Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 5395 - Tukwila Apartments - Water Damage Repair
CITY OF TUKWILA IT- Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -- 1 F4-9 BUILDING PERMIT Work to be done T Site Address 5811 S. 15 PL. Building Use APARTMENTS Property Owner BADLEY ENTERPRISES Address 15304 57TH AVENUE S. Contractor SWEITZER & ASSOC INC. Address 11207 26TH S.W PERMIT # 3 96- Control # 88 -273 Suite # Tenant TUKWILA APARTMENTS Assessors Account # Phone # 246-3060 Zip 98188 Phone # 243 -5259 SEATTLE, WAL] /i /i Z) p 98146 pat P' 7 SEATTLE, WA #RDSWEA1125KK FOR BUILDING PERMIT ONLY Approved for Issuance By: S q • Ft. 1Office Storage/ Ware ho use Retail Other IOcc. Load 1st Fl. 2nd F1. 3rd F1. Total Fire Protection: [] Sprinklers [] Detectors Zoning Type of Construction Special Conditions Fees sq. ft. @ sq. ft. @ sq. ft. @ sq. ft. @ 1st Fl. 2nd Fl. other other Total Valuation of Construction Bldg. Permit Fee Plan Check Fee Demolition Surcharges Other Other TOTAL 45,900. Receipt # 5049 $ 389.00 Receipt # 5049 $ 253.00 Receipt # $ Receipt # 5049 $ Receipt # $ Receipt # $ 3.50 $ 645.50 FOR SIGN PERMIT ONLY ❑ Permanent ❑ Temporary ❑ Single Face ❑ Double Face ❑ Wall Mounted [] Free Standing ❑ Other Building face Setbacks: Front Side Side Rear Square Footage of each sign face Special Conditions Total square footage of sign THIS PERMIT BECOMES NULL ANU V010 IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION UR 'aORK I5 YUSPENUED OR ABANDUNCU FuR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. 1 HEREBY CERTIFY THAT l HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS ANU ORDINANCES GOVERNING THI TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DUES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE UR ANGEL THE pROy1510 ANY OTHER STATE OR LOCAL LAW REGULATING C STRUCTION OR THE PERFORMANCE OF CONSTRUCTION. L (/ s: Z�r�ti —� Oate it .1._./2q. LICENSED CONTRACTORS DECLARATION I hereby affirm that I am licensed under provisions of the Business and Professions Code. and my license is in full force and effect. Oate Contractor (signature) OWNER- BUILDER DECLARATION ) 1, as owner of the property, or my employees, with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale. ( ) 1, as owner of the property, am exclusively contracting with licensed contractor's to construct the project. Owner (signature) Date__ -- CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washingtop 98188 (206) 433 - BUILDING PERMIT Work to be done T I Site Address 5811 S. 152ND PL. Building Use APARTMENTS Property Owner BADLEY ENTERPRISES Address 15304 57TH AVENUE S. Contractor SWEITZER & ASSOC INC. #RDSWEA1125KK Address 11207 - 26TH S.W. PERMIT # Control # ,513 96-- ) 88 -273 Suite # Tenant TUKWILA APARTMENTS Assessors Account # Phone # 246 -3060 Zip 98188 Phone # 243 -5259 /5)P 98146 Fees SEATTLE, WA SEATTLE, W 1 FOR BUILDING PERMIT ONLY Approved for Issuance By: S q • Ft. Office Storage/ arehuse W o Retail Other Occ. Load 1st Fl. 2nd F. '3rd Fl. Total Fire Protection: ❑ Sprinklers ❑ Detectors Zoning Type of Construction Special Conditions Date_ sq. ft. @ sq. ft. @ sq. ft. @ sq. ft. @ 1st Fl. $ 2nd F1. $ other $ other $ Total Valuation of Construction $ Bldg. Permit Fee Plan Check Fee Demolition Surcharges Other Other TOTAL 45,900. Receipt # 5049 $ 389.00 Receipt # 5049 $ 253.00 Receipt # $ Receipt # 5049 $ 3.50 Receipt # $ Receipt # $ $ 645.50 FUR SIGN PERMIT ONLY ❑ Permanent ❑ Temporary ❑ Single Face ❑ Double Face ❑ Wall Mounted ❑ Free Standing ❑ Other Building face Setbacks: Front Side Side Rear Square Footage of each sign face Total square footage of sign Special Conditions • THIS PERMII BECuMES NULL ANU v0ID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION UP aORK 15 '.':SPENUED OR ABANDUNti FuR A PURIUD OF 180 DAYS AT ANY TIME AFTER WORK l5 COMMENCED. I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNUW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THI TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT ODES NOT PRESUME TU GIVE AUTHORITY TO VIOLATE UR , ANCEI THE %ROy1S10 ANY OTHER STATE OR LOCAL LAW REGULATING CQIjSTRUCTION OR THE c PERFORMANCE OF CONSTRUCTION. Signed L e G i.' , - c �— Date 7-1,i5. 3 l? �L .L -- LICENSED CONTRACTORS DECLARATION 1 hereby affirm that I am licensed under provisions of the Business and Professions Code, and my license is in full force and effect. Contractor (signature) Date OWNER- BUILDER DECLARATION ) I, as owner of the property, or my employees, with wages as their sole compensation, will do the work, and the structure offered for sale. ( 1 I, as owner of the property, am exclusively contracting with licensed contractor's to construct the project. Owner (signature)_____. Oat. is not intended Cr k: 3v36Yraww. u�... H. e.. se.»...., rt. uawn. vr.:... �...,. n.... �, ur, �... y.......,...._.. e.•..,...««.....-...,.......,_..,.._,....,,,..... �__•___......._..__._. �........_._.`......._....-._..._.............•.. «......., »...+.«,,..w..,�r...•. va�a:�e,at7FYw?rcsv.CiC'v7t8't� CITY OF TUKWILA Bwiiding Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 Type of Inspection Site Address Requestor Special Instructions INSPECTION RECORD X95' PERMIT # Date 7.1461 cbooi)(1.4.4Z Date Wanted a.m. p.m. c=..9V/ •,3a L 8i� S / �4dJLProject 6-detir Phone # Inspection Results /Comments: Inspector '.�4aA'����A�+:t� +'�7SZ9,�,�?e i t7Ti?[:.' �t,`• Et: i'. ikx' rcLc, .r...w...»...•.....�..,_....... CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila. Washington 98188 (206) 433 -1849 ._ ..................._._._..,._..._«..........................• rwr. r�cuwe.•f,• v.. eu.,. rnzv..wrtn4v*e.»'...S,A.1::itA'L w.tM�YA %:i?i;�_R:.Y•� "1iLn.�.:?i. INSPECTION RECORD n PERMIT # G% Date 3- g -ts7 °f Type of Inspection (, 2J1 /l t' ru 2//4' Site Address 6-CS)//— /3;2''' S/. Requestor Special Instructions Instructions , 4 / vt/i /f /'!/1/ • Date Wanted '3 Project 7e,(X . Phone # .m. Inspection Results /Comments: % 9,, i/ 9' ; dv 7-a 9 '�h AVI/T ?fidtles.' /4/ C■46774bPri/5 Inspector -� +• -�,r- Date 3 '/er Mra11:1a�,'..z';.'`. u�:%` c'' ri4i' �m, �r?: 4ftkxe:: rxa:. m., r ..pr»n.T,...,.r,.n.,...._�..,._ ,.....___... _ CITY OF TUKWILA Building Division 6200 Southcenter Boulevard 1`ukwlle, Washington 98188 (206) 433 -1849 Type of Inspection " //v✓ /�� Date Wanted 3 ^ 'J, p.m• Site Address /9J-, 5e4/ Project ,`u 4 "die/3' Requestor / 1 %/`' h// 7,2 2 &fr' Phone # Special Instructions • INSPECTION RECORD PERMIT # ,� 3 7', Date 3 — /(61� Inspection Results /Comments: ,44'/ /? ./l4g/ /�%J,h /? /97-7;14,/ 9 c, �/Sjs a../' //t 4$-P /��''/,�'1` .0 s�`I %3.i � ;'i.L.. Celo / /114. -- 0,1/22/14/ T/h y' /'N S ,-4.l.2.49 /5 /VP ? I l-'011/it,e14- € ..91/7/ _,‘" ergots /1-we() 774511----- 7h', if)he 4 /94.41 /a/91 C- 494- Ver,rA51.., dh1 =�,r- C3 .G'i 'it/.0,L ?'vv4'67 '4 ' S ; .7*' as. d - ' //,09///; j d ' i i'4' .4 Inspector a- Date 0 "109r89 CITY OF TUKWILA Building Division ,6200 Southcsntar Boulevard Tukwila, Washlnoton 98188 (206) 433 -1849 Type of Inspection /1 3 Site Address 53)/ 5 /6-0_, `Q.p Requestor INSPECTION RECORD PERMIT # "•5,305 Date /—;17-39 Date Wanted Qdaey Project Phone # a /(p -3Ob 2 a.m. .,r.. 1 /_ Special Instructions Inspection Results /Comments: 4t CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washinaton 98188 (206) 433 -1849• INSPECTION RECORD PERMIT # 4C.)91,— Date / —/, "'er?� Type of Inspection % 11-" fatArrli%645* Date Wanted /9M, a.m. p.m. Site Address .9--/p/ /- 5 /�;It Project Tien ,/,A,l.s Requestor Phone # Special Instructions Inspection Results /Comments: /(--2 ,052/ s _,__ .903 Inspector Date CITY OF TUKWILA Building Division 0200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 • INSPECTION RECORD PERMIT # 53Q5 Date / %418F Type of Inspection i'G" ind/7Q Site Address 5N5 6 /52 &z Requestor 1, 7fl i Special Instructions Date Wanted /.2//S. Project -ri.)71 a Phone # `2 2/6o -366.6 Inspection Results /Comments: ,,"'/ /;1./,__ /4/%:////r— / //-/ S /lti -/a 6 Inspector�� Date /V. 2i�,Pd7 CITY.OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila. Washington 98188 (206) 433 -1849 Type of Inspection gelOy- Site `l5- Address 5 5 )6--,21-101 Requestor GeG''Y C Special Instructions D's ready 7?6w ._........................».,..—.._..._...._._....... ...,....w..- ..a:>..x.,....,«,.« ,nww..xsaw c,.: r: ntiasa> cv [ra�esxtiefrct- :itGiU!h+shb¢YUSWti INSPECT 9N RECORD PERMIT # 5-395--d Date /P2,J21- Date Wanted ) hi-/6---75 Project t ICL'f /C, gfii1/71- f3 Phone # ?I./6 3060 r ` /vtt / Qve ki7e .m. Inspection Results /Comments: � /crv/,%/j/ //l,I/t% ad/ /7) 44/7-- /9//.S .09a*- Vo9 Inspector `~ Date /.2.—/O CITY OF TUKWILA Building 0ivision 6200 Southcenter Boulevard Tukwila, Washington. 98188 (206) 433 -1849 .... w.. «.�..�.ww,..w...,ww.ncw»+nen.xr : wN. f4` Fri:,UH1n`�essM.X.�`.,•Y.C9i; -) . INSPECTION RECORD PERMIT # ,96- Date Type of Inspection e2,0721,44i Date Wanted adaiai a.m. p.m. Site Address ,rS Project '72. 240/1/0_, Requestor i - P ( 3 Y c , Phone # c 2 1 - 1 6 - 306,0 Special Instructions Inspection Results/Comments: /'%'//pYl/ ///r- ,A3 Inspector Date /A"Af^G%P CITY''OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 Type of Inspection ,4 �) Site Address j' /5 5 J5 tae Requestor 6eAe9i Special Instructions * AIP /p /_0j INSPECTP'1N RECORD PERMIT # 53Q5 Date /D/v8 /8B Date Wanted adapt t a.nl. p.m. Project %GL- -y /Q1 t ?j2i 4) Phone # ay6 —j'pW /ham a oo C1� 2c e aGi Inspection Results /Comments: 4j( /'Ov/i:f/eL, 4, l v,ej4 /9//5 U7 /D Inspector Date /0--`,.21 -o9, CITY ,OF TUKWILA Building Division. 6;00 Southcenter Boulevard Tukwila. Washington 98188 (206) 433 -1849 .._.. �,. .......«.- �...�r_... »_..�.u, -.. _......._....._. �. «...wr.�... +.�..tr+�•v�.uumw.rf wr+ w+ iwitYrlN�fS�R2 :iM.1l'i1M1Yt!:`.{T.7.',C.i!i:' Type of Inspection 5811 .� /5-.2.)1d Site Address 'Fran? /\49 Requestor J r:P.v/,:WI., 4-01 Special Instructions INSPECTION RECORD PERMIT # '17395 Date 10- 10'Frr Ora -404o Date Wanted, -4-8? (a.m. Project 77,0460/../a.../ 0.-XL &5. Phone # J%/et.) 30bO Inspection Results /Comments: ,/ , 9Jv/ /,t/f G'i( %U Ge24/ /'Y Inspector Date / G - /1 -,519 CITY ,OF TUKWILA' Building Division 600 Southcentar Boulevard Tukwila. Washington 98188 (206) 433 -1849 ............_..,...,...... �_......:.. �.._.._.__..._... Y......_. �.._.. �,.....,...- �. ..,.,,...«,.,.�..m,...,...vean, ww. as,., artraiv: zo- ..a•+ir+it�YRn2:i'».'ff�"''`l�% INSPECTION RECORD PERMIT # Date /6; —3—W Type of Inspection ,cie7ba, Date Wanted / Site Address 6-Wit /J-2not Project At,le of ja a is Requestor /926'' FP Phone # ,216-30&0 Special Instructions •. Inspection Results /Comments: Inspector Date /9 -- t / -e-5)0 CITY .OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 INSPECTION RECORD ( 4 PERMIT # 11�,34/t5 Date Wzmr Type of Inspection Cr 241.24/)0 — Date Wanted Q/a7 /88' a.m. .s,. Site Address 58 z - Project riciezJ7'%a QtS &66Y796 — r)?9 Phone # 04 '3060 Requestor Special Instructions IL'OILIeG (LAY c %,t 600 /YL_ do. ctrl ‘e A.466. th a v.. a/.� •_ o�c Inspection Results /Comments: / : � , / & ) - /` i 9/'— ' o % �4i 5e vfi2} /?-7- , /=- 77'/, 5j r-e, ,t/,2 /fAl Inspector Date 7-A4.7 CITY 0F TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 • INSPECTt'`;N RECORD PERMIT # Cerio/Difi9 /i!// Date ? — //- c57.6") Type of Inspection /�i'��U� - Date Wanted a.m. p.m. Site Address 5'P /� / 592 4/i,' Project 2--iTlfk/42,9 ,4j$ Requestor Phone # Special Instructions Inspection Results /Comments: C0rt/ %}G%/aj' 1,J/5 f1//i .gN ,.vi �%i9 01- ,^ ,W6.-/1 S ell/ C1/44 /t/) 5 77- 71,4 6- afr-' d 5 /I-afro 7,1/5t c.[U`'S 70#4/4 !2-' f #v, we ..c 7-• glt/ / / /AiT oet.G17/ '71 v2i /i • % •O 4L S . D r i r / c - �5 / i z i % ✓ G - %lid 1, v / ? /"wV 44/a/ il/ &if %t/G.- tY ti 77'/ .1,90i zd /3e4 ,:44 /9 %i i J ' /f Inspector Date 52///90 BADLEY ENTERPRISES, INC. Commercial Property Investment & Management ROBERT (ROB) BADLEY p PRESIDENT (604) 263.1201 c" • CITY OF TUKWILA Building Division 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433-1849 3726 WEST 35th AVENUE VANCOUVER, B.C. V6N 2N7 INSPECTnN RECORD PERMIT # Cd/41 „AL Date /cZ'3c2 Type of Inspection 47'2114— W/lin/, ..., i,e/..tm_2e).---- Date Wanted cp-m.,0969 p.m. Site Address .--g/".--/#.;2', /V, Project7Z/icujf 44''S, Requestor i?e ' 4/9JIfrV Phone # ,,2.9. PG Special Instructions Inspection Results/Comments: C.,0,tilii/J1-.5 f/MiGis ,// 7yyuy//)I/4',v' T on/ ni f J4' 7' 61./ j, /.= irktooe 4/ 724-i A/11,5gde .49 / 1 Jr pa, $i/mi /7— 12/10Z /1/1/1e-7MtA)- t/ 27711-1 1/1)( uJ/L 2- 4/i /9 /211A,:iJ ;ukoo, 410 it>6.- G/19 :v/2 /412 27) 2?_ 'A4t2 7/7iii. /0 coy.wiy. i/i/1 wrk /l- d/ T 4,j J ke 1,4fr ,zm 4111/i/ 0.491,47)5Y) /a/ftiW 7-1/A /9/1,/$1, AgirmineWaula, /10ee/160 ,;4-, Inspector Date JEFFREY N. HILLSON, P.E. TRANSPORTATION • CIVIL • STRUCTURAL © ALPHA ENGINEERS, INC. 16040 CHRISTENSEN ROAD, SUITE 305 =.1. SEATTLE, WA 98188.2929 (206) 248.1412 CITY OF TUKWILA INSPECTI" N RECORD Building Division 6200 Southcenter Boulevard Tukwila. Washington 98188 PERMIT # (206) 433 -1849 Date /�� /P(F) Type of Inspection eeyA ,t// � /l' t11//3A`!' Wanted a.m. p.m. Site Address 64 /1/41,01 I'JM/1!// .S Project /qJ 7,' /M) f /V/-.- / Requestor 577/t'S• /7:14441/,? Phone # Special Instructions A/2:/am72�,, ,//r?/3,4 it? car✓ 9.i %/� 4? 4€• ry Cam n4,'4"Q / -)am 9W'4 5 -- T� 4(14,Al Inspection Resul,t /s /Comments: Date g0462 THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TIJKW I LA BUILDING PERMIT NUMBER 1. No changes will be made to plans unless approved by Engineer and Tukwila Building Department. 2. Electrical work to be inspected by State Electrical Inspectors and all required electrical permits obtained through that agency. 3. All permits to be posted at job site prior to start of any construction. 4. When Special Inspection is required either the owner, architect or engineer shall notify the Tukwila Building Department of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the building Department in a timely manner. Reports shall contain address and permit number of the project being inspected. 3. All structural concrete to be special inspected. (Sec. 306, UBC) 6. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1985 Edition), Uniform Mechanical Code (1985 Edition), Washington State Energy Code (1986 Edition), and Washington State Regulations for Barrier Free Facility (1986 Edition). City of Tukwila PLANNING DEPARTMENT 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1 849 DATE: August 4, 1988 TO: Duane Griffin FROM: Tom Jensen SUBJECT: Water Problem Complaint from Gencor Construction Steve Friedman of Gencor Construction was contacted and he advised of a water problem on the North Hills Apartment site. Site work is in progress now, and it appears that water coming from 5815 S. 152nd, an apartment building above the North Hills site is causing erosion problems. Investigation revealed that water coming from around and under 5815 S. 152nd (Tukwila Apartments) was running into a swale on their property. This swale was in disrepair causing the water to run onto the down hill building site rather than into the natural drainage to the west. As work was in progress at the Tukwila Apartments, they were also checked. The manager, George Ferguson (246 -3060) was contacted about the problem. It was suggested that the hose on the pump he had installed be extended to divert some of the water past the North Hills construction site. He was also advised to stop work on the apartments as no permit had been issued. It appeared too that floor on the east end of the building was being repaired due to rot. Reportedly, 66 - 2x12's needed to be replaced, however, the damage appears to be more extensive. There is also a ditch dug from the north side of the building around the east end, and out to the swale on the south side of the property. This building appears to be about 20 years old, three story wood - frame, built on an undersized foundation that is placed on grade. The structure appears to be settling and reportedly they have had roof drainage problems due to this settlement. The ditch that has been dug around the northeast end of the building has caused an additional problem in that it has removed the bearing soil next to the footings. This, in effect, leaves the footing with very little support, and may have to be underpinned to prevent further settling. As to the rotting problem in the floor ti Duane Griffin August 4, 1988 Page 2 joists, rim joist, and sill plates reported by the manager, additional investigation may be needed. There is a lot of mold and mildew in the crawlspace, and the lower sections of the siding are rotten. The dryrot in the floor system may also have extended upward into the walls, and this should be investigate. The general condition of the building appears poor, and in need of maintenance. NOTE: Mr. Ferguson. called, advising that an engineer would be out tomorrow to look at the problem. ATT: Photos (7) • Map 6 —nN 4051110.n 1111•1111111.., • (470 rrnr 111 3 1Y3YON - IY N(r ,im • - d, Y/ f 0 1 1 1 V I V O t o atr 1 Vote • `t Dose '5 ii A 4 4 S : ' J urn '_)..;.•t rye•._ 4�1 I" • I r.j.. �.�y.:.r • •`11 . i.�t •*W� °1 • r' _� F. _ ...3 /f'1 J.!. 1-1...,,,..- ,;,:':.; r:. *. '.i. ..;--1-1:111 1 •,;',,,..!:i.'".. /r ✓' .� i1r' . ittg•14• pia W .s W =env: alts •- • i ... , Si .1 A Windy. ti "',..iflid; 1+:. \:.\ 1 ,ai tTtfti ^, • a • r. r ,,--) ofs,'-- • • 4( '11 A . • :,;; TL N1 .C.,1 1' 1 ' f'‘ ) 1.( ! 4 T 111■11R11.••■•■•••• ENGINEERING CONSULTATION CONSTRUCTION INSPECTION MATERIAL TESTING ROOFING INSPECTION REPORT NUMBERCR N2 42526 'I PREVIOUS RPT. NO. `1 Zs.ZS PACIFIC TESTIN LABORATORIES EXECUTIVE OFFICES 3220'- 17TH AVENUE WEST • SEATTLE. WASHINGTON 98119 TELEPHONE (2061 282 -0666 • TELECOPIER 282.0710 ULTRASONIC EXAMINATION GEOLOGICAL SURVEYS SOIL TEST BORING CHEMICAL ANALYSIS COMPRESSION TEST RESULTS MAILING �hl f' btu. 1 Q8 PORTEDF k cu LO _ DATE ADDRESS N 4 n `,"C n 198 L7BY, DATE Se0.�41 f. USA . 9 6 l t 5—'`. NUMR C31 3 i k w i k SIR SOY -oo 3s- ` ARCHITECT sty wick b fc, PI i ENGINEER Eli keerS ■ • W, CONTRACTOR PROJECT LOCATION MARK _� TRUCK N0. T K • SIZE AREA (SQ. IN.) DATE CAST DATE BROKEN AGE AT TE T ULTIMATE TRENGTH p, ,I. l 6xI ' ) 7 q- 1�( -88 q )1 8 ? Jo 44 . CEU 8 (it fill IINcW[iil Ib 2 88 )-8 i4441--0-0 57 got) Y so �' L �'1 j 1fl -.c - B8 ).$ �� d o-uv II� TEMP. a WEATHER C Ie&t 7 ? mow PL l to l� e Loa CEMENT C'SE AGG. FINE AGG. PROPORTIONS J Lbs. [] Sacks/Cu. Yd. ® Lbbs. ar 0 In. M. Lbe (Not Certified by P. T. Lab) c4 (/ 1166 12 T 7) DESIGN 1� STRENGTH fc 2 v Q5, , ADMIX I� qq Per Sack 0, Per '� W 4 L=A TYPE OF CEMENT if ;SLUMP iry. AIR I) ! r %; QUANTITY 99 1D Cu. Yds. SAMPLING IN ACCOIIDANCE WITH IMX PROPORTIONS VERIFIED APPUCAMLE CODE AND SPEC ? Ye S BY SATCHING SUPERVISION? 0 POUR LOCATION 1 NOTES. I C. e. & LO vx 4-4- a C / c. Li L)r' E V+o t d O� l v1 1 d CL S coy-. Sfa'. e V) Q. �, S � o r l S. . Q P 1.) 11. 1 j e v K) (. W; e. $ a f r, !8 c Je0. /IN D L A.4"t tQ tvon A - L ' 4- P i, , h e; A Qvvk h e 1.5 4-0 k', n e. 10 . A S wcs ft.., VOCOV4Qo.Le WcFL olppovtA 5 fez .5. 'This unification attests to the accuracy of the results obtained from the actual test performed and/or observations made within the scope of the work u defined above. Certification shall (vibe construed 10 rePreeent inspection, approval or aoceplanc a of other associated work ors warranty of design or wodcabilRy oi ern specification requirements.' Certified Report by Pacific Testing Laboratories Copies to: L S r) 2 L 'c1,., � FIME VERIFIED BY. I• oc1 9 'c.:~ DATE HOURS MILE. AGE OTHER EXPENSES COST CODE ON OFF RT OT KIND AMOUNT CARP fill IINcW[iil Milk 1111111111111=- II� TOTAL HOURS TOTAL ENGINEERING CONSULTATION CONSTRUCTION INSPECTION MATERIAL TESTING ROOFING INSPECTION REPORT NUMBERCRy�N2 42525 PREVIOUS RPT. NO.0 4 ZS -A �E PACIFIC TESTIN LABORATORIES EXECUTIVE OFFICES 3220 • 17TH AVENUE WEST • SEATTLE. WASHINGTON 98119 TELEPHONE (206) 282.0666 • TELECOPIER 282.0710 ULTRASONIC EXAMINATION GEOLOGICAL SURVEYS 5011 TEST BORING CHEMICAL ANALYSIS COMPRESSION TEST RESULTS MAILING ADDRESS PROJECT LOCATION 11111 � 8�E i•RTEDk �t1Ll1+tQ►�' DATE L — (� - U 9REVIEWED BV� DATE ea'kk. le U.)A. 48115" VoJ \ \DYEj rtr_ moo OD 5, Leal ekt Pkwy, NUMMBHEA RD. v eY Dq PERMIT ' '73 NUMBERATEf,)6Q 7 _6035 NUMBER f� ( v ARCHITECT Sy/ l V t G `' T(� VL L ENGINEER Vi� n ✓i€ e r‘ . 10 t_Ak,A C n CONTRACTOR MARK • SIZE AREA (SO. IN.) DATE CAST DATE BROKEN AG AT TEST ULTIMATE TRENGTH L :, .. P.S.I. NUYI yx4 )(8 ik, ei-' 8 1- ,)1 -BB z?e -io /9© L / -1a -� M 43c-450 '.4 'p 11 i0-11-- a a 3'I so-° 2-44 7 0 TEMP. & WEATHER Clem 6S° CEMENT PROPORTIONS ❑ Lbs. ® Sadla/Cu. Vd. (Not Certified by P. T. Lab) MIXING PLANT CSE AGG. [] Lbs. ❑ kn. Max. TYPE OF CEMENT — n SLUMP PPICBE AEA$PCI S APPLICAL COOE ANO ft POUR \ LOCATIou)s ON & NOTES' e A LOrN Q \t woe k) Q vt Q a l✓ C. 64` 04 �v.. a Sf DESIGN STRENGTH 1c FINE AGG. ADMIX p Lbs I, 0 Per Sack [] Per 70/30 St:41g 1111f ` E4 fade+ / ^ (/ ins AIR ry � QUANTITY 1-5 V e e eJ laCe& V' o k* j t7 Td c)% ro /GAI. SPec_$ . IMX PROPORTIONS VERIFIED MY MATCHING SUPERVISION? tS Cu C/111 b►6c. k€.d otik- ex►S1-4,4 1 e +weep L,'I� Ins �� Di tier 1) ht tAU 4 rt n 41 C C 014 vt c e r.0 j #1*-• Cu. Yds. 'This c•nification attests to the accuracy of the results obtained kom the actual tat performed and/or observations made within the scope of the work as defined above. C•Nficalion shall not b• construed to represent Inspection, approval or acceptance of other associated work or a warranty of design a workability of the specification requirements.' Certified Report by Pacific Testing Laborat �.. saw, �' -•{ SEP2 2 .... !t iitlta(vedllrl�' BY: HOURS DATE OCR ; 9 r.. -* -. «. CO ST CODE OFF OT MILE- AGE OTHER EX KIND PENSES AMOUNT TOTAL HOURS TOTAL ENGINEERING CONSULTATION CONSTRUCTION INSPECTION MATERIAL TESTING ROOFING INSPECTION REPORT NUMRERCR N2 42524 PREVIOUS RPT. N0. ,M PACIFIC TESTIN LABORATORIES EXECUTIVE OFFICES 3220 - 17TH AVENUE WEST • SEATTLE, WASHINGTON 98119 TELEPHONE (206) 282 -0666 • TELECOPIER 282 -0710 ULTRASONIC EIIAMINATION GEOLOGICAL SURVEYS SOIL TEST BORING CHEMICAL ANALYSIS COMPRESSION TEST RESULTS MAILING ADDRESS 4 2 0 AL 6 ((t p,0,1 1p / WA, 98iIs PROJECT b LOCATION 1-7 Q D 15 > Ce Kier I IL , NNUUMBERORD. I } e ` bQ BYPORTED - /34U OA DATE -_-1 - 1 y - (/ V REVIEWED /- BY r7 b 4 t DATE Q /� /�� PERMIT NUMBER J J 1 3 Tu^ toI NUMBER A (___ -V (�V. 9- 22 ft ARCHITECT ENGINEER CONTRACTOR sy) v & h� n e -.r s 4), a)8 L. u IA d ier . 6, !4 MARK T :K€T NO. SIZE = AREA (SQ. IN.) 1 DATE CAST DATE BROKEN I ATESTT ULTIMATE $TRENGTP L S I I A 1 Y t. ‘t-r- g-14 -B$ 9- 214$ 1 s30- losp. Xar4�` L i j0-11-88 s G ?cr.-0 Vj 1-0/0 TEMP. & WEATHER CEMENT PROPORTIONS ❑ Lb. ❑ Sacksi Cu. Yd. (Not Certified by P. T. Lab) MIXING PLANT b h S i4e C'SE AGG. FINE AGG. ❑ Lbs. ❑ In. Max' ❑ Lbe Yz sack L.',mc 3 sAdveis TYPE OF CEMENT ; SLUMP SAMPUNO IN ACCORDANCE WITH APPLICABLE CODE AND SPEC T s DESIGN STRENGTH fc ADMIX ❑Par Sack ❑PN Tyre ins. AIR ! v /A %; QUANTITY As A s ea ed Cu. Yds. OMX PROPORTION= VERIFIED ye, s BY MATCHING SUPERVISION? POUR LOCATION s NOTES' p' !L L [ k 4 O � .1 c ( I 114 O b / 6 I � / / L l c- h i O C , is CX out cKls f■- 1 w'.�tOout 1 o ■t 2 ODV" O l / h "4 I kIK e s 18, 0. I Z�� i.'. �, , (,t (I '�v' k NX Q 1 p ac_c_or D s ec t R is „uas ( Ok CC 0 N IX AL in c- L L) 11- re ✓� CPIraw �� s P /P 'This certification attests to the accuracy of the results Obtained from the actual test performed and/or observations made within the scope of tla work as defined above. Cenillcalion sNaNl not be construed to represent inspection, approval or acceptance of other associated work or a warranty of design or workability of the specification requirertants.' Certified Report by Pacific Tasting ;10: SEP 2 2 L - • • DATE k/a/FS___ HOURS MILE- AGE OTHER EXPENSES COST CODE ON OFF RT OT KIND AMOUNT 1 D ‘ % 0 IQ L'.Sb':45- 6 i TOTAL HOURS TOTAL ORDINANCE COMPLIANCE - PLAN CHECK Sheet I ot___ Date: 6-30-88 PROJECT: t S <Ui L& Ate, •F DN • ' -:sza moN SSl1 l524d G The following corrections and /or clarifications are required to complete the plan review. CALL en PfLOAA EllstIAEGes -DAL, 246 -14(Z- {- K6 J R A- N )A\4 'woe c.k'' F'A RaD p9 0U 5 tckV 1- -o,o c*c. Citvk ((J U = 44- i;60V_ te e. _ ftro q. = *4 1/1 1 1 , 6iu() cdt(� \ Cur A e .o<crao Lo cad &_Av2_Dtiercorei 6$1 tioe) lsu �v Li so WA-LL = P) " 44-tC,K e9 (9 7/ ieUti 00 Z I try .t 1olh t o! ? I y �. a N 14. p 11` °' A. 3 `t 11.1 0,7 al cd Ii 0 s • oZ 1s ,�� *2�9�! • eb,.4 11 st, �Q r o 1 fly OOM 1� Sul �u 10a 00 • a co Ae 1 Z° z4 N I3, 30 o I1 a 1 c � 0 0 T 76 %. h IA a. • HF 3+ zro Q cl ° < I a? a 4 d i 1\1 4 re/ w � w V H tiI 1 U Zgo EE4 z 7 ZWU4 1 �w� Wit- I ZWc J WAN ,. ami ,z �r'IFA QU IL1 stAi •1d m 0 O z C N at O L m N b ° L O O t U L O 4- 0 N O C a •C v O L O ao c r L L r c 0 0 U D 0 r LO co a u u u 2 F- w �tl OM 01 2 0 N m t on plans or noted In knockouts. The bottom of the precast boss section may be rounded. 6' Riser Section furnished with cutouts or shall have a wall thickness of 2' minimum. Knocl, outs c O 4- 0 0 N L a, N 6 a M • • 'V.,• (0 O 4.. m 0 + E a O 3 L O o m v a 0 C L 0 Ii 0 m h 9 r 0 0 O w L p O L H N C A O m \ D .0 3 N t r N E`° a v W X O O O ¢ O 0 L 0 r v c o 0 C 0} +O 0 t", m 0/ U 0 E 2 L 0 13 C `f O a 0 In O O 0. 1/) C N O U G 0 O L m V In 0 L L V m 0 CO 1U 00 W b 0 C H L U N 0 4 CATCH BASIN TYPE I 1 m STANDARD PLAN Al TRANSPORT .0N, CIVIL & STRUCTURAL c ENGINEERING CONSULTANTS CLASS 'F' BEDDING FOR FLEXIBLE PIPE IN TRENCHES '' L MIN, Covr►&'N, Bedding Material, Type 2, Flexible Pipe (See Sec. 9-03.12(3) for Gradation. Foundation level 100 - imit of Pipe Zone L .1 A = 4' MIN. Co 0 Notes: I. Provide uniform support under barrel. 2. Work bedding under haunches. f�taM s INAtspoper- Pub/ I...! 8-1,8 I t SUBJECT _ TV‘ W M. BY A2. DATE / &big. SHEET _ • Am TRANSPORTATION, CIVIL & STRUCTURAL o ENGINEERING r.ISULTANTS • w 1 *A 344 so W 7 `N1 O V sO O �r 0. 3. vA. I 14 Z t (\ loq 5.1 4 ,%eciot U SUBJECT_ -0.1 LNIL` _ i CLIENT BY r!�'1 DATE SHEET gB *_ CK DATE 3,E) 2 n: - F- `.d d 1_ O A. '2 -t \ N o 2 id, Cie D- ° $ 6 Q it c. M 1, w fl • „.,)‘• •' :':'n�taJ:�'�:- '�?��.�.. AYE► nY. w�W :n+.iui..tl�►a'.1�:�'.: /r.rSi tO aL 3 u �L b Q ou o 1- 0 0 I°'. 7 q� W J� ' n� fi _' 1 0 4 s) 3 ce j x �[ 1c4 -ci OJ c 8 - 1 a. 3' • a i. 2 -3- 3 to %J3u al' lit la 0 2 3 0. tcb .. LL X tl 4•••• y. <17 \ ■ 2 5.. :►.,au}w.yAltmo mikhl.4.t41$ j.: :*, 0 OV 0 , • •...••• • ' • ''"•:::••1'.:•; 7 r;.••,,;:.%vi!:.+•;•4,•,$k • RETAKE 0 PREVIOUS DOCUMENT TRANSPORTATION, CIVIL & STRUCTURAL ' A ENGINEERING Q' ,ISULTANTS jr tb 4A RI ID Z,q o J. 1o° al.flL ° );IZ z aail 9 IN Z n J 0 .9 SUBJECT _' i4.Wil f _ 4P-11. a BY ? rfri DATE i/L4 _ _ SHEET tlb_ CLIENT CK DATE :• ' -4411EATia. r `` Kunkc BAK e. 41- Goo ,• Cur RorrEP Elk/0 eSk" .C1-0 0;Z. .7,6r /44+1P rizzAr A/E4e) F-oua 7bEA/414. -Soar INTO PLlire , NEv../ 2k/2 84-#e4 ry# IJELA) Ex?", ;(7dP ie477.0A) 7-Ye EX'' ./1E477# /N4 PR°4"/°4 St/ M are4krh.4 LZA74 FoR CF Tbr Emove Da frkelaa PI-Lewocio er A-S ReePoIRP-Z 7b Ft.00lt ..701.5r5 • RsPLAIC.C.- ‘,1/ NF-40) Exr, 412 40E. PLY1.400> FI7ofaZ 1"4 NE(4 g NAM 11-7rAct4 Exisr A. seccr Ar .-fm'(. e /a "; / Nro (..4) SPAcr- t--/ re) 7b TOP dp 2pc 4 Pw4 j c.Are.- Sr.) Srt.3 u •Jaek_ I )(314 4.6 )40(-311 41)-04 2 14.1/ X0L•1° ).-jz.,(Aaar,oulde ZT2.4 4-cqUe s #.1 a70%* rye.) CUR& Nora.S ALL- A. t' 7-rme3a( A4 ME/MC 1.* 4) ALA. Ccoczarr._ 414 IZE /Air- 4 &c. c; (0.0,0 pc fru, .1, 80 LT-.S .31-1 Au. C4,/uf-`012m To A-,s-r-frl fit So • • 144 ; i:" .■ • 0 CIVP/CA-. SEC.77 c>rJ mokri-k. A Pr- " • CONS:it.TANTS tt hOAD, SEATTLE. WA 98188 Ftochi, 5 poww- Q 21-00z iwr• F--bunlcArrk3,--.1 CZ. Gelii /z-=, Ata. NEW E ,t7; cYP SH6477ia Tye Xisr S.11E,177 /fro4 -ref' .•• 1 f!' Ur Z077014 0 -7z) Re RD 71-7--.:0 1(3,2.7-1 0.-1 • -7-,2:€41-- tv/ - ,o et", NJ SO ea- 1(-•41 -rer - t\Je.W axL4d a wi pv,soc.T- CJLtJC reitit> Co or) S Q TYP. Ho*. cor•ir• TYr• • (LA? '2o ) A ()4gJ 441.--0‘‘• C mer) c.. 4-1-u s - ISht C•scAA LAC-- c. CITY Of TUAWILA APPROVED AUG 0 1988 PAPat 7b To P og C.L)REL k_ qt)scr of_ sti k Acq-A° le Ex /Ai, • ' • urea:09 r:rrioipve3oFkle:FFs PcPILTLA..' • • bal:::17-it4+111 • • z I " • rr • • • • • • ' a Fc))01' 45 pot.- Q 2!--out INT-6 Es.ts..Titi 'Fe" )u (00 • Pe.EPtit...4., ti P /CAL.— .5 Et-77 c.v.' it\J 0/2714- --vrA FDR- ssii 0.4.° p oll (au A Fr . 44, ply, ...woe. et. 1 JrioNm. -•■•■■ ••••• sc.-0 ell 14 ?RA ac. g, DP/AJc7 AJ /41%10 FoR (A) orakl),,11, s FrA,A.#4 7?) / CI PEG itc..An RoAc aRitaqp-:es ( muivic.oc. Comsr W S A07—; %IAA Ark TRANSPORTATION, CIVIL & STRUCTURAL a ENGINE ...ING CONSULTANTS TUKWILA'S APARTMENTS RESIDENT MANAGERS GEORGE & KATHRYN FERGUSON 246.3060 3A ° et. 20°P1. Airs ,s moo* MAY 6E., dM irrre• TF- 2- Vu P1STAriK To wad. -- �`� llED )cIff 'iD I'- u tI 1 1,-( iA r • St- tostva a CgAWL S,Cg. -. i Ti M P. SNoR k/Gr SC(.► iME 14_02...._Ak_012 WALL. SUBJECT 7u,10& I - Phis • BY 1 DATE jI1i/&2 SHEET 2 QF_Z. CLIENT CK _ _ _ _ _ DATE hc TRANSPORTATION, CIVIL & STRUCTURAL =tc� ENGINEERI # #ONSULTANTS S To'l %/A'r'f°4+.,. 5V/ S /512-41'° SUBJECT . i L(I4 _ rt .. BY _ 44._ DATE a dd _ SHEET _ CLIENT CK _ DATE /. 1c TRANSPORTATION, CIVIL & STRUCTURAL Ci ENGINEERIN .ONSULTANTS s7Ae 0-2 0 FF511L PRPIN��r� P \?KIN CT LOT rIIBST C$ IRb07"' LAW N E N.p O T'3)(7- Fv r TT-- 10 vtA iw„ � poi l.G 1%y -.d ; l iV Alz■ c. O,S . xi 0,71 ' = 040 ifs 1,0e--Cs • D, O., t O , Zo 5 ZI Cj; T4 G3 Z -ro C* ' REo tO 424- = l 1 3 -/5 ‘5 l? n; a)O ` /.. 3 7 O 3 *91 47,094 )izd Y' 7#-4 o'? ! o, '0'07 I 4-c-Ir5 , Sc(-5 de. G$Z, -/-o 63. 3 SUBJECT - 72444-#4/2/-4% BY Ilife016.1 DATE e.'/0_' `/SHEET -/ CLIENT CK DATE b TRANSPORTATION, CIVIL & STRUCTURAL MC% ENGINEERIN •ONSULTANTS • S I; v- IS.7 0/3' Y-g- -7,T4761 11 frbit? Fgow7 e: -2, 1171;l Q,o /_g 74/44- 1 SUBJECT _ % ,L � � BY AWN_. DATE -1.-8":027 . SHEET _ CLIENT CK DATE 2 4 1• flRtJE Wr3%-e • /Mu A NIltitpr..ou6 4,Wt, TU • 1, 1' 1414-1164 r44N 3D11°" • 0+2 Gt x/sr. J; RtscEG . / `• J1/ "ki' stiff 0 $ uMeA Tiywr L I,J€. (z 1, off- - 2 %o) 2k 3 4-RN /TL/ f8i4J yg/ ' //y 51.6 /• 3 % Et.) r''PE / C,B, W STAiuDA.ZG Gr%017E.- s.f, Coef.g: . LF "" OF- P^Rk./•t1t c.vr-- NEc4) L... /Mr C r COAJ,UFC7 f.)R,a'Al To PO cP i■ CkAw` .(1401 cam_ pv c spy r= cry v�T�9 St' -'A . p1 w1 r r, .r/ 0,7 A Mfrw %WE / CA7'Cri BAs/Al sia, 4 pre 'E>Aik . SE. SECrisAl of Pkc RTY CITY Of TUKWILA Building Division 62,00 Southcenter Boulevard Tukwila, Washington 98188 .(206.)- 433 -1849 BUr PERMIT APPLICP'ION Control # XX -2 73 Site Address 5 I I S- (Sa,/.►c P I. ,N4 L qatg6Suite# Floor# Project Name /Tenant kT�k.: W ((.c A ccs , Valuation of Construction`s �� q ©O 2"— Assessors Account# Property Owner Nut,EY enjEZQ21S &S Phone a -`1 G._ 306 0 Address 1530■ 5.24k (kve.. S. Sep -kqe ,LJA Zip 93-(`3 Applicant Gior-g'e 2GLLso'1 Phone 2y6._3060 Address k. S30 (1 S ?Ak Ric. , .∎ .-CtEI Ue / it)A Zip `i $188' Architect /Engineer NI Pi, p., £r,)eji Nog e¢S — je..-cc «t(sc, r Phone .24a - 14I2 Address ( ( o °y O CL215't I s e . e4 ce -$qef LL.. Zip lE ($ $ Contractor - ti,/ 4 ' C X u e _ Li cense# 1eOS(Jt 4 // k k Phoney 6;16- --9 Address % eV- 245e.e..1, _9dfM/t- /al- Zip f �! Class of Work: ❑ New ❑ Addition ❑ Demolition II ❑ Tenant Improvement [] Remodel (residential) ❑ Reroof Interior Demolition ] Other ,40)erze Describe work to be done =(.9 ' ' FLU, , ,. ,. • r ; 'i LC) 1 /�>, �A� ( Alt a)y V`C71 r 1'7 e )z��/ ,�$c� -t.-- ,� ete, , /C /irc..71 -4902/ pvz ?L tr Type of Const. (UBC) w oohf Occ. Group (UBC) Square footage of entire building Square footage of tenant space Building Use .k +Adct,,eA :6 Will there be a change of use? ❑ Yes 0 No If yes, describe change of use, including square footages of changed areas Will there be storage or use of flammable, combustible or hazardous materials on the premise or area of construction? ❑ Yes 4 No If yes, explain I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT AND THAT I HAVE THE PROPERTY OWNER' AUTHORIZATION 0 DO THIS WORK. /f Applicant /Authorized Agent (signature) �✓, y4^ `�' vI Date /` , cam` /yge (print name)Geoar 0, FEi .6L•soto !Contact Person (please print) s-A_ry\e Phone 211 6 - 3 8 6 0 OFFICE USE ONLY • FEES: Building Permit Fee (000/322.100) $ 3 $q, 0- Receipt# 5-0‘-/ Date Paid 8 02f- Plan Check Fee (000/345.830) D5.3. di) Receipt# Date Paid Bldg Code Sur Charge (000/386.904) 3.50 Receipt# 4 Date Paid Energy Sur Charge* (000/386.907) Receipt# Date Paid Other ( ) Receipt# Date Paid *New construction only TOTAL Co `fs. ,sa (OWES: $ -e— ) SQUARE FOOTAGE /BUILDING USE INFORMATION Square Footslae of Entir Building: FLOOR USE /Occ Type SQ.FT. UCC- LOAD USE /Occ Type SQ.FT. OCC LOAD, USE /Occ TYp SO.FT. OCC 041 TOTAL SQ.FT.4 TOTAL OCC. Tant TRACKING DEPT. DATE IN DATE OUT COMMENTS BLDG 3 Approved for Issuance Type of Const. To Mahan: Date Approved: °�- O -5e FIRE Approved (Initials) Per letter dated Fire Protection: p Sprinklers ❑ Detectors PLNG Approved (Initials) ❑BAR • L'`i • 1'1 SN Zoning Setbacks: N S E W Parking stalls required for: Site Tenant Space Parking stalls provided: Site Tenant Space ADDITIONAL PARKING STALLS REQUIRED: Approved (Initials ;% ___ Per letter /plans dated (��9 d PWD c�/ sl ,,r�. Di►i,��cAs- /t' CCciP/NU— ; —yuNi9 _ / Aolvv6u55- N)7' R(i)o Fociivh f /L -)