Loading...
HomeMy WebLinkAboutUtilities 2012-11-14 Item 2A - Review - 2012 Surface Water Comprehensive PlanCit y of Tuk Jim Haggerton, Mayot TO FROM: :1 DATE: November 9, 2012 SUBJECT: Surface Water Comprehensive Plan Project No. 91041202 2012 Surface Water Comprehensive Plan for Review ISSUE Review the draft 2012 Surface Water Comprehensive Plan. BACKGROUND The City hired CH2M Hill to update our Surface Water Comprehensive Plan (SWCP) to reflect changes in regulatory requirements and drainage needs within the City. The current SWCP was completed in 2003 and does not reflect changes in regulations required under the City's National Pollutant Discharge Elimination System Permit, our current GIS inventory, completed CIP projects, the Tukwila South annexation area, nor newly identified needs. DISCUSSION The SWCP is being presented to the Committee for review and comment. Chapter 5 was reviewed previously and covered the proposed changes to the CIP. This review will be a page by page review starting at the beginning of the plan. Once the plan has been reviewed, staff will complete a final draft, obtain a SEPA determination, and bring the SWCP forward for final review and Council approval by resolution. RECOMMENDATION Information only.. WAPW Eng1PR0JECT8tA- DR ProiectslSurface Water Camp Ptan t91041202;r Info Memo -Draft Plan for Review 2 gl 11- 9- 12dccx