� L F { .T. LAST REVS3ON SY1dBDl DATE . CHECKED SHEET I V Al APPROVE!) BY DEPT. DATE E 4?" + stat , s"- , 22 BAR 91 Tint _ MECHANICAL MASTER D.C. ,6,,, :::: 917007-02 & -� 03 � ��•M DWD NO. OR DASH # --02 & -03 99 r 14 —M ] [... PROJECT SITE 7 -127 KING COUNTY AIRPORT OFFICE CENTER (FAA) 99 FROM SEATTLE - TACOMA AIRPORT F ♦ j 4t+ Y -l Y Y C ✓wt ✓ ers3Ya�i�? 1w G J r �. ... fQ .rf �•y.5r af' BOENG LDG VICINITY MAP FR I DOWNTOWN SEATTLE EAST MARGINAL WAY CORPORATE PARK 599 TUKWILA 900 EXIT 157 -- EXIT 158 DEVELOPMENTAL CENTER I I IILLIl IIIIiIIIIIIIII .IIIII�;`I. 'I1II'1III1,1,�� t, le THS INCH I 0 1 2 3 0 c 6 86 LZ 9 SZ 4 7Z ` CZ. ( 11111111I 111I11II)ILII ialIIILIIII I1fIf1111i�LiiI jl11111!I r r 1E11III11111 111111 1 1I1I111I111 1111111111 111 III 1111111 III 4 5 6 7 NOTE: If the microfilmed _ .._. . document is less clear notice, 16 is due to the quality of the original ZZ LZ 0? 61. Qt II II, 1 If!II IIIIIIIIII! IIIIII! III 8 than this document. ;,t 9t St +/t et Zt • tt 01, 6 8 L 11 1 1 !I!II I IIii l ili! 1 11 ! 1 � 1 1111 111111111 1 11 1 11ilil llilliif 11111! l! IIII�Iillli !flllIIIfIIfIIIIillll!IIIIIIti If • �, .!� '';;.R /�.... /��'�,f �. G',i" P .. ..( `%F�F�1; .K 1fJ F, S'Z �l �.i:� i�l"' t. f. s e t WW0 I !IIIiI!IIIIIII111111IIIIIf1 111111111 IIiIIIIIIIIIIIII FROM KENT & AUBURN —EXIT 157 900 NO SCALE S L 3RD IR EDNG 725 E S TUKWIL Y BLDG. ADDRESS: 9725 E. NARGINAI WAY S. iUKWILA,WASHINGTON AREA MAP TM PROJECT SITE 9 -120 BUILDING LOCAITON IASEratElAlig FACILITIES DEPARTMENT ARK NO SCALE PMENT RGON W SHINGT N W'i�r ^' -iwti4. ig.S.,a....wN.L.le�.+ren:�. :::...1., i. m * R..�ci;mn -...0 ;; t BRIEF PROJECT NARRATIVE C I AUBURN, WA. ❑ EVERETT, WA. Li KENT, WA. C; PORTLAND, OR. D REN TON, WA. N SEATTLE, WA. 98002 98201 98031 97220 98055 98124 NES c SEAT' GENERAL NOTES CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED LAY CITY OF TUKWILA MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS. 1. VERIFY ALL DIMENSIONS AND CONNECTIONS BEEORE ANY WORK. 2. NOTIFY FACILITY ENGINEERS SHOULD EXISTING CONDITIONS REQUIRE DESIGN REVISIONS. 3. COORDINATE WORK WITH OTHER CRAFTS. 4, RETURN THIS SAME SET TO TERRY BENNETT AT BLOC. 9 -51 COL N /1, AFTER COMPLETION OF THIS CONSTRUCTION, PROJECT CHECKLIST ❑ ENGINEERING CALCULATIONS ( IF APPLICABLE ) CI ROOMS LABELED PER OCCUPANCY PER U.B.C. TABLE 33-A. 13 BUILDING FLOOR NUMBER ON PRINT FOR AREA OF CONSTRUCTION. NUMBER OF PRINTS REQUIRED FOR PERMIT PACKAGE: ❑ 1. GENERAL ( PERMIT SHELL & C ORE) 6 SETS OF ENERGY CALCULATIONS 2 SETS OF CIVIL DRA4MNGS WITH UTILITIES 2 SETS SOILS REPORTS, STAMPED BY GEOTECHNICAL ENGINEER 2 SETS STRUCTURAL CALCULATIONS 2 SETS PROJECT CONSTRUCTION SPECIFICATIONS 2 SETS TOPOGRAPHICAL SURVEY 2 COPIES OF LEGAL DESCRIPTION 2 SETS OF WORKING DRAWINGS 0 2. TENANT IMPROVEMENTS, 2 COMPLETE SETS El 3. MECHANICAL, 2 COMPLETE SETS ❑ 4. FIRE PROTECTION /SPRINKLERS, 2 COMPLETE SETS 0 CENTER SOLDT�I c'ACE iBI THESE DRAWINGS CONFORM TO THE 1988 U.B.C., U.F.C., U.P.C,, AND THE 1990 BARRIER FREE CODE AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. MECHANICAL IMPROVEMENTS ON THIS JOB CONSIST OF THE FOLLOWING: 1. INS TALL (2) 12 TON COOLING UNITS IN NEW LAB SPACE. . 2. REPLACE EXISTING HEATING COIL WITH COOLING COIL IN REFURBISHED DUCT BRANCH. 3. DI iC1ING COOLED AIR DOWN THROUGH NEW SUSPENDED CEILING. 4. RELATED TRADES TO BE PERFORMED WITH THIS PROJECT: ARCHITECTURAL, Ef. ECTRICAL AND FIRE PROTECTION. LAND USE CODE BUILDING CODES REV OCCUPANCY GROUP CONSTRUCTION TYPE FLOOR AREAS: BUILDING FOOTPRIN1 BUILDING CROSS FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR BUILDING HEIGHT STORIES OCCUPANT LOAD: HANDICAPPED REQUIRE - MEN IS FIRE PROTECTION SEISMIC ZONE SEPNRRT PERK APPRO J REQ111P,9 Si CODE SUMMARY 181,826 181,826 74,362 75,530 31,710 224 54 FT 4 NO CHANGES eLeCI IC ,y w NS TUKWILA 1988 UBC, WASHINGTON STATE ENERGY CODE, WASHINGTON STATE BARRIER FREE CODE AND ADDITIONS PER CITY OF TUKWILA GROUP B, DIVISION 2, OFFICE & FACTORY TYPE II, N BARRIER FREE FULLY AUTOMATIC, F/S CLASS 1 SPRINKLERS `THROUGHOUT 7 I understand that the Plan Check approvals are subject to errors and omissions and approval of p:;ff!c does not authorize the violation of any adopted code or ordinance. Receipt of con- tractor's copy of approved plans acknowledged. By ;�- Dete /?. Permit No. RECEIVED are OF TUKWILA are MAY 30 1991 PERMIT CENTER ror AUSTIN ASSOCIATES KEY PLAN DETAILS CONSTRUCTION NOTES AIR CONDITIONING PLAN APPROVED DRAWN (sY APPROVED REVISION APPROVED WATER, WASTE 81 VENT LINES - CAULK /WOUND WINIDO1A/3 OF FUNNEL DR.AIN5 IN AREA. --FUNNEL R.ELOCATED FROM NEAR COL. B.G FUNNEL DRAIN ELEVATION DETAIL MASTER DRAWING OF UTILITIES 3RD FLOOR BLDG. 9.120 WOOD TOP WITH 1-40LE5 FOR THE TWO PIPES ONLY. VENT LINE TO RRICER-- 11 '< RECEIVED CITY (1FTIIKWII_A MAY 3 0 1991 PERMITCENTEP HEY PLAN BU/LOING 3•12c) FUNNEL. TO SINK DR/1N LAST REVISION SHEET JOS NO. ( 1110 1. ) DWG N° ' 09 12 0 - 4100 0 rr „,,,;;;;;,„ ' 4 BALCONY SMOKE FIRESTAT FIRE DAMF 12/ FIRE DAMPER CONTROL RANGE -SMOKE BALCONY FACILITIES DEPARTMENT ACCEPTABILITY THIS DESIGN ANDS SPECIFICATION IS APPROVED I s ALL DUCTWORK( SHALL BE INSTALLED W t TH BOTTOM OF DUCT LEVEL 2. FOR TYPICAL RADIATION INSTALLATION SEE DRAWING 6130-D-12.0-Z09 3. FOF TYPICAL AHU ELEVATION AND DETAILS SEE DRAWING 6130- D-120 -216 4. FOR AHU CONTROL DIAGRAMS SEE DRAWING 61307 -D -120 -22-5 5. FOR REL i EF DAMPER CONTROL DIAGRAMS SEE DRAWING 6130 -D- 120 -224 G. KEY TO RADIATION - NUMBER OF TIERS MBH LINEAL FT. (BASED ON SPECIFIED RADIATION) T, THIS DRAWING SUPERSEDES DRAWING 6130- - D- I20- NOTES CONSTRUCTION NOTES SCALE: I 3RD FLOOR HVAC PLAN KEY PLAN RECEIVED CITY OF TUKWILA PERMIT CENTER PERMIT CENTER REVISION Eal APPROVED DATE REVISION BY APPROVED DATE FACILITIES DEPARTMENT A CCEPTABILITY TNIS DESIGN SUBTITLE SECTION DETAILS LAST REVISION SYMBOL DATE _ APPROVED BY DEPT APPROVED HEAD PRESSURE LIMIT SWITCHES EXPANSION VALVE REFRIGERANT PIPING DIAGRAM AIR 12 CONSTRUCTION NOTES ROOF ANTENNA RANGE 12=0" HAWN .R ECIK I,M.ION FAN DETAIL /if RECEIVED BALCONY ( - (I ) 4 SECTION 6/25 FIRESTIIT FIRE OAMPL (NOIMALLY CLOSED BALCONY 2. FOR Typ:cAL RADIATION It\ISTALLATiON DR.AkAil i\IG .3. FOR T'Y'PI CAL. Al--1(J ELEVATION AND L2E:TAIL5 DRAWING 1)42O-ZIG 44 FOR AHU CONTROL DIAGRAMS SEE ORAWINK, 61.30-1)-1a0- Z2..5 5. FOR RE A I EF DAMPER CONTROL IAA GR'Alvi]) 5EE DRAWING 6130 /20 4 KEY TO RADIATION LINEAL FT. (13A5ED ON 5PECI F I ED RADIATI'ON) 7. TH I 5 DRAW1 SJ6 SUPERSEDES DRAWING (-; I 30 -0 -120 -Z10