Loading...
HomeMy WebLinkAboutPermit M94-0060 - TRC INC• ( TRc, rklc. m Permit No: M94 -0060 Type: B -MECH Category: NRES Address: 946 INDUSTRY DR Location: Parcel #: 252304 -9015 Contractor License No: TRCIN * *171CN TENANT TRC, INC. 946 INDUSTRY DR, TUKWILA, WA 98188 OWNER KOLL BUSINESS CENTER 601 STRANDER BLVD, TUKWILA WA 98188 CONTRACTOR TRC, INC. 946 INDUSTRY DRIVE, TUKWILA, WA 98188 CONTACT ROBERT MCELFRESH 946 INDUSTRY DR, TUKWILA, WA 98188 UMC Edition: 1991 Signature:_ Print Name:1 1/4' MECHANICAL PERMIT Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 ******************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Permit Description: REMOVE EXISTING SPLIT SYSTEM EQUIPMENT AND INSTALL NEW ROOFTOP UNITS. Valuation: Total Permit Fee: ****** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Status: ISSUED Issued: 04/28/1994 Expires: 10/25/1994 Suite: Phone: 206 575 -0711 Phone: 206 575 -0711 5,600.00 30.00 Permit Center Authorized Signature Date I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain t h i s lding 'e t. Date : m t, Title:_ (206) 431-3670 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the. work is suspended or abandoned for a period of 180 days from the last inspection. AMOUNT OWING: 1030.00 CONTACTED Ethel* DATE NOTIFIED LI D. ( 4 BY: (init.) BY: (init.) 2nd NOTIFICATION 3RD NOTIFICATION BY: (init.) PLAN CHECK NUMBER YYPILI INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that the status of the project may be ascertained at any time. • Plan corrections shall be completed and approved prior to sending to the next department. • Any conditions or requirements for the permit shall be noted in the Sierra system or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ", date and initial. DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. DEPARTMENT BUILDING - initial review O FIRE O PLANNING 0 OTHER BUILDING - final review BUILDING OFFICIAL CITY OF TUKL ' A Department of bommunity Development — Permit Center 6300 Southcenter Boulevard - #100, Tukwila, WA 98188 (206) 431 -3670 Mechanical Permit Application Tracking PROJECT NAME SITE ADDRESS GI Lilo Inc). u e-tvy DY SUITE NO. DATE „IN 14-QD-cw REVIEW COMPLETED APPROVED::;: INIT: INIT: INIT: ROU ED) INIT: KC- 9 / 4 / INIT: CONSULTANT: ZONING: UMC EDITION (year): Date Sent - FIRE DEPT. LETTER DATED: SCREENING REQUIRED? 0 Yes 0 No REFERENCE FILE NOS.: Date Approved - FIRE PROTECTION: U Sprinklers U Detectors N/A INSPECTOR: BAR/LAND USE CONDITIONS? U Yes U 01/07/93 SITE ADDRESS SUITE # 9 2. ct, 4c. L to UbulTn-; OR, w VALU OF CONSTRUCT ON - $ 51(e)e) ASSESSOR ACCOUNT # 2 D2.304 -cio I -dam PROJECT AME/TENANT ' — n26 i I Yr,G , - OFFA&6 12.G t A07e1 -- TYPE OF WORK: ❑ New /Addition K Modifications ❑ Repair ❑ Other: DESCRIBE WORK TO BE DONE: . . 1 t✓ RCJi G 6 t ra`rj j 4F L (l t'S (. e-( &2u P -Z . - teU) )P ©lam ( kj m - ... ....... CONTRACTOR "C' 7� I 1\z. PHONE J3 , ..Q I l EXP. DATE ( ZIP tg��a 7 / c, BUILDING USE (office, warehouse, etc.) , PP/G6 NATURE OF BUSINESS: M 1-64i1 L, 17G6 P 11 c 1, 64:34.)77 . Td12 * 44-,u AEG, - .roc, WILL THERE BE A CHANGE IN USE? No ❑ Yes IF YES, EXPLAIN: WILL THERE BE TORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? IF YES, EXP . Tt No ❑ Yes PROPERTY OWNER V..,0 l.�lr M,��� --1 e ,tG PHONE 1 %6 4 6 -4 cc a AS :: E . IC P RMIT F E•>«< >i ZIP c >r (' � ADDRESS (cam l �J1s� �w CONTRACTOR "C' 7� I 1\z. PHONE J3 , ..Q I l EXP. DATE ( ZIP tg��a 7 / c, ADDRESS �" Nt -a�2 �1�t17C� WA. ST. CONTRACTOR'S LICENSE # 4 - �,1't� I� c fC) <<; :<D.ESCRIP:TI •::: < ><:;:<; >:>;' MOUNT - AS :: E . IC P RMIT F E•>«< >i i: 1500: »':< > > < >i < > < >: >:`; < >i;< >: PLAN CHECK FEE 'THER .. :, ;TOTAL;:.. :.;..:.::.:.:.::.: CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER )( Y)9 (-1 APPLICATION MUST BE FILLED OUT COMPLETELY APPLICATION AND KNOW 3AME TC I :HEREBY CERTIFYTHAT tHAVE ; AN READ D EXAMINEOTHI AND ; :CORRECT `AND:I AM AUTH APPLY POR : ' I BUILDING OWNER OR AUTHORIZED AGENT ADDRESS 94/4,, Vvi�•t° CONTACT PERSON ic t-Fr or MECHAN, ZAL PERMIT APPLICATION Mechanical Foe Worksheet must also be filled out and attached to this application. FEES (for staff use only) DATE ~Z Z -9,4- PHONE !�,.��.. CITY/ZIP 9,918e) PHONE 5 APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Application and plans must be complete in order to be accepted for plan review. BUILDING OWNER/AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be flied in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Meci'apical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. DATE APPLICATION ACCEPTED L4- a -c �I DATE APPLICATION EXPIRES cya4-- o7,WJ F625-052-000 (3-92) , l.a GEN : C • INC ...„ 9 INDUSTRY DR ,StATTLS, WA 9E310 • FIEGISTRATIONkUMBER. EFFECTIVE riAtt, EXPIRATION DATE 0.2f1:5/83 , . trwr,VASi. • 0 DEPARTMENT OF LABOR AND INDUSTRIES THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A • STATE OF WASHINGTON Project: Ke. G r ype of In ' � t IV ' 1 mss{ y `ttU �'1Jau sh' r, : e �, ►� _. ... .,�, 6, a . ._—.i IV Special Instructions: Date Wantetd: 3 _ q am. .m. c) �� Request er. Cam) r J Phone No.: c, 7 s "" 0 7) ' CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. INSPECTION RECORD Retain a copy with per t PEC0a RINI NO./ (206) -4 3670 ❑ Corrections required prior to approval. COMMENTS: 1 ❑ $30.00 REINSPECTION F E REQUIRED. Prior to reinspection, fee must be - <id at 6300 Southcenter Blvd., Suile 100. Call to schedule r'einspection. COMMENTS: Type of Inspection; � no, ' 017)\ G Pel P. ,o, ►.G (Li t4 . ( 0,=- -.I es' 1 C o p.) (t -{Q 1 E aN\ ti c (A NAT t ' 1 ' - pa P• It it <( r, : „ cm R -coy i� Ob we wanted: "" ;� �. nester: Requester: T i ry) (1-<v,f - L... 0 /A— c', Protect :�ge_ � `,.l o . Type of Inspection; � no, ' Address: uIn \ r� Y Date Called: J- I �1 "� q Sped 1 \ �� : „ cm R -coy i� Ob we wanted: "" ;� �. nester: Requester: T i ry) PhoneNo.; — 01 I 1 Inspector: Recept No.: r -� INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 1e. 7 Date: (206) 431-3670 ❑ Approved per applicable codes. K required prior to approval. 3 1 ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection. r ype o ns . 1A_ .4 . c� !� Special Instwdfor,s: C i otlicid D h o G 1 1 Date Wanted: Requester. 1 ti' ^ A ` • L./ Phone No,. 7 U ts - INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206) 431 -3670 jk(Approved per applicable codes. f Corrections required prior to approval. COMMENTS: 7-6cgj -1 - ,,✓ /d 4(A 171,7 nspect Date: 5/ n /i e ! ❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection. IRe cept No.: Dale: * ** * *k * ** * * * *.k * * * * *•k ** *** * ****** k * * * * *k ** * **** *** *k * * * * * *•* **k• CITY OF TUKWI:LA WA TRANSMIT ****** ************************4************* TRANSMIT Number 94000480 Amount: 30.00 04/29/94 09:4.; Permit Nc�: M94--0060 Type: 13 -MACH . MECHANICAI. Parcel NO: 252304-015 Site Addres : 946 IWD.USTRY AR Payment .Method. CHECK' No.tat',i On: •,TRC, ]:NC. • Iriit: BLS` *•k•k *k *k **k•k*r **** * *•k* * * ** k• A* k k** **. ** ****k_k•k * **•h* *k.•k* *k * ** k rl*** * Account: Code Dezaer`i pt isort . 000/345. SU PLAN CHECK "..NONRCS 6.00 .: 000/322.100 • :MECHA.NICAL - WIRES • 24.00 Total .t'th.i . Payment): 30..00 Total Feet; Al 1,Paymenta : . 0�l�irice: GENERA 30.00 TOTAL 30.00 CHECK 30:A0 CHANGE 0.00 1420A000 21:34. Address: 946 INDUSTRY DR Suite: Tenant: TRC, INC. Type: B -MECH Parcel #: 252304 -9015 CITY OF TUKWILA Permit No: M94 -0060 Status: ISSUED Applied: 04/22/1994 Issued: 04/28/1994 * ** * ** * * * ** * * * *•k* k*********.*********• k********• k*** ** ** * ***•k * * * * *•k ** * * *•k* **•k * Permit Conditions: 1. No changes wi 1 l be made t,o t: h2� .,<.; ;p'�lans ;l�e.s iUns approved by the Architect and the 'Tu}'•w,lie�; B i . ,i-- `1'dl`ng tDl v ;s:�ioj�. z:%,, 2. Plumbing permit s 8 "ll be`obtairrl�ed through 4 t'he !eattle -King County Departmen't ao rPub1,,,ic Health P1umb`ing'"w1 : '1 . b„e inspected by tli,a;t"'agen %. udi g.� (296 -4722) . s i `` `V . ' F4, �% 1 ... as "; k4' f'iux6,• . x , ` p � 3. Electr1ca ✓/e' `'ia 11- be o.b.ta-�inad t.hr'ough :the , Division , of CO 'or and In and•,,,all e•'1ectrica } (p'. T ^'�'''� work w1 be t ins pected b th a ; e. cy ( 248 - 0)` 4: +' '•,v;' 4. 'Al1 pe -, i'ts, in "spectlon re.Oorids',' 'an'd.. 6 �' 6. approved 'plats ° y st 11 e\ ,b main ilned ata,.,.ehe,gjob site prior to the s tar t 1 ,5of t '�, any oortttrur.ct i on..;'' The d9cu'rnent,s " to be ma i nta i n a ' `d . avai,1,ah1e.,�,u 1 >final .inspect i on °ap_prNpva1 is granta�,d. N4'I -'44 , 5. ReadA ,lry ice essi access_ to, r<bof mo'iunted equipment`- "'1s'' ,.• requ�,red . .....:J _ ..,...•,•,,. .. ' ,$ „ , , - -•° 6. Any exposed in`sula,t''ions, b•ackfi material sha l have a' Flame Spread Rating : : : j'e ss't, t 1 l an' d �- i > a't e r � i"a1 `sh„all bear , id e ntl „r f ioa,i7,i show ng t f i,,per r f ormance : rating thereof w 7 . All ''const.ruct ton �,to bet,,don•e ,1n, conformance' with approved,:,,•,. p1ans, an, d r„egyirer /o.f � ,th: 8u Laing Code (r1991 ti Edition) as anende i--, y th e . Wash:i'ngt t on � St'ate...,Bui 1ding,JCode', "i� Un i f .Me.chan'ica 1 Coii'e ' (1991 Edition . and :'`;,Washington •and Ener \b,y e p s e': (19 ;91 Second Edition >. J7,1'.'--,----''' ;.A 8. Va1 ity. off`R The issuance: of?.a'., p rmi`t o,r a pr va.l'-fof plans'pecif %ications and computations `sha:11., r'� not b cohh -,,,; strued Ft • lie a p et ^mit for or an ';'''-',,y Of,' a ny violation , of . any the provisions of this ;cod •ox, 'of •,, other;, , x �'�•v • ordinance Hof the j, ""'No permit prresumirlgt to gi authority � r v or° 'canc th e pro of ; 1h $ i:s c od e sha11 be v . . `,y: , {� v�, ' te r, ,, :j�= xy x ;'�. ': .•4 . F-s? Fss: .--: ::....... :sis■ 4- • ' -••••;:" i • • 8 : .-... 4 Ps I< E: C as rs s. 1.4 I ts i rs s E el s rs .5... es r z.-.• P Lyi 2 ' 87$.1401h Av I.E. 4 gUil a 201 ,:- EXPIRES STRUCTURAL CALCULATIONS For: Project: Location: ov luoq _ RECEIVED N???‘°\IE. CITY OF TUKWILA 27 ISSli APR 2 2 199h A? egi) PERMIT CENTER 01\fiSI J g umber: CIVIL 1121 STRUCTURAL 0 TRANSPORTATION H - - 1 , ; I 'I� I III III I` I I I I � I I 1LA-L 1 rill, I I � III�IIlI111 kri .I 40! bikb. I '1 AKi3 CONSULTING ENGINEERS f 1 1 •. 1• 15,1 Iai I lajz,v 1 1 I 140 , ' " c l I) I I I 1 I 1 ; I • /x,../4 1 111 1 11, L j _0 f 1 , .i 1 1,• 1 r / , '.7 I z a 1 , ,e9 4./4./ I r 1 I . r '' ;i 1 1 I 11 I 1 , I ; i ■ l I i t I , I 1 lil,i a�'�l it 1 1 , 1 ( I I 1 1 1 1 t', I 1 ' I i I I i 1 j 1 1,• I, t. i 1j111iiiII;I 4 i II 1 1 1 1 i I I I I! + i 4 1 1; .! ',jl I 0 I : 1 ! I 0 04 / LOCATION:9 , „, �`J^; 11� � _ _ D11 • - , � y gij �r'7e' 1 1 tO �s- f f? �,, CHECKED; _ SHEET _AUDIT: 7L^te..••� *•.r,•G..., ..f�C7 i' ►':. f.;�._t--:•�: DAT>w• c�til�"�V ` 7 1530 • 140TH AVE, N,E. • SUITE 201 4 BELLEVUE • WA 98005 • (206)747-3592 JON NO, 1-4 r" I • ...:.. - .T.■ .-t 1 t .L :..7.1 Z. .. .:: :7.. ... .. ........... .. . .... .. . ........ . . 1-1 t'.. =: 1_, C. ru ::...--'. I-.1 I T• 1 r1 '9 ri . s i ri .I.• .. e- .. F. _ et .4 . • 1 • . . „ ; , 1 I - , , i I 1 • • 1 . . . . CP/Pek...1.1eM ra2LA/2L •- 1 I • ' 1 ( i 1 Illiiitill : .. , • ! ! •i 1 ; 1 e : ,/,ct . . ::: !LI . .,, .:•__,.._, _...6 1 _,...1 17m4k, 1 ! i 1 „ /t • . / ; - I) , J, . • 1 1 t , • , . : , 1 1 1 ; , . 1 i ! 1 • ; , : • , • , i WWI I • i . • 1 I ; 1 M• 074) i1 kJ I I ! • • , ! -1 i• • I I • 1 1 I ' ' • I 65 • ; r77 , • ;e54, 1 P"'!•Iii•t 3 i --7 4'Ff>is'o.-e? I , • ; ) 1 1 4 I, 1 ' , ; 1 1 : • ' - . . . , , 1 . •.,... I it igreez.") ' : I I • • / ' ' 1 P 1 1 134v /7•!:....• . . ' . : • . -.' t - i-: ' f,41c,e4, .• Ili:. :iii ,, , . '. ' t 1 i ;., ig , • t I 1 t 1 , 1. /-- • ._., ___ ' •• ; 1 1 ; • , ; I • ,, i ; • 1 h • -- (i 5 T 1 )0J 1 . 4 . z.• in . , . 1 " Iz• I . 6 i • Li Fri C. i ffl‘Lrr, 5( -Irr - M 7 r . 4. 0 I ' ; i ' • i ' . . . • . . • ; ' X40 I-.. . 0 ri • . , ! . , , . , . i , . ! , 1 ei • ; t.".. -4 / 4/ Ptivt-bi,>' 1 .k..514-) 1 -d , . 04 4 - 1s? . I t 14= b • • • • , , ■ ! • • Mz 1 , ; • i . „ 1 ! . • , V s I • : i : . • i ! i ' i ..; . i ,••••V ! 1 ., , , ! ! '1 Fk, ''-"' r= • ' • ! . ; ! j : : 1 1 :1 I 1 i , 1 1 8d e ' ' ' . / fy734 :e, . . • . ' riV I i 4/4, ; . . 1 . . . ! ! ! . :1 . i ; .. I 1 i I I I ; 1 1 • - • : ' • ; • . 1 ' • 1 . . • . • 1 I : 1AI, zj ie-1 . 1/0"; . 0' . wirk .. • ' ::: iT1;;;11111 .!..illyli!,,:;: • . ,,,•:::.,!!•;ii,li,i , „ 1 1 , I 1 , . ; i • : • . : . -----'-1- • Ayiirpg'4i-d4 iit,.3 1:6(13 CONSULTING ENGINEERS PROJEOTt Tke /7-- LOCATION; CLIENT: I ■...114•••••••••■••• ••■■■■■■•■••■• ,11, i c. 1 3 I I • 4i ; HI H lil': ,11,•' I; . .I• i i• ;) . ; t A 0010 L.L., • A d e 1630 • 140TH AVE. N.S. • SUITE 201 • BELLEVUE WA 0005 • (206)747.3592 • A K13 CONSULTING ENGINEERS '_. '' H F•: P: r_ ._. r . = I 1 r 1 PI •S, E r-i • 1 r-i ._ .= r- F. . 171 _. • �+ • • 1 i., P4 1' I I' ' f L941; • /r7 II : ; 1 1 ; 1 r . 1 ► I ;' 11 I I lip z , '4 L7 II i I i ' I iI 1 1 P 1 3 1471 g ) 4 1 1 14'" ' '' .1/6,67 1 I I • I 1; ' •1 I i r I l I 1 I � , 11 ii 11 • PROJECT: " C1� ' �. .8"8"G41. (_)fJ LOCATION: CLIENT: CHECKED: DATEt 11„_tbeL 1530 • 140TH AVE. N.E. • SUITE 201 • BELLEVUE • WA 98005 • (208)744 • 713 • SHEET JOS N0. 7 1460Z1 I-VPZLO LUZO 141.46xia e..vAes - Ncrrub: 01.4.51,0eg1 1.142 L I Aut Ce4/043q 1 -extrin? 1 4X/4 1! fiztie-T; 4.151t7r27.. E 7-1;4 evei 1 e 2 i p Virxrir 4=7 45if g MA-Actaiti o)Ife-et- lit t.: 0:etvi7A/ tT PI IT; ran Air Conditioning_ Economics V 600 By: C.D.S. MARKETING PAGE 1 ## #11 11111111$ #1# #1 1111111111111 11#111 #111 #11 # #11# #11 #1 #11 #1111##1111 #1# # ## 1111 111111 11111# #1 #1# #1 #11### # #1 #111## 111# #11##111 #1 #111111 #1 #1 #11111114 #1 11 it TRACE 600 ANALYSIS 11 11 11 by C.D.S. MARKETING #1 ## 11 ## #11# 111111111##111##11111 #111 #11111 #11111111 #11## #111111 #1##'11111 # #1 #111111 11 #1 #1111# 111 ##tt #11#14111111 #1 # #1## #111 #111 #11111 # #11 ## #111# #1111111 #1# #111# TRC OFFICE REMODEL TUKWILA, WASHINGTON TRC, INC. TRC, INC. Weather File Code: SEATTLE Location: SEATTLE, WA Latitude: 47.0 (deg) Longitude; 122,0 (deg) Time lone: 8 Elevation: 386 (ft) Barometric Pressure: 29.5 (in. Hg) Summer Clearness Number: 0.95 Winter Clearness Number: 0.95 Summer Design Dry Bulb: 84 (F) Summer Design Wet Bulb: 66 (F) Winker Design Dry Bulb: 24 (F) Summer Ground Relectance: 0.20 Winter Ground Relectance: 0.20 Air Density: Air Specific Heat: Density- Specific Heat Prod: Latent Heat Factor: Enthalpy Factor: 0.0749 (Lbm/cuft) 0.2444 (Btu /lbm /F) 1.0988 (Btu-min. /hr /tuft /F) 4,836.9 (Btu-min. /hr /tuft) 4.4953 (Lb-min. /hr /cuft) Design Simulation Period: January To December System Simulation Period: January To December Cooling Load Methodology: TETD /Time Averaging Time /Date Program was Run: 14;26:.15 4/18/94 Dataset Name: TRCOFFIC .TM RECEIVED CITY OF TUKWILA APR 22199. PERMIT CENTER System System Number Type 1 SZ 2 SZ Totals System System Number Type 1 SZ 2 5Z Totals Trane Air Conditioning Economics By: C,D,S. MARKETING AIRFLOW - ALTERNATIVE 1 Outside Airflow (Cfm) CAPACITY - ALTERNATIVE 1 Main Sys. Capacity (Tons) 3.9 3,3 7,3 ENGINEERING CHECKS - ALTERNATIVE 1 System Main/ System Number Auxiliary Type 1 Main S7 2 Main SZ Cooling Heating Return Exhaust Supply Exhaust Airflow Airflow Airflow Airflow Airflow Airflow (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) 320 1,862 1,862 1,889 1,862 0 0 340 1,554 1,554 1,573 1,554 0 0 660 3,417 3,417 3,461 3,417 0 0 Cooling Aux. Sys. Opt, Vent Capacity Capacity (Tons) (Tons) 0.0 0.0 0.0 Percent Outside Air SYSTEM SUMMARY (Design Airflow Quantities) 0,0 0.0 0. Main Auxil. Room Cooling Totals (Tons) SYSTEM SUMMARY (Design Capacity Ouantities) 3,9 3,3 7,3 Main Sys. Capacity (Btuh) - 27,381 - 25,725 - 53,106 Aux. Sys. Capacity (Btuh) ENGINEERING CHECKS 0 0 0 Preheat Capacity (Btuh) The building peaked at hour 16 month 7 with a capacity of 0 0 0 Heating Reheat Humidif, Opt, Vent Capacity Capacity Capacity (Btuh) (Btuh) (Btuh) 6.9 tons Cooling - -- Heating - - -° Cfm/ Cfm / Sq Ft Btuh/ Cfm/ Btuh/ Sq Ft Ton /Ton Sq Ft Sq Ft Sq Ft 17.19 0.93 474.7 509.1 23.57 0.93 -18.85 21,87 1,14 464.5 407,0 29.48 1.14 -26.67 0 -10,258 0 - 10,595 0 - 20,853 Floor Area Sq Ft 1,997 1,362 V 600 PAGE 2 Heating Totals (Btuh) 0 - 37,639 0 -36,320 0 - 73,959 Trane Air Conditioning_ Economics By: C.D.S. MARKETING SYSTEM CHECKSUMS System 1 Peak SI - SINGLE ZONE tt1111$1111t$tt11ttt141t1 COOLING COIL PEAK t1t1 t4111111111itt1$1t1111titiii CLG SPACE PEAK 111 #11111111 HEATING COIL PEAK 11111111 Peaked at Time =_> Mo /Hr: 7/16 1 Mo /Hr: 7/17 i Mo /Hr: 13/ 1 Outside Air =_> OADB /WB /HR: 81/ 63/ 60.3 1 OADB: 80 i OADB: 24 Envelope Loads Skylite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup OV /UNDR Sizing 0 Exhaust Heat Terminal Bypass Grand Total ==> 45,596 0 Total Capacity Capacity (Mbh) Main Htg -27.4 Aux Htg 0.0 Preheat -0.0 Reheat 0.0 Humidif -10.3 Opt Vent 0.0 total -37.6 Zr Space Ret. Air Sens. +Lat. Sensible (Btuh) (Btuh) 0 0 0 0 0 2,270 0 17,703 0 -2,536 2,167 -40 0 0 91 2,258 17,397 11,263 3,754 10,245 0 679 21,508 4,433 21,830 - 21,830 0 0 Sens Cap. (Tons) (Mbh) (Mbh) Main Clg 3.9 47,1 42.2 Aux Clg 0.0 0.0 0,0 Opt Vent 0.0 0,0 0.0 Totals 3.9 47.1 HEATING COIL SELECTION 0 0 0 0 Coil Airfl Ent (cfm) Deg F 1,862 62.1 0 0,0 1,862 62.1 0 0.0 347 12.7 0 0.0 Ret. Air Net Percnt 1 Latent Total Of Tot 4 (Btuh) (Btuh) (7.) 1 0 0.00 1 0 0.00 4 2,270 4,82 1 17,703 37,60 1 -2,536 -5.39 t 2,127 4.52 t 0 0.00 1 0 0.00 1 91 0.19 1 19,655 41.75 1 15,017 31.90 1 10,245 21.76 1 0 679 1.44 1 0 25,941 55.10 1 0 0.00 i 0 818 1.74 I t 662 1.41 1 0 0.00 1 0 0,00 1 0 0.00 1 0 0 0.00 1 0 0 0,00 1 1 0 47,076 100.00 1 COOLING COIL SELECTION Coil Airfl Entering DB /WB /HR (cfm) Deg F Deg F Grains 1,862 78.5 63.3 64,2 0 0,0 0.0 0.0 0 0.0 0.0 0.0 Lvg Deg F 75,5 0.0 57,7 0,0 55.5 0,0 Type Vent Infil Supply Mincfm Return Exhaust Rm E;ih Auxil . - AIRFLOWS (cfm) Cooling 320 27 1,862 0 1,862 320 0 0 V 600 PAGE 3 1 Space Percnt t Space Peak Coil Peak Sensible Of Tot, t Space Sens Tot Sens (Btuh) (y.) 1 (Btuh) (Btuh) 0 0.00 1 .0 0 0 0.00 1 0 0 4 0.00 1 0 -3,267 0 0.00 1 0 0 0 0.00 1 0 -2,945 2,269 5.54 1 -2,113 -2,578 0 0.00 1 0 0 0 0.00 1 0 0 92 0.22 1 -1,346 -1,346 2,361 5.77 1 -3,459 -10,136 11,263 27.52 1 0 0 5,042 12.32 t 0 0 0 0.00 1 0 0 16,305 39.84 1 0 0 22,260 54.39 1 -6,677 0 0 0.00 1 0 - 16,182 0.00 1 0 0.00 1 0 0.00 1 0 0 0.00 1 -1,062 -1,062 0.00 1 0 0.00 1 0 1 40,927 100.00 1 - 11,198 - 27,380 100.00 Leaving DB /WB /HR Deg F Deg F ` Grains 57.7 54.9 60.8 0.0 0.0 0.0 0,0 0.0 0,0 Heating 320 27 1,862 .0: 1,862 320 0 0 Gross Floor Part ExF1r Roof Wall - ENGINEERING CHECKS- - Clg X OA `17,2 Clg Cfm /Sgft 0.93' Clg Cfm /Ton 474.72 Clg Sqft/Ton 509.09. Clg Btuh/Sift 23.57 . No. People 16 Htg 'X CA . 17.,2 Htg'Cfm /SqFt .0.93. Htg Btuh /SgFt - 13.71' AREAS Total . Glass (sf) (7.) 1,997 0 0 1,843 0 . 0 696 132 19 -- TEMPERATURES .(F) --- Type: Clg Htg SADB 58.0 Plenum 112.5 Return: 78.0 Ret /OA 78,5 Runarnd 78.0 FnMtrTD 0.1 fn B1dTD:, 0.1. Fn Frict i0.2 Percnt Of Tot. (%) 0.00 0,00 11,93 0.00 10,76 9.41 0.00 0.00 4.92 37.02 0.00 0.00 0,00 0.00 0.00 59.10 0.00 0.00 0.00 3.88 0,00 0.00 75.5 59,4 70.0 62.1 70.0 0.1 0.1 0.2 SYSTEM CHECKSUMS Envelope Loads Skylite Solr Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Outside Air Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup OV /UNDR Sizing Exhaust Heat Terninal Bypass Grand Total = => Main Htg Aux Htg Preheat Reheat Humidif Opt Vent Total ; ...if.�� Irene Air Conditioning Economics By: C,D.S. MARKETING 111111111111111 #1111#1111 COOLING COIL PEAK # 11111# #11111 #11 #11111 #11111111 CLG SPACE PEAK 1111 #1111111 HEATING COIL PEAK Peaked at Time =_> Mo /Hr: 8/15 1 Outside Air =_> OADB /WB /HR: 80/ 64/ 66.9 1 OADB: 81 1 OADB: 24 Space Sens. +Lat, (Btuh) 0 0 0 0 0 1,075 0 0 50 1,125 10,751 10,880 0 21,631 16,578 0 39,334 System 2 HEATING COIL SELECTION Ret, Air Sensible (Btuh) 0 0 1,362 12,780 -1,852 -154 12,136 3,584 858 4,442 -16,578 0 Total Capacity Sens Cap. (Tons) (Mbh) (Mbh) Main Clg 3.3 40.2 35.3 Aux Clg 0.0 0.0 0.0 Opt Vent 0.0 0,0 0.0 Totals 3.3 40.2 0 0 0 0 Capacity Coil Airfl Ent (Mbh) (cfm) Deg F -25.7 1,554 59.9 0 0.0 1,554 59.9 0 0.0 358 12.7 0 0,0 0.0 -0.0 0.0 -10.6 0.0 -36,3 Peak Si - SINGLE ZONE 1 Ret. Air Net Percnt # Latent Total Of Tot 1 (Btuh) (Btuh) (1.) 1 0 0,00 1 0 0.00 1 1,362 3.39 # 12,780 31.83 1 -1,852 -4,61 1 920 2.29 1 0 0.00 1 0 0.00 1 50 0.13 1 13,261 33.03 1 14,335 35,70 # 10,880 27.10 1 0 858 2.14 1 0 26,073 64.94 1 0 0.00 # 0 265 0.66 1 553 1.38 1 0 0,00 1 0 0.00 1 0 0.00 1 0 0 0,00 1 0 0 0.00 1 1 0 40,152 100.00 1 COOLING COIL SELECTION Coil Airfl Entering DB /WB /HR (cfm) Deg F Deg F Grains 1,554 78.5 63.4 64.3 0 0,0 0.0 0.0 0 0.0 0,0 0.0 Lvg Type Deg F Vent 75,0 lnfil 0.0 Supply 57.3 Mincfm. 0.0 Return 55.5 Exhaust 0,0 Rm Exh Auxil AIRFLOWS (cfm) Cooling Heating 340 18 340 18 1,554 . 1,554 0 0 1,554 1,554 340 340 0 Mo /Hr: 7/16 1 Mo /Hr: 13/ 1 Space Percnt 1 Space Peak Coil Peak Percnt Sensible Of Tot 1 Space Sens Tot Sens Of Tat (Btuh) (X) I (Btuh) (Btuh) (%) 0 0.00 1 0 0 0.00 0 0.00 1 0 0 0;00 0 0,00 1 0 -2,410 9.37 0 0.00 1 0 0 0.00 0 0,00 1 0 -1,888 7,34 1,015 2.92 1 -1,369 -1,651 6.42 0 0.00 1 0 0 0.00 0 0.00 1 0 0 0.00 20 0.06 1 -918 -918 3.57 1,035 2.97 1 -2,287 -6,866 26.69 10,751 30.90 1 0 0 0.00 5,355 15,39 1 0 0 0.00 0 0.00 1 0 0 0.00 16,106 46.28 1 0 0 0.00 17,657 50,74 1 -4,579 0 0.00 0 0.00 1 0 -17,186 66.80 0.00 1 0 0.00 0,00 1 0 0.00 0.00 $ 0 0.00 0 0.00 1 -1,673 -1,613 6.50 0.00 1 0 0.00 0,00 1 0 0.00 1 34,798 100,00 1 -8,540 - 25,725 100.00 Leaving DB /WB /HR Deg F Deg F Brains 57.3 54,7 60,7 0.0 0.0 0,0 0.0 0.0 0.0 0 0 - ENGINEERING CHECKS- - Clg X OA 21,9 Clg Cfm /Sgft 1.14, Clg Cfm /Ton 464,54 Clg Sqft /Ton 407.00 Clg Btuh /Sqft .,.29.48 No. People 17 Htg X OA 21.9 .Htg Cfm /SqFt 1,14 Htg Btuh /SgFt - 18.89' AREAS V 600 PAGE 4 11# #1111 Gross Total Glass (sf) (7.) Floor 1,362 Part ExFlr Roof. Wall 0 0 1,362 0 0 555 84 15 -- TEMPERATURES (F) --- . Type. Clg Htg SADB 57,6 75.0 Plenum 116.4 59,4 Return ' 18.0 70.0 Ret /OA 78.5 59.9 Runarnd 78,0. 70.0 Fn MtrTD 0, 1' "0.1 fn .B1dTD' 0.1 : .: 0.1 .Fn Frict 04'. 0.2 • Trane Air Conditioning Economics By; C.D.S. MARKETING MAIN SYSTEM COOLING - ALTERNATIVE 1 Room Number Description Peak Time Mo /Hr 1 CONSTRUCTION OFF 7/17 Zone 1 Total /Ave. Zone 1 Biock 7/17 2 OFFICE 1 7/17 Zone 2 Total /Ave, lone 2 Block 7/17 3 OFFICE 2 7/17 Zone 3 Total /Ave. lone 3 Block 7/17 4 ENGINEERING 7/16 Zone 4 Total /Ave. Zone 4 Block 7/16 5 ESTIMATING 7/16 Zone 5 Total /Ave. Zone 5 Block 7/16 6 TYPING 7/16 Zone 6 Total /Ave, Zone 6 Block 7/16 7 OFFICE 7/16 Zone 7 Total /Ave. Zone 7 Block 7/16 8 LUNCH 7/16 Zone 8 Total /Ave. Zone 8 Block 7/16 9 FOYER 7/16 Zone 9 Total /Ave. Zone 9 Block 7/16 System 1 Total /Ave. System 1 Block 7/17 10 RECEPTION 7/17 Zone 10 Total /Ave. Zone 10 Block 7/17 11 CONFERENCE 10/13 Zone 11 Total /Ave, Zone 11 Block 10 /13 12 COMPTROLLER 7/16 Zone 12 Total /Ave. Zone 12 Block 7/16 13 OFFICE 7/16 Zone 13 Total /Ave. Zone 13 Block. 7/16 14 OFFICE 7/16 Zone 14 Total /Ave. Zone 14 Biock 7/16 15 SERVICE 7/16 OA Rm Supp. Cond. Dry Dry DB/WB Bib Bulb (F) (F) (F) PEAK COOLING LOADS (Main System) Space Space Space Space Peak Air Sens. Lat. Time Flow Load Load Mo /Hr (Cfm) (Btuh) (Btuh) 80 62 78 58.0 177 3,892 634 7/17 80 62 78 58,0 177 3,892 634 80 62 78 58.0 177 3,892 634 7/17 80 62 78 58.0 134 2,938 316 7/17 80 62 78 58.0 134 2,938 316 BO 62 78 58.0 134 2,938 316 7/17 80 62 78 58.0 200 4,388 312 7/16 80 62 78 58,0 200 4,388 312 60 62 78 58,0 200 4,388 312 7/16 81 63 78 58.0 325 7,149 641 7/14 81 63 78 58.0 325 7,149 641 81 63 78 58.0 325 7,149 641 7/14 81 63 78 58.0 152 3,340 321 7/14 81 63 78 58.0 152 3,340 321 81 63 78 58.0 152 3,340 321 7/14 81 63 78 58.0 148 3,242 320 7/14 81 63 78 58.0 148 3,242 320 81 63 78 58.0 148 3,242 320 7/14 81 63 78 58,0 196 4,317 322 7/14 81 63 78 58,0 196 4,317 322 81 63 78 58,0 196 4,317 322 7/14 81 63 78 58.0 147 3,233 492 7/14 81 63 78 58.0 147 3,233 492 81 63 78 58.0 147 3,233 492 7/14 81 63 78 58.0 383 8,427 1,734 7/14 81 63 78 58.0 383 8,427 1,734 81 63 78 58.0 383 8,427 1,734 7/14 80 62 78 58.0 1,862 40,927 5,091 80 62 78 58.0 1,862 40,915 4,996 7/16 80 62 78 58.0 340 7,470 628 7/17 80 62 78 58.0 340 7,470 628 80 62 78 58.0 340 7,470 628 7/17 64 55 78 55.8 260 6,362 2,562 8/14 64 55 78 55.8 260 6,362 2,562 64 55 78 55.8 ` 260 6,362 2,562 8/14 81 63 78 58.0 200 4,387 641 7/14 81 63 78 58.0 200 4,387 641 81 63 78 58,0 200 4,387 641 7 /14 81 63 78 58.0 130 2,862 '. 320 7/14 81 63 76 58.0 130 2,862 . 320 81 63 78 58,0 130 2,862 320 7/14 81 63 78 58,0 109 2,386 321 7/14 81 63 78 58.0 109 2,386 321 81 63 78 58.0 109 2,386 321 7/14 81 63 78 56.0 377 8,274 643 7/14 Coil OA Rm Supp. Coil Coil Coil Cond. Dry Dry Air Sens. Lat. OB/WB Blb Bulb Flow Load Load (F) (F) (F) (Cfa) (Btuh) (Btuh) 80 80 80 80 80 80 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 81 80 80 80 80 80 80 81 81 81 81 81 81 81 81 81 81 62 62 62 62 62 62 63 63 63 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 63 63 62 62 62 64 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 78 64 78 64 78 6578 65 78 65 78 65 78 65.78 65 78 65 78 65 78 65 78 65 78 58.2 58.2 58.2 58.2 58.2 58,2 58.5 58.5 58.5 58.2 58.2 58.2 58,2 58.2 58.2 58.2 58.2 58.2 58.3 58,3 58.3 58.2 58.2 58.2 58.3 58.3 58,3 58.3 58.3 58.7 58.7 58.7 55.8 55.8 55.8 58.6 58.6 58.6 58.6 58.6 58.6 58.5. 58.5 58,E 58.8 177 9,580 177 9,580 177 9,520 134 10,471 134 10,471 134 10,401 200 3,414 200 3,414 200 3,354. 325 4,984 325 4,984 325 4,984 152 2,746 152 2,746 152 2,746 148 2,132 148 2,132 148 2,132 196 2,883 196 2,883 196 2,883 147 2,313 147 2,313 147 2,313 383 3,658 383 3,658 383 3,658 1,862 42,180 1,862 41,649 340 12,876 340. 12,876 340 12;806: 260 8,128 260 8,128 260 8,102 200 3,192 200 3,192 200 3,192 .130 2,002 130: 2,002 130 2,002 109, 1,932 109 1,932 109 .1,,932. 377 ,5,051 V 600 PAGE 5 330 330 330 195 195 195 309 309 309 772 772 772 375 375 375 374 374 374 401 401 401 515 515 515 1,624 1,624 1,624 4,895 3,982 416 4,16 416 1,934 1,934 1,934 675 675 675 362 362 .362 345 .. 345 . 345 795 Trane Air Conditioning Economics By: C.D.S. MARKETING MAIN SYSTEM COOLING — ALTERNATIVE 1 Peak . OA Rm Supp, Time Cond. Dry Dry Room Mo /Hr DB /WB Blb Bulb Number Description (F) (F) (F) Zone 15 Zone 15 16 COPY Zone 16 Zone 16 System 2 System 2 Total /Ave, Block 7/16 7/16 Total /Ave, Block 7/16 Total /Ave. Block 7/16 PEAK COOLING LOADS (Main System) Space Space Space Space Peak Air Sens. Lat. Time Flow Load Load Mo /Hr (Cfm) (Btuh) (Btuh) 81 63 78 . 58.0 377 8,274 643 81 63 78 58.0 377 8,274 643 7/14 81 63 78 58,0 139 3,057 320 7/14 81 63 78 58.0 139 3,057 320 81 63 78 59.0 1.39 3,057 320 7/14 81 63 78 57.6 1,554 34,798 5,436 81 63 78 58.0 1,554 34,785 5,473 8/15 OA Rm Supp, Cond. Dry Dry DB /WB Blb Bulb (F) (F) (F) 81 65 78 81 65 78 81 65 78 81 65 78 81 65 78 80 64 78 80 64 78 V 600 PAGE 6 Coil Coil Coil Coil Air Sens. Lat. Flow Load Load (Cfm) (Btuh) (Btuh) 58.8 377 5,051 795 58,8 377 5,051 795 58.7 139 2,076 368 58,7 139 2,076 368 58.7 139 2,076 368 58.2 1,554 35,257 4,895 58.4 1,554 31,698 5,284 vr. Trane Air Conditioning Economics By: C.D.S. MARKETING MAIN SYSTEM HEATING - ALTERNATIVE 1 Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave, Zone 2 Block 3 OFFICE 2. Zone 3 Total /Ave. Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave. Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave. Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block B LUNCH Zone 8 Total /Ave. Zone B Block 9 FOYER Zone 9 Total /Ave, Zone 9 Block System 1 Total /Ave. System 1 Block 10 RECEPTION Zone 10 Total /Ave. Zone 10 Block. 11 CONFERENCE Zone 11 Total /Ave, Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave. Zone 12 Block 13 OFFICE Zone 13 Total /Ave, Zone 13 Black 14 OFFICE Zone 14 Total /Ave. Zone 14 Block 15 SERVICE Floor Area (Sq Ft) Peak Time Mo /Hr 154 13/ 1 154 154 13/ 1 107 13/ 1 107 107 13/ 1 184 13/ 1 184 184 13/ 1 354 13/ 1 354 354 13/ 1 133 13/ 1 133 133 13/ 1 170 13/ 1 170 170 13/ 1 195 13/ 1 195 195 13/ 1 154 13/ 1 154 154 13! 1 547 13/ 1 547 547 13/ 1 1,997 1,997 13/ 1 317 13/ 1 317 317 13/ 1 171 13/ 1 171 171 13/ 1 171 13/ 1 171 171 13/ 1 117 13/ 1 117 117 13/ 1 80 13/ 1 80 80 13/ 1 374 13/ 1 PEAK HEATING (Main System) Space OA Re Supp, Cond. Dry Dry DB/WB Blb Bulb (F) (F) (F) LOADS Coil V 600 PAGE 7 Space Space Peak 0A Re Supp. Coil Coil Air Sens. Time Cond. Dry Dry Air Sens. Flow Load Mo /Hr DB /MB Bib Bulb Flow Load (Cfm) (Btuh) (F) (F) (F) (Cfm) (Btuh) 24 21 70 75.0 177 -973 13/ 1 24 21 70 75.0 177 -2,995 24 21 70 75.0 177 -973 24 21 70 75.0 177 -2,995 24 21 70 75.0 177 -973 13/ 1 24 21 70 75.0 177 -2,995 24 21 70 75.0 134 -734 13/ 1 24 21 70 75,0 134 -1,745 24 21 70 75.0 134 -734 24 21 70 75.0 134 -1,745 24 21 70 75.0 134 -734 13/ 1 24 21 70 75.0 134 -1,745 24 21 70 76.6 200 -1,454 13/ 1 24 21 70 76.6 200 -2,465 24 21 70 76.6 200 -1,454 24 21 70 76.6 200 -2,465 24 21 70 76.6 200 -1,454 13/ 1 24 21 70 76.6 200 -2,465 24 21 70 75.0 325 -1,787 13/ 1 24 21 70 75.0 325 -3,809 24 21 70 75.0 325 -1,787 24 21 70 75.0 325 -3,809 24 21 70 75.0 325 -1,787 13/ 1 24 21 70 75.0 325 -3,809 24 21 70 75.0 152 -835 13/ 1 24 21 70 75.0 152 -1,846 24 21 70 75.0 152 -835 24 21 70 75,0 152 -1,846 24 21 70 75.0 152 -835 13/ 1 24 21 70 75,0 152 -1,846 24 21 70 75.0 148 -811 13/ 1 24 21 70 75.0 148 -1,821 24 21 70 75.0 148 -811 24 21 70 75.0 148 -1,821 24 21 70 75.0 148 -811 13/ 1 24 21 70 75.0 148 -1,821 24 21 70 76.6 196 -1,435 13/ 1 24 21 70 76.6 196 -2,446 24 21 70 76.6 196 -1,435 24 21 70 76.6 196 -2,446 24 21 70 76,6 196 -1,435 13/ 1 24 21 70 76.6 196 -2,446 24 21 70 75.0 147 -808 13/ 1 24 21 70 75.0 147 -2,365 24 21 70 75.0 147 -808 24 21 70 75.0 147 -2,365 24 21 70 75.0 147 -808 13/ 1 24 21 70 75.0 147 -2,365 24 21 70 75.6 383 -2,360 13/ 1 24 21 70 75.6 383 -7,888 24 21 70 75.6 383 -2,360 24 21 70 75.6 383 -7,888 24 21 70 75.6 383 -2,360 13/ 1 24 21 70 75.6 383 -7,888 24 21 70 75,5 1,862 - 11,198 24 21 70 75.5 1,862 - 27,381 24 21 70 75.5 1,862 - 11,214 13/ 1. 24 21 70 75.5 1,862 -27,397 24 21 70 75.0 340 -1,868 13/ 1 24 21 70 75.0 340 -3,889 24 21 70 75.0 340 -1,868 24 21 70 75.0 340 -3,889 24 21 70 75.0 340 -1,868 13/ 1 24 21 70 75.0 340 -3,889 24 21 70 75.0 260 -1,431 13/ 1 24 21 70 75.0 260 -9,518. 24 21 70 75.0 260 -1,431 24 21 70 75.0 260 -9,518 24 21 70 75.0 260 -1,431 13/ 1 24 21 70 75.0 260 -9,518 24 21 70 75.0 200 -1,097 13/ 1 24 21 70 75.0 200 -3,119 24 21 70 75.0 200 -1,097 24 21 70 75.0 200 -3,119 24 21 70 75.0 200 -1,097 13/ 1 24 21 70 75.0 200 -3,119 24 21 70 75.0 130 -715 13/ 1 24 21 70 75.0 130 -1,726 24 21 70 75,0 130 -715 24 21 70, 75.0 130 -1,726 24 21 70 75.0 130 -715 13/ 1 24 21 70 75.0. 130 -1,726 24 21 70 75.0 109 -596 13/ 1 24 21 70 75.0 109 -1,607. 24 21 70 75.0 109 -596 24 21 70 75.0 . 109. -1,607 24 21 70 75.0 109 -596 13/,1 .24 21 70 75,0 109 -1,607 24 21 70 75.0 377 -2,069 13/ 1 24 21 70 75.0 377 -4,090 Trane Air Conditioning Economics By: C.D.S. MARKETING MAIN SYSTEM HEATING - ALTERNATIVE 1 PEAK HEATING LOADS (Main System) V 600 PAGE 8 Space Coil Peak OA Rm Supp. Space Space Peak OA Rm Supp, Coil Coil Floor Time Cond. Dry Dry Air Sens. Time Cond, Dry Dry. Air Sens. Room Area Mo /Hr DB /WB Blb Bulb Flow Load No/Hr DB /WB Blb Bulb Flow Load Number Description (Sq Ft) (F) (F) (F) (Cfm) (Btuh) (F) (F) (F) (Cfm) (Btuh) Zone 15 Total /Ave. 374 24 21 70 75,0 377 -2,069 24 21 70 75.0 377 -4,090 one 15 Block 374 13/ 1 24 21 70 75.0. 377 -2,069 13/ 1 24 21 70 75.0 377 -4,090 16 COPY 132 13/ 1 24 21 70 75.0 139 -764 13/ 1 24 21 70 75.0 139 -1,775 Zone 16 Total /Ave. 132 24 21 70 75.0 139 -764 24 21 70 75,0 139 -1,775 Zone 16 Block 132 13/ 1 24 21 70 75.0 139 -764 13/ 1 24 21 70 75.0 139 -1,775 System 2 Total /Ave. 1,362 24 21 70 75.0 1,554 -8,540 24 21 70 75.0 1,554 -25,725 System 2 Block 1,362 13/ 1 24 21 70 75,0 1,554 -8,486 13/ 1 24 21 70 75.0 1,554 -25,671 Trane Air Conditioning Economics By: C.D.S. MARKETING COOLING LOADS AT COIL PEAK - ALTERNATIVE 1 Room Number Description 1 CONSTRUCTION OFF Zane 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave. Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave. Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave, Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave, Zone 8 Block 9 FOYER Zone 9 Total /Ave. Zone 9 Block System 1 Total /Ave. System 1 Block 10 RECEPTION Zone 10 Total/Ave. Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave. Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave: Zone 12 Block 13 OFFICE Zone 13 Total /Ave. Zone 13 Block 14 OFFICE Zone 14 Total /Ave. Zone 14 Block 15 SERVICE BUILDING ENVELOPE COOLING LOADS V 600 PAGE 9 (Roof - Skylight) (At time of Coil Peak) Roof Roof Skylight Skylight Return Air Roof Space Roof Skylight Skylight Skylt Return Air Skylt Space Skylt Sensible R.A. Sensible Space Return Air Space Solar Conduction R.A. Conduction Space Load CLTO. Load CLTD Solar Solar CLF Load CLTD Load CLTD (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0 0 .000 0 0.0 0 0.0 0 0.0 0 0 0,000 0 0.0 156 29.2 0 63.7 0 0 0.000 0 0,0 156 29.2 0 63.7 0 0 0.000 0 0,0 156 29.2 0 63.7 0 0 0.000 0 0.0 289 31.5 0 66.0 0 0 0,000 0 0.0 289 31,5 0 66.0 0 0 0.000 0 0.0 289 31.5 0 66.0 0 0 0.000 0 0.0 416 23.5 0 58.0 0 0 0.000 0 0.0 416 23.5 0 58,0 0 0 0.000 0 0.0 416 23,5 0 58.0 0 0 0.000 0 0.0 156 23.5 0 58.0 0 0 0.000 0 0.0 156 23.5 0 58.0 0 0 0.000 0 0.0 156 23.5 0 58.0 0 0 0,000 0 0.0 200 23.5 0 58.0 0 0 0,000 0 0.0 200 23.5 0 58.0 0 0 0.000 0 0.0 200 23.5 0 58.0 0 0 0.000 0 0.0 229 23.5 0 58.0 0 0 0.000 0 0.0 229 23.5 0 58.0 0 0 0.000 0 0.0 229 23.5 0 58.0 0 0 0,000 0 0.0 181 23.5 0 58.0 0 0 0.000 0 0.0 181 23.5 0 58.0 0 0 0.000 0 0.0 181 23.5 0 58.0 0 0 0,000 0 0,0 643 23.5 0 58.0 0 0 0.000 0 0.0 643 23.5 0 58.0 0 0 0,000 0 0.0 643 23.5 0 58,0 0 0 0.000 0. 0,0 2,270 24.6 0 59.1 0 0 0.000 0 0,0 2,903 31.5 0 66.0 0 0 0.000 0 0.0 0 401 25.3 0 63.7 0 0 0.000 0 0.0 0 401 25.3 0 63.7 0 0 0.000 0 0.0 0 401 .25.3 0 63.7 0 0 0.000 0 0,00 0. 106 12.4 0 50.8 0 0 .0.000 0 0.0. 0 106 12.4 0 50.8 0 0 0.000 0 0.0 0 106 12.4 0 50.8 0 0 0.000 0 0.0 0 167 19.6 0 58.0 0 0 0,000 0 0.0 0 167 19.6. 0. 58.0 0 0 0.000 0 .:0.0 0 167 19.6 0 58.4 0 0.'0.000 0 :. 0.0 0 115 19.6 0 58.0 0 0 0.000 0 0.0 115 19,6 0 58.0 0 0 0.000 0 0,0 115 19.6 0 58.0 0 0 0,000: 0 0,0 79 19.6 0 58.0. 0'' 0 .0,000 0:; 0,0 7 9 19.6 0 .58.0 0 0 0.000 0 0.0 ;. . 79 19.6 0 ,:58.0: 0 0 0,000 0 .::0.0 366 19.6 0 58,0 0' 0 0.000.: :; 0 0 . 0 .: 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0,0 . 0.0. 0.0 Q.0. 0.0 0.0.. 0.0 0.0 0,0 0.0 0.0 Trane Air Conditioning Economics By: C.D.S. MARKETING COOLING LOADS AT COIL PEAK - ALTERNATIVE 1 Room Number Description Zone 15 Total /Ave. Zone 15 Block 16 COPY Zone 16 Total /Ave. Zone 16 Block System 2 Total /Ave. System 2 Block Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave, Zone 1 Block, 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave. Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave, Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave, Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave. Zone ' 8 Block 9 FOYER Zone 9 Total /Ave. Zone S ' Block System 1 Total /Ave. BUILDING ENVELOPE COOLING (Roof - Skylight) (At time of Coil Peak) Roof Roof Return Air Roof Space Roof Skylight Sensible R.A, Sensible Space Return Air Load CLTD Load CLTD Solar (Btuh) (F) (Btuh) (F) (Btuh) 366 19.6 366 19.6 129 19.6 129 19.6 129 19,6 1,362 20.0 1,218 17.9 BUILDI Wall Wall Plenum Plenm Load CLTD (Btuh) (F) 0 0 0 0 0 0 107 107 107 0 0 0 0 0 0 0 0 0 -118 -118 -118 0 0 0 -30 . -30 -30 -40 0.0 0.0 0.0 0.0 0,0 0.0 25.2 25,2 25.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 -16.6 -16,6 -16,6 0.0 0.0 0.0 -16.6 -16.6 716,6' -3,0, 0 0 0 0 0 0 0 58.0 58.0 58.0 58.0 58,0 58.4 56.3 Wall Wall Space Space Load CLTD (Btuh) (F) 517 72.8 517 72.8 517 72.8 403 72.8 403 72.8 403 72.8 930 59.7 930 59.7 930 59,7 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0. 0 0,0 0 0,0 0 0.0 253 17.9 253 17,9 253 17.9 0 0.0. 0. 0.0 O ` 0,0 64 17,9 64, 17,9: 64 :.,17,9 2,167 47,2. 0 0 0 0 0 0 0 Skylight Space Solar (Btuh) NG ENVELOPE COOLING • (Wall - Window) (At time of Coil Peak) 0 0 0 0 0 0 0 LOADS Skylt Solar CLF 0.000 0.000 0.000 0.000 0.000 0.000 0.000 LOADS. Glass Glass Glass Space Return Air Solar Solar Solar CLF (Btuh) (Btuh) 0 7,823 1.000 0 7,823 1.000 0 7,823 1.000 0 9,213 1,000 0 9,213 1.000. 0 9,213 1.000 0 667 .0.800 0 667 0.800 0 667. 0.800 0 0 0.000. 0 0 moo .0 0 ,0.000 0 0 0.000 0 0 0.000 0 0 0.000 0 .0 0.000 . 0 0.000 0 0.000 0.000 0.000: 0.000 0.000 0 0.000 0 0.000.: 0 .0.000 0 9.000'. 0 0.000 17,703 0.991 Skylight Return Air Conduction Load (Btuh) 0 0 0 0 0 0 0 Skylt R.A. CLTD (F) Glass Glass Space, Space Conduction CLTD (Btuh) (F) 0.0 0.0 0.0 0.0 0.0 0.0 0,0 Skylight Space Conduction Load (Btuh) V 600 PAGE 10 0 0 0 0 0 n 0 Skylt Space CLTD (F) 0.0 0,0 0.0. 0.0 0.0 0.0 0,0 Glass. Glass Return Air R.A. Conduction CLTD (Btuh) (F) 0 2.1 -916 -32.4 0 0.0 -916 -32.4 0 0.0 ' -975 -34,5 0 2,1 -1,079 -32.4 0 0.0 - 1,079 -32.4 0 0.0 -1,149 -34.5 0 3,4 -541 -31.1 0 '0,0 ' -541 -31.1 0 0.0 -600 -34.5 0 0.0 0 0.0 0 • 0.0 0 ' 0.0 0 0.0.. 0 0,0 . . 0 0.0 0 0.0 . 0 : 0.0 0 , 0.0 0 0,0. 0 0.0 0 0.0.. 0: .0.0. 0; .0.0 0 . ' 0.0. 0.0. 0 0.0.. 0.0 0 :.. 0.0 0. 0,. 0,0 '0,0 00 X32;1. Room Number Description System 1 Block 10 RECEPTION Zone 10 Total /Ave, Zone 10 Biock 11 CONFERENCE Zone 11 Total /Ave, Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave. Zone 12 Block 13 OFFICE Zone 13 Total /Ave. Zone 13 Biock 14 OFFICE Zone 14 Total /Ave, Zone 14 Block 15 SERVICE Zone 15 Total /Ave, Zone 15 Block 16 COPY Zone 16 TotallAve. Zone 16 Block System 2 Total /Ave. System 2 Block Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave, Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave, Trane Air Conditioning Economics V 600 By: C.D.S. MARKETING PAGE 11 COOLING LOADS AT COIL PEAK - ALTERNATIVE 1 BUIL Wall Wall Plenum Plenm Load CLTD (Btuh) (F) 150 0 0 1) -43 -43 -43 0 0 0 0 0 0 0 0 0 -111 -111 -111 0 0 0 -154 -87 11.8 0.0 0.0 0.0 -16.9 -16,9 -16.9 0.0 0,0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 -20.5 -20.5 -20.5 0,0 0.0 0.0 -19.4 -9.5 DING ENVELOPE COOLING LOADS (Wall - Window) (At time of Coil Peak) Wall Space Load (Btuh) 2,141 671 671 671 21.0 210 210 0 0 0 0 0 0 0 0 0 194 194 194 0 0 0 1,075 826 Wall Space CLTD (F) 46.3 73.2 73.2 73,2 21.5 21.5 21.5 0,0 0,0 0.0 0.0 0.0 0.0 0,0 0,0 0.0 17.9 17.9 17.9 0.0 0.0 0.0 36.1 28.9 Exposed Expsd Floor Floor. Partition Part. Sensible CLTD Sensible CLTD (Btuh) (F) (Btuh) (F) 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 0 0 .0.0 0 0 . 0.0 0 0 0.0 .. 0 0 0.0 0 0.0 0.0 0.0 0.0 0,0 0,0 0.0 0.0 0,0 0..0 0.0 Glass Space Solar (Btuh) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Glass Return Air Solar (Btuh) 16,471 9,213 9,213 9,213 3,567 3,567 3,567 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12,780 9,808 Infilt. Infilt, Airflow Sensible (Cfe) (Btuh) 2 5 2 5 2 5 1 3 1 3 1 3 2 9 2 9. 2 9, 5 18. 5 18 BUILDING ENVELOPE COOLING LOADS (Exposed Floor - Partitions - Infiltration) (At time of Coil Peak) Glass Solar CLF 0.914 1.000 1.000 1,000 0.910 0.910 0.910 0.000 0,000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0,973 0.758 Glass Space Conduction (Btuh) Infilt. Latent (Btuh) Plenm Dry B Temp, (F) -16 112.5. -16 112.5 -16 112.5 -9 112.5 -9 112;5 -9 .112,5 • 2 112.5 2 .112.5 -2 112.5. 13. 112.5 .. 13 112.5 • Glass Glass Space Return Air CLTD Conduction (F) (Btuh) 0 0.0 0 2.1. 0 0.0 0 0.0 0 1.5 0 0,0 0 0.0 0 0,0 0 0,0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 Ceiling, Sensible Load (Btuh) 1,683 1,683 1,683 1,170 1,170 :1,170':. _2 2, 009 2,009. 2,009 3,865 3,865 Glass R.A. CLTD (F) -2,724 -34.5 -1,209 -36.3 -1,209 -36,3 -1,279 -38.4 -642 -36,9 -642 -36,9 -668 -38.4 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0,0 0 0.0 0 0,0 0.0 0 0,0 0 0.0 0 0.0 0 0.0 0 0.0 -1,852 -36.5 -1,948 -38.4 0 Envelope . Total (Btuh) 9,096 9,096 9,037 9,858 9,858 9,788 3,468 .3,468 3,409 4,312 4,312 Trane Air Conditioning Economics V 600 By: C.D.S. MARKETING PAGE 12 COOLING LOADS AT COIL PEAK. - ALTERNATIVE 1 Room Number Description Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave. Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave, Zone 7 Block 8 LUNCH Zone 8 Total /Ave, Zone 8 Block 9 FOYER Zone 9 Total /Ave, Zone 9 Block System 1 Total /Ave, System 1 Block 10 RECEPTION Zone 10 Total /Ave, Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave, Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave, Zone 12 Block 13 OFFICE Zone 13 Total /Ave, Zone 13 Block 14 OFFICE Zone 14 Total /Ave, Zone 14 Block 15 SERVICE Zone 15 Total /Ave, Zone 15 Block 16 COPY Zone 16 Total /Ave. Zone 16 Block. System 2 Total /Ave, System 2 Block, Exposed Floor Sensible (Btuh) BUILDING ENVELOPE COOLING LOADS (Exposed Floor - Partitions - Infiltration) (At time of Coil Peak) 0 0 0 0 0 0 0 0 0 0 0 0 Expsd Floor CLTD (F) 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0,0 0,0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0,0 0,0 0.0 0.0 0,0 0,0 Partition Part. Sensible CLTD (Btuh) (F) 0 0.0 0 0.0 0 0,0 0 0,0 0 0.0 0 0,0 0 0.0 0 0,0 0 0.0 0 0,0 0 0.0 0 0,0 0 0,0 0 0.0 0 0,0 0 0.0 0 0.0 0 0,0 0 0.0 0 0.0 0 0,0 0 0.0 0 0.0 0 0.0 0 0,0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0,0 0 0.0 0 0,0 0 0.0 0 0.0 0 0.0 0 0,0 0 0.0 0 0,0 0 0.0 0 0.0 Infilt. Airflow (Cfm) 5 2 2 2 2 2 2 3 3 3 2 2 2 7 7 7 27 27 4 4 4 2 2 2 2 2 2 2 2 2 1 1 1 5 5 5 2 2 2 18 18 Infilt. Sensible (Btuh) 18 7 7 7 9 9 9 10 10 10 8 8 8 27 27 27 95 100 10 10 10 4. 4 4 9 9 9 6 6 6 4 4 4 19 19 19 7 7 7 . 58 PIenm Infilt, Dry B Latent Temp. (Btuh) (F) 13 4 4 4 5 5 5 0 9 9 1 1 1 -10 -10 -10 -4 -84 -22 -22 -22 -9 -9 -9 1 1 1 3 3 3 1 1 1 16 16 16 3 3 3 -7 3i 112.5 112.5 112.5 112.5 112.5 112,5 112.5 112,5 112.5 112.5 112.5 112.5 112,5 112.5 112.5 112.5 112.5 112,5 116,4 116.4 116,4 116.4 116.4 116.4 116.4 116.4 116,4 116.4: 116.4 116.4 116.4. 116.4 116.4 116,4 116,4 116.4 116.4 116.4 116,4 116.4 116.4 Ceiling Sensible Load (Btuh) 3,865 1,454 1,454 1,454 1,858 1,858 1,858 2,131 2,131 2,131 1,683 1,683 1,683 5,976 5,976 5,976 21,830 21,830 3,860 3,860 3,860 2,077 2,077 2,077 2,077 2,077' 2,077 1,424 1,424 1,424 979. 979. 979 4,553 4,553'. 4;553. 1,407.; 1,607 1,607' 16,578 16,578 Envelope Total (Btuh) 4,312 1,621 1,621 1,621 2,072 2,072 2,072 2,515 2,515 2,515 1,873 1,873 1,873 6,671 6,671 6,671 41,465 40,788 12,923 12,923. 12,853 5,269 5,269 . 5 J 142 2,254 . 2,254 2,254 1,547: 1,547 ,1,547 1,063, 1,063 1,063 5,037 5,037 5,037 . 1,746, '..: 1,746 1,746 . 29,839' Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave. Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave. Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave. Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave. Zone 8 Block 9 FOYER Zone 9 Total /Ave, Zone 9 Block System 1 Total /Ave. System 1 Block 10 RECEPTION Zone 10 Total /Ave. Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave. Zone 11 Block 12 COMPTROLLER Zone 12. Total /Ave, Zone 12 Block 13 OFFICE Zone 13 Total /Ave. Zone 13 Block 14 OFFICE Zone 14 Total /Ave. Zone 14 Block 15 SERVICE Trane Air Conditioning Economics By: C.D,S, MARKETING COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 (Roof - Skylight) (At time of Space Peak) Roof Roof Return Air Roof Space Roof. Skylight Skylight Skylt Sensible R.A. Sensible Space Return Air Space Solar Load. CLTD Load CLTD Solar Solar CLF (Btuh) (F) (Btuh) (F) (Btuh) (Btuh) .0 0 0 153 153 153 262 262 262 545 545 545 205 205 205 262 262 262 301 301 301 237 237 237 843 843 843 2,807 2,629 361 361 361 -278 -278 -278 214. 214 214 147 147. 147 101 101 101 469 BUILDING ENVELOPE COOLING LOADS 0.0 0,0 0.0 28.5 28,5 28,5 28.5 28.5 28.5 30,8 30,8 30,8 30,8 30.8 30.8 30.8 30.8 30.8 30.8 30.8 30,8 30.8 30.8 30.8 30.8 30.8 30.8 30.5 28.5 22.8 22.8 22.8 - 32.6 - 32.6 -32.6 25.1 25,1. 25.1 25.1 25.1 25.1 25.1 25.1 25.1 25.1 0 0.0 0 0.0 0 0.0 0 63,7 0 63.7 0 63,7 0 63.7 0 63.7 0 63.7 0 66.0 0 66.0 0 66.0 0 66.0 0 66.0 0 66.0 0 66.0 0 66.0 0 66.0 0 66,0 0 66.0 0 66.0 0 66.0 0 66.0 0 66.0 0 66.0 0 66.0 0 66.0 0 65.6 0 63.7 0 63.7 0 63.7 0 63.7 0 8,3 0 8.3 0 8.3 0 66.0 0 66,0 0 66.0 0 66.0 0 . 66.0 0 66.0 66.0 66.0 66.0 66.0 0 0 0.000 0 0 0,000 0 0 0.000 0 0 0.000 0 0 0.000 0 0 0,000 0 0 0.000 0 0 0.000 0 0 0.000 0 0 0,000 0 0 0,000 0 ' 0 0.000 0 0 0.000 0 0 0,000 0 0 0.000 0 0 0.000. 0 0 0,000 0 0 0.000 0 0 0.000 0 ' 0 0.000 0 0 0.000 0 ' 0 0.000. 0 0 0.000 0 0 0.000 0 0 0.000 0 0 0.000 0 0 0,000 0 0 0.000 0 0 0.000 0 0 0.000 0. ' 0 0.000 0 0 0.000 0 0 0.000 0 0 0.000. 0 0 0,000 0 . 0 ..0.000 0 .0.000 0.000' 0.000 0.000 0.000 0.000 0,000. 0.000 0.000 Skylight Return Air Conduction Load (Btuh) V 600 Skylight Skylt Space Skylt . Conduction Space CLTD ' Load . CLTD (F) (Btuh) (F) 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 . 0 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 0 0 0.0 0 0 0,0 0 0 0.0 0 0 0.0 0 0 0,0 0 0 0.0 0 0 0.0 0 0 0,0 ' 0 0 0.0 0 0 0.0 0 0 0.0 0 0 .0.0. 0 0 .. 0.0 ' 0 0 0.0 0 0 0.0 0 0 0.0 0 0.0 0 0.0 0 0,0 0. 0,0 0 0.0 0 0.0 0 0.0 0 . 0 0.0 0.0 0.0 0.0. 0.0 0.0 00 0.0 ' 0.0 0.0 PAGE 13 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0,0 .' 0.0 0.0 0.0 0.0 0.0' 0..0 Room Number Trane Air Conditioning Economics V 600 By C.D,S, MARKETING PAGE 14 COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 Zone 15 Total /Ave, Zone 15 Block 16 COPY Zone 16 Total /Ave, Zone 16 Block System 2 Total /Ave. System 2 Block Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave, Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave. Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave. Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave. Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave, Zone 8 Block 9 FOYER Zone 9 Total /Ave. Zone 9 Block System 1 Total /Ave. Roof Roof Return Air Roof Space Sensible R,A, Sensible Load CLTD Load Description (Btuh) (F) (Btuh) 469 469 166 166 166 1,179 1,708 BUILDING ENVELOPE COOLING 25.1 25.1 25,1 25,1 25.1 17.3 25.1 BUILD Wall Wall Plenum Plenm Load CLTD (Btuh) (F) ING ENVELOPE COOLI (Wall - Window) (At time of Space Peak) Wall Space Load (Btuh) (Roof - Skylight) (At time of Space Peak) 0 0 0 0 0 0 0 Roof Skylight Space Return Air CLTD Solar (F) (Btuh) 66.0 66.0 66,0 66.0 66,0 58.2 66,0 Wall Space CLTD (F) 0 0 0 0 0 0 0 Skylight Space Solar (Btuh) Glass Glass Space Return Air Solar Solar (Btuh) (Btuh) LOADS 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 NG LOADS Skylight Skylt Return Air Solar Conduction CLF Load (8tuh) Glass Solar CLF Skylt R,A. CLTD (F) 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0,0 0 0.0 517 72.8 0 7,823 1.000 . 0 2.1 0 0,0 517 72.8 0 7,823 1.000 0 0,0 0 0.0 517 72.8 0 7,823 1.000 0 0.0 0 0,0 403 72.8 0 9,213 1.000 0 2.1 0 0.0 403 72.8 0 9,213 1.000 0 0.0 0 0,0 403 72.8 0 9,213 1.000 0 0.0 122 28,7 995 63.9 0 609 0.730 0 2.1 122 28.7 995 63.9 0 609 0.730 0 0.0 122 28.7 995 63,9 0 609 0.730 0 0.0 0 0.0 0 0.0 . 0 0 0.000 0 0,0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0 0,000 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0 0,000 0 0.0. -107 -15.2 283 20.0 0 0 0.000 0 0.0 -107 -15.2 . 283 20.0 0 0 0.000 0 0.0. -107 -15,2 283 20,0 0 0 0.000 0 0.0 0. 0.0 0 0.0 . 0 0 0.000 0 0.0 0 0.0 0 0.0 .0 0 0.000 0 '0.0 0 0.0 0 0.0 , 0 '.0 0.000 0 . 0,0 -27. -15.2 71 20,0 0 0 0.000 0 0.0 -27 -15,2 71 20,0 0 0 0.000 0 0.0 -27 -15.2 71 20.0 0 0 0,000 0 . ;0,0 -12 -0.9 2,269 49.4 ' 0 17,645 0.987 0 0.0 Skylight Space Conduction Load (Btuh) 0 0 0 0 0 0 0 Skylt Space CLTD (F) Glass Glass Glass Glass Space Space Return Air R.A. Conduction CLTD Conduction CLTD (Btuh) (F) (Btuh) (F) 0,0 0.0 0.0 0,0 0.0 0.0 0.0 -935 -33.1 -935 -33.1 -995 -35.2 -1,101 -33.1 - 1,101. -33.1 -1,171 -35.2 -576 . -33.1 -576 -33.1 -612 -35.2 0 0.0 0 0.0 0, 0.0 0 0.0 0 , 0.0 0 0.0 0 0.0 0 0.0 0 0,0 0 0..0 . 0 0.0 .. 0 0.0 0 0.0 0 0.0 0: . 0:0,. 0 0.0 0 0.0 .,0 ":0.0 -2,612 -33.1 Irene Air Conditioning Economics V 600 By: C.D.S, MARKETING PAGE 15 COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 Room Number Description System 1 Block 10 RECEPTION Zone 10 Total /Ave. Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave, Zone 11 Block 12 COMPTROLLER lone 12 Total /Ave, Zone 12 Block 13 OFFICE Zone 13 Total /Ave, Zone 13 Block 14 OFFICE Zone 14 Total /Ave. Zone 14 Block 15 SERVICE Zone 15 Total /Ave. Zone 15 Block 16 COPY Zone 16 Total /Ave. Zone 16 Block System 2 Total /Ave. System 2 Block Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE '1 Zone 2' Total /Ave. Zone 2 Block 3 OFFICE 2 tone 3 Total /Ave, Zone 3 Block 4 ENGINEERING Zone 4 Total/Ave. Wall Plenum Load (Btuh) BUILD Wall Plenm CLTD (F) ING ENVELOPE COOLING LOADS (Wall - Window) (At time of Space Peak) Wall Wall Glass Glass Glass Glass Glass Glass Glass Space Space Space Return Air Solar Space Space Return Air R.A, Load CLTD Solar Solar CLF Conduction CLTD Conduction CLTD (Btuh) (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) 182 14.2 2,287 49.4 0 17,645 0.997 0 0.0 -2,778 -35.2 0 0.0 671 73,2 0 9,213 1.000 0 2,1 -1,293 -38.9 0 0.0 671 73.2 0 9,213 1.000 0 0.0 -1,293 . -38.8 0 0.0 671 73.2 0 9,213 1.000 0 0.0 -1,363 -40.9 -71 -27,8 129 13.1 0 5,249 0.980 0 -13.6 -949 -54.5 -71 -27.8 128 13.1 0 5,249 0,990 0 0.0 -949 -54.5 -71 -27.8 129 13.1 0 5,249 0.980 0 0.0 -712 -40.9 0 0.0 0 0,0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0,0 0 0.0 0 0.0 0 0,0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0,0 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0,0 0 0.0 0 0,0 0 0 0.000 0 0,0 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0,0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0,0 0 0.0 -113 -20.9 216 20.0 0 0 0.000 0 0.0 0 0.0 -113 -20.9 216 20,0 0 0 0.000 0 0,0 0 0.0 -113 -20.9 216 20.0 0 0 0.000 0 0.0 0 0,0 0 0.0 0 0.0 0 0 0.000 0 0,0 0 0.0 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0.0 0 0.0 0 0,0 0 0 0.000 0 0.0 0 0.0 -185 -23.1 1,015 34.1 0 14,462 0.993 0 0.0 -2,241 -44.2 -69 -7,6 953 33.3 0 9,939 0.798 0 0.0 -2,075 -40.9 BUILDING ENVELOPE COOLING LOADS (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) Exposed Expsd Floor Floor Partition Part. Infilt, Infilt. Sensible CLTD Sensible CLTD Airflow Sensible (Btuh) (F) (Btuh) (F) (Cfm) '(Btuh) 0 0.0 0 0.0 2 5 0 0.0 0 0.0 ' 2 . 5 0 0,0 0 0,0 2 .. 5 0 0.0 0. 0,0 1 3 0 0.0 0 0.0 1 3 0 0.0 0 0.0 1' 3 0 0.0 0 0.0 2 6 0 0.0 0 0.0 2 6 0 0.0 0 0,0 2 6 0 0.0 0 ' 0.0 5 19 0 0,0 0 0.0 5 18 Plenm Ceiling Infilt, Dry B Sensible Envelope. Latent Temp. Load Total. (Btuh) (F) '(Btuh) (Btuh) -16 113.2 ' .1,717 9,110 -16 113.2 1,717 ' 9,110 -16 113:2 1,717 9,051 -9 113.2 1,193 9,854 -9 113.2 1,193 • 9,854 -9 113.2 1,193 ,. 9,784 -13 113,2':. 2,048 3,454 -13 113.2 2,048 • 3,454. -13 113.2_;: 2,048 `; 3,417, =9. 113.2; 3,942` 4,.495. -9 113.2 . 3,942 ,.:.4,495 Room Number Description Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave, Zone 5 .Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave, Zone 8 Block 9 FOYER Zone 9 Total /Ave. Zone 9 Biock System 1 Total /Ave, System 1 Block 10 RECEPTION Zone 10 Total /Ave. Zone 10 Block 11 CONFERENCE Zone 11 Total/Ave. Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave. Zone 12 Biock 13 OFFICE Zone 13 Total /Ave, Zone 13 Block 14 OFFICE Zone 14 Total /Ave. Zone 14 Block 15 SERVICE Zone 15 Total /Ave. Zone 15 Biock 16 COPY Zone 16 Total /Ave. Zone 16 Block System 2 Total /Ave. System 2 Block Trane Air Conditioning Economics By: C,D.S, MARKETING COOLING LOADS AT SPACE PEAK - ALTERNATIVE 1 BUILDING ENVELOPE COOLING LOADS (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) Exposed Expsd Floor Floor Partition Part. Infilt. Infilt. Sensible CLTD Sensible CLTD Airflow Sensible (Btuh) (F) (Btuh) (F) (Cfm) (Btuh) 0 0.0 0 0.0 5 18 0 0.0 0 0.0 2 7 0 0,0 0 0.0 2 7 0 0.0 0 0,0 2 7 0 0.0 0 0.0 2 9 0 0.0 0 0,0 2 9 0 0.0 0 0.0 2 9 0 0,0 0 0.0 3 10 0 0.0 0 0.0 3 10 0 0.0 0 0.0 3 10 0 0.0 0 0,0 2 8 0 0.0 0 0.0 2 8 0 0.0 0 0.0 2 8 0 0.0 0 0.0 7 27 0 0.0 0 0.0 7 27 0 0.0 0 0.0 7 27 0 0.0 0 0.0 27 92 0 0.0 0 0,0 27 62 0 0.0 0 0.0 4 10 0 0.0 0 0.0 4 10 0 0.0 0 0,0 4 10 0 0.0 0 0.0 2 -34 0 0.0 0 0.0 2 -34 0 0.0 0 0,0 2 -34 0 0.0 0 0.0 2 9 0 0.0 0 0.0 2 9 0 0.0 0 0,0 2 9 0 0.0 0 0.0 2 6 0 0.0 0 0.0 2 6 0 0,0 0 0,0 2 6 0 0,0 0 0.0 1 4 0 0.0 0 0.0 1 4 0 0.0 0 0.0 1 4' 0 0,0 0 0.0 5 19 0 0,0 0 0.0 5 19 0 0.0 0 0.0 5 19 0 0.0 0 0.0 2 7 0 0.0 0 0.0 2 0 0,0 0 0,0 .2 0 0.0 0 0.0 18 0.0 0 0.0 18 . Infilt. Latent (Btuh) Plena Dry B Temp. (F) -9 113.2 -4 113.2 -4 113.2 -4 113.2 -5 113.2 -5 113.2 -5 113.2 -3 113,2 -3 113.2 -3 113.2 -9 113.2. -9 113.2 -9 113.2 -43 113.2 -43 113.2 -43 113.2 -111 113.2 -207 113,2 - 22 118.9 -22 118,9 -22 118.9 -38 118.9 -38 .118.9. - 38 118.9 -9 118.9 -9 118.9 -9 118.9 -5. 118.9 -5 118,9 -5 118.9 -4 118.9 -4 118.9 -4' 118.9 -7 118.9, -7 118.9 -7 118.9 -5 118.9 -5 118.9 -5 . 118.9 - 89.'118.9 -52 .118.9 Ceiling Sensible Load (Btuh) 3,942 1,482 1,482 1,482 1,895 1,895 1,895 2,174 2,174 2,174 1,717 1,717 1,717 6,094 6,094 6,094 22,260 22,260 4,112 4,112 4,112. 2,212 ,2,212 2,212 2,212 `2,212 2,212 1,517 1,517 1,517 1,043 1,043. • 1,043 4,849 4,849, 4,849 1,711: 1,711 1,711 17,657 17,657.' V 600 PAGE 16 Envelope Total '(Btuh) 4,495 1,690 1,690 1,690 2,160 2,160 2,160 2,656 2,656 2,656 1;953 1,953 1,953 6,965 6,965 6,965 42,338 42,079 13,052 13,052 12,982 6,220 .6,220 6,456 2,426 2,426 2,426 1,665 1,665 4,665 1,144 '. 1,144 1,144 , 5;433. 5,433 5,433' ` 1,879 1,879' 1,879 28,129' Room Number Trane Air Conditioning Economics By: C.D.S. MARKETING HEATING LOADS AT COIL PEAK - ALTERNATIVE 1 1 CONSTRUCTION OFF on 1 Total /Ave, Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave, Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave, one 4 Block 5 ESTIMATING Zone 5 Total /Ave. Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE. Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave. Zone 8 Block 9 FOYER Zone 9 Total /Ave. Zone 9 Block System 1 Total /Ave, System 1 Block 10 RECEPTION Zone 10 Total /Ave. Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave, Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave, Zone 12 Block 13 OFFICE Zone 13 Total /Ave. Zone 13 Block 14 OFFICE Zone 14 Total /Ave, Zone 14 Block 15 SERVICE Roof Return Air Sensible Load Description (Btuh) BUILDING ENVELOPE HEATIN6 (Roof - Skylight) (At time of Coil Peak) Roof Roof Space Roof Skylight R.A. Sensible Space Return Air CLTD Load CLTD Solar • (F) (Btuh) (F) (Btuh) Skylight Space Solar (Btuh) LOADS Skylt Solar CLF V 600 PAGE 17 Skylight Skylight Return Air Skylt Space Skylt Conduction R.A. Conduction Space Load CLTD Load CLTD (Btuh) (F) (Btuh) (F) 0 0.0 0 0.0 0 0 0.000 0 0.0 0 0 0.0 0 0.0 0 0 0 .000 0 0.0 0 0 0.0 0 0,0 0 0 0.000 0 0.0 0 - 190 -35.4 0 -46,0 0 0 0.000 0 0.0 0 -190 -35.4 0 -46.0 0 0 0.000 0 0,0 0 -190 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -326 -35.4 0 -46.0 0 0 0.000 0 0.0 0 - 326 -35.4 0- 46.0 0 0 0.000 0 0.0 0 -326 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -627 -35.4 0 -46.0 0 0 0.000 0 0,0 0 - 627 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -627 -35.4 0 -46.0 0 0 0.000 0 0.0 0 - 236 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -236 -35.4 0 -46,0 0 0 0.000 0 0.0 0 -236 -35.4 0 -46.0 0 0 0.000 0 0,0 0 -301 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -301 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -301 -35.4 0 -46.0 0 0 0,000 0 0.0 0 -346 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -346 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -346 -35.4 0 -46.0 0 0 0.000. 0 0.0 0 -273 -35.4 0 -46.0 0 0 0.000 0 0.0 0 - 273 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -273 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -969 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -969 -35.4 0 -46.0 0 0 0,000 0 0.0 . 0 - 969 -35,4 0 -46.0 0 0 0.000 0 0.0 .0 -3,267 -35,4 0 -46.0 0 0 0.000 0 0,0 . 0 -3,267 -35.4 0 -46.0 0 0 0,000 0 0.0, 0 -561 -35.4 0 -46.0 0 0 0.000 0. 0.0 0 -561 -35.4 0 -46,0 0 0 0.000 0 0.0 0 - 561 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -302 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -302 -35,4 0 -46.0 0 0 0.000 0 0.0 0 - 302 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -302 -35.4 0 -46.0 ' 0 0 0.000 0 . 0.0 0 -302 -35.4 0 -46,0 0 ' 0 0.000 0 0,0 0 -302 -35.4 0 -46.0 . 0 0 0.000 0 0.0 0 -207 -35.4 ' 0 -46.0 0 0 0.000 0 0.0 ' 0 -207 -35.4 0 -46.0 0 . 0 '0.000 .0. 0.0 ' 0 -207 -35.4 0 -46.0 0 0 0.000 0 00 4 -142 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -142 -35,4 0 - 46.0 0 0 0,000. 0 0,0 0 -142 -35.4 0 -46.0 0 0 0.000 0 0.0 -662 -35,4 0 -46,0. 0 0 0.000 0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0,0 0.0 0.0 00 0.0 0.0 0.0 Trane Air Conditioning Economics By C,D,S. MARKETING HEATING LOADS AT COIL PEAK - ALTERNATIVE 1 Room Number Description Zone 15 Total /Ave. Zone 15 Block 16 COPY Zone 16 Total /Ave. Zone 16 Biock System 2 Total /Ave, System 2 Block Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave. Zone 3 Biock 4 ENGINEERING Zone 4 Total /Ave. Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave. Zone 5 Block 6 TYPING Zone 6 Total /Ave, Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave. Zone 8 Block 9 FOYER Zone 9 Total /Ave, . Zone 9 Block System 1 Total /Ave. BUILDING ENVELOPE HEATING (Roof - Skylight) (At time of Coil Peak) Roof Roof Return Air Roof Space Roof Skylight Sensible R,A, Sensible Space Return Air Load CLTD Load CLTD Solar (Btuh) (F) (Btuh) (F) (Btuh) -662 -35.4 -662 -35.4 -234 -35.4 -234 -35.4 -234 -35.4 -2,410 -35.4 -2,410 -35,4 Wall Plenum Load (Btuh) 0 0 0 0 0 0 -151 -151 -151 0 0 0 0 0 0 0 0 0 -251 -251 -251 0 0 0 -63 -63 -63 -465 Wall Plenm CLTD (F) 0.0 0.0 0.0 0.0 0.0 0.0 - 35.4 -35.4 -35.4 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 -35,4 -35,4 - 35.4 0.0 0.0 0.0 -35.4 -35.4 -35.4 - 35..4. Wall Space Load (Btuh) 0 0 0 0 0 0 0 -46.0 -46.0 -46.0 -46.0 -46.0 -46.0 -46.0 Wall Space CLTD (F) Skylight Space Solar (Btuh) Glass Glass Space Return Air Solar Solar (Btuh) (Btuh) LOADS Skylt Solar CLF 0 0 0.000 0 0 0.000 0 0 0.000 0 0 0.000 0 0 0,000 0 0 0,000 0 0 0.000 BUILDING ENVELOPE HEATING LOADS (Wall - Window) (At time of Coil Peak) Glass Solar CLF Skylight Return Air Conduction Load (Btuh) Skylt R,A. CLTD (F) 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 Skylight Space Conduction Load (Btuh) V 600 PAGE 18 Skylt Space CLTD (F) 0 0.0 0 0,0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 Glass Glass Glass Glass Space Space Return Air R.A, Conduction CLTD Conduction CLTD (Btuh) (F) (Btuh) (F) - 327 -46.0 0 0 0,000 0 -46.0 -1,054 -327 -46.0 0 0 0.000 0 0,0 -1,054 -327 -46,0 0 0 0.000 0 0,0 314 -255 -46.0 0 0 0,000 0 -46.0 -1,242 -255 -46.0 0 0 0.000 0 . 0,0 -1,242 - 255 -46.0 0 0 0.000 0 0.0 370 -716 -46.0 0 0 0.000 0 -46.0 -649 -716 -46.0 0 0 0.000 0 0.0. -649 -716 -46.0 0 0 0.000 0 0.0 193 0 0.0 0 0 0,000 0 0.0 0 0 0,0 0 0 0.000 0 0.0 0 0 0.0 0 0 0.000 0 0.0 0 0 0.0 0 0 0.000 0 0.0 0 0 0.0 0 0 0,000 0 0.0 0 0 0.0 0 0 .0.000 0 0.0 0 0 0.0 0 0 0.000 0 0.0 0 0 0,0 0 0 0.000 0 0.0 .0 o 0.0 0 o 0.000 0 0.0 0 -651 -46,0 ' 0 0 0.000 . ' 0 0,0 0 -651 -46.0 0 0 0.000 0 ' 0.0 0 -651 -46.0 0 0 0,000 0 0.0 0 0 0,0 0 0 0.000 0 .0,0 ' 0 0 0.0 0 0 0.000 0 0,0 0 0 0,0 0 0 0.000 0 0.0 0 -164 -46.0 0 0 0.000 `0 0.0 0 -164 -46.0 0 ' 0 0.000 0 .. 0.0 . 0 -164 -46.0. 0 0 0.000 0 0,0 , 0 -2,113 -46,0 0 0 0,000 0 0.0 2,945 -35.4 -35.4 10.6 -35,4 -35.4 10.6 -35.4 -35.4 10.6 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,.0 0.0 0.0. 0,0 Trane Air Conditioning Economics By: C,D.S, MARKETING HEATING LOADS AT COIL PEAK - ALTERNATIVE 1 Room Number Description System 1 Block 10 RECEPTION Zone 10 Total /Ave, Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave, Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave. Zone 12 Block 13 OFFICE Zone 13 Total /Ave. Zone 13 Block 14 OFFICE Zone 14 Total /Ave. Zone 14 Block 15 SERVICE Zone 15 Total /Ave. Zone 15 Block 16 COPY Zone 16 Total /Ave. Zone 16 Block System 2 Total /Ave. System 2 Block Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave. Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave. Wall Plenum Load (Btuh) BUILDING ENVELOPE HEATING LOADS (Wall - Window) (At time of Coil Peak) -452 0 0 0 -91 -91 -91 0 0 0 0 0 0 0 U 0 -192. -192 -192 0 0 0 -282 -324 Wall Plenm CLTD (F) -35.4 0.0 0.0 0.0 -35.4 -35.4 -35,4 0,0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -35.4 -35,4 -35.4 0.0 0.0 0,0 -35.4 -35.4 Wall Space Load (Btuh) -2,129 -422 -422 -422 -450 -450 -450 0 0 0 0 0 0 0 0 -498 -498 -498 0 0 0 -1,369 -1,315 Wall Space CLTD (F) -46.0 -46.0 -46.0 -46,0 -46.0 -46.0 -46.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 -46.0 -46.0 -46.0 0.0 0.0 0.0 -46.0 -46.0 Glass Space Solar (Btuh) Glass Return Air Solar (Btuh) 0 0 0 0 0 0 t) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 n 0 0 0 0 0 Glass Solar CLF 0.000 0.000 0.000 0.000 0.000 0.000 0,000 0,000 0.000 0.000 0.000 0.000 0,000 0.000 0.000 0.000 0.000 0.000 0,000 0.000 0.000 0.000 0.000 0,000 BUILDING ENVELOPE HEATING LOADS (Exposed Floor - Partitions - Infiltration) (At time of Coil Peak) Exposed Expsd Floor Floor Partition Part. Infilt. Infilt. Infilt. Sensible CLTD Sensible CLTD Airflow Sensible Latent (Dtuh) (F) (Btuh) (F) (Cfm) (Btuh) (Btuh) 0 0.0 0 0.0 2. -104 0 0 0.0 0 0.0 2 -104 0 0 0.0 0 0.0 2 -104 0 0 0.0 0 0,0 1 -72 0 0 0,0 0 0.0 1 -72 0 0 0.0 0 0.0 1 -72 0 0 0.0 0 0.0 2 -124 0 0 0.0 0 0.0 2 -124 0 0 0.0 0 0.0 2 -124 0 0 0,0 0 0.0 5 -238 0 0.0 0 0.0 5 -238 Glass Space Conduction (Btuh) Plena Dry B Temp. (F) 0 0.0 0 -46.0 0 0.0 0 0.0 0 -46.0 0 0.0 0 0,0 0 0.0 0 0.0 0 0.0 0 0,0 0 0.0 0 0.0 0 0,0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0,0 0 0.0 0 0.0 0 0.0 0 0.0 59,4 59,4 59.4 59.4 59.4 59.4 59.4. 59.4.. 59.4 59.4 59.4 Glass Space CLTD (F) Glass Return Air Conduction (Btuh) Ceiling Sensible Load (Btuh) -515 -515 -515 -358 -358 =358 -614 -614 -614 -1,182. -1,182 877 -1,240 -1,240 372 -648 -648 194 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -1,888 566 V 600 PAGE 19 Glass R.A. CLTD (F) 10,6 - 35.4 - 35.4 10.6 - 35,4 -35,4 10.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0,0 0,0 - 35.4 10.6 Envelope Total. (Btuh) -2,000 -2,000 -631 -2,116 -2,116 -504- .-2,580 2,580 -1,738 -2,047 -2,047 Trane Air Conditioning Economics V 600 By: C,D,S. MARKETING PAGE 20 HEATING LOADS AT COIL PEAK - ALTERNATTIVE 1 Room Number Description BUILDING ENVELOPE HEATING LOADS (Exposed Floor - Partitions - Infiltration) (At time of Coil Peak) Exposed Expsd Plena Ceiling Floor Floor Partition Part. Infilt, Infilt, Infilt. Dry B Sensible Envelope Sensible CLTD Sensible CLTD Airflow Sensible Latent Temp. Load Total (Btuh) (F) (Btuh) (F) (Cfm) (Btuh) (Btuh) (F) (Btuh) (Btuh) Zone 4 Block 0 0.0 0 0.0 5 -238 0 59.4 -1,182 -2,047 5 ESTIMATING 0 0.0 0 0.0 2 -90 0 59.4 -445 -770 Zone 5 Total /Ave. 0 0.0 0 0.0 2 -90 0 59.4 -445 -770 Zone 5 Block 0 0.0 0 0.0 2 -90 0 59,4 -445 -770 6 TYPING 0 0.0 0 0.0 2 -115 0 59.4 -568 -984 Zone 6 Total /Ave. 0 0.0 0 0.0 2 -115 0 59.4 -568 -984 lone 6 Block 0 0.0 0 0.0 2 -115 0 59.4 -568 -984 7 OFFICE 0 0.0 0 0.0 3 -131 0 59.4 -652 -2,031 Zone 7 Total /Ave. 0 0.0 0 0.0 3 -131 0 59.4 -652 -2,031 Zone 7 Block 0 0.0 0 0.0 3 -131 0 59.4 -652 -2,031 8 LUNCH 0 0,0 0 0.0 2 - 104 0 59.4 -515 -892 Zone 8 Total /Ave. 0 0.0 0 0.0 2 -104 0 59.4 -515 -892 lone 8 BIock 0 0.0 0 0.0 2 -104 0 59.4 -515 -892 9 FOYER 0 0,0 0 0.0 7 -368 0 59.4 -1,828 -3,393 Zone 9 Total /Ave. 0 0.0 0 0.0 7 -368 0 59.4 -1,828 -3,393 Zone 9 Block 0 0.0 0 0.0 7 -368 0 59,4 -1,828 -3,393 System 1 Total /Ave. 0 0.0 0 0.0 27 -1,346 0 59.4 -6,677 - 16,813 System 1 Block 0 0,0 0 0.0 27 -1,346 0 59.4 -6,677 - 12,994 10 RECEPTION 0 0.0 0 0.0 4 -214 0 59.4 -1,066 - 3,503 Zone 10 Total /Ave. 0 0.0 0 0.0 4 -214 0 59.4 7.1,066 -3,503 Zone 10 Block 0 0.0 0 0.0 4 -214 0 59.4 -1,066 -1,891 • 11 CONFERENCE 0 0.0 0 0.0 2 -115 0 59.4 -574 - 2,179. lone 11 Total /Ave. 0 0,0 0 0.0 2 -115 0 59.4 -574 - 2,179 Zone 11 Block 0 0.0 0 0.0 2 -115 0 59.4 -574 -1,337 12 COMPTROLLER 0 0,0 0 0.0 2 -115 0. 59.4 -574 -991 Zone 12 Total /Ave, 0 0.0 0 0.0 2 -115 . 0 59.4 -574 -991 Zone 12 Block 0 0.0 0 0.0 2 -115 0 59,4 ' -574 -991 13 OFFICE 0 0.0 0 0.0 2 -79 0 59.4 ' -393 -679 Zone 13 Total /Ave. 0 0.0 0 0.0 2 -79 .0 • 59.4 -393 -679 Zone 13 Block 0 0.0 0 0.0 2 -79 0 59.4 '-393 7'679 14 OFFICE 0 0.0 0 0,0 1 -54. 0 59.4 -270 -467 Zone 14 Total /Ave, 0 0.0 0 0.0 1 -54 ' 0 .59,4 ' 7.270 -467 Zone 14 Block 0 0.0 0 0.0 1 . -54 0 59.4 :-270 ' -467 15 SERVICE 0 0.0 0 0,0 5 . -252 0 '59.4_. 1,258 ' - 2,861, -. Zone 15 Total /Ave, 0 0,0 0 0,0 5 -252 0 59.4. 1,258 2,861': Zone 15 Block 0 0.0 . 0 0.0 5 -252 0 59,4 -1,258 :-2;861 16 COPY 0 0.0 0 0.0 2 -89 0 .59.4 .444 =766 Zone 16 Total /Ave. 0 0.0 0 0.0 2 -89 0: 59.4 '-444. -766 Zone 16 Block 0 •0.0 • 0 0.0 2 -89 0 59.4 -444 - 766 System 2 Total /Ave. 0 0,0 0 0.0 18 . -918 0 59:4 -4,579 11,446 System 2 Block 0 0.0 .. 0 0.0. '.18 ' -918, 0 .59.4;. 4;579 8,979 Trane Air Conditioning Economics By: C.D.S, MARKETING HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave, Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave. Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave. Zone 5 Block 6 TYPING Zone 6 Total /Ave, Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave, Zone 8 Block 9 FOYER Zone 9 Total /Ave. Zone 9 Block System 1 Total /Ave. System 1 Block 10 RECEPTION Zone 10 Total /Ave. Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave. Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave. Zone 12 Block 13 OFFICE Zone 13 Total /Ave. Zone 13 Block 14 OFFICE Zone 14 Total /Ave. Zone 14 Block 15 SERVICE Roof Return Air Sensible Load (Btuh) BUILD! Roof R.A. CLTD (F) NG ENVEL (Roof (At time Roof Space Sensible Load (Btuh) OPE HEATING LOADS - Skylight) of Space Peak) 0 0.0 0 0.0 0 0 0.000 0 0.0 0 o 0.0 0 0,0 0 0 0.000 0 0.0 0 0 0.0 0 0,0 0 0 0,000 0 0.0 0 -190 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -190 -35.4 0 -46.0 0 0 0,000 0 0.0 0 -190 -35.4 0 -46,0 0 0 0.000 0 0.0 0 -326 -35.4 0 -46,0 0 0 0,000 0 0.0 0 -326 -35,4 0 -46,0 0 0 0,000 0 0,0 0 -326 -35.4 0 -46.0 0 0 0.000 0 0.0 0 - 627 -35.4 0 -46,0 0 0 0,000 0 0.0 0 -627 -35,4 0 -46.0 0 0 0,000 0 0.0 0 -627 -35.4 0 -46.0 0 0 0.000 0 0,0 0 -236 -35,4 0 -46.0 0 0 0.000 0 0.0 0 -236 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -236 -35.4 0 -46,0 0 0 0.000 0 0.0 0 - 301 -35.4 0 -46.0 0 0 0.000 0 0.0 0 - 301 -35.4 0 -46,0 0 0 0.000 0 0.0 0 - 301 -35,4 0 -46,0 0 0 0.000 0 0.0 0 - 346 -35.4 0 -46.0 0 0 0,000 0 0.0 0 -346 -35.4 0 -46.0 0 0 0.000 0 0.0 0 - 346 -35.4 0 -46.0 0 0 0,000 0 0.0 0 -273 -35.4 0 -46,0 0 0 0.000 0 0.0 0 -273 -35.4 0 -46.0 0 0 0.000 0 0.0 0 - 273 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -969 -35.4 0 -46,0 0 0 0,000 0 0.0 0 - 969 -35.4 0 -46.0 0 0 0.000 0 0.0 0 - 969 -35,4 0 -46.0 0 0 0.000 0 0.0 0 -3,267 -35.4 0 -46.0 0 0 0.000 0 0,0 0 -3,267 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -561 -35.4 0 -46,0 0 0 0.000 0 0.0 0 -561 -35.4 0 -46,0 0 0 0.000 0 0.0 0 -561 -35,4 0 -46,0 0 0 0.000 0 0,0 0 -302 -35.4 0 -46.0 0 0 0.000 0 0.0 0 -302 -35.4 0 -46.0 0 0 0.000 0 0.0. 0 -302 -35.4 0 -46,0 0 0 0.000 0 0.0 o - 302 -35.4 0 -46.0 0 0 0.000 0 0.0 0 =302 -35.4. 0 -46.0 0 0 0,000 0 0.0 0 -302 -35.4 0 -46,0 0 0 0.000 0 0,0 .0 -207 -35.4 0 -46.0 0 0 0.000 0 0,0 0 -207 -35.4 0 -46.0 0 0 0.000 . 0 0.0 0 -207 -35.4 0 -46.0 0 0 0.000 0 0.0 , 0 -142 -35.4 0 -46.0 0 0 0,000 0 0.0 - 142 -35,4 0 -46.0 0 0 0.000 , 0 0.0 0 -142 -35.4 0 -46,0 0 0 .0,004 0 0.0 -662 -35.4 0 -46,0 0 0 0,000 0 0,0 V 600 PAGE 21 Skylight Skylight Roof Skylight Skylight Skylt Return Air Skylt Space Skylt Space Return Air Space Solar Conduction R.A. Conduction Space CLTD Solar Solar CLF Load CLTD Load CLTD (F) (Btuh) (Btuh) (Btuh) (F) (Btuh) (F) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0,0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0.. 0.0 0.0 0.0 0,0 0.0 0, 0 .' 0.0 Room Number Description Trane Air Conditioning Economics By: C.D.S. MARKETING HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 Room Number Description Zone 15 Total /Ave. Zone 15 Block 16 COPY Zone 16 Total /Ave. Zone 16 Block System 2 Total /Ave, System 2 Block 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total/Ave. Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave. Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave. Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave, Zone 7 Block 8 LUNCH Zone 8 Total /Ave. Zone 8 Block 9 FOYER Zone 9 Total /Ave, Zone 9 Block. System 1 Total /Ave., BUILDING ENVELOPE HEATING (Roof - Skylight) (At time of Space Peak) Roof Roof Return Air Roof Space Roof Skylight Sensible R.A. Sensible Space Return Air Load CLTD Load CLTD Solar (Btuh) (F) (Btuh) (F) (Btuh) -662 -35.4 -662 -35,4 -234 -35.4 -234 -35.4 -234 -35.4 -2,410 -35,4 -2,410 -35.4 BUILDIN Wall Wall Plenum Plenm Load CLTD (Btuh) (F) 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 -151 -35.4 -151 -35.4 -151 -35.4 0 0.0 0 0.0 0 0,0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 -251 -35.4 -251 -35.4 -251 -35.4 0 0.0 0 0.0 0 0.0' -63 -35.4 -63 -35.4 -63 -35.4 -465 -35,4 0 0 0 0 0 0 0 -46.0 -46.0 -46.0 -46.0 -46.0 -46.0 -46.0 0 0 0 0 0 0 0 Skylight Space Solar (Btuh) G ENVELOPE HEATING (Wall - Window) (At time of Space Peak) Wall Wall Space Space Load CLTD (Btuh) (F) -327 -46,0 -327 -46,0 -327 -46.0 -255 -46.0 -255 -46.0 -255 -46.0 -716 -46,0 - 716 -46.0 -716 -46.0 0 0.0 0 0.0 0 0.0 0 '0,0 0 0.0. 0 0,0 0 0.0 0 0.0 0 0.0 -651 -46.0 -651 -46.0 -651 -46,0 0 0.0 0 0,0 0 0.0. - 164 -46.0 - 164 -46.0 -164 -46.0 -2,113 -46.0 Glass Glass Space Return Air Solar Solar (Btuh) (Btuh) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0. 0 0 0 0 0 0 0 0. 0 0 0 0 0 0 (0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LOADS Skylt Solar CLF 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 0,000 LOADS Glass Solar CLF 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0,000 0,000 0.000 0,000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000,. 0.000 Skylight Return Air Conduction Load (Btuh) Glass Glass Space Space Conduction CLTD (Btuh) (F) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0" 0 0 0 0 0 .0 0 Skylt R.A. CLTD (F) 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0,0 0 0,0 -46.0 0.0 0.0 -46.0 0.0 0,0 -46.0 0.0 0.0 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0.; 0.0 0.0. 0.0. 0.0 0.0 Skylight Space Conduction Load (Btuh) Glass Return Air Conduction (Btuh) -1,054 -1,054 314 -1,242 -1,242 370 -649 -649 193 0 0 0 0 0 0. 0 0 V 600 PAGE 22 Skylt Space CLTD (F) 0 0.0 0 0.0 0 0,0 0 0,0 0 0.0 0 0.0 0 0.0 Glass R.A. CLTD (F) -35.4 -35.4 10.6 -35,4 -35,4 10.6 -35,4 -35,4 10.6 0.0 0.0 0.0 0,0 0.0 0.0 , 0.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0. 0.0 0.0 0.0 0.0 -35,4 Trane Air Conditioning Economics By: C.D.S. MARKETING Room Number Description Room Number Description System 1 Biock 10 RECEPTION Zone 10 Total /Ave, Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave. Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave. Zone 12 Block 13 OFFICE Zone 13 Total /Ave. Zone 13 Block 14 OFFICE Zone 14 Total /Ave, Zone 14 Block 15 SERVICE Zone 15 Total /Ave. Zone 15 Block 16 COPY Zone 16 Total /Ave. Zone 16 Block System 2 Total /Ave. System 2 Block 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Biock 3 OFFICE 2 Zone 3 Total /Ave. Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave. Wall Plenum Load (Btuh) HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 BUILD Wall Plenm CLTD (F) -452 -35.4 0 0.0 0 0.0 0 0.0 -91 -35.4 -91 -35.4 -91 -35.4 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 -192 -35,4 -192 -35.4 -192 -35,4 0 0.0 0 0.0 0 0.0 -282 -35.4 -324 -35.4 1NG ENVELOPE' HEATING LOADS (Wall - Window) (At time of Space Peak) Wall Space Load (Btuh) - 2,129 -422 -422 -422 -450 -450 -450 0 0 0 0 0 0 0 0 -498 -498 -498 0 0 0 - 1,369 -1,315 Wall Space CLTD (F) -46.0 -46.0 -46.0 -46.0 -46.0 -46,0 -46.0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -46.0 -46,0 -46,0 0.0 0.0 0.0 -46.0 -46.0 Glass Space Solar (Btuh) 0 0.0 0 0.0 2 0 0.0 0 0.0 2 0 0.0 0 0.0 2 0 0,0 0 0,0 1 .. 0 0,0. 0 0.0 1 0 0,0 0 . 0,0 1 0 0.0 0 0.0 2 0 0.0 0 0.0 2 0. 0.0 . . 0 0,0 .. 2 .: 0 :.0.0 0 0.0 5 0 0.0 0 0.0 Glass Return Air Solar (Btuh) 4 0 0.000 0 0 0,000 0 0 0.000 0 0 0,000 0 0 0.000 0 0 0.000 0 0 0.000 0 0 0.000 0 0 0,000 0 0 0.000 0 0 0.000 0 0 0,000 0 0 0,000 0 0 0,000 0 0 0.000 0 0 .0.000 0 0 0,000 0 0 0.000 0 0 0,000 0 0 0,000 0 0 0.000 0 0 0.000 0 0 0,000. 0 0 0.000 BUILDING ENVELOPE HEATING LOADS (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) Exposed Expsd Floor Floor Partition Part, Infilt. Infilt, Sensible CLTD Sensible CLTD Airflow Sensible (Btuh) (F) (Btuh) (F) (Cfm) (Btuh). - 104 - 104 -104 -72 -72 -72 . -124 -124 -124 723O -238 Glass Solar CLF Glass Space Conduction ,(Btuh) Infilt. Latent (Btuh) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Plenm Dry. B' Temp.. • (F) Glass Space CLTD (F) 0.0 -46.0 0.0 0.0 -46.0 0,0 0,0 0.0 0.0 0.0 0.0 0.0 0.0 0,0 0.0 0.0 0,0 0.0 0,0 0,0 0.0 0.0 0.0 0.0 Glass Return Air Conduction (Btuh) Ceiling. Sensible Load (Btuh) V 600 PAGE 23 Glass R.A. CLTD (F) 877 10.6 -1,240 -35.4 - 1,240 -35.4 372 10.6 -648 -35.4 -648 -35.4 194 10.6 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 -1,88B -35.4 566 10.6 Envelope .Total (Btuh) 0 59.4 '' . -515 ; `-2 : :0 59,4 -515 . ' -2000 0 59.4 -515 631'. 0 59,4` . , .,-358 ' 2,116 "' 0 59.4 :- -2,116_ 59.4 -358 -504 59.4 -614.1 -2,580 59.4 -614 ' 7.2,580 59.4. -614 . 1,738 :.. 0 59.4.: -1,182 : -1,047. 54.4 -1,182 -2,047 Trane Air Conditioning Economics By: C.D.S. MARKETING HEATING LOADS AT SPACE PEAK - ALTERNATIVE 1 BUILDING ENVELOPE HEATING LOADS (Exposed Floor - Partitions - Infiltration) (At time of Space Peak) V 600 PAGE 24 Exposed Expsd Plenm Ceiling Floor Floor Partition Part. Infilt. Infilt, Infilt, Dry B Sensible Envelope Room Sensible CLTD Sensible CLTD Airflow Sensible Latent Temp. Load Total Number Description (Btuh) (F) (Stub) (F) (Cfm) (Btuh) (Btuh) (F) (Btuh) (Btuh) Zone 4 Block 0 0,0 0 0.0 5 -238 0 59.4 -1,182 -2,047 5 ESTIMATING 0 0,0 0 0.0 2 -90 0 59.4 -445 -770 Zone 5 Total /Ave. 0 0.0 0 0.0 2 -90 0 59.4 -445 -770 Zone 5 Block 0 0,0 0 0.0 2 -90 0 59.4 -445 -770 6 TYPING 0 0.0 0 0,0 2 -115 0 59.4 -568 -984 Zone 6 Total /Ave. 0 0,0 0 0.0 2 -115 0 59.4 -568 -984 Zone 6 Block 0 0.0 0 0.0 2 -115 0 59,4 -568 -984 7 OFFICE 0 0,0 0 0,0 3 -131 0 59,4 -652 -2,031 Zone 7 Total /Ave, 0 0.0 0 0.0 3 -131 0 59.4 -652 -2,031 Zone 7 Block 0 0.0 0 0.0 3 -131 0 59.4 -652 -2,031 8 LUNCH 0 0.0 0 0.0 2 -104 0 59.4 -515 -892 Zone 8 Total /Ave. 0 0,0 0 0.0 2 -104 0 59.4 -515 -892 Zone 8 Block 0 0,0 0 0.0 2 -104 0 59.4 -515 -892 9 FOYER 0 0.0 0 0.0 7 -368 0 59.4 -1,828 -3,393 lone 9 Total /Ave. 0 0.0 0 0.0 7 -368 0 59.4 -1,828 -3,393 Zone 9 Block 0 0.0 0 0.0 7 -368 0 59.4 - 1,828. -3,393 System 1 Total /Ave. 0 0.0 0 0,0 27 -1,346 0 59.4 -6,677 -16,813 System 1 Block 0 0.0 0 0,0 27 -1,346 0 59,4 -6,677 - 12,994 10 RECEPTION 0 0,0 0 0,0 4 -214 0 59.4 -1,066 - 3,503, Zone 10 Total /Ave, 0 0,0 0 0.0 4 -214 0 59.4 -1,066 -3,503 Zone 10 Block 0 0.0 0 0.0 4 -214 0 59.4 -1,066 -1,891 11 CONFERENCE 0 0,0 0 0.0 2 -115 0 59,4 . -574 -2,179 Zone 11 Total /Ave, 0 0.0 0 0.0 2 -115 0 59.4 -574 -2,179 Zone 11 Block 0 0,0 0 0.0 2 . -115 0 59.4. -574 -1,337 12 COMPTROLLER 0 0,0 0 0.0 2 -115 0 59.4 574 ' -991 Zone 12 Total /Ave. 0 0.0 0 0.0 2 -115 0 59.4 -574 -991 Zone .12 Block 0 0.0 0 0,0 2 -115 0 59.4 -574 -991. 13 OFFICE 0 0.0 0 0,0 2 -79 0 59.4 -393 -679 Zone 13 Total /Ave. 0 0.0 0 0.0 2 -79 0 " 59,4 . -393 7679 Zone 13 Block 0 0.0 0 0.0 2 -79 0 59,4 . -393 . :479 14 OFFICE 0 0.0 0 0.0 1 -54 0 59.4 -270 -467" Zone 14 Total /Ave, 0 0.0 0 0.0 1. -54 .0 59.4 -270 -467 Zone 14 Block 0 0.0 0 0,0 1 754 0 .59.4: -270 -467 15 SERVICE 0 0.0 0 0.0 5 -252 0'59.4 :-1,258 2,861 Zone 15 Total /Ave. 0 0,0 0 0.0 5 -252. 0 59.4 - 1',258 -2,861. Zone 15 Block 0 0.0 0 0,0" 5 -252 0 59.4. -1,258 -2861 16 COPY 0 0.0 0 0.0. 2 -89 0 59,4: -444 .': 766..: lone 16 Total /Ave, 0 0.0 0 0.0 2,. -89: 0 59.4 -444 -766 Zone 16 Block 0 0.0 0 0.0 2 -89. 0 59.4; -444 . -766' System 2 Total /Ave, 0 0,0 0 0,0 18 "111:1 0" 59.4, -4,579 11,446' System 2 Block 0 0.0 0 00 18 -918 0 '.'59.4......* 4,579 8,,979,. Trane Air Conditioning Economics By: C.B.S. MARKETING COOLING LOADS AT COIL PEAK - ALTERNATIVE 1 AIRFLOW COOLING LOADS (At time of Coil Peak) V 600 PAGE 25 Ventilation Optional Ventilation Bypass Ov /Undr Room Airflow Sensible Latent Airflow Sensible Latent Airflow Sensible Latent Sizing Number Description (Cfm) (Btuh) (Btuh) (Cfm) (Btuh) (Btuh) (Cfm) (Btuh) (Btuh) (Btuh) 1 CONSTRUCTION OFF 40 93 -305 0 0 0 0 0 0 0 Zone 1 lotal /Ave. 40 93 -305 0 0 0 0 0 0 0 lone 1 Block 40 93 -305 0 0 0 0 0 0 0 2 OFFICE 1 20 47 -121 0 0 0 0 0 0 0 Zone 2 Total /Ave. 20 47 -121 0 0 0 0 0 0 0 Zone 2 Block 20 47 -121 0 0 0 0 0 0 0 3 OFFICE 2 20 75 -14 0 0 0 0 0 0 0 Zone 3 Total /Ave. 20 75 -14 0 0 0 0 0 0 0 Zone 3 Block 20 75 -14 0 0 0 0 0 0 0 4 ENGINEERING 40 151 109 0 0 0 0 0 0 0 Zone 4 Total /Ave. 40 151 109 0 0 0 0 0 0 0 Zone 4 Block 40 151 109 0 0 0 0 0 0 0 5 ESTIMATING 20 75 46 0 0 0 0 0 0 0 Zone 5 Total /Ave. 20 75 46 0 0 0 0 0 0 0 Zone 5 Block . 20 75 46 0 0 0 0 0 0 0 6 TYPINGG 20 75 44 0 0 0 0 0 0 0 Zone 6 Total /Ave. 20 75 44 0 0 0 0 0 0 .0 Zone 6 Block 20 75 44 0 0 0 0 0 0 0 7 OFFICE 20 75 67 0 0 0 0 0 0 0 Zone 7 Total /Ave. 20 75 67 0 0 0 0 0 0 0 Zone 7 Block 20 75 67 0 0 0 0 0 0 0 8 LUNCH 31 116 13 0 0. 0 0 0 0 0 Zone 8 Total /Ave. 31 116 13 0 .0 0 0 0 0 0 Zone 8 Block 31 116 13 0 0 0 .0 0 0 0 9 FOYER 109 412 -143 0 0 0 0 0 0 0 Ione 9 Total /Ave. 109 412 -143 0 0 0 0 0 0 0 Zone 9 Block 109 412 -143 0 0• 0 0 0 0 0: System 1 Total /Ave. 320 1,121 -303 0 0 0 0 0 0. . 0 System 1 Block 320 1,207 -1,136 0 0 0 0 0 0 0 10 RECEPTION 40 93 -212 0 0 0 0 0 0 0 Zone 10 Total /Ave. 40 93 -212 0 0 0 0 0 0 ' 0 Zone 10 Block 40 93 -212 .0 0 0 0 0 ' . 0 11 CONFERENCE 160 267 -656 0 ' 0 0 0 .0 0 0:. Zone 11 Total /Ave. 160 267 -656 0 0 0 0 o„ '' 0 ' 0 Zone 11 Block 160 267 -656 0 0 0 0 0`. . 0 : 0 12 COMPTROLLER 40 151 24 ' 0 0 0 ' 0 ' 0 . 0 ' . .:0 Zone 12 Total /Ave. 40 151 24 0 : 0 0 0 0 0: 0 Zone 12 Block 40 151 24 0 0 0 0: 0. 0 0 13 OFFICE 20 75 34 0 0, 0 0 0- 0 0 Zone 13 Total /Ave. 20 75 i 34 0 0 0 0 0, 0 Zone 13 Block . '20 . 75 34 0 0 14 OFFICE •20 ' .75 19 0 ' 0,1. Zone . 14 Total /Ave. . 20 75 19' . 0 0 Zone 14 Block . '20 75 . 19 0 15 SERVICE ' , .40 .151 ' 129 0 Trane Air Conditioning Economics V 600 By: C.D.S. MARKETING PAGE 26 COOLING LOADS AT COIL PEAK - ALTERNATIVE 1 AIRFLOW COOLING LOADS (At time of Coil Peak) Ventilation Optional Ventilation Bypass Ov /Undr Room Airflow Sensible Latent Airflow Sensible Latent Airflow Sensible Latent Sizing Number Description (Cfm) (Stub) (Btuh) (Cfm) (Btuh) (Btuh) (Cfm) (Btuh) (Btuh) (Btuh) Zone 15 Total /Ave, 40 151 129 0 0 0 0 0 0 0 Zone 15 Block 40 151 129 0 0 0 0 0 0 0 16 COPY 20 75 39 0 0 0 0 0 0 0 Zone 16 Total /Ave, 20 75 39 0 0 0 0 0 0 0 Zone 16 Block 20 75 39 0 0 0 0 0 0 0 System 2 Total /Ave. 340 BBB -623 0 0 0 0 0 0 0 System 2 Block 340 742 -272 0 0 0 0 0 0 0 Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave. Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave, Zane 3 Block 4 ENGINEERING Zone 4 Total /Ave. Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave, Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave. Zone 8 Block 9 FOYER Zone 9 Total /Ave. Zone 9 Biock System 1 Total /Ave. System 1 Block 10 RECEPTION Zone 10 Total /Ave, Zone 10 Block 11 CONFERENCE Ione 11 Total /Ave. Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave, Zone 12 Block 13 OFFICE Zone 13 Total /Ave. Zone 13 Block 14 OFFICE .. Zone 14 Total /Ave. Zone 14 Biock 15 SERVICE Trane Air Conditioning Economics V 600 By: C.D.S. MARKETING PAGE 27 HEATING LOADS AT COIL PEAK - ALTERNATIVE 1 (Cfm) 40 40 40 20 20 20 20 20 20 40 40 40 20 20 20 20 20 20 20 20 20 31 31 31 109 109 109 320 320 40 40 40 160 160 160 40 40 40 20 20 20 20 20 20 40 AIRFLOW HEATING LOADS (At time of Coil Peak) - -- Ventilation -- ---- Op. Vent. - --- - -- -- Reheat - - - -- - - -- Humidif, - - -- Airflow Sensible Airflow Sensible Airflow Sensible Airflow Latent (Cfm) (Btuh) (Cfm) (Btuh) (Cfm) (Btuh) 0 0 0 0 42 -1,244 0 0 0 0 42 -1,244 0 0 0 0 42 -1,244 0 0 0 0 21 -634 0 0 0 0 21 -634 0 0 0 0 21 -634 0 0 0 0 22 -664 0 0 0 0 22 -664 0 0 0 0 22 -664 0 0 0 0 45 -1,323 0 0 0 0 45 -1,323 0 0 0 0 45 -1,323 0 0 0 0 22 -644 0 0 0 0 22 -644 0 0 0 0 22 -644 0 0 0 0 22 -659 0 0 0 0 22 -659 0 0 0 0 22 -659 0 0 0 0 23 : -669 0 0 0 0 23 -669 0 0 0 0 23 -669 0 0 0 0 33 -972 0 0 0 0 33 -972 0 0 0 0 33 -972 0 0 0 0 117 -3,450 0 0 0 0 117 -3,450 0 0 0 0 117 -3,450 0 0 0 0 347 - 10,258 0 0 0 0 347 - 10,258 0 0 0 0 44 -1,308 0 0 0 0 44 -1,308 0 0 0 0 44 -1,308 0 0 0 0 162 -4,800 .: 0 0 0 0 ,162 -4,800 0 0 0 0 162 . -4,800 4 0 0 0 42 -1,251 0 0 0 0 42 71,251 0 '0 0 42 -1,251 0 0 0 : 22 -638 0 0 0 0 22 ' . -638. 0 0 . , .0 0 22 -638;, 21 -623: (Btuh) -2,022 -2,022 - 2,022 -1,011 - 1,011 -1,011 -1,011 -1,011 -1,011 -2,022 -2,022 -2,022 -1,011 - 1,011 - 1,011 -1,011 - 1,011 -1,011 - 1,011 - 1,011 -1,011 -1,557 -1,557 - 1,557 -5,527 -5,527 - 5,527 - 16,182 - 16,182 -2,022 -2,022 -2,022 -8,087 -8,087 -8,087 - 2,022 -2,022 -2,022 -1,011 -1,011 -1,011 - 1,011 -1,011 -1,011 -2,022 .. -623 623 -1 Total (Btuh) - 3,266 -3,266 -3,266 -1,645 -1,645 - 1,645 -1,675 -1,675 -1,675 -3,345 -3,345 -3,345 - 1,655 -1,655 -1,655 - 1,670 - 1,670 -1,670 - 1,679 -1,679 -1,679 -2,529 -2,529 - 2,529' -8,978 -8,978 8,978 - 26,441. - 26,441 -3,330 -3,330 - 3,330 - 12,888. - 12,888 - 12,888' 3,272 3,272 3,272 - 1,649. - 1;649.. 1,649 -1•,434. -1,634 =1,634 3,353 Trane Air Conditioning_ Economics By: M.S. MARKETING • HEATING LOADS AT COIL PEAK - ALTERNATIVE 1 AIRFLOW HEATING LOADS (At time of Coil Peak) Ventilation -- - --- Op. Vent, - - -- - - - -- Reheat - - - -- ---- Humidif. - - -- Room Airflow Sensible Airflow Sensible Airflow Sensible Airflow Latent Total Number Description (Cfm) (Btuh) (Cfm) (Btuh) (Cfm) (Btuh) '(Cfm) (Btuh) (Btuh) Zone 15 Total /Ave. 40 ' - 2,022 0 0 0 0 45 -1,331 -3,353 Zone 15 Block 40 -2,022 0 0 0 0 45 -1,331 - 3,353 16 COPY 20 1,011' 0 0 0 0 22 -644 -1,655 Zone 16 Total /Ave. 20 -1,011 0 0 0 0 22 -644 -1,655 Zone 16 Block 20 -1,011 0 0 0 0 22 -644 -1,655 System 2 Total /Ave, 340 17,186 0 0 0 0 358 - 10,595 - 27;781 System 2 Block 340 -17,186 0 0 0 0 358 - 10,595 -27,781 V 600 PAGE 28 Trane Air Conditioning Economics By C,D.S, MARKETING Room Number Description 1 CONSTRUCTION OFF Zone 1 Total /Ave, Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave, Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave. Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave. Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave. Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave. Zone 7 Block 8 LUNCH Zone 8 Total /Ave. Zone 8 Block 9 FOYER Zone 9 Total /Ave. Zone 9 Block. System 1 Total /Ave. System 1 Block 10 RECEPTION Zone 10 Total /Ave. Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave. Zone 11 Block 12 COMPTROLLER Zone 12 Total /Ave. Zone 12 Block 13 OFFICE Zone 13 Total /Ave. Zone 13 Block 14 OFFICE Zone 14. Total /Ave.. Zone 14 Block, 15 SERVICE 0 0 0 0 0., 0 0 0 0 0 .0 0 0 200 200' 0 • 0 0. 2 .: 200. . 130 130 0 0",•• 0 0,. : 130 130 :0 0 0 4 130 `1 0 4 0 0 109: 109: .0. • .. 0 0 : '. 109 •;109 0 0. • 0 4:. 377::. 377: COOLING AIRFLOW HEAT GAIN /LOSS ALTERNATIVE 1 Duct Supply Heat Fan Pickup Heat (Btuh) (Btuh) AIRFLOW HEAT GAIN AND LOSS-- - (At time of Coil Peak) Return System System Room Run System Fan Exhaust Exhaust Exhaust Ducted Plenum Around Corridr Return Heat Heat Loss Total Airflow Airflow Airflow Airflow Airflow Airflow Airflow. (Btuh) (Btuh) (Btuh) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) 0 63 .0 0 63 40 0 0 0 0 177 0 63 0 0 63 40 0 0 0 .0 177 0 63 0 0 63 40 0 0 0 0 177 0 48 0 0 48 20 0 0 0 . 134 '0. 48 0 0 48 20 0 ' 0 0 0 .134 0 48 0 0 48 20 0 0 0 0 134 0 71 0 0 71 20 0 0 0 0 200 0 71 0 0 71 20 0 0 0 0 200 0 71 0 0 71 20 0 0 0 0 200 0 116 0 0 116 40 0 0 0 0 325 0 116 0 0 116 40 0 0 0 0 325 0 116 0 0 116 40 0 '0 0 0 325 o 54 0 0 54 20 0 0 0 0 152 0 54 0 0 54 20 0 0 0 0 152 0 54 0 0 54 20 0 0 0 0 152 0 52 0 0 52 20 0 0 0 0 148. 0 52 0 0 52 20 0 0 0 0 148 0 52 0 0 52 20 0 0 0 0 148 0 70 0 0. 70 20 0 0 0 0 196 0 70 0 0 70 20 0 0 0 0 196 0 70 0 0 70 20 .0 0 0 0 196. 0 52 0 0 52 31 0 0 .0 ' .0 147 0 52 0 0 52 ' 31 ' 0 0 . 0 . 141 0 52 0 0 52 31 ' 0 . 0 0 0, 147 0 136 0 0 136 ' 109 ' 0 ' '0 0 0. 383 0 136 0 0 136 . 109 . 0 0 0 0 383 383 0 136 0 0 136 109 0' 0 0 0 383 383 0 662 0 . 0: ' 662 320 0 . 0 ' 0 0 1,862 1,862 0 662 0 0 662 320 0 0 0 0 1,862 1,862 0 121 .. . 0 . 0 121 . 40 0 ' . 0 0 0 . .340 340. 0 121 0 ' 0 121 40 0 0 0 p_ 340 0 121 0 0 121. 40 0 0 0 0 0 93 .. 0 0 .93 160. ,: 0 0 0 0 260 0 93 0 0 .93 160 0 0 0 0 260 0. 93 0 0 93 160 0 0 0 • 0 260, 0 71. 0 0 71 40 0 0 0 0 200 Cooling 71 0 0 71 '40 71 . 0 0 71 : 40 46 0 0 ..46 20, ' 46 0 0 46 .20 '46 0 .. 0 46 : 20 39 0 0 39 '20 '39 0 0 " 39 20 39 0 0 39 20 134 0 0 134 40 V 600 PAGE 29 177 177 177 134 134 134 200 200 200 325 325 325 152 152 152 148 148 148 196 196 196 147 147 147 383 340 "340 260 260 '260 200 Trane Air Conditioning Economics By C,D,S, MARKETING MW COOLING AIRFLOW HEAT GAIN /LOSS - ALTERNATIVE 1 Room Number • Zone 15 Total /Ave, Zone 15 Block 16 COPY Zone 16 Total /Ave, Zone 16 .Block System 2 Total /Ave. System 2 Block Duct Heat Pickup Description (Btuh) 0 0 0 0 0 0 0 AIRFLOW HEAT GAIN AND LOSS (At time of Coil Peak) Supply Fan Heat (Btuh) 134 134 49 49 49 553 553 Return System Fan Exhaust Heat Heat Loss (Btuh) (Btuh) 0 0 0 0 0 0 0 0 0 0 (: 0 0 0 Cooling System Room Run System Exhaust Exhaust Ducted Plenum Around Corridr Return. Total Airflow Airflow Airflow Airflow Airflow Airflow Airflow (Btuh) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) 134 134 49 49 49 553 553 40 40 20 20 20 340 340 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 377 377 139 139 139 1,554 1,554 V 600 PAGE 30 377 377. 139 139 139 1,554 1,554 Room Number Description Trane Air Conditioning Economics By: C.D.S. MARKETING HEATING AIRFLOW HEAT GAIN /LOSS - ALTERNATIVE 1 1 CONSTRUCTION OFF Zone 1 Total/Ave. Zone 1 Block 2 OFFICE 1 Zone 2 Total /Ave, Zone 2 Block 3 OFFICE 2 Zone 3 Total /Ave, Zone 3 Block 4 ENGINEERING Zone 4 Total /Ave, Zone 4 Block 5 ESTIMATING Zone 5 Total /Ave, Zone 5 Block 6 TYPING Zone 6 Total /Ave. Zone 6 Block 7 OFFICE Zone 7 Total /Ave, Zone 7 Block 8 LUNCH Zone 8 Total /Ave. Zone 8 Block 9 FOYER Zone 9 Total /Ave. Zone 9 Block System 1 Total /Ave. System 1 Block 10 RECEPTION Zone 10 Total /Ave. Zone 10 Block 11 CONFERENCE Zone 11 Total /Ave. Zone 11 Block 12 COMPTROLLER Zone 12 Total/Ave', Zone 12 Block 13 OFFICE Zone 13 Total /Ave.. Zone 13 Block .. 14 OFFICE Zone 14 Total /Ave.'. Zone 14 Block. 15 SERVICE AIRFLOW HEAT GAIN AND LOSS (At time of Coil Peak) Supply Return System Fan Fan Exhaust Heat Heat Heat Loss Total (Btuh) (Btuh) (Btuh) (Btuh) Heating System Room Run System Exhaust Exhaust Ducted Plenum Around Corridr Return Airflow Airflow Airflow Airflow Airflow Airflow Airflow (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) 0' 0 0 0 40. 0 0 0 0 177 177 0 0 0 0 40 0 0 0. 0 177 177 0 0 0 0 0 0 0 0 0 177 177 0 0 0 0 20 0• 0 0 0 134. • 134 0 0 0 0 20 0 0 0 0 134 134 0 0 0 0 0 0 0 0 0 134 134 0 0 0 0 20 0 0 0 0 200 200 0 0 0 0 20 0 U 0 0 200 200 0 0 0 0 0 0 0 0 0 200 200 0 0 0 0 40 0 0 0 0. 325 325 0 0 . 0 0 40 0 0 • 0 325 325 0 0 0 0 40 0 0 0 0 325 325 0 0 0 0 20 0 0 0 0 152 152. 0 0 0 0 20 0 0 • 0 0. 152 152 0 0 0 0 20 0 0 0 0 .152' 152 • 0 0 0 0 20 0 0 • 0 0 148 . 148 0 0 0 0 20 0 0 0 0 148 148 • 0 .0 0 0 20 0 0 0 0 148 148 • 0• 0 0 0 20 0 0 ' U 0 ' 196 196 0 0 0 0 20 0. 0 0 0 ,196 ' 196 0 0 0 0 0' 0 . 0• :0 0 . 196 196 • 0 0 0 ' 0 ' 31 0 0 .0 0 1,47 147 • 0' 0 0 0 31 0 0 0' • 0 147 ..147 0 0 . 0 ' ' 0 . 31 0• •.0 0 0 147 147 0 0 0 0 • 109 ' 0 . 0 ' 0 '0 383 ' .383 ' 0 0 0 0' . 109 0: O• . 0 0 383 . 383 0 0 0 . • 0. • 109 0 0• • 0. ' 0 383 383 0 0 0 ' • 0 320 ' 0 0 0 0 1,862 1,862 0 . 0 0 . 0 . 320 0 ' 0 ' 0 0 .1, 862 1,867. ' 0 0 0 ' . 0 40 0 0 ' '0 . • 0 • 340 .: ' .340 0 • . 0 0 0 40, 0 U. 0 0: :`340 ., . 0 0 0 0• 0 .. , 0 0 • 0 0 340" .0 0 0 0 160 ' 0 0 ,, 0.. 0 260 0 '0. 0 . 0 160 0 0: 0.. 0 260 o- 0 0 0 158 . 0 0. 0 A :260 0 0 0 . 40 0 0 • 0 0 : , , 40 0 . • 0 • 0. 0 ' . 0 40 . 0 0 0 0 0 2 0 200. ; 200. .200 200 200' 200 13U: 130 130 . 130;: 109 109: 109 . leg 377 . 20 20 20 20 20 . . '40 V 600 PAGE 31 340 340 260,, 260 260 Trane Air Conditioning Economics. By: C,D,S. MARKETING HEATING AIRFLOW HEAT GAIN /LOSS - ALTERNATIVE 1 Room Number Zone 15 Total /Ave, Zone 15 Block 16 COPY Zone 16 Total /Ave. Zone 16 Block System 2 Total /Ave. System 2 Block Supply Fan Heat Description (Btuh) 0 0 0 0 0 0 0 AIRFLOW HEAT GAIN AND LOSS At time of Coil Peak) Return Fan Heat (Btuh) 0 0 t) 0 0 0 0 System Exhaust Heat Loss (Btuh) 0 0 0 0 0 0 0 Total (Btuh) 0 0 0 0 0 0 0 Heating System Room Run System Exhaust Exhaust Ducted Plenum Around Corridr Return Airflow Airflow Airflow Airflow Airflow Airflow Airflow (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) (Cfm) 40 40 20 20 20 340 340 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 377 377 139 139 t39 1,554 1,554 V 600 PAGE 32 377 317 139 139 139 1,554 1,554 Trane Air Conditioning Economics V 600 By: C,D.S, MARKETING PAGE 33 BUILDING U- VALUES - ALTERNATIVE 1 BUILDING U- VALUES Room U- Values Room Room (Btu/hr/sqft/F) Mass Capac. Room Summr Wintr Summr Wintr (lb/ (Btu/ Number Description Part. EkF1r Skylt Skylt Roof Windo Windo Wall Ceil. sqft) sqft/F) 1 CONSTRUCTION OFF 0.000 0,000 0.000 0.000 0,000 0.600 0.632 0,090 0.317 16.0 2.96 Zone 1 Total /Ave. 0.000 0.000 0.000 0,000 0.000 0.600 0.632 0.090 0.317 16.0 2.96 2 OFFICE 1 0.000 0.000 0.000 0.000 0.050 0.600 0.632 0,090 0,317 24.4 6.74 Zone 2 Total /Ave. 0.000 0.000 0,000 0,000 0.050 0.600 0.632 0.090 0.317 24,4 6,74 3 OFFICE 2 0.000 0.000 0.000 0.000 0.050 0.600 0.632 0.122 0,317 26.0 6.90 Zone 3 Total /Ave. 0.000 0.000 0.000 0,000 0,050 0.600 0.632 0.122 0,317 26.0 6.90 4 ENGINEERING 0.000 0.000 0,000 0.000 0.050 0.000 0.000 0.000 0.317 21,4 6.41 Zone 4 Total /Ave. 0.000 0.000 0.000 0.000 0,050 0.000 0.000 0.000 0.317 21.4 6.41 5 ESTIMATING 0.000 0.000 0.000 0,000 0.050 0.000 0.000 0.000 0.317 21.4 6.41 Zone 5 Total /Ave. 0.000 0.000 0.000 0.000 0.050 0,000 0.000 0.000 0.317 21.4 6.41 6 TYPING 0.000 0.000 0.000 0.000 0,050 0.000 0.000 0,000 0.317 21,4 6.41 Zone 6 Total /Ave, 0.000 0.000 0.000 0,000 0,050 0.000 0.000 0.000 0.317 21,4 6.41 7 OFFICE 0.000 0.000 0.000 0.000 0,050 0.000 0.000 0.118 0,317 116.1 25.14 Zone 7 Total /Ave. 0.000 0.000 0.000 0.000 0.050 0,000 0,000 0.118 0,317 116.1 25.14 8 LUNCH 0.000 0.000 0,000 0.000 0.050 0.000 0.000 0.000 0.317 21.4 6.41 Zone 8 Total /Ave, 0.000 0.000 0.000 0.000 0.050 0.000 0.000 0.000 0,317 21.4 6.41 9 FOYER 0,000 0.000 0.000 0.000 0.050 0.000 0.000 0.066 0.317 36.6 9.41 Zone 9 Total /Ave. 0,000 0.000 0.000 0.000 0.050 0.000 0,000 0.066 0.317 36.6 9.41 System 1 Total /Ave. 0.000 0.000 0.000 0.000 0.050 0.600 0,632 0.105 0,317 35.0 8.86 10 RECEPTION 0.000 0.000 0.000 0.000 0.050 0.600 0.632 0.130 0,317 22.5 6,53 Zone 10 Total /Ave. 0,000 0.000 0,000 0.000 0.050 0.600 0.632 0.130 0,317 22.5 6.53 11 CONFERENCE 0.000 0.000 0.000 0.000 0.050 0.600 0,632 0.080 .0.317 94.6 20.79 Zone 11 Total /Ave. 0.000 0.000 0,000 0.000 0.050 0.600 0.632 0.080 0.317 94.6 20.79 12 COMPTROLLER 0.000 0.000 0,000 0,000 0.050 0.000 0.000 0.000 0.317 21.4 6.41 Zone 12 Total /Ave. 0.000 0,000 0,000 0.000 0.050 0.000 0.000 0.000 0.317 21.4 6.41 13 OFFICE 0.000 0.000 0.000 0.000 0,050 0.000 0.000 0.000 0,317 21.4 6.41 Zone 13 Total /Ave, 0.000 0.000 0.000 0.000 0.050 0.000 0.000 0.000 0.317 21.4 6.41 14 OFFICE 0,000 0.000 0.000 0.000 0.050 0.000 0.000 0.000 0.317 21,4 6.41 Zane 14 Total /Ave, 0,000 0.000 0,000 0.000 0.050 0.000 0.000 0.000 0,317 21.4 6.41 15 SERVICE 0.000 0.000 0,000 0.000 0,050 0.000 0.000 0.066 0.317 88.9 19.75 Zone 15 Total /Ave. 0.000 0,000 0,000 0,000 0.050 0,000 0.000 0.066 0.317 88.9 19.75 16 COPY 0.000 0,000 0.000 0.000 0.050 0.000 0,000 0.000 0,317 21.4 6.41 Zone 16 Total /Ave, 0.000 0.000 0,000 0,000 0.050 0,000 0,000 0.000 0.317 21,4 6.41 System 2 Total /Ave. 0.000 0.000 0.000 0.000 0.050 0.600 0,632 0,080 0.317 49.4 11.90 Building 0.000 0.000 0.000 0.000 0.050 0.600 0,632 0.094 0,317 40.8 10.09 Trane Air Conditioning Economics By: C.D.S. MARKETING BUILDING AREAS - ALTERNATIVE 1 BUILDING AREAS V 600 PAGE 34 Floor Total Exposed Number of Area /Dupl Floor Partition Floor Skylight Skl Net Roof Window Win Net Wall Room Duplicate Room Area Area Area Area /Rf Area Area /MI Area Number Description Fir Rm (sqft) (sqft) (sqft) (sqft) (sqft) (X) (sqft) (sqft) (7.) (sqft) 1 CONSTRUCTION OFF 1 1 154 154 0 0 0 0 0 47 37 79 Zone 1 Total /Ave. 154 0 0 0 0 0 47 37 79 2 OFFICE 1 1 1 107 107 0 0 0 0 107 56 47 62 Zone 2 Total /Ave, 107 0 0 0 0 107 56 47 62 3 OFFICE 2 1 1 184 184 0 0 0 0 184 29 15 163 Zone 3 Total /Ave, 184 0 0 0 0 184 29 15 163 4 ENGINEERING 1 1 354 354 0 0 0 0 354 0 0 0 Zone 4 Total /Ave, 354 0 0 0 0 354 0 0 0 5 ESTIMATING 1 1 133 133 0 0 0 0 133 0 0 0 Zone 5 Total /Ave. 133 0 0 0 0 133 0 0 0 6 TYPING 1 1 170 170 0 0 0 0 170 0 0 0 Zone 6 Total /Ave. 170 0 0 0 0 170 0 0 0 7 OFFICE 1 1 195 195 0 0 0 0 195 0 . 0 180 Zone 7 Total /Ave. 195 0 0 0 0 195 0 0 180 8 LUNCH 1 1 154 154 0 0 0 0 154 0 0 0 Zone 8 Total /Ave. 154 0 0 0 0 154 0 0 0 9 FOYER 1 1 547 547 0 0 0 0 547 0 0 81 Zone 9 Total /Ave, 547 0 0 0 0 547 • 0 0 81 System 1 Total /Ave. 1,997 0 0 0 0 1,843 132 19 564 10 RECEPTION 1 1 317 317 0 0 0 0 317 56 44 71 Zone 10 Total /Ave. 317 0 0 0 0 317 56 44 71 11 CONFERENCE 1 1 171 171 0 0 0 0 171 29 16 154 Zone 11 Total /Ave. 171 0 0 0 .0 171 29 16 . 154 12 COMPTROLLER 1 1 171 171 0 0 0 0 171 0 0 0 lone 12 Total /Ave. 171 0 0 0 0 171 0 0 0 13 OFFICE 1 1 117 117 0 0 0 0 117 0 0 0 Zone 13 Total /Ave, 117 0 0 0 0 117 0 0 0 14 OFFICE 1 1 80 80 0 0 0 0 80 0 0 0 Zone 14 Total /Ave, 80 0 0 0 0 80 0 0 0 15 SERVICE 1 1 374 374 0 0 0 0 374 0 0 246 Zone 15 Total /Ave, 374 0 0 0 0 374 0 0 .. 246 16 COPY 1 1 132 132 0 0 0 0 132 0 0 0 Zone 16 Total /Ave, 132 0 0 0 0 132 0 0 0 System 2 Total /Ave, 1,362 0 0 0 .0 1,362 84 15 471_ Building 3,359 0 0 0 0 3,205. 216 17 1,035 • Trane Air Conditioning Economics By: C.D.S. MARKETING • ASHRAE 90 ANALYSIS - ALTERNATIVE 1 ASHRAE 90 ANALYSIS Overall Roof U -Value = 0.050 (Btu /Hr /Sq Ft /F) Overall Wall U -Value = . 0.181 (Btu /Hr /Sq Ft /F) Overall Building U -Value = 0,.087 (Btu /Hr /Sq Ft /F) Roof Overall Thermal Transfer Value (OTTVr) = 2.64 (Btu /Hr/So Ft) Wall Overall Thermal Transfer Value (OTTVw) = 21.56 (Btu /Hr /Sq Ft) V 600 PAGE 35 • t , 7Y. 404111/44 ga, „ 4 944 APR 2 2 1994 Prr cam U i N I I ti r: 4M ,, ,. - .411'1t{I. ...a. , s6a" ruoti • eu', r .r.4.* g rflt1 t.-SS r`C Snit '':*M #tN .n. a.'Hp•4t•4 CONSTRUCTION OFFICE rot I_ 1VlS ROOF PLAN SCALE: 1/8" • 1' -0" tea& I. ALL 11111LICTIMIAL INIS AND ST a CCNT TOR « T 3. ALL I.P* VOLTAM 111111411, NAND D11CONliCTr, MOTOR STAMM AND 00111411CT10NC TO oare It R1' rLaCTINCAL COAAICACTOR 1. SUPPLY DUCR'HALL M SRN LAW' W T10N OP 1121A,0I4A DUCT 00141111111/011011 MANUAL. R.DOILM CUM SHALL ON UL IN LOOM CLAN 1 DUCT. WTM iOi AL CO M is R#01�! RTS INiMII.O wrM LOCAL 0001, 1/. !TALL ,•DAY MOINIMPIPIAOLII, 1 1t Nt -SACK T►•U900TAT,140NlvSJ. 'NUN OR SCOW. 1l14SO1N mqi4-00b0 944 946 ft0N1C 210 C P1 !tJrFK. k'1. Is 1a 14" e r li.F : r( - <AoF: a OM 4 • 0 C 10 "0 • e' D NK 171 CI•1 1 ;.. { •h 11 1:•••:. t /�•� . Mane 02140111111 YIRLL �IOOP 14" e a CM e' 171 GRI FLOOR FLAN SCALE: 1/4" • 1' -0" e 4ee SERVICE,. 'CONSTRUCTION WAREHOUSE ri leo 0l silt /0 • I • • .• 1 4' 2 I a' 14 "x414" TRANSFER a' 0 10 "0NC. et C<'M , ds 0 4 1 14' e 44 x 44 MALL Li! rr e /u/ • '4' IiLOCATeD OLIItIPRINT MACHO* IM000 w 112 6 a Mg re/ r «' su RTU -1- 1 • P\ 100 NK c�FF;' •" • NC � ) Sma . . • L e.: ;TlNiN'IMG C)F •" • e'0 • 14'X44'RA& 10' rI n �V• a � d x24TA. 44x44 *At m 4 NOVB: IMMO! PAIN 2211 CPM RXNtta to etu a SOW — POOP 11001110) NON len . 0 OFF ICC r F: • • CPM 1 M ° ._._, RT 1 \--41 "X11" S.A DROP (TYPICAL) 10" • a OAS Mlialt Sr LOCAL GAS UTILITY CO 22, OM �4 --Ht- 1 21' r ft 4 DROP (TYPICAL) J- ! _ 4_ i INSTALL NOW r OAS MIl1/IOt. aT►waLA APR 2 2 1994 maw a.na , t,,.-,,a... , • • 4111111.1, 03/4 .: ' THERMOSTAT TERMINAL 90ARC L- 1w11Y11® j0 UNIT TERMINAL BOARD TEMPERATURE CONTROL SCHEMATIC • • — Ma - -1 • • tin q (tic0 4' X 2* 19th -LAM SEAM AREA OP MOP P NETMATi0N 2!/' X It �K ilf� M Myr w•eat 1 RTU - 2 S.Q. 4 R.Q. DROPS V4' • NIP We• -r 1•" • Mobs RTU -1 +t RtU -2 Installation Detail HMS l ALL OMLICTURAI. ev*w AND K11•POPIT SY a CO TRACTS% 2. ALL Lill V OLTA M VM114111, RIND DNCCN*Ctr, MOTOR •TAM M Alt CON*Ct1CNS tO NIGUIPN" NINE St BLsCTAICAL CONTRACTOR >t. NPPLY OIICt •HALL M P1. LAT/•t 11101704 Cr •MAGNA DUCT CONVIIWCtION PW41AL. PLEkISL* Duet boa n w.. w LIVID CLAM 1 DUCT. 4. ALL OM4"SIT SMALL M MANED IN ftOthr trf a VAN LOCAL 000t MIMIC flaallIM ANTS. �. NVIALL 1 -OAY NNW NTABAtAC namlO TAT, MON IIMILL t•1!N OR 11411 L, w• apply RTU -1 B.Q. 4 R.Q. DROPS V4' • r-r W • rtir APPRo o pfl •' gU1LpAN arV APR 2 2 1994 Par a as !tint M-3 WAVY t A f i f J. cc �G • 8G •12 kt' �hlli� rifilfifi ( IMl(161;ll �nnf�c�tllll►lu�. .},�._.... -w. ....r- .r_...�..Al. r..... _. _..,....�.�rr .c a.. ,....arid *' I - .at C . i. �'� ,fi` '' r Jr - -, •�r _3,,:r PZ‘IOVE EXiSl.i NG PEWORATED PACF. CEILING PIPPU6ERS. REPLACE tut NEW MOPULAR srt g - CEILING' PITT-USER TO MATCH EXIeTING. ZZ OZ 6L 81 Lt Zl It IU4 illa i�ili � I I ! I111 41111111 lI NOTE! rIf " the <microfilmed document is less clear than this notice, it is due to the quality of the 'original document. SEPARATE PERMIT " REQUIRED' FOR MECHANICAL ELECTRIC L 0 PLUMBING CAS PIPING •� : CITY 07 TUKIMLA BUILOING DEVE81ON 1 U %d &rgta s inecttoerrc OVAVIft titans dies n ©t adopted '610d •os tra0 - 0' 0 � �1 F ECEIVEQ CITY OF TUKWILA APR 222 PERMIT ENT F11 ypp ro vats are a pp r oval o ends � 4oIation of anv ipt ,of don, ac avw%edged. 1. ALL SiletUoTURAL REVIEW AND SUPRORT BY CsENERAL `CONTRACTOR. t. ALL LINE VOLTA wIRING;PUSED DiecOWEcTS, MQTOP STARTERS AND CoNNECTIoNS TO E UIf/MENT 13Y ELECTRICAL coNl•RAOToR . SUPPLY DUell SHALL BE PER LATEST EDITION C SM.A.C.N.A, DUCT CONSTR3.ICTiON MANUAL. F DUCT SHALL: BE U.L. 1S1 LISTED CLASS f PUcT 4 AU, Ecuw t`"!N1' SHALL EicE SECURED IN ACcoRDANGE UJ1TH LOCAL' COLE, SE18MtG REQUIREMENTS, INSTALL. 1-DAY PRoGRAmMABLE, NIGHT SET -> ACK tHERMoSTAT, PesNEyWELL 1' -1300 OR EQUAL weatieoft. 11 0 NK 166 CR1 3 9z §z Y ? ez tz o s, I �ji�flill� ui 1161 i ; r 1 4 -4044. . -y, .9.11 . - . ti/SW Ye i�'...'.it:3 +LYF:..4Yi.:'.M'G!'y::, —t,t •�i' NOTE: If the microfilmed document is "less clear `'`than this notice, it is due'to' the quality'of the °anginal document. ExiSITWA CONCPErre WALL • SERWIcEa'COSTR .WAREHOUSE.' c&..ST13tAAAT!PsIC, Of F T E .. 6110N 10 11r Cft"t all 0 • Nl. 200 CR1 RECEIVED CITY OF TUKWIL PERMIT CENTER th7^ ^r,�xr� I w 4 , 1! I } Jf. totif0or,, #0,0" �t tt 1 ..F4 L. - • !4!.!W9 r ! . ± ' "? Ms��.' SL -:: :'t'.: F ✓ti *. L . : ¢..:;� e.T .... - . NOTE: If the microfilmed document is Jess c!ear than this notice, it is due " to ? the quality of the riginal 'document. r i(,U �;fitlli�� 01 Pattie?) Aw Drop —law 0° Return 1. ALL STRUCTURAL, RE'YiEW AND SUPPORT BY GENERAL CONTRACTOR. . . � . ALL LINE VOLTA 4E O RM, FUSED t tr3CQwECT8, MOTOR STARTERS AND CCNNF.CT!ONS TO EQUIPMENT MENT` 8Y ELECTRICAL: CONTRACTOR, 3. eupOLy DUCT UCT CON BE PER ON M L . FLEXIBLE DUCT SI4ALL U.L. 181 LISTEra CLASS I DUCT. +4. ALL ECIUIPMENT SHALL ISE SECURED IN ACCORDANCE wlfll LOCAL coi f , sEteric G REQUIREMENTS, INSTALL ` -PA►'t PROGRAMMABLE, NIGHT SET-BACK THERMOSTAT, i EYU ELL'`T -1 OR EQUAL. 16° 0 Returno 'IY!44TA CA.; V.1 oik ebt Iyi tt) v& IG 01\ RECEIVED CITY OF TU1:WILA APR 2 2 1994 14 '49