HomeMy WebLinkAboutPermit 0567-M - BOEING #9-08.40567-M 91-144
BOEING #9-08.4 HVAC
9303 EAST MARGINAL WAY SOUTH
.
i ::'::::0:' .......................................................................
UMC EDITJON (YEAR__' 1988
FIRE PROTECTION: • fl N/A
PROJECT NAME/TENANT: Boeing 1/9-08.4
CONDITIONS (other than noted on or attached to permit/plans):
VALUE OF WORK: $ cf
TYPE OF WORK: (2) New/Addition ( Modifications ( ) Repair
(
) Other:
APPROVED FOR , ..
BUILDING
ISSUANCE BY: OFFICIAL
• .... Ihria
- .07Aawan
,
DATE: - -
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
„-------- ollijIMP
SIGNATURE: / , 4111111b
' ' Saw
DATE: S
PRINT NAME: -r - -2--c--1-r,'
COMPANY:
i ::'::::0:' .......................................................................
SITE ADDRESS: a3-3-9-E Marginal Wy S
SUITE NO.
PROJECT NAME/TENANT: Boeing 1/9-08.4
98124-2207
VALUE OF WORK: $ cf
TYPE OF WORK: (2) New/Addition ( Modifications ( ) Repair
(
) Other:
DESCRIPTION OF WORK: Install 3-ton air conditioner.
98124-2207
WA. ST. CONTRACTOR'S LICENSE NO. N/A
JEXPIRATION DATE:
N/At
PROPERTY OWNER: Boeing
IPHONE: 544-2975
ADDRESS: P.O. Box 3707, M/S 46-87,
Seattle, WA IZIP:
98124-2207
SLONTRACTOR: Boeing
IPHON E: 544-2975
ADDRESS: P.O. Box 3707, M/S 46-87,
Seattle, WA ZIP:
98124-2207
WA. ST. CONTRACTOR'S LICENSE NO. N/A
JEXPIRATION DATE:
N/At
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
MECHANICAL
PERMIT NO. 050 - nn
DATE ISSUED:
P C
Lc 1 - Rough-inNents/Ducts 431-3670
up 2 - Fire Final 575-4407
w 3 - Planning Final 431-3680
• 4 -
x 5 - Mechanical Final 431-3670 I
MECHAW:AL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
DATE
FEES AMOUNT RECEIPT # DATE
Basic Ferrnit.fer $15.00 JLJ( 1*(kii:]
Plans.QhpCkFe
TOT.
Plan Check No.: 91
DATE(S)
REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE ISSUED
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and Industries (277-7272)
This issuance, or if Perhfit
the work is..SUSpended;,OrabandOned for p2periOd,OI:180'daYs frOni:thellaetlinepedti .1
PERMIT NO.
CONTACTED
l
l
ReC)
tII
� C2r
DATE READY
DATE NOTIFIED
_a \
— j (p l
(init.)
J
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
��
`� /`..40
3RD NOTIFICATION
BY:
(init.)
PLAN CHECK
NUMBER
QI rm
D EPARTM ENT •
O PLANNING
O OTHER
PROJECT NAME
no- i n *9 q
SITE ADDRESS SUITE NO.
g3o3
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box Indicates which departments need to review the project.
REVIEW COMPLETED
t BUILDING - s -ig
initial review
O FIRE
g BUILDING - c
final rAviAw "
R..O
(ROUTED)
INIT:
INIT:
INIT:
i1, -51
INIT: c, -
MECHANICI. PERMIT
APPLICATION TRACKING
CONSULTANT: Date Sent -
FIRE PROTECTION:
ZONING:
REFERENCE FILE NOS.:
UMC EDITION (year):
Icl
UIREMENTS. / :$ ; COM M . _..
[1
FIRE DEPT. LETTER DATED:
Sprinklers
SCREENING REQUIRED? fYes (l No
Date Approved
Detectors ( ) N/A
INSPECTOR:
BAR/LAND USE CONDITIONS? Yes
0w17,ao
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 4334849 NAME PAXT JOB# 910596 -08
,: >i!•.rDESCRIPTIQN.* 1 .
agAMOUI4T:o.
RCM*.
tiv { °DATE$P
��`'� •
BASIC' PERA� IT'FEE IY 3`
t'�i �� t' f
� r f
� "•'k `'
I t °
Y�„�,',`t�'yi .� •
"�''�•'
3 " �• 4 !
w:.K' }•i�,i• S:" t •r., .
f`��•� • >a'r•' ,
Y a.:� : ci: { ' . ;y; >:yi i
' e' ; •t' J • 4y ":," 4 •,�
# w ..:{. y ',�..*
!h; 3:1 "' >
Am .:*
'Ss! :l > <'X: ' Z ` %�C':
I `3<f•>rp,4f..;},t
PLAN
1 NUMBER CHECK q l `"I 4 � I
UNiT(S�° FEEY:<f #�::,;•# ;s.<::,:ra:1f >;:
PLAN; ECK1:FEE <f..� }«b1
31�s >
6..
° y J:iS':ss{
te err,.. s
C !`•.. .s #::`3f7::,�' ?jE.:y:,i }: }.r;r� : �i�� ?i •
OTHER �; }, :, �'.. },f,; • }, 4
.. ;, f ;.� .> .
x. �{�i��;..;s..�f,i.
; < <s�� 1: . x: , .;,'., •
�lk: lr..a�tt 1 �,:; : »1r�2�L.vP,y. �
APPLICATION MUST BE FILLED OUT COMPLETELY
i Iii : ; :t �': {.:` �f.G} r•Y..•:t j:E 4f. :0 ¢ 1k 4;.• :, .. N: KI
':is: < : <.;::: eft;>.:,:.::' aiTOTAM;,•<,. f. c, 1F' i ? t: t ,..,.^ rra :i:.;,•:}'s:;`i,i'ft8i�gn:,:
CITY /ZIP
• : -
PHONE (206) 544 -2975
1 DDRESS SUITE #
4 E . MARGINAL WAY SO. BLDG# 9 -08.4
OF CONSTRUCTION - $ 9,000.00
PROJECT NAME/TENANT
BOEING MILITARY AIRPLANES
TYPE OF WORK: CO New /Addition 0 Modifications 0 Repair 0 Other: ,
DESCRIBE WORK TO BE DONE:
INSTALL 3 TON AIR CONDITIONER
E RA7INGJSIZE..:. :.:: : }; -' :: NUM Uf#tT5 "
LIEBERT 3TON 1200CFM 1
BUILDING USE (office, warehouse, etc.)
OFFICE
NATURE OF BUSINESS: .
WILL THERE BE A CHANGE IN USE? 0 No 0 Yes iF YES, EXPLAIN:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
'BUILDING? ® No 0 Yes IF YES, EXPLAIN:
PROPERTY OWNER BOEING MILITARY AIRPLANES
PHONE
(206) 544 - 2975
ADDRESS P.O.BOX 3707, M/S 46 -87, SEATTLE, WA.
ZIP 98124 - 2207
CONTRACTOR BOEING MILITARY AIRPLANES
'PHONE i 2 6) 544 - 2925
ADDRESS
JZIP
g8174 -77n7
.O F.
P .BOX 37n7. _ M/S 46 -R7. SEA7 wr .WA.
WA. ST. CONTRACTOR'S LICENSE #
EXP. DATE
ARCHITECT Rr)RTN{; MTi,TTARY ATRAT,'.N S
PHONE (206) 544 -2975
ADD P.O. BOX 3707, M /S 46 -87, SEATTLE, WAi JZ1P 98124 -2207
K�. HA:. ! .< . A•V:E FiE "A'ANO;EXfL R, •.kll. :•.P GA'F O A.
�' (., • T ,'j:t � . � +t iN� �.: Ark �.� ,� �
ri .t. .
` :'iS .M ?� ' •} . i...p;4t
T'TF{1J ' : : }> !'� . A
AtJ . ...OFiR�C'>t; :ANa• A , ;'AtJC OF�IZ�[7..:T'S�::•� }. . * 4 }f
i�
,� • }.. .• k:,
a :
3: 4 : `
Q .H.E }iSMETO:S .
�N W'T..� '}
S!$i„Y•... "f:`: r ;t }�rR'Y,: "!t's' ^2�.6: f %.4 J•. t.: .
. �' 4 .. }C � .: i •
, 3.' . . .x � s�.. r. TLS. •:'t .
} ., .+. 4 'f:.:.Gf. y 4 Yl.`1}%S }. :1.�'FM1:'f�. eY(
BUILDING OWNER
OR
AUTHORIZED
AGENT
SIGNATURE /
_ ��✓ .4e,......4-. - -- � �
DATE
08 - 12 - 91
PRINT NAME
Y C C : 00 Y
PHONE
21 . -
ADDRESS
P.O. BOX 3707 I __M S 46 -87 SEATTLE WA
CITY /ZIP
• : -
PHONE (206) 544 -2975
CONTACT PERSON TERRY BENNETT
CITY OF TUKWILA 1
Department of Comm unity Development - Building. Division
APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form.. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
i'iiiulete• In'uiudi to acceolad for plan review,
BUILDING OWNER / AUTHORIZED AGENT If the applicant Is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled In by the
applicant. This figure is used for budget 'reporting purposes only and not to calculate your lees,
EXPIRATION OF PLAN REVIEW Applications for which no permit Is issued within 180 days following the dale of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined In Section 304(d) of the Uniform
Mechanical Code (current edition), No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 433-1849.
DATE APPLICATION ACCEPTED
MECHANV AL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out and attached to this l!cation.
FEES (for staff use only)
DATE APPLICATION EXPIRES
03413/119
Li► ► r (Jr ► un vr►Ls4
Department of Community Development - Building Division
6200 Southcenter Boulevard, Tukwila WA 98188
(206) 433 -1849
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
INSTRUCTJONS - Complete the worksheet,
. p
H . lndiaating: the;number of units being installed •
In`eacli category;: multiplied by the unit cost.
. Then.:tally. the, subtotal column highlighted at
t he bottom of the worksheet. At time of : • .submittal; staff.: will calculate the remaining, fees.
• ... . - • • - •
DESCRIPTION
UNIT COST
NO. OF
UNITS
X
TOTAL
COST
BASIC FEE
$15.00
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$g,00
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
X
3
Installation or relocation of each floor furnace, including vent.
$9.00
4
Installation or relocation of each suspended heater, recessed wall heater
or floor - mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
x
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9.00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
, 9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu /h.
$22.50
X
1 0
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
x
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
13
Each air- handling unit over 10,000 cfm.
$11.00
x
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
x
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.00
x
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
x
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
SUBTOTAL (unit foe)
ati,
PLAN CHECK FEE lss% t
�ualotoll
//
(D
GRAND TOTAL
$ 30.00
MECHANICAL PERMIT
FEE Wt.RKSHEET
CITY OF TUKWILA
6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91- 144 -M: Boeing #9 -08.4
9e E Marginal Wy S
6 1303
PHONE N (2061 433.1800 Gary L. VunDusen, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OW THE APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER o) 5iIm
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (872-
6363).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
5. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 . Edition),
Washington State Energy Code (1991 Edition), and
Washington State Regulations for Barrier Free Facility
(1989 Edition).
6. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for, or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
PROJECT: - AG- 0 . ,
PERMIT NO.
(5-67 7,4
/ipr --7-(
SITE ADDRESS: Lf C- f 'VJ e /
DATE CALLED:
TYPE OF INSPECTION: Ai, • y,
/
DATE WANTED:
7E7-74_4/
REQUESTER:
SPECIAL INSTRUCTIONS:
PHONE NO.:
INSPECTION RESULTS /COMMENTS:
�j
C C:� & 7c;
e-
'
r .
di
INSPECTOR: /i/.,,,P _ %L44.0-7.1
DATE:
ti.
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTION RECORD
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
PIAN REVIEW COMMEi‘ CS
Plan Check No.: ` 1 1 `4 M Project: -44- ~''0 .
REQUIRED INSPECTIONS
X
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
X All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1. Footings
2. Foundation
3. Slab /Slab Insulation
4. Shear Wall Nailing
5. Roof Sheathing Nailing
6. Masonry Chimney
7. Framing
8. Insulation
9. Suspended Ceiling
10. Wall Board Fastening
1 ligpu r tttiit
12.
13.
14. Fire Final
15. Planning Final
16. Public Works Final
X
17. Building Final
PIAN REVIEW COMMEi‘ CS
Plan Check No.: ` 1 1 `4 M Project: -44- ~''0 .
REQUIRED INSPECTIONS
X
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
X All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
REVISION BY
RECORD DRAWINGS MJC
SPOT COOLER COL A/9 JOB NO. 910596-08 PAXTON
MATCH LINE (FOR CONTINUATION SEE SHEET 4M11)
FACILITIES DEPARTMENT
ACCEPTABILITY THIS DESIGN AND/OR CHECKED
SPECIFICATION IS APPROVED R.MURRAY
APPROVED BY DEPT BATE M.CAUNITIS
W.HENCKEL
- 151507rx —
K.RAMSEY
TITLE
BLDG 9,08,4
1' IPiCA1 POMP NUM1: SYSTEM:
EJUIPMENT NUMBER cOP MAINTENANCE & LABEL.
- -TouiPmr SEE SCHEDULE ON SHEET M4.
1 ) LIEBERT SPOT C1101..EP
r TLf .!:.1.10SIA: I'!tsi CAS ALI SCE PIPING DRAWING FOP.
LAS' VALI.
1, KE. L. (_/\
-* 1990 U.X.0 RRQUiitiVieNteS
REFRIGERila
C
ct. to es r or s and (Piss\ ons tWr ov oi
ans does no% auttori/e the violation any
adopted code or ordinance. fleceis ok CO
oiledg
tractor' scop.i ot ov ed
griPe
Labels pair. DIAGONAL. BRAC LNG
FLOOR
JOB NO, 910596
HECEIVED
crTY OF Twomux
Aug I 4 1991
PERMIT CENTER
BE&C,
ENGINEERS
FLTIOR HVAC PLAN - B
COL A-F/8-13
CITY OF TUKWILA
APPROVED
AUG 16 1991
s
BUILDING DIVISION
RECORD
DRAWINGS
REV. B 8/1/91
;:„ , . • . • •
--•-•----- • ------- - - - - ------
. •
%."
0 16 THS INCH 1
111111 1111111111111 11111i
2
0€ se 8G L.Z 9Z SZ +7Z ze
I 111
- • ' • „ • , - •• • • -
• • • , ••• .
,-,...,c:
IIifIIF J 111111 111111 11'111 11111-1111111111111111111T1 III
4 5 . 6 7 8
NOTE: If the microfilmed document is less clear than this
notice, it is due to the quality of the toriginal document.
1Z 0? 61 91, Lt 91 21 4 71 El Z1 13
,
- IiWI!l
•
1111 111111111111111111111111111111111111111111111
9 10 11 wavNGER.0. 12
01, 6
9 I, E I. v4..Q
11111111i!
•
f'"•1 ' • „
— ,
; • .
• • ' ' • . • .' ' ,
•
62C4M12
MR,J/10-01- 90
1 2N
REVISION
BY
APPROVED
DA.TE
SYM
REVISION
BY
APPROVED
DATE
RECORD DRAWINGS
DW/MJC
•AXTON
KMEE19192
lik l
II
1-3/-7/
-__________
0
SOOT COOLER COL. A/9 JOB NO. T196-08
1111 0VIIMI.1 1 101= 1 .7 1 711 11 •11N.11...O.M11.41111.111110.1.1110.1M
. .
-
........_
-.
3/4' ID DN
It'
1/2' ID
1 1/2"I
\k-1Pc
1/2- ID
'
4
1/2 HPWS
2' HPWR
2' HPWS
1 z- ---3'FIPWR
---731-1PWS
CO
,T _ _ --
1.n.
"3' HPWR
HPWS
2' HPWR
2' HPWS
1 1/2' ID
' 14PIN
1' HP\A/S
- 1/2' CW
2' SAN
6' HPWR UP
8' DN
1 1/2' ID DN
TO S. SINK
SEE SHEET /All
11
2' PV UP
& DN --7
-1/2' PW
-- 3/4' ID DN
61111611611111/ S61411100 01•01066161
111161/111[16 16.16■14f Pries6166 nii 11~1140.21116111illii
MATCH LINE (FOR CONTINUATION SEE SHEET 4M61)
afirif7ALF,AW
FACILITIES DEPARTMENT
LINE
1 1/4' HPWR
1 1/4' HPWS
■••••■•et,... m.••••••••■•••••••Orc......e.v...■
•••••■meskoft... 0"..M.1.111.01.0.1•■•••••■■VounsIt
O AUBURN, WA, 98002
O BELLEVUE, WA. 98007
O EVERET r, WA. 98201
O KENT, WA, 98031
O PORTLAND, DR. 97220
RENTON, WA 98055
IN SEATTLE, WA. 98124 j
.ZV.711.`
SEE NOTE 3
4' RWL DN
ACCEPTABILITY
THIS DESIGN AND/OR
SPCCIFICA TION IS APPROVED
APPROVED 13 Y DEPT DATE
LIEViCAFTIF
iratir BABAZADEH
n —
R. MURRAY
NOR.
r BABAZADEH
iirckr.
HENCKEL
APPROVED
K. RAMSEY
Ax r A
T YPICAL HEAT PUMP SYWA
N.A1N ENANCE & LABEL.
T ;THE DI.. ILE UN SHEET M4,
TITLE
CONNECT NEV 1 GLYCOL SUPPLY AND RETURN LINES TO NEV (3) TON
SPOT COOLER lb( 0 t
CONNCCT NEY ;.'2' DRAIN LINE 10 NEW SPOT COOLER CONDENSATE PUMP
AND EXIEND fil EXISTING DRAIN ABOVE DROP CEILING.
[12. NEV !/:?' CW LINE ID E:XISTING SUPPLY AND EXTF.ND WITH BALL
VALV1 s ra NEW SPO1 COOLER
KEY PLAN
NO CAL r1
81 DG 9.08,04
DEMOUN I ABLE PAR r TIM
FURNISH: D AND INSTALLED
By OWNER
iDROGRO PER NE TERS
AND F,TC 45 PAR THIN
IC 4 PART 'JILIN
TC 5C PARTITION
JOB NO. 91059618
_- _._a._._.___._____.-____ smIrmAinoramift.
BEM:
ENGINEERS
1 NI(STER
COL A-F/8-13
PERNUTCENTER
SHEET
RECI1RD
DRAWINGS
(111? OF TWO
APPROVED
AU6 1 6 MI
BUIL MG DivISION
REV,B 8/1/91
10.01
DATE
JOB O.
86062
9.4c No.
9.08-4M62
_ ..... _ .
— — —
SZ 4 7Z CZ ZZ
1
1111111111111111111111111111111111111111111111111111 r urriTITI
0 16 7146 INCH 1 2
4
NOTE: If the
notice, it is
1Z OZ 61
11 17 117 7•
5 6 2 7 8
microfilmed document is less clear than this
due to the quality of the priginal document.
61 91 St in £1. El 11 Q 6
1111111111 , 1 1 111 !IIIIIIIIMIld111111111 1 1111111111111111101111111111111111111111111111i9
1 1
1 11111111In7
1 0 11 MADEMERUAMY 12
! 9 S 4 7 C
e
62C4M62
1 7:7 77 -77.711.C.7.7:
DR' /10-6- 90