Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit D08-245 - AT&T MOBILITY - REROOF
AT &T MOBILITY 16425 SOUTHCENTER PY D07 -245 Parcel No.: 5379200290 Address: 16425 SOUTHCENTER PY TUKW Suite No: Tenant: Name: AT &T MOBILITY Address: 16425 SOUTHCENTER PY , TUKWILA WA Owner: Name: ARGUS GROUP LTD Address: C/O METROVATION , 225 108TH AVE NE #520 98004 Phone: Contact Person: Name: MIKE KELLEY Address: 5817 S OAKES ST , TACOMA WA 98409 Phone: 253 228 -8651 Contractor: Name: A S P V ROOFING Address: 5817 OAKES ST , TACOMA WA 98409 Phone: 253 - 228 -8651 Contractor License No: SPVROPV941Q7 DESCRIPTION OF WORK: REROOF: EXISTING ROOF OF HOT TAR WITH BASE SHEET OF FLAT ROOF 5/8 PLYWOOD. RECOVERING WITH DURO -LAST SINGLE PLY VINYL MECHANICALLY FASTENED AND HOT AIR WELDED. Value of Construction: $6,800.00 Type of Fire Protection: Type of Construction: doc: IBC -10/06 CityMf Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us DEVELOPMENT PERMIT * *continued on next page ** Permit Number: D08 -245 Issue Date: 05/12/2008 Permit Expires On: 11/08/2008 Expiration Date: 11/27/2008 Fees Collected: $299.03 International Building Code Edition: 2006 Occupancy per IBC: 0019 D08 -245 Printed: 05-12 -2008 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N City ofukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tulcwila.wa.us Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: Permit Center Authorized Signature: doc: IBC -10/06 N I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the perform of ork. I am authorized to sign and obtain this development pe Signature: Date: 5 Print Name: 7/7A 1/,//,', Permit Number: D08 - 245 Issue Date: 05/12/2008 Permit Expires On: 11/08/2008 Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. D08 -245 Printed: 05-12 -2008 • City of Tukwila Parcel No.: 5379200290 Address: 16425 SOUTHCENTER PY TUKW Suite No: Tenant: AT &T MOBILITY 1: ** *BUILDING DEPARTMENT CONDITIONS * ** Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS • Permit Number: D08 - 245 Status: ISSUED Applied Date: 05/01/2008 Issue Date: 05/12/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: Prior to fmal inspection a written statement from the roofing contractor shall be required. The statement shall confirm the fire classification of the roof assembly that was installed. 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. * *continued on next page ** doc: Cond -10/06 008 -245 Printed: 05-12 -2008 Signature: Print Name: • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. , 7 fe -lz87 doc: Cond -10/06 D08 -245 Date: 71-2 e53 ordinances governing or local laws regulating Printed: 05-12 -2008 Property Owners Name: Mailing Address: CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.citukwila.wa.us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: lb I .Z5 Sovt'l2CQI1le/' PA /21. Tenant Name: ATT Name: 717 ff ,1 Mailing Address: 5 3/7 5 5 5y E -Mail Address: 1 P . J/e e7 GENERAL CONTRACTOR'' INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping, Company Name: A 5 / G' / Mailing Address: V7 S OX AS 5 57` Contact Person: �! a � Gr'= /z y E -Mail Address: �i J�,e /,e`Le C a 5t (- Contractor Registration Number: 5p0?OP1'y '//Z;) 7 Contact Person: E -Mail Address: Contact Person: E -Mail Address: Q:\Applications\Forms- Applications On Line \3 -2006 - Permit Application.doc Revised: 9 -2006 bh ?V $ - Building Pernl.. No. Mechanical Permit No. Plumbing /Gas Permit No. Public Works Permit No. Project No. King Co Assessor's Tax No.: Suite Number: New Tenant: [v]'.... Yes ..No :pg 5 )) City Day Telephone: City (For office use only) - O`L`D o State Floor: Zip CONTACT PERSON -- who do we c when your permit is ready to be issued 25, ?6s/ 98ire f' State Zip Fax Number: 7' ' / / City State Zip Day Telephone: , % 53 ,Z S B65? Fax Number: 25 3 1 67, /1 Q ? j Expiration Date: t,/C7 �Jf 2.e=e9 ARCIIITECT OF REC - All plans must be 'wet stamped by Architect. of Record' Company Name: Mailing Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD - All plans must be wet stamped by Engineer Company Name: Mailing Address: City Day Telephone: Fax Number: State Zip Page 1 of 6 BUILDING PERMIT INFORM4TION — 206- 431 -3670 Valuation of Project (contractor's bid price): $ ZIW.1 Gt ' ten # 0 R1✓ Ze Scope of Work (please provide detailed information): Will there be new rack storage? ❑.... Yes Provide All Building Areas in Square Footage Below `Floor 2n Floor 3` Floor Floors thru Basement Accessory Structure* Attache< Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck Existing Interior Remodel Addition to Existing Structure Type of xistruction per IBC Type of Occupancy per IBC PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1/2" x 1I " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q:Wpplications\Forms- Applications On Line'3 -2006 - Permit Application.doc Revised: 9 -2006 bh Existing Building Valuation: $ ❑ .. No If yes, a separate permit and plan submittal will be required. Compact: Handicap: Page 2 of 6 PERMIT APPLICATION NOT — Applicable to all permits in this a ication Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNEp ORIZED AGENT: Signature: l Date: ,��5> 22, 265/ Print Name: Mid /{k"Z ? Mailing Address: 5 577 5 0/ 1 - 1 . 5 5t Date Application Accepted: Q:\Applications\Fonns- Applications On LineN3 -2006 - Permit Application.doc Revised: 9 -2006 bh Iaoriole; Cit Day Telephone: State Zip Date Application Expires: 04A Staff Initials: Page 6 of 6 1 Fixture Type: Qty Fixture Type: Qty tore Type: Qty Fixture, Type: Qty Bathtub or combination bath /shower Drinking founta' or water cooler (per he ) Was ountain Gas piping outlets Bidet Food -waste inder, commercia Receptor, irect waste Clothes washer, domestic Floor dra' Sinks Dental unit, cuspidor Shower ingle head trap Urinals Dishwasher, domestic, with independent drain Lavat Water Closet Building sewer or trailer park sewer Ra' water system — per d in (inside building) Water heater and /or vent Additional medical gas - lets /outlets — six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors epair or alteration of water piping and /or water treating equipment Repair or alteration of drainage or vent piping ical gas piping system sery one to five inlets /o ets for specific gas 1 PLUMBING AND GAS PIPIN('" 6 ERMIT INFORMATION - 206.431. 70 PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: City State Zip Day Telephone: Fax Number Expirati I, Date: Contact Person: E -Mail Address: Contractor Reg tration Number: Valuation of Plumbing • k (contractor's bid price): $ Valuation of Gas Piping wor . contractor's bid price): $ Scope of Work (please provide • :. iled information): Building Use (per Int'1 Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping a utlets being talled and the quantity below: Q \Applications\Forms- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 5 of 6 Receipt No.: R08 -01436 Initials: JEM User ID: 1165 Payee: MICHAEL E KELLEY ACCOUNT ITEM LIST: Description BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 1541 299.03 000/322.100 000/345.830 000/386.904 RECEIPT Parcel No.: 5379200290 Permit Number: D08 -245 Address: 16425 SOUTHCENTER PY TUKW Status: PENDING Suite No: Applied Date: 05/01/2008 Applicant: AT &T MOBILITY Issue Date: Account Code Current Pmts Payment Amount: $299.03 Payment Date: 05/01/2008 09:29 AM Balance: $0.00 178.50 116.03 4.50 Total: $299.03 1866 05/01 9711 TOTAL 299.03 doc: Receiot -06 Printed: 05 -01 -2008 COMMENTS: Type of In; ��cVon: 00 ._. J Address: S . (6trd pAfiCi,Jtjf Date Called: Special Instructions: Date Wanted: _ a.m. 3-23— oe m. A - -✓`S pc e_.{ DA kin ar; "_ . " dj /` r c c a e , l c f-r. J iv+e- 7-, r el& S De e . - . t C I A-' ".I I 4 Project: Type of In; ��cVon: 00 ._. J Address: S . (6trd pAfiCi,Jtjf Date Called: Special Instructions: Date Wanted: _ a.m. 3-23— oe m. Requester: Phone No: 1 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Doc - -24, PERMIT NO. (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. Inspectp�` !' , eA Date: S 0 $58.00 REINSPECTION FEE REQUIRED. Prior o inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. Receipt No.: Date: i7✓ - �: t: �--_ t-',•...`.,. �b�' a, .rst'.''`L',•�+''i''obY7i�ri3�' "" '' -'� `R. - ':.` ` "+i���Y`�6.'s8�. - - - •..�:�tt.�c�F it .L. ou t�C41�i: • ft • h rbe ctt a4q, al: `L r l /; u 'kJ cl qe lI '11,3 , r t� 1f- r 1/ µl1 .huoo— AST Roofing, Inc. 525 Morley Drive Saginaw, MI 48601 15 YEAR NDL WARRANTY Duro-I a s t , Inc., C D u r o - L a s t " ) g r a n t s t h i s N o Dollar Limit CNDL') wananty t o the owner ('Owner') of a b udding containing a Duna-Last Roofing System CD-L System') installed by anAuduized Dealea'Conaactor ("Contractor"), subbed to the coalitions and limitations contained herein. Duna-Last's obhgation during the 1' through the 15" years shall be to repair any leak m the D-L System caused by any defect in a component of the D-L System or by the wotdnnanship of the Contractor, but only as said workmanship pertains to the installation of the D-L System itself and not as it pertains to other work performed, if any. Duro-Last's obligation includes, at Dum- Last's option, either the repay or replacement of part or all of the D-L System, and also includes the furnishing of/or cost of Labor (at the Contactor list price in effect at the time of the repair) to repair the D-L System provided the following conditions are met a) Duro -Last and its Contractor have been paid in full for the D -L System; b) The Owner has notified Duro -Last by certified mail, return receipt request, within 30 days of the discovery any leak or other alleged D -L System failure; c) The Owner allows Duio-Last's employees or agents or its Contractor access to the D-L System including, if necessary, the removal and replacement by Owner at Owner's expense of any and all rooftop overburden; d) Duro -Last authorizes the repair, and, e) At Duro - Last's option, either Duro- Last's own employees or agents or a Contractor makes the repair. LIMITATIONS I) This limited warranty does not apply to a D -L System installed on a single- family residence. 2) Duro-Last is not liable for any D -L System failure nor for subsequent damages arising from causes outside Duro- Last's control including, but not limited to: a) Damage caused by fire, lightning, hurricane, gale, hail, tornado, flood, earthquake or acts of God; or b) Damage caused by accident, vandalism, intentional act, negligence or failure to use reasonable care, whether on the part of the Owner or another; or c) Damage caused by any unauthonzed modification to the D -L System including, but not limited to, damage caused by unauthonzed components used in mstallation or repair, or by additional equipment or structures added to or made a part of the roof, or by traffic, or by chemicals not normally found in nature or the like; or d) Damage caused by defects in the building design; or e) Interior condensation and/or moisture entering the D -L System through walls, copings, structural defects, HVAC Systems, or any part of the building structure, including from adjacent buildings. 3) Duro-Last does not warrant the watertightness of metal products that are located outside of the termination of the Duro-Last membrane. 4) Duro -Last does not warrant against color change and/or pattern change and/or print change in the D -L System. 5) This limited warranty passes to future Owners of the building for the full fifteen (15) years hereof. 6) This limited warranty becomes effective only upon signature by both an authorized Duro-Last representative and the original Owner. 7) This limited warranty is governed in all respects by the laws of the State of Michigan, regardless of the state of purchase or installation. 8) Duro-Last does not waive any nghts under this limited warranty by refraining from exercising its rights in full m one or more instances. THE REMEDIES STATED HEREIN ARE THE SOLE AND EXCLUSIVE REMEDIES PROVIDED BY DURO -LAST FOR ALLEGED FAILURE OF THE D-L SYSTEM. OR FOR CONTRACTOR WORKMANSHIP. THIS LIMITED WARRANTY ALSO COVERS CONSEQUENTIAL DAMAGES DERIVED FROM LEAKS CAUSED BY DEFECTS WARRANTED AGAINST ABOVE. THERE ARE NO WARRANTIES OF MERCHANTABILITY OR OF FITNESS FOR A PARTICULAR PURPOSE (EITHER EXPRESS OR IMPLIED) THAT EXTEND BEYOND THE FACE OF THIS LIMITED WARRANTY; DURO -LAST EXPRESSLY DISCLAIMS ANY SUCH FURTHER WARRANTIES If DURO - LAST's Authorized Dealer /Contractor made any statements about DURO - LAST's merchandise and services, those statements are not warranties, cannot be relied upon by Owner, and are not part of the contract for sale or installation. AT T S-23- ZCt19, Customer's Signature Name of Building DURO -LAST, ®INC. Date tgnature of A Bldg. Designation. £ ,4,'c f . f Sq. Foot. /y /S "35' Serial Number: 155103 VICTOR DA E TECH REP Installed By A. A. P. v Warranty No: 02# es PAOcu ed Duro -Last Representative /d5/ZS 01/4c :eider PK1.1y. Address of Building lc.kwi l LA. 48188 City, State & Zip of Building DL -15 COM 3/08 • ° 7 1•; 'fD , "�, ✓i - '•( -% '1 ti i' i e $ i:i-o ..a ►Ili -�• I • ,.�41 i b yin ,lf4 L GGl ` � J 1d e1/1 n � . � Ilia , * r a j f o ec� " Faa n I ors 111 iLG/ b1J I , i41r t\i11 i .y4 ,Qc i ii' /vo,..� n,.,�n•. ii ii i I'r .n. ,,� r ,...p , . :., �,,fc i i r y i i,:aT,:. i o i i i lri. _ >, , -... :.,r r` i ri1 l J I' { Ve d, war li CO lk ■ ii •nH f(I) :1 I; %I) 7/r ( • z. • • ma y • sue I`V lr^ 11� w 177!111 r >• r 1. r i 1 1$!..,.1., 1 .• n i r 1 - ii ,., i i i i i - { i F ,1 w unJ 7!! - 1 p . � JJ!!9 ` t F7 111► ►. a �' L;;•Fi Lu �P Q L� tilj \,�✓. a 1 i I 6� 4 7 4 0,111 . i J P l lijrlr COMMENTS: t .k A ` (;-(-6:1 � t Type of Inspecti IQ 4 i l__ d b s ~f�� _t'l N�� Die ailed: �� � f (`� _ S ecial Instructions: • p CI §-1 Li UCJU V5-7 +/Z Date anted: a.m. `�–�r' r- `. : .m. Requester: Phone ` loj ' -, r,, /1 ,Q 6s... 1 MA J f orc k i t uL2-A k 1 L. - e,...1 Ad , 1 S P c'�c e-A• . , : 3 k , ' R,iQ. /.pp r f ) ,A (<< r d ProjPc n ` (;-(-6:1 � t Type of Inspecti IQ 4 i l__ d b s ~f�� _t'l N�� Die ailed: �� � f (`� _ S ecial Instructions: • p CI §-1 Li UCJU V5-7 +/Z Date anted: a.m. `�–�r' r- `. : .m. Requester: Phone ` loj ' -, r,, /1 ,Q 6s... 1 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION ' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 0 Approved per applicable co Inspec>Or: 1 GA * - 1 Date: �- Z-.? _ k bo821. orrections required prior to approval. $58.00 REINSPECTION FEE EQUIRED. Prior to inspection. fee must be paid at 6300 Southcenter Blv .. Suite 100. Call the schedule reinspection. Receipt No.: Date: 17 ...'i$:t?' }...a`.�`a_: x'7.41 +l�:C!f�•�dfs�i��"� . ' r gm.s �4��l�nrk�.ri�3�b!�Ai �.Yk_� �. . ... , D5/ Re:0, 7 c_,Ifti.e.. ifvv,4 oaf -a. , 1/t- 04., ik o . ,._ if,o,c 5,a__ e - Gi:/"X Afro -- S7' 1 *,G Wo7Z - ,j_ec_Q_i G c - a f✓' l,/�h FILE PIar review approval is subject to snore and cmilssions. Ap. royal of construction dotes , : n the violation of any adopted code or ordinance. Receipt oiapproued field -Co t6t1 editions -is-a awlieeigeek— C1tar oLTukadia BUILDING. DIVISION CODE COM -- PLIANCE PROVED Ai TA 8MMDN MAY - 6 20 ; Pe a Y - 1�n PERMIT cE EVISIONS No changes era ha_ mario tr the c of work without prior approval of Tukwila Buil. in Di NOTE: Revisions will require a new plan submittal and may nciu Addinnnal-plan- reuievu fees -t- 0 Kik, 05/01/2008 09:16 FAX 18005662698 MECHANICALLY FASTENED SYSTEMS TABLE OF CONTENTS Duro-Last Introduction Requirements Irl ON 1 „ .4nt • . . „ , Pre-job Inspection Fastener Selection and Deck Combinations .i„ LEMEisi TI i`• •••;:!'' '” • • • • - •?• • -.1!:;i!i?'." •., • •%. It!„ '• • ' WPC!: •-•:••q441;3' i• r “Ot1101' ■Trk..)11:!IfIr.17V1/111.0 Roof Preparation Installation Cautions and Warnings MECHANICALLY FASTENED 'SPECIFICATIONS REVIEWED FOR CODE COMPLIANCE AP'''ROVED MAY - 6 2008 City Of Tukwila B ILDING DIVISI N Interlocking 71:11!, "Durai-last' and 'The Worlds Best Roof' In the Ouro-Las* Globe are registered marks owned by Ouro-Last Roofing, Inc. 0002 Ounwlast Reefing. btai Duro-Last Roofing, Inc. 525 Morley Drive Saginaw, MI 48601 Tel: 800-248-0280 Fax: 800-432-9331 2 2 2 3, 4 5, 6 6, 7, 8 9 RECitiVEri MAY -1 2008 PERMIT CENTER • • 1 05/01/2008 09:17 FAX 18005662698 Duro -Last INTRODUCTION MECHANICALLY FASTENED SYSTEMS SECTION 1 - -- GENERAL lj 003 The following is the information required to install the Duro -Last roofing system. Each installation should be in compliance with the detail drawings, instructions, material descriptions, and other information stated herein. REQUIREMENTS 1. The Duro -Last Roofing System must be installed by an authorized Duro -Last contractor. 2. The proper slip sheets must be installed between the Duro -Last membrane and the substrate. 3. A Duro -Last quality assurance specialist must inspect the Duro -Last Roofing System for compliance with the Duro -Last specifications before a commercial /industrial warranty is issued. 4. All materials used in the installation of the Duro -Last Roofing System must be products of Duro -Last Roofing, Inc., or accepted products as defined and described in the specification. Other materials must be accepted in writing by the Duro -Last Engineering Services Department prior to being used in the Duro -Last Roofing System. 5. The Duro -Last contractor is responsible for following all applicable building, plumbing and electrical codes. 6. Fastening for buildings that are located in high wind zones (120 mph ±) and /or those equal to or greater than 40 -feet (12 m) in height will be fastened no greater than 12- inches (.31 m) on center and will have fastener tab /row spacings no greater than 60- inches on center. In addition, the roof system may require additional securement tabs near the roof edge, spaced 28- inches (.7 m) on center. If you have a building that is greater than 40 -feet in height or located in a high wind zone, contact the Duro -Last Engineering Services Department at 800 - 248 -0280. 7. The 10 -Foot Tab system is not intended for buildings in excess of 40 -feet and in some high wind zone applications. DELIVERY The Duro -Last roofing system and related materials will be shipped in the original packaging and with shipping labels intact. Containers will be labeled with manufacturer /supplier's name, product name and identification. Upon arrival, each shipment should be checked for damage or shortages. The freight agent should be made aware of any problems and must note the damage or shortage on the freight bill. Concealed damage must be reported to the freight agent immediately upon discovery. Materials damaged in shipping, handling or storage cannot be used. HANDLING Once the Duro -Last roofing system is delivered to the job site, the contractor is responsible for all handling and installation. Adequate personnel and equipment should be available to safely lift and place the Duro- Last roofing system onto the rooftop. The components of the roofing system should be staged near load - bearing supports in a manner convenient to final placement. STORAGE Duro -Last materials should be kept clean and dry. Materials should be stored on pallets and covered with tarps. Care should be taken to place materials away from areas where water may pond or areas that water falls onto from higher elevations. All sealants must be stored at temperatures above 40 °F (5 °C). Keep combustible materials away from heat, sparks, and open flames. Follow precautions outlined on the containers or supplied by the material manufacturer. [ MECHANICALLYYFASTENED •SPECIFICATIONS • Septeniber.26051 2 Deck;Type. Fastener Type :.. '. Notes Steel Duro -Last HD Screws Duro -Last XHD Screws Must penetrate a minimum of 1 in. from the top surface of deck. Wood Duro -Last HD Screws Duro -Last XHD Screws Must penetrate a minimum of 1 in. from the top surface of deck. Structural Concrete Duro -Last Concrete Nail Duro -Last Concrete Screw Duro -Last HD Screws Duro -Last XHD Screws Must penetrate a minimum of 1 in. from the top surface of deck. Pre -drill a minimum of 1/2 in. deeper than the required depth of the fasteners using a 3/16 in. bit. Gypsum Auger Fastener* Liquid Auger Fastener ** Pre -drill required for auger fasteners. Use a 7/16 -9/16 in. bit. * Must penetrate a minimum of 1 1/2 in. from the top surface of deck. * Factory Mutual- designed systems require minimum of 2 in. penetration. ** Liquid Augers must penetrate a minimum of 2 in. from the top surface of the deck. 05/01/2008 09:17 FAX 18005662698 PRE -JOB INSPECTION Duro -Last 1004 SECTION 2--- QUALITY ASSURANCE CORE CUTS 1. When re- covering an existing roofing system, the authorized Duro -Last contractor or representative appointed by Duro -Last Roofing, Inc., will conduct an inspection of the proposed job site roof conditions, determine the needed fastener type and length, moisture content of the existing roofing system, and note damaged areas to be repaired prior to installation of the Duro -Last roofing system. 2. The Duro -Last contractor is responsible for performing a series of core cuts to determine and verify the above information. The Duro -Last contractor and /or building owner is responsible for the repair of all core cuts. 3. Duro -Last Roofing, Inc. does not approve the practice of roofing over existing roofing systems that contain excess water. Excess water is defined as water observed within a core cut or moisture squeezed from the core sample taken. PULL TESTS 1. Fastener pull out tests must be conducted on the roof deck with approved fasteners to verify the integrity of the deck and to establish fastening pattems that meet the requirements of Duro -Last specifications. Contact the Duro -Last Engineering Services Department at 800 - 248 -0280 with any questions. 2. It is the responsibility of the installer to make sure pull out tests are taken on -site by either the fastener manufacturer, the Duro -Last contractor or the Duro -Last sales representative. The sections of decking where integrity is in question should be the locations for the tests. Values must be documented on a roof drawing, locating the test pulls and pullout test values. In situations where new construction prevents on- site pullout tests, a pre - assembled deck representing the proposed deck type should be constructed and tested. 3. The number of pull tests required will be as follows: perform a minimum of 10 pull tests for up to 50,000 square feet and five additional pull tests for each additional 50,000 square feet or portion thereof, on each project. Areas of low pull test results will require additional pull tests. FASTENER SELECTION AND DECK COMBINATIONS The fasteners used to attach insulation, re -cover board and Duro -Last membrane must be supplied by Duro- Last Roofing, Inc. The following table summarizes the appropriate fasteners to use for different deck types. If a fastener type is needed that is not listed below, the Duro -Last Engineering Services Department must approve its use, in writing, prior to installation. p: MECHANICALLY FASTENED SPECIFICATIONS :. Seplerimber.'2005 3 Cementitious Wood Fiber (Tectum) Auger Fastener* Liquid Auger Fastener ** Do not pre- drill. * Must penetrate a minimum of 1 1/2 in. from the top surface of deck. * Factory Mutual- designed systems require minimum of 2 in. penetration. ** Liquid Auger must penetrate a minimum of 2 in. beyond the top surface of the deck. Lightweight Concrete Auger Fastener* Liquid Auger Fastener ** Duro -Last Concrete Screw Duro -Last Concrete Nail Duro -Last HD Screws Duro -Last XHD Screws Pre -drill required. Augers: Use a 7/16 -9/16 in. bit. Others: Use a 3/16 in. bit. * Must penetrate a minimum of 1.1/2 in. from the top surface of deck. * Factory Mutual- designed systems require minimum of 2 in. penetration. ** Liquid Auger must penetrate a minimum of 2 in. from the top surface of the deck. Walls and Curbs., Yes Notes Cinder and Concrete Block Zinc Plated Metal Anchors Duro -Last Concrete Screw Duro -Last Concrete Nail .. Duro-Last HO Screws Duro -Last XHD Screws Must penetrate a minimum of 1 in. from the top surface. Pre -drill a minimum of 1/2 in. deeper than the required depth of the fasteners using a 3/16 in. bit (1/2 in. for metal anchors). 05/01/2008 09:18 FAX 18005662698 Duro -Last When determining what plates to use and where to use them, refer to the following table: a 00 5 y devia on MECHANICALLY FASTENED SPECIFICATIONS �`�i : •• ,.._ _,. ,September 2005'- 4 2 ":Poly = 171ate:. '2" Barbed'Metal ** , ..3" Square Metal . Insulation Plate Fastening Tabs Yes Yes No No Parapet Flashings Yes Yes Yes No Penetrations Yes Yes Yes No Insulation Yes No Yes Yes 05/01/2008 09:18 FAX 18005662698 Duro -Last When determining what plates to use and where to use them, refer to the following table: a 00 5 y devia on MECHANICALLY FASTENED SPECIFICATIONS �`�i : •• ,.._ _,. ,September 2005'- 4 :._........ _ _ _ 60 PSF System Design Table (Field Area Only)_ Fastener PuII out Resistance (Lbs) Fastener Spacing (Inches)' ' 120 "Tabs ! "Tabs' ; 28 "Tabs I' 900 18" O.C. 18" O.C. 24" O.C. 600 • 12" O.C. 18" O.C. 24" O.C. 450 9" O.C. 18" O.C. 24" O.C. 375 6" O.C. 15" O.C. 18" O.C. 350 6" O.C. 15" O.C. 18" O.C. 325 6" O.C. 12" O.C. 18" O.C. 300 6" O.C. 12" O.C. 18" O.C. 275 N/A 12" O.C. 18" O.C. 225 N/A 9" O.C. 18" O.C. 210 N/A 6" O.C. 18" O.C. 175 N/A 6" O.C. 15" O.C. 150 N/A 6" O.C. 15" O.C. 140 N/A N/A 12" O.C. 139 OR LESS N/A N/A N/A (iC!up. bow: Pla!d) algal uBlsea we ;siCS iSd 0 Fastener RI' Resistance (Lbs)..'; Fastener Spacing! (Inches) ;;,,,; .: 120" Tabs 60 " Tabs : ;. ;, 28" Tabs ,,. 900 12" O.C. 12" O.C. 18" O.C. 600 9" O.C. 12" O.C. 18" O.C. 450 6" O.C. 12" O.C. 18" O.C. 375 N/A 9" O.C. 18" O.C. 350 N/A 6" O.C. 18" O.C. 325 N/A 6" O.C. 18" O.C. 300 N/A 6" O.C. 15" O.C. 275 N/A 6" O.C. 15" O.C. 225 N/A 6" O.C. 12" O.C. 210 N/A N/A 12" O.C. 175 N/A N/A 9" O.C. 150 N/A N/A N/A 140 N/A N/A N/A 139 OR LESS N/A N/A N/A 05/01/2008 09:18 FAX 18005662698 Duro - Last FASTENER SPACING TABLE* — FOR USE WITH ALL DECK TYPES Ijj006 *These tables may not be used for buildings located in special wind regions, wind zones that are greater than 120 -mph or buildings with an eave height greater than 40 -feet. Buildings that meet these criteria must have a roof system designed by the Duro -Last Engineering Services Department. The tables to the left indicate the enhancement in the FIELD AREA only. Membrane attachment on Duro -Last designed roof systems, buildings in special wind regions or with excessive building heights (40' or taller), and all Factory Mutual- insured buildings will require special field, perimeter, and corner fastening. The width of the perimeter area is determined by the either the lesser of 40% of the building height at the eaves or 10% of the overall plan width of the building and /or roof area. The perimeter must never be less than four feet wide. Feel free to contact the Duro -Last Engineering Services Department at 800 - 248 -0280 for additional design information. 5 05/01/2008 09:18 FAX 18005662698 Duro -Last IJ007 SECTION 3 - -- IMPLEMENTATION ROOF PREPARATION RE -COVER — Built -up Roofs (BUR) a) If the BUR is gravel surfaced and the pea gravel or crushed stone is 1/4 -3/8 inches (6 mm - 10 mm) in size, it must be leveled and maintained at 4 lbs. /sq.ft. (20 Kg /m Then, a minimum 3/8 -inch (10 mm) Duro -Last supplied underlayment or 1 -inch (25 mm) thick insulation must be used. If the loose stone on an old BUR is vacuumed or swept, a separator sheet of a minimum 3/8 -inch (12 mm) thickness, such as a Duro -Last approved re -covery board, must be used. CAUTION: Removing more than the loose gravel may affect the resulting fire rating. Consult the Duro-Last Engineering Services Department at 800 -248 -0280 for fire rated assemblies. b) If the BUR is a smooth or granular surfaced application and is free of sharp edges and debris, then it can be re- covered with a minimum of a 3 -mil polyethylene sheet, though a 3/8" underlayment is recommended. c) EPS insulation cannot be used over coal tar pitch or asphalt without a slipsheet between the coal tar pitch and the insulation as well as between the membrane and the insulation. Duro -Last underlayments are approved for direct application over aged coal tar pitch roofs. d) When roofing over asphalt or coal tar roofs (including tear -off), an approved separator sheet must be used. Asphalt -based products are incompatible with the Duro -Last roofing membrane. Note: Should the Duro- Last membrane become soiled with roofing asphalt, the affected membrane must be cleaned immediately using approved cleaners and procedures. If the asphalt cannot be properly cleaned from the membrane, the affected membrane must be removed and new membrane installed, or overlay the affected area with an approved slipsheet and new membrane. Extreme caution should be taken if you are doing a tear -off while installing the membrane. RE -COVER — Single -Ply Roofs a) All existing single -ply roofing membrane must be cut free from the entire roof perimeter, cut free around all penetrations, and cut in between fastener rows prior to the installation of the Duro -Last membrane. When reroofing after a tear -off, caution should be used to prevent the Duro -Last membrane from contacting incompatible materials. (See "Getting Started" [Item 9] within the Introduction Section for approved substrates) b) If the existing system is mechanically fastened, there is often a problem with loose fasteners. Because of this problem, cut the membrane open and remove all loose fasteners before installing the slipsheet. c) If a PVC membrane has been installed directly over styrene insulation without a separation sheet, then the old membrane must be removed, damaged insulation replaced, and an approved slip sheet installed. d) If the existing membrane is ballasted and the Duro -Last membrane is to be mechanically fastened, it is necessary to do fastener pull -out tests on the deck. Also, the type of insulation and its density needs to be determined to ensure that the insulation will meet Duro -Last Roofing, Inc. requirements. (See Substrate Separation within the "General Specifications" section for approved substrates). Be aware that if the existing insulation is "loose -laid" it must be fastened with an approved fastening pattern. (See Detail 1020) RE -COVER — Metal Roof Re- cover /Retrofit a) The metal roof panel must be clean, smooth, free of sharp edges and loose foreign material. Damaged areas and other factors affecting the installation of the Duro -Last roofing system must be repaired prior to the installation of the membrane. b) A metal roof panel must be separated from the Duro -Last membrane by at least 7/16 -inch (13 mm) hardboard (gypsum, plywood, or oriented strand board(OSB)) or 1 -inch (25 mm) rigid insulation. Duro -Last 1/2 - inch fan fold insulation may be used if the flutes are completely filled. The gaps between the ribs of the metal and the insulation fill can not exceed 1/4 -inch in width. c) Flute filler material must consist of polyisocyanurate insulation. Flute filler must be mechanically fastened with Duro -Last fasteners and plates, as needed, to hold the insulation in place. d) Insulation /re -cover board must be neatly fitted to the roof deck and its penetrations. 4' x 8' boards must have a minimum of five fasteners /distribution plates. The insulation /re -cover board must be the minimum thickness required by the manufacturer to span any gaps between the flute filler and the center of the rib. Gaps between insulation /re -covery boards cannot exceed 1/4 -inch (6 mm) in width. No more insulation /re- covery board will be installed than can be covered with membrane and completed before the end of the :. MECHANICALLYFASTENED SPECIF1CA71ONS' Septerribe� 2D05' 05/01/2008 09:19 FAX 18005662698 Duro -Last day's work or before the onset of inclement weather. Duro -Last fasteners and Duro -Last plates as well as approved fastening pattems are required for attachment of all insulation /re -cover board. Contact the Duro- Last Engineering Sercives Department at 800 - 248 -0280 with any questions. e) High- density wood fiberboard is acceptable on metal building re- covers when the building slope is 1 -inch vertical for every 12- inches horizontal or greater. High- density wood fiber will not be accepted as flute filler. f) Plywood is acceptable to re -cover metal roofs. The minimum thickness, if it is being used as re -covery board, shall be 7/16 -inch. The minimum thickness for the plywood being used as decking must be 9/16" minimum. Fasteners must penetrate through both the plywood and the existing metal roof. g) If the plywood will be acting as the new deck for membrane attachment, it must be installed at 20 fasteners per board into the existing roof. Note: It is the responsibility of the contractor to ensure that the weight requirements of the building are not exceeded when installing additional materials over pre - engineered buildings. h) When installing the Duro -Last membrane over light -gauge metal with low pull -out values, a mock assembly should be tested to ensure that the fastener is drawn into the stress distribution plate without stripping (popping) out the metal panel. In the event that the metal panel strips out, membrane fastening to the purlins may be required. NEW CONSTRUCTION a) All concrete surfaces must be troweled smooth. If the concrete surface is not smooth, a minimum 3/8 -inch (10 mm) fan- folded underlayment is required. b) The roof deck or existing roof system must be clean, smooth, free of sharp edges, and loose foreign material. Damaged areas and other factors affecting the installation of the Duro -Last Roofing System must be repaired prior to the installation of the membrane. c) A metal deck must be separated from the Duro -Last membrane by at least 1/2 -inch (13 mm) hardboard (gypsum, plywood, or oriented strand board) or 1 -inch (25 mm) rigid insulation. It is the responsibility of the contractor to ensure that the selected insulation is adequate to span the flutes of the deck. If it is not, the flutes must be filled with an approved insulation. See "Insulation Selection and Installation" for further details. d) All plywood surfaces must be smooth and free of all foreign material. Gaps between sheets of plywood should not exceed 1/4 ". Prior to the installation of the membrane a 3 -mil (min) separator sheet or duct tape must be installed over any H- clips, if they are used on any plywood decking. INSTALLATION x008 WOOD NAILER a) Wood nailers must be a #2 grade lumber, or better and must be fastened to the deck, wall or existing secured nailer in such a manner that they resist 180 -Ibs. (2,643 N /M) of force per linear foot of nailer in any direction. Fasteners used to attach wood nailers must be spaced no greater than 18- inches (.46 m) apart. Wood nailers are required in any situation where 1 -inch (25 mm) or greater of insulation is added to the roof perimeter edge. The top of the nailers must be flush with the top of the insulation. Wood nailers are not required at a change of plane such as the intersection between a parapet wall and the decking. b) Duro -Last Engineering Services requires that for nailers and other lumber supports identified as ACQ or CA treated, only stainless steel fasteners be used. Additionally, for all new construction, untreated lumber should be used for nailers with standard e- coated fasteners. Further, treated lumber dating 2003 or earlier is acceptable for use with e- coated fasteners as lumber over two years of age is unlikely to contain the copper based treatments. INSULATION SELECTION AND INSTALLATION a) Insulation products must be neatly fitted to the roof deck and its penetrations. 4' x 8' insulation boards must have a minimum of five fasteners /distribution plates installed per board. No gap should exceed 1/4-inch (6 mm) in width. No more insulation products should be installed than can be covered with membrane and completed before the end of the day's work or before the onset of inclement weather. Duro -Last fasteners and Duro -Last plates as well as approved fastening pattems are required for attachment of all insulation products. MECHANICALLY FASTENED 'SPECIFICATIONS . .. � ' :.. ' September . 2 . 005 7 05/01/2008 09:20 FAX 18005662698 Duro -Last IJ009 ' b) The minimum compression characteristics of insulation products as determined by ASTM D -1621 will be as follows: • Polyisocyanurate products: 20 PSI (137.8 kPa) • Fiberglass products: 16 PSI (110.3 kPa) • Extruded polystyrene products: 25 PSI (172.3 kPa) • Expanded polystyrene products: 15 PSI (124.1 kPa) and 1.5 PCF (24 Kg /m density (certified) and a minimum 1 -inch (25 mm) thick. • Expanded polystyrene products covered with or laminated to a hardboard facer: 12 PSI (82.7 kPa) and 1.25 PCF (20 Kg /m3) densities and a minimum of 1 -inch (25 mm) thick. MEMBRANE INSTALLATION a) The prefabricated roof section is positioned on the deck to expose the first securement tab. The securement tab is mechanically fastened to the deck with approved fasteners, and stress distribution plates (see Fastener Selection and Deck Combinations in this section). The roof section is then unrolled and pulled taut to remove any wrinkles exposing the second securement tab. This process is repeated until the entire roof section has been mechanically fastened to the deck, including all securement tabs and all edges. The next section of roofing membrane is then positioned to provide a minimum 6 -inch (.15 m) overlap. The above processes are repeated until the substrate is completely covered. b) The edge of a 2 -inch (50 mm) Poly -Plate must be installed flush with the outside edge of a fastening tab. c) The maximum fastener spacing is 18- inches (.30 m) on center in rows 60- inches (1.52 m) apart. For tab spacings greater than 60- inches, the maximum fastener spacing is 12- inches. Refer to the fastener spacing table. d) When installing membrane, ensure that the appropriate side of the membrane is exposed to elements. For white and gray membrane, the smooth side should be exposed. On the tan membrane, it will be the embossed side of the membrane that should be exposed. e) If the membrane is attached to the support structure beneath the roof deck, special precautions must be taken. If the membrane is attached to a steel purlin structure, all fasteners must penetrate a minimum of 1 3/4 -inch (44 mm) from the top of the purlin using Duro -Last purlin fasteners. If the membrane is being attached to a wood truss structure, all fasteners must penetrate a minimum of 1 -inch (25 mm) from the top surface of the truss with approved Duro -Last fasteners. PERIMETER MEMBRANE INSTALLATION a) The first tab on all perimeter roof sections that have tabs parallel with the roof edge or parapet wall, must be between 24 -36 inches (.6 m and .9 m) from the edge or the wall. If the parapet wall is greater than 24- inches (.6 m) tall, a perimeter tab may be placed at 63" away from the roof edge (5 -foot tab system only). b) On 10 -foot tab systems, the first tab on all perimeter roof edges must be between 24 -36 inches (.6 m and .9 m) from the edge followed by a second tab placed 84 -96 inches (2.1 m and 2.4 m) from all exterior roof edges. Parapet wall height does not change this minimum requirement. c) On buildings with multiple roof levels, such as equipment penthouses, a roof perimeter edge is defined as any roof having a vertical height difference 3 -feet or greater than the lower roof areas surrounding it. If this condition exists, that area must be treated as a separate roof and will require a perimeter tab. See note "a ". d) On buildings located in high wind zones (greater than 120 -mph) or on structures that are 40 -feet or higher, additional wind tabs and an increased fastener spacing may be required. Contact the Duro -Last Engineering Services Department at 800 - 248 -0280 for additional information. HOT AIR WELDING a) Position the membrane so that an overlap of the top membrane overlaps the bottom membrane a minimum of 6- inches. Ensure the welding area is dry, clean and free of foreign material. b) Weld the top membrane to the bottom membrane using a hand -held welder or an automatic welding machine, and silicone roller. A minimum 1 -inch (38 mm) wide continuous weld is required. c) All field - welded seams must be inspected with a tack claw and all deficiencies repaired prior to inspection by Duro -Last. 1: MECHANICALLY FASTENED SPECIFICATIONS Sep(erriber20051 8 05/01/2008 09:20 FAX 18005662698 Duro -Last Ii010 FLASHINGS a) The Duro -Last membrane must not contact surfaces, including all insulated chimney pipes, exhaust pipes and combustible fuel pipes, which maintain or exceed temperatures of 120 °F. b) All flashings must be terminated at a minimum of 8- inches above the roof surface. c) See "Mechanically Fastened" details section for installation references. TWO WAY AIR VENT a) Two -Way Air Vents must be installed at a rate of one vent for every 1,000 square feet of deck area. b) Two -Way Air Vents are not to be installed near drains or in valleys. c) Two -Way Air Vents must be evenly spaced across the roof area and centered between rows of fastening tabs. d) See Details 5010 & 5020 for installation references. ROOF DRAINS a) All existing roofing materials must be removed from drain bowl and clamping ring. After the Duro -Last membrane is properly installed onto the bowl and the clamping ring set in place, all bolts securing the ring must be installed to provide constant, even compression on the sealant ( tube min). If bolts are broken or missing, replacements must be installed. b) If the Duro -Last drain boot is to be used, apply 1 /2 tube of sealant (min) to the outside of the drain boot and insert it into the drain. Install composite compression drain rings as low into the drain as possible. c) See Details 2011, 2020, 2021, 2025, 2030, 2041 & 2050 for installation references. EXPANSION JOINTS See Details 1140, 1150, 1160, 1170 & 6160 for installation references. PITCH PAN a) Use pitch pans only when standard Duro -Last flashings cannot be used. b) Only Duro -Last self - leveling pitch pan sealers may be used when creating a pitch pan. c) See Details 4030, 4040 and 4045 for installation references. WALKWAY PAD Duro -Last Roof Trak II Walkway Pad is recommended at all roof access points, service units and high traffic areas. Building owners who choose not to purchase the Roof Trak II Walkway Pad increase their risk of potential third party damage to the Duro -Last Roofing System. Note: Weld only one side of the Walkway Pad if it will be covering any field seams. This will allow the Duro -Last Technical Representative to inspect the entire field seam. CAUTIONS AND WARNINGS 1. Duro -Last Roofing, Inc. will not be responsible for damage that may occur as a result of the dew point falling within a roof deck subassembly or building. 2. All Polystyrene insulation (Styrofoam, Formular, Dow, EPS, etc. - blue, white, gray, green, or pink) must have an approved nonstvrene facer or a 3 -mil polyethylene slipsheet covering when installed in direct contact with existing or new PVC membranes. Polyethylene or polypropylene facers are acceptable only after testing, and approval by Duro -Last for compatibility. 3. Phenolic foam is not an approved insulation in new construction or re- roofing applications. The Duro- Last Roofing System may not, under any circumstance, be installed over phenolic foam. 4. Perlite and wood /mineral fiber- boards are not acceptable substrates for the Duro -Last membrane. 5. Wood fiber boards are only acceptable when a metal roof is being retrofitted. 6. If asbestos is encountered, the building owner must be notified at once. The owner is solely responsible for determining the proper course of action. 7. A Duro -Last roof shall not be installed over areas of roofs if one or more of the following conditions exist: a. The building structure is not sufficient to handle the load of the completed system. b. It is not possible to find an approved fastener that will properly hold in the substrate. c. Roofs are subject to hot embers, slag or burning debris. d. Incompatible chemicals exhausted directly onto the roof or may come in contact with the roof in liquid form. (See Chemical Resistance in the General Section) e. Steam is exhausted directly onto the roof that is in excess of 120° F. MECHANICALLY FASTENED'SPECIFICATIONS ,;. .. September 7005; 9 05/01/2008 09:21 FAX 18005662698 Duro -Last 1UF'U.R1U128 - Rooting Systems ONLINE CERTIFICATIONS DIRECTORY Page Bottom See General Information for Roofl g Systems DURO-LAST INC 525 W MORLEY DR SAGINAW, MI 48601 USA TGFU.R10128 Roofing Systems Roofing Systems "Duro- Last" (PVC) 40 to 60 mil membrane Includes white, gray and tan colors for all Classifications. 1. Deck: NC SINGLE PLY MEMBRANE SYSTEMS Class A - Ballasted Incline: 2 R10128 doll Page 1 of 12 G -P Gypsum DensDeck® or DensDeck Prime ®, 1/4 In. thick (min), may be used In lieu of Atlas Roofing "FR -10" and "FR -50" slip sheets and 1/2 In. thick gypsum wallboard In all applicable classifications. Insulation: — Any UL Classified Isocyanurate Insulation (tapered or uniform thickness), any thickness, any UL Classified EPS Insulation (tapered or uniform thickness), any thickness covered with 1 In. perlite, Owens - Coming "Roof Deck Board" or perllte, 1 -1/2 to 3 In. Membrane: — "Duro- Last" (PVC), laid loose. Surfacing: — River bottom stone (3/4 to 1 -1/2 In. dlam), 1000 Ibs /sq. 1. Deck: NC Incline: 3 Insulation: — Polystyrene, any thickness. Barrier Board: — 1 /2 -In. min HD wood fiberboard, mechanically fastened. Membrane: — "Duro -Last" (PVC) adhered with "DURO -LAST SB ADHESIVE" at 1 -1/3 gal /sq. 2. Deck:. NC Incline: 2 Insulation: — Atlas Rooflng "ACFoam II ", any thickness, mechanically fastened. Membrane: — "Duro-Last" (PVC) adhered with "DURO -LAST SB" at 1 -1/3 gal /sq. 3. Deck: NC Incline: 2 -1/2 Insulation: — Polystyrene, any thickness. Barrier Board: — 1 /2 -In. min HD wood fiberboard, mechanically fastened. Membrane: — "Duro-Last" (PVC) adhered with "DURO -LAST WB1 ADHESIVE" at 1 gal /sq. 4. Deck: NC Incline: 2 Insulation: — Polystyrene, any thickness. 5. Deck: NC Incline: 3 Class A - Fully Adhered Insulation: — Atlas Rooflng "ACFoam II ", any thickness, mechanically fastened. Membrane: — "Duro- Last" (PVC) adhered with "DURO -LAST WB1 ADHESIVE" at 1 gal /sq. http : / /database.ul.com /cgi- bin/XYV /template /LISEXT /1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:21 FAX 18005662698 I lit' U.K1U1•LS - Kootmg Systems • barrier Board: — 1 /2 -in. min HD wood flberboard, mechanically fastened. Membrane: — "Duro- Last" (PVC) adhered with "DURO -LAST WB ADHESIVE" at 1 gal /sq. 6. Deck: NC Incline: 2 8. Deck: NC Insulation: — Atlas Roofing "ACFoam II °, any thickness, mechanically fastened. Membrane: — "Duro -last" (PVC) adhered with "DURO -LAST WB ADHESIVE" at 1 gal /sq. 7. Deck: NC Incline: 2 -1/2 Insulation: — Any UL Classlfied.polyisocyanurate, any thickness, adhered with hot roofing asphalt. Barrier Board: — Min. 1/4 In. GP Gypsum DensDeck Prime ®, adhered with hot roofing asphalt. Membrane: — "Duro- Last" (PVC) adhered with "DURO -LAST WB1 ADHESIVE" at 1 gal /sq. Insulation: — Polystyrene, any thickness. Barrier Board: — 1 /2 -in. min HD wood fiberboard, mechanically fastened. Membrane: — "Duro- Last" (PVC) adhered with "Tab Sealer" at 1 -1/2 gal /sq. 9. Deck: NC Incline: 3 Insulation: — Atlas Roofing "ACFoam II ", any thickness, mechanically fastened. Membrane: — "Duro- Last" (PVC) adhered with "Tab Sealer" at 1 -1/2 gal /sq. 10. Deck: C -15/32 Incline: Unlimited Insulation: — Any UL Classified polylsocyanurate, any thickness, adhered with hot roofing asphalt or Dow Chemical \'s "Insta- StIk ". Barrier Board: — Min. 1/4 in. G -P Gypsum DensDeck Prime ®, adhered with hot rooflng asphalt or Dow Chemical "Insta- Stik ". Membrane: — "Duro -Last" (PVC) adhered with "Tab Sealei at 1 -1/2 gal /sq. 1. Deck: C -15/32 Incline: 3 Barrier Board: — Gypsum, 1/2 In. min, joint offset 6 In. from joints In the deck, mechanically fastened. Insulation (Optional): — A. Atlas Rooflng "ACFoam II ", any thickness. B. Owens - Corning "Roof Deck Boards ". C. Wood fiber. D. Perlite, 1 -1/2 to 3 In. incl. Membrane: — "Duro-Last" (PVC). 2. Deck: NC Insulation (Optional): — A. Any UL Classified polystyrene insulation (tapered or uniform thickness) any thickness covered with 1 in. perlite or 1 in. wood fiber or Atlas Roofing "FR10 ". B. Atlas Rooflng "ACFoam II ", any thickness. C. Owens - Corning "Roof Deck Boards ". D. Wood flber. E. Perllte 1 -1/2 to 3 In. Incl. Duro -Last Incline: 2 Class A - Mechanically Fastened Incline: 3 at012 Page 2of12 http : / /database.ul.com/cgi- bin/XYV /template /LISEXT/ 1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:21 FAX 18005662698 Duro -Last 1Ut U.R1U122S - Rooting Systems • Membrane: — "Duro- Last" (PVC). 3. Deck: C -15/32 Incline: 2 Slip Sheet: — One layer Atlas Roofing "FR50 ", 15 mil /min. Insulation: — Two layers 3/4 In. perlite, joints staggered 16 in., mechanically fastened. Membrane: — "Duro- Last" (PVC). 4. Deck: C -15/32 Incline: 3/4 Slip Sheet: — Four layers Atlas Roofing "FR10 ", mechanically fastened. Insulation (Optional): — Glass fiber, perlite, Atlas Rooflng "ACFoam II ", Rmax "Multi- Max ", Johns Manville "ENRGY 1" or Apache Products "Apache Pyrox ", any thickness, mechanically fastened. Membrane: — "Duro- Last" (PVC). 5. Deck: NC Membrane: — "Duro -Last" (PVC). 6. Deck: NC Incline: No limitation Incline: 3 Insulation: — Apache Products "Apache White Line ", "Apache Pyrox ", any thickness, mechanically fastened or adhered. Membrane: — "Duro -Last" (PVC). 7. Deck: C -15/32 Incline: No limitation Base Sheet: — Class C mineral surfaced sheet roll roofing, granule side up. Sllp Sheet: — Four layers Atlas Rooflng "FR10 ", mechanically fastened. Membrane: — "Duro -Last" (PVC). 8. Deck: C -15/32 Incline: 2 Base Sheet: — Class C mineral surfaced sheet roofing, granule side up. Slip Sheet: — Four layers Atlas Roofing "FR10 ", mechanically fastened. Insulation (Optional): — Glass fiber or perlite, any thickness, mechanically fastened. Membrane: — "Duro- Last" (PVC), mechanically fastened. 9. Deck: C -15/32 Incline: No limitation Fj013 Page 3of12 Insulation: — Any UL Classified EPS Insulation (tapered or uniform thickness) or polyisocyanurate, any thickness, mechanically fastened. Barrier Board: — Gypsum, 1/2 in., mechanically fastened. Membrane: — "Duro-Last" (PVC). 10. Deck: NC Incline: 1 Insulation: — Atlas Roofing "ACFoam II ", 1.0 In. min. Membrane: — "Duro -Last" (PVC). 11. Deck: NC Incline: No limitation Insulation: — Polystyrene, any thickness, mechanically fastened. Slip Sheet: — One layer Atlas Roofing "FR10 ", mechanically fastened. Membrane: — "Duro- Last" (PVC). 12. Deck: NC Incline: 2 -1/2 Insulation: — Rmax "Multi- Max ", any thickness, mechanically fastened. Membrane: — "Duro-Last" (PVC). http : / /database.ul.com/cgi- bin/XYV /template /LISEXT /1 FRAME /showpage.html ?name= TGFU.R... 1/23/2008 05/01/2008 09:22 FAX 18005662698 Duro -Last fj014 TGFU.R10128 - Roofing Systems Page 4 of 12 13. Deck: NC 14. Deck: C -15/32 Incline: 1 -1/2 15. Deleted. 16. Deleted. 17. Deck: NC 18. Deck: NC Incline: 3 20. Deck: NC 23. Deck: NC Insulation: — Johns Manville "ENRGY 1 ", any thickness, mechanically fastened. Membrane: — "Duro- Last" (PVC). Barrier Board: — Gypsum, 1/2 in. min, joints offset 6 In. min from joints In deck, mechanically fastened. Insulation (Optional): — Atlas Roofing "ACFoam II ", Owens - Corning "Roof Deck Board ", Rmax "Multi -Max ", Johns Manville " ENRGY 1 ", perilte, any thickness, mechanically fastened or adhered with hot roofing asphalt. Membrane: — "Duro- Last" (PVC), mechanically fastened. Insulation: — Any UL Classified EPS Insulation (tapered or uniform thickness), any thickness. Barrier board: — Apache Products "Apache Pyrox" or Atlas Roofing "ACFoam III" , 1 -1/2 In. min. Membrane: — "Duro- Last" (PVC), mechanically fastened. Insulation: — Atlas Roofing "ACFoam II ", any thickness. Membrane: — "Duro -Last" (PVC). 19. Deck: C -15/32 Incline: 1/2 Insulation: — 3/4 in. (min) Partek Insulation "Paroc Capboard" with all joints staggered 6 In. (min) from the plywood joints. Membrane: — "Duro -Last" (PVC). Insulation: — Polystyrene, any thickness. Slip Sheet: — Atlas Roofing "FR -10 ". Membrane: — "Duro-Last' (PVC). 21. Deck: C -15/32 Slip Sheet: — Four layers Atlas Roofing "FR -10 ". Membrane: — "Duro- Last" (PVC). 22. Deck: NC Insulation: — Carpenter Insulation "Foamfold ", Membrane: — "Duro -Last" (PVC). Slip Sheet: — One ply Atlas Roofing "FR50 ". Membrane: — "Duro- Last" (PVC). 24. Deck: C -15/32 Incline: 2 Incline: 3 Incline: No limitation Incline: No limitation Incline: 1 Incline: 1 Incline: 3 Barrier Board: — G -P Gypsum DensDeck ®, 1/4 In. (min) with all joints staggered a min of 6 In. from the plywood joints. Membrane: — "Duro -Last" (PVC). 25. Deck: NC Incline: 1 -1/2 Insulation: — Hunter "H- Shield" polylsocynurate Insulation any thickness. Membrane: — "Duro-Last" (PVC). http : / /database.ul.com /cgi- bin/XYV /template /LISEXT /1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:22 FAX 18005662698 I ur u.x1 u 125 - Koonng systems Duro -Last 26. Deck: NC Incline: 2 Insulation: — "Ultra -Fold TPM" or "Ultra Guard TPM", mechanically fastened. Membrane: — "Duro- Last" (PVC), mechanically fastened. 27. Deck: C -15/32 Incline: 2 Barrier Board: — 1/2 in. gypsum board with all joints staggered 6 In from the plywood Joints. Insulation: — "Ultra -Fold TPM" or "Ultra Guard TPM ", mechanically fastened. Membrane: — "Duro- Last" (PVC), mechanically fastened. 28. Deck: C -15/32 Incline: 2 -1/2 Barrier Board: — Gypsum, 1/2 In. min, joints offset 6 In from joints In deck, mechanically fastened. Insulation (Optional): — Celotex "Star AP" or "Hy -Tec ", any thickness. Membrane: — "Duro- Last" (PVC). 29. Deck: NC Incline: 2 -1/2 Insulation (Optional): — Celotex "Star AP" or "Hy -Tec ", any thickness. Membrane: — "Duro- Last" (PVC). 30. Deck: C -15/32 Incline: 1/4 Slip Sheet: — Two layers Atlas Rooflng "FR10 ", mechanically fastened. Insulation (Optional): — Celotex "Star AP, "Hy -Tec ", "Hy -Therm AP" or Apache Products "Apache Pyrox ", any thickness, mechanically fastened. Membrane: — "Duro -Last" (PVC). 31. Deck: NC Incline: -1/2 Insulation: — Celotex 'Star AP" or "Hy- Tec ", any thickness, mechanically fastened or adhered. Membrane: — "Duro -Last" (PVC). 32. Deck: C -15/32 Incline: 1 Barrier Board: — Gypsum, 1/2 In. min, joints offset 6 In. from joints in deck, mechanically fastened. Insulation (Optional): — Celotex "Star AP" or "Hy -Tec ", any thickness, mechanically fastened or adhered with hot roofing asphalt. Membrane: — "Duro -Last° (PVC), mechanically fastened . 33. Deck: NC Incline: 2 -1/2 Insulation: — Any UL Classlfled EPS insulation (tapered or uniform thickness), any thickness. Barrier Board: — Celotex "Hy -Therm AP ", 1 -1/2 In Membrane: — "Duro-Last" (PVC). 34. Deck: NC Incline: 1 Insulation: — Firestone "ISO 95 +GL ", any thickness. Membrane: — "Duro- Last" (PVC) 35. Deck: C -15/32 Incline: 2 Underlayment: — Two layers Elk "Versashleld Underlayment ". Membrane: — "Duro- Last" (PVC). 36. Deck: C -15/32 Incline: 1/4 Slip Sheet: — Two layers Elk "VersaShield Underlayment" or "VersaSh(eid FB -2S ". Insulation: — Any UL Ciassifleld, any thickness (except EPS). Membrane: — "Duro-Last° (PVC). a015 Page 5 of 12 http: // database. ul .com /cgi- bin/XYV /template/LISEXT /1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:22 FAX 18005662698 1tit1 U.K1U1l2S - Kooting Systems • 37. Deck: C -15/32 Incline: 1/4 38. Deleted. 39. Deck: C -15/32 Incline: 1/4 40. Deck: NC 41. Deck: NC 43. Deck: NC 44. Deck: NC 46. Deck: NC Slip Sheet: — Three layers Elk "VersaShield F8 -1S ". Insulation: — Any UL Classifleld, any thickness (except EPS). Membrane: — "Duro-Last" (PVC). Slip Sheet: — Two layers Elk "VersaShleld FB -1S ". Insulation: — Any UL Classifleld, any thickness (except EPS and wood fiberboard). Membrane: — "Duro-Last" (PVC). Incline: See note Impact: 3 Insulation: — Polyisocyanurate Insulation (see note), 1 -3 In. thickness. Membrane: — "Duro - Last" (PVC), mechanically fastened with 2 In. polyplates and #14 screws. Note: See Indlvldual Classification of speclflc polyisocyanurate Insulation used. Incline: See note Impact: 4 Insulation: — Polylsocyanurate insulation (see note), min. 4 In. thickness. Membrane: — "Duro -Last" (PVC), mechanically fastened with 2 In. polyplates and #14 screws. Note: See Indlvldual Classification of specific polyisocyanurate Insulation used. 42. Deck: C -15/32 Incline: 3 Impact: 4 Insulation (Optional): — Polylsocyanurate Insulation, any thickness. Barrier Board: — G -P Gypsum DensDeck ®, 1/4 in. (min) with all joints staggered a min of 6 In. from the plywood joints. Membrane: — "Duro-Last" (PVC), mechanically fastened with 2 in. potyplates or 3 In. metal plates and #14 screws. Incline: See Note Impact: 3 Insulation: — Polylsocyanurate insulation (see note), 1 -3 In. thickness. Membrane: — "Duro-Last" (PVC), mechanically fastened with 2 In. polyplates and #14 screws. Note: See Individual Classifications for speclflc polyisocyanurate insulation used. 45. Deck: C -15/32 Incline: See Note Impact: 4 Insulation: — Polyisocyanurate insulation (see note), min 4 In. thickness. Membrane: — "Duro-Last" (PVC), mechanically fastened with 2 In. polyplates and #14 screws. Note: See individual Classifications for specific polyisocyanurate Insulation used. Incline: 3 Impact: 4 Insulation (Optional): — Polyisocyanurate Insulation, any thickness. Barrier Board: — G -P Gypsum DensDeck ®, 1/4 In.(min) with all joints staggered a min of 6 In. from the plywood joints. Membrane: — "Duro - Last" (PVC), mechanically fastened with 2 In. polyplates or 3 In. metal plates and #14 screws. Incline: 1/2 Impact: 4 Insulation: — Polylsocyanurate Insulation, 1 Inch minimum thickness. Slip Sheet: — Leggett & Platt" Nova Rollout " - mechanically fastened. Membrane: — "Duro-Last" (PVC), mechanically fastened with 2 In. polyplates and #14 screws. 47. Deck: NC Incline: 1 Duro -Last fj016 Page 6 of 12 http: / /database.ul. com/cgi- bin /XYV/ template /LISEXT / 1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:22 FAX 18005662698 Duro -Last Q017 1 ur u.Kl u l zii - t oonng systems Page 7 of 12 .Insulation: — The Dow Chemical Co. "STYROFOAM DECKMATE", "STYROFOAM DECKMATE Plus ", or "STYROFOAM Square Edge ", any thickness, mechanically attached or loose laid. Slip Sheet: — Atlas Roofing "FR10 ", "FR 11" or "FR 50 ". Membrane: — "Duro -Last" (PVC) ", 48. Deck: NC Incline: 2 Insulation: — Polystyrene, EPS or beadboard, any thickness. Slip Sheet: — One layer "VersaShleld FB -1S" or "VersaShleid FB -2S ". Membrane: — "Duro- Last" (PVC) 49. Deck: C -15/32 2. Deleted. 3. Deck: C -15/32 6. Deleted. 7. Deleted. 8. Deleted. 9. Deck: NC Insulation: — Atlas Rooflng "ACFoam I1", any thickness. Slip Sheet: — Atlas Roofing "FR50 ". Membrane: — "Duro-Last" (PVC). Incline: See Note 2 Impact: 4 Base Sheet: — One ply Type G2, Atlas Rooflng "FR -10" or Elk Corp "VersaShleld ", mechanically attached. Barrier Board: — Min. 1/4 in. United States Gypsum Co. "Securock Roof Board ", with all joints staggered a min of 6 In. from the plywood joints, mechanically fastened (See Note 1). Insulation (Optional): — Polylsocyanurate Insulation (See Note 2). Membrane: — "Duro-Last" (PVC), mechanically fastened with 2 In. polyplates and #14 screws. Note 1: If Insulation is not used, barrier board Is to be mechanically fastened with 2 In. polyplates and #14 screws. Note 2: Max Incline shall be In accordance with Classification established for Insulation /membrane roofing system, but Is limited to 3:12. Class B - Mechanically Fastened 1. Deck: C -15/32 Incline: 3/4 Slip Sheet: — Two layers Atlas Roofing "FR10 ", mechanically fastened. Insulation (Optional): — Glass flber or perlite, any thickness, mechanically fastened. Membrane: — "Duro- Last" (PVC). Incline: No limitation Base Sheet: — Class C mineral surfaced sheet roll roofing, granule side up. Slip Sheet: — Two layers Atlas Roofing "FR10 ", mechanically fastened. Membrane: — "Duro- Last" (PVC). 4. Deck: C -15/32 Incline: 2 Base Sheet: — Class C mineral surfaced sheet roll roofing, granule side up. Slip Sheet: — Two layers Atlas Rooflng "FR10 ", mechanically fastened. Insulation (Optional): — Glass flber or perlite, any thickness, mechanically fastened. Membrane: — "Duro- Last" (PVC). 5. Deck: NC Incline: 3 Insulation: — Rmax "Multi -Max" or Johns Manville "ENRGY 1 ", any thickness, mechanically fastened. Membrane: — "Duro- Last" (PVC), mechanically fastened. 10. Deck: C -15/32 Incline: 1 Incline: No limitations Slip Sheet: — Atlas Roofing "FR10 ". Insulation: — One of the following, 2 In. min thickness with all joints staggered 6 in. (min) from plywood joints. http: / /database.ul.com/cgi- bin /XYV/ template /LISEXT /1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:23 FAX 18005662698 Duro -Last Ij018 TGFU.R10128 - Roofing Systems Page 8 of 12 A. Atlas Roofing "ACFoam II ". B. Apache Products "Apache Pyrox" or "Apache White Line ". C. Johns Manville "ENRGY 2G ". D. Firestone Building Products "ISO 95 +GW ". E. Rmax "Multi -Max FA ". Membrane: — "Duro -Last" (PVC). 11. Deck: C -15/32 Incline: 1 Slip Sheet: — One layer Atlas Roofing "FR50 ". Membrane: — "Duro- Last" (PVC), mechanically fastened. 12. Deck: C -15/32 Incline: 1/2 Slip Sheet: — Atlas Rooflng "FR10 ". Insulation: - Celotex "Hy -Therm AP" or "Hy -Tec (Energy Lok) ", 2 In. min thickness with all joints staggered 6 in. (min) from plywood joints. Membrane: — "Duro- Last" (PVC). 13. Deck: C -15/32 Incline: 2 Underlayment: — Two layers Elk "Versashleld Underlayment". Membrane: — "Duro- Last" (PVC), mechanically fastened. 14. Deck: C -15/32 Incline: 2 Slip Sheet: — One layer Elk "VersaShield Underlayment". Membrane: — "Duro- Last" (PVC). 15. Deck: C -15/32 Incline: 1 -1/2 Slip Sheet: — One layer Elk "VersaShield Underlayment" or "VersaShield FB -2S ". Membrane: — "Duro-Last" (PVC). 1. Deck: C- 15/32(OSB or plywood) Incline: 1 1. Deck: C -15/32 Existing Roof System: — Class A, B or C covered with: Barrier Board: — Gypsum, 1/2 In. min. Insulation (Optional): — B. Atlas Rooflng "ACFoam II ", any thickness. Class C - Mechanically Attached Slip Sheet: — One layer Atlas Roofing FR10. Insulation (Optional): — Atlas Roofing "ACFoam II ", Rmax "Multi Max ", Johns Manville "ISO 1 ", Celotex "Hy -Tec ", "Star AP" or "Hy -Therm AP ", any thickness. Membrane: — "Duro- Last" (PVC), mechanically fastened. MAINTENANCE AND REPAIR SYSTEMS Class A Incline: 1/4 A. Any UL Classified polystyrene Insulation (tapered or uniform thickness) any thickness covered with G -P Gypsum DensDeck® or one layer of Elk "VersaShleld F8 -1S" or "VersaShield FB -2S ". http: / /database.ul. com/cgi- bin/XYV /template /LISEXT/ 1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:23 FAX 18005662698 Duro -Last Q019 'I'UF U.R10128 - Roofing Systems Page 9 of 12 • C. Owens - Coming "Roof Deck Boards ". D. Wood fiber. E. Perlite, 1 -1/2 to 3 In. Incl. Membrane: — "Duro -Last" (PVC), mechanically fastened. 2. Deck: NC Incline: 3 Existing Roof System: — Class A gravel surfaced. Membrane: — "Duro -Last" (PVC), mechanically fastened. 3. Deck: NC Incline: 1/4 Existing Roof System: — Class A, B or C covered with: Insulation (Optional): — A. Any UL Classifled polystyrene Insulation (tapered or uniform thickness) any thickness covered with 1 In, perilte or 1 In. wood fiber or Atlas Roofing "FR10 ". B. Atlas Roofing "ACFoam II ", any thickness. C. Owens - Corning "Roof Deck Boards ". D. Wood flber. E. Perite, 1 -1/2 to 3 In. incl. Membrane: — "Duro-Last" (PVC), mechanically fastened. 4. Deck: C -3/4 Incline: 1/4 Existing Roof System: — Class A covered with: Membrane: — "Duro- Last" (PVC), mechanically fastened. 5. Deck: C 15/32 Incline: 1/4 Existing Roof System: — Class A, B or C gravel surfaced. The gravel must be maintained at 400 Ibs /sq. Separation Sheet: — Type 30 or G2 (45 lb) base sheet, Atlas Rooflng "FR10" or undeHayment boards consisting of Amoco Foam Products "Amocor P14, PB4 or P86," or min 1/2 In. thick wood fiber roof Insulation. Membrane: — "Duro -Last" (PVC), mechanically fastened. 6. Deck: C -15/32 Incline: 3/4 Existing Roof System: — Class A, B or C BUR system, smooth surface covered with: Slip Sheet: — Two layers Atlas Roofing "FR10 ", mechanically fastened. Membrane: — "Duro-Last" (PVC), mechanically fastened. 7. Deck: C -15/32 Incline: No limitation Existing Roof System: — A. Class A, B or C mineral or smooth surfaced asphalt felt rooflng system, covered with: B. Single -ply (modified bitumen) roof system, covered with: C. Class A, 8 or C asphalt organic felt or glass flber mat shingles, covered with: Slip Sheet: — Four layers Atlas Roofing "FR10 ", mechanically fastened. Membrane: — "Duro-Last" (PVC), mechanically fastened. http : / /database.ul.com /cgi- bin/XYV/ template /LISEXT /1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:23 FAX 18005662698 Duro -Last a020 TGFU.R10128 - Rooting Systems : Page 10 of 12 8. Deck: C -15/32 Incline: 1 Existing Roof System: —'Class A gravel surfaced asphalt felt roofing system. The gravel must be maintained at 400 Ibs /sq. Insulation: — Carpenter Insulation "Foamfold ", mechanically fastened. Membrane: — "Duro- Last" (PVC), mechanically fastened. 9. Deck: C -15/32 Incline: No limitation Existing Roof System: — Class A, B or C roof (smooth or granular surfaced cap sheet, shingles or modified bitumen single ply), covered with 1/2 In. (min) gypsum board, mechanically fastened. Membrane: — "Duro- Last" (PVC), mechanically fastened. 10. Deck: NC Incline: 3 Existing Roof System: — Insulated or unlnsulated ballasted single ply membrane, ballast may be removed, covered with: Slip Sheet: — Atlas Roofing "FR10" or Elk Versa - Shield 1S, mechanically fastened or loose laid. Membrane: — "Duro - Last" (PVC), mechanically fastened. 11. Deck: C -15/32 Incline: 2 Existing Roof System: — Cass A gravel surfaced asphalt felt roofing system. The gravel must be maintained at 400 Ibs /sq. Insulation: — Polyfoam Packers "ThermoSafe -RB" Insulation, mechanically fastened. Membrane: — "Duro- Last" (PVC), mechanically fastened. 12. Deck: NC Incline: 2 Existing Roofing System: — Class A, B or C built uup system, smooth surface, cap sheet or gravel surfaced; gravel may be removed. Barrier Board (If gravel is removed): — 1/2 in. gypsum board. Insulation: — "Ultra -Fold TPM" or "Ultra Guard TPM ", mechanically fastend. Membrane: — Duro-Last (PVC), mechanically fastened. 13. Deck: C -15/32 Incline: 2 Existing Roof System: — Class A, smooth or gravel surfaced (gravel maintained at 400 Ib. per sq.) Insulation: — Amocor -PB6, PB6W, PG38, PG39 or Duro -Fold® Membrane: — "Duro- Last "(PVC), mechanically fastened. 1. Deck: C -15/32 Incline: 1 Class B Existing Roof System: — Class B BUR system smooth surfaced covered with Slip Sheet: — A Type 30 or G2 (45 Ib) base sheet. B. One layer Atlas Roofing "FR10 ", mechanically fastened. C. AMOCO Foam Products "Amnocor P14, PB4, PB6 ". D. Carpenter Insulation "Foamfold ". E. Min 1/2 In. wood fiber roof insulation. F. 3 mIl polyethylene film. Membrane: — "Duro- Last" (PVC), mechanically fastened. 2. Deck: C -15/32 Incline: No limitations Base Sheet: — One layer Type G2 Owens - Corning base sheet, mechanically fastened to deck. Cap Sheet: — One layer Type G3 GAF Mineral Surfaced Cap Sheet, hot mopped. http: // database. ul. com /cgi- bin /XYV/ template /LISEXT /1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:24 FAX 18005662698 Duro -Last TGFU.R10128 - Roofing Systems • •Membrane: — "Duro-Last" (PVC), mechanically fastened. Coating: — Kool Seal "Uniflex" Elastomeric White Gray or Black roof coating at 3/4 to 1 gal /sq. Surfacing: — No. 11 roofing granules embedded in the wet coating at 50 lbs /sq. 3. Deck: C -15/32 Incline: No limitation Existing Roof System: — A. Class A, B or C mineral or smooth surfaced asphalt felt roofing system, covered with: B. Single -ply (modified bitumen) roof system, covered with: C. Class A, B or C asphalt organic felt or glass fiber mat shingles, covered with: Slip Sheet: — Two layers Atlas Roofing "FR10 ", mechanically fastened. Membrane: — "Duro- Last" (PVC), mechanically fastened. Class A, B or C 1. Deck: C -15/32 Incline: 2 Existing Roof System: — Class A, B or C, Classification to be retained, covered with: Membrane: — "Duro- Last" (PVC), mechanically fastened. Existing roof Classlflcatlon remain the same. 2. Deck: C -15/32 Incline: 2 4. Deck: NC Existing Roof System: — Class A, B or C, Classlflcatlon to be retained, covered with: Membrane: — "Duro-Last" (PVC), mechanically fastened, Existing roof Classlflcatlon remain the same. 3. Deck: C -15/32 Incline: 2 Existing Roofing System: — Class A, B or C built up system smooth surface, cap sheet or gravel sufaced; gravel must maintain at 400 lb/ per sq; existing classification will be maintained. Insulation: — "Ultra -Fold TPM" or "Ultra Guard TPM ", mechanically fastened. Membrane: — "Duro- Last" (PVC), mechanically fastened. Incline: 1/2 Impact: 4 Existing Roof System: — Class A, B or C, Classification to be retained, covered with: Insulation: — Polylsocyanurate Insulation, 1 Inch minimum thickness. Slip Sheet: — Leggett & Platt" Nova Rollout " - mechanically fastened. Membrane: — "Duro -Last" (PVC), mechanically fastened with 2 in. polyplates and #14 screws. 5. Deck: C -15/32 Incline: 2 Existing Roof System: — Class A, B or C , Classification to be retained, covered with: Slip Sheet: — Elk "VersaShield FB -1S ", or Elk "VersaShleld FB -2S ", or Elk "VersaShield Underlayment ", or Atlas Rooflng "FR10 ", or Atlas Roofing "FR50 ", or Polyethylene (not UL Classified), 3 mils. Membrane: — "Duro-Last" (PVC), mechanically fastened, Existing roof Classification remain the same. Last Undated on 2007 -03 -21 Questions? Notice of Disclaimer Page Top lit1021 Page 11 of 12 Copyright (e) 2008 Underwriters Laboratories Inc.® The appearance of a company's name or product In this database does not In Itself assure that products so identified have been manufactured under UL's Follow -Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow -Up Service. Always look for the Mark on the product. UL permits the reproduction of the material contained In the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and /or Listings (files) must be presented In their entirety and In a non - misleading manner, without any manipulation of http: / /database. ul.com/cgi- bin/XYV /template/LISEXT / 1 FRAME /showpage.html ?name = TGFU.R... 1/23/2008 05/01/2008 09:24 FAX 18005662698 Duro -Last f J022 '1'UFU.K10128 - Rooting Systems Page 12 of 12 •ttie data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from Underwriters Laboratories Inc." must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice In the following format: "Copyright © 2008 Underwriters Laboratories Inc. ®" fi i fk•dtp?pdgat.016tift1140.pn .w rli1 rb0 tjr & 3 6 r ..iniiilQ tvilh 1 r:; r. r.tia'fl P, oor1e: http: // database. ul. com /cgi- bin/XYV /template /LISEXT /1 FRAME /showpage.html ?name= TGFU.R... 1/23/2008 10 -01 -2008 MIKE KELLEY 5817 S OAKES ST TACOMA WA 98409 Ciz y of Tukwila RE: Permit No. D08 -245 16425 SOUTHCENTER PY TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 11/18/2008 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: fer Marshall, 't Technician Permit File No. D08 -245 Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 DEPARTMENTS Bui •'d g D ivision Public Works Comments: Approved n Notation: Documents/routing slip.doc 2 -28 -02 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D08 -245 PROJECT NAME: AT & T SITE ADDRESS: 16425 SOUTHCENTER PY X Original Plan Submittal Response to Correction Letter # DATE: 05 -01 -08 Response to Incomplete Letter #_ Revision # After Permit Issued APPROVALS OR CORRECTIONS: Structural Incomplete Approved with Conditions Fire Prevention DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete 12 Planning Division n ❑ Permit Coordinator DUE DATE: 0 -06 -08 Not Applicable TUES/THURS ROUTING: Please Route Structural Review Required n No further Review Required Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: REVIEWER'S INITIALS: DATE: DUE DATE: 06 -03 -08 Not Approved (attach comments) n REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License SPVROPV941 Q7 Licensee Name A S P V ROOFING Licensee Type CONSTRUCTION CONTRACTOR UBI 602476088 Ind. Ins. Account Id #1 Business Type INDIVIDUAL Address 1 5817 S OAKES ST Address 2 City TACOMA County PIERCE State WA Zip 98409 Phone 2532288651 Status ACTIVE Specialty 1 ROOFING Specialty 2 UNUSED Effective Date 11/27/2006 Expiration Date 11/27/2008 Suspend Date Separation Date Parent Company Previous License MEKINEK950C3 Next License Associated License Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date #1 GREAT AMERICAN INS. CO. FS7615467 11/15/2006 Until Cancelled $6,000.00 11/27/2006 Business Owner Information Name Role Effective Date Expiration Date KELLEY, MICHAEL E OWNER 11/27/2006 Look Up a Contractor, Electric or Plumber License Detail 1 Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. I • Page 1 of 2 https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= SPVROPV941 Q7 05/12/2008 .368 SO. FT, rap = 127 KEY MAP i -NY SHEEPSX114 ITAFSIZ • SToCE -- T . 1 L.. go Ce.) 24. GAR. pARKNJGr LoT Souni GENTEK PARKWAY EXI ROUTE OF ACCESSIBILITY /69Z9 vr4CPNm11 AT &T STORE 'it/ 98rag 1. ELECTRICAL ENGINEER TO LOCATE ALL EXIT SIGNS AND VERIFY POWER/SELF ONF CONFIGURATION (WALL OR CELING), MOUNTING C C 2. EDG 1 120 ELN; MANUFACTURER: LITHONIA. 3. LITHONIA LIGHTING EDGE UT EXIT LIGHT, SINGLE FACE LETTERS. i i ..,...0,M O .. R EWE FOR COOS COMPLIANCE APPRO MAY - 2008 City Of Tukwila 'LOIN DNISI• 6.1 S IMP UM 10-01 NORTH sr 01 El M P RECEIVED MAY -12008 PERMIT CENTER+