HomeMy WebLinkAboutUtilities 2012-11-14 Item 2A - Review - 2012 Surface Water Comprehensive PlanCit y of Tuk
Jim Haggerton, Mayot
TO
FROM:
:1
DATE: November 9, 2012
SUBJECT: Surface Water Comprehensive Plan
Project No. 91041202
2012 Surface Water Comprehensive Plan for Review
ISSUE
Review the draft 2012 Surface Water Comprehensive Plan.
BACKGROUND
The City hired CH2M Hill to update our Surface Water Comprehensive Plan (SWCP) to reflect
changes in regulatory requirements and drainage needs within the City. The current SWCP was
completed in 2003 and does not reflect changes in regulations required under the City's
National Pollutant Discharge Elimination System Permit, our current GIS inventory, completed
CIP projects, the Tukwila South annexation area, nor newly identified needs.
DISCUSSION
The SWCP is being presented to the Committee for review and comment. Chapter 5 was
reviewed previously and covered the proposed changes to the CIP. This review will be a page
by page review starting at the beginning of the plan.
Once the plan has been reviewed, staff will complete a final draft, obtain a SEPA determination,
and bring the SWCP forward for final review and Council approval by resolution.
RECOMMENDATION
Information only..
WAPW Eng1PR0JECT8tA- DR ProiectslSurface Water Camp Ptan t91041202;r Info Memo -Draft Plan for Review 2 gl 11- 9- 12dccx