Loading...
HomeMy WebLinkAboutTrans 2014-08-11 Item 2B - Bid Award - MACNAK Construction for Manufacturing/Industrial Center Smart Street Non-Motorized ConstructionCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director BY: David Sorensen, Project Manager DATE: August 8, 2014 SUBJECT: Tukwila Manufacturing /Industrial Center Smart Street Non - Motorized Project Project No. 91310406 Bid Award ISSUE Award the bid for construction of the Tukwila Manufacturing /Industrial Center (MIC) Smart Street Non - Motorized Project. BACKGROUND This project will design and construct bicycle facilities, a shared use path, and shared bicycle /vehicle lanes along portions of East Marginal Way South, South Boeing Access Road, and Airport Way South. The project corridor extends from SR 599 on the south end of the Tukwila city limits to the north end at Airport Way South. ANALYSIS A call for bids was advertised for the Tukwila MIC Smart Street Non - Motorized Project on July 16 and 23, 2014 and two bids were opened on August 6, 2014. The lowest apparent bidder was MACNAK Construction with a bid of $216,806.00. The engineer's estimate was $156,840.00. BUDGET AND BID SUMMARY (All amounts include sales tax) Bid Results Estimate 2014 Budget Bid Amount $ 216,806.00 $ 156,840.00 $ 500,000.00 Contingency (15 %) 32,520.90 0.00 0.00 Total $ 249,326.90 $ 156.840.00 $ 500 000.00 RECOMMENDATION Council is being asked to award the construction contract for the Tukwila MIC Smart Street Non - Motorized Project to MACNAK Construction in the amount of $216,806.00 and consider this item on the Consent Agenda at the August 18, 2014 Regular Meeting. Attachments: Vicinity Map 2014 CIP, Page 26 Bid Tabulation W:IPW Eng' \PROJECTSIA- RW & RS Projects\Tukwila MIC Smart Street Non - Motorized Project (91310406)1Design1Ad and Award1TC DocslFinal TC Docsllnfo Memo Bid Award 08- 08- 14- sb.docx 5 93 St Project Location S 102 St 5 104 St S 108 Si Rainier Golf 8. Country Club 5111 St S113 SI S 116 St S 5 124 012451 S 127 St Highline SpenaIty Center S 136 SI 51365 City o <wila TUKWILA MIC CENTER SMART STREET NON - MOTORIZED PROJECT 6 June 17, 2013 Vicinity Map CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2014 to 2019 PROJECT: Tukwila MIC Smart Street Non - Motorized Project Project No. 91310406 DESCRIPTION: Design and construct bicycle lanes /facilities on the corridor of East Marginal Way S (Tuk Intl Blvd to Boeing Access Rd) and Airport Way (BAR to NCL). Manufacturing /Industrial Center (MIC). JUSTIFICATION: Non - motorized improvements are desired throughout the City to reduce traffic congestion and offer alternative modes of travel. STATUS: New project for the 2014 - 2019 CIP. MAINT. IMPACT: Minimal impact, additional pavement markings and minor asphalt widening to maintain. COMMENT: A federal CMAQ grant has been awarded for $104,838 in design funds and $482,047 for construction. FINANCIAL Through Estimated (in $000's) 2012 2013 2014 2015 2016 2017 2018 2019 BEYOND TOTAL EXPENSES Design 58 64 122 Land (R /W) 0 Const. Mgmt. 58 58 Construction 500 500 TOTAL EXPENSES 0 58 622 0 0 0 0 0 0 680 FUND SOURCES Awarded Grant 50 537 587 Proposed Grant 0 Mitigation Actual 0 Traffic Impact Fees 0 City Oper. Revenue 0 8 85 0 0 0 0 0 0 93 TOTAL SOURCES 0 58 622 0 0 0 0 0 0 680 2014 - 2019 Capital Improvement Program 26 CITY OF TUKWILA - MIC SMART STREET NON-MOTORIZED PROJECT FINAL BID LIST SUMMARY August 6, 2014 1 2 Engineers Estimate Macnak Construction LLC Road Construction Northwest, Inc Item No. Item Description Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost 1 UNANTICIPATED CONSTRUCTION CONFLICT 1 FA $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 2 ROADWAY SURVEYING 1 LS $ 3,000.00 $ 3,000.00 $ 15,000.00 $ 15,000.00 3 RECORD DRAWINGS (MINIMUM BID $2,000) 1 LS $ 2,000.00 $ 2,000.00 $ 3,500.00 $ 3,500.00 4 SPCC PLAN 1 LS $ 2,000.00 $ 2,000.00 S 3,500.00 $ 3,500.00 5 RESOLUTION OF UTILITY CONFLICTS 1 FA $ 2,000.00 $ 2,000.00 $ 2,000.00 $ 2,000.00 6 MOBILIZATION 1 LS $ 13,900.00 $ 13,900.00 $ 30,000.00 $ 30,000.00 7 PROJECT TEMPORARY TRAFFIC CONTROL 1 LS $ 10,000.00 $ 10,000.00 $ 25,000.00 $ 25,000.00 8 FLAGGERS AND SPOTTERS 250 HR $ 45.00 $ 11,250.00 $ 100.00 $ 25,000.00 9 OFF-DUTY UNIFORMED POLICE OFFICER 12 HR $ 80.00 $ 960.00 $ 100.00 $ 1,200.00 10 CLEARING AND GRUBBING 1 LS $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 11 REMOVING ASPHALT CONC. PAVEMENT 60 SY $ 5.00 $ 300.00 $ 75.00 $ 4,500.00 12 IREMOVINGPAVEMENTMARKING 270 LF $ 4.00 $ 1,080.00 $ 10.00 $ 2,700.00 13 ROADWAY EXCAVATION INCL. HAUL 20 CY $ 35.00 $ 700.00 $ 100.00 $ 2,000.00 14 'CRUSHED SURFACING BASE COURSE 40 TON $ 35.00 $ 1,400.00 S 60.00 $ 2,400.00 15 HMA CL 1/2" PG 64-22 150 TON $ 200.00 $ 30,000.00 $ 200.00 $ 30,000.00 16 PLANING BITUMINOUS PAVEMENT 650 SY $ 8.00 $ 5,200.00 $ 10.00 $ 6,500.00 17 EROSION/WATER POLLUTION CONTROL 1 FA $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 18 ESC LEAD 30 DAY $ 50.00 $ 1,500.00 $ 150.00 $ 4,500.00 19 STORMWATER POLLUTION PREVENTION PLAN 1 LS $ 5,000.00 $ 5,000.00 $ 3,500.00 $ 3,500.00 20 RAISED PAVEMENT MARKER TYPE 1 10 HUND $ 200.00 $ 2,000.00 $ 266.00 $ 2,660.00 21 'RAISED PAVEMENT MARKER TYPE 2 3 HUND $ 500.00 $ 1,500.00 $ 500.00 $ 1,500.00 22 PERMANENT SIGNING 1 LS $ 9,300.00 $ 9,300.00 $ 5,000.00 $ 5,000.00 23 PLASTIC TRAFFIC ARROW 1 EA $ 200.00 $ 200.00 $ 500.00 $ 500.00 24 PAINTED WIDE LANE LINE 10,200 LF $ 2.00 $ 20,400.00 $ 0.73 $ 7,446.00 25 PLASTIC SHARED BICYCLE LANE SYMBOL 35 EA $ 200.00 $ 7,000.00 $ 350.00 $ 12,250.00 26 PLASTIC BICYCLE LANE SYMBOL 41 EA $ 150.00 $ 6,150.00 $ 150.00 $ 6,150.00 27 PROPERTY RESTORATION 1 FA $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 5,000.00 5,000.00 $ 5,000.00 8,000.00 $ 8,000.00 3,000.00 $ 3,000.00 2,500.00 $ 2,500.00 2,000.00 $ 2,000.00 $ 32,000.00 $ 32,000.00 $ 65,000.00 $ 65,000.00 85.00 $ 21,250.00 110.00 $ 1,320.00 $ 15,000.00 $ 15,000.00 130.00 $ 7,800.00 15.00 $ 4,050.00 135.00 $ 2,700.00 115.00 $ 4,600.00 250.00 $ 37,500.00 25.00 $ 16,250.00 5,000.00 $ 5,000.00 70.00 $ 2,100.00 2,500.00 $ 2,500.00 550.00 $ 5,500.00 650.00 $ 1,950.00 $ 21,500.00 $ 21,500.00 500.00 $ 500.00 2.00 $ 20,400.00 400.00 $ 14,000.00 250.00 $ 10,250.00 $ 5,000.00 $ 5,000.00 Certified by Scott B. Soiseth, P.E. David Evans and Associates, Inc. TOTAL BID Date PAATUKA00000010\0700BLDWIC Certified Bid Tabulation_2014-08-06 xis co $ 156,840.00 $ 216,806.00 $ 316,670.00 Page 1 of 1