HomeMy WebLinkAboutPermit 0587-M - HOMEWOOD SUITES - D: .'j ,,b SU R TES
EL D
.::::::::::::]:::::!::
PHONE: 318-352-8238
UMC EDITION (YEAR: .8:
FIRE PROTECTION: InS•rinklers flDetectors •N/A
CONTRACTOR:
CONDITIONS (other than noted on or attached to permit/OM:
PROJECT NAME/TEN. k B. • t ew • o d Suites Hotel
Repair
q
APPROVED FOR BUILDING
ISSUANCE BY: "I OFFICIAL
DATE: / it
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating co ction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATURE: / /
DATE:
_
PRINT NAME: L ' M F-6
PO -- a A-
.g 77--F---e -1 1 7 /
COMPANY: —
PROEF.BELQWN_ERIDianansiguLaglzgiQament Co.
PHONE: 318-352-8238
SITE ADDRESS: 6945 Southcenter B1 #D
CONTRACTOR:
SUITE NO. E5
PROJECT NAME/TEN. k B. • t ew • o d Suites Hotel
Repair
VALUE OF WORK: . 5,500.00
Other:
TYPE OF WORK: 13 New/Addition Modifications
DESCRIPTION OF WORK: Install HVAC equipment.
PROEF.BELQWN_ERIDianansiguLaglzgiQament Co.
PHONE: 318-352-8238
ADE___21:1Ea$: 401Key_aar_Amemme. Natchitoches, LA
ZIP: 71457
PHONE: 714-632-5000
'ZIP: 92806
CONTRACTOR:
Energy Systems Technology, Inc.
3010 Coronado #11, Anaheim, CA
ADDRESS:
WA. ST. CONTRACTOR'S LICENSE NO. ENERGST099NN
'EXPIRATION DATE: 8-02-92
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
MECHANICAL
PERMIT NO. 0 1 — n
DATE ISSUED:
006'o
DATE DATE(S)
REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE ISSUED
1 - Rough-in/Vents/Ducts
2 - Fire Final
3 - Planning Final
4 -
X 5 - Mechanical Final
OTHER AGENCIES:
431-3670
575-4407
431-3680
431-3670
MECHANkAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
B Permit Fee
PlAtattokEozo;2222;L:,
TOTAL
Plan Check No.:
4143-
AMOUNT
$15.00
83.00
............................................
.
91-154-M
DATE
Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and Industries (277-7272)
permit:shall become nultand veld if the Work is net commenced days from the.dateo
issuance; if the4eril is suSpended or abandoned for a theriecl of 180 days from the last inSbActiOn:
PERMIT NO.
CONTACTED
L-a ( � � �
DATE READY
.
DATE NOTIFIED
f �� � Y � '.
�-- l c (init.) -pfs3
PERMIT EXPIRES
i,
2nd NOTIFICATION
BY:
(init.)
AMOUNT OWING
t 1 a • 5
C�'�
3RD NOTIFICATION
BY:
(init.)
MECHANICS ", PERMIT
APPLICATION TRACKING
PLAN CHECK
NUMBER
gI1St
BUILDING - %b- 9/5-1q(
initial review (ROUTED)
(_ I INIT 1
FIRE
❑ PLANNING
❑ OTHER
BUILDING -
final •aviAw 1,
REVIEW COMPLETED
PROJECT NAME
SITE ADDRESS
INIT:
R O
INIT:
INIT:
Fkonr∎•aWcc) 60
SUITE NO.
t LLIS f3o l lkt11C_-•2 )'e'
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests'for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
CONSULTANT:
ZONING:
SCREENING REQUIRED? fYes
REFERENCE FILE NOS.:
UMC EDITION (year):
3EQ UIR ; EME
Date Sent -
n
No
CtM.M
Date Approved
FIRE PROTECTION: (iSprinklers Detectors N/A
FIRE DEPT. LETTER DATED: f l - ' 9- J/ INSPECTOR: ) 9
IBAR/LAND USE CONDITIONS?
)Yes
[iNo
08/17/90
PROPERTY OWNER �' . (� ri )av\
(
P-- (..'31-
S`Z3a'
ZI� t
5o00
ADDRESS u'Ot - t-'-
N a k-c�'t�" „..0 ?�� 6
r
CONTRACTOR 2 „, w., 1 Lv-o Vic_.__
ADDRESS oo
?j hl vv.co =S-_
EXP AT -
ZIP
WA. ST. CONTRACTOR'S LICENSE # 't~ N e R G.-5T. O ck g N N
:::::DESCRIPTION
:AMOUNT:
RCPT.#
::::.:::::::DATE:::::: :.
BASIC! PERMIT: FEE
$15 :00 '
UNIT(S) FEE
PLAN: CHECK :FEE
c't :
OTHER
TOTAL < .
&Q.; ,.
CITY OF TUKWILA
Department of Community Development - Building
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER
g1
APPLICATION MUST BE FILLED OUT COMPLETELY
SITE_iDDRESS --') SUITE #
vA . Csj►
PROJECT NAME/TENANT
TYPE OF WORK:
DESCRIBE WORK TO BE DONE:
BUILDING USE (office, warehouse, etc.)
Jam(
NATURE OF BUSIINESp:
WILL THERE BE A CHANGE IN USE?
..EREBY.CERI
T
U E; 1ND C:ORRRI
cA 00 ■ W
i New /Addition O Modifications 0 Repair 0 Other:
SIGNATU
Division
TING/SIZE
No O Yes IF YES, EXPLAIN:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? No 0 Yes IF YES, EXPLAIN:
I?. AN D;: EXAMINED: :APPLICATI ON
HORIZ TO: APP F.OR r' I ' ER
BUILDING OWNER
OR PRINT NAME Ja 0
AUTHORIZED mil,
AGENT ADDRESS
3.0 (o Ca -4 0MarL 4k- H
CONTACT PERSON
MECHAI. CAL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out
and attached to this application.
FEES (for staff use only)
VALUE OF CONSTRUCTION - $
NUMBEROFIJNETS
PHONE A, e
CITY 4 7 �P b
PHONE - 6.32. - Skrua
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
plans must be complete in order to be accented for Plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
DATE APPLICATION ACCEPTED DATE APPLICATION EXPIRES
DESCRIPTION
UNIT COST
NO OF
UNITS
x
TOTAL
COST
BASIC FEE
$15.00
$4.50
SUPPLEMENT PERMIT FEE
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu /h.
$9.00
X
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
x
3
Installation or relocation of each floor furnace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included in an appliance permit.
$4.50
x
6
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
7
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9.00
2
X
Ig
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu /h.
$22.50
X
10
Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
X
s
i
13
Each air - handling unit over 10,000 cfm.
$11.00
x
14
Each evaporative cooler other than a portable type.
$6.50
X
15
Each ventilation fan connected to a single duct.
$4.50
bt
X
16
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
/ 3
17
Installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$11,00
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
X
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
X
O8! 1 WOO
SUBTOTAL
CI DO
PLAN CHECK FEE (25% of
subtotal)
aq .
GRAND TOTAL
$1aa. -
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHANC:..;AL PERMIT
FEE WORKSHEET
INSTRUCTIONS • - C the :worksheet,
• indicating the number of units being
nstalled in each: category :At time of
ubmittal, 'staff will calculate the fees.
CITY OF TUKWILA
6200 SOUTH CENTER (BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91- 154 -M: Homewood Suites Hotel
6945 Southcenter B1 #D
PHONE N (206) 433.1800 Gary L. VanDunn, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PARS' _„Q APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER tT .
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (872-
6363).
3. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
4. Maintain 1 -hour fire- resistive assemblies.
5. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
6. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1991 Edition), and
Washington State Regulations for Barrier Free Facility
(1989 Edition).
7. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for, or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188 -7661
(206) 575 -4404
Fire Department Review
Control #91 -151M through #91 -155M (5 letters)
(513)
Gary L. VanDusen, Mayor
Re: Homewood Suites, Bldg. #A - 6915 Southcenter Blvd.,
Bldg. #B - 6925 Southcenter Blvd., Bldg. #C - 6935
Southcenter Blvd., Bldg. #D - 6945 Southcenter Blvd., Bldg.
#E - 6955 Southcenter Blvd.
Dear Sir:
September 10, 1991
The attached set of building plans have been reviewed by
The Fire Prevention Bureau and are acceptable with the
following concerns:
1. Maintain sprinkler protection for all enclosed areas.
(NFPA 13, 4- 1.1.1) (UFC 10.302)
All sprinkler drawings shall be prepared by companies
licensed to perform this type of work. Drawings shall
first be approved by the Washington Survey & Rating
Bureau, Factory Mutual Engineering or Industrial Risk
Insurers, then by the Tukwila Fire Department. No
sprinkler work shall commence without approved
drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1)
(UFC 10.305)
2. H.V.A.C. units rated at 2,000 cfm require
auto - shutdown devices. These devices shall be separately
zoned in the alarm panel and local U.L. Central Station
supervision is required.
This is a requirement for the supervision of detectors
already required by the mechanical code.
.^...v 0:1:77r Trtrr..Mear7M7,7 7:M ITOT T,;t7 A MM :fiMM IV:W rtk
FINALAPP,FRM
City of Tukwila
FIRE DEPARTMENT
444 Andover Park East
Tukwila, Washington 98188-7661
(206) 575-4404
Project Name
TUKWILA FIRE DEPARTMENT
FINAL APPROVAL FORM
/Retain current inspection schedule
Needs shift inspection
,"proved without correction notice
Approved with correction notice issued
Sprinklers:
Fire Alarm:
Hood & Duct:
Ha on: 4/
Monitor:
Pre-Fire:
Permits:
oz9
F
/ )
Authorized Signature Date
:::',
Gary L. VanDusen, Mayor
Control No.
Permit No. e) , g
- // ?e!
,e 5v ic
Address ‘9 .), b p i Suite #
•
T.F.D. Form F.P. 85
Project:
401
1i'or� K -P/
Type of Inspection:
Date Called:
D
�
Address:
Special Instru ions:
Date Wanted: 2
--
��� Z
J
am.
m.
Requester:
Phone No.:
0.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
Approved per applicable codes.
INSPECTION RECORD (
Retain a copy with permit
c 7
PERMT N0.
(206) 431 - 3670
❑ Corrections required prior to approval.
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Dale:
COMMENTS:
ype o nspe on:
i , MIIII
lif V6MIIIMMFVAIfialeMll
44 A '''
Spec al Ins ructions:
Date anted:
— 0/ am. ill
Requester:
IFININAMZWA
0 Fl" ■-- C-6 \ L.- u. 1.—) \ Tt
1.-MA A lit—E:
c e ' -- g ack ps
h o pribv._-ct e tt.1
A-P' 12,. win__
?
2)
Vl WrgY1-1 ,-.1 -0-EZ •
KJ
.
,
,
.
r.-•
f
c- 1:
ia'Aiff-0600
70.M i
ype o nspe on:
i , MIIII
lif V6MIIIMMFVAIfialeMll
44 A '''
Spec al Ins ructions:
Date anted:
— 0/ am. ill
Requester:
IFININAMZWA
SPE 10 0.
Inspector:
INSPECTION RECORD C
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
osgq
PERM' NO.
(206) 431-3670
0 Approved per applicable codes. - 'borrctioif requtred prior to approval.
Date:
0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Dale:
776rea:
ct I) e p - s ma_ t e.. -7 7 - 1771We
o Inspection:
ion: 111411.,6.e.
Date Called: I 0 _ 1 —q /
Address: g tie) iuwacosista31
fri
Special
Date Wanted:
(0 c;0 1/am. Jo,
Requester:
.
Phone No.: q
6 L ... y ..a....._,
•
Inspector:
O itigisEcTioN RECORD C
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
yg, Approved per applicable codes. 0 Corrections required prior to approval.
0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
0:
(206) 431-3670
DATE
- (3
CITY OF TUKWILA
6300 SOUTHCENTER BOULEVARD
TUKWILA, WA 98188
* * REVISION SUBMITTAL * *
PROJECT NAME WO OA ( S
ADDRESS Cv 9/5 (A33 S. - i0`�
SHEET NUMBER(S) / ► l 3, - 6 - 7
"Cloud" or highlight all areas of revisions and date revisions.
RECEIVED
CITY OF TUKWIIA
SEP 1 3 1991
PERMIT CENTER
CONTACT PERSON C,}'2 T S 04 ( 77-)" PHONE 4 q 441 4
ARCHITECT OR ENGINEER
PERMIT NUMBER (If previously issued)
PLAN CHECK NUMBER qt- t -I r th rU 0 �' 1 664
TYPE OF REVISION: I- C -&77c 0 !" /91C- w/ f
SUBMITTED TO:
•ff".tand that the Pt:,3n Check aovr("'
PROJECT DESIGNER:
OWNER:
REPORT PREPARED BY:
Job Number: 91065
Date: 8 /16/1991
TITLE 24 REPORT FOR:
Homewood Suites Hote]. (BLDG. E5)
Tukwila, Washington
Dimitri Demopulos Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
Dimension Development Company Inc.
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
RECEIVED
CIN nF TI IKWILA
AUG 2 2 1991
PERMIT CENTER ..
The COMPLY 24 computer program has been used to perform the calculations
summarized in this compliance report. This program has interim approval
and is authorized by the California Energy Commission for use with the
Second Generation Nonresidential Building Energy Efficiency Standards
for Nonresidential Occupancies. Second Generation Residential Occupancies
shown to comply with this program conform to the results produced by the
Public Domain Point System, developed by the California Energy Commission.
This program developed by Gabel Dodd Associates (415) 428 -0803.
Table Of Contents for Title 24 Report
Cover Page
Table of Contents
Form CF-1R Certificate of Compliance: Residential
Form CF -3 Construction Assemblies .............
Form CF -4 HVAC Summary
HVAC Zone & Space Loads Summary ... ....'........... .....' 13
6
12
CERTIFICATE OF COMPLIAN
Residential (part 1 of 3c
.Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
PROJECT ADDRESS Job #: 91065
Tukwila, Washington
GENERAL INFORMATION
Compliance Method: Point System
Climate Zone: 1
Total Conditioned Floor Area: 5032 sqft
Building Occupancy: Multi - Family
Front Entry Orientation: West
Number of Dwelling Units: 8
Floor Construction Type: Slab
Infiltration Control: Standard
BUILDING SHELL INSULATION
Component Area U -Value Location /Comments
CF -1R page 3 of 17
THERMAL MASS Thick
Mass Material Area (in) Type Location /Description
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
R -13 Frame Wall 1492 0.0885 1ST FL -UNIT F TYPE 4
R -13 Frame Wall 1492 0.0885 2ND FL -UNIT F TYPE 4
R -30 BU Roof /Acoust Clg 2516 0.0343 2ND FL -UNIT F TYPE 4
Carpeted Slab 2516 0.7200 1ST FL -UNIT F TYPE 4 /Insul= R -0.0
Concrete, Heavyweight 2516 4.000 Covered 1ST FL -UNIT F TYPE 4 /Int Mass
CERTIFICATE OF COMPLIAN : Residential (part 2 of 3
.Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
GLAZING
Location Orient Area
SHADING (for Glazing above)
Location Exterior Device
1ST FL -UNIT F TYPE 4
50 % Bug Screen
50 % Bug Screen
2ND FL -UNIT F TYPE 4
50 % Bug Screen
50 % Bug Screen
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
1ST FL -UNIT F TYPE 4
East 88.0 Double 0.65 0.88 0.64
West 88.0 Double 0.65 0.88 0.64
2ND FL -UNIT F TYPE 4
East 88.0 Double 0.65 0.88 0.64
West 88.0 Double 0.65 0.88 0.64
Over
SC hang
0.84 0.0
0.84 0.0
0.84 0.0
0.84 0.0
CF -1R page 4 of 17
COMPLY 24 v 3.10
Building Permit No
Checked By
Glass w /Int
Type U -Val SC Shade Description
Date (User # 1184)
Double /Medium Blinds
Double /Medium Blinds
Double /Medium Blinds
Double /Medium Blinds
Framing Type
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
Metal w/o Mullions
CERTIFICATE OF COMPLIANCE: Residential (part 3 of 3)
.Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
HVAC SYSTEMS Minimum Output Duct
System Type Efficiency (Btuh) Location
Zone Furnace Max:
Cooling Exception:
HOT WATER SYSTEMS
System Type
Gas Fired
License No:
Signed:
(Date)
DOCUMENTATION AUTHOR
Jason C. Tsou /J.T. Engineering Services
1641 W. Main St. Ste # 410
Alhambra, Ca. 91801
(818) 281 -9894 Lic. Expire: 12/31/91
Signed:
(Date)
Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Tank Manufacturer /Model No.
Volume (or approved equal)
50.0 Std Gas 50 gal or less
SPECIAL FEATURES /REMARKS (Add extra sheets if necessary)
Signed:
Signed:
CF -1R
COMPLY 24 v 3.10
Checked By
page 5 of 17
Building Permit No
Date (User # 1184)
Duct Manufacturer /Model No.
RVal (or approved equal)
Heat Pump 6.800 HSPF 10200 Vent. Attic Space 4.2 EMI MH4D2 /CHX12
Heat Pump 9.500 SEER 11500 Vent. Attic Space
1.3 x [ 60841 Btuh + (10 x 5032 sqft)] = 144509 Btuh
CFM Cooling (see Load Calcs) requires Btuh
# of Energy R -12
Sys Credits Blanket
8 0 Y
COMPLIANCE STATEMENT
This Certificate of Compliance lists the building features and performance
specifications needed to comply with Title 24, Chapter 2 -53 and Title 20,
Chapter 2, Subchapter 4, Article 1 of the California Administrative Code.
This certificate has been signed by the individual with overall design
responsibility and the building owner, who shall retain a copy of it and
transmit the certificate to any subsequent purchaser of the building. When
this Certificate of Compliance is submitted for a single building plan to
be built in multiple orientations, all building conservation features which
vary are indicated in the Special Features /Remarks section.
DESIGNER BUILDING OWNER
Dimitri Demopulos Inc. Dimension Development Company Inc.
7277 Regency Square Blvd. # 100
Huston, Texas 77036
(713) 783 -0055
ENFORCEMENT AGENCY
Name:
Agency:
Telephone:
(Date)
(Date)
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (BLDG. E5)
Designer:. Dimitri Demopulos Inc.
Location: Washington- Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: R -13 Frame Wall
Assembly Type: Wall
Assembly Tilt: 90 deg (Vertical)
Construction Components
Outside Air Film
1. Stucco
2. Membrane, Vapor - Permeable Felt
3. Insulation, Mineral Wool, R -13
4. Gypsum or Plaster Board
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 15.0 %
Framing Material: Softwood, Douglas Fir -Larch
Sketch of Construction Assembly
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
•
0.70
Wood Shingles
12.3 lb /sqft
2.88
Date: 8/16/1991
R -Value
U -Value
Total
CF -3
page 6 of 17
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25
0.875 0.17
0.010 0.06
* 3.500 13.00
0.500 0.45
0.68
14.61
0.17
0.17
0.06
13.00
0.45
0.68
14.53
Calculation for Framing Adjustment
Summer U -Value
0.0684 x 0.85 + 0.1969 x 0.15 = 0.0877
Winter U -Value
0.0688 x 0.85 + 0.2000 x 0.15 - 0.0885
OVERALL VALUES ADJUSTED FOR FRAMING
11.40 11.30
0.0877 0.0885
==_=== ==_ = ==
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: R -30 BU Roof /Acoust Clg
Assembly Type: Roof
Assembly Tilt: 0 deg (Horizontal Roof)
Construction Components
Outside Air Film
1. Roofing, Built -Up
2. Plywood
3. Insulation, Mineral Wool, R -30
4. Air Space
5. Acoustical Tile, Wood or Cane Fiber
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 10.0 %
Framing Material: Softwood, Douglas Fir - Larch
Sketch of Construction Assembly
Absorptivity:
Roughness: Stucco,
Weight:
Heat Capacity:
0.70
Wood Shingles
7.8 lb /sqft
2.46
Date: 8/16/1991
R -Value
U -Value
Total
Summer
0.0291 x 0.90 + 0.
Winter
0.0297 x 0.90 + 0.
CF -3 page 7 of 17
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Fr (in) Summer Winter
0.25
0.375 0.33
0.500 0.63
* 9.500 30.00
6.000 1.00
0.500 1.19
0.17
0.33
0.63
30.00
0.93
1.19
0.92 0.61
34.31 33.73
Calculation for Framing Adjustment
U -Value
0729 x 0.10 = 0.0335
U -Value
0762 x 0.10 = 0.0343
OVERALL VALUES ADJUSTED FOR FRAMING
29.84 29.15
0.0335 0.0343
=== = == __=__=
cl CONSTRUCTION ASSEMBLY CO PLIANCE FORM
'Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri. Demopulos Inc.
Location: Washington-Seattle
Documentation: Jason C. Tsou/J.T. Engineering Services
Assembly Name: R-19 Raised Floor
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Construction Components
Outside Air Film
• 1. Insulation, Mineral Wool, R-19
2. Plywood
3. Flooring, Carpet and Fibrous Pad
4.
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 10.0 %
Framing Material: Softwood, Douglas Fir-Larch
Sketch of Construction Assembly
Absorptivity:
Roughness: Clear Pine
Weight:
Heat Capacity:
0.70
3.9 lb/sqft
1.27
Date: 8/16/1991
R-Value
U-Value
Total
Summer
0.0440 x 0.90 + 0.
Winter
0.0436 x 0.90 + 0.
Checked By
0.25
* 6.000 19.00
0.625 0.78
0.250 2.08
(-,
CF-3 page 8 of 17
COMPLY 24 v 3.10
Building Permit No
Date (User # 1184)
Th R-Value
Fr (in) Summer Winter
0.17
19.00
0.78
2.08
0.61 0.92
22.72 22.95
Calculation for Framing Adjustment
U-Value
1035 x 0.10 = 0.0500
U-Value
1011 x 0.10 = 0.0493
OVERALL VALUES ADJUSTED FOR FRAMING
20.02 20.27
0.0500 0.0493
====== M1=====
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
`Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: Carpeted Slab
Assembly Type: Floor
Assembly Tilt: 180 deg (Horizontal Floor)
Outside Air Film
1. Concrete, 140 ib, Not Dried
2. Flooring, Carpet and Fibrous Pad
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
•
Absorptivity: 0.70
Roughness: Concrete, Asph. Shingles
Weight: 40.9 lb /sqft
Heat Capacity: 9.01
R -Value
Total
CF -3 page 9 of 17
COMPLY 24 v 3.10
3.500
0.250
Building Permit No
Checked By
Date (User # 1184)
Th R -Value
Construction Components Fr (in) Summer Winter
0.25
0.28
2.08
0.17
0.28
2.08
0.61 0.92
3.22 3.45
OVERALL VALUES ADJUSTED FOR FRAMING
3.22 3.45
U -Value 0.3106 0.2899
_ = = =__ =_ = = ==
CONSTRUCTION ASSEMBLY C0.LCJLIANCE FORM
Assembly Name: Solid Wood Door
Assembly Type: Door
Assembly Tilt: 90 deg (Vertical)
Outside Air Film
1. Hardwood, Maple
2.
3.
4.
5.
6.
7.
8.
9.
Inside Air Film
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Absorptivity:
Roughness: Clear Pine
Weight:
Heat Capacity:
Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Th R -Value
Construction Components Fr (in) Summer Winter
0.70
6.1 lb /sqft
2.39
R -Value
Total
CF -3 page 10 of 17
1.750
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
0.25 0.17
1.54 1.54
0.68 0.68
2.47 2.39
OVERALL VALUES ADJUSTED FOR FRAMING
2.47 2.39
U -Value 0.4049 0.4184
m===esa ama= ==
CONSTRUCTION ASSEMBLY COMPLIANCE FORM
Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Assembly Name: Double /Medium Blinds
Assembly Type: Glazing
Th R -Value
Construction Components Fr (in) Summer Winter
Outside Air Film
1. CEC Double Glazing
2.
3.
4.
5.
6.
7.
8
9.
Inside Air Film 0.68 0.68
Framing Percentage: 0.0 %
Framing Material: NONE
Sketch of Construction Assembly
Winter Shading Coefficient: 0.88
Summer Shading Coefficient: 0.64
R -Value
U -Value
Total
CF -3 page 11 of 17
0.500
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
0.25 0.17
0.69 0.69
1.62 1.54
OVERALL VALUES ADJUSTED FOR FRAMING
1.62 1.54
0.6179 0.6500
HVAC EQUIPMENT SUMMARY FORM
'roject: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC EQUIPMENT SUMMARY BY ZONE
No HVAC Zone
FAN ENERGY
HVAC System
FAN WATTAGE INDEX
No. Heating Cooling
HVAC System (WS -4) Sys KBtu Eff KBtu Eff
Totals 0 KBtu 0 KBtu
No. Motor Drive Conv No. Fan
Sys BHP Eff. Eff. Fact Fans Watts
Total 0
0 watts / 0 sgft a 0.000 watts /sqft
CF -4 page 12 of 17
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
HVAC ZONE HEATING & COOLING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
HVAC ZONE DESCRIPTION
HVAC Zone Name:
Heating System Name:
Cooling System Name:
System Multiplier:
Heating Schedule:
Cooling Schedule:
Fan Schedule:
Peak Load Method:
Relative Humidity:
SPACES IN THIS ZONE
1ST FL -UNIT F TYPE 4
2ND FL -UNIT F TYPE 4
Bypass
Supply
Supply
Supply
Ventilation Air
Duct Conduction
Duct Leakage
Fan Heat Gain
Ventilation
Return Air Lighting Gain
Return Duct Conduction
Return Duct Leakage
Return Fan Heat Gain
PEAK
(Jan 12am)
(Jan 12am)
TOTAL SPACE LOAD
O cfm)
EFFECTIVE SPACE LOAD
O cfm)
TOTAL SYSTEM LOAD
SYSTEM PERFORMANCE
AT DESIGN CONDITIONS
Date: 8/16/1991
37298 (Aug 2pm) 12536
31258 (Aug 2pm) 14391
68556 26927
page 13 of 17
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
UNIT F
EMI MH4D2 /CHX12
8
Residential Heating
Residential Cooling
Residential HVAC & Fans
NONCOINCIDENT
50 %
COOLING
HEATING PEAK SENSIBLE LATENT
O ( 0 cfm) 0
O 0
O 0
-7715 7715
60841 34642 2264
O ( 0 cfm) 0 -0
0
O 0
O 0 0
-0 0
60841 34642 2264
2.9 tons 0.2 tons
48076 73578 22891
6.1 tons 1.9 tons
1132
1132
2264
-0
0
RESIDENTIAL SPACE HEATING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
Carpeted Slab
SUPPLY AIR QUANTITY
Perim =
Date: 8/16/1991
Area
1492.0 x
80.0 x
176.0 x
218.5 x
Infiltration: 1.00 x 0.018 x 2516 sqft x 8.0 ft x
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
1ST FL -UNIT F TYPE 4
U -Value TD Btu /hr
gm* OWN MINN AM*
0.0885 x 49.0 = 6469
0.4184 x 49.0 = 1640
0.6500 x 49.0 = 5605
47 = 10270
0.75 AC x 49.0 = 13315
TOTAL HOURLY HEAT LOSS FOR SPACE
Heating: 37298 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)]
page 14 of 17
70 F
21 F
49 F
37298
848 cfm
RESIDENTIAL SPACE COOLINGLOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
Area
1492.0 x
80.0 x
176.0 x
Infiltration: 1.00 x 0.018 x 2516 sqft x 8.0
Solar Gain Orient.
Double /Medium Blinds East
Double /Medium Blinds West
Internal Gain
Lighting
Equipment
Occupants
Latent Gain Op Frac.
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
Op Frac. Area
TOTAL HOURLY SENSIBLE
Date: 8/16/1991
Shaded Unshaded
Area SGF Area SGF SC
[ 0.0 x 15 + 88.0 x 73] x 0.54 = 3473
[ 0.0 x 15 + 88.0 x 73] x 0.54 = 3473
Area
1.00 x 2516.0
1.00 x 2516.0
1ST FL -UNIT F TYPE 4
U -Value
COMPLY 24
Checked By
0.0877 x 1.6
0.4049 x 1.6
0.6179 x 2.0
ft x 0.75 AC x
Heat Gain Conv.
1.00 x 2516.0 x 0.200 x 3.413
1.00 x 2516.0 x 0.200 x 3.413
1.00 x 2516.0 x 225 / 500
HEAT GAIN FOR SPACE
Heat Gain Conv.
x 0.000 x
x 225 /
TOTAL HOURLY LATENT HEAT GAIN FOR SPACE
12536 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)]
page 15 of 17
Building Permit No
Date (User # 1184)
3.413
500
78 F
80 F
2 F
DETD Btu /hr
2.0 a 543
v 3.10
209
52
217
Btu /hr
Btu /hr
1717
1717
1132
12536
Btu /hr
0
1132
1132
505 cfm
RESIDENTIAL SPACE HEATING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington- Seattle Date: 8/16/1991
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Winter Dry Bulb Temperature:
Design Temperature Difference:
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
R -30 BU Roof /Acoust Clg
SUPPLY AIR QUANTITY
2ND FL -UNIT F TYPE 4
page 16 of 17
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
70 F
21 F
49 F
Conduction Area U -Value TD Btu /hr
1492.0 x 0.0885 x 49.0 = 6469
80.0 x 0.4184 x 49.0 = 1640
176.0 x 0.6500 x 49.0 = 5605
2516.0 x 0.0343 x 49.0 = 4229
Infiltration: 1.00 x 0.018 x 2516 sqft x 8.0 ft x 0.75 AC x 49.0 = 13315
TOTAL HOURLY HEAT LOSS FOR SPACE 31258
Heating: 31258 Btu /hr / [1.10 * (105 F Supply - 65 F TStat)] = 710 cfm
C
RESIDENTIAL SPACE COOLING LOAD SUMMARY
Project: Homewood Suites Hotel (BLDG. E5)
Designer: Dimitri Demopulos Inc.
Location: Washington - Seattle
Documentation: Jason C. Tsou /J.T. Engineering Services
Space Name:
Design Indoor Dry Bulb Temperature:
Design Outdoor Summer Dry Bulb Temperature:
Design Temperature Difference:
Conduction
R -13 Frame Wall
Solid Wood Door
Double /Medium Blinds
R -30 BU Roof /Acoust Clg
Solar Gain
Double /Medium Blinds
Double /Medium Blinds
Internal Gain
Lighting
Equipment
Occupants
Latent Gain
Equipment
Occupants
SUPPLY AIR QUANTITY
Cooling:
Area
Shaded
Orient. Area SGF
East [ 0.0 x 15 +
West [ 0.0 x 15 +
Op Frac. Area
1.00
1.00
1.00
Op Frac. Area
Date: 8/16/1991
COMPLY 24 v 3.10
Building Permit No
Checked By
Date (User # 1184)
2ND FL -UNIT F TYPE 4
78 F
80 F
2 F
U -Value DETD Btu /hr
1492.0 x 0.0877 x 1.6 =
80.0 x 0.4049 x 1.6 =
176.0 x 0.6179 x 2.0 =
2516.0 x 0.0335 x 22.0 =
Infiltration: 1.00 x 0.018 x 2516 sqft x 8.0 ft x 0.75 AC x 2.0 = 543
x 2516.0 x
x 2516.0 x
x 2516.0 x
Unshaded
Area SGF SC Btu /hr
88.0 x 73] x 0.54 = 3473
88.0 x 73] x 0.54 = 3473
Heat Gain
0.200 x
0.200 x
225 /
TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE
1.00 x 2516.0 x 0.000 x
1.00 x 2516.0 x 225 /
TOTAL HOURLY LATENT HEAT GAIN FOR
14391 Btu /hr / [1.08 * ( 78 F TStat - 55 F Supply)]
page 17 of 17
209
52
217
1855
Conv. Btu /hr
3.413 =
3.413 =
500 =
1717
1717
1132
14391
Heat Gain Conv. Btu /hr
3.413 = 0
500 = 1132
SPACE
1132
579 cfm
PLAN CHECK
NUMBER
9 ki 5
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
PROJECT:
ADDRESS:
DATE:
S EE;
it A
t PLAN REViEW
gome w OnI'i1 SurrE"
AtzY Comma 1-YTS
• .p t. e— CnYJ C E i21.bS
Prepared by:
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
1 �
AN CALL U Nl�'5 "F-OZ NE.,47 -- nA'5
0.3 A. SnA,4 t.� M �,c.� r4 �.1 t C � L C.LCS E T
u l L.1=4 Qua # L r.
Plan Check
2_
2
Ft AN REVIEW COMME( TS , �
No.:Cl (` l9A Project: . kpMEWOM) JJVC's
REQUIRED INSPECTIONS
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
S All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high- strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14 Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1.
Footings
2.
Foundation
3.
Slab /Slab insulation
4.
Shear Wall Nailing
5.
Roof Sheathing Nailing
6.
Masonry Chimney
7.
Framing
8.
Insulation
9.
Suspended Ceiling
10.
Wall Board {le■Au'm
r p \
11. [" 6utN `'1In
12.
13.
14.
Fire Final
15.
Planning Final
16.
Public Works Final
}�
17.
Building Final
Plan Check
2_
2
Ft AN REVIEW COMME( TS , �
No.:Cl (` l9A Project: . kpMEWOM) JJVC's
REQUIRED INSPECTIONS
No changes will be made to the plans unless approved by the Architect
and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296 - 4722).
Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
S All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high- strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
12. Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
14 Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is in addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.