Loading...
HomeMy WebLinkAboutUtilities 2014-06-16 Item 2C - Bid Award - Road Construction Northwest for Thorndyke Safe Routes to SchoolCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director / BY: Grant Griffin, Senior Program Manager DATE: June 13, 2014 SUBJECT: Thorndyke Safe Routes to School Project No. 91210302 Bid Award ISSUE Award the bid for construction of the Thorndyke Elementary Safe Routes to School Project. BACKGROUND The City has a strong desire to improve residential streets and was awarded Federal Safe Routes to School (SRTS) Program grant funds in the amount of $457,000.00 to improve S 150th Street between Tukwila International Blvd and 42nd Ave S as a walking route to Thorndyke Elementary School. The project will include adding a sidewalk on one side of S 150th Street, curb, gutter, drainage, crossing improvements, illumination, educational material, maps, and enforcement. This project will also improve safety and mobility for children by enabling and encouraging them to walk and bicycle to school. ANALYSIS A call for bids was advertised on May 8 and May 15, 2014 and three bids were opened on May 29, 2014. The lowest bidder was Road Construction Northwest, Inc., with a bid of $1,136,256.00. The engineer's estimate was $993,415.00. No errors were found on the bid tabulations. Road Construction Northwest, Inc. has successfully worked for the City in the past and is currently constructing the Tukwila Urban Center Transit Center and Andover Park West improvements. BUDGET AND BID SUMMARY As the construction bid and Construction Management estimate is higher than budgeted, additional funding is being proposed. This project includes the construction of drainage facilities with $270,000 budgeted from the Annual Small Drainage Program Fund and $100,000 from the Annual Overlay and Repair Program. With the favorable bids in other projects, $300,000 is now available from the 2014 Annual Overlay and Repair Project and the Interurban Ave S improvements had a balance of $295,000. All three bids were fairly close and as this is an important residential street project with partial grant funding, staff recommends awarding the bid to Road Construction Northwest, Inc. Bid Results Estimate 2014 Budget $1,136,256.00 $993,415.00 $567,000.00 113,625.60 0.00 200,000.00 55,000.00 Bid Amount Contingency (10 %) Construction Mgmt Estimate Annual Overlay Program Interurban Ave S Budget Balance Annual Small Drainage Total 300,000.00 295,000.00 270,000.00 $1,449,881.60 $993 415.00 $1,487,000.00 RECOMMENDATION Council is being asked to award the construction bid for the Thorndyke Safe Routes to School Project to Road Construction Northwest, Inc. in the amount of $1,136,256.00 and consider this item at the June 23, 2014 Committee of the Whole and subsequent Special Meeting that same night due to the summer construction season. Attachments: Vicinity Map 2014 CIP Page 4, 15, and 82 Consultant Recommendation Bid Tabulation W:\PW Eng1PROJECTSIA- RW 8 RS Projects\Safe Routes to School - Thorndyke (91210302)IPEIThorndyke Info Memo Bid Award sb.doc 35 s Not to Scale Vicinity Map lx i S S 137t S o- 74 i I/ S 0) o 139th St Q 14 th Lo L() 0 Safe Route I....y !.. „_ „! City Limits 1 I 1 i Iii ft S 144th St a) Q S 146th St C N d' R co a) Q S 148th St -c S 150th St 1 L i / i S 159th St S 152nd St m- Project Location S 156th St S158th St S 160th St 1 1 1 co a) IS 1..4th St Q IL Thorndyke Elementary School Safe Routes to School Date: February 21, 2013 36 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Thorndyke Safe Routes to School Project No. 91210302 DESCRIPTION: Construction of roadway improvements and new sidewalk on the north side of S 150th St between Tukwila International Blvd and 42nd Ave S. Also a new crosswalk on S 150th St in front of Thorndyke Elementary. JUSTIFICATION: Enhance safety for students walking and biking to Thorndyke Elementary and encourages alternate transportation choices. STATUS: This route is one of the high priority missing sidewalk areas prioritized as part of Walk and Roll Plan. MAINT. IMPACT: Negligible. WSDOT Safe Routes to School Federal grant for $457K. Surface water on S 150th St is also programmed COMMENT: for $270k (see SDP on page 82) and $100k from Overlay & Repair for a total project cost of $1.082m. Education, enforcement, and encouragement are included as part of the Safe Routes to School grant requirements. FINANCIAL Through Estimated (in $000's) 2012 2013 2014 2015 2016 2017 2018 BEYOND TOTAL EXPENSES Project Location 4 rm 1 Design 48 28 14 ? i ►; S 90 Land (RAN) 5 cal A Z ,t 4 tJ rr•• A\ At I� 4' _ p 2 S1 w S F44 St _6St S 14 ►w , 3 St m ® `A `i., N ► 0 Const . Mgmt. 11111 i 55 55 Construction 567 567 TOTAL EXPENSES 0 48 650 14 0 0 0 0 0 712 FUND SOURCES Awarded Grant 48 395 14 457 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 0 0 255 0 0 0 0 0 0 255 TOTAL SOURCES 0 48 650 14 0 0 0 0 0 712 2014 - 2019 Capital Improvement Program 4 37 Project Location 4 rm 1 ? i ►; S ll 5 cal A Z ,t 4 tJ rr•• A\ At I� 4' _ p 2 S1 w S F44 St _6St S 14 ►w , 3 St m ® `A `i., N ► 8 14: " G. r_ St s 47 8 156 a S� t .. ;* 411* S I• 56 St .)" f t A s 3 t S 160 St • 'GIS 11111 i 2014 - 2019 Capital Improvement Program 4 37 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Annual Overlay and Repair Program Project No. 91310401 DESCRIPTION: Select, design and construct asphalt and concrete pavement overlays of arterial and residential streets. JUSTIFICATION: Preserve and maintain the street structure in a safe and useable state by resurfacing before failure which also minimizes costs. Some individual sites may be coordinated with water, sewer, and surface water projects. STATUS: Each year various sections of roadway throughout the City are designed and constructed for asphalt overlay. MAINT. IMPACT: Reduces annual maintenance. COMMENT: Ongoing project. Only one year actuals shown in first column. FINANCIAL Through Estimated (in $000's 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL EXPENSES Design 194 100 100 125 125 150 150 175 175 1,294 Land (RAN) 0 Const. Mgmt. 165 175 175 175 200 200 225 225 1,540 Construction 969 1,225 1,250 1,260 1,300 1,320 1,325 1,325 9,974 TOTAL EXPENSES 1,328 100 1,500 1,550 1,560 1,650 1,670 1,725 1,725 12,808 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 City Oper. Revenue 1,328 100 1,500 1,550 1,560 1,650 1,670 1,725 1,725 12,808 TOTAL SOURCES 1,328 100 1,500 1,550 1,560 1,650 1,670 1,725 1,725 12,808 2014 - 2019 Capital Improvement Program 15 38 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Annual Small Drainage Program Project No. Varies DESCRIPTION: Select, design, and construct small drainage projects throughout the City. JUSTIFICATION: Provide drainage corrections for existing /ongoing drainage problems throughout the City, including culvert replacements, drain extensions, and pavement upgrades. STATUS: Projects for this annual program are taken from Small Drainage Project List. MAINT. IMPACT: Reduces maintenance. Ongoing project, only one year shown in first column. Construction expenses may occur over two calendar COMMENT: years. Budget for 2014 includes $270k for Thorndyke Safe Routes to School (S 150th St). Grants from State Municipal Stormwater Capacity Grants. FINANCIAL Through Estimated (in $000's) 2012 2013 2014 2015 201 2018 BEYOND TOTAL EXPENSES Design 174 80 80 80 80 80 80 80 80 814 Land (RMI) 0 Const. Mgmt. 135 65 80 80 80 80 80 80 80 760 Construction 694 500 325 325 525 525 525 525 525 4,469 TOTAL EXPENSES 1,003 645 485 485 685 685 685 685 685 6,043 FUND SOURCES Awarded Grant 20 170 50 240 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 Utility Revenue 983 645 315 485 635 685 685 685 685 5,803 TOTAL SOURCES 1,003 645 485 485 685 685 685 685 685 6,043 Project Location: Entire System 2014 - 2019 Capital Improvement Program 82 39 ENGINEERS ARCHITECTS LANDSCAPE ARCHITECTS SURVEYORS KPG SEATTLE TACOMA May 30, 2014 Grant Griffin Senior Program Manager City of Tukwila 6200 Southcenter Blvd Tukwila, WA 98188 RE: Thorndyke Elementary Safe Routes to School Dear Grant, As requested, KPG has tabulated the bids and reviewed the bid packages submitted for the City of Tukwila Thorndyke Elementary Safe Routes to School. The lowest bidder in the amount of $1,136,256.00 is Road Construction Northwest, Inc. As part of our review, we called the City of Sumner regarding the Parker Road East Sidewalk Improvement Project. This project was $1,022,533. The city stated Road Construction Northwest performed excellent work. We have also checked the status of Road Construction Northwest on the Washington State Labor and Industries web page to confirm they are currently insured, bonded, and licensed. It is KPG's recommendation that the Thorndyke Elementary Safe Routes to School be awarded to Road Construction Northwest, Inc. We have enclosed the original bid package along with the contractor verification for your review. Sincerely, KPG, Inc. Nelson Davis, P.E. cc: Enclosures: Road Construction Northwest bid package including Contractor Verification 753 9TH Avenue North • Seattle, WA 98109 • Phone (206) 286 -164o • Fax (206) 286 -1639 2502 Jefferson Avenue • Tacoma, WA 98402 • Phone (253) 627 -072o • Fax (253) 627 -4144 www.kpg.com 40 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS Thorndyke Elementary Safe Routes to School Bid Tabulation Project No. 91210302, TA No. 5252 May 29, 2014 Engineers Estimate Road Construction NW RW Scott Construction Co. Ceccanti No. Section on Item Qty Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost ROADWAY 1 1 -04 Unexpected Site Changes 1 FA $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 $ 20,000.00 2 1 -05 Roadway Surveying 1 LS $ 20,000.00 $ 20,000.00 $ 15,000.00 $ 15,000.00 $ 12,000.00 $ 12,000.00 $ 15,000.00 $ 15,000.00 3 1 -07 Resolution of Utility Conflicts 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 4 1 -07 SPCC Plan 1 LS $ 800.00 $ 800.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 5 1 -09 Mobilization 1 LS $ 75,000.00 $ 75,000.00 $ 90,000.00 $ 90,000.00 $ 102,000.00 $ 102,000.00 $ 120,000.00 $ 120,000.00 6 1 -10 Traffic Control Supervisor 1 LS $ 40,000.00 $ 40,000.00 $ 10,000.00 $ 10,000.00 $ 15,000.00 $ 15,000.00 $ 59,000.00 $ 59,000.00 7 1 -10 Flaggers and Spotters 1,300 HR $ 48.00 $ 62,400.00 $ 57.00 $ 74,100.00 $ 52.00 $ 67,600.00 $ 44.00 $ 57,200.00 8 1 -10 Other Traffic Control Labor 180 HR $ 48.00 $ 8,640.00 $ 75.00 $ 13,500.00 $ 56.00 $ 10,080.00 $ 47.00 $ 8,460.00 9 1 -10 Portable Changeable Message Sign 6,000 HR $ 4.00 $ 24,000.00 $ 6.00 $ 36,000.00 $ 14.00 $ 84,000.00 $ 2.00 $ 12,000.00 10 1 -10 Other Temporary Traffic Control 1 LS $ 15,000.00 $ 15,000.00 $ 9,000.00 $ 9,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 11 1 -10 Off -Duty Uniformed Police Officer 50 HR $ 80.00 $ 4,000.00 $ 80.00 $ 4,000.00 $ 90.00 $ 4,500.00 $ 80.00 $ 4,000.00 12 2 -01 Clearing and Grubbing 1 LS $ 20,000.00 $ 20,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 35,000.00 $ 17,000.00 $ 17,000.00 13 2 -02 Removal of Structure and Obstruction 1 LS $ 10,000.00 $ 10,000.00 $ 45,000.00 $ 45,000.00 $ 110,000.00 $ 110,000.00 $ 60,000.00 $ 60,000.00 14 2 -03 Roadway Excavation Incl. Haul 1,400 CY $ 22.00 $ 30,800.00 $ 30.00 $ 42,000.00 $ 29.00 $ 40,600.00 $ 37.00 $ 51,800.00 15 2 -03 Unsuitable Foundation Excavation Incl. Haul 60 CY $ 40.00 $ 2,400.00 $ 60.00 $ 3,600.00 $ 10.00 $ 600.00 $ 37.00 $ 2,220.00 16 2 -03 Gravel Borrow Incl. Haul 600 TN $ 25.00 $ 15,000.00 $ 30.00 $ 18,000.00 $ 15.00 $ 9,000.00 $ 20.00 $ 12,000.00 17 2 -12 Construction Geotextile for Separation 300 SY $ 5.00 $ 1,500.00 $ 11.00 $ 3,300.00 $ 2.00 $ 600.00 $ 2.00 $ 600.00 18 4 -04 Crushed Surfacing Top Course 2,300 TN $ 25.00 $ 57,500.00 $ 28.00 $ 64,400.00 $ 30.00 $ 69,000.00 $ 30.00 $ 69,000.00 19 5 -04 HMA Cl. 1/2" PG 64 -22 1,280 TN $ 90.00 $ 115,200.00 $ 110.00 $ 140,800.00 $ 103.00 $ 131,840.00 $ 170.00 $ 217,600.00 20 5 -04 HMA Thickened Edge 1,350 LF $ 6.00 $ 8,100.00 $ 9.00 $ 12,150.00 $ 5.00 $ 6,750.00 $ 7.00 $ 9,450.00 21 6 -13 Modular Block Wall 65 SF $ 35.00 $ 2,275.00 $ 90.00 $ 5,850.00 $ 70.00 $ 4,550.00 $ 50.00 $ 3,250.00 22 7 -12 Adjust Water Valve 6 EA $ 500.00 $ 3,000.00 $ 700.00 $ 4,200.00 $ 300.00 $ 1,800.00 $ 350.00 $ 2,100.00 23 7 -15 Adjust Water Meter Box 14 EA $ 400.00 $ 5,600.00 $ 700.00 $ 9,800.00 $ 300.00 $ 4,200.00 $ 350.00 $ 4,900.00 24 7 -15 Coordinate Water Meter Relocation 12 EA $ 400.00 $ 4,800.00 $ 800.00 $ 9,600.00 $ 300.00 $ 3,600.00 $ 50.00 $ 600.00 25 8 -01 Erosion /Water Pollution Control 1 FA $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 26 8 -01 TESC, Detention /Retention & SWPPP Facilities 1 LS $ 15,000.00 $ 15,000.00 $ 3,500.00 $ 3,500.00 $ 2,000.00 $ 2,000.00 $ 15,000.00 $ 15,000.00 27 8 -04 Cement Conc. Traffic Curb and Gutter 1,650 LF $ 20.00 $ 33,000.00 $ 28.00 $ 46,200.00 $ 15.00 $ 24,750.00 $ 25.00 $ 41,250.00 28 8 -04 Cement Conc. Traffic Curb 210 LF $ 15.00 $ 3,150.00 $ 30.00 $ 6,300.00 $ 24.00 $ 5,040.00 $ 30.00 $ 6,300.00 SIDEWALK 29 8 -06 Cement Conc. Driveway Entrance Type 1 580 SY $ 60.00 $ 34,800.00 $ 75.00 $ 43,500.00 $ 36.00 $ 20,880.00 $ 40.00 $ 23,200.00 30 8 -14 Cement Conc. Sidewalk 450 SY $ 35.00 $ 15,750.00 $ 40.00 $ 18,000.00 $ 26.00 $ 11,700.00 $ 30.00 $ 13,500.00 31 8 -14 Cement Conc. Driveway 280 SY $ 60.00 $ 16,800.00 $ 75.00 $ 21,000.00 $ 35.00 $ 9,800.00 $ 40.00 $ 11,200.00 32 8 -14 Cement Conc. Curb Ramp Type Parallel A 3 EA $ 2,500.00 $ 7,500.00 $ 1,500.00 $ 4,500.00 $ 1,700.00 $ 5,100.00 $ 1,500.00 $ 4,500.00 33 1 8 -14 Cement Conc. Curb Ramp Type Parallel A, Modified 1 EA $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,700.00 $ 1,700.00 $ 1,500.00 $ 1,500.00 STORM DRAINAGE 34 2 -09 Shoring or Extra Excavation Class B 1 LS $ 8,000.00 $ 8,000.00 $ 1.00 $ 1.00 $ 2,500.00 $ 2,500.00 $ 25,000.00 $ 25,000.00 35 7 -04 Ductile Iron Storm Sewer Pipe 8 In. Diam. 160 LF $ 65.00 $ 10,400.00 $ 65.00 $ 10,400.00 $ 70.00 $ 11,200.00 $ 88.00 $ 14,080.00 36 7 -04 Ductile Iron Storm Sewer Pipe 12 In. Diam. 190 LF $ 80.00 $ 15,200.00 $ 75.00 $ 14,250.00 $ 80.00 $ 15,200.00 $ 95.00 $ 18,050.00 37 7 -04 Storm Sewer Pipe 8 In. Diam 60 LF $ 45.00 $ 2,700.00 $ 65.00 $ 3,900.00 $ 80.00 $ 4,800.00 $ 82.00 $ 4,920.00 38 7 -04 Storm Sewer Pipe 12 In. Diam 1,300 LF $ 45.00 $ 58,500.00 $ 70.00 $ 91,000.00 $ 55.00 $ 71,500.00 $ 85.00 $ 110,500.00 39 7 -04 Remove /Abandon Existing Storm Sewer Pipe 1,480 LF $ 15.00 $ 22,200.00 $ 4.00 $ 5,920.00 $ 12.00 $ 17,760.00 $ 6.00 $ 8,880.00 40 7 -04 Remove /Abandon Existing Water Pipe 1,220 LF $ 15.00 $ 18,300.00 $ 4.00 $ 4,880.00 $ 12.00 $ 14,640.00 $ 6.00 $ 7,320.00 41 7 -05 Connection to Drainage Structure 1 EA $ 1,000.00 $ 1,000.00 $ 2,000.00 $ 2,000.00 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 42 7 -05 Connection to Drainage Pipe 1 EA $ 800.00 $ 800.00 $ 2,000.00 $ 2,000.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 43 7 -05 Adjust Catch Basin 1 EA $ 500.00 $ 500.00 $ 700.00 $ 700.00 $ 500.00 $ 500.00 $ 350.00 $ 350.00 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS Thorndyke Elementary Safe Routes to School Bid Tabulation Project No. 91210302, TA No. 5252 P May 29, 2014 Engineers Estimate Road Construction NW RW Scott Construction Co. Ceccanti No. Section on Item Qty Unit Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost 44 7 -05 Concrete Inlet 10 EA $ 900.00 $ 9,000.00 $ 900.00 $ 9,000.00 $ 700.00 $ 7,000.00 $ 1,150.00 $ 11,500.00 45 7-05 Catch Basin Type 1 26 EA $ 1,000.00 $ 26,000.00 $ 1,300.00 $ 33,800.00 $ 1,100.00 $ 28,600.00 $ 1,250.00 $ 32,500.00 46 7 -05 Catch Basin Type 2, 48 In. Diam. 1 EA $ 3,000.00 $ 3,000.00 $ 7,000.00 $ 7,000.00 $ 2,500.00 $ 2,500.00 $ 4,200.00 $ 4,200.00 47 7 -05 Storm Drain Marker 38 EA $ 40.00 $ 1,520.00 $ 100.00 $ 3,800.00 $ 18.00 $ 684.00 $ 35.00 $ 1,330.00 48 7 -06 Pothole Existing Utilities 25 EA $ 600.00 $ 15,000.00 $ 600.00 $ 15,000.00 $ 400.00 $ 10,000.00 $ 350.00 $ 8,750.00 SANITARY SEWER 49 1 7 -05 'Remove and Replace Sewer Manhole Frame and Grate 1 5 1 EA $ 700.00 1 $ 3,500.00 $ 700.00 1 $ 3,500.00 $ 500.00 j $ 2,500.00 $ 500.00 1 $ 2,500.00 TRAFFIC SIGNALS 50 1 8 -20 (Traffic Signal Modifications at S. 150th St. & 42nd Ave. S. 1 1 LS $ 32,000.00 1 $ 32,000.00 $ 31,000.00 1 $ 31,000.00 $ 35,500.00 1 $ 35,500.00 ( $ 35,000.00 [ $ 35,000.00 TRAFFIC CONTROL DEVICES 51 8 -09 Raised Pavement Marker Type 1 8 HUND $ 200.00 $ 1,600.00 $ 300.00 $ 2,400.00 $ 385.00 $ 3,080.00 $ 300.00 $ 2,400.00 52 8 -09 Raised Pavement Marker Type 2 1 HUND $ 350.00 $ 350.00 $ 450.00 $ 450.00 $ 495.00 $ 495.00 $ 500.00 $ 500.00 53 8 -21 Permanent Signing 1 LS $ 5,000.00 $ 5,000.00 $ 7,000.00 $ 7,000.00 $ 7,500.00 $ 7,500.00 $ 7,500.00 $ 7,500.00 54 8 -22 Plastic Stop Line 60 LF $ 12.00 $ 720.00 $ 11.00 $ 660.00 $ 15.00 $ 900.00 $ 14.00 $ 840.00 55 8 -22 Plastic Crosswalk Line 370 SF $ 8.00 $ 2,960.00 $ 11.00 $ 4,070.00 $ 10.00 $ 3,700.00 $ 8.00 $ 2,960.00 56 8 -23 Temporary Paint Line 1,350 LF $ 0.50 $ 675.00 $ 1.00 $ 1,350.00 $ 2.00 $ 2,700.00 $ 1.00 $ 1,350.00 ROADSIDE DEVELOPMENT 57 8 -01 Topsoil /Fine Compost 150 CY $ 45.00 $ 6,750.00 $ 55.00 $ 8,250.00 $ 64.00 $ 9,600.00 $ 50.00 $ 7,500.00 58 8 -01 Hydroseed 1,315 SY $ 3.00 $ 3,945.00 $ 3.00 $ 3,945.00 $ 0.85 $ 1,117.75 $ 2.00 $ 2,630.00 59 8 -01 High Visibility Fence 1,970 LF $ 4.00 $ 7,880.00 $ 4.00 $ 7,880.00 $ 5.00 $ 9,850.00 $ 2.00 $ 3,940.00 60 8 -02 Property Restoration 1 FA $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 $ 15,000.00 61 8 -12 Chainlink Fence Type 4 100 LF $ 40.00 $ 4,000.00 $ 44.00 $ 4,400.00 $ 55.00 $ 5,500.00 $ 30.00 $ 3,000.00 62 8 -18 Remove and Replace Mailbox Support 8 EA $ 800.00 $ 6,400.00 $ 400.00 $ 3,200.00 $ 700.00 $ 5,600.00 $ 200.00 $ 1,600.00 63 8 -26 Remove and Replace Fence 50 LF $ 60.00 $ 3,000.00 $ 20.00 $ 1,000.00 $ 50.00 $ 2,500.00 $ 40.00 $ 2,000.00 FRANCHISE UTILITY ITEMS 64 8 -19 Adjust Gas Valve 2 EA $ 500.00 $ 1,000.00 $ 700.00 $ 1,400.00 $ 400.00 $ 800.00 $ 350.00 $ 700.00 65 8 -19 Temporary Utility Pole Support 6 EA $ 2,000.00 $ 12,000.00 $ 800.00 $ 4,800.00 $ 1,000.00 $ 6,000.00 $ 500.00 $ 3,000.00 TOTAL BID $ 993,415.00 $ 1,136,256.00 $ 1,151,416.75 $ 1,241,430.00