Loading...
HomeMy WebLinkAboutPermit D08-451 - REISCHLING PRESS - RACKSREISCHLING PRESS 3325 S 116 ST EXPIRED 04 D08 -451 Parcel No.: 1023049069 Address: 3311 S 120 PL TUKW Suite No: Tenant: Name: REISCHLING PRESS INC Address: 3311 S 120 PL , TUKVVILA WA CitAf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us DEVELOPMENT PERMIT Owner: Name: SABEY CORPORATION Address: 12201 TUKWILA INTL BLVD 4THFL , SEATTLE WA 98168 Phone: Contact Person: Name: MIKE SORENSON Address: 1100 SW 7TH ST , RENTON WA 98057 Phone: 206 -818 -4488 Contractor: Name: NORTHWEST HANDLING SYSTEMS Address: 1100 SW 7 ST , RENTON WA 98055 Phone: Contractor License No: NORTHHS963ND • Permit Number: D08 - 451 Issue Date: 10/20/2008 Permit Expires On: 04/18/2009 Expiration Date: 10/09/2009 DESCRIPTION OF WORK: INSTALL (15) BAYS OF RACKING TO SUPPORT MECHANIOCAL BLOWER AND SHEET METAL HOOD ASSEMBLY. MECHANICAL BLOWER PROVIDES AIR TO COOL LARGE PRINTERS. Value of Construction: $0.00 Fees Collected: $180.23 Type of Fire Protection: SPRINKLERS International Building Code Edition: 2006 Type of Construction: Occupancy per IBC: * *continued on next page ** doc: IBC -10/06 D08 -451 Printed: 10 -20 -2008 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non- Profit: N Water Main Extension: Private: Public: Water Meter: Permit Center Authorized Signature: Signature: Print Name: doc: IBC -10/06 City Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us N //"i'ce.. J (3l�e/�1SU✓1 • Permit Number: D08 - 451 Issue Date: 10/20/2008 Permit Expires On: 04/18/2009 Date: I b ��Fl - c I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit. Date: /497.''%e This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. D08 -451 Printed: 10 -20 -2008 Parcel No.: 1023049069 Address: Suite No: Tenant: 3311 S 120 PL TUKW • • City of Tukwila REISCHLING PRESS INC 1: ** *BUILDING DEPARTMENT CONDITIONS * ** Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: D08 -451 ISSUED 10/02/2008 10/20/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 6: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 7: All rack storage requires a separate permit issued through the City of Tukwila Permit Center. Rack storage over 8 -feet in height shall be anchored or braced to prevent overturning or displacement during seismic events. The design and calculations for the anchorage or bracing shall be prepared by a registered professional engineer licensed in the State of Washington. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: ** *FIRE DEPARTMENT CONDITIONS * ** 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (IFC 1008.1.8.3 subsection 2.2) 14: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle doc: Cond -10/06 008 -451 Printed: 10 -20 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us is engaged from inside the tenant space. (IFC Chapter 10) 15: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC 1008.1.8.1) 16: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10) 17: Aisles leading to required exits shall be provided from all portions of the building and the required width of the aisles shall be unobstructed. (IFC 1013.4) 18: Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30,480 mm) or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (IFC 1011.1) 19: Every exit sign and directional exit sign shall have plainly legible letters not less than 6 inches (152 mm) high with the principal strokes of the letters not less than 0.75 inch (19.1 mm) wide. The word "EXIT" shall have letters having a width not less than 2 inches (51 mm) wide except the letter "I ", and the minimum spacing between letters shall not be less than 0.375 inch (9.5 mm). Signs larger than the minimum established in section 1011.5.1 of the International Fire Code shall have letter widths, strokes and spacing in proportion to their height. The word "EXIT" shall be in high contrast with the background and shall be clearly discernible when the exit sign illumination means is or is not energized. If an arrow is provided as part of the exit sign, the construction shall be such that the arrow direction cannot be readily changed. (IFC 1011.5.1) 20: Exit signs shall be illuminated at all times. To ensure continued illumination for a duration of not less than 90 minutes in case of primary power loss, the sign illumination means shall be connected to an emergency power system provided from storage batteries, unit equipment or on -site generator. (IFC 1006.1, 1006.2, 1006.3) 21: Means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. The means of egress illumination level shall not be less than 1 foot -candle (11 lux) at the floor level. The power supply for the means of egress illumination shall normally be provided by the premise's electrical supply. In event of a power failure an emergency power system shall provide power for a duration of not less than 90 minutes and shall consist of storage batteries, unit equipment or on -site generator. (IFC 1006.1, 1006.2, 1006.3) 22: Maintain sprinlder coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may require relocating arid/or adding sprinkler heads. (IFC 901.4) 23: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate flooring, cutting tables, shelves and overhead doors. (NFPA 13- 8.6.5.3.3) 24: All new sprinlder systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk Insurers Kemper or any other representative designated and /or recognized by the City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #2050) 25: Maintain fire alarm system audible /visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible /visual notification devices. (City Ordinance #2051) 26: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) doc: Cond -10/06 D08 -451 Printed: 10 -20 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us • 27: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 28: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 29: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond - 10/06 * *continued on next page ** D08 -451 Printed: 10 -20 -2008 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Date: / 0�.---o/ 7 doc: Cond -10/06 D08 -451 Printed: 10 -20 -2008 Company Name: Company Name: Mailing Address: Contact Person: E -M.' - - . CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 hllh:: 'www. ci.lukwilu. ivu, ass Name: / Yom. 5C) ri2r1,.c c'.- Mailing Address: / 10 5 l C7 Mailing Address: I O () Contact Person: /C4 I IQ. 5 c;re i.s j- i E -Mail Address: M S u t'2h SCiil 6) r) 1-u ` (0 et, Contractor Registration Number: Nu r+11 w / „2.- 'F Company Name: N (■t (CC i i � r lt,Qer/ E -Mail Address: Q:Wpplications\Forms- Applications On Line' -2006 - Permit Application.doc Revised: 9 -2006 bh t r�tt �l2 Mailing Address: 4 1 1 a. tA,l, � /`O fr(,4✓� City Contact Person: 1- 1 (91(1 1)05 –Hs- Building Permit No. Mechanical Permit No Plumbing /Gas Permit No. Public Works Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: IO 3 c o (( 1 Floor: Site Address: 3'3 1 i S, l 00 F - S'fa. / 6 ° Suite Number: I O Tenant Name: p, I S CAI ). j (rat S 1-41( - New Tenant: Er'' Yes ❑ .. No Property Owners Name: s ib h r' 5 4 6 e"j Mailing Address: - D 1 City State cJ,A Zip CONTACT PERSON — who do we contact when your permit is ready to be issued Day Telephone: (9-01 r g City State Zip E -Mail Address: 0 Q reo Kan G'iical Fax Number: Lion' c- dal? - 6 GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumb'ng and Gas Piping (pg 5)) .E� v'li - City State / Zip Day Telephone: (Of) d 7 ��s � Fax Number: l f r } r 6' ti 4 Expiration Date: ) ) / / C2 c r ARCHITECT' OF RECORD All plans must be wet stamped by Architect of Record City Day Telephone: Fax Number: ENGINEER OF RECORD All plans must be wet stamped by Engineer of Record Day Telephone: Fax Number: State Zip C4 c,/may State Zip - / Si ` lU 38(z) SeVY .7 3 Page 1 of 6 BUILDING PERMIT INFORMATION - 206 -431 -3670 Valuation of Project (contractor's bid price): $ 5 Scope of Work (please provide detailed information): , ft S'I-r Cf (/ s) 51 mzciletru (4 / biota __99e__ s- rye,/ t°►'►�G�4.�t ee..r Tw ✓1��Ks e-t1r 7e. (yep GaraGvt y . /Let.?r ^I/1l jc� /G?s ,� r revl Will there be new rack storage? [Yes Existing Building Valuation: $ /) S 0 f r e ? Ic l a 512 r ���>`.s , {4cd�-c/ 5 a 1 e i c;,-) .i / G Cfs'il G./ r ? 9 ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes 0 No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: V Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ®�No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q:\Applications\Forms- Applications On Line'3 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1S Floor /', 000 /3--49C----) _ - ---' r-- 2n Floor 3` Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck BUILDING PERMIT INFORMATION - 206 -431 -3670 Valuation of Project (contractor's bid price): $ 5 Scope of Work (please provide detailed information): , ft S'I-r Cf (/ s) 51 mzciletru (4 / biota __99e__ s- rye,/ t°►'►�G�4.�t ee..r Tw ✓1��Ks e-t1r 7e. (yep GaraGvt y . /Let.?r ^I/1l jc� /G?s ,� r revl Will there be new rack storage? [Yes Existing Building Valuation: $ /) S 0 f r e ? Ic l a 512 r ���>`.s , {4cd�-c/ 5 a 1 e i c;,-) .i / G Cfs'il G./ r ? 9 ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes 0 No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: V Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ®�No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q:\Applications\Forms- Applications On Line'3 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 2 of 6 PERMIT APPLICATION NOTES - Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AU 0 Signature: Print Name: i kinc. __ __ Day Telephone: - y 8 Mailing Address: 1 k 00 S- W 7' S ?`- (R P �vTer∎ Date Application Expires: L Date Application Accepted: GENT: Q:\Applications\Forms- Applications On Line \3 -2006 - Permit Application.doc Revised: 9 -2006 bh City Date: J State Zip Staff Initials: Page 6 of 6 Receipt No.: R08 -03411 Initials: WER User ID: 1655 Payee: MIKE SORENSON ACCOUNT ITEM LIST: Description BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http://www.ci.tukwila.wa.us Parcel No.: 1023049069 Permit Number: D08 -451 Address: 3311 S 120 PL TUKW Status: PENDING Suite No: Applied Date: 10/02/2008 Applicant: REISCHLING PRESS INC Issue Date: TRANSACTION LIST: Type Method Descriptio Amount Payment Check 7131 180.23 Account Code Current Pmts 000/322.100 000/345.830 000/386.904 RECEIPT 106.50 69.23 4.50 Total: $180.23 Payment Amount: $180.23 Payment Date: 10/02/2008 08:32 AM Balance: $0.00 doc: Receiot -06 Printed: 10 -02 -2008 e Material Handling Experts , ATTENTION FIRE AND BUILDING DEPARTMENTS RACK INFORMATION SUPPLEMENT Kt� 1 tfi tt) ��CE CO pE COMP V OCI 16 20 SITE ADDRESS: 3311 S. 120 Place Suite 160 TENANT NAME: Reischling Press, Inc. DATE: October 1, 2008 APPLICANT: Mike Sorenson / (206) 818 -4488 1. Load application and rack configuration drawings attached. 3. Stamped engineering calculations attached. 8. Building egress and exits indicated on attached drawings. SOS -'15 1100 'SW 7th St Renton, WA 98055 (425) 255 -0500 ph (425) 228-6946 fax 2. Attached plans detail the rack locations, dimensions, and specifications. Attached plans detail the building /ceiling configuration. 4. Vertical members of storage racks are designed and installed so that failure of one vertical member will not cause collapse of more than the bay or bays directly supported by that member. 5. Commodities stored: Racks to support Mechanical Blower and sheet metal hood assembly which provides circulated air to cool industrial printers. Blower assembly weighs approximately 600 lbs. 6. Sprinkler System Information: .39 gallons per minute /over 5600 sq. ft. 2289 gallons per minute at 63.03 psi with 360 heads. 7. Smoke and heat vents: In place, but not required for square footage of racking (under 12,000 square feet). RECEIVED OCT 02 2008 PERMIT CENTER 10/10/2008 16:10 G. OHANIAN BY DATE . fare: SUBJECT B18- 240 -3813 RACK DISGIN ING RAdK DErilI(N & ENWNEERINd do. 412 WET BROADWAY, QUITE #204 QLENDALE. OA. 91204 TEL (818)240 -3910 FAX:(818)240 -3813 Rescie4yrc PRESS 3(( S. /2ota Pi., sa #re se /6a 7OIc W /LA w 4. 48/ 68 /QFsPDNse re. Pow c•Vca sPEc /ht /NSPEcr /on✓ is 1b 1 fog SroAA ' Ri9 ANcvVc,e 4t rs /NS719 i4T /eN. INc/O/2S 40 Pt R` '. ' [ - 13. ._._._. RECEIVED CITY OF TUKWILA OCT 14 2008 PERMIT CENTER PAGE 03/03 SHEET NO....? W 1 JOB NO... K.P.-.l..7.R2 EXPIRES 12 -26 -09 CORRECTION LTR# 1 ¶;o NISI REFERENCE FOR STRENGTH REDUCTION FACTORS a Including Seismic Excluding Seismic ACI 318 Section D.4.4 1.1 1.4 ACI 318 Section D.4.5 1.2 1.55 Page 3 of 14 ESR -1917 accordance with ACI 318 Appendix D and this report must be modified by a factor of 0.60. 4.1.12 Structural Sand Lightweight Concrete over Metal Deck: Use of structural sand lightweight concrete is allowed in accordance with values presented in Table 3 and installation details as show in Figure 5. 4.2 Allowable Stress Design: 4.2.1 General: Design resistances for use with allowable stress design Toad combinations calculated in accordance with Section 1605.3 of the IBC and Section 1612.3 of the UBC, must be established as follows: Rallow,ASD = R a (5) where Rd = 0 Rk represents the limiting design strength in tension (0N) or shear (OV „) as calculated according to ACI 318 Sections D.4.1.1 and D.4.1.2 and Section 4.1 of this report. For Toad combinations including earthquake, the value Rd in Equation (5) must be multiplied by 0.75 in accordance with ACI 318 Section D.3.3.3. Limits on edge distance, anchor spacing and member thickness, as given in Tables 3 and 4 of this report, must apply. Allowable service loads for single anchors in tension and shear with no edge distance or spacing reduction are provided in Tables 6 through 9, for illustration. These values have been derived per Equation (5) using the appropriate strength reduction factors Ofrom Tables 3 and 4 and the a factors provided in Section 4.2 of this report. The value of a must be taken as follows: 4.2.2 Interaction: In lieu of ACI 318 D.7.1, D.7.2 and D.7.3, interaction must be calculated as follows: For shear loads V s 0.2 • Va,mw,ASD, the full allowable load in tension Taaow,ASD may be taken. For tension loads T s 0.2 • Tauow, 4r ` in shear Val,ow,ASD may be to en. OD � ®��� � For all other cases: T C V Ptr ® + s 1.2 6 lQ��{6) allow oci ltd 6) Installation: T allow,ASD Installation parameters are pro 2. The Hilti KB -TZ must manufacturer's published instru must be installed in holes drill tatOla or concrete using carbide - tipped masonry drill bits complying with ANSI B212.15 -1994. The nominal drill bit diameter must be equal to that of the anchor. The drilled hole must exceed the depth of anchor embedment by at least one anchor diameter to permit over - driving of anchors and to provide a dust collection area as required. The anchor must be hammered into the predrilled hole until at least four threads are below the fixture surface. The nut must be tightened against the washer until the torque values specified in Table 1 are achieved. For installation in the soffit of concrete on steel deck assemblies, the hole diameter in the steel deck not exceed the diameter of the hole in the concrete by more than V, inch (3.2 mm). For member thickness and edge distance restrictions for installations into the soffit of concrete on steel deck assemblies, see Figure 5. 4.4 Special inspection: Specie inspection is required, in accordance with Section 1704.13 of the IBC and Section 1701.5.2 of the UBC. The special inspector must be on the jobsite continuously during anchor installation to verify anchor type, anchor dimensions, concrete type, concrete compressive strength, hole dimensions, hole cleaning procedures, anchor spacing, edge distances, concrete thickness, anchor embedment, and tightening torque. 5.0 CONDITIONS OF USE The Hilti KB -TZ anchors described in this report comply with the codes listed in Section 1.0 of this report, subject to the following conditions: 5.1 Anchor sizes, dimensions and minimum embedment depths are as set forth in this report. 5.2 The anchors must be installed in accordance with the manufacturer's published instructions and this report. In case of conflict, this report governs. 5.3 Anchors must be limited to use in cracked and uncracked normal- weight concrete and structural sand lightweight concrete having a specified compressive strength, f' of 2,500 psi to 8,500 psi (17.2 MPa to 58.6 MPa), and cracked and uncracked normal- weight or structural sand lightweight concrete over metal deck having a minimum specified compressive strength, f' of 3,000 psi (20.7 MPa). 5.4 The values of r used for calculation purposes must not exceed 8,000 psi (55.1 MPa). 5.5 Loads applied to the anchors must be adjusted in accordance with Section 1605.2 of the IBC and Sections1612.2 or 1909.2 of the UBC for strength design, and in accordance with Section 1605.3 of the IBC and Section 1612.3 of the UBC for allowable stress design. 5.6 Strength design values must be established in accordance with Section 4.1 of this report. 5.7 Allowable design values are established in accordance with Section 4.2. .8 Anchor spacing and edge distance as well as minimum member thickness must comply with Tables 3 and 4. 9 Prior to installation, calculations and details demonstrating compliance with this report must be submitted to the code official. The calculations and details must be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed. Since an ICC -ES acceptance criteria for evaluating data to determine the performance of expansion anchors subjected to fatigue or shock loading is unavailable at this time, the use of these anchors under such conditions is beyond the scope of this report. 5.11 Anchors may be installed in regions of concrete where cracking has occurred or where analysis indicates cracking may occur (f,> f,), subject to the conditions of this report. 5.12 Anchors may be used to resist short-term loading due to wind or seismic forces, subject to the conditions of this report. 5.13 Where not otherwise prohibited in the code, KB -TZ anchors are permitted for use with fire- resistance -rated D ` A BY 'G. OHANIAN DATE. 9 -24 -08 SUBJECT_ STRUCTURAL CALCULATIONS OF STORAGE RACKS FOR: REISCHLING PRESS 311 S. 120TH PL. STE 160 TUKWILA, WA. 98168 PER IBC 2006 EDITION STORAGE RACKS CAPACITY: 4000 # / LEVEL ON TYPE "A" & "B" 2000 # / LEVEL ON TYPE "C" CALCS. 1 THRU 5 DRAWINGS: RD -13702 RACK DEIIIGN & ENGINEERING CO. 412 WEgT BROADWAY, OTTE #204 LBNDALE. dA. 91204 TEL:(818)240 -3810 FAX:(818)240 -3813 to8 '-IS I FLE COPY EXPIRES 12 - - SHEET NO. 1 JOB NO.. RD - 13702 RECEIVED OCT 0 2006 PERMIT CENTER By G. OHANIAN DATE . 9 - 24 - 0 8 SUBJECT b io tn 115 IL) r 96" 1 4 ti 4 1 TYPE "A" 4" BEAM 96" LONG M= 96962 K _ 25 -K S .80 <.77 120" 'TYPE "C" 5 1/8" AJ;AM M= 1447x2.2K =4O "K 8 S c 1.2<1.3 A = WxL =.740<liA 160 = .8 384x1, xE ^.43 " < 96 =.53 384xI xE 180 1 RAdK DESIGN & ENOINEERIN(4 do. 412 WET BROADWAY, BUM #204 (LENDALE, CA. 91204 TEL:(818)240 -3810 FAX:(818)240 -8819 4000 #/ LEVEL +25% IMPACT LOAD 2200 #/ BEAM SIDE VIEW TYPE "8" I ,=3.6 S =1.3 F Y= 55 KS. 4000 #/ LEVEL +25% IMPACT LOAD 2200 #/ BEAM I =1.84 S =.85 Fy =55 KS/ SIDE VIEW 4" BEAM 120" LONG 2000 #/ LEVEL +25% IMPACT LOAD 1200 #1 BEAM zan• M _ 120"x1, 2Z = 18°K 8 S R = = .54 <.85 A _ 5xWxL _ 48 "< 384xI, xE SHEET NO. 2 JOB NO. RD - 13702 I =1.84 S =.85 F Y= 55 KSI. =.67 ' BY G. OHANIAN DATE 9 -24 -08 SUBJECT SEISMIC DESIGN _ S DS xI V— Rx1.4 STRESS 1 =1 NO PUBLIC ACCESS R =6 MOM. CONN. R =4 BRACED S =1 (USGS WEBSITE, "SITE CLASS 0 ") W =D.L.+ 3 L.L. LOAD PER COLUMN TYPE "A" & "B" L.L.= 2 x 2x4K =2.6K 3 2 ca. W =.2 2.6 2.8 K ✓ _ 1x1x2.8 _ LONGIT. 6x1.4 ✓ _ 1x1x2.8 =.SK TRANS. 4x1.4 COLUMN ANALYSIS 100% LOAD L.L.= 2x4K = 4K 2 COL. COMBINED STRESS RATIO P P + M a — 11 +22 = .83 <1.33 a x RACK DESIGN & ENGINEERING CO. 412 WEgT BROADWAY, QUITE #204 QLENDALE, dA. 91204 TEL:(818)240 -3810 FAX:(818)240 -3813 IBC 2006 ASCE 7 (SEC. 15.5.3), RMI SPECS. Fy =55 KSI A =.62 S =.68 r =1.2 r =1.1 W= .2 D.L + . 4 LL =4.2 K LONGIT. SEISMIC 17 _ 5•K ° (LI — W= .2 1.5 K .33 6 KI 60x1.7 _ rx — - 85 r K1 =1_41. = 40 5 Max =S .Fb =22 'K 10 10•K TYPE "C" 2 Fe =( xi- 2 = 40 rK Fn =Fy(1 4F ) =36 P =F 22 P _ Pn _11 K Po 1.92 — SHEET NO. 3 JOB NO. RD - 13702 L.L. =3-x 2x2 =1.3K 3 2 coL. ✓ _ 1xlx1.5 =. 17K LONGR. 6x1.4 ✓ _ 1x1x1.5 =.26K TRANS 4x1.4 TRANS. .17X58" =10 K • By G. OHANIAN _ DATE. 9 -24 -08 SUBJECT BASE PLATE ANCH. TENSION = 14— (62x3 ") =.23 ANCHOR SHEAR = .2 — 2 K TYPE "A" & "B" (2) -1/2 "0 ANCHORS WITH 7 3/4 "x5 "x3/8" BASE PLATE TYPE "C" (1) -1/2 "0 ANCHOR WITH 4 1/2 "x3 "x3/8" BASE PLATE 1/2"0 HILTI KB —TZ ANCHORS ESR -1917 OR APPROVED EQUAL. MOMENT AT BEAM CONNECTION 7/16 "0 RIVET A =.1 Fy = 79 KSI Va = .1 x79x.4 = 3 K Ma = 3 Kx4 "x1.33 = 16 3 PIN CONN. CONN. OVERTURNING TYPE "A" & "B" M .5 "x.5x1.15 =69" MR = 2.8 K x44 "= 123 .K NO UPLIFT TYPE "C" M •26 "x.5x1.15 =34"K MR = 1.5 K x44 " = 66 "K NO UPLIFT RACK DESIGN & ENGINEERING CO. 412 WET BROADWAY. gUITE #204 LENDALE. DA. 91204 TEL:(818)240 -3810 FAX:(818)240 -3813 7.5" "K 4.2K 1O:2) TOP LEVEL LOADING (100% LOAD) L.L.= 1 x 2 4K = 2 K W= .2 +2 =2.2K V — 1x1x2.2 =.39x TRANS. 4x1.4 L.L. = 1x2 K = 1 K 2 W =.2 +1 K = 1.2K V — 1x1x1.2 21 K TRANS. 4x 1.4 • SHEET NO. 4 JOB NO.. RD - 13702 7 3/4 "x5 "x3/8" BASE PLATE M =.39 Kx2x120 =94"K M 2.2Kx44 " =97 K NO UPLIFT M = .21 Kx2x114" =48"K M 1.2Kx44 " =53 "K NO UPLIFT • BY i G. OHANIAN DATE 9 -24 -08 SUBJECT. LOAD TO DIAGONAL P = .5 = 1.2 44 BOTH SIDES TYP FY =55 KSI A =.31 r =.48 Q =.74 L= 56" CHECK WELDS 1/8" WELD 1.5" LONG EACH SIDE (3" TOTAL) 3x.125x.707x70x.3 = 5.7 K CHECK SLAB 4200 4.2 °i 1000 F = 12.3 KSI P = 3.8 4.2x144=605 605 =24" M= (12 ) 2 x1000x 2 x12 =1500 # S= 12x5 = 50 6 1500 = 30 <1.6 2500 =80 50 RACK DESIGN & ENGINEERING CO. 412 WE BROADWAY. QUITE #204 LENDALE. dA. 91204 TEL:(818)240 -3810 FAX:(818)240 -3813 1 3/4" \ xFF x t =.07" TYP 4200 # SHEET NO. 5 . RD -13702 JOB NO. 5" CONCRETE SLAB 2500 PSI. CONC. 1000 PSF. SOIL 03 -02 -2008 MIKE SORENSON 1100 SW 7TH ST RENTON WA 98057 RE: Permit No. D08 -451 3311 S 120 PL TUKW Dear Permit Holder: Department of Community Development Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writinff and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 04/18/2009 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, seutA_ xc: fer Marshall, 't Technician Permit File No. D08 -451 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 r October 9, 2008 Mike Sorenson 1100 SW 7` Street Renton, WA 98057 Dear Mr. Sorenson: • Guy of Tukwila Department of Community Development Jack Pace, Director RE: CORRECTION LETTER #1 Development Application Number D08 -451 Reischling Press Inc -- 3311 South 120 Place • This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time, the Fire Department has no comments. Building Department: Allen Johannessen at 206 - 433 -7163 if you have questions regarding the attached comments. Jim Haggerton, Mayor Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that two (2) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, ttw Brenda Holt Permit Coordinator end File No. D08 -451 P:\Permit Cen ter \Correction Letters \2008008-451 Correction Ltr #1.DOC wer 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 / Building Division Review Memo • • Date: October 9, 2008 Project Name: Reischling Press Inc. Permit #: D08- 451 Plan Review: Allen Johannessen, Plans Examiner Tukwila Building Division Allen Johannessen, Plan Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Engineer calculations specify HILTI KB -TZ anchors for securing storage rack base plates. Calculations reference bolt installation per ESR -1917 where the report specifies "Special Inspection is required ". Please provide notes on the plans and in the engineer's calculations that specify special inspection requirements for the storage rack installation. (IBC 1704 -13 & 1707.6) Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. PERMIT COORD COPY. PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D08 -451 DATE: 10 -14 -08 PROJECT NAME: REISCHLING PRESS INC SITE ADDRESS: 3311 S 120 PL Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # after Permit Issued DEPARTMENTS: khroo � g D �s on n Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Documents/routing slip.doc 2 -28 -02 Fire Prevention Structural Incomplete n TUES/THURS ROUT NG: Please Route Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: DATE: DATE: Planning Division n Permit Coordinator No further Review Required DUE DATE: 10-16-08 Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg El Fire ❑ Ping ❑ PW ❑ Staff Initials: DUE DATE: 11-13-08 Not Approved (attach comments) n Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ?ERMT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D08 -451 PROJECT NAME: REISCHLING PRESS INC SITE ADDRESS: 3311 S 120 PL STE 160 X Original Plan Submittal Response to Correction Letter # DATE: 10 -02 -08 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: IH Btii .f g '!vision X11 0 6 1 Fire Prevention Public Works ❑ Structural U Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: TUES/THURS RO ING: Please Route Documents/routing slip.doc 2 -28-02 APPROVALS OR CORRECTIONS: Incomplete u Planning Division DUE DATE: 10 -07-08 Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: DATE: DUE DATE: 11 -04 -08 Approved Approved with Conditions n Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: 1 0 : 1 '04 Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initial • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: /O / /3,C al ❑ Response to Incomplete Letter # ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued R CRYO ❑ Revision requested by a City Building Inspector or Plans Examiner OCT 14 2 008 Project Name: REISCHLING PRESS INC PEgMlrceuren Project Address: 3311 South 120 Place Contact Person: Mike Sorenson Phone Number: L2d6 8/8 7a? Summary of Revision: Er //t*2e r t?O7 celtak AA,. Jp2t / /nS e e,*r4 -, o `T G�t c, r bo //s '� 6e p r iCr( h d /mg s »r% j t- ho r d , 7(3°K a5 -3 r iRodiAord , Ctz4 dna7 I{ PS- R8/ - 5 tia5- tr i -SAY, Plan Check/Permit Number: D08-451 Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: AkAiC3 K A Entered in Permits Plus on \applications \forms - applications on line\revision submittal Created: 8 -13 -2004 Revised: Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 6 TRAVS 81S103354822BCM 10/01/2001 Cancelled 01/01/1980 $12,000.00 10/09/2001 5 TRAVELERS CASUALTY Et SURETY 81S103354822BCM 10/01 /200010/01/2001 $6,000.00 01/04/2001 4 UNITED PACIFIC U2160121 10/01/199710/01 /2000 $6,000.00 3 UNITED PACIFIC INS CO U2160121 10/01/199310/01 /1997 $4,000.00 2 FIDELITY a DEPOSIT CO 30132992 04/06/198810 /01/1993 $4,000.00 1 GREAT AMERICAN INS CO 9740689 04/06/198104 /06/1988 Name Role Effective Date Expiration Date FRANCK, JAMES J 01/01/1980 THOMAS, KEVIN A 01/01/1980 KOSTY, CLARK R 01/01/1980 Untitled Page General /Specialty Contractor A business registered as a construction contractor with Lai to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company NORTH WEST HANDLING SYS INC 4252550500 1100 SW 7TH ST RENTON WA 980552939 KING CORPORATION UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License Next License Associated License Specialty 1 Specialty 2 600051641 ACTIVE NORTHWH275JF CONSTRUCTION CONTRACTOR 4/6/1973 10/9/2009 GENERAL UNUSED Business Owner Information • • Bond Information h ttnc• / /fnrtrpcc wa art v /1ni/hhin/Tl eta i1 acnv9T.irpncp= N(1RTNWT- T77STF Page 1 of 2 1 n/ ')n/'nng PROPOSED ;CAGE AREA L J PADDER PUNCH AISLE CUTTING WIRE LOOP BIND - - - - --C TYPE "C" RACKS RACK - - TYP NORTH SCALE: 1/8" = 1'-0" KS TYPE " NORTH REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. FILE COPY Permit No. By Date: CZ City ofT't sea APR 1;8 2009 Plar review approval Is subject to errors and omissions. A pproval of construction documents does not au"zhcriza the violation of any adopted code or ordinance. Recei71 of approved Field Copy and pnditions is ack, lo, i c,. , RECEIVED OCT 02 200$ PERMIT CENTER SHEET NUMBER DRAWING NUMBER BOTH SIDES TYP. t =.07" SEC. A -A BRACING DETAIL t =.07" (1)-1/2"0 ANCHOR BOLT PER BASE PLATE 3 1/4" EMB., (SEE NOTE NO. 4) 1/4"0 SAFETY LOCK (1000 # CAPACITY) 7/16 "0 RIVET ASTM A354 -79 BASE PLATE DETAIL (2)-1/2"0 ANCHOR BOLTS PER BASE PLATE 3 1/4" EMB., (SEE NOTE NO. 4) 3 PIN CONNECTION a d' 96" TYPE 0 0 r • 144" 44" N 96" RE' iEVv tN CODE COMPLIANc . APPROVFr. OC I 1 6 MI City Of Tukwila B ILDING tIVISIG 3 yO1 tS 1- DESIGN OF STEEL STORAGE RACKS AS SHOWN BY THESE DRAWINGS AND CALCULATIONS ARE IN COMPLIANCE WITH THE REQUIREMENTS OF THE IBC 2006 EDITION 2 -STEEL FOR ALL SHAPES FY= 55 KSI. ASTM A570-85 GR.55 (EXCEPT AS NOTED) 3-ALL WELDED CONSTRUCTION IN A SHOP OF AN APPROVED FABRICATOR #1464 (E70XX ELECTRODES) 4 -ALL ANCHORS HILTI KB -TZ (ESR -1917) OR APPROVED EQUAL 5-CONCRETE SLAB 5" THICK 2500 PSI. SOIL BEARING CAPACITY 1000 PSF 6- STORAGE RACK CAPACITY 4000 #/ LEVEL ON TYPE "A" & "B" 2000 #/ LEVEL ON TYPE "C" 7-ALL RACK INSTALLATIONS SHALL DISPLAY IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT PLAQUE EACH NOT LESS THAN 50 SQUARE INCHES IN AREA SHOWING THE MAXIMUM PERMISSIBLE UNIT LOAD OF NOTE NO. 6 8- STORAGE RACKS SHALL BE INSTALLED WITH A MAXIMUM TOLERANCE FROM THE VERTICAL OF 1/2" IN 10'-0" OF HEIGHT EXPIRES 12- .26 -09 R EV. DATE RACK DESIGN AND ENGINEERING 412 wErr BROADWAY, SUITE #204, GLENDALE, CA. 91204 DRAWN BY: A.KH. SCALE: NONE DATE: 9- 24•-0$ PROJECT: EX APR 1/.3 2009 REVISION RECEivP OCT 02 ZD PERMIT CENTER REISCHLING PRESS 311 S. 120TH PL. STE 160, TUKWILA, WA. 113168 E3 No. STORAGE RACK D D-13702 R ETAILS � SHEET NC