Loading...
HomeMy WebLinkAboutPermit M08-048 - WESTFIELD SOUTHCENTER MALL - PUMPKIN PATCHPUMPKIN PATCH 1026 SOUTHCENTER MALL M08 -048 Parcel No.: Address: Suite No: doc: IMC Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: Value of Mechanical: $43,000.00 Type of Fire Protection: SPRINKLER/AFA CitAlf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 6364200010 1026 SOUTHCENTER MALL TUKW PUMPKIN PATCH 1026 SOUTHCENTER MALL , TUKWILA WA WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD CA TIM SCHENK 1120 E 80 ST, STE 211 , BLOOMINGTON MN Contractor: Name: OAKSTONE CONSTRUCTION INC Address: 4065 YOSEMITE PL , PLACERVILLE CA Contractor License No: OAKSTCI988KC MECHANICAL PERMIT DESCRIPTION OF WORK: NEW TENANT IMPROVMENT: (2) NEW VAVS, NEW DUCT WORK AND DIFFUSTERS, NEW CONTROLS, AND (1) NEW EXHAUST FAN Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 0 Appliance Vent 0 Repair or Addition to Heat/Refrig /Cooling System.... 0 Air Handling Unit <10,000 CFM 2 >10,000 CFM 0 Evaporator Cooler 0 Ventilation Fan connected to single duct 1 Ventilation System 0 Hood and Duct 0 Incinerator: Domestic 0 Commercial/Industrial 0 EOUIPMENT TYPE AND OUANTITY * * continued on next page ** M08 -048 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 800 541 -0821 Phone: 530 - 642 -8858 Expiration Date: 05/24/2008 M08 -048 03/17/2008 09/13/2008 Fees Collected: $653.75 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 19 Thermostat 2 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment Printed: 03 -17 -2008 Permit Center Authorized Signature: • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us ciJ Permit Number: M08 -048 Issue Date: 03/17/2008 Permit Expires On: 09/13/2008 Date: 3 - F2 -68 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction o s• e perform $ of work. 1 41am authc ri d to sign and obtain this mechanical permit. Signature: Print Name: Date: 3 / 2 doc: IMC -10/06 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -048 Printed: 03 -17 -2008 Parcel No.: 6364200010 Address: 1026 SOUTHCENTER MALL TUKW Suite No: Tenant: PUMPKIN PATCH 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 -048 Status: ISSUED Applied Date: 02/19/2008 Issue Date: 03/17/2008 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 14: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) doc: Cond -10/06 M08 -048 Printed: 03 -17 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 18: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 19: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 20: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond -10/06 * *continued on next page ** M08 -048 Printed: 03 -17 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Print Name: Date: 3 --/ ? -0 9 �.� KJ29J doc: Cond -10/06 M08 -048 ordinances governing or local laws regulating Printed: 03 -17 -2008 CITY OF TUKWIL* Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Building Permit. t7O Mechanical Permit No. M Plumbing /Gas Permit No. PGTli, Public Works Permit No. Foy -10 Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION 1 King Co Assessor's Tax No.: GS Co 4 - cpe" 1 1 Site Address: 3 S x§InC er lker Ma\\ Tenant Name: RixylVc;(\ cb rekh Property Owners Name: ' ∎lays ie1A . Cbccxx - Wrkon Mailing Address: 11C0Ot Roakvarcl Lc- S Pl e \eSC.A GO.aS City Suite Number: 1Z-1, Floor: \ New Tenant: NI Yes ❑ ..No State Zip CONTACT PERSON - who do we contact when your permit is ready to be issued • Name: - T1YNA �c rtp rvr= Day Telephone: gbb 1 S41 OR2 Mailing Address: 1120 EaSA R4 Jk S*P e _ :kuik2 2M , PAt vliv‘CftCy\ AN I.AM Sc ZV City State Zip E -Mail Address: '\TYVe er \ r jcic'tps. cory, Fax Number: qS2. i csS'4-4g0 q GENERAL CONTRACTOR INFORMATION - I . (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: -re, . D Mailing Address: Zip State City Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: ARCHITECT.. OF RECORD - All plans must be wet stamped by Architect of Record Company Name: Cc VIYNC \ IAN -elan Alto Mailing Address: - 71\ I'lor4h cter ( oar, SS irei k in , TT C o tt l '- City State Contact Person: 3e. e_ or1 Day Telephone: c<\1 Crc 3 S - SCa 9 G, E -Mail Address . �rci rOw‘e- -hO il\u.re . LOM Fax Number: g ►7 l G.74 bh Zip ENGINEER OF RECORD = All plans must be wet stamped by Engineer of Record Company Name: E I yvte.ndocc 2 ASSoci ck 1 Tel GBe \e.. Mailing Address: Z51 g E Rau Dr. Nu), G: yNati -Nor; W A '1g�3S I l2- ?_ AT to Or, a -per's Gtpve d Ci ty State Zip cJ �{'Z ( Contact Person:. \ ey ran:? t-18O r i -3 ■ re. LeNl Day Telephone: 2Z $'S$ SERA/ l t O l R E -Mail Address: ialetteir,P Pathell.mt. \ c l eVyp` m) - Ikihtee, Fax Number :2C?I4rSg- S'i*$f-'"1►4} /S 't -I$o4 Q:Wpplications\Por ms- Applications On Line .3 -2006 - Permit Application.doc COPel Revised: 9 -2006 Page 1 of 6 Valuation of Project (contractor's bid price): $ ate, Orr) Scope of Work (please provide detailed information): et v td - re* cr_■ \ -- e--w v\4 r e. l V M Q, E { cbif r ) - reYNO YNt Existing Building Valuation: $ l st Floor: 2nd Floor 3` Floor Floors ' thru Basement'. Accessory .Structure* ' Attached Garage Detached Garage - Attached Carport, Detached ;,Carport , Covered. Deck Uncovered Deck Provide All Building Areas in Square Footage Belo • x"isting. 5, gg Interior Remodel ON FIRE PR ti ECTION/HAZARDOUS MATERIALS: Addition to. Existing:;; Structure, = Type ''fConstruction i1 N . Type•of Occupancy;per IBC:.:. M PLANNING DIVISION: Single family building footp: t (area of the foundation of all structures, plus any dec over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelli •, provide the following: Lot Area (sq ft Floor area of principal dwelling: Floor area of accessory dwelling: *Provide doc entation that shows that the principal owner lives in one of the dwell ,:s as his or her primary residence. Number of Parkin tails Provided: Standard: Compact: Handicap: Will there be a • ange in use? ❑ Yes ® No If "yes ", explai Will there be new rack storage? ❑ Yes Q:Wpplications\Foms- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh ❑.. No If yes, a separate permit and plan sub ttal will be required. E. .. Sprinklers NI Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ® No If "yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Page 2 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Futnace> 100K BTU Evaporator Cooler Diffuser 19 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct S Thermostat • Z 15 -30 HP /1,000,000 BTU Suspended/Wall /Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig /Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Z Incinerator — Comm/Ind MECHANICAL PERMIT INFWMATION - 206 - 431 -3670 Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New _la Replacement .... ❑ Indicate type of mechanical work being installed and the quantity below: Q:\Applications\Fonns- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh I MECHANICAL CONTRACTOR INFORMATION Company Name: 'T G . t . Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ 43, coo • Scope of Work (please provide detailed information): 2 new VAN/ , f1P 7 du[ ux 'r = '. d t Pais e r te. a'� ► a� C-a rcIA s i nP k.A) 1ncu..t Fuel Type: Electric ® Gas _1=1 Other: Page 4 of 6 • PUBLIC WORKS PERMIT IN ,RMATION = 206 - 433 -0179 Scope of Work (please provide detailed information): Water District ❑ ...Tukwila ❑ ...Water Availabili Provided Sewer District ❑ ...Tukwila ❑ ...Sewer Use Certificate Please refer to Public Works Bulletin #1 for fees and estimate sheet. Septic System: ❑ On -site Septic System — For -site septic system, provide 2 copies of a current septic design approve•. King County Health Department. Submitted with Application (mark oxes which apply): ❑ ...Civil Plans (Maximum Paper Si — 22" x 34") ❑ ...Technical Information Report (Sto Drainage) ❑ .. Geotechnical Repo ❑...Traffic Impact Analysis ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) ❑ .. Maintenance A a, ment(s) ❑...Hold Harmless — (SAO) ❑...Hold Harmless — (ROW) Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 7 ours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction/Excavation/Fill - Right -of -way Non Right -of -way ❑ ...Total Cut ❑ ...Total Fill FINANCE INFO TION Call before you Dig: 1 - 800 - 424 - 5555 ❑...Water District #125 ❑ .. Highline ❑ ... Val Vue ❑ .. Renton 0... Sewer Availability Provided cubic yards cubic yards ❑ ...Sanitary Side Sewer ❑ .. Aba •'.n Sept Tank ❑ .. Grease Interceptor ❑ ...Cap or Remove Utilities ❑ .. C .i Cut ❑ .. Channelization El ...Frontage Improvements .. " : vement Cut ❑ .. Trench Excavation ❑ ...Traffic Control Looped Fire Line ❑ .. Utility Undergrounding ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic W .` er " ❑ ...Permanent Water Meter Size.. WO # ❑ ...Temporary Water Meter Si WO # ❑ ...Water Only Meter Size.. WO # ❑ ...Sewer Main Extensio Public Private ❑ ...Water Main Extensi Public Private ❑ .. Rig f -way Use - Profit for less than 72 hours ❑ .. ' ' t -of -way Use — Potential Disturbance ❑ .. Work in Flood Zone ❑ .. Storm Drainage ❑ .. Renton ❑ .. Seattle Deduct Water Meter Size Fire Line Size at ' operty Line Number of Public Fire Hydrant(s) ❑ ...Water ❑ ...Sewer ❑ ...Sewage Treatment Monthly S. ice Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: Q:lApplication& Fonns- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh City State Zip Day Telephone: City State Zip Page 3 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTH RIZE A GENT: t Signature: L ' AUTH ,/t/ Date: t 1311 OR Print Name: Ti mn Scihr K- Day Telephone: 90e) IS4 t - C)R'Zi Mailing Address: 112o Er S-k 80 S$or€ e_ - Strike Zt \ � � 1r�nrvt Y c 1 -an , M i'V City State Zip Date Application Expires: Date Application Accepted: Q:'Applications'Forms- Applications On Linel3 -2006 - Permit Application.doc Revised: 9-2006 bh Staff Initials: Page 6 of 6 i Fixture Type: Qty Fixture Type: o -, Fixture Type: Qty Fixture Type: Qty Bathtub or combination bath/shower Drinking fountain or water cooler (per head) Wash fountain Gas piping outlets Bidet Food -waste grinder, commercial Receptor, indirect waste Clothes washer, domestic Floor drain y : inks Dental unit, cuspidor Shower, single h - : trap i , •nals Dishwasher, domestic, with independent drain Lavatory 1 ter Closet Building sewer or trailer park sewer Rain wate ' ystem — per drain (i t,. ide building) Wate eater and/or vent Additional medical gas inlets /outlets — six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Rep. • or alteration of water pi . • g and/or water treating _ • uipment Repair o `,:Iteration of drainag , s r vent piping Medical gas piping system serving one to five inlets /outlets for specific gas PLUMBING AND GAS PIPINNPERMIT INFORMATION L 206 - 431 - 670 PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: `T . R Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Plumbing work contractor's bid price): $ (Z 356. CO Valuation of Gas Piping work ontractor's bid price): $ Scope of Work (please provide d iled information): U)Qk Y1eQ}�>- Building Use (per Intl Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Indicate type of plumbing fixtures and/or gas piping outl being i . :- ailed and the quantity below: Q: Applications\Fonns- Applications On Linel3 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 5 of 6 Parcel No.: 6364200010 Permit Number: M08 -048 Address: 1026 SOUTHCENTER MALL TUICW Status: APPROVED Suite No: Applied Date: 02/19/2008 Applicant: PUMPKIN PATCH Issue Date: Receipt No.: R08 -00787 Initials: WER User ID: 1655 Payee: OAKSTONE CONSTRUCTION TRANSACTION LIST: Type Method Descriptio Amount Payment Check 11674 523.00 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Account Code Current Pmts 000.322.102.00.0 523.00 Total: $523.00 Payment Amount: $523.00 Payment Date: 03/17/2008 02:24 PM Balance: $0.00 doc: Receiot -06 Printed: 03 -17 -2008 RECEIPT NO: R08 -00472 Initials: JEM User ID: 1165 Payee: ELDER -JONES SET ID: S000000966 SET NAME: 'I'mp set/Initialized Activities SET TRANSACTIONS: Set Member Amount City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http.• //www. ci. tukwila. wa. us D08 -095 1,129.70 EL08 -165 118.90 18 1 048 130.75 PG08 -052 29.00 TOTAL: 1,408.35 TRANSACTION LIST: Type Method Description Amount Payment Check 50782 ACCOUNT ITEM LIST: Description ELECTRICAL PLAN - NONRES PLAN CHECK - NONRES SET RECEIPT TOTAL: 1,408.35 1,408.35 Account Code Current Pmts 000.345.832.00.0 118.90 000/345.830 1,289.45 TOTAL: 1,408.35 Payment Date: 02/19/2008 Total Payment: 1,408.35 6779 02/19 9710 TOTAL 1400.35 Project: f pk,-1 ' 3 *I1 Type of Inspection: Inspection:_,,, ( 1' Address: J. 6 !1.(! Date Called: Special Instructions: Date Wanted: 7-II -D' a.m. Requester: Phone No: (-t Inspector: INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. (206)4 -3670 © Approved per applicable codes. D Corrections required prior to approval. COMMENTS: 4 Date: El $60.00 RVNSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 1 Receipt No.: 'Date: COMMENTS: \ /- % gLe4-. vv. Ai' 4 flu - NS. -Passe , � • v.< IA v1/474...1.7, GAt - ! 4 VA J -2- Rta,,..,.,.. 4.ikee i Am . itio -e0,4 S. vv..S w: LAc -1 F Date Called: Special Instructions: Date Wanted: ,,,f //) ! O S a.m. p.m. Requester: Project: n '" i' k , n Pt +c {,. Type of Inspection: cm +ic4- 5/.1.4.4-0/a f. Address: /824 MALL. Date Called: Special Instructions: Date Wanted: ,,,f //) ! O S a.m. p.m. Requester: Phone No: 71 INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 • Approved per applicable codes. Inspector: INSPECTION RECORD Retain a copy with permit PERMIT NO. (206)431 -3670 Corrections required prior to approval. &/ 'Date: 1/ If /D? El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 1Date: Proje -tom Type of spection: COMMENTS: / A I, 1. Address: I 0 Z(„, yvl A < Date Called: p ; rre,«s 11 It 114 v�,-4 r le��t1% -. r- Special Instructions: P Date W Hied: L�— / ! - U V m� p.m. Requester: Ph e N `b -Oco Approved per applicable codes. Corrections required prior to approval. COMMENTS: / A I, 1. 1.rszlei Bn 01 p ; rre,«s 11 It 114 v�,-4 r le��t1% -. r- P c (',os -. i dL INSPECTION NO. INSPECTION RECORD Retain a copy with permit Ma PERMIT NO. CITY OF TUKWILA BUILDING DIVISION r- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Inspector Date: $58:00 REINSPECTION FEE REQUIRED. Prior to inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: Project: P /4. n flu k A Type of Inspection: f °A5A Ile t4 Addres: II Jag/ codi. t'ar,T''i f ?a // Date Called: Special Instructions: — Date Wanted: -5-2e-pe a.m. p.m. Requester: Phone No: q /f 5 ogOf l Inspector: INSPECTION RECORD Retain a copy with permit PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 ❑ Approved per applicable codes. Corrections required prior to approval. COMMENTS: Cre, n T, k A s, cpfr I a c l Date: 0 $58.0 REINSPECTION FEE REQUIRED. Prior o inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: 'Date: - M,1,� .. == - •a�CS:s. �,. a.:a�.>.,r. :}S:s :h' �--. -� e�haclD�9l7r,Ln:e E+�i,., w ...; n �'.�N i .ft•u COMMENTS: 0 I c Fire Alarm: Type of Inspection: I- c- E(t se �4 (- Address: Suite #: /°°- to S • C 6 I 1 L(-- Contact erson: Special Instructions: Phone No.: iiito_ E-7) - X ltiA( - © K S r� A L :- . N ? e, pf 3 E ""e`h l-.. Lf — &�,) J t,A t 1,,,,.._( dS Re - 1 ecl Project: c.a $., ek: 0 0 I c Fire Alarm: Type of Inspection: I- c- E(t se �4 (- Address: Suite #: /°°- to S • C 6 I 1 L(-- Contact erson: Special Instructions: Phone No.: iiito_ E-7) - X Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: INSPECTION NUMBER Fl Approved per applicable codes. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 Word /Inspection Record Form.Doc 1/13/06 Do t5 0.E- -ll/ PERMIT NUMBERS I I Corrections required prior to approval. Inspector: f-- Date: 7 /i, Hrs.: n $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. T.F.D. Form F.P. 113 ACTIVITY NUMBER: M08 -048 DATE: 02 -19 -08 PROJECT NAME: PUMPKIN PATCH SITE ADDRESS: 1026 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: tng Division B it n Public Works Complete Comments: TUES/THURS ROUTING: Please Route REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 HERMIT COORD COPY � PLAN REVIEW /ROUTING SLIP 11 MAX/2 - 6 Fire Prevention VI Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete n Structural Review Required APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: Planning Division ❑ Permit Coordinator ❑ DUE DATE: 02-26-08 DATE: DATE: Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: n No further Review Required n DUE DATE: 03-5-08 Not Approved (attach comments) n Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License OAKSTCI988KC Licensee Name OAKSTONE CONSTRUCTION INC Licensee Type CONSTRUCTION CONTRACTOR UBI 602190669 Ind. Ins. Account Id #1 Business Type CORPORATION Address 1 4065 YOSEMITE PL Address 2 City PLACERVILLE County OUT OF STATE State CA Zip 95667 Phone 5306428858 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 5/24/2002 Expiration Date 5/24/2008 Suspend Date Separation Date Parent Company Previous License Next License Associated License Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date #1 CBIC CD7268 05/01/2002 Until Cancelled $12,000.00 05/03/2002 Business Owner Information Name Role Effective Date Expiration Date MARKWELL, CHARLES AGENT 05/24/2002 KREISL, WILLIAM A PRESIDENT 05/24/2002 Look Up a Contractor, Electriian or Plumber License Detail Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. • Page 1 of 2 https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= OAKSTCI988KC 03/17/2008 • 1 L f 11157 S� foU s moo mom r milserta t rira O L:' 12"0 10"4) a iP GD4 240 GFM GD4 240 GFM 8"4: GD4 8" 4) GD4 240 GFM 8"o GD4 240 cat 8" GD4 V A NAIL. S"4 004 GFM SENSOR � r -' .8:40"4) GD4 0 ~1 2 GFM 8'R 12". MEDI PRESSURE CONNECT TO EXIS N , 20" MEDIUM FRESSIRE DUCT; VpRIFY LOCATION I6 ". MEDIUM PRESSURE 1 MECHANICAL PLAN SCALE: 1/4 I'-0" NOTED: ALL DUCTWORK UPSTREAM OF THE VAV BOXES SHALL BE CONSTRUCTED TO A 4" PRESSURE CLASSIFICATION REVIEWED OM ON CO CE CODE COMPLIANCE MAR - I 008 B IL Of Tukwila N 01b Ti PER 2006 IMC SECTION 606 Install smoke detector to shut down air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See 1MC 606.2.2 for approved method of detection) SEPARATE PERMIT REQUIRED FOR; ❑ Mechanical L Electi cal *hinting INT Gas Piping City of Tukwila BUILDING DIVISION REVISE No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal 1 and may include additional plan review fees. j NOTE: DI STOG AFF 2 "4' 4 FM M IO' -0' I2'. MEDIUM OCATION FILE Copy Permft No. 5 8 Plar review approval Is Approval of construction subject to errors and omissions. the violation of any adopted cod o or ina , authorize of approved Field Co Receipt By Date: � - d City of Tukwila BUILDING DIVISION DATE: Issue For Permit /Construction 1/28/08 JOB NO: 0778 DRAWN: MAH CHECKED: JJE 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635 -5696 FAX: (817) 635 -5699 Elmendorf & Associates Mechanical Engineers 25I8 East Bay Dtrive, Gig Harbor, WA 98335 253 - 858 -5885, 253 - 858 -5884 FAX MiNEEMEMENriliMMEMEMI REVISIONS ammirnommimiumnim MECHANICAL PLAN SHEET NUMBER RECEIVED CITY OF TUKWILA FEB 19 2008 PERMIT CENTER OiLto O VAV OX SHL)LE 14AN TIRANE MODEL I CAL SYMSOLS MARK C O Q ' ( " DESCRIPTION (E) MIN EXISTIN (N) 147"0P NEW (AC) 0.15 ABOVE CEILING UTR 3 UP THRU ROOF W/ GAP 4 FLASHIN SA 8 " 4" SUPPLY AIR RA 0.15 RETURN AIR. EA EXHAUST AIR OA OUTSIDE AIR Ft" FIRE DAMPER F3L7I7 $ACKDRAFT DAMPER VI VIBRATION ISOLATOR (AL) ACOUSTICALLY LINED PLENUM OR. DUCT SECTION WALL THERMOSTAT, UP 4' -6" SD DUCT MOUNTED SMOKE DETECTOR (SEE ELEC.) 1^LSR WALL SUPPLY DIFFUSERS 1^1RG WALL RETURN GRILLE CEG CEILING EXHAUST GRILLE Cle. CEILING RETURN GRILLE RCD ROUND CEILING DIFFUSER GD4,GD3,ETG CEILING DIFFUSER; 4 WAY, 3 WAY, ETC. if I IT 4 VOLUME DAMPER (VD) 11111 if FLEXIBLE DUCT CONNECTION (FG) ® SECTION T1 -IRIJ SUPPLY AIR DUCT 0 SECTION THRU RETURN AIR DUCT ® SECTION THRU EXHAUST OR OUTSIDE AIR DUCT II GROSS HATCHING OP DUCT SECTION INDICATES PENETRATION OF DUCT UP THRU ROOF OR NEXT FLOOR. VAV OX SHL)LE MARK . TIRANE MODEL SIZE GFM C O Q ' ( " REMARKS MAX MIN 3 VCCF 147"0P 3180 1210 0.15 I" MA1 l PAGE INSULATION & PRESSURE INDEFENDAMT MALL APPROVED PDG CONTROLS AM& 3 WITH TRM PLASTER FRAME VCCF 8 " 4" 180 315 0.15 IN MATT PAGE INSULATION 4 PRESSURE INDEPENDANT MALL APPROVED MG CONTROLS An & C RI LLE, R!C I STER, 4 IUS SCH!DUL TAO MFR. / MODEL BORDER TYPE REMARKS S "cr GD4 TITUS TOGA 1N/ I8X I S NECK 4 8 "D NECK ADAPTOR 24X24 FACE 3 4 —WAY WITH TRM PLASTER FRAME 8 "cp CD2 TITUS TOGA W/ ISXIS NECK 4 8N NECK ADAPTOR 24X24 FACE 3 2 —WAY OPPOSED WITH TRM PLASTER FRAME 24X24 CRG TITUS 50F 3 WITH TRM PLASTER FRAME EXHAUST FAN SCH! UL. MARK MODEL GFM "SP ELECTRICAL REMARKS HP VOLTS PH GREEN+ -IEGIC G8-10. 100 .5 1/4 120 I4 1N/FACTORY CURB 4 BOO CONTROLLED BY SENSOR SEE ELEG DWGS A NOT PROVIDE CONTROLS PER MALL STANDARDS. CONTROLS SHALL BE INSTALLED BY A MALL APPROVED CONTROLS CONTRACTOR VOLUME DAMPER. ROUND BRANCH DUCT TAKEOFF. RECTANGULAR TO ROUND WIDE MOUTH TEE. SCALE: NTS J ar ILA z a TYPICAL SRANGFi DUCT TAKEO REWEWED CODE COMPLIANCE E ..._ APPROVE MAR - 4 2006 City Of Tukwila NG VI 10 RETANGULAR DUCT MAIN. ACCOUSTIG LINING. RECEIVED CITY OF TUKWILA FEB 1 ' 9 2008 PERMIT CENTER MENiMIMMINNOMMENINIE DATE: Issue For Permit /Construction 1/28/08 JOB NO: 0778 DRAWN: MAH CHECKED: JJE 711 N. FIELDER RD. ARLINGTON, TX 76012 PH: (817) 635 -5696 FAX: (817) 635 -5699 En Ld I C Elmendorf & Associates Mechanical. Engineers 2518 East Bay Drive, NW Gig Harbor, WA 98335 253- 858 -5885, 53 -858 -5 !EXPIRES 3 -3-09 EMEINEMEMENNINERM REVISIONS SCHEDULES AND DMtI I LS SHEET NUMBER M2,1 MECHANICAL SPECIFICATIONS SECTION 15800 - HEATING, VENTILATING AND AIR CONDITIONING 1.00 - GENERA!- 1.01 SCOPE OF WORK Provide and install complete a nd operational HVAG system as indicated on the drawings and in this specification. Work shall include, but not be limited to the following: A. Heating, ventilating * air conditioning systems, including all component parts. B. Air distribution system including grilles, registers, diffusers $ ductwork. G. Flashing and sealing of roof penetrations for water tightness. D. Toilet exhaust systems. E. Licenses, permits and associated fees. F. Hangers and support systems for air conditioning units, ductwork and piping. G. Complete Temperature Controls, including all components necessary. 1.02 RELATED WORK INCLUDED UNDER OTHER SECTIONS A. B. G. D. Plumbing Section 15400 Testing and Balancing Section 15e100 Electrical Section 16000 Fire Protection Section 15500 1.03 EXAMINATION OF SITE A. Contractor shall visit site and verify all existing conditions prior to submitting bid to familiarize himself with all existing conditions including entrance and exit facilities, elevator limitations, hours of permitted by the building for transportation of equipment and materials. Contractor must satisfy himself as to the nature and scope of the work and difficulties that affect the execution and completion of the work. The contractor shall examine all existing structural conditions, take all necessary measurements and note existing conditions for the purpose of moving equipment into the building. B. Submission of a bid will be construed as evidence that such an examination has been made and later claims for labor, equipment or materials required, or for any difficulties encountered which could have been avoided had a proper examination been made will not be compensated for or recognized. 1.04 DRAWINGS A. The drawings are generally diagrammatic and indicate general arrangement of equipment, ducts and piping. B. The contractor shall coordinate his work with ail contract drawings and drawings a other trades to verify spaces in which work will be installed. Maintain maximum headroom and space conditions at all locations. G. The contractor shall without extra charge, make reasonable modifications in the layout as needed to prevent conflict with work of other trades and structural members or for the proper execution of work. 1.05 RULES AND REGULATIONS: A. The work and materials shall conform and comply to the international Plumbing and International Mechanical Code, National Energy Code, National Electrical Code, National Fire Protection Association and ail applicable ordinances and codes of the authority having Jurisdiction. Furnish without any extra charge, any additional material and labor when required to comply with these laws, ordinances and codes though the work be riot mentioned in this division or shown on the drawings. B. Contractor shall obtain all approvals, tests, inspections and permits, and pay all necessary fees for all work pertaining to this project. All agencies having Jurisdiction shall be complied with. 1.06 SHOP DRAWINGS AND MATERIAL SUBMITTALS A. Submit for review to Pumpkin Patch (6 copies) a complete and ail - inclusive list of all equipment and materials, including automatic temperature controls, cuts of equipment, sequence of operation, ductwork and proposed for use, accompanied by manufacturer's data sheets giving sizes, capacities, etc. Data shall be forwarded in a single package written 15 days after award of contract. contractor shall not install any equipment without Engineer's approval. B. A set of shop drawings shall be prepared and delivered to Pumpkin Patch by the contractor showing all equipment, ductwork, piping, and air outlets as installed in the field, including ail sizes and changes to the original design prior to construction. A set of reproducibles, along with three sets of blueprints of these shop drawings shall be delivered to Pumpkin Patch. These drawing shall be modified to represent "as- built" conditions upon completion of the work A set of repraducibtes with three sets of bluelines shall be delivered to Pumpkin Patch prior to final acceptance of this poJect. C. The contractor shall coordinate his work with architectural drawings, final ceiling layout, lighting and work of other trades. 1.01 ELECTRICAL 14ORK A. The following electrical work shall be part of division 15 performed in accordance with division 16 specifications. B. Mechanical contractor shall verify the electrical characteristics required of all equipment with the electrical drawings, electrical contractor, and field conditions prior to ordering any equipment. C. All power wiring shall be by electrical contractor, mechanical contractor shall provide all controls and control and interlock wiring, wiring diagrams, relays, starters and motors for all mechanical equipment. Starters shall have low voltage protection and built -in thermal overload protection. 1.08 OPERATION MANUALS AND OWNER INSTRUCTIONS A. Contractor shall furnish operating and maintenance instruction including control ail control systems at the completion of the installation. Submit three copies of bound manuals. B. At the completion of work the contractor shall in the conjunction with the Pumpkin Patch's representatives, arrange a meeting to instruct the maintenance contractor. Contractor shall fully instruct all details of operation and maintenance for the equipment provided. Contractor shall provide equipment check list shown on these drawings. I.OQ CUTTING AND PATCHING A. The contractor shall do all cutting, drilling and patching which may be required for the installation of the work under this specification. B. Patching shall be of the same workmanship, material and finish, and shall match accurately all surrounding construction in a manner satisfactory to the Architect/ Engineer. C. No cutting of the structure shall be permitted without written approval of the Architect/ Engineer. D. Existing ducts, pipes, utilities, etc. that are damaged during the construction period, whether or not due to the contractor's negligence shall be repaired or replaced by the contractor and left in a condition satisfactory to the Engineer. E. The space around pipes, ducts, utilities, etc. penetrating rated walls, shall not exceed 1/2 inch and shall be packed solid with mineral wooi or equivalent. perimeter shall be closed off by tight fitting metal escutcheons on both sides of this construction as required by applicable codes. 1.10 GUARANTEE The Contractor shall leave the entire installation in complete working order free from any defective material, workmanship or finish. He shall guarantee to repair or replace, without charge, defects due to faulty workmanship or material for a period of one year from the date of filing of the Notice of Completion. 2.00 - PRODUCTS 2.01 DUCTWORK A. All ductwork shall be galvanized sheet steel of gauges called for in ASHRAE and SMACNA guidelines 4 standards. Complete installation shall comply with the latest SMACNA standards. All ductwork shall be sealed tight not to exceed 5% air leakage. Seal all ducts in accordance with seal class "B" 2 inch as per SMACNA standards. Materials shall be clearly stamped or marked with grades and gauges. wicks lae. sec�led i■n CA:ccarnAc ce.. w \ }14 Sto.r,c orti RS -le B. Round sheet metal shall be United Sheet Metal spiral "Uniseal" with Uniform fittings, machine formed or approved equal. G. Provide low leakage adjustable volume damper at the end of each branch duct just upstream of the flexible duct connection to the diffuser to allow for balancing of system. Access to volume damper shall be from diffuser which shall have a plaster frame which it shall rest in. The diffuser shall be lifted and the volume damper shall be located to be easily reached from the diffuser's plaster frame opening. Where shown on drawings or where required by space limitations, access panels shall be provided in ceiling for volume damper access. 2.02 DUCTWORK ACCESSORIES A. Damper Operators: I. Ducts with external insulation: Ventlock #637, DuraDyne, Young, or approved equal. 2. Ducts with internal insulation and /or no insulation: Ventlock #635, DuraDyne, Young, or approved equal. B. Flexible Connections: Ventfabrics "Ventglas ", DuraDyne, or approved equal, U.L. approved with metal attachment. C. Air Extractor: Titus -AG or approved equal. D. Duct turning vanes shall be in accordance with SMACNA Duct Manual for hollow double thickness turning vanes. E. Round branch take -off fittings from rectangular ducts fittings shall be 45° rectangular wide mouth tees. F. Support ductwork according to the SMACNA Duct Manual and the drawings. G. Duct Access Doors: Ventfabrics, Ventlock, or approved equal, insulated access doors. Provide with all hardware and sealant. Access doors at fire dampers shall be Ruskin Manufacturing Co_ approved type only. H. "Ductmate" connections may be used whenever possible. Ductwork having other type of Joints shall be sealed with duct sealant of a non - hardening type mastic or liquid elastic sealant, such as " Dura Dyne" type 5-2 or approved equal. 1. Duct Hangers: I. Band Hangers: same material as ducts. 2. Rod -Type Hangers: Mild low carbon steel, fully threaded at each end with 2 removable nuts each end for positioning and locking rod in place. Must be galvanized. J. Curved elbows shall have centerline radius equal to one and one -half times duct width In plane of turn. K. Square elbows shall have turning vanes. Miter elbows (not square) shall have turning vanes 3 inches o.c. L. Volume dampers shall be constructed to SMACNA Standards and shall be American Warming and Ventilating, Inc. series "VC" or approved equal. 2.03 AIR DEVICES A. Diffusers: Titus model TDCA with TRM plaster frame or as shown on plans. Provide sizes and type as shown an plans. Provide with volume dampers or extractors at diffuser as shown on plans or as required to allow for proper balancing of system. Paint entire interior flat black. Provide Thermafuser TF -HG heating/cooing diffusers in office as indicated on plans. 13. Return Grilles and Exhaust Registers: Titus model 50F with TRM plaster frame. Provide with accessories as shown on drawings. 2.04 FIRE DAMPERS Fire and Smoke Dampers: Ruskin or approved equal. All fire and smoke dampers shall be UL listed and NFPA approved. Damper shall be located out of air stream, installed in accordance with their requirements and rated for use in Dynamic System. 2.05 INSULATION A. Material: Owens - Corning or approved equal I -1/2 inch reinforced foil faced fiberglass (vapor sealed) insulation. Install in accordance with Manufacturer's recommendations. B. Flame spread index and smoke - density ratings shall not exceed 25 and 50, respectively. C. Acoustically Lined Ductwork and Plenums: I. Acoustically line rectangular ductwork as shown on plans and within ten feet of any fan. 2. Acoustical internal insulation shall be I" Owens - Corning Fiberglas coated duct liner board or approved equal. Duct sizes shown on drawings are inside clear dimensions. Apply insulation with Manufacturer's approved adhesives, mastics and mechanical fasteners. D. Pips Insulation: 500 degrees "Snap On" or approved equal sectional pipe covering with factory applied all service Jacket and joint with A 'J butt strips, I" thick. Fittings and valves shall be insulated with "Snap Form" PVC covered insulation system. 2.06 TEMPERATURE CONTROL SYSTEM Provide complete control system as shown on plans and as necessary for proper control of all mechanical systems. Controls shall be by Ac unit manufacturer as shown on plans. 2.01 REFRIGERANT PIPING Type AGR refrigerant tubing, vauuum sealed deoxidized and dehydrated. Install "Semco Trisalator" 500 isolators at all piping attachments to building. Insulate with 1" thick Armstrong Armaflex or Rubatex flexible rubber insulation, sealed with approved mastic. For insulation located outdoors, apply two coats aerobol emulsion and wrap with fiberglass mesh. 3.00 - INSTALLATION AND EXECUTION 5.01 INSTALLATION REQUIREMENTS A. Ductwork: 1. Install all ductwork straight and level and to provide maximum headroom. 2. Properly seam, brace, stiffen, support, and render ducts air tight. Where S.1ACNA plates indicate duct stiffeners or reinforcing angles, install continuous angles around ail four sides. 3. Adjust ducts to suit local conditions and if necessary to accomplish this, dimensions may be changed by maintaining cross - sectional areas. All changes must be approved by the Engineer. 4. Diagonally or transversely crossbreak all panels on metal rectangular ducts over lS inches in either direction. 5. Tapers: Pitch sides of duct in "diverting" or "converging" air flow with a maximum of 1 to 1 tapers. 6. Tape all transverse and longitudinal duct and plenum joints and field formed seams airtight. 1. Install seismic restraints and duct hangers as specified in SMACNA guidelines. S. Duct branches shall be fitted with volume dampers where shown on drawings and where required, extraction dampers. All accessible volume controls shall have locking quadrants. All inaccessible controls (dampers, etc.) shall be provided with permanent extensions to accessible spaces. Q. Air inlets, outlets shall be properly set in place and are to have hang wires in all four corners or as required by mall or local code. Registers and grilles shall be tightly sealed. 3.02 VIBRATION ISOLATION A. Install all new AC. units and exhaust fans with approved vibration isolators with seismic restraints. submit isolators to Engineer for approval. Make duct connections and arrange ductwork to minimize all transmission of vibration and/or fan noise. 3.02 TESTING AND BALANCING A. Balancing of air conditioning system Hill be performed by an independent test and balancing agency. The mechanical contractor shall cooperate with the selected test and balance agency in the following manner: B. Provide sufficient time before final completion date so that test and balancing can be accomplished. C.. Provide immediate labor and tools to make corrections when required without undue delay. Install balancing dampers, belts and pulleys as required by test and balance agency. D. The contractor shall put all heating, ventilating and air conditioning systems and equipment into full operation and shall continue the operation of same during each working day of testing and balancing. E. Testing and balancing agency shall be kept informed of any major changes made to system during construction and shall be provided with complete as -built drawings. F. Tenant must furnish Landlord's Construction Superintendent at site with two (2) copies of certified Air Balance Report. The Balance Report must be approved before Tenant will be permitted to open for business. END OF SECTION 1.00 - GENERAL 1.01 A. 1.02 A. D. 1.03 A. 1.05 D. E. F. H. 5.00 5.01 A. B. C. D. E. Section 15 - TESTING, ADJUSTING AND BALANCING DESCRIPTION The system balancing contract shall be performed under a separate contract from the HVAG contract. Balancing of the systems shall be performed by an independent test and balancing agency, which specializes in the balancing and testing of HVAG systems. The balancing contractor shall be a member of the Associated Air Balancing Council or approved equal organization. Document shall be certified by a Registered Testing and Balancing Engineer. SCOPE OF WORK Perform systems balancing in strict accordance with the test procedures established by Associated Air Balancing Council. B. The test and balance shall be performed upon completion of the WAG. systems and after completion of the general operating test. C. Prior to starting the AC. equipment, the contractor shall install a new set of filters. After testing and balancing is complete a new set of filters shall be Installed as a final change before the store stocking process. Provide test and balance reports. RELATED WORK SPECIFIED IN OTHER SECTIONS For extent of mechanical work to be performed by the mechanical contractor see specification section 15600. SUBMITTALS Provide (6) six copies of a completion report to Pumpkin Patch for evaluation and approval. Report shall include as a minimum, but not limited to the following design and test balance information: A. Diagram of system tested with outlets identified by numbers keyed to the test report sheets. Diagram showing location, type and unit served of all thermostats. S. Each equipment shall be identified by equipment service number, manufacturer model number and serial number, motor H.P. motor nameplate voltage, motor RPM, actual and design static pressure, actual outlet velocity, and actual and design GFM. G. Each air outlet shall be Identified with manufacture model number, size, velocity, correction factor, actual and design CFM. Each coil shall be identified by equipment service number, manufacture model number and size, number of roes, total cfm, air inlet and outlet dry bulb and wet bulb temperatures, and whether DX coil, chilled water coil, hot water coil, electric strip, etc.. If water coil indicate water inlet and outlet temperatures and GPM. Traverse reading of main supply, return and outside air ducts to establish air quantities. Teat and record temperatures from main supply during full heating and full cooling. Report in writing with the balancing report any discrepancies on items not installed in accordance with HVAG drawings and specifications. As part of the mechanical work the mechanical contractor wilt make any changes in the pulleys, belts and dampers or the addition of dampers required for the correct balance as recommended by the air balance agency, at no additional cost. 2.00 - PRODUCTS (Not Applicable) - EXECUTION ADDITIONAL INFORMATION For Pumpkin Patch records, test and balance contractor shall complete the following questionnaire and submit with final report: Are the thermostats as specified? yes, no. If not indicate make and model Are the duct Joints taped with high pressure duct sealant (United Sheet Metal's United Duct sealer) or 6 ounce canvas saturated with aerobol or hardcast type "DT" as specified? yes, no. How are the connections between the main trunk and flexible duct made? Provide sketch. Note any deviations from the mechanical drawings. Balancing reports will not be considered complete until all questions noted under "additional information" are completed. 5.03 WARRANTY The test and balance agency shall include an extended warranty of c10 days, after completion of work, during which time Pumpkin Patch, at their discretion, may request a recheck or resetting of any outlet, supply air fan, or exhaust fan as listed in test report. END OF SECTION CODE' COMPLIANCE APP ROVED MAR - 4 2008 RECEIVED CITY OF TUKWILA FEB 19 2008 PERMIT CENTER DATE: Issue For Permit /Construction 1/28/08 JOB NO: 0778 DRAWN; MAH CHECKED: JJE 711 N. FIELDER RD, ARLINGTON, TX 76012 PH: (817) 635 -5696 FAX: (817) 635 -5699 N i z z Elmendorf & Associates Mechanical Engineers 2518 East Bay Drive, NQV Gig Harbor, WA 98335 253 - 858 -58:. 5 253 -8� 884 FAX virrrimpg IE>TIREs 3-3-09 REVISIONS MECHAN1!CAI- SPECIFICATIONS SHEET NUMBER M3,1