Loading...
HomeMy WebLinkAboutPermit M08-032 - WESTFIELD SOUTHCENTER MALL - SBARROSBARRO 2600 SOUTHCENTER MALL FC -4 M08 -032 Parcel No.: 6364200010 Address: Suite No: Owner: Name: WEA SOUTHCENTER LLC Address: 11601 WILSHIRE BLVD , LOS ANGELES CA Cityif Tukwila 2600 SOUTHCENTER MALL TUKW Contact Person: Name: MICHELLE DOUGLAS Address: 831 JAMES ST, 2ND FLOOR , SYRACUSE NY Contractor: Name: ANCOR INC Address: 831 JAMES ST 2ND FLOOR , SYRACUSE NY Contractor License No: ANCORI *054N1 DESCRIPTION OF WORK: MECHANICAL FOR TENANT IMPROVEMENT (FOOD COURT) Value of Mechanical: $40,000.00 Type of Fire Protection: Furnace: <100K BTU 1 >100K BTU 0 Floor Furnace 0 Suspended/VVall/Floor Mounted Heater 0 Appliance Vent 1 Repair or Addition to Heat/Refrig /Cooling System.... 0 Air Handling Unit <10,000 CFM 1 >10,000 CFM 0 Evaporator Cooler 1 Ventilation Fart connected to single duct 1 Ventilation System 2 Hood and Duct 2 Incinerator: Domestic 0 Commercial/Industrial 0 doc: IMC -10/06 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http://www.ci.tukwila.wa.us MECHANICAL PERMIT Tenant: Name: SBARRO Address: 2600 SOUTHCENTER MALL, FC4 , TUKWILA WA EQUIPMENT TYPE AND QUANTITY * *continued on next page ** Permit Number: Issue Date: Permit Expires On: M08 -032 04/22/2008 10/19/2008 Phone: Phone: 315 233 -1300 X 111 Phone: 315- 233 -1300 Expiration Date: 06/06/2009 Fees Collected: $615.33 International Mechanical Code Edition: 2006 Boiler Compressor: 0-3 HP /100,000 BTU 1 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 9 Thermostat 1 Wood/Gas Stove 1 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment M08 -032 Printed: 04 -22 -2008 Permit Center Authorized Signature: Signature: doc: IMC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M08 -032 Issue Date: 04/22/2008 Permit Expires On: 10/19/2008 Date: CO /d. - /$0 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit. Date: /-Z 7- 08 Print Name: ' (140e( /10 a r This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -032 Printed: 04 -22 -2008 Parcel No.: 6364200010 Address: 2600 SOUTHCENTER MALL TUKW Suite No: Tenant: SBARRO 1: ** *BUILDING DEPARTMENT CONDITIONS * ** • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 -032 Status: ISSUED Applied Date: 02/06/2008 Issue Date: 04/22/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: ** *FIRE DEPARTMENT CONDITIONS * ** 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: A Type 1 hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. Each required commercial kitchen exhaust hood and duct system required by section 610 of the International Fire Code to have a Type 1 hood shall be protected with an approved automatic fire - extinguishing system installed in accordance with this code. (IFC 610.2, IFC 904.2.1 and IFC 904.11) Automatic fire - extinguishing systems shall comply with UL 300 or other equivalent standards and shall be installed in accordance with the requirements of the listing. (NFPA 96, 10.2.3) doc: Cond -10/06 M08 -032 Printed: 04 -22 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 14: All new automatic fire - extinguishing systems and all modifications to existing automatic fire- extinguishing systems shall have fire department review and approval of drawings prior to installation or modification. 15: Local U.L. central station supervision is required. (City Ordinance #2051) 16: Portable fire extinguishers shall be provided within a 30 -foot (9144 mm) travel distance of commercial -type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (IFC 904.11.5) 17: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and TM 906.9) 18: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6) 19: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 20: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 4 -3, 4 -4) 21: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 22: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 23: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 24: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 25: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 26: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 27: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 28: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) doc: Cond -10/06 M08 -032 Printed: 04 -22 -2008 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us 29: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes such condition or violation. 30: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila (206)575 -4407. * *continued on next page ** doc: Cond -10/06 M08 -032 does not imply approval of Fire Prevention Bureau at Printed: 04 -22 -2008 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: (-_--: Print Name: AC- ic-i-e / 4 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tulcwila.wa.us G doc: Cond -10/06 M08 -032 Date: C / Zz -62 Y ordinances governing or local laws regulating Printed: 04 -22 -2008 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: tiP.:36 OD C) Site Address: AOC )Cit \CL:fth}t 1Vt&.0 .ciu k. Foi4 m1 � Suite Number: EC:- 2 ch 3 Name: New Tenant: jloor: Yes ❑ .. No Tenant Nam _smut) Property Owners Name: VAle 54 (k11 t vpc'i Q �d Cn Mailing Address: { J(i'O i Ci . ) 101 rit;l`ti^ CONTACT PERSON — who do we contact when your permit is ready to be issued Name: Ai't(hr �YIC�• l.G1'L' 1Ct Michelle Div Mailing Address: S31 cL4M1S ST. 2ix Jut{ E -Mail Address: . /. 3 —1 # GENERAL CONTRACTOR INFORMATION - (Contractor Information for. Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: Mailing Address: Contact Person: E -Mail Address: ni( 09I Q S(a) curici'yi it Contractor Registration Number: f(,o.T_ IE 0 5'4-1 Company Name: DTM A rd1i t'd Mailing Address: (003I W .. 20, 3 C J ,uk.. atcL Contact Person: AmyPrt1'i1( or Den n{ S M t }Cl1 f t rainy G murchikth . Gam E -Mail Address: 831 JAMES ST. 2nd rimy' Company Name: )Chfi2CkL',l fii5iitpprs Mailing Address: 3035 :Sbieth `j ar i Stet'. - - Contact Person: C�t &J1I11c1Q -1 E -Mail Address: j(1155 (k e It t, schna it t, Schna l • (--0m Q:\Applications\Fomss- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh s Irks Cit Building Permit No. Mechanical Permit No. Plumbing /Gas Permit No. Public Works Permit No. Project No. p (For office use only) OrK a S Day Telephone: / City Fax Number Sy (tCl L' e JJ City Day Telephone: Fax Number: Expiration Date: ARCHITECT OF RECORD -All, plans must be wet stamped by Architect of Record Day Telephone: Fax Number: ENGINEER OF RECORD All plans must be wet stamped by Engineer of Record Otm. city Day Telephone: Fax Number: C A State Zip 35 /33- 1?xoo x1l( 4 lU�l j?,2.C►.� Zip t 13203 S to Zip . �S? -i 3Co x l I 1 L3iSl qt,ing a33 j3 J4 'Aeon State Zip r711-11?). Jj4i R1'7� 4 4$ 9 ). `7/A7 6 (03194 State Zip ,5S I " () 1 4021 « • ' 140 Page 1 of 6 N n ,x� � v►` �iUwt Existing nterior Remodel Addition to Existing Structure ��' t ! PJi.I��- New C" f T of YPe Construction per IBC Type of YP Occupancy per IBC 1 Floor 2" Floor Tonal+ ti n �sief 2c r f > � 3 Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck !`� Uncovered Deck BUILDING PERMIT INFORMATION - 206 - 431 -3670 Valuation of Project (contractor's bid price): $ I 'IO 000 Scope of Work (please provide detailed information): I —krior , teila'tt IL; Icd out oC S i b (fanci ceux - restattr'a f.+ food al 1r--1- cyf f dirt sk aityciAry /Wi of Will there be new rack stor ? R Yes Lot Area (sq ft): *Provide docu PLANNING DIVISION: Single family building footprint (. a of the foundation of all structures, plus any decks over 18 inches an verhangs greater than 18 inches) *For an Accessory dwelling, p .vide the following: Number of Parkin .. lls Provided: Standard: Compact: Handicap: Will there be a change in use? FIRE PR TECTION /HAZARDOUS MATERIALS: Sprinklers [" Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes []� No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q:\ Applications\Fonns- Applications On Line'3 -2006 - Permit Application.doc Revised: 9 -2006 bh ❑.. No If yes, a separate permit and plan s +mittal will be required. Provide All Building Areas in Square Footage Below Existing Building Valuation: $ 4A Floor area of principal dwelling: Floor area of accessory dwelling: ation that shows that the principal owner lives in one of the dwellings as his or her primary residence. ❑ Yes ❑ No If `yes ", explain: Page 2 of 6 Unit Type: Qty Unit Type: .. Qty Unit Type: Qty Boiler /Compressor: Qty Furnace<100K BTU I Air Handling Unit >10,000 CFM ._— Fire Damper 0 -3 HP /100,000 BTU Furnace>100K BTU — Evaporator Cooler f Diffuser q 3 -15 HP /500,000 BTU — Floor Furnace • Ventilation Fan Connected to Single Duct .. Thermostat ` 1 15 -30 HP /1,000,000 BTU ' Suspended/Wall/Floor Mounted Heater Ventilation System n L Wood/Gas Stove , 30 -50 HP /1,750,000 BTU Appliance Vent I Hood and Duct L Emergency Generator _ 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System ---,- Incinerator - Domestic ^- Other Mechanical Equipment Air Handling Unit <10,000 CFM 1 Incinerator — Comm/Ind MECHANICAL PERMIT INFORMATION - 206 -431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: 1 60 Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price, Scope of Work (please provide detailed informatio j ` ' fee , \A.c wo r vr. Use: Residential: New ....El/ Replacement .... ❑ Commercial: New .... Replacement .... ❑ Fuel Type: Electric Gas ... Indicate type of mechanical work being installed and the quantity below: Q: Applications\i o'ms- Applications On Line\3 -2006 - Permit Application. doe Revised: 9 -2006 bh r1G y r 0 0 C C o v - (i 2 -ec "It Ae, Other: Page 4 of 6 PUBLIC WORKS PERMIT INFORMATION — 206 -433 -0179 Scope of Work (please provide detailed information): Water District ❑ ...Tukwila El ...Water Availabili • rovided Sewer District ❑ ...Tukwila ❑ ...Sewer Use Certificate Please refer to Public Works Bulletin #1 for fees and estimate sheet. gtiorPrwuied F*wut 1 XiS j Muu 0... Water Distri # 125 ❑ .. Highline ... VaWue / J ❑ .. Renton ..Sewer Availability Provided Septic System: ❑ On -site Septic System — For on -site 'tic system, provide 2 copies of a current septic des': approved by King County Health Department. Submitted with A . lication mark boxes w h a ❑ ...Civil Plans (Maximum Paper Size — 22" ❑ ...Technical Information Report (Storm Draina: ❑ .. Geotec cal Report ❑ ...Bond ❑ .. Insurance ❑ a. ment(s) ❑ .. Ma' nance Agreement(s) Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right -of -way Non Right -of -way ❑ ...Total Cut ❑ ...Total Fill cubic yards cubic yards ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protectio Irrigation Domesti ❑ ...Permanent Water Meter Siz '. ❑ ...Temporary Water Meter ❑ ...Water Only Meter S ❑ ...Sewer Main Extensio t Public _ ❑ ...Water Main Extension Public Q:1Appheations\Forns- Applications On Line\3 - 2006 • Permit Application.doc Revised: 9 -2006 bh Call before you Dig: 1- 800 - 424 -5555 (d �l• bandon Septic Tank . Curb Cut •• Pavement Cut •• Looped Fire Line Work in Flood Zone ❑ orm Drainage 4,4 ❑ .. Renton ❑ . S .. Right -of -way Use - Profit for less than 72 hours ❑ .. Right -of -way Use — Potential Disturbance El .. Grease Interceptor El .. Channelization El .. Trench Excavation ❑ .. Utility Undergrounding WO # WO WO # ❑ ...Deduct Wa Meter Size Private Private ❑ ... Traffic Impact Analysis El ...Hold Harmless — (SAO) ❑ ...Hold Harmless — (ROW) FINANCE INFORMATION Fire Line Size at Property Line ❑ ...Water ❑ ...Sewer ❑ ...Sewage Treatment Monthly Service Billing to: Name: Water Meter Refund/Billing: Name: Mailing Address: Number of Public Fire Hydrant(s) Day Telephone: Mailing Address: City State Zip Day Telephone: City State Zip Page 3 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Signature: Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHOR AGENT: Date: f / l/JDtg Print Name: Alai �I� t ,( � tCYI LOF�,' Day Telephone: 3 %5/33 - /30D Mailing Address: ZS a I Tam, S c 1, YT . 1 9. 11Gd R t`�I Q City ( t J /1i� 3�� 03 0 to Zip Date Application Accepted: )14. that( ,o1,/ Q $ C Da 4n � Mco,, . hr SEAM . T Q:V..pplications\Fonns- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh Date Application Expires: Staff Initials: Page 6 of 6 Fikture _ • , . :.Qty. : Figttire- Type:, _... ...... Fixture_Type: , . , • t Qty.„ Figtiiie.Type :.-=.. _ • . Bathtub or combination bath/shower — Drinking fountain or water cooler (per head) . Wash fountain r Gas piping outlets Bidet Food -waste grinder, commercial ' . eptor, indirect was 6 Clothes washer, domestic ---- Floor drain i Sinks 5 Dental unit, cuspidor .. Shower, single he trap --- Urinals Dishwasher, domestic, with independent drain ■• Lavatory , Water Close ,. - Building sewer or trailer park sewer — Rain water • . tem – per drain (insi ., building) — Water heater and/o vent i Additional medical gas inlets/outlets – six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors .^ Repair o .l teration of water piping • ' d/or water treating equip ent Repair or alteration of drainage or vent piping •~'' Medical gas piping system serving one to five inlets/outlets for specific gas PLUMBING AND GAS PIPING PERMIT INFORMATION — 206- 431 -3670 PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: 713 ) Mailing Address: City State Zip Day Telephone: Fax Number: Expiration Date: Contact Person: E -Mail Address: Contractor Registration Number: Valuation of P1 i bing work (contractor's bid price °■.0 ODD Valuation of Gas P . g work (contractor's bid price): $ Cj 0C'( Scope of Work (please • • vide detailed information'• Building Use (per Int'l Building Code): l`'\03\ 'f 00(i COO Occupancy (per Int'l Building Code): ! Utility Purveyor: Water: (t ' �, I Indicate type of plumbing fixtures and/or gas piping outle Q:1Applications\Fomss- Applications On Line13.2006 - Permit Application.doc Revised: 9 -2006 bh • installed and the quantity below: re e Tbt,c/ e . V'r`ctiv t t /Sewer: C_:,\ Page 5 of 6 Receipt No.: R08 -01268 Initials: LAW User ID: 1632 Payee: ANCOR, INC ACCOUNT ITEM LIST: Description MECHANICAL - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Payment Check 09637 498.26 Parcel No.: 6364200010 Permit Number: M08 -032 Address: 2600 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 02/06/2008 Applicant: SBARRO Issue Date: TRANSACTION LIST: Type Method Descriptio Amount RECEIPT Account Code Current Pmts 000/322.100 498.26 Total: $498.26 Payment Amount: $498.26 Payment Date: 04/22/2008 11:11 AM Balance: $0.00 1468 04/22 9710 TOTAL 498.26 doc: Receiot -06 Printed: 04 -22 -2008 Receipt No.: R08 -00394 Initials: JEM User ID: 1165 Payee: ANCOR, INC. ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http://www.ci.tukwila.wa.us RECEIPT Parcel No.: 6364200010 Permit Number: M08 -032 Address: 2600 SOUTHCENTER MALL TUKW Status: PENDING Suite No: Applied Date: 02/06/2008 Applicant: SBARRO Issue Date: TRANSACTION LIST: Type Method Description Amount Payment Check 8902 117.07 Account Code Current Pmts 000/345.830 117.07 Total: $117.07 Payment Amount: $117.07 Payment Date: 02/12/2008 11:51 AM Balance: $498.26 8484 02/12 9710 TOTAL 117.07 doc: Receiot -06 Printed: 02 -12 -2008 Project: 5ba -ero Type of Inspection: Fi'i4l Address o a // Date Called: Special nstr u ( ct � io / ns: Date Wanted: / / /�� p m. m. Requester: Phone No: ..CIS 3S'D 1.4 4/ lig Approved per applicable codes. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. _ CITY OF TUKWILA BUILDING DIVISION Ir- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Inspector: Date: $60 .00 R 5 ECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. • Corrections required prior to approval. COMMENTS: Cnri,4 v di / //t f p (9/111114 /rA41 Receipt No.: 'Date: Project: Vie Giv Type of Inspection: [' K41/.51404 L Address: 940010 -9 Date Called: Special Instructions: Date Wanted: �� 7- e ate. Requester: Phone No: I3 Inspector: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. COMMENTS: ol� (Date: 7- (7-4, P 8 El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: 1 COMMENTS: 1 / / / of 1 Address: c A'CC 00 1 /4 // Date Called: • 27 s fL I.«* iu r a, k, Date Wanted Requester: LO Si41 6„014..t..-5 t. Perk 1 Project: Type of Inspection: Address: c A'CC 00 1 /4 // Date Called: • Special Instructions: Date Wanted Requester: Phone No: 12 INSPECTION RECORD Retain a copy with permit A-az PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. 1.a Corrections required prior to approval. Inspector: Date: $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: COMMENTS: ( ?..A. Address: . 0 7,1r19// f1�3 t TeaSt'�Ii{tt( caIreelIy Date Wanted: _ fe® iV4s I s y ' {-19s a fa iHv is tom I..n gffiter or,,' 1 1 st),1 ei:pe 4 storitr I ii • Project: S 1 4i2 440 Type of / gr /A, Address: . 0 7,1r19// Date Called: Special Instructions: Date Wanted: _ fe® Requester: Phone No: 380 —926 • I U INSPECTION NO. Approved per applicable codes. INSPECTION RECORD Retain a copy with permit meg 2 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 El Corrections required prior to approval. Inspector: Date: El $60.00 REII�PECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Project: ' W A' S e`d 0 / 5 Type of Inspection: 1 - 1 SAN!) S r� I .& 7 et a W Y∎ Address: '2-400 , 4 t. L Date Called: Special Instructions: . Date Wanted: / / / / b p / j a.m. p.m. Requester: Phone No: Sts ;TO '42 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Rie n 1171Jr4 no. r1 r5 's 1 25 u►+ Aga I 4 4_ nspector: M t7? - o32, PERMIT NO. (206)431 -3670 !Date: .7/111 7 El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: 'Date: ,., ' Project: •4((47 Type of Inspection: Hi di F... -1 A dress: 24PP 11.11 re 4 Date Called: Special Instructions: Date Wanted: 1 / f / / r 42 a.m. V Requester: L' 4'a Phone No: • Approved per applicable codes. Inspector: M n3 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION V- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Corrections required prior to approval. COMMENTS: 04 Abi5A -74+ O tC- 'Date: 7 — i EJ $60.00 R PECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Project: n � 0 :0 A Type of Inspection: Address: 7,CoUC3 Ill AI1 Date Called: _. Special Instructions: Date Wanted: ` — 7 - /0"Q( J (p.m. Requester: Phone No -j )S 380 -1- 42-(0 ( 1 INSPECTION RECORD Retain a copy with permit n468 -03Z_ • PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 ❑ Approved per applicable codes. El Corrections required prior to approval. COMMENTS: ittof itid/ Date: 0 dip Inspector: El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspectio4. - Receipt No.: 'Date: Pr . "9 Type of Inspection: 1 7/( Address: 1q// Date ailed: Special Instructions: Date Wa ted: t Requester: Phone No: . St57-4/i/7-9, 2 INSPECTION RECORD Retain a copy with permit o 8 eY7 INSPECTION NO. PERMIT O CITY OF TUKWILA BUILDING DIVISION /8 " 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Ei Approved per applicable codes. Corrections required prior to approval. COMMENTS: plc 4, ,-- Inspector: (Date: 62- r7 $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Pr Type o Inspection • .. .Address . _ ,27 W( Date Called: Special Instructions: Date Wa ted: a .m RequesTer: Phone No: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION / 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 ® Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: 01C- Inspector: Date: El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: ti P �O Type In pectiop: / / V Ad res; /77/ Date Called: Special Instructions: Date U grad: 7 - m p.mJ Requester: Phone No: INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION '�' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 N Approved per applicable codes. INSPECTION RECORD Retain a copy with permit Correctiaris required prior to approval. COMMENTS: P 11 1.at.11 ?St e t q Inspector :d n Isti3 Date: 6fC( ve ❑ $58.00 REINSPECTION FEE REQUIRED. Prior o inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: Project: Type of Inspection: , Address: Date Called: Special Instructions: Date Want /��� !/ L....•' Requester: . Phone N3 )S t3/ Y7 7 d INSPECTION NO. INSPECTION RECORD Retain a copy with permit 04 03;. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION tt 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 El Approved per applicable codes. RI Corrections required prior to approval. COMMENTS: i r of po-i4 +P.f,74 0 16,4 air dy../ Art real, e_ ❑ $60.00 RIVSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Project: Sb Type of Inspecti� f Addres s �� Date Called: Special Instructions: Date Wanted / 7 / Jf4 Requester: Phone No *40 VGs INSPECTION RECORD Retain a copy with permit 010 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 0- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 3 Approved per applicable codes. g Corrections required prior to approval. COMMENTS: 4/4e4 7 1.34 -14 Date: / 7' Inspector: $5800 INSPECTION FEE REQUIRED. Prior o inspection. fee must be 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. 'Date: Receipt No.: Proj �� VC Type art Inspe ` ■ Called: Address: all9 b On 4( ( Date 1 , Special Instructions: Date Wanted: m. Requester: 14' 9171 _ INSPECTION RECORD. Retain a copy with permit ( (' 'U 7� INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 0 Approved per applicable codes. Corrections required prior to approval. COMMENTS: /,/1 (e.5cL,(71 ' ��� � -� - - d In t,) Q. bG ern +e 4-e ti r-e. Inspector: Date: " $58.0 5 INSPECTION FEE REQUIRED. Prior to inspection, fee must be paid (6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. Receipt No.: Date: ., & .. Project: Se ilQaC) ection: Type of I At c ii rj Address 1. � A- ( r 1 Date Called: Special Instructions: Date Wan ed: —( - CP Requester: Phone No: { L./ �,.c� -- . ZIO - 0 V 1D (b5 INSPECTION RECORD Retain a copy with permit nw8 io 3 � PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. COM MENTS: ? /* ot /;1514/4.4 /44t chtdic te4se. d it.67 Inspector: El $58.00 paid a Date: 5 .4 9 / 6 ' SPECTION FEE REQUIRED. Prior o inspection. fee must be 00 Southcenter Blvd., Suite 100. Call the schedule reinspection. Receipt No.: Date: Project: sL r1 -0 Sprinklers: Type of Inspection: ',` - ) 6+ I Address: a. c, o S c. Suite #: F c — y M4 I( Contact Person: IF r , I (3 c, ��- 1, Special Instructions: Monitor: Phone No.: 0(0 Needs Shift Inspection: `r Sprinklers: Y Fire Alarm: A Hood & Duct: `1 Monitor: ( , .ji 4 4, Pre -Fire: Permits: Occupancy Type: 1. lj 3 INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT PERMIT NUMBERS 444 Andover Park East. Tukwila. Wa. 98188 206- 575 -4407 b Approved per applicable codes. n Corrections required prior to approval. COMMENTS: Mc ok Inspector; 57 I Date: - 2_1 ct - �r3 Hrs.: I $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Word /Inspection Record Form.Doc 1/13/06 T.F.D. Form F.P. 113 COMMENTS: Sprinklers: Type of Inspection: o p 4 ( -)c T 4-1 o t) r? 4 1)C.-1-- `T ? t kn - IL ci.. "1 OR ; i ri { .. 1 C-:, 1 jl 'A i is - U Contact Person: C 4-4,-/ Special Instructions: ff Phone No.: 2s1 :/c - ?``' i' p c-1 Ni Al _ OIL. ( »- ; : ( ?)- 5._-.)Ft... ; tt! !( (. f' At. - OIL °-- 0 kZ- 70 s` DC Project: .f.)"i .4,g'; , Sprinklers: Type of Inspection: o p 4 ( -)c T Address: 7 C - -v„) r.. Suite #: 4 Contact Person: C 4-4,-/ Special Instructions: Occupancy Type: Phone No.: 2s1 :/c - ?``' i' Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT rib t r co, 0—, 2— PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 Approved per applicable codes. n Corrections required prior to approval. Inspector: . to Lk Date: -7/i Go Hrs.: $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from e City of Tukwila Finance Department. Call to schedule a reinspection. Word /Inspection Record Form.Doc 1/13/06 T.F.D. Form F.P. 113 r .: ,� 101110.1M.. VANN v 1111 AMP411 June 13, 2008 GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION Mr. Dean Betts AnCor, Inc. 831 James Street Syracuse, NY 13203 RE: Special Inspection Sbarro Tukwila, WA Dear Mr. Betts, In accordance with your request and authorization, our firm performed special inspections for the above - referenced project. The inspections were performed by our inspectors from June 2 through June 3, 2008. Our inspector's field reports are attached. Unless otherwise indicated, the structural activities noted on the attached daily field reports were in accordance with the approved project plans and specifications. A guarantee that the contractor has necessarily constructed the structure in full accord with the plans and specifications is neither intended nor implied. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office at (253) 939 -2500. Respectfully submitted, KRAZAN & ASSOCIATES, INC E6074a7-__ Kathryn Gordo Project Manager Puyallup Division CC: City of Tukwila aza1 & ASSOCIATES, INC. RECEIVED JUN 30 10081 COMMUNITY DEVELOPMENT Offices Serving The Western United States KA No. 066 -08138 Permit No. M08 -032 922 Valley Avenue NW Suite 101 • Puyallup, Washington 98371 • (253) 939 -2500 • Fax: (253) 939 -2556 08138 DFR FIELD ® ' azan & A S S O C I A T E S, I N C. REPORT NO.: 8138DFR060208 -gn DATE: 6-2 -08 GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION PROJECT #: 066-08138 PROJECT: t3J S Ouse .BA P.o' $ LOCATION: South Center Mall KRAZAN PROJECT MANAGER: K.E.G. 1) Met with the contractor to verify inspection and review plans. Superinte; - epresentative: Structural Steel CONTRACTOR: Shawmut PERMIT NO: M08-032 INSPECTOR George Nail! / Jonathan Pink JURISDICTION: City of Tukwila WEATHER: Cloudy Arrived on site as requested by the contractor to perform Structural Steel inspection in conformance to project plans and specs. 2) Performed visual inspection of Kitchen hood grease duct per section 506.3.3.1 of the 2006 IBC Mechanical code which revealed pin holes in welded connections, notified contractor of location and need for reinspection. 3) Noted sections of duct that were not accessible and notified contractor who stated that he would have the ceiling grid removed were obstructing access and reschedule inspection. To the b S my knowledge, the above WAS / WAS NOT ® performed in accordance with the approved pans, specifications, and regulatory requirem Technician George Nail! Offices Serving the Western United States Temp: 55 F Equipment/Asset Number(s): Form 1501 r.2 Effective Date: 12 -20-07 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. :y a aZa1 & Associates, Inc. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE: 6/d0De6' PROJECT #: e' - BB / PROJECT: S6 47 LOCATION: 4r/Q 7Ce ye?' V KRAZAN PROJECT MANAGER: 4r-ga CONTRACTOR: ,4Neilae . ~ C PERMIT N0. A/ 49B -tD3Z INSPECTOR (f,1/vAC 4I.4N JURISDICTION: C /77 el iti kZed /AN'4 WEATHER: R1LeZeistrr TEMP: erSA »FIELD ❑ SHOP WELDING ❑ M.T. ❑ P.T. 'V.T. Item(s) inspected: aeeigre 2Xler.r /S X /5" (fp /6 Agee r'�r�ts J Wei" 0404ewEerfd•sl A r AiDob ,01 ��et mo b /aide d 4 : 2- 7 1– ROO V 0e/DieJ)64) QD 3s -revs /av�/.D.4V7y *V diuteAvorArle40 6441v.ee inge le o Z 5'06 l 49 areS2!/e4 _ oc to //BE/T . /e vm' T/DMIr #F7 �1'f li ir/S O.E •›'o /~r-s -Position: FLAT VERITCAL HORIZONTAL OVERHEAD ❑ Filler Metal: rocess: SMAW FCAW GMAW SAW ❑ Other: ,,IIVeld Type: FILLET C.P. P.P. PLUG - Other: S .Weld Size A(1.6:.. 1/4" 5/16" 3/8" ❑ Other cedes: AISC TITLE 21 TITLE 24 UBC ASME To the best of my knowledge, the abovt10/ WAS NOT performed in accordance with the approved plans, specifications, and regulatory requiremelits. Superintendent/Representative: Technici� 1:2 / 1444. , WELDING REPORTNO.: 4689 Serving the Western United States This field report indicates our inspector's observation and testing results based on the site condition and contractor's activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. Some information on this report has been provided by others on site. Revision 1 Effective Date: 11/15/07 The information provided in this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. ANF & ASSOCIATES April 7, 2008 Westfield Design & Construction 633 South Center Trailer #3 Seattle, CA 98188 Attn: Bryan Low, Tenant Coordinator RE: HVAC Equipments on Level 3 South Center, Tukwila, WA Dear Bryan: We have completed our review of the level 3 floor framings at the designated HVAC equipment areas based on the following criteria: 1) Maximum single equipment weight of 1,500 lbs with a plan area of 6 square feet minimum. 2) There is no floor opening required under the equipment. 3) Minimum clearance between equipments is 3' -O" on 4 sides typical. Our review shows that the level 3 floor framings at the designated HVAC equipment areas can safely support the HVAC equipments if the criteria as mentioned above are met. Level 3 floor framings under the equipments which do not meet the criteria as mentioned above shall be reviewed and reinforced as required by a professional engineer registered in the state of Washington. Please call us should you have any questions regarding the above. Sincerely yours, ANF & Associates Michael H. Wang, P.E. Associate pr.r.r0 : imam /of /e Z.oP f, I FILE C A!W rh E '131'2008'.25906 Letter to Westfield h c@ C re 111:4C level 3ai :South Center Mall dated 4-7 -2008 Y Consulting Structural Engineers REVIEWED FOR CODE COMPLIANCE APPROVED APR 18 2008 ILDIN CITY OF TUKWILA APR 08 2008 PERMIT CENTER CORRECTION LTR# 9420 Telstar Ave.. Suite 118 • Flair Commerce Center • El Monte, CA 91731 • Tel; (626)448 -8182 • Fax (626)448 -8092 Of Tukwila DIVISION MO1 Odit52. I ANT &Assocums Consulting Structural Engineers RECEIVED CITY OF TUKVV1LA APR 0 8 2008 PERMIT CENTER Fax! (626) 448-8092 1151: (626) 448-4311177 -5gtf pi 7 agepacbdimet 9420 Talent Avenue. Suite 118, El Monte, CA 91731 MECH. CURB PER MECHANICAL DRAWINGS SECTION A-A MAX C8x 11.5 TYP. - ... CONC. TOPPING --, \ ‘, OVER METAL DECK., . . '■ HILTI , 1 x4' EMBED. (ICBO# 4780) A EDGE OF NEW OPEN'G pL.1/4x8 C10x15.3 -- PL.1/4x8 6' —0" MAX. 1 ism OR W12x14 B 3/161 6 NOTE (E)STL. BM:- DO NOT OVERCUT OF CONCRETE FLOOR OPEN'G \ 1 CORE DRILL 4"0 OPEN'G @ CORNERS & THEN 3716 .. SAWCUT THE REST OF OPEN'G. SECTION B-B a z 0 cc • FLOOR BEAMS SEE PLAN PLAN , _ W/1" RETURN 2,/2" '7i6 , , ,TYP. TYP. CONC. FLOOR OPENING DETAIL SK1-031008 REVIEWED FOR CODE COMPLIANCE APPROVED APR 1 8 2008 Citl Of Tukwila B ILDIN DIVISION FE,E, COPY By - - • -"- :s )4.* - 00 Joe No. 2..55-10 CORRECTION LTR# • W ThL (626) 448-8182 ANF & ASSOCIATES Roza ont1611ist Fax: (626) 448-8092 5 D L L TH Cc-tv Consulting Structural Rushton:* 8@paebeLs 9420 Utast Avame, Snits 118, El Monte, CA 91731 Joe Ely D/ Okra 3 —10 4) METAL DECK W/-, CONC. FILL • • • - - -+ MAX. - SINGLE OPENING (N) L3x3x1/4 W/5/8"0 KWIK BOLT II TO BETTOM OF FLUTE ©12"0.C. WITH 4 1/2" EMBED. • GROUP OF OPEN'GS 0 • NOTES: 1. DO NOT CUT OPENINGS IN DECK UNTIL 7 DAYS AFTER CONC. HAS BEEN POURED 2. SINGLE OPENINGS NOT LARGER THAN 8" DIAMETER OR 8" SQUARE REQUIRE NO ANGLES. 3. CONC. OPENINGS OR GROUP OF OPENING EXCEEDING 16" OR CUTTING 2 BOTTOM FLUTES REQUIRE SECONDARY BEAM REINFORCEMENT AS PER DETAIL SK1-031008 TYP. METAL DECK ROOF/FLOOR OPEN'G W/ CONC. TOPPING SK2 031008 SM. Or Cooling Equipment Schedule Equip. ID Brand Name' Model No. Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location AHO'- 1/COND- 1 Carrier 40RM007 / 38ARZ008 88800 2400 Econo 12.70 NA Roof / Space Applicant Address: CORRECTION LTR# Applicant Phone: Fan Equipment Schedule Equip. ID Brand Name' Model No.' CFM SP' HP /BHP Flow Control Location of Service ANA - 1/COND- 1 Carrier 40RM007 / 38ARZ008 2400 0.50 2.40 CV Roof / Space 51195 0.980 Applicant Address: CORRECTION LTR# Applicant Phone: Heating Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency" ABU- 1/COND- 1 Carrier 40RM007 / 38ARZ008 42284 2400 Econo 51195 51195 0.980 Applicant Address: Applicant Phone: Project Info Project Address Sbarro - Seattle, WA Date 3/14/2008 2600 Southcenter Pkwy, Suite FC4 For Building Dept. Use 8 - --r-.. ti _.. �O® REV-it IA,- E E CO MP, 7 Seattle, WA 98188 Applicant Name: Applicant Address: Applicant Phone: 2006 Washington State Nonresidential Energy Code Compliance Form Mechanic'aI Summary MECH -$01 2006 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. ['Includes Plans Compliance Option OPT Include documentation requiririg compliance corrtmissloning requirements Se Revised July 2007 APR 1 8 200 -I r ® Simple System 0 Complex System Q Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. 'If available. 2 As tested according to Table 14 -1A through 14-1G. 3 If required. ' COP, HSPF Combustion Efficiency, or AFUE, as applicable. s Flow control types: variable air volume(VAV), constant volume C V1 or oniable speed (VS). CITY RECEIVED K CU LA APR 0 8 2008 PERMIT CENTER SNCE1 A O T y O,Z System Description If Heating /Cooling -' Constant vol? -/ Air cooled? L Packaged sys? Q <20,000 Btuh? See Section 1421 for full description or Cooling Only: Split system? ' J Economizer included? of Simple System qualifications. If Heating Only: 9 Y= � 5000 cfm? <5000 � <70 /o outside air? <70% Mechanical Summary (back) MECH -SU Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. START Heating Only No <70% OSA Yes 2006 Washington State Nonresidential Energy Code Compliance Form Reference Section 1421 Yes — Heating/Cooling or Cooling Only otal Ca.. wo economize <240,000 Btuh or 10 %? Econo Included? Y Yes Simple System Allowed (section 1420) Reference Section 1423 oI Ca <20,000 tuh? Yes Use Complex 01 Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Mechanical Permit Plans Checklist MECH -CIK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Address Sbarro - Seattle, wA Date 3/14/2008 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Requires Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance yes 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule M - 2 yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M n.a. 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans M -1 yes 1412.2 Deadband control Indicate 5 degree deadband minimum M - 3 n.a. 1412.3 Humidity control Indicate humidistat yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types M- 3 yes 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage M n.a. 1412.4.2 Optimum Start Indicate optimum start controls n.a. 1412.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412.6 Combustion htg. Indicate modulating or staged control yes 1412.7 Balancing Indicate balancing features on plans M 1412.8 Ventilation Control Indicate demand control ventilation for high- occupancy areas n.a. 1422 Thermostat interlock Indicate thermostat interlock on plans yes 1423 Economizers Equipment schedule M -2 1413 Air economizers yes 1413.1 Air Econo Operation Indicate 100% capability on schedule M n.a. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb n.a. 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance yes 1413.3 Integrated operation Indicate capability for partial cooling M - 2 n.a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary M - 3 n - a. 1414.2 Duct insulation Indicate R -value of insulation on duct n.a. 1415.1 Piping insulation Indicate R -value of insulation on piping 1416 Completion Requirements yes 1416.2.1 Commissioning Provide commissioning plan M -3 yes 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M - 3 yes 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training M - 3 yes 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report M -3 yes 1434 Separate air sys. Indicate separate systems on plans I4-1 yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. n.a. 1441 Elec. water heater Indicate R -10 insulation under tank n.a. 1442 Shut -off controls Indicate automatic shut -off yes 1443 Pipe Insulation Indicate R -value of insulation on piping P n.a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool heater efficiency n.a. 1453 Pool heater controls Indicate switch and 65 degree control n.a. 1454 Pool covers Indicate vapor retardant cover n.a . 1454 Pools 90+ degrees Indicate R -12 pool cover idential Ener Code Compliance Form Dennis. Mitchell NCARB, AIA. Architect Mechanical Comment M08 -032 Comment 1. New mechanical equipment to be installed on the roof exceeding 400 pounds shall require an engineer's analysis for the roof structure with calculations to show the roof structural members are sufficient for the combined loads imposed by all mechanical equipment. Provide details with the engineer's calculations. All engineer's documents shall be original wet stamped and signed by the engineer. Response: Since there are several Landlord, Westfield Corporation, applied units on the roof directly above this Sbarro space the Landlord has elected to directly reply to this comment with engineered wet signed and sealed details of all the roof loads above Sbarro's space FC -4. Comment 2. Please identify with method shall be used where drainage of grease from the roof exhaust fan shall be captured in an approved grease reservoir. (IMC 506.5.2) Response: Drawing M -2 Cooking hood detail has been revised to now require a drain line from the roof to a floor sink. All of the floor sinks and floor drains are plumbed to the Mall's common grease trap. It is our understanding that the plumbing and electrical plans have been approved and that the Fire Department has no comments. Shou ;i you require any additional information please contact us. Sinc a ely, Dennis T. Mitc e CA AIA cc: Gregory Schnackel, Engineer Dean Betts, AnCor, Inc. x102 Michelle Douglas, AnCor, Inc. x.149. II1 DENNIS T. MITCHELL ARCHITECT *6031 WEST I -20, STE 260 *ARLINGTON, TX 76017 *817/ 483 -1146 *FAX 817/ 483 -7377 February 25, 2008 Michelle Douglas AnCor Inc 831 James Street, 2 Floor Syracuse, NY 13203 RE: CORRECTION LETTER #1 Mechanical Application Number M08 -032 Sbarro — 2600 Southcenter Mall, Suite FC -4 Dear Ms. Douglas, This letter is to inform you of corrections that must be addressed before your plumbing permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire Department has no comments. Building Department: Allen Johannessen, at 206 433 -7163 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that two (2) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Brenda Holt Permit Coordinator encl xc: File No. M08 -032 • Ciy of T ukwi la �u- P:\Permit Center \Correction Letters\2008\M08 -032 Correction Ltr # 1.DOC wer • Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • Building Division Review Memo Date: February 20, 2008 Project Name: SBARRO Permit #: M08 -032 Plan Review: Allen Johannessen, Plans Examiner • Tukwila Building Division Allen Johannessen, Plan Examiner , I The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and /or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. New mechanical equipment to be installed on the roof exceeding 400 pounds shall require an engineer's analysis for the roof structure with calculations to show the roof structural members are sufficient for the combined loads imposed by all the mechanical equipment. Provide details with the engineer's calculations. All engineer's documents shall be original wet stamped and signed by the engineer. 2. Please identify what method shall be used where drainage of grease from the roof exhaust fan shall be captured in an approved grease reservoir. (IMC 506.5.2) Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. •PERMIT COORS COPY � PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: M08 -032 DATE: 04 -08 -08 PROJECT NAME: SBARRO SITE ADDRESS: 2600 SOUTHCENTER MALL, FC -4 Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: Bui isi L Public Works Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete n Comments: TUES/THURS ROUTING: Please Route REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28 -02 n n Permit Coordinator n Planning Division DUE DATE: 04-10-08 Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: Structural Review Required No further Review Required DATE: DUE DATE: 05-08-08 Approved n Approved with Conditions I " I Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: n Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ACTIVITY NUMBER: M08 -032 DATE: 02 -06 -08 PROJECT NAME: SBARRO SITE ADDRESS: 2600 SOUTHCENTER MALL, FC4 X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: 'vision Public Works Comments: O DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete rvr Incomplete TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28 -02 • PERMIT COORS GOF°V • PLAN REVIEW /ROUTING SUP t5(I 00C Fire Prevention Structural DATE: DATE: Planning Division Permit Coordinator n n DUE DATE: 02-12-08 Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: No further Review Required n DUE DATE: 03-1 1-08 Approved n Approved with Conditions n Not Approved (attach comments) F Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: • i Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: �� Date: Project Name: Project Address: • City of Tukwila Deportment of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc ❑ Response to Incomplete Letter # [I, Response to Correction Letter # / ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner 5 L4rr // 2-C,06 r -4 SOLI «e.,.,4- ) k)/ , ritki,,), / .. WA- 9k/S1 Contact Person: M ,'L_Je /1e 7)o2- /.¢ c Phone Number: 3 /S- 571'— 4 Summary of Revision: / L ern-r , �7 P4_ o ` 7 ' A r ' . ' � `±..r .._ r. • ' / — L e 7 t 4-0, R vs/ Fi i L., e.4e cd /o, - ,L. 57 - 4, -/zrr- _) ,4 msri7 / e7 l+I'r> e----)* Gr.) e_/ , 7 A. ct/,e 4,7 0 T i -J cie /s - roo F /,/oo,- 'fr cl/e/ O� j .5.4_ a2o6C /414 { S/ 4 & _ Le ii G nC e 'Ar — /97ef 4: , /e 6t t Pi? m4 7 Sheet Number(s): in j i)-22 / /27 3 "Cloud" or highlight all areas of revision including date of evasion j9) Received at the City of Tukwila Permit Center by: Entered in Permits Plus on 04 1 \applicatioasccoams- applications on Iine%revision submittal Plan Check/Permit Number: A - 32. Steven M. Mullet, Mayor Steve Lancaster, Director „RECEIVED OF TU APR 0 8 2008 PERMIT CENTER License ANCORI *054N1 Licensee Name ANCOR INC Licensee Type CONSTRUCTION CONTRACTOR ' UBI 601646868 Verify Workers Comp Premium Status . Ind. Ins. Account Id 01/01/1980 . Business Type CORPORATION Address 1 831 JAMES ST 2ND FL Address 2 City SYRACUSE County OUT OF STATE : State NY Zip 13203 Phone 3152331300 ' Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 8/21/1995 Expiration Date 6/6/2009 Suspend Date . Separation Date Parent Company . Previous License Next License Associated License Name Role Effective Date Expiration Date ANTHONY, THOMAS J 01/01/1980 ANTHONY, JOSEPH G 01/01/1980 Look Up a Contractor, Electriin or Plumber License Detail Wa:1i ngionn'State Department Labor(andll Look Up a Contractor, Electrician or Plumber Printer Friendly Version IGeneral /Specialty Contractor '.A business registered as a construction contractor with LEI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. License Information Business Owner Information ' Bond Information Bond Company Bond Account Home Claims & Insurance Workplace Rights Trades & Licensing Effective Find a Law or Rule Expiration Cancel Topic Index I Contact Info Search Get a Form or Publication 621 Help Impaired Bond Received Page 1 of 2 https: // fortress. wa. gov /lni/bbip/Detail.aspx ?License= ANCORI *054N1 04/22/2008 HEATING-VENTILATING-AIR CONDITIONIRG SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION A STEAM I M C A I ILI RE IZTE RE) STEAM HIGH PRESSURE) AUTOMATIC CONTROL VALVE 0 SUPPLY DUCT (SA) / 1 R A 03/10/08 PRESSURE REGULATING VALVE (PRV) // // 6 171 RETURN OR EXHAUST OR FRESH AIR DUCT (RA OR EA) - - -/- -/- -//- -At- CONDENSATE LOW PRESSURE) CONDENSATE MEDIUM PRESSURE) CONDENSATE HIGH PRESSURE) 110R C) SAI-L 1 Y RELIEF VALVE GRS Zil BLOW Oft VALVE SOUND TRAP 11. sr 1 HOT WATER SUPPLY (HEATING) - HWS - - OW F AND T TRAP (CAP. #,/HR) - - HWR - - HOT WATER RETURN (HEATING) CFM SUPPLY REGISTER OR GRILLE (R OR G) THERMOSTATIC TRAP 1 SIZE ETHYLENE GLYCOL SUPPLY -EG- S.P. STATIC PRESSURE I- -C±1A RETURN REGISTER OR GRILLE (R OR G) - -EG- - ETHYLENE GLYCOL RETURN CIRCUIT SETTER FLOW CONTROL VALVE SIZE CHILLED WATER SUPPLY 1- FRESH AIR INTAKE (FA) -CWS- AIR BLEEDER VALVE (RADIANT PANEL) SEE - - CWR - - CHILLED WATER RETURN AIR ELIMINATOR ROUND CEILING DIFFUSER (SUPPLY) 1 ■MMIL -, - -, - CONDENSAiE OR VACUUM PUMP DISCHARCF D AUTOMATIC BALANCING VALVE HUMIDIFICATION LINE -;'. -.-6 F (TI 1 5 1 1; D LY C 5 11 1; 1G REMNr H -0 SOLENOID VALVE (REFRIGERANT) FUEL OIL SUPPLY -Fos - 6 -- THERMOSTATIC EXPANSION VALVE (REFR.) imm SQUARE CEILING DIFFUSER (SUPPLY) FUEL OIL RETURN -FOR- BACK PRESSURE VALVE - -Fov- - FUEL OIL VENT o SIGHT GLASS ME= NLYIIL C AZD IN I D I F 2) S ER GAS LINE G -(9- PIPE OR ROUND DUCT RISER C ).. (). SQUARE LING DIFFUSER CEILING THREE WAY THROW REFRIGERANT LJOUID LINE --11L Fc-i FAN COIL UNIT AND MARK 4 1-- REFRIGERANT SUCTION UNE I -- SQUARE CEILJNG DIFFUSER TWO WAY THROW RS- REFRIGERANT HOT GAS DISCHARGE UNE LIFtL UNIT HEATER-PROPELLER TYPE & MARK - c o El .. AUTOMATIC DAMPER CONDENSER WATER C Di- CABINET UNIT HEATER & MARK - -CR- - CONDENSER WATER RETURN _Arvvv\A__ GRAVITY DAMPER BOILER BLOW Oft Fr_i mafl FIN TUBE, MARK AND CAPACITY - NO- FR D FIRE DAMPER EXHAUST STEAM • c-1 CONVECTOR AND MARK Es- REDUCER EMI EM I UNIT VENTILATOR AND MARK --NM- 1 BD BASEBOARD DIFFUSER - "I'' ECCENTRIC RED UCER E M' RECTANGULAR v L., DU SHOWN UNION ' K ROUND ROUND DUCT: i- c 1 7 l jEj D R S= J UPP i g i HEATING RISER NUMBER oil c S 6 0 l'r STRAINER =111=2 CANVAS CONNECTION 0 EXHAUST FAN RISER NUMBER EXPANSION JOINT VOLUME DAMPER (ELEV AND PLAN) -1=1- /AN/ BR BASEBOARD RADIATION ICEI THERMOSTAT TURNING VANES 0 REMOTE SENSOR li THERMOMETER . EXTRACTOR p PRESSURE GAGE 4.- 1 .- PROJECT NUMBER -. ., I 3234A REV DATE BY NOTES A 12/21/07 LANDLORD COMMENTS L\ 01/29/08 ENERGY CODE REVISION A 03/10/08 LANDLORD REVISION -, DRAWN BY: JLH CHECKED BY: GRS DATE: ••_ 11-19-07 1 - 2006 1 C 502.2.1.1 OPERATION. Type I Hood systems shall be desigced Tod- installe to automatically activate the exhaust an whenev cooking operations occui\ activation of the exhaust fan shall occur tIr ug, an interlosk with the cooking appliance, by rn an of heat sensors or by means of other aprirove_d methods. 508.1 MAKEUP AIR. For mechanical makeup air systems, the exhaust and makeup air systems shall be electrically interlocked to insure that • makeup air is provided when ever the exhaust system is in operation. Makeup air intake opening locations shall comply with Sections 401.4 and 401.4.1. N NOTE 4 \ 345 CFM - 1 8' D-2 ; AIOTZ.10. FM NOTE 7 NOTE 3 !!!:•'!'"...; ':••'• ,4ECHANICAL NO7FS• 1. FURNISH AND INSTALL NEW 7 DAY PROGRAMMABLE 77-/ERMOSTAT. 2. FURNISH AND INSTALL GREASE EXHAUST DUCT FROM INLET OF ROOF MOUNTED GREASE EXHAUST FAN TO EXHAUST HOOD COLLAR. CONTRACTOR SHALL WRAP ALL GREASE DUCTWORK WITH FYREIVRAP MAX 2.0 DUCT INSULATION- ICC (ICB0) SYSTEM AS MANUFACTURED BY UNIFRAX CORPORATION OR EQUAL. FABRICATE DUCT FROM 18 GAUGE STEEL WITH SMOOTH WELDED SEAM CONSTRUCTION. 3. FURNISH AND INSTALL MAKE-UP ,4IR DUCT AND CONNECT TO MAKE-UP AIR UNIT (MAU-1) ON ROOF. 4. BALANCE DAMPER TO PROVIDE CAPTURE-JET AIR PLENUM 94 CFM MAKE- UP AIR. 5. BALANCE AHU-1 TO 2400 CFA/ SUPPLY WITH MINIMUM 675 CFM OUTSIDE AIR. 6. PROVIDE BAKER'S PRIDE MODEL PB-24S EYEBROW EXHAUST HOOD FOR ENCLOSED PIZZA OVEN. 7. EXHAUST HOOD FURNISHED BY OWNER INSTALLED BY H. V. A . C. CONTRACTOR. REFER TO SHEET A-5 FOR HOOD INFORMATION. 8. DUCT SMOKE DETECTOR ON RETURN SIDE DUCT AND SHUTDOWN RELA Y SHALL BE FURNISHED BY THE ELECTRICAL CONTRACTOR FOR INSTALLATION BY THE MECHANICAL CONTRACTOR. ALL WIRING SHALL BE BY THE ELECTRICAL CONTRACTOR. 9. EXHAUST DUCT FROM INLET OF ROOF MOUNTED EXHAUST FAN (EF-2) TO PIZZA OVEN EYEBROW HOOD COLLAR. 10. PAINT DIFFUSER OR GRILL TO MATCH SELLING' AREA CEILING. 71. INSTALL GREASE EXHAUST FAN SO THAT THE OUTLET IS EVEN WITH THE TOP SCREEN WALL FOR ROOFTOP MECHANICAL AREAS. NOTE 1 Air System Information Air System Name Equipment Class Air System Type AHU-1 SPLT AHU SZCAV Sizing Calculation Information Zone and Space Sizing Method: Zone CFM Sum of space airflow rates Space CFM Individual peak space loads Central Cooling COI Sizing Data Total coil load 5.4 Tons Total coil load 65.2 MBH Sensible coil load 61.2 MBH Coil CFM at Jun 1400 2708 CFM Max block CFM 2708 CFM Sum of peak zone CFM 2708 CFM Sensible heat ratio 0.938 ft 145.9 BTU/(hr-ft 82.2 Water flow @ 10.0 °F rise N/A . _ - Central Heating Coil Sizing Data Max coil load 39.2 MBH Coil CFM at Des Htg 2708 CFM Max coil CFM 2708 CFM Water flow @ 20.0 °F drop N/A Supply Fai Sizing Data Actual max CFM 2708 CFM Standard CFM 2664 CFM Actual max CFM/ft 3.41 CFM/ft Outdoor Ventilation Air Data Design airflow CFM 675 CFM CFM/ft 0.85 CFM/ft • EF-1 SCALE: 1/4" = 1'-0" H.V.A.C. ROOF PLAN RE' ISIONS No changes shall be made to th' sconr, of work without prior approval of Tukwila Building Division NOTE: Revisions will require a new plan submittal ind may include ;additional plan review fees. j Number of zones 1 Floor Area 793.0 Calculation Months Jan to Dec Sizing Data Calculated CFM/person EF-2 \ By Date: Load occurs at Jun 1400 OA DB / WB 83.5 / 64.8 °F Entering DB / WB 79.0 / 64.5 °F Leaving DB / WB 57.8 / 56.4 °F Coil ADP 55.4 ° F Bypass Factor 0.100 Resulting RH 49 % Design supply temp. 55.0 °F Zone T-stat Check 1 of 1 OK Max zone temperature deviation 0.0 °F Load occurs at Des Htg BTU/(hr-ft 49.4 Ent. DB / Lvg DB 58.3 / 72.0 °F Fan motor BHP 0.00 BHP Fan motor kW 0.00 kW Fan static 0.00 in wg SEPARATE PERMIT REQUIRED FOR: 0 Mechanical Electrical i 115 Gas Piping City of Tukwila BUILDING DIVIS101 FILE COPY Permit No. Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Fie, . Co and ions is acknowledged: 75.00 CFM/person ( 4 - 1-2- -- 08 LEGEND EXIS77NG NEW WORK NEW TO EXIS77NG CONNEC770N , COISSIftla=gaWrpggggeoz,gui• LANDLORD NOTES- A . EFFECT I VE JULY 7, 2007 THE CITY OF TUKWILA WILL BE UNDER THE 2006 INTERNATIONAL CODES AND ALL PERMIT SUBMITTALS NEED TO BE IN CONFORMANCE WITH THIS EDITION. 5. IT IS THE TENANT 'S/TENANT ARCHITECTS RESPONS IB L I TY TO VERIFY AND CONFORM TO ALL APPLICABLE CODES AND REGULATIONS. SUBSEQUENT PLANS WILL BE REVIEWED UNDER THE THEN CURRENT CODES AND ORDINANCES. C. TENANT '5 CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL WITHIN THE LANDLORD'S TENANT CRITERIA MANUAL INCLUDING ITS RULES AND REGULATIONS. D. TENANT 'S CONTRACTOR IS TO VERIFY LOCATION; GET APPROVAL AND REQUIREMENTS FOR ALL CORING LOCATIONS ON CONCRETE FLOORING IVI 77-1 WESTFIELD ON-SITE TENANT COORDINATOR PRIOR TO PROCEEDING' WITH WORK. E. TENANT SHALL PROPERLY SEAL ALL PENETRATIONS TO COMPLY W177-/ CODE REQUIREMENTS. THE FIRE RATED FLOOR ASSEMBLY SHALL BE MAINTAINED. ALL PLUMBING, MECHANICAL AND ELECTRICAL DEVICES PENETRATING FLOOR SHALL BE FIRE RATED. F. ALL ROOF PENETRATIONS MUST BE APPROVED BY WESTFIELD?S ON-SI TE TENANT COORDINATORS . ALL ROOF PENETRATIONS SHALL BE MADE BY LANDLORD'S APPROVED ROOFING CONTRACTOR AT TENANT '5 EXPENSE. ALL FINAL WEATHERPROOFING SHALL BE DONE BY WESTFIELD-APPROVED WATERPROOFING CONSULTANT PER LANDLORD'S SPECIFICATIONS ,4T TENANT'S EXPENSE. G. TENANT '5 CONTRACTOR SHALL PROVIDE A FIRE WATCH AND PORTABLE FIRE EXTINGUISHER WHERE EVER ANY WELDING IS DONE WITHIN THE DEMISED PREMISES. THE PERSON PERFORMING THE FIRE WATCH SHALL REMAIN IN THE TENANT SPACE FOR AT LEAST 1 HOUR AFTER THE COMPLETION OF ANY WELDING. THIS SHALL BE COORDINATED THROUGH THE CITY OF TUKWILA FIRE DEPARTMENT. H. TENANT SHALL FURNISH AND INSTALL ALL ROOFTOP HVAC EQUIPMENT AS REQUIRED FOR THEIR SPACE AT LOCATIONS DESIGNATED BY LANDLORD AND CANNOT EXTEND OVER THE DESIGNATED AREA. TENANT SHALL FURNISH AND INSTALL ALL. ASSOCIATED DUCTWORK WITHIN THEIR SPACE AND ROUTING' FROM TENANT SPACE TO THE ROOFTOP EQUIPMENT. DUCTWORK ROUTING SHALL BE APPROVED BY LANDLORD PRIOR TO INSTALLA TION. I. KITCHEN GREASE EXHAUST DUCTS SHALL BE FABRICATED IN ACCORDANCE WITH ALL CODES AND SHALL BE MIN. 18 GAUGE STEEL WITH SMOOTH WELDED JOINTS. ACCESS DOORS SHALL BE ON VERTICAL SURFACE OF THE HORIZONTAL RUN, BOTTOM OF VERTICAL RISER, AND PER LOCAL CODE. AUTOMATIC AND MANUAL SHUT-DOWN FUEL OR POWER SUPPLY MUST BE PROVIDED. J. DO NOT ATTACH ANYTHING DIRECTLY TO SLAB OR ROOF DECK ABOVE. K. ALL TENANT EQUIPMENT, ON THE ROOF, SHALL BE LABELED /1'I 77i' TENA/VT'S NAME AND SPACE NUMBER. L . TENANT 'S CONTRACTOR SHALL ARRANGE WITH LANDLORD '5 APPROVED ROOFING CONTRACTOR TO INSTALL WALKWAYS AROUND ALL ROOFTOP MOUNTED HVAC EQUIPMENT AT TENANT'S EXPENSE. GENERAL NOTES: A. EXISTING CONDITIONS ARE BASED ON "AS-BUILT" DRAWINGS PROVIDED BY THE OWNER AND LIMITED FIELD VERIFICATION. CONTRACTOR SHALL ADJUST TO ACTUAL FIELD CONDI TIONS AT NO ADDITIONAL EXPENSE TO THE OWNER. B. MECHANICAL CONTRACTOR SHALL FIELD COORDINATE WITH ELECTRICAL CONTRACTOR FOR ALL POWER REQUIREMENTS. C. COORDINATE DUCT ROUTING AND HEIGHTS WITH GENERAL CONTRACTOR. VERIFY ALL CLEARANCES BEFORE STARTING' WORK. D. THE CONTRACTOR SHALL OBTA IN A COPY OF THE LANDLORD TEN4IVT CRITERIA MANUAL. TENANT CRITERIA MANUAL REQUIREMENTS SHALL BE INCLUDED IN THIS CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH LANDLORD REQUIREMENTS AT NO EXTRA COST TO THE TENANT. E. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. NO ADDITIONAL COMPENSATION WILL BE MADE FOR ANY EXTRAS DUE TO CONTRACTOR S FAILURE TO VISIT THE dOBSI7E AND/OR PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS BID. ANY DISCREPANCIES SHALL BE IMMEDIA7ELY REPORTED TO THE ENGINEER FOR RESOLUTION. F. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL APPLICABLE GOVERNMENT AND LOCAL CODES. 6'. THIS PROJECT UTILIZES A PLENUM RETURN AII? CEILING DESIGN. ALL EQUIPMENT AND MATERIALS INSTALLED IN THE PLENUM RETURN CEILING MUST MEET THE FLAME SPREAD AND SMOKE DEVELOPED RATINGS OF 25/50 AND BE APPROVED FOR USE IN PLENUM RETURN CEILINGS. CORRECTION RECEIVED CITY OF TUKWILA LT R# _L. PERMIT CENTER APR 0 8 2008 ARCHITECT DTM ARCHITECT 6031 W. INTERSTATE 20, SUITE 260 ARLINGTON, TX 76017 TEL: 817.483.1146 FAX: 817.483.7377 dtmarchitect@dtmarchitect.com ENGINEER F3Schnaskel a Nevaurk 0 Omaha a LosAngaias a 800-5814963 viww.sdnackebaarn 1 NOTES 1 ALL WORK SHALL CONFORM TO MALL CRITERIA. IT IS THE RESPONSIBIUTY OF THE sue CONTRACTOR TO OBTAIN. REVIEW & UNDERSTAND THE MALL CRITERIA AND TO INCUJDE ADJUSTMENTS FOR WORK REQUIRED PER MALL CRITERIA IN THE BID PROPOSAL. 1 ORIENTATION Conceive. Construct. Connect. 831 JAMES STREET, SYRACUSE, NEW YORK 13203 PHONE: 315.233.1300 FAX: 315.233.1314 PROJECT sharre WESTFIELD SOUTHCENTER 2600 SOUTHCENTER PKWY SUITE FC4 SEATTLE, WA 98188 I SHEET TITLE 1 HALAL. PLAN AND H.V.A.C. PIPING PLAN SHEET 1 M -En 1 DIFFUSERS, GRILLES AND REGISTERS MARK SERVICE LOCATION CLG. TYPE MANUFAC. CATALOG NUMBER REMARKS D -1 SUPPLY CEILING AC TILE E. H. PRICE 24x24 SCD31 SEE PLAN FOR NECK SIZE D -2 SUPPLY CEILING GYP. E. H. PRICE 24x24 SCD31 SEE PLAN FOR NECK SIZE D -3 MAKE —UP CEILING GYP. E. H. PRICE PDDR 12X12 SEE PLAN FOR NECK SIZE G -1 RETURN CEILING AC TILE E. H. PRICE 24x24 SCD31 SEE PLAN FOR NECK SIZE G -2 RETURN CEILING GYP. E. H. PRICE 24x24 SCD31 SEE PLAN FOR NECK SIZE AIR BALANCE SCHEDULE EXHAUST: SERVES SERVICE EXHAUST (CFM) TOTALS (CFM) EF -1 KITCHEN HOODS RPM 2,361 REMARKS HP VOLTS PH CYO. —2,361 MAKEUP AIR: SUPPLY AIR (CFM) SERVES DESIGN OA (CFM) PERCENT OA /SA 1/2 115 MAU -1 1,500 COOKING HOOD 1,500 100% EF -2 RTU -1 2,400 SPACE 675 28% 1/4 115 1 60 1725 GREENHECK CUBE -098 -4 2,175 3/4 TOTAL NEGATIVE AIR FLOW 186 EXHAUST FANS MARK LOCATION SERVICE CFM EXT. S.P• (IN W.G.) . SONES MOTOR DATA RPM MFR. REMARKS HP VOLTS PH CYO. EF -1 ROOF RANGE HOOD 1,821 0.5 15.6 1/2 115 1 60 1725 GREENHECK CUBE -131 -5 EF -2 ROOF OVEN HOOD 540 0.5 11.1 1/4 115 1 60 1725 GREENHECK CUBE -098 -4 MAKE —UP AIR FAN /HEATER SCHEDULE MARK LOCATION HEATING CAP. TONS S.P. AMB. ENT. AIR ELECTRICAL MANUFAC. MODEL NUMBER HP MARK SERVES CAPACITY CFM (IN. AIR TEMP. XX HEATING MANUFACTURER MODEL NUMBER 3 CARRIER 38ARZ008 2.4 460 (MBH) CARRIER 40RM007 H20) RISE H.P. VOLTS PH MEDIA MAU -1 RANGE HOOD 83.5 1,500 0.5 47 3/4 115 1 NAT. GAS GREENHECK DG- 109 —H10 AIR COOLED CONDENSING UNITS MARK LOCATION SERVES CAP. TONS SUCTION TEMP. 'F AMB. ENT. AIR MOTOR DATA MANUFAC. MODEL NUMBER HP VOLTS PH COND -1 ROOF AHU -1 7.5 XX 83.5 1/4 460 3 CARRIER 38ARZ008 GRAVITY INTAKE VENT MARK LOCATION SERVICE CFM EXT S.P. ( IN W.G. ) THROAT SIZE ( IN. X IN. ) HOOD SIZE ( IN. X IN. ) MANUFACTURER MODEL NUMBER GIV -1 ROOF FRESH AIR 2400 0.053 14X36 36X49 PENNBARRY AIRETTE AEGI AIR HANDLING UNITS MARK COOLING CAP. ELECTRIC HEATING COIL CFM TOTAL S.P. (IN. H20) FAN MOTOR MANUFACTURER AND MODEL NUMBER TOTAL SENS. KW VOLTS PHASE HP VOLTS PH AHU -1 88.8 61.5 15.0 460 3 2400 0.5 2.4 460 3 CARRIER 40RM007 N ! PROJECT NUMBER 1 3234A \ REV DATE BY NOTES A 12/21/07 LANDLORD COMMENTS Q 01/29/08 ENERGY CODE REVISION L 03/10/08 LANDLORD REVISION DRAWN BY: JLH CHECKED BY: GRS ` DATE: 11 -19 -07 v N ,. TURNING VANES TRANSFORMATION 90° ELBOW 45° ELBOW SIMILAR SUPPLY OR RETURN WYE (RECTANGULAR DUCT) FE D - >i 3/4 D RETURN AIR BRANCH FITTING 3" MIN. PER/ME7FR OVERLAP (TYP) NOTE: STAGGER ALL JOINTS 10 1/2" BETWEEN FYREWRAP DUCT INSULATION LAYERS (TYP.) FYREWRAP DETAIL NOT TO SCALE THREE TURNING VANES NO THROAT RADIUS FYREWRAP DUCT /NSULA 770N TWO LAYERS AT 1 1/2" EXPANSION TURNING' VANE SHORT RADIUS 90' ELBOW TAKE —OFF USE ONLY IN AREAS WHERE SPACE IS LIMITED DUCTWORK DETAILS NOT TO SCALE EXTERIOR LAYER FILAMENT TAPE (TEMPORARY HOLD) PLUS 55302 BONDING (PERMANENT HOLD) ON 10 1/2" CENTERS (1 1/2" FROM EDGES PLUS MIDDLE; 3 EACH PER 24" WIDE WRAP) INTERIOR LAYER FILAMENT TAPE ONLY, ON 10 7/2" CENTERS 2/3D CONTRACTION f�D�l FULL RADIUS FULL RADIUS ELBOW TAKE —OFF 3" MIN. LONGITUDINAL OVERLAP (TYP.) THIS DETAIL STANDARD FOR TYP /CAL /NSTALLA 770N OF GREASE DUCT (NSULA 770N. PRO VIDE /NSULA 770N PER LANDLORDS INSURANCE CARRIER REQUIREMENTS, NFPA STANDARDS AND UL RA 77NG PER CODE REQUIREMENTS. NOTE 6 INSULATED MAKE —UP A/R DUCT CONNECT TO MAU -7 VENTED ROOF CURB EXTENSION CONNECT EXHAUST DUCT TO EXISTING LANDLORD PORV/DED DUCT CHASE CONNECTION CONNECT MAKEUP A/R DUCT TO 7X7 CAPTURE —JET COLLER J NOTES: 1. MECHAN /CAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF ALL HOOD SYSTEMS TO CITY FOR APPROVAL PR /OR TO /NSTALLA 770N a TOTAL HOOD SYSTEM TO BE IN COMPLETE CONFORMANCE W/TH NFPA, AND ALL LOCAL CODES AND REGULA 77ONS AND LANDLORD CRITERIA. 3, MECHAN /CAL CONTRACTOR SHALL COORD /NA 7F ALL ANSUL FIRE PROTEC770N SYSTEMS WITH FIRE PRO7EC770N CONTRACTOR WHO SHALL ALSO BE RESPONS /BLE FOR ALL PERMITS AND TESTING REQUIRED. 4, CONTRACTOR SHALL WRAP ALL GREASE DUCTWORK 141771 FYREWRAP MAX 20 DUCT INSULATION — ICC (ICBO) SYSTEM AS MANUFACTURED BY UNIFRAX CORPORA 770N. 5. PROVIDE ACCESS PANELS AT 10=0" INTERVALS AND EVERY CHANGE OF DIRECT /ON. 6. GREASE HOOD EXHAUST FANS MUST BE SURROUNDED BY A SELF — CONTAINED GREASE RETENTION SYSTEM TO PROTECT ADJACENT ROOF SURFACES. SYSTEM SIMILAR TO "GREASE GUARD COMPANY'; SCHAUMBURG, /LL /NO /S. COOKING HOOD DETAIL NOT TO SCALE SP /N COLLAR FITTING, W /TH MANUAL VOLUME DAMPER b DUCT STRAP FASTENER (TYP.) NOT TO SCALE RESTRAINED SPRING VIBRATION ISOLATORS, (PRO VIDE SEISMIC SNUBBERS WHERE APPL /CABLE) NOT TO SCALE CEILING / SUSPENDED CEILING SUPPLY A/R DUCT (NSULA 7ED FLEX /BLE DUCT, 24" MAX /MUM LENGTH TRANS/770N F/T77NG FOR DIFFUSER IF REQUIRED CEILING DIFFUSER & DUCT CONNECTION DETAIL UPBLAST EXHAUSTER ROUND R /G /D DUCTWORK BRANCH CONDENSING UNIT SUPPORT DETAIL 40" MINIMUM AND EVEN WITH THE TOP SCREEN WALL FOR ROOFTOP MECHANICAL AREAS COOKING EQUIPMENT GREASE PIPE DOWN TO TENANT'S FLOOR SINK (FS -1) CONNECTED TO GREASE WASTE (SEE SHEET P -2). HOOD EXHAUST DUCT DOWN TO HOOD (NOTE 4 & 5) D /FFUSER, SEE DRA WING MIN /MUM STRAIGHT SECTION ENTRY INTO D /FFUSER SHALL BE EQUAL TO BRANCH SIZE COOLING CAPACITIES BASED ON ARI STANDARD 210/240 -89: 80' F DB/ 6T F WB INDOOR ENTERING AIR TEMPERATURE, 95' F DB AIR ENTERING OUTDOOR FAN. SCHEDULED UNIT CFM MAY DIFFER FROM ARI STANDARD CFM. 1) PROVIDE INTEGRATED DIFFERENTIAL ENTHALPY ECONOMIZER 1) PROVIDE CONDENSER COIL HAIL GUARD 2) PROVIDE ROOF CURB TENANT CONDENSING UN /T 1) PROVIDE ROOF CURB 2) PROVIDE BACKDRAFT DAMPER PROVIDE PROTECTIVE PAD UNDER BLOCKING IN ACCORDANCE 1077-I THE ROOFING MANUFACTURERS INSTRUCT /ON 4x4 PRESSURE TREATED BOARD BETWEEN ROOF AND CONDENSING UNIT SUPPORT 90 FIVE SECTION ELBOW 90 BRANCH TAKE —OFF NOT TO SCALE -*A- 4.re;ka., M -. � 4 r._ 45 "THREE SECTION ELBOW 45 BRANCH TAKE -OFF REVIEWED FOR CODE COMPLIANCE APPROVED City Of Tukwila BUILDING DIVISION APR 1 8 2000 RECEIVED CITY OF TUKWILA APR 0 8 2008 TYPICAL ROUND DUCT FITTINGS PERMIT CENTER ExpiR R C 1= DTM ARCHITECT 6031 W. INTERSTATE 20, SUITE 260 ARLINGTON, TX 76017 TEL: 817.483.1146 FAX: 817.483.7377 dtmarchitect @dtmarchitect.com E N G I N E E R Schnagek © Nei/York o Omaha d Lam n 800-581-0563 wwwschnackel.com NOTES ALL WORK SHALL CONFORM TO MALL CRITERIA. IT IS THE RESPONSIBILITY OF THE SUB CONTRACTOR TO OBTAIN. REVIEW & UNDERSTAND THE MALL CRITERIA AND TO INCLUDE ADJUSTMENTS FOR WORK REQUIRED PER MALL CRITERIA IN THE BID PROPOSAL. I ORIENTATION 1 Conceive. Construct. Connect. 831 JAMES STREET, SYRACUSE, NEW YORK 13203 PHONE: 3152311300 FAX: 3152311314 PROJECT sbarrog WESTFIELD SOUTHCENTER 2600 SOUTHCENTER PKWY SUITE FC4 SEATTLE, WA 98188 I SHEET T I T L E H.V.A.C. SCHEDULES AND DETAILS SHEET 1 M -2 r 1 Section 15800 - Heating, Ventilating & Air Conditioning (See HVAC drawings) 1.01 GENERAL A. SCOPE 1. The General Requirements of DIVISION 1 govern the work in this section. 2. Provide all labor, materials and equipment necessary to properly install automatic, gas - fired heating systems in each unit, supplying air to all rooms where shown on Drawings and called for in the Specifications. 3. Equipment as specified together with all necessary ducts, grilles, registers, controls, piping, low voltage fans, control wiring, hangers, stands, equipment supports, flashing at equipment, duct and pipe insulation, unless otherwise noted. 4. Related Work by Others: a. Painting except as herein specified. b. Line voltage wiring and conduit. c. Electrical supply connection to equipment. B. All work shall conform to all federal, state and local codes and any landlord requirements as specified in the executed Lease Agreement. Mechanical Contractor shall verify and coordinate scope of work with landlord, if specified in the executed Lease Agreement. C. The Contractor shall examine the premises and verify the existing conditions under which he will be obligated to operate in performing this part of the work or that will in any manner affect the work under contract. The Contractor shall cooperate with the other trades so that the installation of all equipment may be properly coordinated. Contractor shall bring to the attention of the Architect /Engineer any discrepancies between field conditions and design documents. D. All equipment furnished shall fit the space available, with connection, etc. , in the required locations and with adequate space for operating and servicing. The drawings are generally diagrammatic and indicate the manner and method of the installation while the specifications and equipment list denote the type and quality of material and workmanship to be used. Where a conflict exists between the drawings and the specifications, the Contractor shall promptly notify the Architect whose decision shall be final. No allowance will be made subsequently in this connection to behalf of the Contractor after award of the contract. E. Regulations and Codes All mechanical equipment shall conform with the requirements of the State Mechanical Code, the State Building Code, the State Energy Code, NFPA 90A 96,101 and all applicable local codes and ordinances. F. Drawings for HVAC work are diagrammatic, showing the general location, type, layout and equipment required. The drawings shall not be scaled for exact measurements. Refer to manufacturer's standard installation drawings for equipment connections and installation requirements as required. Furnish and install ductwork, connections, accessories, offsets and materials necessary to facilitate the system's functioning as indicated by the design and the equipment indicated. The work shall be in accordance with local codes and ordinances and subject to inspection. Contractor shall obtain all necessary permits and pay any associated fees. G. The Contractor shall install all piping, ductwork and equipment as required to conform the structure, avoid obstructions, preserve ceiling heights and headroom and make all equipment requiring maintenance or repair accessible. H. The HVAC contractor shall install HVAC systems as shown, noted and specified. Equipment may not be substituted unless written approval by the Architect, Engineer, or Owner's Representative is obtained. Any changes to the ductwork layout will necessitate submission of sheet metal shop drawings for Engineer's review. Any unauthorized changes will be removed at contractor's expense if deemed necessary by Architect, Engineer, or Owner's Representative. I. The plans shall require tests mandated by this section be performed and the results recorded. The plans shall require preparation of preliminary and final reports of test procedures and results as described herein. At a minimum, the plans shall identify the following for each test: 1. A detailed explanation of the original design intent, 2. Equipment and systems to be tested, including the extent of tests, 3. Functions to be tested (for example, calibration, economizer control, etc.), 4. Conditions under which the test shall be performed (for example, winter and summer design conditions, full outside air, etc.), 5. Measurable criteria for acceptable performance. J. Record drawings shall include as a minimum the location and performance data on each piece of equipment, general configuration of duct and pipe distribution system, including sizes, and the terminal air and water design flow rates of the actual installation. K. The training of the appropriate maintenance staff for each equipment type and /or system shall include, as a minimum, the following: 1. System /Equipment overview (what it is, what it does and which other systems and /or equipment does it interface with). 2. Review of the available O &M materials. 3. Review of the Record Drawings on the subject system /equipment. 4. Hands -on demonstration of all normal maintenance procedures, normal operating modes, and all emergency shutdown and start- up procedures. L. A preliminary report of commissioning test procedures and results shall be completed and provided to the Owner. The preliminary commissioning report shall identify. 1. Deficiencies found during testing required by this section which have not been corrected at the time of report preparation and the anticipated date of correction. 2. Deferred tests which cannot be performed at the time of report preparation due to climatic conditions. 2.01 MATERIALS 3. Climatic conditions required for performance of the deferred tests, and the anticipated date of each deferred test. M. A complete report of test procedures and results shall be prepared and filed with the owner. The Final Commissioning Report shall identify. 1. Results of all Functional Performance Tests. 2. Disposition of all deficiencies found during testing, including details of corrective measures used or proposed. 3. All Functional Performance Test procedures used during the commissioning process including measurable criteria for test acceptance, provided herein for repeatability. EXCEPTION: Deferred tests which cannot be performed at the time of report preparation due to climatic conditions. All ductwork shall be constructed of galvanized steel sheet metal and be fabricated according to the S.M.A.C.N.A. low velocity duct manual, for 2" pressure class. B. All elbows shall have proper radius or HVAC contractor shall provide double thickness airfoil turning vanes required by S.M.A.C.N.A. No square throat elbows shall be installed without double thickness turning vanes. C. All duct connections to equipment shall be loaded type vinyl, vibration elimination connections, (FC) flexible connections. D. Flex duct: Provide factory assembled Class 1 air duct (UL 181) with fiberglass insulation and reinforced outer protective cover /vapor barrier. Flex duct shall meet NFPA 90A with flame spread under 25, smoke developed under 50, and shall be rated for 2" W.C. pressure and 0 to 250 degree temperature. Maximum length shall be 2' -0 ". E. All new supply and return ductwork shall be insulated with either 1" thick duct liner or 1" thick duct wrap. Duct liner shall meet NFPA 90A, flame spread under 25, smoke developed under 50. Thickness, density and "R" value shall be per code. Duct liner shall be fastened to inside of ductwork as per manufacturer's directions and S.M.A.C.N.A. "Duct Liner Application Standard ". Size of ducts shall be increased for duct liner insulation, sizes shown on plan are inside free area. Duct wrap shall be foil reinforced kraft facing meeting NFPA 90A, flame spread under 25, smoke developed under 50, thickness, density and "R" value shall be per code. Duct wrap shall be fastened to ductwork per manufacturer's directions. The round branch ductwork insulation shall be fastened to ductwork per manufacturer's directions. The round branch ductwork shall be insulated with 1" thick fiberglass sleeve with foil jacket and all joints and terminations sealed with foil or duct tape. All supply and return ductwork exposed to view and located in the conditioned space shall be lined A. F. If ductwrap is the chosen method of insulation, the inside of the supply and return ducts from the air conditioner shall be lined from the air handling equipment to a distance of 10' from the unit, with Ultralite #300 - 1/2" thick, or other approved Duct liner acoustical board. The material shall be fitted carefully on the inside of the duct and shall be fastened on with cement supplemented by screws and washers on top and sides of duct. 3.01 EXECUTION A. All ductwork transitions shall be (FOT) "Flat on Top" unless otherwise specified on plan. All duct dimensions listed are inner air stream dimensions. B. All ductwork shall be routed above the suspended ceiling space unless otherwise noted on the plans. All ductwork shall be supported and attached per S.M.A.C.N.A. standards. C. All outside air intakes shall be a minimum of 10'- 0" away from exhaust discharge openings and plumbing vent stacks. D. The mechanical systems shall be complete with all necessary appurtenances for a complete operating system. E. Automatic temperature control systems shall be desig;ied and installed by an experienced contractor: See Automatic Temperature Control Specifications. F. Provide UL approved fire dampers for all penetrations through fire rated walls, partitions, ceilings, and floors. Install fire dampers as per manufacturer's directions and as per UL guidelines. G. An independent balancing contractor shall balance system to air quantities shown on plan. Balancing contractor shall use duct mounted manual dampers for air system balancing. Use of terminal damper is not acceptable. Balance HVAC systems as per Washington State Energy Code Section 1416.2.2 and "Test and Balance Mechanical System Specifications ". H. The Architect or Owner's Representative shall be notified 48 hours or more prior to all final testing and balancing work so that he and /or the Engineer may be present to observe this work. The balancing contractor shall submit written reports of all air flow readings, static pressures, GPM rates, pressure readings, temperature readings, motor amperages etc. to document properly balanced air flow in all HVAC systems. L Provide a volume damper for every inlet and outlet (diffuser, register, grille, etc.) of the supply ductwork distribution system whether shown or not on the plans. Provide additional volume dampers and /or extractors at branch take -offs from ductwork mains as required to achieve ARI volume distribution and balancing. J. The contractor shall warranty all materials and guarantee all workmanship for one year from substantial completion. Provide full 5 year guarantee on all air conditioning compressors. K. Submit two Operation and Maintenance Manuals bound in 8 -1/2" x 11" page binders, titled "Operation And Maintenance Manual ". Subdivide binder contents with page dividers by system and equipment. Include all shop drawings, test and balance reports and warranties per Washington State State Energy Code Section 1416. Submission of these documents shall be a requirement for final payment. L. Ductwork shall be tested to 2 inches W.G. with not more than 5 percent allowable leakage. Ductwork shall be tested in sections as the installation proceeds. Any leaks shall be sealed before the next section is installed. Tested sections shall be marked with indelible marker, showing date and initials of contractor foreman responsible for the test. M. Low and medium pressure supply and return ductwork shall be sealed in accordance with S.M.A.C.N.A. Seal Class C. N. Core -drill or saw -cut existing walls, roof, etc. as required for piping or ductwork and fire -stop opening around pipe or ductwork. Verify location of structural beams, joists, etc. before drilling or cutting. Notify architect of any discrepancies. 0. Wherever foundation walls, outside walls, roofs, etc. are cut for installation of systems, they shall be patched to match existing construction and sealed weather tight. Work shall be performed by craftsmen skilled in their respective trades. P. Provide 3 sets of pleated disposable filters. One set to be used until completion of construction phase. Install one set at completion of construction phase and deliver one set to owner and label each set of filters to denote their respective HVAC units. Filters shall be similar to American Air Filter PerfectPleat. F. Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -7. Extent of sealing required is as follows: 1. Static pressure: 36 inch to 2 inches; seal transverse joints. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at ataUtai epser7suo6: 12iriialch'IsCtcor3 gnu, seal all transverse joints and longitudinal seams. 3. Static pressure: Above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. G. Within 90 days after the date of system acceptance, record drawings of the actual installation be provided to the building owner. Record drawings shall include as a minimum the location and performance data on each piece of equipment, general configuration of duct and pipe distribution system, including sizes, and the terminal air and water design flow rates. H. HVAC control systems shall be tested to ensure that control devices, components, equipment and systems are calibrated, adjusted and operate in accordance with approved plans and specifications. Sequences of operation shall be functionally tested to ensure they operate in accordance with approved plans and specifications. A complete report of test procedures and results shall be prepared and filed with the owner. Section 15900 - Test and Balance Mechanical System Specifications 1.01 GENERAL A. The mechanical equipment shall be completely installed and in continuous operation as required to accomplish the adjusting and balancing work specified. B. Perform adjusting and balancing when the system is operating at design capacity. C. Only qualified personnel shall perform balancing work. 1. Submit evidence that the personnel who will perform the balancing of the project systems are certified for review by the Owner /Engineer prior to performing the work. 2. Qualified personnel shall be holders of an engineering degree or a certificate of a nationally recognized testing and balancing standards committee /organization. D. The balancing contractor shall be completely independent of the installing contractor. Any form of association is unacceptable. Documented proof of independence by the balancing contractor is required and shall be submitted to Owner prior to start of balancing work. E. During substantial completion inspection, a percentage (not more than 5 of the recorded data) will be subject to reverification by the Owner /Engineer. Contractor shall take instrument reading as required. 1.02 Submittals: A. Submit data sheet on each item of balancing equipment as required for Owner /Engineer review. 1. Include name of device 2. Manufacturer's name 3. Model number 4. Latest date of calibration 5. Correction factors B. Submit a report containing all data and other related information recorded during balancing, placed on appropriate forms for Owner /Engineer review. Reports shall certify that the methods used and results achieved are as specified. C. Submit copies of report to Owner and to Engineer. Provide (3) copies of report to Engineer for review. Provide (2) copies of report to Owner. 1.03 Air system (adjust and balance system in accordance with the following requirements): A. Preliminary. 1. Identify and list: a. size, b_ type and manufacturer of all equipment to be tested c. including air terminals d. check all system components for proper installation and operation. 2. Verify all fans and motors for proper rotation. 3. Use manufacturer's ratings for all equipment to make required calculations, except where field test shows rating to be impractical. 4. Verify that all instruments are accurately calibrated and maintained. 5. Install clean filters. 6. Simulate wet cooling, coil with baffles. B. Central System: 1. Adjust and record supply, return and exhaust fans rpm to design requirements within the limits of mechanical equipment provided. 2. Test and record motor voltage and running amperes including motor nameplate data and starter heater ratings. 3. Make pitot tube traverse of main supply, exhaust and return ducts, determine and record cfrn at fans and adjust fans to design supply cfm with +/- 5 tolerance. 4. Record system static pressure, suction and discharge. 5. Adjust system for design outside air cfm, see schedules. 6. Adjust system for design recirculated air, cfm. 7. Record heating apparatus entering air temperatures, dry bulb in degree F. 8. Record cooling apparatus entering air temperatures, dry bulb and wet bulb in degree F. 9. Record heating apparatus leaving air temperatures, dry bulb in degree F. 10. Record cooling apparatus leaving air temperatures, dry bulb and wet bulb in degree F. C. Distribution: 1. Adjust zones or branch ducts to design cfm. D. Air terminals (diffusers and grilles): 1. Identify each air terminal on reports as to location and determine required flow reading. 2. Adjust each air terminal to design requirements with +/- 10% cfm tolerance. 3. Balance procedure on air terminals shall include: comparison of required fpm velocity and observed velocity, adjustment of terminal, and comparison of required cfm and observed cfm after adjustment. 4. Adjust flow patterns from air terminal units to design intent and as equipment permits. E. Verification: 1. Prepare summation of readings of observed cfm for each system. Compare with required cfm. Determine coil and filter static pressure drops. 2. Verify design cfm at fans as described in 1.03.B.2 above: building shall be under slight positive pressure in normal operating mode. 1.04 Automatic Control System: A. The temperature control contractor's representative shall set and adjust automatically operated devices to achieve the required sequence of operations. B. Balancing contractor shall verify all controls for proper calibration and list those controls requiring adjustment by temperature control system installer. Section 15950 - Automatic Temperature Control Specification A. Automatic Temperature control system shall be installed by a contractor with minimum five (5) years of experience in the installation of electric and electronic control systems. B. All wiring and wiring connections shall be provided by the control contractor unless shown on electrical drawings. All wiring shall comply with the electrical specifications and local electrical codes. C. Provide all relays, contactors, switches, adjustable set- points, wiring, conduits and transformers as required for automatic temperature control system. D. At completion of work, adjust and make ready for operation all thermostats. Dampers, switches and other control devices. Provide manuals and instruction to the building operating personnel. Provide one year guarantee after final acceptance of work to cover all materials and labor to be repaired /replaced by the control contractor at no cost to Owner. Provide wiring diagrams of all systems and turn over to Owner. E. Provide the Following Control Sequences: 1. Rooftop units, a. Thermostats are to be wall mounted solid state with internal battery backup. Themostats shall have 7day /24hr programming and capability of system shutdown and temperature setback, with 5F minimum deadband control, fan cycling and override features. If new thermostats are provided for existing units, they shall be selected to be compatible with the existing HVAC equipment. b. Provide sub -base for thermostat. c. All fans supplying more than 2000 cfm of air to any space and all recirculating fans systems serving areas of egress shall be installed with a smoke detector in the supply or return ductwork, as required by local code. The smoke detector shall be wired to stop the fan upon detection of smoke and signal the building system, if present. The smoke detector shall be furnished by the Mechanical Contractor, mounted in the duct by the mechanical contractor, and wired by the electrical contractor. If a building fire alarm system is installed, the smoke detector and audible /visible alarm shall be furnished and wired by the fire alarm contractor and mounted by the mechanical contractor. ( REVIEWED FOR CODE COMPLIANCE APPROVED APR 1 8 211OF City Of Tukwila . ,_ BUILDS RECEIVED CITY OF TUKWILA APR 0 8 2008 PERMIT CENTER A R C H I T E C T DTM ARCHITECT 6031 W. INTERSTATE 20, SUITE 260 ARLINGTON, TX 76017 TEL: 817.483.1146 FAX: 817.483.7377 dtmarchitect @dtmarchitectcom E N G I N E E R Schnackel 0 twrwk o Omaha o Las Angeles a 830-581-0963 wwwschnackeLcom NOTES ALL WORK SHALL CONFORM TO MALL CRITERIA. IT 15 THE RESPONSIBIUTY OF THE SUB CONTRACTOR TO OBTAIN. REVIEW & UNDERSTAND THE MALL CRITERIA AND TO INCLUDE ADJUSTMENTS FOR WORK REQUIRED PER MALL CRITERIA IN THE BID PROPOSAL. ORIENTATION 1 Conceive. Construct. Connect. 831 JAMES STREET, SYRACUSE, NEW YORK 13203 PHONE: 315.233.1300 FAX: 315233.1314 P R O J E C T sbarro* WESTFIELD SOUTHCENTER 2600 SOUTHCENTER PKWY SUITE FC4 SEATTLE, WA 98188 1 SHEET TITLE J H.V.A.C. SPECIFICATIONS SHEET 1 M -3 PROJECT NUMBER I 3234A REV DATE BY NOTES Q 12/21/07 LANDLORD COMMENTS n 01/29/08 ENERGY CODE REVISION Q 03/10/08 LANDLORD REVISION DRAWN BY: JVR CHECKED BY: GRS DATE; 11-19 -07 r 1 Section 15800 - Heating, Ventilating & Air Conditioning (See HVAC drawings) 1.01 GENERAL A. SCOPE 1. The General Requirements of DIVISION 1 govern the work in this section. 2. Provide all labor, materials and equipment necessary to properly install automatic, gas - fired heating systems in each unit, supplying air to all rooms where shown on Drawings and called for in the Specifications. 3. Equipment as specified together with all necessary ducts, grilles, registers, controls, piping, low voltage fans, control wiring, hangers, stands, equipment supports, flashing at equipment, duct and pipe insulation, unless otherwise noted. 4. Related Work by Others: a. Painting except as herein specified. b. Line voltage wiring and conduit. c. Electrical supply connection to equipment. B. All work shall conform to all federal, state and local codes and any landlord requirements as specified in the executed Lease Agreement. Mechanical Contractor shall verify and coordinate scope of work with landlord, if specified in the executed Lease Agreement. C. The Contractor shall examine the premises and verify the existing conditions under which he will be obligated to operate in performing this part of the work or that will in any manner affect the work under contract. The Contractor shall cooperate with the other trades so that the installation of all equipment may be properly coordinated. Contractor shall bring to the attention of the Architect /Engineer any discrepancies between field conditions and design documents. D. All equipment furnished shall fit the space available, with connection, etc. , in the required locations and with adequate space for operating and servicing. The drawings are generally diagrammatic and indicate the manner and method of the installation while the specifications and equipment list denote the type and quality of material and workmanship to be used. Where a conflict exists between the drawings and the specifications, the Contractor shall promptly notify the Architect whose decision shall be final. No allowance will be made subsequently in this connection to behalf of the Contractor after award of the contract. E. Regulations and Codes All mechanical equipment shall conform with the requirements of the State Mechanical Code, the State Building Code, the State Energy Code, NFPA 90A 96,101 and all applicable local codes and ordinances. F. Drawings for HVAC work are diagrammatic, showing the general location, type, layout and equipment required. The drawings shall not be scaled for exact measurements. Refer to manufacturer's standard installation drawings for equipment connections and installation requirements as required. Furnish and install ductwork, connections, accessories, offsets and materials necessary to facilitate the system's functioning as indicated by the design and the equipment indicated. The work shall be in accordance with local codes and ordinances and subject to inspection. Contractor shall obtain all necessary permits and pay any associated fees. G. The Contractor shall install all piping, ductwork and equipment as required to conform the structure, avoid obstructions, preserve ceiling heights and headroom and make all equipment requiring maintenance or repair accessible. H. The HVAC contractor shall install HVAC systems as shown, noted and specified. Equipment may not be substituted unless written approval by the Architect, Engineer, or Owner's Representative is obtained. Any changes to the ductwork layout will necessitate submission of sheet metal shop drawings for Engineer's review. Any unauthorized changes will be removed at contractor's expense if deemed necessary by Architect, Engineer, or Owner's Representative. I. The plans shall require tests mandated by this section be performed and the results recorded. The plans shall require preparation of preliminary and final reports of test procedures and results as described herein. At a minimum, the plans shall identify the following for each test: 1. A detailed explanation of the original design intent, 2. Equipment and systems to be tested, including the extent of tests, 3. Functions to be tested (for example, calibration, economizer control, etc.), 4. Conditions under which the test shall be performed (for example, winter and summer design conditions, full outside air, etc.), 5. Measurable criteria for acceptable performance. J. Record drawings shall include as a minimum the location and performance data on each piece of equipment, general configuration of duct and pipe distribution system, including sizes, and the terminal air and water design flow rates of the actual installation. K. The training of the appropriate maintenance staff for each equipment type and /or system shall include, as a minimum, the following: 1. System /Equipment overview (what it is, what it does and which other systems and /or equipment does it interface with). 2. Review of the available O &M materials. 3. Review of the Record Drawings on the subject system /equipment. 4. Hands -on demonstration of all normal maintenance procedures, normal operating modes, and all emergency shutdown and start- up procedures. L. A preliminary report of commissioning test procedures and results shall be completed and provided to the Owner. The preliminary commissioning report shall identify. 1. Deficiencies found during testing required by this section which have not been corrected at the time of report preparation and the anticipated date of correction. 2. Deferred tests which cannot be performed at the time of report preparation due to climatic conditions. 2.01 MATERIALS 3. Climatic conditions required for performance of the deferred tests, and the anticipated date of each deferred test. M. A complete report of test procedures and results shall be prepared and filed with the owner. The Final Commissioning Report shall identify. 1. Results of all Functional Performance Tests. 2. Disposition of all deficiencies found during testing, including details of corrective measures used or proposed. 3. All Functional Performance Test procedures used during the commissioning process including measurable criteria for test acceptance, provided herein for repeatability. EXCEPTION: Deferred tests which cannot be performed at the time of report preparation due to climatic conditions. All ductwork shall be constructed of galvanized steel sheet metal and be fabricated according to the S.M.A.C.N.A. low velocity duct manual, for 2" pressure class. B. All elbows shall have proper radius or HVAC contractor shall provide double thickness airfoil turning vanes required by S.M.A.C.N.A. No square throat elbows shall be installed without double thickness turning vanes. C. All duct connections to equipment shall be loaded type vinyl, vibration elimination connections, (FC) flexible connections. D. Flex duct: Provide factory assembled Class 1 air duct (UL 181) with fiberglass insulation and reinforced outer protective cover /vapor barrier. Flex duct shall meet NFPA 90A with flame spread under 25, smoke developed under 50, and shall be rated for 2" W.C. pressure and 0 to 250 degree temperature. Maximum length shall be 2' -0 ". E. All new supply and return ductwork shall be insulated with either 1" thick duct liner or 1" thick duct wrap. Duct liner shall meet NFPA 90A, flame spread under 25, smoke developed under 50. Thickness, density and "R" value shall be per code. Duct liner shall be fastened to inside of ductwork as per manufacturer's directions and S.M.A.C.N.A. "Duct Liner Application Standard ". Size of ducts shall be increased for duct liner insulation, sizes shown on plan are inside free area. Duct wrap shall be foil reinforced kraft facing meeting NFPA 90A, flame spread under 25, smoke developed under 50, thickness, density and "R" value shall be per code. Duct wrap shall be fastened to ductwork per manufacturer's directions. The round branch ductwork insulation shall be fastened to ductwork per manufacturer's directions. The round branch ductwork shall be insulated with 1" thick fiberglass sleeve with foil jacket and all joints and terminations sealed with foil or duct tape. All supply and return ductwork exposed to view and located in the conditioned space shall be lined A. F. If ductwrap is the chosen method of insulation, the inside of the supply and return ducts from the air conditioner shall be lined from the air handling equipment to a distance of 10' from the unit, with Ultralite #300 - 1/2" thick, or other approved Duct liner acoustical board. The material shall be fitted carefully on the inside of the duct and shall be fastened on with cement supplemented by screws and washers on top and sides of duct. 3.01 EXECUTION A. All ductwork transitions shall be (FOT) "Flat on Top" unless otherwise specified on plan. All duct dimensions listed are inner air stream dimensions. B. All ductwork shall be routed above the suspended ceiling space unless otherwise noted on the plans. All ductwork shall be supported and attached per S.M.A.C.N.A. standards. C. All outside air intakes shall be a minimum of 10'- 0" away from exhaust discharge openings and plumbing vent stacks. D. The mechanical systems shall be complete with all necessary appurtenances for a complete operating system. E. Automatic temperature control systems shall be desig;ied and installed by an experienced contractor: See Automatic Temperature Control Specifications. F. Provide UL approved fire dampers for all penetrations through fire rated walls, partitions, ceilings, and floors. Install fire dampers as per manufacturer's directions and as per UL guidelines. G. An independent balancing contractor shall balance system to air quantities shown on plan. Balancing contractor shall use duct mounted manual dampers for air system balancing. Use of terminal damper is not acceptable. Balance HVAC systems as per Washington State Energy Code Section 1416.2.2 and "Test and Balance Mechanical System Specifications ". H. The Architect or Owner's Representative shall be notified 48 hours or more prior to all final testing and balancing work so that he and /or the Engineer may be present to observe this work. The balancing contractor shall submit written reports of all air flow readings, static pressures, GPM rates, pressure readings, temperature readings, motor amperages etc. to document properly balanced air flow in all HVAC systems. L Provide a volume damper for every inlet and outlet (diffuser, register, grille, etc.) of the supply ductwork distribution system whether shown or not on the plans. Provide additional volume dampers and /or extractors at branch take -offs from ductwork mains as required to achieve ARI volume distribution and balancing. J. The contractor shall warranty all materials and guarantee all workmanship for one year from substantial completion. Provide full 5 year guarantee on all air conditioning compressors. K. Submit two Operation and Maintenance Manuals bound in 8 -1/2" x 11" page binders, titled "Operation And Maintenance Manual ". Subdivide binder contents with page dividers by system and equipment. Include all shop drawings, test and balance reports and warranties per Washington State State Energy Code Section 1416. Submission of these documents shall be a requirement for final payment. L. Ductwork shall be tested to 2 inches W.G. with not more than 5 percent allowable leakage. Ductwork shall be tested in sections as the installation proceeds. Any leaks shall be sealed before the next section is installed. Tested sections shall be marked with indelible marker, showing date and initials of contractor foreman responsible for the test. M. Low and medium pressure supply and return ductwork shall be sealed in accordance with S.M.A.C.N.A. Seal Class C. N. Core -drill or saw -cut existing walls, roof, etc. as required for piping or ductwork and fire -stop opening around pipe or ductwork. Verify location of structural beams, joists, etc. before drilling or cutting. Notify architect of any discrepancies. 0. Wherever foundation walls, outside walls, roofs, etc. are cut for installation of systems, they shall be patched to match existing construction and sealed weather tight. Work shall be performed by craftsmen skilled in their respective trades. P. Provide 3 sets of pleated disposable filters. One set to be used until completion of construction phase. Install one set at completion of construction phase and deliver one set to owner and label each set of filters to denote their respective HVAC units. Filters shall be similar to American Air Filter PerfectPleat. F. Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -7. Extent of sealing required is as follows: 1. Static pressure: 36 inch to 2 inches; seal transverse joints. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at ataUtai epser7suo6: 12iriialch'IsCtcor3 gnu, seal all transverse joints and longitudinal seams. 3. Static pressure: Above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. G. Within 90 days after the date of system acceptance, record drawings of the actual installation be provided to the building owner. Record drawings shall include as a minimum the location and performance data on each piece of equipment, general configuration of duct and pipe distribution system, including sizes, and the terminal air and water design flow rates. H. HVAC control systems shall be tested to ensure that control devices, components, equipment and systems are calibrated, adjusted and operate in accordance with approved plans and specifications. Sequences of operation shall be functionally tested to ensure they operate in accordance with approved plans and specifications. A complete report of test procedures and results shall be prepared and filed with the owner. Section 15900 - Test and Balance Mechanical System Specifications 1.01 GENERAL A. The mechanical equipment shall be completely installed and in continuous operation as required to accomplish the adjusting and balancing work specified. B. Perform adjusting and balancing when the system is operating at design capacity. C. Only qualified personnel shall perform balancing work. 1. Submit evidence that the personnel who will perform the balancing of the project systems are certified for review by the Owner /Engineer prior to performing the work. 2. Qualified personnel shall be holders of an engineering degree or a certificate of a nationally recognized testing and balancing standards committee /organization. D. The balancing contractor shall be completely independent of the installing contractor. Any form of association is unacceptable. Documented proof of independence by the balancing contractor is required and shall be submitted to Owner prior to start of balancing work. E. During substantial completion inspection, a percentage (not more than 5 of the recorded data) will be subject to reverification by the Owner /Engineer. Contractor shall take instrument reading as required. 1.02 Submittals: A. Submit data sheet on each item of balancing equipment as required for Owner /Engineer review. 1. Include name of device 2. Manufacturer's name 3. Model number 4. Latest date of calibration 5. Correction factors B. Submit a report containing all data and other related information recorded during balancing, placed on appropriate forms for Owner /Engineer review. Reports shall certify that the methods used and results achieved are as specified. C. Submit copies of report to Owner and to Engineer. Provide (3) copies of report to Engineer for review. Provide (2) copies of report to Owner. 1.03 Air system (adjust and balance system in accordance with the following requirements): A. Preliminary. 1. Identify and list: a. size, b_ type and manufacturer of all equipment to be tested c. including air terminals d. check all system components for proper installation and operation. 2. Verify all fans and motors for proper rotation. 3. Use manufacturer's ratings for all equipment to make required calculations, except where field test shows rating to be impractical. 4. Verify that all instruments are accurately calibrated and maintained. 5. Install clean filters. 6. Simulate wet cooling, coil with baffles. B. Central System: 1. Adjust and record supply, return and exhaust fans rpm to design requirements within the limits of mechanical equipment provided. 2. Test and record motor voltage and running amperes including motor nameplate data and starter heater ratings. 3. Make pitot tube traverse of main supply, exhaust and return ducts, determine and record cfrn at fans and adjust fans to design supply cfm with +/- 5 tolerance. 4. Record system static pressure, suction and discharge. 5. Adjust system for design outside air cfm, see schedules. 6. Adjust system for design recirculated air, cfm. 7. Record heating apparatus entering air temperatures, dry bulb in degree F. 8. Record cooling apparatus entering air temperatures, dry bulb and wet bulb in degree F. 9. Record heating apparatus leaving air temperatures, dry bulb in degree F. 10. Record cooling apparatus leaving air temperatures, dry bulb and wet bulb in degree F. C. Distribution: 1. Adjust zones or branch ducts to design cfm. D. Air terminals (diffusers and grilles): 1. Identify each air terminal on reports as to location and determine required flow reading. 2. Adjust each air terminal to design requirements with +/- 10% cfm tolerance. 3. Balance procedure on air terminals shall include: comparison of required fpm velocity and observed velocity, adjustment of terminal, and comparison of required cfm and observed cfm after adjustment. 4. Adjust flow patterns from air terminal units to design intent and as equipment permits. E. Verification: 1. Prepare summation of readings of observed cfm for each system. Compare with required cfm. Determine coil and filter static pressure drops. 2. Verify design cfm at fans as described in 1.03.B.2 above: building shall be under slight positive pressure in normal operating mode. 1.04 Automatic Control System: A. The temperature control contractor's representative shall set and adjust automatically operated devices to achieve the required sequence of operations. B. Balancing contractor shall verify all controls for proper calibration and list those controls requiring adjustment by temperature control system installer. Section 15950 - Automatic Temperature Control Specification A. Automatic Temperature control system shall be installed by a contractor with minimum five (5) years of experience in the installation of electric and electronic control systems. B. All wiring and wiring connections shall be provided by the control contractor unless shown on electrical drawings. All wiring shall comply with the electrical specifications and local electrical codes. C. Provide all relays, contactors, switches, adjustable set- points, wiring, conduits and transformers as required for automatic temperature control system. D. At completion of work, adjust and make ready for operation all thermostats. Dampers, switches and other control devices. Provide manuals and instruction to the building operating personnel. Provide one year guarantee after final acceptance of work to cover all materials and labor to be repaired /replaced by the control contractor at no cost to Owner. Provide wiring diagrams of all systems and turn over to Owner. E. Provide the Following Control Sequences: 1. Rooftop units, a. Thermostats are to be wall mounted solid state with internal battery backup. Themostats shall have 7day /24hr programming and capability of system shutdown and temperature setback, with 5F minimum deadband control, fan cycling and override features. If new thermostats are provided for existing units, they shall be selected to be compatible with the existing HVAC equipment. b. Provide sub -base for thermostat. c. All fans supplying more than 2000 cfm of air to any space and all recirculating fans systems serving areas of egress shall be installed with a smoke detector in the supply or return ductwork, as required by local code. The smoke detector shall be wired to stop the fan upon detection of smoke and signal the building system, if present. The smoke detector shall be furnished by the Mechanical Contractor, mounted in the duct by the mechanical contractor, and wired by the electrical contractor. If a building fire alarm system is installed, the smoke detector and audible /visible alarm shall be furnished and wired by the fire alarm contractor and mounted by the mechanical contractor. ( REVIEWED FOR CODE COMPLIANCE APPROVED APR 1 8 211OF City Of Tukwila . ,_ BUILDS RECEIVED CITY OF TUKWILA APR 0 8 2008 PERMIT CENTER A R C H I T E C T DTM ARCHITECT 6031 W. INTERSTATE 20, SUITE 260 ARLINGTON, TX 76017 TEL: 817.483.1146 FAX: 817.483.7377 dtmarchitect @dtmarchitectcom E N G I N E E R Schnackel 0 twrwk o Omaha o Las Angeles a 830-581-0963 wwwschnackeLcom NOTES ALL WORK SHALL CONFORM TO MALL CRITERIA. IT 15 THE RESPONSIBIUTY OF THE SUB CONTRACTOR TO OBTAIN. REVIEW & UNDERSTAND THE MALL CRITERIA AND TO INCLUDE ADJUSTMENTS FOR WORK REQUIRED PER MALL CRITERIA IN THE BID PROPOSAL. ORIENTATION 1 Conceive. Construct. Connect. 831 JAMES STREET, SYRACUSE, NEW YORK 13203 PHONE: 315.233.1300 FAX: 315233.1314 P R O J E C T sbarro* WESTFIELD SOUTHCENTER 2600 SOUTHCENTER PKWY SUITE FC4 SEATTLE, WA 98188 1 SHEET TITLE J H.V.A.C. SPECIFICATIONS SHEET 1 M -3