HomeMy WebLinkAboutPermit M08-067 - SABEY CORPSABER CORD
3355 S 120 PL
EXPIRED 09 -22 -OS
M08 -067
Parcel No.: 1023049069
Address:
Suite No:
3355 S 120 PL TUKW
Tenant:
Name: SABEY CORP
Address: 3355 S 120 PL , TUKWILA WA
Contact Person:
Name: MATT LANPHIER
Address: 5005 3 AV S , SEATTLE WA
Contractor:
Name: MCKINSTRY CO LLC
Address: PO BOX 24567 , SEATTLE WA
Contractor License No: MCKINCL942DW
Value of Mechanical: $75,000.00
Type of Fire Protection:
doc: IMC -10/06
City.of Tukwila
Furnace: <100K BTU 0
>100K BTU 0
Floor Furnace 0
Suspended/Wall/Floor Mounted Heater 0
Appliance Vent 0
Repair or Addition to Heat/Refrig /Cooling System.... 0
Air Handling Unit <10,000 CFM 0
>10,000 CFM 0
Evaporator Cooler 0
Ventilation Fan connected to single duct 0
Ventilation System 0
Hood and Duct 0
Incinerator: Domestic 0
Commercial/Industrial 0
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
MECHANICAL PERMIT
Owner:
Name: SABEY CORPORATION
Address: 12201 TUKWILA INTL BLVD 4THFL , SEATTLE WA
EQUIPMENT TYPE AND QUANTITY
* *continued on next page **
Permit Number: M08 -067
Issue Date: 03/18/2008
Permit Expires On: 09/14/2008
Expiration Date: 03/16/2010
DESCRIPTION OF WORK:
INSTALLATION OF FUTURE SUPPLY .AND RETURN DUCTS BETWEEN 2ND AND 3RD FLOOR OFFICE
TI BUILDOUT FOR SABEY CORP. NO ACTIVE VENTILATION SYSTEM WILL BE CONNECTED TO
MECHANICAL WORK ASSOCIATED WITH THIS PERMIT.
Phone:
Phone: 206 255 -8102
Phone: (206)762 -23311
Fees Collected: $966.88
International Mechanical Code Edition: 2006
Boiler Compressor:
0 -3 HP /100,000 BTU 0
3 -15 HP /500,000 BTU 0
15 -30 HP /1,000,000 BTU.. 0
30 -50 HP /1,750,000 BTU.. 0
50+ HP /1,750,000 BTU 0
Fire Damper 0
Diffuser 0
Thermostat 0
Wood/Gas Stove 0
Water Heater 0
Emergency Generator 0
Other Mechanical Equipment 0
M08 -067 Printed: 03 -18 -2008
Permit Center Authorized Signature:
Signature:
doc: IMC -10/06
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http. / /www.ci.tukwila.wa.us
Permit Number: MO8 -067
Issue Date: 03/18/2008
Permit Expires On: 09/14/2008
/ 41A7-7- L' ki /O6f �c S
Print Name:
Date: 09111
I hereby certify that I have read and el a ►fined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied , whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I . ' tho �;• to sign and obtain this mechanical permit.
Date:
V gAg
This permit shall become mill and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
M08 -067 Printed: 03 -18 -2008
Parcel No.: 102304906!1
Address: 3355 S 120 PL TUKW
Suite No:
Tenant: SABEY CORP
1: ** *BUILDING DEPARTMENT CONDITIONS * **
doc: Cond -10/06
• •
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
PERMIT CONDITIONS
* *continued on next page **
Permit Number: M08 - 067
Status: ISSUED
Applied Date: 03/07/2008
Issue Date: 03/18/2008
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center
(206/431- 3670).
4: All permits, inspection re . zords, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. The se documents shall be maintained and made available until final inspection approval is
granted.
5: All construction shall be clone in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
6: Manufacturers installatior. instructions shall be available on the job site at the time of inspection.
7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary
sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other
excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of
this requirement.
8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building
Department (206- 431 - 3670).
9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requir..ng the correction of errors in the construction documents and other data.
M08 -067 Printed: 03 -18 -2008
doc: Cond -10/06
• •
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing
this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating
construction or the performance of work.
veIlr
Signature:
Print Name:
Date:
3 0
0 0
M08 -067 Printed: 03 -18 -2008
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.ci.tukwila.wa.us
Company Name: "IC k W-6 7— 1/4 C
Mailing Address: A° 3t?XC Z'/5 b 7 ,
Contact Person: / 4-1 At rT Lit 4 0/°rl t t--R
E -Mail Address:
Company Name: /"/CKtnS.S77Z CC
Contact Person: i T T W E(3 i3
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
98 King Co Assessor's Tax No.:
Site Address: 3355 5 1204, P1 /8 � '6 g Suite Number: Floor: 2 7 3
Tenant Name: 3'61. CORO°.
Property Owners Name: S, EY CCtP.
Mailing Address: 3J 55 S IZO / 7'K�v'
Mailing Address: -500 3r c) AVE 5 , S FJR PILE
E -Mail Address: '00 i't't' G / ti 5 'f' Ny . CO t
6 v+-t e h, ,1 r y .
Contractor Registration Number: / C 1< / Af C 1.4 1 Z Q u!
Mailing Address: to 4 O)( 256 7 r s EAT
E -Mail Address: ' . f i ' "65 1-7y
Q:Wpplications \Forms - Applications On Line\3 -2006 - Permit Application.doc
Revised: 9 -2006
bh
b T
Building Permit No.
hanical Permit No.
Plumbing /Gas Permit No.
Public Works Permit No
Project No.
office use only)
( J / ; 9'8 /
cit
CONTACT PERSON — who do
e contact when your permit is ready to be issued
Name: / 1447-7 L-0 — /'44-K /4JS77kY ID. Day Telephone: 206 - Z55 - 8/122
GENERAL CONTRACTOR INFORMATION
(Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5))
t.�Sp
101,D+
New Tenant: ❑ Yes Q No
State
City State Zip
Fax Number: 206 - 1'5 - fe
City State Zip
Day Telephone: 20& - 255 $ / 0 2
Fax Number: 206 _ 6 5 f3 _ /ex e
Expiration Date: 3 //6 /2c 0 Q
City
State
Zip
ARCHITECT OF RECORD — All plans must be wet stamped by Architect of Record
Company Name:
Mailing Address:
Zip
Day Telephone:
Contact Person:
E -Mail Address: Fax Number:
ENGINEER OF RECORD - All plans must be we
tamped by Engineer of Record
City State Zip
Day Telephone: 206 - 76 2 33 /1
Fax Number:
Page 1 of 6
Unit Type:
Qty
Unit Type: ,
Qty
Unit Type:
Qty
Boiler /Compressor:
Qty
Furnace <10OK BTU
Air Handling Unit >10,000
CFM
Fire Damper
0 -3 HP /100,000 BTU
Furnace >100K BTU
Evaporator Cooler
Diffuser
3 -15 HP /500,000 BTU
Floor Furnace
Ventilation Fan Connected
to Single Duct
Thermostat
15 -30 HP /1,000,000 BTU
Suspended/Wall /Floor
Mounted Heater
Ventilation System
Wood/Gas Stove
30 -50 HP /1,750,000 BTU
Appliance Vent
Hood and Duct
Emergency
Generator
50+ HP /1,750,000 BTU
Repair or Addition to
Heat/Refrig/Cooling
System
Incinerator - Domestic
Other Mechanical
Equipment
Air Handling Unit
<10,000 CFM
Incinerator — Comm/Ind
Company Name:
MECHANICAL PERMIT INFORMATION — 206 -431 -3670
MECHANICAL CONTRACTOR INFORMATION
A3377Z 7' CD.
Mailing Address: 7 Ox P/567 $ TTLE
Contact Person: MAT 7 1"A) Pt? l c
✓h at,'I 60 ratrc_ r t S fr N. cc 0-1
Contractor Registration Number: MC -</AJ t_ - 9 2- 11
E -Mail Address:
Valuation of Mechanical work (contractor's bid price): $ 7 5 - , O O 0
Scope of Work (please provide detailed information): / ").S TA LL - 77G N (3F Ft> r1-) / .5 +'PPL Y
RFTvneio A )eT5 ,Q A/ z 3 3v) fLcCk OFF/« T. /, 80 / tilour
FoR 6'416.EY writ. , Alp Ac-1VE VE•JTI LAT <SYS r Gv /LL teC
1OA»UEGTEL 7d /4FLhf4ct) /Cri-L CORK AsSOUstTEO GU/TH T11 /S i'tRf"1 /fir
Use: Residential: New .... ❑ Replacement .... ❑
Commercial: New ....Er
... L Replacement .... ❑
Fuel Type: Electric ❑ Gas ....E Other: /v /A
Indicate type of mechanical work being installed and the quantity below:
Q:\Applications\Forms- Applications On Line\3 -2006 - Permit Application.doc
Revised: 9 -2006
bh
C YO/ Z-
City State Zip
Day Telephone: 20 - . Z �� - 5 /0 L
Fax Number: z86- (� B - i83's
Expiration Date: 3//b/Z00 b
Page 4 of 6
PERMIT APPLICATION NOTES — Applicable to all permits in this application
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition).
1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR AUTHORIZE) A !z N
Date: &/� /Z 6)O)
Print Name: /'/Tr L AJ,. H / E f Day Telephone: 714- 755 - /01_
Signature:
Mailing Address: / /3 24 567
Date Application Accepted:
0 01- a l
Q:\Applications \Forms- Applications On Line\3 -2006 - Permit Application.doc
Revised: 9 -2006
bh
Date Application Expires:
SEATTLE 7F !zV-
City State Zip
Staff Initials:
Page 6 of 6
Receipt No.: R08 -00658
Initials: JEM
User ID: 1165
Payee: MCKINSTRY CO
ACCOUNT ITEM LIST:
Description
doc: Receipt -06
MECHANICAL - NONRES
PLAN CHECK - NONRES
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: http: / /www.ci.tukwila.wa.us
RECEIPT
Parcel No.: 1023049069 Permit Number: M08 -067
Address: 3355 S 120 PL TUKW Status: PENDING
Suite No: Applied Date: 03/07/2008
Applicant: SABEY CORP Issue Date:
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 9364 966.88
Account Code Current Pmts
000.322.102.00.0 773.50
000/345.830 193.38
Total: $966.88
Payment Amount: $966.88
Payment Date: 03/07/2008 03:35 PM
Balance: $0.00
9631 03/10 9710 TOTAL
966.88
Printed: 03 -07 -2008
COMMEN
14
P1-I -E'er , _S A (l ord �-) ( Ai— ' '
?_..t . •I- A (l L. f r IJJA f Gt
5 /d. A--f ( . P '/--e A i op fir-itk-
o r
p. Li :7 r /! e iJ f _ Oro ✓?
l 4 7 - 6 ,fl 4,A
Li 7
_1
___.,
a.m.
m
Requester:
1
Proje •
Type of Inspection:
rA AA e A
Address:
385 S ie
i i 41
t ?.d --
Date Called/
Special Instructions:
Date Wanted:
a.m.
m
Requester:
Phone No:
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION 12 '
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
Approved per applicable codes. ❑ Corrections required prior to approval.
Receipt No.:
INSPECTION RECORD
Retain a copy with permit
'Date:
Date:
fl $58.00 REINSPECTION FEE REQUIRED. Prior o inspection. fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection.
i?�en.'�i�u.... a,�.a,r'+,� � — 3-- '"�'i'°' - r . • ....0 _ °�7�� _�„ � .cta •d9._, - — - �s .
07 -29 -2008
MATT LANPHIER
5005 3 AV S
SEATTLE WA 98124
RE: Permit No. M:08 -067
3355 S 120 PL TUKW
Dear Permit Holder:
In reviewing our current records the above noted permit has not received a fmal inspection by the City of Tukwila Building Division.
Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the
provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not
commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or
abandoned at any time after the work is commenced for a period of 180 days.
Based on the above, you are hereby advised to:
Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or fmal inspection.
This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if
the project should be considered abandoned.
If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for
additional periods not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why
circumstances beyond the applicants control have prevented action from being taken.
In the event you do not call for the above inspection and receive an extension prior to 09/22/2008 , your permit will become null and
void and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
xc:
fer Marshall,
it Technician
Permit File No. M38 -067
City of f Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 o Fax: 206 - 431 -3665
• PERMIT COORD COPY
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: M08 -067 DATE: 03 -07 -08
PROJECT NAME: SABEY CORP
SITE ADDRESS: 3355 S 120 Pl.
X Original Plan Submittal
Response to Correction Letter #
DEPARTMENTS:
itAA, 3.
BuiId)ng L.Avision
Public Works
Complete
Comments:
APPROVALS OR CORRECTIONS:
Documents/routing slip.doc
2 -28 -02
Fire 611 NIL
Structural
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Incomplete n
Approved Approved with Conditions
Notation:
REVIEWER'S INITIALS:
Response to Incomplete Letter #
Revision # After Permit Issued
Planning Division
n Permit Coordinator
DUE DATE: 03-11-08
Not Applicable n
Permit Center Use
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES/THURS ROU ING:
Please Route Structural Review Required n No further Review Required
REVIEWER'S INITIALS: DATE:
DUE DATE: 04-08-08
Not Approved (attach comments)
DATE:
Permit Center Use. Only
CORRECTION LETTER MAILED:
Departments issuel corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
License Information
License
MCKINCL942DW
Licensee Name
MCKINSTRY CO LLC
Licensee Type
CONSTRUCTION CONTRACTOR
UBI
602569922
Ind. Ins. Accaunt Id
70616500
Business Type
LIMITED LIABILITY COMPANY
Address 1
PO BOX 24567
Address 2
City
SEATTLE
County
KING
State
WA
Zip
98134
Phone
2067623311
Status
ACTIVE
Specialty 1
GENERAL
Specialty 2
UNUSED
Effective Date
3/16/2006
Expiration Date
3/16/2010
Suspend Date
Separation Date
Parent Company
Previous License
MCKIN * *372N0
Next License
Associated License
Business Owner Information
Name
Role
Effective
Date
Expiration
Date
PEDERSEN, JAMIE
D
AGENT
03/16/2006
ALLEN, DEAN C
PARTNER/MEMBER
03/16/2006
MOORE, DOUGLAS
J
PARTNER/MEMBER
03/16/2006
ALLEN, DAVID E
PARTNER/MEMBER
03/16/2006
TEPLICKY, JOSEPH
PARTNER/MEMBER
03/16/2006
Look Up a Contractor, Electr or Plumber License Detail
Washington State Department of Labor and Industries
General/Specialty Contractor
A business registered as a construction contractor with L &I to perform
construction work within the scope of its specialty. A General or Specialty
construction Contractor must maintain a surety bond or assignment of
account and carry ge neral liability insurance.
Bond Information
Page 1 of 2
https: // fortress .wa.gov /lni/bbip /printer.aspx ?License= MCKINCL942DW 03/18/2008
SHEET NUMBER
SHEET TITLE
SCALE 7
MO.O
DRAWING INDEX, SYMBOLS AND ABBREVIATIONS
NONE
MO.2
SEISMIC INFORMATION
NONE
M2.2
HVAC 2ND FLOOR PLAN
1/8" = 1-0"
M2.3
HVAC 3RD FLOOR PLAN
1/8" = 1' -0 "
M4.0
SECTIONS
1/4' = 1-0"
M7.0
HVAC SPECIFICATIONS
NONE
0
-
0
0
0
C
L
0
S=
CD
i-
`f
0
0
c
0
c
0
ABBREVIATIONS
GENERAL
AD
ADJ
AFF
AFG
AG
AMP
ARCH
AUTO
AUX
BD
BHP
BLDG
BOP
BOT
BS
BTU
BTUH
CA
CAB
COND
C/L
CLG
CFM
CLG
CO
CO2
COL
CONC
COND
CONN
CONSTR
CONTR
CTL
DET
DIA
DIAG
DIM
DISCH
DIV
DN
DS
DWDI
DWG
DWV
(E)
EA
EC
EL
ELEC
ELEV
EP
EQUIP
ESP
EXH
EXIST
(F)
F
FA
FCO
FDC
FDN
FIG
FIN
FIO
FLEX
FLG
FLR
FO
FP
FPM
Ff
FTG
FURN
GA
GALV
GC
GEN
GPM
GWB
HP
HR
HS
HTG
HTR
ID
LAB
LF
MAU
MAX
MBH
MED
MEZZ
MFR
MH
MIN
MISC
MTD
N/A
NC
NEG
NIC
NO
NOM
NTS
OA
OC
OD
OVHD
POC
PRELIM
PSI
PSIG
R
RAD
REQD
RPM
SECT
SF
SIM
SPEC
SQ
STD
STRUC
LABORATORY
LINEAL FOOT
QTY QUANTITY
ACCESS DOOR
ADJUSTABLE
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE GROUND
AMPERE
ARCHITECT; ARCHITECTURAL
AUTOMATIC
AUXILIARY
BOARD
BRAKE HORSEPOWER
BUILDING
BOTTOM OF PIPE
BOTTOM
BIRD SCREEN
BRITISH THERMAL UNIT
BRITISH THERMAL UNITS PER HOUR
COMPRESSED AIR
CABINET
CONDENSATE
CENTER LINE
CEILING
CUBIC FEET PER MINUTE
CEILING
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
CONCRETE
CONDENSER; CONDENSATE
CONNECT; CONNECTION
CONSTRUCTION
CONTRACTOR
CONTROL
DETAIL
DIAMETER
DIAGONAL
DIMENSION
DISCHARGE
DIVISION
DOWN
DISCONNECT SWITCH; DOOR SWITCH
DOUBLE WIDTH, DOUBLE INLET
DRAWING
DRAIN, WASTE, VENT
EXISTING
EACH
ELECTRICAL CONTACTOR; END CAP
ELEVATION
ELECTRICAL
ELEVATION
ELECTRICAL PANEL; END PLUG
EQUIPMENT
EXTERNAL STATIC PRESSURE
EXHAUST
EXISTING
FUTURE
FAHRENHEFT
FIRE ALARM
FLOOR CLEANOUT
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIGURE
FINISH
FURNISHED AND INSTALLED BY OWNER
FLEXIBLE
FLANGE
FLOOR
FUEL OIL
FIRE PROTECTION
FEET PER MINUTE
FOOT; FEET
FOOTING
FURNISH
GAGE
GALVANIZED
GENERAL CONTRACTOR
GENERATOR
GALLONS PER MINUTE
GYPSUM WALL BOARD
HIGH
HORSEPOWER; HIGH PRESSURE
HEATING RETURN
HEATING SUPPLY
HEATING
HEATER
INSIDE DIAMETER /DIMENSION
MAKE -UP AIR UNIT
MAXIMUM
1000 BRITISH THERMAL UNITS PER HOUR
MEDIUM
MEZZANINE
MANUFACTURER
MANHOLE
MINIMUM; MINUTE(S)
MISCELLANEOUS
MOUNTED
NOT APPLICABLE
NORMALLY CLOSED
NEGATIVE
NOT IN CONTRACT
NORMALLY OPEN; NUMBER
NOMINAL
NOT TO SCALE
OVERALL
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
POINT OF CONNECTION
PRELIMINARY
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH GAUGE
RELOCATED
RADIUS
REQUIRED
REVOLUTIONS PER MINUTE
SECTION
SQUARE FOOT
SIMILAR
SPECIFICATION
SQUARE
STANDARD
STRUCTURAL
TBD
TI
TOC
TOS
TYP
UG
UNO
VAV
VD
VER
VFD
VSD
W/
HVAC
AC
ACT
AHU
BDD
BOD
CC
CRU
CT
CV
DB
DIFF
DMPR
EA
EAT
ECG
EF
FCU
FD
FM
FP
FTU
HC
HR
HVAC
PIPING
BP
CD
CHW
CHR
CHS
CT
EWT
TO BE DETERMINED
TENANT IMPROVEMENTS
TOP OF CONCRETE
TOP OF STEEL
TYPICAL
UNDERGROUND
UNLESS NOTED OTHERWISE
VARIABLE AIR VOLUME
VOLUME DAMPER
VERIFY
VARIABLE FREQUENCY DRIVE
VARIABLE SPEED DRIVE
WITH
WITHOUT
AIR CONDITIONING
ACOUSTICAL CEILING TILE
AIR HANDLING UNIT
BACKDRAFT DAMPER
BOTTOM OF DUCT
COOLING COIL
COMPUTER ROOM UNIT
COOLING TOWER
CONSTANT VOLUME
DRY BULB
DIFFUSER
DAMPER
EXHAUST AIR
ENTERING AIR TEMPERATURE
EGGCRATE GRILLE
EXHAUST FAN
FAN COIL UNIT
FIRE DAMPER
FREQUENCY MODULATION
FIRE PROTECTION; FAN POWERED
FAN TERMINAL UNIT
GRD GRILLE, REGISTER, DIFFUSER
HEATING COIL
HEATING RETURN
HEATING, VENTILATION AND
AIR CONDITIONING
LAT LEAVING AIR TEMPERATURE
LD LINEAR DIFFUSER
MC MECHANICAL CONTRACTOR
MECH MECHANICAL
MOD MOTOR OPERATED DAMPER; MODULATING
MUA MAKE UP AIR
OA OVERALL; OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
RA
RAT
RCP
RTU
SA
SAT
SD
SF
S /FD
SL
SLSM
SM
SP
TDH
TG
TOD
TSP
UH UNIT HEATER
WB
WC
WG
DCW
DHW
DHWC
DSP
WC
WH
WSP
FHV
LWT
TOP
RETURN AIR
RETURN AIR TEMPERATURE
REFLECTED CEILING PLAN
ROOF TOP UNIT
SUPPLY AIR
SUPPLY AIR TEMPERATURE
SMOKE DAMPER
SUPPLY FAN
SMOKE FIRE DAMPER
SOUND LINED
SOUND LINED SHEET METAL
SHEET METAL
STATIC PRESSURE
TOTAL DYNAMIC HEAD
TRANSFER GRILLE
TOP OF DUCT
TOTAL STATIC PRESSURE
WET BULB
WATER COLUMN
WATER GAUGE
PLUMBING
AD AREA DRAIN
CO CLEAN OUT; CARBON MONOXIDE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRCULATION
DRY STANDPIPE
EWC ELECTRICAL WATER COOLER
FD FLOOR DRAIN
IE INVERT ELEVATION
IN WC INCHES WATER COLUMN
IW IONIZED WATER; INDIRECT WASTE
NPCW NON POTABLE COLD WATER
ORL OVERFLOW RAINWATER LEADER
PD PLANTER DRAIN; PRESSURE DROP
PERF PERFORATED
PLBG PLUMBING
PRV PRESSURE REDUCING VALVE
RPBP REDUCED PRESSURE
BACKFLOW PREVENTER
SD STORM DRAIN
SS SANITARY SEWER
VTR VENT THROUGH ROOF
WASTE
WATER CLOSET
WATER HEATER
WET STANDPIPE
BACKFLOW PREVENTER
CONDENSATE DRAIN
CHILLED WATER
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONICAL TEE
ENTERING WATER TEMPERATURE
FIRE HOSE VALVE
LEAVING WATER TEMPERATURE
TOP OF PIPE
PIPING IDENTIFICATION
HVAC
PLUMBING
FIRE PROTECTION
A
COND
-®-- CDR -.
CDS
CHS
- - - CHR - G
HR
HS
RL
-. -RS ---
ST
GRW
GAW
ID
IRR
NP
ORL
PW
PSD
RWL
----RWL----
SD
SS
—UD
- -
W
—W
DSP
FDC
F
FP
FW
WSP
PIPING FITTINGS
1t1
I�{
101
f'
I
+' ! f
VALVES
/pi 0?1
131
-10
4""
4 AV
4 RAV
T
o1
1$1
PIPING ACCESSORIES
11
r nnn rfnnn # WATTS /LF
6L.
i
A
COND
CDR
CDS
CHS
CHR
G
HR
HS
RL
RS
ST
CW
GRW
GAW
HW
HWC
ID
IRR
NPCW
ORL
PW
PSD
RWL
RWL
SD
SS
UD
V
W
W
DSP
FDC
F
FP
FW
WSP
COMPRESSED AIR PIPE
CONDENSATE DRAIN PIPE
CONDENSER WATER RETURN PIPE
CONDENSER WATER SUPPLY PIPE
CHILLED WATER SUPPLY PIPE
CHILLED WATER RETURN PIPE
NATURAL GAS PIPE
HEATING WATER RETURN PIPE
HEATING WATER SUPPLY PIPE
REFRIGERANT LIQUID PIPE
REFRIGERANT SUCTION PIPE
STEAM SUPPLY
COLD WATER PIPE (POTABLE)
GREASE WASTE
GARAGE WASTE
HOT WATER PIPE (POTABLE)
HOT WATER CIRCULATING (POTABLE)
INDIRECT DRAIN
IRRIGATION WATER PIPE
NON - POTABLE CW PIPE
OVERFLOW RAINWATER LEADER
PUMPED WASTE
PUMPED STORM DRAIN
RAINWATER LEADER BELOW GRADE
RAINWATER LEADER
STORM DRAIN PIPE
SANITARY SEWER PIPE (SITE)
UNDERDRAIN PIPE
VENT PIPE (SANITARY)
WASTE PIPE
WASTE PIPE BELOW GROUND
DRY STAND PIPE
FIRE DEPT. CONNECTION PIPE
FIRE SPRINKLER PIPE
FIRE PROTECTION WATER PIPE
FIRE PROTECTION WASTE PIPE
WET STAND PIPE
TEE W /PIPE UP
TEE DOWN W /ELBOW
TEE UP W/ ELBOW
TEE UP
TEE DOWN
90' ELBOW UP
90° ELBOW DN
CAP
UNION
FLANGE
FLEX HOSE CONNECTION
DOUBLE BELLOWS FLEX CONNECTION
SINGLE BELLOWS FLEX CONNECTION
FLOW ARROW
CONCENTRIC REDUCER
ECCENTRIC REDUCER
SLOPE SYMBOL
BREAK OR CONTNUATION SYMBOL
DOWN SPOUT NOZZLE
CLEANOUT
45' ELBOW
45° ELBOW
90' ELBOW
90° ELBOW
CROSS
TEE
WYE
TAP
HOSE CONNECTION
MOTORIZED 2 -WAY VALVE
MOTORIZED 3 -WAY VALVE
PRESSURE REDUCING VALVE
CONTROL VALVE
RELIEF VALVE
BALL VALVE
3 -WAY GATE VALVE
BUTTERFLY VALVE
DIAPHRAGM VAVLE
CHECK VALVE
NEEDLE VALVE
GLOBE VALVE
GLOBE VALVE ANGLE
GLOBE VALVE 3 -WAY
GATE
PLUG VALVE
BALANCING VALVE
HOSE BIBB
PUMP
MANUAL AIR VENT
AUTOMATIC AIR VENT
HIGH CAPACITY AIR VENT
SHOCK ARRESTOR
FLOW SWITCH
VACUUM BREAKER
PRESSURE GAUGE
TEMPERATURE SENSOR
TEMPERATURE INDICATOR
AUTO FLOW VALVE
FLOW METER
Y STRAINER
Y STRAINER W/ BALL VALVE
PIPE SLEEVE
STEAM TRAP
PETES PLUG
HEAT TRACING
SUCTION DIFFUSER W/ STRAINER
REDUCED PRESSURE
BACKFLOW PREVENTOR
FUNNEL DRAIN
FLOOR DRAIN
ROOF DRAIN
ROOF OVERFLOW DRAIN
FLOOR SINK
DUCTWORK ACCESSORIES
=1
AD
12x12 2 "SL
DUCTWORK
J
t=1=}
FM
12x12 SL
cniwup
RECTANGULAR DUCT
RECTANGULAR DUCT
RECTANGULAR DUCT
RECTANGULAR DUCT
\I\
IA
\
00 SMOKE DETECTOR
C�
c \f)
I\
I
BIRDSCREEN OR SCREENED OPENING
1
INSTRUMENTATION AND CONTROLS
THERMOSTAT
SENSOR
SUPPLY GRILLE
RETURN OR EXHAUST GRILLE
VOLUME DAMPER
MOTOR OPERATED DAMPER
AIRFLOW MONITOR
REMOTELY OPERATED VOLUME DAMPER
(YOUNG REGULATOR OR APPROVED)
BACK DRAFT DAMPER
COORDINATE WITH CEILING APPURTENANCES.
FLEX CONNECTION
FIRE DAMPER THROUGH WALL
FIRE DAMPER THROUGH FLOOR
FIRE /SMOKE DAMPER THROUGH WALL
FIRE /SMOKE DAMPER THROUGH FLOOR
ACCESS DOORS
1" ACOUSTICALLY LINED DUCT
2" ACOUSTICALLY LINED DUCT
CHANGE OF ELEVATION RISE(R) DROP(D)
TRANSITION
TURNING VANES
RETURN / EXHAUST / OUTSIDE AIR
SUPPLY / TRANSFER AIR
TERMINAL UNITS - SEE SCHEDULE FOR TYPE
SUPPLY AIR DUCT
TURNING UP OR TOWARD
SUPPLY AIR DUCT
TURNING DOWN OR AWAY
EXHAUST OR RETURN AIR DUCT
TURNING UP OR TOWARD
EXHAUST OR RETURN AIR DUCT
TURNING DOWN OR AWAY
ROUND DUCT
TURNING UP OR TOWARD
ROUND DUCT
TURNING DOWN OR AWAY
OVAL DUCT
TURNING UP OR TOWARD
OVAL DUCT
TURNING DOWN OR AWAY
FLEXIBLE DUCT
CARBON MONOXIDE SENSOR
VISUAL ALARM LIGHT - WALL MOUNTED
GRILLE /REGISTER /DIFFUSER
DOUBLE LINE
T
C 1
LINEAR DIFFUSER (CEILING)
LINEAR DIFFUSER (WALL)
1 LOUVER PLAN VIEW
H\ /AC - ANNOTATION
VAV BOX TAG
S- C8 -09 -A
1
DUCT WORK
EQUIPMENT TAG
EF - 2 - 1
LOUVER TAG
PB1 -1
CEILING RETURN, EXHAUST
OR TRANSFER AIR GRILLE
LOCATION / SITE MAP
LEGAL DESCRIPTION
CEILING SUPPLY AIR DIFFUSER
CEILING SUPPLY AIR DIFFUSER
(SHOWN WITH THROW ARROWS)
LOUVER (ELEVATION VIEW)
0 ROUND DUCT SYMBOL
FLOOR # - DISCRETE BOX #
SEE BELOW
PRIMARY CFM
FAN CFM
ACOUSTICAL ACCESSORIES (IF REQ'D)
KW OF AUX. HEAT.
VAV BOX SIZE; SEE SCHED.
PARALLEL FAN
FLAT OVAL DUCT SYMBOL
°--- CONSECUTIVE
EQUIP. #
FLOOR OF EQUIP.
LOCATION
EQUIPMENT
DESIGNATION
GRILLE, REGISTER, OR DIFFUSER TAG
DT5 - -618
CFM EACH
SIZE
TYPE CODE
EQUIPMENT TAG
LD5 /3 -300 LINEAR DIFFUSER GRILLE
T — CFMEACH
ACTIVE LENGTH IN FT.
TOTAL LENGTH IN FT.
TYPE CODE
LOUVER TAG
CONSECUTIVE
LOUVER #.
- FLOOR LOCATED
FACADE DESIGNATION
B - BANK
M - MUSEUM
NE 1/4 OF THE SE 1/4 AND SE 1/4 OF THE SE 1/4
OF SECTION 9 AND GOV'T LOT 15 AND SW 1/4 OF
THE SW 1/4 OF SECTION 10, T23N., R4E., W.M. CITY
OF TUKWILA, KING COUNTY, WASHINGTON.
GENERAL INFORMATION SYMBOLS
//50 /f//5//ff
X X X X X X X X X X X X
X
GENERAL NOTES:
DRAWING INDEX
NEW MECHANICAL WORK
FUTURE TI SCOPE & NEW WORK OTHER THAN MECHANICAL
DEMO MECHANICAL WORK
DETAIL OR DIAGRAM NUMBER
SHEET NUMBER
WHERE DETAIL /DIAGRAM SHOWN
SECTION LETTER
SHEET NUMBER WHERE SECTION SHOWN
PLAN NUMBER
SHEET NUMBER WHERE, PLAN SHOWN
REVISION NUMBER - DENOTES NUMBER AND DATE
WHEN REVISION OR ISSUE OCCURED
REVISION CLOUD - DENOTES AREA OF CHAN E
DETAIL REFERENCE OUTLINE
WITH NUMBER AND SHEET LOCATION
MATCHLINE
PLUMBING FIXTURE CALL -OUT
(SEE PLUMBING SCHEDULES)
DRAWING NOTE REFERENCE
POINT OF CONNECTION
CENTERLINE
STRUCTURAL BEAM PENETRATION (SEE M503
STRUCTURAL BEAM HAUNCH (SEE M503)
1. VERIFY LOCATIONS AND DIMENSIONS OF ALL EQUIPMENT AND COORDINATE ALL WORK PRIOR
TO START OF CONSTRUCTION.
2.OBTAIN APPROVAL OF STRUCTURAL ENGINEER PRIOR TO INSTALLATION OF PENETRATIONS NOT
PREVIOUSLY COORDINATED OR AGREED UPON, I.E. ANCHOR BOLT DEPTHS, ETC.
3.CONCRETE EQUIPMENT CURBS, PIPING RAT SLABS, SUMP BASINS, AND HO'..GEKEEPING PADS
ARE SHOWN FOR APPROXIMATE LOCATION AND SIZE AND ARE TO BE PROVIDED F3Y THE
GENERAL CONTRACTOR. WHERE PROVIDED, REFER TO STRUCTURAL INFO FON ADDITIONAL
DETAILS.
4. COMPLETION AND COMMISSIONING FOR MECHANICAL SYSTEMS:
A. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO THE OWNER (PER 2006
WASHINGTON STATE ENERGY CODE SECTION 1416.2.4.3)
B. PROVIDE TO THE OWNER ALL NECESSARY SYSTEM OPERATION AND MAINTENANCE MANUALS
(PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.4.2)
C. BALANCE ALL HVAC SYSTEMS AND PROVIDE TO THE OWNER A WRITTEN E_EALANCING REPORT
(PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.2.1)
D. EQUIPMENT /SYSTEMS TESTING SHALL BE PERFORMED IN ACCORDANCE WITH APPROVED
PLANS (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.3.1)
E. TEST, CALIBRATE AND ADJUST ALL HVAC CONTROLS AND SEQUENCES Or • OPERATION IN
ACCORDANCE WITH THE APPROVED PLANS (PER 2006 WASHINGTON STAT" ENERGY CODE
SECTION 1416.2.3.2), NECESSARY TESTS ARE IDENTIFIED IN 2006 WASHINGTON
ENERGY CODE SECTION 1416.2.3.1; PREPARE A PRELIMINARY COMMISSIONING REPORT OF
TEST PROCEDURES AND RESULTS PRIOR TO ISSUANCE OF A FINAL CER 1' : OF
OCCUPANCY (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1 4 1 P .2.5.1); PROVIDE
TO THE OWNER A FINAL COMMISSIONING REPORT OF TEST PROCEDURES r \!T\ RESULTS
(PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.5.2).
5. PERFORMANCE OF ALL NEW BUILDING MECHANICAL SYSTEMS WILL COMPLY WITH OR EXCEED
THE MINIMUM REQUIREMENTS AS SET FORTH IN THE 2006 WASHINGTON STATE ENERGY CODE
SECTION 1410 - GENERAL REQUIREMENTS.
6. MINIMUM VENTILATION QUANTITIES WILL COMPLY WITH OR EXCEED THE 2006 INTERNATIONAL
MECHANICAL CODE.
7.ALL MOTORS WILL COMPLY WITH CHAPTER 15 OF THE 2006 WASHINGTON STATE ENERGY
CODE. FOR ADDITIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS
DRAWING SET.
8. ALL SYSTEMS WILL BE INSULATED AS PRESCRIBED IN CHAPTER 14, TABLE 14-5 OF THE
2006 WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND
PIPING SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET.
9. VERIFY THAT ALL NECESSARY INFORMATION HAS BEEN PROVIDED PRIOR TO CONNECTION OF
EQUIPMENT FURNISHED BY THE OWNER OR OTHERS.
10. FOR ADDITIONAL SYSTEM AND EQUIPMENT SEISMIC REQUIREMENTS, REFER TO STRUCTURAL
INFORMATION (WHERE PROVIDED) AND PROJECT SPECIFIC SEISMIC DESIGN INFORMATION
SHEET CONTAINED WITHIN THIS DRAWING SET.
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE: Revisions will require a new plan submittal
and may include additional plan review fees.
R WE FOR IGE
CODE COMPLIANCE
PROVED
LIAR 1 ti `[1b
FILE COPY
Permit No.
SEPARATE PERMIT
REQUIRED FOR:
CI Mechanical
K Electrical
Plumbing
`g Gas Piping
City of Tukwila
BUILDING DIVISION
Of Tukwila
Plar review approval is subject to etrol8 and OMISS10119.
Approval of construction documents does not authorize
the violation of any adopted code or ordinance. Receipt
of approved Field Copy and acknoW1edged:
B
Date: _
City of Tukwila
BUILDING DIVISION
E
•-
CITY uF 1 USvv1LA
MAR 0 7 2008
PERMIT CENTER
0(el
SEP 2 2 2008
1
} • , t 1 .�:� ; . of .. s.4 {� <! �i � " ?it,.�' 3 k 'L '�rYl�_iio -� `� ` .<�,s'.� ;:�� +''s�4
ite Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1--800 -669- -6223
PORTLAND:
12021 NE AIRPORT WAY
SUITE G
PORTLAND, OR 97220
503-331.-0234
www.mckinstry.com
PROJECT
SABEY TUK 5
PHASE A SHELL
HVAC DUCTWORK
3355 S. 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
NO DATE
McKINSTRY DMSION:
SHEET TITLE:
SHEET NUMBER:
EXPIRES: 07 -12 -09 J
DESCRIPTION
03/06/08 PERMIT SET
SEP 22innn
ENGINEERING
DESIGNED BY: T. MARINO
DRAWN BY: B. HUCKINS
CHECKED BY: M. WEBB
JOB NUMBER:
DATE: 03-06--2008
SCALE: SEE DRAWING
DRAWING INDEX,
SYMBOLS, AND
ABBREVIATIONS
M
Q .
MECHANICAL, PIPING, AND PLUMBING IMPORTANCE FACTOR TABLE
COMPONENT DESCRIPTION
STANDARD
COMPONENT
IP =1.0
CRITICAL
COMPONENT
IP =1.5
NOTES:
HVAC - SHEETMETAL/EQUIPMENT
g Load
g Load,
with Exp.
Anchors
HVAC SUPPLY - MEDIUM PRESSURE
.26 g
X
.39 g
HVAC SUPPLY - LOW PRESSURE
Level 2 Ceiling
X
.44 g
HVAC OUTSIDE AIR
.65 g
X
.23 g
HVAC RETURN
.34 g
X
Level 1
HVAC EXHAUST
.23 g
X
.34 g
TRANSFER AIR DUCT
X
GARAGE EXHAUST
X
GREASE KITCHEN EXHAUST DUCT
(TYPE 1 HOOD EXHAUST)
X
NON - GREASE KITCHEN EXHAUST DUCT
(TYPE 2 HOOD EXHAUST)
X
FLUES - BOILERS, HW HEATERS
X
PIPING
HEATING WATER
X
CONDENSER WATER
X
NATURAL GAS
X
MAKEUP WATER
X
REFRIGERANT
X
PLUMBING
COLD WATER (POTABLE)
X
COLD WATER (NON - POTABLE)
X
HOT WATER (POTABLE)
X
HOT WATER RECIRC (POTABLE)
X
CONDENSATE INDIRECT WASTE
X
NATURAL GAS MEDIUM PRESSURE (2 -5 PSIG)
X
NATURAL GAS LOW PRESSURE ( <14" WC)
X
RAINWATER LEADER/
OVERFLOW RAINWATER LEADER
X
UNDERSLAB DRAINAGE
X
SANITARY VENT
X
SANITARY WASTE
X
Piping Systems - High deformability elements and attachments
(Converted to ASD)
Level
Component
Ip =1.0
Component
Ip =1.5
g Load
g Load,
with Exp.
Anchors
g Load
g Load,
with Exp.
Anchors
Level 3 Ceiling / Roof
.26 g
.61 g
.39 g
.91 g
Level 2 Ceiling
.23 g
.44 g
.34 g
.65 g
Level 1 Ceiling
.23 g
.32 g
.34 g
.48 g
Level 1
.23 g
.23 g
.34 g
.34 g
Piping Systems - Limited deformability elements and
attachments (Converted to ASD)
Level
Component
Ip =1.0
Component
Ip =1.5
g Load
g Load,
with Exp.
Anchors
g Load
g Load,
with Exp.
Anchors
Level 3 Ceiling/Roof
.36 g
.61 g
.55 g
.91 g
Level 2 Ceiling
.26 g
.44 g
.39 g
.65 g
Level 1 Ceiling
.23 g
.32 g
.34 g
.48 g
Level 1
.23 g
.23 g
.34 g
.34 g
Piping Systems - Low deformability elements and attachments
(Converted to ASD)
Level
Component
Ip - 1.0
Component
Ip = 1.5
g Load
g Load,
with Exp.
Anchors
g Load
g Load,
with Exp.
Anchors
Level 3 Ceiling / Roof
.61 g
.61 g
.91 g
.91 g
Level 2 Ceiling
.44 g
.44 g
.65 g
.65 g
Level 1 Ceiling
.32 g
.32 g
.48 g
.48 g
Level 1
.23 g
.23 g
.34 g
.34 g
General Mechanical Equipment -
Pressure Vessels and skirts free standing (Converted to ASD)
Level
Component
Ip =1A
Component
Ip =1.5
g Load
g Load,
with Exp.
Anchors
g Load
g Load,
with Exp.
Anchors
Level 3 Ceiling / Roof
.91 g
1.21 g
1.36 g
1.82 g
Level 2 Ceiling
.65 g
1.09 g
.98 g
1.63 g
Level 1 Ceiling
.48 g
.8 g
.72 g
1.2 g
Level 1
.3 g
.5 g
.45 g
.76 g
General Mechanical Equipment - Boiler and
furnaces, Other (Converted to ASD)
Level
Component
Ip = 1.0
Component
Ip = 1.5
g Load
g Load,
with Exp.
Anchors
g Load
g Load,
with Exp.
Anchors
Level 3 Ceiling / Roof
.36 g
.61 g
.55 g
.91 g
Level 2 Ceiling
.26 g
.44 g
.39 g
.65 g
Level 1 Ceiling
.23 g
.32 g
.34 g
.48 g
Level 1
.23 g
.23 g
.34 g
.34 g
HVAC Systems - Non - vibration Isolated,
Mounted in -line with ductwork,
Other (Converted to ASD)
Level
Component
Ip =1.0
Component
Ip =1.5
g Load
g Load,
with Exp.
Anchors
g Load
g Load,
with Exp.
Anchors
Level 3 Ceiling / Roof
.36 g
.61 g
.55 g
.91 g
Level 2 Ceiling
.26 g
.44 g
.39 g
.65 g
Level 1 Ceiling
.23 g
.32 g
.34 g
. .
Level 1
.23 g
.23 g
.34 g
.76 g
HVAC Systems -
Vibration Isolated (Converted to ASD)
Level
Component
Ip =1.0
Component
Ip =1.5
g Load
g Load,
with Exp.
Anchors
g Load
g Load,
with Exp.
Anchors
Level 3 Ceiling / Roof
.91 g
1.21 g
1.36 g
1.82 g
Level 2 Ceiling
.65 g
1.09 g
.98 g
1.63 g
Level 1 Ceiling
.48 g
.8 g
.72 g
1.2 g
Level 1
.3 g
.5 g
.45 g
.76 g
Piping Systems -
Limited deformability elements and attachments
Level
Component
1p = 1.0
Component
Ip = 1.5
SHL
SHL,
with Exp.
Anchors
SHL
SHL,
with Exp.
Anchors
Level 3 Ceiling / Roof
A
AA
AA
AA*
Level 2 Ceiling
B
A
A
AA
Level 1 Ceiling
B
A
A
A
Levell
B
B
A
A
Piping Systems -
High deformability elements and attachments
Level
Component
Ip = 1.0
Component
Ip = 1.5
SHL
SHL,
with Exp.
Anchors
SHL
SHL,
with Exp.
Anchors
Level 3 Ceiling / Roof
B
AA
A
AA*
Level 2 Ceiling
B
A
A
AA
Level 1 Ceiling
B
A
A
A
Level1
B
B
A
A
Piping Systems -
Low deformability elements and attachments
Level
Component
Ip =1.0
Component
Ip =1.5
SHL
SHL,
with Exp.
Anchors
SHL
SHL,
with Exp.
Anchors
Level 3 Ceiling / Roof
AA
AA
AA*
AA*
Level 2 Ceiling
A
A
AA
AA
Level 1 Ceiling
A
A
A
A
Levell
B
B
A
A
General Mechanical Equipment -
Boiler and furnaces, Other
Level
Component
Ip = 1.0
Component
Ip = 1.5
SHL
SHL,
with Exp.
Anchors
SHL,
SHL with Exp.
Anchors
Level 3 Ceiling / Roof
A
AA
AA AA*
Level 2 Ceiling
B
A
A AA
Level 1 Ceiling
B
A
A A
Level1
B
B
A A
General Mechanical Equipment -
Pressure Vessels on skirts and free standing
Level
Component
Ip = 1.0
Component
Ip = 1.5
SHL
SHL,
with Exp.
Anchors
SHL,
SHL with Exp.
Anchors
Level 3 Ceiling / Roof
AA*
AA*
AA* - NA -
Level 2 Ceiling
AA
AA*
AA* - NA -
Level 1 Ceiling
A
AA*
AA* AA*
Levell
B
AA
A AA*
HVAC Systems -
Vibration Isolated
Level
Component
Ip = 1.0
Component
Ip = 1.5
SHL
SHL,
with Exp.
Anchors
SHL
SHL,
with Exp.
Anchors
Level 3 Ceiling / Roof
AA*
AA*
AA*
- NA -
Level 2 Ceiling
AA
AA*
AA*
- NA -
Level 1 Ceiling
A
AA*
AA*
AA*
Level 1
B
AA
A
AA*
HVAC Systems -
Non-vibration Isolated, Mounted in -line with ductwork,
Other
Level
Component
Ip = 1.0
Component
Ip = 1.5
SHL
SHL,
with Exp.
Anchors
SHL
SHL,
with Exp.
Anchors
Level 3 Ceiling / Roof
A
AA
AA
AA*
Level 2 Ceiling
E3
A
A
AA
Level 1 Ceiling
B
A
A
A
Levell
B
A
A
A
z
0
L.
0
0
0
0
r
R
n
0
0
0
c
L2
0
C
0
Y_
0
0
0
dr;
0
C
0
CO
Cf
(,
0
L
SEIS
OR
J
EISMC BASS OF
SEISMIC RESTRAINTS IVAY BE EXCLUDED WHEN
aR I.p = 1.5:
DESIGN:
BRACE ALL DUCTWORK AND PIPING PER SMACNA'S "SEISMIC RESTRAINT MANUAL" OR MASON INDUSTRIES "SEISMIC RESTRAINT MANUAL"
IN ACCORDANCE WITH THE COMPONENT IMPORTANCE FACTOR AND THE SEISMIC HAZARD LEVEL (SHL) OR 'g' LOAD LISTED IN THE
APPLICABLE TABLE. OBTAIN THE COMPONENT IMPORTANCE FACTOR FROM THE DUCT WORK OR PIPING MATRIX.
VIC RESTRAINTS MAY BE EXCLUDED WHEN 1 = 1.0:
• MECHANICAL AND ELECTRICAL COMPONENTS IN SEISMIC DESIGN CATEGORIES D, E, AND F WHERE Ip = 1.0 AND FLEXIBLE
CONNECTIONS BETWEEN THE COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT ARE PROVIDED AND THAT ARE
MOUNTED AT 4 FT (1.22M) OR LESS ABOVE A FLOOR LEVEL AND WEIGH 400 LB (1780 N) OR LESS.
[ASCE 7 -02 SECTION 9.6.1 - EXCEPTION #5]
• MECHANICAL AND ELECTRICAL COMPONENTS IN SEISMIC DESIGN CATEGORIES D, E, AND F WEIGHING 20 LB (95 N) OR LESS WHERE
Ip = 1.0 AND FLEXIBLE CONNECTIONS BETWEEN THE COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT ARE
PROVIDED, OR FOR DISTRIBUTION SYSTEMS WEIGHT 5 LB /FT (7N /M) OR LESS.
[ASCE 7 -02 SECTION 9.6.1 - EXCEPTION #6]
SEISMIC RESTRAINTS ARE NOT REQUIRED FOR HVAC DUCTS WITH Ip = 1.0 IF EITHER OF THE FOLLOWING CONDITIONS ARE MET:
A. HVAC DUCTS ARE SUSPENDED FROM HANGERS 12 IN. (305 MM) OR LESS IN LENGTH FROM THE TOP OF THE DUCT TO THE
SUPPORTING STRUCTURE. THE HANGERS SHALL BE DETAILED TO AVOID SIGNIFICANT BENDING OF THE HANGERS AND THEIR
ATTACHMENTS.
B. HVAC DUCTS HAVE A CROSS - SECTIONAL AREA OF LESS THAN 6 FT (0.557M
[ASCE 7 -02 SECTION 9.6.3.10]
• DUCTILE PIPING IN SEISMIC DESIGN CATEGORIES D, E, OR F DESIGNATED AS HAVING AN Ip = 1.0 AND A NOMINAL PIPE SIZE OF 3
IN. (75 MM) OR LESS.
[ASCE 7 -02 SECTION 9.6.3.11.D.3]
• EQUIPMENT ITEMS INSTALLED IN -LINE WITH THE DUCT SYSTEM (E.G. FANS, HEAT EXCHANGERS, AND HUMIDIFIERS) WEIGHING LESS
THAN 75 LB (344 N) DO NOT NEED TO BE BRACED INDEPENDENT OF THE DUCT SYSTEM. [INTERPRETED FROM ASCE 7 -02 SECTION
9.6.3.10] UNBRACED PIPING ATTACHED TO IN -LINE EQUIPMENT SHALL BE PROVIDED WITH ADEQUATE FLEXIBILITY TO ACCOMMODATE
DIFFERENTIAL DISPLACEMENTS.
[ASCE 7 -02 SECTION 9.6.3.10]
a PIPING - ROD HANGERS SHALL NOT BE USED AS SEISMIC SUPPORTS UNLESS THE LENGTH OF THE HANGER FROM THE SUPPORTING
STRUCTURE IS 12 IN. (305 MM) OR LESS. ROD HANGERS SHALL NOT FEE CONSTRUCTED IN A MANNER THAT SUBJECTS THE ROD
TO BENDING MOMENTS .
[ASCE 7-02 SECTION 9.6.3.11.4.C]
* 1/2 Brace Spacing Required
* 1/2 Brace Spacing Required
HVAC S
HVAC/SH
SHL
SEISV
- I-TV
is
-ET
V
DESIG\
SMACNA SISMC
TA
L = QUIPVIE \T
VALUES:
* 1/2 Brace Spacing Required
* 1/2 Brace Spacing Required
SEISMIC ALLOWABLE STPLSS D
ETAL FQI,I
LOA:
V
T
AZARD L
=V
SEISMIC DESIGN VALUES ARE CALCULATED IN ACCORDANCE WITH IBC 2003. IBC FORCES ARE
"STRENGTH DESIGN" BASED. VALUES HAVE BEEN USED TO SELECT FROM SMACNA ADDENDUM NO. 1
TABLE M-10 "NEW' VALUES IN ORDER TO USE THE SMACNA SEISMIC RETRAINT MANUAL.
* 1/2 Brace Spacing Required
Highly Deformable Pipe Includes: Steel or Copper Piping
with weld /braze /groove fitted joints.
1/2 Brace Spacing Required
Limited Deformable Pipe Includes: PVC or PVDF Piping
-L DFSIG
-SIG\
PINK
SHL
W �
VAL
• SEISMIC DESIGN VALUES ARE CALCULATED IN ACCORDANCE WITH IBC 2003. IBC FORCES ARE
"STRENGTH DESIGN" BASED. VALUES HAVE BEEN CONVERTED TO "ALLOWABLE STRESS DESIGN" VALUES
IN ORDER TO UTILIZE MASON INDUSTRIES SEISMIC RESTRAINT GUIDELINES.
• THESE VALUES CAN BE USED TO SELECT SEISMIC BRACING FROM MASON INDUSTRIES SEISMIC
RESTRAINT GUIDELINES.
J
Limited Deformable Pipe Includes: PVC or PVDF Piping
RR\C
SiS
Highly Deformable Pipe Includes: Steel or Copper Piping with
weld /braze /groove fitted joints.
VALJS:
G A\ D
DESIG\
0
A\
V IC
D
RLMB\C
VALJ-S:
PLJ
* 1/2 Brace Spacing Required
Low Deformability Piping Includes: Cast Iron, Glass Pipe,
FRP (Fiberglass Reinforced Pipe)
V
LOAD
B
Low Deformability Piping Includes: Cast Iron, Glass Pipe,
FRP (Fiberglass Reinforced Pipe)
1
REVIEWED FOR
CODE COMPLIANCE
APP .OM
MAR 1 7 2008
City Of Tukwila ._
L.A.LmagillI VISION
CITY
MAR 0 7 2008
PERMIT GENII ER
PROJECT
SABEY TUK 5
PHASE A SHELL
HVAC DUCTWORK
3355 S. 120th Place
Tukwila, WA 98168
REGISTRATION:
EXPIRES: 07 -12 -09
REVISIONS:
NO DATE DESCRIPTION
03/06/08 PERMIT SET
SHEET NUMBER:
McKINSTRY DMSION:
DESIGNED BY: T. MARINO
DRAWN BY: B. HUCKINS
CHECKED BY: M. WEBB
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
SEISMIC
INFORMATION
i istry
ife Of Your Building
PORTLAND:
12021 NE AIRPORT WAY
SUITE G
PORTLAND, OR 97220
503- 331 -0234
SEP 2 2 2nno
--L ovff
ENGINEERING
03 -06 -2008
SEE DRAWING
MOE2
SEATTLE:
5005 3RD AVENUE 5
PO BOX 24567
SEATTLE, WA 98124
1 -800 -669 -6223
www.mckinstry.com
/
L ...;....I
11
FUTURE DUCTWORK
UP TO 3RD FLOOR
(TYP)
r
CAP FOR FUTURE
99"x99" SUPPLY AND RETURN
DUCTWORK UP TO 3RD FLOOR
(FIELD VERIFY PENETRATION
LOCATIONS)
M4
SCALE : 1/8"
HVAC 2ND FLOOR PLAN
FUTURE DUCTWORK
//-
(TYP)
CAP FOR FUTURE
/
•
F1.4
_ 721
, , •
• .
llllthIr
420x70 • ••• • • •• •••••••• ••••••••• ••• • . •
•••
I
P '
"c:•.;:)
BUILDING KEY PLAN
NO SCALE
REVIEWED FOR
CODE COMPLIANCE
APPROVED
MAR 1 7 2008
City Of Tukwila
UI EVISlIcA
CITY OF TliKvvILA
MAR 0 7 2008
PERMIT CENTER
AREA OF WORK
3355 S. 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
NO DATE DESCRIPTION
03/06/08 PERMIT SET
DESIGNED BY: T. MARINO
DRAWN BY: B. HUCKINS
CHECKED BY: M. WEBB
JOB NUMBER:
DATE: 03-06-2008
SCALE: SEE DRAWING
SHEET TITLE:
SHEET NUMBER:
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1-800-669-6223
PORTLAND:
12021 NE AIRPORT WAY
SUITE G
PORTLAND, OR 97220
503-331-0234
PROJECT
SABEY TUK 5
PHASE A SHELL
HVAC DUCTWORK
EXPIRES: 07-12-09
www. main stry.com
r•T
SEP 2 2 20
McKINSTRY DMSION:
ENGINEERING
HVAC 2ND FLOOR PLAN
M2 2
• _
0 .• -
V:1
0
0
0
0
r:!.7
0
0
02
s_
(.1
02
0
N
FUTURE DUCTWORK
DN TO 2ND FLOOR
(T(P)
1
M2.3
99"x99" SUPPLY AND RETURN
DUCTWORK DN TO 2ND FLOOR
(FIELD VERIFY PENETRATION
LOCATIONS)
CAP FOR FUTURE
SCALE : 1/8" 1'-0"
FUTURE DUCTWORK
(TYP)
HVAC 3RD FLOOR PLAN
S
• ;;;; ;;;;;;;;;;;;;;;;;;;;;;;:::::".;;;;,
1
Et
!`:!!'.:i I ,111111.1111.111.,:'111I.1.!11111/I1111111111111111111111111:11111■II.1,111 !!!!!!!!
1.1'
1 11. 11'1,11,11 1.
!, !!!!!!!!!,111,,,,,,,IIII,1111111,11111,11;IIIILIIIIIIIIIIIIII■11111111111111111IIIIEE1111■III■11111!IIEIll I' EII !! 3 .. 11 `I! • '
AREA OF WORK
iIIIIllilll „ .
NO SCALE
BUILDING KEY PLAN
CITY 12 1 .,
MAR 0 7 ZOod
PERMIT CENTER
PROJECT
SABEY TUK 5
PHASE A SHELL
HVAC DUCTWORK
3355 S. 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
NO DATE
SHEET TITLE:
r EXPIRES: 07
SHEET NUMBER:
instry
ife Of Your Building
PORTLAND:
12021 NE AIRPORT WAY
SUITE G
PORTLAND, OR 97220
503-331-0234
DESCRIPTION
03/06/08 PERMIT SET
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1-800-669-6223
www. mckinstry.com
DESIGNED BY: T. MARINO
DRAWN BY: B. HUCKINS
CHECKED BY: M. WEBB
JOB NUMBER:
DATE: 03-06-2008
SCALE: SEE DRAWING
crID o o 9nnn
LUUU
McKINSTRY DIVISION:
ENGINEERING
HVAC 3RD FLOOR PLAN
M23
I I
F TURE T.I.
1' CTWORK
; •
CAP FOR FUTURE
99x99
7 ,/ •
/
CAP FOR FUTURE
99x99
99x99 CAP FOR FUTURE
3PD
FUTURE Ti.
DUCTWORK
2 IN D H...0 k
S HUC ID
REAM
REVIEWED FOR
CODE COMPLIANCE
APPROVED
MAR 1 7 2008
SEP 2 2 2000
r
un' r
MAR 0 7 2008
PERMIT CENTER
City Of Tukwila
IL I DIVISION
PROJECT:
SABEY TUK
PHASE A SHELL
HVAC DUCTWORK
3355 S. 120th Place
Tukwila, WA 98168
REGISTRATION:
REVISIONS:
NO DATE
McKINSTRY
SHEET TITLE:
SECTIONS
SHEET NUMBER:
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEAME, WA 98124
1-800-669-6223
PORTLAND:
12021 NE AIRPORT WAY
SUITE G
PORTLAND, OR 97220
503-331-0234
www.mckinstry.com
DESCRIPTION
EXPIRES: 07-12-09
03/06/08 PERMIT SET
DESIGNED BY: T. MARINO
DRAWN BY: B. HUCKINS
CHECKED BY: M. WEBB
JOB NUMBER:
DATE: 03-06-2008
SCALE: SEE DRAWING
ENGINEERING
M4.0
Duct system
or Section
SMACNA Pressure & Dimensions
Seal Classes Inside, overall
Materials
(duct, lining)
Unlined galvanized duct, see submittal for
gauge and reinforcement. Rectangular to have
TDF connections, round may be spiral. Flex:
4' max. length, Thermaflex GKM or equal
Fittings
(shop built)
5 -gore elbows, cen-
terline radius of 1.5e
Conical tees for
bidirectional flow.
Purchased fittings
(dampers, louvers)
1 -1/2 Hr airfoil smoke
fire dampers per
UL555S 110V N.C.
operator outside duct
Insulation
(indoor, outdoor)
Outdoor: R -7, alum. jacket
Indoor: none
Seismic (besides
normal han• ers
Rigid attachment
to structure
Testing requirement
field testin•
none required
HVAC Supply
medium pressure
(From AHUs)
SMACNA +4" pressure, seal class A Inside clear dimensions
shown. Overall, allow 4"
add'I for flanges on rect-
angular, 2" insul. on round
HVAC Return /Exhaust
medium pressure
(Inlet to AHUs/ Fans)
SMACNA +4" pressure, seal class A Inside clear dimensions
shown, also OD for round.
Overall, allow 4" add'I for
flanges on rectangular, plus
Galvanized duct, 1" lining only where
indicated on plans. See submittal for gauge
and reinforcement. Rectangular to have
TDFconnections, round may be spiral. Flex:
ducts and 4" from sides of trench.
5 -gore elbows, cen-
terline radius of 1.5o
Conical tees for
bidirectional flow.
bidirectional flow.
1 -1/2 Hr airfoil smoke
fire dampers per
UL555S 110V N.C.
operator outside duct
Outdoor: R -7, alum. Jacket
Indoor: R -3.3
Rigid attachment
to structure
none required
C
Cb
L
C.
- 0
Cr;
<r
L
L
C;
0;
0
Ductwork Specification
Notes:
1. Provide 3 feet minimum of flex duct wherever flex duct is used to connect a diffuser to the ductwork.
2. If these plans conflict with architectural plans for diffuser placement, use the architect's placement if space allows.
3. Fiberglass duct liner is used as an acoustical control measure only.
4. Provide and coordinate all access doors necessary to maintain, adjust and test HVAC components above the ceiling.
40' 0
REVIEWED FOR
CODE COMPLIANCE
APPROVED
MAR 1 7 7009 '
City Of Tukwila 1yV,
SEP 2 2 2008
r�-
CITY
MAR 0 71000
PERMIT CENTER
3355 S. 120th Place
Tukwila. WA 98168
REGISTRATION:
REVISIONS:
NO DATE DESCRIPTION
03/06/08 PERMIT SET
McKINSTRY DMSION:
DESIGNED BY: T. MARINO
DRAWN BY: B. HUCKINS
CHECKED BY: M. WEBB
JOB NUMBER:
DATE: 03 -06 -2008
SCALE: SEE DRAWING
SHEET TITLE:
SHEET NUMBER:
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 - 669 -6223
PORTLAND:
12021 NE AIRPORT WAY
SUITE G
PORTLAND, OR 97220
503- 331 -0234
www.mckinstry.com
SABEY TUK 5
PHASE A SHELL
HVAC DUCTWORK
EXPIRES: 07-12-09
ENGINEERING
HVAC SPECIFICATIONS
M7.0
.v- ti'�d1 "1