Loading...
HomeMy WebLinkAboutPermit M08-053 - WESTFIELD SOUTHCENTER MALL - WHITE HOUSEWHITE HOUSE 656 SOUTHCENTER MALL M08 -053 Parcel No.: 6364200010 Address: Suite No: Tenant: Name: Address: doc: IMC -10/06 Cityitf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 656 SOUTHCENTER MALL TUKW Value of Mechanical: $25,000.00 Type of Fire Protection: WHITE HOUSE 656 SOUTHCENTER MALL , TUKWILA WA Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA Contact Person: Name: KATHY KRUSE Address: 10877 WATSON RD , ST LOUIS MO Contractor: Name: MERIT MECHANICAL INC. Address: PO BOX 2109 , REDMOND, WA Contractor License No: MERITMI163CM Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial MECHANICAL PERMIT EQUIPMENT TYPE AND QUANTITY DESCRIPTION OF WORK: CONSTRUCTION OF ONE VENTILATION SYSTEM INCLUDING SUPPLY DUCTS, DIFFUSERS, RETURN AIR PLENUM, FAN POWERED VAV BOX WITH ELECTRIC HEAT, TOILET EXHAUST FANS, EXHAUST DUCTWORK, AND ALL ASSOCIATED ACCESSORIES AND CONNECTIONS 1 0 0 0 0 0 1 0 0 0 1 0 0 0 * * continued on next page ** M08 -053 r Permit Number: Issue Date: Permit Expires On: Phone: Phone: 314 - 821 -1100 Phone: 425 883 -9224 Expiration Date: 06/01/2009 M08 -053 04/25/2008 10/22/2008 Fees Collected: $451.25 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 18 Thermostat 1 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 2 Printed: 04 -25 -2008 Permit Center Authorized Signature: 1/ Wtvr` I hereby certify that I have read and ex governing this work will be complied The granting of ermit does not pre construction then rformance of work. Signature: Print Name: doc: IMC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M08 -053 Issue Date: 04/25/2008 Permit Expires On: 10/22/2008 Date: Ott( 2-C1451 ed this permit and know the same to be true and correct. All provisions of law and ordinances hether specified herein or not. 've authority to violate or cancel the provisions of any other state or local laws regulating orized to sign and obtain this mechanical permit. Date: This permit shall become null and void if the wor - not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -053 Printed: 04 -25 -2008 Parcel No.: 6364200010 Address: 656 SOUTHCENTER MALL TUKW Suite No: Tenant: WHITE HOUSE 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 -053 Status: ISSUED Applied Date: 02/22/2008 Issue Date: 04/25/2008 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 14: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) doc: Cond -10/06 M08 -053 Printed: 04 -25 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: hltp: / /www.ci.tukwila.wa.us 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 18: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 19: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 20: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 21: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond - 10/06 * *continued on next page ** M08 -053 Printed: 04 -25 -2008 lb 0 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any construction or t • pe ' ormance of work. Signature: Print Name: doc: Cond -10/06 M08 -053 Date: of law and ordinances governing other work or local laws regulating Printed: 04 -25 -2008 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 hiip ''wtrw. c1..iuktt'ilu.wu.us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION rX2 Site Address: (c? Tenant Name: IT ie� t Y t� sic t✓ MLA �t i Property Owners Name: Mailing Address: .3 ,i 44: C- Company Name: G/ `7r. r) Company Name: T -Ae kt Building Permit No. Mechanical Permit No. Plumbing /Gas Permit No. Public Works Perm Ne Projec tog -03 Ply o (For office u e only) King Co Assessor's Tax No.: t of 36, 476 -- G) 0 Suite Number: 11, ' C) Floor: New Tenant: ® Yes .. No City State Lip CONTACT PERSON - hen your per Name: I6- 71-4`{ V.12(.(f)e-- ( G.A -thCrb Mailing Address: l O 1 : ST • Lc7C t E -Mail Address: CI') tCO�3 C C.CtSCOCc',r'p. CYDrr1 GENERAL CONTRACTOR INF! (Contractor Information for M,ecthanic (pg 4) to TION robing and as Piping Company Name: "1" l C Mailing Address: City Day Telephone: Fax Number: Contact Person: E -Mail Address: Contractor Registration Number: Contact Person: e, T1-t'( V-12.6 E -Mail Address: C i h t CC>S (`l"t SCOCC 1 -C1)rn Mailing Address: 10,C5 Contact Person:✓1 ®� E - Mail A ddress: ' Ch COhr APr!i ".it rd, Day Telephone: i 4 - 110 S, MO (,_231a? City State Zip Fax Number: i 4 - zS eLt - 41(c . State Zip Expiration Date: ARCHITECT OF R be wet aped by Archite Mailing Address: 10b t i T t.) e1 "), .t7 S-. (,C7a 1 - 5 , NO CDJ 1 Z City State Lip Day Telephone: 3 t 4- L (- HOC Fax Number: �' l 4- P)6 t- 4 1.& ENGINEER OF RECORD Ati plans must be wet stamped by Engineer of Record Iac' -tom, ST, Ls, HO (0,5M City Site Day telephone: 314 - e7e., 1- I (Ob Fax Number: 31.4--< 4 1.672 pa„,, I of I tip Pit-,T YPe: Qty 'Unit Type: ; _ Qty Unit Type:. Qiy. . Boiler/Compressor: Qty Furnace <100K BTU 1 Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler Diffuser (8 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat t 15 -30 HP /1,000,000 BTU Suspended/Wall /Floor Mounted Heater Ventilation System ( Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat /Refrig /Cooling System Incinerator - Domestic Other Mechanical Equipment Ib u_e - r 6'XHAu`JT 2 Air Handling Unit <10,000 CFM J Incinerator - Comm /Ind t MECHANICAL PERMIT INFORMATION .206=431 -1670 MECHANICAL CONTRACTOR INFORMATION Company Name: t'�0 Mailing Address: City State Zip Contact Person: E - Mail Address: Contractor Registration Number: Expiration Date: Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... [g Replacement .... ❑ Valuation of Mechanical work (contractor's bid price): S aS aa Scope of Work (please provide detailed information): Con 5 ,/ F OAIE j V A 7'7L -477 ( ' )r F�►'t l NC L.4..) D i Al PPL.-y b oc.--s, wiruS6k.S , 2E RM ' ' f izivu •mil, FAA! - l oWEREO L' i 4 ✓ Be or 04 774 & Cr - g t C M E A T , l u- € X ' T F:4 A,(.5 �X µAver Dt. T'W Amb f}6.SDcl4 44.ESesoeLES 4 CeMAIEGTrem/S, Day Telephone: Fax Number: Fuel Type: Electric ® Gas ..••0 Other: Indicate type of mechanical work being installed and the quantity below: (i 41 - „„n. In I 1 <;,,.:ii ' t.an bh Paer 4 of ti • hh S BUILDIN OWNER OR HORIZED AGENT: Signatu ?2/c. C_>?/ I .•e I 1n LIn . 211■ I': n:vi AO' II; .,+. „b • PERMIT APPLICATION NOTES — Applicable to per -mits in this application Value of Construction In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Date: c ) /0P Print Name: Gig -tZQL STEQ EL�X , C-11•—`-- Day Telephone: 6I 4 'j�l - I 100 Mailing Address: 1 71 ltl,.- -(Spl- -D, ST L6C.-, IS, ib 6312- 7 Zip City State I Date Application Accepted: Date Application Expires: Staff Initials: Page hofh RECEIPT NO: R08 -01336 Initials: WER User ID: 1655 SET TRANSACTIONS: Set Member Amount ACCOUNT ITEM LIST: Description City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us Payee: MERIT MECHANICAL, INC. SET RECEIPT SET ID: 0425 SET NAME: MERIT MECH EL08 -468 86.00 EL08 -469 74.00 M08_ 361.00 TOTAL: 521.00 ELECTRICAL PERMIT - NONR MECHANICAL - NONRES Payment Date: 04/25/2008 Total Payment: 521.00 TRANSACTION LIST: Type Method Description Amount Payment Check 23709 521.00 TOTAL: 521.00 Account Code Current Pmts 000.322.101.00.0 160.00 000.322.102.00.0 361.00 TOTAL: 521.00 1645 04/25 9711 TOTAL 52100 n vrrcr a na RECEIPT NO: R08 -00503 Initials: WER User ID: 1655 Payee: CASCO SET ID: 2008 SET NAME: WHITE HOUSE SET TRANSACTIONS: Set Member Amount City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http:/lwww.ci.tukwila.wa.us D08 -100 1,925.30 EL08 -178 205.00 M0,8;0'5'3� 90.25 PG08 -055 47.00 TOTAL: 2,267.55 TRANSACTION LIST: Type Method Description Amount Payment Check 800418 ACCOUNT ITEM LIST: Description ELECTRICAL PLAN - NONRES PLAN CHECK - NONRES SET RECEIPT TOTAL: Payment Date: 02/22/2008 Total Payment: 2,267.55 2,267.55 2,267.55 Account Code Current Pmts 000.345.832.00.0 205.00 000/345.830 2,062.55 TOTAL: 2,267.55 9'73 02/22 9710 L 2267.55 Project: } ` 1� 1 17 .5 Type of Inspection: �, 17 4 Address: ! �` 11/4 Date Called: , Special Instructions: Date Wanted: l / a.m. Requester: Phone No: INSPECTION NO. INSPECTION RECORD Retain a copy with permit 02-0S PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 g i Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: LI $60.00 INSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: 'Date: Project: to L. -e ..0 Type of Inspection: Sievvgaz SL. k4 0 ae b. Address: t 4 MALL- Date Called: Special Instructions: Date Wanted: 1 l4 / 0' a.m. p.m. Requester: Phone No: 70 l gl0 4'te 2- INSPECTION RECORD Retain a copy with permit V 3 PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Ch Qpproved per applicable codes. Corrections required prior to approval. COMMENTS: Vkv °1 fel.....v< AAdvess no .11- fcc54 <R id tS LrP ■ % $- LAI. - 1G ri $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: 'Date: Pro d" � 415( Type of Cti9n + , � 2 y f ' Cal l1 Address e . Date lled: Special Instructions: Date Wanted: • (,o — /' _ C p.m. Requester: Phe ►yo _ Q -- iiGz7 El Approved per applicable codes. INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 ,pg4s3 PERMIT NO. (206)431 -3670 El Corrections required prior to approval. COMMENTS: 1 t/ V ,1951Q1/ /2-A ) ‘6r4ficc7 Inspector: (Date ` / g - El $60.0 EINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Project: (0l h l� 1-- (csco Ty f I n: `p(t o - i f•..) Ad ress: h m A- ( ( Date Called: Special Instructions: Date Wanted: a.m. gy —( Requester: 4r.:. do so I-16 7 z INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 14 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. [] Corrections required prior to approval. COMMENTS: J4 Ok coder - fl sees nspector: (7 $58.0 paid a Date : 5 / . INSPECTION FEE REQUIRED. Prior o inspection. fee must be 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspectiQn. Receipt No.: Date: Project - y ht4e ) c .tav, Type o nspection .- Ad s: 0.5c rri Pro Date Called: Special Instructions: Date Wanted: — _ d a.m� p.m. Requester: Phone No: & � 7 W % INSPECTION RECORD Retain a ropy with permit ! ¥'F: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 iroe 6 PERMIT NO. (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. 1 COMMENTS: p/A 04 40 /451, h tifO/ e( $58.0 E(NSPECTION FEE REQUIRED. Prior o inspection, fee must be paid a 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. Receipt No.: Date: Project: I-dk . k7, , I`^1( - /6 /,/I kj Type of Inspection: I-12W L Address: Suite #: Contact Person: /- 1AA0110 Special Instructions: No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre-Fire: Permits: Occupancy Type: (F per applicable codes. ' INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT I - os O - 100 PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206- 575 -4407 n Corrections required prior to approval. COMMENTS: Inspector: Date: H rs.: $80.00 REINSPECTION FEE REQUIRED. You will receive an)nvoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Word /Inspection Recckd'Form.Doc 1/13/06 T.F.D. Form F.P. 113 Project Info Project Address 633 SOUTHCENTER Date 2/20/2008 SPACE g 1130 For Building Department Use SEATTLE, WA 98188 Applicant Name: CHICO's FAS, INC. Applicant Address: 11215 METRO PARKWAY, FT. MEYERS, FL 33912 Applicant Phone: 239 -274 -4113 2006 Washington State Nonresidential Energy Code Compliance Form Project Summary PRJ -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms t‘uSriN E. Scweu-ee - /IECHAn! <cht. EvG /A/ 6e z /c /o8 comn • • ` ;R7± r—r ttO8 053 MAR - 3 2p08 lJ Of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED Ci Revised July 2007 4CEIVED FEB 2 2 2008 JER►viil CENTER Cooling Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location VAV -1 TITUS TQP -6 N/A 2500 N/A N/A N/A STOCK ROOM Applicant Name: CHICO'S FAS, INC. Applicant Address: 11215 METRO PARKWAY, FT. MEYERS, FL 33912 Applicant Phone: 239- 274 -4113 Fan Equipment Schedule Equip. ID Brand Name' Model No.' CFM SP' HP /BHP Flow Control Location of Service VAV -1 TITUS TQP -6 2500 0.50 0.75 VAV STOCK ROOM 34121 Applicant Name: CHICO'S FAS, INC. Applicant Address: 11215 METRO PARKWAY, FT. MEYERS, FL 33912 Applicant Phone: 239- 274 -4113 Heating Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency VAV -1 TITUS TQP -6 34121 2500 N/A 34121 34121 Applicant Name: CHICO'S FAS, INC. Applicant Address: 11215 METRO PARKWAY, FT. MEYERS, FL 33912 Applicant Phone: 239- 274 -4113 Project Info Project Address 633 SOUTHCENTER Date 2/20/2008 SPACE 6 1130 For Building Dept. Use SEATTLE, WA 98188 Applicant Name: CHICO'S FAS, INC. Applicant Address: 11215 METRO PARKWAY, FT. MEYERS, FL 33912 Applicant Phone: 239- 274 -4113 Mechanical Summary MECH -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms 2006 Washington State Nonresidential Energy Code Compliance Form Revised July 2007 Project Description Briefly describe mechanical system type and features. Includes Plans Fan - Powered, Parallel Flow VAV box with 10KW Electric heater. VAV connected to Mall Supply Air Duct. Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 Compliance Option Q Simple System Q Complex System O Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. 'lf available. 2 As tested according to Table 14 -1A through 14-1G. 3 If required. 4 COP, HSPF Combustion Efficiency, or AFUE, as 6 applicable. Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: ❑ Constant vol? ❑ Split system? ❑ Air cooled? ❑ Packaged sys? ❑ <20,000 Btuh? ❑ Economizer included? If Heating Only: 9 Y� <5000 cfm? ❑ 5000 cfm . < o ❑ 70 /o outside air? 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. <70% OSA Air Cooled, Constant Vol? Simple System Allowed (section 1420) ool Ca• <20,000 Btuh?� otal Ca.. wo economize <240,000 Btuh or 10 %? Use Complex Systems (section 1430) Outd• or Adjacent to • utdoor ool Ca <54,000 Btuh? Heating Only <5000 cfm? No Reference Section 1421 ■ Yes — Yes* Heating /Cooling or Cooling Only Ingle split Syste Package , N. <= 84,000 Yes - Unit ? / . Btuh? i Y Econo Included? Yes Reference Section 1423, V Yes Yes Yes Yes Yes Yes Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Fan Equipment Schedule Equip. ID Brand Name' Model No.' CFM SP' HP /BHP Flow Control Location of Service Location For Building Dept. Use SEATTLE, WA 98188 Applicant Name: CHxCO'S FAS, INC. Applicant Address: 11215 METRO PARKWAY, FT. MEYERS, FL 33912 Applicant Phone: 239 -274 -4113 Cooling Equipment Schedule Equip. ID Brand Name Model No. Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location For Building Dept. Use SEATTLE, WA 98188 Applicant Name: CHxCO'S FAS, INC. Applicant Address: 11215 METRO PARKWAY, FT. MEYERS, FL 33912 Applicant Phone: 239 -274 -4113 Heating Equipment Schedule Equip. ID Brand Name' Model No. Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency For Building Dept. Use SEATTLE, WA 98188 Applicant Name: CHxCO'S FAS, INC. Applicant Address: 11215 METRO PARKWAY, FT. MEYERS, FL 33912 Applicant Phone: 239 -274 -4113 Project Info Project Address 633 SOUTHCENTER Date 2/20/2008 SPACE # 1130 For Building Dept. Use SEATTLE, WA 98188 Applicant Name: CHxCO'S FAS, INC. Applicant Address: 11215 METRO PARKWAY, FT. MEYERS, FL 33912 Applicant Phone: 239 -274 -4113 2006 Washington State Nonresidential Energy Code Compliance Forms Mechanical Summary MECH -SUM Project Description Briefly describe mechanical system type and features. ❑ Includes Plans 2006 Washington State Nonresidential Energy Code Compliance Form Include documentation requiring compliance with commissioning requirements, Section 1416. 'If available. 2 As tested according to Table 14 -1A through 14-1G. 3 If required. 4 COP, HSPF Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). Revised July 2007 Compliance Option 0 Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: ❑ Constant vol? ❑ Air cooled? ❑ Packaged sys? ❑ <20,000 Btuh? ❑ Economizer included? • Split system? If Heating Only: ❑ <5000 cfm? ❑ <70% outside air? 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. <70% OSA Econo Included? ool Ca• <20,000 Btuh? Air Cooled, Constant Vol? otal Ca . wo economize <240,000 Btuh or 10 %? Use Complex Systems (section 1430) Outd or Adjacent to utdoor ool Ca <54,000 Btuh? Heating Only <5000 Yes N cfm? Reference Section 1421 Yes* Heating /Cooling or Cooling Only Ingle r� Package Yes N Unit / Yes Simple System Allowed (section 1420) 1 ' Reference Section 1423 Yes Yes Yes No Yes Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Mechanical !Complex Systems Checklist MECH 2006 Washington State Nonresidential Energy Code Compliance Forms -COMP Revised July 2007 Project Address 633 SOUTHCENTER Date 2/20/2008 The following additional information is necessary to check a mechanical permit application for a complex mechanical system for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Use the checklist as a reference for notes added to the mechanical drawings (see the MECH- CHK checklist for additional system requirements). This information must be on the plans since this is the official record of the permit. Having this information in separate specifications alone is NOT an acceptable alternative. For Building Department Use Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY n.a. 1431.1 Field assem. sys. Provide calculations n.a. 1432.1 Setback & shut -off Indicate separate systems or show isolation devices on plans n.a. 1432.2.1 Air system reset Indicate automatic reset n.a. 1432.2.2 Hydronic System Indicate automatic reset, cooling tower, & heat pump loop valves n.a. 1433 Air Economizer Indicate economizer on equipment schedule or provide calculations to justify exemption and demonstrate 10% higher efficiency for equipment with out economizer. n.a. 1433 Water Economizer Indicate water economizer and provide calculations if 1433 Exception 2 is utilized n.a. 1434 Separate air sys. Indicate separate systems on plans no 1435 Simul. ht & clg. g' g Indicate that simultaneous heating and cooling is prohibited, unless use of exception is justified n. a. 1436 Heat recovery Indicate heat recovery on plans; complete and attach heat recovery calculations n.a. 1437 Elec. motor effic. MECH -MOT or Equip. Schedule with hp, rpm, efficiency yes 1438 Variable flow sys. Indicate variable flow on fan and pump schedules MP2 n.a. 1439.1 Kitchen Hoods Indicate uncooled and unheated make -up air n.a. 1439.2 Fume Hoods Indicate VAV, unheated /uncooled or heat rec. makeup Start Here / Section 1411 -1 Equipment Efficiency Shall Meet Tables 14 -1A through 14 -1G 2006 Washington State Nonresidential Energy Code Compliance Form no is circled for any question, provide explanation: VAV electric heater is interlocked with the fan motor from the factory to prevent simultaneous heating and cooling. Decision Flowchart Use this flowchart to determine how the requirements of the Complex Systems Option apply to the project. Refer to the indicated Code sections for more complete information on the requirements. as /Oil Fuma input _> 225,000 � - N tuh or Gas /O' 't Heat Yes 1411.1 Intermittent Ignition Device & Power Venting or Damper. If input? 225,000 Btuh then 1412.6 Modulating or Staged Combustion Controls Required 1411.1 0.75% Maximum Jacket Loss Any Fuel Fumac input? 225,000 Btuh? ield- Assemble Equipment? Air System Serving Multiple Zones? Capacity of HW. Heating System > X00,000 Btuhl Yes Yes Section 1431.1 Calculations of Total On -Site Energy Input & Ouput Required (continued on back) Yes Section 1432.2.1 Supply Air Reset Controls Required Yes No Section 1432.2.2 Hot Water Supply Temperature Reset Required 2006 Washington State Nonresidential Energy Code Compliance Forms Yes 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical - Complex Systems (back) MECH -COMP 0% Air Econ Provided? Section 1413 Water Cooled w/Water Econo? Total Clg Capacity w/ Water Econo <500 Tons? EER 10% Better than Code Yes • pply Air >5,0 cfm & OSA > 70% Section 1437 Motors Must Meet Efficiencies in Table 14 -4 otor Incl. qpmt. Covr'd by Tbl 14 -1 A -14- 1 G? i Yes Application Involves Variable ) Yes Flow? No Yeses — Yes-► Yes tal Cap. / cono <= 480,00 Btuh or 20% of otal Cap.? Yes Section 1436 50% Effective Heat Recovery Required Multi -speed Motor in Multi - peed system? Yes ystem or Zon w/ Simultaneous Htg. & Clg.? Section 1435 Zone Controls Must Reduce Supply Air Quantity Before Reheating /Recooling Yes No Section 1439.1 No Heating or Cooling for at Least 50% of Make -up Air o- Yes-• ► Section 1433 Economizer Required Yes Yes Section 1438 Variable Flow Devices Required Yes Section 1439.2 One Required: a. 50% VAV Exhaust & Make -up b. 75% Direct Makeup w/ Tempering Only Heat Recovery per 1436 Constant Volume w/ < 50fpm Face Velocity c. d. Revised July 2007 Open Motors nosed Motors 3,600 1,800 1,200 3,600 1,800 1,200 Efficiency CO Efficiency ( °/ ) - 82.5 80.0 75.5 82.5 80.0 82.5 84.0 84.0 82.5 84.0 85.5 84.0 84.0 85.5 84.0 84.0 86.5 84.0 86.5 86.5 85.5 87.5 87.5 85.5 87.5 87.5 87.5 87.5 87.5 87.5 88.5 88.5 88.5 89.5 89.5 88.5 89.5 90.2 89.5 89.5 89.5 89.5 91.0 90.2 90.2 91.0 90.2 90.2 91.0 91.0 90.2 91.0 90.2 91.0 91.7 91.7 91.0 92.4 91.7 91.0 92.4 92.4 91.0 92.4 91.7 91.7 93.0 93.0 91.7 93.0 93.0 92.4 93.0 93.0 92.4 93.0 93.0 93.0 93.6 93.6 93.0 93.6 93.6 93.0 94.1 93.6 93.0 94.1 93.6 93.0 94.1 94.1 93.6 94.5 94.1 93.6 94.5 94.1 94.5 94.5 94.1 93.6 95.0 94.5 94.5 95.0 95.0 94.5 95.0 94.5 95.0 95.0 95.0 Electric Motors MECH -MOT 2006 Washington State Nonresidential Energy Code Compliance Forms Project Address Complete the following for all design A & B squirrel -cage, T -frame induction permanently wired polyphase motors from 1 hp to 200 hp having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the exceptions below applies). Motor No. or Location Minimum Nominal Full -Load Efficient Synchronous Speed (RPM) HP 1.0 1.5 2.0 3.0 5.0 7.5 10 15 20 25 30 40 50 60 75 100 125 150 200 HP 2006 Washin• ton State Nonresidential Energ Code Com•Hance Form 633 SOUTHCENTER Type (open /closed) Description of Application or Use Date For Building Department Use Synch. Speed 2/20/2008 Min.Nom. Full load Efficiency Exceptions: 1. Motors in systems designed to use more than one speed of a multi -speed motor. 2. Motors already included in the efficiency requirements for HVAC equipment (Tables 14- 1A or 14 -1B). 3. Motors that are an integral part (i.e. not easily removed and replaced) of specialized process equipment (i.e. equipment which requires a special motor, such as an explosion - proof motor). 4. Motors integral to a listed piece of equipment for which no qualifying motor has been approved (i.e. if the only U.L. listing for the equipment is with a less- efficient motor and there is no energy - efficient motor option). For motors claiming an exception, list motor and note which exception applies. Revised July 2007 Mechanical Permit Plans Checklist 2006 Washington State Nonresidential Energy Code Compliance Forms MECH -CHK Revised July 2007 Project Address 633 SOUTHCENTER Date 2/20/2008 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance n.a. 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule n.a. 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency n.a. 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans MP1 yes 1412.2 Deadband control Indicate 5 degree deadband minimum MP2 n.a. 1412.3 Humidity control Indicate humidistat yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types MP2 n.a. 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage n.a. 1412.4.2 Optimum Start Indicate optimum start controls n.a. 1412.5 Heat pump control Indicate microprocessor on thermostat schedule n.a. 1412.6 Combustion htg. Indicate modulating or staged control yes 1412.7 Balancing Indicate balancing features on plans MP2 1412.8 Ventilation Control Indicate demand control ventilation for high- occupancy areas n.a. 1422 Thermostat interlock Indicate thermostat interlock on plans n.a. 1423 Economizers Equipment schedule 1413 Air economizers n.a. 1413.1 Air Econo Operation Indicate 100% capability on schedule n.a. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb n.a. 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance n.a. 1413.3 Integrated operation Indicate capability for partial cooling n.a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary MP2 yes 1414.2 Duct insulation Indicate R -value of insulation on duct MP2 yes 1415.1 Piping insulation Indicate R -value of insulation on piping MP2 1416 Completion Requirements yes 1416.2.1 Commissioning Provide commissioning plan MP2 yes 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing MP1, 2 yes 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training MP2 yes 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report MP2 n.a. 1434 Separate air sys. Indicate separate systems on plans yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. yes 1441 Elec. water heater Indicate R -10 insulation under tank MP2 n.a. 1442 Shut -off controls Indicate automatic shut -off yes 1443 Pipe Insulation Indicate R -value of insulation on piping MP2 n.a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool heater efficiency n.a. 1453 Pool heater controls Indicate switch and 65 degree control n.a. 1454 Pool covers Indicate vapor retardant cover n.a. 1454 Pools 90+ degrees Indicate R -12 pool cover 2006 Washington State Nonresidential Energy Code Compliance Form no is circled for any question, provide explanation: 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off -hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity ( nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry -bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off -hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity ( nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry -bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying 2006 Washington State Nonresidential Energy Code Compliance Form . 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2. are isolated from the exterior with an automatic shut -off damper complying air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum start controls shall be designed to automatically adjust the start time of an HVAC system each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include microprocessor controls that minimize supplemental heat usage during start-up, set- up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btulh shall have modulating or staged combustion control. 000 EXCEPTIONS: 1. Boilers. 2. Radiant heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6. Exception: Piping installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAC 51 -26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for building completion and commissioning requirements.) ACTIVITY NUMBER: M08 -053 DATE: 02 -22 -08 PROJECT NAME: WHITE HOUSE SITE ADDRESS: 656 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENT : 491r9 Bu ng Division Public Works ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route REVIEWER'S INITIALS: • • PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP Structural Incomplete Structural Review Required APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: Documents/routing stip.doc 2 -28 -02 611 ,9'!i 2_ 2q-Iti Fire Prevention rr; DATE: DATE: Planning Division Permit Coordinator DUE DATE: 02 -26-08 Not Applicable No further Review Required DUE DATE: 03-25-08 n Not Approved (attach comments) ❑ Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License MERITMI163CM Licensee Name MERIT MECHANICAL INC Licensee Type CONSTRUCTION CONTRACTOR UBI 600517946 Ind. Ins. Account Id 46817500 Business Type CORPORATION Address 1 PO BOX 2109 Address 2 City REDMOND County KING State WA Zip 980732109 Phone 4258839224 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 2/14/1984 Expiration Date 6/1/2009 Suspend Date Separation Date Parent Company Previous License Next License AUTOMMC044QH Associated License Business Owner Information Name Role Effective Date Expiration Date KIRKWOOD, RODERICK V PRESIDENT 02/14/1984 Bond Amount KIRKWOOD, JOAN M SECRETARY 02/27/2006 FRICKBERG, WILLIAM MICHAEL VICE PRESIDENT 02/27/2006 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date Look Up a Contractor, Electrie or Plumber License Detail Washington State Department of Labor and Industries General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. • Page 1 of 3 https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= MERITMI163CM 04/25/2008 MECHANICAL KEYED NOTES ' ®" 1 S1- SUPPLY AIR DEVICE "TITUS" OMNI 24 "X24 ". PROVIDE VOLUME DAMPER AS SHOWN ON DIFFUSER MOUNTING SCHEMATIC (SHEET MP2). FRAME TYPE 3 AND TRM RAPID MOUNT FRAME. WHITE FINISH. 2 S2- SUPPLY AIR DEVICE "TITUS" OMNI 12 "X12 ". PROVIDE VOLUME DAMPER AS SHOWN ON DIFFUSER MOUNTING SCHEMATIC (SHEET MP2). FRAME TYPE 3 AND TRM RAPID MOUNT FRAME. WHITE FINISH. 3 53- SUPPLY AIR DEVICE "TITUS" OMNI 24 "X24 ". PROVIDE VOLUME DAMPER AS SHOWN ON DIFFUSER MOUNTING SCHEMATIC (SHEET MP2). FRAME TYPE 3. WHITE FINISH. 4 EXHAUST AIR DEVICE "NUTONE" MODEL 672R 9 "X9" LOUVERED FACE. PROVIDE VOLUME DAMPER. EXTEND & CONNECT NEW EXHAUST TO LANDLORD'S EXISTING EXHAUST DUCT. TRANSITION AS REQIURED. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND CONNECTION REQUIREMENTS PRIOR TO SUBMITTING BID. 5 R2- RETURN AIR DEVICE " TITUS" 355RL 24 "X12" LOUVERED FACE. FRAME TYPE 3. WHITE FINISH. CONTRACTOR SHALL INSTALL WITH LOUVER OPENINGS FACING WALL. 6 MOUNT THERMOSTAT ON WALL 48" TO 56" AFF. LOCATE REMOTE SENSORS AT THE DIRECTION OF CHICO'S PROJECT MANAGER. NOTE THAT "I" STAT BY LIGHTSTAT IS CUSTOM PROGRAMMED FOR EACH CHICO'S LOCATION AND MUST BE ORDERED BY CONTRACTOR AT AWARD OF JOB TO ENSURE ON TIME DELIVERY. 7 EXTEND NEW 3" VENT TO 3" VENT STUB -IN. FIELD VERIFY LOCATION OF STUB -IN PRIOR TO INSTALLING ANY PIPING. 8 EXTEND NEW 4" SANITARY PIPING TO EXISTING SANITARY. FIELD VERIFY EXACT LOCATION, SIZE, AND INVERT ELEVATION PRIOR TO INSTALLING PIPING. CONTRACTOR SHALL OBTAIN APPROVAL AND REQUIREMENTS FOR ALL TRENCHING WITH LANDLORD'S ON -SITE REPRESENTATIVE PRIOR TO INSTALLING ANY PIPING. 9 EXTEND NEW 3/4" DOMESTIC WATER TO 3/4" WATER STUB -IN. FIELD VERIFY EXACT LOCATION PRIOR TO INSTALLING NEW PIPING. PROVIDE REDUCED PRESSURE BACKFLOW PREVENTER AND WATER METER WITH REMOTE READER IF REQUIRED. VERIFY REQUIREMENTS WITH LANDLORD'S FIELD REPRESENTATIVE AND LOCAL UTILITY. 10 CONTRACTOR SHALL ROUTE DUCTWORK TO AVOID ALL EXISTING WATER, GAS, SPRINKLER PIPING, BEAMS, JOISTS, ETC. CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO INSTALLING ANY DUCTWORK. 11 SMOKE DETECTOR IN RETURN AIR TO SHUT DOWN UNIT AND CLOSE ALL DAMPERS ON SIGNAL. WIRE SMOKE DETECTOR TO BUILDING ALARM SYSTEM OR A REMOTE AUDIONISUAL DEVICE WITH MANUAL RESET LOCATED IN A CONSTANTLY MONITORED LOCATION. 12 EXTEND AND CONNECT 8" DIA. EXHAUST DUCT TO EXISTING EXHAUST DUCT. FIELD VERIFY EXACT SIZE AND LOCATION PRIOR TO BID. CONTRACTOR SHALL VERIFY ALL CONNECTION REQUIREMENTS PRIOR TO BID. r 0 r X011• CO X CD C0 x CA .. 50 CFM 6" DIA. NECK 50 CFM " DIA. NECK 16" DIA © 22 "x10" NECK a L 1 X N ■111111•■► WC -1 WC 1 / t WCO- i 11 SCALE = 1/2" = 1' -0" FD -1 MS -1 FD -1 WH-1 �NC 20x18 LAV -1 () 0 00 LAV -1 22 "x10" NECK J 00 ■ D (13.8 DF -1 ENLARGED PLUMBING PLAN • ‘6, rAm 410 CFM 10 "DIA. NECK (13.8 O FD -1 WCO-1 3" SAN 3" SAN I 3 "V 2 "V 3/4" CW 4" SAN 4" SAN 4" SAN 3/4" CW 1/2" CW 210 CFM 8" DIA. NECK WHA -1 4" SAN 4" SAN MP1 SCALE = N.T.S. L 3/4" CW 4" SAN 11 0 210 CFM 8" DIA. NECK 2 "V C 1/2" CW 4" SAN 3 PLUMBING ISOMETRIC LANDLORD NOTES TENANT'S CONTRACTOR SHALL MAINTAIN A MINIMUM OF 6" UNOBSTRUCTED CLEARANCE HEIGHT IN RETURN AIR PLENUM ABOVE CEILING ALLOWING FOR AIR FLOW BACK TO LANDLORD AIR CONDITIONING UNIT. ALL TENANTS ON THE GROUND FLOOR REQUIRING BELOW GRADE WORK SHALL COORDINATE WITH LANDLORD PRIOR TO ANY SLAB DEMOLITION. TENANT'S CONTRACTOR SHALL COORDINATE WITH LANDLORD TO PROVIDE OPPORTUNITY FOR SPECIAL INSPECTION AND PHOTOGRAPHIC DOCUMENTATION BY LANDLORD OF BELOW GRADE WORK PRIOR TO THE COVERING UP OF SUCH WORK. TENANT'S CONTRACTOR SHALL BE RESPONSIBLE FOR RECONSTRUCTION AND PATCHING OF THE SLAB -ON -GRADE SYSTEM, INCLUDING GRAVEL LAYERS, VAPOR BARRIER, AND CONCRETE. TENANT'S CONTRACTOR SHALL PROVIDE A FIRE WATCH AND PORTABLE FIRE EXTINGUISHER WHERE ANY WELDING IS DONE WITHIN THE DEMISED PREMISES. THE PERSON PERFORMING THE FIRE WATCH SHALL REMAIN IN THE TENANT SPACE FOR AT LEAST 1 HOUR AFTER THE COMPLETION OF ANY WELDING. THIS SHALL BE COORDINATED THROUGH THE CITY OF TUKWILA FIRE DEPARTMENT. 175 CFM 6" DIA. NECK O II '175CFM 6" DIA. NECK I • I WHA -1 3/4" 3/8" 1/2" CW (TYP) 3/4" 3/4" 3/4" 1/2" HW (TYP) 1 -1/2" 3" SAN 4 ,, SAN 3/8" 3/4" 3/4" 1 -1/2" 3/4" 1/2" CW (TYP) LAV -1 1 -1/2" SAN (TYP) 3/4" 1 -1/2 "V 1 -1/2" 1/2" 3/4" 3/4" 3/4" 3/4" 3/4" 2 "V WO 4" SAN 175CFM 6" DIA. NECK 175 CFM 6" DIA. NECK OPENING IN CLOSET AREA FOR RETURN AIR. SEE DETAIL 2/A5.2 FOR ADDITIONAL INFORMATION (TYP. OF BOTH CLOSETS). T 10 170 CFM O 6" DIA. NECK Plar review approval is subject to errors and omissions, Approval of construction documents does not authorize the violation o . ,:r a dopted • 2 'r ordnance. Receipt of approved W eld C •py and con.:(. • s is acknowlec ged: 16x10 By Date: FILE COPY Permit No City of Tukwila BUILDING DIVISION 0 175 CFM 6" DIA. NECK 175 CFM 6" DIA. NECK . . COD �,�- ®'OD MAC C 8x10 175 CFM_ - 6" DIA. NECK SEPARATE PERM* REQUIRED ;: C3 foledianical r ectrical Of Gas Piping City of Tukwila BUILDING DIVISION REVISIONS No th shall be made to the scope of wo w ithout prior approval of j Tu 'la Building Division. NOTE Revisions will require a new plan subrilial and may include additional plan review fees: I Ori 7 175 CFM O6" DIA. NECK • 0 GENERAL NOTES • it ot, ii i ;, 5 • 7 1,1 tio& 053 A.) DUCT SIZES SHOWN ARE SHEET METAL DIMENSIONS. NO DUCT LINER. B.) PROVIDE SINGLE WALL TURNING VANES @ ALL ELBOWS AND TEES PER SMACNA STANDARDS. C.) DO NOT PROVIDE AIR EXTRACTORS OR SPLITTER DAMPERS WHICH PROTRUDE INTO RECTANGULAR TRUNK DUCTS. PROVIDE ROUND SPIN -IN FITTINGS FOR ROUND BRANCH DUCTS. D.) ROUND BRANCH DUCTS ARE SAME SIZE AS DIFFUSER WHICH IT SERVES. E.) CONTRACTOR SHALL FIELD VERIFY THE EXACT SIZE, LOCATION, AND CONDITION OF ALL EXISTING EQUIPMENT, PIPING, DUCTWORK, ETC. TO BE REUSED, RETAINED OR CONNECTED TO. F.) CONTRACTOR SHALL IDENTIFY ROOF MOUNTED EQUIPMENT WITH STORE NAME AND UNIT NUMBER USING PERMANENT, WEATHER PROOF 2" HIGH DIE -CUT LETTERS. G.) CONTRACTOR SHALL COMPLY WITH ALL LANDLORD'S TENANT CRITERIA. COORDINATE AND SCHEDULE ALL WORK WITH LANDLORD'S HELD REPRESENTATIVE. H.) MAXIMUM FLEXIBLE DUCT LENGTH SHALL NOT EXCEED 5' -0 ". FLEXIBLE DUCTS SHALL BE INSTALLED TO PROVIDE SWEEPING CONFIGURATIONS WITH NOT LESS THAN MANUFACTURER'S RECOMMENDED BEND RADIUS, WITHOUT UNDUE RESTRICTIONS, BUT NOT CREATING UNNECESSARY SAGS OR CURVES. FLAT BANDING MATERIAL NOT LESS THAN 1 -1/2" WIDE SHALL BE USED TO SUSPEND FLEXIBLE DUCTING. DUCTING FURNISHED WITH FACTORY INSTALLED GROMMETS SHALL BE SUSPENDED BY WIRES ATTACHED TO GROMMETS. WHERE CEILING SPACE IS NOT SUFFICIENT TO PERMIT TOP CONNECTION TO CEILING DIFFUSER WITH PROPER BEND RADIUS FOR FLEXIBLE DUCT, CONTRACTOR SHALL FABRICATE AND /OR PROVIDE AN ADAPTER BOX FOR DIFFUSER TO PERMIT SIDE CONNECTION OF FLEXIBLE DUCT. I.) CONTRACTOR SHALL PROCURE THE SERVICES OF A LANDLORD APPROVED NEBB OR AABC CERTIFIED AIR BALANCE & TESTING AGENCY TO BALANCE, ADJUST & TEST EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING 3 COPIES OF BALANCE/TEST AGENCY'S REPORT TO CHICO'S PROJECT MANAGER AND LANDLORD'S REPRESENTATIVE FOR REVIEW. J.) BALANCING OF AIR DEVICES SHALL BE ACCOMPLISHED BY ADJUSTING BRANCH TAKEOFF DAMPER AT MAIN TRUNK DUCT. DAMPERS IN THE NECKS OF AIR DEVICES SHALL BE USED FOR FINAL TRIM ONLY, AND IN NO CASE FOR GREATER THAN 10% OF THE INDICATED VOLUME FOR THE INDIVIDUAL AIR DEVICE. K.) CONTRACTOR SHALL PROVIDE ALL WATER, WASTE AND VENT PIPING AS REQUIRED TO MAKE A COMPLETE AND WORKING SYSTEM IN EVERY RESPECT. ALL WORK SHALL COMPLY WITH ALL STATE AND LOCAL CODES AND THE STANDARDS AND REQUIREMENTS OF THE LANDLORD. FIELD VERIFY ALL LOCATIONS AND SIZES OF UTILITES. L.) ANY PENETRATION THROUGH THE ROOF SHALL BE COORDINATED WITH THE LANDLORD'S FIELD REPRESENTATIVE AND SHALL BE DONE BY A LANDLORD APPROVED ROOFING CONTRACTOR TO MAINTAIN THE ROOFING WARRANTY. M.) TENANT /MALL CRITERIA DOCUMENTS SHALL BE CONSIDERED A PART OF THE CONSTRUCTION DOCUMENTS. TENANT CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS STATED THEREIN WHETHER SPECIFICALLY DESCRIBED ON THE DRAWINGS OR NOT. N.) DO NOT SUSPEND ANY ITEMS FROM DECK OR SLAB ABOVE. ALL ITEMS SHALL SUSPENDED FROM STRUCTURE UNLESS OTHERWISE NOTED. PROVIDE MISCELLANEOUS STEEL AS REQUIRED. date comet " . I M..) I).,12/ u / / W/ UN (i/\11 'hO lE C MANA(E.H'-; Ph. 314. 821. 1100 Fax 314.821.4162 Email chicos @cascocorp.com cc PROF PH f sfiv 000133 " ;,ES 7,,RIiO Cam. C, ALBERTS . SSIONAL F RE(' ORD E 314 -8. - IIUO IC. #C00183 E PIKES 07/21/0 ihP prn ni re , nrd i9 prac tic indi,n Jual. O O UJ CO 0 a do H H i 0 FEB 2 2 2008 w PER i;/3s ! CENTER F2 HVAC & PLUMBING FLOOR PLAN project drawn by checked by scale MP1 IDES F'.IN 7 :O7H56 As indicated PLUMBING FIXTURE SCHEDULE MARK DESCRIPTION MANUFACTURER MODEL FIXTURE CONNECTIONS REMARKS WASTE VENT CW HW 0.25 FLOOR DRAIN WC -1 WATER CLOSET- INSTALL FLUSH VALVE ON OPEN SIDE OF WATER CLOSET AMERICAN STANDARD "CADET" #2377.100 3" 2" 1/2" - -- L6 GAL PER FLUSH, FLOOR MOUNTED, ELONGATED BOWL, TANK TYPE, CHROME TRIP LEVER, WATER SAVER, VITREOUS CHINA. MEETS ADA AND ANSI REQUIREMENTS WHEN INSTALLED WITH TOP OF SEAT BETWEEN 17" AND 19 ". FURNISH WITH WHITE AMERICAN STANDARD MODEL #5325.024 OPEN FRONT SEAT WITH COVER AND CHROME SUPPLY STOPS. EQUALS BY KOHLER OR CRANE. LAV -1 LAVATORY AMERICAN STANDARD "COMRADE" #0124.024 1 -1/2" 1 -1/2" 1/2" 1/2" PROVIDE WITH AMERICAN STANDARD FAUCET "RELIANT" MODEL #2385.0000 WITH POLISHED CHROME FINISH. EQUALS BY KOHLER OR CRANE. MS -1 MOP SINK FIAT MSB -2424 3" 2" 3/4" 3/4" MOLDED STONE WITH VINYL BUMPERGUARD. FURNISH WITH AMERICAN STANDARD "COMMERCIAL" MODEL #8344.112 EXPOSED YOKE WALL MOUNT UTILITY FAUCET, TOP BRACE, VACUUM BREAKER, STOPS IN SHANKS, METAL LEVER HANDLES, 6" THREADED SPOUT AND 1/2" NPT FEMALE INLETS. FD -1 FLOOR DRAIN ZURN Z -415 3" 2 - -- - -- 3" PIPE SIZE WITH TYPE "B" POLISHED NICKEL BRONZE STRAINER AND TRAP PRIMER CONNECTION. EQUALS BY JAY R. SMITH OR WADE. DF -1 DRINKING FOUNTAIN OASIS PACSL HI /LOW 1 -1/2" 1 -1/2" 1/2" - -- WALL MOUNTED. FURNISH WITH WALL HANGER PLATE, CHROME P -TRAP AND SUPPLY STOP. MOUNT TO ANSI STANDARD FOR HANDICAPPED AT 34 1/2" MAX. FROM FLOOR TO SPOUT OUTLET. TP -1 TRAP PRIMER PRESICION PLUMBING PRODUCTS, INC. P2 -500 - -- - -- 1/2" - -- ADJUSTABLE FLOW RATE, INTEGRAL VACUUM BREAKER AND INTEGRAL BACKFLOW PREVENTER. MOUNT IN AN ACCESSIBLE LOCATION PER MANUFACTURER'S PRINTED INSTRUCTIONS, PROVIDE WITH TRAP PRIMER DISTRIBUTION UNIT - PRECISION PLUMBING PRODUCTS INC., MODEL #DU -2. WCO -1 WALL CLEAN OUT ZURN Z -1441 - -- - -- SIZE PER PIPING LATERAL, 4" MAX. DURA COATED CAST IRON BODY, WITH GAS WATERTIGHT APS TAPERED PLUG, AND ROUND SMOOTH STAINLESS STEEL ACCESS COVER WITH SECURING SCREW. WHA -1 WATER HAMMER ARRESTOR SIOUX CHIEF 653 -B - -- - -- 3/4" - -- EQUAL BY PRECISION PLUMBING PRODUCTS, INC. WH -1 ELECTRIC WATER HEATER A.O. SMITH DEL -6 - -- - -- 3/4" 3/4" ENERGY SAVER LOWBOY, ELECTRIC WITH GLASS LINED TANK, 6 GALLON, 1,500 W., 120V11 PH. EQUALS BY RHEEM OR RUUD. SUPPLY FIXTURE UNITS FIXTURE NUMBER WATER SUPPLY FIXTURE UNITS TOTAL COLD HOT DRINKING FOUNTAIN 1 0.25 - -- 0.25 FLOOR DRAIN 2 - -- - -- 2 MOP SINK L._ 2.25 2.25 3 2 LAVATORY 2 1.5 1.5 TANK TYPE WATER CLOSET (1.6GPF) 2 5 - -- 5 TOTAL WATER SUPPLY FIXTURE UNITS TOTAL PEAK DEMAND (GPM) 10.25 15.4 NOTE: THE 2006 IPC, TABLE El 03.3(2): "LOAD VALUES DEMAND DETERMINED FROM THE 2006 IPC, ESTIMATING DEMAND." LOAD VALUES TAKEN FROM ASSIGNED TO FIXTURES." TOTAL TABLE E103.3(3): "TABLE FOR DRAINAGE FIXTURE UNITS FIXTURE NUMBER DRAINAGE FIXTURE UNITS TOTAL DRINKING FOUNTAIN 1 0.5 0.5 FLOOR DRAIN 2 2 4 MOP SINK 1 2 2 LAVATORY 2 1 2 TANK TYPE WATER CLOSET (1.6GPF) 2 4 8 TOTAL DRAINAGE FIXTURE UNITS MINIMUM PIPE SIZE REQUIRED: 3" PIPE SIZE ON PLAN: 4" 16.5 NOTE: THE 2006 IPC, TABLE 709.1: "DRAINAGE AND GROUPS." PIPE SIZE IPC, TABLE 710.1(2): "HORIZONTAL LOAD VALUES TAKEN FROM FIXTURE UNITS FOR FIXTURES DETERMINED FROM THE 2006 FIXTURE BRANCHES AND STACKS." THERMOSTAT SET POINTS MODE OCCUPIED UNOCCUPIED COOLING 75° F 85°F HEATING 68° F 55° F THERMOSTATS FOR HEATING AND COOLING SHALL HAVE SET RANGE OF 55° F TO 85° F ADJUSTABLE TO PROVIDE A RANGE OF 10° F BETWEEN FULL HEATING AND FULL COOLING. ALL HEATING AND COOLING THERMOSTATS SHALL BE DESIGNED TO TERMINATE ALL HEATING AT 68° F AND ALL COOLING AT 75° F HVAC EQUIPMENT SHALL COMPLY WITH GOVERNING ENERGY CODE. THERMOSTATIC CONTROLS SHALL BE CAPABLE OF A DEADBAND OF AT LEAST 5°F. GENERAL MECHANICAL CONDITIONS 1. THE GENERAL AND SPECIAL CONDITIONS OF THE ARCHITECTURAL DRAWINGS SHALL BE INCLUDED AS PART OF THESE DOCUMENTS. 2. ALL MATERIALS SHALL BE NEW, UNUSED, AND THE BEST OF THEIR RESPECTIVE KINDS AND FREE FROM DEFECTS. 3. THE CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE AIR DISTRIBUTION SYSTEM WITHIN THE TENANT SPACE TO INCLUDE, BUT NOT LIMITED TO ALL DUCTWORK, HANGERS, INSULATION, VAPOR BARRIER, SUPPLY DIFFUSERS, RETURN GRILLES, FLEXIBLE CONNECTIONS, AND CONTROL INSTALLATION AS REQUIRED FOR A COMPLETE AND WORKING SYSTEM. THE CONTRACTOR SHALL PAY ALL FEES, GIVE ALL NOTICES, FILE ALL NECESSARY DRAWINGS AND OBTAIN ALL PERMITS AND CERTIFICATES OF APPROVAL REQUIRED IN CONNECTION WITH ALL WORK UNDER THIS CONTRACT. ALL WORK SHALL BE FURNISHED AND INSTALLED IN FULL ACCORDANCE WITH ALL LOCAL LAWS, ORDINANCES, RULES AND REGULATIONS. 4. DRAWINGS ARE DIAGRAMMATIC ONLY, INTENDING TO SHOW GENERAL RUNS AND LOCATIONS OF THE WORK AND ARE NOT INTENDED TO BE RIGID IN SPECIFIC DETAIL. 5. THE CONTRACTOR SHALL BE HELD TO HAVE EXAMINED THE SITE FOR HIS WORK BEFORE HAVING SUBMITTED HIS PROPOSAL. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR CONDITIONS FOUND DURING THE COURSE OF THE CONTRACT. 6. THE CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AT THE SITE AND BE RESPONSIBLE FOR THE CORRECTNESS OF THE SAME. 7. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF HIS WORK WITH LIGHTING PLANS, REFLECTED CEILING PLANS, LANDLORD'S SPRINKLER PLANS AND ALL OTHER TRADES. 8. THE INSTALLATION OF ALL EQUIPMENT AND MATERIALS REQUIRING ACCESS SHALL BE MADE IN SUCH MANNER AS TO MAKE THE EQUIPMENT AND MATERIALS READILY ACCESSIBLE FOR OPERATION, MAINTENANCE AND REPAIRS. 9. STORAGE OF CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE ONLY IN SPACES AS DESIGNATED BY THE ARCHITECT /OWNER. 10, CONSTRUCTION DEBRIS AND RUBBISH GENERATED BY THE CONTRACTOR SHALL BE REMOVED FROM PREMISES DAILY TO MAINTAIN A CLEAN AND WORKABLE AREA. 11. ALL WORK AND EQUIPMENT SHALL BE FULLY GUARANTEED FOR ONE (1) YEAR FROM THE DATE OF FINAL PAYMENT AND ACCEPTANCE. 12. ALL WORK, INCLUDING INSIDE OF SUPPLY AIR DUCTS, AND EQUIPMENT WITHIN THE CONTRACT AREA FURNISHED AND INSTALLED UNDER THIS CONTRACT SHALL BE CLEANED TO THE SATISFACTION OF THE OWNER BEFORE TURNING SAME OVER TO THE OWNER. 13. CONNECT NEW WORK TO EXISTING IN A NEAT AND APPROVED MANNER. 14. INTERRUPTION OF HEATING, POWER AND AUXILIARY SYSTEMS WHERE AND IF REQUIRED SHALL BE COORDINATED AND SHALL OCCUR ONLY DURING PREARRANGED ACCEPTABLE TIMES. 15. ALL DESIGN SHALL INCORPORATE CURRENT ASHRAE METHODS. 16. WHEN EXISTING DUCTWORK IS UTILIZED, SIZES SHALL BE AS SHOWN ON DWGS. AS MINIMUM REQUIREMENT. FIRE PROTECTION STANDARDS 1. THE CONTRACTOR SHALL RETAIN AND PAY FOR A "PROFESSIONAL OF RECORD" FOR ALL FIRE SPRINKLER AND FIRE PROTECTION WORK. 2. THE DRAWINGS AND ALL SPECIFICATIONS FOR ALL FIRE PROTECTION WORK ARE PERFORMANCE IN SCOPE AND INTENT. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS, EQUIPMENT, LABOR, DESIGN, LAYOUT, DETAILS, DRAWINGS, DOCUMENTS, AND ALL CRITERIA TO MEET GOVERNING AUTHORITIES, CODES, REGULATIONS, AND UNDERWRITER'S REQUIREMENTS FOR ALL FIRE PROTECTION WORK. 4. CONTRACTOR SHALL VISIT THE SITE TO BECOME FAMILIAR WITH THE EXISTING CONDITIONS PRIOR TO SUBMITTING BID. 5. A COMPLETE SET OF ALL REQUIRED DOCUMENTS SHALL BE PREPARED AND SUBMITTED TO THE PROPER AUTHORITIES WITHIN THIRTY (30) DAYS OF CONTRACT AWARD. 6. THE LANDLORD'S DESIGN CRITERIA SHALL BE CONSIDERED PART OF THESE SPECIFICATIONS. 7. ALL FIRE PROTECTION WORK SHALL BE SCHEDULED IN ADVANCE WITH THE LANDLORD'S FIELD REPRESENTATIVE. FIRE PROTECTION SYSTEM SHALL BE FULLY OPERATIONAL WHEN THE CONTRACTOR IS OFF THE SITE. PLUMBING SPECIFICATION 1. PROVIDE A COMPLETE AND OPERATING PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS. THE INSTALLATION SHALL BE COMPLETE WITH ALL FIXTURES, FITTINGS, TRIM AND ACCESSORIES TO PROVIDE A COMPLETE, FUNCTIONING SYSTEM, PROVIDE FOR ALL CODE REQUIREMENTS AND DISABILITY PROVISIONS. 2. PROVIDE SQUARE TOP CLEANOUT COVERS ON FLOOR CLEANOUTS. SQUARE COVERS SHALL BE ALIGNED WITH BUILDING CONSTRUCTION AND FLUSH WITH FINISHED FLOOR. 3. SUPPLY PIPING SHALL BE TYPE "L" COPPER INSTALLED WITH LEADLESS SOLDER. SANITARY WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON WITH HUBLESS CONNECTOR FITTINGS ABOVE GRADE. BELOW GRADE SHALL BE SERVICE WEIGHT CAST IRON HUB AND SPIGOT GASKET JOINT. HOT AND COLD WATER SUPPLY PIPING SHALL BE INSULATED WITH A MINIMUM 1/2" FIBERGLASS WITH VAPOR PROOF ALL SERVICE JACKET OR EQUIVALENT CLOSED CELL FOAM INSULATION AS ALLOWED BY LOCAL CODES FOR INSTALLATION IN RETURN AIR PLENUMS. 4. ALL VALVE HANDLES SHALL BE COLOR CODED IN ORDER SO THAT THEY SHALL CORRESPOND AS FOLLOWS: A. BLUE - COLD WATER B. RED - HOT WATER 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PIPING SUPPORTS, HANGERS AND METHODS FOR ATTACHMENT TO WALLS AND PARTITIONS. 6. NO PIPING SHALL RUN THROUGH DUCTWORK. 7. CONTRACTOR SHALL VERIFY ALL DIMENSIONS, SPACES AND CONDITIONS PRIOR TO FABRICATION AND INSTALLATION OF EQUIPMENT AND MATERIAL. 8. CONTRACTOR SHALL GUARANTEE ALL WORK FREE FROM DEFECTS OF WORKMANSHIP AND /OR MATERIAL FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. 9. DIELECTRIC UNIONS SHALL BE PROVIDED WHEREVER DISSIMILAR METALS ARE JOINED. 10. REFER TO PLUMBING FIXTURE SCHEDULE FOR SPECIFICATIONS FOR NEW FIXTURES AS REQUIRED. MECHANICAL SPECIFICATIONS 1. AIR BALANCING A. CONTRACTOR SHALL PROCURE THE SERVICES OF AN INDEPENDENT NEBB OR AABC CERTIFIED AIR BALANCE AND TESTING AGENCY TO BALANCE, ADJUST & TEST EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING 3 COPIES OF BALANCE/TEST AGENCIES REPORT TO CHICO'S PROJECT MANAGER AND LANDLORD OPERATIONS DIRECTOR FOR REVIEW. MIN. OUTDOOR C.F.M. AND INDOOR FAN C.F.M. SHALL BE PROVIDED AS SHOWN ON RTU SCHEDULE (NOTE: BALANCE MUST BE WITHIN ± 5% OF DESIGN). 2. DUCTWORK A. INSTALL ALL DUCTWORK IN COMPLETE CONFORMANCE WITH RECOMMENDED CONSTRUCTION STANDARDS FOR RECTANGULAR AND ROUND SHEET METAL AND FLEXIBLE DUCTS IN ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS AND ALL OTHER AUTHORITIES HAVING JURISDICTION. FLEXIBLE DUCT SHALL NOT EXCEED 5' -0" IN LENGTH. MINIMUM SHEETMETAL THICKNESS SHALL BE 26 GA. B. ALL DUCT JOINTS SHALL BE SEALED PER SMACNA SEAL CLASS "C" USING DUCT SEAL AS MANUFACTURED BY UNITED SHEET METAL, OR EQUAL. GRAY DUCT TAPE SHALL NOT BE ACCEPTED. C. STRAP HANGERS SHALL NOT BE LESS THAN 1" BY 1/8" THICK ON SIX (6) FOOT CENTERS AND ATTACHED TO SIDE OF DUCT WITH SHEET METAL SCREWS. INSULATED FLEXIBLE DUCT MAY BE USED FOR LOW PRESSURE RUNOUTS TO INDIVIDUAL DIFFUSERS IN LENGTHS NOT TO EXCEED FIVE (5) FEET FOR EACH DIFFUSER. SEAL ALL SHEETMETAL SCREW PENETRATIONS. D. ALL RECTANGULAR AND ROUND SUPPLY DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A MINIMUM THICKNESS THAT CONFORMS TO THE STANDARD OF THE GOVERNING CODE AND SHALL IN NO CASE BE LESS THAN 2" AND SHALL HAVE A CONTINUOUS VAPOR BARRIER JACKET W /ALL JOINTS TAPED AND SEALED. E. PROVIDE FLEXIBLE CONNECTION BETWEEN ALL FAN POWERED EQUIPMENT AND CONNECTING DUCTWORK. F. ALL INSULATION, JOINING MATERIALS, SEALER, ETC.. SHALL HAVE A U.L. FLAME SPREAD CLASSIFICATION OF NO MORE THAN 25 AND A SMOKE DEVELOPMENT RATING NOT MORE THAN 50. 3. AIR DEVICES A. SUPPLY DIFFUSERS: (TITUS AS STANDARD) SHALL BE FURNISHED WITH BAKED WHITE ENAMEL FINISH, AND SHALL BE SELECTED FOR NECK VELOCITIES NOT EXCEEDING 800 FPM AND NOISE LEVEL OF NC -35 OR LESS. B. SUPPLY DIFFUSERS SHALL BE ROUND NECK, STEEL, MODEL OMNI, SIZED USING CRITERIA INDICATED ABOVE FOR LAY -IN CEILING GRID TYPE CONSTRUCTION OR DRYWALL CEILING AS INDICATED ON DWG. DIFFUSERS SHALL BE COMPLETE WITH ADJUSTABLE AIR PATTERNS AS REQUIRED (REFER TO HVAC /PLUMBING PLAN, SHEET MP1). C. RETURNS SHALL BE 22 INCH SQUARE NECK (ROUND IN STORAGE) STEEL, PERFORATED FACE MODEL PAR. FACE VELOCITY OF RETURN REGISTERS SHALL NOT EXCEED 500 FPM. VOLUME CONTROL DAMPER NOT REQUIRED FOR RETURN INSTALLATION. D. COORDINATE LOCATION OF AIR DEVICES WITH LIGHTS, SPRINKLERS, SPEAKER, SMOKE DETECTORS, ETC. 4. EQUIPMENT A. REFER TO MECHANICAL PLANS FOR SPECIFICATIONS OF HVAC EQUIPMENT. B. ALL NEW EQUIPMENT SHALL BE EQUIVALENT TO THE SPECIFIED ITEM. ANY ACCOMMODATIONS FOR ALTERNATE MANUFACTURERS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. C. MOUNT NEW EQUIPMENT USING VIBRATION MOUNTS OR HANGERS MOST SUITABLE FOR THE APPLICATION. D. ALL EQUIPMENT SHALL BE INSTALLED ACCORDING TO MANUFACTURERS INSTRUCTIONS. E. EXISTING EQUIPMENT TO REMAIN SHALL BE CLEANED AND SERVICED TO RENDER IT FULLY OPERATIONAL. CONTRACTOR TO ADVISE TENANT OF COMPONENTS AND /OR CONTROLS, WHICH NEED TO BE REPLACED. F. COORDINATE UNIT LOCATION WITH LANDLORD AND SITE CONDITIONS. G. INSTALL GAS PIPING AND CONNECT TO NEW UNITS. FIELD VERIFY GAS METER LOCATION AND SIZE. INSTALL GAS REGULATOR WHERE REQUIRED. H. GAS PIPING SHALL BE SCHEDULE 40 (ASTM -Al20) BLACK STEEL WITH 300 lb. BLACK FULLY OPERATIONAL. MALLEABLE IRON BANDED SCREWED OR WELD PATTERN FITTINGS AS APPLICABLE. I. ALL PIPING AND FITTINGS LOCATED OUTDOORS AND ABOVE GRADE SHALL BE CLEANED FREE OF RUST AND PAINTED. ALL FITTINGS TO BE MADE WITH PIPE JOINT COMPOUND. TEFLON TAPE NOT ALLOWED. 5. CONTROLS A. PROVIDE CONTROLS AS SPECIFIED. SPECIAL CONTROL METHODS WILL BE ADDRESSED ON AN INDIVIDUAL BASIS. B. THE CONTRACTOR SHALL PROVIDE ALL 24V WIRING INCLUDING CONNECTIONS, CHECK, TEST AND START -UP. C. COORDINATE INTERFACING OF DUCT MOUNTED SMOKE DETECTOR (WHEN SPECIFIED OR REQUIRED) WITH ELECTRICAL CONTRACTOR TO STOP FAN. DOCUMENTATION CONSTRUCTION DOCUMENTS SHALL REQUIRE THAT WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. CONSTRUCTION DOCUMENTS SHALL REQUIRE AN OPERATING MANUAL AND MAINTENANCE MANUAL BE PROVIDED TO THE BUILDING OWNER. THE MANUAL SHALL BE IN ACCORDANCE WITH INDUSTRY ACCEPTED STANDARDS AND SHALL INCLUDE, AT A MINIMUM, THE FOLLOWING: 1. SUBMITTAL DATA STATING EQUIPMENT SIZE AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. ALL OTHER HVAC CONTROL SYSTEMS, AND OTHER AUTOMATICALLY CONTROLLED SYSTEMS FOR WHICH ENERGY CONSUMPTION, PERFORMANCE, OR MODE OF OPERATION ARE REGULATED BY THIS CODE, SHALL BE TESTED TO ENSURE THAT CONTROL DEVICES, EQUIPMENT AND SYSTEMS ARE CALIBRATED, ADJUSTED AND OPERATE IN ACCORD WITH APPROVED PLANS AND SPECIFICATIONS. SEQUENCES OF OPERATION SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN ACCORD WITH APPROVED PLANS AND SPECIFICATIONS. 2. OPERATION AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE, EXCEPT EQUIPMENT NOT FURNISHED AS PART OF THE PROJECT. REQUIRED ROUTINE MAINTENANCE ACTIONS SHALL BE CLEARLY IDENTIFIED. 3. NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY. 4. HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING DIAGRAMS, SCHEMATICS, AND CONTROL SEQUENCE DESCRIPTIONS. DESIRED OR FIELD DETERMINED SET POINTS SHALL BE PERMANENTLY RECORDED ON CONTROL DRAWINGS AT CONTROL DEVICES, OR, FOR DIGITAL CONTROL SYSTEMS, IN PROGRAMMING COMMENTS. DRAWING NOTES SHALL REQUIRE COMMISSIONING IN ACCORDANCE WITH SECTION1416 . DRAWING NOTES MAY REFER TO SPECIFICATIONS FOR FURTHER COMMISSIONING REQUIREMENTS. PLANS AND SPECIFICATIONS SHALL REQUIRE TESTS MANDATED BY THIS SECTION BE PERFORMED AND THE RESULTS RECORDED. PLANS AND SPECIFICATIONS SHALL REQUIRE PREPARATION OF PRELIMINARY AND FINAL REPORTS OF TEST PROCEDURES AND RESULTS AS DESCRIBED IN SECTION 1416.2.3. PLANS AND SPECIFICATIONS SHALL IDENTIFY THE FOLLOWING FOR EACH TEST: 5. A COMPLETE NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE INCLUDING SUGGESTED SET POINTS. VAV # 1 MANUFACTURER TITUS MODEL TQP NOTE: INSTALL ALL PLUMBING FIXTURES TO BE FULLY ACCESSIBLE TO INDIVIDUALS WITH DISABILITIES IN ACCORDANCE WITH 'THE AMERICANS WITH DISABILITIES ACT OF 1990 (ARCHITECTURAL GUIDELINES). FIXTURES AND THEIR INSTALLATION SHALL ALSO COMPLY WITH AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) PUBLICATION A117.1 - 'PROVIDING ACCESSIBILITY AND USABILITY FOR PHYSICALLY HANDICAPPED PEOPLE' AND /OR GOVERNING CODES. - ALL PLUMBING FIXTURES EQUIPMENT, TRIM, & FITTINGS SHALL COMPLY WITH LOCAL, STATE, AND FEDERAL REGULATIONS AND CODES, INCLUDING, BUT NOT LIMITED TO, WATER AND ENERGY CONSERVATION CODES. THE SCHEDULED AND /OR SPECIFIED PLUMBING FIXTURES AND EQUIPMENT REPRESENT THE MINIMUM CRITERIA AND SHALL BE THE BASIS FOR THE CONTRACTOR'S BASE BID. IF THE SCHEDULED OR SPECIFIED FIXTURES OR EQUIPMENT DO NOT COMPLY WITH GOVERNING CODES OR REGULATIONS IN ALL RESPECTS, THE CONTRACTOR SHALL PROVIDE AN ALTERNATE BID FOR COMPLYING FIXTURES, EQUIPMENT, TRIM, OR FITTINGS. THE ABSENCE OF AN ALTERNATE BID SHALL BE CONSTRUED TO MEAN THAT THE CONTRACTOR'S BID INCLUDES ALL COSTS NECESSARY TO MEET ALL REGULATIONS & CODES. ALL PIPING BELOW LAVATORY SHALL BE INSULATED WITH TRUEBRO LAV GUARDS AND CONFIGURED TO PROTECT AGAINST CONTACT. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORY. G.C. TO PROVIDE REFLECTIVE TAPE TO SUPPLY AIR MAIN FLEXIBLE CONNECTION (MAX. 5ft.) Th DIFFUSER MOUNTING SCHEMATIC SCALE = N.T.S. INSULATED ROUND DUCT Si r UNIT SIZE 7 7 N. DRYWALL CEILING SUPPLY AIR DIFFUSER 1-{y L„adn Cycutel a, , +,11Eg'Ge PER 2006 IMC SECTION 606 Install smoke detector to shut down air distribution by VAY's when the total combined C F M of all VAY's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection) Sulldtnq Summary Loads Bulldrng peaks In September at 11pm. 1l Roof Waft Gass Floor Slab Skin Loads Lighting Equipment People Partition OW. Prat H eat Prat. Cool, Vent. Heat Vent. Cool. Infiit Heat, In91. DravHThru Fan 81oVeThru Fan Reserve Cap. Reheat Cap S°PptY Duct Return Duct Misc. Supply Misc. Return & lildi ng Totals 6 THE Ventaation In51tration Pretreated Air Zone Loads Plenuni Loads Fan & Duct Loads Bufltng Totals 7,694 3,000 26 It WN4E1M SF.arTiF Via H,7eSe CrIV INLET (IN. 16 VOLUME DAMPER NI ill 0.00 0.00 0,00 0.00 0.00 0.00 0,00 V"E'3`S'o`)C"`i:'1iur i Tr ?i riifrai rb lipltr 6fRO ;•T Total Building Supply Air (based en a 17' TA) Total Bulldhig Vent. Air (0.0056 of Supply)! Total Conditioned A4 Space Supply Air Per Unit Area: Area Per Cooing Capacity Caofin0 Capacity Per Area! Heating Capacity Per Area: Total Hearing Requeed Weh Outside Alr Total Caohng Required Mb Outside Ali. 0.00 0.10 0.00 0,00 0.09 0.00 0.00 0,00 0.00 090 900 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0,00 0,00 aim 0.00 REQ INLET PRESSURE (IN. W.C.) 0.25 STRAP CLAMP (TYPICAL) PLASTER FRAME 29,0 10,05 0,544 7,41 0.00 5,544 40.459 52.00 0 5.44 0 5,544 a 40,456 a 0 48,450 2,600 CFM O cFra 3,105 Sq. 07899 CFM,Sq.ft 730.3 Sq.ftron 0. 0014 Tons/SO fl 0.00 BrvMSq.ft O 60,0 4.03 Tans FAN POWERED, PARALLEL FLOW TERMINAL UNIT SCHEDULE il1i II !r: 28,00 4 12,95 EXTERNAL STATIC (IN. W.C.) ortiek als • , L two 0.00 o.00 0 .00 0, 54.02 21.08 24.82 I o.00 I O.o0 I 0. 0.00 0.00 0.0o 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00 _.. 0 0 0.00 0 0.00 0 o.w 52,003 100.00 0 0.00 0 0.00 52003 100.00 Frloey retw t5 .', or 00 PM 0.5 2 HVAC BUILDING LOAD SUMMARY MP22� SCALE = N.T.S. FAN BHP 3/4 PRIMARY AIR TEMP (DEG F) 57 MAX SUPPLY CFM 2500 MIN SUPPLY CFM 950 VACUUM RELIEF VALVE WATTS 36A PROVIDE HW EXPANSION TANK AMTROL #S7 -12 WHERE REQUIRED BY CODE. 3/4" CW 3/4" HW La O z 0 a 1 n A\ 01 /Ili /DH carom I. LI_'IJ1`. , M i 1). 1 087 i WA ION f;OAr) C 1 MANN .f f<L; Ph. 314. 821. 1100 Fax 314.821.4162 Email chicos @cascocorp.com 0 od ca 0 Q C. ALBERTS 7:7ES ''..I( Al iF PEt .tF'D HO NI- GNI i' 'I 1 ,U - i -Il,i Cq EXPIRES 07/21/09 la.. , LIC. #00018394 scale project checked by 7J2 1 J HVAC & PLUMBING SCHEDULES & DETAILS 3117656 As indicated ELECTRIC HEATER KW 10 APPROVED 4" DEEP DRAIN PAN SET ON PLYWOOD PLATFORM R -10 INSULATION UNDER TANK 3/4" PLYWOOD VOLTS /PH /HZ 460/3/60 4 DIELECTRIC UNION NOTE: PROVIDE ADEQUATE WALL BRACING TO SUPPORT WATER HEATER & PLATFORM MOUNT WATER HEATER ABOVE FINISHED CEILING. MCA 14 MOCP 20 WH -1 NOTE: SET TEMP. @ 110°F (WATER HEATER DETAIL .MP2 / SCALE = N.T.S. ACCESSORIES 10 KW ELECTRIC HEATER 18 GA. 2" WIDE METAL STRAP CODE O'r,PNCE ' MAR - 3 2008 City Of Tu�►niia , B ILDING DIVISION T & P RELIEF VALVE (FACTORY INSTALLED) WITH FULL SIZE DRAIN LINE. RUN RELIEF LINE TIGHT TO WALL AND TERMINATE IN MOP SINK. PROVIDE AIR GAP AS REQUIRED BY CODE. 1 1/2" x 1 1/2" x 1/8" STEEL ANGLE FRAME OF ALL WELDED CONSTRUCTION PRIME AND PAINT WHITE. SECURE TO WALL WITH STEEL FASTENERS, 1" DRAIN LINE FROM DRAIN PAN. RUN DRAIN LINE TIGHT TO WALL AND TERMINATE IN MOP SINK. PROVIDE AIR GAP AS REQUIRED BY CODE. SYMBOLS LEGEND DUCT SMOKE DETECTOR REMOTE SENSOR THERMOSTAT THERMOSTAT AND SUBBASE EQUIPMENT DESIGNATION 0 KEYED NOTES AR REVISION NUMBER POINT OF CONNECTION BETWEEN NEW AND EXISTING PIPING (IF APPLICABLE) VOLUME DAMPER SUPPLY AIR DEVICE RETURN OR EXHAUST AIR DEVICE