HomeMy WebLinkAboutPermit 4495 - Koll Business Center - Koll 36 - ReroofCITY OF TUKWILA
Building Division
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1845
BUILDING PERMIT
PERMIT # (N675
Control # 86 -351
Work to be done Reroof
Site Address 1100 - 1125 Industry Dr Suite # Tenant Koll #36
Building Use Office /warehouse Assessors Account # 252304 -9071
Property Owng011 Business Center Seattle Phone # 206/643 -1716
Address 2021 152nd AMER Avenue N.E. Redmond, WA Zip 98052
Contractor Pacific Rainier Roofing, Inc. #PA- CI- FR- R -248LC Phone # 206/367 -2525
Address 10735 Stone Avenue North Seattle, WA 4 Zip 98133
/, dt.
FOR BUILDING PERMIT ONLY Approved for issuance by
S Ft.
Sq.
Office
Storage/
Warehouse
Retail
Other
Occ.
Load
1st F1.
2nd FI.
3rd F1.
Total
Fire Protection:(] Sprinklers [] Detectors
Zoning Type of Construction
Special Conditions
Fees
sq. ft. @ 1st F1. $
sq. ft. @ 2nd F1. $
sq. ft. @ other $
sq. ft. @ other $
Total Valuation of Construction $ 28,630
Bldg. Permit Fee
Plan Check Fee
Demolition
Surcharges
Other
Other
Receipt #3802 $ 278.00
Receipt # $
Receipt # $
Receipt #3802 $ 1.50
Receipt # $
Receipt # $
TOTAL $ 279.50
FOR SIGN PERMIT ONLY
C1 Permanent [] Temporary
E Single Face C1 Double Face D] Wall Mounted [I Free Standing [I Other
Building face
Setbacks: Front Side
Side Rear
Square Footage of each sign face Total square footage of sign
Special Conditions
ter.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR
ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES
GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
SIOLATE IA �£AN EL EIIAPROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONS RUCTI0NN OR THE PEE FORMANCE OF CONSTRUCTION.
igned_ V /vtG ��� ✓1 Date /0 —13 � _111 &
I hereby affirm that I amt 1 ens
.Contractor (signature)
LICENSED CONTRACTORS DECLARATION
d Iln prov ions of the Business and Professions Code, and %y license is in ful o and effect.
{.4" �,._ Date ! D / .7"— /Pr
OWNER- BUILDER DECLARATION
( ) 1, as owner of the property, or my employees, with wages as their sole compensation, will do the work, and the structure is not intended or
offered for sale.
( ) I, as owner of the property, am exclusively contracting with licensed contractor's to construct the project.
Owner (signature) Date
CITY OF TUKWILA g-
Building Division
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1845
BUILDING PERMIT
Work to be done Reroof
Site Address 1100 - 1125 Industry Dr Suite #
Building Use Office /warehouse Asses
Property Owne011 Business Center Seattle
Address 2021 152nd Anna Avenue N.E. Redmond, WA
Contractor Pacific Rainier Roofing, Inc. #PA-CI-FR-R-248LC
Address 10735 Stone Avenue North Seattle, -WA
PERMIT # L/ LiQ�
1
Control # 86 -351
Tenant Kol1 #36
Assessors Account # 252304 -9011
Phone # 2U6 /643 -1/16
Zip 98052_
Phone # 2Ob /3b/ -25'25
Zip 9U13.3
FOR BUILDING PERMIT ONLY A
roved for issuance b
Sq.
S Ft.
Office
Warehous
Warehouse
Retail
Other
Occ.
Load
1st F1.
2nd FT-
3rd F1.
Total
Fire Protection: n Sprinklers [j Detectors
Zoning Type of Construction
Special Conditions
'(l
t•
Fees
sq. ft. @
sq. ft. @
sq. ft. @
sq. ft. @
1st F1. $
2nd Fl. $
other $
other $
Total Valuation of Construction $ 28,630
Bldg. Permit Fee
Plan Check Fee
Demolition
Surcharges
Other
Other
TOTAL
Receipt #3802 $ 278.00
Receipt # $
Receipt # $
Receipt #702- $ 1.5U
Receipt # $
Receipt # $
$ 279.50
FOR SIGN PERMIT ONLY
0 Permanent [] Temporary
0 Single Face [[ Double Face J Wall Mounted 0 Free Standing [[Other
Building face Setbacks: Front Side Side Rear
Square Footage of each sign face Total square footage of sign
Special Conditions
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR
ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
I HEREBY CERT FY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES
GOVERNING TH $ TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DUES NOT PRESUME TO GIVE AUTHORITY TO
VIOLATE -)CAN ;EL HE sPROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING COS RUCTION} OR THE PEIFORMANCE OF CONSTRUCTION.
�)( /Signed_ /I�V✓te)' � Date �U /1 — / (7Z
--r LICENSED CONTRACTORS DECLARATION
11/ ens d und,r prov ions of the Business and Professions Code, and y licen e,7is in ful orc and
Contractor (signature)Y {' +-- Date //
OWNER- BUILDER DECLARATION
( ) 1, as owner of the property, or my employees, with wages as their sole compensation, will do the work, and the structure is not intended or
offered for sale.
( ) 1, as owner of the property, am exclusively contracting with licensed contractor's to construct the project.
Owner (signature) Date
I hereby affirm that I am
effect.
CITY OF TUKWILA
Building Division
6200 Southcenter Boulevard
T kwila, Washington 98188
(206) 433 -1849
Type of Inspection /`7nd/
Site Address / /DO /426
Requestor
Special Instructions
(/-eko7r)
INSPECT")N RECORD
)
PERMIT # 4/49.:
Date
Date Wanted
Project
Phone #
Inspection Results /Comments:
Inspector
Date l0 /0
PACIFIC RAINIER ROOFING, INC.
10735 Stone Avenue North
Seattle, Washington 98133 -8996
Phone (206) 367 -2525
223- 01- PA- CI- FR- R248LC
September 29, 19$7.
FORM LETTER
City of Tukwila
6200 Southcenter Blvd.
Tukwila, WA 9$1$$
Attention: Building Dept.
Reference: Building Permit #4495
Subject: Notice of Completion
Gentlemen:
Pacific Rainier Roofing, Inc. has installed a roof membrane as-
sembly consisting of a Tamko Spec #134 (data sheet enclosed),
which meets the requirements for Class A or Class B roofs. This
roof was, installed for Koll Business Center at Building #36 1100-
1126 Industry Dr. Tukwila, WA 9$1$$ under Building Permit #4495.
Please notify this office of your final inspection and acceptance.
If we may be of further assistance, please advise.
Sincerely,
PACIFIC RAINIER ROOFING, INC.
D.K. Unrue
DKU /rsh
Enclosures
an equal opportunity employer; --
PACIFIC RAINIER ROOFING, INC.
10735 Stone Avenue North
Seattle, Washington 98133 -8996
Phone (206) 367 -2525
223- 01 -PA -C I- FR- R248LC
September 29, 19$7
FORM LETTER
City of Tukwila
6200 Southcenter Blvd.
Tukwila, WA 9$1$$
Attention: Building Dept..
Reference: Building Permit #4495
Subject: Notice of Completion
Gentlemen:
Pacific Rainier Roofing, Inc. has installed a roof membrane as-
sembly consisting of a Tamko Spec #134 (data sheet enclosed),
which meets the requirements for Class A or Class B roofs. This
roof was :installed. for Koll Business Center at Building #36 1100-
1126 Industry Dr. Tukwila, WA 9$1$$ under Building Permit #4495.
Please notify this office of your final inspection and acceptance.
If we may be of further assistance, please advise.
Sincerely,
PACIFIC RAINIER ROOFING, INC
D.K. Unrue
DKU /rsh
Enclosures
CITY OF TUKWILA (
Building Division
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1845 BUILDING PERMIT
PERMIT #- �' -�f -�;
Control # 36 -351
Work to be done -roof
Site Address 11 1125 ir:dustr'i Suite # Tenant ;011 =mob
Building Use u ',Ire ;w;1rehouse Assessors Account # Za2-C4 -9071
Property Owner,; i „enter ;:e;Attle
1
Address l i i(Y,Yf! rive!`.(( N.G. r:cdf'0!��I, r.A
Contractor ",�c:; i , �;..: )i��r IWof ing, Inc. r. =r-N- CI -FR- c..;LC
Address 1Q, Sion,,; qorth ::eat : e , MM
I
FOR BUILDING PERMIT ONLY .=, .:,roved for issuPin, :e )y j ,�i� , ,1 •/�
Sq. Ft.
Office
Warehou/ e
Warehou s
Retail
Other
Occ.
Load
1st F1.
2nd Fl.
3rd F1.
1
Total
Fire Protection: C1 Sprinklers [j Detectors
Zoning Type of Construction
Special Conditions
Phone # .0 /c4. -1//5
Zip
Phone # �: Js)L. /::h / -d.)L3
Zip /(✓.1JJ
i s i1,
Fees
sq. ft. @ 1st F1. $
sq. ft. @ 2nd Fl. $
sq. ft. @ other $
sq. ft. @ other $
Total Valuation of Construction $
Bldg. Permit Fee Receipt #A)L $
Plan Check Fee Receipt # $
Demolition Receipt # $
Surcharges Receipt # j6 JL $
Other Receipt # $
Other Receipt # $
TOTAL
$ ..'7 ).55
FOR SIGN PERMIT ONLY
C1 Permanent [] Temporary
[] Single Face [] Double Face [] Wall Mounted [] Free Standing [] Other
Building face Setbacks: Front Side Side Rear
Square Footage of each sign face Total square footage of sign
Special Conditions
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK 1S SUSPENDED OR
ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES
GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO
VIOLATE OR '-CANCEL 1HE ,:PROVISIONS Of ANY OTHER STATE OR LOCAL LAW REGULATING C SZRUCTION OR THE PERFORMANCE OF CONSTRUCTION.
',Signed .i 4j A . Date �J -1)-1 `Ti-)
LICENSED CONTRACTORS DECLARATION
I hereby affirm that 1 am licens d under provi,fions of the Business and Professions Code, and 7y license.is In full fora- and effect.
I •. .,, . y Date � } r , i it . %) ( -1
,; Contractor (signature) � .. t ! _
OWNER - BUILDER DECLARATION
( ) 1, as owner of the property, or my employees, with wages as their sole compensation, will do the work, and the structure is not intended or
offered for sale.
( ) 1, as owner of the property, am exclusively contracting with licensed contractor's to construct the project.
Owner (signature) Date
TYPE III
STEEP ASPHALT
TAMKO
VAPOR•CHAN
VENTING
BASE SHEET
AWAPLAN 170
GRANULE
SURFACED
SPOT MOP ON
12 -•24' CENTERS
WITH TYPE III,
STEEP ASPHALT
XISTING GRAVEL
SURFACED
MEMBRANE
(BROOM
AND PRIME)AVEL
12.0 TAMKO RE- ROOFING SYSTEMS
12.1 RI-ROOFING OVER EXISTING
GRAVEL SURFACED MEMBRANE
(ASPHALTIC COMPOSITION)
Specification 131 (Regular)/131 HW
(Heat Welding/231 (AWAPLAN 170)
12.1.1 Slope
Positive drainage up to 11/4 in. per lineal ft.
12.1.2 Material Per
Requirements 100 Sq. Ft.
TAMKO VAPOR -CHAN
Fiberglass Venting
Base Sheet 1 Ply
TAMKO AWAPLAN REGULAR
or AWAPLAN 170
AWAPLAN Heat Welding Grade
(Granule Surfaced) 1 Ply
Asphalt As specified
Concrete Primer Approx. 3/4 Gal,
12.1.3 Specification Asphalt: The asphalt shall be
certified by the manufacturer to meet ASTM
D- 312.84, Type ID. (See Section 6.6 for more
details.)
12.1.4 Preparation: Broom the membrane surface
and remove all of the loose roofing gravel and
debris. Make random cuts or breaks in the old
membrane 4 ft. o.c. to allow vapor pressure to
vent. All wet or deteriorated insulation or
membrane must be removed and replaced
prior to the application of new roofing mate-
rials. The surface should be primed with
TAMKO Concrete Primer at a rate of approxi-
mately 3/4 gal. per 100 sq. ft. prior to the
application of new roofing materials.
12.1.5 TAMKO VAPOR -CHAN: Over the old mem-
brane and starting at the low point of the
roof, install one ply of TAMKO VAPOR -CHAN
base sheet. The VAPOR -CHAN should be side
lapped 2 in,, and end lapped 4 in. The base ply
should be secured to the old membrane with
spots of Type III, Steep Asphalt spaced on (not
to exceed) 24 in, centers.
12.1.6 AWAPLAN Regular or AWAPLAN 170:
Starting at the low point of the roof, install
one ply of TAMKO AWAPLAN or AWAPLAN
170 granule surfaced sheet, side lapped 4 in.,
and end lapped 6 in. The AWAPLAN or
AWAPLAN 170 should be solidly adhered to
the base ply (pressed into the hot asphalt)
with approximately 30 lbs. (-1-15 %) of speci-
fication asphalt.
12.1.7 AWAPLAN Heat Welding: Starting at the
low point of the roof, Install one ply of
TAMKO welding grade AWAPLAN, side lapped
4 in., and end lapped 6 in. The AWAPLAN
should be solidly adhered to the base ply by
heating the back -side with a torch at the junc-
ture of the base ply and the AWAPLAN roll
sufficiently to form a bead of melted asphalt
as the AWAPLAN is rolled out.
12.1.8 Flashing: The flashing material must be
granule surfaced TAMKO AWAPLAN,
AWAPLAN 170 or VERSA -FLASH 160. (See
Sections 6.9 and 13.0 for more details.)
12.1.9 Venting: TAMKO approved roof vents should
be placed at a minimum of one vent for each
10 squares of roof area.
TYPE III
STEEP ASPHALT
TAMKO
VAPOR•CHAN
VENTING
BASE SHEET
SPOT MOP ON
12'•24• CENTERS
WITH TYPE 111,
STEEP ASPHALT
AWAPLAN/
AWPLAN 170
GRANULE
SURFACED
EXISTING GRAVEL
SURFACED
MEMBRANE
DO NOT PR ME) —
12.2 RE- ROOFING OVER EXISTING
GRAVEL SURFACED MEMBRANE
(COAL -TAR PITCH) Specification
132 (Regular) /132 HW (Heat Welding/
232 ( AWAPLAN 170)
12.2.1 Slope
Up to 1/4 in. per lineal ft.
12.2.2 Material Per
Requirements 100 Sq. Ft.
TAMKO VAPOR -CHAN
Fiberglass Venting
Base Sheet 1 Ply
TAMKO AWAPLAN REGULAR
or AWAPLAN 170
AWAPLAN Heat Welding Grade
(Granule Surfaced) 1 Ply
Asphalt As specified
12.2.3 Specification Asphalt: The asphalt shall be
certified by the manufacturer to meet ASTM
D- 312 -84, Type III. (See Section 6.6 for more
details.)
12.2.4 Preparation: Broom the membrane surface
and remove all of the loose roofing gravel and
debris. Make random cuts or breaks in the old
membrane 4 ft, o,c, to allow vapor pressure to
vent from the old system and any existing
insulation materials. All wet or deteriorated
insulation or membrane must be removed and
replaced prior to the application of new roof-
ing materials, DO NOT USE ANY PRIMERS.
12.2.5 TAMKO VAPOR -CHAN: Over the old mem-
brane and starting at the low point of the
roof, install one ply of TAMKO VAPOR -CHAN
base sheet. The VAPOR -CHAN should be side
lapped 2 in. and end lapped 4 in. The base ply
should be secured to the old membrane with
spots of Type 111, Steep Asphalt spaced on (not
to exceed) 24 in. centers,
12,2.6 AWAPLAN Regular or AWAPLAN 170:
Starting at the row point of the roof, install
one ply of TAMKO AWAPLAN or AWAPLAN
170 granule surfaced sheet, side lapped 4 in.,
and end lapped 6 in. The AWAPLAN or
AWAPLAN 170 should be solidly adhered to
the base ply (pressed into the hot asphalt)
with approximately 30 lbs. (2.15 %) of speci-
fication asphalt.
12.2.7 AWAPLAN Heat Welding: Starting at the
low point of the roof, install one ply of
TAMKO welding rade AWAPLAN, side lapped
4 in., and end lapped 6 in. The AWAPLAN
should be solidly adhered to the base ply by
heating the backside with a torch at the junc-
ture of the base ply and the AWAPLAN roll
sufficiently to form a bead of melted asphalt
as the AWAPLAN is rolled out.
12.2.8 Flashing: The flashing material must be
granule surfaced TAMKO AWAPLAN,
AWAPLAN 170 or VERSA -FLASH 160. (See
Sections 6.9 and 13.0 for more details.)
12.2.9 Writing: TAMKO approved roof vents should
be placed at a minimum of one vent for each
10 squares of roof area.
07500/TAM
Buyline 3120
AYWPLAW
AWPLAN 170
GRANULE SURFACED
\ ,. TYPE III
STEEP ASPHALT TAMKO VENT.PLY
_r� i - FIBERGLASS
PUNCHED
BASE SHEET
EXISTING SMOOTH
SURFACED MEMBRANE
(PRIMED)
12.3 RE- ROOFING OVER EXISTING
INORGANIC SMOOTH SURFACED
MEMBRANE — Specification 134 1
(Regular) /134 HW (Heat Welding)/
234 (AWAPLAN 170)
12.3.1 Slope
Up to 3 in. per lineal ft.
12.3.2 Material Per
Requirements 100 Sq. Ft.
TAMKO VENT -PLY
Punched Fiberglass
Base Sheet 1 Ply
TAMKO AWAPLAN REGULAR
or AWAPLAN 170
AWAPLAN Heat Welding Grade
(Granule Surfaced) 1 Ply
Asphalt Approx. 30 lbs.
Concrete Primer Approx. 3/4 gal.
12.3.3 Specification Asphalt: The asphalt shall
be certified by the manufacturer to meet ASTM
D-312-84, Type 111. (See Section 6.6 for more
details.)
12.3.4 Preparation: Clean and prime the entire sur-
face with 3/4 gal. of TAMKO Concrete Primer
per 100 sq. ft. All wet or deteriorated insulation
must be removed and replaced prior to the
application of new roofing materials.
12.3.5 TAMKO VENTPLY: Over the old membrane
and starting at the low point of the roof, install
one ply of TAMKO VENT PLY Punched Fiberglass
Base Sheet. Install the VENT-PLY by rolling out
the sheet dry over the roof membrane, sprinkle
mop to hold the sheet in place until the final
course is installed. Side laps shall be 2 in. and
end laps 4 in.
12.3.6 AWAPLAN Regular or AWAPLAN 170:
Starting at the low point of the roof, install one
ply of TAMKO AWAPLAN or AWAPLAN 170
granule surfaced sheet, side lapped 4 in., and
end Zapped 6 in. The AWAPLAN or AWAPLAN
170 should be solidly adhered to the base ply
(pressed Into the hot asphalt) with approxi-
mately 30 lbs. (± 15 %) of specification asphalt.
12.3.7 AWAPLAN Heat Welding: Starting at the
low point of the roof, install one ply of TAMKO
welding grade AWAPLAN, side lapped 4 in.,
and end Zapped 6 in. The AWAPLAN should be
solidly adhered to the base ply by heating the
back -side with a torch at the juncture of the
base ply and the AWAPLAN roll sufficiently to
form a bead of melted asphalt as the AWAPLAN
is rolled out.
12.3.8 Flashing: The flashing material must be
granule surfaced TAMKO AWAPLAN, AWAPLAN
170 or VERSA -FLASH 160. (See Sections 6.9
and 13.0 for more details.)
12.3.9 Venting: TAMKO approved roof vents should
be placed at a minimum of one vent for each
10 squares of roof area.
25
TAM (0
A I F N A I I
:vgANiFU'iteiZataMietXI
October 7, 1986
Mr. Monty Moore
Pacific Rainier Roofing, Inc.
10735 Stone Avenue North
Seattle, WA 98133
SUBJECT: U.L. APPROVAL
TAMKO ROOFING SYSTEMS #134 & #234
Dear Mr. Moore:
P. 0. SOX 1404
601 NORTH HIGH ST.
AREA COOS 14171 624.6644
JOPLIN. MISS0URI 64602
Please be advised that Tamko's Recover Specifications #134 and #234
are approved by U.L. as A, B or C when installed in compliance with the
1986 Building Materials Directory. The reference card is R3225
(N Item 5). The new card listing will allow the use of Vent -Ply or
Vapor -Chan as the base ply. The surfacing options of fibered aluminum or
emulsion will not change.
If local code authorities require more information, they can call
U.L. at 312 - 272 -8800.
vn
cc: W. Kent Blanchard
John Kirby.
Sincerely,
4.1a-41
Richard McReynolds
Western Regional Manager
Macdonald: 1cLaren Associatd` :J nc
Consulting Engineers
October 3, 1986
Mr. Charles E. Scofield
Koll Company
601.Strander Boulevard
Tukwila, WA 98188
RE: Koll Business Center
Additional Roofing Loans
Dear Mr. Scofield,
We have examined the structural drawings and have determined
that the following buildings are capable of a 1.65 additional
roof load: Building 22, 26,30, 31, 36 and 42 (6 buildings).
Sincerely,
(:e12 1 tt-r t.%'�'C 1/U4t..t,
D. Bruce`'McLaren, P.E. T■mk0' 413¢ (6/s6Z.Ft)
DBM /cmh OAS E- VENT PLY , /83
4w PU-1N 170
R5PHALT
Ned J Macaonald.
215 Eighth avenue North
D Bruce :"cLaren James C, Petersen
Sea:ae. WA, 981og 206.€22.45.0
City of Tukwila
6200 Southcenter Boulevard
Tukwila Washington 98188
(206) 433 -1800
Gary L. VanDusen, Mayor
September 14, 1987
Pacific Rainier Roofing
10735 Stone Ave. N.
Seattle, WA 98133
Attn: Monty Moore
Re: Building Permits #4490, #4491, #4492, #4493, #4494, #4495 and #4496.
Koll Buildings #22, #26, #28, #30, #31, #36, and #42 (reroof)
Dear Mr. Moore:
Our records indicate that these permits have not been finalled`by the Building
Division. In order for us to sign -off on this project we need you to provide
us with a written statement regarding compliance with the Uniform Building
Code (1985 Edition) roof covering requirements. The attached handout provides
you with an example statement. Please provide this information within 15
days of receipt of this letter or contact us with the status of this project.
If you should have any questions, please contact me at 433 - 1852.
Sincerely,
////‘/., ,<.J ; `�
Norm Bray
Building Inspector
LU t L
(PLO ■
1 CIS n ()Y
kY Yre
Macdonald lcLaren Associates' trit
Consulting Engineers
October 3, 1986
Mr.` Charles E. Scofield
Koll.Company
601 Strander Boulevard
Tukwila, WA 98188
RE:.Koll Business Center
Additional Roofing Loans
Dear Mr. Scofield,
We have examined the structural drawings and have determined
that the following buildings are capable of a 1.65 additional
roof load: Building 22, 26,30, 31, 36 and 42 (6 buildings),.
Sincerely,
t? ?n,U-te:41C
D. Bruce McLaren,
DBM /cmh
Neil J. Macdonald
215 Eighth Avenue North.
RECEIVED
c1Tr OF. TUKW1LA
OCT 9 1986
BUILDING DEPT.
D. Bruce.McLaren James C. Peterson
Seattle, WA 98109 206-622-4580
Malarkey
BUILT -UP ROOFING
SPECIFICATIONS
NM3
NAILABLE DECK
MINERAL SURFACED
FIBERGLASS
FIBERGLASS
PREMIUM 1 SBS BASE SHEET PREMIUM 1 PLY SHEET
NAILABLE
DECK
12 "f
0 --- 0 0
0 0 — 0
9..112 "f
0 0 0 0
0 0
18"
t
0
0 0 0
o
0 0 0
0
0 0 0 0
•
t
34"
•
1
34"
ROOFING ASPHALT
ZONE 3
CLASS• "A" — Up to 2"
V.L M77 r,Ci. — 2"-i 6
Materials Per 100 Square Feet
Premium 1 SBS Base Sheet 1 ply 30 lbs.
Premium 1 Ply Sheet 1 ply 11 lbs.
Premium Cap Sheet 1 ply 75 lbs.
Asphalt between Plies 50 lbs.
General requirements are applicable as part of this
specification.
APPLICATION:
Over wood boards only, lay one ply of rosin sheath-
ing paper. Lap each sheet at least 2" and nail suffi-
ciently to hold In place.
Apply Malarkey Premium 1 SBS Base Sheet so flow
of water is over or parallel to the laps. Lap each
sheet 2" on sides and 6" on ends. Nail each sheet
9" on center through the laps and 18" on center
along line 12" distance from each edge. Turn up 2"
above cant at all vertical surfaces.
Apply Malarkey Premium 1 Ply Sheet parallel to the
base sheet and lap so water flow is over not
against laps. All end laps shall be 4" and adjacent
FIBERGLASS
PREMIUM CAP SHEET
end laps shall be 12" apart. The full width of each
sheet shall be embedded in hot asphalt at the rate
of 25 lbs. per 100 square feet. The sheet shall be
lightly broomed as it Is applied.
Apply Malarkey Premium Cap Sheet surfacing
parallel to the underlying roofing and lapped so the
flow of water is over the laps. The sheets shall be
cut into 12' lengths and allowed to flatten before
application. The underlying roofing shall be
mopped with hot asphalt at the rate of 25 lbs. per
100 square feet, Malarkey Premium Cap shall be
neatly set in place providing a 2" side lap and 4"
end laps. Adjacent end laps shall be at least 3'
apart.
Malarkey recommends the use of its SBS Polyester
Cap Sheet as a base flashing material.
RECEIVED
CITY OF TUKWILA
OCT 9 1986
BUILDING DEP1
1
�% 6200 1n9T 1 ' ')ING PERMIT APPLICATION / I
.� � 6200 Sout111���___enter Boulevard B V'�i"" •' QIn �
+ Tukwila, Washington 98188 s, Control # W� 51
(206) 433 -1845
Site Address 1100 -1126 Industry Drive Bldg #36 Suite# Floor#
Project Name /Tenant Koll Business Center Phase 5
Valuation of Construction 289 630.00 Assessors Account# 95- 6465818
Property Owner Koll Business Center Seattle Phone 206/643 -1776
Address 2021 152nd Avenue N.E. Redmond, WA Zip 98052
Applicant The Koll Company 5/5 -07b5
Phone
Address 601 Strander Tukwila, WA Zip 98188
Architect /Engineer none Phone
Address Zip
Contractor Pacific Rainier Roofing, Fdnse# PA— CI— FR= R248LC Phone 206/367 -2525
Address 10735 Stone Avenue Nonth Seattle, WA Zip 98133
Class of Work: ❑ New ❑ Addition ❑ Tenant Improvement ❑ Remodel (residential) x Reroof
❑ Demolition ❑ Interior Demolition ❑ Other
Describe work to be done Reroofing
Type of Const. (UBC) Occ. Group (UBC)
Square footage of entire building 17,800 S.F. Square footage of tenant space
Building Use Office /warehouse Will there be a change of use? C1 Yes
J No
If yes, describe change of use, including square footages of changed areas
Will there be storage or use of flammable, combustible or hazardous materials on the premise or
area of construction? ❑ Yes x❑ No If yes, explain
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND
CORRECT AND THAT I HAVE THE PROPERTY OWNER'S AUTHORIZATION TO DO THIS WORK.
Applicant /Authorized Agent (si gnature) ,'vr- 'z1-2 7f'eZ!-_ Date 9/22/86
(print name) Monty D. Moore
Contact Person (please print) Monty D. Moore Phone 206/367 -2525
OFFICE USE ONLY
FEES: Building Permit Fee (000/322.100) $ 27 $, OO Receipt# " ..10 Date Paid_ 1�} q -sj✓
Plan Check Fee (000/345.830) Receipt#
Date Paid
Bldg Code Sur Charge (000/386.904) 1.50 Receipt#
Date Paid
Energy Sur Charge* (000/386.907) Receipt
Date Paid ,
Other ( ) Receipt# °. Date Paid °'
*New construction only TOTAL o2-.1q45-0 (OWES: $ 0 )
SQUARE FOOTAGE /BUILDING USE INFORMATION Footide of Entirq Building:
FLOOR
USE /Occ Type
SQ.FT.
occ-
LOAD
USE /Occ Tvpe9
.19uare
SQ.FT.
OCC
LOAD.
USE /Occ TYDq
SQ.FT.
OCC
Qgj,
TOTAL
SO.FT.
TOTAL
OCC.
TRACKING
DEPT.
DATE IN
DATE OUT
COMMENTS
BLDG
J
,cbNA
\� -��
�wi,
\G 1��
pprove or Issuance Type of onst.
To Mahan: Date Approved:
FIRE
Approved (Initials) Per letter dated
Fire Protection: ❑ Sprinklers ❑ Detectors
PLNG
Approved (Initials)
■ BAR ■ LAND USE/SEPTTONDTTINS
Zoning Setbacks: N S E W
Parking stalls required for: Site Tenant Space
Parking stalls provided: Site Tenant Space
ADDITIONAL PARKING STALLS REQUIRED:
PWD
Approved (Initials) Per letter /plans dated