HomeMy WebLinkAboutPermit 0585-M - HOMEWOOD SUITES - B0585-m 91-152 homewood suites hvac
6925 southcenter boulevard #b
M r► 501 TES
-RUILL
:::'::.:: QmppANca.!::::::::.
Dimension Development Co.
UMO EDITION (Y 1988
FIRE PROTECTION: X)S•rinklers x Detectors N/A
CONDITIONS (other than noted on or attached to permit/plans):
SITE ADDRESS: 6925 Southcenter Bl 1/B
ADDRESS:
3010 Coronado 1111, Anaheim, CA
'4
APPROVED FOR 4 cri i .. ,4 e.,ste _ d_. BUILDING
ISSUANCE BY: OFFICIAL
DATE:
(
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating co uction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATUR e€AL-ea .c.
DATE: 9 -/ 3 - q i
PRINT NAME: /Ce I- >9- M
COMPANY:
PROP RTY OWNER:
Dimension Development Co.
'PHONE: 318
ZIP: 71457
PHONE: 714
ADDREU:
401 Keyser Avenue, Natchitoches, LA
Energy Systems Technology, Inc.
SITE ADDRESS: 6925 Southcenter Bl 1/B
ADDRESS:
3010 Coronado 1111, Anaheim, CA
SUITE NO. B4
PROJECT NAME/TENANT' Homewood u tes Hotel
( ) Repair
(
VALUE OF WORK:
) Other:
$ 52,980.00
TYPE OF WORK: X New/Addition ( ) Modifications
DESCRIPTION OF WORK: Install HVAC equipment.
PROP RTY OWNER:
Dimension Development Co.
'PHONE: 318
ZIP: 71457
PHONE: 714
ADDREU:
401 Keyser Avenue, Natchitoches, LA
Energy Systems Technology, Inc.
CONTRACTOR:
ADDRESS:
3010 Coronado 1111, Anaheim, CA
ZIP: 92896
WA. ST. CONTRACTOR'S LICENSE NO. ENERGST099NN
EXPIRATION DATE: 8-02-92
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
MECHANICAL
PERMIT NO. C 57sca-in
DATE ISSUED:
,-
MECHANk,‘AL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
FEES AMOUNT RECEIPT # DATE.
Basic Permit Fee 15.00 4l
Unit Fee 1,104.00
EEL
.ag
TOTAL l398.76
Plan Check No.: 91
DATE DATE(S)
APPROVED INSPECTOR CORRECTION NOTICE ISSUED
REQUIRED INSPECTIONS
1 - Rough-in/Vents/Ducts
2 - Fire Final
3 - Planning Final
4 -
x 5 - Mechanical Final
PHONE NO.
431-3670
575-4407
431-3680
431-3670
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and industries (277-7272)
This permit shall become null anctvoid if the work is not commenced•within from:theaate:o
iUh work is suspended or abandoned fora oeriod of 180 daiis finrn tho last ifisnOntion:'''':'
MECHANICK,, PERMIT
APPLICATION TRACKING
PLAN CHECK
NUMBER
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
RT
....... ...............................
4 BUILDING -
initial review
FIRE
O PLANNING
O OTHER
DATE READY
. BUILDING -
final rAviAw
PERMIT EXPIRES
AMOUNT OWING
PROJECT NAME
4cmQ wood 5L)i-v-
SITE ADDRESS
(0 ` lAnc -e r -COY f31
...............
Spicti
REVIEW COMPLETED
PERMIT NO.
•
ct r
ROUTED
q -q4l
INIT:
INIT:
0 '
INIT:
?(ID /c /l
INIT: (r.-
CONSULTANT: Date Sent -
FIRE PROTECTION:
UIREME NTS..
............... ...............................
Sprinklers
FIRE DEPT. LETTER DATED: y-9- 9)
SUITE NO.
....... .........
OMVI
. ...............................
Date Approved -
INSPECTOR:
Detectors N/A
ZONING: 1BAR/LAND USE CONDITIONS? Yes No
SCREENING REQUIRED? rives fl No
REFERENCE FILE NOS.:
UMC EDITION (year):
(4
CONTACTED
DATE NOTIFIED
2nd NOTIFICATION
3RD NOTIFICATION
BY. ,.�Q
(init.) `--�U -�
BY:
(init.)
q — « —G 11
BY:
(init.)
08/17 /90
PROPERTY OWNER , gal. •- -r. • I rt
'
\-0C4
'UN
PYWIt 3Sa
- S
Z1 (..4
7
ADDRESS Pt. z_ / 11 N&ivC A.Z
CONTRACTOR ��
) 10
PHOf i _ 6.3t2 s O' u
PLAN 'CHECK FEE
ADDRESS 3t l," �.Cbu ' - ,� #
^�
ZIP�
WA. ST. CONTRACTOR'S LICENSE # 2.1,4 C R G s
0ci9 N N
TOTAL
EXP. WI/5, Z
:DESCRIPTION
: AMOUNT
RCPT :#.'
.::::::DATE.::::.:
BASIC PERMIT FEE
`$15.00:
UNIT(S)':FEE
) 10
PLAN 'CHECK FEE
a.1c(.7Q,
OTHER.:.
TOTAL
1 3ci6 70
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER
q
APPLICATION MUST BE FILLED OUT COMPLETELY
SITE ADDRESS SUITE #
�o a 2S S oven Co )ve - U_) C)Jf
PROJECT NAME/TENANT
Kowa St.►.Ata K
TYPE OF WORK: New /Addition ❑ Modifications ❑ Repair ❑ Other:
DESCRIBE WORK TO BE DONE:
BUILDING USE (office, warehouse, etc.)
NATURE OF BUSINESS:
WILL THERE BE A CHANGE iN USErkp No ❑ Yes IF YES, EXPLAIN:
I
SUE AND CORRI C1
BUILDING OWNER
OR
AUTHORIZED
AGENT
CONTACT PERSON
SIGNATURE
DATE APPLICATION ACCEPTED
RATINGtSizE< > >: > >
C bm p�__
la 1 AiiA:AUTHORi�Ef� TO.EIPP
PRINT NAME , ..a Me.c.Uc.,r-
ADDRESS -30 C- - •Vt-- I-1
MECHAN: ;AL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out
and attached to th a lication.
FEES (for staff use only)
VALUE OF CONSTRUCTION - $
9 s 6 . 0 0 53
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? ❑ No ❑ Yes IF YES, EXPLAIN:
E'READ AND EXAMINED ;THIS APPL.ICATION'
R THtS ::PER
D
DATE
PHONE
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
Plans must be complete in order to be accepted for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure 1s used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
DATE APPLICATION EXPIRES
W
<`:NUNtBER <OF<.UNITS< >?
36 ReV 1_s
CITY /ZIP eia_c 4
PHONE 6 3. 25Oo
a
06/18/90
DESCRIPTION
UNIT COST
NO OF
UNITS
X
TOTAL
COST
$15.00
BASIC FEE
SUPPLEMENT PERMIT FEE
$4.50
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$9.00
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
x
3
Installation or relocation of each floor furnace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not Included in an appliance permit.
$4.50
x
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9.00
2,2.,
x
1 q 18 °%
..*,,lif.
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and Including 1,750,000 Btu /h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
Gig
,
X -....
4y�
13
Each air- handling unit over 10,000 cfm.
$11.00
X
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
x
, /G o
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
j
X
`tom
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$1 1.00
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
x
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
--M
08118100
SUBTOTAL
PLAN CHECK FEE (25% of
subtotal)
I ( CU .51)
GRAND TOTAL
$n t;7
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHANF)AL PERMIT
FEE WORKSHEET
INSTRUCTIONS -
n u C omplete the worksheet,
indicating the mber: of un is being
in stalled in each category. At trine of
submittal, ;'staff will calculate the fees
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
INSTRUCTIONS - Complete the worksheet,
Ind th number of units being
Installed in each category At time of
sub mittal, staff will calculate the fees.
DESCRIPTION
UNIT COST
NO. OF
UNITS
x
TOTAL
$ COST J
BASIC FEE
SUPPLEMENT PERMIT FEE
$4.50
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$9.00
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
x
3
Installation or relocation of each floor furnace, including vent.
$9,00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
x
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9.00
X
D7
1 ; 8T
/installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu /h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
X
12
ach air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
3
)1 „0
13
Each air - handling unit over 10,000 cfm.
$11.00
X
14
Each evaporative cooler other than a portable type.
$6.50
X
15
,.Each ventilation fan connected to a single duct.
$4.50
Z.
x
9.00
16
,
` Each ventilation system which is not a portion of any heating or
air- conditioning system authorized by a permit.
$6.50
X
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
Installation or relocation of each commercial or Industrial -type incinerator.
$11.00
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
x
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
06/18/DO
SUBTOTAL
PLAN CHECK FEE ( aubtotil)
13. qO
GRAND TOTAL
$ • 1_n • 3 1
'U
l
MECHANF;AL PERMIT
FEE WORKSHEET
DESCRIPTION
UNIT COST
NO OF
UNITS
X
TOTAL
CO T
BASIC FEE
0 N
SUPPLEMENT PERMIT FEE
4.50
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$9.00
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
X
3
Installation or relocation of each floor furnace, including vent.
$9.00
x
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
x
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9.00
0
X
90
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu /h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
-
) cis
13
Each air - handling unit over 10,000 cfm.
$11.00
X
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
X
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
� -^
J
X
3�
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6,50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.00
x
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
X
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed In
this code.
$6.50
X
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHANE)AL PERMIT
FEE WORKSHEET
INSTRUC.710 Complete the worksheef,
Indicating the number of units being
installed in each category. At time of ;
submittal, staff will calculate the fees.
06118190
SUBTOTA
PLAN CHECK FEE
GRAND TOTAL
subtotal)
CITY OF TUKWILA
6200 SOUTIICENTCR!BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91- 152 -M: Homewood Suites Hotel
6925 Southcenter B1 #B
PHONE # (2061 433.1800 Gary L. VanDuscn, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART F HE APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (872-
6363).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. Maintain 1 -hour fire - resistive assemblies.
5. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
6. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State. Energy Code (1991 Edition), and
Washington State Regulations for Barrier Free Facility
(1989 Edition).
7. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for, or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Fire Department Review
Control #91 -151M through #91 -155M (5 letters)
(513)
Dear Sir:
Gary L. VanDusen, Mayor
September 10, 1991
Re: Homewood Suites, Bldg. #A - 6915 Southcenter Blvd.,
Bldg. #8 - 6925 Southcenter Blvd., Bldg. #C - 6935
Southcenter Blvd., Bldg. #D - 6945 Southcenter Blvd., Bldg.
#E - 6955 Southcenter Blvd.
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. Maintain sprinkler protection for all enclosed areas.
(NFPA 13, 4- 1.1.1) (UFC 10.302)
All sprinkler drawings shall be prepared by companies
licensed to perform this type of work. Drawings shall
first be approved by the Washington Survey & Rating
Bureau, Factory Mutual Engineering or Industrial Risk
Insurers, then by the Tukwila Fire Department. No
sprinkler work shall commence without approved
drawings. (City ordinance #1528 & NFPA 13, 1 -9.1)
(UFC 10.305)
2. H.V.A.C. units rated at 2,000 cfm require
auto - shutdown devices. These devices shall be separately
zoned in the alarm panel and local U.L. Central Station
supervision is required.
This is a requirement for the supervision of detectors
already required by the mechanical code.
(-
*ILA
City of Tukwila
19
09
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188-7661
(206) 575-4404
TUKWILA FIRE DEPARTMENT
FINAL APPROVAL FORM
Project Name c 44,4' 5
r< I/4
Address
Suite #
/ without correction notice
Approved with correction notice issued
Sprinklers:
Fire Alarm:
• Hood & Duct:
Halon:
Monitor:
Pre-Fire:
Permits:
49A 1 / 7./9),/
Authorized Signature
FINALAPP.FRM
Retain current inspection schedule/
Needs shift inspection
A
;-
• , . • , • .•
Control No. 9/4
Permit No. oS V.7
Date
Gary L. VanDusen, Mayor
3 L / 7 2-
T.F.D. Form F.P. .85
ial
PERMIT NO. ( N"�--
PROJECT: c
SITE ADDRESS:
DATE CALLED:
TYPE OF INSPECTION: -
DATE WANTED:
a.m.
SPECIAL INSTRUCTIONS:
REQUESTER:
PHONE NO.:
INSPECTION RESULTS /COMMENTS:
4, c: J
tom_
INSPECTOR: � --' L,- L-- 2.-- --
DATE: 2 w- aia ,--9.
,
SG ktsA Yettedzsitrztzaa.cual r
...................... +rvw.snnv..vrFVUVw�tW.:i'tM1:9tr purlW�IR<YSbaf Mer..e,. r.e*1 •. w.... rru. v.. �rverw��nwn�xa�wWbMYHdSCM /A�91W..�lh°
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
INSPECTIOk RECORD
6300 Southcenter Boulevard - #100
Tukwila Washington 98188
M MMIIIIIIV:.
n.pe ion , I A ► G{
•" r
il.teCa e■: 4 -.. i
Special Instructions:
c (� bald
? , , \ 1 0
1 °
Date Wanted:
c� „
f N '7 Ci am. P m
R equester:
Cap
Phone N%/ (p / _
( L4
•
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
Approved per applicable codes.
INSPECTION RECORD
Retain a copy with permit
0 % -M
PERMIT NO,�
(206) 431 -3670
❑ Corrections required prior to approval.
COMMENTS: h1 ' ; l
( , Y • e•�- c P � rlP r
170
o pk y-k-s
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
I ReceOt No.:
Date:
• ro ect:
ter, i1/
-
ype o nspect . n:
", .�
� ' re -, : /
L$
, &Gd
s to .: , ; /,•,--- 36--2 -.
Special Instructions:
-
Date Wanted:
Requester:
Phone No,:
0.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
g Approved per applicable codes.
Inspector:
;F'a�J�rk'rt�.. t; ''��"', l • + �w.� -�.t ,i tilry�.`K:C' >. oer�.: L.' �'�' - 7S'3� l•7".`'t v. r/lwl+�p'
INSPECTION RECORD .
Retain a copy with permit
aS
PERMIT NO.
(206) 431 -3670
COMMENTS:
❑ Corrections required prior to approval.
ti irr-, Date: /✓,��
❑ �. REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
I Receipt No.:
Dale:
r : / " • Type of lnspedio
a& _� "Ur.' --..4-2014 4% /J / dA ..
, .
. a Instructions:
Date Wanted: _ _4_ 92.
•m.
Requested/ p ,
�LII i1
PA
Approved per applicable codes.
Receipt rim
f l! ...
il
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
1
(206) 431 -3670
❑
orredtiorrs required prior to approval.
COMMENTS:
+ vow 4 -•
$30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Date:
i:4.et
1.1L IL , . .'1.+1.I.
11�.
1 "ype off s
•
�: `
` i
He a e.: 1 .___ci ... G D
Speclar nstruct ons:
Date Wanted: f
ter q am,
Requester: (y
Inspector:
$30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
0.
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
COMMENTS:
058"5 -nit
PERMIT NO.
(206) 431 -3670
Approved per applicable codes. O Corrections required prior to approval.
DATE
— c — `Z(
CITY OF TUKWLLA
6300 SOUTHCENTER BOULEVARD
TUKWILA, WA 98188
* * REVISION SUBMITTAL * *
PROJECT NAME ov\ -U) Cb
SHEET NUMBER(S) /VI 3 V ` r( V
"Cloud" or highlight all areas of revisions and dake revisions.
RECEIVED
CITY OF TUJKWILA
SEP 1 3 1991
PERMIT CENTER
ADDRESS Cv 9 / S (7;q33
� % S
CONTACT PERSON CI) T S ( - 7 - 7) 'PHONE /cam et 4 41 45 t
ARCHITECT OR ENGINEER
PERMIT NUMBER (If previously issued)
PLAN CHECK NUMBER qt- lS l /Y' th 66
TYPE OF REVISION: REL° C-& 77 2 ti C) P Ca (. f
SUBMITTED TO:
TITLE 24 REPORT FOR:
Homewood. Suites Hotel (BLDG B4) 5
Tukwila, Washington
PROJECT DESIGNER:
Dimitri Demopulos Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
OWNER:
Dimension Development Company. Inc.
REPORT PREPARED BY:
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
Job Number: 91065
Date: 8/16/1991
RECEIVED
CITY OF TUKWILA
AUG 221991
PERMIT CENTER
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has interim approval
and is authorized by the California Energy Commission for use with the
Second Generation Nonresidential Building Energy. Efficiency Standards
for. Nonresidential Occupancies. Second Generation Residential Occupancies
shown to' comply with this program conform to the . results produced by the
Public Domain Point System, developed by the California Energy Commission.
This program developed by Gabel Dodd Associates (415Y428-0803.'
LERTIFICATE OF.COMPLIANC : Residential (part 1 of 3
Project: Homewood Suites Hotel (BLDG 84)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
PROJECT ADDRESS
Tukwila, Washington
GENERAL INFORMATION
Compliance Method:
Climate Zone:
Total Conditioned Floor Area:
Building Occupancy:
Front Entry Orientation:
Number of Dwelling Units:
Floor Construction Type:
Infiltration Control:
BUILDING SHELL INSULATION
Component Area U -Value
R -13 Frame Wall 2790 0.0885
R -13 Frame Wall 767 0.0885
R -13 Frame Wall 2028 0.0885
R -13 Frame Wall 767 0.0885
R -13 Frame Wall 2028 0.0885
R -13 Frame Wall 34 0.0885
R -13 Frame Wall 34 0.0885
R -13 Frame Wall 34 0.0885
R -30 BU Roof /Acoust Clg 2056 0.0343
R -30 BU Roof /Acoust Clg 4216 0.0343
R -30 BU Roof /Acoust Clg 786 0.0343
Carpeted Slab 6168 0.7200
Carpeted Slab
THERMAL MASS Thick
Mass Material Area (in) Type
Concrete,
Concrete,
Concrete,
Concrete,
Heavyweight
Heavyweight
Heavyweight
Heavyweight
6168 4.000 Covered
786 4.000 Covered
786 4.000 Covered
786 4.000 Covered
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Job #: 91065
. Point System
1
21070 sqft
Multi- Family
West
36
Slab
Standard
Location /Comments
CF -1R page 3 of 30
COMPLY 24
Building Permit No
Checked By
v 3.10
Date (User # 1184)
1ST FL -UNIT E,D TYPE 12
2ND FL -UNIT E TYPE 4
2ND FL -UNIT A TYPE 8
3RD FL -UNIT E TYPE 4
3RD FL -UNIT A TYPE 8
1ST FL- CORRIDOR
2ND FL- CORRIDOR
3RD FL- CORRIDOR
3RD FL -UNIT E TYPE 4
3RD FL -UNIT A TYPE 8
3RD FL- CORRIDOR
1ST FL -UNIT E,D TYPE 12 /Insul R -0.0
786 0.7200 1ST FL- CORRIDOR /Insul= R -0.0
Location /Description
1ST FL -UNIT E,D TYPE 12 /Int Mass
1ST FL- CORRIDOR /Int Mass
2ND FL- CORRIDOR /Int Mass
3RD FL- CORRIDOR /Int Mass
Documentation: Jason C. Tsou /J.T. Engineering Services
CERTIFICATE OF COMPLIANCE: Residential (part 2 of 3) CF -1R page 4 of 30
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
GLAZING
Location Orient Area
1ST FL -UNIT E,D TYPE 12
East 363.0 Double 0.65
West 363.0 Double 0.65
2ND FL -UNIT E TYPE 4
West 121.0 Double 0.65
2ND FL -UNIT A TYPE 8
East 320.0 Double 0.65
West 320.0 Double 0.65
3RD FL -UNIT E TYPE 4
West 121.0 Double 0.65
3RD FL -UNIT A TYPE 8
East 320.0 Double 0.65
West 320.0 Double 0.65
1ST FL- CORRIDOR
2ND FL- CORRIDOR
3RD FL- CORRIDOR
SHADING (for Glazing above)
Location Exterior Device
1ST FL -UNIT E,D TYPE 12
50 % Bug Screen
50 % Bug Screen
2ND FL -UNIT E TYPE 4
50 % Bug Screen
2ND FL -UNIT A TYPE 8
50 % Bug Screen
50 % Bug Screen
3RD FL -UNIT E TYPE 4
50 % Bug Screen
3RD FL -UNIT A TYPE 8
50 % Bug Screen
50 % Bug Screen
1ST FL- CORRIDOR
2ND FL- CORRIDOR
3RD FL- CORRIDOR
Date: 8/16/1991
Checked By
Glass w /Int
Type U -Val SC Shade Description
COMPLY 24 v 3.10
Building Permit No
Date (User # 1184)
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
Over
SC hang
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
Framing Type
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
CERTIFICATE OF COMPLIANCE : Residential (part 3 of 3) CF -1R
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington /Seattle Date: 8/16/1991
Documentation: JasoniC. Tsou /J.T. Engineering Services
HVAC SYSTEMS Minimum' Output Duct
System Type Efficiency (Btuh) Location
Heat Pump 6.800 HSPF 10200 Vent. Attic Space 4.2 EMI MH4D2 /CHX12
Heat Pump 9.500 SEER 11500 Vent. Attic Space
Heat Pump 6.800 HSPF 17100 Vent. Attic Space 4.2 COMFORTER YC018G /18VDX
Heat Pump 9.000 SEER 17500 Vent. Attic Space
Zone Furnace Max:
Zone Furnace Max:
Cooling Exception:
HOT WATER SYSTEMS
System Type
Gas Fired
1.3 x [218884 Btuh + (10 x 18712 sqft)] = 527805 Btuh
1.3 x [ 12861 Btuh + (10 x 2358 sqft)] = 47373 Btuh
CFM Cooling (see Load Calcs) requires Btuh
Tank Manufacturer /Model No.
Volume (or approved equal)
50.0 Std Gas 50 gal or less
SPECIAL FEATURES /REMARKS (Add extra sheets if necessary)
COMPLIANCE STATEMENT
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Chapter 2 -53 and Title 20,
Chapter 2, Subchapter 4, Article 1 of the California Administrative Code.
This certificate has been signed by the individual with overall design
responsibility and the building owner, who shall retain a copy of it and
transmit the certificate to any subsequent purchaser of the building. When
this Certificate of Compliance is submitted for a single building plan to
be built in multiple orientations, all building conservation features which
vary are indicated in the Special Features /Remarks section.
DESIGNER BUILDING OWNER
Dimitri Demopulos Inc. Dimension Development Company Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
License No:
Signed:
DOCUMENTATION AUTHOR
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410 '
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
Signed:
(Date)
(Date)
Signed:
ENFORCEMENT AGENCY
Name:
Agency:
Telephone:
Signed:
page 5 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Duct Manufacturer /Model No.
RVa1 (or approved equal)
# of Energy R -12
Sys Credits Blanket
36 0 Y ,
(Date)
(Date)
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason IC. Tsou /J.T. Engineering Services
Assembly Name: R -13 Frame Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Compones}ts
Outside Air Film
1. Stucco
2. Membrane, Vapor - Permeable Felt
3. Insulation, Mineral Wool, R -13
4. Gypsum or Plaster Board
5.
6.
7.
8.
9.
Inside Air Film
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
Framing Percentage: 15.0 %
Framing Material: Softwood, Douglas Fir -Larch
Sketch of Construction Assembly
0.70
Wood Shingles
12.3 lb /sqft
2.88
Winter
0.0688 x 0.85 + 0.
Summer
0.0684 x 0.85 + 0.
R -Value
U -Value
4.,
Total
CF -3 page 6 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25
0.875 0.17
0.010 0.06
* 3.500 13.00
0.500 0.45
0.17
0.17
0.06
13.00
0.45
0.68 0.68
14.61 14.53
Calculation for Framing Adjustment
U -Value
1969 x 0.15 = 0.0877
U -Value
2000 x 0.15 = 0.0885
OVERALL VALUES ADJUSTED FOR FRAMING
11.40 11.30
0.0877 0.0885
C
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason
Assembly Name:
Assembly Type:
Assembly Tilt:
Construction Components
9.
Inside Air Film
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
1
C. Tsou /J.T.
R -30 BU Roof /Acoust
Roof
0 deg (Horizontal
Framing Percentage: 10.0 %
Framing Material: Softwood,
Sketch of Construction Assembly
Clg
Roof)
Outside Air Film
1. Roofing, Built -Up
2. Plywood
3. Insulation, Mineral Wool, R -30
4. Air Space
5. Acoustical Tile, Wood or Cane Fiber
6.
7.
8.
0.70
Wood Shingles
7.8 lb /sqft
2.46
Date: 8/16/1991
Engineering Services
R -Value
U -Value
Total
CF -3 page 7 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.375
0.500
* 9.500
6.000
0.500
0.25 0.17
0.33 0.33
0.63 0.63
30.00 30.00
1.00 0.93
1.19 1.19
0.92 0.61
34.31 33.73
Douglas Fir -Larch
Calculation for Framing Adjustment
Summer U -Value
0.0291 x 0.90 + 0.0729 x 0.10 = 0.0335
Winter U -Value
0.0297 x 0.90 + 0.0762 x 0.10 = 0.0343
OVERALL VALUES ADJUSTED FOR FRAMING
29.84 29.15
0.0335 0.0343
= =s =m=
s = == ==
c :
CONSTRUCTION ASSEMBLY COMPLIANCE FORM CF -3 page 8 of 30
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington Date: 8/16/1991
Documentation: Jason
Assembly Name: R -19 Raised Floor
Assembly Type: Floor;
Assembly Tilt: 180 d g (Horizontal Floor)
9.
Inside Air Film
Framing Percentage: 10.0 %
Framing Material: Softwood, Douglas Fir -Larch
Sketch of Construction Assembly
0.70
Absorptivity:
Roughness: Clear Pine
• Weight:
Heat Capacity:
C. Tsou /J.T. Engineering Services
3.9 lb /sqft
1.27
Total
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Construction Components Fr (in) Summer Winter
Outside Air Film � 0.25 0.17
1. Insulation, Mineral Wool, R -19 * 6.000 19.00 19.00
2. Plywood 0.625 0.78 0.78
3. Flooring, Carpet and Fibrous Pad 0.250 2.08 2.08
4.
5.
6.
7.
8.
0.61
22.72
0.92
22.95
Calculation for Framing Adjustment
Summer U -Value
0.0440 x 0.90 + 0.1035 x 0.10 = 0.0500
Winter U -Value
0.0436 x 0.90 + 0.1011 x 0.10 = 0.0493
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value 20.02 20.27
U -Value 0.0500 0.0493
C.'
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington
Assembly Name: Carpesed Slab
Assembly Type: Floor
Assembly Tilt: 180 d ;g (Horizontal Floor)
Construction Compone
Outside Air Film
1. Concrete, 140 lb, Not Dried
2. Flooring, Carpet and Fibrous Pad
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Seattle
is
Framing Percentage: ! 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 40.9 lb /sqft
Heat Capacity: 9.01
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
R -Value
Total
CF -3 page 9 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25
3.500 0.28
0.250 2.08
0.17
0.28
2.08
0.61 0.92
3.22 3.45.
OVERALL VALUES ADJUSTED FOR FRAMING
3.22 3.45
U -Value 0.3106 0.2899.
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: Solid Wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Outside Air Film
1. Hardwood, Maple
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Absorptivity: 0.70
Roughness: Clear Pine
Weight: 6.1 lb/sqft
Heat Capacity: 2.39
R -Value
U -Value
Total
CF -3 page 10 of 30
1.750
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Construction Components Fr (in) Summer Winter
0.25 0.17
1.54 1.54
0.68 0.68
2.47 2.39
OVERALL VALUES ADJUSTED FOR FRAMING
2.47 2.39
0.4049 0.4184
s===ass =aa ===
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington-
Documentation: Jason
Outside Air Film
1. CEC Double Glazing
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Seattle
Assembly Name: Double /Medium Blinds
Assembly Type: Glazing
Date: 8/16/1991
C. Tsou /J.T. Engineering Services
Th R -Value
Construction Components Fr (in) Summer Winter
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Winter Shading Coefficient: O.B8
Summer Shading Coefficient: 0.64
R -Value
Total
CF -3 page 11 of 30
0.500
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
0.25 0.17
0.69 0.69
0.68 0.68
1.62 1.54
OVERALL VALUES ADJUSTED FOR FRAMING
1.62 1.54
U -Value 0.6179 0.6500
nacmms c =n =ma
r�
HVAC EQUIPMENT SUMMARY FORM
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC EQUIPMENT SUMMARY BY ZONE
FAN ENERGY
HVAC System
FAN WATTAGE INDEX
CF -4 page 12 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
No. Heating Cooling
No HVAC Zone HVAC System (WS -4) Sys KBtu Eff KBtu Eff
Totals 0 KBtu 0 KBtu
No. Motor Drive Cony No. Fan
Sys BHP Eff. Eff. Fact Fans Watts
Total 0
0 watts / 0 sqft = 0.000 watts /sqft
HVAC ZONE HEATING & COOLING LOAD SUMMARY g a e 13 of 30
P
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
SPACES IN THIS ZONE
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
UNIT A,E & D
EMI MH4D2 /CHX12
System Multiplier: 36
Heating Schedule: Residential Heating
Cooling Schedule: Residential Cooling
Fan Schedule: Residential HVAC & Fans
Peak Load Method: NONCOINCIDENT
Relative Humidity: 50 %
COOLING
PEAK HEATING PEAK SENSIBLE LATENT
1ST FL -UNIT E,D TYPE 12 (Jan 12am) 100689 (Aug 2pm) 43665 2776
2ND FL -UNIT E TYPE 4 (Jan 12am) 19700 (Aug 2pm) 9460 925
2ND FL -UNIT A TYPE 8 (Jan 12am) 51487 (Aug 2pm) 35952 1897
3RD FL -UNIT E TYPE 4 (Jan 12am) 23155 (Aug 2pm) 10976 925
3RD FL -UNIT A TYPE 8 (Jan 12am) 58573 (Aug 2pm) 39060 1897
TOTAL SPACE LOAD 253604 139113 8420
Bypass Ventilation Air ( 0 cfm) 0 ( 0 cfm) 0 -0
Supply Duct Conduction 0 0
Supply Duct Leakage 0 0 0
Supply Fan Heat Gain - 34720. 34720
EFFECTIVE SPACE LOAD 218884 173833 8420
Ventilation ( 0 cfm) 0 ( 0 cfm) 0 -0
Return Air Lighting Gain 0
Return Duct Conduction 0 0
Return Duct Leakage 0 0 0
Return Fan Heat Gain -0 0
TOTAL SYSTEM LOAD 218884 173833 8420
14.5 tons 0.7 tons
SYSTEM PERFORMANCE 216340 331099 103008
AT DESIGN CONDITIONS 27.6 tons 8.6 tons
RESIDENTIAL SPACE HEATING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8 /16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
SUPPLY AIR QUANTITY
C
page 14 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST .FL-UNIT E,D TYPE 12
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R -13 Frame Wall 2790.0 x 0.0885 x 49.0 = 12096
Double /Medium Blinds 726.0 x 0.6500 x 49.0 = 23123
Carpeted Slab Perim = 698.5 x 47 = 32830
Infiltration: 1.00 x 0.018 x 6168 sqft x 8.0 ft x 0.75 AC x 49.0 = 32641
TOTAL HOURLY HEAT LOSS FOR SPACE 100689
Heating: 100689 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] = 2288 cfm
RESIDENTIAL SPACE COOLING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction Area
R -13 Frame Wall,
Double /Medium Blinds
Infiltration: 1.00 x 0.018 x 6168 sqft x 8.0 ft x 0.75 AC x 2.0 = 1332
Solar Gain
Double /Medium Blinds
Double /Medium Blinds
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
C
Shaded Unshaded
Orient. Area SGF Area SGF SC Btu /hr
East
West
1.00
1.00
1.00
TOTAL HOURLY SENSIBLE
f
2790.0 x
726.0 x
U -Value
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST FL -UNIT E,D TYPE 12
DETD Btu /hr
0.0877 x 1.6 = 391
0.6179 x 2.0 = 897
[ 0.0 x 15 + 363.0 x 73] x 0.56 = 14924
[ 0.0 x 15 + 363.0 x 73] x 0.56 = 14924
Op Frac. Area
x 6168.0
x 6168.0
x 6168.0
Op Frac. Area
1.00 x 6168.0
1.00 x 6168.0
TOTAL HOURLY LATENT
Heat Gain
x 0.200 x
x 0.200 x
x 225 /
HEAT GAIN FOR
Heat Gain
x 0.000 x
x 225 /
HEAT GAIN FOR
Conv. Btu /hr
3.413 =
3.413 =
500 =
SPACE
page 15 of 30
78 F
80 F
2 F
4210
4210
2776
43665
Conv. Btu /hr
3.413 = 0
500 = 2776
SPACE
2776
43665 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 1758 cfm
RESIDENTIAL SPACE HEATING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wobd Door
Double /Medium Blinds
Infiltration: 1.00 x 0.018 x
SUPPLY AIR QUANTITY
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT E TYPE 4
Area U -Value TD
767.0 x 0.0885 x 49.0
80.0 x 0.4184 x 49.0
121.0 x 0.6500 x 49.0
2056 sqft x 8.0 ft x 0.75 AC x 49.0
TOTAL HOURLY HEAT LOSS FOR SPACE
Heating: 19700 Btu /hr / [ 1.10 * (105 F Supply - 65 F TStat)]
page 16 of 30
70 F
21 F
49 F
n
a
Btu /hr
3325
1640
3854
10880
19700
448 cfm
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
SUPPLY AIR QUANTITY
RESIDENTIAL SPACE HEATING LOAD SUMMARY page 18 of 30
---------------------------------------------------------------------------
Project: Homewood Suites Hotel (BLDG B4) COMPLY 24 v 3.10
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT A TYPE 8
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R -13 Frame Wall 2028.0 x 0.0885 x 49.0 = 8792
Double /Medium Blinds 640.0 x 0.6500 x 49.0 = 20383
Infiltration: 1.00 x 0.018 x 4216 sqft x 8.0 ft x 0.75 AC x 49.0 = 22311
TOTAL HOURLY HEAT LOSS FOR SPACE 51487
Heating: 51487 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] = 1170 cfm
RESIDENTIAL SPACE COOLING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Double /Medium Blinds
Infiltration: 1.00 x
Solar Gain
Double /Medium Blinds
Double /Medium Blinds
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
East
West
TOTAL HOURLY
Op Frac.
Area
2028.0
640.0
0.018 x 4216 sqft x 8.0
Shaded
Orient. Area SGF
Op Frac. Area
SENSIBLE HEAT GAIN FOR SPACE
Area
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
page 19 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT A TYPE 8
78 F
80 F
2 F
U -Value DETD Btu /hr
x 0.0877 x 1.6 = 285
x 0.6179 x 2.0 = 791
ft x 0.75 AC x 2.0 = 911
Unshaded
Area SGF SC Btu /hr
[ 0.0 x 15 + 320.0 x 73] x 0.56 = 13156
[ 0.0 x 15 + 320.0 x 73] x 0.56 = 13156
Heat Gain Conv. Btu /hr
1.00 x 4216.0 x 0.200 x 3.413 =
1.00 x 4216.0 x 0.200 x 3.413 =
1.00 x 4216.0 x 225 / 500 =
1.00 x 4216.0 x 0.000 x 3.413 =
1.00 x 4216.0 x 225 / 500 =
2878
2878
1897
35952
Heat Gain Conv. Btu /hr
35952 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 1447 cfm
0
1897
1897
.-
RESIDENTIAL SPACE HEATING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
page 20 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3RD FL -UNIT E TYPE 4
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R -13 Frame Wall 767.0 x 0.0885 x 49.0 = 3325
Solid Wood Door 80.0 x 0.4184 x 49.0 = 1640
Double /Medium Blinds 121.0 x 0.6500 x 49.0 = 3854
R -30 BU Roof /Acoust Clg 2056.0 x 0.0343 x 49.0 = 3456
Infiltration: 1.00 x 0.018 x 2056 sqft x 8.0 ft x 0.75 AC x 49.0 Q 10880
SUPPLY AIR QUANTITY
TOTAL HOURLY HEAT LOSS FOR SPACE 23155
Heating: 23155 Btu /hr / [ 1.10 * (105 F Supply - 65 F TStat)] = 526 cfm
4ESIDENTIAL SPACE COOLING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction Area
Internal Gain
Lighting.
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Op Frac. Area
page 21 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
3RD FL -UNIT E TYPE 4
78 F
80 F
2 F
U -Value DETD Btu /hr
R -13 Frame Wall 767.0 x 0.0877 x 1.6
Solid Wood Door 80.0 x 0.4049 x 1.6
Double /Medium Blinds 121.0 x 0.6179 x 2.0
R -30 BU Roof /Acoust Cig 2056.0 x 0.0335 x 22.0
Cooling: 10976 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] _
Date (User # 1184)
108
52
150
1516
Infiltration: 1.00 x 0.018 x 2056 sqft x 8.0 ft x 0.75 AC x 2.0 444
Shaded Unshaded
Solar Gain Orient. Area SGF Area SGF SC Btu /hr
- - -- - -- - - -- - -- - - --
Double /Medium Blinds West [ 0.0 x 15 + 121.0 x 73] x 0.56 = 4975
Heat Gain Cony. Btu /hr
1.00 x 2056.0 x 0.200 x 3.413 = 1403
1.00 x 2056.0 x 0.200 x 3.413 = 1403
1.00 x 2056.0 x 225 / 500 = 925
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 10976
Op Frac. Area Heat Gain Cony. Btu /hr
1.00 x 2056.0 x 0.000 x 3.413 = 0
1.00 x 2056.0 x 225 / 500 = 925
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 925
442 cfm
RESIDENTIAL SPACE HEATING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
SUPPLY AIR QUANTITY
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3RD FL -UNIT A TYPE 8
page 22 of 30
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R -13 Frame Wall 2028.0 x 0.0885 x 49.0 = 8792
Double /Medium Blinds 640.0 x 0.6500 x 49.0 = 20383
R -30 BU Roof /Acoust Clg 4216.0 x 0.0343 x 49.0 = 7086
Infiltration: 1.00 x 0.018 x 4216 sqft x 8.0 ft x 0.75 AC x 49.0 = 22311
TOTAL HOURLY HEAT LOSS FOR SPACE 58573
Heating: 58573 Btu /hr / [ 1.10 * (105 F Supply - 65 F TStat)] = 1331 cfm
fESIDENTIAL SPACE COOLING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction Area
R -13 Frame Wall
Double /Medium Blinds
R -30 BU Roof /Acoust Clg
Infiltration: 1.00 x 0.018 x
Solar Gain Orient.
Double /Medium Blinds East
Double /Medium Blinds West
Internal Gain
Lighting
Equipment
Occupants
Latent Gain Op Frac.
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
4216 sqft x 8.0
Op Frac. Area
3RD FL -UNIT A TYPE 8
U -Value
COMPLY 24
Building Permit No
Checked By
Date (User # 1184)
78 F
80 F
2 F
DETD Btu /hr
2028.0 x 0.0877 x 1.6 =
640.0 x 0.6179 x 2.0 =
4216.0 x 0.0335 x 22.0 =
Shaded
Area SGF
Area
ft x 0.75 AC x 2.0
Unshaded
Area SGF SC
[ 0.0 x 15 + 320.0 x 73] x 0.56 = 13156
[ 0.0 x 15 + 320.0 x 73] x 0.56 = 13156
Heat Gain Conv.
1.00 x 4216.0 x 0.200 x 3.413 =
1.00 x 4216.0 x 0.200 x 3.413
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE
Heat Gain
Cony.
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
page 23 of 30
= 911
1.00 x 4216.0 x 225 / 500 =
1.00 x 4216.0 x 0.000 x 3.413 =
1.00 x 4216.0 x 225 / 500 =
v 3.10
285
791
3109
Btu /hr
Btu /hr
2878
2878
1897
39060
Btu /hr
39060 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 1572 cfm
0
1897
1897
IIVAC ZONE HEATING
Project: Homewood
Designer: Dimitri
Location: Washington - Seattle
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE
1ST FL- CORRIDOR
2ND FL- CORRIDOR
3RD FL- CORRIDOR
\_
&COOLING LOAD SUMMARY
Suites Hotel (BLDG B4)
Demopulos Inc.
PEAK
(Jan 12am)
(Jan 12am)
(Jan 12am)
TOTAL SPACE LOAD 15754
Bypass Ventilation Air ( 0 cfm)
Supply Duct Conduction
Supply Duct Leakage
Supply Fan Heat Gain
EFFECTIVE SPACE LOAD
Ventilation ( 0 cfm)
Return Air Lighting Gain
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
HEATING
TOTAL SYSTEM LOAD 12861
AT DESIGN CONDITIONS
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
4999 (Aug 2pm)
4717 (Aug 2pm)
6038 (Aug 2pm)
0 ( 0 cfm)
0
0
-2893
12861
0 ( 0 cfm)
0
0
- 0
page 24 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
CORRIDOR
COMFORTER YC018G /18VDX
3
Residential Heating
Residential Cooling
Residential HVAC & Fans
NONCOINCIDENT
50 %
COOLING
PEAK SENSIBLE LATENT
1614
1614
2194
5422
0
0
0
2893
8315
0
0
0
0
0
354
354
354
1062
- 0
0
1062
- 0
0
8315 1062
0.7 tons 0.1 tons
SYSTEM PERFORMANCE 30224 40413 14637
3.4 tons 1.2 tons
4 ::
RESIDENTIAL SPACE HEATING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
SUPPLY AIR QUANTITY
page 25 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST FL- CORRIDOR
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R -13 Frame Wall 34.0 x 0.0885 x 49.0 = 147
Solid Wood Door 20.0 x 0.4184 x 49.0 = 410
Carpeted Slab Perim = 6.0 x 47 = 282
Infiltration: 1.00 x 0.018 x 786 sqft x 8.0 ft x 0.75 AC x 49.0 = 4160
TOTAL HOURLY HEAT LOSS FOR SPACE 4999
Heating: 4999 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] = 114 cfm
tESIDENTIAL SPACE COOLING LOAD SUMMARY page 26 of 30
Project: Homewood Suites Hotel (BLDG B4)
i
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
SUPPLY AIR QUANTITY
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Space Name: 1ST FL- CORRIDOR
78 F
80 F
2 F
Conduction Area U -Value DETD Btu /hr
R -13 Frame Wall 34.0 x 0.0877 x 1.6 = 5
Solid Wood Door 20.0 x 0.4049 x 1.6 = 13
Infiltration: 1.00 x 0.018 x 786 sqft x 8.0 ft x 0.75 AC x 2.0 = 170
Shaded Unshaded
Solar Gain Orient. Area SGF Area SGF SC Btu /hr
Internal Gain Op Frac. Area Heat Gain Conv. Btu /hr
Lighting 1.00 x 786.0 x 0.200 x 3.413 = 537
Equipment 1.00 x 786.0 x 0.200 x 3.413 = 537
Occupants 1.00 x 786.0 x 225 / 500 = 354
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 1614
Latent Gain Op Frac. Area Heat Gain Corm. Btu /hr
Equipment 1.00 x 786.0 x 0.000 x 3.413 = 0
Occupants 1.00 x 786.0 x 225 / 500 = 354
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 354
Cooling: 1614 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 65 cfm
c:
tESIDENTIAL SPACE HEATING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Solid Wood Door
SUPPLY AIR QUANTITY
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL- CORRIDOR
page 27 of 30
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R -13 Frame Wall. • 134.0 x 0.0885 x 49.0 = 147
20.0 x 0.4184 x 49.0 = 410
Infiltration: 1.00 x 0.018 x 786 sqft x 8.0 ft x 0.75 AC x 49.0 = 4160
TOTAL HOURLY HEAT LOSS FOR SPACE 4717
Heating: 4717 Btu /hr / [1.10 * (105 F Supply -.65 F TStat)] = 107 cfm
Space Name:
SUPPLY AIR QUANTITY
C.
1ESIDENTIAL SPACE COOLING LOAD SUMMARY
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
page 28 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL- CORRIDOR
78 F
80 F
2 F
Conduction Area U -Value DETD Btu /hr
R -13 Frame Wall 34.0 x 0.0877 x 1.6 = 5
Solid Wood Door 20.0 x 0.4049 x 1.6 = 13
Infiltration: 1.00 x 0.018 x 786 sqft x 8.0 ft x 0.75 AC x 2.0 = 170
Shaded Unshaded
Solar Gain Orient. Area SGF Area SGF SC Btu /hr
Internal Gain Op Frac. Area Heat Gain Cony. Btu /hr
Lighting 1.00 x 786.0 x 0.200 x 3.413 = 537
Equipment 1.00 x 786.0 x 0.200 x 3.413 = 537
Occupants 1.00 x 786.0 x 225 / 500 = 354
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 1614
Latent Gain Op Frac. Area Heat Gain Cony. Btu /hr
Equipment 1.00 x 786.0 x 0.000 x 3.413 = 0
Occupants 1.00 x 786.0 x 225 / 500 = 354
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 354
Cooling: 1614 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 65 cfm
(-
PRESIDENTIAL SPACE HEATING LOAD SUMMARY page 29 of 30
---------------------------------------------------------------------------
Project: Homewood Suites Hotel (BLDG B4) COMPLY 24 v 3.10
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991 Checked By
Documentation: Jason C. Tsou /J.T. Engineering Services Date (User # 1184)
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
R -30 BU Roof /Acoust Clg
Infiltration: 1.00 x 0.018 x
SUPPLY AIR QUANTITY
Building Permit No
3RD FL- CORRIDOR
70 F
21 F
49 F
Area U -Value TD Btu /hr
34.0 x 0.0885 x 49.0 = 147
20.0 x 0.4184 x 49.0 = 410
786.0 x 0.0343 x 49.0 = 1321
786 sqft x 8.0 ft x 0.75 AC x 49.0 = 4160
TOTAL HOURLY HEAT LOSS FOR SPACE 6038
Heating: 6038 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] = 137 cfm
,jRESIDENTIAL SPACE COOLI U LOAD SUMMARY
}
Project: Homewood Suites Hotel (BLDG B4)
Designer: Dimitri Demopulos Inc.
Location:. Washington- Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction Area U -Value DETD Btu /hr
R -13 Frame Wall 34.0 x 0.0877 x 1.6 = 5
Solid Wood Door 20.0 x 0.4049 x 1.6 = 13
R -30 BU Roof /Acoust Clg 786.0 x 0.0335 x 22.0 = 580
Infiltration: 1.00 x 0.018 x 786 sqft x 8.0 ft x 0.75 AC x 2.0 = 170
Solar Gain Orient. SC Btu /hr
Internal 'Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
Op Frac.
Op Frac. Area
1.00 x
1.00 x
Date: 8/16/1991
Shaded Unshaded
Area SGF Area SGF
page 30 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3RD FL- CORRIDOR
78 F
80 F
2 F
Area Heat Gain Cony. Btu /hr
1.00 x 786.0 x 0.200 x 3.413 =
1.00 x 786.0 x 0.200 x 3.413 =
1.00 x 786.0 x 225 / 500 =
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE
786.0 x 0.000 x 3.413 =
786.0 x 225 / 500 =
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
537
537
354
2194
Heat Gain Conv. Btu /hr
0
354
354
2194 Btu /hr / [1.08 * ( 78 F TStat - 55 F. Supply)] = 88 cfm
TITLE. 24 REPORT FOR:
Homewood Suites Hotel (BLDG. 2) 5
Tukwila, Washington
PROJECT DESIGNER:
Dimitri Demopulos Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
OWNER:
Dimension Development Company Inc.
REPORT PREPARED BY:
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
Job Number: 91065
Date: 8/16/1991
RECEIVED
CITY OF TUKWILA
AUG 2 2 1991
PERMIT CENTER
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has interim approval
and is authorized by the California Energy Commission for use with the
Second Generation Nonresidential Building Energy Efficiency Standards
for Nonresidential Occupancies. Second Generation Residential Occupancies
shown to comply with this program conform to the results produced by the
Public Domain Point System, developed by the California Energy Commission.
This program developed by Gabel Dodd Associates (415) 428 - 0803.
J
Table Of Contents for Title 24 Report
Cover Page
Table of Contents
Form CF -1R Certificate of Compliance: Residential
Form CF -3 Construction Assemblies
Form CF -4 HVAC Summary
HVAC Zone & Space Loads Summary ....... ...................'...
6
12
• •...... 13
'CERTIFICATE OF COMPLIAL: Residential (part 1 of gc CF -1R page 3 of 30
.
Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T.
PROJECT ADDRESS
Tukwila, Washington
GENERAL INFORMATION
Compliance Method:
Climate Zone:
Total Conditioned Floor Area:
Building Occupancy:
Front Entry Orientation:
Number of Dwelling Units:
Floor Construction Type:
Infiltration Control:
BUILDING SHELL INSULATION
Component Area U -Value
R -13 Frame Wall
R -13 Frame Wall
R -13 Frame Wall
R -13 Frame Wall
R -13 Frame Wall
R -13 Frame Wall
R -13 Frame Wall
R -13 Frame Wall
R -30 BU Roof /Acoust
R -30 BU Roof /Acoust
R -30 BU Roof /Acoust
R -19 Raised Floor
Carpeted Slab
Carpeted Slab
Clg
Clg
Clg
4091 0.0885 1ST
934 0.0885 2ND
1411 0.0885 2ND
934 0.0885 3RD
1411 0.0885 3RD
28 0.0885 1ST
28 0.0885 2ND
28 0.0885 .3RD
2116 0.0343 3RD
3084 0.0343 3RD
654 0.0343 3RD
52 0.0493 2ND
5140 0.7200 1ST
654 0.7200 1ST
THERMAL MASS Thick
Mass Material Area (in) Type
Concrete, Heavyweight
Concrete, Heavyweight
Date: 8/16/1991
Engineering Services
Job #: 91065
Point System
1
17502 sqft
Multi - Family
West
30
Slab
Standard
Location /Comments
Location /Description
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
FL -UNIT E,D TYPE 10
FL -UNIT A TYPE 4
FL -UNIT E TYPE 6
FL -UNIT A TYPE 4
FL -UNIT E TYPE 6
FL- CORRIDOR
FL- CORRIDOR
FL- CORRIDOR
FL -UNIT A TYPE 4
FL -UNIT E TYPE 6
FL- CORRIDOR
FL -UNIT A TYPE 4 /Over Open
FL -UNIT E,D TYPE 10 /Insul= R -0.0
FL- CORRIDOR / Insul= R -0.0
5140 4.000 Covered 1ST FL -UNIT E,D TYPE 10 /Int Mass
654 4.000 Covered 1ST FL- CORRIDOR /Int Mass
''CERTIFICATE OF COMPLIAL: Residential (part 2 of ic CF -1R page 4 of 30
Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
GLAZING
Location Orient Area
1ST FL -UNIT E,D TYPE 10
South 302.5 Double 0.65
North 302.5 Double 0.65
2ND FL -UNIT A TYPE 4
South 160.0 Double 0.65
North 160.0 Double 0.65
2ND FL -UNIT E TYPE 6
South 181.5 Double 0.65
North 181.5 Double 0.65
3RD FL -UNIT A TYPE 4
South 160.0 Double 0.65
North 160.0 Double 0.65
3RD FL -UNIT E TYPE 6
South 181.5 Double 0.65
North 181.5 Double 0.65
1ST FL- CORRIDOR
2ND FL- CORRIDOR
3RD FL- CORRIDOR
SHADING (for Glazing above)
Location Exterior Device
1ST FL -UNIT E,D TYPE 10
50 % Bug Screen
50 % Bug Screen
2ND FL -UNIT A TYPE 4
50 % Bug Screen
50 % Bug Screen
2ND FL -UNIT E TYPE 6
50 % Bug Screen
50 % Bug Screen
3RD FL -UNIT A TYPE 4
50 % Bug Screen
50 % Bug Screen
3RD FL -UNIT E TYPE 6
50 % Bug Screen
50 % Bug Screen
1ST FL- CORRIDOR
2ND FL- CORRIDOR
3RD FL- CORRIDOR
Date: 8/16/1991
COMPLY 24
Checked By
Glass w /Int
Type U -Val SC Shade Description
v 3.10
Building Permit No
Date (User # 1184)
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
Over
SC hang
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
Framing Type
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
� CERTIFICATE OF COMPLIAL: Residential (part 3 o
Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri*mopulos Inc.
Location: Washington- Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC SYSTEMS Mini Output Duct
System Type EfficOncy (Btuh) Location
Heat Pump 6.800 10200 Vent. Attic Space 4.2 EMI MH4D2 /CHX12
Heat Pump 9.500SEER 11500 Vent. Attic Space
Heat Pump 6.800iHSPF 17100 Vent. Attic Space 4.2 COMFORTER YC018G /18VDX
Heat Pump 9.000EER 17500 Vent. Attic Space
Zone Furnace Max: 1.3 x [204081 Btuh + (10 x 15540 sqft)] = 467325 Btuh
Zone Furnace Max: 1.3 x [ 10465 Btuh + (10 x 1962 sqft)] = 39111 Btuh
Cooling Exception: CFM Cooling (see Load Caics) requires Btuh
HOT WATER SYSTEMS
System Type
Gas Fired
Tank Manufacturer /Model No. # of Energy R -12
Volume (or approved equal) Sys Credits Blanket
50.0 Std Gas 50 gal or less 30 0 Y
SPECIAL FEATURES /REMARKS (Add extra sheets if necessary)
COMPLIANCE STATEMENT
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Chapter 2 -53 and Title 20,
Chapter 2, Subchapter 4, Article 1 of the California Administrative Code.
This certificate has been signed by the individual with overall design
responsibility and the building owner, who shall retain a copy of it and
transmit the certificate to any subsequent purchaser of the building. When
this Certificate of Compliance is submitted for a single building plan to
be built in multiple orientations, all building conservation features which
vary are indicated in the Special Features /Remarks section.
DESIGNER BUILDING OWNER
Dimitri Demopulos Inc. Dimension Development Company Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
License No:
Signed:
(Date)
DOCUMENTATION AUTHOR
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
Date: 8/16/1991
Signed:
CF -1R page 5 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Duct Manufacturer /Model No.
RVal (or approved equal)
ENFORCEMENT AGENCY
Name:
Agency:
Telephone:
(Date)
Signed: Signed:
(Date) (Date)
: ASSEMBLY Ct4PLIANCE FORM
Project: Homewood Suite Hotel (BLDG. 2)
Designer: Dimitri Demop os Inc.
Location: Washington -Se tle Date: 8/16/1991
Documentation: Jason C. sou /J.T. Engineering Services
Assembly Name: R -13 Fr Wall
Assembly Type: Wall
Assembly Tilt: 90 deg ertical)
Construction Components
Sketch of Construction
Outside Air Film
1. Stucco
2. Membrane, Vapor - Permeable Felt
3. Insulation, Mineral Wool, R -13
4. Gypsum or Plaster B rd
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 15.p %
Framing Material: Sof wood, Douglas Fir-Larch
Absorptivity:
Roughness: Stucco, Woo
Weight:
Heat Capacity:
sembly
0.70
Shingles
12.3 lb/sqft
2.88
Total
Summer
0.0684 x 0.85 + 0
Winter
0.0688 x 0.85 + 0
R -Value
U -Value
CF -3 page 6 of 30
COMPLY 24
Checked By
0.25
0.875 0.17
0.010 0.06
* 3.500 13.00
0.500 0.45
0.68
14.61
U -Value
.1969 x 0.15
U -Value
.2000 x 0.15
v 3.10
Building Permit No
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.17
0.17
0.06
13.00
0.45
0.68
14.53
Calculation for Framing Adjustment
= 0.0877
= 0.0885
OVERALL VALUES ADJUSTED FOR FRAMING
11.40 11.30
0.0877 0.0885
'CONSTRUCTION ASSEMBLY CLPLIANCE FORM
.Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
Assembly Name: R -30 BU1Roof /Acoust Clg
Assembly Type: Roof
Assembly Tilt: 0 deg (Horizontal Roof)
Construction Components
Outside Air Film
1. Roofing, Built -Up
2. Plywood
3. Insulation, Mineral Wool, R -30
4. Air Space
5. Acoustical Tile, Wood or Cane Fiber
6.
7.
8.
9.
Inside Air Film
Sketch of Construction Assembly
0.70
Wood Shingles
7.8 lb /sgft
2.46
R -Value
U -Value
Date: 8/16/1991
Total
Summer
0.0291 x 0.90 + 0.
Winter
0.0297 x 0.90 + 0.
CF -3 page 7 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25 0.17
0.375 0.33 0.33
0.500 0.63 0.63
* 9.500 30.00 30.00
6.000 1.00 0.93
0.500 1.19 1.19
0.92 0.61
34.31 33.73
Framing Percentage: 10.0 %
Framing Material: Softwood, Douglas Fir -Larch
Calculation for Framing Adjustment
U -Value
0729 x 0.10 = 0.0335
U -Value
0762 x 0.10 = 0.0343
OVERALL VALUES ADJUSTED FOR FRAMING
29.84 29.15
0.0335 0.0343
` CONSTRUCTION ASSEMBLY CLPLIANCE FORM
Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T.
Assembly Name: R -19 Raised Floor
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Construction Components
Outside Air Film
1. Insulation, Mineral Wool, R -19
2. Plywood
3. Flooring, Carpet and Fibrous Pad
4.
5.
6 .
7.
8 .
9.
Inside Air Film
Framing. Percentage: 10.0 %
Framing Material: Softwood,
Sketch of Construction Assembly
Absorptivity:
Roughness: Clear Pine
Weight:
Heat Capacity:
0.70
Date: 8/16/1991
Engineering Services
Douglas Fir -Larch
3.9 lb /sqft
1.27
Total
CF -3
Checked By
Calculation for Framing
Th R -Value
Fr (in) Summer Winter
0.25
* 6.000 19.00
0.625 0.78
0.250 2.08
Summer U -Value
0.0440 x 0.90 + 0.1035 x 0
Winter U -Value
0.0436 x 0.90 + 0.1011 x 0
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value 20.02
U -Value 0.0500
page 8 of 30
COMPLY 24 v 3.10
Building Permit No
Date (User # 1184)
0.17
19.00
0.78
2.08
0.61 0.92
22.72 22.95
Adjustment
.10 = 0.0500
.10 = 0.0493
20.27
0.0493
' CONSTRUCTION ASSEMBLY CO ►•.PLIANCE FORM
Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: Carpeted Slab
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Outside Air Film
1. Concrete, 140 lb, Not Dried
2. Flooring, Carpet and Fibrous Pad
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 40.9 lb/sqft
Heat Capacity: 9.01
R -Value
Total
a CF -3 page 9 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Construction Components Fr (in) Summer Winter
0.25
3.500 0.28
0.250 2.08
0.17
0.28
2.08
0.61 0.92
3.22 3.45
OVERALL VALUES ADJUSTED FOR FRAMING
3.22 3.45
U -Value 0.3106 0.2899
" ! CONSTRUCTION ASSEMBLY COL•jPLIANCE FORM
Project: Homewood Suites Hotel (BLDG. 2)
!
Designer: Dimitri1emfpulos Inc.
Location: Washingt n- Seattle Date: 8/16/1991
Documentation: Jas n C. Tsou /J.T. Engineering Services
Assembly Name: Sol
Assembly Type: Doo
Assembly Tilt: 90
Construction Compo
Outside Air Film
1. Hardwood, Maple
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
d rod Door
del (Vertical)
ents
1
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Absorptivity:
Roughness: Clear Pine
Weight:
Heat Capacity:
0.70
6.1 lb /sgft
2.39
R -Value
U -Value
Total
CF -3 page 10 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25 0.17
1.750 1.54 1.54
0.68 0.68
2.47 2.39
OVERALL VALUES ADJUSTED FOR FRAMING
2.47 2.39
0.4049 0.4184
CONSTRUCTION ASSEMBLY CEPLIANCE FORM
• Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri cpulos Inc.
Location: Washingt - Seattle Date: 8/16/1991
1 F;
Documentation: Jas . Tsou /3.T. Engineering Services
Outside Air Film
1. CEC Double Gla
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Y
Assembly Name: Dou le Medium Blinds
Assembly Type: Gla y ype: a i
n
Construction Compo n s
in
9
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Winter Shading Coefficient: 0.88
Summer Shading Coefficient: 0.64
Total
CF -3 page 11 of 30
Th R -Value
Fr (in) Summer Winter
0.500
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
0.25 0.17
0.69 0.69
0.68 0.68
1.62 1.54
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value
1.62 1.54
U -Value 0.6179 0.6500
HVAC EQUIPMENT SUMMARY CAM
,,Project: Homewood Suites Hotel (BLDG. 2)
1 f , .
Designer: Dimitri Iemopulos I t o.
Location: Washington - Settle Date: 8/16/1991
Documentation: Jason C.'Tsou /J.T. Engineering Services
HVAC EQUIPMENT S
No HVAC Zone
FAN ENERGY
HVAC System
FAN WATTAGE INDEX
CF -4 page 12 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
T BY ZONE
No. Heating Cooling
HVAC System (WS -4) Sys KBtu Eff KBtu Eff
---------------- - - - - -- - -- - - -- - - -- -- -- - - --
Totals 0 KBtu 0 KBtu
'No. Motor Drive Conv No. Fan
Sys BHP Eff. Eff. Fact Fans Watts
Total 0
0 watts / 0 sqft = 0.000 watts /sqft
HVAC ZONE HEATING & COO LOG LOAD SUMMARY
„Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri mTpulos Inc.
Location: Washingt - Seattle Date: 8/16/1991
Documentation: Jas n C. Tsou /J.T. Engineering Services
HVAC ZONE DESCRIPT
HVAC Zone Name:
Heating System Nam
Cooling System Nam
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE PEAK
1ST
2ND
2ND
3RD
3RD
FL -UNIT
FL -UNIT
FL -UNIT
FL -UNIT
FL -UNIT
E,D TYPE 10 (Jan 12am)
A TYPE 4 (Jan 12am)
E TYPE 6 (Jan 12am)
A TYPE 4 (Jan 12am)
E TYPE 6 (Jan 12am)
Bypass Ventilation Air
Supply Duct Conduction
Supply Duct Leakage
Supply Fan Heat Gain
TOTAL SPACE LOAD
0 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 0 cfm)
Return Air Lighting Gain
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
HEATING
97071
27205
36459
30636
41643
233014
0
0
0
-28933
204081
0 (
0
0
-0
204081
180283
UNIT A,E & D
EMI MH4D2 /CHX12
30
Residential Heating
Residential Cooling
Residential HVAC & Fans
NONCOINCIDENT
50 %
COOLING
PEAK SENSIBLE LATENT
(Aug 2pm) 19578
(Aug 2pm) 8942
(Aug 2pm) 11601
(Aug 2pm) 10502
(Aug 2pm) 13875
O cfm)
O cfm)
page 13 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
64498
0
0
0
28933
93431
0
0
0
0
0
2313
952
1388
952
1388
6993
-o
0
6993
-0
0
93431 6993
7.8 tons 0.6 tons
344895 16861
28.7 tons 1.4 tons
RESIDENTIAL SPACE HEATINv LOAD SUMMARY
..Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry ,Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
Carpeted Slab
Infiltration: 1.00 x 0.018 x
SUPPLY AIR QUANTITY
page 14 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST FL -UNIT E,D TYPE 10
70 F
21 F
49 F
Area U -Value TD Btu /hr
4091.0 x 0.0885 x 49.0 = 17737
200.0 x 0.4184 x 49.0 = 4100
605.0 x 0.6500 x 49.0 = 19269
Perim = 612.0 x 47 = 28764
5140 sqft x 8.0 ft x 0.75 AC x 49.0 = 27201
TOTAL HOURLY HEAT LOSS FOR SPACE 97071
Heating: 97071 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] = 2206 cfm
K RESIDENTIAL SPACE COOLII LOAD SUMMARY
,,Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Stirrer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
Infiltration: 1.00 x
Solar Gain
Double /Medium Blinds
Double /Medium Blinds
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
Area
Op Frac. Area
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE
Op Frac. Area
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
page 15 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST FL -UNIT E,D TYPE 10
78 F
80 F
2 F
U -Value DETD Btu /hr
4091.0 x 0.0877 x 1.6 =
200.0 x 0.4049 x 1.6 =
605.0 x 0.6179 x 2.0 =
574
130
748
0.018 x 5140 sqft x 8.0 ft x 0.75 AC x 2.0 = 1110
Shaded Unshaded
Orient. Area SGF Area SGF SC Btu /hr
- - -- - -- - - -- - -- - - --
South [ 0.0 x 15 + 302.5 x 32] x 0.54 = 5234
North [ 0.0 x 15 + 302.5 x 15] x 0.54 = 2453
Heat Gain Conv. Btu /hr
1.00 x 5140.0 x 0.200 x 3.413 =
1.00 x 5140.0 x 0.200 x 3.413 =
1.00 x 5140.0 x 225 / 500 =
3509
3509
2313
19578
Heat Gain Conv. Btu /hr
1.00 x 5140.0 x 0.000 x 3.413 =
19578 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 788 cfm
0
1.00 x 5140.0 x 225 / 500 = 2313
2313
RESIDENTIAL SPACE HEATIC LOAD SUMMARY
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Conduction
SUPPLY AIR QUANTITY
,.Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT A TYPE 4
page 16 of 30
70 F
21 F
49 F
Area U -Value TD Btu /hr
R -13 Frame Wall 934.0 x 0.0885 x 49.0 = 4049
Solid Wood Door 80.0 x 0.4184 x 49.0 = 1640
Double /Medium Blinds 320.0 x 0.6500 x 49.0 = 10192
R -19 Raised Floor 52.0 x 0.0493 x 49.0 - 126
Infiltration: 1.00 x 0.018 x 2116 sqft x 8.0 ft x 0.75 AC x 49.0 m 11198
TOTAL HOURLY HEAT LOSS FOR SPACE 27205
Heating: 27205 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] - 618 cfm
RESIDENTIAL SPACE COOLIL LOAD SUMMARY
,.Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Ir
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
R -19 Raised Floor
Infiltration: 1.00 x
Solar Gain
Double /Medium Blinds
Double /Medium Blinds
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
Orient.
South
North
Area
934.0 x
80.0 x
320.0 x
52.0 x
Op Frac. Area
Op Frac. Area
2ND FL -UNIT A TYPE 4
U -Value
COMPLY 24
Heat Gain Cony.
Building Permit No
Checked By
Date (User # 1184)
0.0877 x 1.6
0.4049 x 1.6
0.6179 x 2.0
0.0500 x 0.0
78 F
80 F
2 F
1.00 x 2116.0 x 0.200 x 3.413 =
1.00 x 2116.0 x 0.200 x 3.413 =
1.00 x 2116.0 x 225 / 500 =
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE
Heat Gain Conv.
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
8942 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] _
page 17 of 30
v 3.10
DETD Btu /hr
_
_
1.00 x 2116.0 x 0.000 x 3.413 =
1.00 x 2116.0 x 225 / 500 =
131
52
395
360 cfm
0
0.018 x 2116 sqft x 8.0 ft x 0.75 AC x 2.0 = 457
Shaded Unshaded
Area SGF Area SGF SC Btu /hr
[ 0.0 x 15 + 160.0 x 32] x 0.54 = 2768
[ 0.0 x 15 + 160.0 x 15] x 0.54 = 1298
Btu /hr
1444
1444
952
8942
Btu /hr
0
952
952
•
RESIDENTIAL SPACE HEATIL LOAD SUMMARY
,.Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
SUPPLY AIR QUANTITY
page 18 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT E TYPE 6
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R -13 Frame Wall 1411.0 x 0.0885 x 49.0 = 6117
Solid Wood Door 120.0 x 0.4184 x 49.0 = 2460
Double /Medium Blinds 363.0 x 0.6500 x 49.0 = 11561
Infiltration: 1.00 x 0.018 x 3084 sqft x 8.0 ft x 0.75 AC x 49.0 16321
TOTAL HOURLY HEAT LOSS FOR SPACE 36459
Heating: 36459 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] A 829 cfm
RESIDENTIAL SPACE COOLI v LOAD SUMMARY
..Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
Infiltration: 1.00 x
Solar Gain
Double /Medium Blinds
Double /Medium Blinds
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
Area
Op Frac. Area
Date: 8/16/1991
TOTAL HOURLY SENSIBLE HEAT GAIN FOR
Op Frac. Area Heat Gain
1.00 x 3084.0 x 0.000 x
1.00 x 3084.0 x 225 /
TOTAL HOURLY LATENT HEAT GAIN FOR
11601 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] -
page 19 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT E TYPE 6
78 F
80 F
2 F
U -Value DETD Btu /hr
1411.0 x 0.0877 x 1.6 =
120.0 x 0.4049 x 1.6 =
363.0 x 0.6179 x 2.0 =
198
78
449
0.018 x 3084 sqft x 8.0 ft x 0.75 AC x 2.0 = 666
Shaded Unshaded
Orient. Area SGF Area SGF SC Btu /hr
South [ 0.0 x 15 + 181.5 x 32] x 0.54 = 3140
North [ 0.0 x 15 + 181.5 x 15] x 0.54 = 1472
Heat Gain Corm. Btu /hr
1.00 x 3084.0 x 0.200 x 3.413 =
1.00 x 3084.0 x 0.200 x 3.413 =
1.00 x 3084.0 x 225 / 500 -
SPACE
SPACE
2105
2105
1388
11601
Conv. Btu /hr
3.413 = 0
500 = 1388
1388
467 cfm
A.
RESIDENTIAL SPACE HEATIL LOAD SUMMARY
,.Project:. Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
R -30 BU Roof /Acoust Clg
SUPPLY AIR QUANTITY
page 20 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3RD FL -UNIT A TYPE 4
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
934.0 x 0.0885 x 49.0 = 4049
80.0 x 0.4184 x 49.0 - 1640
320.0 x 0.6500 x 49.0 = 10192
2116.0 x 0.0343 x 49.0 = 3557
Infiltration: 1.00 x 0.018 x 2116 sqft x 8.0 ft x 0.75 AC x 49.0 = 11198
TOTAL HOURLY HEAT LOSS FOR SPACE 30636
Heating: 30636 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] 696 cfm
RESIDENTIAL SPACE COOLIv LOAD SUMMARY
,.Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
R -30 BU Roof /Acoust Clg
Area U -Value DETD
page 21 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3RD FL -UNIT A TYPE 4
78 F
80 F
2 F
934.0 x 0.0877 x 1.6 =
80.0 x 0.4049 x 1.6 =
320.0 x 0.6179 x 2.0 =
2116.0 x 0.0335 x 22.0 =
Infiltration: 1.00 x 0.018 x 2116 sqft x 8.0 ft x 0.75 AC x 2.0 =
Btu /hr
131
52
395
1560
457
Shaded Unshaded
Solar Gain Orient. Area SGF Area SGF SC Btu /hr
Double /Medium Blinds South [ 0.0 x 15 + 160.0 x 32] x 0.54 = 2768
Double /Medium Blinds North [ 0.0 x 15 + 160.0 x 15] x 0.54 = 1298
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Op Frac. Area
Heat Gain Cony. Btu /hr
1.00 x 2116.0 x 0.200 x 3.413 = 1444
1.00 x 2116.0 x 0.200 x 3.413 = 1444
1.00 x 2116.0 x 225 / 500 = 952
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 10502
Op Frac. Area Heat Gain Conv. Btu /hr
1.00 x 2116.0 x 0.000 x 3.413 = 0
1.00 x 2116.0 x 225 / 500 = 952
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 952
Cooling: 10502 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 423 cfm
RESIDENTIAL SPACE HEATI L LOAD SUMMARY
,.Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
R -30 BU Roof /Acoust Clg
SUPPLY AIR QUANTITY
3RD FL -UNIT E TYPE 6
page 22 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
1411.0 x 0.0885 x 49.0 = 6117
120.0 x 0.4184 x 49.0 = 2460
363.0 x 0.6500 x 49.0 = 11561
3084.0 x 0.0343 x 49.0 = 5184
Infiltration: 1.00 x 0.018 x 3084 sqft x 8.0 ft x 0.75 AC x 49.0 = 16321
TOTAL HOURLY HEAT LOSS FOR SPACE 41643
Heating: 41643 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] = 946 cfm
RESIDENTIAL SPACE COOLINv LOAD SUMMARY
.Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction Area
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
R -30 BU Roof /Acoust Clg
Solar Gain
Double /Medium Blinds
Double /Medium Blinds
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
1411.0 x
120.0 x
363.0 x
3084.0 x
Shaded
Orient. Area SGF
South [ 0.0 x 15 +
North [ 0.0 x 15 +
Op Frac. Area
1.00
1.00
1.00
x 3084.0
x 3084.0
x 3084.0
TOTAL HOURLY SENSIBLE
Op Frac. Area
1.00 x 3084.0
1.00 x 3084.0
Date: 8/16/1991
3RD FL -UNIT E TYPE 6
U -Value
page 23 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
78 F
80 F
2 F
0.0877 x 1.6 =
0.4049 x 1.6 =
0.6179 x 2.0 =
0.0335 x 22.0 =
DETD Btu /hr
198
78
449
2274
Infiltration: 1.00 x 0.018 x 3084 sqft x 8.0 ft x 0.75 AC x 2.0 = 666
Unshaded
Area SGF SC Btu /hr
181.5 x 32] x 0.54 = 3140
181.5 x 15] x 0.54 = 1472
Heat Gain Conv. Btu /hr
x 0.200 x 3.413 =
x 0.200 x 3.413 =
x 225 / 500 =
HEAT GAIN FOR SPACE
2105
2105
1388
13875
Heat Gain Cony. Btu /hr
x 0.000 x 3.413 =
x 225 / 500 = 1388
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
13875 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 559 cfm
0
1388
k
HVAC ZONE HEATING & COOING LOAD SUMMARY
?.Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC ZONE DESCRIPTION
page 24 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
CORRIDORS
HVAC Zone Name:
Heating System Name: COMFORTER YCO18G /18VDX
Cooling System Name:
System Multiplier: 3
Heating Schedule: Residential Heating
Cooling Schedule: Residential Cooling
Fan Schedule: Residential HVAC & Fans
Peak Load Method: NONCOINCIDENT
Relative Humidity: 50 %
SPACES IN. THIS ZONE
1ST FL- CORRIDOR
2ND FL- CORRIDOR
3RD FL- CORRIDOR
COOLING
PEAK HEATING PEAK SENSIBLE LATENT
(Jan 12am) 4274 (Aug 2pm) 1345 294
(Jan 12am) 3992 (Aug 2pm) 1345 294
(Jan 12am) 5092 (Aug 2pm) 1828 294
TOTAL SPACE LOAD 13358 4518 882
Bypass Ventilation Air ( 0 cfm) 0 ( 0 cfm) 0 -0
Supply Duct Conduction 0 0
Supply Duct Leakage 0 0 0
Supply Fan Heat Gain -2893 2893
EFFECTIVE SPACE LOAD 10465 7411 882
Ventilation ( 0 cfm) 0 ( 0 cfm) 0 -0
Return Air Lighting Gain 0
Return Duct Conduction 0 0
Return Duct Leakage 0 0 0
Return Fan Heat Gain -0 0
TOTAL SYSTEM LOAD 10465 7411 882
0.6 tons 0.1 tons
SYSTEM PERFORMANCE 30224 40413 14637
AT DESIGN CONDITIONS 3.4 tons 1.2 tons
a
RESIDENTIAL SPACE HEATINU LOAD SUMMARY
~.Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
SUPPLY AIR QUANTITY
page 25 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST FL- CORRIDOR
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R -13 Frame Wall 28.0 x 0.0885 x 49.0 = 121
Solid Wood Door 20.0 x 0.4184 x 49.0 = 410
Carpeted Slab Perim = 6.0 x 47 = 282
Infiltration: 1.00 x 0.018 x 654 sqft x 8.0 ft x 0.75 AC x 49.0 = 3461
TOTAL HOURLY HEAT LOSS FOR SPACE 4274
Heating: 4274 Btu /hr / [ 1.10 * (105 F Supply - 65 F TStat)] = 97 cfm
0
,RESIDENTIAL SPACE COOLING LOAD SUMMARY
,•Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction Area
R -13 Frame Wall
Solid Wood Door
Infiltration: 1.00 x 0.018 x
Solar Gain Orient.
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
1.00 x
1.00 x
Date: 8/16/1991
Shaded
Area SGF
Op Frac. Area
U -Value
TOTAL HOURLY SENSIBLE HEAT GAIN FOR
Op Frac. Area
Heat Gain
Checked By
Heat Gain Conv.
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
page 26 of 30
COMPLY 24 v 3.10
Building Permit No
Date (User # 1184)
1ST FL- CORRIDOR
DETD
78 F
80 F
2 F
28.0 x 0.0877 x 1.6 =
20.0 x 0.4049 x 1.6 =
654 sgft x 8.0 ft x 0.75 AC x 2.0 =
Unshaded
Area SGF SC
1.00 x 654.0 x 0.200 x 3.413 =
1.00 x 654.0 x 0.200 x 3.413 =
1.00 x 654.0 x 225 / 500 =
SPACE
Cony.
654.0 x 0.000 x 3.413 =
654.0 x 225 / 500 =
Btu /hr
4
13
141
Btu /hr
Btu /hr
446
446
294
1345
Btu /hr
0
294
294
1345 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 54 cfm
RESIDENTIAL SPACE HEATING LOAD SUMMARY
r•Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
R -13 Frame Wall
Solid Wood Door
SUPPLY AIR QUANTITY
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL- CORRIDOR
Conduction Area U -Value TD Btu /hr
28.0 x 0.0885 x 49.0
20.0 x 0.4184 x 49.0
page 27 of 30
70 F
21 F
49 F
Infiltration: 1.00 x 0.018 x 654 sqft x 8.0 ft x 0.75 AC x 49.0
121
410
= 3461
TOTAL HOURLY HEAT LOSS FOR SPACE 3992
Heating: 3992 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] - 91 cfm
e
.RESIDENTIAL SPACE COOLING LOAD SUMMARY
Space Name:
SUPPLY AIR QUANTITY
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
, Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
page 28 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL- CORRIDOR
78 F
80 F
2 F
Conduction Area U -Value DETD Btu /hr
R -13 Frame Wall 28.0 x 0.0877 x 1.6 = 4
Solid Wood Door 20.0 x 0.4049 x 1.6 = 13
Infiltration: 1.00 x 0.018 x 654 sqft x 8.0 ft x 0.75 AC x 2.0 = 141
Shaded Unshaded
Solar Gain Orient. Area SGF Area SGF SC Btu /hr
Internal Gain Op Frac. Area Heat Gain Conv. Btu /hr
Lighting 1.00 x 654.0 x 0.200 x 3.413 - 446
Equipment 1.00 x 654.0 x 0.200 x 3.413 = 446
Occupants 1.00 x 654.0 x 225 / 500 = 294
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 1345
Latent Gain Op Frac. Area Heat Gain Cony. Btu /hr
Equipment 1.00 x 654.0 x 0.000 x 3.413 = 0
Occupants 1.00 x 654.0 x 225 / 500 = 294
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 294
Cooling: 1345 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] - 54 cfm
.RESIDENTIAL SPACE HEATI G LOAD SUMMARY
' Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
SUPPLY AIR QUANTITY
page 29 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3RD FL- CORRIDOR
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R -13 Frame Wall 28.0 x 0.0885 x 49.0 = 121
Solid Wood Door 20.0 x 0.4184 x 49.0 = 410
R -30 BU Roof /Acoust Clg 654.0 x 0.0343 x 49.0 = 1099
Infiltration: 1.00 x 0.018 x 654 sqft x 8.0 ft x 0.75 AC x 49.0 = 3461
TOTAL HOURLY HEAT LOSS FOR SPACE 5092
Heating: 5092 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] = 116 cfm
11+
.RESIDENTIAL SPACE COOLING LOAD SUMMARY
!'Project: Homewood Suites Hotel (BLDG. 2)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date:
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
R -30 BU Roof /Acoust Clg
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
Area
28.0
20.0
654.0
Op Frac. Area
8/16/1991
page 30 of 30
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3RD FL- CORRIDOR
78 F
80 F
2 F
U -Value DETD
x 0.0877 x 1.6 =
x 0.4049 x 1.6 =
x 0.0335 x 22.0 =
Infiltration: 1.00 x 0.018 x 654 sqft x 8.0 ft x 0.75 AC x 2.0 =
Shaded Unshaded
Solar Gain Orient. Area SGF Area SGF SC
Internal Gain Op Frac. Area Heat Gain Cony.
1.00 x 654.0 x 0.200 x 3.413
1.00 x 654.0 x 0.200 x 3.413
1.00 x 654.0 x 225 / 500
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE
Heat Gain Conv.
1.00 x 654.0 x 0.000 x 3.413 =
1.00 x 654.0 x 225 / 500 =
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
Btu /hr
4
13
482
141
Btu /hr
Btu /hr
446
446
294
1828
Btu /hr
0
294
294
1828 Btu /hr / [ 1.08 * ( 78 F TStat - 55 F Supply)] = 74 cfm
TITLE 24 REPORT FOR:
Homewood Suites Hotel (Bldg 3)
Tukwila, Washington
PROJECT DESIGNER:
Dimitri Demopulos Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
OWNER:
Dimension Development Company Inc.
REPORT PREPARED BY:
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
Job Number: 91065
Date: 8/16/1991
RECEIVED
CITY OFTUJKWILA
AUG 22199I
PERMIT CENTER
The COMPLY 24 computer program has been used to: perform the calculations
summarized in this compliance report. This program has interim'approval
and is authorized by the California Energy Commission for use with the
Second Generation Nonresidential Building Energy Efficiency Standards
for Nonresidential Occupancies. Second Generation Residential Occupancies
shown to comply with this program conform to the results produced by the
Public Domain Point System, developed by the California Energy Commission.
This.program developed by Gabel Dodd . Associates: (415) 428 -0803.
Table of Contents
Table Of Contents for Title 24 Report
Cover Page 1
2'
Form CF -1R Certificate of Compliance: Residential 3
Form CF -3 Construction Assemblies 6
Form CF -4 HVAC Summary 12
HVAC Zone & Space Loads Summary 13
'CERTIFICATE OF COMPLIANCE: Residential (part 1 of CF -1R
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date:
PROJECT ADDRESS
Tukwila, Washington
GENERAL INFORMATION
Compliance Method:
Climate Zone:
Total Conditioned Floor Area:
Building Occupancy:
Front Entry Orientation:
Number of Dwelling Units:
Floor Construction Type:
Infiltration Control:
BUILDING SHELL INSULATION
Component Area
THERMAL MASS
Mass Material
NONE
Area
Thick
(in)
Job #: 91065
8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Point System
1
0 sqft
Single Fam Det
West
3
Raised
Standard
U -Value Location /Comments
Checked By
Type Location /Description
page 3 of 18
COMPLY 24 v 3.10
Building Permit No
Date (User # 1184)
N CERTIFICATE OF COMPLIANCE: Residential (part 2 of CF -1R page 4 of 18
Project: Homewood Suites Hotel (Bldg 3)
4
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Checked By
Glass w /Int
Location Orient Area Type U -Val SC Shade Description
GLAZING
SHADING (for Glazing above)
Location Exterior Device
Over
SC hang Framing Type
COMPLY 24 v 3.10
Building Permit No
Date (User # 1184)
CERTIFICATE OF COMPLIANCE: Residential (part 3 of
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC SYSTEMS Minimum Output Duct
System Type Efficiency (Btuh) Location
Max. Furnace Output: 45000 Btuh + [(75% - 71 %) x 7000] = 71744 Btuh
Cooling Exception: CFM Cooling (see Load Calcs) requires Btuh
HOT WATER SYSTEMS Tank Manufacturer /Model No. # of Energy R -12
System Type Volume (or approved equal) Sys Credits Blanket
SPECIAL FEATURES /REMARKS (Add extra sheets if necessary)
COMPLIANCE STATEMENT
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Chapter 2 -53 and Title 20,
Chapter 2, Subchapter 4, Article 1 of the California Administrative Code.
This certificate has been signed by the individual with overall design
responsibility and the building owner, who shall retain a copy of it and
transmit the certificate to any subsequent purchaser of the building. When
this Certificate of Compliance is submitted for a single building plan to
be built in multiple orientations, all building conservation features which
vary are indicated in the Special Features /Remarks section.
DESIGNER BUILDING OWNER
Dimitri Demopulos Inc. Dimension Development Company Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
License No:
Signed:
(Date)
DOCUMENTATION AUTHOR
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
Signed:
(Date)
Date: 8/16/1991
Signed:
ENFORCEMENT AGENCY
Name:
Agency:
Telephone:
Signed:
CF -1R page 5 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Duct Manufacturer /Model No.
RVal (or approved equal)
(Date)
(Date)
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: R -13 Frame Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Outside Air Film
1. Stucco
2. Membrane, Vapor - Permeable Felt
3. Insulation, Mineral Wool, R -13
4. Gypsum or Plaster Board
5.
6.
7.
8.
9.
Inside Air Film
Sketch of Construction Assembly
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
0.70
Wood Shingles
12.3 lb /sgft
2.88
Date: 8/16/1991
CF -3 page 6 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25
0.875 0.17
0.010 0.06
* 3.500 13.00
0.500 0.45
0.17
0.17
0.06
13.00
0.45
0.68 0.68
Total 14.61 14.53
Framing Percentage: 15.0 %
Framing Material: Softwood, Douglas Fir -Larch
Calculation for Framing Adjustment
Summer U -Value
0.0684 x 0.85 + 0.1969 x 0.15 - 0.0877
Winter U -Value
0.0688 x 0.85 + 0.2000 x 0.15 ■ 0.0885
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value 11.40 11.30
U -Value 0.0877 0.0885
- CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: R -30 BU Roof /Acoust Clg
Assembly Type: Roof
Assembly Tilt: 0 deg (Horizontal Roof)
Construction Components
Outside Air Film
1. Roofing, Built -Up
2. Plywood
3. Insulation, Mineral Wool, R -30
4. Air Space
5. Acoustical Tile, Wood or Cane Fiber
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 10.0 %
Framing Material: Softwood, Douglas Fir -Larch
Sketch of Construction Assembly
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
0.70
Wood Shingles
7.8 lb /sgft
2.46
Date: 8/16/1991
Summer
0.0291 x 0.90 + 0.
Winter
0.0297 x 0.90 + 0.
R -Value
U -Value
Total
CF -3 page 7 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25
0.375 0.33
0.500 0.63
* 9.500 30.00
6.000 1.00
0.500 1.19
0.17
0.33
0.63
30.00
0.93
1.19
0.92 0.61
34.31 33.73
Calculation for Framing Adjustment
U -Value
0729 x 0.10 = 0.0335
U -Value
0762 x 0.10 = 0.0343
OVERALL VALUES ADJUSTED FOR FRAMING
29.84 29.15
0.0335 0.0343
CONSTRUCTION ASSEMBLY COr1PLIANCE FORM
Project: Homewood Suites Hotel (Bldg 3)
J
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: R -19 Raised Floor
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Th R -Value
Construction Components Fr (in) Summer Winter
Outside Air Film
1. Insulation, Mineral Wool, R -19
2. Plywood
3. Flooring, Carpet and Fibrous Pad
4.
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 10.0 $
Framing Material: Softwood,
Sketch of Construction Assembly
Absorptivity:
Roughness: Clear Pine
Weight:
Heat Capacity:
0.70
Date: 8/16/1991
'. CF -3 page 8 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
0.25
* 6.000 19.00
0.625 0.78
0.250 2.08
0.17
19.00
0.78
2.08
0.61 0.92
Total 22.72 22.95
Douglas Fir -Larch
Calculation for Framing Adjustment
Summer U -Value
0.0440 x 0.90 + 0.1035 x 0.10 = 0.0500
Winter U -Value
0.0436 x 0.90 + 0.1011 x 0.10 = 0.0493
3.9 lb/sqft
1.27
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value 20.02 20.27
U -Value 0.0500 0.0493
- , CONSTRUCTION ASSEMBLY CGtjPLIANCE FORM (7, CF -3 page 9 of 18
Project: Homewood Suites Hotel (Bldg 3)
Designer: Diq�itri Demopulos Inc.
Location: Washington- Seattle
Documentatio: Jason C. Tsou /J.T. Engineering Services
Assembly Nam: Carpeted Slab
Assembly Typ : Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Th R -Value
Construction Components Fr (in) Summer Winter
Outside Air Film 0.25 0.17
1. Concrete, 140 lb, Not Dried 3.500 0.28 0.28
2. Flooring, Carpet and Fibrous Pad 0.250 2.08 2.08
3.
4.
5.
6.
7.
8.
9.
Inside Air Film 0.61 0.92
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 40.9 lb /sgft
Heat Capacity: 9.01
Date: 8/16/1991
R -Value
Total
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3.22 3.45
OVERALL VALUES ADJUSTED FOR FRAMING
3.22 3.45
U -Value 0.3106 0.2899
. CONSTRUCTION ASSEMBLY C IPLIANCE FORM
Project: Homewood Suites Hotel (Bldg 3)
Designer: Di itri Demopulos Inc.
Location: Washington- Seattle
Documentatio
Assembly Nam : Solid Wood Door
Assembly Typ : Door
Assembly Til : 90 deg (Vertical)
Construction
Outside Air ;ilm
1. Hardwood, Maple
2.
3.
4.
5.
6 .
7.
8.
9.
Inside Air Film
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Absorptivity:
Roughness: Clear Pine
Weight:
Heat Capacity:
Date: 8/16/1991
: Jason C. Tsou /J.T. Engineering Services
Total
6.1 lb /sqft
2.39
0.70
CF -3 page 10 of 18
Th R -Value
Components Fr (in) Summer Winter
1.750
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
0.25 0.17
1.54 1.54
0.68 0.68
2.47 2.39
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value
2.47 2.39
U -Value 0.4049 0.4184
CONSTRUCTION ASSEMBLY Cd FORM
Project: Homewood Suites Hotel (Bldg 3)
Designer: Di itri Demopulos Inc.
Location: Wa hington- Seattle Date: 8/16/1991
Documentatio : Jason C. Tsou /J.T. Engineering Services
Assembly Name: Double /Nonres Int Shade
Assembly Typ : Glazing
Th R -Value
Constructio n
Components Fr (in) Summer Winter
Outside Air Vilm 0.25 0.17
1. CEC Double Glazing 0.500 0.69 0.69
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film 0.68 0.68
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Winter Shading Coefficient: 0.88
Summer Shading Coefficient: 0.85
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value
Total
4:, CF -3 page 11 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1.62 1.54
1.62 1.54
U -Value 0.6179 0.6500
HVAC EQUIPMENT SUMMARY CAM
FAN ENERGY
HVAC System
FAN WATTAGE INDEX
Project: Homewood Suites Hotel (Bldg 3)
Designer: Di itri Demopulos Inc.
Location: Walhington- Seattle Date: 8/16/1991
Documentatio : Jason C. Tsou /J.T. Engineering Services
CF -4 page 12 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
HVAC EQUIPME T SUMMARY BY ZONE
No. Heating Cooling
No HVAC Zon, HVAC System (WS -4) Sys KBtu Eff KBtu Eff
1 1ST FLOG COMFORT YC060G /60VDX -HP 1 56 2.80 55 8.90
2 2ND FLOG COMFORT YC048G /48VDX -HP 1 46 2.80 47 8.90
3 3RD FLOOR COMFORT YCO36G /36VDX -HP 1 35 2.80 35 8.90
Totals 136 KBtu 137 KBtu
No. Motor Drive Conv No. Fan
Sys BHP Eff. Eff. Fact Fans Watts
COMFORT YC060G /60VDX -HP (Fans) 1 x 0.50 / [0.70 x 1.00] x 746 x 1 = 533
COMFORT YC048G /48VDX -HP (Fanl) 1 x 0.50 / [0.70 x 1.00] x 746 x 1 = 533
COMFORT YCO36G /36VDX -HP (Fanl) 1 x 0.33 / [0.66 x 1.00] x 746 x 1 = 373
Total 1439
1439 watts / 3555 sqft = 0.405 watts /sqft
T HVAC ZONE HEATING & CO01...NG LOAD SUMMARY
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date:
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System MultiOlier:
Heating Schedule:
Cooling Sche ule:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE
1ST FLOOR
Bypass
Supply
Supply
Supply
Ventilation Air (
Duct Conduction
Duct Leakage
Fan Heat Gain
PEAK
(Jan 12am)
TOTAL SPACE LOAD
28 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 249 cfm)
Return Air Lighting Gain
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
page 13 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST FLOOR
COMFORT YC060G /60VDX -HP
1
Office Heating
Office Cooling
Office HVAC & Fans
NONCOINCIDENT
50 %
COOLING
HEATING PEAK SENSIBLE LATENT
24444 (Aug 4pm) 25435 3530
24444 25435 3530
1492 ( 28 cfm) 0 -269
1222 1272
489 509 71
-0 0
27648 27215 3331
13432 ( 249 cfm) 0 -2423
0
276 272
553 544 67
-1819 1819
40091 29851 975
2.5 tons 0.1 tons
32757 39819 18059
3.3 tons 1.5 tons
* SPACE HEATING & COOLINLOAD SUMMARY
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
SUPPLY AIR QUANTITIES
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
COOLING
DESIGN CONDITIONS HEATING SENSIBLE LATENT
1ST FLOOR
Peak Hour: Jan 12am Aug 4pm
Indoor Conditions: 70 F DB 78 F DB 50 % RH
Outdoor Conditions: 21 F DB 78 F DB 62 F WB
LOAD COMPONENT Btu /hr Btu /hr Btu /hr
Wall Conduction 6002 1068
Window Conduction 3586 -82
Door Conduction 1230 339
Roof Conduction 0 0
Skylight Conduction 0 0
Floor Conduction 0 0
Slab Conduction 8131
Interior Conduction 0 0
Infiltration 5495 0
Solar Gain 7261
Lighting 8593
Equipment 4725 0
Occupants 3530 3530
SPACE LOADS
page 14 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
24444 Btu /hr 25435 Btu /hr 3530 Btu /hr
2.1 tons 0.3 tons
Heating: 24444 Btu /hr / [1.10 * (105 F Supply - 60 F TStat)] = 494 cfm
Cooling: 25435 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 1024 cfm
HVAC ZONE HEATING & CO(CNG LOAD SUMMARY
•
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE
2ND FLOOR
Bypass
Supply
Supply
Supply
Ventilation Air (
Duct Conduction
Duct Leakage
Fan Heat Gain
EFFECTIVE SPACE LOAD
Ventilation
Return Air Lighting Gain
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
PEAK
(Jan 12am)
TOTAL SPACE LOAD 18347
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
page 15 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
2ND FLOOR
COMFORT YC048G /48VDX -HP
1
Office Heating
Office Cooling
Office HVAC & Fans
NONCOINCIDENT
50 %
COOLING
HEATING PEAK SENSIBLE
18347 (Jul 4pm) 28859
Date (User # 1184)
28859
28 cfm) 1523 ( 28 cfm) 0
917 1443
367 577
-0 0
21154 30879
254 cfm) 13704 ( 254 cfm) 0
0
212 309
423 618
-1819 1819
33674 33624
2.8 tons
27101 33532
2.8 tons
LATENT
3602
3602
-275
72
3399
-2472
68
995
0.1 tons
15927
1.3 tons
A SPACE HEATING & COOLINLOAD SUMMARY
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Window Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
Interior Conduction
Infiltration
Solar Gain
Lighting
Equipment
Occupants
SUPPLY AIR
Heating:
Cooling:
SPACE LOADS
QUANTITIES
HEATING
Jan 12am
70 F DB
21 F DB
Btu /hr
5883
4459
1230
1101
0
68
0
0
5606
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Jul 4pm
78 F DB
78 F DB
Btu /hr
1275
-18
312
486
0
6
0
0
9102
9273
4821
3602
page 16 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FLOOR
COOLING
SENSIBLE LATENT
50 % RH
62 F WB
Btu /hr
0
3602
18347 Btu /hr 28859 Btu /hr 3602 Btu /hr
2.4 tons 0.3 tons
18347 Btu /hr / [1.10 * (105 F Supply - 60 F TStat)] - 371 cfm
28859 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 1162 cfm
•
4 HVAC ZONE HEATING & COL NG LOAD SUMMARY
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE
3RD FLOOR
Bypass
Supply
Supply
Supply
Ventilation Air (
Duct Conduction
Duct Leakage
Fan Heat Gain
PEAK
(Jan 12am)
TOTAL SPACE LOAD 15072
15 cfm)
EFFECTIVE SPACE LOAD
Ventilation ( 136 cfm)
Return Air Lighting Gain
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
page 17 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3RD FLOOR
COMFORT YCO36G /36VDX -HP
1
Office Heating
Office Cooling
Office HVAC & Fans
NONCOINCIDENT
50 %
COOLING
HEATING PEAK SENSIBLE LATENT
15072 (Jul 4pm) 19853 1932
19853 1932
817 ( 15 cfm) 0 -147
754 993
301 397 39
-0 0
16944 21243 1823
7349 ( 136 cfm) 0 -1326
0
169 212
339 425 36
-1273 1273
23528 23153 534
1.9 tons 0.0 tons
20503 25353 11479
2.1 tons 1.0 tons
4 SPACE HEATING & COOLING LOAD SUMMARY
Project: Homewood Suites Hotel (Bldg 3)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle
SUMMARY OF PEAK HOUR LOADS FOR SPACE
Space Name:
DESIGN CONDITIONS
Peak Hour:
Indoor Conditions:
Outdoor Conditions:
LOAD COMPONENT
Wall Conduction
Window Conduction
Door Conduction
Roof Conduction
Skylight Conduction
Floor Conduction
Slab Conduction
Interior Conduction
Infiltration
Solar Gain
Lighting
Equipment
Occupants
SUPPLY AIR
Heating:
Cooling:
SPACE LOADS
QUANTITIES
HEATING
Jan 12am
70 F DB
21 F DB
Btu /hr
5103
4459
1230
1273
0
0
0
0
3007
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Jul 4pm
78 F DB
78 F DB
Btu /hr
1016
-40
303
542
0
0
0
0
8619
4896
2585
1932
page 18 of 18
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
3RD FLOOR
COOLING
SENSIBLE LATENT
50 % RH
62 F WB
Btu /hr
0
1932
15072 Btu /hr 19853 Btu /hr 1932 Btu /hr
1.7 tons 0.2 tons
15072 Btu /hr / [1.10 * (105 F Supply - 60 F TStat)] ■ 304 cfm
19853 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] ■ 799 cfm
P AN REVIEW COMME TS It N1
Plan Check No.: - 1 1 " I - M Project: . -\
REQUIRED INSPECTIONS
2
2
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high- strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the Job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit, The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1.
Footings
2.
Foundation
3.
Slab /Slab Insulation
4.
Shear Wall Nailing
5.
Roof Sheathing Nailing
6.
Masonry Chimney
7.
Framing
8.
Insulation
9.
Suspended Ceiling
10. Board , m p,,,�s
rp Wall
11. i..tkst■e1 "Zln
12.
13.
X
14.
Fire Final
15.
Planning Final
16.
Public Works Final
17.
Building Final
P AN REVIEW COMME TS It N1
Plan Check No.: - 1 1 " I - M Project: . -\
REQUIRED INSPECTIONS
2
2
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high- strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractors responsibility to have a set of
plans approved by that agency on the Job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit, The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
CITY OF TUIKWILA
Dept. of Community Development - Building Division
Phone: (206) 431.3670
PROJECT: M me w
ADDRESS:
DATE:
S ale
►t
PLAN REVIEW
PLAN CHECK
NUMBER
/
L e— Cr [ (2.a
FAN COIL v N L *F'a ce. 4- 1E.>47 -- M
I 1.1s
N A Stvvict L... Mme-i4 4 l L. CLE T'
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
Prepared by: