Loading...
HomeMy WebLinkAboutPermit 0567-M - BOEING #9-08.40567-M 91-144 BOEING #9-08.4 HVAC 9303 EAST MARGINAL WAY SOUTH . i ::'::::0:' ....................................................................... UMC EDITJON (YEAR__' 1988 FIRE PROTECTION: • fl N/A PROJECT NAME/TENANT: Boeing 1/9-08.4 CONDITIONS (other than noted on or attached to permit/plans): VALUE OF WORK: $ cf TYPE OF WORK: (2) New/Addition ( Modifications ( ) Repair ( ) Other: APPROVED FOR , .. BUILDING ISSUANCE BY: OFFICIAL • .... Ihria - .07Aawan , DATE: - - I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. „-------- ollijIMP SIGNATURE: / , 4111111b ' ' Saw DATE: S PRINT NAME: -r - -2--c--1-r,' COMPANY: i ::'::::0:' ....................................................................... SITE ADDRESS: a3-3-9-E Marginal Wy S SUITE NO. PROJECT NAME/TENANT: Boeing 1/9-08.4 98124-2207 VALUE OF WORK: $ cf TYPE OF WORK: (2) New/Addition ( Modifications ( ) Repair ( ) Other: DESCRIPTION OF WORK: Install 3-ton air conditioner. 98124-2207 WA. ST. CONTRACTOR'S LICENSE NO. N/A JEXPIRATION DATE: N/At PROPERTY OWNER: Boeing IPHONE: 544-2975 ADDRESS: P.O. Box 3707, M/S 46-87, Seattle, WA IZIP: 98124-2207 SLONTRACTOR: Boeing IPHON E: 544-2975 ADDRESS: P.O. Box 3707, M/S 46-87, Seattle, WA ZIP: 98124-2207 WA. ST. CONTRACTOR'S LICENSE NO. N/A JEXPIRATION DATE: N/At CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431-3670 MECHANICAL PERMIT NO. 050 - nn DATE ISSUED: P C Lc 1 - Rough-inNents/Ducts 431-3670 up 2 - Fire Final 575-4407 w 3 - Planning Final 431-3680 • 4 - x 5 - Mechanical Final 431-3670 I MECHAW:AL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) DATE FEES AMOUNT RECEIPT # DATE Basic Ferrnit.fer $15.00 JLJ( 1*(kii:] Plans.QhpCkFe TOT. Plan Check No.: 91 DATE(S) REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE ISSUED OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732) Electrical - Washington State Department of Labor and Industries (277-7272) This issuance, or if Perhfit the work is..SUSpended;,OrabandOned for p2periOd,OI:180'daYs frOni:thellaetlinepedti .1 PERMIT NO. CONTACTED l l ReC) tII � C2r DATE READY DATE NOTIFIED _a \ — j (p l (init.) J PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING �� `� /`..40 3RD NOTIFICATION BY: (init.) PLAN CHECK NUMBER QI rm D EPARTM ENT • O PLANNING O OTHER PROJECT NAME no- i n *9 q SITE ADDRESS SUITE NO. g3o3 INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" in box Indicates which departments need to review the project. REVIEW COMPLETED t BUILDING - s -ig initial review O FIRE g BUILDING - c final rAviAw " R..O (ROUTED) INIT: INIT: INIT: i1, -51 INIT: c, - MECHANICI. PERMIT APPLICATION TRACKING CONSULTANT: Date Sent - FIRE PROTECTION: ZONING: REFERENCE FILE NOS.: UMC EDITION (year): Icl UIREMENTS. / :$ ; COM M . _.. [1 FIRE DEPT. LETTER DATED: Sprinklers SCREENING REQUIRED? fYes (l No Date Approved Detectors ( ) N/A INSPECTOR: BAR/LAND USE CONDITIONS? Yes 0w17,ao 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 4334849 NAME PAXT JOB# 910596 -08 ,: >i!•.rDESCRIPTIQN.* 1 . agAMOUI4T:o. RCM*. tiv { °DATE$P ��`'� • BASIC' PERA� IT'FEE IY 3` t'�i �� t' f � r f � "•'k `' I t ° Y�„�,',`t�'yi .� • "�''�•' 3 " �• 4 ! w:.K' }•i�,i• S:" t •r., . f`��•� • >a'r•' , Y a.:� : ci: { ' . ;y; >:yi i ' e' ; •t' J • 4y ":," 4 •,� # w ..:{. y ',�..* !h; 3:1 "' > Am .:* 'Ss! :l > <'X: ' Z ` %�C': I `3<f•>rp,4f..;},t PLAN 1 NUMBER CHECK q l `"I 4 � I UNiT(S�° FEEY:<f #�::,;•# ;s.<::,:ra:1f >;: PLAN; ECK1:FEE <f..� }«b1 31�s > 6.. ° y J:iS':ss{ te err,.. s C !`•.. .s #::`3f7::,�' ?jE.:y:,i }: }.r;r� : �i�� ?i • OTHER �; }, :, �'.. },f,; • }, 4 .. ;, f ;.� .> . x. �{�i��;..;s..�f,i. ; < <s�� 1: . x: , .;,'., • �lk: lr..a�tt 1 �,:; : »1r�2�L.vP,y. � APPLICATION MUST BE FILLED OUT COMPLETELY i Iii : ; :t �': {.:` �f.G} r•Y..•:t j:E 4f. :0 ¢ 1k 4;.• :, .. N: KI ':is: < : <.;::: eft;>.:,:.::' aiTOTAM;,•<,. f. c, 1F' i ? t: t ,..,.^ rra :i:.;,•:}'s:;`i,i'ft8i�gn:,: CITY /ZIP • : - PHONE (206) 544 -2975 1 DDRESS SUITE # 4 E . MARGINAL WAY SO. BLDG# 9 -08.4 OF CONSTRUCTION - $ 9,000.00 PROJECT NAME/TENANT BOEING MILITARY AIRPLANES TYPE OF WORK: CO New /Addition 0 Modifications 0 Repair 0 Other: , DESCRIBE WORK TO BE DONE: INSTALL 3 TON AIR CONDITIONER E RA7INGJSIZE..:. :.:: : }; -' :: NUM Uf#tT5 " LIEBERT 3TON 1200CFM 1 BUILDING USE (office, warehouse, etc.) OFFICE NATURE OF BUSINESS: . WILL THERE BE A CHANGE IN USE? 0 No 0 Yes iF YES, EXPLAIN: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE 'BUILDING? ® No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER BOEING MILITARY AIRPLANES PHONE (206) 544 - 2975 ADDRESS P.O.BOX 3707, M/S 46 -87, SEATTLE, WA. ZIP 98124 - 2207 CONTRACTOR BOEING MILITARY AIRPLANES 'PHONE i 2 6) 544 - 2925 ADDRESS JZIP g8174 -77n7 .O F. P .BOX 37n7. _ M/S 46 -R7. SEA7 wr .WA. WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT Rr)RTN{; MTi,TTARY ATRAT,'.N S PHONE (206) 544 -2975 ADD P.O. BOX 3707, M /S 46 -87, SEATTLE, WAi JZ1P 98124 -2207 K�. HA:. ! .< . A•V:E FiE "A'ANO;EXfL R, •.kll. :•.P GA'F O A. �' (., • T ,'j:t � . � +t iN� �.: Ark �.� ,� � ri .t. . ` :'iS .M ?� ' •} . i...p;4t T'TF{1J ' : : }> !'� . A AtJ . ...OFiR�C'>t; :ANa• A , ;'AtJC OF�IZ�[7..:T'S�::•� }. . * 4 }f i� ,� • }.. .• k:, a : 3: 4 : ` Q .H.E }iSMETO:S . �N W'T..� '} S!$i„Y•... "f:`: r ;t }�rR'Y,: "!t's' ^2�.6: f %.4 J•. t.: . . �' 4 .. }C � .: i • , 3.' . . .x � s�.. r. TLS. •:'t . } ., .+. 4 'f:.:.Gf. y 4 Yl.`1}%S }. :1.�'FM1:'f�. eY( BUILDING OWNER OR AUTHORIZED AGENT SIGNATURE / _ ��✓ .4e,......4-. - -- � � DATE 08 - 12 - 91 PRINT NAME Y C C : 00 Y PHONE 21 . - ADDRESS P.O. BOX 3707 I __M S 46 -87 SEATTLE WA CITY /ZIP • : - PHONE (206) 544 -2975 CONTACT PERSON TERRY BENNETT CITY OF TUKWILA 1 Department of Comm unity Development - Building. Division APPLICATION SUBMITTAL In order to ensure that your application Is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form.. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and i'iiiulete• In'uiudi to acceolad for plan review, BUILDING OWNER / AUTHORIZED AGENT If the applicant Is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled In by the applicant. This figure is used for budget 'reporting purposes only and not to calculate your lees, EXPIRATION OF PLAN REVIEW Applications for which no permit Is issued within 180 days following the dale of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined In Section 304(d) of the Uniform Mechanical Code (current edition), No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 433-1849. DATE APPLICATION ACCEPTED MECHANV AL PERMIT APPLICATION Mechanical Fee Worksheet must also be filled out and attached to this l!cation. FEES (for staff use only) DATE APPLICATION EXPIRES 03413/119 Li► ► r (Jr ► un vr►Ls4 Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. INSTRUCTJONS - Complete the worksheet, . p H . lndiaating: the;number of units being installed • In`eacli category;: multiplied by the unit cost. . Then.:tally. the, subtotal column highlighted at t he bottom of the worksheet. At time of : • .submittal; staff.: will calculate the remaining, fees. • ... . - • • - • DESCRIPTION UNIT COST NO. OF UNITS X TOTAL COST BASIC FEE $15.00 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu /h. $g,00 2 Installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 X 3 Installation or relocation of each floor furnace, including vent. $9.00 4 Installation or relocation of each suspended heater, recessed wall heater or floor - mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. $4.50 x 6 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 X 7 Installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $9.00 X 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 X , 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu /h. $22.50 X 1 0 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 x 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 x 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air- handling unit over 10,000 cfm. $11.00 x 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 x 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6.50 18 Installation or relocation of each commercial or industrial -type incinerator. $11.00 x 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 x 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee is listed in this code. $6.50 X SUBTOTAL (unit foe) ati, PLAN CHECK FEE lss% t �ualotoll // (D GRAND TOTAL $ 30.00 MECHANICAL PERMIT FEE Wt.RKSHEET CITY OF TUKWILA 6200 SOUTIICENTER BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91- 144 -M: Boeing #9 -08.4 9e E Marginal Wy S 6 1303 PHONE N (2061 433.1800 Gary L. VunDusen, Mayor THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OW THE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER o) 5iIm 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872- 6363). 3. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 4. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 5. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 . Edition), Washington State Energy Code (1991 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 6. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. PROJECT: - AG- 0 . , PERMIT NO. (5-67 7,4 /ipr --7-( SITE ADDRESS: Lf C- f 'VJ e / DATE CALLED: TYPE OF INSPECTION: Ai, • y, / DATE WANTED: 7E7-74_4/ REQUESTER: SPECIAL INSTRUCTIONS: PHONE NO.: INSPECTION RESULTS /COMMENTS: �j C C:� & 7c; e- ' r . di INSPECTOR: /i/.,,,P _ %L44.0-7.1 DATE: ti. CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PIAN REVIEW COMMEi‘ CS Plan Check No.: ` 1 1 `4 M Project: -44- ~''0 . REQUIRED INSPECTIONS X No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). X All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab /Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening 1 ligpu r tttiit 12. 13. 14. Fire Final 15. Planning Final 16. Public Works Final X 17. Building Final PIAN REVIEW COMMEi‘ CS Plan Check No.: ` 1 1 `4 M Project: -44- ~''0 . REQUIRED INSPECTIONS X No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). X All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. REVISION BY RECORD DRAWINGS MJC SPOT COOLER COL A/9 JOB NO. 910596-08 PAXTON MATCH LINE (FOR CONTINUATION SEE SHEET 4M11) FACILITIES DEPARTMENT ACCEPTABILITY THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED R.MURRAY APPROVED BY DEPT BATE M.CAUNITIS W.HENCKEL - 151507rx — K.RAMSEY TITLE BLDG 9,08,4 1' IPiCA1 POMP NUM1: SYSTEM: EJUIPMENT NUMBER cOP MAINTENANCE & LABEL. - -TouiPmr SEE SCHEDULE ON SHEET M4. 1 ) LIEBERT SPOT C1101..EP r TLf .!:.1.10SIA: I'!tsi CAS ALI SCE PIPING DRAWING FOP. LAS' VALI. 1, KE. L. (_/\ -* 1990 U.X.0 RRQUiitiVieNteS REFRIGERila C ct. to es r or s and (Piss\ ons tWr ov oi ans does no% auttori/e the violation any adopted code or ordinance. fleceis ok CO oiledg tractor' scop.i ot ov ed griPe Labels pair. DIAGONAL. BRAC LNG FLOOR JOB NO, 910596 HECEIVED crTY OF Twomux Aug I 4 1991 PERMIT CENTER BE&C, ENGINEERS FLTIOR HVAC PLAN - B COL A-F/8-13 CITY OF TUKWILA APPROVED AUG 16 1991 s BUILDING DIVISION RECORD DRAWINGS REV. B 8/1/91 ;:„ , . • . • • --•-•----- • ------- - - - - ------ . • %." 0 16 THS INCH 1 111111 1111111111111 11111i 2 0€ se 8G L.Z 9Z SZ +7Z ze I 111 - • ' • „ • , - •• • • - • • • , ••• . ,-,...,c: IIifIIF J 111111 111111 11'111 11111-1111111111111111111T1 III 4 5 . 6 7 8 NOTE: If the microfilmed document is less clear than this notice, it is due to the quality of the toriginal document. 1Z 0? 61 91, Lt 91 21 4 71 El Z1 13 , - IiWI!l • 1111 111111111111111111111111111111111111111111111 9 10 11 wavNGER.0. 12 01, 6 9 I, E I. v4..Q 11111111i! • f'"•1 ' • „ — , ; • . • • ' ' • . • .' ' , • 62C4M12 MR,J/10-01- 90 1 2N REVISION BY APPROVED DA.TE SYM REVISION BY APPROVED DATE RECORD DRAWINGS DW/MJC •AXTON KMEE19192 lik l II 1-3/-7/ -__________ 0 SOOT COOLER COL. A/9 JOB NO. T196-08 1111 0VIIMI.1 1 101= 1 .7 1 711 11 •11N.11...O.M11.41111.111110.1.1110.1M . . - ........_ -. 3/4' ID DN It' 1/2' ID 1 1/2"I \k-1Pc 1/2- ID ' 4 1/2 HPWS 2' HPWR 2' HPWS 1 z- ---3'FIPWR ---731-1PWS CO ,T _ _ -- 1.n. "3' HPWR HPWS 2' HPWR 2' HPWS 1 1/2' ID ' 14PIN 1' HP\A/S - 1/2' CW 2' SAN 6' HPWR UP 8' DN 1 1/2' ID DN TO S. SINK SEE SHEET /All 11 2' PV UP & DN --7 -1/2' PW -- 3/4' ID DN 61111611611111/ S61411100 01•01066161 111161/111[16 16.16■14f Pries6166 nii 11~1140.21116111illii MATCH LINE (FOR CONTINUATION SEE SHEET 4M61) afirif7ALF,AW FACILITIES DEPARTMENT LINE 1 1/4' HPWR 1 1/4' HPWS ■••••■•et,... m.••••••••■•••••••Orc......e.v...■ •••••■meskoft... 0"..M.1.111.01.0.1•■•••••■■VounsIt O AUBURN, WA, 98002 O BELLEVUE, WA. 98007 O EVERET r, WA. 98201 O KENT, WA, 98031 O PORTLAND, DR. 97220 RENTON, WA 98055 IN SEATTLE, WA. 98124 j .ZV.711.` SEE NOTE 3 4' RWL DN ACCEPTABILITY THIS DESIGN AND/OR SPCCIFICA TION IS APPROVED APPROVED 13 Y DEPT DATE LIEViCAFTIF iratir BABAZADEH n — R. MURRAY NOR. r BABAZADEH iirckr. HENCKEL APPROVED K. RAMSEY Ax r A T YPICAL HEAT PUMP SYWA N.A1N ENANCE & LABEL. T ;THE DI.. ILE UN SHEET M4, TITLE CONNECT NEV 1 GLYCOL SUPPLY AND RETURN LINES TO NEV (3) TON SPOT COOLER lb( 0 t CONNCCT NEY ;.'2' DRAIN LINE 10 NEW SPOT COOLER CONDENSATE PUMP AND EXIEND fil EXISTING DRAIN ABOVE DROP CEILING. [12. NEV !/:?' CW LINE ID E:XISTING SUPPLY AND EXTF.ND WITH BALL VALV1 s ra NEW SPO1 COOLER KEY PLAN NO CAL r1 81 DG 9.08,04 DEMOUN I ABLE PAR r TIM FURNISH: D AND INSTALLED By OWNER iDROGRO PER NE TERS AND F,TC 45 PAR THIN IC 4 PART 'JILIN TC 5C PARTITION JOB NO. 91059618 _- _._a._._.___._____.-____ smIrmAinoramift. BEM: ENGINEERS 1 NI(STER COL A-F/8-13 PERNUTCENTER SHEET RECI1RD DRAWINGS (111? OF TWO APPROVED AU6 1 6 MI BUIL MG DivISION REV,B 8/1/91 10.01 DATE JOB O. 86062 9.4c No. 9.08-4M62 _ ..... _ . — — — SZ 4 7Z CZ ZZ 1 1111111111111111111111111111111111111111111111111111 r urriTITI 0 16 7146 INCH 1 2 4 NOTE: If the notice, it is 1Z OZ 61 11 17 117 7• 5 6 2 7 8 microfilmed document is less clear than this due to the quality of the priginal document. 61 91 St in £1. El 11 Q 6 1111111111 , 1 1 111 !IIIIIIIIMIld111111111 1 1111111111111111101111111111111111111111111111i9 1 1 1 11111111In7 1 0 11 MADEMERUAMY 12 ! 9 S 4 7 C e 62C4M62 1 7:7 77 -77.711.C.7.7: DR' /10-6- 90