Loading...
HomeMy WebLinkAboutPermit PG07-077 - JC PENNEYJC PENNEY 1200 SOUTHCENTER MALL EXPIRED 09 -30 -07 PG07 -077 Parcel No.: 2623049085 Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Value of Plumbing /Gas Piping: Fees Collected: doc: UPC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 1200 SOUTHCENTER MALL TUKW JC PENNEY 1200 SOUTHCENTER MALL , TUKWILA WA WEA SOUTHCENTER LLC 11601 WILSHIRE BL , LOS ANGELES CA MICHAEL TSCHOHL 7503 228 ST SW , EDMONDS WA EAGLE GAS MECHANICAL INC Address: 7503 228 ST SW , EDMONDS WA Contractor License No: EAGLEGM077DT DESCRIPTION OF WORK: RUN NEW GAS LINE FROM NEW PSE METAL ON ROOF TO EXISTING GAS FUEL LINE ON ROOF IN MECHANICAL ROOM $17,000.00 $110.00 plumbing Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountain or water cooler (per head) Food -waste grinder, commercial Floor drain Shower, single head trap Lavatory Wash fountain Receptor, indirect waste Sinks Urinals Water Closet PLUMBING /GAS PIPING PERMIT FIXTURE TYPE AND OUANTITY * *continued on next page ** Permit Number: Issue Date: Permit Expires On: Phone: Phone: 425 750 -7764 Phone: 425 776 -9689 Expiration Date: 04/24/2008 Uniform Plumbing Code Edition: 2003 International Fuel Gas Code Edition: 2003 Steven M Mullet, Mayor Steve Lancaster, Director PG07 -077 04/02/2007 09/29/2007 Plumbing (cont.) 0 Building sewer and each trailer park sewer 0 0 Rain water system - per drain (inside bldg) 0 0 Water heater and/or vent 0 O Industrial waste treatment interceptor, including 0 its trap and vent, except for kitchen type O grease interceptors 0 0 Repair or alteration of water piping and/or water O treatment equipment 0 O Repair or alteration of drainage or vent piping 0 0 Medical gas piping system serving (1 -5) 0 inlets /outlets for a specific gas 0 O Medical gas piping (6 +) inlets /outlets 0 0 Gas Piping 0 Gas piping outlets (0 -5) 1 0 Gas piping outlets (6 +) 0 PG07 -077 Printed: 04 -02 -2007 Signature: Print Name: doc: UPC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Center Authorized Signature: GIk Date: 6`11, I hereby certify that I have read and x ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be compile wi , whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the • - o • f work. I am authorized to sign and obtain this plumbing /gas piping permit. Permit Number: PG07 -077 Issue Date: 04/02/2007 Permit Expires On: 09/29/2007 Date: Steven M Mullet, Mayor Steve Lancaster, Director --c7 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PG07 -077 Printed: 04 -02 -2007 Parcel No.: 2623049085 Address: Suite No: Tenant: 1: ** *PLUMBING AND GAS PIPING * ** doc: Cond - 10/06 JC PENNEY City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 1200 SOUTUCENTER MALL TUKW PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: PG07 -077 ISSUED 03/28/2007 04/02/2007 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 8: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 9: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected m accordance with the requirements of the building code. 10: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. * *continued on next page ** PG07 -077 Printed: 04 -02 -2007 syd City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. doc: Cond -10/06 Date: —a ? PG07 -077 Printed: 04 -02 -2007 CITY OF TUKWILA Community Developme 7epartment Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print* / King Co Assessor's Tax No.: 9.1/2.- - 1, « 5 Site Address: / Z Se'irWGC-71/7C-+G i6 Suite Number: Floor: Tenant Name: ■J • C. -c-- , (, 5 New Tenant: ❑ .... Yes IQ ..No Property Owners Name: •S • C. ? A $ Mailing Address: lZOa COT, TNeir. lyyti't•4_. CONTACT PERSON - Who do we contact when your permit is ready to be issued Name:( c , Lqi t- V S 4o &4 L- Mailing Address: 1 6l7 3 ZZS s S. E -Mail Address: irroctapViliC Q Cam. at.s r • d'J T Company Name: t'o CE GAS C- Mailing Address: - 7 4 5 - 0b 2-2•3 T •u.) Contact Person: Contractor Registration Number: Ef1¢IaLE Th77 O T Q: Applications\Forms- Applications On Line'3 -2006 - Plumbing -Gas Piping Permit Application.doc Revised: 42006 bh 7U K.- City Day Telephone: 'Z S' ?SD -776'{ City Fax Number: State PLUMBING / GAS PIPING CONTRACTOR INFORMATION City LAN4' 9, 24 State Zip State Day Telephone: 426'- 76 •77 6f! E -Mail Address: EP■G�riclAS Q Corn C.a.a� • 1 Fax Number: Expiration Date: V /2e,0' ARCHITECT OF RECORD -All plans must be wet stamped by Architect of Record Company Name: Mailing Address: Zip Contact Person: E -Mail Address: City Day Telephone: Fax Number: State ENGINEER OF RECORD All plans must be wet stamped by Engineer of Record Company Name: Mailing Address: Zip Contact Person: E -Mail Address: State 9$c862 Zip Saoz� Zip City Day Telephone: Fax Number: Page 1 of 2 Valuation of Project (contractor's bid p $ 1 1100b s� Scope of Work (please provide detailed information): Own, N �1 °`a I rwe ern Nest P.S .8 µem chi.) EX/6 / nA)s 5AS 'Zoe- /ive 0.0 hone' i: , ee,bl..c ec o2. gam? Building Use (per Intl Building Code): Occupancy (per Intl Building Code): Utility Purveyor: Water: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type: Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Building sewer or trailer park sewer Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Fixture Type: Drinking fountain or water cooler (per head) Food -waste grinder, commercial Floor drain Shower, single head trap Lavatory Rain water system — per drain (inside building) Repair or alteration of water piping and/or water treating equipment Fixture Type Wash fountain Receptor, indirect waste Sinks Urinals Water Closet Water heater and/or vent Repair or alteration of drainage or vent piping Qty Fixture-Type: , Gas piping outlets Additional medical gas inlets/outlets — six or more Medical gas piping system serving one to five inlets/outlets for specific gas Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Intemational Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 02/ 147 UTHO ED ( Signature: Date: ( n? Print Name: IJuc t Ft l) sc no kL-- Mailing Address: 7 3 7 S 4r- 5 • `J Date Application Expires: D°t to Date Application Accepted: Q:\Applications\Fonns- Applications On Linel3 -2006 - Plumbing -Gas Piping Penni Application.doc Revised: 4 -2006 bh Sewer: Day Telephone: 4.2S Ste 776'( City State Zip Staff Initials: Page 2 of 2 Receipt No.: R07 -00451 Payee: EAGLE GAS MECHICAL, INC. ACCOUNT ITEM LIST: Description GAS - NONRES PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 2623049085 Permit Number: PGOZ -077 Address: 1200 SOUTHCENTER MALL TUICW Status: PENDING Suite No: Applied Date: 03/28/2007 Applicant: JC PENNEY Issue Date: Initials: JEM Payment Date: 03/28/2007 11:50 AM User ID: 1165 Balance: $0.00 TRANSACTION LIST: Type Method Description Amount Payment Check 7568 110.00 Account Code Current Pmts 000/322.100 88.00 000/345.830 22.00 Total: $110.00 Payment Amount: $110.00 ?7 TOTAL '1 ,O doc: Receiot -06 Printed: 03- 28-2007 Project: / T of I ctio • / '� "` r ss: / 1 v 569/7ti,eete r 744 Date Called: /f ---, Special Instructions: DateiWanted: r a.m 47/-- 3 -Q '7 p.m. Requester: Phone No: I /2- - ) 5 ) 7 6 5f INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ,; } i /G 7 4 7 7 X Approved per applicable codes. Corrections required prior to approval. COMMENTS: A� Ok 1 $58.00 REINSPECTION REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to sechedule reinspection. Receipt No.: Date: 07 -31 -2007 MICHAEL TSCHOHL 7503 228 ST SW EDMONDS WA 98026 RE: Permit No. PG07 -077 1200 SOUTHCENTER MALL TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the Uniform Plumbing Code and/or International Fuel Gas Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Plumbing and/or Gas Code does allow the Building Official to approve one extension of time for an additional period not exceeding 180 days. Extension requests must be in writin2' and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 09/30/2007 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Je er Marshall, Permit Technician xc: Permit File No. PG07 -077 Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 ACTIVITY NUMBER: PG07 - 077 DATE: 03 -28 -07 PROJECT NAME: JC PENNEY SITE ADDRESS: 1200 SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Buil in Division WO/ Public Works Complete [A Comments: Please Route Documents/routing slip.doc 2 -28 -02 ^-' PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP TUES/THURS ROUT NG: REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ Structural Review Required Planning Division ❑ Permit Coordinator C DUE DATE: 03-29-07 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: No further Review Required DATE: DUE DATE: 04-26-07 Approved ❑ Approved with Conditions ► J Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License EAGLEGM077DT Licensee Name EAGLE GAS MECHANICAL INC Licensee Type CONSTRUCTION CONTRACTOR UBI 601454859 Ind. Ins. Account Id #3 Business Type CORPORATION Address 1 7503 228TH ST SW Address 2 City EDMONDS County SNOHOMISH State WA Zip 98026 Phone 4257769689 Status ACTIVE Specialty 1 PLUMBING Specialty 2 AIR HEAT,VENTILATION,EVAPORAT Effective Date 3/30/1993 Expiration Date 4/24/2008 Suspend Date Separation Date Parent Company Previous License Next License Associated License Business Owner Information Name Role Effective Date Expiration Date TSCHOHL, MICHAEL V Cancel Date 01/01/1980 Bond Amount DUKES, SUSAN #3 01/01/1980 980911089 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date #3 STATE FARM FIRE & CAS CO 980911089 03/23/2002 Until Cancelled $6,000.00 04/15/2002 Look Up a Contractor, Electrir; an or Plumber License Detail Page 1 of 3 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. https: // fortress .wa.gov /lni/bbip /printer.aspx ?License= EAGLEGM077DT 04/02/2007 - / I NSTALL 4" MPE P PER WO f 10902fi.. 76 -- r r / 45 4 4 PIPE CLAMP i 7 76 -33400 19 1 12 1 120 - 2` CP SHIELD P P.Q. 18 1 12 2 240 - 2' CP SHIELD 9 99 -95459 -17 1 1 6 6 X 90' WELD ELL 6 60 -00752 -16 1 1 6 6 X r WELD REDUCER - 7 72 -00520 .15 1 1 2 2 18138 REG. FLG. WHIT 1 -1/4' ORIFICE SET AT 6" W. C. 7 74 -00483 .14 1 1 2 2` CLASS 150 BUND FLANGE 6 64 -00150 13 1 1 2 2 BALL VALVE. FLANGE BY FLANGE 5 56 -00335 12 4 4 2 2" BOLT KIT, 15FFSVX 1 50 - -0.3012 11 3 3 2 2" CLASS 150 WELD NECK FLANGE 64 -00180 10 M METER LOCK 14 85 -00415 39 1 1-1/4 THREADED CAP 52 -00620 .38 1 1 1 1 -1/4" BALL VALVE ' 56 -C4325 37 1 1 2 2 x 1 -1 /4 REDUCER TEE 78- :'')358 -S6 2 28 2 2` rim CLAMP 76 -32400 35 2 2 2 2` X 90' WELD ELL 60 -00500 .34 1 15 1 120' - '" CP SHIELD P.O. .33 P POWOEI )ATING - MILS P.O. .32 1 10 C CONCREIL PATS 12' X 3' x 2D 85 -00687 31 1 1 T THERMO COUPLE TYPE WIRE 11< -12 85 -00960 .30 1 1 C CP CADWELD CARTRIDGE STEEL 85 -00080 29 I I f f9 ANODE 66 -00025 28 1 1 4 4" BOLT KIT. 15FFSV 50 -00040 17 1 1 4 4 BOLT KIT. 15FFSVX 50- 00042 26 2 2 4 4` CLASS 150 WELD NECI FLANGE 64 -00350 25 1 1 4 4" BALL VALVE. FLANGE E? FLANGE 56 -00336 24 4 4 G GAS PIPELINE WARNING SKIN 3 35 -00805 23 1 1 G GAS PIPEUNE WARNING DECAL 3 12 1 15 2 240 - 4 CP SHIELD 99 -95460 21 7 73 B B -LINE ROOF PIPE SUPPORT. MODEL C10 P.O. :'0 1 1 4 4` M- STOPPER BOTTOM OW 99 -95451 19 1 1330 2 2 BARE STEEL PIPE 70 -00270 18 2 2 4 4" X 2` WELD REDUCER 72 -00502 17 2 2 4 4" WELD TEE 78 -00412 16 3 3 4 4` X 45' WELD ELL 60 -00672 15 ± ±700' 4 4" BARE STEEL PIPE. .237 WALL 99 -95124 EMI - aft - - = =ai ; ; • E: ReAft- AL-VC 003E - w , - , ,- - - - - - _ • - . . • ., - . 9 1 1 4 4 MPE TRANSIIK;.l FITTING 78 -00811 8 1 1 C CP TEST LEPD 8E•X 50 -00307 7 1 10' 1 10 CP TEST LE: O WIRE 85 -00930 A INSTALLATION AND RETIREMENT I PI; :E 1 INSTALLATION PHASE 1 RETIREMENT I LOS 1 r '. WON 109028998 PER • WO j to-0 -3 on .' _ - I PRO:. TYPE RETIRE PIPE RETIRE RETIRE ACTUAL ORIGINAL YEAR SIZE rOOTAG( F00f GE SIZE LIATERIAI. FOOTAGE RETU.E (OR .GIB NUMBER) 4` 288' MPE 4` STW 2: 1966 PH SE 11 INSTALLATION PHASE 11 RETIREMENT I - ? WO# 109026276 PER WO# 108529900 2" 330' STW 4" STW - 484' 1967 4` 520' MPE 2" STW 479' 1967 4` SQL_ STW 1 -1/4" STW 197' 1967 1" STW 95' 1967 74 73 2 72 1 71 I 10' 2 2 4" ROTTOIu( OUT STOPPER. H17',60 _ 2 4 AID CAP &300' j ; CP BOIIDING CABLE ±300' j 4 GAUGL DETECT WARNING 'IRE 1300' 4• /APE rii'E 2 - 4' MPE C %I C( •: PLEI( •LOAD VALVE BOX 4" UPE POLYVALVE SUPPORT )X 4 r.1PE POLYVALVE 1STALL 4 'aPE. W0l 1 r�902899L L -- PHASE I -- 4' : 90 MPE Ell 4' WE TRANSIIIO FITTING CP TEST LEAD B( P.. ^ CP TEST _LE/ ' WIRE 4' X 90' WELD E; 4' MPE TEE DEACTIVATE EX. 2' STEEL PIPE PROP. 4 STEEL :ME0 VIM PORDER C0A ;PER PSE TS SP1. 14600700. 42 2` 8U 1O FLANGE. /-- SEE M 1 109026538 FOR USA COU11IIUA110N DC CD • 1 N 1 1/4 LOCK / TAOGT'• PSE l' -'Y -PASS VALVE °)SW TO BE THI S VALVE FOR ON D11,000R : RISER PROP. 2" BARE STEEL F"'E 00 60- 0674 78- 0811 50- •10307 :49 60- - 0697 76- .. )766 713 85- •920 85- :940 70- 9466 52- )689 99- 5260 99- ;258 1809 78- .0413 52- 56- OEA . IVATE EX. 1 -1/4' ST L PIPE - 2 TEST tOIOS DIURETIC% t i'ISTALL CP SHIELD UNDER EACH SUPPORT 8RACKET.11§E 2.10' ON BOTTOM OF P8'E -- ROD won 'L0P FOR 360• COVERAGE. e4i ` TObeitl10�`4'-�EYONO EACH SIDE 000 c: C CHANNEL. 4' x 45 MO ELL O (CUT TO FIT) ... B -LIn( ROOF F•PE SUP NOT ' 7,CALE 9 No, 10 - '&t SECTIO5 C - C WESTF IELD SOUTMCENTER RISER DETAIL NU1 10 SCALE r-0. me 4 X 4T SELO ELL (CUT TO flu) 16 �r - DEACTIVATE UL I -I/4' Ss:EL PIPE I 2 - S lllll /t / \J♦( S \ /CS\ j \ �/♦ , \ �S S�T Pena No. Pevlelrr arproal k saject I D OTOS and ,av lw of el construction 41 7Uction rrt aasvw rideZ i c: �':/ axepizd code or aldranct Re It T a g_ 2 - 0.7 • MICMISIVEKIIIMMIND PROP. 4' STEER (OAKO 1111 P01►UER cosmic PER PSE 15 SPEcZZICATION 14&10700. Tukwila fl DIVISION • STANDARD IP & LE GAS REPLACEMENT CC NSTRUCTION NOTES: 1. NOTIFY GAS CUSTi MERS, OR DISTRIBU lE FLYER /1443 A MINIMUM OF TWO WORK' IG DAYS PRIOR TO A PLANNED OUTAGE. 2. INSTALL ONE POUT •) ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL AI10 -E AND TEST LEAD V 'ES PER PSE GAS OPERATING STANDARD 2525.2300. 3. MAIN IAIN CA1110DI I''ROJEC IIOII FOR SIEEL MAIL -IS BY THE USE OF CON IINUI I Y FONDS OR 0I1IER MEANS € TERMINED BY 111E f SE CORROSION ENGINEER PER PSE GAS OPERATING STAND !D 2600.1300. 4. INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES P0201 AND P0303 ANO PSE GAS OPERATING STANDARD 2600.1200. TES LEAD WIRES ARE T;EOUIRED ON ALL TRANSITION FITTINGS. 5. INS1 ALL CURB VALVE Al PROPERTY LINE OR 5/8" PE WHIP A T MAIN (AS REQUIRE(' • ON ' AND EXISTING `SERVICES PER PSE GA OPERATING STANDARD 2550.1600. 6. REF! :� TO PSE GAS OPERATING STANDARD 2 .1700 FOR MAIN AND SERVICE COVER REOI'IREMENTS. 7. MAIN . AND SERVICES SHALL BE TESTEO AND 1RGED PER PSE GAS OPERATING STAI TAROS 2525.3300. 2525.3400 AND 252' 200, AND PSE GAS FIELD PROCEDURE P081 •. 8. PRO. .CT MANAGER TO MAKE EGOR RUN IMME ATELY PRIOR TO STARTING CON' IRUCTION. 9. INS' = LL REPLACEMENT MAINS PER PSE GAS ( CRATING STANDARDS 2525.2100 F )R INSE! DONS AND 2525.3500 FOR ABANDONMEI • OR DEACTIVATION. ►1 10. PLUG ENDS OF DEACTIVATED OR INSERTED MA !S AND SERVICES IN ACCORDANCE '711 PSE AS OPERATING STANDARDS 2525.2100 i 'U 2525.3600. 11. REM' IE OR RENDER INOPERABLE DEACTIVATEL VALVES ON CASING WHERE MPE F IPE IS INSE' TED. 1:'. !NSW METER SETS SHALL BE MOVED OUTSIDE M POSSIBLE OR SET REG' .ATORS AND VENTS OUTSIDE PER PSE GAS OPERATING STANDARDS 2575.2 500 AND ?550.1700. 1 5_ REPI CE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND '575.2300. REPI CE ALL "NO RECORD" SERVICES AND 1-1/8 " PE SERVICES INSTALLED PRIOR TO (.. -. .f •ir�V •.• J • - E: R V.S OKTS NrJI req. xe a r::i 11J - 1985 A %, "JETS f E CODE COMPS -TAN of kimila [AVT1ONI GAS PIPELINE 1. - GABS CONSTRUCTION NOTES: FIELD LOCATE ALL UI )ERGROUND UTILITIES. E CAVATOR TO CALL "ONE - CALL" TYI') WORKING DAYS mot TO CONSTR" "TION. IN ':STERN WASHINGTON CALL: 1 - 800- 424 - 55'',5. If 10 fTITAS C( N TY CAL 1- 800 - 553 -4344. 2. NOTIFY APPROPRIATE PERMITTING GENCY P R TO JOB START(SEE PERMIT REQUIREMENTS). 3. ALL CONSTRUCTION IS TO CONFOF' . TO PSE GAS OPERATING STANDARDS ANT? GAS FIELI' "ROCEOURES. 4. ERO: it AND SEDIMENT CONTROL - -HALL BE PER PSE STANDARD PRACTICE 0150.3200 TECh DUES FOR TEMPORARY ERO :019 AND SEDIMENT CONTROL ANO ANY ADDITIONAL LOC/ JURISDICTION REOUIREMENT . 5. NOTII PROPERTY OWNERS ADJAC- MINIM M OF TWO WORKING DAYS I FIVE! ;ALONG WITH UST OF FREQL REG/ .01NG THE PURCHASE OF AR 6. ANY ' HANGE IN ROUTE, PIPE SIZE F001 .GE MUST BE APPROVED BY REPT :SENTATIVc.. 7. COMI ETE "PIT : CONDITION REPOT ON 1 PORT F(Z WIRE BOX (TEST :1T TO Pr OPOSED CONSTRUCTION ACTIVITIES A 2IOR TO TIEGINNING CONSTRUCTION. DISTRIBUTE - .NTLY AS <ED QUESTI(INS AND INFORMATION EXCESS t LOW VALVE, IF APPLICABLE. !TYPE, T11: -IN METHOD OR ADDITIONAL MAIN 'HE APPF:OPRTATE PSE ENGINEER OR PSE -" ON ALL METALLIC PSE FACILI1 :. CHECK BOX EAD) INSTALLATION. PIPET .IE MARK RS AND WARNING ' IGNS SHALL BE INSTALLED AND RECORDED DY THE CON1 ACTOR F R PSE GAS OPER/ INC ' STANDARD 2525.2500. INST. L MAIN AL' ES OUT OF TR. FIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INST LEO ANL RE -:ORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 252: 1600 FOF AL _ HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND FOR LL VALVE i ViHERE PERSISTANT SNOWFALL MAY OBSCURE THE VALVE BOX . EVENT A CIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO BE CON :ECTEO EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPRO p R1ATE 3E ENGINEER OR PSE REPRESENTATIVE. ;0. TOI SHAT APP: I1. SYS• 4 MAOP 'ENOTED BY: [SYSTEM MAOP = 45 PSIG. I 12. GAU= AND MONITOR USE OF ALL STOPPERS TO ENSURE / )EQUATE FEED. i3. RES ZE ALL ORIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDiT10N. 14. PUR POINTS AND PRESSURE -TAPS TO BE INSTALLED PER PSE GAS OPERATING STAi AROS 2525.3400, AND 2525.1200. 15. MAIL AND SERVICES SHALL BE TESTED ANT) PURGED PER PSE GAS OPERATING STAi BARDS '5.3300 AND 2525.3400. 16. IF 1. TALUC P E 1S INVOLVED, COORDINATE INSTALLATION WITH CP TECH. Al : 3HLECHT T 206 -396 -0515. 17. NOT =. ALL AC Al FOOTAGE. LOCATION AND MATERIAL CHANGES ON THE AS -BUILT 1: -I RED. ( '' EMOTES FOOTAGE BETWEEN FITTINGS. 18. N'Y Y CORR.. .ON CON TROL TECHNICIAN AL SCHLECHT AT 206 -3S.- • -0515 48 HO''R PRI' i TO CON- TRUCTION. 1 9. • :'E: •'.AP Al!.. EXISTING CAS PIPE ? ; EMM :i; 'N11H IRE4TON '=F'!MER A:- :fl :4'"x TAPE 2A, I11C JDING UNDERNEATH EACH PIT- SUPPORT. 20. ALL NEW PIPE TO BE POWDER CO TED PER PSE SPECIFICATION 1490.0700. C))11 DIGGI IN Q NG 1' . % ALL VICINITY Q)lt t DCAL <40' a TN r]€JR.'racr. 1 -� -710 -1!515 P1 ELINE WARNING SIGNS ITN 10 SCALE (CHE 8= E COurIE P •f , I P E 1 = J L 1 N E 1 V1 DR 1- &10 -71• -131.5 coot IoaeT etNSnT 1107 : SCALE obit r -s tent :• 0.s+ & sari! a GO ..d•. Camdsl- of Prq. a %Ws old Gas Prsss, a Stomp. rod CF' UV! s Red-Tired cue Os -trot. Mdte•:ae verified end Qboi es nor.! en pipe.•ads. L! YK• & T+j ->A toc s acrel css as -t alt. xote . inning 01 Iry . EOM & l 01 mob) I000Gons. Shaw e- : _ Lacat oas k Cal-de-tin Rod'C.y. ensue: SIvssbare 0117a .�J 7 8" -- 0.emperey PILCP ICK CWE . 3 -$ -v7 A A A PIPEUNE W. RNING DECAL A REVISED TO SEPARATE PHASE 1 & PHASE A00 14 CABLE PER W0 109028998. CESCR - 1 REVISIONS "111=11r - Smoososs. early 1- 1 TY;,e:YJpk P4oS5r PRESSURE V / TIME ON y. "' -Al TIME OFF /2 -' AJti PRESSURE TIME ON TIME OFF SYS MAOP 45 PSIG 1 [ATE :YPp TEST 1 >•TsNr -6 -t7 ATE 0 I3-r-c7 TYPE ICST UATE01 MIE Or Tess» Hess 60 r'ROJECI PHASE PiiitsE • PHASEI ServicelMeler Service/Meter Servioe&leler 1 ServirellAdar Seal:04 ter ServIcaSider Relkeramt 0 1 REVS 1 GAS MAIN INSTA1 ATIOWRETIREI:.:NT GAS MAIN PRESSURE & I ES TI:: ; NOIW% X 1 :J211111 10633352 10614349 C.onbac1oc CONSTRUCTION COST COD as 26 -23-4 SF 1 1 -234 -4 UTILITIES CONTACT PHONES 051 -103 -2 Esl hated Length OP MAP `2.074 PUGET SOUrr, I: ac TESTED E- .' J, }sc. Pm, Tt!r ='o ay Prac ".":R CONTRACTORS IPA i tual TESTED B r 1Q90262 1090289 1085292 Vlclnity A'�, Joann FAc1/IESARRANGEMENTs • Owner / Developer Co:. fact Info QONSTRUC110 N SOUTHCENTER D1STA11 4` MPE & 4" STW P WAIN 633 SOUTHCENTER SEATTLE, WA 98188 SITE (0 O N v C B CA: 424.5655 2 BUSINESS DAYS a EYOU MG nes ME M.MDITOSE gawp UPON TOR EXACT llOr sFgeOU IT - stiAL ESTATEUEASEMEHT REQUIRED SAP Sc .cr older. _1099 i2Z6_ Ekassir -weer. N/A SCALE AS -SHOWN ED KINTIA no 0 T 74 73 2 72 1 71 I 10' 2 2 4" ROTTOIu( OUT STOPPER. H17',60 _ 2 4 AID CAP &300' j ; CP BOIIDING CABLE ±300' j 4 GAUGL DETECT WARNING 'IRE 1300' 4• /APE rii'E 2 - 4' MPE C %I C( •: PLEI( •LOAD VALVE BOX 4" UPE POLYVALVE SUPPORT )X 4 r.1PE POLYVALVE 1STALL 4 'aPE. W0l 1 r�902899L L -- PHASE I -- 4' : 90 MPE Ell 4' WE TRANSIIIO FITTING CP TEST LEAD B( P.. ^ CP TEST _LE/ ' WIRE 4' X 90' WELD E; 4' MPE TEE DEACTIVATE EX. 2' STEEL PIPE PROP. 4 STEEL :ME0 VIM PORDER C0A ;PER PSE TS SP1. 14600700. 42 2` 8U 1O FLANGE. /-- SEE M 1 109026538 FOR USA COU11IIUA110N DC CD • 1 N 1 1/4 LOCK / TAOGT'• PSE l' -'Y -PASS VALVE °)SW TO BE THI S VALVE FOR ON D11,000R : RISER PROP. 2" BARE STEEL F"'E 00 60- 0674 78- 0811 50- •10307 :49 60- - 0697 76- .. )766 713 85- •920 85- :940 70- 9466 52- )689 99- 5260 99- ;258 1809 78- .0413 52- 56- OEA . IVATE EX. 1 -1/4' ST L PIPE - 2 TEST tOIOS DIURETIC% t i'ISTALL CP SHIELD UNDER EACH SUPPORT 8RACKET.11§E 2.10' ON BOTTOM OF P8'E -- ROD won 'L0P FOR 360• COVERAGE. e4i ` TObeitl10�`4'-�EYONO EACH SIDE 000 c: C CHANNEL. 4' x 45 MO ELL O (CUT TO FIT) ... B -LIn( ROOF F•PE SUP NOT ' 7,CALE 9 No, 10 - '&t SECTIO5 C - C WESTF IELD SOUTMCENTER RISER DETAIL NU1 10 SCALE r-0. me 4 X 4T SELO ELL (CUT TO flu) 16 �r - DEACTIVATE UL I -I/4' Ss:EL PIPE I 2 - S lllll /t / \J♦( S \ /CS\ j \ �/♦ , \ �S S�T Pena No. Pevlelrr arproal k saject I D OTOS and ,av lw of el construction 41 7Uction rrt aasvw rideZ i c: �':/ axepizd code or aldranct Re It T a g_ 2 - 0.7 • MICMISIVEKIIIMMIND PROP. 4' STEER (OAKO 1111 P01►UER cosmic PER PSE 15 SPEcZZICATION 14&10700. Tukwila fl DIVISION • STANDARD IP & LE GAS REPLACEMENT CC NSTRUCTION NOTES: 1. NOTIFY GAS CUSTi MERS, OR DISTRIBU lE FLYER /1443 A MINIMUM OF TWO WORK' IG DAYS PRIOR TO A PLANNED OUTAGE. 2. INSTALL ONE POUT •) ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL AI10 -E AND TEST LEAD V 'ES PER PSE GAS OPERATING STANDARD 2525.2300. 3. MAIN IAIN CA1110DI I''ROJEC IIOII FOR SIEEL MAIL -IS BY THE USE OF CON IINUI I Y FONDS OR 0I1IER MEANS € TERMINED BY 111E f SE CORROSION ENGINEER PER PSE GAS OPERATING STAND !D 2600.1300. 4. INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES P0201 AND P0303 ANO PSE GAS OPERATING STANDARD 2600.1200. TES LEAD WIRES ARE T;EOUIRED ON ALL TRANSITION FITTINGS. 5. INS1 ALL CURB VALVE Al PROPERTY LINE OR 5/8" PE WHIP A T MAIN (AS REQUIRE(' • ON ' AND EXISTING `SERVICES PER PSE GA OPERATING STANDARD 2550.1600. 6. REF! :� TO PSE GAS OPERATING STANDARD 2 .1700 FOR MAIN AND SERVICE COVER REOI'IREMENTS. 7. MAIN . AND SERVICES SHALL BE TESTEO AND 1RGED PER PSE GAS OPERATING STAI TAROS 2525.3300. 2525.3400 AND 252' 200, AND PSE GAS FIELD PROCEDURE P081 •. 8. PRO. .CT MANAGER TO MAKE EGOR RUN IMME ATELY PRIOR TO STARTING CON' IRUCTION. 9. INS' = LL REPLACEMENT MAINS PER PSE GAS ( CRATING STANDARDS 2525.2100 F )R INSE! DONS AND 2525.3500 FOR ABANDONMEI • OR DEACTIVATION. ►1 10. PLUG ENDS OF DEACTIVATED OR INSERTED MA !S AND SERVICES IN ACCORDANCE '711 PSE AS OPERATING STANDARDS 2525.2100 i 'U 2525.3600. 11. REM' IE OR RENDER INOPERABLE DEACTIVATEL VALVES ON CASING WHERE MPE F IPE IS INSE' TED. 1:'. !NSW METER SETS SHALL BE MOVED OUTSIDE M POSSIBLE OR SET REG' .ATORS AND VENTS OUTSIDE PER PSE GAS OPERATING STANDARDS 2575.2 500 AND ?550.1700. 1 5_ REPI CE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND '575.2300. REPI CE ALL "NO RECORD" SERVICES AND 1-1/8 " PE SERVICES INSTALLED PRIOR TO (.. -. .f •ir�V •.• J • - E: R V.S OKTS NrJI req. xe a r::i 11J - 1985 A %, "JETS f E CODE COMPS -TAN of kimila [AVT1ONI GAS PIPELINE 1. - GABS CONSTRUCTION NOTES: FIELD LOCATE ALL UI )ERGROUND UTILITIES. E CAVATOR TO CALL "ONE - CALL" TYI') WORKING DAYS mot TO CONSTR" "TION. IN ':STERN WASHINGTON CALL: 1 - 800- 424 - 55'',5. If 10 fTITAS C( N TY CAL 1- 800 - 553 -4344. 2. NOTIFY APPROPRIATE PERMITTING GENCY P R TO JOB START(SEE PERMIT REQUIREMENTS). 3. ALL CONSTRUCTION IS TO CONFOF' . TO PSE GAS OPERATING STANDARDS ANT? GAS FIELI' "ROCEOURES. 4. ERO: it AND SEDIMENT CONTROL - -HALL BE PER PSE STANDARD PRACTICE 0150.3200 TECh DUES FOR TEMPORARY ERO :019 AND SEDIMENT CONTROL ANO ANY ADDITIONAL LOC/ JURISDICTION REOUIREMENT . 5. NOTII PROPERTY OWNERS ADJAC- MINIM M OF TWO WORKING DAYS I FIVE! ;ALONG WITH UST OF FREQL REG/ .01NG THE PURCHASE OF AR 6. ANY ' HANGE IN ROUTE, PIPE SIZE F001 .GE MUST BE APPROVED BY REPT :SENTATIVc.. 7. COMI ETE "PIT : CONDITION REPOT ON 1 PORT F(Z WIRE BOX (TEST :1T TO Pr OPOSED CONSTRUCTION ACTIVITIES A 2IOR TO TIEGINNING CONSTRUCTION. DISTRIBUTE - .NTLY AS <ED QUESTI(INS AND INFORMATION EXCESS t LOW VALVE, IF APPLICABLE. !TYPE, T11: -IN METHOD OR ADDITIONAL MAIN 'HE APPF:OPRTATE PSE ENGINEER OR PSE -" ON ALL METALLIC PSE FACILI1 :. CHECK BOX EAD) INSTALLATION. PIPET .IE MARK RS AND WARNING ' IGNS SHALL BE INSTALLED AND RECORDED DY THE CON1 ACTOR F R PSE GAS OPER/ INC ' STANDARD 2525.2500. INST. L MAIN AL' ES OUT OF TR. FIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INST LEO ANL RE -:ORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 252: 1600 FOF AL _ HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND FOR LL VALVE i ViHERE PERSISTANT SNOWFALL MAY OBSCURE THE VALVE BOX . EVENT A CIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO BE CON :ECTEO EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPRO p R1ATE 3E ENGINEER OR PSE REPRESENTATIVE. ;0. TOI SHAT APP: I1. SYS• 4 MAOP 'ENOTED BY: [SYSTEM MAOP = 45 PSIG. I 12. GAU= AND MONITOR USE OF ALL STOPPERS TO ENSURE / )EQUATE FEED. i3. RES ZE ALL ORIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDiT10N. 14. PUR POINTS AND PRESSURE -TAPS TO BE INSTALLED PER PSE GAS OPERATING STAi AROS 2525.3400, AND 2525.1200. 15. MAIL AND SERVICES SHALL BE TESTED ANT) PURGED PER PSE GAS OPERATING STAi BARDS '5.3300 AND 2525.3400. 16. IF 1. TALUC P E 1S INVOLVED, COORDINATE INSTALLATION WITH CP TECH. Al : 3HLECHT T 206 -396 -0515. 17. NOT =. ALL AC Al FOOTAGE. LOCATION AND MATERIAL CHANGES ON THE AS -BUILT 1: -I RED. ( '' EMOTES FOOTAGE BETWEEN FITTINGS. 18. N'Y Y CORR.. .ON CON TROL TECHNICIAN AL SCHLECHT AT 206 -3S.- • -0515 48 HO''R PRI' i TO CON- TRUCTION. 1 9. • :'E: •'.AP Al!.. EXISTING CAS PIPE ? ; EMM :i; 'N11H IRE4TON '=F'!MER A:- :fl :4'"x TAPE 2A, I11C JDING UNDERNEATH EACH PIT- SUPPORT. 20. ALL NEW PIPE TO BE POWDER CO TED PER PSE SPECIFICATION 1490.0700. C))11 DIGGI IN Q NG 1' . % ALL VICINITY Q)lt t DCAL <40' a TN r]€JR.'racr. 1 -� -710 -1!515 P1 ELINE WARNING SIGNS ITN 10 SCALE (CHE 8= E COurIE P •f , I P E 1 = J L 1 N E 1 V1 DR 1- &10 -71• -131.5 coot IoaeT etNSnT 1107 : SCALE obit r -s tent :• 0.s+ & sari! a GO ..d•. Camdsl- of Prq. a %Ws old Gas Prsss, a Stomp. rod CF' UV! s Red-Tired cue Os -trot. Mdte•:ae verified end Qboi es nor.! en pipe.•ads. L! YK• & T+j ->A toc s acrel css as -t alt. xote . inning 01 Iry . EOM & l 01 mob) I000Gons. Shaw e- : _ Lacat oas k Cal-de-tin Rod'C.y. ensue: SIvssbare 0117a .�J 7 8" -- 0.emperey PILCP ICK CWE . 3 -$ -v7 A A A PIPEUNE W. RNING DECAL A REVISED TO SEPARATE PHASE 1 & PHASE A00 14 CABLE PER W0 109028998. CESCR - 1 REVISIONS "111=11r - Smoososs. early 1- 1 TY;,e:YJpk P4oS5r PRESSURE V / TIME ON y. "' -Al TIME OFF /2 -' AJti PRESSURE TIME ON TIME OFF SYS MAOP 45 PSIG 1 [ATE :YPp TEST 1 >•TsNr -6 -t7 ATE 0 I3-r-c7 TYPE ICST UATE01 MIE Or Tess» Hess 60 r'ROJECI PHASE PiiitsE • PHASEI ServicelMeler Service/Meter Servioe&leler 1 ServirellAdar Seal:04 ter ServIcaSider Relkeramt 0 1 REVS 1 GAS MAIN INSTA1 ATIOWRETIREI:.:NT GAS MAIN PRESSURE & I ES TI:: ; NOIW% X 1 :J211111 10633352 10614349 C.onbac1oc CONSTRUCTION COST COD as 26 -23-4 SF 1 1 -234 -4 UTILITIES CONTACT PHONES 051 -103 -2 Esl hated Length OP MAP `2.074 PUGET SOUrr, I: ac TESTED E- .' J, }sc. Pm, Tt!r ='o ay Prac ".":R CONTRACTORS IPA i tual TESTED B r 1Q90262 1090289 1085292 Vlclnity A'�, Joann FAc1/IESARRANGEMENTs • Owner / Developer Co:. fact Info QONSTRUC110 N SOUTHCENTER D1STA11 4` MPE & 4" STW P WAIN 633 SOUTHCENTER SEATTLE, WA 98188 SITE (0 O N v C B CA: 424.5655 2 BUSINESS DAYS a EYOU MG nes ME M.MDITOSE gawp UPON TOR EXACT llOr sFgeOU IT - stiAL ESTATEUEASEMEHT REQUIRED SAP Sc .cr older. _1099 i2Z6_ Ekassir -weer. N/A SCALE AS -SHOWN ED KINTIA no 0 T t PNC B ANK sutA •-0 J 0: V PLOT PLAN A S CALE: 1" = 50' 1 RE( =T ALL EXISTING 4' PIPING AND SE • IX TI1111 TRENTON PmMIR AtUO WAX TAT 2A. DESIGN b • • �i a e (7 �� I 1 I JAMBA 1 . JUICE THE PICTURE PEOPLE 1 EIERCROMBIE 1 1 1 1 • r 1_ , ANAPAMOF CONIRACINER:11 Macy: 4 LEVELS 250.407s1 229 - 4 • • • • ..r ammo V z us m � 6 ' z bs ! Le ]t •T '(.'111 ATE N 1 0 Vl 1 00 i . xo STAREWCRS 1 SEATTLE MARINERS ! TEAM SHOP P. ;IFIC SONY."( AR D ( . ACT. MT asps. _a+e�...•+�. _% e = • e 1 1 1 1 1 ammo 126' rt S Cr•CCIO , . ti x V: X 0c THE R/RE ROSE 111 T 11_C 0 In R • .1J c� • J• 0NGUI AR • 1 1 L 1 I 6 _ - RELOCATE ' $ ATTACH NE1ER 10 Ex. COtICREI' 3S IN 10 LOCATION. ;IS • >. 1 s , III[ : ' 1 SHOP i �'. - x 1 I••- vaFL • GO I I: Hy; ta 0 0 x V m QV cc a • - " I Th ----I L.._i -- -t I T OF SUNGLA$S 1/2 _L... —._— HUT L.. . - LJ I i 1 I Cal I fil .:" ".• ! 'SD Q t W i i1 9 tS !SS 888238888 • 0 NY DRIVE u GOROON'S JEWELERS CLAIRE • 0 ;WC Q}NIC • 1I . 1E0 WI COAL • S RUCTU . LEVEL f I •'' :E CAS' 4L P !1'= COUti LIBRARY 1 -••,,I TmTYLf • r�I,1ES PIA 'MOUE 11 ec W W N •• ATTACH 11115 uEIER 10 MONO WALL. SILtE. b �t SEE DETAIL C (2)4'X901NE10 Ell - 1 Q 0 1 1I 33 N o 126' 4* I ►T0IIIERH0o0 1' JOURNEYS! PIERCING ! PAGODA eASKIN ! I :1 UM I R0138INS • E KITS CAMERA SPECS II+ 1HE CITY r--- -- -(2)4 X U 1 M�ELO Elti 1 DEACUVAIE EX CSI IP PIPE (PHASE II) PER V40/ 108529900. 1 ! ; 1 I ! ! r ' ! I ! i j i . 1 ■ - . 1 1 DEACTIVATE EX 4151 IP PIPE 4- PER TIO 108529900. 1 I ! (PHASE q$ r 1 i ! 1 1 L 1 REPLACE EX. SERVICE AND TIE-111 TO NE• MAIN 68 - OEAC11Vx:: EY 2 ST IP F': :ER 160/ 1085299' ; t . to• 1 1.1 a • 410 E1 +' SIEEI 09 F E.: J c NEMSTA: • ..�...� ....._ L I 2' to t•. p7gOClII ps,,k 1 I / I L L I I I 1 2froAlas rag It . —__•- SEE DET. ' '3 zw I I.l x .' I O 1(E 11 + o PR OP. 2 :_ COAIE N1 111 14 It 1 \cx r TY S' IL SIB tM.S •- r1 RCCF TTE IWS ROC ••:I 1 ie•_ 4 - \ )- 4 0 \ !* _ n I in 0 ` • I 1 3 u i a .- c i () I& 0. REPL. EX. SVC lc 11E - TO :; I MAIN. ATE/ CH SVC f0 E) .v .i O 4'X9 0 'W EL IDELL t : ss 'w c,t c/� T 'II SEE DETAIL • 1 1 —116 ---� • ,. • ! ---- - - - --1 - -\ 4#P . 0 - It _ r-- - NEW PARKI — • _ GRA I_ T 11 PAYLESS 1 SI•IOESOURCE l' r - • "A: EXISTING MERVRIS SEF =''. c r• I• • 1 PAO & UNISIRUI AI FISER REPLACE £X. ;Ee :T`E APIO 11E -IN 10 NEw MAID- +rig CONCRE 1E PAO & AI TACIIEO ' -1•: c III 10 LOCATIOPI. KID'S OCKER Rout . -_. vowr M 1 i . ,....i • . 11.000111 I ISA AT APPROX. 26 RISER ABOVE BUILDING (METER FOR PSE 10 IUSTALI. SEE JOB/ 109026538 FOR. DETAIL) 1 4' X S0' MiELO Ell 6O .1CPemey PROP 4 SIEEL FUEL LINE COATED MATH PO'NOER COAL - 4_ x 2' Kto REDuc(R H8 2' 18138 REG. MATH t -1 4 ORIFICE Al VLCC ,Penney 3 LEVELS 276.4680 r ry N1; X J u tg Vat 'CA RE-x1 EX FUEL ONE s1 6 "X9O ELO ELL INTO &.M.OeNC COP. 4 u c Tt 65 (INSTAL. 14 CAKE) - ®Q!)--- ; CA st =.D PHASE '(PER NOT_ 12o 1. REr FUEL NE NOTAPARIOF UPE 0 @€ POLINAIM NI !- :s NEAR aW 0 >• .EP �n JEIKL RS aW, 4 WC TRANS. FI •. ING Cj•__211 NOTAPAItTOf CONTRACUFERttT ®wup. INSTALL 4 E CAP FOR PHA 1 11E -R1 T1 POSITRX1 S -c/L 4 R 1EE _by cit.k_mc L V j 4_ PALL VALVE (INSUI.A1U' PLAICE) (cEF =JIEET 1/2 FOR VAL%f 011 RISER) ? CAAt C/t L( g ni l�c- !iH' 2311 -)' 4-- x- 40-*E10 ELL-RISER- Ai IAOI -ON WALL. ANOTHER -4'-J ELD EtT- O1 -R0O1_ 10P (SEE RISER DETAIL ON SHEET 1/2) 4' X Tritif-EttO (Be or OPEN TREN01) r 104 A 1 • 1. Ace 14 ("EILE PER MI 109028998. iii 1 REVISIONS k r MEM, MEMO EA CO ■ • PROP. 4" 1 - E IP ',mire° (UNDER 1NG) 3201 CA NOTE: VA. :"IELD MI RIME OPEN TRE 11 PHASE 11 4" UPE PAVVIO 329 CA WESTFIELD WV VIDE OPEN TRENL \\\ \-\\-\-\\' CIA TE PER WOI PeOP. 'Mil POWER COAT. sy ( DETAIL C I I :ACTIVATE [.... TAT . TONG ( 4 STEEL COATED VAIN TRENTON PRIMER. 0 0 ° REvs 1 DATE 9: SK 14 26-23-4 @332'W. 150'S CA 4" BOTTOM OUT STOPPER 400 (INSTALL ft CABLE) r :- A TEST LEAD & BOX V.9329 150'S CA NOT TO SCALE 1 0 MPE TEE t9900 (PHASE 7--IN 4 IVO STOPPE %Of 1090289C Intact inforea•;enc P MAP 212.074 PUGET SOUND FliERGY EX. STW VESCRIPTION IP 150'S JULIE MALY 1-2627 CELL PHONE DT SIGrk-3 VT ACK CONTRACTORS 11/1C. NERSECT 0 TEST LEAD & ' CUT CAP (4' VO.0 CAM® PHASE 1 DO OF MAIN PUP (C LOPE CAP) "W CA, 'S CAO REAL ESTATFJEASEPAENT — (INSTALL 1 CABLE) 329'W CA-PHASE I 4 MPE TRANSIBON FITTING 329'1N. 18'S CACI iprrsIrs IL SERVE FIRESTONE E F V A " eT 36L 2 OW-RIESS DAYS BEFORE TOT: 4G ACTION PROJECT MGR J. SNIDER 425- T MAP jou ARRANGENEas SC UTHCENTER 633 SOUTHCEMTER SEATTLE, WA 98188 NOT 10 SCALE X 90' WELD ELL REPLACE EX. %AWE AND 11E-IN TO NEW UAW. VISTA' CONCRETE PAD AND ATTACH SEF .E IN TO LOCATION. PROP. 4" STEEL COATED vim IDER COAT.° PROP. 4 ;TM. P MARA 0 DEACTIVATE EX 4 31EEL PPE IT' 150 NOT TO SCALE 4" X 90' MPE ELL@ (OPEN POSITION) V CA t DEACRVAJE EX. 4 :- IP PIPE /— PER WOf 108529900 C'HASE I). A IL CONTACT PHONE 25 462=39 00 PEk TUP et IE 12 -OS FETAT 1 CD 1 1 le •