HomeMy WebLinkAboutPermit 0537-M - EXERCISE EQUIPMENT CENTER0537-M 91-116
EXERCISE EQUIPMENT CENTER HVAC
359 STRANDER BOULEVARD
.
„;::::i:;::: .1ANCE::::::::;::::::i::::;::::::!;::•:::::,:::::::::::::::m.:i::::::::::::;::::::::::::::::::::::::::::::::::;.:::::::::::::!
UMC EDITION (YEAR : • •
453
FIRE PROTECTION: . Sprinklers Detectors X
.......
CONDITIONS (other than noted on or attached to permit/plans):
CONTRACTOR:
VALUE OF WORK: 5
130.00
APPROVED FOR I C
ISSUANCE BY: t. • . tf A .
BUILDING
--;•-.., OFFICIAL
DATE: \---' (
.. ..
W. •NTRA T•R'
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or / th: performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATURE: .
,.j .2. '7. / 9 /
PRINT !._2--.,,,-i....,..--._.., / ,:_....„-,7e...."”)
COMPANY: ..- Pe--, e.',.._ -
t:.::iiii.iiMMiii•:i.:i:::ini:M:::::::::.ii:::.i;::::::::::::::i.::::::::::i.i::::i.iM:;•:::::::::i:::iii:;1:i::::::::iii:;:::::i::::::::.:::::.&:::.i:.::ii:i:i.;::i•iiIiii.P.ROJECII:::INFORMA:TiON::::::::::::::::::i:;M:i.i:::::iii:'::::::::i::::•::::::::::M::::::::::::::::::::::,::'
SITE ADDRE : 359 Strander BI
453
SUITE NO.
915 118th Avenue S.E., Suite 110, Bellevue, WA
--• 11, ' 1 iii EN . Exercise E ui•ment Center
CONTRACTOR:
VALUE OF WORK: 5
130.00
nghtimay,Leuilin New/Addition ig) Modifications
el Re air
a Other:
W. •NTRA T•R'
DESCRIPTION OF WORK: Install HVAC and ductwork.
PROPERTY OWNER:
Spieker Partners PHONE:
453
ADDRESS:
915 118th Avenue S.E., Suite 110, Bellevue, WA
1ZIP: 98004
CONTRACTOR:
Pac Inc. IPHONE:
395
ADDRESS:
1702 Pike Street N.W. , Suite 1, Auburn WA
IZIP: 98001
W. •NTRA T•R'
LI EN E N• PACAII*154B2 EXPIRATION DATE: 1 92
CITY OF TUKWILA
Department of Community Development - Building
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
MECHANICAL
PERMIT NO.
DATE ISSUED:
MECHATCAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
Division
FEES AMOUNT
Bsic Permit Fee
Unit Fee
0 30.00
TAL
Plan Check No.:
$15.00
91-116-M
gRECEIRTA
SP CTI I' AT I
REQUIRED INSPECTIONS PHONE NO.
X 1 - Rough-in/Vents/Ducts 431-3670
• 2 - Fire Final 575-4407
"la 3 - Planning Final 431-3680
pp 4
X 5 - Mechanical Final 431-3670
11,11•■•■•■■•■•■■ .. . • • , , • , • • „
DATE(S)
APPROVED INSPECTOR CORRECTION NOTICE ISSUED
DATE
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and Industries (277-7272)
permit shall becOMe:nUlliand void if the nOVCOMMenced•WithiW180':dayS.'frOM of
• .:.• . . . • .
. . is ,
issuance;:oriif:tha..wOr suspended or abandoned for a period of 180 'days. froM-thelaStilnspeCtion:!::.:::::::::::,
PERMIT NO.
CONTACTED
L-- k- r
'C n
DATE READY
DATE NOTIFIED
r� (� �
W -- (3[ 5 _ i f (init.) -1.1
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
B Y:
(i nit J
AMOUNT OWING
.30. Q�'
3RD NOTIFICATIO
MECHANICAL`. PERMIT
APPLICATION TRACKING
PLAN CHECK
NUMBER
gi - m
DEPAR .:<.:;.:.:.:. :.... :.::;
BUILDING - tP- -qi
initial review
O FIRE
O PLANNING
O OTHER
§4 BUILDING - 6,
final rAviAw
REVIEW COMPLETED
PROJECT NAME
SITE ADDRESS SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
APPROVE
25
ROUTED
INIT:
INIT:
INIT:
INIT:
ZONING:
CONSULTANT: Date Sent -
UIRENI N'TS` l ' 'C MIME .._
Date Approved -
FIRE PROTECTION: Sprinklers • Detectors • N/A
FIRE DEPT. LETTER DATED:
SCREENING REQUIRED? ( (l No
REFERENCE FILE NOS.:
UMC EDITION (year):
INSPECTOR:
(BAR/LAND USE CONDITIONS? ]Yes
No
lob
011117/ 90
SITE ADDRESS SUITE #
359 STRANDER BLVD
VALUE OF CONSTRUCTION - $
5130.00
PROJECT NAME/TENANT
EEC PK-el Ct . E(I_U 1Y1Prk C:kI t e
PHONE453 -1 .00
TYPE OF WORK: 0 New /Addition Modifications ❑ Repair ❑ Other:
WA.
DESCRIBE WORK TO BE DONE:
INSTALL HVAC AND DUCT WORK
CONTRACTOR PAC -AIRE, INC.
'!'1fPE RATING/SIZE :.. :. ;::WUMBER U N
S > °:::
GAS /ELM S TON
WA.
ZIP 98001
WA. ST. CONTRACTOR'S LICENSE # PACAI I * 154B2
EXP. DATE 1 -92
BUILDING USE (office, warehouse, etc.)
OFFICE
NATURE OF BUSINESS:
EXERCISE EQUIPMENT
WILL THERE BE A CHANGE IN USE? ETITITO Yes IF YES, EXPLAIN:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? JNo ❑ Yes IF YES, EXPLAIN:
PROPERTY OWNER SPIEKER PARTNERS
PHONE453 -1 .00
ADDRESS 915 118TH AVE. SE SUITE 110 BELLEVUE,
WA.
ZIP 98004
CONTRACTOR PAC -AIRE, INC.
!HONE 395 - 4004
ADDRESS 1702 PIKE ST. NW SUITE 1 AUBURN,
WA.
ZIP 98001
WA. ST. CONTRACTOR'S LICENSE # PACAI I * 154B2
EXP. DATE 1 -92
r ■■■•,
t
CITY OF TUKWILA
of Community Development - Building
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER
APPLICATION MUST BE FILLED OUT COMPLETELY
I;HEREBY CERTIFY 'HAT I I » IMINETH TALO
TRUE AND, :AND I AM AUTH +► p 'TO APPLY FOR :THIS': ,: ERMIT
BUILDING OWNER SIGNATURE,!
OR ,
PRINT NAME
AUTHORIZED
AGENT
CONTACT PERSON
ADDRESS 1 PIKE ST. W SUITE 1
BOB MULLEN
MECHANICAL PERMIT
APPLICATION
Division
Mechanical Fee Worksheet must also be filled out
and attached to this application.
FEES (for staff use only)
DESCRIPTION
BASIC PERMIT FEE.
UNIT(S) FEE
PLAN .CHECK .rE
OTHER:
TOTAL`
AMOUNT : RCPT a�'
�
DATE
0
KNOW THE SA
•
DATE 6/19/91
PHONE 395 - 4004
CITY /ZIP AUBURN 98001
PHONE 395 - 4004
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed Information on application and plan submittal requirements. Application and
Plans must be complete In order to be accepted for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation Is for the work covered by this permit and must be filled In by the
applicant. This figure is used for budget reporting purposes only and not to calculate your tees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
SUBMITTAL CHECKLIST
MECHANICAL
Q Completed mechanical permit application (one for each structure or tenant)
Ei Two (2) sets of mechanical plans, which include:
• Floor plan
• System layout
• Elevations (for roof mounted equipment)
• Heat Loss Calculations
Structural calculations stamped by a Washington State licensed engineer may be
required if structural work is to be done (2 sets)
Note: Hood and duct systems require a building permit for the duct shaft.
DESCRIPTION
UNIT COST
NO OF
UNITS
X
TOTAL
COST
$15.00
$4.50
BASIC FEE
SUPPLEMENT PERMIT FEE
1 Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu/h.
$9.00
X
2 Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu/h.
$11.00
x
3 installation or relocation of each floor furnace, including vent.
$9.00
4 Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
x
5 installation, relocation or replacement of each appliance vent installed and
not included In an appliance permit.
64.50
X
6 Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
0 0
7 Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu/h.
$$.00
x
8 Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu/h and including 500,000 Btu/h.
$16.50
X
9 Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu/h to and including 1,750,000 Btu/h.
$22.50
X
I 0 Installation or relocation of each boiler or compressor over 30
horsepower to and Including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu/h.
$33.50
x
I 1 Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu/h.
$56.00
X
12 Each air - handling unit to and Including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a. permit Is
required elsewhere in this code.)
$6.50
X
13 Each air - handling unit over 10,000 clm.
$11.00
X
4 Each evaporative cooler other than a portable type.
$6.50
.
X
5 Each ventilation fan connected to a single duct. ....
$4.50
X
6 Each ventilation system which Is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
7 Installation of each hood which is served by mechanical exhaust, Including
the ducts for such hood.
$6.50
X
18 Installation or relocation of each commercial or industrial -type incinerator.
$11.00
x
19 installation or relocation of each commercial or industrial -type incinerator.
$45.00
x
' - Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
�,.rm
SUBTOTAL
OA 0
PLAN CHECK FEE l e a u eltao
p�
GRAND TOTAL
$ Bo . -0
•
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHAN SAL PERMIT
FEE WORKSHEET
INSTRUCTIONS - Complete the worksheet
indicating the of units;•being `
stalled In each category.' At time pf
mittaf, staffwill calculate the tes$.
CITY OF TUKWILA
6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 PHONE II (206) 433.1800
Plan Check #91- 116 -M: Exercise Equipment Center
359 Strander Bl
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART 4P COVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County
Health Department and plumbing will be inspected by that
agency, including all gas piping (296- 4732).
3. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (872-
6363).
4. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
5. Readily accessible access to roof mounted equipment is
required.
6. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
7. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washignton State Energy Code (1989 Edition), and
Washington State Regulations for Barrier Free Facility
(1989 Edition).
8. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
Cary L. VanDusen, Mayor
PROJECT: .--:, • .. _ -, ;, _
_ -
PERMIT NO.
s/
SITE ADDRESS: _ /
DATE CALLED:
— •-4
TYPE OF INSPECTION: � ,�
i)
DATE WANTED:
�
•-
SPECIAL INSTRUCTIONS:
REQUESTER:
--•
-P . ONE NO.:
INSPECTION RESULTS/COMMENTS:(-- (Z..-
7
��y, -
INSPECTOR: (4. "! ,P��C,90
DATE:
7_ /Gj! __e
. ... .-... ...��...�..�sw.•.+arw�r- h* ✓.Vxr Yi)nv.n i » %i H5 *st Y.t .S:.Hw.NU"+vrr.�tr; va {.)�vne.t PO. •..na4rrr r."'+n! »+r ..a+x+oru 0
.r 1
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTION RECORD V
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PROJECT: EP C..
PERMIT NO. oS 31 '0
SITE ADDRESS: 36G p f ()4 y {
DATE CALLED: 1-1-1-R1 E 1
TYPE OF INSPECTION: Ine. 1 ,"
R• c •
DATE WANTED: - 1^ I jt, - •
SPECIAL INSTRUCTIONS:
REQUESTER: s
PHONE NO.: S- 14Q0L4
INSPECTION RESULTS /COMMENTS:
6 -rvi" c.v.-044'7
INSPECTOR: 5---A- - .-
DATE: 7 ( Y -4 (
ti;sit?.2�'::.KM:?N.i:Anv!„NJ Is�xy: wv; a: G:. n.}, tcxva m„ ur,:....•..... w., ..w,ew.�- .-.w.w.r�,n +a,rs «.rw!1 }Y.r.•sa:rc,t+ �rc�t}w?':F :'^.�,'•:a +nu! +v�•.•
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
t.�t{
INSPECTION RECORD
RNA v;. +i f.'w}al4�aetcF
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
RECEIVED
JUN 11 '91 13:16 ENGINEER 1ORTHWEST 522 -6698 C ClTY�F
ENGINEERS - NORTHWEST INC. P.S. JUN 24 1991
6969 WQObLAWN AVE. N.E,.„ SUITE 205 =SEA1I'LE, WA 98115 • (206)525.7560 • FAX WM&
1.
JOB No. (9 66434 . 0 - , Joe NAME i ' C' • . 1 40t.i I . NCP'►J?r(L. DATt I
5U!lJECT 7JCJ U1.�1 C�/.J �,�/_ • �{ux, �A SHEET
ev PHIL. V.
3 ooursLe �o rsr
co •41.o " '44
JUN 21 '91 14:14 , ENGINEERS NORTHWEST 522 -6698 z r.1'1
ENGINEERS- NORTHWEST INC, P.S. CITY OFTUKWI
6869 WOODL.AWN AVE. N.E. - SUITE 205 • SEATTLE, WA 9$115 - (200)525.7550 - FAX # (20� �CEAITIElt
EEC
•
; : • ~ '. AREA .( S0 FTC • 1.800
SQ FT /TON
CFM/SQ FT.
LOAD
ROOF HEATING LOAD
WALL HEATING LOAD
WARM UP LOAD
HEAT LOAD WITH VENT
PARAMETERS
TOT SENSIBLE LOAD,
TOTAL COIL LOAD
RESULTING ROOM RH
DEGREES ROTATED
NON - CEILING RETURN
CARRIER DEFAULTS
a
a
a
■
a
■
a
a
a
CFM w.
836'
• 838
. 785
867
1.010
1.136'
1.135
761 ,
■ . 4.410
■ 13.055
m 3,072
: 2.590
■ 0
a 0
■ • 0
■ 2.590
• 792
■
.10
■ 510
■ 281
■ 684
■
1.485
■ 3,348
,e 0
■ 2.993
■ 1.188
a 3.690
■ 2.017
■ 5.707
■ 3.690
TONS (-
559
:0.63
7,632••
8.141
0
39.797
32.934
38.641
42%r
0
• a • ••• • .•" •
,
PLAN REVIEW COMMENTS CeMTER Plan Check No.: I I l M Project: XQ RC I S► �. 0 31'P IV\E 17
REQUIRED INSPECTIONS
) 1 ' 6
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
y Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be Inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
7 All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
Inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
j < Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department Inspection should be made by
calling King County Health Department, 296-4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
• . (a) 7.
X Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1.
Footings
2.
Foundation
3.
Slab/Slab Insulation
4.
Shear Wall Nailing
5.
Roof Sheathing Nailing
6.
Masonry Chimney
7.
Framing
8.
Insulation
9.
Suspended Ceiling
10. Wall Board Fastening
X
11.
'1 4u � IN 'Iv
12.
13.
14.
Fire Final
15.
Planning Final
16.
Public Works Final
17. Building Final
PLAN REVIEW COMMENTS CeMTER Plan Check No.: I I l M Project: XQ RC I S► �. 0 31'P IV\E 17
REQUIRED INSPECTIONS
) 1 ' 6
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
y Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be Inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
7 All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
Inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
j < Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department Inspection should be made by
calling King County Health Department, 296-4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
• . (a) 7.
X Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
GENERAL NOTES
EQUIPMENT SCHEDULE
ELECTRICAL PLUMBING
APPROVED