Loading...
HomeMy WebLinkAboutPermit 0443 - General ElectricJOB ADDRESS 112 Andover Park East DATE 4/29/74 ,LEGAL, LOT NO. 4 & 5 BLK TRACT E C TTACHED SHEET) Andover Industrial P k f' 1 OWNER MAIL ADDRESS ZIP PHONE 2 General Electric 112 Andover Park', Seattle, Wa. 98188 CONTRACTOR MAIL ADDRESS PHONE LICENSE NO. At. 3_4 3 Burfi'II Construction Co. 3400 16th Ave. West Seatt e, Via. 223- 01 -48b ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. 4 ENGINEER MAIL ADDRESS PHONE LICENSE NO. 5 LENDER MAIL ADDRESS BRANCH s 0- 578 -27996 USE or BUILDING Office 8 Class of work: 0 NEW • ADDITION la ALTERATION 0 REPAIR • MOVE • REMOVE s Describe work: Alter Lobby per plan 10 Change of use from Change of use to 11 Valuation of work: $ 2 t 500.00 F PLAN CHECK FEE 15.60 PERMIT FEE 24. SPECIAL CONDITIONS: Type of Const. Occupancy Group Division Size of Bldg. (Total) Sq. Ft. No. of Stories Max. Occ. Load Fire Zone Use Zone Fire Sprinklers Required • Yes • No APPLICATION ACCEPTED BY: PLANS CHECKED BY APP • • FOR ISSU Y: Or f No. of Dwelling Units OFFSTREET PARKING Covered SPACES: Uncovered NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS' COM- MENCED, I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER ST • OR LOCAL LAW REGULATING C STRUCTIO OR THE PER 0 'y • E OF CONSTRUCTION. 1 /. • Special Approvals Required Not Required Approved ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT OTHER (Specify) FOUNDATION FRAMING FINAL SIGNATURE or OWNER (IT OWNER BU 0 '1 SIGNATURE OR AUTHORIZED AGENT 10ATE1 BUILDING PERMIT Applicant to complete numbered spaces only. CI( OF TUKWILA BUILDINGS RMIT 14475 - 59th Ave. So. / Tukwila, Washington 98067 BUILDING PERMIT NO. N° 443 WH ROPERLY VALIDATED ON THIS SPACE) THIS IS YOUR PERMI CASH PERMIT VALIDATION PLAN CHECK VALIDATION CK. U M..O. S '7 `� 1 �1� �1 "t OCCUPANCY PERMIT REQUIRED CASH JOft ADD ft ES5 , • • ti '' l�t� DATE / L� ter ( 1 7 4. LEGAL LOT O. _ ...) PLR 1 TRACT '..-- 4-.^-4,-,x,-,.')„e( ^ ..- ^ +EC ATTACHED SHEET) • OWNER C MAIL ADDRESS ZIP PHONE /// CONTRACTOR / MAIL ADDRESS PHONE LICENSE HO. k. IAa ,c creer. d - 3— -( u a —f7d`o -7' �-0c - (6 7 6 ` ARCHITECT OR DESIGNER MAIL ADDRESS PHONE LICENSE NO. • ENGINEER MAIL ADDRESS PHONE LICENSE NO. 5 • LENDER MAIL ADDRESS BRANCH 6 ( . e- f-? -- 2 ? ( [ n( USE OP BUILDING 1 . / /' • ~ 7 � • C• -1,.- + l � -- ti �.� 8 Class of work: • NEW D ADDITION I„1'ALTERATION • REPAIR • MOVE • REMOVE 9 Describe work: •td f- L y s --, Q 1( • 10 Change of u fr • Change of use to •. • ' • 11 Valuation of work: $ h "' PLAN CHECK FEE _ �f �� PERMIT FEE Y �_ SPECIAL CONDITIONS: Type of Const. Occupancy Group • Dlvlslon . Size of Bldg. (Total) Sq.•Ft. No. of &tortes • Max. • Occ. Load Fire Zone Use Zone ' Fire Sprinklers Required Dyes Oro APPLICATION ACCEPTE D OV _ PLANS CHECKED BY: • APPROVED FOR ISSUANCE BY: No. of Dwelling Units OFFSTREET PARKING SPACES: Covered Uncovered _ .r..._.....«. NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMB- ING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUC- TION AUTHORIZED IS NOT COMMENCED WITHIN 60 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK I$ COM• MENCED. I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. V ALL PROVISIONS OF LAWS AND ORDINANCES OVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT ODES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION O.R THE PERFORMANC pF ONSTRUCTION. , /', -� � A . L C Special Approvals _ . Required Not Required Approved ZONING • HEALTH DEPT. ' FIRE DEPT. SOIL REPORT • OTHER (Specify) ' • • . FOUNDATION FRAMING FINAL 1IGH ATUHL or OWNER (or OWNER BUILDER) V Cwt / d .• +ra- SIGNATURE OR AUTHORIZED AGENT ! UA APPLICATION Applicant to complete numbered spaces only. CITY OF TUKWILA BUILDING PERMIT '5 - 59th Ave. So. / Tukwila, Washington ' 157 general electric co ge plan approved vicinity map legal description site plan general notes details floor plan sections first floor plan details elevations floor plan detail loading dock bumper fire door section mezzanine details first floor plan roof plan roof details finish schedule door schedule door detail elevations elevations elevations sections wall sections details plan main entrance bindon minor entrance details reflected ceiling plan detail demonstration room stair display area wall details stair details baffle panel details base detail window detail reflected ceiling plan details elevations demonstration room space glass screen detail section deatils vanity shelf restroom plans restroom details details wall detail window detail foundation plan footing under block walls slab over toilet and trash room . office foundation plan main entrance stair section ceiling slab vault room section • panel to column bracket corrections details section wall panels office roof and mezzanine sections roof and mezzanine framing warehouse roof framing plan bracing base connection tv antenna connection site plan section sprinkler valve box detail first floor plan plumbing maintenance canopy plan plumbing riser diagram first floor office plan mezzanine floor plan first floor plan plumbing riser diagram details sprinkler plan details display room alternate plan mechanical exhaust fan duct detail mezzanine floor plan first floor plan warehouse plan and heating first floor plan heating mechanical room plan partial roof plan site plan telephone diagram system conduit installation diagram power riser tv conduit diagram display area alternate lighting plan demonstration room control panel main entrance plan first floor plan unit mezzaine floor plan control diagram demonstration room conduit diagram schematic diagram heating control first floor plan electric heating plan electrical plan electrical plan