Loading...
HomeMy WebLinkAboutPermit 4519 - AllPak Container - Cyclone UnitCITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1845 BUILDING PERMIT PERMIT # ( /5J Control # 86 -345 (513) Work to be done T.I. (Structural for Cyclone Unit) 1 k Site Address 480 Andover Pk E Suite # Tenant l 204- 9093 -Q Building Use Office /Warehouse /Manufacturing Assessors Account # Property Owner Alipak Container, Inc. Phone # 515090U Address E Contractor Archer M- anufacturing Co. Address 12613 - 148th S.E., Renton, WA FOR BUILDING PERMIT ONLY Approved for dssuance by Sq. Ft. s3T. Office Storage/ ue Wa reho s Retail Other Occ. Load 2nd F1. Ord F1. Total Fire Protection: XX Sprinklers ❑ Detectors Zoning C -M Type of Construction Special Conditions Phone 7�e-s730 Zip 98056 ..49/ Fees sq. ft. @ 1st F1. $ sq. ft. @ 2nd F1. $ sq. ft. @ other $ sq. ft. @ other $ Total Valuation of Construction $ 42,000 Bldg. Permit Fee Plan Check Fee Demolition Surcharges Other Other Receipt #(4►q $ 363.00 Receipt #3749 $ 236.00 Receipt # $ Receipt 07,j7- t{,j $ 1.50 Receipt # $ Receipt # $ TOTAL $ 600.50 FOR SIGN PERMIT ONLY (J Permanent J Temporary [[Single Face [] Double Face [l Wall Mounted [J Free Standing [] Other Building face Setbacks: Front Side Side Rear Square Footage of each sign face Total square footage of sign Special Conditions THIS PERMIT BECOMES NULL ANU VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK 15 COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANC n TH PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRICTION OR THE PERFORMANCE OF CONSTRUCTION. Qigned__!_ V'T ^^ Date 111 61 8 LICENSED CONTRACTORS DECLARATION I hereby affirm that 1 am licensed der prypvisions of the Business and Professions Code, and my lic nse is in full force and effect. Contractor (signature) —�1 -- L� --�'� Date 1i�1 OWNER- BUILDER DECLARATION ( ) I, as owner of the property, or my employees, with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ( ) I, as owner of the property, am exclusively contracting with licensed contractor's to construct the project. Owner (signature) Date CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1845 BUILDING PERMIT PERMIT # (-,/T'O Control # 86 -345 (513) Work to be done HVAC (Cyclone) Site Address 480 Andover Pk E Suite # Tenant Aiipak Building Use Office /Warehouse /Manufactruing Assessors Account # 262304-9093 -0 Property Owner Allpak Container, Inc. Phone # u/5 -0300 Address 480 Andover Pk L. Zip Contractor Archer Manufactruing Co. Phone # 746 -b/30 Address 12613 - 148thWS.E., REnton FOR BUILDING PERMIT ONLY Approved for issuance i6y Sq. s Warehouse e Retail Other Occ. Load 1st F1. 2nd Fl. 3rd F1. Total Fire Protection: [[ Sprinklers [I Detectors Zoning Type of Construction Special Conditions Zip 98056 Fees sq. ft. @ 1st F1. $ sq. ft. @ 2nd F1. $ sq. ft. @ other $ sq. ft. @ other $ Total Valuation of Construction $ N/A Bldg. Permit Fee Plan Check Fee Demolition Surcharges Other Other TOTAL Receipt # Receipt # Receipt # Receipt # Receipt # Receipt # $ N/A FOR SIGN PERMIT ONLY (l Permanent [] Temporary [� Single Face [] Double Face [] Wall Mounted Free Standing [] Other Building face Setbacks: Front Side Side Rear Square Footage of each sign face Total square footage of sign Special Conditions 1 THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL, THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. 9 1 l y_ I1 C �. Signed Date I LICENSED CONTRACTORS DECLARATION I hereby affirm that I am licensed under provisions of the Business and Professions Code, and m li ense is in full force and effect. Contractor (signature) Ite,- , Date 1 OWNER- BUILDER DECLARATION ( ) I, as owner of the property, or my employees, with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. OW "' - -as owner of the property, am exclusively contracting with licensed contractor's to construct the project, \ure)Date CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1845 BUILDING PERMIT Work to be done T.I. (Structural for Cyclone Unit) Site Address Building Use Property Owner Address Contractor Address PERMIT # i5 /C1 Control # 86 -345 (513) 480 Andover P1< L Suite # Tenant Al1pa Office /Warehouse /Manufacturing Assessors Account # 262304- 9093 -0 Alipak Container, Inc. Phone # b /5(BUU 480 Andover Pk E Archer M- anufacturing Co. ) Phone # g -5730 12613 - 148th S.E. , Renton, WF( . ,: , t, 1 ; Zip 98056 FOR BUILDING PERMIT ONLY A •roved for assua S q • Warehouse Retail Other Occ. Load 1st F1. 2nd F1. 3rd F1. Total Fire Protection: ® Sprinklers [( Detectors Zoning C 44 Type of Construction Special Conditions L_' ) ` sq. ft. s.q)., ft. @ f sq!._.ft. @ ,... 'sq. ft. @ 1st F1. $ 2nd F1. $ other $ other $ Total Valuation of Construction $ 42,000 / Bldg.flpermi4- F•ee-" Receipt #(.01 $ 363.00 Plan check Fee Receipt # $ 236.00 Demolition Receipt # $ Surcharges Receipt #7;:517 $ 1.50 Other Receipt # $ Other Receipt # $_� TOTAL $ 600.50 FOR SIGN PERMIT ONLY [( Permanent Q Temporary [] Single Face C1 Double Face (] Wall Mounted [( Free Standing ❑ Other Building face Setbacks: Front Side Side Rear Square Footage of each sign face Total square footage of sign Special Conditions THIS PERMIT BECOMES NULL ANU VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK 1S COMMENCED. I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE 08 CANCE. THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CO STR CTION OR THE PERFORMANCE OF CONSTRUCTION. %igned / 1.ca(,'ti�(�" I)� ;�t Date LICENSED CONTRACTORS DECLARATION 1 hereby affirm that 1 am licensed ujder provisions of the Business and Professions Code, and my license is in full force and effect. Contractor (signature) �f i� --�^ Date ll�� OWNER- BUILDER DECLARATION ( ) 1, as owner of the property, or my employees, with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ( 1 1, as owner of the property, am exclusively contracting with licensed contractor's to construct the project. Date Owner (signature) tttvu ti�3z.1vfH,xcw�asu »xr ms... ter. ,ti„ .., _ CITY OF TUKWILA Building Division Tukwila,ltWashinaton Boulevard 8188 PERMIT # y��Z (206) 433-1849 Date /2 3/17 Type of Inspe tion f% (4/4V/P2 _ -21 Date Wanted / . g7 Site Address .Soo s 64)0- Project Requestor Phone # ...,,....»..,._...... ..................,....,..»..., «.»....,..„..rows,. ..a:'u4,41,30•u?ar!Sar.y;.,• 14"d+ iw4•.'.) iY; zV.8:1T.Y:'::F3i'Y.�'£Ak }�ti5;�: 1 INSPEC ,•;'ON RECORD Special Instructions Inspection Results /Comments: ,d, Ae,„ Inspector Date /,.2.3%8 7 *CITY OF TUKWILA Building Division 6200 Southcenter Boulevard ' Tukwila, Washington 98188 (206) 433 -1849 Type of Inspe tion Site Address Sep /9/< Ca Requestor Special Instructions ,) a..�.«.ninc•!inx :x.••ckaws�.navtaa sh- nteNSMItrEEiVOilt^ ti,MVit INSPECT' 9N RECORD ELY PERMIT # y✓`��cl Date /Z 3, ?7 Date Wanted //. 7 a.m. Project K. Phone # • • Inspection Results /Comments: Inspector r7 xet, Date «z% `" 7 .". �" ttueraH�t�S':. SYZU, na+. an�vt :u:,rua..- zw'..a..wv..:.e., e.«.,,.,.., ,.�....�.u...enx•,m. r.,. ,CITY OF TUKWILA . • Building Division Tukwila,tWashingtonu198188 (206) 433 -1849 Type of Inspection Site Address 9g0 Requestor Special Instructions ,.w.. «.,... »..........r.,,,..,..,., ... ...�- rr,_..x., �.,....«.. s >,iae.n�.r....a,,.ow. «.n�a.xwc INSPECT ON RECORD �Y PERMIT # yJr r c /5"'W Date //8/i7 teg, /e9.14143 �I� '���,' Date Wanted //07 a.m. p.m C:.crat Project (4/2.4_,Ae p� Phone # Inspection Results /Comments: .,4_,A740/24 r <. r• haeoe ,aL) Inspector %fie X�? Date /fe /,�� °,.5.`.:s!si7?�klGv}ti;4: till ?,3E.t•.iAtT.tX6Yltbcx:4rac•r` e ArtrA S/ast•xuw.t% CITY OF TUKWILA •lailding Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 i:t1774]u!"r7•??S -.l 4 '9:.57:';."s Y!A �:� ADS:`.,",'" n: �VL!.' 5 tY+iSi'CC:�i�tni }r,.�t.t.i. ^r.: 'i��.'S:lbkf�'ii+S i• °.$:1�i�3' 't::C1iY::3tiii-0L" . Type of Inspection Site Address 5612 a,,LektAt/ AE -24 4.0 Requestor � e Special Instructions INSPECT N RECORD PERMIT # g5/9 �/5/(7 Date Wanted ///4 %'7 Date Project Phone # ?1.30 Inspection Results /Comments: Inspector i71&-t_i„t � Date �'. x•.' } {.{�'.v44!� YAn 7 ,•.!(;rlsC,•rtn •f�jR ', ..1 "4 . .3:YS ?'.' y1 y�ri� �i : .. d CITY OF TUKWILA Central Permit System Control No. ?'d - j' `/.9 Permit No. `'7 //1-- FINAL APPROVAL FORM TO: ❑ Building ❑ Planning ❑ Public Works ,ET Fire Dept. ❑ Police ❑ Parks/Recreation Project Name .4 // / ea A" Address •-- „r, Type of Permit(s) r / /, r� c This project is nearing completion. Please investigate your area of responsibility and indicate below either your final approval or necessary corrections. If no response is received within one week, it will be assumed that the project is of no concern to your department and a certificate of occupancy may be issued. This project is NOT approved by this department; the following corrections are necessary: () () (•) () () () ( () () () () . ( ) Authorized Signature Date 1 This project is approved by this department: • Authorized Signature Date CPS Form 3 1 City of Tukwila Fire Department Gary VanDusen Mayor Hubert H. Crawley Fire Chief Fire Department Review Control t86-345 October 20, 1986 Re: Allpak Container - 480 Andover Park East Dear Sir: The attached set of buildinN plans have been reviewed try The Fire Prevention Bureau and are acceptable with the followinN concerns: 1. Maintain sprinkler Protection for all enclosed areas. (NFPA 13y 4-1.1.1) All modifications to sprinkler systems shall have the written approval of the WashinNton SurveYinN & RatinN Bureau y Factory Mutual EnNineerinN or Industrial Risk Insurers, then by the Tukwila Fire Department. No sPrinkler work shall commence without approved drawinNs. (City Ordinance #1141 & NFPA 13y 1-9.1) Yours tyuiwy The Tuk 1.a Fire Prevention Bureau City of Tukwila Fire Department, 444 Andover Park East, Tukwila, Washington 98188 (206) 575-4404 Mahan&DeSalvo CONSULTING ENGINEERS 1411 Fourth Avenue Bldg. Seattle, Washington 98101 (206) 624 -8150 November 3, 1986 11 Mr. Duane Griffin City of Tukwila 6230 Southcenter Blvd Tukwila, Washington 98188 Regarding; Plan Review 86 -T -16 (Allpack Container) Dear Mr. Griffin, We have received additional informatin on your proposed project and have reviewed it for compliance with Chapters 23 through 29 of the 1985 Edition of the Uniform Building Code. All our comments have been answered satis- factorily. Please note that there are two redmarks, Sheet Al and A3. The redmarks have been approved by Mike Glanz of mga. Please call if you have any questions. Sincerely, MAHAN & DESALVO Bridget Smith cc: mga. 6869 Woodlawn Avenue NE Seattle, Washington 98115. NOV "EVEIMI3 ,Q 3 1986 CITY OF TUKVVI A PLANNING DEPT. r Mahan &DeSalvo CONSULTING ENGINEERS 1411 Fourth Avenue Bldg. Seattle, Washington 98101 (206) 624-8150 October 27, 1986 Mr. Duane Griffin City of Tukwila 6230 Southcenter Blvd Tukwila, Washington 98188 Regarding: Plan Review 86 -T -16 (Allpack Container Inc.) Dear Mr. Griffin, We have received additional information for the proposed project and have reviewed it for compliance with Chapters 23 through 29 of the 1985 Edition of the Uniform Building Code. No review was required for Ordinance, Regulations for Barrier Free Facilities or the Washington State Energy Code. Please have the applicant respond to the following comments in itemized letter form and resubmit any necessary calculations and /or drawings. The architect has been contacted by phone and was informed of the following comments: Structural 1. Provide all equipment loads on the drawings. 2. Provide all weld sizes on the drawings. Detail 14/A3, baseplate to flange weld is inadequate per Table 27 -E -1. 3. Provide lateral calculations for the cyclone. 4. Clarify location of braces on W6 columns. Provide height and span to wall. 5. Section 7/A3, clarify new members which are added for support of fans and show Section cut designation. 6. Bolts are used to connect baseplate to slab at the cyclone support. How is the cover for steel attained? 7. Provide embedment length of bolts into concrete at wall and slab. Tin.P[NDI [No\1 0 8.1986 CITY OF TUKWILA PLANNING DEPT. October 17, 1986 Mr. Duane Griffin City of Tukwila Re: Plan Review 86 -T -16 Page two . Call for compliance with the 1985 code verses the 1982 code. Please call if you have any questions. Sincerely, MAHAN & DESALVO Bridget Smith cc: mga 6869 Woodlawn Avenue NE, Suite 110 Seattle, Washington 98115 TO MICHAEL GLANZ /ARC i ECT 6869 Woodlawn Avenue NE #110 SEATTLE, WASHINGTON 98115 (206) 522-6125 Orty WE ARE SENDING YOUttached ❑ Under separate cover via ❑ Shop drawingsrints ❑ Plans CLC 11 `TL d ©IF U'GDG3l RS ltitl [1`l1' 11r ° 1. DATE 10 (zSf4' JOB NO. ATTENTION REf A/ �] l.�Jl�+1 1,�5" 3 / IN,I .,- (C���C.C,046 ing 7 -/� iii o/)) RECEIVED CITY OF TUKWILA OCT 28 1986 BUILDING il.."tf>'. following items: ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION /z. (- )BV 2 L G-r vc-ru eAtz - 1-4 7 C".At -C , THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval or your use ❑ Approved as noted ❑ Submit copies for distribution As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS n OM i 28 19861 677-1- OF TUKWILA PLANNINti DbPT. COPY TO PAOOUCl24O INZllhf lac, GOA Wu ONII. SIGNED: /iii ��j� ; 0�64/111' 0 snclosuns an not •s noted, kindly notify us et once. ENG I N cRS - NORTHWEST ca. P.S. 6869 WOODLAWN AVE. N.E. - SUITE 205 - SEATTLE, WA 98115 — (206)525 -7560 Jos No. JOB NAME di/ pat !L DATE I — 3G - J6 "SUBJECT C, uG�04� 5N/) Ov_ SHEET OF RECEIVED CITY OF TUKWILA OCT 10 1986 BUILDING DEPT. CC/ k eji ✓14... q > 4-4'1 be. 14•44) bcc BY f /. 4 ENG I N RS -NORTH WEST 1 NC. P.S. 6869 WOODLAWN AVE. N.E. - SUITE 205 - SEATTLE, WA 98115 - (206)525.7560 JOB No. JOB NAME i-1 SUBJECT c� c %'' r ✓Ji i70^7— 1 zr DATE. %-'��� SHEET .2 OF BY Za x 32 11 -7 _ ,2.6.2 K 3 ::: rti a `,J ,41• i 7 ' 70 75.5 rc /./4 .7d; 2241 24,1— :;377.1;').1.13 =, /0 la at) 4.0 159 e 30.041 3Y 7 cJG )4- g.-C) Gv�. el e.166‘ cr• Ds" KNt. Joe No SUBJECT ENG I ; NORTH WES&MC. P.S. 6869 WOODLAWN AVE. N.E. - SUITE 205 - SEATTLE, WA 98115 - (206)525 -7560 JOB NAME OG Kr re 1vu e. DATE, SHEET BY o - OF 673- • 3 / = f• /✓- " /10-6:1 OCT 3 1996 AHA! 8t SM11111 RECEIVED CITY OF TUKWILA i .' �; {• 2 8 1986 BUILDING DEM ENGIN ERS— NORTHWEST INC. �� P.S. 6869 WOODLAWN AVE. N. E. - SUITE 205 - SEATTLE, WA 98115 - (206)525 -7560 Joe No. rr Joe NAME 6W PGA- (Ac. SUBJECT C� G `61\$ CA. I � q DATE SHEET flu /b OF BY "I` � ,r0ba.�l� .ito c f8 CAA. c,&• n< <o ■.4 6•1" PUGET SOUND AIR POLLUTION CONTROL AGENCY ENGINEERING DIVISION V I vI Ci: ,Ul L moo/, 200 WEST MERCER STREET P.O. BOX 9863 SEATTLE, WASHINGTON 98109 (206) 344 -7334 Al rr;.■ !r. -_, • Notice of Construction and Application for Approval •Note: Information required by Section la rnust be completed for this form to be accepted for review. POLLUTION FOR AIR EQUIPMENT FORM R DATE 9 �� %86NiC a INSTRUCTION SHEETS BEFORE FORWARDING PLLEASE CONSULTINSTRUC7 A. COMPLETE THE 1 2 ,[_]3 rj 4 5 Y�y 6 SECTIONS INDICATED 07 g t/f9 Nj1p1�111[�?j12 b. COMPANY (OR OWNER�I..I✓N)STALLATION ADDRESS ( �"� 4� oo V�~ P � �-'`�l / + 'r"� c. COMPANY (OR OWNER) NAME r---`` �� A u V A k• Co IJ T rA (rJ E12.. 1 I iV C. , d. APPLICANT M l C*(1 e1.-- C7 l.f►1J z 046A A A rlemrNf4 4 e1/AVg e. PREPARED BY: (Nome and Title) MI Li-i -fit■ C'I.A' L /Pct2c,1M -i T>—r.7 1. PRE RED4IY• ISro `fury / / . .... o. PHONE S 2 t -6 /As a• AIR POLLUTION CONTROL EQUIPMENT DATA b. TYPE OF EQUIPMENT G`?u.Ot.Jt c. MAKE AND MODE, A 442. 32 d. DIMENSIONS IL x W x H) So'-o k,4 (1-l0 vIA. h. CONNECTED TO: e. NUMBER • IF UNITS pfk) I. CAPACITY pop L. r g. AUXILIARY EQUIPMENT I- Zdlt 4,000 CFMtNPu.T 72,vo4M,r 3 FAMES Su Yet- 4'',y�i . BAGHOUSE b. NUMBER OF BAGS c. SHAKING CYCLE (auto or menu I rapping or reverse alr) d. CLOTH AREA a. MATERIAL USED • 1. Q. AIR TO CLOTH RATIO (Ft. /Min.) h. CONNECTED TO d. MEAN VELOCITY OF GAS (FPS) • ELECTROSTATIC PRECIP. b. ELECTRODE SEPARATION IFTI c. COLL. ELECTRODE DIMENSIONS: W x 1 (Feet) e. AREA ISq Ft) f. VOLTAGE o. COLL. ELECTRODE OR PLATE AREA (So Ft) h. CONNECTED TO: . BURNER DATA b. TYPE OF BURNER, FUEL c. MAKE AND MODEL d. RATING e. NUMBER OF UNITS /IGNITION 1. g. CFM EXHAUSTED (Temp) b. TYPE OF VENT c. DIMENSIONS (L x H x W) lb? D I Sc4-f'/i -ezevg h. CONNECTED TO: e.`� STACKS, VENTS d. DAMPERS e. NUMBER OF VENTS, MAT'L USED 1. g. CFM EXHAUSTED (Temp) i h. CONNECTED TO: • SCRUBBER DATA b. TYPE OF FLOW (Spray, Bubbler) c. PACKING TYPE /SIZE d. PRESSURE DROP (Inches of water) e. COMPOSITION OF SOLUTION 1. g. FLOW RATE (GPH) h. MAKE UP (GPH) • FAN DATA b. TYPE OF FAN (Designate Blade) c. MAKE AND MODEL d. MOTOR DATA RPM H e. NUMBER OF FANS. MAT'L USED 1, o. CFM EXHAUSTED 1 Temp ® SP) h. CONNECTED TO. . CYCLONE DATA b. TYPE OF CYCLONE c. MAKE AND MODEL .0 common 0 split Duct 0 Multiclone ( YL -2)2- d. INLET AREA Sq. Ft If. NUMBER OF UNITS, MAT'L USED _ _ 1. BODY OIA. (INCH) I'32II OUTLET DIA. (INCH) g. BODY HEIGI•IT (INCH) 'L(o2In EFFICIENCY h. CONNECTED TO: COLLECTION DATA b. DESCRIPTION OF COLLECTED c. AMOUNT COLLECTED POUNDS /DAY lc 114'40 Vcr4 411'S , 1. g. COLLECTION EFFICIENCY d. PARTICLE SIZE (MICRONS Average) h. DISPOSITION OF COLLECTION WASTE e. TYPES OF POLLUTANTS Particulate 0 Gas C Odor a. GAS FLOW b. ACTUAL CFM mac. SCFM (Reg I Standard) d. TEMPERATURE (•F1 IN OUT h. ' e. PRESSURE DROP I. EFFICIENCY 9. INLET AND OUTLET POLLUTANT CONCENTRATIONS rc a ADDITIONAL DATA b ATTACH BROCHURE 1F�( ATTACH PLANS /SPECS l=� d' h. 1. +� . ATTACH EMISSION ESTIMA (show calculation) ATTACH A SCHEDULE. EQUIPMENT WITH MACE.. MOD L. CAPACI Y oak kti•i), / +l,Lt ' ij I CC4 / d CIA. 40 OF cS SUBMIT NARRATIVE C�J If RIPTfl•N qF •ROCESS ' Or SUBMIT SOURCE TEST DATA SUBMIT MODELING DATA r. ❑ I '{� r J a4nt3ti 1. .►.' 0.�T� tO k. ❑ ° PUGET SOUND AIR POLLUTION CONTROL AGENCY ENGINEERING DIVISION 200 WEST MERCER, P.O. BOX 9863, SEATTLE, WASHINGTON 98109 (206) 344 -7334 INotice of Construction and Application for Approval FORM P SIDE 1 Be sure to complete items 39, 40, 41, & 43 before submitting Form P. (AGENCY USE ONLY) DATE N/C NUMBER REG. NO. VAR. NO SIC. NO COS. NO GRID NO UTM 1. TYPE OF BUILDING (Check) I: New )E■ist.ne 2. STATUS OF EQUIPMENT (Chock) )(New ❑ Existing ❑ Altered o Relocation 7. APPLICANT t M((44$ t._ �LfJ7. / t1 1trr 3. COMPANY (OR OWNER) NAME M -PA- CO LIT NI klet" , I kiC • 8. APPLICANT ADDRESS 1'b WocYnLI1/4.0t AQe rJE. qtf Ho StAr -, i.,c 4, COMPANY IOR OWNER■ MAILING ADDRESS �8o 1DalEa'Z.. PNU- Y / Se-14TtU 9. INSTALLATION ADDRESS 48o kJJ O V ViiitI - E sT � S�iorr 10, TYPE OF PROCESS Got2rui&A -cen q-Hp 12, oo/cL t4NO 13AL1/J4 _ 5, NATURE OF BUSINESS YLOX Wrel9 coi) TN- c/JE'L.S mf-ei. `(0 EQUIPMENT (ENTER ONLY NEW EQUIPMENT OR CHANGES. ENTER NUMBER OF UNITS OF EQUIPMENT IN COLUMN 'NO. OF UNITS. COMPLETE FORM 'S' FOR EACH ENTRY.) 11, N0. OF UNITS SPACE HEATERS OR BOILERS (Complete Form S•A) 14• NO. OF UNITS OVENS 15. NO. OF UNITS MECHANICAL EQUIP. 16, NO. OF UNITS MELTING FURNACES (al 12, NO. OF UNITS (a) 13. NO. OF UNITS INCINERATORS (Comolelo Form S•B) OTHER SYSTEMS (al CORE BAKING OVEN (al AREAS BULK CONVEYOR CLASSIFIER STORAGE BIN BAGGING OUTSIDE BULK STORAGE LOADING OR UNLOADING BATCHING MIXER (SOLIDS) OTHER GENERAL OPER. EQUIP. (a) POT REVERBERATORY ELECTRIC INDUC /RESIST CRUCIBLE CUPOLA ELECTRIC ARC SWEAT OTHER METALLIC GLASS OTHER NON METALLIC OTHER EQUIPMENT (b) PAINT BAKING Ibl (b) (c) PLASTIC CURING (c) IC) Id) LITHO COATING OVEN Id) (o) DRYER (e) (d) (e( II) ROASTER 111 (11 la) (bI IC) 17. NO, OF UNITS DEGREASING, SOLVENT ABRASIVE BLASTING OTHER - SYSTEM GENERAL OPER. EQUIP. (p) KILN lo) le) )h) HEAT • TREATING (h) (h) li 1 OTHER (i) (I) 111 III (I1 17. N0. OF UNITS GENERALOPER.EQUIP. 17. N0. OF UNITS t8. NO. OF UNITS la) (b) (c) Id) (e1 CHEMICAL MILLING PLATING 01 GALVANIZING (k) ASPHALT BLOWING CHEMICAL COATING COFFEE ROASTER SAWS & PLANERS STORAGE TANK SPRAY PAINTING GUN SPRAY BOOTH OR ROOM FLOW COATING FIBERGLASSING OTHER (91 IMPREGNATING (11 (a) DIGESTER DRY CLEANING FORMING OR MOLDING (h MIXING OR FORMULATING (m )b) (c) (1) REACTOR (n) Id) ()) STILL (o) le► CONTROL DEVICES (ENTER NUMBER OF UNITS OF EQUIPMENT IN SPACES IN COLUMNS. COMPLETE A FORM R FOR EACH ENTRY.) 10, NO. OF UNITS CONTROL DEVICE 20. NO. OF UNITS CONTROL DEVICE 21. No. OF UNITS CONTROL DEVICE 22. No. OF UNITS CONTROL DEVICE (a) Ibl 1 -- SPRAY CURTAIN CYCLONE MULTIPLE CYCLONE INERTIAL COLL. - OTHER EOUIPMENT COST ta) AIR WASHER (a) ABSORBER (a) DEMISTER )b) WET COLLECTOR (b) ADSORBER (b) BAGHOUSE lc) 1.1) 23. BASIC (Es) mate) lel VENTURI SCRUBBER (e) FILTER PADS lc) ELEC. PRECIPITATOR Idl (d) AFTERBURNER Id) OTHER 24. CONTROL [Estimate) EQUIPMENT COST 25. DAILY FROM It HOURS oo AM to 10.000 PM 26. DAYS OF S M OPERATION (Circle) T W T F S 77. ESTIMATED STARTING DATE OF CONSTRUCTION: 2E1. ESTIMATED COMPLETION DATE OF CONSTRUCTION: r29. RAW MATERIALS (List starting material used In process) AND FUELS (Type and amount) ANNUAL AMT. UNITS 30. PRODUCTS (List End Products) ANNUAL PROD. UNITS /01 . Ihl 11.1 . III 11 Ii1 ' 4 Notice of Construction Application FORM P STACKS OR VENTS (LIST NUMBER, TYPE, AND SIZE OF VENT) :11. NO. )F UNITS DESCRIPTION OF OPENING 32. HEIGHT ABOVE GRADE (FT.) 33. VOLUME EXHAUSTED DIMENSIONS (INCHES) 34. LENGTH (OR DIAM) 35. WIDTH U1I STACKS Ib) FLUES ICI PROCESS OR GENERAL EXHAUST (d) PROCESS OR GENERAL VENTS Ia) SKYLIGHT OR WINDOW EXHAUST HOOD OTHER FLOW DIAGRAM 36. FLOW DIAGRAM INSTRUCTIONS; (a) FLOW DIAGRAM MAY BE SCHEMATIC. ALL EQUIPMENT SHOULD BE SHOWN WITH EXISTING EQUIPMENT 50 INDICATED. (b) SHOW FLOW DIAGRAM OF PROCESS STARTING WITH RAW MATERIALS USED AND ENDING WITH FINISHED PRODUCT. (c) IF MORE THAN ONE PROCESS 15 INVOLVED TO MAKE FINISHED PRODUCT, SHOW EACH PROCESS AND WHERE THEY MERGE. (r1) INDICATE ALL POINTS IN PROCESS WHERE GASEOUS OR PARTICULATE POLLUTANTS ARE EMITTED. TO FLOW CHART CAN BE ATTACHED SEPARATELY IF NECESSARY, (DRAWINGS MAYBE SUBMITTED INSTEAD IF DESIRED). (1) SHOW PICKUP AND DISCHARGE POINTS FOR HANDLING OR CONVEYING EQUIPMENT. • t LIST OF ATTACHMENTS AND ACCOMPANYING DATA OR COMMENTS . CERTIFICATION: I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT THE INFORMATION CONTAINED IN THIS APPLICATION AND THE ACCOMPANYING FORMS, PLANS, AND SUPPLEMENTAL DATA DESCRIBED HEREIN IS, TO THE BEST OF MY KNOWLEDGE. ACCURATE AND COMPLETE. SIGNATURE 40. DATE TYPE 011 PRINT NAME 42. TITLE 43. PHONE • • 'M.11019/14/1 el OIL 4 TABLE 10 CYCLONE SEPARATORS FORM PI.2172•9) Point Number (from Flow Diagram) Manufacturer & Model No. (if available) Al2ct -O2. 32 Name of Abatement Device C cA.47%.t.- Type of Particulate Controlled C.OYULV.C.v AIM Ctrl h s, GAS STREAM CHARACTERISTICS Flow Rate (acfm) Gas Stream Temperature ( °F) Particulate Grain Loading (grain /scf) Inkt Outlet Design Maximum Average Expected PARTICULATE DISTRIBUTION (By Weight) Micron Range 0.0-1.0 1.0-3.0 3,0-5.0 5.10 10-20 over 20 Inlet % Outlet % % % % % % % °k % % % CYCLONE CHARACTERISTICS Type of Cyclone (check appropriate boxes): (-yi wet ,.single C3 guadruple VI-dry Cl dual Q multiclone Give Dimensions of Cyclone (See sample sketch): Gas Out I. $ S. Z in. . u1. ��� 2: H in. 6. D in, GUt 111 «I H ' 3, S in, 7. A in. L O 4. L in. 8. J in, L. -A--41. s D Method of Removal of Particulate from FRONT from Cyclone. VIEW TOP VIEW Pressure drop through cyclone (inches water) ADDITIONAL' INFORMATION On separate sheets attach the following: A. Details regarding principle of operation B. An assembly drawing (Front and Top View) of the abatement device dimensioned and to scale clearly showing the design, size and shape. If the device has bypasses, safety valves, etc., include in drawing and specify when such bypasses are to be used and under what conditions. INLET 15" OUTLET 11.3/8" x 12%:" SIZE 40 DESIGN 8 91.10" WHEEL CIRC. 29" DIA. WHEEL (SIX) RPM 71p Speed FPM SND 1N. SND HP 1' SP 114" SP 2' SP 214' SP r SP 35.i. SP 4" SP 41V SP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM - HP CFM HP 474 3600 1,11 .09 1380 .35 3410 4.74 2730 4.02 501 3800 1.24 .11 1765 .48 4300 6.46 3800 5.86 r 527 4000 1,37 .12 2100 .61 5100 8.33 4660 7.72 3700 6.44 553 4200 1,51 .15 2380 .75 1220 .45 5410 , 9.73 4560 8.48 3590 7.05 580 4400 1,66 .16 2620 .90 1690 .63 6080 11.58 5410 10.9 4570 9.54 3640 8.0 606 4600 1.82 .19 2860 1.07 2070 .82 6700 14.3 6140 13.35 5440 12.1 4600 10.62 3620 8.86 ' 633 4800 1.97 .21 3080 1.24 2390 1.01 1190 .60 6750 15.87 6170 14.72 5440 13.33 4670 11.83 4170 10.86 659 5000 2.14 .25 3300 1.43 2700 1.22 1790 .88 7400 18.8 6840 17.66 6280 16.43 5580 14.96 4760 13.23 692 5250 2,36 .29 3590 1.72 3030 1.50 2280 1.06 7920 21,77 7500 20.87 6980 19.55 16390 18.24` 5710 16.67 725 5500 2,60 .33 3830 2.00 3340 1.79 2700 1.50 1790 1.10 8080 24.1 7640 23.0 7150 21.7 6540 20.2 757 5750 2.84 .38 4080 2.34 3640 2.12 3100 1.86 2330 1.48 8630 27.6 8170 26.37 7760 25.2 7240 23.9 790 6000 3.09 .43 4340 2,69 3900 2.46 3400 2.18 2780 1.87 1900 1.39 8820 30,5 8400 29.3 7990 28.1 823 6250 3,35 .48 4570 3.07 4170 2.85 3750 2.61 3170 2.27 2460 1.86 9380 34.5 9010 33.4 8620 32.0 856 6500 3.62 .54 4830 3.49 4440 3,26 4030 3.01 3570 2.70 2910 2.30 2090 1.79 9570 37.7 9190 36.5 889 6750 3.91 .61 5070 3.95 4700 3.71 4330 3.47 3900 3.17 3340 2.70 2650 2.33 10080 42.3 9750 41.2 922 7000 4.31 .70 5380 4.61 5030 4.36 4670 4,09 4280 3.68 3850 ' 3.48 3260 3.05 2540 2.51 10350 46.2 988 7500 4.33 ,83 5770 5.55 5460 5.28 5100 4.99 4780 4.73 4400 4.42 3960 4.04 3360 3.55 2700 2.98 1054 8000 5.50 1,01 5950 6.54 5640 6.25 5310 5.92 4970 5.61 4600 5.29 4190 4.86 3650 4.36 1119 8500 6.21 1.21 6440 7.95 6140 7.66 5860 7.35 5530 7.02 5240 6.69 4890 6.33 4490 5.89 1185 9000 6.97 1.44 6930 9.60 6620 9.22 6360 8.99 6090 8.61 5780 8.21 5520 7.92 5180 ...7.51 1251 9500 7.76 1.69 7380 11,34 7110 10.92 6830 10.60 6580 10,28 6300 9.92 6050 9,61 ' 5780 9.29` 1317 10000 8.59 1,76 7600 12.97 7340 12.57 7090 12.23 6840 11.85 6590 11,48 6340 '11':10' 1382 10500 9.50 2.28 7830 14.88 7640 14.52 7370 14,10 7150 13.74 6880 13.30 1514 11000 10.40 2,62 8320 17.25 8140 16.94 7910 16.52 7680 16.11 7440 15.62 RpM Tip Speed FPM SND 1P4. 94D HP 5' SP 5W' SP 6" SP 7" SP 8' SP 9" SP 10" SP 11' SP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP 1119 8500 6.21 1,21 3950 5.32 3410 4.74 2730 4.02 1185 9000 6.97 1,44 4760 7,0 4300 6.46 3800 5.86 r 1251 9500 7.76 1.69 5460 8.79 5100 8.33 4660 7.72 3700 6.44 1317 10000 8.59 1,96 6040 10.68 5740 10.24 5410 , 9.73 4560 8.48 3590 7.05 1382 10500 9,50 2.28 6660 12.94 6390 12.47 6080 11.58 5410 10.9 4570 9.54 3640 8.0 1448 11000 10.4 2.62 6740 15,2 6980 14.87 6700 14.3 6140 13.35 5440 12.1 4600 10.62 3620 8.86 ' 1514 11500 11.3 2.99 7720 17,74 7480 17.33 7290 16.92 6750 15.87 6170 14.72 5440 13.33 4670 11.83 4170 10.86 1580 12000 12.4 3.41 8360 20.7 8010 20.12 7800 19.7 7400 18.8 6840 17.66 6280 16.43 5580 14.96 4760 13.23 1647 12500 13.4 3.84 9940 44,7 8560 23.25 8350 22.8 7920 21,77 7500 20.87 6980 19.55 16390 18.24` 5710 16.67 1712 13000 1.1,5 4,34 8900 26.1 8460 25.1 8080 24.1 7640 23.0 7150 21.7 6540 20.2 1777 13500 15.5 4.85 9080 28.8 8630 27.6 8170 26.37 7760 25.2 7240 23.9 1843 14000 16.9 5.42 9180 31.5 8820 30,5 8400 29.3 7990 28.1 1910 14500 18.1 6,04 9750 35.7 9380 34.5 9010 33.4 8620 32.0 1975 15000 19.3 6.65 10270 40.0 9890 38.8 9570 37.7 9190 36.5 2041 15500 20.7 7,31 10810 44.6 10410 43.53 10080 42.3 9750 41.2 2108 16000 22.0 8.05 11290 49.8 10950 48.6 10620. 47,3 10350 46.2 2PM Tip Speed p SND IN. SND HP 12" SP 13 ' SP 14' SP 15' SP 16' SP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP 1 580 12000 12.4 3,41 3850 10,88 I&17 12500 13.4 3,84 4960 14.92 4020 12.79 r 1712 13000 14.5 4.34 5830 18.5 5170 16.76 4230 14.54 1777 13500 15.5 4.85 6680 22.3 6050 29.5 5360 18.8 4510 16.5 1843 14000 16.9 5.32 7460, 26.5 6930 25.1 6280 23.17 5570 21.0 4860 19.0 1910 14500 18.1 6.00 8150 30.7 7660 29.2 7100 27.4 6500 25.6 5820 23.5 ' 1975 15000 19.3 6.65 8810 35,2 0370 33.8 7930 32.3 7350 30.3 6720 28.3 2041 15500 20.7 7,31 9430 40.3 8970 38.4 8580 37.0 8120 35.3 7600 33.5 2108 16000 22.0 8.05 9940 44,7 9660 43.7 9260 42.1 8860 40.6 8380 38,8 INLET 21" OUTLET 16" x.17.5/8" SIZE 55 DESIGN 8 124.09" WHEEL CIRC. 39%:" DIA. WHEEL (SIX) RPM Tip Speed FPM SND IN. SND 1" SP 1W' SP 7" SP 2%' SP 3" SP 3W SP 4" SP 4W SP HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP 348 3600 1.11 .17 2560 .64 8.79 5060 7.45 670 367 3800 1.24 .20 3280 .88 11.97 7050 10.86 • 918 387 4000 1.37 .23 3880 1.16 15,42 8640 14.32 6860 11.94 962 406 4200 1.51 .27 4410 1.39 2270 .84 18.03 8460 15.74 6660 13.07 1015 426 4400 1,66 .30 4860 1.68 3140 1.17 21.47 10040 20.20 8470 al 6750 14,84 1064 445 4600 1.82 .35 5300 1.98 3840 1,52 26.5 11380 24.75 10080 22.42 8530 19,68 6720 16.43 1113 464 4800 1.97 .40 5720 2.30 4430 1.88 2210 1.01 29.43 11440 27.30 10080 24.70 8650. 21.9 7740 20,25 1162 484 5000 2.14 :46 6120 2.65 5020 2.26 3320 1.63 34.9 12690 32.75 11650 30.47 10350 27.72 8840 24,52 1209 508 5250 2.36 .53 6650 3.18 5630 2.78 4240 1.97 40.4 13910 38.7 12930 36.27 11860 33.82 10590 30.92 1258 532 5500 2,60 .61 7100 3.32 6190 3.32 5000 2.79 3320 2,04 44,65 14170 42,65 13260 40.25 12130 37.48 1307 556 5750 2.84 .70 7580 4.33 6750 3.93 5760 3.44 4330 2.74 51.2 15150 48.9 14400 46.8 13440 44.3 1355 580 6000 3.09 .79 8050 4.98 7240 4.55 6320 4.04 5160 3.46 3520 2.58 56.5 15580 54.4 14820 52.1C 1403 604 6250 3.35 ,90 8470 5.70 7740 5.29 6960 4.84 5880 4.21 4560 3.44 64.0 16710 61.8 15980 59.3 1452 628 6500 3.67 1.01 8960 6.47 8240 6,04 7480 5.57 6610 5.00 5400 4.27 3870 3.32 70.0 17040 67,6: 1500 653 6750 3.91 1.13 9400 7.32 8710 6.88 8030 6.43 7240 5.88 6180 5.01 4920 4.33 78.5 18100 76.5 1548 677 7000 4.31 1,30 9970 8.54 9320 8.07 8650 7.59 7940 6.83 7130 6.46 6050 5.65 4710 5.58 85.6 725 7500 4.63 1.54 10690 10.29 10120 9.78 9460 9.25 8860 8.76 8160 8.19 7340 7.49 6230 6.58 5000 5.53 774 8000 5.50 1.87 11030 12,12 10470 11.58 9850 10.98 9220 10.4 8530 9.81 7770 9.02 6760 8.06 822 8500 6.21 2.24 11920 14.75 11400 14,18 10860 13,62 10250 13.0 9720 12.4 9060 11.73 8320 10.92 670 9000 6.97 2.67 12840 17.78 12270 17.08 11780 16.48 11280 15.95 10720 15.23 10240 14.68 9600 13.97' 918 9500 7.76 3.14 13690 21.0 13180 20.5 12650 19.64 12200 19.05 11680 18.38 11210 17.81 10720 17.21 967 10000 6.59 3.64 14100 14.03 13620 23.3 13150 22.66 12670 21.96 12220 21.28 11750 20.58 1015 10500 9.50 4,24 14520 27.6 14160 26.9 13660 26,12 13250 25.43 12770 24.63 1064 11000 10.40 4.86 15420 32.0 15080 31.37 14650 30.6 14220 29.66 13780 28.93, 0 0 1i '.1 17 13 • 9: 1: 72 11 7C 19 d 1 RPM Tip, Speed FPM D 1N . SND HP 5' SP 514 ' SP 6" SP 7" SP 8' SP 9" SP 10" SP 11' SP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP 872 8500 6.21 2.24 7320 9.85 6320 8.79 5060 7.45 670 9000 6.97 2.67 8820 12.98 7960 11.97 7050 10.86 • 918 9500 7.76 3.14 10130 16.29 9460 15,42 8640 14.32 6860 11.94 962 10000 8,59 3.64 11190 19.79 10640 18,98 10020 18.03 8460 15.74 6660 13.07 1015 10500 9.50 4.24 12350 23.97 11850 23,12 11270 21.47 10040 20.20 8470 17.68 6750 14,84 1064 11000 10.4 4.86 13260 28.17 12920 27.57 12420 26.5 11380 24.75 10080 22.42 8530 19,68 6720 16.43 1113 11500 11.3 5.54 14370 32.74 13870 32.15 13510 31.4 12520 29.43 11440 27.30 10080 24.70 8650. 21.9 7740 20,25 1162 17000 12.4 6.32 15320 38.4 14850 37.32 14470 36.56 13730 34.9 12690 32.75 11650 30.47 10350 27.72 8840 24,52 1209 12500 13.4 7.13 18440 82,9 15870 43.10 15470 42.20 14700 40.4 13910 38.7 12930 36.27 11860 33.82 10590 30.92 1258 13000 14.5 8.05 16500 48.44 15690 46.5 14970 44,65 14170 42,65 13260 40.25 12130 37.48 1307 13500 15.5 8.99 16840 53.5 16000 51.2 15150 48.9 14400 46.8 13440 44.3 1355 14000 16,9 10.05 17010 56.5 16370 56.5 15580 54.4 14820 52.1C 1403 14500 18,1 11,12 18070 66.1 17400 64.0 16710 61.8 15980 59.3 1452 15000 19.3 12.34 19040 74.2 18340 71.95 17760 70.0 17040 67,6: 1500 15500 20.7 13.55 20050 82.8 19300 80.75 18690 78.5 18100 76.5 1548 16000 22.0 14.92 20920 92.4 20300 90.0 19680 87.6 19180 85.6 RPM Tip FPMd SND IN. SND HP 12' SP 13 ' SP 14' SP 15' 5P 16" SP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP CFM HP_ 1162 12000 12.4 6.33 7150 20.93 1209 12500 13.4 7.13 9220 27.30 7450 23.7 • 1756 13000 14.5 8,05 10800 34.30 9580 31.1 7850 26.97 1307 13500 15.5 8.99 12380 41,4 11230 36.1 9950 34.9 8370 30.6 1355 14000 16.9 10.05 13830 49.7 12850 46.5 11640 43.0 10330 39.0 9000 35:2 140? 14500 18.1 11.12 15100 57.0 14200 54.1 13180 50.9 12050 47.5 10800 43.6 1457 15000 19.3 12.34 16330 65.2 15510 62.6 14700 59.9 13640 56,2 12470 52.6 1500 15500 20.7 13.55 17500 74.7 16640 71.3 15900 60.7 15070 65.5 14100 62.2 1548 16000 22.0 14.92 18440 82,9 17910 81.1 17170 78.2 16430 75.3 15540 71.9 •••■••■■••• 3,. DIMENSIONS FOR ARRANGEMENT 1 — DESIGN 8 PLANING MILL EXHAUSTERS • r• d d v. PLAN 88 _ P Y FRONT ELEVATION OUTLET FLANGE 32 AA N SIDE ELEVATION PLANING MILL EXHAUSTERS DESIGN 8 ARRANGEMENT NO. 1 SIZES 30 TO 90 INCL. • e• • • S WWL 1 SVgigFI . . KEYWAY A il 9 G. 0 E F G H J K L M N P 0 R S T Y AA Be GC 0 b C d v ‘sed 3Q. 1 2,1 I t•d ' i 5/0 •LJ± 1 14126'16+ 81181 91 G. 5 11 10 ai lof MIIIPEIRE 119 14 M INNIERINIIII 1* 11 I-g 201 2 3 25' 42;15441111 4 8 53i a 32._ I 4 4 7 51 11 151- 161 2 12 213 2 14 1 2 16k 2 2 2 4 21' 9 20 10i 7 11 . I 38(.1 42,, 5 5 6 6 6 13 16 17 19 21 m 13 I 4 jI21. 5 6'. 6 tql1L. 9 10 11 10 12 1.4 1 17 19' 22 40 I 29 I I% 3/8 0/16 17‘ 18i. 211 24 113 23 13. 26 141.28 : 1 31 e 12 ' 14. 5 171 77 8 9 'oil 1 1-- 45 1 32 I 115/14 'e2 4 1/4_120 121 24 127 23 4 ifq 4 I■ T —7 , 1 , 50 3 5%16 !,115.4e In A 223'2206 30 23' I 28 52 56i 18 4 19 . 4 i 55 1 39 Vg_ 2346 , L2 t i/4 24i1,25:1 29 331 25 _ .7 I ---7 60 I,. 4 2,3ijAt 2 l'ite 1/2.0;4 .26281 34114 4 , M-11 i 3 7 0 I 4 9 3/oe 1 I■1 6 : 5/3 4 5/16 131 32j 375 -TO 56 V2 1 211114 i Ivo ileT3-5g 7jr 421, 222 42 32 47a361.42 171 20 1,29i 41 34191 441251-13- 50 11 46 18 1211-: 24 17 ir1 30 64. 19i 4 2I 4 I0 R 91-2- 22 30 12k 51 .55 5/* - 1" 8 8 8 26 30 34 21 23' 25 14 134 14 1 27 , 20.4 iii. 33 74 4 ..4k 6 2 11 15 17 29 30 22 24* ti ii 35 36 854 811 91 25. 28 6 27i 6 32i 6 13i6 12jk 6 154/ 141 i r 90 1 t 64 1 213A 6 54i 1. 5/16 40 I42i 48 S4441 261 100 • •Zij co tr.! • 1 1 '''l t•') C) 1 1 c i,k .torn .._. 1p i 0, to ct (Di 0 - ,x,11 u m tc: 1R+ to tn 0)1 CV � I1C? f) *C's ;__ 't' t (h rh �F] • I, C' v? 4214:::1P-- p LL) U? c" CV 4.s i 1.'. e: i +f: t +•:1, n.' r .; _�' C4 0 C7 WI i I, 0 tr: 0 t ;:,u'[. 11. 0) :�.1 C]:` Lrf q'i ( • } r()I -. • • 1 ,t7:} �-. l.). i. } ral c: '1._ ..4. ...... .._..__.- r'1._._ :_.' j.j ..r.r, t,',`.�i 0; i 1... ti M_ (� s • t.'.21 M 10,4t)1 .. ' ‘,:*1::1.;‘4.1:j. 1 ( a' lXs: 4f } d f� r i': K•.• 01 0' C,' -- :.ri.dwr.�r i... -~j" (;.,.' fl. t-- t<~ .."..,..4.- • - 1 -: - i. :.y.i_.CT� v._ .i-+ itt`_• -4�; •..4°L.• ».i- ' , i 1 1 �� .. L':y.: R., C:" �T•• re', t()}`?_P r...; a , i Q•: 0' (r.}. ";hl 1,r.; y.. f%) n 1- Hfo., .0.i ....f 1 co' so cr. �' :...i.; cu' cr,' 1 1 Cti! Q) 1 4'., 4": . t•. - ■ t r. a,,, t�� t �I ,its 1 ,...1.-7 . - '- i"*..., !It 041....."7(...j.2 it v•.;,-.. Q h' .W to (r) o at to t.' 1 • CI) CV 4 d1 � ,r ti 0, O 4'11 0 r.it'. t�l r:), C4'} t!.) • f+., 1 .•. .. •, I Y), A.; }•_ t ? to u'0 rr' '-? c..: u . (x: W. c`. ;��'.• (f). C, _._ -T . .: . L.l: M r� 61, - 0Y,- j1)kr f..: +� • : _...1L' u ..rn 1 3, : V' - i �.�i i ....: • tl" 1 f - : •'^..1.., 1.._..4.. .. _......,.�..F .i- 1...._ ! ..� .. t. '� .' t : H. � •�•.•17)tC'} c: r— SS'. r'„? 1 it: .-, . _ to P►74 .....ito ' 1 C, ci fit'r.? ' C11 W — d. M; t? , e t n t!• t i'1 : I i .. • -z+ • •. vn • .4'7•' c? c. kt . F.... _s... 0 . y �[ 1 G� U h.- 7 — x'} }� :. C 0 '? 0 CO a X Gti1 Ui t:e '�' te Fig F Z X� X m 0. i•-.1 - i ce. J -? F- V. h• w! h H V of 0 `t 1 aww3•s c)!tr,Hi N .t.� ..: N .fi 1 I xi 'h .•.) �1 t -- p. 4, • 1- 1}-- 1- F-. i v.! al! 1. = (.: , 4! �' W w L1 cl): c' U. C . 7' • •NCI g .:. ' L..1 t.t1 w c} PUGET SOUND AIR POLLUTION CONTROL AGENCY 200 West Mercer Street, Room 205 P. 0. Box 9863 Seattle, Washington 98109 ENVIRONMENTAL CHECKLIST WAIT - You may not need to fill out the attached checklist Please read and check the following: Because of the State Environmental Policy Act, the action for which you are filing a Notice of Construction and Application for Approval to this Agency requires the completion of an environmental checklist. BUT: If you can answer "yes" to either of the following questions with respect to the action being proposed, the attached checklist need not be completed: 1. I have obtained a State, City or County permit and filled out an environmental checklist. 1 1 Yes No If you answered "yes ", give State, City or County Department and date, and attach a copy of the checklist. 2. An environmental checklist or assessment has previously been filled out for another agency. Yes P71. No If "yes ", give agency and date, and attach a copy of the checklist. If your answer to both of the above questions was "no", you must fill out the attached environmental checklist. 'fl f. 1 T f1 1 T _ __ 11_ Prepared by: (S gnature) M V' . G- . (Print Name) Are-cb1118vT /T • Puget Sound Air Pollution Control Agency rrca 64vicei S. Coco 96C , 3a. '33: 200 West Mercer Street, Room 205, P.O. Box 9863 Seattle, Washington 98109 (206) 344-7330 Date: 9 iZ(o18o Proponent: M- c)TAl /\)(3W-1 Project, Brief Title: 1) H \)bLLk)(a EQVIP14I0`r" ENVIRONMENTAL CHECKLIST Purpose of Checklist: The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring prepara- tion of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to ^'= • • ^'.it• 2e•y• E3c. the best of your knowledge. In most cases, you should be . °a °'3; `OIOe^'} able to answer the questions from your own observations or ERCE COUNTY project plans without the need to hire experts. If you ; ==, ue$OU1M1 really do not know the answer, or if a question does not 383.5E51 apply to your proposal, write "do not know" or "does not •:ONOhoshcour:Ty apply ". Complete answers to the questions now may avoid NW- 552-3565 unnecessary delays later. DARD Or DIRECTORS i /AIRMAN Doug Sutherland. Mayor Tacoma auto Agnew Councilman Snehomiah County Tim Hill. King County Executive fillies Royer Mayor Seattle Joe Slorlinr. Pierce County Executive VICE CHAIRMAN! Ray Aardal, Commissioner Kilsap County Gene Lobe. Mayor Bremerton William E. Moore. Mayor Everest Linda Tans, Member at Large A.R. Dammkoehler. Air Pollution Control Officer Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these ques- tions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different par- cels of land. Attach any additional information that will help describe your proposal or its environmental effects. The Agency may ask you to explain your answers or provide additional infor- mation reasonably related to determining if there may be signifi- cant adverse impact. j.Le of checklist for nonproject proposals: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION, com- plete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site should be read as "proposal," "proposer," and "affected geographic area," respectively. TO BE COMPLETED BY THE APPLICANT A. BACKGROUND 1. Name of proposed project, if applicable: Pn- -'px 001J 1 N1 kl e L I rJ e-, cow 1-hA7 J t 4,J Gt etm em T 2. Name of applicant: I6filket_ &(10.iL 3. Address and phone number of applicant and contact person: Name: t"t(rh+A - GLoo2 Title: /ac(2_c + `eCT Firm t-t&tt, AKu +iTt -cT«fE * I NN "pct Telephone : 522 -(. t25 PO Box /Street : C40e, e5 c,0O00c..Jaul4 AVE. de. 44.1(0 City /State /Zip: GuAli e-, WA. ?)SIIS 4. Date checklist prepared: 1f3 (2-6, /66" 5. Agency requesting checklist: 14&eT Sdc/n)a Ale POLCV7t0A) A-c7e10 c 6. Proposed timing or schedule (including phasing, if applicable): C-04vritid.1(vr\) P11TIn1Gt C0114 2 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. N oT AT P(L eNr 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for govern- mental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. 10. List any government approvals or permits that will be needed for your proposal, if known. Pukver SOUND X12 PoLLTcor/ C— eArrrcaL A- t3o -rc c e7. oF c.oN sTrukL'n aN , C Lt. V C-{+ A-7o, (A -c., & 7 1(.r_ i4.j u c L4) mJ6 pm /00-s/ r► 2E L2 ePT fo0W-o ✓At-, 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. iN$'TAU- 5Zo CAA_ -01- C // JOYC1 � ,.. 2,40 u O N 'rU Sw A' io f 1 — Gtr .Pd/nl7S. :41.4/ 3 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a pro- posal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 4.0o AEIo6A/=21-- PPflLL sT o&) r2a0f- of Sttt ,V !At .40 vairo 44c-t Vw VIV Y r_ `-%•r 2D AADOV C p v*- B. ENVIRONMENTAL ELEMENTS 1. Earth a. G_al description of the site (circle one): rolling, hilly, steep slopes, mountainous, b. What is the steepest slope on the site (approxi- mate.percent slope)? t/A c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. /VA — GeneltACt citaj k4 implit-Telo d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. 011 4 e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. f. Could erosion occur as a result of clearing, con - struction, or use? If so, generally describe. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? t5CI ST 1/Je4 ArT &2 h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: to A 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. 5 e. Proposed measures to reduce or control emissions or other impacts to air, if any: 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year -round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. 3) Estimate the amount of fill and dredge mate- rial that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. �0 � u) Will the proposal require surface water with- drawals or diversions? Give general descrip- tion, purpose, and approximate quantities if known. 6 5) Does the proposal lie within a 100 -year flood - plain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. a b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities if known. 2) Describe waste material that will be dis- charged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals . .; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. � kf c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. (Jo nrtr VMS PicdPd ,( 2) Could waste materials enter ground or surface waters? If so, generally describe.. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: o,a 4. Plants a. Check or circle types of vegetation found on the site: __deciduous tree: alder, maple, aspen, other '- evergreen tree: fir, cedar, pine, other shrubs ✓ grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? c. List threatened or endangered species known to on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: 0914 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, (ongbirds), other: .... mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known be on or near the site. c. Is the site part of a migration route? If explain. kj e W f" p rt - f M rs kw a F PR &E r SoU nr12 501 u/Aj d. Proposed measures to preserve or enhance wildlife, if any: 47)-74 ft'avirteia 9 Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the com- pleted project's energy needs? Describe whether it will be used for heating, manufacturing, etc. cr`? - P oce55 VJ Would your project affect the potential use of solar energy by adjacent properties? If so, generally. describe. I)'o c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. k).0/Q6 A400l Describe special emergency services' that might be required. OM ✓a- p(eS J - 6, 10 2) Proposed measures to reduce or control envi- ronmental health hazards, if any: 0 - S(tg C� L/Loii Co )MT( GATES 1-€. Dr24eeell t'to V at) t 1 N,j b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? 060 2) What types and levels of noise would be created by or associated with the project on a short -term or a long -term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. cis "J AkfcE /l9OT Di SGaLAAce Move eAcit-e,r2 v09 L L,S '4-r Thi s G &fir 4 ' 3) Proposed measures to reduce or control noise . impacts, if any: 8. Land and Shoreline Use a. What is the current use of the site and adjacent Ei� properties? /A STiLI� 41 L(� W � r r' 11 b. Has the site been used for agriculture? If so, describe. NoT IA Lis-( 20 c. Describe any structures on the site. 2 OK\ S t 1 nl ( —�' i �- — (�(� Co /JGf W f . L U bS d. Will any structures be demolished? If so, what? e. What is the current zoning, classification of the site? G f. What is the current comprehensive plan designation of the site? Cwt g. If applicable, what is the current shoreline master program designation of the site? OjA- h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. 12 i. Approximately how many people would reside or work in the completed project? t STr4 6i C Vg S j. Approximately how many people would the completed project displace? k. Proposed measures to avoid or reduce displacement impacts, if any: 1. Proposed measures to ensure the proposal is compat- ible with existing and projected land uses and plans, if any: 0-19-0-13 9. Housing Y' a, Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. PJ &) b. Approximately how many units, if any, would be eliminated ? Indicate whether high, middle, or low - income housing. po c. Proposed measures to reduce or control housing impacts, if any: 13 10. Aesthetics a. What is the tallest height of any proposed struc- ture(s), not including antennas; what is the prin- cipal exterior building material(s) proposed? ZQ 0.ve3' � t4 r G 7 or- E ST /nJCc $tittuvlikici Zq ex. tsTAG) b. What views in the immediate vicinity would altered or obstructed? 09(1/: c. Proposed measures to reduce or control aesthetic impacts, if any: 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? 0061 b. Could light or glare from the finished project be a safety hazard or interfere with views? N0' c. What existing off -site sources of light or glare may affect your proposal? 14 d. Proposed measures to reduce or control light and glare impacts, if any: 12. Recreation a. What designated and informal recreational oppor- tunities are in the immediate vicinity? NoY Cvplcc,+81,6 b. Would the proposed project displace any existing recreational uses? If so, describe. Aljb c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: N/A 13. Historic and Cultural Preservation a. Are there any placescr objects listed on, or pro- posed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. 15 b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. Pr c. Proposed measures to reduce or control impacts, if any: /VA 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. t. S (j nS ( moo ✓cam Is974- .6614 b. Is site currently served by public transit? If not, what is the, approximate distance to the nearest transit stop? ciit 5 Ice Na T g. tJcv rJ t>1.4.-f— kAA 4,iti // c. How many parking spaces would the completed project have? How many would the project eliminate? e 1ST I t.) v Pr T &5 se N�rJ3 *9-4 Gil r4 V 16 d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. tJo f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. t Proposed measures to reduce or control transporta- tion impacts, if any: 15. Public Services tVp, a. Would the project result in an increased need for public services (for example, fire protection, police protection, health care, schools, other)? If so, generally describe. N b. Proposed measures to reduce or control direct impacts on public services, if any. 17 16. Utilities itie.= tly - ab the site: service, septic sys em, other. Describe the utilities that are proposed for the . project, the utility providing the service, and service, and the general construction activities on the site or in the immediate vicinity which might be needed. Nyp, C. SIGNATURE. The above answers are true and complete to the best of my knowledge. I understand that the agency is relying on . them to make its d cisio . Signature: Date Submitted: 10 P2 /B6 18 D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (Do not use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not imple- mented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardo s substances; orI production of noise? 1jSSf4hl �� 8- SC1 -,�G 100.61+ cc�f s 2,,,-ev Proposed measures to avoid or reduce such increase are: Qum- S 11,E c c.Lo KM. -1'0 XeEP Molter c-i9 hoc,✓{ —, (eS w t Ivi. 2. How would the proposal be likely to affect plants, animals, fish, or mariner life? r / Proposed measures to protect or conserve plants, animals, fish, or marine life are: How would the proposal be likely to deplete energy or natural resources? u 56 or a 1121 -ry to f ew94 19 Proposed measures to protect or conserve energy and natural resources are: StAtit - S 5Tit -raw i1 w tterJ tJo -r Nt e 41f 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental pro - tection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? O% Proposed measures to protect such resources or to avoid or reduce impacts are: OA. 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? 0/A Proposed measures to avoid or reduce shoreline and land use impacts are: Ofrs- 6. How would the proposal be likely to increase demands on transportation or public services and utilities? 20 Proposed measures to reduce or respond to such demand(s) are: a/A 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. W I LA- e13r6LY go T coopA 21 ENGIN(ERS— NORTHWEST 61C. P.S. 6869 WOODLAWN AVE. N.E.- SUITE 205 - SEATTLE, WA 98115 - (206)525 -7560 JOB No. SUBJECT JOB NAME 9 / / pa, l_ DATE - �G SHEET OF BY ENG I: ERS - NORTHWEST NC. P. S. 6869 WOODLAWN AVE. N.E. - SUITE 205 - SEATTLE, WA 98115 - (206)525 -7560 JOB No JOB NAME 'SUBJECT r r #4.0 •rye. v'r VI- l,zr /•zs s1. ,Z DATE 9. S SHEET 2 OF BY 7 fit; 70 .2> . ') I- 2, 2 23./. 1G•L 35.0 c{ ' fc /. /5'. r 2. 76 S 20/d" cr. Y= - 22. / 1 1319 1,: zG• z b 1 �•- 2- � G d o k "-, c.c� a G r(C. to LI.C. (ego,04r...... '3 1c. 7t 7Y erg: C.6'` 4? ,. 2 G rS h+ 0.4 w.4 .1.14/;/)C A JOB No. SUBJECT ENGINC:ERS- NORTHWEST �INC. P.S. 6869 WOODLAWN AVE. N.E. - SUITE 205 - SEATTLE, WA 98115 - (206)525 -7560 JOB NAME �'IIDGGK� /4. c_..1 �, •1- /oGLI v� =2 ."$0 C_"' en boil- f"Nru •. ►� : 1. / 5, hi DATE / ° 7 g SHEET OF BY C7s're•3) //2 tc. Noia O Gi:�'4C A) ? AO /',f' i ;L:. t� i. •.,�� C�—. Site Project Valuation Property Address Applicant Address Architect Address Contractor Address Describe CITY OF TUKWILA Building Division 6200 Southcenter Boulevard MECHANICAL PERMIT APPLICATION Tukwila, Washington 98188 (206) 433 -1845 Address 480 fla t- Vj412k -.. e-` 1 CONTROL# gQ c6" Suite# Floor# Name /Tenant of work Owner A1..t'M Cf1ta/Atn3?YLi t/,,G # 4,%" ,°0 Assessors Account As-(..L. -Ptrf C C.oi3761/4I.., /A)(_. Phone - 400 1 )ji/ IL #',W: Zip m,LGfI L, &(,-AoU'L A2c.or ,T Phone SZ Z•— &/Z-S• j Culooptilllo - , Al &t -94//0 „ceifigg Zip q&)/ s- /Engineer ; 6- .0 Phone Zip f�j. License# Phone Zip work to be done 01514u.. cjc, i4JE entSrlafte CoLLeTviC_ Indicate the type of equipment TYPE to be installed, rating /size of equipment, and number of each: RATING /SIZE NUMBER * _ , �- : c 1 `V2._ 4-f 'L 32. oao cgn'1 itt Ax 1 _ -- . , 9 4o tp 000 c.fsi --- 7 000 c fiti s Y1i - Gt-k -- #4' 5S t? 000 Criii - 9 40 0 Gf-iii 1 • Two (2) sets of plans must be submitted meeting the application requirements of Section 302(b) and (c), 1985 Uniform Mechanical Code. Roof -top equipment work requires submission of building elevations. I HEREBY CERTIFY THAT I HAVE CORRECT AND THAT I HAVE THE Applicant /Authorized Agent (print Contact Person (please print) READ AND EXAMINED THIS APPLICATION PROPERTY OWNER'S AUTHORI TI (signature) AND KNOW THE SAME TO BE TRUE AND T DO THIS WORK. Date j0/7/86 name) %ICif 6C4440 /4?teM rv-ur .51014E- Phone 522—'i 1.5 TRAKING FEES: Basic Permit Fee Unit Fee Plan Check Fee Other OFFICE USE ONLY Receipt# Date Paid (000/322.100) $ (000/322.100) Receipt# Date Paid (000/345.830) Receipt# Date Paid ( / ) Receipt# Date Paid TOTAL (OWES: $ ) DEPT.' DATE IN DATE OUT COM .J. BLDG / rt 6 NI)Y Approved aprve, for Issuance I1. i nit a s •,!1Al, PLNG ✓ �/1.5SW l �&O ` G •. CITY OF TUKWILA � ' �8utlding Division f � ..�!�% 6200 'tVcienter Boulevard BUI( NG PERMIT APPLIC " • -1ON 441,71,0.4,' Tukwila, Washington 98188 ) • , Control # ,r (D "�6 (206) 433 -1845 22 Site Address 42,c, { QQoVGir2.. PA12* -- G.-61-T- Suite# Floor# Project Name /Tenant P J-4 (Ac -- C, 1\i rA -1 /J 71 /k . ,&L !col-WELD Valuation of Construction f ¢2) 000,00 Assessors Account# 2107 "301/-670% •-Q Property Owner / -(,LIi2kek- CnN ZA-InJe'(t( 14N)L , A Phone t '75 07062 Add ress 462 g? Zip "r Applicant tit i c (+ ,;(, ( =A4V jJ Z/ (24+1 Phone 52Z-67115- Address Co Dc c) GQ0c► L f rJ t/e , ti.i,� • !10 SL"nr1 -u Zip sE5/I S Architect /Engineer 5 144 Phone Address Zip Contractor 1J6k License# Phone Address Zip Class of Work: D New 125Addition Tenant Improvement fl Remodel (residential) Q Reroof Demolition Interior Demolition [] Other Describe work to be done (il3 (1 tL C.� GC4►J Jb 3 /t1 JS OA) P-P)OP Type of Const. (UBC) 5-562-00,. Occ. Group (UBC) B --Z__ Square footage of entire building •72, 3i3 Square footage of tenant space e Building Use (17,171a;) vOrdLEFiAd.45 - /11,r& • Will there be a change of use? Yes 0.4o / If yes, describe change of use, including square footages of changed areas Will there be storage or use of flammable, combustible or hazardous materials on the premise or area of construction? No [] No If yes, explain c Q, OILY - 4 jT(dG ' _r►1/ ' L=.L• ' to, 1, I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION CORRECT AND THAT I HAVE THE PROPERTY OWNER'S AUTHORIZATION s j Applicant /Authorized Agent (signature) , ,L�; , 411 AND KNOW THE SAME TO BE TRUE AND TO DO THIS WORK. /LAIN& Date /(77/47/4( (print name) LPL_• _M)i i , ;,., MCI Imi Contact Person (please print) Sf1 Phone 52 -' 12,c OFFICE USE ONLY FEES: Building Permit Fee (000/322.100) $ 3103,00 Receipt# Date Paid Plan Check Fee (000/345.830) ,A.34,00 Receipt# -a•7 Date Paid Bldg Code Sur Charge (000/386.904) 1.50 Receipt# Date Paid Energy Sur Charge* (000/386.907) Receipt# Date Paid Other ( ) Receipt# Date Paid *New construction only TOTAL 600,50 (OWES: $ ) SQUARE FOOTAGE /BUILDING USE INFORMATION Square Footage of Entirq Buildina; FLOOR USE /Occ Type. SQ.FT. UGC LOAD USE /Occ Typ; SQ.FT. OCC LOAD. USE /Occ TYD4 SO.FT, OCC on f L SQ.FT. OCC. - TRACKING DEPT. GATE IN DATE OUi' COM BLDG ��Q O1- �(a p \� �`,` Approved for Issuance ype'o" onst. To Mahan: late Approved:11-43'$(..e FIRE u' t \ 1 j) J 1 Approved ni ti al s ,_'• Per letter dated • Ld • Fire Protection: ►t pri n l ers ■ Detectors �1 PLNG ✓ 1/ %`t \q r� \)1'''° 4 pproved (Initials) ' l.- 0E0' ■ L' 1 " c1 ONS Wing Set ac s: N S E W king stalls required for: Site Tenant Space arking stalls provided: Site Tenant Space ADDITIONAL PARKING STALLS REQUIRED: PWD Approved (Initials) Per letter /plans dated _1 + • • allpak container cyclone installation mga floor plan reflected ceiling roof framing section At cyclone column to floor duct support „ 1”43 r . posto,s r .:r:- z s:;.: I. BUILDING AUTHORITY: CITY OP TUKWILA 2. CODES: 19$2 UBC SET, TUKWILA ZONING AND WA. STATE ENERGY CODE 3. ji.TE AREA 117,315 SF 4. BUILDING AREA: EXISTING BUILDING As 46,393 SF EXISTING BUILDING 041 25,000 SF TOTAL 72,393 SF SITE COVERAGE: 72,393/117.315 NO CHANGE. 5. ZONING /LAND USE: CM 6. OCCUPANCY: 8 -2 - WAREHOUSE, OFFICE MANUFACTURING 1. CONSTRUCTION TYPE: 5K ($prinkiered) 8. SEISMIC ZONE: III 9. PARKING: EXISTING - 68 REQUIRED AND SHOW - 1 CHANGE ? . DRAWINGS ARE NOT TO BE SCALED. CONTACT ARCHITECT FOR RESOLUTION.` OF ANY CONFLICTS OR DISCREPANCY. CONTRACTOR TO VERIFY ALL FIELD, DIMENSIONS AND CONDITIONS - ANY DISCREPANCY BETWEEN PLAN AND ACTUAL CONDITION IS TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR RESOLU'ION. 2. EACH CONTRACTOR TO INSPECT EACH SHEET OF DRAWINGS INSOFAR AS IT MAY APPLY TO HIS PORTION OF THE WORK. CONTRACTORS TO COORDINATE SO NO CONFLICT OCCURS. 3. ALL PPOVISiOHS ARE TO MEET OR EXCEED APPLICABLE i'ORTIONS OF O.S.H.A., W.I.S.H.A., WASHINGTON STATE ENERGY CODE OR LOCALLY AMENDED COUNTER- PART, UBC , t.iMC , N. F. P . A. , ETC., LOCAL ZONING CODES AND LOCAL AMENDMENTS TO THESE CODES AND STANDARDS. (ALL CURRENT EDITIONS AS ADOPTED BY LOCAL AUTHORITY). 4. THE CONTRACTOR SHALL CALL THE ARCHITECT FOR FIELD OBSERVATION AS RtQUESTED BY OWNER. 5. IN THE EVENT OF FIELD ERRORS OR OMISSIONS THE CONTRACTOR SHALL NOT!FY THE ARCHITECT AND MAKE NO REPAIRS WITHOUT HIS APPROVAL. 6. CONTRACTOR TO PROVIDE ALL WORK, SERVICES, AND ,MATERIALS NE ESSAR Qt TO CONSTRUCT A COMPLETE OPERATING FACILITY. (tV Z: 040 7. THE CONTRACTOR SHALL APPLY AND SECURE ALL PERMITS EXCEPT BUILDING PERMITS. HE SHALL PAY ALL NECESSARY FEES AND POST BONDS REQUIRED. OWNER HAS FILED NOTICE OF CONSTRUCTION WITH THE PUGET SOUND AIR POLLUTION CONTROL AGFNCv. 8. FIRE SPRINKLERS TO BE BIDDER DESIGNED - SUBMIT TO BUILDING OFFICIAL AND FIRE MARSHALL PRIOR TO FABRICATION FOR APPROVAL AND TO ARCHITECT FOR REVIEW. ALL FIRE EXTINGUISHERS PER N.F.P.A. OD OW ••. ..+. wr ......r.r..r*++* w.. 1. DESIGN LOADS: Roof Seismic 40 psf total load Zone 3 2. LUMBER AND TIMBER: Hem -Fir and Douglas Fir graded in accordance with West Coast Lumber Inspection Grading Rules 016, Joists: Doug -Fir No. 2 Ft) = 1250 p.s.1. (kiln -dry) Misc. Teaming: Hem -Fir standard and better Ledgers: Pressure treated Doug -Fir No. 2 All bolt heads bearing on wood shall have heavy cut washers. Provide 2 layers of 15' building felt under columns bearing on concrete. Framing nailing in accordance with Schedule 25 -P of U.B.C. 3. MISCELLANEOUS STEEL: AVM A36 fs = 24,000 p.s.i, t7Oxx electrodes at all welds. WABO certified welders, only. DRILLED ANCHORS: Molly "Parabol t" or equal. Minimum embedment in concrete 4" in 5" subs. AO, I t,oc i P' / re ) on"e 5, MISCELLANEOUS HANGARS: Simpson, Bowmen or approved. Nail all specified holes. item to suit conditions of load and installation. CilYOFThKWtj APPROVED. DEC 1.11986 4: PIUIEU Bu L 0 tNG t ISi N crry OF "FI. P W1L,A a a C 1. 1986 8U t„ I 11+ft[s 1 . .1Y [Cesit*.4 That Portion of the Northeast Quarter of the Southeast Quarter of Section 26, Township 23 North, Range 4 East, V.O. Described at Follows: BUILDINia ,t: BUILDING B: Beginning at the Southwest Corner of tract 8, Andover -: d_ttrial Park No. 5, es tecordad 10 Volume 83 of Plats, Pages 22 and 23, records of Ding County, Washington; thence Soeth Oro 47' 28* West 22S feet; Thence South 88' 12' 32" Cast 297 feet; Thence North 01'' 47' 28" East 226 Feet to the Southeast Corner of said Tract 8; thence Wort, 880 12' 32* West 29? feet to the point of beginning. Subjeet to an easement for uttlitiOS over the West 1S feet thereof and sub ect to as easement for railroad over the East 27 feet thereof, Beginning at the Southwest corner of Lot 8 of the Plat of Andover Industrial Park No. 5, as recorder in Volume 83 of Plats, Pages 22 and 23, records of King County, Washington; thence South OIL' 47' 28' West along the Southerly extension of the West line of said Lot() a distance of 22600 feet, to the true point or beginning: thence South 880 12' 32* East a distance of 297.00 feet, Thence South 01' 47' 28* Kest, a distance of 170.00 feet; Thence North 88* 12' 32'" West, a dt St+snce of 297,O0 feet; Thence North O1° 67' 28" Cast, a di s tence of 170.00 feet to the true point of beginning. Subject to an easement for utilities over the West 1S feet thereof, and Subject to aA eastetnent for railroad over the East 27 feet thereof, and other easements, encumbrances and restrictions of reCord, nnti mul11n 1w1f11t unlIth in ult uninn unto! " nnfori C4Jy L # t !,1th fll l;tlittt fif ;iiffff4ift!1t111 • {' • .(. roof framing floor plan reflected ceiling section @ cyclone column to floor duct support