Loading...
HomeMy WebLinkAboutPermit M08-033 - WESTFIELD SOUTHCENTER MALL - LOVE CULTURELOVE CULTURE 1006 SOUTHCENTER MALL M08 -033 Parcel No.: 6364200010 Address: Suite No: doc: IMC-10/06 CityOf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 1006 SOUTHCENTER MALL TUKW Tenant: Name: LOVE CULTURE Address: 1006 SOUTHCENTER MALL , TUKWILA WA Owner: Name: WEA SOUTHCENTER LLC Address: 11601 WILSHIRE BLVD , LOS ANGELES CA Contact Person: Name: PAUL JAIME Address: 2413 PACIFIC COAST HY #202 , LOMITA CA Contractor: Name: T N T MECHANICAL LLC Address: 22833 BOTHELL- EVERETI' , HY 1164 Contractor License No: TNI'MEL *011K7 DESCRIPTION OF WORK: TENANT IMPROVEMENT: NEW DUCTWORK AND EXHAUST FANS Value of Mechanical: $20,000.00 Type of Fire Protection: SPRINKLERS Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat /Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial MECHANICAL PERMIT EQUIPMENT TYPE AND QUANTITY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * * continued on next page ** M08 -033 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 310 606 -2078 Phone: 425 - 486 -4327 Expiration Date: 05/27/2008 M08 -033 05/16/2008 11/12/2008 Fees Collected: $384.83 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment Printed: 05 -16 -2008 Permit Center Authorized Signature: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this pe 't • construction or the pe - o�� . i% f/ Signature: doc: I MC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us es not presume to give authority to violate or cancel the provisions of any other state or local laws regulating e of work. I am authorized to sign and obtain this mechanical permit. Print Name: C jGo /4e// This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Permit Number: M08 -033 Issue Date: 05/16/2008 Permit Expires On: 11/12/2008 Date: Date: j ./� /� M08 -033 Printed: 05 -16 -2008 Parcel No.: 6364200010 Address: 1006 SOUTHCENTER MALL TUKW Suite No: Tenant: LOVE CULTURE 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 -033 Status: ISSUED Applied Date: 02/07/2008 Issue Date: 05/16/2008 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air - moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 14: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) doc: Cond -10/06 M08 -033 Printed: 05 -16 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 18: An electrical permit from the City of Tukwila Building Department Permit Center (206 - 431 -3670) is required for this project. 19: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 20: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 21: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond - 10/06 * *continued on next page ** M08 -033 Printed: 05 -16 -2008 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Print Name: doc: Cond -10/06 c Ste ( �l • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us M08 -033 Date: 5/4�� ordinances governing or local laws regulating Printed: 05-16 -2008 r CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 hv://www,ci.tylevila.ra.us tukwila.wa.us Site Address: l OO N 1 `"kd'ci•` Tenant Name: L-c 1 Cam; t Property Owners Name: Lo\J ( ".J ' ab Mailing Address: • -941 S S 6-1-6 is Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print'* Name: pv.1t \ vY12_ Mailing Address: QC?" ?A C. C()M 1 RINi 1 E -Mail Address: posiul llh c (Swl GEt 1YERAL CONTRACTOR'IN�+ ORIVIATLON ( Contr T idormatio i.for {Pg 4) for' PIu ibio anid Gas Piping Epp 5» • Company Name: 1-131) Mailing Address: Zip Contact Person: E -Mail Address: Contractor Registration Number ARCHITECT OF RECORD All plans must be wet stamped.by Arebitect of Record Company Name: Clkr0 1Q1A. tJ Mailing Address: 1 l N e' f ( L1) 0-0M) Contact Person: S ls-f\ t TK E -Mail Address: Fax Number: lc f ' (03S - S4 rG ENGOYNEER OF-RECORD — Alt plans must b wet itamperl bp'Ing deer of Record Company Name: tt- L t.) t2-S c l t-S Mailing Address: 1 S3 t A E61.#- - DgAA - pl tr--E _' Y t Contact Person: I'46 SW N +q,•ct•1 Q:Wpplieadoneanna- Applications On Linn\? -2006- PermitAppli®tion.doc Revised 9 -2006 bb Building Permit No. Mechanical Permit No. Plumbing/Gas Permit No. VfrVi S Public Works Petrnit No: Project No. 120-/(7, t (For qffice use only) King Co Assessor's Tax No.: L -t- Coto a' .Suite umber: ( QCC , Floor: New Tenant: .-' Yes .. No l (, •Al∎IGa5% CA State city Day Telephone: 3l C ( 6647 `aO City State Zip Fax Number: 31b 1606 1 State C ip6 Zip 8 city Day Telephone: Fax Number: Expiration Date: pt�- Iri NIthTOM City Zip Day Telephone: (91 36S - 36 $ 1 11-1 OW; V.:1 4i - s: city state Zip Day Telephone: %Sw' L A - `iDSo E -Mail Address: Fax Number: $ S " 4) VO 5 Page 1 of 6 Q: Applicffiionz\FamrApplicffioons On tinet3 -2006 - PermitApplicadondoe Revised 9 -2006 bh Valuation of Project (contractor's bid price): $ 10;\ ) 0 0 0 Existing Building Valuation: $ Scope of Work (please provide detailed information): New s T b i z FQ- rJ tL A P 3 1 6 . ; (' l t-Am ( , e i'1114 G, iZd.emS , BizeAtL i STD E M. A¢.E U t i e C c ` A 4 S fi ( v c ; f 6 I . t 4 C V 4 P i 0rnS i'{ t -tA u:A \ , e a e ( - . T v - i C - l a - \ , i (-act HT I' U I B 1 i4. . Will there be new rack storag Q..... Yes g. No If yes, a separate permit and plan su a ittal will be required. P r_o l • - 4.11.11, ',1 III , .1.( Attahgd'Garage. Detached :o uge Attached Carport Detached : Covd Um oysred Deck . • C E) �l to tttgA te$511t t18i' 1► Tyl • t PLANNING DIVISION: Single family building footprint (area the foundation of all structures, phis any decks over 18 inch and overhangs greater than 18 inches) *For an Accessory dwelling, provi the following: Lot Area (sq ft): Floor area of principal dwelling: area of accessory dwelling: *Provide documental . that shows that the principal owner lives in one of the dwellings as his or 'mary residence. Number of Parking Stalls ' . ided Standard: Compact Handicap: Will there be a change in use? 0 Yes ......No If yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers ❑._ Automatic Fire Alarm ❑ ..... None 0 .......Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? Q. Yes No If "yes', attach list of materials and storage Locations on a sepanite 8-1/2" x II" paper including quantities and Material Safe ata Sheets SEPTIC SYSTEM 0.......On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Page 2of6 Company Name: Mailing Address: MECHANICAL CONTRACTOR INFORMATION . 1 F50 Indicate type of mechanical work being installed and the quantity below: QMppdicationsWcane- Applicffiam On Line\3 -2006 - PermitApplicatioadoc Revised: 9 -2006 bh City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: f Valuation of Mechanical work (contractor's bid price): $ L' V Scope of Work (please provide detailed information): {�,l li LL (4 W d (� Q,W 16i ur fan5- Use: Residential: New .... 0 Replacement .... ❑ Comme ial: New.... 0 Replacement .... 0 Fuel Type: Electric X Gas....0 Other: Page 4 of 6 ■ ; :(qty : # Type. ' , ::'.: : : :BoilerJGatnpressor Fire Damper 0-3 HP /100,000 BTU Un><t:TYpe: I. Qty.:I:.jJutt ape: Furnace<100K BTU Air Handling Unit >10,000 CFM Furnacc> 100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15-30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater . Ventilation System Wood/Gas Stove 30-50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/1nd . Company Name: Mailing Address: MECHANICAL CONTRACTOR INFORMATION . 1 F50 Indicate type of mechanical work being installed and the quantity below: QMppdicationsWcane- Applicffiam On Line\3 -2006 - PermitApplicatioadoc Revised: 9 -2006 bh City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: f Valuation of Mechanical work (contractor's bid price): $ L' V Scope of Work (please provide detailed information): {�,l li LL (4 W d (� Q,W 16i ur fan5- Use: Residential: New .... 0 Replacement .... ❑ Comme ial: New.... 0 Replacement .... 0 Fuel Type: Electric X Gas....0 Other: Page 4 of 6 ■ • • FUBLIC WO PUTTT INFQRM0 N Zs Scope of Work (please provide detailed information): Plow :rote rta RUNIC: R!or:1 aulletht :krfeea:alltt OWate.sheet. Water District Tukwila ❑... er District #125 la ...Water Availability Provided Sewer District ...Tukwila ❑ ...Sewer Use Certificate ❑ ...Total Cut ❑ ...Total Fill ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic W ❑ ...Permanent Water Meter Size... ❑ ...Temporary Water Meter Size .. ❑ ...Water Only Meter Size ❑ ...Sewer Main Extension. :...Public ❑ ...Water Main Extension... Public ❑... ValVue ❑ ...Sewer Av ability Provided Septic System: ❑ On -site Septic System — For on -site septic system, ' rovide 2 copies of a current septic design app Submitted with Application (mark boxes which apply): 0 ...Civil Plans (Maximum Paper Size — 22" s 34") ❑ ...Technical Information Report (Storm Drainage) ❑ .. Geotechnieall ❑ ...Bond ❑ _. Insurance ❑ _. Easement(s) ❑ .. Maintenance Proposed Activities (mark bozos that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right-of-way Non Right -of-way cubic yards cubic yards Q. WppliwtioroT«ms-Appticatimu On tine \3 -2006 - Permit Appliwtion.doe Revised 9-2006 bh Call before you Dig: 1- 800 -424 -5555 ❑ Aband Septic Tank ❑..Cur. ut ❑+.. ent Cut ❑ ... . . ped Fire Line [] .. Highline ❑ .. Renton WO # WO # WO # Private Private - of-way Use - Profit for less than 72 hours -of-way Use — Potential Disturbance © .. Work in Fl . d Zone ❑ .. Storm Drains • ❑ .. Renton ❑ .. Seattle by King County Health Department. ❑...Traffic Impact Analysis t(s) El ...Hold Harmless — (SAO) 0 ... Hold Harmless — (ROW) ❑ .. Grease Interceptor Channelization . Trench Excavation Utility Undergrounding ❑...Deduct Water Meter Sr e FINANCE INFORMATION Fire Line Size at Property Line ❑ ...Water ❑...Sewer Monthly Service Billins to: Name: Mailing Address: Water Meter Refund/Billins: Name: Mailing Address: Number of Public Fire Hydrant(s) ❑ .._Sewage Treatment Day Telephone: City State hp Day Telephone: city S tate Page 3 of 6 PERMIT APPLICATION: NOTES - Applicable gall permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Print Nam Mailing Address: • Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90. days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). i t I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW TIJE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O ' • R AUT ZE •4' ENT: Signature: � � Date: 0/ 3l ke Iii Date Application Accepted: Q: Applications \FannMPPV ons On Un 3 -2006 - Permit Appfiwfion4ac Revved: 9 -2006 bh Date Application Expires: • Day Telephone: ' 1 2C2 City state oil 01-1A) Staff Initials: Page 6 of 6 7 Fixture Type: Q t Y ` F ix t u r e T y p e : ' ..• . e e :' 'Qty Fxture: Type: Qty Bathtub or combination bath/shower Drinking fountain or water cooler (per head) t': h fountain Gas piping outlets Bidet Food -waste gander, commercial R -> ,. , .r, indirect • Clothes washer, domestic Floor drain Sinks Dental unit, cuspidor Shower, single head trap Urinals Dishwasher, domestic, with independent drain Lavatory /;t Water Clos Building sewer or trailer park sewer Rain water system , . er drain (inside buil• ". g) Water heater an, , or vent Additional medical gas inlets/outtets — six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Repair oralte • '•n of water piping and/o ater treating equipmen Repair or alteration , of drainage or vent piping Medical' gas piping system serving one to five inlets/outlets for specific gas • PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: Mailing Address: 1RO Contact Person: E -Mail Address: Contractor Registration Number: tractor's bid price): $ t) i 0 V ctor's bid price): $_ ormation): Valuation of Plumbing work ( Valuation of Gas Piping work (co Scope of Work (please prow it d Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Indicate type of plumbing fixtures and/or gas piping outlets be . installed • City state Zip Day Telephone: Fax Number: Expiration Date: the quantity below: Q:wppl cetio sWam,- Applicanonc On Line \3-2005 - ramitApplicahon.doc Revised: 9-2006 bh Page 5 of 6 Receipt No.: R08 -01679 Payee: TNT MECHANICAL ACCOUNT ITEM LIST: Description MECHANICAL - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 6364200010 Permit Number: M08 -033 Address: 1006 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 02/07/2008 Applicant: LOVE CULTURE Issue Date: Initials: WER Payment Date: 05/16/2008 10:54 AM User ID: 1655 Balance: $0.00 TRANSACTION LIST: Type Method Descriptio Amount Payment Check 4792 313.86 Account Code Current Pmts 000/322.100 313.86 Total: $313.86 Payment Amount: $313.86 2504 05/16 9710 TOTAL 313.86 doc: Receiot -06 Printed: 05 -16 -2008 r ..,.. orrec►ne nc RECEIPT NO: R08 -00351 Initials: JEM Payment Date: 02/07/2008 User ID: 1165 Payee: PERMITS DIRECT SET ID: S000000954 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member Amount • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http : //w w. ci. tukwila. wa. us D08 -076 834.86 EL08 -126 184.50 M08 -033 70.97 PG08 -033 38.00 TOTAL: 1,128.33 TRANSACTION LIST: Type Method Description Amount Payment Check 1220 1,128.33 TOTAL: 1,128.33 ACCOUNT ITEM LIST: Description ELECTRICAL PLAN - NONRES PLAN CHECK - NONRES SET RECEIPT Total Payment: 1,128.33 Account Code Current Pmts 000.345.832.00.0 184.50 000/345.830 943.83 TOTAL: 1,128.33 82 33 02/07 0710 TOTAL 11:28.33 Project; Type of I3s ection: Address: • 1 0Co Y4i( Date Called: . Special Instructions: Date Wanted: m. Requester: Phone No: 2 L>-3q7-3 5Y,. INSPECTION NO. INSPECTION RECORD Retain a copy, with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3610 A pproved per applicable codes. Corrections required prior to approval. COMMENTS: Fi iia/ &w'17/Se Inspector: Date: 94 345, ❑ $60.00 I INSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: !Date: COMMENTS: Ty a of Inspection: Type St,.A- dow-P\ Address: 1 00 t9 v ttr4 -1 Air- ..iv Add yDe; nil: 1 Z3 – ,04 - eitkC S od 4 LA — IC Phone No: U kt/ - 2 Lk n 4d I I?SS no • Ill — f Seit4s tssani 4- LAC- tg" I Project: � �� 6,44 I- I-�,.R Ty a of Inspection: Type St,.A- dow-P\ Address: 1 00 t9 Date Called: Special Instructions: Date Wanted: 1 //cg /o g , a.m. p.m. Requester: Phone No: 1`1 INSPECTION NO. INSPECTION RECORD Retain a copy with permit W'o? -o3 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION « 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 pproved per applicable codes. EJ Corrections required prior to approval. 1 lnspector: Date 51/bt ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: Proje .0 I .// ?4 _ TYpg tp - `v' Ad r t a 4 0 in /7l/ Date Called: Special Instructions: Date 7 ted / / / d , e� / 4. m. Requester: Phone /2 39 2 7 .t INSPECTION NO. INSPECTION RECORD Retain a copy with permit -63 Oa , + PERMIT N CITY OF TUKWILA BUILDING DIVISION f. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. COMMENTS: (4 ,'r o,,Aty.'7 C/.11l4D i'Qfie_. ��. `P O or re c ti; Lj t/er I- - Inspector: ,01.40 El $60.EINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: 'Date: : Project t. ? t •L c ,t Type of Inspection: RI fl -A Address: 1 19 0 4 , MAI/ Date Called: Special Instructions: . - Date Wanted: c ` 3'7 ` .$ m. Requester: Phone No: y2s 343 9247 11 o$ -o3) INSPECTION RECORD. Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION PT 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 El Approved per applicable codes. El Corrections required prior to approval. COMMENTS: /_ 04- -t2 66 o /ef 01(A r 4- -O rnwA. /n cry <, u,r cif() p o� , i "AD sAst#4 411 Inspector: ,z, Date: �� J' ri $60. i ' INSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Pro'ec em "` 11 u"t Type s 1 Arc16 � ` 4. 7 Date Called. Special Instructions: Date W nted: p .m. Requester: Pho a No �-- -.311.- INSPECTION NO. El Approved per applicable codes. INSPECTION RECORD Retain a copy with permit ❑ $58. e!J EINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter BtVd.. Suite 100. Call the schedule reinspection. •4 1W4 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Corrections required prior to approval. Receipt No.: Date: COMMENTS: 4€1,/ S/Y Ltvls a( � %)ups S A no,' .te s { idi i) etripie ©i .5 rim L / eor!' bri4a 1 6// l' l /1/1 rccraG...if� y k ifd5a)serie A{' M "1"A eeS- p S,J r -Hi 0' -, p1 PAf/1d At 0.7 eto Date: /, P r o j e c t : l-o / ( - w Type of r Pect \o n: Address: r U 0 & Suite #: S . C _ � A L L- Contact son: Special Instrucctions: Occupancy Type: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT a� -S- 15( — O7 7 PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 154 - Approved per applicable codes. Corrections required prior to approval. COMMENTS: -PA - O/( / Plies ` -7 1) , eJ u4 l— t tAeti' • c (C - See--K � ra-� 1 J� g 6 As I Uf nspector: Date: �/ i 5 (°g Hrs.: n $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Word/Inspection Record Form.Doc 1/13/06 T.F.D. Form F.P. 113 ACTIVITY NUMBER: M08 - 033 DATE: 02 - - PROJECT NAME: LOVE CULTURE SITE ADDRESS: 1006 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: 0 Bui . ng D'vision Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: • PERMIT CHORD COPY • PLAN REVIEW/ROUTING SLIP Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROU ING: Please Route Structural Review Required REVIEWER'S INITIALS: n Structural Incomplete APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28-02 Fire Prevention DUE DATE: 02-12-08 n No further Review Required DATE: DATE: Planning Division Permit Coordinator Not Applicable Not Approved (attach comments) n DUE DATE: 03-11-08 Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License TNTMEL*011K7 Licensee Name T -N -T MECHANICAL LLC Licensee Type CONSTRUCTION CONTRACTOR UBI 601950443 Ind. Ins. Account Id PARTNER/MEMBER Business Type LIMITED LIABILITY COMPANY Address 1 22833 BOTHELL - EVERETT HWY 1164 Address 2 City BOTHELL County SNOHOMISH State WA Zip 98021 Phone 4254864327 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 5/27/1999 Expiration Date 5/27/2010 Suspend Date Separation Date Parent Company Previous License Next License Associated License Business Owner Information Name Role Effective Date Expiration Date HARRISON, SCOTT PARTNER/MEMBER 01/01/1980 LIBSACK, JERI PARTNER/MEMBER 01/01/1980 Look Up a Contractor, Electrici n or Plumber License Detail Washington State Department of Labor and Industries General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. • Bond Information Bond #3 Bond Company Name DEVELOPERS SURETY & INDEM CO Bond Account Number 850223C Effective Date 05/27/2002 Expiration Date Until Cancelled Cancel Date Impaired Date Bond Amount $12,000.00 Received Date 03/18/2000 Page 1 of 2 https: / /fortress.wa. gov /lni/bbip /printer. aspx ?License= TNTMEL *011 K7 05/16/2008 .t,Wudhl �h!irai:. 11 MIS. °�i,i 1 A: �.�, ra'.(:r,xi ,I,m" • uri,{ rd"ah ".1r SD— 500 CFM f I1 V1N11a.1 r - q1 +rIPVu' SD -2 12 SD-2 80 CFM SD -1 _. 130 CFM SD -1 500 CFM a.1 r . '. 1'" a1V�V1 j. d rx�✓N,�1 I IhD 1 1 V4. "',•?w 1"r~.1. 1'' ' ?,hlla�C V o +1 o& " Iflid v Imu �tll nuVryIII� '� r ,Idhka " ! dIi 1 a " hut j k... rlR N11>ktu " p a'Su, i<$�" II 1 { �NN,Ia0 1f j 11 d6 p C"�. aa,,, ,lr 1 1�.�rc,d G1' ,Fr °I,�a1JI1N -. , rr'ylr 40 CFM �� 111111 i It 7 a tvloci Fh,cal Electrical iirGas Piping City of TuK ^ +ia i.!II'�iE D;‘,, I i ✓. L [ P,16' ytl f .i II IIy II I� I I 'kllu l + �Ya rf i" 'V I W SD -2 80 CFM SD -2 80 CFM f t• ; a 6� , �x' .11'':11 . ±" m ,wJ�Y11 X 4 1 ,..., .. � INU,.dR" . "� ,° ahVw J" g ap,:z.;. V u l l l ��� of �; ".,•'1�, 4 +1'"�s�M�,, p hltil �§ 16x14 Date: ►�1()T (') 12 "t SD -1 400 CFM (=) RG- RG -1 SD -1 400 CFM SD -1 500 CFM SD -1 500 CFM FILE COP' Permit No. 11 f Plar review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation f ,1 y adopted code or ordinance. Receipt of approved F' I� Copy and conditions is acknowledged: By ,.. 72( (` �...X`///•�s'��/// XXX 10 .��Kdh!r li :: 14x14 :its "'�I.d h r "�filtlul4ll °!�, ' , v •�N I1 N 1� III , ,II ��a 1 MECHANICAL CODED NOTES: PROVIDE LOW VOLTAGE PROGRAMMABLE THERMOSTAT COMPATIBLE WITH NE POWERED VAV BOXES. EXTEND AND CONNECT CONTROL WIRING TO ASSOC FAN POWERED VAV BOX AS REQUIRED. INSTALL AT 54" A.F.F.. PROVIDE LOW VOLTAGE REMOTE AIR TEMPERATURE SENSOR COMPATIBLE 14 PROGRAMMABLE THERMOSTAT. EXTEND AND CONNECT CONTROL WIRING TO ASSOCIATED THERMOSTAT AS REQUIRED. INSTALL SENSOR AT 48" AFF. GENERAL CONTRACTOR TO UNDERCUT. DOOR 1" FOR AIRFLOW. PROVIDE AND BALANCE NEW FAN POWERED VAV BOX AS SCHEDULED. FIE VERIFY THE EXACT REQUIREMENTS AND LOCATIONS. REPLACE PLEATED Al FILTERS WITH NEW PLEATED AIR FILTERS AT CONSTRUCTION COMPLETION. PROVIDE NEW EXHAUST FAN AS SCHEDULED. PROVIDE MOTOR OPERATED C EXTEND AND CONNECT NEW EXHAUST DUCTWORK TO EXISTING EXHAUST M NOT USED. PROVIDE 1" LINED RETURN DUCTWORK. INSTALL AS HIGH AS POSSIBLE. EXISTING SUPPLY DUCT MAIN TO REMAIN. EXISTING RETURN DUCT MAIN TO REMAIN. EXISTING TOILET EXHAUST MAIN TO REMAIN. ," 1 01; e lfir rti16 V11111VId yl�.4N111111 @III. 400 CFM hall Il,ulil i s 111 1r VIIVu1h1411iiiV S ,St" III {1 VtiON,4 d s+ � 54. 1+11 �U116 1IIIIVhu VIII Iakw a11111N u M t ,� L,i,1 G IJP14 VIJIIIVII PsuI IPII V INII hV!lihIVWIIVll 1 . r . 5 MECHANICAL PLAN MECHANICAL LEGEND SYMBOL DESCRIPTION SD j SUPPLY DIFFUSER 0 LOW VOLTAGE THERMOSTAT AIR TEMPERATURE SENSOR SUPPLY DUCT WITH ELBOW TURNED UP —Xi SUPPLY DUCT WITH ELBOW TURNED DOWN _ – VI RETURN OR EXHAUST DUCT, ELBOW TURNED UP f. RETURN OR EXHAUST DUCT, ELBOW TURNED DOWN `- BRANCH TAKE OFF 1" LINED DUCTWORK — r -- --~ EXISTING WORK TO REMAIN NEW WORK 12x14 Iga SD -1 400 CFM SD -1 500 CFM d�V�IVhN1linu FELD V COMMONS E1�61uuo __ THERMOSTAT SCHEDULE MODE OCCUPIED UNOCCUPIED WINTER 70 "F 55'F SUMMER 73f UNCONTROLLED THE OWNER RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. SHOULD THE OWNER FIND CORRECTIVE WORK NECESSARY, HE WILL NOTIFY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, THE COST OF REINSPECTIONS WILL BE BORNE BY THE CONTRACTOR. IF WORK IS REQUIRED BY OWNER IN ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE, CONTRACTOR SHALL BE DIRECTED BY TENANT TO ADDRESS THIS WORK IN A TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CAN NOT ACCOMPLISH THE TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE, THE OWNER MAY AT HIS DISCRETION TAKE OVER SUCH WORK AND BACK CHARGE THE CONTRACTOR FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND /OR ADHERENCE TO PLANS AND SPECIFICATIONS. DESIGN DRAWINGS ARE SCHEMATIC. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. BIDDING CONTRACTORS SHALL HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT ARCHITECT, ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT. KOHRS LONNENI HEAL ENGINEERS, PSC MECHANICAL/ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE, 11 FT, THOMAS, KENTUCKY 41075 859 -- 442 - -8050 859 — •442 -8058 FAX WWW.KLHENGRS.COM DATE PROJECT 8151.01 SHEET NO. CO C7 C4 G� 0 O 0 w 0 z co w w 4 J Z O Z 0 0 Co DESCRIPTION MECHANICAL PLAN RECEIVED ci OF TUKWILA FEB 0 7 2008 PERMIT CENTER AR DEVICE SCHEDULE NOTES: 1. SYMBOL KEY- 3. VOLUME DAMPER - FACTORY FURNISHED. OPPOSED BLADE OR BUTTERFLY WHERE AVAILABLE. ADJUSTABLE FROM FACE. 2. FINISH- 4. BORDER STYLE - A" TITUS #26 - STANDARD WHITE. "A" SURFACE MOUNTED (FOR DRYWALL MOUNTED DIFFUSERS ONLY). "B" TITUS (G,C. TO FIELD PAINT A OR B TO MATCH CEILING OR WALL "B" LAY -IN, PROVIDE WITH TITUS MODEL NUMBER WITH ENAMEL FINISH). TRIM FRAME FOR DRYWALL CEILING. SEE DETAIL SHEET. SYMBOL MANUFACTURER / CATALOG NUMBER SIZE MOUNTING MATERIAL FINISH DAMPER BORDER REMARKS MOD. NECK CEILING DUCT WALL STEEL ALUM. *SD -1 TITUS OMNI 24 "x24" SEE PLAN 0 1 1 0 0 A 0 8 3003 SD -2 TITUS M 12 "x12" SEE PLAN 0 1111__ 0 olo 000 A 0 A 39 Lrl 00 0 0 0 0 0.3 2802 2500 320 624 ,74 - cw 011: tO r•-• 2500 101A 1018 _ 102 103 FITTING AREA 227 8 4 0.2 197 320 0.14 FITTING AREA 311 10 5 0.2 0 0 � 249 0 360 90 360 _Q,,]1 *RG -1 TITUS 24"x24" 0 0 7 0 0 RESTROOM A 0 A 0 RR -1 TITUS 350RL 14 "x14" _, .08 104 .. CORRIDOR 0 0 0 A 0 A 16 70 Q ] 105A STOCK AREA 1 1 213 0 0 0 1 1 0 0.15 HVAC VENTILATION SCHEDULE MARK PRESSURE E E Ct 10 I D ILLS LIJ LLJ Id G./ Z ZILLI Id ROOM 100A ROOM NAME SYS ZONE AREA CLNGHT AIR CHGS OA CHGS PEOPLE DES PEOPLE RED 38 OA PER 0 QA SOFT 0.3 REQ SUP ACT SUP _EL IA_ __ 645 ACT OA 644 ACT RET ACT EXH CRIT OA 0,24 0,28 SALES AREA -- 1 1 2302 0 0 0 77 3003 2800 2800 0 - 0 r 0,.,..cocooc„ 1()OB SALES AREA 1111__ 2335 olo 000 0 0 1 0 0 0 , 1 1 0 0 0 0 0 1 1 0 78 39 Lrl 00 0 0 0 0 0.3 2802 2500 320 624 ,74 - cw 011: tO r•-• 2500 101A 1018 _ 102 103 FITTING AREA 227 8 4 0.2 197 320 0.14 FITTING AREA 311 10 5 0.2 0 0 � 249 0 360 90 360 _Q,,]1 RESTROOM 49 0 0 30 7 0 0 -- RESTROOM 4 0 ___ 0 0 30 - 7 0 _, .08 104 .. CORRIDOR 113 0 0 0.05 25 70 16 70 Q ] 105A STOCK AREA 1 1 213 0 0 0 1 1 0 0.15 139 150 35 34 150 105B STOCK AREA 2 1 281 0 � 0 1 1 0 0.15 169 500 125 125 500 0 0 E HVAC EXHAUST FAN SCHEDULE MARK E -1 E -2 DESCRIPTION EXHAUST FAN EXHAUST FAN AREA SERVED RESTROOM RESTROOM MFGR GREENHECK GREENHECK MODEL SP -B110 SP -B110 VOLTS 120 120 PHASE 1 1 WEIGHT 10 10 EMERG CFM 75 75 ESP (IN) 0.25 0.25 BHP HP WATTS RPM ACCESS 1 1 FLA OCP 20 20 C ooling .Ec1 ui pnwnt Schedule 1 quip. C Brand Name' . . :1ef No.' B Capacity' O Total CFM o OSA CFM S SEER IPLV L Location Project Addr e sr, Love Culture - Southsentar tva.11 Date 1/10/2008 G3 Sout:hcenter Parkway, :spnr;rn 1:+uO For Building Dept. Use .... .. ........_ .. Tukwi u, WA 7 °3le.0 .....,,.... -. ppllrant lJarrl,;" KLH E7J tvyoru Applicant Address: 1h id Al Bik • i t . 'Phorruxs, KY 41.075 Applicata P110r1:3: 1159-112•E3050 Project Info i're lac: Address Lovu CULtaru - Zkaa.h000t at. raa11 Date :1/10/2000 633 aouthuontur Parkway, Spade 1200 For Building Department Ilse 'I'1kwila, WA 901.00 Applicant Nan10: HLH Engineers Applicant AddreSS: 15113 Alexunario Yiiso, Ft. .'hotasa, 14Y 41075 Applicant Phone, aS9 -4s,a -13050 23" OR 11" INSIDE DIMENSION 24 1/4 0 HVAC VAV BOX SCHEDULE SYSTEM SIZE MAX CFM MIN CFM MBH GPM VOLTS PHASE HP HTG KW V1 -01 24x16 3400 1190 39 0 480 3 14 V2 -01 24x16 3360 1176 38 0 480 3 13.8 MECHANICAL RESP TY SCHEDULE ITEM FURNISHED BY INSTALLED BY REUSE N \p, REMARKS CR LANDLORD CONT'R LANDLORD CONT'R OTHER EXISTING AIR CONDITIONING EQUIPMENT X STRUCTURAL SUPPORT FOR EQUIPMENT X ROOF CURB X ROOFING X ROOF CANT STRIP X ROOF CURB LEVELING X FAN POWERED VAV BOX MC MC DIFFUSERS AND GRILLES MC MC WALL FIRE DAMPERS X COMB. FIRE \SMOKE DAMPERS X LOW PRESSURE DUCTWORK MC MC HIGH \MEDIUM DUCTWORK MC MC DUCT SUPPORTS MC MC SEISMIC BRACING MC MC TEMPERATURE CONTROL SYSTEM MC MC WIRED BY MC RELIEF AIR MOTOR OPERATED DAMPER X SMOKE DETECTORS X ZONE DAMPERS X DUCT HEATER X UNIT \BASEBOARD HEATERS X RETURN AIR FAN X OUTSIDE AIR INTAKE HOOD \FAN X RELIEF AIR HOOD \FAN X TOILET EXHAUST FAN MC MC WIRED BY EC TOILET EXHAUST DUCTWORK MC MC TOILET EXHAUST WALL OR ROOF CAP X AIR BALANCE REPORT GC AS -BUILT DRAWINGS MC SECONDARY DRAIN PANS X CONDENSATE PUMPS X HVAC LOADS COOLING LOAD BREAKDOWN HEATING LOAD BREAKDOWN MARK . ROOF WALL CPART CGLASS CSOLAR LIGHTS (3EQUIP PSENS ciSSEN - AN OAS TSENSCPLATCOAL .TLATCTOT I H - WALL IMPART FGLASS HLAB HSPACEOA H ITV-1 13.8 0 0 0 0 60.2 8.1 42.8 125.1 2.3 8.2 70.8 35.8 -0.5 17 87,8 28.8 0 0 0 5.8 34.7 42 59.5 FPV -2 6,9 0 0 0 0 29.9 6.1 21.5 64.8 2 2 8.8 75,9 18.2 -0.5 17.6 93,5 14.3 1 0 0 - 2.9 17.2 45.1 62.4 - - HVAC / ELECTRICAL COORDINATION SCHEDULE ANBREVIATIONS - - CONTRACTOR TYPE MOTOR CONTROL, I Ti'E CONTROL TYPE �_ -__ - -_ -�-_ - - - - -- - - -- - - -- - - ------ - - -- - -- DC LOCAL DISCONNECT EC ELECTRICAL CONTRACTOR CS COMBINATION STARTER TC TIMECLOCK MC MOTOR CONTROL (POWER) EX EXISTING MCC MOTOR CONTROL CENTER CPT CONTROL POWER TRANSFORMER SD DUCT SMOKE DETECTOR FC FIRE PROTECTION CONTRACTOR MG MAGNETIC STARTER OR CONTACT BAS BUILDING AUTOMATON SYSTEM CN CONTROLS GC GENERAL CONTRACTOR MS MANUAL STARTER LOW LOW VOLTAGE CONTROLS TS TOGGLE SWITCH HC HVAC CONTRACTOR VFD MfEE FREQUE LINE LINE VOLTAGE CONTROLS C/B H.A.C.R. CIRCUIT BREAKER AT SOURCE PANELBOARD MFR MANUFACTURER MSR MANUAL STARTER W /CONTROL RELAY RLINE REVERSE AC11NG LINE VOLTAGE STAT FUSE FUSE AT LOCAL DISCONNECT (VERIFY FIELD RATING) PC PLUMBING CONTRACTOR OV OVERCURRENT PROTECTION MAN MANUAL FLA OPERATING FULL LOAD AMPS OR OWNER OR OTHERS FA FIRE ALARM MCA MINIMUM CIRCUIT AMPAC!T"( CO CARBON MONOXIDE SENSOR CP CORD AND PLUG CONNECTION INT INTEGRAL TO EQUIPMENT MARK DESCRIPTION VOLTS PHASE EMERG BHP T HP HTG KW :WATTS FLA MCA OCP DC FURN DC INST DC WIRE MC TYPETMC TURN MC INST MC WIRE CN TYPE CN FURN''CN INST CN WIRE SD QUAN E -1 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 E-2 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 0/1 -01 VAV BOX 480 3 14 16,8 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC HC 0 V2 -01 VAV BOX 480 3 13.8 16,6 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC L HC 0 Heating Equipment Schedule Equip. Capacity OSA cfrn ID Brand Narne' Model No 1 Btuih Total CFfrl or Ecerie? input Btuh Output Btuh Efficiency' vl -o1 vita. ATrrr 47768 3400 782 v2 - 01 Titus ATV 47086 3360 840 Ilan Equipment Schedule Equip. ID Brand Name' Model No. CFM SP' I IP /BHP Flow Control Location o Service v1 -01 •ritun R'PCS 3400 0.50 0.75 Cv Above Ceiling , ,r:4-a1 Titus A'Tpa 3360 0.50 0.75 r_ Above Coiling E -1 Greenback SP-D110 75 0.25 CV Ahoy Coiling E -2 greenback HP -14110 75 0.25 CY Abovo Coiling Mechanical Permit Plans Checklist MECH =,CHK 7 'CC wasn,rgron ;u. genic, dent 4 e;•,u +gy Cuue Corm errs. f .. o•s ..,- Nevada Jul, 2007 Project Address Love €:nit,.rr, - Mmancontor rtn11 Q3 � 1/10/2008 The following orrn i on o• necessary ' o -F -' m a i • •r ' :r• i compliance 1 th 'he rnechanica requirements in h' information , .0 check a iced nr Ical permit t a}.pl ,al ur for with The 1 the Washintllon State Nonresidential Energy Code Applicability Code Location Budding Departrrlerll y(3:i. no, n.a ) Sec C omponent inlcrmatJOn Required en Pains Notes HVAC REQUIREMENTS (Sections 1401-1424) '1411 Equipment performance n, a, 1411.4 Pkg. elec. hlg.& elg List heat pump, nn schedule yes 1411.1 ryiinirr UM CHIC:1uncy Lquiprnent schedule with type, capacity, efficiency M -2 n.a. 1411.1 Col nbusliun fag. Indicate rnlerrnittent ignition, Ilueidraft damper & jacket loss 1412 HVAC controls you t 412.1 Temperature zones Indicate locations on plans to -1 yes 1412.2 Oeact ;arid control Indicate 5 degree deadband rmrnrnum M -3 n. a. 1412.3 /tumidity central Indicate humidistat you 1412.4 Automatic setback Indicate thermostat with night setback arid 7 dl(I day types I4 - 3 YOB 1412.4 1 Dampers Indicate camper location and auto. controls & max. leakage M--3 ep M -3 irr 'm �r Indicate optimum '• controls Y 1=112 4.r. Opt 7l Start d rite optlr CI stud n • a • 141 Z.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412 6 Combustion htg. IR di ate modulating or staged control you 1412.7 Balancing Indic rte balancing features on plans M -3 1412.8 Ventilation Control Indicate ,lomand control ventilation for high•cccupancy areas you 1422 Thermostat lnterloCk Indicate thermostat interlock on plans M -1 n• a . 1423 Econorniters Equipment schedule 1413 Air economizers n. a, 1413.1 Air Econo Ope'utk ri Indicate 100% capability on schedule n,a, 1413.1 Wtr Econo Operation Malt ete 100'! capacity at 45 degF db & 40 deg F wb 1.a. 141;3.2 Water Econo Dec Indicate cig load & water ecorloe & QV tower performance n. a • '141;7..;3 Integrated operation Indicate capability for partial cooling r n.a. 1413,4 Humidification Indicate direct e',rap or fag atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary yea 1414.2 Duct Insulation Indicate 11-value of insulation on duct F1 -3 n. a • 1415.1 Piping insulation Indicate R -value of insulation on piping TaTt amp ntron "cold re amts yea 14162,1 Commissioning Provide commissioning plan M Ye 416.2.2-3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M - you 1416.2.4 Commissioning lndicato O &M manuals record drawings, staff training M -3 yes 1416.2.5 Cornet. Report Indicate requirements for prelim. & final commissioning report 14 - you 1434 Separate air sys. Indicate separate systems on plans M - you Mochantcal Completed and attached. Equipment schedule with types, M -3 Summary Form inputloutput, efficiency, chi, hp, economizer Ta iVTC FfEAf`E 3CSL (";}edtions 1440- 1454) - 1440 Service water htg. you 1441 Elec:. wafer healer Indicate R -10 insulation under tank P -1 you 1442 Shut-off controls Indicate automatic Shut °Off Y - Y es 14 Pipe Insulation Indicate 11-value 01 insulation on piping P -1 TI -a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool healer efficiency n.a. 1453 Pool heater controls Indicate s',vitch and 65 degree control n.a. 14 &4 Pool covers Indicate vapor retardant cover n. a. 1454 Pools 90+ degrees h R-12 pool cover eharacal - ;c Systems, c Checklist , MESH G( NIP 2CO0'sr asnilp Stale run eSidenbd Energy Cccf; Compria'v Lurnu nuvuse @,ry 2 001 'Project Adlff(';;,; Love Culture - Gouthcen:or Mall Date 1/10/2008 The fnllo,ving additional nforrnation is necessary to check e mechanical permit appIicatlor for a complex For Building Department Use nreutianlcai systern for compliance with the mecnanical requirements in the Washington Stale 1 Energy CJCdn Use the checklist as a reference to rotas added to the. mecharl it drawings (see the MECf-I- CHK checklist Tor additional system requli rnenlo) this Infornlatticn must be un the plans since this is the officio` record of the permit Having this information In separate specifications alone Is NOT an acceptable alternative. Applicability Code l.ccat.on Ruining Department (yes, no. n.a.) Section Component Information Required an Plan., f en ADDITIONAL CHECKLIST ITEMS FO '1 COMPLEX SYSTEMS ONLY `. a. 1431 1 Field assent. sys. Provide calculations yva 1432.1 Setback & shut eft Indicate separate systems cr show isolation devices on plans 14 n.1- 1432.2.1 Air system reset Indleate automatic reset - Indicate automatic reset, cooling tower. & heal pump Loop n.a, 1432.2 .2 Hydronic System valves mitigate economizer Uri equipment schedule ur provide n.a. 1433 Air Economizer calculations to justify exemption and demonstrate 10%higher efficiency for equipment with out economizer. - I ridicate water economizer and provide calculations 1 1433 n ,ri . 1.133 Water E-curlunlzer Exception 2 is Lionized rr.e- 1434 32parate air sys. indicate separate systems on plans Indicate that simultaneous heating arid cooling is prohibited, yea 1435 Simul hog. & clg. unless use of exception is justif Od r4--3 -- -- indicate heat recover/ on plans: complete and attach heat u.a, 1436 Heat recovery recovery calculations you 1437 Elec. motor efflc MECH -MOT or Equip. Schedule with hp, rpm, efficiency E1 - 1438 Variable flow sys. Indicate variable flow on fan and pump schedules acs 1439.1 Kitchen Floods Indicate uncooled and unheated make -up air n. a . 1439.2 Fume Hoods Indicate VAV, unheatedfuncooled or heat roe. makeup 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 Project Info i're lac: Address Lovu CULtaru - Zkaa.h000t at. raa11 Date :1/10/2000 633 aouthuontur Parkway, Spade 1200 For Building Department Ilse 'I'1kwila, WA 901.00 Applicant Nan10: HLH Engineers Applicant AddreSS: 15113 Alexunario Yiiso, Ft. .'hotasa, 14Y 41075 Applicant Phone, aS9 -4s,a -13050 23" OR 11" INSIDE DIMENSION 24 1/4 0 HVAC VAV BOX SCHEDULE SYSTEM SIZE MAX CFM MIN CFM MBH GPM VOLTS PHASE HP HTG KW V1 -01 24x16 3400 1190 39 0 480 3 14 V2 -01 24x16 3360 1176 38 0 480 3 13.8 MECHANICAL RESP TY SCHEDULE ITEM FURNISHED BY INSTALLED BY REUSE N \p, REMARKS CR LANDLORD CONT'R LANDLORD CONT'R OTHER EXISTING AIR CONDITIONING EQUIPMENT X STRUCTURAL SUPPORT FOR EQUIPMENT X ROOF CURB X ROOFING X ROOF CANT STRIP X ROOF CURB LEVELING X FAN POWERED VAV BOX MC MC DIFFUSERS AND GRILLES MC MC WALL FIRE DAMPERS X COMB. FIRE \SMOKE DAMPERS X LOW PRESSURE DUCTWORK MC MC HIGH \MEDIUM DUCTWORK MC MC DUCT SUPPORTS MC MC SEISMIC BRACING MC MC TEMPERATURE CONTROL SYSTEM MC MC WIRED BY MC RELIEF AIR MOTOR OPERATED DAMPER X SMOKE DETECTORS X ZONE DAMPERS X DUCT HEATER X UNIT \BASEBOARD HEATERS X RETURN AIR FAN X OUTSIDE AIR INTAKE HOOD \FAN X RELIEF AIR HOOD \FAN X TOILET EXHAUST FAN MC MC WIRED BY EC TOILET EXHAUST DUCTWORK MC MC TOILET EXHAUST WALL OR ROOF CAP X AIR BALANCE REPORT GC AS -BUILT DRAWINGS MC SECONDARY DRAIN PANS X CONDENSATE PUMPS X HVAC LOADS COOLING LOAD BREAKDOWN HEATING LOAD BREAKDOWN MARK . ROOF WALL CPART CGLASS CSOLAR LIGHTS (3EQUIP PSENS ciSSEN - AN OAS TSENSCPLATCOAL .TLATCTOT I H - WALL IMPART FGLASS HLAB HSPACEOA H ITV-1 13.8 0 0 0 0 60.2 8.1 42.8 125.1 2.3 8.2 70.8 35.8 -0.5 17 87,8 28.8 0 0 0 5.8 34.7 42 59.5 FPV -2 6,9 0 0 0 0 29.9 6.1 21.5 64.8 2 2 8.8 75,9 18.2 -0.5 17.6 93,5 14.3 1 0 0 - 2.9 17.2 45.1 62.4 - - HVAC / ELECTRICAL COORDINATION SCHEDULE ANBREVIATIONS - - CONTRACTOR TYPE MOTOR CONTROL, I Ti'E CONTROL TYPE �_ -__ - -_ -�-_ - - - - -- - - -- - - -- - - ------ - - -- - -- DC LOCAL DISCONNECT EC ELECTRICAL CONTRACTOR CS COMBINATION STARTER TC TIMECLOCK MC MOTOR CONTROL (POWER) EX EXISTING MCC MOTOR CONTROL CENTER CPT CONTROL POWER TRANSFORMER SD DUCT SMOKE DETECTOR FC FIRE PROTECTION CONTRACTOR MG MAGNETIC STARTER OR CONTACT BAS BUILDING AUTOMATON SYSTEM CN CONTROLS GC GENERAL CONTRACTOR MS MANUAL STARTER LOW LOW VOLTAGE CONTROLS TS TOGGLE SWITCH HC HVAC CONTRACTOR VFD MfEE FREQUE LINE LINE VOLTAGE CONTROLS C/B H.A.C.R. CIRCUIT BREAKER AT SOURCE PANELBOARD MFR MANUFACTURER MSR MANUAL STARTER W /CONTROL RELAY RLINE REVERSE AC11NG LINE VOLTAGE STAT FUSE FUSE AT LOCAL DISCONNECT (VERIFY FIELD RATING) PC PLUMBING CONTRACTOR OV OVERCURRENT PROTECTION MAN MANUAL FLA OPERATING FULL LOAD AMPS OR OWNER OR OTHERS FA FIRE ALARM MCA MINIMUM CIRCUIT AMPAC!T"( CO CARBON MONOXIDE SENSOR CP CORD AND PLUG CONNECTION INT INTEGRAL TO EQUIPMENT MARK DESCRIPTION VOLTS PHASE EMERG BHP T HP HTG KW :WATTS FLA MCA OCP DC FURN DC INST DC WIRE MC TYPETMC TURN MC INST MC WIRE CN TYPE CN FURN''CN INST CN WIRE SD QUAN E -1 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 E-2 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 0/1 -01 VAV BOX 480 3 14 16,8 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC HC 0 V2 -01 VAV BOX 480 3 13.8 16,6 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC L HC 0 Heating Equipment Schedule Equip. Capacity OSA cfrn ID Brand Narne' Model No 1 Btuih Total CFfrl or Ecerie? input Btuh Output Btuh Efficiency' vl -o1 vita. ATrrr 47768 3400 782 v2 - 01 Titus ATV 47086 3360 840 Ilan Equipment Schedule Equip. ID Brand Name' Model No. CFM SP' I IP /BHP Flow Control Location o Service v1 -01 •ritun R'PCS 3400 0.50 0.75 Cv Above Ceiling , ,r:4-a1 Titus A'Tpa 3360 0.50 0.75 r_ Above Coiling E -1 Greenback SP-D110 75 0.25 CV Ahoy Coiling E -2 greenback HP -14110 75 0.25 CY Abovo Coiling Mechanical Permit Plans Checklist MECH =,CHK 7 'CC wasn,rgron ;u. genic, dent 4 e;•,u +gy Cuue Corm errs. f .. o•s ..,- Nevada Jul, 2007 Project Address Love €:nit,.rr, - Mmancontor rtn11 Q3 � 1/10/2008 The following orrn i on o• necessary ' o -F -' m a i • •r ' :r• i compliance 1 th 'he rnechanica requirements in h' information , .0 check a iced nr Ical permit t a}.pl ,al ur for with The 1 the Washintllon State Nonresidential Energy Code Applicability Code Location Budding Departrrlerll y(3:i. no, n.a ) Sec C omponent inlcrmatJOn Required en Pains Notes HVAC REQUIREMENTS (Sections 1401-1424) '1411 Equipment performance n, a, 1411.4 Pkg. elec. hlg.& elg List heat pump, nn schedule yes 1411.1 ryiinirr UM CHIC:1uncy Lquiprnent schedule with type, capacity, efficiency M -2 n.a. 1411.1 Col nbusliun fag. Indicate rnlerrnittent ignition, Ilueidraft damper & jacket loss 1412 HVAC controls you t 412.1 Temperature zones Indicate locations on plans to -1 yes 1412.2 Oeact ;arid control Indicate 5 degree deadband rmrnrnum M -3 n. a. 1412.3 /tumidity central Indicate humidistat you 1412.4 Automatic setback Indicate thermostat with night setback arid 7 dl(I day types I4 - 3 YOB 1412.4 1 Dampers Indicate camper location and auto. controls & max. leakage M--3 ep M -3 irr 'm �r Indicate optimum '• controls Y 1=112 4.r. Opt 7l Start d rite optlr CI stud n • a • 141 Z.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412 6 Combustion htg. IR di ate modulating or staged control you 1412.7 Balancing Indic rte balancing features on plans M -3 1412.8 Ventilation Control Indicate ,lomand control ventilation for high•cccupancy areas you 1422 Thermostat lnterloCk Indicate thermostat interlock on plans M -1 n• a . 1423 Econorniters Equipment schedule 1413 Air economizers n. a, 1413.1 Air Econo Ope'utk ri Indicate 100% capability on schedule n,a, 1413.1 Wtr Econo Operation Malt ete 100'! capacity at 45 degF db & 40 deg F wb 1.a. 141;3.2 Water Econo Dec Indicate cig load & water ecorloe & QV tower performance n. a • '141;7..;3 Integrated operation Indicate capability for partial cooling r n.a. 1413,4 Humidification Indicate direct e',rap or fag atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary yea 1414.2 Duct Insulation Indicate 11-value of insulation on duct F1 -3 n. a • 1415.1 Piping insulation Indicate R -value of insulation on piping TaTt amp ntron "cold re amts yea 14162,1 Commissioning Provide commissioning plan M Ye 416.2.2-3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M - you 1416.2.4 Commissioning lndicato O &M manuals record drawings, staff training M -3 yes 1416.2.5 Cornet. Report Indicate requirements for prelim. & final commissioning report 14 - you 1434 Separate air sys. Indicate separate systems on plans M - you Mochantcal Completed and attached. Equipment schedule with types, M -3 Summary Form inputloutput, efficiency, chi, hp, economizer Ta iVTC FfEAf`E 3CSL (";}edtions 1440- 1454) - 1440 Service water htg. you 1441 Elec:. wafer healer Indicate R -10 insulation under tank P -1 you 1442 Shut-off controls Indicate automatic Shut °Off Y - Y es 14 Pipe Insulation Indicate 11-value 01 insulation on piping P -1 TI -a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool healer efficiency n.a. 1453 Pool heater controls Indicate s',vitch and 65 degree control n.a. 14 &4 Pool covers Indicate vapor retardant cover n. a. 1454 Pools 90+ degrees h R-12 pool cover eharacal - ;c Systems, c Checklist , MESH G( NIP 2CO0'sr asnilp Stale run eSidenbd Energy Cccf; Compria'v Lurnu nuvuse @,ry 2 001 'Project Adlff(';;,; Love Culture - Gouthcen:or Mall Date 1/10/2008 The fnllo,ving additional nforrnation is necessary to check e mechanical permit appIicatlor for a complex For Building Department Use nreutianlcai systern for compliance with the mecnanical requirements in the Washington Stale 1 Energy CJCdn Use the checklist as a reference to rotas added to the. mecharl it drawings (see the MECf-I- CHK checklist Tor additional system requli rnenlo) this Infornlatticn must be un the plans since this is the officio` record of the permit Having this information In separate specifications alone Is NOT an acceptable alternative. Applicability Code l.ccat.on Ruining Department (yes, no. n.a.) Section Component Information Required an Plan., f en ADDITIONAL CHECKLIST ITEMS FO '1 COMPLEX SYSTEMS ONLY `. a. 1431 1 Field assent. sys. Provide calculations yva 1432.1 Setback & shut eft Indicate separate systems cr show isolation devices on plans 14 n.1- 1432.2.1 Air system reset Indleate automatic reset - Indicate automatic reset, cooling tower. & heal pump Loop n.a, 1432.2 .2 Hydronic System valves mitigate economizer Uri equipment schedule ur provide n.a. 1433 Air Economizer calculations to justify exemption and demonstrate 10%higher efficiency for equipment with out economizer. - I ridicate water economizer and provide calculations 1 1433 n ,ri . 1.133 Water E-curlunlzer Exception 2 is Lionized rr.e- 1434 32parate air sys. indicate separate systems on plans Indicate that simultaneous heating arid cooling is prohibited, yea 1435 Simul hog. & clg. unless use of exception is justif Od r4--3 -- -- indicate heat recover/ on plans: complete and attach heat u.a, 1436 Heat recovery recovery calculations you 1437 Elec. motor efflc MECH -MOT or Equip. Schedule with hp, rpm, efficiency E1 - 1438 Variable flow sys. Indicate variable flow on fan and pump schedules acs 1439.1 Kitchen Floods Indicate uncooled and unheated make -up air n. a . 1439.2 Fume Hoods Indicate VAV, unheatedfuncooled or heat roe. makeup 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 23" OR 11" INSIDE DIMENSION 24 1/4 0 HVAC VAV BOX SCHEDULE SYSTEM SIZE MAX CFM MIN CFM MBH GPM VOLTS PHASE HP HTG KW V1 -01 24x16 3400 1190 39 0 480 3 14 V2 -01 24x16 3360 1176 38 0 480 3 13.8 MECHANICAL RESP TY SCHEDULE ITEM FURNISHED BY INSTALLED BY REUSE N \p, REMARKS CR LANDLORD CONT'R LANDLORD CONT'R OTHER EXISTING AIR CONDITIONING EQUIPMENT X STRUCTURAL SUPPORT FOR EQUIPMENT X ROOF CURB X ROOFING X ROOF CANT STRIP X ROOF CURB LEVELING X FAN POWERED VAV BOX MC MC DIFFUSERS AND GRILLES MC MC WALL FIRE DAMPERS X COMB. FIRE \SMOKE DAMPERS X LOW PRESSURE DUCTWORK MC MC HIGH \MEDIUM DUCTWORK MC MC DUCT SUPPORTS MC MC SEISMIC BRACING MC MC TEMPERATURE CONTROL SYSTEM MC MC WIRED BY MC RELIEF AIR MOTOR OPERATED DAMPER X SMOKE DETECTORS X ZONE DAMPERS X DUCT HEATER X UNIT \BASEBOARD HEATERS X RETURN AIR FAN X OUTSIDE AIR INTAKE HOOD \FAN X RELIEF AIR HOOD \FAN X TOILET EXHAUST FAN MC MC WIRED BY EC TOILET EXHAUST DUCTWORK MC MC TOILET EXHAUST WALL OR ROOF CAP X AIR BALANCE REPORT GC AS -BUILT DRAWINGS MC SECONDARY DRAIN PANS X CONDENSATE PUMPS X HVAC LOADS COOLING LOAD BREAKDOWN HEATING LOAD BREAKDOWN MARK . ROOF WALL CPART CGLASS CSOLAR LIGHTS (3EQUIP PSENS ciSSEN - AN OAS TSENSCPLATCOAL .TLATCTOT I H - WALL IMPART FGLASS HLAB HSPACEOA H ITV-1 13.8 0 0 0 0 60.2 8.1 42.8 125.1 2.3 8.2 70.8 35.8 -0.5 17 87,8 28.8 0 0 0 5.8 34.7 42 59.5 FPV -2 6,9 0 0 0 0 29.9 6.1 21.5 64.8 2 2 8.8 75,9 18.2 -0.5 17.6 93,5 14.3 1 0 0 - 2.9 17.2 45.1 62.4 - - HVAC / ELECTRICAL COORDINATION SCHEDULE ANBREVIATIONS - - CONTRACTOR TYPE MOTOR CONTROL, I Ti'E CONTROL TYPE �_ -__ - -_ -�-_ - - - - -- - - -- - - -- - - ------ - - -- - -- DC LOCAL DISCONNECT EC ELECTRICAL CONTRACTOR CS COMBINATION STARTER TC TIMECLOCK MC MOTOR CONTROL (POWER) EX EXISTING MCC MOTOR CONTROL CENTER CPT CONTROL POWER TRANSFORMER SD DUCT SMOKE DETECTOR FC FIRE PROTECTION CONTRACTOR MG MAGNETIC STARTER OR CONTACT BAS BUILDING AUTOMATON SYSTEM CN CONTROLS GC GENERAL CONTRACTOR MS MANUAL STARTER LOW LOW VOLTAGE CONTROLS TS TOGGLE SWITCH HC HVAC CONTRACTOR VFD MfEE FREQUE LINE LINE VOLTAGE CONTROLS C/B H.A.C.R. CIRCUIT BREAKER AT SOURCE PANELBOARD MFR MANUFACTURER MSR MANUAL STARTER W /CONTROL RELAY RLINE REVERSE AC11NG LINE VOLTAGE STAT FUSE FUSE AT LOCAL DISCONNECT (VERIFY FIELD RATING) PC PLUMBING CONTRACTOR OV OVERCURRENT PROTECTION MAN MANUAL FLA OPERATING FULL LOAD AMPS OR OWNER OR OTHERS FA FIRE ALARM MCA MINIMUM CIRCUIT AMPAC!T"( CO CARBON MONOXIDE SENSOR CP CORD AND PLUG CONNECTION INT INTEGRAL TO EQUIPMENT MARK DESCRIPTION VOLTS PHASE EMERG BHP T HP HTG KW :WATTS FLA MCA OCP DC FURN DC INST DC WIRE MC TYPETMC TURN MC INST MC WIRE CN TYPE CN FURN''CN INST CN WIRE SD QUAN E -1 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 E-2 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 0/1 -01 VAV BOX 480 3 14 16,8 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC HC 0 V2 -01 VAV BOX 480 3 13.8 16,6 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC L HC 0 Heating Equipment Schedule Equip. Capacity OSA cfrn ID Brand Narne' Model No 1 Btuih Total CFfrl or Ecerie? input Btuh Output Btuh Efficiency' vl -o1 vita. ATrrr 47768 3400 782 v2 - 01 Titus ATV 47086 3360 840 Ilan Equipment Schedule Equip. ID Brand Name' Model No. CFM SP' I IP /BHP Flow Control Location o Service v1 -01 •ritun R'PCS 3400 0.50 0.75 Cv Above Ceiling , ,r:4-a1 Titus A'Tpa 3360 0.50 0.75 r_ Above Coiling E -1 Greenback SP-D110 75 0.25 CV Ahoy Coiling E -2 greenback HP -14110 75 0.25 CY Abovo Coiling Mechanical Permit Plans Checklist MECH =,CHK 7 'CC wasn,rgron ;u. genic, dent 4 e;•,u +gy Cuue Corm errs. f .. o•s ..,- Nevada Jul, 2007 Project Address Love €:nit,.rr, - Mmancontor rtn11 Q3 � 1/10/2008 The following orrn i on o• necessary ' o -F -' m a i • •r ' :r• i compliance 1 th 'he rnechanica requirements in h' information , .0 check a iced nr Ical permit t a}.pl ,al ur for with The 1 the Washintllon State Nonresidential Energy Code Applicability Code Location Budding Departrrlerll y(3:i. no, n.a ) Sec C omponent inlcrmatJOn Required en Pains Notes HVAC REQUIREMENTS (Sections 1401-1424) '1411 Equipment performance n, a, 1411.4 Pkg. elec. hlg.& elg List heat pump, nn schedule yes 1411.1 ryiinirr UM CHIC:1uncy Lquiprnent schedule with type, capacity, efficiency M -2 n.a. 1411.1 Col nbusliun fag. Indicate rnlerrnittent ignition, Ilueidraft damper & jacket loss 1412 HVAC controls you t 412.1 Temperature zones Indicate locations on plans to -1 yes 1412.2 Oeact ;arid control Indicate 5 degree deadband rmrnrnum M -3 n. a. 1412.3 /tumidity central Indicate humidistat you 1412.4 Automatic setback Indicate thermostat with night setback arid 7 dl(I day types I4 - 3 YOB 1412.4 1 Dampers Indicate camper location and auto. controls & max. leakage M--3 ep M -3 irr 'm �r Indicate optimum '• controls Y 1=112 4.r. Opt 7l Start d rite optlr CI stud n • a • 141 Z.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412 6 Combustion htg. IR di ate modulating or staged control you 1412.7 Balancing Indic rte balancing features on plans M -3 1412.8 Ventilation Control Indicate ,lomand control ventilation for high•cccupancy areas you 1422 Thermostat lnterloCk Indicate thermostat interlock on plans M -1 n• a . 1423 Econorniters Equipment schedule 1413 Air economizers n. a, 1413.1 Air Econo Ope'utk ri Indicate 100% capability on schedule n,a, 1413.1 Wtr Econo Operation Malt ete 100'! capacity at 45 degF db & 40 deg F wb 1.a. 141;3.2 Water Econo Dec Indicate cig load & water ecorloe & QV tower performance n. a • '141;7..;3 Integrated operation Indicate capability for partial cooling r n.a. 1413,4 Humidification Indicate direct e',rap or fag atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary yea 1414.2 Duct Insulation Indicate 11-value of insulation on duct F1 -3 n. a • 1415.1 Piping insulation Indicate R -value of insulation on piping TaTt amp ntron "cold re amts yea 14162,1 Commissioning Provide commissioning plan M Ye 416.2.2-3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M - you 1416.2.4 Commissioning lndicato O &M manuals record drawings, staff training M -3 yes 1416.2.5 Cornet. Report Indicate requirements for prelim. & final commissioning report 14 - you 1434 Separate air sys. Indicate separate systems on plans M - you Mochantcal Completed and attached. Equipment schedule with types, M -3 Summary Form inputloutput, efficiency, chi, hp, economizer Ta iVTC FfEAf`E 3CSL (";}edtions 1440- 1454) - 1440 Service water htg. you 1441 Elec:. wafer healer Indicate R -10 insulation under tank P -1 you 1442 Shut-off controls Indicate automatic Shut °Off Y - Y es 14 Pipe Insulation Indicate 11-value 01 insulation on piping P -1 TI -a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool healer efficiency n.a. 1453 Pool heater controls Indicate s',vitch and 65 degree control n.a. 14 &4 Pool covers Indicate vapor retardant cover n. a. 1454 Pools 90+ degrees h R-12 pool cover eharacal - ;c Systems, c Checklist , MESH G( NIP 2CO0'sr asnilp Stale run eSidenbd Energy Cccf; Compria'v Lurnu nuvuse @,ry 2 001 'Project Adlff(';;,; Love Culture - Gouthcen:or Mall Date 1/10/2008 The fnllo,ving additional nforrnation is necessary to check e mechanical permit appIicatlor for a complex For Building Department Use nreutianlcai systern for compliance with the mecnanical requirements in the Washington Stale 1 Energy CJCdn Use the checklist as a reference to rotas added to the. mecharl it drawings (see the MECf-I- CHK checklist Tor additional system requli rnenlo) this Infornlatticn must be un the plans since this is the officio` record of the permit Having this information In separate specifications alone Is NOT an acceptable alternative. Applicability Code l.ccat.on Ruining Department (yes, no. n.a.) Section Component Information Required an Plan., f en ADDITIONAL CHECKLIST ITEMS FO '1 COMPLEX SYSTEMS ONLY `. a. 1431 1 Field assent. sys. Provide calculations yva 1432.1 Setback & shut eft Indicate separate systems cr show isolation devices on plans 14 n.1- 1432.2.1 Air system reset Indleate automatic reset - Indicate automatic reset, cooling tower. & heal pump Loop n.a, 1432.2 .2 Hydronic System valves mitigate economizer Uri equipment schedule ur provide n.a. 1433 Air Economizer calculations to justify exemption and demonstrate 10%higher efficiency for equipment with out economizer. - I ridicate water economizer and provide calculations 1 1433 n ,ri . 1.133 Water E-curlunlzer Exception 2 is Lionized rr.e- 1434 32parate air sys. indicate separate systems on plans Indicate that simultaneous heating arid cooling is prohibited, yea 1435 Simul hog. & clg. unless use of exception is justif Od r4--3 -- -- indicate heat recover/ on plans: complete and attach heat u.a, 1436 Heat recovery recovery calculations you 1437 Elec. motor efflc MECH -MOT or Equip. Schedule with hp, rpm, efficiency E1 - 1438 Variable flow sys. Indicate variable flow on fan and pump schedules acs 1439.1 Kitchen Floods Indicate uncooled and unheated make -up air n. a . 1439.2 Fume Hoods Indicate VAV, unheatedfuncooled or heat roe. makeup 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 HVAC VAV BOX SCHEDULE SYSTEM SIZE MAX CFM MIN CFM MBH GPM VOLTS PHASE HP HTG KW V1 -01 24x16 3400 1190 39 0 480 3 14 V2 -01 24x16 3360 1176 38 0 480 3 13.8 MECHANICAL RESP TY SCHEDULE ITEM FURNISHED BY INSTALLED BY REUSE N \p, REMARKS CR LANDLORD CONT'R LANDLORD CONT'R OTHER EXISTING AIR CONDITIONING EQUIPMENT X STRUCTURAL SUPPORT FOR EQUIPMENT X ROOF CURB X ROOFING X ROOF CANT STRIP X ROOF CURB LEVELING X FAN POWERED VAV BOX MC MC DIFFUSERS AND GRILLES MC MC WALL FIRE DAMPERS X COMB. FIRE \SMOKE DAMPERS X LOW PRESSURE DUCTWORK MC MC HIGH \MEDIUM DUCTWORK MC MC DUCT SUPPORTS MC MC SEISMIC BRACING MC MC TEMPERATURE CONTROL SYSTEM MC MC WIRED BY MC RELIEF AIR MOTOR OPERATED DAMPER X SMOKE DETECTORS X ZONE DAMPERS X DUCT HEATER X UNIT \BASEBOARD HEATERS X RETURN AIR FAN X OUTSIDE AIR INTAKE HOOD \FAN X RELIEF AIR HOOD \FAN X TOILET EXHAUST FAN MC MC WIRED BY EC TOILET EXHAUST DUCTWORK MC MC TOILET EXHAUST WALL OR ROOF CAP X AIR BALANCE REPORT GC AS -BUILT DRAWINGS MC SECONDARY DRAIN PANS X CONDENSATE PUMPS X HVAC LOADS COOLING LOAD BREAKDOWN HEATING LOAD BREAKDOWN MARK . ROOF WALL CPART CGLASS CSOLAR LIGHTS (3EQUIP PSENS ciSSEN - AN OAS TSENSCPLATCOAL .TLATCTOT I H - WALL IMPART FGLASS HLAB HSPACEOA H ITV-1 13.8 0 0 0 0 60.2 8.1 42.8 125.1 2.3 8.2 70.8 35.8 -0.5 17 87,8 28.8 0 0 0 5.8 34.7 42 59.5 FPV -2 6,9 0 0 0 0 29.9 6.1 21.5 64.8 2 2 8.8 75,9 18.2 -0.5 17.6 93,5 14.3 1 0 0 - 2.9 17.2 45.1 62.4 - - HVAC / ELECTRICAL COORDINATION SCHEDULE ANBREVIATIONS - - CONTRACTOR TYPE MOTOR CONTROL, I Ti'E CONTROL TYPE �_ -__ - -_ -�-_ - - - - -- - - -- - - -- - - ------ - - -- - -- DC LOCAL DISCONNECT EC ELECTRICAL CONTRACTOR CS COMBINATION STARTER TC TIMECLOCK MC MOTOR CONTROL (POWER) EX EXISTING MCC MOTOR CONTROL CENTER CPT CONTROL POWER TRANSFORMER SD DUCT SMOKE DETECTOR FC FIRE PROTECTION CONTRACTOR MG MAGNETIC STARTER OR CONTACT BAS BUILDING AUTOMATON SYSTEM CN CONTROLS GC GENERAL CONTRACTOR MS MANUAL STARTER LOW LOW VOLTAGE CONTROLS TS TOGGLE SWITCH HC HVAC CONTRACTOR VFD MfEE FREQUE LINE LINE VOLTAGE CONTROLS C/B H.A.C.R. CIRCUIT BREAKER AT SOURCE PANELBOARD MFR MANUFACTURER MSR MANUAL STARTER W /CONTROL RELAY RLINE REVERSE AC11NG LINE VOLTAGE STAT FUSE FUSE AT LOCAL DISCONNECT (VERIFY FIELD RATING) PC PLUMBING CONTRACTOR OV OVERCURRENT PROTECTION MAN MANUAL FLA OPERATING FULL LOAD AMPS OR OWNER OR OTHERS FA FIRE ALARM MCA MINIMUM CIRCUIT AMPAC!T"( CO CARBON MONOXIDE SENSOR CP CORD AND PLUG CONNECTION INT INTEGRAL TO EQUIPMENT MARK DESCRIPTION VOLTS PHASE EMERG BHP T HP HTG KW :WATTS FLA MCA OCP DC FURN DC INST DC WIRE MC TYPETMC TURN MC INST MC WIRE CN TYPE CN FURN''CN INST CN WIRE SD QUAN E -1 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 E-2 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 0/1 -01 VAV BOX 480 3 14 16,8 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC HC 0 V2 -01 VAV BOX 480 3 13.8 16,6 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC L HC 0 Heating Equipment Schedule Equip. Capacity OSA cfrn ID Brand Narne' Model No 1 Btuih Total CFfrl or Ecerie? input Btuh Output Btuh Efficiency' vl -o1 vita. ATrrr 47768 3400 782 v2 - 01 Titus ATV 47086 3360 840 Ilan Equipment Schedule Equip. ID Brand Name' Model No. CFM SP' I IP /BHP Flow Control Location o Service v1 -01 •ritun R'PCS 3400 0.50 0.75 Cv Above Ceiling , ,r:4-a1 Titus A'Tpa 3360 0.50 0.75 r_ Above Coiling E -1 Greenback SP-D110 75 0.25 CV Ahoy Coiling E -2 greenback HP -14110 75 0.25 CY Abovo Coiling Mechanical Permit Plans Checklist MECH =,CHK 7 'CC wasn,rgron ;u. genic, dent 4 e;•,u +gy Cuue Corm errs. f .. o•s ..,- Nevada Jul, 2007 Project Address Love €:nit,.rr, - Mmancontor rtn11 Q3 � 1/10/2008 The following orrn i on o• necessary ' o -F -' m a i • •r ' :r• i compliance 1 th 'he rnechanica requirements in h' information , .0 check a iced nr Ical permit t a}.pl ,al ur for with The 1 the Washintllon State Nonresidential Energy Code Applicability Code Location Budding Departrrlerll y(3:i. no, n.a ) Sec C omponent inlcrmatJOn Required en Pains Notes HVAC REQUIREMENTS (Sections 1401-1424) '1411 Equipment performance n, a, 1411.4 Pkg. elec. hlg.& elg List heat pump, nn schedule yes 1411.1 ryiinirr UM CHIC:1uncy Lquiprnent schedule with type, capacity, efficiency M -2 n.a. 1411.1 Col nbusliun fag. Indicate rnlerrnittent ignition, Ilueidraft damper & jacket loss 1412 HVAC controls you t 412.1 Temperature zones Indicate locations on plans to -1 yes 1412.2 Oeact ;arid control Indicate 5 degree deadband rmrnrnum M -3 n. a. 1412.3 /tumidity central Indicate humidistat you 1412.4 Automatic setback Indicate thermostat with night setback arid 7 dl(I day types I4 - 3 YOB 1412.4 1 Dampers Indicate camper location and auto. controls & max. leakage M--3 ep M -3 irr 'm �r Indicate optimum '• controls Y 1=112 4.r. Opt 7l Start d rite optlr CI stud n • a • 141 Z.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412 6 Combustion htg. IR di ate modulating or staged control you 1412.7 Balancing Indic rte balancing features on plans M -3 1412.8 Ventilation Control Indicate ,lomand control ventilation for high•cccupancy areas you 1422 Thermostat lnterloCk Indicate thermostat interlock on plans M -1 n• a . 1423 Econorniters Equipment schedule 1413 Air economizers n. a, 1413.1 Air Econo Ope'utk ri Indicate 100% capability on schedule n,a, 1413.1 Wtr Econo Operation Malt ete 100'! capacity at 45 degF db & 40 deg F wb 1.a. 141;3.2 Water Econo Dec Indicate cig load & water ecorloe & QV tower performance n. a • '141;7..;3 Integrated operation Indicate capability for partial cooling r n.a. 1413,4 Humidification Indicate direct e',rap or fag atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary yea 1414.2 Duct Insulation Indicate 11-value of insulation on duct F1 -3 n. a • 1415.1 Piping insulation Indicate R -value of insulation on piping TaTt amp ntron "cold re amts yea 14162,1 Commissioning Provide commissioning plan M Ye 416.2.2-3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M - you 1416.2.4 Commissioning lndicato O &M manuals record drawings, staff training M -3 yes 1416.2.5 Cornet. Report Indicate requirements for prelim. & final commissioning report 14 - you 1434 Separate air sys. Indicate separate systems on plans M - you Mochantcal Completed and attached. Equipment schedule with types, M -3 Summary Form inputloutput, efficiency, chi, hp, economizer Ta iVTC FfEAf`E 3CSL (";}edtions 1440- 1454) - 1440 Service water htg. you 1441 Elec:. wafer healer Indicate R -10 insulation under tank P -1 you 1442 Shut-off controls Indicate automatic Shut °Off Y - Y es 14 Pipe Insulation Indicate 11-value 01 insulation on piping P -1 TI -a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool healer efficiency n.a. 1453 Pool heater controls Indicate s',vitch and 65 degree control n.a. 14 &4 Pool covers Indicate vapor retardant cover n. a. 1454 Pools 90+ degrees h R-12 pool cover eharacal - ;c Systems, c Checklist , MESH G( NIP 2CO0'sr asnilp Stale run eSidenbd Energy Cccf; Compria'v Lurnu nuvuse @,ry 2 001 'Project Adlff(';;,; Love Culture - Gouthcen:or Mall Date 1/10/2008 The fnllo,ving additional nforrnation is necessary to check e mechanical permit appIicatlor for a complex For Building Department Use nreutianlcai systern for compliance with the mecnanical requirements in the Washington Stale 1 Energy CJCdn Use the checklist as a reference to rotas added to the. mecharl it drawings (see the MECf-I- CHK checklist Tor additional system requli rnenlo) this Infornlatticn must be un the plans since this is the officio` record of the permit Having this information In separate specifications alone Is NOT an acceptable alternative. Applicability Code l.ccat.on Ruining Department (yes, no. n.a.) Section Component Information Required an Plan., f en ADDITIONAL CHECKLIST ITEMS FO '1 COMPLEX SYSTEMS ONLY `. a. 1431 1 Field assent. sys. Provide calculations yva 1432.1 Setback & shut eft Indicate separate systems cr show isolation devices on plans 14 n.1- 1432.2.1 Air system reset Indleate automatic reset - Indicate automatic reset, cooling tower. & heal pump Loop n.a, 1432.2 .2 Hydronic System valves mitigate economizer Uri equipment schedule ur provide n.a. 1433 Air Economizer calculations to justify exemption and demonstrate 10%higher efficiency for equipment with out economizer. - I ridicate water economizer and provide calculations 1 1433 n ,ri . 1.133 Water E-curlunlzer Exception 2 is Lionized rr.e- 1434 32parate air sys. indicate separate systems on plans Indicate that simultaneous heating arid cooling is prohibited, yea 1435 Simul hog. & clg. unless use of exception is justif Od r4--3 -- -- indicate heat recover/ on plans: complete and attach heat u.a, 1436 Heat recovery recovery calculations you 1437 Elec. motor efflc MECH -MOT or Equip. Schedule with hp, rpm, efficiency E1 - 1438 Variable flow sys. Indicate variable flow on fan and pump schedules acs 1439.1 Kitchen Floods Indicate uncooled and unheated make -up air n. a . 1439.2 Fume Hoods Indicate VAV, unheatedfuncooled or heat roe. makeup 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 MECHANICAL RESP TY SCHEDULE ITEM FURNISHED BY INSTALLED BY REUSE N \p, REMARKS CR LANDLORD CONT'R LANDLORD CONT'R OTHER EXISTING AIR CONDITIONING EQUIPMENT X STRUCTURAL SUPPORT FOR EQUIPMENT X ROOF CURB X ROOFING X ROOF CANT STRIP X ROOF CURB LEVELING X FAN POWERED VAV BOX MC MC DIFFUSERS AND GRILLES MC MC WALL FIRE DAMPERS X COMB. FIRE \SMOKE DAMPERS X LOW PRESSURE DUCTWORK MC MC HIGH \MEDIUM DUCTWORK MC MC DUCT SUPPORTS MC MC SEISMIC BRACING MC MC TEMPERATURE CONTROL SYSTEM MC MC WIRED BY MC RELIEF AIR MOTOR OPERATED DAMPER X SMOKE DETECTORS X ZONE DAMPERS X DUCT HEATER X UNIT \BASEBOARD HEATERS X RETURN AIR FAN X OUTSIDE AIR INTAKE HOOD \FAN X RELIEF AIR HOOD \FAN X TOILET EXHAUST FAN MC MC WIRED BY EC TOILET EXHAUST DUCTWORK MC MC TOILET EXHAUST WALL OR ROOF CAP X AIR BALANCE REPORT GC AS -BUILT DRAWINGS MC SECONDARY DRAIN PANS X CONDENSATE PUMPS X HVAC LOADS COOLING LOAD BREAKDOWN HEATING LOAD BREAKDOWN MARK . ROOF WALL CPART CGLASS CSOLAR LIGHTS (3EQUIP PSENS ciSSEN - AN OAS TSENSCPLATCOAL .TLATCTOT I H - WALL IMPART FGLASS HLAB HSPACEOA H ITV-1 13.8 0 0 0 0 60.2 8.1 42.8 125.1 2.3 8.2 70.8 35.8 -0.5 17 87,8 28.8 0 0 0 5.8 34.7 42 59.5 FPV -2 6,9 0 0 0 0 29.9 6.1 21.5 64.8 2 2 8.8 75,9 18.2 -0.5 17.6 93,5 14.3 1 0 0 - 2.9 17.2 45.1 62.4 - - HVAC / ELECTRICAL COORDINATION SCHEDULE ANBREVIATIONS - - CONTRACTOR TYPE MOTOR CONTROL, I Ti'E CONTROL TYPE �_ -__ - -_ -�-_ - - - - -- - - -- - - -- - - ------ - - -- - -- DC LOCAL DISCONNECT EC ELECTRICAL CONTRACTOR CS COMBINATION STARTER TC TIMECLOCK MC MOTOR CONTROL (POWER) EX EXISTING MCC MOTOR CONTROL CENTER CPT CONTROL POWER TRANSFORMER SD DUCT SMOKE DETECTOR FC FIRE PROTECTION CONTRACTOR MG MAGNETIC STARTER OR CONTACT BAS BUILDING AUTOMATON SYSTEM CN CONTROLS GC GENERAL CONTRACTOR MS MANUAL STARTER LOW LOW VOLTAGE CONTROLS TS TOGGLE SWITCH HC HVAC CONTRACTOR VFD MfEE FREQUE LINE LINE VOLTAGE CONTROLS C/B H.A.C.R. CIRCUIT BREAKER AT SOURCE PANELBOARD MFR MANUFACTURER MSR MANUAL STARTER W /CONTROL RELAY RLINE REVERSE AC11NG LINE VOLTAGE STAT FUSE FUSE AT LOCAL DISCONNECT (VERIFY FIELD RATING) PC PLUMBING CONTRACTOR OV OVERCURRENT PROTECTION MAN MANUAL FLA OPERATING FULL LOAD AMPS OR OWNER OR OTHERS FA FIRE ALARM MCA MINIMUM CIRCUIT AMPAC!T"( CO CARBON MONOXIDE SENSOR CP CORD AND PLUG CONNECTION INT INTEGRAL TO EQUIPMENT MARK DESCRIPTION VOLTS PHASE EMERG BHP T HP HTG KW :WATTS FLA MCA OCP DC FURN DC INST DC WIRE MC TYPETMC TURN MC INST MC WIRE CN TYPE CN FURN''CN INST CN WIRE SD QUAN E -1 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 E-2 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 0/1 -01 VAV BOX 480 3 14 16,8 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC HC 0 V2 -01 VAV BOX 480 3 13.8 16,6 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC L HC 0 Heating Equipment Schedule Equip. Capacity OSA cfrn ID Brand Narne' Model No 1 Btuih Total CFfrl or Ecerie? input Btuh Output Btuh Efficiency' vl -o1 vita. ATrrr 47768 3400 782 v2 - 01 Titus ATV 47086 3360 840 Ilan Equipment Schedule Equip. ID Brand Name' Model No. CFM SP' I IP /BHP Flow Control Location o Service v1 -01 •ritun R'PCS 3400 0.50 0.75 Cv Above Ceiling , ,r:4-a1 Titus A'Tpa 3360 0.50 0.75 r_ Above Coiling E -1 Greenback SP-D110 75 0.25 CV Ahoy Coiling E -2 greenback HP -14110 75 0.25 CY Abovo Coiling Mechanical Permit Plans Checklist MECH =,CHK 7 'CC wasn,rgron ;u. genic, dent 4 e;•,u +gy Cuue Corm errs. f .. o•s ..,- Nevada Jul, 2007 Project Address Love €:nit,.rr, - Mmancontor rtn11 Q3 � 1/10/2008 The following orrn i on o• necessary ' o -F -' m a i • •r ' :r• i compliance 1 th 'he rnechanica requirements in h' information , .0 check a iced nr Ical permit t a}.pl ,al ur for with The 1 the Washintllon State Nonresidential Energy Code Applicability Code Location Budding Departrrlerll y(3:i. no, n.a ) Sec C omponent inlcrmatJOn Required en Pains Notes HVAC REQUIREMENTS (Sections 1401-1424) '1411 Equipment performance n, a, 1411.4 Pkg. elec. hlg.& elg List heat pump, nn schedule yes 1411.1 ryiinirr UM CHIC:1uncy Lquiprnent schedule with type, capacity, efficiency M -2 n.a. 1411.1 Col nbusliun fag. Indicate rnlerrnittent ignition, Ilueidraft damper & jacket loss 1412 HVAC controls you t 412.1 Temperature zones Indicate locations on plans to -1 yes 1412.2 Oeact ;arid control Indicate 5 degree deadband rmrnrnum M -3 n. a. 1412.3 /tumidity central Indicate humidistat you 1412.4 Automatic setback Indicate thermostat with night setback arid 7 dl(I day types I4 - 3 YOB 1412.4 1 Dampers Indicate camper location and auto. controls & max. leakage M--3 ep M -3 irr 'm �r Indicate optimum '• controls Y 1=112 4.r. Opt 7l Start d rite optlr CI stud n • a • 141 Z.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412 6 Combustion htg. IR di ate modulating or staged control you 1412.7 Balancing Indic rte balancing features on plans M -3 1412.8 Ventilation Control Indicate ,lomand control ventilation for high•cccupancy areas you 1422 Thermostat lnterloCk Indicate thermostat interlock on plans M -1 n• a . 1423 Econorniters Equipment schedule 1413 Air economizers n. a, 1413.1 Air Econo Ope'utk ri Indicate 100% capability on schedule n,a, 1413.1 Wtr Econo Operation Malt ete 100'! capacity at 45 degF db & 40 deg F wb 1.a. 141;3.2 Water Econo Dec Indicate cig load & water ecorloe & QV tower performance n. a • '141;7..;3 Integrated operation Indicate capability for partial cooling r n.a. 1413,4 Humidification Indicate direct e',rap or fag atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary yea 1414.2 Duct Insulation Indicate 11-value of insulation on duct F1 -3 n. a • 1415.1 Piping insulation Indicate R -value of insulation on piping TaTt amp ntron "cold re amts yea 14162,1 Commissioning Provide commissioning plan M Ye 416.2.2-3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M - you 1416.2.4 Commissioning lndicato O &M manuals record drawings, staff training M -3 yes 1416.2.5 Cornet. Report Indicate requirements for prelim. & final commissioning report 14 - you 1434 Separate air sys. Indicate separate systems on plans M - you Mochantcal Completed and attached. Equipment schedule with types, M -3 Summary Form inputloutput, efficiency, chi, hp, economizer Ta iVTC FfEAf`E 3CSL (";}edtions 1440- 1454) - 1440 Service water htg. you 1441 Elec:. wafer healer Indicate R -10 insulation under tank P -1 you 1442 Shut-off controls Indicate automatic Shut °Off Y - Y es 14 Pipe Insulation Indicate 11-value 01 insulation on piping P -1 TI -a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool healer efficiency n.a. 1453 Pool heater controls Indicate s',vitch and 65 degree control n.a. 14 &4 Pool covers Indicate vapor retardant cover n. a. 1454 Pools 90+ degrees h R-12 pool cover eharacal - ;c Systems, c Checklist , MESH G( NIP 2CO0'sr asnilp Stale run eSidenbd Energy Cccf; Compria'v Lurnu nuvuse @,ry 2 001 'Project Adlff(';;,; Love Culture - Gouthcen:or Mall Date 1/10/2008 The fnllo,ving additional nforrnation is necessary to check e mechanical permit appIicatlor for a complex For Building Department Use nreutianlcai systern for compliance with the mecnanical requirements in the Washington Stale 1 Energy CJCdn Use the checklist as a reference to rotas added to the. mecharl it drawings (see the MECf-I- CHK checklist Tor additional system requli rnenlo) this Infornlatticn must be un the plans since this is the officio` record of the permit Having this information In separate specifications alone Is NOT an acceptable alternative. Applicability Code l.ccat.on Ruining Department (yes, no. n.a.) Section Component Information Required an Plan., f en ADDITIONAL CHECKLIST ITEMS FO '1 COMPLEX SYSTEMS ONLY `. a. 1431 1 Field assent. sys. Provide calculations yva 1432.1 Setback & shut eft Indicate separate systems cr show isolation devices on plans 14 n.1- 1432.2.1 Air system reset Indleate automatic reset - Indicate automatic reset, cooling tower. & heal pump Loop n.a, 1432.2 .2 Hydronic System valves mitigate economizer Uri equipment schedule ur provide n.a. 1433 Air Economizer calculations to justify exemption and demonstrate 10%higher efficiency for equipment with out economizer. - I ridicate water economizer and provide calculations 1 1433 n ,ri . 1.133 Water E-curlunlzer Exception 2 is Lionized rr.e- 1434 32parate air sys. indicate separate systems on plans Indicate that simultaneous heating arid cooling is prohibited, yea 1435 Simul hog. & clg. unless use of exception is justif Od r4--3 -- -- indicate heat recover/ on plans: complete and attach heat u.a, 1436 Heat recovery recovery calculations you 1437 Elec. motor efflc MECH -MOT or Equip. Schedule with hp, rpm, efficiency E1 - 1438 Variable flow sys. Indicate variable flow on fan and pump schedules acs 1439.1 Kitchen Floods Indicate uncooled and unheated make -up air n. a . 1439.2 Fume Hoods Indicate VAV, unheatedfuncooled or heat roe. makeup 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 HVAC LOADS COOLING LOAD BREAKDOWN HEATING LOAD BREAKDOWN MARK . ROOF WALL CPART CGLASS CSOLAR LIGHTS (3EQUIP PSENS ciSSEN - AN OAS TSENSCPLATCOAL .TLATCTOT I H - WALL IMPART FGLASS HLAB HSPACEOA H ITV-1 13.8 0 0 0 0 60.2 8.1 42.8 125.1 2.3 8.2 70.8 35.8 -0.5 17 87,8 28.8 0 0 0 5.8 34.7 42 59.5 FPV -2 6,9 0 0 0 0 29.9 6.1 21.5 64.8 2 2 8.8 75,9 18.2 -0.5 17.6 93,5 14.3 1 0 0 - 2.9 17.2 45.1 62.4 - - HVAC / ELECTRICAL COORDINATION SCHEDULE ANBREVIATIONS - - CONTRACTOR TYPE MOTOR CONTROL, I Ti'E CONTROL TYPE �_ -__ - -_ -�-_ - - - - -- - - -- - - -- - - ------ - - -- - -- DC LOCAL DISCONNECT EC ELECTRICAL CONTRACTOR CS COMBINATION STARTER TC TIMECLOCK MC MOTOR CONTROL (POWER) EX EXISTING MCC MOTOR CONTROL CENTER CPT CONTROL POWER TRANSFORMER SD DUCT SMOKE DETECTOR FC FIRE PROTECTION CONTRACTOR MG MAGNETIC STARTER OR CONTACT BAS BUILDING AUTOMATON SYSTEM CN CONTROLS GC GENERAL CONTRACTOR MS MANUAL STARTER LOW LOW VOLTAGE CONTROLS TS TOGGLE SWITCH HC HVAC CONTRACTOR VFD MfEE FREQUE LINE LINE VOLTAGE CONTROLS C/B H.A.C.R. CIRCUIT BREAKER AT SOURCE PANELBOARD MFR MANUFACTURER MSR MANUAL STARTER W /CONTROL RELAY RLINE REVERSE AC11NG LINE VOLTAGE STAT FUSE FUSE AT LOCAL DISCONNECT (VERIFY FIELD RATING) PC PLUMBING CONTRACTOR OV OVERCURRENT PROTECTION MAN MANUAL FLA OPERATING FULL LOAD AMPS OR OWNER OR OTHERS FA FIRE ALARM MCA MINIMUM CIRCUIT AMPAC!T"( CO CARBON MONOXIDE SENSOR CP CORD AND PLUG CONNECTION INT INTEGRAL TO EQUIPMENT MARK DESCRIPTION VOLTS PHASE EMERG BHP T HP HTG KW :WATTS FLA MCA OCP DC FURN DC INST DC WIRE MC TYPETMC TURN MC INST MC WIRE CN TYPE CN FURN''CN INST CN WIRE SD QUAN E -1 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 E-2 EXHAUST FAN 120 1 20 MFR MFR MFR MS EC EC EC MAN EC EC EC 0 0/1 -01 VAV BOX 480 3 14 16,8 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC HC 0 V2 -01 VAV BOX 480 3 13.8 16,6 25 MFR MFR MFR MG MFR MFR MFR LOW HC HC L HC 0 Heating Equipment Schedule Equip. Capacity OSA cfrn ID Brand Narne' Model No 1 Btuih Total CFfrl or Ecerie? input Btuh Output Btuh Efficiency' vl -o1 vita. ATrrr 47768 3400 782 v2 - 01 Titus ATV 47086 3360 840 Ilan Equipment Schedule Equip. ID Brand Name' Model No. CFM SP' I IP /BHP Flow Control Location o Service v1 -01 •ritun R'PCS 3400 0.50 0.75 Cv Above Ceiling , ,r:4-a1 Titus A'Tpa 3360 0.50 0.75 r_ Above Coiling E -1 Greenback SP-D110 75 0.25 CV Ahoy Coiling E -2 greenback HP -14110 75 0.25 CY Abovo Coiling Mechanical Permit Plans Checklist MECH =,CHK 7 'CC wasn,rgron ;u. genic, dent 4 e;•,u +gy Cuue Corm errs. f .. o•s ..,- Nevada Jul, 2007 Project Address Love €:nit,.rr, - Mmancontor rtn11 Q3 � 1/10/2008 The following orrn i on o• necessary ' o -F -' m a i • •r ' :r• i compliance 1 th 'he rnechanica requirements in h' information , .0 check a iced nr Ical permit t a}.pl ,al ur for with The 1 the Washintllon State Nonresidential Energy Code Applicability Code Location Budding Departrrlerll y(3:i. no, n.a ) Sec C omponent inlcrmatJOn Required en Pains Notes HVAC REQUIREMENTS (Sections 1401-1424) '1411 Equipment performance n, a, 1411.4 Pkg. elec. hlg.& elg List heat pump, nn schedule yes 1411.1 ryiinirr UM CHIC:1uncy Lquiprnent schedule with type, capacity, efficiency M -2 n.a. 1411.1 Col nbusliun fag. Indicate rnlerrnittent ignition, Ilueidraft damper & jacket loss 1412 HVAC controls you t 412.1 Temperature zones Indicate locations on plans to -1 yes 1412.2 Oeact ;arid control Indicate 5 degree deadband rmrnrnum M -3 n. a. 1412.3 /tumidity central Indicate humidistat you 1412.4 Automatic setback Indicate thermostat with night setback arid 7 dl(I day types I4 - 3 YOB 1412.4 1 Dampers Indicate camper location and auto. controls & max. leakage M--3 ep M -3 irr 'm �r Indicate optimum '• controls Y 1=112 4.r. Opt 7l Start d rite optlr CI stud n • a • 141 Z.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412 6 Combustion htg. IR di ate modulating or staged control you 1412.7 Balancing Indic rte balancing features on plans M -3 1412.8 Ventilation Control Indicate ,lomand control ventilation for high•cccupancy areas you 1422 Thermostat lnterloCk Indicate thermostat interlock on plans M -1 n• a . 1423 Econorniters Equipment schedule 1413 Air economizers n. a, 1413.1 Air Econo Ope'utk ri Indicate 100% capability on schedule n,a, 1413.1 Wtr Econo Operation Malt ete 100'! capacity at 45 degF db & 40 deg F wb 1.a. 141;3.2 Water Econo Dec Indicate cig load & water ecorloe & QV tower performance n. a • '141;7..;3 Integrated operation Indicate capability for partial cooling r n.a. 1413,4 Humidification Indicate direct e',rap or fag atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary yea 1414.2 Duct Insulation Indicate 11-value of insulation on duct F1 -3 n. a • 1415.1 Piping insulation Indicate R -value of insulation on piping TaTt amp ntron "cold re amts yea 14162,1 Commissioning Provide commissioning plan M Ye 416.2.2-3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M - you 1416.2.4 Commissioning lndicato O &M manuals record drawings, staff training M -3 yes 1416.2.5 Cornet. Report Indicate requirements for prelim. & final commissioning report 14 - you 1434 Separate air sys. Indicate separate systems on plans M - you Mochantcal Completed and attached. Equipment schedule with types, M -3 Summary Form inputloutput, efficiency, chi, hp, economizer Ta iVTC FfEAf`E 3CSL (";}edtions 1440- 1454) - 1440 Service water htg. you 1441 Elec:. wafer healer Indicate R -10 insulation under tank P -1 you 1442 Shut-off controls Indicate automatic Shut °Off Y - Y es 14 Pipe Insulation Indicate 11-value 01 insulation on piping P -1 TI -a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool healer efficiency n.a. 1453 Pool heater controls Indicate s',vitch and 65 degree control n.a. 14 &4 Pool covers Indicate vapor retardant cover n. a. 1454 Pools 90+ degrees h R-12 pool cover eharacal - ;c Systems, c Checklist , MESH G( NIP 2CO0'sr asnilp Stale run eSidenbd Energy Cccf; Compria'v Lurnu nuvuse @,ry 2 001 'Project Adlff(';;,; Love Culture - Gouthcen:or Mall Date 1/10/2008 The fnllo,ving additional nforrnation is necessary to check e mechanical permit appIicatlor for a complex For Building Department Use nreutianlcai systern for compliance with the mecnanical requirements in the Washington Stale 1 Energy CJCdn Use the checklist as a reference to rotas added to the. mecharl it drawings (see the MECf-I- CHK checklist Tor additional system requli rnenlo) this Infornlatticn must be un the plans since this is the officio` record of the permit Having this information In separate specifications alone Is NOT an acceptable alternative. Applicability Code l.ccat.on Ruining Department (yes, no. n.a.) Section Component Information Required an Plan., f en ADDITIONAL CHECKLIST ITEMS FO '1 COMPLEX SYSTEMS ONLY `. a. 1431 1 Field assent. sys. Provide calculations yva 1432.1 Setback & shut eft Indicate separate systems cr show isolation devices on plans 14 n.1- 1432.2.1 Air system reset Indleate automatic reset - Indicate automatic reset, cooling tower. & heal pump Loop n.a, 1432.2 .2 Hydronic System valves mitigate economizer Uri equipment schedule ur provide n.a. 1433 Air Economizer calculations to justify exemption and demonstrate 10%higher efficiency for equipment with out economizer. - I ridicate water economizer and provide calculations 1 1433 n ,ri . 1.133 Water E-curlunlzer Exception 2 is Lionized rr.e- 1434 32parate air sys. indicate separate systems on plans Indicate that simultaneous heating arid cooling is prohibited, yea 1435 Simul hog. & clg. unless use of exception is justif Od r4--3 -- -- indicate heat recover/ on plans: complete and attach heat u.a, 1436 Heat recovery recovery calculations you 1437 Elec. motor efflc MECH -MOT or Equip. Schedule with hp, rpm, efficiency E1 - 1438 Variable flow sys. Indicate variable flow on fan and pump schedules acs 1439.1 Kitchen Floods Indicate uncooled and unheated make -up air n. a . 1439.2 Fume Hoods Indicate VAV, unheatedfuncooled or heat roe. makeup 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 Heating Equipment Schedule Equip. Capacity OSA cfrn ID Brand Narne' Model No 1 Btuih Total CFfrl or Ecerie? input Btuh Output Btuh Efficiency' vl -o1 vita. ATrrr 47768 3400 782 v2 - 01 Titus ATV 47086 3360 840 Ilan Equipment Schedule Equip. ID Brand Name' Model No. CFM SP' I IP /BHP Flow Control Location o Service v1 -01 •ritun R'PCS 3400 0.50 0.75 Cv Above Ceiling , ,r:4-a1 Titus A'Tpa 3360 0.50 0.75 r_ Above Coiling E -1 Greenback SP-D110 75 0.25 CV Ahoy Coiling E -2 greenback HP -14110 75 0.25 CY Abovo Coiling Mechanical Permit Plans Checklist MECH =,CHK 7 'CC wasn,rgron ;u. genic, dent 4 e;•,u +gy Cuue Corm errs. f .. o•s ..,- Nevada Jul, 2007 Project Address Love €:nit,.rr, - Mmancontor rtn11 Q3 � 1/10/2008 The following orrn i on o• necessary ' o -F -' m a i • •r ' :r• i compliance 1 th 'he rnechanica requirements in h' information , .0 check a iced nr Ical permit t a}.pl ,al ur for with The 1 the Washintllon State Nonresidential Energy Code Applicability Code Location Budding Departrrlerll y(3:i. no, n.a ) Sec C omponent inlcrmatJOn Required en Pains Notes HVAC REQUIREMENTS (Sections 1401-1424) '1411 Equipment performance n, a, 1411.4 Pkg. elec. hlg.& elg List heat pump, nn schedule yes 1411.1 ryiinirr UM CHIC:1uncy Lquiprnent schedule with type, capacity, efficiency M -2 n.a. 1411.1 Col nbusliun fag. Indicate rnlerrnittent ignition, Ilueidraft damper & jacket loss 1412 HVAC controls you t 412.1 Temperature zones Indicate locations on plans to -1 yes 1412.2 Oeact ;arid control Indicate 5 degree deadband rmrnrnum M -3 n. a. 1412.3 /tumidity central Indicate humidistat you 1412.4 Automatic setback Indicate thermostat with night setback arid 7 dl(I day types I4 - 3 YOB 1412.4 1 Dampers Indicate camper location and auto. controls & max. leakage M--3 ep M -3 irr 'm �r Indicate optimum '• controls Y 1=112 4.r. Opt 7l Start d rite optlr CI stud n • a • 141 Z.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412 6 Combustion htg. IR di ate modulating or staged control you 1412.7 Balancing Indic rte balancing features on plans M -3 1412.8 Ventilation Control Indicate ,lomand control ventilation for high•cccupancy areas you 1422 Thermostat lnterloCk Indicate thermostat interlock on plans M -1 n• a . 1423 Econorniters Equipment schedule 1413 Air economizers n. a, 1413.1 Air Econo Ope'utk ri Indicate 100% capability on schedule n,a, 1413.1 Wtr Econo Operation Malt ete 100'! capacity at 45 degF db & 40 deg F wb 1.a. 141;3.2 Water Econo Dec Indicate cig load & water ecorloe & QV tower performance n. a • '141;7..;3 Integrated operation Indicate capability for partial cooling r n.a. 1413,4 Humidification Indicate direct e',rap or fag atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary yea 1414.2 Duct Insulation Indicate 11-value of insulation on duct F1 -3 n. a • 1415.1 Piping insulation Indicate R -value of insulation on piping TaTt amp ntron "cold re amts yea 14162,1 Commissioning Provide commissioning plan M Ye 416.2.2-3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M - you 1416.2.4 Commissioning lndicato O &M manuals record drawings, staff training M -3 yes 1416.2.5 Cornet. Report Indicate requirements for prelim. & final commissioning report 14 - you 1434 Separate air sys. Indicate separate systems on plans M - you Mochantcal Completed and attached. Equipment schedule with types, M -3 Summary Form inputloutput, efficiency, chi, hp, economizer Ta iVTC FfEAf`E 3CSL (";}edtions 1440- 1454) - 1440 Service water htg. you 1441 Elec:. wafer healer Indicate R -10 insulation under tank P -1 you 1442 Shut-off controls Indicate automatic Shut °Off Y - Y es 14 Pipe Insulation Indicate 11-value 01 insulation on piping P -1 TI -a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool healer efficiency n.a. 1453 Pool heater controls Indicate s',vitch and 65 degree control n.a. 14 &4 Pool covers Indicate vapor retardant cover n. a. 1454 Pools 90+ degrees h R-12 pool cover eharacal - ;c Systems, c Checklist , MESH G( NIP 2CO0'sr asnilp Stale run eSidenbd Energy Cccf; Compria'v Lurnu nuvuse @,ry 2 001 'Project Adlff(';;,; Love Culture - Gouthcen:or Mall Date 1/10/2008 The fnllo,ving additional nforrnation is necessary to check e mechanical permit appIicatlor for a complex For Building Department Use nreutianlcai systern for compliance with the mecnanical requirements in the Washington Stale 1 Energy CJCdn Use the checklist as a reference to rotas added to the. mecharl it drawings (see the MECf-I- CHK checklist Tor additional system requli rnenlo) this Infornlatticn must be un the plans since this is the officio` record of the permit Having this information In separate specifications alone Is NOT an acceptable alternative. Applicability Code l.ccat.on Ruining Department (yes, no. n.a.) Section Component Information Required an Plan., f en ADDITIONAL CHECKLIST ITEMS FO '1 COMPLEX SYSTEMS ONLY `. a. 1431 1 Field assent. sys. Provide calculations yva 1432.1 Setback & shut eft Indicate separate systems cr show isolation devices on plans 14 n.1- 1432.2.1 Air system reset Indleate automatic reset - Indicate automatic reset, cooling tower. & heal pump Loop n.a, 1432.2 .2 Hydronic System valves mitigate economizer Uri equipment schedule ur provide n.a. 1433 Air Economizer calculations to justify exemption and demonstrate 10%higher efficiency for equipment with out economizer. - I ridicate water economizer and provide calculations 1 1433 n ,ri . 1.133 Water E-curlunlzer Exception 2 is Lionized rr.e- 1434 32parate air sys. indicate separate systems on plans Indicate that simultaneous heating arid cooling is prohibited, yea 1435 Simul hog. & clg. unless use of exception is justif Od r4--3 -- -- indicate heat recover/ on plans: complete and attach heat u.a, 1436 Heat recovery recovery calculations you 1437 Elec. motor efflc MECH -MOT or Equip. Schedule with hp, rpm, efficiency E1 - 1438 Variable flow sys. Indicate variable flow on fan and pump schedules acs 1439.1 Kitchen Floods Indicate uncooled and unheated make -up air n. a . 1439.2 Fume Hoods Indicate VAV, unheatedfuncooled or heat roe. makeup 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 Mechanical Permit Plans Checklist MECH =,CHK 7 'CC wasn,rgron ;u. genic, dent 4 e;•,u +gy Cuue Corm errs. f .. o•s ..,- Nevada Jul, 2007 Project Address Love €:nit,.rr, - Mmancontor rtn11 Q3 � 1/10/2008 The following orrn i on o• necessary ' o -F -' m a i • •r ' :r• i compliance 1 th 'he rnechanica requirements in h' information , .0 check a iced nr Ical permit t a}.pl ,al ur for with The 1 the Washintllon State Nonresidential Energy Code Applicability Code Location Budding Departrrlerll y(3:i. no, n.a ) Sec C omponent inlcrmatJOn Required en Pains Notes HVAC REQUIREMENTS (Sections 1401-1424) '1411 Equipment performance n, a, 1411.4 Pkg. elec. hlg.& elg List heat pump, nn schedule yes 1411.1 ryiinirr UM CHIC:1uncy Lquiprnent schedule with type, capacity, efficiency M -2 n.a. 1411.1 Col nbusliun fag. Indicate rnlerrnittent ignition, Ilueidraft damper & jacket loss 1412 HVAC controls you t 412.1 Temperature zones Indicate locations on plans to -1 yes 1412.2 Oeact ;arid control Indicate 5 degree deadband rmrnrnum M -3 n. a. 1412.3 /tumidity central Indicate humidistat you 1412.4 Automatic setback Indicate thermostat with night setback arid 7 dl(I day types I4 - 3 YOB 1412.4 1 Dampers Indicate camper location and auto. controls & max. leakage M--3 ep M -3 irr 'm �r Indicate optimum '• controls Y 1=112 4.r. Opt 7l Start d rite optlr CI stud n • a • 141 Z.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412 6 Combustion htg. IR di ate modulating or staged control you 1412.7 Balancing Indic rte balancing features on plans M -3 1412.8 Ventilation Control Indicate ,lomand control ventilation for high•cccupancy areas you 1422 Thermostat lnterloCk Indicate thermostat interlock on plans M -1 n• a . 1423 Econorniters Equipment schedule 1413 Air economizers n. a, 1413.1 Air Econo Ope'utk ri Indicate 100% capability on schedule n,a, 1413.1 Wtr Econo Operation Malt ete 100'! capacity at 45 degF db & 40 deg F wb 1.a. 141;3.2 Water Econo Dec Indicate cig load & water ecorloe & QV tower performance n. a • '141;7..;3 Integrated operation Indicate capability for partial cooling r n.a. 1413,4 Humidification Indicate direct e',rap or fag atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary yea 1414.2 Duct Insulation Indicate 11-value of insulation on duct F1 -3 n. a • 1415.1 Piping insulation Indicate R -value of insulation on piping TaTt amp ntron "cold re amts yea 14162,1 Commissioning Provide commissioning plan M Ye 416.2.2-3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M - you 1416.2.4 Commissioning lndicato O &M manuals record drawings, staff training M -3 yes 1416.2.5 Cornet. Report Indicate requirements for prelim. & final commissioning report 14 - you 1434 Separate air sys. Indicate separate systems on plans M - you Mochantcal Completed and attached. Equipment schedule with types, M -3 Summary Form inputloutput, efficiency, chi, hp, economizer Ta iVTC FfEAf`E 3CSL (";}edtions 1440- 1454) - 1440 Service water htg. you 1441 Elec:. wafer healer Indicate R -10 insulation under tank P -1 you 1442 Shut-off controls Indicate automatic Shut °Off Y - Y es 14 Pipe Insulation Indicate 11-value 01 insulation on piping P -1 TI -a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool healer efficiency n.a. 1453 Pool heater controls Indicate s',vitch and 65 degree control n.a. 14 &4 Pool covers Indicate vapor retardant cover n. a. 1454 Pools 90+ degrees h R-12 pool cover eharacal - ;c Systems, c Checklist , MESH G( NIP 2CO0'sr asnilp Stale run eSidenbd Energy Cccf; Compria'v Lurnu nuvuse @,ry 2 001 'Project Adlff(';;,; Love Culture - Gouthcen:or Mall Date 1/10/2008 The fnllo,ving additional nforrnation is necessary to check e mechanical permit appIicatlor for a complex For Building Department Use nreutianlcai systern for compliance with the mecnanical requirements in the Washington Stale 1 Energy CJCdn Use the checklist as a reference to rotas added to the. mecharl it drawings (see the MECf-I- CHK checklist Tor additional system requli rnenlo) this Infornlatticn must be un the plans since this is the officio` record of the permit Having this information In separate specifications alone Is NOT an acceptable alternative. Applicability Code l.ccat.on Ruining Department (yes, no. n.a.) Section Component Information Required an Plan., f en ADDITIONAL CHECKLIST ITEMS FO '1 COMPLEX SYSTEMS ONLY `. a. 1431 1 Field assent. sys. Provide calculations yva 1432.1 Setback & shut eft Indicate separate systems cr show isolation devices on plans 14 n.1- 1432.2.1 Air system reset Indleate automatic reset - Indicate automatic reset, cooling tower. & heal pump Loop n.a, 1432.2 .2 Hydronic System valves mitigate economizer Uri equipment schedule ur provide n.a. 1433 Air Economizer calculations to justify exemption and demonstrate 10%higher efficiency for equipment with out economizer. - I ridicate water economizer and provide calculations 1 1433 n ,ri . 1.133 Water E-curlunlzer Exception 2 is Lionized rr.e- 1434 32parate air sys. indicate separate systems on plans Indicate that simultaneous heating arid cooling is prohibited, yea 1435 Simul hog. & clg. unless use of exception is justif Od r4--3 -- -- indicate heat recover/ on plans: complete and attach heat u.a, 1436 Heat recovery recovery calculations you 1437 Elec. motor efflc MECH -MOT or Equip. Schedule with hp, rpm, efficiency E1 - 1438 Variable flow sys. Indicate variable flow on fan and pump schedules acs 1439.1 Kitchen Floods Indicate uncooled and unheated make -up air n. a . 1439.2 Fume Hoods Indicate VAV, unheatedfuncooled or heat roe. makeup 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 eharacal - ;c Systems, c Checklist , MESH G( NIP 2CO0'sr asnilp Stale run eSidenbd Energy Cccf; Compria'v Lurnu nuvuse @,ry 2 001 'Project Adlff(';;,; Love Culture - Gouthcen:or Mall Date 1/10/2008 The fnllo,ving additional nforrnation is necessary to check e mechanical permit appIicatlor for a complex For Building Department Use nreutianlcai systern for compliance with the mecnanical requirements in the Washington Stale 1 Energy CJCdn Use the checklist as a reference to rotas added to the. mecharl it drawings (see the MECf-I- CHK checklist Tor additional system requli rnenlo) this Infornlatticn must be un the plans since this is the officio` record of the permit Having this information In separate specifications alone Is NOT an acceptable alternative. Applicability Code l.ccat.on Ruining Department (yes, no. n.a.) Section Component Information Required an Plan., f en ADDITIONAL CHECKLIST ITEMS FO '1 COMPLEX SYSTEMS ONLY `. a. 1431 1 Field assent. sys. Provide calculations yva 1432.1 Setback & shut eft Indicate separate systems cr show isolation devices on plans 14 n.1- 1432.2.1 Air system reset Indleate automatic reset - Indicate automatic reset, cooling tower. & heal pump Loop n.a, 1432.2 .2 Hydronic System valves mitigate economizer Uri equipment schedule ur provide n.a. 1433 Air Economizer calculations to justify exemption and demonstrate 10%higher efficiency for equipment with out economizer. - I ridicate water economizer and provide calculations 1 1433 n ,ri . 1.133 Water E-curlunlzer Exception 2 is Lionized rr.e- 1434 32parate air sys. indicate separate systems on plans Indicate that simultaneous heating arid cooling is prohibited, yea 1435 Simul hog. & clg. unless use of exception is justif Od r4--3 -- -- indicate heat recover/ on plans: complete and attach heat u.a, 1436 Heat recovery recovery calculations you 1437 Elec. motor efflc MECH -MOT or Equip. Schedule with hp, rpm, efficiency E1 - 1438 Variable flow sys. Indicate variable flow on fan and pump schedules acs 1439.1 Kitchen Floods Indicate uncooled and unheated make -up air n. a . 1439.2 Fume Hoods Indicate VAV, unheatedfuncooled or heat roe. makeup 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 2C : Wu;Ylr glen Stai • tlV•.�r'± Wider 2006 Washington State Nonresidential Energy Code Compliance Form I11 r8 11'.S P rpm= S ummary 2C00 w;knrn eta Slplc d.uirw,de r no is circl for any question, Provide explanation: Decision Flowchart , Start Here J E:uo'tian 1411.1 Fqulpnen Fr icierrcy Shall Meet Table's 14 - thro 1uh 1418 2006Washington State Nonresidential Energy Code Compliance Form eruy corJd rcxrp, anra Forma 2006 Washington Sla e Nonresidential Energy Code Compliance Form ksd„!01 FumuCU. Dr, input 226,000 14 `Atuh at 800/0)8 Glad F1co9 Yes 1411 1 Inlunnittent Ignition 0o•Aco . Anwar Veiling or Damper. I1 input 225,600 Fitun Ellen 1412.6 P.1Odulatillg or 301904 Cornlastian Cunlrol Required Use this flowchart to determine hots the requirements of the Complex Systems Option apply to the project. Refer to the Indicated Code sections for more complete information on the reLltliremenls. Any Fuel Fuma c /f Ansonrolod`., input 225,000 JN ~'� Equipment' //h10 �, Btutr7 .- i Yes 1411.1 0.16"4 Maximum Jackal Loss Yea 1 Suction 1431.1 Calculations of Iota! On - Site hnorgY Input R Ouput Rnqulrod 0 (continued on back) 00vraec Ji ly 260/ Air ay..tum �, , of 1i�1K �.- Sarviri8 Multiple Nt- ' rleilling Sy »tom , C0rtos7 "-3110,00o Ellen Yes r Soalion 1432.2.1 Supply Air Resat Controls Required Yes 5ecihm 1432.2.2 Hot `Hafer Supply 1ernpurufure WOW! Required NO Project Description B riellydescribe VICI,i2111i3/11 system type and features. Li Includes Plans Compliance Option HVAC ACCESSORIES ACCESSORIES: 1. MOTOR DAMPER 2. ECONOMIZER 3. ROOF CURB 4. SMOKE DETECTOR 5. INTAKE HOOD 6. VIBRATION ISOLATION 7. FLAT FILTER 8. FILTER /MIXING BOX 9. ACCESS DOOR 10. FLEX CONNECTIONS 11. MOUNTING COLLAR 12. HOT GAS BYPASS FAN POWERED SERIES VAV BOXES SHALL BE TITUS ATQS, SIZE 7. AIR FLOW AND COOLING LOAD BASED ON 55 DEGREE ENTERRING AIR TEMPERATURE Lriorg/ C,,ct, u ltd Jly 20$/ Inch:de ncDralmentalion requiring compliance /01111 cornrms.siron::ng requirements, Section 1416. Simple System rro) Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate t,1ECH SUP4 for simple & complex systems ) ELltttl:7trient Schedules The following information is required to be Incorporated with hoe mechanical equipment schedules on the plains, For protects without plans, fill in She required information below. 'If avtlitat)18, As tested according to 'fable 14 -IA through 14 -1G. 11 required 4 COP, HSPF Celebes Efficiency, or AFUE, as applicable. 'Flow control types: variable) air volurne(VAV), constant volume (CV), or variable ,peed (VS) 2006 Washington State Nonresidential Energy Code Compliance Form s circled for any question, provide explanation: 13. FACE /BYPASS DAMPER 17. 14. CONDENSATE PUMP 18. 15. MOTOR GUARD 19. 16. GREASE TRAP 20. DUCT FLANGES 21. ECON POWERED EXHAUST BASE RAIL 22. ECON BAROMETRIC RELIEF HUMIDIFIER 23. HEAT RECLAIM COIL CO2 SENSORS PER 2006 IMC SECTION 606 Install smoke detector to shut crown air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection SCALE: NONE CABINET EXHAUST FAN 0 KEYED NOTES: 1. NOT USED 2. GALVANIZED ALL THREAD ROD SUSPEND FROM BUILDING STRUCTURE AND FROM FAN MOUNTING FLANGES. USE CHANNELS UNDER FAN AS AN ALTERNATIVE SUPPORT 3. CEILING FAN 4. OUTLET FLANGE 5. BACKDRAFT OR MOTOR OPERATED DAMPER (SEE SCHEDULE SPECS) 6. METAL HANGER, SECURE TO STRUCTURE AND TO DUCTWORK 7. BRICK VENT, LOUVER, ROOF CAP AS REQUIRED 8. FLEXIBLE CONNECTION T MC = MECHANICAL CONTRACTOR GC = GENERAL CONTRACTOR EC = ELECTRICAL CONTRACTOR RESPONSIBILITY SCHEDULES LEGEND AND CODED NOTES LL = LANDLORD RC = ROOFING CONTRACTOR * ** ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S ROOFING CONTRACTOR AT THE TENANTS EXPENSE. * PROVIDE TITUS TRM RAPID FRAME MOUNT ACCESORY AT NON -FIRE RATED GYPSUM BOARD CEILING LOCATIONS. i 9 0 1 4 0 fl iii ii ,rrsi. e 3 MAIN SUPPLY DUCT fl iffm ,arm' 'm rei',,, i O KEYED NOTES: RECTANGULAR LOW PRESSURE BRANCH SCALE: NONE 1 MAXIMUM LENGTH OF INSUL. FLEX DUCT EQUALS 5 FEET. FLEX NOT PERMITTED IN INACCESSIBLE CEILINGS 2. INSULATED DUCT, COLLAR AND DIFFUSER BY HVAC CONTRACTOR 3. SCOOP 4. SPIN IN FITTING WITH MANUAL VOLUME DAMPER O KEYED NOTES: 1. 20 GAUGE DOUBLE SHEET METAL AIR FOIL FULL DEPTH OF MAIN DUCT UP TO 12" WIDE BRANCHES 18 GAUGE ON WIDER BRANCHES 2. MAIN DUCT 3. GALVANIZED 3/16" ROD 4. VENTLOCK NO. 600 -3 DAMPER BLADE, BRACKET & LOCKING BALL JOINT WITH 1/4 "0 GALVANIZED OPERATOR PAD 5. BRANCH DUCT 6. DOUBLE THICKNESS TURNING VANES (TYPICAL) 7. 3" RADIUS MINIMUM NSULAIION 5. INTERNAL BUTTERFLY DAMPER FOR DRYWALL APPLICATIONS ONLY. (PROVIDE KEY FOR ADJUSTMENT) SECURE TO CEILING PER MANUFACTURER'S RECOMMENDATIONS AND PER CEILING FINISH. PROVIDE GRID CLIPS PER MFG'R REQUIREMENTS. PROVIDE FRAMING FOR DRYWALL INSTALLATION. 7. HANGER, SECURE TO STRUCTURE AND DUCTWORK 8. CLAMP DIFFUSER INSTALLATION TYPICAL SCALE: NONE _..., SUSPEND FROM STRUCTURE WITH \ HANGER RODS. RODS TO HAVE VIBRATION ISOLATORS UNLESS FAN AND MOTOR ARE INTERNALLY ISOLATED 2. INSULATED FLEXIBLE INLET DUCT WITH MAXIMUM LENGTH OF 24" 3. ELECTRIC HEATING COIL 4. FLEXIBLE DUCT CONNECTION 5. ACOUSTICAL DUCT LINER THROUGH FIRST ELBOW OR FIRST TAKE -OFF UNLESS SPECIFIED OTHERWISE 6. SPACE SUPPLY DUCT - TRANSITION TO SIZE SHOWN ON PLAN 7. ELECTRIC COIL SIDE HINGED TERMINAL BOX 8. INTERNAL TURNING VANES OR BAFFLE TO ASSURE EVEN AIRFLOW ACROSS HEATING COIL 9. FILTER FRAME 10. PLENUM AIR INLET 11. CONTROL BOX 12. SHEET METAL DUCT INTO VAV BOX, MINIMUM LENGTH OF 3 TIMES INLET DUCT DIAMETER KEYED NOTES; -24 1/4" OR 13 1/4" OUTSIDE DIMENSION 24 ", 20" 18" 12" FAN POWERED VAV BOX SCALE: NONE L NOTE: ROUGH -IN OPENING SIZES NOMINAL_ 20 "X 20" = 20 1/2"X 20 1/2" NOMINAL 24 "X 24" - 24 1/2 "X 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED ----GYP DD CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFFUSER MTG DETAIL SCALE: NONE KOHRS LONNEMANN HEIL ENGINEERS, PSC MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859 -442 -8050 859 - 442 -8058 FAX WWW.KLHENGRS.COM DATE SHEET W CO CD C'4 rn U O 0 w O z co w z w 0 NO. DESCRIPTION K L H M OB 03 3 MECHANICAL DETAILS AND SCHEDULES RECEIVED CITY OF TUKWIL+ FEB 0 l 2008 PERMIT CENTER PROJECT 8151.01 M=m2 1006 SOUTHCENTER MALL, TUKWILA, WA 98188 WESTFIELD SOUTHCENTER PROJECT COORDINATOR GRAHAM DOWNES T. 619.234.2565 F. 619.234.2568 GEINIERAL. CONSTRUCTION NOTES 1. ALL WORK AND MATERIALS TO BE IN ACCORDANCE WITH THESE SPECIFICATIONS AND STANDARDS. 2. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE LOCAL CODES, LAWS AND REGULATIONS. 3. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED FEES, PERMITS, AND INSPECTIONS. 4. INSTALL ALL DUCTWORK TO BEST SUIT FIELD CONDITIONS AND COORDINATE WITH THE INSTALLATION WORK OF OTHER TRADES. THE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE THE EXACT LOCATIONS OF DUCTWORK. 5, EACH SYSTEM OF DUCTWORK SHALL BE CLEANED OF ALL FOREIGN MATERIAL AND ROUGH SPOTS PRIOR TO BEING PLACED INTO SERVICE AND BEFORE OPERATIONAL TESTS ARE PERFORMED. 6. EACH SYSTEM OF DUCTWORK SHALL BE PRESSURE TESTED IN ACCORDANCE WITH RECOGNIZED INDUSTRY STANDARDS. 7, DURING ENTIRE CONSTRUCTION PERIOD, THE CONTRACTOR SHALL MAINTAIN ADEQUATE FIRE EXTINGUISHERS READY FOR USE IN CASE OF FIRE. 8. PROTECTION OF PUBLIC: THE CONTRACTOR SHALL PROTECT THE PUBLIC FROM INJURY DURING PROCESS OF THE WORK BY POSTING WARNING SIGNS, GUARD LIGHTS, AND BARRICADES. 9. COORDINATE ALL WORK WITH ARCHITECTURAL, ELECTRICAL, AND STRUCTURAL DRAWINGS. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEMS SUCH AS PIPE, DUCT, ETC. TO BE IN CONTACT WITH ANY EQUIPMENT. 10, ALL DUCT SIZES SHOWN REPRESENT THE INSIDE DIMENSIONS. SEE MECHANICAL SPECIFICATIONS FOR INSTALLATION REQUIREMENTS. 11. COORDINATE ALL CUTTING AND PATCHING WITH GENERAL CONTRACTOR. SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING OF HIS WORK. 12. OBTAIN WRITTEN PERMISSION OF ARCHITECT BEFORE PROCEEDING WITH ANY CUTTING OR PATCHING OF STRUCTURAL SYSTEMS. INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE. 13. FURNISH AND INSTALL MATERIALS, EQUIPMENT AND LABOR AS SHOWN AND AS NECESSARY FOR COMPLETE WORKABLE SYSTEMS. 14. RESTORE ALL DAMAGE RESULTING FROM YOUR WORK AND LEAVE PREMISES IN CLEAN CONDITION WHEN FINISHED WITH WORK. 15. MECHANICAL CONTRACTOR TO SCHEDULE THE DATE OF INDEPENDENT AIR BALANCE TO TEST AND BALANCE HVAC SYSTEM. CONTACT AIR BALANCE MINIMUM (2) WEEKS PRIOR TO DESIRED AIR BALANCING DATE. MECHANICAL CONTRACTOR IS RESPONSIBLE TO INSURE ALL SYSTEMS ARE 100 PERCENT COMPLETE AND FUNCTIONAL PRIOR TO THE AIR BALANCER'S ARRIVAL. IF AIR BALANCER ARRIVES ON SITE AND BALANCING IS IMPOSSIBLE DUE TO INCOMPLETE AND /OR INOPERABLE SYSTEMS, THIS CONTRACTOR TO PAY FOR ALL EXPENSES ASSOCIATED WITH THE RESCHEDULING OF AIR BALANCING CONTRACTOR'S RETURN VISIT TO JOB SITE AND BALANCING OF SYSTEMS. REPORT SHALL INCLUDE BUT NOT LIMITED TO ALL FAN SYSTEMS AND ALL THE SUPPLY, RETURN AND EXHAUST TERMINALS CONNECTED INTO THE SYSTEM. SUBMIT (4) COPIES OF THE REPORT TO THE ARCHITECT FOR REVIEW. 16. INSTALL ALL DUCTWORK TO AVOID ARCHITECTURAL FRAMING, STRUCTURAL MEMBERS, AND OTHER OBSTRUCTIONS. 17. COORDINATE INSTALLATION OF ACCESS PANELS REQUIRED FOR MAINTENANCE AND INSPECTION OF ALL EQUIPMENT. COORDINATE EXACT LOCATION WITH GENERAL CONTRACTOR AND ARCHITECT. 18. GENERAL CONTRACTOR SHALL PROVIDE ACCESS PANELS AT ALL CONCEALED COILS, MIXING BOXES, REHEAT BOXES, CONTROL VALVES, MOTORS AND FIRE DAMPERS, ETC, ALL VOLUME DAMPERS TO BE ACCESSIBLE, GENERAL CONTRACTOR TO FURNISH ACCESS PANELS AND DOORS AND COORDINATE WITH OTHER TRADES. 19. SEAL AROUND ALL DUCTS PENETRATING FIRE SEPARATIONS WITH LISTED AND APPROVED FIRE SEAL MATERIAL. SEALANT AROUND DUCTS SHOULD BE LISTED AND APPROVED FOR THE SPECIFIC USE. 20. CONTRACTOR SHALL GUARANTEE PLENUM IS OF TIGHT CONSTRUCTION AS TO NOT ALLOW FOR RECIRCULATION OF CONTAMINATED AIR. 21. DUCTWORK SHALL BE SHEET METAL. GENERAL MECHANICAL NOTES 1. PRIOR TO BID, MECHANICAL CONTRACTOR SHALL VISIT THE JOB SITE AND FIELD VERIFY THE EXISTING CONDITIONS. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING THE EXISTING STRUCTURE, ETC. 2. LOCATION OF EQUIPMENT AND DUCTWORK APPARATUS INDICATED ON THE DRAWINGS ARE APPROXIMATE ONLY AND SHALL BE CHANGED TO MEET THE ARCHITECTURAL AND STRUCTURAL CONDITIONS AS REQUIRED, AT NO COST TO THE OWNER. 3. SUSPEND EQUIPMENT AND DUCTWORK DIRECTLY FROM PRIMARY STRUCTURAL ELEMENTS. EQUIPMENT AND DUCTWORK MAY NOT BE SUSPENDED FROM THE ABOVE DECK. 4. INSTALL HVAC EQUIPMENT AND BALANCE AIR FLOWS AS INDICATED. 5. CONTRACTOR TO VERIFY VOLTAGE REQUIREMENTS FOR HVAC EQUIPMENT WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING. IF REQUIRED, MECHANICAL CONTRACTOR TO PROVIDE STEP DOWN TRANSFORMER AT HVAC EQUIPMENT. CONNECTIONS TO TRANSFORMER BY ELECTRICAL CONTRACTOR. 6. ALL DUCT SIZES SHOWN REPRESENT THE INSIDE DIMENSIONS. SEE MECHANICAL SPECIFICATIONS FOR INSULATION REQUIREMENTS. 7. DUCTWORK SHALL BE INSTALLED AS HIGH AS POSSIBLE. 8. NO FIBERGLASS DUCT BOARD, NOR SUBSTITUTES ALLOWED. 9. ALL OPENINGS IN DUCTWORK DUE TO DEMOLITION OR NEW CONSTRUCTION SHALL BE PATCHED AND SEALED AIR TIGHT. 10. ALL SUPPLY AND RETURN DUCTS PASSING THROUGH FiRE RATED WALLS SHALL HAVE APPROVED FIRE DAMPERS. 11. EXISTING RETURN AIR OPENINGS IN DEMISING WALLS TO REMAIN. FIELD VERIFY EXACT LOCATIONS. 12. ALL EQUIPMENT, INSTALLATIONS AND MATERIALS SHALL COMPLY WITH ALL APPLICABLE LANDLORD CRITERIA AND LOCAL CODES, MECHANICAL COMMISSIONING Summary This section includes the general requirements that apply to the implementation of the commissioning process without regard to specific systems, assemblies, equipment, and components. Related Documents Drawings and general provisions of the contract, including General and Supplementary Conditions and other Division 1 specification sections apply to this section. References ASHRAE Guideline 0 -2005: lee C ,reie ,ei ;tying Tess e;s ACC Commissioning Guideline - 2005 Description Commissioning provides tools to the owner to verify that building systems meet the owner's intent and that the systems, components, and equipment to be commissioned have been installed and operate within the performance guidelines identified in the design intent documents. The commissioning process shall not remove or reduce the responsibility of the design team, contractors, subcontractors, vendors. manufacturers, or suppliers to meet the requirements of the contract documents. The commissioning process shall meet the requirements and be completed in accordance of the Washington State Energy Code Section 1416. Systems and Equipment 'co be Commissioned The following systems, components, and equipment are the project: Mechanical Systems Fan Powered VAV Boxes with Electric reheat Testing, Adjusting, and Balancing Automatic Ternperature Control System focus of the commissioning process on this Coordination and Schedule The Commissioning Authority (CxA) is the member of the commissioning team that administrates and coordinates commissioning activities for the commissioning team. The commissioning team includes the CxA and any support personnel, the owner's representative, the design team, the general contractor, contractors and subcontractors, vendors, manufacturers, and equipment suppliers. The general contractor shall incorporate the commissioning activities Into the overall project schedule, Commissioning Plan A detailed Commissioning Plan containing the owner's project intent, design tearn's basis of design, and a compilation of sample checklists, test forms, and training requirements will be available for review to the contractors / sub- contractors at the beginning of construction. The Commissioning Plan is intended only as a guide for commissioning activities on the project. The drawings and specifications are the contract requirements and shall be considered the extent of the contractors' responsibilities related to commissioning and commissioning activities. The following provides a brief overview of the requirements for the commissioning plan. Provide the design intent document. Provide a list of equipment and system to be tested. With in this list an explanation shall be provided that describes the methods of testing. Provide the conditions at which the equipment and systems shall be tested. Commissioning Team The commissioning team shall consist of members appointed by the owner and members appointed by contractors. Each individual shall have the authority to act on behalf of the represented entity and should be organized to implement the commissioning process through coordinated actions and be dedicated to remain involved in the project until completion. The commissioning team shall consist of, but not be limited to, representatives of the owner aid include the CxA, representatives of the facility user and operation and maintenance personnel, and representatives of the design team. The commissioning team shall consist of, but not be limited to, representatives of each contractor, including project superintendent, subcontractors, installers, suppliers, vendors, manufacturers, and specialists deemed appropriate by the CxA. Responsibilities The general responsibilities of various parties in the commissioning process are provided in this sub - section. Commissioning Authority (CxA) The primary responsibility for the CxA is to coordinate and direct the commissioning process activities. The CxA will coordinate the commissioning work and, with the general contractor and the owner, help integrate commissioning activities into the master schedule. Develop the Commissioning Plan to guide the commissioning process. Plan and conduct commissioning meetings. Originate and distribute information and assist the design and construction teams to successfully conclude the commissioning process through systems verification, functional performance testing, and verification of conformance with the design intent of each system to be commissioned. Gather and review sequences, and work with contractors and the design team until sufficient clarity has been obtained, in writing, to be able to write detailed functional performance testing procedures. With necessary assistance and review from installing contractors, the CxA will write the functional performance testing procedures for equipment and systems to be commissioned and submit to the commissioning team for review and comment. Observe and coordinate functional performance testing to verify that system performance meets the design intent. Document the results of the functional performance testing directly and /or verify that the appropriate technicians document the testing. The CxA shall compile standard forms to be used by the commissioning team for consistency of approach and type of information to be recorded. Review and provide comment on the O&M manuals and record drawings. Provide a final commissioning report. Products Test Equipment All standard testing equipment required to perform startup and initial checkout and required performance testing shall be provided by the contractor for the equipment being tested. This includes, but is not limited to, two -way radios, test equipment, meters, and data recorders. Any special equipment, tools, and instruments (only available from the manufacturer or specific vendor and specific to the piece of equipment) that are required for testing equipment according to these contract documents shall be included in the contractor's base bid price and shall be turned over to the owner at project close -out. All testing equipment shall be of sufficient quality and accuracy to test and /or measure system performance within the tolerances specified in the specifications. All equipment shall be calibrated according to the manufacturers' recommended intervals and when dropped or damaged, Calibration tags shall be affixed or certificates readily available. Power supplies of the appropriate size and type shall be provided for all supplied equipment not supplied with integral power supplies. Execution Deficiencies and Non - conformance The CxA will review the report and provide comment through the general contractor, to the contractor / subcontractor. The installing subcontractors or vendors shall correct all areas that are deficient, and shall notify the owner via the general contractor as soon as outstanding items have been corrected, and resubmit an updated startup report with a Statement of Correction on the original non - compliance report. When satisfactorily completed, the CxA will recommend approval of the execution of the checklists and startup of each system. Functional Performance Testing The systems identified in the commissioning scope of work will be operated through the different modes of operation to verify that the systems function within the performance guidelines identified in the design intent documents and to meet the owner's intent. The functional performance testing provides all team members with documentation to verify the operation of the systems and equipment at turnover. This testing process will be documented utilizing functional performance testing checklists. Before functional performance test procedures are finalized, the contractor shall provide to the design team and the CxA all requested documentation and a current list of changes affecting equipment or systems. Using the testing parameters and requirements in the technical specifications, the CxA shall update /develop specific test procedures and forms to verify and document operation of each piece of equipment and system. Each contractor /subcontractor or vendor, as appropriate, shall provide assistance to the CxA in developing the final procedures. Prior to finalization, the design team shall review and provide comment on the test procedure. The CxA will provide the commissioning team members and others, as required, the functional performance testing checklists, plans, and procedures as determined by the contract drawings and specifications, and identified by manufacturers' recommendations. Skilled technicians shall be provided by the appropriate contractors familiar with the system, components, equipment, and the facility in order to execute the functional performance testing of the system, subsystems, associated systems, components, and equipment. Each contractor will be responsible to operate the systems to be commissioned and assist the CxA who will be verifying the functional performance testing procedures. During the functional performance testing, each responsible contractor or subcontractor, at the discretion of the CxA, may address minor problems discovered as may be necessary in order to successfully complete the testing procedure. In such cases, the deficiency and resolution will be documented on the procedure form or an attached sheet. The responsibility to resolve, correct, and retest deficiencies or other issues discovered during the functional performance testing is with the contractor, with design team approval, cis required. Final interpretive authority is with the design team. Final acceptance authority is with the Owner and general contractor. The CxA will document the resolution process. After resolution of deficiencies and other issues, the functional performance testing shall be redone. Any required re-- testing shall not be considered a justified reason for a claim of delay or for a time extension by a contractor. Seasonal and Deferred Testing If any check or test cannot be completed due to the project completion level, required occupancy condition or other deficiency or issue, execution of checklists and performance testing may be delayed upon approval of the owner, general contractor, and CxA. These tests will be conducted in the same manner as the seasonal tests and as soon as possible. Services of necessary parties may be negotiated. During the warranty period, seasonal testing (tests delayed until weather conditions are closer to the system's design) shall be completed as part of this contract. The CxA shall coordinate this activity through the owner and general contractor. Tests will be executed by the appropriate contractors, documented by the CxA, and any issues or deficiencies should be corrected by the appropriate contractor / subcontractors. Any final adjustments to the O &M manuals and as-- builts due to the testing or resolution or issues shall be made by the contractor. Operations and Maintenance Manuals and data The cornrnissioning process requires detailed O &M documentation as identified in this section and technical specifications. Contractor shall submit two draft copies of the complete operating and maintenance manual to the CM for review by the design team and CxA within 30 calendar days after review of equipment shop drawings. One copy will be returned to the contractor within 30 days after receipt by the design team and CxA. Contractor shall submit corrected final approved manuals prior to substantial completion. Prior to the final submittal, the CxA shall review the O &M manuals (in addition to the initial draft O &M manual), and documentation, with redline as- builts, for systems that were commissioned to verify compliance with the specifications and drawings. The CxA will communicate, through the owner and general contractor, issues or deficiencies in the manuals to the contractor or design team, as requested. The CxA will review each equipment warranty and verify that all requirements to keep the warranty valid are clearly stated. This work does not supersede the design team's review of the 0 &M manuals according to the design team's contract. The scope of the operation and maintenance manuals for the commissioning process shall include, but not be limited to, the following: Submittal data stating equipment size and selected options for each piece of equipment requiring maintenance. Operation and maintenance manuals for each piece of equipment requiring maintenance. Name and address of at least one service agency. HVAC controls system maintenance and calibration information, including wiring diagrams, schematics, and control sequence descriptions. A complete narrative of how each system is intended to operate. Manual Construction: the manuals shall be constructed with the following components: Bin& heavy duty, 3 -ring, vinyl covered, loose leaf binders, in thickness necessary to accommodate contents, sized to hold 8.5" x 11" paper, with clear plastic sleeve on the spine to hold label describing contents and with pockets inside the covers to hold folded oversize sheets. Provide as many binders as required for convenience of use and reference. Dividers: heavy paper dividers with plastic covered tabs for each section. Mark each tab to correlate with the table of contents. Protective plastic sleevee: transparent sleeves designed to enclose diagnostic software discs for computerized electronic software. MECHANICAL SPECIFICATION GENERAL: General Provisions of the Contract including General and Supplementary Conditions and General Requirements apply to work of this section. SCOPE: The base bid includes furnishing all materials, labor, tools, and equipment and the performance of all work required to install a complete heating and air conditioning system as outlined herein. J .LITY ASSURANCE: Provide a complete installation in conformance with the following standards. AGA American Gas Association ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers NFPA National Fire Protection Association SMACNA Sheet Metal and Air Conditioning Contractors National Association. Statewide Building Code IMC International Mechanical Code WORK NOT JNCLUDED: The following work is not included under this contract: - Electric power wiring of motors -Starters and disconnect switches except as hereinafter specified - Field painting of equipment except as hereinafter specified RERMITS. FEES. INSPECTIONS. LAWS, AN.12....BEGULATJQJI Permits and fees of every nature required in connection with this work shall be obtained and paid for by this contractor who shall also pay for all the installation fees and similar charges. Laws and regulations, which bear upon or affect the various branches of this work shall be complied with by this contractor and are hereby made a part of this contract. All work, which such laws require to be inspected, shall be submitted to the proper public official for inspection and a certificate of final approval must be furnished. SEISMIC BRACING: Provide seismic bracing of mechanical and electrical components where required by code. WORK IN EXISTING SPACES: General: Care shall be taken when working in existing spaces so as not to damage existing walls and ceilings where work is being performed. Ceilings: Where work is being performed above ceilings, and the architectural drawings do not indicate ceiling modifications by the general contractor, it shall be the responsibility of this contractor to remove and replace existing ceilings where work is being performed. In those instances, all repair and installation of new grid, ceiling panels, etc shall be the responsibility of this contractor. Match existing finishes. Walls & Floors: It shall be the responsibility of this contractor to patch existing walls and floors and match existing finishes where work is being removed or installed and patching is being performed, unless noted otherwise on the architectural drawings. TESTS AND ADJUSTMENTS: No ducts, piping, fixtures or equipment shall be concealed or covered until they have been inspected and approved by the Architect and the inspector who shall be notified by the contractor when the work is ready for inspection. Work shall be completely installed, tested and leak tight before inspection is required. All tests shall be repeated to the satisfaction of those making the inspection. METAL DUCTWORK DUCTWORK MATERIALS Exposed Ductwork Materials: Where ductwork is indicated to be exposed to view in occupied spaces, provide materials which are free from visual imperfections including pitting, seam marks, roller marks, stains and discolorations, and other imperfections, including those which would impair painting. Exposed ductwork which is to be painted shall have paint grip applied. Sheet Metal: Except as otherwise indicated, fabricate ductwork from galvanized sheet steel, lock forming quality; with G 90 zinc coating and mill phosphatized for exposed locations. Minimum gauge shall be 24. MISCELLANEOUS DUCTWORK MATERIALS Volume Dampers: Provide volume dampers in all branch ducts or as required for balancing to required air flows. Fittings: Provide radius type fittings fabricated of multiple sections with maximum 15 deg. change of direction per section. Unless specifically detailed otherwise, use 45 deg. laterals and 45 deg. elbows for branch takeoff connections. Where 90 deg. branches are indicated, provide conical type tees. Duct Sealant: Non- hardening, non - migrating mastic or liquid elastic sealant, type applicable for fabrication /installation detail, as compounded and recommended by manufacturer specifically for sealing joints and seams in ductwork. Duct Cement: Non - hardening migrating mastic or liquid neoprene based cement, type applicable for fabrication /installation detail, as compounded and recommended by manufacturer specifically for cementing fitting components, or longitudinal seams in ductwork. Ductwork Support Materials: Except as otherwise indicated, provide hot - dipped galvanized steel fasteners, anchors, rods, straps, trim and angles for support of ductwork. LINED DUCT Fabricate ductwork with duct liner in each section of duct where indicated. Laminate liner to internal surfaces of duct in accordance with instructions by manufacturers of lining and adhesive, and fasten with mechanical fasteners. Duct liner to be 3-lb density for acoustic requirements 1" thick or as noted. Size of ductwork shown on the drawings is free net area, outside dimension of ducts will need to be increased if lined duct is used. Size of ductwork shown on the drawings is free net area, outside dimension of ducts will need to be increased if lined duct is used. Duct Liner: Fibrous glass of thickness indicated. 3-lb density. All liners, insulation and adhesives shall have a flame spread index not more than 25 and a smoke developed index of not more than 50. Duct Liner Adhesive: Duct Liner Fasteners: Comply with SMACNA HVAC Duct Construction Standards. INSTALLATION OF METAL DUCTWORK General: Assemble and install ductwork in accordance with recognized industry practices which will achieve air -tight (5% leakage for systems rated 3" and under; 1% for systems rated over 3 ") and noiseless (no objectionable noise) systems, capable of performing each indicated service, Install each run with minimum number of joints. Align ductwork accurately at connections, within 1/8" misalignment tolerance and with internal surfaces smooth, Support ducts rigidly with suitable ties, braces, hangers and anchors of type which will hold ducts true -to -shape and to prevent buckling. Support vertical ducts at every floor. Sealing: Seal all longitudinal seams, S's and drives and all joints with mastic or cement. Install according to SMACNA standards. Balancing Dampers: The sheet metal contractor shall be fully responsible for installing balancing dampers in the ductwork, (whether shown on the drawing or not) in order to arrive at the intended air flow. The balancing sub- contractor shall provide direction and assistance in determining locations where dampers are required. Additional dampers, if required shall be installed at no additional cost to the owner. Wall Penetrations: Seal and pack around all ducts and piping sleeves which pass through walls that extend to bottom side of structure and rated walls. Field Fabrication: Complete fabrication of work at project as necessary to match shop - fabricated work and accommodate installation requirements. Routing: Locate ductwork runs, except as otherwise indicated, vertically and horizontally and avoid diagonal runs wherever possible. Run ductwork in shortest route which does not obstruct useable space or block access for servicing building and its equipment. Hold ducts close to wails, overhead construction, columns, and other structural and permanent enclosure elements of building. Limit clearance to 1/2" where furring is shown for enclosure or concealment of ducts, but allow for insulation thickness, if any. Where possible, locate insulated ductwork for 1" clearance outside of insulation, Wherever possible in finished and occupied spaces, conceal ductwork from view, by locating in mechanical shafts, hollow wall construction or above suspended ceilings. Do not encase horizontal runs in solid partitions, except as specifically shown. Coordinate layout with suspended ceiling and lighting layouts and similar finished work. Electrical Equipment Spaces: Do not route ductwork through transformer vaults and their electrical equipment spaces and enclosures. Penetrations: Where ducts pass through interior partitions and exterior wails, and are exposed to view, conceal space between construction opening and duct or duct insulation with sheet metal flanges of same gage as duct. Overlap opening on 4 sides by at least 1 -1/2 ". Fasten to duct and substrate. Where ducts pass through fire -rated floors, walls, or partitions, provide fire dampers and firestopping between duct and substrate, in accordance with requirements of Division -7 Section "Firestopping ". Coordination: Coordinate duct installations with installation of accessories, dampers, coil frames, equipment, controls and other associated work of ductwork system. INSTALLATION OF DUCT L.INFR General: Install duct liner in accordance with SMACNA HVAC Duct Construction Standards. Size of ductwork shown on the drawings is free net area, outside dimension of ducts will need to be increased if lined duct is used. Store internally lined ductwork up off of the floor. Protect internally lined ductwork from water and dust. "Butter the leading edge of all internal duct lining with the manufacturer's recommended adhesive. Inspect and repair all damaged lining prior to installation of ductwork. INSTALLATION OF FLEXIBLE DUCTS Maximum Length: For any duct run using flexible ductwork, do not exceed 5' - 0" extended length. Installation shall have smooth full radius turns down to diffuser. Installation not permitted above inaccessible ceilings. A CESS PANELS: Furnish all access panels required for proper servicing of equipment. Provide access panels for all concealed valves, vents, controls and cleanout doors, and sprinkler devices required by NFPA. Provide frame as required for finish. Furnish panels to General Contractor. Exact locations to be approved by the Architect. Minimum size to be 12" x 12 ", units to be 16 gauge steel, locking device shall be screwdriver cam locks. (HANGERS AND SUPPORTS: Support all piping, ductwork and equipment by hangers or brackets. Furnish structural steel members where required to support piping arid equipment. No portion of piping or valves shall be supported by equiprnent. Ductwork - Support by means of hangers as follows: Duct Width Hanger Size and Type Max. Spacing 30 or less ( #16 gage) 8 31 to 60 ( #14 gage) 8 61 to 90 3/8" dia. Rod 8 A pair of hangers shall be located at every transverse joint and elsewhere according to the table. FANS AND VENTII ATORS CEILING VENTILATORS Centrifugal Ceiling Exhausters: Provide centrifugal ceiling exhausters, designed for ceiling or wall mounting, of type, size and capacity as scheduled. Provide AMCA Certified Ratings Seal. Type: Provide galvanized steel housing lined with acoustical insulation, adaptable for ceiling or wall installation. Provide centrifugal fan wheels mounted on motor shaft with fan shrouds, all removable for service. Provide integral backdraft damper fan discharge. Grille: Provide steel louvered grille with flange on intake with thumbscrew attachment to fan housing. Motor: Provide permanent split - capacitor motor, permanently lubricated. Accessories: Provide manufacturer's standard roof jack, wall cap, and transition fittings as indicated on drawings or schedules. Duct Lining: Provide 1" thick, 3-lb density duct liner a minimum of 5' (five feet) up and down stream of fan. Manufacturer: Subject to compliance with requirements, provide centrifugal ceiling exhausters of one of the following: me Breid ert Carnes Cook Co., Loren. Greenheck. Penn Ventilator Co., Inc. Jenn Fan Twin City Fan & Blower INSPECTION General: Examine areas and conditions under which power and gravity ventilators are to be installed. Do not proceed with work until unsatisfactory conditions have been corrected. INSTALLATION OF POWER AND GRAVITY VENTILATORS Coordinate ventilator work with work of roofing, walls, and ceilings, as necessary for proper interfacing. Provide access door in duct below ventilator to service damper. Solder bottom joints and up 2" of side joints of duct under roof ventilator to retain any moisture entering ventilator. Access: Provide access and service space around and over fans as indicated, but in no case less than that recommended by manufacturer. Roof Curbs: Furnish roof curbs to roofing Installer for installation. Install according to roofing manufacturer's recommendation and specifications. Electrical Wiring: Install electrical devices furnished by manufacturer but not specified to be factory- mounted. Furnish copy of manufacturer's wiring diagram submittal to Electrical Installer. Verify that electrical wiring installation is in accordance with manufacturer's submittal and installation requirements of Division -16 sections. Ensure that rotation is in direction indicated and intended for proper performance. Do not proceed with centrifugal fan start -up until wiring installation is acceptable to fan Installer. FIELD QUALITY CONTROL Testing: After installation of ventilators has been completed, test each ventilator to demonstrate proper operation of units at performance requirements specified. When possible, field correct malfunctioning units, then retest to demonstrate compliance. Replace units, which cannot be satisfactorily corrected. ADJUSTING AND CLEANING Cleaning: Clean factory - finished surfaces. Repair any marred or scratched surfaces with manufacturer's touch -up paint. VARIABLE - AIR - VOLUME UNITS FAN POWERED TERMINALS Fan Section: Provide galvanized steel plenum, acoustically lined, housing forward curved fan with belt or direct driven permanent split capacitor motor. Provide velocity sensor ring and damper with jack shaft. Provide air filter and back -draft damper. Provide control- powered transformer for each box. At installer's option, ship controls to box manufacturer for factory mounting. All shipping costs shall be borne by the temperature control contractor, box manufacturer is responsible for mounting. Provide the following type of coil: Manufacturer: Subject to compliance with requirements, provide air terminals of one of the following: Anemostat Products Div., Dynamics Corp. of America. Carnes Co. E.H. Price Enviro -Tec Krueger Titus Products Div., Philips Industries, Inc. Carrier Corp., Sub. of United Technologies Corp. Trane (The) Co. MetalAire Tuttle & Bailey INSPECTION Examine areas and conditions under which air terminals are to be installed. Do not proceed with work until unsatisfactory conditions have been corrected in manner acceptable to Installer. INSTALLATION OF AIR TERMINALS General: Install air terminals as indicated, and in accordance with manufacturer's installation instructions, Location; Install each unit level and accurately in position indicated in relation to other work; and maintain sufficient clearance for normal service and maintenance, but in no case less than that recommended by manufacturer. FIELD QUALITY CONTRQl Upon completion of installation and prior to initial operation, test and demonstrate that air terminals, and duct connections to air terminals, are leak- tight. Repair or replace air terminals and duct connections as required to eliminate leaks, and retest to demonstrate compliance. CLEANING Clean exposed factory- finished surfaces. Repair any marred or scratched surfaces with manufacturers touch -up paint. SEQUENCE OF OPERATION: Central Air Terminal Units VAV Boxes Provide low voltage DDC controller, transformer, differential pressure transmitter, actuator and wiring for VAV box. Mechanical Contractor shall field or factory mount controller at their expense. Electrical Contractor shall provide all 120 power wiring as required for transformers and temperature control panels. Electrical Contractor shall connect to existing spare at electrical panel board and provide proper circuit breaker per NEC and label panel board accordingly. Mechanical Contractor shall route all low voltage wiring to VAV boxes, controllers and thermostats for complete operation. VAV box manufacturer shall furnish flow ring, f2" round damper shaft for direct mounting of actuator, and control enclosure. Provide wall mounted temperature sensors and thermostats with digital display of room temperature and setpoint ( +/- 3 deg. F. adjustable frorrr setpoint determined by BAS), override feature (2 hours, adjustable), The fan shall be on when the space is occupied. On a call for heat, primary air damper shall modulate close. On a further call for heat, the electric heating coil shall stage on. On a call for cooling, electric heating coil shall stage off. On a further call for cooling, the primary air damper shall modulate open. Exhaust Fans Toilet Exhaust Fans Exhaust fans shall be controlled by local manual switch furnished, installed arid wired by electrical contractor. When activated, exhaust fan motor damper shall open and fan shall start. CONTROLS: Electrical contractor will provide power wiring. HVAC contractor shall provide all the low voltage wiring of HVAC units and controls, thermostats and controllers. Thermostat shall be by the manufacturer of the HVAC unit (heat /cool /auto /off) with night setback. Provide plastic protective cover for all thermostats. AIR BALANCING: Before final approval, balance entire system with quantities listed. Provide manual volume dampers as required to obtain design air flows. Balance Report shall clearly state the supply, return, outside air and exhaust CFM for each outlet or inlet. Balance Report shall indicate the design and actual total air flow, suction and discharge static pressure, brake horsepower and amps of all fans for the project. Provide all necessary dampers, diverters as required. Provide a copy of the balance report to the owner and landlord. DUCTWORK INSULATION; Provide insulation on all supply air ductwork. All liners, insulation and adhesives shall have a flame spread index not more than 25 and a smoke developed index of not more than 50. Rigid Fiberglass Ductwork Insulation: Glass fibers bonded with a thermosetting resin. Comply with ASTM C 612, Type 18, without facing and with vapor barrier all- service jacket manufactured from kraft paper, reinforcing scrim, aluminum foil, and vinyl film. Insulation shall have a minimum R value as required by Code. Flexible Fiberglass Ductwork Insulation; Glass fibers bonded with a thermosetting resin. Comply with ASTM C 553, Type II, without facing and with vapor barrier all- service jacket manufactured from kraft paper, reinforcing scrim, aluminum foil, and vinyl film. Insulation shall have a minimum R value as required by Code. Vapor Barrier Material for Ductwork: Paper - backed aluminum- -foil, except as otherwise indicated; strength and permeability rating equivalent to factory- applied vapor barriers on adjoining ductwork insulation, where available; with following additional construction characteristics: High Puncture Resistance: Low vapor transmission (for ducts in exposed areas: Mech. Rooms, etc.) Moderate Puncture Resistance: Medium vapor transmission (for ducts in concealed areas). GUARANTEE The contractor shall provide a guarantee in written form stating that all work under this section shall be free of defective work, materials, or parts for a period of one year from the date of owner's final acceptance and shall repair, revise or replace at no cost to the owner any such defects occurring within the guarantee period. Contractor shall also state in written form that any items or occurrences arising during the guarantee period will be attended to in a timely manner and will in no case exceed four (4) working days from date of notification by owner. RECEIVED CITY OF TUKWILA FEB 0 7 2003 PERMIT CENTER KOHRS LONNEMANN H IL ENGINEERS, IPSO MECHANICAL /ELECTRICAL ENGINEERS 1538 ALEXANDRIA PIKE, STE. 11 FT. THOMAS, KENTUCKY 41075 859- 442 -8050 859- 442 -8058 FAX WWW.KLHENGRS.COM SHEET 'Sy c EXi' iiFS PROJECT 8151.01 DESCRIPTION W Z W 0 z 0 D J W LL. OD W M 33 MECHANICAL NOTES AND SPECIFICATIONS