HomeMy WebLinkAboutPermit 0586-M - HOMEWOOD SUITES - C0586-m homewood suites hvac
91-153 6935 southcenter boulevard #c
IgINCbob t()
TEL �G
..:
lANcE::
UMC EDITION (YEAR : • ::
FIRE PROTECTION: x Sprinklers x Detectors N/A
PROJECT NAME/TENA 1 ; • • II . • • • ..
CONDITIONS (other than noted on or attached to permit/plans):
VALUE OF WORK:
$ 18,250.00
- E •F W•RK: in New/Addition Modifications
APPROVED FOR BUILDING
ISSUANCE BY: OFFICIAL
,.)
DATE:
ZIP: 9280
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating c o. ction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATURW2.6Lee / C.-..
DATE: 9 -/ 3 -- q I
PRINT NAME: PffrAL /91 1/V)-e--li
COMPANY: ...-- —7-r
•:;:lii'::::::::igiii.::.';
SITE ADDR_ESS: 6935 Southcenter B1 #C
PHONE: 318-352-8238
SUITE NO. C5
PROJECT NAME/TENA 1 ; • • II . • • • ..
ZIP: 71457
VALUE OF WORK:
$ 18,250.00
- E •F W•RK: in New/Addition Modifications
Repair
(---) Other:
ZIP: 9280
DESCRIPTION OF WORK: Install HVAC equipment.
IEXPIRATION DATE: 8-02-92
Pa** a •
R ' • ■,- , • le e o ent Co.
PHONE: 318-352-8238
ADDRESS:
401 Keyser Avenue. Natchitoches, LA
ZIP: 71457
CONTRACTOR:
Energy Systems Technology, Inc.
IPHONE: 714-632-5000
ADDRELS:
3010 Coronado 1111, Anaheim, CA
ZIP: 9280
WA. ST. CONTRACTOR'S LICENSE NO. ENERGST099NN
IEXPIRATION DATE: 8-02-92
CITY OF TUKWILA
Department of Community Development - Building
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
MECHANICAL
PERMIT NO. oF_5 - 1Y)
DATE ISSUED:
SpFCT 10 N ICOR (call4Or tisP et tiahs VII s oUrs4m i/ c
DATE DATE(S)
REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE ISSUED
1 - Rough-in/Vents/Ducts 431-3670
2- Fire Final 575-4407
3 - Planning Final
4.
X 5 - Mechanical Final
431-3680
431-3670
MECHANICAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
Division
Basio,Permit::F
Unit Fee
T
'PAL
....................
Plan Check No.: 91-153-M
4RECEIPT4
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and Industries (277-7272)
15 become null and void if the work 14:nptcommenced
Or if the work is'sbspended'Or':ebehdOhed a OeiiOd of 180 clitl-fr6iit'thela:siliiidi4Ctio.h.
PERMIT NO.
..
CONTACTED
DATE NOTIFIED
— I- ,
G I I � q
` `
'�/ j�
,t �V ,D/\ •
BY;
(init.) �-;CJ�I/
DATE READY
PERMIT EXPIRES
2nd NOTIFICATION
ON
`
BY:
)
AMOUNT OWING
g d i rD, '
3RD NOTIFICATION
BY:
(init.)
( ECHANICAL. PERMIT
J M APPLICATION TRACKING
PROJECT NAME
0 n1y= 1)30Qc) SU i*
SITE ADDRESS
Vt v cAlnt - er 131
SUITE NO.
PLAN CHECK
NUMBER
- 153 - 01
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
DEP ARTMENT < ;DATE IN: >.::: >::: ::>::.:.:.::::< : >::; >::::::;:: > ...... ::..::::: :::> , ; .c
REtJIREMENTS:..:l,. <tMME
JBUILDING -
initial review
FIRE
O PLANNING
O OTHER
BUILDING -
final raviAw
aa-a
cqedct(
q l
REVIEW COMPLETED
INIT:
INIT:
INIT:
9 /0 (
IN T: _ C6-t_
CONSULTANT:
OUTEDL
q,q,411 FIRE PROTECTION: it Sprinklers
FIRE DEPT. LETTER DATED:
ZONING:
UMC EDITION (year):
Date Sent -
REFERENCE FILE NOS.:
Date Approved -
Detectors N/A
INSPECTOR: 5' 5
IBAR/IAND USE CONDITIONS? fl Yes (] No
SCREENING REQUIRED? (`Yes (l No
PROPERTY OWNER ,d(ivi tti,(- /U,t.1 ,a0 -1. G(,)` /jiZ//2/ Dj1,)
P HON E _/) 35;.
- J .7
ZIP 71 7
:'
ADDRESS In / y"cwZ /9 � A/6T CI FT 7 DG-fl6-S -
CONTRACTOR /J i2y L f f T7�iof 7-C /' / A.iC.
.
PHONI
E�' e. f_ (,a ;5o v
-2
ADDRESS
l
a - CO.
WA. ST. CONTRACTOR'S LICENSE # olv-re6.sr O l 9N,I.)
EXP. DATE/ / Z
e
:::DESCRIPTION
I ; AMOUNT::::
RCPT: #,:
:'
BASIC PERMIT FEE
1 5:00:
UNIT(S)':FEE
a - CO.
PLAN :: :CHECK FEE
OTHER.
: :TOTAL'
:
uc
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER
q 1 - 1 5 7 5 -- M
APPLICATION MUST BE FILLED OUT COMPLETELY
� SITE ADDRESS 3T/6 C 1 '2 L
£ SUITEC
PROJECT NAME/TENANT
7 f '7
TYPE OF WORK: (XNew/Addition 0 Modifications 0 Repair 0 Other:
DESCRIBE WORK TO BE DONE:
l�J
CONTACT PERSON c_cf/ ' )
DATE APPLICATION ACCEPTED
Co inn tv)
BUILDING USE office, warehouse, etc.)
/L
NATURE OF SINE
WILL THERE BE A CHANGE IN USE? gNo 0 Yes IF YES, EXPLAIN:
MECHAKCAL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out
and attached to this application.
FEES (for staff use only)
VALUE OF CONSTRUCTION - $
/ZO C ...
WILL THERE B�,S TORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
B_
BUILDING? No 0 Yes IF YES, EXPLAIN:
BUILDING OWNER SIGNATU
OR
AUTHORIZED
AGENT
PRINT NAME
AD'ANDEXAMINEDTH IS:APPI�ICATION'
.. .................. ........ .... ....... ........ .................... .
................................ ....
.......... ..... . ...............
ORIZED' TO _ ":per
fra
ADDRESS SDI p Ca 1j D #H
P H ON E(7/. 6 ,70 -,1706
CITY /ZIP //11
PHONE
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
plans must be complete in order to be accented for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
DATE APPLICATION EXPIRES
08/18190
DESCRIPTION
UNIT COST
UNITS
x
COST
BASIC FEE
$15.00
$4.50
SUPPLEMENT PERMIT FEE
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$9.00
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
x
3
Installation or relocation of each floor furnace, Including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor - mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
x
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9,00
, .
. -:,
x
1 3 lt>
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu /h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
t
X
10/4
U
U
13
Each air - handling unit over 10,000 cfm.
$11.00
X
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
X
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
/_
W
X
3c?
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$11.0
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
x
20
,
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
08/18/90
SUBTOTAL
I 00
PLAN CHECK FEE (25 b� of
t ,
GRAND TOTAL
$ ,L1'10.-.53
.
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHAM ..;AL PERMIT
FEE WORKSHEET
INSTRUCTION - Complete theworksheet, • indicating the numbe of units be
msfalled in each category At time of
submittal, staff will calculate the fees
CITY OF TUKWILA
6200 SOUTIICENTER BOULEVARD, TUKIVILA, IVASIIINCTON 98188
Plan Check #91- 153 -M: Homewood Suites Hotel
6935 Southcenter B1 #C
I'IIONE 11 (206103.1800
Cory L. VaIDose,, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER n5___ /
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (872-
6363).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. Maintain 1 -hour fire - resistive assemblies.
5. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
6. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1991 Edition), and
Washington State Regulations for Barrier Free Facility
(1989 Edition).
7. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for, or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
t� T
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Fire Department Review
Control #91 -151M through #91 -155M (5 letters)
(513)
Gary L. VanDusen, Mayor
September 10, 1991
Re: Homewood Suites, Bldg. #A - 6915 Southcenter Blvd.,
Bldg. #B - 6925 Southcenter Blvd., Bldg. #C - 6935
Southcenter Blvd., Bldg. #D - 6945 Southcenter Blvd., Bldg.
#E - 6955 Southcenter Blvd.
Dear Sir:
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. Maintain sprinkler protection for all enclosed areas.
(NFPA 13, 4- 1.1.1) (UFC 10.302)
All sprinkler drawings shall be prepared by companies
licensed to perform this type of work. Drawings shall
first be approved by the Washington Survey & Rating
Bureau, Factory Mutual Engineering or Industrial Risk
Insurers, then by the Tukwila Fire Department. No
sprinkler work shall commence without approved
drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1)
(UFC 10.305)
2. H.V.A.C. units rated at 2,000 cfm require
auto - shutdown devices. These devices shall be separately
zoned in the alarm panel and local U.L. Central Station
supervision is required.
This is a requirement for the supervision of detectors
already required by the mechanical code.
" r r r • ^ r r • 1 7 r r r " r 1 rr, 7. ^ r r • " r r 1
1909
Authorized Signature
FINALAPP.FRM
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East I I
Tukwila, Washington 98188-7661
(206) 575-4404
TUKWILA FIRE DEPARTMENT
FINAL APPROVAL FORM
Project Name
Address x93 t - A a
//Retain current inspection schedule
Needs shift inspection
/Approved without correction notice
Approved with correction notice issued
Sprinklers:
Fire Alarm:
Hood & Duct:
Halon:
Monitor:
Pre
Permits:
A/
Gary L. VanDusen, Mayor
• Control No. )/-
Permit No.
Suite
Date
C
• • -
T.F.D. Form F.P. 85
147f1004
SPECIAL INSTRUCTIONS:
INSPECTOR:
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
PROJECT: /1-00-7/P. ���0�,� ,�, 1
SITE ADDRESS:
TYPE OF INSPECTION:
INSPECTION RESULTS /COMMENTS:
INSPECTION RECORD
PERMIT NO. 5 --,A/j
DATE CALLED:
DATE WANTED:
REQUESTER:
PHONE NO.:
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
DATE: '7 2-2 3
• rq ct:
ct: :1.1 i
,.I.I
VIIMS
ypeo nspe.t • .
• i i I.
� .te • e•:
ecfa Inst ions:
•
Date r anted:
— am. p .m.
9� .
_3 l
Requester
_f
Phone No.. V al 4 c
Inspector:
........
PECT
0.
( INSPECTION RECORD C
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
❑ Approved per applicable codes. / 6694619s required prior to approval.
DB E M
PERMR N 0.
(206) 431 -3670
COMMENTS:
1 <l ec -LA.
v. t 11A P P t v - - 24C
z)
`-►
• ro e
■
ype o ns • =Mon:
, e S. ° 1 Ui+
D' %te a e•: )1..'5_9
(f
a Stfu�
Sp In ons:
6 _5 octoy
Date Wanted: l ... 9 1
0
Requester :C
itili
Phone No.: q0q
oM.:,•— .,...:. rear.+ ,o.c.r....«- ...,rNrr— ^,•- "+•..; „ "". :.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
Approved per applicable codes.
COMMENTS: U Yn G 4- / •/^—)
/ 3/
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Recut No
0 INSPECTION RECORD
Retain a copy with permit
Wit t . 1 1 • + : / f I t
•
oete: 4 •
US -m
PERMIT NO.
(206) 431 -3670
❑ Corrections required prior to approval.
TYPE OF REVISION:
* * REVISION SUBMITTAL * *
DATE 3 G 1
CITY OF TUKWILA
6300 SOUTHCENTER BOULEVARD
TUKWILA, WA 98188
PROJECT NAME i'Tv S C/{ C -S
ADDRESS 6, 9 /5-- e-'5 (-27
CONTACT PERSON CARS - U I 77 PHONE
ARCHITECT OR ENGINEER
PERMIT NUMBER ��jj (If previously issued)
PLAN CHECK NUMBER ( IV OM) /1'1 thru 0 1(-- L s5 - 11'\
1aELo ck9 -?7a,c) p 19 /G : - (2f
r //2' - P/l .l
SHEET NUMBER(S) 3 1' " ` (4\ - 6
"Cloud" or highlight all areas of revisions and daEe revisions.
SUBMITTED TO:
RECEIVED
CITY OF TUKWILA
SEP 1 3 1991
PERMIT CENTER
g6
C (tr—ie)
TITLE 24 REPORT FOR:
Homewood Suites Hotel (BLDG. C5)
Tukwila, Washington
PROJECT DESIGNER:
Dimitri Demopulos Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
OWNER:
Dimension Development Company Inc.
REPORT PREPARED BY:
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
Job Number: 91065
Date: 8/16/1991
RECEIVED
CITY OF TUKWILA
AUG 22 1991
PERMIT CENTER
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has interim approval
and is authorized by the Califbrnia Energy Commission for use with the
Second Generation Nonresidential Building Energy Efficiency Standards
for Nonresidential Occupancies. Second Generation Residential Occupancies
shown to comply with this program conform to the results produced by the
Public Domain Point System, developed by the California Energy Commission.
This program developed by Gabel Dodd Associates (415) 428 -0803.
Table Of Contents for Title 24 Report
Cover Page
Table of Contents
Form CF -1R Certificate of Compliance: Residential 3
Form CF -3 Construction Assemblies 6
Form CF -4 HVAC Summary 12
HVAC Zone & Space Loads Summary 13
CERTIFICATE OF COMPLIANCE: Residential (part 1 of 3
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
PROJECT ADDRESS
Tukwila, Washington
GENERAL INFORMATION
Compliance Method:
Climate Zone:
Total Conditioned Floor Area:
Building Occupancy:
Front Entry Orientation:
Number of Dwelling Units:
Floor Construction Type:
Infiltration Control:
BUILDING SHELL INSULATION
Component Area
R -13 Frame Wall
R -13 Frame Wall
R -13 Frame Wall
R -13 Frame Wall
R -30 BU Roof /Acoust
R -30 BU Roof /Acoust
Carpeted Slab
Carpeted Slab
2260
2260
210
210
Clg 5152
Clg 1112
5152
1112
THERMAL MASS
Mass Material Area
Concrete, Heavyweight 5152
Concrete, Heavyweight 1112
0.0885
0.0885
0.0885
0.0885
0.0343
0.0343
0.7200
0.7200
Job #: 91065
Point System
1
12528 sqft
Multi- Family
West
24
Slab
Standard
U -Value Location /Comments
1ST FL -UNIT
2ND FL -UNIT
1ST FL -UNIT
2ND FL -UNIT
2ND FL -UNIT
2ND FL -UNIT
1ST FL -UNIT
1ST FL -UNIT
F
F
H
H
F
H
F
H
CF -1R page 3 of 22
TYPE
TYPE
TYPE
TYPE
TYPE
TYPE
TYPE
TYPE
COMPLY 24
Thick
(in) Type Location /Description
v 3.10
Building Permit No
Checked By
Date (User # 1184)
8
8
4
4
8
4
8 /Insul= R -0.0
4 /Insul= R -0.0
4.000 Covered 1ST FL -UNIT F TYPE 8 /Int Mass
4.000 Covered 1ST FL -UNIT H TYPE 4 /Int Mass
GLAZING
Location Orient Area
• M CERTIFICATE OF COMPLIANCE: Residential (part 2 of 3
,,Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
1ST FL -UNIT F TYPE 8
East 176.0 Double 0.65
West 176.0 Double 0.65
2ND FL -UNIT F TYPE 8
East 176.0 Double 0.65
West 176.0 Double 0.65
1ST FL -UNIT H TYPE 4
East 61.0 Double 0.65
West 61.0 Double 0.65
2ND FL -UNIT H TYPE 4
East 61.0 Double 0.65
West 61.0 Double 0.65
SHADING (for Glazing above)
Location Exterior Device
1ST FL -UNIT F TYPE 8
50 % Bug Screen
50 % Bug Screen
2ND FL -UNIT F TYPE 8
50 % Bug Screen
50 % Bug Screen
1ST FL -UNIT H TYPE 4
• 50 % Bug Screen
50 % Bug Screen
2ND FL -UNIT H TYPE 4
50 % Bug Screen
50 % Bug Screen
Date: 8 /16/1991
CF -1R page 4 of 22
COMPLY 24
Building Permit No
Checked By
Glass w /Int
Type .0 -Val SC Shade Description
v 3.10
Date (User # 1184)
0,88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
0.88 0.64 Double /Medium Blinds
Over
SC hang
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
0.84 .0.0
0.84 0.0
0.84 0.0
0.84 0.0
Framing Type
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
CERTIFICATE OF COMPLIANCE: Residential art 3 of 3) CF -1R page 5 of 22
(P g
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC SYSTEMS Minimum Output Duct
System Type Efficiency (Btuh) Location RVal (or approved equal)
Heat Pump 6.800 HSPF 10200 Vent. Attic Space 4.2 EMI MH4D2 /CHX12
Heat Pump 9.500 SEER 11500 Vent. Attic Space
Heat Pump 6.800 HSPF 10200 Vent. Attic Space 4.2 EMI MH4D2 /CHX12
Heat Pump 9.500 SEER 11500 Vent. Attic Space
Zone Furnace Max: 1.3 x [112621 Btuh + (10 x 10304 sqft)] = 280359 Btuh
Zone Furnace Max: 1.3 x [ 21216 Btuh + (10 x 2224 sqft)] = 56493 Btuh
Cooling Exception: CFM Cooling (see Load Calcs) requires Btuh
HOT WATER SYSTEMS
System Type
Gas Fired
SPECIAL FEATURES /REMARKS (Add extra sheets if necessary)
COMPLIANCE STATEMENT
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Chapter 2 -53 and Title 20,
Chapter 2, Subchapter 4, Article 1 of the California Administrative Code.
This certificate has been signed by the individual with overall design
responsibility and the building owner, who shall retain a copy of it and
transmit the certificate to any subsequent purchaser of the building. When
this Certificate of Compliance is submitted for a single building plan to
be built in multiple orientations, all building conservation features which
vary are indicated in the Special Features /Remarks section.
DESIGNER BUILDING OWNER
Dimitri Demopulos Inc. Dimension Development Company Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
License No:
Signed:
(Date)
DOCUMENTATION AUTHOR
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410 '
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
Signed:
(Date)
Date: 8/16/1991
Signed:
ENFORCEMENT AGENCY
Name:
Agency:
Telephone:
Signed:
COMPLY 24
Checked By
v 3.10
Building Permit No
Date (User # 1184)
Duct Manufacturer /Model No.
Tank Manufacturer /Model No. # of Energy R -12
Volume (or approved equal) Sys Credits Blanket
50.0 Std Gas 50 gal or less 24 0 Y
(Date)
(Date)
CONSTRUCTION ASSEMBLY COM
PLIANCE FORM
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location:, Washington- Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: R -13 Frame Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Outside Air Film
1. Stucco
2. Membrane, Vapor- Permeable Felt
3. Insulation, Mineral Wool, R -13
4. Gypsum or Plaster Board
5.
6.
7.
8.
9.
Inside Air. Film
Date: 8/16/1991
Framing Percentage: 15.0 %
Framing Material: Softwood, Douglas Fir -Larch
Sketch of Construction Assembly
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
0.70
Wood Shingles
12.3 lb /sgft
2.88
Total
CF -3
Sumner U -Value
0.0684 x 0.85 + 0.1969 x 0.
Checked By
Winter U -Value
0.0688 x 0.85 + 0.2000 x 0.
page 6 of 22
COMPLY 24 v 3.10
Building Permit No
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25
0.875 0.17
0.010 0.06
3.500 13.00
0.500 0.45
0.17
0.17
0.06
13.00
0.45
0.68 0.68
14.61 14.53
Calculation for Framing Adjustment
15 = 0.0877
15 = 0.0885
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value 11.40 11.30
U -Value 0.0877 0.0885
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T.
Assembly Name: R-30 BU Roof /Acoust Clg
Assembly Type: Roof
Assembly Tilt: 0 deg (Horizontal Roof)
Construction Components
Outside Air Film
1. Roofing, Built -Up
2. Plywood
3. Insulation, Mineral Wool, R -30
4. Air Space
5. Acoustical Tile, Wood or Cane Fiber
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 10.0 %
Framing Material: Softwood,
Sketch of Construction Assembly
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
0.70
Wood Shingles
7.8 lb /sqft
2.46
Date: 8/16/1991
Engineering Services
Total
CF -3 page 7 of 22
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.375
0.500
* 9.500
6.000
0.500
0.25 0.17
0.33 0.33
0.63 0.63
30.00 30.00
1.00 0.93
1.19 1.19
0.92
34.31
Douglas Fir -Larch
Calculation for Framing Adjustment
Summer U -Value
0.0291 x 0.90 + 0.0729 x 0.10 = 0.0335
Winter U -Value
0.0297 x 0.90 + 0.0762 x 0.10 = 0.0343
OVERALL VALUES ADJUSTED FOR FRAMING
R -Value 29.84 29.15
U -Value 0.0335 0.0343
0.61
33.73
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
.
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle
Assembly Name: R -19 Raised Floor
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Construction Components
Outside Air Film
1. Insulation, Mineral Wool, R -19
2. Plywood
3. Flooring, Carpet and Fibrous Pad
4.
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 10.0 %
Framing Material: Softwood, Douglas Fir -Larch
Sketch of Construction Assembly
Absorptivity:
Roughness: Clear Pine
Weight:
Heat Capacity:
0.70
3.9 lb /sqft
1.27
R -Value
U -Value
Total
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Summer
0.0440 x 0.90 + 0
Winter
0.0436 x 0.90 + 0
CF -3 page 8 of 22
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25
* 6.000 19.00
0.625 0.78
0.250 2.08
0.61
22.72
0.17
19.00
0.78
2.08
0.92
22.95
Calculation for Framing Adjustment
U -Value
.1035 x 0.10 = 0.0500
U -Value
.1011 x 0.10 = 0.0493
OVERALL VALUES ADJUSTED FOR FRAMING
20.02 20.27
0.0500 0.0493
= = = = == _ = = = ==
Outside Air Film
1. Concrete, 140 lb, Not Dried
2. Flooring, Carpet and Fibrous Pad
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
CONSTRUCTION ASSEMBLY COICLIANCE FORM CF -3 page 9 of 22
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: Carpeted Slab
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Th R -Value
Construction Components Fr (in) Summer Winter
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 40.9 lb /sqft
Heat Capacity: 9.01
R -Value
Total
3.500
0.250
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
0.25
0.28
2.08
0.17
0.28
2.08
0.61 0.92
3.22 3.45
OVERALL VALUES. ADJUSTED FOR FRAMING
3.22 3.45
U -Value 0.3106 0.2899
CONSTRUCTION ASSEMBLY C0cPLIANCE FORM
Project: Homewood Suites Hotel (BLDG. C5)
Assembly Name: Solid Wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Outside Air Film
1. Hardwood, Maple
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Absorptivity:
Roughness: Clear Pine
Weight:
Heat Capacity:
0.70
6.1 lb /sqft
2.39
R -Value
Total
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
CF -3 page 10 of 22
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Construction Components Fr (in) Summer Winter
0.25 0.17
1.750 1.54 1.54
0.68 0.68
2.47 2.39
OVERALL VALUES ADJUSTED FOR FRAMING
2.47 2.39
U -Value 0.4049 0.4184
=o = =aa
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Assembly Name: Double /Medium Blinds
Assembly Type: Glazing
Outside Air Film
1. CEC Double Glazing
2.
3.
4 .
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Winter Shading Coefficient: 0.88
Summer Shading Coefficient: 0.64
R -Value
U -Value
Total
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
CF -3 page 11 of 22
0.500
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Construction Components Fr (in) Summer Winter
0.25 0.17
0.69 0.69
0.68 0.68
1.62 1.54
OVERALL VALUES ADJUSTED FOR FRAMING
1.62 1.54
0.6179 0.6500
1.
HVAC EQUIPMENT SUMMARY F RM
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC EQUIPMENT SUMMARY BY ZONE
No HVAC Zone
FAN ENERGY
HVAC System
FAN WATTAGE INDEX
No. Heating Cooling
HVAC System (WS -4) Sys KBtu Eff KBtu Eff
Totals
CF -4 page 12 of 22
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
0 KBtu 0 KBtu
No. Motor Drive Cony No. Fan
Sys BHP Eff. Eff. Fact Fans Watts
Total 0
0 watts / 0 sqft = 0.000 watts /sgft
HVAC ZONE HEATING & COOL NG LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE
1ST FL -UNIT F TYPE 8
2ND FL -UNIT F TYPE 8
Bypass Ventilation Air ( 0 cfm)
Supply Duct Conduction
Supply Duct Leakage
Supply Fan Heat Gain
EFFECTIVE SPACE LOAD
Ventilation ( 0 cfm)
Return Air Lighting Gain
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
COOLING
PEAK HEATING PEAK SENSIBLE LATENT
(Jan 12am) 67839 (Aug 2pm) 25214
(Jan 12am) 60213 (Aug 2pm) 29012
TOTAL SPACE LOAD 128052
TOTAL SYSTEM LOAD 112621
SYSTEM PERFORMANCE 96151 147155 45781
AT DESIGN CONDITIONS 12.3 tons 3.8 tons
Date: 8/16/1991
0 ( 0 cfm)
0
0
-15431
112621
0 ( 0 cfm)
0
0
- 0
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
UNIT F
EMI MH4D2 /CHX12
page 13 of 22
16
Residential Heating
Residential Cooling
Residential HVAC & Fans
NONCOINCIDENT
50 4
54226
0
0
0
15431
69657
0
0
0
0
0
2318
2318
4636
- 0
0
4636
-o
0
69657 4636
5.8 tons 0.4 tons
RESIDENTIAL SPACE HEATING LOAD SUMMARY
,Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
Carpeted Slab
SUPPLY AIR QUANTITY
Perim =
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User )# 1184)
1ST FL -UNIT F TYPE 8
page 14 of 22
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
2260.0 x 0.0885 x 49.0 = 9798
160.0 x 0.4184 x 49.0 = 3280
352.0 x 0.6500 x 49.0 = 11211
346.5 x 47 a 16286
Infiltration: 1.00 x 0.018 x 5152 sqft x 8.0 ft x 0.75 AC x 49.0 = 27264
TOTAL HOURLY HEAT LOSS FOR SPACE 67839
Heating: 67839 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] = 1542 cfm
RESIDENTIAL SPACE COOLIS LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction Area
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
Infiltration: 1.00 x 0.018 x 5152
Solar Gain
Double /Medium Blinds
Double /Medium Blinds
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
sqft x 8.0 ft
Shaded
Orient. Area SGF
East
West
Op Frac. Area
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST FL -UNIT F TYPE 8
page 15 of 22
78 F
80 F
2 F
U -Value DETD Btu /hr
2260.0 x 0.0877 x 1.6 =
160.0 x 0.4049 x 1.6 =
352.0 x 0.6179 x 2.0 =
317
104
435
x 0.75 AC x 2.0 = 1113
Unshaded
Area SGF SC Btu /hr
[ 0.0 x 15 + 176.0 x 73] x 0.54 = 6947
[ 0.0 x 15 + 176.0 x 73] x 0.54 = 6947
Heat Gain Conv. Btu /hr
1.00 x 5152.0 x 0.200 x 3.413 = 3517
1.00 x 5152.0 x 0.200 x 3.413 = 3517
1.00 x 5152.0 x 225 / 500 = 2318
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 25214
Op Frac. Area Heat Gain Conv. Btu /hr
1.00 x 5152.0 x 0.000 x 3.413 = 0
1.00 x 5152.0 x 225 / 500 = 2318
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 2318
25214 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 1015 cfm
RESIDENTIAL SPACE HEATING LOAD SUMMARY
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Conduction
SUPPLY AIR QUANTITY.
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
page 16 of 22
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT F TYPE 8
70 F
21 F
49 F
Area U -Value TD Btu /hr
R -13 Frame Wall 2260.0 x 0.0885 x 49.0 = 9798
Solid Wood Door 160.0 x 0.4184 x 49.0 = 3280
Double /Medium Blinds 352.0 x 0.6500 x 49.0 = 11211
R -30 BU Roof /Acoust Clg 5152.0 x 0.0343 x 49.0 = 8660
Infiltration: 1.00 x 0.018 x 5152 sqft x 8.0 ft x 0.75 AC x 49.0 = 27264
TOTAL HOURLY HEAT LOSS FOR SPACE 60213
Heating: 60213 Btu /hr./ [1.10 * (105 F Supply, - 65 F TStat)] = 1368 cfm
RESIDENTIAL SPACE COOLS LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Solar Gain
Double /Medium Blinds
Double /Medium Blinds
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
Orient.
East
West
Op Frac. Area
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
page 17 of 22
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT F TYPE 8
78 F
80 F
2 F
Conduction Area U -Value DETD Btu /hr
R -13 Frame Wall 2260.0 x 0.0877 x 1.6 = 317
Solid Wood Door 160.0 x 0.4049 x 1.6 = 104
Double /Medium Blinds 352.0 x 0.6179 x 2.0 = 435
R -30 BU Roof /Acoust Clg 5152.0 x 0.0335 x 22.0 = 3799
Infiltration: 1.00 x 0.018 x 5152 sqft x 8.0 ft x 0.75 AC x 2.0 = 1113
Shaded Unshaded
Area SGF Area SGF SC Btu /hr
[ 0.0 x 15 + 176.0 x 73] x 0.54 = 6947
[ 0.0 x 15 + 176.0 x 73] x 0.54 = 6947
Heat Gain Conv. Btu /hr
1.00 x 5152.0 x 0.200 x 3.413 = 3517
1.00 x 5152.0 x 0.200 x 3.413 = 3517
1.00 x 5152.0 x 225 / 500 = 2318
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 29012
Op Frac. Area Heat Gain Conv. Btu /hr
1.00 x 5152.0 x 0.000 x 3.413 = 0
1.00 x 5152.0 x 225 / 500 = 2318
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE 2318
29012 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] = 1168 cfm
" HVAC ZONE, HEATING & COOLNG LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE
1ST FL -UNIT H TYPE 4
2ND FL -UNIT H TYPE 4
Bypass
Supply
Supply
Supply
Ventilation Air
Duct Conduction
Duct Leakage
Fan Heat Gain
Ventilation
Return Air Lighting Gain
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
PEAK
(Jan 12am)
(Jan 12am)
TOTAL SPACE LOAD
0 cfm)
EFFECTIVE SPACE LOAD
0 cfm)
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
Date: 8/16/1991
page 18 of 22
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
UNIT H
EMI MH4D2 /CHX12
8
Residential Heating
Residential Cooling
Residential HVAC & Fans
NONCOINCIDENT
50 %
COOLING
HEATING PEAK SENSIBLE LATENT
14741 (Aug 2pm) 7306 500
14190 (Aug 2pm) 8126 500
28931 15432 1000
0 ( 0 cfm) 0 -0
O 0
O 0 0
-7715 7715
21216 23147 1000
0 ( 0 cfm) 0 -0
0
O 0
O 0 0
-0 0
21216 23147 1000
1.9 tons 0.1 tons
48076 73578 22891
6.1 tons 1.9 tons
RESIDENTIAL SPACE HEATILOAD SUMMARY
, Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
Carpeted Slab
SUPPLY AIR QUANTITY
Perim =
Date: 8/16/1991
Area
210.0 x
80.0 x
122.0 x
51.5 x
Infiltration: 1.00 x 0.018 x 1112 sqft x 8.0 ft x
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST FL -UNIT H TYPE 4
U -Value TD Btu /hr
0.0885 x 49.0
0.4184 x 49.0
0.6500 x 49.0
47
0.75 AC x 49.0
TOTAL HOURLY HEAT LOSS FOR SPACE
Heating: 14741 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] _
page 19 of 22
70 F
21 F
49 F
_
_
910
1640
3886
2421
= 5885
14741
335 cfm
RESIDENTIAL SPACE COOLING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction Area
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
Infiltration: 1.00 x 0.018 x 1112 sqft x 8.0 ft x 0.75 AC x 2.0 = 240
Solar Gain Orient.
Double /Medium Blinds East [ 0.0 x 15 + 61.0 x 73] x 0.54
Double /Medium Blinds West [ 0.0 x 15 + 61.0 x 73] x 0.54
Internal Gain
Lighting
Equipment
Occupants
Latent Gain Op Frac.
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
Checked By
1ST FL -UNIT H TYPE 4
U -Value DETD Btu /hr
210.0 x 0.0877 x 1.6 =
80.0 x 0.4049 x 1.6 =
122.0 x 0.6179 x 2.0 =
Shaded Unshaded
Area SGF Area SGF SC Btu /hr
Op Frac. Area Heat Gain Conv.
1.00 x 1112.0 x 0.200 x 3.413
1.00 x 1112.0 x 0.200 x 3.413
1.00 x 1112.0 x 225 / 500
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE
Area Heat Gain Conv.
1.00 x 1112.0 x 0.000 x 3.413 = 0
1.00 x 1112.0 x 225 / 500 = 500
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
7306 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)]
page 20 of 22
COMPLY 24 v 3.10
Building Permit No
Date (User # 1184)
78 F
80 F
2 F
=
29
52
151
= 2408
= 2408
Btu /hr
759
759
500
7306
Btu /hr
500
294 cfm
" RESIDENTIAL SPACE HEATIN LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. C5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
SUPPLY AIR QUANTITY
2ND FL -UNIT H TYPE 4
page 21 of 22
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
R-13 Frame Wall 210.0 x 0.0885 x 49.0 = 910
Solid Wood Door 80.0 x 0.4184 x 49.0 = 1640
Double /Medium Blinds 122.0 x 0.6500 x 49.0 = 3886
R -30 BU Roof /Acoust Clg 1112.0 x 0.0343 x 49.0 = 1869
Infiltration: 1.00 x 0.018 x 1112 sqft x 8.0 ft x 0.75 AC x 49.0 = 5885
TOTAL HOURLY HEAT LOSS FOR SPACE 14190
Heating: 14190 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)].= 323 cfm
! RESIDENTIAL SPACE COOLING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. C5)
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction Area
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
R -30 BU Roof /Acoust Clg
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
U -Value
COMPLY 24
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT H TYPE 4
78 F
80 F
2 F
210.0 x 0.0877 x 1.6 =
80.0 x 0.4049 x 1.6 =
122.0 x 0.6179 x 2.0 =
1112.0 x 0.0335 x 22.0 =
Infiltration: 1.00 x 0.018 x 1112 sqft x 8.0 ft x 0.75 AC x 2.0 =
Solar Gain Orient.
Double /Medium Blinds East
Double /Medium Blinds West
Internal Gain
Lighting
Equipment
Occupants
Latent Gain Op Frac.
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
1.00
1.00
1.00
TOTAL HOURLY SENSIBLE
page 22 of 22
DETD Btu /hr
Shaded Unshaded
Area SGF Area SGF SC Btu /hr
[ 0.0 x 15 + 61.0 x 73] x 0.54 = 2408
[ 0.0 x 15 + 61.0 x 73] x 0.54 = 2408
Op Frac. Area
x 1112.0
x 1112.0
x 1112.0
Area
1.00 x 1112.0
1.00 x 1112.0
Heat Gain Conv.
x 0.200 x 3.413
x 0.200 x 3.413
x 225 / 500
HEAT GAIN FOR SPACE
Heat Gain Conv.
x 0.000 x 3.413
x 225 / 500
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
8126 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)] _
v 3.10
29
52
151
820
240
Btu /hr
759
759
500
8126
Btu /hr
327 cfm
0
500
500
Pit AN REVIEW COMME( TS
Plan Check No.: ` t ` � A \ .RoMewoat)
REQUIRED INSPECTIONS
1
Project:
11 11
l TES
C--
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
S All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high- strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14 Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
" 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1.
Footings
2.
Foundation
3.
Slab /Slab Insulation
4.
Shear Wall Nailing
5.
Roof Sheathing Nailing
6.
Masonry Chimney
7.
Framing
8.
Insulation
9.
Suspended Ceiling
10.
Wall Board '?le.4%.p on
11. rtSQut\N -1ti
1 2.
13.
X
14.
Fire Final
15.
Planning Final
16.
Public Works Final
X
17.
Building Final
Pit AN REVIEW COMME( TS
Plan Check No.: ` t ` � A \ .RoMewoat)
REQUIRED INSPECTIONS
1
Project:
11 11
l TES
C--
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
S All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high- strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14 Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done In conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
" 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
PLAN CHECK
NUMBER
`(I -ISS-M
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
PLAN REVIEW
PROJECT: OME W �T re C. I
ADDRESS:
DATE:
Sa
' A'
S tier.
I
1 N Ar M EN r4 tJ l C4 L CL.0 SE T
A1J Y C. C) AA. AA c tJ `TS
Su eta, #
5p'u P L t <r C. a �2t 1S
Prepared by:
6300 Southcenter Boulevard — #100
Tukwila Washington 98188