Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit PG07-052 - SIMPLY THAI
SIMPLY THAI 375 STRANDER BL PGO7-052 Parcel No.: 2623049064 Address: Suite No: doc: UPC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http:/ /www.ci.tukwila.wa.us 375 STRANDER BL TUKW Tenant: Name: SIMPLY THAI Address: 375 STRANDER BL , TUKWILA WA Owner: Name: REGENCY CENTERS LP Address: PROPERTY TAX DEPARTMENT , PO BOX 13244 Contact Person: Name: GREG BARRERA Address: 375 STRANDER BL , TUKWILA WA Contractor: Name: T P J INC Address: 351 UNION AVE NE , RENTON WA Contractor License No: TPJIN * *981NR DESCRIPTION OF WORK: REPLACE EXISTING REDHCED PRESSURE ZONE ASSEMBLY WITH NEW 009 SERIES WATTS REGULATOR Value of Plumbing /Gas Piping: Fees Collected: $450.00 $185.50 Plumbing Bathtub or combination bath/shower 0 Bidet 0 Clothes washer, domestic 0 Dental unit, cuspidor 0 Dishwasher, domestic, with independent drain 0 Drinking fountain or water cooler (per head) 0 Food -waste grinder, commercial 0 Floor drain 0 Shower, single head trap 0 Lavatory 0 Wash fountain Receptor, indirect waste 0 Sinks 0 Urinals 0 Water Closet 0 PLUMBING /GAS PIPING PERMIT FIXTURE TYPE AND OUANTITY 0 * *continued on next page ** Permit Number: Issue Date: Permit Expires On: Phone: Phone: 206 240 -1409 Phone: (425)228 -3204 Expiration Date: 08/19/2008 Uniform Plumbing Code Edition: 2003 International Fuel Gas Code Edition: 2003 Steven M Mullet, Mayor Steve Lancaster, Director PG07 -052 02/16/2007 08/15/2007 Plumbing (cont.) Building sewer and each trailer park sewer 0 Rain water system - per drain (inside bldg) 0 Water heater and/or vent 0 Industrial waste treatment interceptor, including its trap and vent, except for kitchen type grease interceptors 0 Repair or alteration of water piping and/or water treatment equipment 1 Repair or alteration of drainage or vent piping 0 Medical gas piping system serving (1 -5) inlets /outlets for a specific gas 0 Medical gas piping (6 +) inlets /outlets 0 Gas Piping Gas piping outlets (0 -5) 0 Gas piping outlets (6 +) 0 PG07 -052 Printed: 02 -16 -2007 Permit Center Authorized Signature' Signature: Print Name: doc: UPC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read an ex this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be compli - • wi ' ther specified herein or not. The granting of this permit does n esume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance . I am authorized to sign and obtain this plumbing /gas piping permit. Date: a 11d 6 ' Permit Number: PG07 -052 Issue Date: 02/16/2007 Permit Expires On: 08/15/2007 Steven M Mullet, Mayor Steve Lancaster, Director Date: 62-` iu t o This permit shall become null and void if thelwork is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PG07 -052 Printed: 02 -16 -2007 Parcel No.: 2623049064 Address: Suite No: Tenant: SIMPLY THAI 1: ** *PLUMBING AND GAS PIPING * ** doc: Cond -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 375 STRANDER BL TUB:W PERMIT CONDITIONS * *continued on next page ** Permit Number: Status: Applied Date: Issue Date: PG07 -052 ISSUED 02/14/2007 02/16/2007 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor /ceiling assemblies and fire- resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. PG07 -052 Printed: 02 -16 -2007 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied • whether specified herein or not. doc: Cond -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us The granting of this pe • - s not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the perf • ce of work. Signature: Date: 2 d7 Print Name: PG07 -052 Printed: 02 -16 -2007 Site Address: Tenant Name: Property Owners Name: Mailing Address: CITY OF TUKW- Community Development Department Permit Center 6300 Sotithcenter Blvd., Suite 100 Tukwila, WA 98188 http://wWw.ci.tukwila.wa.us PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** King Co Assessor's Tax No.: 2.-Q 3 t Elm (,VD Suite Number: . 3 -- /S Floor: 1 New Tenant: 0 .... Yes r -7 m. 1.11 L A. , CONTACT PERSON - Who do we contact when your permit is ready to be issued Name: Mailing Address: E -Mail Address: Company Name: Mailing Address: Contact Person: E -Mail Address: Contact Person: E -Mail Address: 1- �t.-t iI�iC31l�1�-� �1ou —+fT� WO 14 •. v Contact Person: t-rtCS PL"T . E -Mail Address: LUAU. PLt— te,t4.L I�u4T, GOC4 Contractor Registration Number:'( E 7 $ P 1. Plumbing/Ga Permit No. Project No. ;' (For o zee use only) . bq City State . Zip Day Telephone: ( ) a 4 6 - i'- 69 I 1..14*_ City L State Zip Fax Number: PLUMBING /.GAS PIPING CONTRACTOR INFORMATION Y City State Zip Day Telephone: 4-2.5 - ZZB - Fax Number: C Z p� 228 /' t om, Expiration Date: d '3 ` YL 1 ARCHITECT OF RECORD- All plans must be wet stamped by Architect of Record Company Name: Mailing Address: Q:1ApplicationsWorms- Applications On Line\3 -2006 - Plumbing -Gas Piping Permit Application.doc Revised: 4 -2006 bh City Day Telephone: Fax Number: State State X..No Zip ,ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Company Name: Mailing Address: City Day Telephone: Fax Number: Zip Page 1 of 2 Fixture Type:! . Qty Fixture Type: Qty Fixture Type: . Qty Fixture Type: Qty Bathtub or combination bath/shower Drinking fountain or water cooler (per head) Wash fountain Gas piping outlets Bidet Food -waste grinder, commercial Receptor, indirect waste Clothes washer, domestic Floor drain Sinks Dental unit, cuspidor Shower, single head trap Urinals Dishwasher, domestic, with independent drain Lavatory Water Closet Building sewer or trailer park sewer Rain water system — per drain (inside building) Water heater and/or vent Additional medical gas inlets/outlets — six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Repair or alteration of water piping and/or water treating equipment Repair or alteration of drainage or vent piping Medical gas piping system serving one to five inlets/outlets for specific gas , j Valuation of Project (contractor's bid price): $ 4-5 7-x - ! Scope of Work (please provide detailed information): Rat��PLA.e -- agE_ 14 c. 9 "P-c-, Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: PERMIT APPLICATION °NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstr. ;d. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY T I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERDU' : Y THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Mailing Address: BUILDING OWNE ' . R AUTHQitIZED AGENT: Signature: v � Print Name: Date Application Accepted: , _ 1 Q:\Applications\Forms- Applications On Line3-2006 - Plumbing -Gas Piping Permit Application.doc Revised: 4 -2006 bh Date Application Expires: ( 14 io- Date: -Fir 4— 7 Day Telephone: C 2' 1 D 1 4-09 City State Zip Staff Initials: Page 2 of 2 Parcel No.: 2623049064 Address: 375 STRANDER BL TUKW Suite No: Applicant: SIMPLY THAI Receipt No.: R07 -00238 TRANSACTION LIST: Type Method Description ACCOUNT ITEM LIST: Description PLUMBING - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Initials: JEM Payment Date: 02/16/2007 01:01 PM User ID: 1165 Balance: $0.00 Payee: UNITED WORLDLINK INC. - SIMPLY THAI RESTAURANT Amount Payment Check 62033 165.50 Account Code Current Pmts 000/322.100 165.50 Total: $165.50 Permit Number: PG07 - 052 Status: APPROVED Applied Date: 02/14/2007 Issue Date: Payment Amount: $ 165.50 doc: Receiot -06 Printed: 02 -16 -2007 Parcel No.: 2623049064 Address: 375 STRANDER BL TUKW Suite No: Applicant: SIMPLY THAI Receipt No.: R07 -00228 Initials: JEM User ID: 1165 Payee: SIMPLY THAI ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES PLUMBING - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT TRANSACTION LIST: Type Method Description Amount Payment Cash 20.00 Account Code Current Pmts 000/345.830 19.50 000/322.100 .50 Total: $20.00 Permit Number: PG07 -052 Status: PENDING Applied Date: 02/14/2007 Issue Date: Payment Amount: $20.00 Payment Date: 02/14/2007 03:28 PM Balance: $87.50 491 02/14 9716 TOTAL 20.00 doc: Receiot -06 Printed: 02 -14 -2007 I J INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Ins • ector: INSPECTION RECORD Retain a copy with permit Pro 'ect //' � /_ f Address: ---s 7 .s / , .-,- /3 L Special Instructions: Type of Inspection: /a/24 -/u Date Called: Date Wanted: a. p.m. Requester: Phone No: c? --- �/O - /4'v (206)431 -3670 COMMENTS: (' K0 ")+7 0`7(// i L✓l Date: 2 -2 -cr7 Corrections required prior to approval. .00 REINSPECTION FE REQUI Prior to inspection, fee must be l aid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. 'Receipt No.: 'Date: 4.....■••■••■••-•-•■••-. PI.11 review cpproval Approwl the vlolats apprc CY — Date: 4:::11 ORS • • , ..../ Ma., wic.........71,....1,......1.ffil,e......:4 , , • - - 1, . .....-'7*"' --- 74" . ' — • s -, i' / . .,......t —...‘ \Acts: C Z I d City of Tukwila BUILDING DIVISION FILE CrIr Permit No. ?KV' di 0.62 tsei ..■■_■•••• 13152512115 No changes shall be made to the scope c7 war:: without prior approval of DuIldIng Dierkfm. a cu'irna:t1 cr.:1 r.lzy Lcuc ciUcr1 mvicw j ..d.rsrat j t bject to errors and omission& documents does not authorize ep code or ondlnancs. Receipt d conditions Is acknowledged: re or mavelenr.e. 61,4.4 444tOgy;: ;'• rvr • ki I klo AJez 31L-16 • t I !„ 1-Ta.C:t;d1 4 Ck -VPOtql ufr."71'',Re+9t ( \ ( tvn44 FLoat. -)cisTiQem stRK akEe.. p .0 • -.....ranamaxesszar-■• ••••••• REVIEWED FOR CODE COMPLIANCE nomirrtor.,..n FEB 1 6 2007 City Of Tukwila BUILDING DivrcTnni Series 009 Reduced Pressure Zone Assemblies Sizes: 1/4" - 3" • Installation • Service • Repair Kits • Maintenance For field testing procedure, send for IS-11C-DL, IS- TIC -9A, IS-TIC-99E AND 1S- TK -99D. For other repair kits and service parts, send for PL -RP -BPD. For technical assistance, contact your local Watts representative. CALIFORNIA PROPOSITION 65 WARNING WARNING: This product contains chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. (California law requires this warning to be given to customers in the State of California.) For more Information: www.wattstnd.com/prop65 IMPORTAN11 Inquire with governing authorities for local installation requirements. NOTE For Australia and New Zealand: Pipeline strainers should be installed between the upstream shutoff valve and the inlet of the backflow preventer. Its important that this assembly be tested periodically In com- pliance with local codes, but at least once per year or more as service conditions warrant. If installed on a fire sprinkler sys- tem, all mechanical checks, such as alarm checks and back - flow preventers, should be flow tested and inspected internally in accordance with NFPA 13 and NFPA 25. F 3" 009NRS FILE copy Perm f• REVIEWED FOR CODE COMPLIANCE r r nnurn FEB 1 6 2007 City Of Tukwila BUILDING DIVISION RPnS -009 • : 3ns. RECEIVED CITY OFTUKWILA FEB 14 7007 PER CENTER elm Umilyd Warranty: Watts Regulator Company warrants each product to be free from defects in material and workmanship under normal usage for a period of one year from the date of original shipment In the event of such defects within the warranty period, the Company will, at Its option, replace or recondition the product without charge. This shall constitute the sole and exclusive remedy for breach of warranty, and the Company shall not be responsible for any incidental, special or consequential damages, Including with- out Imitation, lost profits or the cost of repairing or replacing other property which is damaged IOUs product does not work properly, other costs resulting from labor charges, delays, vandalism, negligence, fouling caused by foreign material, damage from adverse water conditions, chemical, or any other circumstances over which the Company has no control. This warranty shall be invalidated by any abuse, misuse, misapplication or improper installation of the product THIS WARRANTY IS IN UEU OF ALL OTHER WAR- RANTIES, EXPRESS OR IMPLIED, INCLUDING ANY IMPLIED WARRANTIES OF MER- CHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Any implied warranties that are Imposed by law are limited In duration to one year. Some States do not allow Imitations on how long an Implied warranty lasts, and some States do not allow the exclusion or limitation of Incidental or consequential damages. Therefore the above limitations may not apply to you. This Umited Warranty gives you specific uld legal applicable � laws have to determine other yo �� from State to State. You NV WATTS® REGULATOR 6 c- Installation Instructions Indoors - Figure 1 For indoor installations, it is important that the aasemby be easily accessible to facilitate testing and servicing. If it is located in a line close to a wall, be sure the test cocks are easily acces- sible. A drain line and air gap (see literature ES- AG/EUTC) should be piped from the relief valve connection as shown, where evidence of discharge will be clearly visible and so that water damage will not occur. Therefore, never install in con - cealed locations: Outside - Figure 2 In an area where freezing conditions do not occur, Series 009 can be installed outside. The most satisfactory installation is above ground and should be installed in this manner whenever possible. In an area where freezing conditions can occur, Series 009 should be installed above ground in an insulated enclosure. Series 009 must be installed in an accessible location to facili- tate testing and servicing. A discharge line should be piped from the air gap at the relief valve connection making sure that there is adequate drainage. Never pipe the discharge line directly into a drainage ditch, sewer or sump. Series 009 should never be installed where any part of the unit could become submerged in standing water. It is generally recommended that backflbw preventers never be placed in pits unless absolutely necessary and then only when • approved by local codes. In such cases, a modified pit installa- tion is preferred. Parallel - Figure 3 Two or more smaller size assemblies can be piped in parallel (when apprgved) to serve a large supply pipe main. This type of installa- tion is employed where increased capacity is needed beyond that provided by a single valve and permits testing or servicing of an individual valve without shutting down the complete line. ' The number of assemblies used in parallel should be deter- mined by the engineer's judgement based on the operating conditions of a specific installation. For parallel valve installations, the total capacity of the assem- blies should equal or exceed that required by the system. Annual Inspection of all water system safety and control valves Is required and necessary. Regular Inspection, testing and cleaning assures maximum life and proper product function. FIgurel Figure 2 Figure 3 Fiberglass WattsBox Now available, WattsBox Insulated Enclosures, for more Information, send for literature ES-WB. WattsBox _I I .- ij ._5C0/1t'AKIIDl�1 01F ? tin>r;: ':.,,,=,„,..,,, yc ' <4_.:a r, Now aval able, WattsBox Insulated Enclosures, for more information, send for literature ES-WB. W — 2' 009 If SlaIIMIU1l Ili Roo 11611 Whir WA Niff Ii■. Note: Sid ff Valves: When shutoff valves are removed and reassembly is nec- essary, the shutoff valve with the test cock is to be mounted on the inlet side of the backflow preventer. A The 009 should always be installed in an accessible location to facilitate testing and servicing (See page 2). Check the state and local codes to erg that the beck- preventer is installed In such e s t e proper height B. We recommend a strainer be installed ahead of fouling. series assemblies to pro- tect the internal components from unnecessary g. Caution: Do not install with strainer when backflow preventer is used on sel- dom -used water lines which are called upon only during emergencies, such as fire sprinkler lines. Start Up: The downstream shutoff should be dosed. Open upstream slowly and fill valve. When valve is filled, open the downstream hammer slowly and hock fil l the water supply system. This is necessary . C. Water discharge from the relief valve should be vented in accordance with code ditch, requirements. eo sump. The relief valve u be t rminated approximately 12' above sewwer or p. The dischaarge a should to a floor drain. the ground or through an air gap piped NOTE Relief Valve Discharge Rates The installation of an air gap with the drain line terminating above a floor drain will handle any normal discharge or nuisance spitting through the relief valve. However, floor drain size may need to be designed to prevent water damage caused by a catastrophic failure condition. Please refer to Figure No. 1 for maximum relief valve discharge rates, size and capacity of typical floor drains. NOTE Do not reduce the size of the drain line from the air gap fitting. Pipe full line size. D. After initial installation, a discharge from the relief valve opening may occur due to inadequate initial flushing of pipe lines to eliminate dirt and pipe compounds. If flushing will not clear, remove the first check valve and clean thoroughly. NOTE Periodic relief valve discharge may occur on dead end service applica- tions, such as boiler feed lines or cooling tower makeup lines due to fluctuating supply pressure during a static or no flow condition. To avoid this discharge, install a spring - loaded rubber seated check valve ahead of the backflow assembly to lock -in" the downstream pressure. E. Backflow preventers should never be placed in pits unless absolutely neces- sary and then only when and as approved by local codes. In such cases, pro - vision should be made to always vent above flood level or for a pit drain to ensure an adequate air gap below the relief port. F. It is important that Series 009 backflow preventers be inspected periodically for any discharge from the relief valve which will provide a visual indication of need for cleaning or repair of check valves. Also testing for proper operation of the device should be made periodically in compliance with local codes, but at least once a year or more often, depending upon system Relief vent will discharge water when, during no-flow periods, (1) the first check valve is fouled or (2) the inlet pressure to the device drops sufficiently due to upstream pressure fluctuations to affect the required operating differen- tial between the inlet pressure and reduced pressure zone. Other wise, such relief (spitting) can occur when the second check is fouled during emergency backflow or resulting from a water hammer condition. For troubleshooting guide send for S -TSG. NOTE Special consideraticos are necessary when testing assembfies installed on Fire Prevention Systems. Fee Proms System Installationm The National Are protection Agency (NFPA) Guidelines require a confirming flow test be conducted whenever been in valve such as the shutoff valves or a backflow assembly have Certified testers of backflow assemblies must conduct this confirming test. Figure 1 Relief Valve Discharge Rates -1" 009 0 10 20 30 40 50 60 70.80 90 100 150 Zone Pressure psi I -er 1M -a-3/4" M2 -X-1 M21 11/4' - 3" 009 300 III fl 300 mo 250 ■IIIRIMIUIM■III i 200 �..�IIIs g 150 S i NMI 1100 Aal.P�. 0�� ® ■ ®NI 0 10 20 30 40 50 60 70 80 90 100 150 Zane Pressure psi I $ 1 - 1W M2-- 2' M2 2W - "I TYPICAL FLOW RATES AS SIZED BY FLOOR DRAIN MANUFACTURERS: 2' 55 GPM 5' 350 GPM 3' 112 GPM 6' 450 GPM 4' 170 GPM S' 760 GPM Servicing the Relief Valve 1/4"- 211 1. Remove the relief valve cover bolts while holding the cover down. 2. Lift the cover straight off. The stem and diaphragm assem- bly will normally remain with the cover as it is removed. The relief valve spring will be free inside the body at this point. 3. The relief valve seat is located at the bottom of the body bore, and can be removed, If necessary, for cleaning. The disc can be cleaned without disassembly or the relief valve module. If it is determined that the relief valve diaphragm and/or disc should be replaced, the relief valve module can be readily disassembled without the use of special tools. Note: the disc rubber Is molded into the disc holder and is supplied as a disc holder assembly. 4. To re- assemble the relief valve, press the seat firmly into place in the body, center the spring on the seat, and insert the cover and relief valve module as a unit straight into the bore. Press down on the cover to assure proper alignment. Insert and tighten bolts. Caution: If cover will not press flat against body, stem as- sembly is crooked and damage can result. Re -align stem and cover before bolts are inserted. Test Cock No.2 Test Cock No.3 First Check Module Assembly Relief Valve Assembly V Water Outlet Cover — Cover 0-ring Diaphragm Stem & Diaphragm Assembly Retainer Seat 0-ring Body Test Cock No.4 Second Check Module Assembly Replacement Parts -- W - 2" When ordering, specify Ordering Code, Kit number and Valve Size. ' /" - #`"BRDERINGtliDE ` `KIYNO '`` 11/4"-r i` ''DRDERING'CODE °TOT N0. Relief Valve Total Kit: 0887307 RK 009M2 VT 0887277 RK 009M1 VT 0887016 RK 009 VT 0887545 RK 009M2 VT Kit consists of: RV assembly, Seat, Seat 0 -ring, ring and Upper stem 0 -ring. Belief Valve Kits: 0887294 RK 009 VT 0887509 RK SS009 VT 0887002 RK 009M2 VT 0887520 RK SS009M2/M3 VT 0888524 RK 009M3 VT 0887015 RK 009 VT 0887503 RK SS009 VT 0887785 RK 009M2 VT Kit consists of: Seat, Seat 0 -ring, Stem & diaphragm Cover 0-ring and RV spring. Relief Valve Rubber Parts Kits: 0887295 RK 009 RV 0887510 RK SS009 RV 0886998 RK 009M2 RV 0887519 RK SS009M2/M3 RV 0888523 RK 009M3 RV 0887181 RK 009 RV 0887529 RK SS009 RV 0887786 RK 009M2 RV Kit consists of: Diaphragm, Disc assembly, Stem 0- rings, Total Rubber Parts Kits: 0887297 RK 009 RT 0887511 RK SS009 RT 0886999 RK 009M2 RT 0887521 RK SS009M2 RT 0888526 RK 009M3 RT 0888597 RK SS009M3 RT 0887182 RK 009 RT 0887530 RK SS009 RT 0887787 RK 009M2 RT Kit consists at Diaphragm, Two discs, Two di 0 -ring, Two seat 0-rings and RV seat 0 -ring. Cover Kits: 0887296 RK 009 C 0887500 RK SS009 C 0887004 RK 009M2 C 0887501 RK SS009M2/M3 C 0888525 RK 009M3 C 0887013 RK 009 C 0887502 RK SS009 C 0887788 RK 009M2 C KR consists of: Cover and Cover 0 -ring. 1/i — �✓i Ye assembly, Stem 0 -ring, W, 54',' If — 54 54 -1' 1' l Seat 0-ring and Cover O-ring. Ye, W, '/; '/; — W — 1' 1' 1 sc assemblies, Stem 0 -rings, Cover '/i , 34','/i' '/4' —'/' 34 '/; — 1' 1'/i —1'k' 114 —2' 1'/i — 2' 2 ' Cover 0 -ring, Sensing passage 0- Relief Valve Rubber Parts Kit: 0887306 RK 009M2 RV 1W-1W 0887276 RK 009M1 RV 1'/i — 2' 0887184 RK 009 RV 1'/i — 2' 0887544 RK 009M2 RV 2' Kit consists et: Diaphragm, Seat 0-ring, Cover 0-ring and Sensing passage 0 -ring. Complete Rubber Parts Kit: 0887309 RK 009M2 RT 1'/i — l W 0887280 RK 009M1 RT 1'/i —2' 0887185 RK 009 RT 1'/; — 2' 0887547 RK 009M2 RT 2' Kit consists of: Two check assembly 0 -rings, Two disc assemblies, One cover 0- ring, One RV diaphragm, One RV seat 0 -ring, One sensing passage 0-ring, One diaphragm plate 0 One RV lower stem 0 -ring, One RV upper stem 0 - ring, One RV disc assembly.and One bleed screw 0 -ring. )Cover Kit: 0887308 RK 009M2 C 1'/i —1'/t' 0887278 RK 009M1 C 1'W — 2' 0887014 RK 009 C 1'/; — 2' 0887546 RK 009M2 C 2' Kit consists of: Cover, Cover 0 -ring, Sensing passage 0 -ring, Bleed screw 0 -ring, Vent hood and Bleed screw. Servicing First & Second Check Valves 1411 2° 1. Remove the retainer from the body bore. The check valve modules can now be removed from the valve by hand or with 'a screwdriver. Note: The seats and springs of the first and second check modules are not interchangeable. The heavier spring and smaller diameter seat belong with the first check module. 2. The check seats are attached to the cage with a bayonet type locking arrangement. Holding the cage in one hand, push the seat inward and rotate clockwise against the cage. The seat, spring cage, spring and disc assembly are now in- dividual components. Note: 3 /4' M2 modules snap apart. 3. The disc assembly may now be cleaned and re- assembled or, depending on its condition; may be discarded and replaced with a new assembly from the repair kit. 0-rings should be cleaned or replaced as necessary and lightly greased with the FDA approved grease. Refer to parts price list, PL -RP -BPD for more information. 4. Re- assemble the check valve modules. Check modules are installed in the valve body with the seat facing the valve inlet. The modules must be securely in place before the retainer can be replaced. On the 3 /4' size retainer may have to be tilt- ed slightly into place. Replace relief valve assembly. CHECK ASSEMBLY M3 CHECK ASSEMBLY Y - '/4' O -ring . Check Injection Molded Stainless Steel Seal Cage Acetyl Resin Spring • - P* 1 1 0 Seat Disc Spri Seat 0-ring CHECK ASSEMBLY 1' - 2' Check Cage ,---, illir. \ lay; 0). „t.),.,0),,,,,,.• ,...- 21r, _., _,-,_:::, Spri Disc Assembly Relief Valve Module 0-ring Seal 1st Check Silicone Seal Module Cover 0-ring l° O Retainer Watts reserves the right to change or modify product design, construc- tion, specifications, or materials without prior notice and without incur- ring any obligation to make such changes and modifications on Watts products previously or subsequently sold. Replacement Parts - W When ordering, specify Ordering Code, lit number and Valve Siie. 1/4°- 1' . first Check Kits: 0887291 RK 009 CK1 Ye, 44',14' 0887505 RK SS009 CK1 ''H 0887000 • RK 009M2 CK1 3 /i 0887515 RK SS009M2iM3 CK1 -Ye -'/4 0888520 RK 009M3 CK1 • '/4. 0887005 RK 009 CK1 W =1' 0887009 RK 009 CK1SS • 'Ye -1'- 0887525 RK SS009 CK1 . 1' 0887789 RK 009M2 CK1 • 1' Kit consists of: Check assembly and Cover 0 -ring: second Check Kits: • RK 009 CK2 RK SS009 CK2 RK 009M2 CK2 RK SS009M2IM3 CK2 RK 009M3 CK2 RK 009 CK2 RK 009 CK2SS 0887526 RK SS009 CK2 0887790 RK 009M2 CK2 Kit consists of: Check assembly and Cover 0-ring. 0887292 0887506 0887001 0887516 0888521 0887007 088 Check Rubber Parts: 0887293 RK 009 RC3 0887003 RK 009M2 RC3 0888522 RK 009M3 RC3 0887507 • RK SS009 RC1 - 0887517 RK SS009M2. RC1 0888595 RK SS009M3 RC1 0887017 RK 009 RC1 0887527 RK SS009 RC1 0887791 RK 009M2 RC1 0887508 RK SS009 RC2 0887518 RK SS009M2 •RC2 0888596 RK SS009M3 RC2 0887180 RK 009 RC2 0887528 RK SS009 RC2 0887792 RK 009M2 RC2 Kit consists of: Disc, Cover 0-ring and Seat 0 -ring. Aetainerr 1047053 99A847 1047394 998A47 1047001 99FA47 1047001 99FA47 1047401 • 99FA47 1'/4 - r ORDERM CODE :A ND" n;;.; . =rSIZE" y First Check Kit: 0887300 RK 009M2 CK1 0887270 RK 009M1 CK1 0887006 RK 009 CK1 '0887010 RK 009 CK1SS 0887272 RK 009MI CK1SS 0887540 RK 009M2 CK1 y4 44' - M2 -M3 1'W -2' 1W-2' M1, 2' M2 1W-1 M2 1W -1W 1'h" -2` 1W -2' 1'/i -2' 1'W -2' 2' Kit consists of: First check assembly, Cover 0 -ring and Sensing passage 0 -ring. second eck Klt:. 0887301 RK 009M2 CK2 114' -114' 0887271 RK 009M1 CK2 1W - 2 0887008 RK 009 CK2 1W - 2' 0887012 RK 009 CK2SS 1'W - 2' 0887273 RK 009 M1 CK2SS 1W - 2' 0887541 RK 009M2 CK2 2' Kit consists of: Second check assembly, Cover 0-ring and Sensing passage 0 -ring. First Check Rubber Parts Kit: 0887304 RK 009M2 RC1 1W -1'k' 0887274 RK009M1 RC1 1'/i -2' 0887018 RK 009 RC1 1W - 2' 0887542 RK 009M2 RC1 2' Kit consists of: First check assembly 0 -ring, Disc holder assembly, Cover 0 -ring and Sensing passage 0 -ring. second Check Rubber Pads Kit: 0887305 RK 009M2 RC2 1W -1'R 0887275 RK 009M1 RC2 1W - 2' 0887183 RK009RC2 1W -2' 0887543 RK 009M2 RC2 2' Kit consists of: Second check assembly 0 -ring, Disc holder assembly, Cover 0- ring and Sensing passage 0 -ring. Servicing the Relief Valve 2'h " -3" 1. Remove the four or six relief valve cover bolts while holding the cover down. 2. lift the cover straight off. The stem and diaphragm assem- bly will normally remain with the cover as it is removed. The relief valve spring will be free inside the body at this point. 3. The relief valve seat is located at the bottom of the body bore, and can be removed, if necessary, for cleaning. The disc can be cleaned without disassembly of the relief valve module. if it is determined that the relief valve diaphragm and/or disc should be replaced, the relief valve module can be readily disassembled without the use of special tools. Note: The disc rubber is molded into the disc holder and is supplied as a disc holder assembly. 4. To reassemble the relief valve, press the seat firmly into place in the body, center the spring on the seat, and Insert the cover and relief valve module as a unit straight into the bore. Press down on the cover to assure proper alignment. Insert and tighten bolts. Caution: if cover will not press fiat against body, stem assembly is crooked and damage can result. Realign stem and cover before bolts are inserted. NOTE No special tools required to service Series 009 2V2 — 3' Replacement Parts - 21/? - 3 " When ordering, specify Ordering Code, Kt number and Valve Size. r >OttDERINGQOE Refiefyalve Total Kit: 0887021 RK 009 VT 2W — 3' Kit consists of: Seat, Stem assembly, Spring, Two piston o- rings, Row tube 0 -rings and Cover 0 -ring. Relief Valve Rubber Parts Kit: 0887206 RK 009 RV 2W _ 3' Kit consists of: Diaphragm, Disc, Molded disc assembly, Piston 0- rings, Stem 0 -ring and Cover 0 -ring. Ball Type Test Cocks Test Cock No. 2 I Second Check Module Assembly ■� .o_ qtr �, Wi rair First Check Module Assembly Relief Valve Assembly Test Cock No. 3 Water Outlet Test Cock No. 4 R.P. Zone Servicing First & Second Check Valves 2/2 - 3 1. Remove the relief valve assembly as outlined on page 5. 2. Remove the retainer from the body bore. The check valve modules can now be removed from the valve by hand or with a screwdriver. Note: The seats and springs of the first and second check modules are not interchangeable. The heavier spring and smaller diameter seat belong with the first check module. 3. The check seats are attached to the cage with a bayonet type locking arrangement. Holding the cage in one hand, push the seat inward and rotate counterclockwise against the cage. The seat, spring cage, spring and disc assembly are now individual components. 4. The disc assembly may now be cleaned and reassembled or, depending on its condition, may be discarded and replaced with a new assembly from the repair kit. 0 -rings should be cleaned or replaced as necessary and lightly greased with the FDA approved silicon grease. For more information refer to repair parts price list PL-RP-BPD. 5. Reassemble the check valve modules. Check modules are Installed in the valve body with the seat facing the valve inlet. The modules must be securely in place before the retainer can be replaced. Replace relief valve assembly. NOTE No special tools required to service Series 009 VAN — 3` Replacement Parts — 2112U - 3" When ordering, specify Ordering Code, le number and Valve Size. � `� Oit4EAtH6 PODE First Check Kit: 0887019 Second Check Kit: First Check Rubber Parts Kit 0887281 RK 009 RC1 RK 009 CK1 2W — 3' 0887020 RK 009 CK2 2'h' — 3' Kit consists of: Check assembly, Cover 0 - ring and Flow tube 0 - ring. 2'fi' — 3' Second Check Rubber Parts Kit 0887205 RK 009 RC2 2 — 3' Kit consists at Disc, Seat 0 -ring and Flow tube 0 -ring. Total Rubber Parts: 0887207 RK 009 RT 2 — 3' Kit consists of: Diaphragm, Two discs, Two molded disc assemblies, Two seat 0- rings, RV 0 -ring, Two piston 0 -rings, RV stem 0 -ring, Flow tube 0 -rings and Cover 0 -ring. Cover Kit: 0887282 RK 009 C 21/2' — 3' Kit consists at Cover, Cover 0 -ring and Flow tube 0 -ring. Seat Kit: 0887208 RK 009 S 21/2' — 3' Kit consists of: Check seat, Seat 0 -ring and Cover 0 -ring. Check Assemblies Seat ` Disc / Spr Retainer Cage 0 -ring / Assembly Seat Flow Tube Cover 0 -ring Cover Relief Valve Assembly Retainer Test Procedures Reduced Pressure Zone Assemblies Reduced Pressure Zone Assemblies must be inspected and test- ed periodically, In accordance with local codes, to ensure proper operation of check valves within the unit. A differential pressure gauge is recommended for Test No.1 rather than a manometer for the following reasons: It utilizes minimum time to perform the test. It eliminates the necessity of closing the inlet ball valve which could release pipe scale and foreign matter into the baddiow preventer. Only a slight amount of water is 'spilled' In test. A mercury manometer could cause a pollution hazard Test Set Up Reduced Pressure Zone Assembly Close Valves A, B and C on Test Krt. Connect high side hose to test cock #2 Connect low side hose to test cock #3. Close shutoff #2. Open test cocks #2 and #3. Open vent valve C. Open 'high' valve A and bleed to atmosphere until all the air is expelled. Close valve A. Open 'low' valve B and bleed to atmosphere until all air Is expelled. Close 'low' valve B. Close 'vent' valve C. Connect vent hose to test cock #4. Test Procedure Reduced Pressure Zone Assembly Field Test Equipment Required Reduced Pressure Zone Backflow Preventer Test Kit Test No. 1 Purpose: To test Check Valve No. 2 for tightness against reverse flow. Requlrernents: Valve must be tight against reverse flow under all pressure differentials. Slowly open the 'high' valve A and the 'vent' valve C, and keep the 'low' valve B closed. Open test cock #4. Indicated pressure differential will decrease slightly. If pressure differential continues to decrease (until the vent opens) check valve #2 is reported as 'leaking'. Test No. 2 Purpose: To test shutoff #2 for tightness. Requirements: After passing Test No. 1, continue to Test No. 2 by closing test cock #2. The indicated pressure differential will decrease slightly. If pressure differential continues to decrease (approaching "zero"), shutoff #2 is reported to be 'leaking ". Test No. 3 Purpose: To test Check Valve No. 1 for tightness. Valve must be tight against reverse flow under all pressure differentials. Close 'high' valve A and open test cock RP/IS -009 0311 EDP# 1911300 WWATTS REGULATOR #2. Close test cock #4. Disconnect vent hose at test cock #4. Open valves B and C, bleeding to atmosphere. Then closing valve B restores the system to a normal static condition. Observe the pressure differential gauge. If there is a decrease in the indi- cated value, Check Valve No. 1 is reported as "leaking ". Test No. 4 Purpose:. To test operation of pressure differential relief valve. Requirements: The pressure differential relief valve must operate to maintain the "zone" between the two check valves at least 2psi less than the supply pressure. Close 'vent' valve C. Open 'high' valve A. Open the 'low' valve B very slowly until the differ- ential gauge needle starts to drop. Hold the valve at this position and observe the gauge reading at the moment the first discharge is noted from the relief valve. Record this as the opening differen- tial pressure of the relief valve. Note: It is important that the di gauge needle des s lowly. Close test cocks #2 and #3. Use 'vent' hose to relieve pressure from test kit by opening valves A, B and C. Remove all test equipment and open shutoff #2. Ball Type Test Valves (A) (C) Vent Hose (Blue) Auxiliary Test Cock High Hose (Yellow) Low Hose (White or Red) Test Cock No.1 Test Cock ; Test Cock No. 2 No. 3 Caution: To prevent freezing, hold Test Kit vertically to drain differential gauge and hoses prior to placing m case. F79001 CERTIFIED Test Cock No. 4 Watts USA Website: www.wattsreg.com • Watts Canada Website: www.wattscanada.ca C Watts Regulator Co., 1998 Needle Valve INEITAL TEST RESULTS TESTS AFTER REPAIR OR CLEANING ELBA IS DROP ACROSS #1 CHECK VALVE RELIEF VALVE OPENED PSID CSI DROP ACROSS 01 CHECK VALVE /7'. © PSID RELIEF VALVE OPENED 3,3 PSID #1 CHECK VALVE CLOSED TIGHT? ❑ s1 CHECK VALVE LEAKED? D? ❑ R2 CHICCVALVE CLOSED TIGHT? ,ca ‘1. ❑ 12 CHECK VALVE LEAKED? t) APPROVED MR GAP PROVIDED? ' ED? ❑ RPDA PASSED T ST? Yes No ❑ 01 CHECK VALVE CLOSED TIGHT? a fl CHTCKVALVE LEAKED? ❑ n CHECKVALVE CLOSED TIGHT? - E' 02 CHECKVALVE LEAD? ❑ APPROVED MR GAP PROVIDED? Er RPBA PASSED TEST? Yes pt No ❑ DCVA 11 CHECK VALVE CLOSED TIGHT? PSID 01 CHECK VALVE CLOSED TIGHT? ssly #1 CHECK VALVE LEAKED? ❑ t2 CHECK VALVE CLOSED TIGHT? - PSm 11 CHECK VALVE LEAKED? Ili 12 CHECK VALVE CLOSED TIGHi'? PSID 12 CHECK VALVE LEAKED? ■ 02 CHECK VALVE LEAKED? ❑ , DCVA PASSED 'MT/ Yes ❑ No ❑ DCVA PASSED TES T7 Yes I No ❑ . PYBA AIR. INLET OPENED AT PSID AIR INLET OPENED AT PH D AIR INLET FAILED TO OPEN? ❑ CHECK VALVE HELD TIGHT AT PS@ ATR INLET FAILED TO OPEN? ❑ CHECK VALVE HELD TIGHT AT run CHECK VALVE LEAKED? ❑ PYBA PASSED TESTS Yes ❑ Na ❑ CHECK VALVE LEAKED? ❑ PYHA PASSED TEST? Yu ❑, No ❑ NAME. s 1 SERVICE ADDRESS 2 01. CITY ASH:BMYLOCATION ACTION CONTROL SLR MAKE LINK PRESSURE AT TIME OF TEST? APPROVED ASSEMBLY? REMARKS /I TEST COMPANY TINT RTP MMK I certlfr thou used WAC246- 290490 TIMER'S NA E SIGNATURE W Aft er- RITTSTED REPAIRED EY u Public Works Maintenance Department eopp Back/low Assembly Test Report Form i , • • , City of Tukwila STATE LI) CA_ ZIP CODE MODEL 73 PSI G'e TYPE�P6ist SN A 3Lb71 N ❑ c:❑ aznAcarcErrn PEOPLE INV My Of Tukwila BUILDING DIVISION y � mew= BY GCS? • ❑ SN Q dV &o CALIBRATION DATE --- , C; Test Methods mad Di, f fe entfal Pressure Tort Equipment r CERTIFICATION DATE TESTED — -07 REPAIR DATE Z- DATE TESTED . _r2 -0 '! 7 t�-(F2 ACTIVITY NUMBER: PG07 -052 DATE: 02 -14 -07 PROJECT NAME: SIMPLY THAI SITE ADDRESS: 375 STRANDER BL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: Ix kip.) V Bu 'ding Division Public Works Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROU ING: Please Route Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28-02 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Fire Prevention DATE: DATE: Planning Division C Permit Coordinator ❑ DUE DATE: 02-15-07 Not Applicable ❑ No further Review Required DUE DATE: 03-15-07 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License TPJIN * *981NR Licensee Name T P J INC Licensee Type CONSTRUCTION CONTRACTOR UBI 602212259 Ind. Ins. Account Id VICE PRESIDENT Business Type CORPORATION Address 1 351 UNION AVE NE Address 2 City RENTON County KING State WA Zip 98059 Phone 4252283204 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 8/19/2002 Expiration Date 8/19/2008 Suspend Date Separation Date Parent Company Previous License PLUMB ** 132CB Next License Associated License Business Owner Information Name Role Effective Date Expiration Date PALMER, DONALD L PRESIDENT 08/19/2002 Bond Amount PALMER, CANDANCE L VICE PRESIDENT 08/19/2002 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date Until Look Up a Contractor, Electrician or Plumber License Detail Page 1 of 2 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perfonn construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= TPJIN * *981NR 02/16/2007