Loading...
HomeMy WebLinkAboutPermit D08-190 - THE FARWEST GROUP - STORAGE RACKSTHE FARWEST GROUP 12668 INTERURBAN AV S D08 -190 Parcel No.: 2716000030 Address: 12668 INTERURBAN AV S TUKW Suite No: City Tukwila Tenant: Name: THE FARWEST GROUP Address: 12668 INTERURBAN AV S , TUKWILA WA Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Owner: Name: RREEF AMERICA REIT II CORP/ Address: PO BOX 4900 #207 , SCOTTSDALE AZ 85261 Phone: Contact Person: Name: CHAR HEATON Address: 12268 INTERURBAN AV S , TUKWILA WA 98168 Phone: 206 622 -6955 X 162 Contractor: Name: BEYERS CONSTRUCTION INC Address: 6920 HEIGHTS PL SW , SEATTLE WA 98136 Phone: 206 932 -9472 Contractor License No: BEYERCI142JC DEVELOPMENT PERMIT DESCRIPTION OF WORK: INSTALLATION OF 1/2 BAY OF RACKS /SHELVING AND BOLT TO CONCRETE FLOOR doc: IBC - 10/06 * *continued on next page ** Permit Number: D08 -190 Issue Date: 04/25/2008 Permit Expires On: 10/22/2008 Expiration Date: 03/08/2009 Value of Construction: $0.00 Fees Collected: $66.87 Type of Fire Protection: SPRINKLERS International Building Code Edition: 2006 Type of Construction: Occupancy per IBC: D08 -190 Printed: 04 -25 -2008 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Flood Control Zone: Hauling: N Start 'lime: Land Altering: Landscape Irrigation: Moving Oversize Load: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: Permit Center Authorized Signature: I hereby certify that I have read and e governing this work will be complied The grantin• •f this permit does not pres constructi•n or •erformance of work. Signatur: doc: IBC -10/06 City 60Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us N Volumes: Cut 0 c.y. Permit Number: Issue Date: Permit Expires On: Size (Inches): 0 End Time: Fill 0 c.y. Start Time: End Time: Private: Profit: N Private: Public: Non - Profit: N Public: Date: f D08 -190 04/25/2008 10/22/2008 ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. give authority to violate or cancel the provisions of any other state or local laws regulating uthorized to sign and obtain this development permi Print Name: 2,JZYA_A Cy( -r_? Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. D08 -190 Printed: 04 -25 -2008 Parcel No.: 2716000030 Address: Suite No: Tenant: THE FARWEST GROUP 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 8: ** *FIRE DEPARTMENT CONDITIONS * ** doc: Cond -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 12668 INTERURBAN AV S TUKW PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Manufacturers installation instructions shall be available on the job site at the time of inspection. D08 -190 ISSUED 04/14/2008 04/25/2008 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 10: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (2A, 20B:C) dry chemical type. Travel distance to any fire extinguisher must be 75 or less. (IFC 906.3) (NFPA 10, 3 -2.1) 11: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 12: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6) 13: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) D08 -190 Printed: 04 -25 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 14: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 4 -3, 4 -4) 15: Storage height to not exceed 12 ft. or existing sprinlder system density must be increased. 16: Storage shall be maintained 2 feet or more below the ceiling in nonsprinldered areas of buildings or a minimum of 18 inches below sprinlder head deflectors in sprinklered areas of buildings. (IFC 315.2.1) 17: Nominal 6" transverse flue spaces between loads and at rack uprights shall be maintained in single row, double row, and multiple row racks. Random variations in the width of flue spaces or in their vertical alignment shall be permitted. (NFPA 13- 12.3.1.13) 18: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate flooring, cutting tables, shelves and overhead doors. (NFPA 13- 8.6.5.3.3) 19: All new sprinlder systems and all modifications to existing sprinlder systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk Insurers Kemper or any other representative designated and /or recognized by the City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #2050) 20: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 21: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 22: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond - 10/06 * *continued on next page ** D08 -190 Printed: 04 -25 -2008 Signa • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Print Name: 2bN1dv� L.A/ doc: Cond -10/06 D08 -190 Date: • ordinances governing or local laws regulating Printed: 04 -25 -2008 SITE LOCATION d�j- , / p �,✓l ,1 King Co Assessor's Tax No.: Site Address: /246 D /% / atez," fN diehi s. Suite Number: Floor: Tenant Name: 7fi O � /� Property Owners Na//me: r /e.„4- Mailing Address: /C�7eQD � e / dy to be issued CONTACT PERSON - w da w con your permit is r Name: c!, Mailing Address: 2-6 6 ,L ‘)76-'re./..46. E -Mail Address: (J /?e a / & /2,/i1 � /� Company Name: � L- � -�' Mailing Address: 6 .2e) ll' Contact Person: E -Mail Address: CITY OF TUKWIL, Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Q:\Applications\Forms- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh Plumbing /Gas P Public Works Permit No. Project No. Building Pert,_ Mechanical Permit No. ertnit No. (For 207 11,0 Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** A'f'1 New Tenant: El .... Yes g.No 1 GD 2, ' ./f 1/14w 7 z1/14— 441/:° 7 " / 4 I 61 'S AL tate 9 Day Telephone: ..2.6‘ - Zug-2— - vG f G-,1 City State Zip Fax Number: b —,.7 GENERAL, CONTRACTOR INFORMATION - (Contractor Information for.Mechanical (pg 4) for Plumbing and Gas Piping (pg Contact Person: „e1- E -Mail Address: Contractor Registration Number: ,5 i //9 / t/G City State Zip Day Telephone: l/ll/ 70 Fax Number: Expiration Date: ..„-vfJg�, 1 plans us t be,wet stampe ARCHITECT OF RI by ;Arclty Company Name: Mailing Address: City Day Telephone: Fax Number: State Zip mped by Enginiee Company Name:/„ ‘-.57,-ee -72V/e 4G- G � I /.e( .- 6/0- /..4/G.— o/' Mailing Address: `� �� sC, 6t7 ,�'�U'/- j � -- ��C 7 /City Day Telephone: 7/V j� " 739 0 / State Zip Contact Person: , e' f . t v-A,9"/�/ E -Mail Address:. i / # ,�'fi r�'1 G , 4e,7 , / Fax Number: 7/7 t� — 2769 Page 1 of 6 BUILDING PERMIT INFORMATION - 206 -431 -3670 Valuation of Project (contractor's bid price): $ 4 Scope of Work (please provide detailed information): 6'or` arm( Will there be new rack storage? ❑.... Yes Number of Parking Stalls Provided: Standard: Q.\P.pplications\Forms- Applications On Linei3 -2006 -Permit Application.doc Revised: 9 -2006 bh O�- Compact: FIRE PROTECTION/HAZARDOUS MATERIALS: 4 . Sprinklers ❑ Automatic Fire Alarm ❑ None Existing Building Valuation: $ ❑ .. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Squat e Footage Below 3 ro Floor Floors thra Basemen Access() Atta Detached G age Detached Card Cove Do Unco ec . nterior Remodel Addition to Existing Structure Type of traction per IBC Type of Occupancy per IBC PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: 0 Handicap: Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If `yes', attach list of materials and storage locations on a separate 8 - 1/2 "x 11 "paper including quantities and Material Safe ata Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Page 2 of 6 Date Application Accepted: 1/1 � �A 1 Date Application Expires: ' toti � { Staff Initials: A.6.---„1 PERMIT APPLICATION.NO - Applicable to all permits in:thi's Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDIN ER OR AU HORIZ : GENT: Date: e: Print Name: X6,(4 4/ ea./if/440 Day Telephone: 0 ( Mailing Address: /26423 /A/TF,/10fA.10:„AtA/ 72 /C--r‘se City State Zip Signature: Q:WpplicationsWortns- Applications On Linel3 -2006 - Permit Application.doc Revised: 9 -2006 bh e Page 6 of 6 Fixture Type: Qty Fixture Type: • Fixture Type: Qty Fixture Type: Qty Bathtub or combination bath /shower Drinking fountain or water cooler (per head) Wash fountain Gas piping outlets Bidet Food -waste grinder, commercial Receptor, indirect waste Clothes washer, domestic Floor drain . inks Dental unit, cuspidor Shower, single h . trap 1 - nals Dishwasher, domestic, with independent drain Lavatory W. r Closet Building sewer or trailer park sewer Rain wate .ystem — per drain (i de building) Water - ater and /or vent Additional medical gas inlets /outlets — six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Repai r alteration of water pip' : and /or water treating e• 4 ipment Repair or a ration of drainage o vent piping Medical gas piping system serving one to five inlets /outlets for specific gas PLUMBING AND GAS PIPNNt ERMIT INFORMATION - 206 - 43'"x'70 PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: Contact Person: E -Mail Address: Contractor Registration Number: work (contractor's bid price): $ work (contractor's bid price): $ ide detailed information): Valuation of Plumb Valuation of Gas Pipin Scope of Work (please pr Building Use (per Intl Building Code): Occupancy (per Int'1 Building Code): Utility Purveyor: Water: Indicate type of plumbing fixtures and /or gas piping o . ets being i • .tailed and the quantity below: Q:\Applications'Forms- Applications On Line \3-2006 - Permit Application.doc Revised: 9 -2006 bh Sewer: City State Zip Day Telephone: Fax Number: Expiration Date: Page 5 of 6 Parcel No.: 2716000030 Permit Number: D08 -190 Address: 12668 INTERURBAN AV S TUKW Status: PENDING Suite No: Applied Date: 04/14/2008 Applicant: THE FARWEST GROUP Issue Date: Receipt No.: Initials: User ID: R08 -01165 JEM 1165 Payee: THE FARWEST GROUP, INC. TRANSACTION LIST: Type Method Descriptio Amount Payment Check 84910 66.87 ACCOUNT ITEM LIST: Description BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE City � f Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Account Code Current Pmts 000/322.100 000/345.830 000/386.904 RECEIPT 37.80 24.57 4.50 Total: $66.87 • Payment Amount: $66.87 Payment Date: 04/14/2008 11:17 AM Balance: $0.00 4104/14 ?7.u. TOTAL 66.87 rdnr.: Rannint -(1R Printerl• (14- 14- 9(1t1R P_ro'ect: rye �"-w@s1" 6 J�p Type of I spec on: 6U !K Address: 1 ?..1„(. g. t cfj r b AA Ai L Date Called: JI,jfti Special Instructions: I, 1 `' � �� / /! pate Wanted: a.m. - 0Y Requester: Phone No: 7,)6 - (a 7, 2. - LgSS INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Lo' - 1 PERMIT NO. 1- (206)431 -3670 v Approved per applicable codes. Corrections required prior to approval. T COMMENTS: r _I Mart" c o t ) . - - f 1 r..T . 0 1 0 L L ', L:ti Inspect 0j , Dater ❑ $58.00 REINSPECTION FEE REQUIRED. Prior to inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: Project: "7I E I WL 51 66iii P Typ of Inspection: ' 9 /WPM- 114 Address: 126 40 Suite #: _...f A. 5 , ,/ Intact Person: 1 �4 wutll r /..) N A-14p Special Instructions: Pre -Fire: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: . p Monitor: Pre -Fire: Permits: Occupancy Type: • INSPECTION NUMBER INSPECTION RECORD Retain a..copy with permit CITY OF TUKWILA FIRE DEPARTMENT PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206- 575 -4407 - Approved per applicable codes. n Corrections required prior to approval. COMMENTS: ..t... - t•a1. -r • ., ..Ra�.y. a. y .. .rr ..y... ..l v.■ A...J. drl3 -:4%., w.0 % 5 , � Inspector: Q_, J s h it Firs:: 1 • $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from City of Tukwila Finance Department. Call to schedule a reinspection. • Word /Inspection .Record Form:Doc 1/13/06 T.F.D. Form :F.P. 113 b' • THE FARWEST GROUP, INC. SITE ADDRESS: 12668 Interurban Ave. S TENANT NAME: The Farwest Group DATE: April 14, 2008 APPLICANT: Donovan Conrad / 206 - 622 -6955 A Business Printing Promotional Agency CO P P is mit Non .. . RACK INFORMATION SU PPLEfi E r. 3w i 1. Load application and rack configuration drawings attach 2. Attached plan detail of the rack locations, dimensions and specifications. Attached plan detail of the building/ceiling configuration. 3. Stamped engineering calculations attached. 4. Vertical members of storage racks are designed so that failure of one vertical member will not cause collapse of more than the bay or bays directly supported by that member. 5. Commodities stored: Cotton & polyester shirts, promotional items such as coffee mugs, pens, etc. Most items are bulk stacked or stored in cardboard boxes. 6. Sprinkler System Information: .39 GPM / 5600 square feet. Sprinkler head temperature: 165 degrees. 7. Smoke and heat vents: Not required. 8. Building egress and exits indicated on attached drawings. Seattle - Corporate Headquarters 12668 Interurban Avenue South Seattle, WA 98168 -3318 (206) 622 -6955 • (800) 776 -6955 Fax: (206) 622 -5587 E -mail: salesinfo @farwestgroup.net REVIEW F AN CODE COMPLI p,PR 2 y, 20 C t BUILDINCO REC EIV CITY OF TU E LA APR 14 2008 PERMIT CENTER RACK LAYOUT i . :.. FARVVEST GROUP • TUKWILA, WA 1 -ow Mb. . MTN wow. 12668 - Farwest Group GATEWAY CORPORATE CENTER 6,250 SO. FT. FARWEST GROUP 12668 INTERURBAN AVE. SOUTH TUKWILA, WA 98168 r t d n 717 Sir : . '.P. '� t• _',�iC.•�•'•�e� ` ��.5'•^�°,t's:i °`; t. ‘�, Project Nome : FARWEST GROUP Project Number : H- 040308 -5 Dote : 04/04/08 Street Address : 12008 INTERURBAN AVE. City /State : TUKWILA, WA 98108 Scope of Work : STORAGE RACKS RECEIVED CITY OF TUKWILA APR 14 2008 PERMIT CENTER FILE COP i% oncepts ngineering 1200 N. Jefferson St., Suite F Anaheim, GA 92807 Tel: 714.032.7330 Fax: 714.632.7763 e -mail: mall @sceinc.net - REVIEWED - FOR CODE COMPLIANCE PPROVED APR 2 `? 2008 EXPIFES 10/25/0 APR 0 4 2008 PA tip S tructural C oncepts E ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: S.P. TABLE OF CONTENTS Project: FARWEST GROUP Project #: H-040308 -5 Title Page 1 Table of Contents 2 Design Data and Definition of Components 3 Critical Configuration 4 Seismic Loads 5 to 6 Column 7 Beam and Connector 8 to 9 Bracing 10 Anchors 11 Base Plate 12 Slab on Grade 13 FARWEST GRP t Page Or< of l3 4/4/2005 S tructural C oncepts E ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.6327763 Design Data By: S.P. 1) The analyses conforms to the requirements of the 2006 IBC and the 2004 Rack Manufacturers Institute Sepedfications for Steel Storage Racks (RMI) MH16.1 -2004 and the ASCE 7 -05, section 15.5.3 2) Transverse braced frame steed conforms to ASTM A570, Gr.55, with minimum strength, Fy =55 ksi Longitudinal frame beam and connector steel conforms to ASTM A570, Gr.55, with minimum yield, Fy =55 ksi All other steel conforms to ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksi 3) Anchor bolts shall be provided by installer per ICBO reference on plans and calculations herein. Installer must provide any special inspection as called out on plans or calculations, or as required by the 10 30 report indicated herein. 4) M welds shall conform to AWS procedures, utilizing E70xic electrodes or similar. All such welds shall be performed in shop, with no field welding allowed other than those supervised by a licensed deputy inspector. 5) The reinforced slab is 5° thick with minimum 2000 psi compressive strength. Soil bearing capacity is 1000 psf. Definition of Components Frame Height Product Beam Beam Length FARWEST GRP H- 040308 -5 A Front View: Down Aisle (Longitudinal) Frame Project: FARWEST GROUP Project #: H-040308 -5 Beam Spacing Column Beam to Column Connector 1 Base Plate and Anchors Page ",3 of Panel Height Depth Section A: Cross Aisle (Transverse ) frame Horizontal Brace Diagonal Brace The components herein are designed within the guidelines of the 2006 IBC and the 2004 Rack Manufacturers Institute Specifications for.Sbotage Racks. :The final design of the system is valid only with proper approval from the jurisdictional building official. 4/4/2008 Component Description STRESS Column Fy =55Ksi INTLK LU21 /3x1- 5/8x14ga P =4150 Ib, M =6136 in-Ib 0.83-0K Column Backer None None None N/A Beam Fy =55Ksi Lvl 1: Intlk 40E 4Hx2.75Wx0.063'Thk Lu =94 in Capacity: 4439 Ib /pr 0.45 -OK Beam Connector Fy =55Ksi Lvl 1: 3 PIN OK I Mconn =7218 in-Ib Mcap =16922 in -Ib 0.43 -OK Brace - Horizontal Fy =55Ksi Intlk 1- 1/2x1- 1/4x16ga 0.23 -OK Brace - Diagonal Fy =55Ksi Intlk 1- 1/2x1- 1 /4x16ga 0.64-0K Base Plate Fy =36Ksi 3x3x1/8 ( Fixity= 0 in-Ib 0.13 -OK Anchor 1 per Base 0.5" x 3.25" Embed HILTI KWIKBOLT 17 ICC ESR 1917, SPECIAL INSPEC. REQD, (T =421 Ib) 0.06 -OK Slab 5" thk x 2000 psi slab. 1000 psf Soil Bearing Pressure 0.6-OK IBC 2006 Seismic Criteria * Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Ss= 1.453, Fa =1 4 42 in 144 in 3 94 in S tructural C oncepts E ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: S.P. Project: FARWEST GROUP Project #: H-040308 -5 Configuration & Summary: TYPE A SELECTIVE RACK 1 Load Per Story Force Story Force Column Column Conn. Beam Level (PL) Beam Spcg Brace Transv Longit. Axial Moment Moment Connector 1 2,000 Ib 18.0 in 52.0 in 108 Ib 61 Ib 4,150 Ib 6,136 "# 7,218 "# 3 PIN OK I 2 2,000 Ib 24.0 in 52.0 in 252 Ib 141 Ib 3,113 Ib 4,238 °# 5,846 "# 3 PIN OK 3 2,000 Ib 24.0 in 26.0 in 397 Ib 222 Ib 2,075 Ib 3,391 "# 5,270 "# 3 PIN OK 4 2,000 Ib 36.0 in 613 Ib 343 Ib 1,038 Ib 3,088 "# 3,575 "# 3 PIN OK Level Notes FARWEST GRP H 040308 - 5 36" 24" 44 24" 18" 94" Total: 1,370 Ib 26" 52" 52" 144 767 Ib Page ht of 1) 42" 4/4/2008 S tructural C oncepts E ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: S.P. Project: • FARWEST GROUP Project #: H-040308 -5 Seismic Forces Configuration: TYPE A SELECTIVE RACK Lateral analysis is performed with regard to the IBC 2006 Sec. 2208.1 and the 2004 RMI Sec 2.7.3. & ASCE 7 -05 sec 15.5.3 Transverse (Cross Aisle) Seismic Load Level 1 2 3 4 FARWEST GRP H 040308 - 5 DL per Lvl= 75 Ib V= Cs *Ip *(LL*0.67 +1.0 *DL) Cs * Ip= 0.2420 Ws= (0.67 * PLRF * PL) + DL V,,,,= 0.015 = 5,660 Ib Eff Base Shear= 0.2420 Cs= 2.5*Ca/R> =0.14* 2/3 *Ss* Fa = 0.2420 PL (Product Load) PL*0.67*PLrf DL 2,000 lb 2,000 Ib 2,000 Ib 2,000 Ib Longitudinal (Downaisle) Seismic Load 1,340 lb 1,340 Ib 1,340 lb 1,340 Ib 5,360 Ib Ws= (0.67 * PL, *PL) + DL = 5,660 Ib Cs * Ip= 1.2*Cvf(R*TA0.66) >= Vmin2 = 0.1356 V,,,, 0.015 Level PL (Product Load) 1 2,000 Ib 2 2,000 Ib 3 2,000 Ib 4 2,000 Ib V�,2= PL*0.67 1,340 Ib 1,340 Ib 1,340 Ib 1,340 Ib 5,360 Ib Vtransv= 0.242 * (300 Ib + 5360 Ib) 75 lb 75 Ib 75 Ib 75 Ib 300 Ib W=5660 Ib 322,620 Eff Base Shear= 0.1356 Vlong= 0.1356 * (300 Ib + 5360 Ib) = 767 lb ASD Loading 0.14'2/3*Sefa= 0.1356 DL 75 Ib 75 Ib 75 Ib 75 Ib 3001b W= 56601b Page 1 of hi 18 in 42 in 66 in 102 in hi 18 in 42 in 66 in 102 in t (RMI Sec 2.5.1.2) = 1,370 lb ASD Loading wi *hi 25,470 59,430 93,390 144,330 wi *hi 25,470 59,430 93,390 144,330 322,620 Ss= 1.453 S1= 0.499 Fa= 1.000 Fv= 1.501 Ca= 0.4 *2/3 *Ss *Fa= 0.3875 (Transverse) R= Ip= 1.0 PL 1.0 Fi 108.21b 252.4 Ib 396.6 Ib 612.9 Ib T= 1.00 sec PL 1.0 (Longitudinal ) R= o. Cv= 2/3 *S1 *Fv= 0.4993 R 60.6 Ib 141.3 Ib 222.0 Ib 343.1 lb 767 Ib R *hi 1,948 -# 10,601 -# 26,176 -# 62,516 -# 1,370 Ib 1= 101,240 4/4/2008 S tructural C oncepts E ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: S.P. Project: FARWEST GROUP Project #: H -040308 -5 f ownaisle Seismic Loads Determine the story moments by applying portal analysis. The base plate is assumed to provide no fixity. Typical frame made Tributary area °f b"° co Seismic Story Forces drank fr me Vlong= 767 Ib Vcol= Vlong /2= 384 Ib F1= 61 Ib F2= 141 Ib F3= 222 Ib Seismic Story Moments Mbase -max= 0 in-Ib < = == Default capacity Mbase -v= (Vcol *hleff) /2 = 3,068 in-Ib < = == Moment going to base Mbase -eff= Minimum of Mbase -max and Mbase -v = 0 in -lb LEVEL 1 2 3 4 M 1 -1= [Vool * hleff]-Mbase-eff = (384 Ib * 16 in)-0 in-lb = 6,136 in-Ib Mseis= (Mupper +Mlower) /2 = 5,187 in-lb hi 18 in 24 in 24 in 36 in Mconn- allow(3 Pin)= 16,922 in-lb FARWEST GRP H 040308 - 5 Configuration: TYPE A SELECTIVE RACK \ \ \1. 4 Axial Load 4,150 Ib 3,1131b 2,075 Ib 1,038 lb Column Moment 6,136 in-Ib 4,238 in-lb 3,391 in -Ib 3,088 in -Ib mns Front View M 2 -2= [Vcol- (F1) /2] * h2 = [384 Ib - 70.7 IbJ *24 in/2 = 4,238 in-lb Mseis(1 -1)= (6136 in-lb + 4238 in -Ib) /2 Mseis(2 -2)= (4238 in-Ib + 3391 in-lb)/2 = 3,815 in -Ib Conceptual System ti Side view Mseismic Mend-fixity Moan 5,187 in-lb 2,031 in-lb 7,218 in-Ib 3,815 in-lb 2,031 in -Ib 5,846 in-Ib 3,239 in-lb 2,031 in -Ib 5,270 in-lb 1,544 in-lb 2,031 in -Ib 3,575 in -Ib Top View Typical Frame made oftwo columns Beam to Column Elevation Summary of Forces Beam Connector 3 PIN OK 3 PIN OK 3 PIN OK 3 PIN OK Page t , of 1 3 4/4/2008 S tructural C oncepts E ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: S.P. Project: FARWEST GROUP Project #: H-040308-5 Column Configuration: TYPE A SELECTIVE RACK Conforms to the requirements of Chapter C5 of the 1996 AISI Cold Formed Steel Design Manual for combined bending and axial Toads. Section Properties Loads Section: IMTLK LU21 /3x1- 5/8x14ga Aeff = 0.437 inA2 Ix = 0.689 inA4 Sx = 0.459 inA3 rx = 1.255 in S2f= 1.67 E= 29,500 Id Axial =P= 4,150 Ib Axial Analysis KxLx/rx = 1.7*18 "/1.255" KyLy /ry = 1 *5270.621" = 24.4 = 83.7 Bending Analysis Combined Stresses Fe= nA2E/(KLJr)maxA2 Fy /2= 27.5 ksi = 41.5ksi Pn= Aeff*Fn = 16,0731b P /Pa= 0.50 > 0.15 Check: P /Pa + (Cmx *Mx) /(Max *Inc) _< 1.33 P /Pao + Mx/Max <_ 1.33 Pno= Ae *Fy = 0.437 inA2 *55000 psi = 24,030 Ib Max= My /S2f = 25245 in -Ib /1.67 = 15,117 in-lb px= { 1/[ 1- (S2c *P /Pcr)] }A -1 = {1 /[1- (1.92 *4150 Ib/18197 Ib)] }A-1 = 0.56 FARWEST GRP h 040308 - 5 Iy = 0.169 inA4 Sy = 0.205 inA3 ry = 0.621 in Fy= 55 ksi Crux= 0.85 Moment =Mx= 6,136 in -Ib (Column stresses @ Level 1)) Sk= 1.92 Pao= Pno(Oc = 240301b/1.92 = 12,515 Ib (4150 Ib/8371 Ib) + (0.85 *6136 in-lb) /(15117 in- Ib*0.56) = 1.11 (4150 Ib/12515 Ib) + (6136 in-lb /15117 in -lb) = 0.74 Kx = 1.7 Lx = 18.0 in Ky = 1.0 Ly = 52.0 in Cb= 1.0 Pa= Pn /Sk = 16073 Ib/1.92 = 8,371 Ib Pcr= nA2EI /(KL)maxA2 = nA2 *29500000 psi /(1 *52 in)A2 = 18,1971b < 1.33, OK <1.33,OK I , 0 3.000 in a+ Fe > Fy /2 Fn= Fy(1-Fy /4Fe) = 55 ksi *[1 -55 ksi /(4 *41.5 ksi)] = 36.8 ksi Myield =My= Sx *Fy = 0.459 inA3 * 55000 psi = 25,245 in -Ib (EQ C5 -1) (EQ C5 -2) 0.075 in 1.625 in Page 7 of (3 4/4/2008 S tructural C oncepts E ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92607 Tel: 714.632.7330 Fax; 714.632.7763 Beam By: S.P. Project: FARWEST GROUP Project #: H-040308 -5 The beam to column connection is assumed to provide partial end fixity for the beam frame. The end moment calculated herein is added to the lateral force force portal moment when analyzing the connection capacity. Section Properties Loads Bending Deflection Beam Member= Intik 40E 4Hx2.75Wx0.0637lik Beam at Level= 1 Beam Type = Formed Ix= 1.634 in ^4 Sx= 0.767 in ^3 Length =L= 94.0 in Lu= 94.0 in End Fixity= 25 % 0 = 0.25 Fb= 0.6 * Fy = 33,000 psi Fb-eff= 33,000 psi Live Load /Pair = 2,000 Ib Mcenter= 0.104 * wLA2 = 10,1571n 4b M= 10,157 in -lb fb= (M /Sx) /a = 15,135 psi Bending Capcity= 4,439 Ib /pair Defl- allow= 1/180 = 0.522 in Deflection Capacity= 5,485 Ib /Pair FARWEST GRP h 040308 - 5 Configuration: TYPE A SELECTIVE RACK Mcenter= B *(wL^2/8) = 0.832 *(wL ^2 /8) Mends= 0 *Mmax(fixed ends) = (wL ^2/12) *0.25 = 0.0208 *wL ^2 DL= oft Thickness= 0.063 in Beam Shape= Step Impact Factor (a)= (1 25 %/2)= 0.875 < = == Critical Fy= 55,000 psi Dead Load /Pair= (5 Ib /ft) * 2 * 94 in /12 = 781b Mends= 0.0208 *wL ^2 = 2,031 in-lb Allowable load per beam pair= 4,439 Ib fb /Fb= 15135 psi /33000 psi 0.46 <= 1.0, OK r 4.000 in 2.750 In 1750,n Coeff B= 0.104/0.125 = 0.832 Mcenter= Mcenter(simple ends) - 0 *Mcenter(fixed ends) = wL ^2/8 - (0.25 * wL ^2/12) = wLA2/8 - wL ^2/48 = 0.104* wLA2 Dist Load =w= 11.1 Ib /in Defl= B * [5wL ^4/(384 *E *Ix)] = [5 *11.1 Ib /in *(94 in) ^4/(384 *29.5x10A6 psi * 1.634 inA4)]*0.832 = 0.195 in <= 0.522 in, OK Page 5 of II 4/4/2008 S t e urol e• s By: S.P. 3 Pin Beam to Column Connection ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 Mconn max= 7,218 in-Ib Load at level 1 Shear Capacity of Pin PIN DIAM= 0.44 in Fy= 55,000 psi Bearing Capacity of Pin Ashear= (0.438 in) ^2 * Pi /4 = 0.1507 inA2 Pshear= 0.4 * Fy * Ashear = 0.4 * 55000 psi * 0.1507in ^2 = 3,315 lb Per the199b AI51(.old Formed Steel Manual, Sec E3.3: trol= 0.08 in Omega= 2.22 Pbearing= alpha * Fu * diam * tool /Omega = 2.22 * 65000 PSI * 0.438 IN * 0.075 IN/2.22 = 2,1351b < 3315 Ib Moment Capacity of Bracket Edge Distance =E= 1.00 in C= P1 +P2 +P3 tdip= 0.18 in = P1 +P1 *(2.574.5 ") +P1 *(0.574.5') = 1.667 * P1 Mcap= Sdip * Fbending = 0.127IN ^3 *0.66 *Fy = 4,610 in -1b Project: FARWEST GROUP Connector Type= 3 Pin TYPE A SELECTIVE RACK Fu= 65,000 psi alpha = 2.22 Pin Spacing= 2.0 in Fy= 55,000 psi Pclip= Mcap /(1.667 * d) = 4610.1 in-lb/(1.667 * 0.5 in) Thus, P1= 2,135 Ib = 5,531 Ib Moon- allow= [ P1* 4. 5"+ P1*( 2. 574.5 ") *2.5 " +P1 *(0.5 74.5 ") *0.5 "] *1.33 = 2135 LB *[4.5" +(2.574.5 ") *23"+ (0.5 "/4.5 ") *0.5 "] *1.33 = 16,922 in-Ib > Mconn max, OK FARWEST GRP H- 040308 -5 1/2 12" Sdip= 0.127 in ^3 SINCE C *d= Mcap = 1.667 AND d= E/2 = 0.50 in Project #: H- 040308 -5 Page of 4/4/2008 S tructural C oncepts . En 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 Transverse Brace Section Properties By: S.P. Project: FARWEST GROUP Diagonal Member= Intik 1- 1/2x1- 1 /4x16ga Area= 0.260 in ^2 r min= 0.460 in Fy= 55,000 psi K= 1.0 S2c= 1.92 Frame Dimensions Diagonal Member V= Vtransv= 1,3701b Horizontal brace Bottom Panel Height =H= 52.0 in Frame Depth =D= 44.0 in Column Width =B= 1.6 in Ldiag= [(D- B *2) ^2 + (1-1-6°)A21^1/2 = 61.5 in Pmax= V*(Ldiag/D) = 1,915 Ib Pn= AREA *Fn = 0.26 in ^2 * 16288 psi = 4,235 Ib Pallow= Pn /S2 = 4235 Ib /1.92 = 2,2061b fa /Fa= Pmax =V= 1,370 Ib (Id /r)= (k * Lhoriz) /r min = (1x 44 in) /0.46in = 95.7 in SINCE Fe >Fy /2, Fn= Fy *(1- fy /4fe) = 31,211 psi fa /Fa= 0.87 <= 1.33 OK 0.32 <= 133 OK Configuration: TYPE A SELECTIVE RACK 1.0_1.500 in 1 025 in 1 1.250 in Horizontal Member= Intik 1 -1 /2x1- 1/4x16ga Area= 0.260 in ^2 r min= 0.460 in Fy= 55,000 psi K= 1.0 Clear Depth= D-B *2= 40.8 in X Brace= NO SINCE Fe <Fy /2, Fn= Fe = 16,288 psi Fe= pi ^2 *E/(kl /r) ^2 Fy /2= 27,500 psi = 31,790 psi Pn= AREA *Fn = 0.26in ^2 *31211 psi = 8,115 Ib (14 /r)= (k* Ldiag)/r min = (1 x 61.5 in /0.46 in ) = 133.7 in Fe= pi ^2 *E/(Id /r) ^2 = 16,288 psi Check End Weld Lweld= 2.5 in Fu= 65 ksi tmin= 0.060 in Weld Capacity= 0.75 * tmin * L * Fu * 1.33/2.5 = 3,900 Ib OK Pallow= Pn /S2c = 8115 1b /1.92 = 4,226 Ib Project #: H -040308.5 1 ,3-1.500 in _.ol -$' !o- 0.25 in 1250 in FARWEST GRP h- 040308 -5 Page b of 1 ?) 4/4/2008 S tructural • Concepts jniP■ En 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: S.P. Project: FARWEST GROUP Project #: H -040308 -5 Anchors Configuration: TYPE A SELECTIVE RACK Loads Fully Loaded rack Vtrans= 1,370 Ib Movt= I(R *hi) *1.15 = 1012401n -Ib * 1.15 = 116,426 in-Ib Top Level Loaded Only Anchor Critical Level= 4 Top Level Loaded: FARWEST GRP h 040308 - 5 Vbans =V= 1,370 Ib DL/Frame= 300 Ib PL/Frame= 8,000 Ib Wst= (0.9 *DL +PL)total= 8,270 Ib LL @ TOP= 2,000 lb DL/Lvl= 75 Ib DL*0.90= 68 lb Lateral Ovt Forces= E(A *hi)= 101,240 in -Ib Vtop= Cs * Ip * Ws >= 350 Ib = 0.242 * (300 Ib + 2000 Ib) = 5571b Mst= (PL @ top + 0.9 *DL- total) *D /2 = (2000 Ib + 300 Ib *0.9) * 42 in /2 = 47,670 in -Ib Tcap *Phi= 2,897 Ib Vcap *Phi= 3,776 Ib Mst= Wst * D/2 = 8270 Ib * 42 in/2 = 173,670 in-Ib Check (1) 0.5" x 3.25" Embed HILTI KWIKBOLT TZ anchor(s) per base plate. Special inspection is provided per ICC ESR 1917. Frame Depth =D= 42.0 in Htrip -M= 102.0 in # Levels= 4 # Anchors /Base= 1 Pullout Capacity =Tcap= 2,178 Ib L.A. Gty Jurisdiction? NO Shear Capadty =Vcap= 2,839 Ib Phi= 1.33 Fully Loaded: (685 lb/3776 Ib) ^1.66 = Hgt @ Lvl 4= 102.0 in Hto0ratio= 2.4 Movt= Vtop*Htop *1.15 = 5571b *102in *1.15 = 65,3361n -Ib T= (Movt- Mst) /D = (65336 in -Ib - 47670 in-lb)/42 in = 421 Ib 0.06 <= 1.0 OK (421 Ib/2897 Ib) ^1.66 + (279 Ib/3776 Ib) ^1.66 = 0.05 <= 1.0 OK T SIDF Fl FVATION V T= (Movt- Mst) /D = (116426in -lb - 173670 in- Ib)/42 in = -1,363 Ib No Uplift Page // of 13 4/4/2008 S tructural C oncepts E ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: S.P. Project: FARWEST GROUP Project #: H-040308 -5 Base Plate Section Baseplate= 3x3x1/8 Width =W = 3.00 in Depth =D = 2.00 in Column Width=b = 3.00 in Column Depth =d= 1.63 in L = 0.19 in Plate Thidmess =t = 0.125 in Down Aisle Loads Configuration: TYPE A SELECTIVE RACK a = 0.50 in Anchor c.c. =2*a =d = 1.00 in N =# Anchor /Base= 1 Fy = 36,000 psi P = 4,150 Ib Mbase =Mb = 0 in -Ib Axial Bearing stress =fa = P/A = P /(D*W) M1= wLA2/2= fa*LA2/2 = 692 psi = 12 in-Ib Moment Stress =fb = M/S = 6*Mb/[(D*BA2] Moment Stress =fb2 = 2 * fb * L/W = 0.Opsi = 0.Opsi Moment Stress =fb1 = fb-fb2 = 0.0 psi FARWEST GRP 11 040308 - 5 M2= fb1 *L ^2)/2 = 0 in-Ib M3 = (1 /2) *fb2 *L *(2/3) *L = (1 /3) *fb2 *LA2 Mtotal = M1 +M2 +M3 = 0 in -Ib = 12 in -Ib /in S -plate = (1)(t ^2)/6 = 0.003 in^3rn Fb = 0.75 *Fy *1.33 = 35,910 psi fb /Fb — Mtotal/[(S-plate)(R,)] = 0.13 OK Tanchor = (Mb- (P *0.9)(a)) /[(d) *N /2] Tallow= 2,897 Ib OK = -3,735 Ib No Tension Page of 1 3 4/4/2008 S tructural C oncepts E ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: S.P. Project: FARWEST GROUP Project #: H- 040308 -5 Slab on Grade Configuration: TYPE A SELECTIVE RACK r i11I rr 111111iu11111111 ∎1l11111111i1.III1 1111111111111111111 x Load Case 1: Product + Seismic Product DL= 150 Ib PLL= Product LL= 4,000 Ib Puncture Slab Bending 1 c y L SLAB ELEVATION Base Plate B= 3.00 in D= 2.00 in Pu= 1.2PDL + 0.5PLL + 1.0 *E = 5,884 Ib Apunct= [(c +t)+(e+t)] *2*t = 150.0 in ^2 Asoil= (Pse *144) /( fsoil) = 847 in ^2 x= (L / = 8.3 in Fb= 5 *(phi) *(fc)A0.5 /1.4 = 103.82 psi Load Case 2: Static Loads PDL= 150 Ib FARWEST GRP h 040308 - 5 width =a= 3.00 in depth =b= 1.63 in L= (Asoil) ^0.5 = 29.10 in M= w*x ^2/2 = (fsoil *x ^2)/(144 *2) = 240.8 in-Ib PLL= 4,000 Ib -_ -_ _ --- .Aisle LL4 Tat Plan ViewPtan View D eff. Plate width =c= 3.00 in eff. Plate depth =e= 2.00 in Concrete Soil fc= 2,000 psi fsoil= 1,000 psf tslab =t= 5.0 in Movt= 116,426 in -Ib phi =0= 0.65 Frame depth= 44.0 in P- seismic =E= (Movt/Frame depth) *1.4 (Strength Design Loads) = 3,7041b Pse= DL+LL +E/1.4= 6,796 Ib Page ( of 1 3 Fpunct= 2.66 *phi*sgrt(Pc) = 77.3 psi fv /Fv= Pu /(Apunct *Fpunct) 0.51 < 1.0 OK y= (c*e)^0.5 + t *2 = 12.4 in 5-slat= 1*t ^2/6 = 4.17 in ^3 fb /Fb= M /(S- slab *Fb) = 0.56 < 1.33, OK DL +LL=Ps= 4,150 Ib Transverse Elev 4/4/2008 Puncture Pu= 1.4 *PDL + 1.7 *PLL = 7,010 Ib Apunct= [(c +t) +(e +t)] *2*t = 150 in ^2 Fpunct= 2.66*phi*sqrt(fc) = 77.3 psi fv /Fv= Pu /(Apunct *Fpunct) = 0.60 < 1.0 OK Slab Bending Asoil= (Ps *144) /( fsoil) L= (Asoil)^0.5 y= (c *e)A0.5 + t *2 = 598 ft ^2 = 24.45 in = 12.4 in x= (L -y)12 M= W x ^2/2 S -slab= 1*t ^2/6 = 6.0 in = (fsoil *x ^2)/(144 *2) = 4.17 in A3 Pb= 5 *(phi) *(Pc) ^0.5/1.7 = 1249 in 1b7Fb= NiJ(5- slab *Fb) = 85.5 psi = 0.35 <1.0,OK DEPARTMENTS: ' :ull��ing ivisi Public Works Complete Comments: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28-02 H ERMIT COORD COPY r PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D08 -190 DATE: 04 -14 -08 PROJECT NAME: THE FARWEST GROUP SITE ADDRESS: 12668 INTERURBAN AV S X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued AV c It" Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete TUES/THURS ROUTING: Please Route 3 Structural Review Required REVIEWER'S INITIALS: Approved ri Approved with Conditions Notation: REVIEWER'S INITIALS: Planning Division ❑ ❑ Permit Coordinator DUE DATE: 04-17-08 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: No further Review Required DATE: DUE DATE: 05-15-08 Not Approved (attach comments) ❑ DATE: n Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License BEYERCI142JC Licensee Name BEYERS CONSTRUCTION INC Licensee Type CONSTRUCTION CONTRACTOR UBI 600615924 Ind. Ins. Account Id PRESIDENT Business Type CORPORATION Address 1 6920 HEIGHTS PL SW Address 2 City SEATTLE County KING State WA Zip 98136 Phone 2069329472 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 4/3/1986 Expiration Date 3/8/2009 Suspend Date Separation Date Parent Company Previous License Next License ZEBRAP *054C1 Associated License Business Owner Information Name Role Effective Date Expiration Date BEYERS, CHRISTINE M 01/01/1980 BEYERS, KENNETH W PRESIDENT 04/03/1986 Look Up a Contractor, Election or Plumber License Detail Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. ACCREDITED • Bond Information Bond #12 Bond Company Name CBIC Bond Account Number SG1179 Effective Date 05/12/2006 Expiration Date Until Cancelled Cancel Date Impaired Date Bond Amount $12,000.00 Received Date 05/09/2006 Page 1 of 3 https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= BEYERCI142JC 04/25/2008 1 66 99 42" 1 2" T 99 . €T ?HE DESIGNS, CONCEPTS, AND FEATURES DEPICTED OR DESCRIBED HEREIN ARE THE EXCLUSIVE PROPERTY OF RAYMOND HANDLING CONCEPTS CORPORATION OR ITS REPRESENTED MANUFACTURERS AND ARE SUBMITTED IN CONFIDENCE. PERMISSION TO USE OR REPRODUCE IN ANY WAY THIS PROPRIETARY INFORMATION IS EXPRESSLY WITHHELD. @ 1989 -2008 RAYMOND HANDLING CONCEPTS CORP. 99 RECEIVE CITY OF TU LA APR 14 2008 PERMIT CENTER IR co y HcIInd Ming c r c e p t s CQrparcat � A u b u r n , W ca s h o r g t c ri FILE a-F P? Permit NO. +'car review approval is subject to error and omissions. Approval I of construction documents s the violation of any adopted code or ordi aT approv . not Rec authorize . •_ d Copy and condT ns is acknowl 1•.; c : City of Tukwila BUILDING D=IVISION _.. No changes shall r1'1ar�e to then scorn of work without prior approval of Tukwila Building Division N OTE: Revisions will require a new plan submittal and may include additional plan revi m fees The P.E.certificati provided herein by SCE, Inc perrainstothe storageraekcomponents only. All otherco ttIi onents are outsideth' scope ofthisc crtthcauon. FARWEST GROUP 12668 INTERURBAN AVE. TUKWILA, WA. 98168 SCALE 3/8 " =1'0" DATE 03/31/08 DRAWN BY J.L. CHECKED 2 " REl1IEW PLIA►NCE CODE COM APPROVED APR 2 `' 2008 ty Of Tukwila DING DWISIQi M 9068 FILE 9068farw 0 DRAWING NO. 1 SHEET 1 OF 1 REV. 1 5/8' NOTES: COLUMN PROTECTORS REQUIRED ON EXPOSED POSTS. NOTES: USE @ ALL BASE/ COLUMN LOCATIONS TYP. DESCRIPTION MATERIAL STEEL YIELD DESCRIPTION MATERIAL STEEL YIELD DESCRIPTION MATERIAL STEEL YIELD 3" COLUMN BASE PLATE: 3" x 3" 1/8" THICK PLATE ASTM A36, Fy= 36,000 PSI ' 1 5/8" a+ 4 J SAFETY PIN 7 GA. . 5/1 6" O GR 55 7/16"8 GR 55 RIVET 3 -PIN CONNECTOR 7 GAGE ASTM A570, Fy= 55,000 PSI 15 GAGE 4" BEAM (INTLK 40E) ASTM A36, Fy = 55,000 PSI DESCRIPTION MATERIAL STEEL YIELD 6" 1" TYP. COLUMN: INTLK LU21 14 GAGE ASTM A570, Fy= 55,000 PSI 3 3/8" NOTES: USE @ ALL BEAM TO COLUMN CONNECTION LOCATIONS TYP. NOTES: USE @ ALL BEAM LOCATIONS TYP. TYP. DESCRIPTION MATERIAL STEEL YIELD DESCRIPTION DESCRIPTION MATERIAL ESR# BRACING: HORIZ. & DIAG. 16 GAGE STEEL ASTM A570, Fy= 55,000 PSI 1917 14 STORAGE RACK ELEVATION 4" 36" 24" 24" 26" 3 1/4" MIN. EMBED. 1 1/2" X 3-1/4" MIN. EMBED. HILTI KWIK BOLT TZ ANCHOR F.F. NOTES: USE @ALL BRACE LOCATIONS TYP. TYPE A SELECTIVE RACK 94" FRONT VIEW NOTES: SEE NOTE #4 ABOVE FOR ANCHOR SPECS HORIZ. BRACE DIAG. BRACE GENERAL CONFIGURATION ROW SPACER 1 L L L BEAM 1 1 NOT A DEPICTION OF THIS PROJECT 1 42 t SIDE VIEW CONNECTOR r BASE PLATE r GENERAL PROJECT NOTES 1. DESIGNED PER THE REQUIREMENTS OF THE 2006IBC 2. SEISMIC CRITERIA Ss = 1.453, S1 = 0.499, Fa = 1.0, Fri = 1.501. 3. STORAGE CAPACITY : 2000# PER LEVEL 4. ANCHORS HILTI KWIK BOLT TZ ESR# 1917 1/2 "0 x 3 1/4" MIN. EMBED. (1) ANCHOR PER BASEPLATE. 5. SPECIAL INSPECTION NOT REQUIRED DURING ANCHOR INSTALLATION. 6. CONCRETE THICKNESS & COMPRESSIVE STRENGTH, 5" x2000 PSI 7. SOIL BEARING PRESSURE 1000 PSF @ GRADE OR BETTER 8. ALL RACK INSTALLATIONS AND RACKS MANUFACTURED IN CONFORMITY WITH THIS STANDARD SHALL DISPLAY IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT PLAQUE EACH NOT LESS THAN 50 SQUARE INCHES IN AREA AND SHOWING THE MAXIMUM PERMISSIBLE UNIT LOAD IN CLEAR, LEGIBLE PRINT. 9. ALL BOLTS A307 OR BETTER. INSTALL TO SNUG TIGHT FIT WITH ALL PLYS IN FLAT CONTACT 10. ALL WELDING PERFORMED IN THE SHOP OF AN APPROVED FABRICATOR BYAWS CERTIFIED WELDERS USING E70XX ELECTRODE OR BETTER. FIELD WELDS, IF ANY, SHALL BE PROVIDED UNDER THE SUPERVISION OF A LICENSED DEPUTY INSPECTOR. 11. THE CLEAR SPACE BELOW SPRINKLERS SHALL BE A MIN. OF 18" BETWEEN TOP OF THE STORAGE AND THE CEILING SPRINKLER DEFLECTOR. RECEIVED CITY OF TUKWILA APR 14 2008 PERMIT CENTER REVIEWED FOR C OD E COMPLIANCE APPROVED APR 2' 7fl (. B CITY Of Tu i?e; BUILDING DIVISi r2; f i' ; ' . � 43 3910/ 0 cc W a EXFIR APR 04 ma 0 1 0 8- i 0 JOB NO. SHEET NO. EL 0 co !— W LL co 0 0 0 N 0 0 a 4 w w H- 040308 -7 SCE 1 OF 1 2