Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M08-005 - WESTFIELD SOUTHCENTER MALL - AEROPOSTALE
AEROPOSTALE 2626 SOUTHCENTER MALL M08 -005 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: DESCRIPTION OF WORK: HVAC FOR TENANT IMPROVEMENT OF NEW MALL SPACE; ADD VAV BOX AND ASSOCIATED DUCTWORK Value of Mechanical: $40,000.00 Type of Fire Protection: Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 0 Appliance Vent 0 Repair or Addition to Heat/Refrig /Cooling System.... 0 Air Handling Unit <10,000 CFM 0 >10,000 CFM 0 Evaporator Cooler 0 Ventilation Fan connected to single duct 0 Ventilation System 0 Hood and Duct 0 Incinerator: Domestic 0 Commercial/Industrial 0 doc: IMC-10/06 Citylif Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 6364200010 2626 SOUTHCENTER MALL TUKW AEROPOSTALE 2626 SOUTHCENTER MALL , TUKWILA WA WEA SOUTHCENTER LLC 11601 WILSHIRE BLVD , LOS ANGELES CA MECHANICAL PERMIT DAPHANE VOLTZ Phone: 412 - 243 - 3430 X223 LAMI GRUBB MANAGEMENT SERVICES , 100 E SWISSVALE AVE TURNER - BUSCH, INC Address: 80 E RIDGEWOOD AVE , PARAMUS, NJ Contractor License No: TURNEI *230J7 EQUIPMENT TYPE AND QUANTITY * *continued on next page ** M08 -005 Permit Number: M08 -005 Issue Date: 03/14/2008 Permit Expires On: 09/10/2008 Phone: Phone: 201- 262 -2121 Expiration Date: 10/27/2008 Fees Collected: $615.33 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 Printed: 03 -14 -2008 Permit Center Authorized Signature: • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us LAIL c„.)r., Permit Number: M08 -005 Issue Date: 03/14/2008 Permit Expires On: 09/10/2008 Date: J ' — OS I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or t performance of wkrk. I axp authorized to sign and obtain this mechanical permit. Signature: Print Name: l'14 S Date: 3 -( - 0 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -10/06 M08 -005 Printed: 03 -14 -2008 Parcel No.: 6364200010 Address: 2626 SOUTHCENTER MALL TUICW Suite No: Tenant: AEROPOSTALE 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 11: ** *FIRE DEPARTMENT CONDITIONS * ** doc: Cond -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 5: Readily accessible access to roof mounted equipment is required. PERMIT CONDITIONS Permit Number: M08 -005 Status: ISSUED Applied Date: 01/04/2008 Issue Date: 03/14/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Thkwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 15: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) M08 -005 Printed: 03 -14 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 16: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 17: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 18: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 19: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 20: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 21: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond -10/06 * *continued on next page ** M08 -005 Printed: 03 -14 -2008 doc: Cond -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: 62A--- ~^ Date: --1( 0 K Print Name: v l/ , e t ►'1 e 3 1►'1 o (-- M08 -005 Printed: 03 -14 -2008 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htLp :%/tt'N'ii cL. LLS Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: C 3Cei'I 20 CO/ C) Suite Number:SpOCE. /42101 Floor: 2- or 3 Tenant Name: a C ropostr e. New Tenant: „IL Yes El .. No Property Owners Name: tVSSi 'e. (d - J cc C, k ' /Y) 4s / — / Pr) C /7-1 CO) d rL 1;10_ I - Mailing Address: 116 Vth Ishi ire. R/V ci 11" Hoo r Los Anie /P s Cdr 90025 City State Zip Site Address: SLP Z L, SO L* ) r M 0. Lk. CONTACT PERSON - who do we contact when your permit is ready to be issued Name: aaphC e V O LtZ. Day Telephone: till - 243 - 3y3 o ( • as 3 ii Mailing Address: L-Ci t7)1 Grubb 64647)1 &rV fces j / a) C- 5u i. sS VC,>_IQ. AI/ e_ � P • its &' l h PA 152.18 J City �I t State J Zip E -Mail Address: Ct / •f2 2) /Q•Mr q/'e�t,o _C',sa/Y� Fax Number: qI 2-3'11 -1586 GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Co(mpanyName:To � c. ft r mi nc� � tom, t I Ivpd ate l ct j Qe pi when Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: (-Or f Ct.n c1 A/10 r an Mailing � 1 � %e I d e k �O O g t CU- 1,nclfo/t 1) 7 (,0 / ( / � / J City Si state 35 r� Zip Contact Person: J e ' Sn'11 +/i Day Telephone: S ? - 6 3J 5(p 9 L , E -Mail Address: lV'Pe ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Company Name: 1'1' eC -LS1 171x1 Jtru C tii r ct ( Cl qsn ee r Lra Cv7 c_ . ma� L C Contact Person: 'j1Lr1G ( �Qe.� t E -Mail Address�e i� Ch1 rte b 01,1 QMpplicationstporns- Applications On Linel3 -2006 - Permit Application.doc Revised: 9 -2006 bit Building Permit No. 0c 0 - Mechanical Permit No. MO 00 5 Plumbing /Gas Permit No. - G09.1 r j Public Works Permit No. Project No. • 1 - 001 (For office use only) cu..tXt_.f ('l � C, Fax Number: 81 7 • -C, 35 -vcp 7 9 Mailing Address: I Q JI W( . 7 6- LU�� /� s i. 9 50 / City r State Day Telephone: 5` �/ 1 S5 >� o C� V Fax Number: . / / ` 85v - 2,33 Page 1 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM 0 Fire Damper 0 -3 HP /100,000 BTU Furnace> 100K BTU tJ Evaporator Cooler 0 Diffuser / ' 3 -15 HP /500,000 BTU C) Floor Furnace O Ventilation Fan Connected to Single Duct 0 Thermostat f �'1SUY] I 15 -30 HP /1,000,000 BTU 0 Suspended/Wall/Floor Mounted Heater d Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU o Appliance Vent 0 Hood and Duct G Emergency Generator 0 50+ HP /1,750,000 BTU `., Repair or Addition to Heat/Refrig/Cooling System 6 Incinerator - Domestic 0 Other Mechanical Equipment ---� Air Handling Unit <10,000 CFM ^ v Incinerator — Comm/Ind y n / 6: L-I C le ( t C_ Rehe ' • • MECHANICAL, PERMIT INFORMATION - 206 -431 -3670 MECHANICAL CONTRACT OR INFORMATION Company Name: JO be. attic-mu-v.0 - LN I U- U pet le- 61 di De pi Well) 17 mot. teiRe Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ 40 c©O Scope of Work (please provide detailed information): In ft r 1. o r + i art t fL t- -a (Ai tf c. /1 LU (Lj c1 ern t-,S-e d .Spa C YAP -' Se c - ti o r► cf a in v to re v rv1 ctr. LA- Ca.C.Cf4 - l l Oki OP VAV &K _ aria re /c ted Ctt( (f ('(c... i etc, -}) con quAC, silsten .Sp Use: Residential: New .... ❑ Replacement .... ❑ Commercial: Nea3(_,,,0 Replacement .... ❑ Fuel Type: Electric■, Gas ....ID Other: Indicate type of mechanical work being installed and the quantity below: Q: \Applications\Forms- Apphcattons On Lmet3 -2006 - Permit Application.don Revised: 9 -2006 bh Page 4 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 9rNER R AUTHORIZED AGENT: Signature: (J:1 Print Name: P Val �Z Day Telephone: y 1 2 - 2. 3" 3%4 30 X 2.3 2. Mailing Address: 1 S 1/..tl,aS va. 1-e-- Aye Pi tsbuv h PA / Cit ` J State Zip Date Application Expires: 7 - L O t I Date Application Accepted: Q:\ApplicationsWonns- Applications On Line' -2006 - Permit Application.doc Revised: 9-2006 bh Date: / 2 / " 0 - Staff Initials: t/t/re Page 6 of 6 Receipt No.: R08 -00765 Payee: TURNER BUSCH INC ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http://www.ci.tukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 027331 498.33 RECEIPT Parcel No.: 6364200010 Permit Number: M08 -005 Address: 2626 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 01/04/2008 Applicant: AEROPOSTALE Issue Date: Initials: WER Payment Date: 03/14/2008 03:08 PM User ID: 1655 Balance: $0.00 Account Code Current Pmts 000/322.100 498.26 000/345.830 .07 Total: $498.33 Payment Amount: $498.33 doc: Receipt-06 Printed: 03 -14 -2008 Receipt No.: R08 -00032 Payee: LAMI GRUBB MANAGEMENT ACCOUNT ITEM LIST: Description rinr :: Rarpint -OR PLAN CHECK - NONRES • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 6364200010 Permit Number: M08 -005 Address: 2626 SOUTHCENTER MALL TUKW Status: PENDING Suite No: Applied Date: 01/04/2008 Applicant: AEROPOSTALE Issue Date: Initials: WER Payment Date: 01/04/2008 03:13 PM User ID: 1655 Balance: $498.33 TRANSACTION LIST: Type Method Description Amount Payment Check 0501 117.00 Account Code Current Pmts 000/345.830 117.00 Total: $117.00 Payment Amount: $117.00 6891 01/07 9710 TOTAL 117.00 PrintRd: ni- 04 -7nnR COMMENTS: Type of Inspection: F I qJ 10 L. \ `` CD iZcr In — , A p,, ewc.0 A? Date Called: Special Instructions: Date Wanted: 1i3 p.m. ‘''r tvC% -4 O t k6-4e f1JA Phone No: kNc?[e, I—. re, ‘el v■S r∎Na lc. c? -lam. C.i `UC.)Vc, NIA rime_ Project: J 4e,ia Pv S r At �__ Type of Inspection: F I qJ 10 L. \ `` Address: Z6Ze,... Date Called: Special Instructions: Date Wanted: 1i3 p.m. Requester: Phone No: 7 a pproved per applicable codes. I spector I Rece •t .ro.: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 IDate: PERMIT NO. (206)431 -3fj7 Corrections required prior to approval. Date: 7 - 2I - v� • $ • 0.00 ' EINSPECTION FEE QUIRED. Prior to inspection, fee must be aid a 6300 Southcenter Blv.., Suite 100. Call to schedule reinspection. Project: � ervp oS -faL-g- Ty a of Inspection: oie_a ..4 -doo) A Address: 2 Co 2 Ca AAu Date Called: Special Instructions: Date Wanted: "t / r f O ? ( a.m. p.m. Requester: Phone No: INSPECTION NO. INSPECTION RECORD Retain a copy with permit Pa-00S PERMIT NO. CITY OF TUKWILA BUILDING DIVISION raj` 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 ,Approved per applicable codes. Corrections required prior to approval. COMMENTS: \ON- I . ' - - Add,.e'Y Po cer if e-S wli k LAG - 2.6 Inspector (Date: 7 / / El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: !Date: •S Project: P e re p og 4-a Le Type of Inspection: S )' 1® a- SAA,c -- di t,J A. Address: 2- ( 4 m AaV Date Called: Special Instructions: • Date Wanted: I ,' �� ( a.m. p•m• Requester: Phone No: S INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Inspector: 1 `065 PERMIT NO. (206)431 -3670 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: ti Pe io Ja 1 Ca /Ice d rS / -I_o nsu C. 1-e L 4 n i ,Date: 1/1,1 0? El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: - COMMENTS: Type of Inspection: /ivy '`., Address: _ 19 // Date Called: Special Instructions: ' NAP, 7 Dip4r-o Gi -)..k4 I 0 s Requester: Phone No: _ // 4 / s`Y 7 i • Y • N :1 ' 1 Projec . �! Type of Inspection: /ivy '`., Address: _ 19 // Date Called: Special Instructions: Date Wanted (en — ' 4(1 am" p.m. Requester: Phone No: _ // 4 / s`Y 7 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3 ❑ Approved per applicable codes. Corrections required prior to approval. Inspector poirJ,( !Date: / ` � � �p va x$60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. - • Receipt No.: !Date: COMMENTS: SSm ai th eG 6"51A(. AouM 444 e, C /1 F iP. , ow &U d f Ptbular e t.. ?ro - i ie'n. 1j a./ /0 IA . Special Instructions: 1 - Date Wanted: 4 4t1-4 4 ' a. 'kV Requester: Phone No: a19 405- 51o) , Project: pro P,si I Type of Inspection: rincl I tied , Ad res ` ii' + Date Called: Special Instructions: 1 - Date Wanted: 4 4t1-4 4 ' a. 'kV Requester: Phone No: a19 405- 51o) , 3 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION R 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. applicable Inspector: rgi Corrections required prior to approval. Date y, % " ? J REINSPECTION FEE REQUIRED. Prior to inspection, fee must be pa' d 't 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: II ,i 6 Project: / Pe,rv�>5 /a. /t° Type of Inspect ..- Address: .2 6.2.- Date Called: Special Instructions: Date Wanted : /CocK a.m. p.m. Requester: Phone No: INSPECTION NO. INSPECTION RECORD Retain a copy with permit we- 5-1 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION le- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 El Approved per applicable codes. Corrections required prior to approval. 4-} COMMENTS: p J OK COI- C_l: tl t '�c cjj - r1 56.-1 e S & e c : Inspector: ip 58.0 INSPECTION FEE Dater /4 $ REQUIRED. Prior o inspection. fee must be paid a 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: Project: n /� 4E f UPOS_ l' r"1 � Type of Inspection: , G�. - / N. 1 Adddre - / �aa • , [ L (1 t Date Called: t Special Instructions; Date Ted: 14 r Q a.m. Requester: Phone No: / � , � 725 L � � S�! . INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION OZ 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 El Approved per codes. COMMEN 4 B -7?),,,s-2,,97-c- El $5:.00 EINSPECTION FEE R QUIRED. rior to inspection, fee must be d t 6300 Southcenter Blv ., Suite 19 . Call the schedule reinspection. Recei No.: Date: D Corrections required prior to approval. /O Project: 14_e_i © Le.. Type of Inspection: l'`° Address: ( -) c ,- �_ Suite #: °- S v , v . Contact Person: Special Instructions: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: INSPECTION NUMBER CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East Tukwila, Wa. 98188 206 -575- roved per applicable codes. INSPECTION RECORD Retain a copy with permit { Word /Inspection Record Form.Doc 1/13/06 0 e , c6 s Po PERMIT NUMBERS Corrections required prior to approval. COMMENTS: Inspector: Date: - 2 ja 3 I O B 1 Hrs.: / $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. T.F.D. Form F.P. 113 Aeropostale - Westfield Southcenter FILE COPY _ f Tukwila B ILD N DIVISION REVIEWED FOR CODE COMPLIANCE APPROVE JAN 1 6 200 ?WANE and omissions. q �� Location Building owner Program user Company Comments By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density- specific heat product Latent heat factor Enthalpy factor Summer design dry bulb Summer design wet bulb Winter design dry bulb Summer clearness number Winter clearness number Summer ground reflectance Winter ground reflectance Design simulation period Cooling load methodology Heating load methodology Seattle, WA Anthony Gianpetro Hallberg Engineering Seattle, Washington 47.0 122.0 8 386 Z9.5 0.0749 0.2444 1.0988 4,836.9 4.4953 80 64 26 0.95 0.95 0.20 0.20 MO5OO5 Hallberg Engineering Inc. I:1Projects1Lami Grubb107- 3201.621Design \Mech107- 3201 -62 09:10 AM on 10/18/2007 6.0 deg deg ft in. Hg January - December TETD -TA1 UATD lb/cu ft Btu/I13-°F Btu /h- cfm - °F Btu - min /h•cu ft Ib•min /hr -cu ft °F °F °F RECEIVE!' JAN 0 4 2008 PERMIT CENTEh TRAcE700 comprehensive building analysis software hum Trans Westfield Southcenter Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total = => COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h 0 0 0 0 0 0 0 0 0 0 33,150 26,351 0 59,501 2,240 0 0 61,741 Mo /Hr: 7 / 14 OADB/WB /HR: 79 / 64 / 67 Plenum Sens. + Lat Btu /h 0 0 0 0 0 0 8,287 0 8,287 -2,240 0 6,047 0 0 0 0 0 Net Percent Total Of Total Btu/ ( %) 41,437 26,351 0 67,78 67,78 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100.00 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 80 Space Percent Sensible Of Total Btu/ ( %) 0 0 61 33,150 50 39 14,640 22 0 0 0 100 47,789 72 2,240 3 0 0 15,900 24 65,929 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 26 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/ Btu /h ( %) 0 0 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 - 41,206 100.00 0 - 41,206 100.00 Main Clg Aux Clg Opt Vent Total 5.7 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /Ib 5.7 67.8 56.1 3,035.3 71.8 60.1 60.3 0.0 0.0 0.0 0 0 0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 67.8 Leave DB/WB /HR °F °F gr /Ib 55.0 52.2 54.7 0 0 0 0.0 0.0 0.0 Project Name: Aeropostale - Westfield Southcenter Dataset Name: I: \Projects \Lami Grubb \07 - 3201.62 \Design\Mech \07 - 3201- 62.trc System Checksums By Hallberg Engineering Inc. Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft ( %) 3,900 0 0 0 0 0 0 0 0 Variable Volume Reheat (30% Min Flow Default) TEMPERATURES Cooling Heating SADB 55.0 70.0 Plenum 71.8 70.0 Return 71.8 70.0 Ret/OA 71.8 70.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 0 0 4,000 2,500 4,000 0 0 0 Heating 0 0 2,500 2,500 2,500 0 0 0 ENGINEERING CKS Cooling % OA 0.0 cfm /ft' 1.03 cfm /ton 708.08 ft' /ton 690.38 Btu/hi-ft' 17.38 No. People 59 Heating 0.0 0.64 -10.57 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm `F 'Lvg °F Main Htg -41.2 2,500.0 55.0 70.0 Aux Htg 0.0 0 0 0 Preheat 0.0 0 0 0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -41.2 TRACE® 700 v6.0 calculated at 09:10 AM on 10/18/2007 Alternative - 1 System Checksums Report Page 1 of 1 Sales Project Name: Aeropostale - Westfield Southcenter Dataset Name: I: \Projects \Lami Grubb\ 07- 3201.62 \Design \Mech \07 - 3201- 62.trc Zone Checksums By Hallberg Engineering Inc. Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Peaked at Time: Outside Air: Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total = => COOLING COIL PEAK Space Plenum Sens. + Lat. Sens. + Lat Btu/ Btu /h 33,150 26,351 0 59,501 2,240 0 0 61,741 Mo /Hr: 7 / 14 OADB/WB /HR: 79 / 64 / 67 0 0 0 0 0 0 0 8,287 0 8,287 -2,240 0 0 0 0 6,047 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 41,437 26,351 67,78 67,78 61 39 0 100 0 0 0 0 0 0 0 0 0 100.00 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 80 Space Percent Sensible Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 33,150 14,640 0 47,789 0 0 0 0 0 0 0 0 0 0 50 22 0 72 2,240 3 0 0 15,900 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat 65,929 100.00 Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 26 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - 41,206 100 0 0 0 - 41,206 100.00 Main CIg 5.7 67.8 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 5.7 67.8 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr /Ib 56.1 0.0 0.0 4,000 0 0 71.8 0.0 0.0 60.1 60.3 0.0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 55.0 53.7 60.3 0.0 0.0 0.0 0.0 0.0 0.0 Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft ( %) 3,900 0 0 0 0 0 0 0 0 TEMPERATURES Cooling Heating SADB 55.0 70.0 Plenum 71.8 70.0 Return 71.8 70.0 Ret/OA 71.8 70.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.0 0.0 Fn Frict 0.0 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxil AIRFLOWS Cooling 0 0 4,000 2,500 4,000 0 0 0 Heating 0 0 2,500 2,500 2,500 0 0 0 ENGINEERING CKS % OA cfm /ft cfm /ton ft /ton Btu /hr•ft No. People Cooling 0.0 1.03 708.08 690.38 17.38 59 Heating 0.0 0.64 -10.57 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -41.2 2,500 55.0 70.0 Aux Htg 0.0 0 0.0 . 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -41.2 TRACE® 700 v6.0 calculated at 09:10 AM on 10/18/2007 Alternative - 1 Zone Checksums report Page 1 of 1 Project Info Project Address Aeropostale # 979 -2626 Southcenter Mall Date 12/31/2007 Tukwila, WA 98188 For Building Department Use Space # 2107 Applicant Name: Daphane Voltz -Lauri Grubb Management Services Applicant Address: loo E. Swissvale Ave Applicant Phone: Pittsburgh PA 15218 2006 Washington State Nonresidential Energy Code Compliance Forms 2006 Washington State Nonresidential Energy Code Compliance Form Piroject Summary PRJ -SUM M OOO s 1 �R^TaTAiQ Revised July 2007 FILE COPY Of Tu ila N DIVISION FOR RE CODE COMPLIANCE E APPROVED JAN 16 2008 JAN 04 2008 'EHN�E f CENTER Cooling Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location Daphane Voltz -Lauri Grubb Management Services Applicant Address: 100 E. Swissvale Ave Applicant Phone: Pittsburgh PA 15218 JAN 04 ZOO Fan Equipment Schedule Equip. ID Brand Name' Model No.' CFM Sp' HP /BHP Flow Control Location of Service Efficiency Daphane Voltz -Lauri Grubb Management Services Applicant Address: 100 E. Swissvale Ave Applicant Phone: Pittsburgh PA 15218 JAN 04 ZOO Heating Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency Daphane Voltz -Lauri Grubb Management Services Applicant Address: 100 E. Swissvale Ave Applicant Phone: Pittsburgh PA 15218 Project Info Project Address Aeropostale 9 979 -2626 Southcenter Mall Date 12/31/2007 Tukwila, WA 98188 For Building Dept. Use Space 9 2107 Applicant Name: Daphane Voltz -Lauri Grubb Management Services Applicant Address: 100 E. Swissvale Ave Applicant Phone: Pittsburgh PA 15218 2006 Washington State Nonresidential Energy Code Compliance Form Med anid I Summary MECH -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. Includes Plans Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 Revised July 2007 New VAV Box to be installed. New supply air duct to be connected from new VAV Box to existing landlord provided supply air system. Mall uses common return air plenum. Compliance Option Q Simple System 0 Complex System Q Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. 'If available. 2 As tested according to Table 14 -1A through 14-1G. 3 If required. ° COP, HSPF, Combustion Efficiency, o - applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: ❑ Constant vol? ❑ Split system? ./ Air cooled? ❑ Packaged sys? ❑ <20,000 Btuh? ❑ Economizer included? If Heating Only: ❑ <5000 cfm? ❑ <70% outside air? M,echani °ca Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only 2006 Washington State Nonresidential Energy Code Compliance Form Reference Section 1421 Simple System Allowed (section 1420) otal Ca . wo economize <240,000 Btuh or 10 %? Heating /Cooling or Cooling Only 1- Reference -\ Section 1423 ol Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. RECEIVED JAN 04 2008 PERMIT CENTER Mec,hanic - Complex Systems Checklist 2006 Washington State Nonresidential Energy Code Compliance Forms MECH -COMP Revised July 2007 Project Address Aeropoatale 1t 979 -2626 Southcenter Mall Date 12/31/2007 The following additional information is necessary to check a mechanical permit application for a complex mechanical system for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Use the checklist as a reference for notes added to the mechanical drawings (see the MECH - CHK checklist for additional system requirements). This information must be on the plans since this is the official record of the permit. Having this information in separate specifications alone is NOT an acceptable alternative. For Building Department Use Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY yes 1431.1 Field assem. sys. Provide calculations Attach n.a. 1432.1 Setback & shut -off Indicate separate systems or show isolation devices on plans n.a. 1432.2.1 Air system reset Indicate automatic reset n .a. 1432.2.2 Hydronic System Indicate automatic reset, cooling tower, & heat pump loop valves n.a. 1433 Air Economizer Indicate economizer on equipment schedule or provide calculations to justify exemption and demonstrate 10% higher efficiency for equipment with out economizer. n.a. 1433 Water Economizer Indicate water economizer and provide calculations if 1433 Exception 2 is utilized n.a. 1434 Separate air sys. Indicate separate systems on plans n.a. 1435 Simul. htg. & clg. Indicate that simultaneous heating and cooling is prohibited, unless use of exception is justified n.a. 1436 Heat recovery Indicate heat recovery on plans; complete and attach heat recovery calculations n.a. 1437 Elec. motor effic. MECH -MOT or Equip. Schedule with hp, rpm, efficiency n.a. 1438 Variable flow sys. Indicate variable flow on fan and pump schedules n.a. 1439.1 Kitchen Hoods Indicate uncooled and unheated make -up air n.a. 1439.2 Fume Hoods Indicate VAV, unheated / uncooled or heat rec. makeup no is cum tea for any question, provtae explanation: Decision Flowchart Use this flowchart to determine how the requirements of the Complex Systems Option apply to the project. Refer to the indicated Code sections for more complete information on the requirements. Start Here Section 1411.1 Equipment Efficiency Shall Meet Tables 14 -1A through 14-1G as/Oil Fuma input 225,000 tuh or Gas/0' 't Heat opacity of H Heating System > 00,000 Btuh Yes 1411.1 Intermittent Ignition Device & Power Venting or Damper. If input > 225,000 Btuh then 1412.6 Modulating or Staged Combustion Controls Required 2006 Washington State Nonresidential Energy Code Compliance Form 1411.1 0.75% Maximum Jacket Loss Section 1431.1 Calculations of Total On -Site Energy Input & Ouput Required (continued on back) Section 1432.2.1 Supply Air Reset Controls Required Section 1432.2.2 Hot Water Supply Temperature Reset Required JAN 04 2008 PEHMI CENTEM Mechani - Complex Systems (back) MECH-COMP 2006 Washington State Nonresidential Energy Code Compliance Forms Yes 2006 Washington State Nonresidential Energy Code Compliance Form 0% Air Econ Provided? Section 1413 Total Clg Capacity w/ Water Econo <500 Tons otor Incl. I gpmt. Covrd by Tbl 14- 1A -14- 1G? tal Cap. cono <= 480,00 Btuh or 20% of otal Cap. Section 1436 50% Effective Heat Recovery Required No Yes Yes Yes Yes Yeses Multi-speed Motor in Multi- eed system No-0 Yes stem or Zon w/ Simultaneous Htg. & Clg.? Application Involves Variable Flow? DONE Section 1435 Zone Controls Must Reduce Supply Air Quantity Before Reheating Recooling Section 1439.1 No Heating or Cooling for at Least 50% of Make -up Air Yes Section 1433 Economizer Required Section 1437 Motors Must Meet Efficiencies in Table 14-4 Section 1438 Variable Flow Devices Required Section 1439.2 One Required: a. 50% VAV Exhaust & Make -up b. 75% Direct Makeup w/ Tempering Only c. Heat Recovery per 1436 d. Constant Volume w/ < 50fpm Face Velocity Yes Revised July 2007 RECE VE JAN 04 2008 PERMIT CENTE -. Mechanical Permit Plans Checklist 2006 Washington State Nonresidential Energy Code Compliance Forms MECH -CHK Revised July 2007 Project Address Aeropostale # 979 -2626 Southcenter Mall 'Date 12/31/2007 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code I Section Component Information Required Location I on Plans Building Department I Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance yes 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule Ml n. a. 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency n.a. 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans Ml yes 1412.2 Deadband control Indicate 5 degree deadband minimum M3 n.a. 1412.3 Humidity control Indicate humidistat yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types m3 n. a. 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage n.a. 1412.4.2 Optimum Start Indicate optimum start controls n.a. 1412.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412.6 Combustion htg. Indicate modulating or staged control yes 1412.7 Balancing Indicate balancing features on plans 141 1412.8 Ventilation Control Indicate demand control ventilation for high - occupancy areas n.a. 1422 Thermostat interlock Indicate thermostat interlock on plans n.a. 1423 Economizers Equipment schedule 1413 Air economizers n.a. 1413.1 Air Econo Operation Indicate 100% capability on schedule n.a. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb n.a. 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance n.a. 1413.3 Integrated operation Indicate capability for partial cooling n. a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary M3 yes 1414.2 Duct insulation Indicate R -value of insulation on duct M3 yes 1415.1 Piping insulation Indicate R -value of insulation on piping M3 1416 Completion Requirements 1416.2.1 Commissioning Provide commissioning plan 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report 1434 Separate air sys. Indicate separate systems on plans yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer Ml SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 - 1454) 1440 Service water htg. no 1441 Elec. water heater Indicate R -10 insulation under tank yes 1442 Shut -off controls Indicate automatic shut -off mg yes 1443 Pipe Insulation Indicate R -value of insulation on piping M3 n.a. 1452 Heat Pump COP Indicate minimum COP of 4.0 ;, f r.FIV n.a. 1452 Heater Efficiency Indicate pool heater efficiency -. ` n.a. 1453 Pool heater controls Indicate switch and 65 degree control JAN 04 2, n.a. 1454 Pool covers Indicate vapor retardant cover CE I n.a. 1454 Pools 90+ degrees Indicate R -12 pool cover r'E ri 2006 Washington State Nonresidential Energy Code Compliance Form no is circfea for any question, proviae explanation: 2006 Washington State Nonresidential Energy Code Compliance Form Mechanics Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14-1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time fora power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off -hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1438. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246- 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance wits ta lRS Extent of sealing required is as follows: �� . 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 84 2008 2. Static pressure: 2 inches to 3 inches; seal all transvers longitudinal seams. dANs 3. Static pressure: above 3 inches; seal all transverse jooiirds,,.lpnngitudjn §I - NTE1 seams and duct wall penetrations. f tr( Li Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. o greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 2006 Washington State Nonresidential Energy Code Compliance Form Mechanics Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14-1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time fora power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off -hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1438. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246- 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance wits ta lRS Extent of sealing required is as follows: �� . 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 84 2008 2. Static pressure: 2 inches to 3 inches; seal all transvers longitudinal seams. dANs 3. Static pressure: above 3 inches; seal all transverse jooiirds,,.lpnngitudjn §I - NTE1 seams and duct wall penetrations. f tr( Li Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. o greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying 2006 Washington State Nonresidential Energy Code Compliance Form 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2. are isolated from the exterior with an automatic shut -off damper complying air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum with Section 1412.4.1. start controls shall be designed to automatically adjust the start time of an HVAC Once outside air ducts meet the above listed requirements, any runs within system each day to bring the space to desired occupied temperature levels conditioned space shall comply with Table 14 -5 requirements. immediately before scheduled occupancy. The control algorithm shall, as a Other ducts and plenums shall be thermally insulated per Table 14 -5. minimum, be a function of the difference between space temperature and occupied Exceptions: setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include 1. Within the HVAC equipment. microprocessor controls that minimize supplemental heat usage during start-up, set- 2. Exhaust air ducts not subject to condensation. up, and defrost conditions. These controls shall anticipate need for heat and use 3. Exposed ductwork within a zone that serves that zone. compression heating as the first stage of heat. Controls shall indicate when 1415 Piping Systems supplemental heating is being used through visual means (e.g., LED indicators). 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment Exception: Piping installed within unitary HVAC equipment. with a capacity over 225,000 Btu /h shall have modulating or staged combustion Water pipes outside the conditioned space shall be insulated in accordance with control. 000 Washington State Plumbing Code (WAC 51 -26) EXCEPTIONS: 1. Boilers. 2. Radiant heaters. 1416 Completion Requirements (Refer to NREC Section 1416 and the Building 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have Commissioning Guidelines, published by the Building Commissioning Association, a means for balancing, including but not limited to, dampers, temperature and for complete text and guidelines for building completion and commissioning pressure test connections and balancing valves. requirements.) RECEIVE JAN 0 4 2006 PERMIT CENTER • P LAN P AEViW I ROUTING SLIP ACTIVITY NUMBER: M08 -005 DATE: 01 -04 -08 PROJECT NAME: AEROPOSTALE SITE ADDRESS: 2626 SOUTHCENTE MALL X Original Plan Submittal _ Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: Z9 5 B i g D vision ❑ Public Works Comments: REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved I Approved with Conditions Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2-28-02 61 MO 141-06 Fire Prevention Structural Lr� DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete I �' � Incomplete n ❑ Permit Coordinator DUE DATE: 01 -10 -08 Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS RO TING: Please Route Structural Review Required I-I No further Review Required DATE: DUE DATE: 02 -07 -08 Not Approved (attach comments) ❑ DATE: Planning Division Not Applicable ►j u Permit Center' Use Only • " ` • ' ' • • . • • • • • CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License TURNEI*230J7 Licensee Name TURNER - BUSCH, INC Licensee Type CONSTRUCTION CONTRACTOR UBI 409016186 Ind. Ins. Account Id SECRETARY Business Type CORPORATION Address 1 214 STATE ST Address 2 City HACKENSACK County OUT OF STATE State NJ Zip 07601 Phone 2019689670 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 4/27/1977 Expiration Date 10/27/2008 Suspend Date Separation Date Parent Company Previous License Next License Associated License Business Owner Information Name Role Effective Date Expiration Date FIORE, ANTHONY PRESIDENT 10/15/2001 FIORE, ALLISON SECRETARY 10/15/2001 EIKE, RUSSELL VICE PRESIDENT 10/17/2002 BAKKE, KENNETH A PRESIDENT 01/01/1980 10/15/2001 ZACHARIAS, LINDA SECRETARY 01/01/1980 10/15 /2001 FICHTER, MICHAEL A VICE PRESIDENT 01/01/1980 10/15/2001 Look Up a Contractor, Electric or Plumber License Detail Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Bond Information I Bond Company I Bond Account I Effective I Expiration I Cancel I Impaired I Bond I Received Page 1 of 3 httns: / /fortress.wa. t?ov /1ni/bbin /nrinter.asnx ?License =TI JRNEI *230J7 01/14/7008 LLD NOTES 1. ALL DOLOR AND MATERIAL SELECTIONS MUST MEET ALL GODE REQUIREMENTS FOR FLAME SPREAD AND SMOKE DEVELOPMENT FACTORS. 2. VERIFY AT JOBSITE CLEARANCE OF EXISTING BRACING AT REAR DOOR. 3. DOOR BELL TO BE INSTALLED AT 3' -6" A.F.F. 4. TENANT'S CONTRACTOR TO GET APPROVAL AND CORING REQUIREMENTS ON UPPER LEVEL PRIOR TO PROCEEDING WITH WORK. 5. TENANT SHALL PROPERLY SEAL ALL PENETRATIONS TO COMPLY WITH CODE REQUIREMENTS. THE FIRE RATED ASSEMBLY SHALL BE MAINTAINED. ALL PLUMBING, ELECTRICAL, AND MECHANICAL DEVICES PENETRATING THE FLOOR SHALL BE FIRE RATED. 6. WATER PROOF MEMBRANE MUST BE INSTALLED UNDER CERAMIC TILE IN TOILET ROOMS A MINIMUM OF 4" UP WALLS. TENANT REQUIRED TO INSTALL LANDLORD APPROVED LATEX RUBBER WATERPROOFING MATERIAL. MEMBRANE SHALL BE MANUFACTURER'S 2 -PART FORMULA CONSISTING OF LIQUID LATEX RUBBER AND POWDER FOR TROWEL APPLICATION WITH GLASS FIBER FABRIC REINFORCEMENT (LATIGRETE 1255 OR SUMMITVILLE S- 1000). INSTALL A WATER TIGHT DOOR THRESHOLD. 7. ALL SUPPORTS TO BE FROM STRUCTURAL BEAMS AND JOISTS. NO CONNECTING TO DECK ALLOWED. 5. STOREFRONT MUST BE INDEPENDENTLY SUPPORTED. LANDLORD'S BULKHEAD GAN ONLY BE USED FOR LATERAL SUPPORT. CODE INFORMATION USE GROUP: M - MERCANTILE APPLICABLE CODES: BUILDING CONSTRUCTION TYPE: 2B 2006 INTERNATIONAL CODE W/ AMENDMENTS FULLY SPRINKLED: YES 2006 INTERNATIONAL MECHANICAL CODE OCCUPANCY CALCULATION: 2006 NATIONAL 2006 UNIFORM ELECTRIC CODE PLUMBING CODE TOTAL SQUARE FOOTAGE = 3565 2006 INTERNATIONAL FIRE CODE SALES AREA: 2003 ANSI 1111 ACCESSIBILITY GUIDELINES 2181 SF / 30 SF per person = 100 2003 NON - RESIDENTIAL ENERGY CODE NON -SALES AREA: PREVAILING LOCAL AMENDMENTS 881 SF / 300 SF per person = 3 TOTAL OCCUPANT LOAD 103 DESCRIPTION OF PROJECT: = ' AEROPOSTALE' RETAIL CLOTHING STORE TENANT FIT -OUT OF A NEW DEMISED SPACE; NEW ADDITION TO AN EXISTING COVERED 3 - STORY MALL (SHELL PERMIT D06 -141) DRAWING INDEX ISSUE REVISION FOR LANDLORD PERMIT GS COVER SHEET 11/23/07 12/27/07 ISI SCHEDULES AND VENDOR LIST 11/23/07 12/27/07 Al CONSTRUCTION PLAN 11/23/07 12/27/07 A2 FIXTURE PLAN 4 DETAILS 11/23/07 12/27/07 A3 FLOOR COVERING PLAN 11/23/07 12/27/07 A4 REFLECTED CEILING PLAN $ DETAILS 11/23/07 I2/27/07 AS LIGHTING PLAN $ DETAILS 11/23/07 12/27/07 A6 STOREFRONT PLAN, ELEVATION 4 DETAILS 11/23/07 12/27/07 A7 STOREFRONT SECTIONS $ DETAILS 11/23/07 12/27/07 AS INTERIOR ELEVATIONS 11/23/07 12/27/07 AG! DETAILS 11/23/07 12/27/07 AIO DETAILS 11/23/07 12/27/07 SG' SIGN PETALS 11/23/07 12/27/07 MO MECHANICAL TITLE SHEET 11/21/07 12/10/07 MI HVAC PLAN 11/21/07 12/10/07 M2 PLUMBING PLAN 11/21/07 12/10/07 M3 MECHANICAL SPECIFICATIONS 11/21/07 12/10/07 EO ELECTRICAL TITLE SHEET $ PANEL SCHEDULES 11/21/07 12/10/07 El LIGHTING PLAN 11/21/07 12/10/07 E2 POWER PLAN 11/21/07 12/10/07 ES ELECTRICAL 17ETAILS 11/21/07 12/10/07 E4 ELECTRICAL. SPECIFICATIONS 11/21/07 12/10/07 SI GENERAL STRUCTURAL 4 DETAILS 12/13/07 52 SUSPENDED CEILING DETAILS 12/13/07 ARCHITECT CORTLAND MORGAN 1II N. FIELDER ROAD ARLINGTON, TX 16012 PHONE: 617 -635 -5616 FAX: 511- 635 -5611 PROJECT MANAGER DAPHANE VOLTZ LAMI GRUBB MANAGEMENT SERVICES 100 EAST SWISSVALE AVENUE PITTSBURGH, PA 15215 PHONE: 412- 243 -3430 FAX: 412 -311 -1586 ENGINEER HALLBERG ENGINEERING 1150 COMMERCE COURT WHITE BEAR LAKE, MN 55110 PHONE: 65I- 745 -1100 FAX: 651- 748 -1370 P"se JONATHAN RADLOVE 1 I PROJECT MANAGER PHONE: 115-826-1110 , MICHAEL HOY+EN CONSTRUCTION MANAGER PHONE: 173 - 572 -4151 TIM ANDERSON VICE PRESIDENT OF CONSTRUCTION , PHONE: 173 --826 -1421 AEROPOSTALE 201 WILLOWBROOK BLVD. 7th FLOOR WAYNE, NJ 01410 ® - - - - _ - TENANT COORDINATOR JOSHUA KIMMEL WESTFIELD CORP., ING. 11601 WILSHIRE BLVD, 14TH FLOOR LOS ANGELES, CA 10025 PHONE: 310 - 513 -4761 FAX: 310-5 MALL OPS. MGR. ANDY G I ARROGGHI WESTFIELD SOUTHCENTER 653 SOUTHCENTER PARKWAY TUKWILA, WA 18168 PHONE: 206- 246 -0423 BUILDING DEPT. BUILDING DIVISION CITY OF TUKWILA 6300 SOUTHGENTER BLVD SUITE 100 TUKWILA, WA 15158 PHONE: 206 - 431 -3670 A EGRESS DIAGRAM 0 0 3rd EXIT ROUTE: DISTANCE 2nd EXIT ROUTE: DISTANCE = 62' -0" EXITING: REQUIRED EXITS 2 FURNISHED EXITS 2 1st EXIT ROUTE: DISTANCE = 87' -0" ADJACENT TENANT ADJACENT TENANT SITE MAP KEY PLAN th AEROPOSTALE STORE LOCATION SPACE #2107 3865 SQUARE FEET or LEVEL 2 of 3 FILE Permit No. Plan Mk* approval is subject to SIM and omissions. � of snyadopted 0rdnance. Receipt of Waved Reld Copy acknostedget BY Date: _ d City of Tulavk BUILDING DIVISION L W SOUTHCENTER REVISIONS No changes shall be madeto the scope of work without prior approval of Tukwila Building Division. NOTE Revisions will require a new plan submittal and may include additional plan review tees. GENERAL CONSTRUCTION NOTES I. THE GENERAL CONTRACTOR (HEREIN AFTER GALLED THE G.G.) IS TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO VERIFY EXISTING CONDITIONS. 2. G.C. 15 TO VERIFY LEASE SPACE DIMENSIONS AND EXISTING BUILDING ELEMENTS FOR COMPLIANCE WITH THE DRAWINGS. NOTIFY THE OWNER AND ARCHITECT FOR RESOLUTION OF DIMENSIONAL CONFLICTS IF EXISTING. NO CHANGE ORDERS WILL BE ISSUED FOR CHANGES REQUIRED IN THE WORK AFTER CONSTRUCTION HAS COMMENCED UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER. 3. ANY DISCREPANCIES, ERRORS, OR OMISSIONS DISCOVERED IN THE CONTRACT DOCUMENTS BY THE CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND LAMI GRUBB BEFORE PROCEEDING WITH RELATED WORK. OTHERWISE, THE CORRECTION OF SUCH ITEMS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 4. THE G.G. SHALL MEET WITH AN AUTHORIZED REPRESENTATIVE OF THE LANDLORD TO REVIEW CONSTRUCTION PROCEDURES. G.G. SHALL COORDINATE WORK WITH THE LANDLORD WITH REGARD TO TEMPORARY BARRICADES, UTILITIES, ALLOWABLE MATERIALS, TRAFFIC ROUTES, DELIVERY LOCATIONS AND METHODS, STORAGE OF MATERIALS AND TOOLS, NOISE, DUST CONTROL, REQUIRED DEPOSITS, REQUIRED CONTRACTORS, GLEAN -UP, AND ALL OTHER MATTERS REQUIRING ADHERENCE TO LANDLORD REQUIREMENTS. 5. APPLICABLE STANDARDS OF THE CONSTRUCTION INDUSTRY HAVE THE SAME FORGE AND EFFECT ON PERFORMANCE OF THE WORK AS IF COPIED DIRECTLY INTO CONTRACT DOCUMENTS OR BOUND AND PUBLISHED HEREWITH. COMPLY WITH STANDARDS IN EFFECT AS OF THE DATE OF CONTRACT DOCUMENTS, UNLESS OTHERWISE INDICATED. 6. THE G.G. IS RESPONSIBLE TO RECEIVE, COUNT AND VERIFY ALL OWNER FURNISHED ITEMS AT THE JOB SITE, INCLUDING, BUT NOT LIMITED TO: FREE - STANDING FIXTURES, PERIMETER FIXTURES, FLOORING, BASE, GLAZING CHANNEL, CASEWORK ITEMS, LIGHTING, LAMPS, GRAPHIC BOXES, AND FITTING ROOM COMPONENTS. T. EXCEPT AS OTHERWISE INDICATED, THE G.G. IS TO FURNISH ALL MATERIALS, LABOR AND EQUIPMENT FOR THE COMPLETE AND SATISFACTORY EXECUTION OF THE CONTRACT WORK AS SHOWN, GALLED FOR, EXPRESSED OR REASONABLY IMPLIED BY THE CONTRACT DOCUMENTS IN COMPLIANCE WITH CODES AND REGULATIONS OF ALL NATIONAL, STATE AND LOCAL AUTHORITIES HAVING JURISDICTION. SEATTLE, WA STORE #979 i SEPARATE D PERMIT REQUIRED [ ✓j Electrical 1 plumbing Gas piping City of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED JAN 1 6 Mob 005 Of Tukwila ND PIIION JAN 0 4 2008 1� PL, ril; LLN 1 INNIMMENNEEMMOMMENNII DATE:11/23/01 JOB NO: 01193 DRAWN: CHECKED: 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635 -5696 FAX: (817) 635 -5699 INEENNEMEMOMMENIMEMIN covER EMT co co try rsi • 8897 RcG1 RED NO ,t ,°pry 5 CC5\ REVISIONS REVISION SHEET NUMBER 12/27/07 k AC AFF AMP AP BDD BTU CFH CFM CHW CHWR CHWS C LG Co CR CW DB DEMO DIA DIFF DWG DX EAT ELEC ELEV EMS ESP EWB EWT EXH EXIST F FSD FCO FD FD FDC FFE FLR FPM Fr GA GAL GC GPH HP HT HVAC HW HZ ID INV KW LAT ABBREVIATIONS AIR CONDITION (-INC. -ED) ABOVE FINISHED FLOOR AMPERE (AMP, AMPS) ACCESS PANEL BACKDRAFT DAMPER BRITISH THERMAL UNIT CIRCUIT BALANCING VALVE CUBIC FEET PER HOUR CUBIC FEET PER MINUTE CIRCULATING HOT WATER CHILLED WATER RETURN CHILLED WATER SUPPLY CEILING CLEANOUT CONDENSATE RETURN COLD WATER DECIBEL DEMOLITION DIAMETER DIFFUSER DRAWING DIRECT EXPANSION ENTERING AIR TEMPERATURE ELECTRICAL ELEVATION ENERGY MANAGEMENT SYSTEM EXTERNAL STATIC PRESSURE ENTERING WET BULB ENTERING WATER TEMPERATURE EXHAUST EXISTING FAHRENHEIT COMBINATION FIRE /SMOKE DAMPER FLOOR CLEANOUT FIRE DAMPER FLOOR DRAIN FIRE DEPARTMENT CONNECTION FINISHED FLOOR ELEVATION FLOOR FEET PER MINUTE FOOT OR FEET GAGE OR GAUGE GALLONS GENERAL CONTRACTOR GALLONS PER HOUR HORSEPOWER HEIGHT HEATING, VENTILATING, AIR CONDITIONING HOT WATER HERTZ INSIDE DIAMETER INVERT KILOWATT LEAVING AIR TEMPERATURE LBS LWB LWT MA MAX MBH MIN MISC NA NC NIC NTS OA OBD ORD PH PVC RA RD REC REL RH RM RPM SA SAN SD SF SP SPEC ST STD TD TSP ✓ • P VFD VSD VOL VTR W/ W/0 WC WCO WT POUNDS LEAVING WET BULB LEAVING WATER TEMPERATURE MIXED AIR MAXIMUM THOUSAND BTU'S /HR MINIMUM MISCELLANEOUS NOT APPLICABLE NOISE CRITERIA NOT IN CONTRACT NOT TO SCALE OUTSIDE AIR OPPOSED BLADE DAMPER OVERFLOW ROOF DRAIN PHASE (ELECTRICAL) POLYVINYL CHLORIDE RETURN AIR ROOF DRAIN RECESSED RELIEF RELATIVE HUMIDITY ROOM REVOLUTIONS PER MINUTE SUPPLY AIR SANITARY SMOKE DAMPER SQUARE FEET STATIC PRESSURE SPECIFICATION STORM STANDARD TEMPERATURE DIFFERENCE TOTAL STATIC PRESSURE TYPICAL VOLTS VARIABLE FREQUENCY DRIVE VARIABLE SPEED DRIVE VOLUME VENT THROUGH ROOF WATTS WITH WITHOUT WATER CLOSET WALL CLEANOUT WEIGHT EQUIPMENT TAGS ACCU AHU AHUP BP CDWP CEF CHWP CP CPR CRP CUH DHC ECH EF EHC ES EUH EWC EWH FCU FPB AIR COOLED CONDENSING UNIT AIR HANDLING UNIT AIR HANDLING UNIT PUMP BOOSTER PUMP CONDENSER WATER PUMP CEILING EXHAUST FAN CHILLED WATER PUMP CIRCULATING PUMP CONDENSATE PUMP AND RECEIVER CONDENSATE RETURN PUMP CABINET UNIT HEATER DUCT HEATING COIL ELECTRIC CABINET HEATER EXHAUST FAN ELECTRIC HEATING COIL ELECTRONIC SENSOR ELECTRIC UNIT HEATER ELECTRIC WATER COOLER ELECTRIC WATER HEATER FAN COIL UNIT FAN POWERED VARIABLE AIR VOLUME BOX GWH HU HUH HWP IH MAU PCWP PHWP PRV REF RF RH RTU SCWP SEP SHWP SP TF USF VAV VUH WS GAS WATER HEATER HUMIDIFIER HORIZONTAL UNIT HEATER HEATING WATER PUMP INTAKE HOOD MAKE -UP AIR UNIT PRIMARY CHILLED WATER PUMP PRIMARY HEATING WATER PUMP POWER ROOF VENTILATOR RELIEF EXHAUST FAN RETURN FAN RELIEF HOOD ROOFTOP UNIT SECONDARY CHILLED WATER PUMP SEWAGE EJECTOR PUMP SECONDARY HEATING WATER PUMP SUMP PUMP TRANSFER FAN UTILITY SET FAN VARIABLE AIR VOLUME BOX VERTICAL UNIT HEATER WATER SOFTENER HVAC SYMBOL LEGEND DUCTWORK SUPPLY DUCT UP SUPPLY DUCT DOWN SUPPLY DUCT UP THROUGH ROOF RETURN /EXHAUST /RELIEF DUCT UP RETURN /EXHAUST /RELIEF DUCT DOWN RETURN /EXHAUST /RELIEF DUCT UP THROUGH ROOF MANUAL VOLUME DAMPER MOTORIZED DAMPER FIRE DAMPER W /ACCESS PANEL FIRE /SMOKE DAMPER W /ACCESS PANEL SMOKE DAMPER W /ACCESS PANEL DUCT RISE (OR DROP) EXISTING DUCTWORK TO REMAIN EXISTING DUCTWORK TO REMAIN EXISTING DUCTWORK TO BE REMOVED EXISTING DUCTWORK TO BE REMOVED SUPPLY AIR TERMINAL RETURN /EXHAUST /TRANSFER AIR TERMINAL VAV BOX HORIZONTAL UNIT HEATER VERTICAL UNIT HEATER ACCESS PANEL THERMOSTAT TEMPERATURE SENSOR SMOKE DETECTOR LONG RADIUS ELBOW SHORT RADIUS ELBOW WITH VANES FD 12/12 12/12 4- 4- 12/12 4- 12/12 4 r 12/12 X 12/12 fi 12/12 12/12 12/12 12/12 i 4- 4- FSD 12/12 ! r L SD I i E: 12/12 L 12 ffAri,Ak 0 L 0 MN 1>4 GATE VALVE 1�1 CHECK VALVE IxHI DRAIN VALVE tfl TP 11 FLOOR DRAIN FLOOR SINK W /HALF GRATE FLOOR SINK W /FULL GRATE BALL VALVE 2 -WAY VALVE SOLENOID VALVE MOTORIZED VALVE EMERGENCY GAS SHUT -OFF VALVE THERMOSTATIC /PRESSURE BALANCE MIXING VALVE TRAP PRIMING VALVE PRESSURE RELIEF VALVE BUTTERFLY VALVE GLOBE VALVE CIRCUIT BALANCING VALVE PLUG VALVE PLUMBING SYMBOL LEGEND X ANCHOR II PIPE FLANGE PIPE GUIDE k' AIR CHAMBER U WATER HAMMER ARRESTER WALL HYDRANT/ HOSE BIBB Ej EXPANSION TANK (M) WATER METER =1 FLOW METER THERMOMETER PRESSURE GAGE ICI STRAINER PUMP PLUMBING FIXTURE TAG FLOOR RECEPTOR TAG q FLOW SWITCH g i 3 -WAY VALVE Q ►t BFP BACKFLOW PREVENTER a REDUCER FLOW ARROW ID STEAM TRAP (F &T) zr THERMOSTAT WELL o EXPANSION JOINT E FLEXIBLE CONNECTOR T TEST PLUG STEAM TRAP (THERMOSTATIC) Ey �C1 n 0 n III UNION n PIPE CAP S PIPE BREAK VACUUM RELIEF VALVE AQUASTAT PRESSURE REGULATOR PIPE DOWN PIPE UP TEE DOWN MISC. SYMBOL LEGEND XXX 1 EQUIPMENT TAG S CONNECTION TO EXISTING A REVISION TRIANGLE < KEY NOTE • SPRINKLER HEAD (SEMI - RECESSED) O SPRINKLER HEAD (UPRIGHT) O SPRINKLER HEAD (FULLY RECESSED) MOo HVAC PIPING LINETYPE LEGEND CH WR CH WR CH WS CH WS CD CD HWR HWR HWRR HWRR HWS HWS RL RL RS RS CHILLED WATER RETURN CHILLED WATER RETURN (EXISTING) CHILLED WATER SUPPLY CHILLED WATER SUPPLY (EXISTING) CONDENSATE DRAIN CONDENSATE DRAIN (EXISTING) HOT WATER RETURN HOT WATER RETURN (EXISTING) HOT WATER REVERSE RETURN HOT WATER REVERSE RETURN (EXISTING) HOT WATER SUPPLY HOT WATER SUPPLY (EXISTING) REFRIGERANT LIQUID REFRIGERANT LIQUID (EXISTING) REFRIGERANT SUCTION REFRIGERANT SUCTION (EXISTING) PLUMBING LINETYPE LEGEND G G DOMESTIC COLD WATER DOMESTIC COLD WATER (BELOW FLOOR /GRADE) DOMESTIC COLD WATER (EXISTING) DOMESTIC HOT WATER DOMESTIC HOT WATER (EXISTING) GAS GAS (ON ROOF) GAS (EXISTING) GAS (EXISTING ON ROOF) SANITARY SEWER (ABOVE FLOOR /GRADE) SANITARY SEWER (BELOW FLOOR /GRADE) SANITARY SEWER (EXISTING) VENT VENT (UNDERFLOOR /GRADE) VENT (EXISTING) SHEET INDEX MO M1 M2 M3 MECHANICAL TITLE SHEET HVAC PLAN PLUMBING PLAN MECHANICAL SPECIFICATIONS FULL SIZE RIGID INLET DUCT . CONNECT TO EXIST. DUCTWORK VAV INLET CONE AND SENSOR V.A.V. BOX NO SCALE 18" MIN. OR 2 TIMES INLET CONE DIAMETER WHICHEVER IS GREATER VAV BOX NEW DISCHARGE DUCT. - - DISCHARGE TRANSITION AS REQUIRED TO MATCH VAV OUTLET TO NEW OR EXISTING DISCHARGE DUCT. (MAX 22 -1/2 DEG.ANGLE) MANUAL VOLUME DAMPER SPIN -ON BELLNOSE FITTING FIRE DAMPER WITH SPRING CLOSURE BRANCH DUCT W/ EXTERNAL INSULATION MAIN DUCT BRANCH MINIMUM 8" CLEARANCE FOR LIGHTS INSULATED FLEXIBLE DUCT MAX 3' -O" LONG FUSIBLE LINK SUPPLY DIFFUSER THERMAL BLANKET NOTE: PROVIDE NYLON BANDS FOR CONNECTING FLEXIBLE AIR DUCT TO DIFFUSER AND BRANCH DUCT. SPLICES IN FLEXIBLE AIR DUCT SHALL NOT BE ACCEPTED. (,) TYPICAL FIRE RATED SUPPLY DIFFUSER NO SCALE SLEEVE 16 GAUGE FOR ALL DUCTS UNDER 24" HEIGHT AND 36" WIDTH, ALL LARGER DUCTS USE 14 GAUGE. 1/8" MAXIMUM VOID BETWEEN SLEEVE AND STRUCTURE PROVIDE SHEET METAL EXTENSION OF EQUAL OR GREATER GAUGE AS DUCT - FIRE DAMPER CENTERED IN SLEEVE FLAT DRIVE (TYPICAL SIDES) S -SLIP (TYPICAL TOP AND BOTTOM) - SLEEVE MUST EXTEND 6" MINIMUM PAST BOTH SIDES OF STRUCTURE i i i i ii i i i ia i i i i% L C FIRE DAMPER DETAIL NO SCALE RETAINING MINIMUM ANGLE 1-1/2"x 1-1/2"x1/8", 14 GAUGE. ANGLE 1" MINIMUM AND COVER CORNERS OF OPENINGS. SECURE ANGLE TO SLEEVE ONLY ON 8" CENTERS WITH #10 STEEL SCREWS. SECURE FIRE DAMPER TO SLEEVE ON 8" CENTERS WITH #10 STEEL SCREWS. SCREWS MUST NOT INTERFERE WITH DAMPER OPERATION. () O REVIEW FOR CODE C APPROVED .IAN] Oty Of BU - LDING DIVISION Tukwila PROVIDE ACCESS DOOR WITH "FIRE DAMPER" LABEL. LOCATE ON SIDE OR BOTTOM OF DUCT. DOOR SIZE MUST PERMIT ACCESS AND RESETTING TO EACH DAMPER SECTION. JAN 0 4 2008 PE «Izl LI`NOEH DATE: JOB NO: DRAWN: CHECKED: KEW 11/21/01 07- 3201.62 APG 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635 -5696 FAX: (817) 635 -5699 m U Q) • 0 c • REVISIONS c\ tic iw r H _ MO - co ¢ '- SHEET NUMBER � � 00 J O DO Ld 0 N LIJ z � L�I UO W V) Co w C) HALLBERG ENGINEERING Mechanical /Electrical Consulting Engineers 1750 Commerce Court, White Bear lake, MN 55110 (651) 748 -1100 • Fax (651) 748 -9370 �z(z� / y� MECHANICAL TITLE SHEET GRILLE REGISTER AND DIFFUSER ' O TYPE A B C UNIT TAG ITEM SUPPLY SUPPLY RETURN TITUS DESCRIPTION SURFACE MOUNT LAY -IN SURFACE MOUNT MINIMUM CFM MANUFACTURER TITUS TITUS TITUS 30 MODEL NUMBER OMNI 24x24 -FD TMSA -FD 50F -FD 28.0 REMARKS STANDARD WHITE FINISH INSTALL W/ PUSH UP PLASTER FRAME STANDARD WHITE FINISH ADJUSTABLE STANDARD WHITE FINISH V-PH-CY VAV D OX IMV II MO UNIT TAG VAV -1 AREA SERVED SALES AREA MANUFACTURER TITUS MODEL NUMBER DESV CFM 4000 MINIMUM CFM 2500 INLET DUCT SIZE 16 "0 MAX NC ® 1.5" SP 30 MAX ESP 0.5 ELECTRIC HEATING COIL KW 28.0 EAT /LAT 55.0/90.0 CONTROL STEPS 2 V-PH-CY 480 -3 -60 ELECTRICAL V -PH -CY 480 -3 -60 DISCONNECT DIV 16 REMARKS - u L N N T R LANDLORD NOTES 1. DO NOT ATTACH ANYTHING DIRECTLY TO SLAB OR ROOF DECK ABOVE. 2. PROVIDE SMOKE DETECTOR AS REQUIRED PER NFPA AND INC. 3. MAXIMUM LENGHT OF FLEX DUCT IS 5' -0". 5. LANDORD PROVIDED A TENANT FIRE SERVICE MAIN WITH BRANCH PIPING STUBBED INTO EACH TENANT'S SPACE. LANDLORD'S SPRINKLER SYSTEM IS DESIGNED PER ORDINARY HAZARD GROUP 2 AND THE LATEST REQUIREMENTS OF NFPA -13. NO ISOLATION VALVES WILL BE PROVIDED OR PERMITTED. ALL SUPPORTS SHALL BE FROM STRUCTURAL BEAMS AND JOISTS, NOT FROM FLOOR OR ROOF DECK ABOVE. 4. TENANT SHALL MAINTAIN A MINIMUM OF 6" UNOBSTRUCTED CLEARANCE HEIGHT IN RETURN AIR PLENUM ABOVE CEILING ALLOWING FOR AIR FLOW BACK TO LANDLORD AIR CONDITIONING UNIT. 6. TENANT SHALL CONNECT A FIRE SPRINKLER SYSTEM TO LANDLORD'S SPRINKLER SYSTEM WITHIN THE DEMISED PREMISES USING APPROVED MECHANICAL FITTINGS. TENANT SHALL PROVIDED AND INSTALL ALL BRANCH PIPING AND SPRINKLERS REQUIRED TO COMPLETE THE SPRINKLER SYSTEM WITHIN THE TENANT SPACE. TENANT'S SPRINKLER SYSTEM DESIGNS SHALL BE BASED UPON THE REQUIEMENTS OF THE STATE OF WASHINGTON, CITY OF TUKWILA FIRE DEPARTMENT. TENANT SHALL ENGAGE THE SERVICES OF A LANDLORD PREFERRED FIRE SPRINKLER CONTRACTOR TO DESIGN, PERMIT AND INSTALL TENANT'S FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH THE BASE BUILDING DESIGN SPECIFICATIONS. SPRINKLER LAYOUT AND PIPE SIZING SHALL BE HYDRAULICALLY DESIGNED ACCORDING TO ORDINARY HAZARD GROUP 2 AND THE LATEST REQUIREMENTS OF NFPA -13. 7. TENANT'S THAT HAVE 50 OR MORE SPRINKLER HEADS WILL REQUIRE A THIRD PARTY REVIEW. THE THIRD PARTY REVIEW MUST BE DONE BY A FIRE PROTECTION ENGINEER (F.P.E.), LICENSED IN THE STATE OF WASHINGTON AS APPROVED BY THE FIRE DEPARTMENT AND LANDLORD. CONTACT THE FIRE DEPARTMENT OR THE TENANT COORDINATOR WITH ANY QUESTIONS REGARDING THIS REQUIREMENT. 8. ALL SPRINKLER HEADS IN THE FORWARD SELLING AREA ARE TO BE CONCEALED POP OFF COVER TYPE. ' 8"o C— co N • I -1 `C' 124x6 24/18 r L r . . 0( 0 0 r O O U U U 9 ' C ' 130x6 o i (6)O L�1 GENERAL NOTES A. THE MECHANICAL CONTRACTOR IS REQUIRED TO PROVIDE AS PART OF BASE BID A SERVICE CONTRACT INCLUDING ALL FILTER CHANGES AND CLEANING AND MAINTENANCE FOR A PERIOD OF 1 YEAR FROM TURNOVER OF SPACE. B. COORDINATE LOCATIONS OF DIFFUSER GRILLES W /ARCH REFLECTED CEILING PLAN. C. SUBMIT COPIES OF TEST & BALANCE REPORT TO LANDLORD, OWNER & ENGINEER. D. ADJUST DISCHARGE PATTERN OF THE DIFFUSER FOR A VERTICAL FLOW. G. DIFFUSER RUNOUT EQUAL TO DIFFUSER CONNECTION UNLESS OTHERWISE SPECIFIED. H. SPRINKLER HEADS ALONG PERIMETER TO BE ADJUSTED TO FIXTURE HEIGHTS. COORDINATE IN FIELD. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL DETAIL. E. REMOVE ALL EXISTING FIRE SPRINKLER HEADS AND DROP LEGS. PROVIDE NEW HEADS OF TYPE SHOWN. REWORK BRANCHES AND MAINS AS REQUIRED FOR NEW ELEVATION. HEADS TO BE UPRIGHT, SEMI - RECESSED OR FULLY RECESSED. FULLY RECESSED TO BE PROVIDED WITH WHITE COVERS. FIRE PROTECTION WORK TO BE PROVIDED BY LANDLORD APPROVED CONTRACTOR. F. CONTRACTOR SHALL COMPLETELY REMOVE FROM THE PREMISES ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS, CONTROL WIRING, ETC. AND ALL ASSOCIATED SUPPORTS, BRACING, PADS, ETC. NOT BEING REUSED OR SHOWN ON TO REMAIN WHETHER IN THE DEMISED SPACE, ON THE ROOF OR OTHERWISE LOCATED OUTSIDE OF THE DEMISED SPACE. DO NOT ABANDON IN PLACE. I. VERIFY ANY ADDITIONAL HVAC CRITERIA WITH LANDLORD. REQUIREMENTS MAY INCLUDE BUT ARE NOT LIMITED TO: GENERAL HVAC REQUIREMENTS, INSULATION, DUCT AND DUCT FITTINGS, HVAC CONTROLS, HANGERS, AND INSTALLATION. O 22 I 1 �7C L I L ... ..... .. ._.,.�. J U l ...� L.. r C I r, Q L.W. VOW/ _ . / se /r.i7. '�Y, i(25 ff/fJf}G. i[ V O 0 6 KEY NOTES O NEW VARIABLE AIR VOLUME BOX (VAV -1) PROVIDED BY TENANT CONTRACTOR. CONNECT VAV -1 TO EXISTING LANDLORD PROVIDED SUPPLY AIR DUCT. FIELD VERIFY EXACT LOCATION AND SIZE OF EXISTING DUCT. MODIFY EXISTING DUCT AS REQUIRED TO ACCOMMODATE VAV -1. VAV -1 SHALL HANG WITH VIBRATION ISOLATING DEVICES. INSTALL VAV -1 SUCH THAT ALL UNIT COMPONENTS ARE FULLY ACCESSIBLE. VERIFY INSTALLATION AND CONTROL REQUIREMENTS WITH LANDLORD. % PROVIDE NEW SENSOR FOR VAV -1 CONTROL 4'-O" A.F.F. SEE SPECIFICATION FOR CONTROLS. O PROVIDE NEW REMOTE CONTROLLER FOR VAV -1 5' -0" A.F.F. MAX. WITHIN 3' -0" OF PHONE BOARD COVERED WITH CLEAR LOCKABLE BOX. SEE SPECIFICATION FOR CONTROLS. <> PROVIDE NEW FIRE DAMPERS IN ALL SUPPLY AND RETURN AIR TERMINALS AS WELL AS IN ANY DUCT REQUIRED BY CODE TO MAINTAIN FIRE RATINGS IN NEW CEILINGS OR NEW WALLS. PROVIDE ADDITIONAL DUCTWORK IF REQUIRED TO ACCOMMODATE NEW FIRE DAMPERS. SEE DETAIL 3 /MO. TYP. EF /LIGHT PROVIDED BY AEROPOSTALE VENDOR. WHEN IN OPERATION, EACH EXHAUST FAN SHALL EXHAUST 150 CFM FROM EACH TOILET ROOM. MECHANICAL CONTRACTOR TO CONNECT 8 "0 DUCT FROM THE EF /LIGHT TO EXISTING LANDLORD PROVIDED TOILET EXHAUST DUCT. PROVIDE BACK DRAFT DAMPERS. MODIFY EXISTING DUCT AS REQUIRED TO ACCOMMODATE NEW DUCT. FIELD VERIFY EXISTING TOILET EXHAUST DUCT SIZE AND LOCATION. O EXISTING MALL DUCT TO REMAIN. FIELD VERIFY EXACT LOCATION AND SIZE. V THE GC MUST ORDER SPRINKLER HEAD CAPS THAT MATCH AERPOSTALE P -2 (BENJAMIN MOORE: #2060 -40 TORONTO BLUE) fff.07.i 017.Y/G, r 0S.V . .6 f�S� /f �J„i16iff F/Ifff' 1-- PER 2006 IMC SECTION 606 Install smoke detector to shut down air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection 3 16/10 CD 2_ U 3 b O 9 U 3 n 7 C> 8 1 O n U 3 D 1 NOTE: THERE IS A FIRE —RATED GYP BOARD CEILING I N THE SALES AREA AND EXIT CORRIDOR AND A FIRE —RATED ACT LAY—IN CEILING IN THE STOC< ROOM. REFER TO ARCHITECTURAL PLANS FOR CEILING HEIGHTS. 1 REVIEWED FOR — CODE COMPLIANCE APPROVED JAN 1 (3 2000 City Of Tukwila BUILDING DIVISION JAN 04 20U8 DATE: II/2l/01 JOB NO: 01- 3201.62 DRAWN: APG CHECKED: KEW 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635 -5696 FAX: (817) 635 -5699 m C 0 0 L 0 0 U -«- U a) '0 L 0 MEMEA A al N M � 8 a „ Ctt 00 j O co <w r .. 0 0) 00 N— w N( < Z ww w V ) (f) � HALLBERG ENGINEERING Mechanical /Electrical Consulting Engineers 1750 Commerce Court, White Bear Lake, MN 55110 (651) 748 -1100 • Fax (651) 748 -9370 REVISIONS ? r ?° f ~ w go‘, • T$ \ -= A HVAC PLAN SHEET NUMBER M1 PLUMBING FIXTURE SCHEDULE Item • P# Exist. To Remain FIXTURE NO. FIXTURE TYPE MANUFACTURER TYPE & MODEL NO. TRIM NO. SUPPORT PIPE SIZES REMARKS TRAP WASTE VENT CW HW P1 WATER CLOSET PRESSURE ASSIST AMERICAN STANDARD CADET (WHITE) 2377.100 CHICAGO FAUCET 1016 FLOOR MOUNT _ 4 " 2 " 1/2 " _ PROVIDE OPEN FRONT COMMERCIAL SEAT 5905.100. ADA COMPLIANT 16 -1/2" RIM HEIGHT. P2 LAVATORY AMERICAN STANDARD LUCERNE (WHITE) 0355.012 CHICAGO FAUCET 894 -317 WALL HUNG 1 -1 /2" 2" 1-1/2" 1/2" 1/2" PROVIDE INSULATED CAST BRASS P -TRAP, PROVIDE HANDICAP INSULATION KIT, (2) CHICAGO FAUCET 1016 ANGLE VALVES P3 HI-LO WATER COOLER ELKAY BARRIER -FREE LZSTLBC - - WALL MOUNT 1 -1/2" 2" 1 -1/2" 1/2" r UNIT TO BE INSTALLED WITH ACCESSORY APRON LKAPREZL FOR ADA COMPLIANCE IF MTh. ON EXPOSED WALL Fl FLOOR DRAIN JOSAM 30003 -6A - - 3" 3" 1 -1/2" - _ PROVIDE 1/2" TRAP PRIMER CONNECTION WHERE INDICATED ON PLANS BATHROOM COMPONENT SCHEDULE Item Model # Exist. To Remain New (Add /Replace) Notes: Toilet See Plumbing Fixture Schedule - 2 --- Toilet Seat See Plumbing Fixture Schedule - 2 -- Sink See Plumbing Fixture Schedule - 2 -- Lever Handle Faucet See Plumbing Fixture Schedule - 2 -- Pipe Wrap See Plumbing Fixture Schedule - 2 -- Water Heater See Water Heater Schedule - 2 Instantaneous Service Sink -- - - -- Water Cooler See Plumbing Fixture Schedule - 1 Hi /Lo Combination Floor Drain See Plumbing Fixture Schedule - 2 -- FIXTURE INSTANTANEOUS WATER HEATER SCHEDULE I H WATER CLOSET (2) 2.5 UNIT NO. MANUFACTURER MODEL KW OUTPUT (GPM) TEMP. RISE 'F r VOLTAGE REMARKS IWH -1 CHRONOMITE LABS, INC. SR -30 8.32 1.0 57 277/1/60 NONE FIXTURE WATER SUPPLY FIXTURE UNITS TOTAL WATER CLOSET (2) 2.5 5 LAVATORY (2) 1 2 SERVICE SINK ( -) - - WATER COOLER (1) 0.5 0.5 FLOOR DRAIN (2) 2 4 TOTAL 7.5 SUPPLY DEMAND (GPM) 7.5 FIXTURE DRAINAGE FIXTURE UNIT VALUE TOTAL WATER CLOSET (2) 4 8 LAVATORY (2) 1 2 SERVICE SINK ( -) - - WATER COOLER (1) 1 1 FLOOR DRAIN (2) 2 4 TOTAL 15 MINIMUM SIZE OF TOTAL SANITARY PIPE (IN.) 3 i P2 P2 0 1 LID o P3 UNDERFLOOR PLUMBING PLAN 1/4" = 1' -0" KEY NOTES 1O EXTEND AND CONNECT NEW 4" SANITARY SEWER PIPING TO EXISTING 4" (MIN) LANDLORD PROVIDED SANITARY SEWER PIPING. FIELD VERIFY EXACT LOCATION, SIZE, FLOW DIRECTION, AND INVERT ELEVATION OF CONNECTION POINT PRIOR TO ROUGH -IN OF NEW SANITARY SEWER PIPING. PROVIDE FCO AT POINT OF CONNECTION TO EXISTING PIPING. <>EXTEND AND CONNECT NEW 3/4" COLD WATER PIPING TO EXISTING 3/4" (MIN) LANDLORD PROVIDED COLD WATER PIPING. FIELD VERIFY EXACT LOCATION OF COLD WATER PIPING PRIOR TO ROUGH -IN.: PROVIDE SHUTOFF VALVE AT POINT OF CONNECTION TO EXISTING PIPING. O EXTEND AND CONNECT NEW 2" VENT PIPING TO EXISTING LANDLORD PROVIDED VENT PIPING. MODIFY EXISTING PIPING AS REQUIRED TO ACCOMMODATE NEW PIPING. FIELD VERIFY EXACT LOCATION AND SIZE OF EXISTING PIPING PRIOR TO ROUGH -IN. K 4 PROVIDE JOSAM 88250 OR EQUAL TRAP PRIMER AS REQUIRED BY CODE. <0> PROVIDE UTILITY GRADE WATER METER WITH DIRECT READ AND REMOTE READER. VERIFY WATER METER REQUIREMENTS AND LOCATION OF REMOTE READER WITH LANDLORD. O 6 PROVIDE WATTS SERIES 909 REDUCED PRESSURE ZONE ASSEMBLY. O VERIFY ANY ADDITIONAL PLUMBING CRITERIA WITH LANDLORD. REQUIREMENTS MAY INCLUDE BUT ARE NOT LIMITED TO: GENERAL PLUMBING REQUIREMENTS, INSULATION, PIPE AND PIPE FITTINGS, VALVES AND COCKS, PIPE SUPPORTS AND COVER PLATES, INSTALLATION, AND PLUMBING FIXTURES. J ' 1 1/4" = 1' -0" l� P3 .1 PLUMBING PLAN MOTE R ADER 4" I` ' Y K 2 \Ii r ry 2 "-I 2 "� i 1_1/2 C` 1_11/2" 2 " — �.r . 1 I 4" 2" ■ I 2 » 6 r- 1 I / 6' r1 -1/2" I 2 I I ' 1 -1 - 1 /2" I C WASTE AND VENT RISER N.T.S. LANDLORD NOTE 1. TENANT'S CONTRACTOR SHALL VERIFY POINTS OF CONNECTION FOR ALL VENT, SEWER, AND WATER PIPING WITH MALL MANAGEMENT BEFORE PROCEEDING WITH WORK. TENANT IS RESPONSIBLE FOR EXTENDING PIPING FROM POINT OF EXISTING CONDITIONS TO TENANT SPACE AT TENANT'S EXPENSE. FCO SIZE OF DRAINAGE PIPING SIZE OF WATER SYSTEMS 1 /2" 3/4" . I IWH 1 N.T.S. i i O " i p 6'- - �► 1 /2 "--I REMOTE READER WATER RISER 1/2\ i 1/2"—] 1 /2 " REVVED FOR CODE COMPLIANCE APPROV JAN MB 2* JAN 0 4 2008 pF .,,, TEFL DATE: 11/21/01 JOB NO: 01- 3201.62 DRAWN: APG CHECKED: KEW 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635 -5696 FAX: (817) 635 -5699 co t U N L 0 4:) c.1 • J LL 00 J w °Q DO W Of N a U w w a w [7: O, (f) HALLBERG ENGINEERING Mechanical /Electrical Consulting Engineers 1750 Commerce Court, White Bear Lake, MN 55110 (651) 748 -1100 • lax (651) 748 -9370 REVISIONS PLUMBING PLAN SHEET NUMBER M2 15010 GENERAL PROVISIONS A. FURNISHING LABOR, MATERIALS, EQUIPMENT AND SERVICES REQUIRED AS SHOWN ON THE DRAWINGS AND SPECIFIED IN DIVISION 15. B. ALL WORK SHALL BE COMPLETE AND SHALL BE LEFT IN OPERATING CONDITION. C. INCLUDE ALL PARTS AND LABOR WHICH ARE INCIDENTAL AND NECESSARY FOR A COMPLETE AND OPERABLE INSTALLATION EVEN THOUGH NOT SPECIFICALLY MENTIONED IN THE CONTRACT DOCUMENTS. D. ARRANGE WITH APPROPRIATE UTILITY COMPANIES TO PROVIDE TEMPORARY AND PERMANENT UTILITY SERVICES AS REQUIRED AND COORDINATE THEIR INSTALLATION WITH CONSTRUCTION PROGRESS OF THIS PROJECT. PAY ALL FEES AND COSTS CHARGED BY UTILITY COMPANIES FOR UTILITY SERVICES. E. OBTAIN ALL TEMPORARY AND PERMANENT PERMITS AND LICENSES REQUIRED IN CONNECTION WITH THIS DIVISION'S WORK. PAY ALL FEES AND EXPENSES REQUIRED FOR SUCH PERMITS AND LICENSES. F. REQUEST INSPECTIONS AS REQUIRED BY REGULATING AGENCIES AND /OR REGULATIONS. PAY ALL CHARGES FOR INSPECTIONS BY REGULATING AGENCIES OF INSTALLATIONS OF PLANS SPECIFICATIONS. G. PROVIDE THE OWNER WITH A CERTIFICATE OF FINAL INSPECTION AND APPROVAL BY ENFORCEMENT AUTHORITIES. H. MEET OR EXCEED ALL CURRENT APPLICABLE CODES, ORDINANCES AND REGULATIONS FOR ALL INSTALLATIONS. PROMPTLY NOTIFY THE ENGINEER, IN WRITING, IF THE CONTRACT DOCUMENTS APPEAR TO CONFLICT WITH GOVERNING CODES AND REGULATIONS. CONTRACTOR ASSUMES ALL RESPONSIBILITY AND COSTS FOR CORRECTING NON - COMPLYING WORK INSTALLED WITHOUT NOTIFYING THE ENGINEER. I. HIGHER QUALITY OF WORKMANSHIP AND MATERIALS INDICATED IN THE CONTRACT DOCUMENTS TAKES PRECEDENCE OVER THAT ALLOWED IN REFERENCED CODES AND STANDARDS. FURNISH: TO OBTAIN, COORDINATE, SUBMIT THE NECESSARY DRAWINGS, DELIVER TO THE JOB SITE IN NEW CONDITION READY FOR INSTALLATION, UNLOAD AND UNPACK, AND GUARANTEE. J. INSTALL: TO RECEIVE AT THE JOB SITE, STORE, ASSEMBLE, ERECT, SET IN PLACE, ANCHOR, APPLY, FINISH, PROTECT, CLEAN, TEST, START -UP, AND MAKE READY FOR OWNER'S USE. K. PROVIDE: TO FURNISH AND INSTALL L. CONTRACTOR IS RESPONSIBLE FOR DIMENSIONAL DIFFERENCES, WEIGHTS, ELECTRICAL REQUIREMENTS AND ANY OTHER RESULTING CHANGES, WHEN USING EQUIPMENT OTHER THAN THAT SCHEDULED ON THE DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR ANY ADDITIONAL COSTS INCURRED AS A RESULT OF SUBSTITUTIONS. M. BEFORE SUBMITTING A PROPOSAL ON THE WORK CONTEMPLATED, EXAMINE THE SITE OF THE PROPOSED WORK AND BECOME THOROUGHLY FAMILIAR WITH EXISTING CONDITIONS AND U LIMITATIONS. NO EXTRA COMPENSATION WILL BE ALLOWED BECAUSE OF MISUNDERSTANDING AS T O THE AMOUNT OF WORK INVOLVED NO R BIDDERS LACK OF KNOWLEDGE OF EXISTING CONDITIONS I WHICH COULD HAVE BEEN DISCOVERED OR REASONABLY ANTICIPATED PRIOR TO BIDDING. N. MECHANICAL EQUIPMENT AND SYSTEMS SHOWN ON THE DRAWINGS AS EXISTING, HAVE BEEN BASED ON EXISTING PLANS, AND MAY NOT BE INSTALLED AS ORIGINALLY SHOWN. IT IS THE CONTRACTORS RESPONSIBILITY TO VISIT THE SITE AND MAKE EXACT DETERMINATION OF THE EXISTENCE, LOCATION AND CONDITION OF SUCH FACILITIES PRIOR TO SUBMITTING A BID. 0. CONSULT THE DRAWINGS AND SPECIFICATIONS OF DIVISION 16 AND OTHER TRADES FOR CORRELATING INFORMATION AND LAY OUT WORK SO THAT IT WILL COORDINATE WITH OTHER TRADES. VERIFY DIMENSIONS AND CONDITIONS (I.E., FINISHED CEILING HEIGHTS, FOOTING AND FOUNDATION ELEVATIONS, BEAM DEPTHS, ETC.) WITH THE ARCHITECTURAL AND STRUCTURAL DRAWINGS. EVERY RISE AND OFFSET REQUIRED MAY NOT SHOW EU UIRED FOR THE WORK. INSTALL PIPING AND Q P. DUCTWORK TO ACCOMMODATE THE BUILDING STRUCTURE AND THE WORK OF OTHER TRADES, WITH ALL REQUIRED OFFSETS AND WITHOUT EXTRA COST TO THE OWNER. Q. OBTAIN EXACT LOCATION OF CONNECTION TO EQUIPMENT, FURNISHED BY OTHERS, FROM THE PERSON FURNISHING THE EQUIPMENT. R. GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION FOR THE PERIOD OF ONE (1) YEAR AFTER THE FINAL COMPLETION OF THE WORK AS EVIDENCED BY ISSUANCE OF THE FINAL CERTIFICATE BY THE ARCHITECT. S. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS APPEARING DURING THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND ARCHITECT AND ENGINEER. INCLUDE DAMAGE TO THE FINISH OR THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIRS. T. MAGNETIC STARTERS, DISCONNECTS, AND POWER WIRING PROVIDED BY THE ELECTRICAL CONTRACTOR, UNLESS OTHERWISE SPECIFIED. U. CONTROL AND INTERLOCK WIRING PROVIDED BY THE MECHANICAL CONTRACTOR, UNLESS OTHERWISE SPECIFIED. V. PROVIDE ONLY PRODUCTS FROM MANUFACTURER'S WITH LOCAL REPRESENTATION THAT CAN PROVIDE COMPLETE COVERAGE, PARTS AND LABOR, FOR REPLACEMENT AND SERVICE OF THEIR PRODUCTS. PROVIDE ONLY EQUIPMENT THAT WILL FIT IN THE SPACE AVAILABLE AND BE COMPLETELY SERVICEABLE. BRING ANY CONFLICTS TO THE ENGINEER'S ATTENTION PRIOR TO ORDERING THE EQUIPMENT. W. COORDINATE/SCHEDULE ALL WORK WITH THE OWNER TO MINIMIZE ANY DISRUPTIONS. CONFINE ALL INTERRUPTIONS TO THE SMALLEST POSSIBLE AREA. PROVIDE TEMPORARY CONNECTIONS IF REQUIRED TO PROVIDE CONTINUITY OF SERVICE. X. INSPECT ALL AREAS AFFECTED BY THE INTERRUPTIONS AND RETURN ALL AUTOMATICALLY CONTROLLED EQUIPMENT, ELECTRICALLY OPERATED EQUIPMENT TO THE SAME OPERATING CONDITION PRIOR TO THE INTERRUPTION. Y. NO FIRE SPRINKLER OR FIRE ALARM SYSTEMS ARE TO REMAIN INACTIVE AT THE END OF THE WORK DAY. ASSURE THAT THE FIRE SPRINKLER OR FIRE ALARM SYSTEM IS OPERATIONAL AT THE END OF EACH WORK DAY. COORDINATE WITH THE OWNER. Z. PROVIDE NEW MATERIAL AND EQUIPMENT, UNLESS NOTED OTHERWISE. PROTECT EQUIPMENT AND MATERIAL FROM DAMAGE, DIRT AND THE WEATHER. AA. PROVIDE THE HIGHEST QUALITY WORKMANSHIP AND PERFORM ALL WORK ONLY BY SKILLED MECHANICS. INSTALL MATERIAL AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS, INSTRUCTIONS AND CURRENT STANDARDS. SIP NOT IN ACCORDANCE G REJECT MATERIAL OR WORKMAN H N T BB. THE ENGINEER RESERVES THE RIGHT TO WITH THE CONTRACT DOCUMENTS, BEFORE OR AFTER INSTALLATION. CC. ALL PIPING AND DUCTWORK SHALL BE RUN IN THE MOST DIRECT AND STRAIGHT MANNER POSSIBLE MAINTAINING PROPER GRADING. DD. IT IS THE INTENT OF THESE PLANS AND SPECIFICATIONS THAT MOST PIPING AND DUCTWORK BE CONCEALED. WHERE EXPOSED, RUN AS CLOSE TO CEILING AND /OR WALL AS POSSIBLE PARALLEL WITH ADJACENT STRUCTURAL OR ARCHITECTURAL ELEMENTS. EE. DO NOT INSTALL PIPING OR DUCTWORK IN ANY SWITCHGEAR, TRANSFORMER, ELEVATOR EQUIPMENT, TELEPHONE, OR ELECTRICAL EQUIPMENT ROOM, UNLESS IT IS A BRANCH SERVING THAT ROOM. FF. DO NOT INSTALL PIPING OR DUCTWORK ABOVE SWITCHBOARDS, PANELBOARDS, CONTROL PANELS, MOTOR CONTROL CENTERS, ETC. GG. ARRANGE WORK TO FACILITATE MAINTENANCE, REPAIR OR REPLACEMENT OF EQUIPMENT. PROVIDE ACCESS FOR DEVICES THAT REQUIRE MAINTENANCE. FOR CONCEALED DEVICES, VERIFY THAT ACCESS PANELS ARE PROPERLY LOCATED AND LABELED. HH. INSTALL MATERIAL AND EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. II. PERFORM ALL CUTTING AND PATCHING NECESSARY TO WORK, UNLESS SPECIFICALLY DELEGATED TO THE GENERAL CONTRACTOR. OBTAIN SPECIAL PERMISSION FROM THE STRUCTURAL ENGINEER BEFORE CUTTING STRUCTURAL MEMBERS OR FINISHED MATERIAL PERFORM ALL PATCHING IN SUCH A MANNER AS TO LEAVE NO VISIBLE TRACE AND RETURN THE AREA AFFECTED TO THE CONDITION OF UNDISTURBED WORK. PERFORM ALL PATCHING BY WORKERS EXPERIENCED, SKILLED, AND LICENSED FOR THE PARTICULAR TYPE OF WORK INVOLVED. INFERIOR WORK WILL NOT BE ACCEPTED. JJ. PATCH ALL HOLES LEFT AS A RESULT OF DEMOLITION OF MECHANICAL EQUIPMENT AND DEVICES. KK. DRILL ALL HOLES IN MASONRY WITH ROTARY DRILL IMPACT TOOLS ARE NOT ALLOWED. CORE DRILL ALL HOLES IN MASONRY AND CONCRETE FOR MECHANICAL PENETRATIONS. PROVIDE AND DISPOSE OF ALL WATER REQUIRED FOR CORE DRILLING. COORDINATE WITH OTHER TRADES TO PREVENT DAMAGE FROM WATER. LL. PREVENT THE SPREAD OF DUST, DEBRIS, AND OTHER MATERIAL INTO ADJACENT AREAS. MM. REPLACE ALL CEILING TILES DAMAGED DURING INSTALLATION OF WORK, WITH NEW TILE. NN. REFINISH ALL MECHANICAL EQUIPMENT DAMAGED DURING SHIPPING AND /OR INSTALLATION TO ITS ORIGINAL CONDITION. REMOVE ALL RUST; PRIME, AND PAINT PER MANUFACTURER'S RECOMMENDATIONS FOR FINISH EQUAL TO ORIGINAL. 00. DO NOT USE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS PROVIDED IN THIS SCOPE OF WORK FOR TEMPORARY HEATING, VENTILATING AND AIR CONDITIONING DURING CONSTRUCTION. PP. PROTECT OPENINGS AND EQUIPMENT FROM OBSTRUCTION, BREAKAGE, MISUSE, DAMAGE OR BLEMISHES. PROTECT MATERIALS AND EQUIPMENT IMMEDIATELY UPON RECEIPT AT THE JOB SITE OR IMMEDIATELY AFTER THEY HAVE BEEN REMOVED FROM THEIR SHIPPING CONTAINERS. UNLESS NOTED OTHERWISE, KEEP THEM CLEAN AND UNDAMAGED UNTIL FINAL ACCEPTANCE OF THE ENTIRE PROJECT BY THE OWNER. WHEN A PORTION OF THE BUILDING IS OCCUPIED BY THE OWNER BEFORE SUBSTANTIAL COMPLETION OF THE ENTIRE PROJECT, MAKE ARRANGEMENTS TO TRANSFER RESPONSIBILITY FOR PROTECTION AND HOUSEKEEPING FOR THE OCCUPIED PORTION. QQ. PROTECT PIPE, DUCT AND EQUIPMENT OPENINGS WITH TEMPORARY PLUGS OR CAPS. KEEP OPENINGS COVERED UNTIL PERMANENT CONNECTIONS ARE COMPLETE. RR. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO MECHANICAL EQUIPMENT, MATERIALS OR WORK UNTIL FINAL ACCEPTANCE OF THE ENTIRE PROJECT BY THE OWNER. KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIAL OR RUBBISH, CAUSED BY HIS EMPLOYEES OR WORK, AT ALL TIMES. REMOVE RUBBISH, TOOLS, SCAFFOLDING, AND SURPLUS MATERIALS FROM AND ABOUT THE BUILDING, AND LEAVE WORK AREAS `BROOM CLEAN' OR ITS EQUIVALENT UPON COMPLETION OF THE WORK. CLEAN MECHANICAL EQUIPMENT AND REMOVE TEMPORARY IDENTIFICATION. S5. IN CASE OF DISPUTE, THE OWNER WILL REMOVE THE RUBBISH AND CHARGE THE COST TO THE CONTRACTOR. TT. BEFORE START -UP, LUBRICATE, CHARGE, AND FILL SYSTEMS AS SPECIFIED AND ACCORDING TO MANUFACTURER'S INSTRUCTIONS. UU. CLEAN, DISINFECT, AND TEST ALL PLUMBING AND PIPING SYSTEMS. W. PERFORM TESTING, ADJUSTING AND BALANCING IN ACCORDANCE WITH THAT SECTION. WW. OPERATE EQUIPMENT AND SYSTEMS IN ALL THEIR OPERATING MODES, TO VERIFY PROPER OPERATION, PRIOR TO FINAL FIELD OBSERVATION AND OWNER INSTRUCTIONS. X.X. ATTEND PRE - TESTING CONFERENCE AS SCHEDULED BY TESTING, ADJUSTING AND BALANCING CONTRACTOR. YY. PROVIDE ASSISTANCE TO TEST, ADJUSTING AND BALANCING CONTRACTOR BY MAKING ADJUSTMENTS TO SYSTEM AND SYSTEM COMPONENTS REQUIRED FOR ACHIEVING DESIGN PERFORMANCE. ZZ. IF ACCEPTABLE PERFORMANCE OF ANY TEST IS NOT ACHIEVED, MAKE THE NECESSARY CORRECTIONS AND THE TEST SHALL BE REPEATED UNTIL ACCEPTABLE PERFORMANCE IS ACHIEVED. AM. FULLY INSTRUCT THE OWNER'S DESIGNATED PERSONNEL IN THE OPERATION OF EACH MECHANICAL SYSTEM AT THE TIME IT IS PUT INTO SERVICE. PROVIDE INSTRUCTION USING COMPETENT INSTRUCTORS AND FACTORY TRAINED PERSONNEL. BBB, INCLUDE DOCUMENTATION OF INSTRUCTIONS IN THE OPERATION AND MAINTENANCE MANUALS. CCC. OBTAIN A WRITTEN STATEMENT FROM THE OWNER THAT HIS DESIGNATED PERSONNEL HAVE BEEN INSTRUCTED. DDD. SUBMIT COMPLETED BOUND OPERATION AND MAINTENANCE MANUALS TO OWNER INCLUDING SHOP DRAWINGS, WARRANTIES, TEST REPORTS, CERTIFICATIONS, TEST AND BALANCE REPORTS, SYSTEM VALIDATION REPORTS AND RECORD DRAWINGS. 15025 DEMOLITION A. FURNISH LABOR, EQUIPMENT, AND MATERIALS REQUIRED FOR CUTTING, DEMOLITION, REMOVAL, PATCHING, AND RESTORATION WORK NECESSARY TO ACCOMPLISH AND COMPLETE ALL DEMOLITION, INCLUDING ANY RELOCATION OR REUSE OF EXISTING MATERIALS, EQUIPMENT, SYSTEMS, AS WELL AS THE DISPOSITION OF SALVAGED MATERIALS OR DEBRIS. B. ACCOMPLISH ALL WORK OF CUTTING, REMOVAL, DEMOLITION, RELOCATION, PATCHING, AND RESTORATION BY USING ONLY MECHANICS SKILLED IN THE TRADE REQUIRED. PROVIDE FOR THE SAFETY OF THE EXISTING BUILDING AND PERSONNEL, AS WELL AS FOR NEW CONSTRUCTION AS A RESULT OF WORK, PROCEDURES, OPERATIONS OR ACTIVITIES UNDER THIS CONTRACT. C. WHERE THE WORK OF REMOVALS, DEMOLITION, CUTTING AND SIMILAR WORK INVOLVES STRUCTURAL CONSIDERATIONS, CONSULT WITH STRUCTURAL ENGINEER. EXERCISE EXTREME CARE TO AVOID DAMAGE AND PRESERVE THE SAFETY OF THE STRUCTURE AND OF ALL PERSONNEL PARTICULAR CARE MUST BE TAKEN WHERE THE DEMOLITION OR REMOVALS OCCUR ADJACENT TO OCCUPIED AREAS. D. UTILIZE COMPETENT AND QUALIFIED TECHNICAL ASSISTANCE TO DEVELOP SAFE METHODS AND TECHNIQUES TO ACCOMPLISH THE WORK, INCLUDING TEMPORARY SHORING AND SUPPORTS, METHODS OF REMOVAL AND OTHER CONSIDERATIONS. DESIGN AND PLACE ALL PERMANENT OR TEMPORARY SUPPORTS TO CARRY ALL LOADS DOWN TO SOUND BEARING, 15081 DUCTWORK INSULATION A. MATERIALS: CONFORM TO MAXIMUM FLAME SPREAD /SMOKE DEVELOPED RATING OF 25150 IN ACCORDANCE WITH ASTM E84, NFPA 255 AND UL 723. FOR `K" VALUE, MOISTURE VAPOR TRANSMISSION, TO ASTM STANDARDS B. C , MAXIMUM MOISTURE ABSORPTION, JACKET, INSULATING CEMENT, AND ADHESIVE. C. MANUFACTURER: SCHULLER - MANVILLE 800 SERIES SPIN -GLAS 1. GLASS FIBER (FLEXIBLE/RIGID): SCHULLER - MANVILLE 800 SERIES SPIN-GLAS. EQUIVALENT PRODUCTS: CERTAINTEED, KNAUF, OWENS- CORNING. 2. GLASS FIBER DUCT LINER, FLEXIBLE: SCHULLER - MANVILLE PERMACOTE LINACOUSTIC STANDARD. EQUIVALENT PRODUCTS: CERTAINTEED, KNAUF, OWENS- CORNING. 3. INSTALL IN ACCORDANCE WITH NAIMA NATIONAL INSULATION STANDARDS. D. SUPPLY DUCTS - CONCEALED: FLEXIBLE GLASS FIBER BLANKET - EXTERNAL: 1 -112 INCHES THICK. E. SUPPLY DUCTS - EXPOSED: RIGID GLASS FIBER - EXTERNAL: 1 INCH THICK. 15083 PIPING INSULATION A. CONFORM TO MAXIMUM FLAME SPREAD /SMOKE DEVELOPED RATING OF 25/50 IN ACCORDANCE WITH ASTM E84, NFPA 255 AND UL 723. B. CONFORM TO ASTM STANDARDS FOR "K" VALUE, MOISTURE VAPOR TRANSMISSION, MAXIMUM MOISTURE ABSORPTION, JACKET, INSULATING CEMENT, AND ADHESIVE. C. MANUFACTURER:GLASS FIBER: SCHULLER - MANVILLE,CERTAINTEED, KNAUF, OWENS- CORNING. 1. CELLULAR FOAM: ARMSTRONG, HALSTEAD, IMCOA/NOMACO, RUBATEX, ARMAFLEX 2000. D. INSTALL IN ACCORDANCE WITH NAIMA NATIONAL INSULATION STANDARDS. VERIFY THAT PIPING HAS BEEN TESTED BEFORE APPLYING INSULATION MATERIALS. VERIFY THAT SURFACES ARE CLEAN AND DRY, WITH FOREIGN MATERIAL REMOVED. E. CONTINUE INSULATION THROUGH WALLS, SLEEVES, PIPE HANGERS, AND OTHER PIPE PENETRATIONS, FINISH AT SUPPORTS, PROTRUSIONS, AND INTERRUPTIONS. F. BURIED PIPING: PROVIDE FACTORY FABRICATED ASSEMBLY WITH INNER ALL - PURPOSE SERVICE JACKET WITH SELF - SEALING LAP, AND ASPHALT IMPREGNATED OPEN MESH GLASS FABRIC, WITH ONE MIL THICK ALUMINUM FOIL SANDWICHED BETWEEN THREE LAYERS OF BITUMINOUS COMPOUND; OUTER SURFACE FACED WITH A POLYESTER FILM. G. SCHEDULE: INSULATION THICKNESS PER LOCAL CODE OR ASHRAE STANDARD 90.1 -1999, WHICHEVER IS MORE STRINGENT. 15100 PLUMBING PIPING A. SANITARY PIPING. 1. CAST IRON PIPE: ASTM A74 SERVICE WEIGHT, FITTINGS: CAST IRON, JOINTS: HUB - AND - SPIGOT, COMPRESSION TYPE WITH NEOPRENE GASKETS OR LEAD AND OAKUM. 2. CAST IRON PIPE: CISPI 301, HUBLESS, FITTINGS: CAST IRON, JOINTS: NEOPRENE GASKET AND L CLAMP AND SHIELD ASSEMBLIES. NOT USED. NOT USED. C (ABOVE GRADE): ASTM B88 TYPE `L ", HARD TEMPER ONLY. EXCEPT THESE MATERIALS SHALL NOT BE USED TO RECEIVE THE WASTES FROM URINALS NOR WASTES FROM WATER CLOSETS IN BATTERY, FITTINGS: CAST BRONZE, OR WROUGHT COPPER, JOINTS: SOLDER, GRADE 50B. B. WATER PIPING. 1. COPPER TUBING (BELOW GRADE): ASTM B88, TYPE °K" SOFT COPPER, FITTINGS: CAST COPPER ALLOY OR WROUGHT COPPER AND BRONZE, JOINTS: BCUP SILVER BRAZE. 2. COPPER TUBING (ABOVE GRADE): ASTM B88, TYPE "L" HARD DRAWN, FITTINGS: CAST COPPER ALLOY OR WROUGHT COPPER AND BRONZE, JOINTS: BCUP SILVER BRAZE. C. VERIFY THAT EXCAVATIONS ARE TO REQUIRED GRADE, DRY, AND NOT OVER - EXCAVATED, D. PREPARE PIPING CONNECTIONS TO EQUIPMENT WITH FLANGES OR UNIONS. E. PROVIDE NON - CONDUCTING DIELECTRIC CONNECTIONS WHEREVER JOINTING DISSIMILAR METALS. F. INSTALL VENT PIPING PENETRATING ROOFED AREAS TO MAINTAIN INTEGRITY OF ROOF ASSEMBLY. G FRAMING, SCRAPE, BRUSH EL TO STRUCTURAL BUILDIN F SCR G. WHERE PIPE SUPPORT MEMBERS ARE WELDED CLEAN, AND APPLY ONE COAT OF ZINC RICH PRIMER TO WELDING. H. PROVIDE SUPPORT FOR UTILITY METERS IN ACCORDANCE WITH REQUIREMENTS OF UTILITY COMPANIES. I. PREPARE EXPOSED, UNFINISHED PIPE, FITTINGS, SUPPORTS, AND ACCESSORIES READY FOR FINISH PAINTING. J. SLEEVE PIPES PASSING THROUGH PARTITIONS, WALLS AND FLOORS. K. USE GROOVED MECHANICAL COUPLINGS AND FASTENERS ONLY IN ACCESSIBLE LOCATIONS. L. PROVIDE UNIONS DOWNSTREAM OF VALVES AND AT EQUIPMENT OR APPARATUS CONNECTIONS. M. PROVIDE BRASS MALE ADAPTERS EACH SIDE OF VALVES IN COPPER PIPED SYSTEM. SOLDER ADAPTERS TO PIPE. N. ESTABLISH INVERT ELEVATIONS, SLOPES FOR DRAINAGE TO 1/4 INCH PER FOOT (SMALLER THAN 3 INCH PIPE), AND 1/8 INCH PER FOOT (3 INCHES AND LARGER) MINIMUM. MAINTAIN GRADIENTS. 0. SLOPE WATER PIPING MINIMUM 0.25 PERCENT AND ARRANGE TO DRAIN AT LOW POINTS. P. PROVIDE NEW SANITARY SEWER SERVICES. BEFORE COMMENCING WORK CHECK INVERT ELEVATIONS REQUIRED FOR SEWER CONNECTIONS, CONFIRM INVERTS AND ENSURE THAT THESE CAN BE PROPERLY CONNECTED WITH SLOPE FOR DRAINAGE AND COVER TO AVOID FREEZING. Q. PROVIDE SUPPORT AND EQUIPMENT REQUIRED TO CONTROL EXPANSION AND CONTRACTION OF PIPING. PROVIDE LOOPS, PIPE OFFSETS, AND SWING JOINTS, OR EXPANSION JOINTS WHERE REQU IRED. R. PROVIDE HANGERS IN QUANTITY AND SPACING REQUIRED TO SUFFICIENTLY SUPPORT PIPING. 15110 VALVES & PLUMBING SPECIALTIES A. MANUFACTURERS: 1. GATE VALVES (UP TO AND INCLUDING 2"): STOCKHAM MODEL B -105, OR EQUIVALENT BY: a. HAMMOND, KITZ, MILWAUKEE, NIBCO, CRANE. 2. BALL VALVES (UP TO AND INCLUDING 2"): APOLLO 77- 100/77 -200 SERIES, OR EQUIVALENT BY: a. HAMMOND, KITZ, MILWAUKEE, NIBCO, WATTS, CRANE. 3. SWING CHECK VALVES (UP TO AND INCLUDING 2- 1/2"): STOCKHAM MODEL B -309 /B -319, OR EQUIVALENT BY: a. HAMMOND, KITZ, MILWAUKEE, NIBCO, CRANE. 4. TEMP. AND PRESS. RELIEF VALVE (UP TO 80,000 BTU INPUT): WATTS 10L MODEL M7 5. WATER HAMMER ARRESTOR: WATTS SERIES 15 6. REDUCED PRESSURE ZONE (RPZ) BACKFLOW PREVENTER: WATTS SERIES 909 7. RPZ AIR GAP FITTING: WATTS 909AG 8. RPZ AIR GAP VENT ELBOW: WATTS 909EL (REQUIRED IN ADDITION TO 909AG IF MTD. VERTICALLY). 9. VACUUM BREAKER: WATTS N36 -'/4 10. PRESSURE REDUCING VALVE: WATTS SERIES U5 11. ATMOSPHERIC VACUUM BREAKER: WATTS SERIES 288A 12. HOSE END VACUUM BREAKER: WATTS SERIES 8 13. DIELECTRIC UNION: WATTS SERIES 3000 14. TRAP SEAL PRIMER VALVE: JOSAM 88250, OR EQUIVALENT BY: A. J.R. SMITH, WADE, ZURN B. INSTALL APPROVED POTABLE WATER PROTECTION DEVICES ON PLUMBING LINES WHERE CONTAMINATION OF DOMESTIC WATER MAY OCCUR; JANITOR ROOMS, FIRE SPRINKLER SYSTEMS, PREMISE ISOLATION. C. INSTALL WATER HAMMER ARRESTORS COMPLETE WITH ACCESSIBLE ISOLATION VALVE ON HOT AND COLD WATER SUPPLY PIPING WHERE REQUIRED BY CODE AND PER MANUFACTURERS RECOMMENDATIONS /REQUIREMENTS. D. INSTALL AIR CHAMBERS ON HOT AND COLD WATER SUPPLY PIPING TO EACH FIXTURE OR GROUP OF FIXTURES (EACH WASHROOM). FABRICATE SAME SIZE AS SUPPLY PIPE OR 3/4 INCH MINIMUM, AND MINIMUM 18 INCHES LONG. 15325 SPRINKLER SYSTEMS A. CONTRACTOR SHALL DESIGN AND HYDRAULICALLY CALCULATE THE NEW AND RENOVATION OF EXISTING PIPING SYSTEMS, INCLUDING LOCATION OF ALL VALVES, DEVICES, AND SPRINKLER HEADS. DESIGN SPRINKLER SYSTEM PIPING BASED ON HAZARD RATING AS OF THE MOST STRINGENT OF THE REGULATING AGENCIES RESPONSIBLE FOR THIS FACILITY, INCLUDING THE OWNER INSURANCE COMPANY REQUIREMENTS AND THE GOVERNING AUTHORITIES, FM OR AS DETERMINED BY LOCAL REQUIREMENTS. PERFORM WORK IN ACCORDANCE WITH NFPA 13. B. SUBMIT SHOP DRAWINGS, PRODUCT DATA, AND HYDRAULIC CALCULATIONS TO AUTHORITY HAVING JURISDICTION, AND OWNER'S INSURANCE UNDERWRITER FOR APPROVAL. SUBMIT PROOF OF APPROVAL TO ARCHITECT/ENGINEER. C. PROVIDE EXTRA SPRINKLERS UNDER PROVISIONS OF NFPA 13. D. PROVIDE SUITABLE WRENCHES FOR EACH SPRINKLER TYPE. E. PROVIDE METAL STORAGE CABINET FOR EXTRA SPRINKLERS LOCATED ADJACENT TO THE VALVE ASSEMBLY. F. SPRINKLER MANUFACTURERS: AUTOMATIC SPRINKLER OF AMERICA, RELIABLE AUTOMATIC SPRINKLER COMPANY, STAR SPRINKLER COMPANY, VIKING CORPORATION. G. WATER FLOW SWITCH: VANE TYPE SWITCH FOR MOUNTING HORIZONTAL OR VERTICAL, WITH TWO CONTACTS; RATED 10 AMP AT 125 VOLT AC AND 2.5 AMP AT 24 VOLT DC. H. INSTALL SYSTEM IN ACCORDANCE WITH NFPA 13. I. INSPECTOR'S TEST CONNECTION: FOR EACH SPRINKLER SYSTEM AND FOR EACH WATERFLOW ALARM DEVICE, WHERE MULTIPLE DEVICES OCCUR, PROVIDE AN INSPECTOR'S TEST ASSEMBLY. J. PROVIDE A FLOW SWITCH FOR EACH SYSTEM. SET RETARD ON FLOW SWITCHES TO 30 SECONDS OR AS REQUIRED BY LOCAL AUTHORITIES HAVING JURISDICTION. K. WATER CURTAINS AT NON -RATED OPENINGS: 1. INSTALL SPRINKLER HEADS ON 6 FOOT CENTERS TO PROVIDE A WATER CURTAIN AT NON -FIRE RATED DOORS AND WINDOWS. LOCATE SPRINKLER HEADS WITHIN 1 FOOT OF THE DOOR OR WINDOW ON BOTH SIDES OF THE DOOR AND WINDOW. 2. SPRINKLER HEADS ARE TO BE SUPPLIED FROM THE WET OVERHEAD SPRINKLER SYSTEM. 3. WATER CURTAIN SPRINKLER HEADS ARE TO BE HYDRAULICALLY CALCULATED AS A PART OF THE OVERHEAD WET SPRINKLER SYSTEM WITH A MINIMUM DESIGN DISCHARGE OF 3 GPM PER LINEAL FOOT WITH NO SPRINKLER DISCHARGING LESS THAN 15 GPM. MINIMUM PRESSURE AT A SPRINKLER HEAD IS TO BE 7 PSI. L. EXISTING FIRE PROTECTION SYSTEMS: 1. IN BUILDINGS WITH EXISTING FIRE PROTECTION SYSTEMS, THE CONTRACTOR SHALL CLOSELY COORDINATE HIS WORK WITH THE OWNER TO MINIMIZE DISRUPTION OF THAT SYSTEM. 2. NO FIRE PROTECTION SYSTEM IS TO REMAIN DEACTIVATED AT THE END OF THE WORK DAY UNLESS AGREED TO WITH THE PROPERTY OWNER, AND A SUITABLE FIRE PROTECTION SCHEME SUCH AS A MANNED FIRE WATCH, HAS BEEN IMPLEMENTED AND APPROVED BY THE OWNER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SEE THAT ALL FIRE PROTECTION SYSTEMS ARE FILLED, AND THE SYSTEM FUNCTIONAL BEFORE COMPLETING HIS WORK DAY. M. CENTER SPRINKLERS IN ONE DIRECTION ONLY IN CEILING TILE WITH LOCATION IN OTHER DIRECTION VARIABLE, DEPENDENT UPON SPACING AND COORDINATION WITH CEILING ELEMENTS. N. ENSURE REQUIRED DEVICES ARE INSTALLED AND CONNECTED AS REQUIRED TO FIRE ALARM SYSTEM. 0. COORDINATE PIPING WITH STRUCTURAL, MECHANICAL PIPING AND DUCTWORK, AND ELECTRICAL WITHIN THE BUILDING. PIPING CONFLICTS BETWEEN SYSTEM SHALL BE REMOVED AND REPLACED AT NO COST TO THE OWNER. P. CONDUCT ALL APPLICABLE TESTS AS REFERENCED IN NFPA STANDARD 13. ALL NECESSARY TESTS SHALL BE CONDUCTED IN CONFORMANCE WITH REQUIREMENTS OF NFPA. Q. WIRING FOR FLOW SWITCHES, VALVE SUPERVISORY SWITCHES, SUPERVISORY PRESSURE SWITCHES, AND POWER TO AIR COMPRESSORS WILL BE PROVIDED UNDER DIVISION 16. COORDINATE LOCATION OF THESE DEVICES WITH THE ELECTRICAL CONTRACTOR. 15410 PLUMBING FIXTURES AND EQUIPMENT A. MANUFACTURERS: 1. WATER CLOSETS; AMERICAN STANDARD, CRANE, ELJER, KOHLER. 2. LAVATORIES; AMERICAN STANDARD, CRANE, ELJER, KOHLER. 3. ELECTRIC WATER COOLERS; ELKAY, HALSEY TAYLOR, HAWS, OASIS. 4. FAUCETS (LAVATORIES): AMERICAN STANDARD, CRANE, ELJER, KOHLER, DELTA, MOEN, CHICAGO FAUCET, ZURN. 5. SEATS: BEMIS, BENEKE, CHURCH, OLSONITE, SPERZEL. 6. CARRIERS: JOSAM, JONESPEC, J.R. SMITH, WADE, ZURN. U B 0 BROCAR, PLUMBEREX SPECIALTY INSULATION KITS: TR E R R CIALTY PRODUCTS. E 8. RECEPTORS (ROOF /FLOOR DRAINS, FLOOR SINKS, ETC..) JOSAM, J.R. SMITH, WADE, ZURN. 9. FLOOR/WALL CLEANOUTS: JOSAM, J.R. SMITH, WADE, ZURN. 10. WATER HEATERS (INSTANTANEOUS): CHRONOMITE LABS, HATCO. B. PROVIDE BRACKETS, BRACES OR REINFORCING ANGLES AS REQUIRED IN ALL PARTITIONS NOT SUFFICIENT IN THEMSELVES TO SUPPORT PLUMBING FIXTURES OR OTHER WALL -HUNG EQUIPMENT. C. INSTALL EACH FIXTURE WITH CHROME PLATED, 17 GAUGE TUBING TRAP WITH CLEANOUT, EASILY REMOVABLE FOR SERVICING AND CLEANING. D. INSTALL COMPONENTS LEVEL, PLUMB AND SECURE. E. INSTALL AND SECURE FIXTURES IN PLACE WITH WALL CARRIERS AND BOLTS. F. SEAL FIXTURES TO WALL AND FLOOR SURFACES WITH SEALANT, COLOR TO MATCH FIXTURE. G. MOUNT LEVER CONTROL FOR HANDICAPPED WATER CLOSETS ON WIDE SIDE OF TOILET STALL. H. INSULATE WASTE AND SUPPLIES FOR ALL HANDICAPPED FIXTURES. I. ROUGH -IN FIXTURE PIPING CONNECTIONS IN ACCORDANCE WITH MINIMUM SIZES INDICATED IN PLUMBING FIXTURE SCHEDULE ON DRAWINGS. J. REVIEW MILLWORK SHOP DRAWINGS. CONFIRM LOCATION AND SIZE OF FIXTURES AND OPENINGS BEFORE ROUGH -IN AND INSTALLATION. K. EXPOSED WATER PIPING CHROME PLATED BRASS. 15810 DUCTWORK A. PERFORM WORK IN ACCORDANCE WITH SMACNA - HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, UNLESS MORE STRINGENT REQUIREMENTS ARE NOTED IN LOCAL CODES, B. GALVANIZED STEEL DUCTS: ASTM A525 AND ASTM A527 GALVANIZED STEEL SHEET, LOCK- FORMING QUALITY, HAVING G60 ZINC COATING OF IN CONFORMANCE WITH ASTM A90. C. INSULATED FLEXIBLE DUCTS: 1. MANUFACTURERS: FLEX -AIRE, FLEXMASTER, NORFLEX, THERMAFLEX, WIREMOLD. 2. TWO PLY VINYL FILM SUPPORTED BY HELICALLY WOUND SPRING STEEL WIRE; FIBERGLASS INSULATION; POLYETHYLENE VAPOR BARRIER FILM. PRESSURE RATING: 10 INCHES WG POSITIVE AND 1.0 INCHES WG NEGATIVE. MAXIMUM VELOCITY: 4000 FPM. TEMPERATURE RANGE: -10 DEGREES F TO 160 DEGREES F. FABRICATE AND SUPPORT IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - INSTALLATION - GENERAL: 1. INSTALL AND SEAL DUCTS IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, UNLESS MORE STRINGENT REQUIREMENTS ARE NOTED IN LOCAL CODES. DUCTWORK WHICH IS DESIGNED TO OPERATE AT PRESSURES ABOVE % INCH WATER COLUMN STATIC PRESSURE SHALL BE SEALED IN ACCORDANCE WITH STANDARD RS -18. EXTENT OF SEALING REQUIRED IS AS FOLLOWS: a. STATIC PRESSURE: % INCH TO 2 INCHES; SEAL TRANSVERSE JOINTS. b. STATIC PRESSURE: 2 INCHES TO 3 INCHES; SEAL ALL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS. c. STATIC PRESSURE: ABOVE 3 INCHES; SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS AND DUCT WALL PENETRATIONS. SEALANT WHERE DUCTS ARE DESIGNED TO OPERATE AT STATIC PRESSURES OF 1 INCH W.C. OR GREATER. 3. SUPPORT DUCTWORK IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, CHAPTER 4, HANGERS AND SUPPORTS. 4. PROVIDE FIRESTOP SYSTEMS FOR PIPE AND DUCT THROUGH - PENETRATIONS OF THE FOLLOWING FIRE - RESISTANCE -RATED ASSEMBLIES, INCLUDING BOTH EMPTY OPENINGS AND OPENINGS CONTAINING PENETRATING ITEMS: FLOOR AND CEILINGS, WALLS AND PARTITIONS, SMOKE BARRIERS, AND CONSTRUCTION ENCLOSED COMPARTMENTALIZED AREAS. 5. DUCT HANGERS SHALL NOT ATTACH TO BOTTOM CHORD OF STEEL JOIST OR METAL ROOF DECKING. ATTACH TO TOP CHORD OF STEEL JOIST. 6. CONNECT DIFFUSERS OR LIGHT TROFFER BOOTS TO LOW PRESSURE DUCTS DIRECTLY OR WITH 3 FEET MAXIMUM LENGTH OF FLEXIBLE DUCT HELD IN PLACE WITH STRAP OR CLAMP. F. PROTECTION: DURING CONSTRUCTION, PROVIDE TEMPORARY CLOSURES OF METAL OR TAPED POLYETHYLENE ON OPEN DUCTWORK TO PREVENT CONSTRUCTION DUST FROM ENTERING DUCTWORK SYSTEM. 15820 DUCTWORK ACCESSORIES A. FIRE DAMPERS: 1. MANUFACTURERS: AIR BALANCE, CESCO, GREENHECK, NAILOR, POTTORFF, PREFCO, RUSKIN, SAFE -AIR. 2. FABRICATE IN ACCORDANCE WITH NFPA 90A AND UL 555, AND AS INDICATED. B. INSTALL ACCESSORIES IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS, NFPA 90A, AND FOLLOW SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE. C. INSTALL CONTROL DAMPERS FURNISHED IN SECTION 15906. D. BACK DRAFT DAMPERS: 1. MANUFACTURERS: AIR BALANCE, CESCO, GREENHECK, NAILOR, POTTORFF, RUSKIN, SAFE -AIR. 2. PROVIDE BACKDRAFT DAMPERS ON EXHAUST FANS OR EXHAUST DUCTS NEAREST TO OUTSIDE AND WHERE INDICATED. 15840 VARIABLE VOLUME BOX A. FURNISH ELECTRONICALLY CONTROLLED, SINGLE DUCT, VARIABLE VOLUME AIR DISTRIBUTION ASSEMBLIES WITH ATTENUATOR OF THE CAPACITIES SCHEDULED. B. EACH ASSEMBLY SHALL BE PRESSURE INDEPENDENT. THAT IS, IT SHALL PROVIDE AIR FLOW REGULATION WITHIN +/- 50FPM, REGARDLESS OF DUCT PRESSURE FLUCTUATION, THROUGHOUT ITS ENTIRE RATED CFM RANGE. EACH ASSEMBLY SHALL RESET TO ANY AIR FLOW BETWEEN ZERO AND THE MAXIMUM CATALOGED CFM WITHOUT CHANGING ORIFICES OR OTHER PARTS. CFM LIMITERS WILL NOT BE ACCEPTED. C. AT AN INLET VELOCITY OF 2000 FPM, THE DIFFERENTIAL STATIC PRESSURE FOR ANY SIZE SHALL NOT EXCEED 0.15" WG FOR THE BASIC ASSEMBLY, OR 0.45' WITH THE SOUND ATTENUATOR ADDED. D. EACH BASIC ASSEMBLY SHALL CONTAIN AN ACOUSTICAL VORTEX SHEDDER. E, THE AIR DISTRIBUTION ASSEMBLY SHALL BE DESIGNED TO MAINTAIN ESSENTIALLY CONSTANT AIR FLOW REGARDLESS OF INLET FLOW VARIATIONS. A HARD DUCT ELBOW OF ANY ANGLE UP TO 90 DEGREES SHALL NOT ALTER THE MAXIMUM OR MINIMUM FACTORY AIR FLOW SETTING BY MORE THAN 10 %. F. THE ELECTRONIC AIR FLOW SENSOR SHALL BE INDEPENDENT OF DUCT AIR TEMPERATURES FROM 50 TO 120 F OVER A VELOCITY RANGE OF 0 -3000 FPM. G. THE ELECTRONIC CONTROLLER SHALL BE CALIBRATED AND THE FACTORY SET FOR THE MAXIMUM AND MINIMUM AIR FLOW RATES AS SCHEDULED. FIELD CALIBRATION AND READJUSTMENT SHALL BE PROVIDED FOR, THE CONTROLLER SHALL BE FITTED WITH AN EXTERNAL TERMINAL BOARD ON WHICH ALL FIELD CONNECTIONS ARE MADE. ALL TERMINALS SHALL BE CLEARLY LABELED. H. THE ELECTRONIC ROOM THERMOSTAT SHALL HAVE A SET POINT RANGE OF 65 TO 85 F AND A THROTTLING RANGE OF 2 F ± 20 %. I. THE ELECTRIC ACTUATOR SHALL EXERT POSITIVE FORCE IN BOTH THE OPENING AND CLOSING DIRECTIONS; SPRING RETURN TYPES WILL NOT BE ACCEPTED. THE ACTUATOR SHALL INCLUDE BUILT -IN LIMITS TO INTERRUPT THE CURRENT TO THE ACTUATOR AT THE STROKE LIMIT IN EACH DIRECTION, THE ACTUATOR SHALL BE ENERGIZED ONLY WHEN THE CONTROLLER SIGNALS A CHANGE IN DAMPER POSITION. THE ELECTRIC ACTUATOR SHALL BE VARIABLE SPEED, DC CONTROLLED. J. THE AIR DISTRIBUTION ASSEMBLY SHALL OPERATE ON A SINGLE OUTSIDE POWER SOURCE OF 6 WATTS, 60 HERTZ, 24 VOLTS AC + 15 %, - 10%. K. THE ASSEMBLY CASING SHALL BE CONSTRUCTED OF 22 GAUGE GALVANIZED STEEL, INTERNALLY LINED WITH 1 INCH, 1 -1/2 POUND DENSITY FIBERGLASS INSULATION WHICH COMPLIES WITH U.L.. -181 AND NFPA 90A. L. THE DAMPER SHALL BE OF HEAVY GAUGE CONSTRUCTION WITH BLADES PIVOTED IN DELRIN SELF - LUBRICATING BEARINGS. THE BLADES SHALL SEAL WITH LESS THAN 2% LEAKAGE AT 3 INCHES SP, AS RATED BY AIR DIFFUSION COUNCIL TEST CODE 1062 R4. M. BASE BID SHALL BE AS MANUFACTURED BY TITUS, ALTERNATE ADD OR DEDUCT SHALL BE ACCEPTED AS MANUFACTURED BY CARNES. 15850 AIR OUTLETS AND INLETS A. GRILLES, REGISTERS AND DIFFUSERS: 1. MANUFACTURERS: ANEMOSTAT, KRUEGER, METALAIRE, NAILOR, PRICE, TITUS, TUTTLE & BAILEY. SECTION 15895 HVAC CLEANING SYSTEM A. SECTION INCLUDES 1. MECHANICAL CLEANING OF HVAC SYSTEMS TO INCLUDE THE REMOVAL OF DIRT, BACTERIA, FUNGI, DUST AND DEBRIS THAT HAS ACCUMULATED INSIDE THE DUCTS AND HVAC EQUIPMENT. 2. CLEANING OF ALL SUPPLY, RETURN, AND EXHAUST AIR DUCTWORK, DIFFUSERS, GRILLES AND REGISTERS. 3. CHEMICAL PRESSURE WASHING AND DECONTAMINATION OF ALL HEATING AND COOLING COILS. 4. DECONTAMINATION OF DAMPERS, SUPPLY AIR FANS, RETURN AIR FANS AND OTHER COMPONENTS. B. QUALITY ASSURANCE 1. SERVICES PROVIDED BY VENTILATION CLEANING CONTRACTOR CERTIFIED BY NATIONAL AIR DUCT CLEANERS ASSOCIATION (NADCA). 2. PERFORM HVAC SYSTEM CLEANING IN ACCORDANCE WITH NADCA STANDARD 1992 -01. C. CLEANING CHEMICALS 1. DEGREASER AS MANUFACTURED BY; ZEPF OR APPROVED SUBSTITUTION. 2. COIL CLEANER AS MANUFACTURED BY; RENEUZ OR APPROVED SUBSTITUTION. 3. SANITIZER AS MANUFACTURED BY; OXINE OR APPROVED SUBSTITUTION. D. VACUUM COLLECTION SYSTEM 1. HEPA FILTERED VACUUM RATED AT 4000 CFM AND ABLE TO MAINTAIN 1.5 INCHES OF STATIC PRESSURE INSIDE THE ISOLATED AREA OF DUCTWORK. 2. AIR COMPRESSOR CAPABLE OF PROVIDING A MINIMUM OF 160 PSI AT 26 CFM. 3 RBS-1500 ROTARY BRUSH SYSTEM FOR MECHANICALLY CLEANING ALL TYPES OF DUCTWORK 150 F TWORK AND VENTILATION SHAFTS E. EXAMINATION 1. VERIFY CONDITIONS AT SITE BEFORE COMMENCING WORK. F. PREPARATION 1. PROTECT ALL FURNISHINGS, EQUIPMENT, ETC. IN WORK AREA WITH POLYETHYLENE OR EQUIVALENT. 2. SEAL OFF ENDS AND OPENINGS OF ANY DUCTWORK, NOT BEING IMMEDIATELY WORK ON. 3. PROTECT ALL INTERNAL DUCT DEVICES SUCH AS TURNING VANES, COILS, FIRE DAMPERS, SENSORS, ETC., FROM COATING OVERSPRAY. 4. SUPPORT AND BRACE DUCTWORK WHICH WILL BE ENTERED BY PERSONNEL FOR DECONTAMINATION. WHICH GENERATES NOISE FROM OCCUPIED ISOLATE EQUIPMENT E FR PIED AREA S. 6. MARK ALL AIR VOLUME CONTROL DAMPER POSITIONS PRIOR TO CLEANING AND RESTORE TO MARKED POSITION AT COMPLETION OF WORK. G. ACCESS DOORS 1. PROVIDE DUCT ACCESS DOORS FOR INSPECTION AND CLEANING BEFORE AND AFTER FILTERS, COILS, FANS, HUMIDIFIERS, DUCT MOUNTED SMOKE DETECTORS, AUTOMATIC DAMPERS, AT FIRE DAMPERS, COMBINATION FIRE AND SMOKE DAMPERS, AND ELSEWHERE AS INDICATED. PROVIDE MINIMUM 8 X 8 INCH SIZE FOR HAND ACCESS, 18 X 18 INCH SIZE FOR SHOULDER ACCESS, AND AS INDICATED. REVIEW LOCATIONS PRIOR TO FABRICATION. H. DUCTWORK 1. DETERMINE ACCESS POINTS TO FACILITATE CLEANING SECTION BY SECTION. 2. PROVIDE WITHIN THE DUCTWORK DISTRIBUTION SYSTEM, PROTECTIVE SEALS OF ANY AREAS DOWNSTREAM FROM RECEIVING PARTICULATES DURING THE INSTALLATION OF ACCESS POINTS. 3. CUT EXISTING EXTERIOR DUCT INSULATION AND DUCT TO PROVIDE AN ACCESS DOOR TO FACILITATE CLEANING. MAXIMUM SIZE OF ACCESS TO BE 22" X 22 ". 4. INSTALL VACUUM COLLECTION UNIT AT A PREDETERMINED LOCATION. CLEAN THE SECTION OF DUCTWORK WITH MULTI- DIRECTIONAL AIR NOZZLE AND PNEUMATICALLY POWERED ROTARY BRUSH SYSTEM. LARGE DUCTS WHICH ARE CRAWLABLE WILL BE AIR WASHED. 5. PRE- VACUUM DIFFUSERS, GRILLES, AND REGISTERS. REMOVE, CHEMICALLY WASH AND RE- SET. 6. MOVE VACUUM COLLECTION UNIT TO NEXT PREDETERMINED LOCATION AND REPEAT PROCESS. o 15906 AUTOMATIC CONTROLS (VAV) A. THE TERMINAL UNIT MANUFACTURER SHALL PROVIDE PRESSURE INDEPENDENT ANALOG ELECTRONIC CONTROLS WHICH CAN BE RESET TO MODULATE AIRFLOW BETWEEN AND THE MAXIMUM CATALOGED CFM, B. THE TERMINAL UNIT SHALL INCORPORATE A MULTI - POINT, CENTER AVERAGING VELOCITY SENSOR. THE SENSOR MUST PROVIDE A MINIMUM DIFFERENTIAL PRESSURE SIGNAL OF 0.03 "WG AT AN INLET VELOCITY OF 500FPM. THE SENSOR MUST PROVIDE CONTROL SIGNAL ACCURACY OF +/ -5 %, WITH THE SAME INLET SIZE AT ANY INLET CONNECTION. C. THE VELOCITY CONTROLLER SHALL HAVE A CONSTANT 2 °F RESET SPAN REGARDLESS OF MINIMUM AND MAXIMUM AIR FLOW LIMITS. THE CONTROLLER SHALL ALLOW FLOW ADJUSTMENTS TO BE MADE AND MONITORED FROM MATCHED THERMOSTAT. IN ADDITION, THE THERMOSTAT SHALL PROVIDE A LIVE VELOCITY READOUT TERMINAL. THE THERMOSTAT SHALL HAVE CONCEALED COVER LATCHES AND TEMPERATURE SETPOINT SLIDERS TO PREVENT TAMPERING. VELOCITY CONTROLLER AND THERMOSTAT ARE BY TERMINAL MANUFACTURER. D. CONTROL DEVICES SHALL BE FACTORY SET FOR THE SCHEDULED MINIMUM AND MAXIMUM FLOW RATES. VELOCITY MEASURING POINTS WILL BE INTEGRATED WITH THE THERMOSTAT FOR FIELD BALANCING AIRFLOW. ALL PNEUMATIC TUBES SHALL BE UL LISTED FIRE RETARDANT (FR) TYPE. EACH TERMINAL SHALL BE EQUIPPED WITH LABELING SHOWING UNIT LOCATION, SIZE, AND MINIMUM AND MAXIMUM CFM SETPOINTS. E. THE TERMINAL MANUFACTURER SHALL PROVIDE A 24 VAC REVERSIBLE DAMPER ACTUATOR. THE ACTUATOR SHALL BE A DIRECT -COUPLED, SHAFT - MOUNTED TYPE WITHOUT EXTERNAL LINKAGES. A MAGNETIC CLUTCH AND LINKAGE RELEASE BUTTON SHALL BE INTEGRAL TO THE ACTUATOR. THE DAMPER SHALL BE FACTORY SET IN AN OPEN POSITION. F. THE TERMINAL MANUFACTURER SHALL PROVIDE A CLASS 2, 24 VAC CONTROL VOLTAGE TRANSFORMER WITH INTERNAL CURRENT LIMITING PROTECTION. ALL CONTROLS SHALL BE INSTALLED IN APPROVED NEMA 1 ENCLOSURE. ALL COMPONENTS MUST BE COMPATIBLE FOR USE WITH GROUNDED CONTROL CIRCUITS PER UL 1995. • THERMOSTATIC CONTROLS SHALL BE CAPABLE OF A DEADBAND OF AT LEAST 5 DEGREES F WITH WHICH THE SUPPLY OF HEATING AND COOLING ENERGY TO THE ZONE IS SHUT OFF OR REDUCED TO A MINIMUM. HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF ACCOMPLISHING A REDUCTION OF ENERGY USE THROUGH CONTROL SETBACK DURING PERIODS OF NON -USE OR ALTERNATE USE OF THE SPACES SERVED BY THE SYSTEM. THE AUTOMATIC CONTROLS SHALL HAVE A MINIMUM SEVEN -DAY CLOCK AND BE CAPABLE OF BEING SET FOR SEVEN DIFFERENT DAY TYPES PER WEEK. IT MUST RETAIN PROGRAMMING AND TIME FOR A POWER LOSS OF 10 HOURS AND INCLUDE AN ACCESSIBLE MANUAL OVERRIDE OF UP TO 2 HOURS. 15950 TESTING, ADJUSTING, AND BALANCING B. C. D. E. F. G. H. AIR OUTLETS AND I DESIGN TO SPACE. OF DESIGN. ADJUST AIR HAND IC T: COOLING CYCLE - OCCUPIED HOURS: UPON A RISE IN SPACE TEMPERATURE ABOVE THE OCCUPIED SETPOINT OF THE THERMOSTAT, THE VAV BOX SHALL MODULATE THE PRIMARY AIR AS REQUIRED TO MAINTAIN SPACE TEMPERATURE AT THE THERMOSTAT SETPOINT. 2. HEATING CYCLE - OCCUPIED UPON S: DROP IN SPACE TEMPERATURE BELOW THE R N A OCCUPIED HEATING SETPOINT OF THE THERMOSTAT, THE VAV BOX SHALL MODULATE TO DECREASE PRIMARY AIRFLOW DOWN TO THE MINIMUM AIRFLOW AND THE ELECTRIC HEATING COIL SHALL CYCLE AS REQUIRED TO MAINTAIN SPACE TEMPERATURE AT THE THERMOSTAT SETPOINT. 3. COOLING CYCLE - UNOCCUPIED HOURS: UPON A RISE IN NIGHT SETBACK SPACE TEMPERATURE ABOVE THE UNOCCUPIED COOLING SETPOINT OF THE THERMOSTAT, THE VAV BOX SHALL MODULATE AS REQUIRED TO MAINTAIN SPACE TEMPERATURE AT THE THERMOSTAT SETPOINT. 4. HEATING CYCLE - UNOCCUPIED HOURS: UPON A DROP IN NIGHT SETBACK SPACE TEMPERATURE BELOW THE UNOCCUPIED HEATING SETPOINT OF THE THERMOSTAT, THE VAV BOX SHALL MODULATE TO DECREASE PRIMARY AIRFLOW DOWN TO THE MINIMUM AIRFLOW AND THE ELECTRIC HEATING COIL SHALL CYCLE AS REQUIRED TO MAINTAIN SPACE TEMPERATURE AT THE THERMOSTAT SETPOINT. A. WORK INCLUDES 1. TESTING, ADJUSTMENT, AND BALANCING OF NEW AND EXISTING AIR SYSTEMS. 2. MEASUREMENT OF FINAL OPERATING CONDITION OF HVAC SYSTEMS. SERVICES PROVIDED BY QUALIFIED PERSONNEL OF MECHANICAL CONTRACTOR OR INDEPENDENT QUALIFIED TESTING AND BALANCING AGENCY. PERFORM TOTAL SYSTEM BALANCE IN ACCORDANCE WITH AABC NATIONAL STANDARDS FOR FIELD MEASUREMENT AND INSTRUMENTATION, TOTAL SYSTEM BALANCE OR NEBB PROCEDURAL STANDARDS FOR TESTING, BALANCING AND ADJUSTING OF ENVIRONMENTAL SYSTEMS. VERIFY THAT SYSTEMS ARE COMPLETE AND OPERABLE BEFORE COMMENCING WORK. AIR HANDLING SYSTEMS: ADJUST TO WITHIN PLUS THIN PLU OR MINUS 5 PERCENT OF DESIGN FOR SUPPLY SYSTEMS AND PLLIS OR MINUS 10 PERCENT OF DESIGN FOR RETURN AND EXHAUST SYSTEMS. ADJUST OUTSIDE Alta TO WITHIN 0 TO PLUS 10 PERCENT OF DESIGN. J LETS: ADJUST TOTAL TO WITHIN PLUS 10 PERCENT AND MINUS 5 PERCENT OF ADJUST OUTLETS AND INLETS IN SPACE TO WITHIN PLUS OR MINUS 10 PERCENT NG AND DISTRIBUTION SYSTEMS TO PROVIDE REQUIRED OR DESIGN SUPPLY, RETURN, N, S TIDE R, AND EXHAUST AIR Q UANTITIES. TEST EXISTING SUP LY, RETURN AND EXHAUST SYSTEMS TO BE MODIFIED PRIOR TO CONSTRUCTION. RESET EXISTING B NCHES SERVING AREAS OF 0 WORK W RK TO CONDITIONS PRIOR TO CONSTRUCTION. BALANCE BRANCHE SERVING REMODELED AREAS, TO NEW CONDITIONS. SUBMIT COPIES OF : &B REPORT TO LANDLORD, OWNER, AND ENGINEER. JAN 0 4 ZU06 DATE: 1I/21/01 JOB NO: 01- 3201.62 DRAWN: APG CHECKED: KEW i � NTEh 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635 -5696 FAX: (817) 635 -5699 A co EMMA ct a co � w J N 00 W 00 Off DO w C3) tY Q Z w eTh W r � `J ` W r^ 1 TT V J r. v , � Q w t ^ V ) COMPL TION RE UIREMB TS A. REFER TO NREC S TION 1416 AND THE BUILDING COMMISSIONING GUIDELINES, PUBLISHED BY THE BUILDING COMMIS ONING ASSOCIATEION, FOR COMPLETE TEXT AND GUIDELINES FOR BUILDING COMPLETION AND COMMISSIONING REQUIREMENTS. HALLBERG ENGINEERING Mechanicd /Electrkcg Consulting Engineers 1750 Commerce Court, While Bear Lake, MN 55110 (651) 748 -1100 • Fax (651) 74S -9370 REVISIONS Co E L-;7 i \ ,,, 1 ‘.: (1224:: HVA S; i z $!9 rt(11 141 MECHANICAL SPECIFICATIONS SHEET NUMBER M3