HomeMy WebLinkAboutReg 2014-06-16 Item 5B - Resolution - 2015-2020 Transportation Improvement ProgramCOUNCIL AGENDA SYNOPSIS
Initials
MeetirigDate
Prepared by
Mayor's review
Council review
06/09/14
BG
06/09/14
b../)
06/16/14
BG
deM/C-
LA
Other
Mtg Date
Mtg Date
AN Date 06/16/14
SPONSOR Council Mayor fl Adm SM.( DC L) []Finance lire fl Legal Ill Pelt Police Z PTV
SPoNsoR's The Transportation Improvement Program (TIP) is required by RCW to be updated
SUMMARY annually. The TIP is primarily a finanical planning document for projects competing for
grants. A Public Hearing is scheduled on June 9, 2014 for the 2015 - 2020 TIP. After the
Public Hearing, the TIP is adopted by resolution and is then incorporated into the Regional
and State TIPs.
Ri ATI [ wi I) BY C COW Mtg. E CA&P Cmte El F&S Cmte
Utilities Cmte C Arts Comm. E Parks
DATE: 5/27/14 COMMITIEE
ITEM INFORMATION
ITEM No.
5.B.
CAS NUMBER:
STAFF SPONSOR: BOB GIBERSON
ORIGIN kJ AGENDA D‘tl. 6/09/14
Aci NDA I II, M Tinis Resolution
adopting the Six-Year Transportation Improvement Program 2015 - 2020
CATEGORY NA Discussion
06/09/14
E Motion
Mtg Date
Resolution
E1 Ordinance
Mtg Date
Bid Award
IN Date
Z Public Hearing
Mtg Date 06/09/14
Other
Mtg Date
Mtg Date
AN Date 06/16/14
SPONSOR Council Mayor fl Adm SM.( DC L) []Finance lire fl Legal Ill Pelt Police Z PTV
SPoNsoR's The Transportation Improvement Program (TIP) is required by RCW to be updated
SUMMARY annually. The TIP is primarily a finanical planning document for projects competing for
grants. A Public Hearing is scheduled on June 9, 2014 for the 2015 - 2020 TIP. After the
Public Hearing, the TIP is adopted by resolution and is then incorporated into the Regional
and State TIPs.
Ri ATI [ wi I) BY C COW Mtg. E CA&P Cmte El F&S Cmte
Utilities Cmte C Arts Comm. E Parks
DATE: 5/27/14 COMMITIEE
Transportation
Cmte
Comm. El Planning Comm.
CHAIR: ALLAN EKBERG
RECOMMENDATIONS:
SPONSOR/ADMIN.
COMMITTEE
Public Works
Unanimous Approval; Forward to Committee of the Whole
COST IMPACT I FUND SOURCE
FXPI,NOIIITRI RPQUIRBD AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source:
Comments..
MTG. DATE
RECORD OF COUNCIL ACTION
6/09/14
Forward to next Regular Meeting
6/16/14
MTG. DATE
ATTACHMENTS
6/09/14
Informational Memorandum dated 05/23/14 (revised after 5/27 TC)
Draft Resolution
Draft 2015 — 2020 TIP Spreadsheet
Current Adopted 2014 — 2019 TIP
Minutes from the Transportation Committee meeting of 05/27/14
6/16/14
Resolution in final form
83
84
City of Tul ila
Washington
Resolution No.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX-YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2015-
2020), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26 as
amended, the City Council of the City of Tukwila has previously adopted a
Transportation Improvement Program and thereafter periodically modified said
Transportation Improvement Program by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six-Year Transportation Improvement Program for the
ensuing six calendar years (2015-2020); and
WHEREAS, on June 9, 2014, a public hearing was held regarding the City's Six-
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A six-year Transportation Improvement Program
for the calendar years 2015-2020 is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the
Secretary of Transportation and the Transportation Improvement Board of the State of
Washington.
W:\Word Processing\Resolutions\TIP 2015-2020 5-19-14
CK:bjs Page 1 of 2
85
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
at a Regular Meeting thereof this day of , 2014.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk De'Sean Quinn, Council President
APPROVED AS TO FORM BY:
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Shelley M. Kerslake, City Attorney
Exhibit: City of Tukwila Six-Year Transportation Improvement Program from 2015 to 2020
W:\Word ProcessinglResolu ons\TIP 2015-2020 5-19-14
CK:bis Page 2 of 2
86
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -06601
53rd Avenue S
S 137th St to S 144th St
Design and construct urban residential street improvements that include curb, gutter,
sidewalk and illumination. Street portion will coordinate with Water and Surface
Water capital improvement program projects.
06/09/14
06/16/14
1833
04
C G O P S
TW
0.420
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2015
0
0
251,000
251,000
P
CN
2016
0
TIB
1,000,000
200,000
1,200,000
Totals
0
1,000,000
451,000
1,451,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
251,000
0
0
0
0
CN
0
600,000
600,000
0
0
Totals
251,000
600,000
600,000
0
0
Report Date: June 10, 2014
Page 1
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -05405
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
06/09/14
06/16/14
1833
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2015
0
0
378,000
378,000
Totals
0
0
378,000
378,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
63,000
63,000
63,000
63,000
126,000
Totals
63,000
63,000
63,000
63,000
126,000
Report Date: June 10, 2014
Page 2
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03766
Andover Park E /Industry Drive Signal
Andover Park E
Industry Drive to
Design and construct a traffic signal and intersection improvements
06/09/14
06/16/14
1833
05
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
CN
2020
0
0
575,000
575,000
Totals
0
0
575,000
575,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
0
0
0
0
575,000
Totals
0
0
0
0
575,000
Report Date: June 10, 2014
Page 3
0
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03764
Andover Park E /Minkler Blvd. Intersection
Andover Park E
Minkler Blvd to
Design and construct intersection and traffic signal improvements and widening for
left turn pockets
06/09/14
06/16/14
1833
03
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
20,000
20,000
P
CN
2020
0
0
602,000
602,000
Totals
0
0
622,000
622,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
20,000
CN
0
0
0
0
602,000
Totals
0
0
0
0
622,000
Report Date: June 10, 2014
Page 4
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03731
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi- annual inspections as well as construct necessary
repairs and maintenance
06/09/14
06/16/14
1833
06
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2015
0
0
1,815,000
1,815,000
Totals
0
0
1,815,000
1,815,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
270,000
270,000
270,000
335,000
670,000
Totals
270,000
270,000
270,000
335,000
670,000
Report Date: June 10, 2014
Page 5
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03733
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
06/09/14
06/16/14
1833
06
C G O P S
TW
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2015
0
0
9,880,000
9,880,000
Totals
0
0
9,880,000
9,880,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
1,550,000
1,560,000
1,650,000
1,670,000
3,450,000
Totals
1,550,000
1,560,000
1,650,000
1,670,000
3,450,000
Report Date: June 10, 2014
Page 6
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -05409
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
06/09/14
06/16/14
1833
08
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
FMSIB
950,000
0
300,000
1,250,000
P
CN
2020
FMSIB
10,812,500
0
1,687,500
12,500,000
Totals
11,762,500
0
1,987,500
13,750,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
1,250,000
CN
0
0
0
0
12,500,000
Totals
0
0
0
0
13,750,000
Report Date: June 10, 2014
Page 7
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
/ 1380(003) TUK -52
Boeing Access Road Bridge Rehabilitation
Boeing Access Road
Interstate 5 to Airport Way South
Rehabilitate the existing Boeing Access Road bridge structure over the Burlington
Norther and Union Pacific Railroads. Work will include rehabilitation of the bridge
sub - structure, seismic retrofit, and construction of a new bridge deck including
pedestrian /bicycle amenities.
06/09/14
06/16/14
1833
14
0.200
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2015
STP(BR)
179,500
0
45,000
224,500
S
CN
2015
STP(BR)
8,625,600
0
2,220,100
10,845,700
Totals
8,805,100
0
2,265,100
11,070,200
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
224,500
0
0
0
0
CN
8,603,000
2,242,700
0
0
0
Totals
8,827,500
2,242,700
0
0
0
Report Date: June 10, 2014
Page 8
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
19
WA -03795
Cascade View Safe Routes to School Phase 2
S 140th St/33rd Ave S
to
Construct an off - street paved shard use path, sidewalks, and a traffic circle at the
intersection of 33rd Ave S and S 140th Street.
06/09/14
06/16/14
1833
28
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2018
0
WSDOT
750,000
89,000
839,000
Totals
0
750,000
89,000
839,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
839,000
0
0
Totals
0
0
839,000
0
0
Report Date: June 10, 2014
Page 9
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
Hearing
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03770
East Marginal Way
E Marginal Way
Boeing Access Road to S 112th St
Design and construct widening to 3 lanes including curb & gutter, sidewalks,
drainage, landscaping, and utility undergrounding.
06/09/14
06/16/14
1833
03
P S T W
0.280
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
170,000
170,000
P
RW
2020
0
0
700,000
700,000
P
CN
2020
STP
1,300,000
0
1,130,000
2,430,000
Totals
1,300,000
0
2,000,000
3,300,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
170,000
RW
0
0
0
0
700,000
CN
0
0
0
0
2,430,000
Totals
0
0
0
0
3,300,000
Report Date: June 10, 2014
Page 10
W *fShirtgaon St t
DepartMeat
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
c
C
no
m 3
cn
aagwnN Aiaoiad
A. PIN /Project No.
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description
B. STIP ID
G. Structure ID
0
oQ
luawpuawy
ON uogniosaa
ad lluawanoadwI
sapo0 4!IRfl
ad l ieluawuoainu3
paainbaa M2I
17
Macadam Road /S 144th St Intersection
Macadam Road
S 144th Street to
Widen Macadam Road to add a northbound left turn lane
WA -03763
06/09/14
06/16/14
1833
03
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
90,000
90,000
P
RW
2020
0
0
90,000
90,000
P
CN
2020
0
0
430,000
430,000
Totals
0
0
610,000
610,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
90,000
RW
0
0
0
0
90,000
CN
0
0
0
0
430,000
Totals
0
0
0
0
610,000
Report Date: June 10, 2014
Page 11
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
WA -03783
Multipurpose Trails
to
Design and construct safe connections to public trails to promoste pedestrian and
bicycle modes of transportation in lieu of motorized vehicles
06/09/14
06/16/14
1833
28
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2015
0
0
50,000
50,000
P
CN
2020
0
0
280,000
280,000
Totals
0
0
330,000
330,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
50,000
0
0
0
0
ALL
0
0
0
0
280,000
Totals
50,000
0
0
0
280,000
Report Date: June 10, 2014
Page 12
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -03769
S 133rd St /SR 599 SB Ramps Intersection
S 133rd Street
SR 599 SB Ramps to
Design and construct intersection improvements including a new traffic signal.
06/09/14
06/16/14
1833
06
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
60,000
60,000
P
CN
2020
STP
460,000
0
110,000
570,000
Totals
460,000
0
170,000
630,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
60,000
CN
0
0
0
0
570,000
Totals
0
0
0
0
630,000
Report Date: June 10, 2014
Page 13
Washington St rtd
Departrmme t mums
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03782
S 144th St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1 -5 between 51st Ave S and 53rd Ave S
06/09/14
06/16/14
1833
28
0.250
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2020
STP(BR)
975,200
0
243,800
1,219,000
Totals
975,200
0
243,800
1,219,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
1,219,000
Totals
0
0
0
0
1,219,000
Report Date: June 10, 2014
Page 14
Washington St td
Departrmme t um
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03762
S 144th St Phase 2
S 144th Street
42nd Ave S to Tukwila International Blvd
Design and construct paving, curb & gutter, sidewalks, drainage, illumination, and
utility undergrounding. Coordinate with Tukwila Village development. May include
on- street parking and bike lanes
06/09/14
06/16/15
1833
03
C G O P S
TW
0.190
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2015
0
TIB
1,000,000
480,000
1,480,000
Totals
0
1,000,000
480,000
1,480,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
1,480,000
0
0
0
0
Totals
1,480,000
0
0
0
0
Report Date: June 10, 2014
Page 15
Washington St td
Departrmme t um
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
16
WA -05410
Strander Blvd /SW 27th St Phase III
Strander Boulevard
E City Limits to West Valley Hwy /SR 181
Design and construct 5 -7 lane facility over /under BNSF and UPRR, extending the
current terminus of SW 27th St at the east City limits to West Valley Highway,
including access into the permanent Sound Transit train station
06/09/14
06/16/14
1833
01
EIS
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2020
FMSIB
5,000,000
0
0
5,000,000
P
ALL
2020
TIGER IV
27,000,000
0
1,150,000
28,150,000
Totals
32,000,000
0
1,150,000
33,150,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
0
0
0
0
33,150,000
Totals
0
0
0
0
33,150,000
Report Date: June 10, 2014
Page 16
Washington St td
Departrmme t um
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03772
TUC /TOD Pedestrian Improvements
Baker Blvd (if extended)
Andover Park W to E City Limits
Design and construct bike and pedestrian connection between the Tukwila Urban
Center and the Commuter Rail Station /TOD area. Connection may include an
underpass under the UPRR line.
06/09/14
06/19/14
1833
28
0.750
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
280,000
280,000
P
RW
2020
0
0
100,000
100,000
P
CN
2020
STP(E)
500,000
0
200,000
700,000
Totals
500,000
0
580,000
1,080,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
280,000
RW
0
0
0
0
100,000
CN
0
0
0
0
700,000
Totals
0
0
0
0
1,080,000
Report Date: June 10, 2014
Page 17
Washington St td
Departrmme t um
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
00
/ 1320(002) TUK -50
Tukwila Urban Center Pedestrian /Bicycle Bridge over Green River
New bridge over the Green River, approximately between Baker Blvd (if extended)
and Longacres Way (if extended)
Near Riverside office complex to Best Western hotel 15901 WVHwy
Development of a new pedestrian /bicycle bridge across the Green River, connecting
the Tukwila Urban Center 'core' to the Sounder Commuter Rail /Amtrak Station and
surrounding neighborhood of transit - oriented development. The project, a
pedestrian /bicycle bridge across the Green River, will form the backbone of a
pedestrian corridor connecting the compact land uses and high ridership bus stop in
the core of the urban center, with the Sounder Commuter Rail /Amtrak Station and its
surrounding transit - oriented development. This will improve public access to the
station from all parts of the center, and provide a direct, safe and enjoyable walking
experience. The high level of urban level amenity will attract the types and densities
of uses envisioned in a regional center.
06/09/14
06/16/14
1833
28
0.640
DCE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2015
0
OTHER
6,000,000
1,485,000
7,485,000
Totals
0
6,000,000
1,485,000
7,485,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
CN
7,485,000
0
0
0
0
Totals
7,485,000
0
0
0
0
Report Date: June 10, 2014
Page 18
Washington St td
Departrmme t um
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
17
WA -03761
Walk & Roll Plan (Nonmotorized Transportation Plan
Various City Streets
to
Select, design, and construct non - motorized projects including bike lanes, sidewalks
and trails. First priorities are: sidewalks on S 152nd Street, TIB to 42nd Ave S;
sidewalk on S 130th St, TIB to S 130th St; sidewalk/bike lanes on Macadam, S 144th
St to S 150th St.
06/09/14
06/16/15
1833
28
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2015
0
0
140,000
140,000
Totals
0
0
140,000
140,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
140,000
0
0
0
0
Totals
140,000
0
0
0
0
Report Date: June 10, 2014
Page 19
Washington St td
Departrmme t um
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03779
West Valley Highway
SR 181 /West Valley Highway
1 -405 to Strander Blvd
Design and costruct widening to 7 lanes including curb & gutter, sidewalks,
illumination, drainage, and traffic control
06/09/14
06/19/10
1833
03
0.500
CE
No
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
60,000
60,000
P
CN
2020
0
0
570,000
570,000
Totals
0
0
630,000
630,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
60,000
CN
0
0
0
0
570,000
Totals
0
0
0
0
630,000
Report Date: June 10, 2014
Page 20
Washington St td
Departrmme t um
Agency: Tukwila
County: King
MPO /RTPO: PSRC
Y Inside
Six Year Transportation Improvement Program
From 2015 to 2020
N Outside
Functional
Class
Priority Number
A. PIN /Project No. B. STIP ID
C. Project Title
D. Road Name or Number
E. Begin & End Termini
F. Project Description G. Structure ID
m
co
Adopted
Amendment
Resolution No.
Improvement Type
Utility Codes
Total Length
Environmental Type
RW Required
14
WA -03765
West Valley Highway /S 156th St
SR181/West Valley Highway
Southcenter Blvd to S 158th St
Construct additional northbound left turn lanes at S 156th Street for northbound HOV
to northbound 1 -405
06/09/14
06/16/15
1833
03
O P S T W
CE
Yes
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2020
0
0
50,000
50,000
P
CN
2020
CMAQ
440,000
0
542,000
982,000
Totals
440,000
0
592,000
1,032,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
0
0
50,000
CN
0
0
0
0
982,000
Totals
0
0
0
0
1,032,000
Federal Funds
State Funds
Local Funds
Total Funds
Grand Totals for Tukwila
56,242,800
8,750,000
26,473,400
91,466,200
Report Date: June 10, 2014
Page 21