Loading...
HomeMy WebLinkAboutPermit 0543-M - BOEING0543-M 91-114 BOEING HVAC 2925 SOUTH 112TH STREET . ::::::::1:::::. UMC EDITION (YEAR 1988 -;• . il AEN.k Boein: VALUE OF WORK: $ 6,500.00 FIRE PROTECTION: •=MODetectors N/A DESCRIPTION OF WORK: Apply supply air to file server room. • Din N hr h floe. • •r h. •I ;n : APPROVED FOR LW, BUILDING ISSUANCE BY: ob.W.MIF OFFICIAL / ,--) DATE: - --- I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. SIGNATURE: ii m ila mmum DATE: PRINT NAME: P4P g, oe.e COMPANY: infe4P /h/z-kzie c'o, ::::::::1:::::. SITE ADDRESS: 2925 S 112 St SUITE NO. -;• . il AEN.k Boein: VALUE OF WORK: $ 6,500.00 •E oF Wo;K• • New/Addition Modifications • Re air • Other: DESCRIPTION OF WORK: Apply supply air to file server room. PROPERTY OWNER: Boeing PHONE: ..2 ADDRESS: 14675 Interurban Avenue South, Tukwila, WA [ZIP: 98168 CONTRACTOR: - MacDonald Miller Company IPHONE: 763 ADDRESS: 7717 Detroit Avenue S.W., Seattle, WA IZIP: 98106 WA, ST. CONTRACTOR'S LICENSE NO, MACDOM248J9 'EXPIRATION DATE: 4 DATE ISSUED: 1 - Rough-in/Vents/Ducts 2 - Fire Final 3 - Planning Final 4 - x 5 - Mechanical Final MECHAN(SAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) CITY OF TUKWILA Department of Community Development - Building 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431-3670 MECHANICAL PERMIT NO. 05 1 -15 DATE Division BasFermit Fe Unit Fee Plan Check Fe.e Other: MOWnmmwT Plan Check No.: Qi!AMOU'NTO,: AR63.00 p0mMOWWWgn I9:50;WWmAWdONOMN 91 43450P4VAM ' 1: N$ OT ON WM? (call for n pool one oat R4 how's In advance) 431-3670 575 431-3680 431-3670 DATE(S) REQUIRED INSPECTIONS PHONE NO. APPRO INSPECTOR CORRECTION NOTICE ISSUED OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732) Electrical - Washington State Department of Labor and Industries (277-7272) This permit shall become null and void if the work is not commenced within 180 days from th� date * * issuance, or if the work is suspended or abandoned for a: erlocl,:.ott80.•days.:: eCti. PERMIT NO. CONTACTED { � k t in ..e. R �c� DATE READY DATE NOTIFIED `' BY: C�� Q (init.) PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING q--- eo 3RD NOTIFICATION B Y MECHANICAL_ PERMIT ii APPLICATION TRACKING gi -u4 PLAN CHECK NUMBER INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. DEPAI TMENT $,BUILDING - initial review O FIRE O OTHER O PLANNING BUILDING - finai rAviAw PROJECT NAME SITE ADDRESS REVIEW COMPLETED INIT: INIT: ROy CONSULTANT: 27 -t:71lC (ROUTED INIT: INIT: FIRE PROTECTION: Sprinklers ❑ Detectors (l N/A FIRE DEPT. LETTER DATED: 'BAR/LAND USE CONDITIONS? SCREENING REQUIRED? nYes n No ZONING: REFERENCE FILE NOS.: UMC EDITION (year): e) SUITE NO. EQ U1R ........:: -, Date Sent - Date Approved - INSPECTOR: OWi7P.0 SITE ADDRESS a CI a5 l 1 a -" SUITE # VALUE OF CONSTRUCTION - $ 625 ~»0,047 PROJECT NAME/TENANT 1h4kMtS orrice P! t< F/LC Se-cti R f it / ,1,061.00 SUpeo2r S ✓,GCS f 2 TYPE OF WORK: 0 New /Addition ig. Modifications 0 Repair 0 Other: CONTRACTOR rvN A L17,) , /3 m1 - 64 e0 . DESCRIBE WORK TO BE DONE: /1-ik So PPL,/ / TO F1 G6 ,C' VET' Poo M ::» :: »:::: >::::<:<::: >::<::::: >::< .... _ ............................................................ RIETINQISIZE :<<:< >; <� > > >< >«'<<< ; ::.:. .<:::� :< ...... .... .............. ......; > > <� >> ; . .......< ............... NUMBt» R::: OF: : >#Y1NlTS< <::<: > <:: ><: >:_::<> ZIP /E I 0 4, WA. ST. CONTRACTOR'S LICENSE # yin A. c_. Do ,• 2 y a Sol _ EXP. DATE y J ,) 9 L BUILDING USE (office, warehouse, etc.) . 9 r ` - F i L G / c o AA m 6 e a -u NATURE OF BUSINESS: /f✓ ,-L sV5iE WILL THERE BE A CHANGE IN USE? (‘No 0 Yes IF YES, EXPLAIN: WILL THERE E STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? Wf. No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER 2, or ,,,it, .5,, PPaILT sk2vlces PHONE 6,62Z e. -SIT ADDRESS 1`/075 ,Q Iw7 v Q(3A�J /ivy S �11 . <1Ju1 l0. l,�J ZIP q 1 (D1 CONTRACTOR rvN A L17,) , /3 m1 - 64 e0 . PHONE 7 6, 3 94/0 0 ADDRESS / 1 7 O F � T e c i , 1 >" 5� h 512 Ve ► l i U - k ZIP /E I 0 4, WA. ST. CONTRACTOR'S LICENSE # yin A. c_. Do ,• 2 y a Sol _ EXP. DATE y J ,) 9 L CITY OF TUKWILA Department of Community Development - Building 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER APPLICATION MUST BE FILLED OUT COMPLETELY BUILDING OWNER OR AUTHORIZED AGENT CONTACT PERSON SIGNATURE PRINT NAME ADDRESS PAIL DATE APPLICATI • N ACCEPTED Ply- -rg i cK '71 7 Qr rec.9 h rJ L 5 c9n) MECHA:_'ICAL PERMIT APPLICATION Division Mechanical Foe Worksheet must also be filled out and attached to this application. FEES (for staff use only) TOTAL'; 1: # DA BASIC PERMIT FEE : ; UNIT(S) PLAN ;CHECK FEE; O HER < 1 DATE / A(.9/v PHONE .71,3 r/ycv CITY/ZIP y 9g/ 0 6 PHONE G5S - c./� ! ye../ APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and clans must be complete in order to be accepted for clan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. DATE APPLICATION EXPIRES orb — �1 08118/00 S613MITTAL CHECI&IST MECHANICAL Completed mechanical permit application (one for each structure or tenant) El Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations C Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) Note: Hood and duct systems require a building permit for the duct shaft. DESCRIPTION UNIT COST NO OF UNITS X TOTAL COST BASIC FEE $15.00 SUPPLEMENT PERMIT FEE $4.50 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and Including 100,000 Btu/h. $9.00 x 2 Installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 X 3 Installation or relocation of each floor furnace, including vent. $9.00 X 4 Installation or relocation of each suspended heater, recessed wall heater or floor - mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. $4.50 x 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 X >. 7 installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9,00 x 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 x 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu/h. $22.50 x 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 x 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 X 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory - assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air - handling unit over 10,000 cfm. $11.00 X 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 X 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which Is served by mechanical exhaust, including the ducts for such hood. $6.50 X 18 Installation or relocation of each commercial or industrial -type incinerator. $11.00 X 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 X 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee is listed in this code. $6.50 X 06/18100 SUBTOTAL 7 , 00 Q a �ie 1 PLAN CHECK FEE ( a s of GRAND TOTAL SCri. 5D CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. MECHA KCAL PERMIT FEE �ORKSHEET CITY OF TUKWILA 6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91- 114 -M: Boeing 2925 S 112 St P110NE N (206) 433.1800 any L. VanDusen, Mayor THE FOLLOWING COMMENTS APPLY TO AND BECOME PART THE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872- 6363). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 5. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 6. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. PROJECT: .,, / • , .4 SITE ADDRESS: r ;. :.... ......- -. y rr„ . TYPE OF INSPECTION: `f V ' / I U.t f OL,Y( Wit∎ ... firir,�„ GL.L)- I PERMIT NO. DATE CALLED: DATE WANTED: 05 q3 -- 14 .s -I 7- Z9 9/ `30 - 9/ a.m. m. SPECIAL INSTRUCTIONS: REQUESTER: W PHONE NO.: 7 6 , 3_ 94c) INSPECTION RESULTS /COMMENTS: a 9 c V DATE: 7 , 36 - 1 INSPECTOR: L-- ::ti3:41.a.!W `u,;arc.FSrre:a:seetxr „war 17 0 a ve.vos ...,,, CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD V 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PAN REVIEW COMMEkTS Plan Check No.: q , (I 4N\ Project: Soemc= p No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. REQUIRED INSPECTIONS 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, Including all gas piping (296 - 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be Inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. 9 All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shalt be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. yNK Any exposed insulations backing material to have Flame Spread Rating of / ` 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof ill be required prior to final inspection (see attached procedure). . All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296-4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. . All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. . Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab/Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening 11. v ..r .... 12. 13. 14. Fire Final 15. Planning Final 16. Public Works Final O 17. Building Final PAN REVIEW COMMEkTS Plan Check No.: q , (I 4N\ Project: Soemc= p No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. REQUIRED INSPECTIONS 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, Including all gas piping (296 - 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be Inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. 9 All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shalt be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. yNK Any exposed insulations backing material to have Flame Spread Rating of / ` 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof ill be required prior to final inspection (see attached procedure). . All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296-4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. . All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. . Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. SOUTH TOWER FIFTH FLOOR PLAN MACDONALD MILLER COMPANY DUWAMISH OFFICE PARK HVAC ELECTRICAL SOUTH TOWER FOURTH FLOOR PLAN AIR SUPPLY HVAC SOUTH TOWER THIRD FLOOR PLAN CONSTRUCTION NOTES SOUTH TOWER SECOND FLOOR PLAN NORTH TOWER FOURTH FLOOR PLAN NORTH TOWER THIRD FLOOR PLAN NORTH TOWER SECOND FLOOR PLAN