Loading...
HomeMy WebLinkAboutPermit M08-067 - SABEY CORPSABER CORD 3355 S 120 PL EXPIRED 09 -22 -OS M08 -067 Parcel No.: 1023049069 Address: Suite No: 3355 S 120 PL TUKW Tenant: Name: SABEY CORP Address: 3355 S 120 PL , TUKWILA WA Contact Person: Name: MATT LANPHIER Address: 5005 3 AV S , SEATTLE WA Contractor: Name: MCKINSTRY CO LLC Address: PO BOX 24567 , SEATTLE WA Contractor License No: MCKINCL942DW Value of Mechanical: $75,000.00 Type of Fire Protection: doc: IMC -10/06 City.of Tukwila Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 0 Appliance Vent 0 Repair or Addition to Heat/Refrig /Cooling System.... 0 Air Handling Unit <10,000 CFM 0 >10,000 CFM 0 Evaporator Cooler 0 Ventilation Fan connected to single duct 0 Ventilation System 0 Hood and Duct 0 Incinerator: Domestic 0 Commercial/Industrial 0 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us MECHANICAL PERMIT Owner: Name: SABEY CORPORATION Address: 12201 TUKWILA INTL BLVD 4THFL , SEATTLE WA EQUIPMENT TYPE AND QUANTITY * *continued on next page ** Permit Number: M08 -067 Issue Date: 03/18/2008 Permit Expires On: 09/14/2008 Expiration Date: 03/16/2010 DESCRIPTION OF WORK: INSTALLATION OF FUTURE SUPPLY .AND RETURN DUCTS BETWEEN 2ND AND 3RD FLOOR OFFICE TI BUILDOUT FOR SABEY CORP. NO ACTIVE VENTILATION SYSTEM WILL BE CONNECTED TO MECHANICAL WORK ASSOCIATED WITH THIS PERMIT. Phone: Phone: 206 255 -8102 Phone: (206)762 -23311 Fees Collected: $966.88 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 M08 -067 Printed: 03 -18 -2008 Permit Center Authorized Signature: Signature: doc: IMC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http. / /www.ci.tukwila.wa.us Permit Number: MO8 -067 Issue Date: 03/18/2008 Permit Expires On: 09/14/2008 / 41A7-7- L' ki /O6f �c S Print Name: Date: 09111 I hereby certify that I have read and el a ►fined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied , whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I . ' tho �;• to sign and obtain this mechanical permit. Date: V gAg This permit shall become mill and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -067 Printed: 03 -18 -2008 Parcel No.: 102304906!1 Address: 3355 S 120 PL TUKW Suite No: Tenant: SABEY CORP 1: ** *BUILDING DEPARTMENT CONDITIONS * ** doc: Cond -10/06 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS * *continued on next page ** Permit Number: M08 - 067 Status: ISSUED Applied Date: 03/07/2008 Issue Date: 03/18/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection re . zords, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. The se documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be clone in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installatior. instructions shall be available on the job site at the time of inspection. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requir..ng the correction of errors in the construction documents and other data. M08 -067 Printed: 03 -18 -2008 doc: Cond -10/06 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. veIlr Signature: Print Name: Date: 3 0 0 0 M08 -067 Printed: 03 -18 -2008 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Company Name: "IC k W-6 7— 1/4 C Mailing Address: A° 3t?XC Z'/5 b 7 , Contact Person: / 4-1 At rT Lit 4 0/°rl t t--R E -Mail Address: Company Name: /"/CKtnS.S77Z CC Contact Person: i T T W E(3 i3 Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION 98 King Co Assessor's Tax No.: Site Address: 3355 5 1204, P1 /8 � '6 g Suite Number: Floor: 2 7 3 Tenant Name: 3'61. CORO°. Property Owners Name: S, EY CCtP. Mailing Address: 3J 55 S IZO / 7'K�v' Mailing Address: -500 3r c) AVE 5 , S FJR PILE E -Mail Address: '00 i't't' G / ti 5 'f' Ny . CO t 6 v+-t e h, ,1 r y . Contractor Registration Number: / C 1< / Af C 1.4 1 Z Q u! Mailing Address: to 4 O)( 256 7 r s EAT E -Mail Address: ' . f i ' "65 1-7y Q:Wpplications \Forms - Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh b T Building Permit No. hanical Permit No. Plumbing /Gas Permit No. Public Works Permit No Project No. office use only) ( J / ; 9'8 / cit CONTACT PERSON — who do e contact when your permit is ready to be issued Name: / 1447-7 L-0 — /'44-K /4JS77kY ID. Day Telephone: 206 - Z55 - 8/122 GENERAL CONTRACTOR INFORMATION (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) t.�Sp 101,D+ New Tenant: ❑ Yes Q No State City State Zip Fax Number: 206 - 1'5 - fe City State Zip Day Telephone: 20& - 255 $ / 0 2 Fax Number: 206 _ 6 5 f3 _ /ex e Expiration Date: 3 //6 /2c 0 Q City State Zip ARCHITECT OF RECORD — All plans must be wet stamped by Architect of Record Company Name: Mailing Address: Zip Day Telephone: Contact Person: E -Mail Address: Fax Number: ENGINEER OF RECORD - All plans must be we tamped by Engineer of Record City State Zip Day Telephone: 206 - 76 2 33 /1 Fax Number: Page 1 of 6 Unit Type: Qty Unit Type: , Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <10OK BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall /Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/Ind Company Name: MECHANICAL PERMIT INFORMATION — 206 -431 -3670 MECHANICAL CONTRACTOR INFORMATION A3377Z 7' CD. Mailing Address: 7 Ox P/567 $ TTLE Contact Person: MAT 7 1"A) Pt? l c ✓h at,'I 60 ratrc_ r t S fr N. cc 0-1 Contractor Registration Number: MC -</AJ t_ - 9 2- 11 E -Mail Address: Valuation of Mechanical work (contractor's bid price): $ 7 5 - , O O 0 Scope of Work (please provide detailed information): / ").S TA LL - 77G N (3F Ft> r1-) / .5 +'PPL Y RFTvneio A )eT5 ,Q A/ z 3 3v) fLcCk OFF/« T. /, 80 / tilour FoR 6'416.EY writ. , Alp Ac-1VE VE•JTI LAT <SYS r Gv /LL teC 1OA»UEGTEL 7d /4FLhf4ct) /Cri-L CORK AsSOUstTEO GU/TH T11 /S i'tRf"1 /fir Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New ....Er ... L Replacement .... ❑ Fuel Type: Electric ❑ Gas ....E Other: /v /A Indicate type of mechanical work being installed and the quantity below: Q:\Applications\Forms- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh C YO/ Z- City State Zip Day Telephone: 20 - . Z �� - 5 /0 L Fax Number: z86- (� B - i83's Expiration Date: 3//b/Z00 b Page 4 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). 1 HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZE) A !z N Date: &/� /Z 6)O) Print Name: /'/Tr L AJ,. H / E f Day Telephone: 714- 755 - /01_ Signature: Mailing Address: / /3 24 567 Date Application Accepted: 0 01- a l Q:\Applications \Forms- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh Date Application Expires: SEATTLE 7F !zV- City State Zip Staff Initials: Page 6 of 6 Receipt No.: R08 -00658 Initials: JEM User ID: 1165 Payee: MCKINSTRY CO ACCOUNT ITEM LIST: Description doc: Receipt -06 MECHANICAL - NONRES PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 1023049069 Permit Number: M08 -067 Address: 3355 S 120 PL TUKW Status: PENDING Suite No: Applied Date: 03/07/2008 Applicant: SABEY CORP Issue Date: TRANSACTION LIST: Type Method Descriptio Amount Payment Check 9364 966.88 Account Code Current Pmts 000.322.102.00.0 773.50 000/345.830 193.38 Total: $966.88 Payment Amount: $966.88 Payment Date: 03/07/2008 03:35 PM Balance: $0.00 9631 03/10 9710 TOTAL 966.88 Printed: 03 -07 -2008 COMMEN 14 P1-I -E'er , _S A (l ord �-) ( Ai— ' ' ?_..t . •I- A (l L. f r IJJA f Gt 5 /d. A--f ( . P '/--e A i op fir-itk- o r p. Li :7 r /! e iJ f _ Oro ✓? l 4 7 - 6 ,fl 4,A Li 7 _1 ___., a.m. m Requester: 1 Proje • Type of Inspection: rA AA e A Address: 385 S ie i i 41 t ?.d -- Date Called/ Special Instructions: Date Wanted: a.m. m Requester: Phone No: INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 12 ' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. ❑ Corrections required prior to approval. Receipt No.: INSPECTION RECORD Retain a copy with permit 'Date: Date: fl $58.00 REINSPECTION FEE REQUIRED. Prior o inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call the schedule reinspection. i?�en.'�i�u.... a,�.a,r'+,� � — 3-- '"�'i'°' - r . • ....0 _ °�7�� _�„ � .cta •d9._, - — - �s . 07 -29 -2008 MATT LANPHIER 5005 3 AV S SEATTLE WA 98124 RE: Permit No. M:08 -067 3355 S 120 PL TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a fmal inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or fmal inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 09/22/2008 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: fer Marshall, it Technician Permit File No. M38 -067 City of f Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 o Fax: 206 - 431 -3665 • PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M08 -067 DATE: 03 -07 -08 PROJECT NAME: SABEY CORP SITE ADDRESS: 3355 S 120 Pl. X Original Plan Submittal Response to Correction Letter # DEPARTMENTS: itAA, 3. BuiId)ng L.Avision Public Works Complete Comments: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28 -02 Fire 611 NIL Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete n Approved Approved with Conditions Notation: REVIEWER'S INITIALS: Response to Incomplete Letter # Revision # After Permit Issued Planning Division n Permit Coordinator DUE DATE: 03-11-08 Not Applicable n Permit Center Use INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROU ING: Please Route Structural Review Required n No further Review Required REVIEWER'S INITIALS: DATE: DUE DATE: 04-08-08 Not Approved (attach comments) DATE: Permit Center Use. Only CORRECTION LETTER MAILED: Departments issuel corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License MCKINCL942DW Licensee Name MCKINSTRY CO LLC Licensee Type CONSTRUCTION CONTRACTOR UBI 602569922 Ind. Ins. Accaunt Id 70616500 Business Type LIMITED LIABILITY COMPANY Address 1 PO BOX 24567 Address 2 City SEATTLE County KING State WA Zip 98134 Phone 2067623311 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 3/16/2006 Expiration Date 3/16/2010 Suspend Date Separation Date Parent Company Previous License MCKIN * *372N0 Next License Associated License Business Owner Information Name Role Effective Date Expiration Date PEDERSEN, JAMIE D AGENT 03/16/2006 ALLEN, DEAN C PARTNER/MEMBER 03/16/2006 MOORE, DOUGLAS J PARTNER/MEMBER 03/16/2006 ALLEN, DAVID E PARTNER/MEMBER 03/16/2006 TEPLICKY, JOSEPH PARTNER/MEMBER 03/16/2006 Look Up a Contractor, Electr or Plumber License Detail Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry ge neral liability insurance. Bond Information Page 1 of 2 https: // fortress .wa.gov /lni/bbip /printer.aspx ?License= MCKINCL942DW 03/18/2008 SHEET NUMBER SHEET TITLE SCALE 7 MO.O DRAWING INDEX, SYMBOLS AND ABBREVIATIONS NONE MO.2 SEISMIC INFORMATION NONE M2.2 HVAC 2ND FLOOR PLAN 1/8" = 1-0" M2.3 HVAC 3RD FLOOR PLAN 1/8" = 1' -0 " M4.0 SECTIONS 1/4' = 1-0" M7.0 HVAC SPECIFICATIONS NONE 0 - 0 0 0 C L 0 S= CD i- `f 0 0 c 0 c 0 ABBREVIATIONS GENERAL AD ADJ AFF AFG AG AMP ARCH AUTO AUX BD BHP BLDG BOP BOT BS BTU BTUH CA CAB COND C/L CLG CFM CLG CO CO2 COL CONC COND CONN CONSTR CONTR CTL DET DIA DIAG DIM DISCH DIV DN DS DWDI DWG DWV (E) EA EC EL ELEC ELEV EP EQUIP ESP EXH EXIST (F) F FA FCO FDC FDN FIG FIN FIO FLEX FLG FLR FO FP FPM Ff FTG FURN GA GALV GC GEN GPM GWB HP HR HS HTG HTR ID LAB LF MAU MAX MBH MED MEZZ MFR MH MIN MISC MTD N/A NC NEG NIC NO NOM NTS OA OC OD OVHD POC PRELIM PSI PSIG R RAD REQD RPM SECT SF SIM SPEC SQ STD STRUC LABORATORY LINEAL FOOT QTY QUANTITY ACCESS DOOR ADJUSTABLE ABOVE FINISHED FLOOR ABOVE FINISHED GRADE ABOVE GROUND AMPERE ARCHITECT; ARCHITECTURAL AUTOMATIC AUXILIARY BOARD BRAKE HORSEPOWER BUILDING BOTTOM OF PIPE BOTTOM BIRD SCREEN BRITISH THERMAL UNIT BRITISH THERMAL UNITS PER HOUR COMPRESSED AIR CABINET CONDENSATE CENTER LINE CEILING CUBIC FEET PER MINUTE CEILING CARBON MONOXIDE CARBON DIOXIDE COLUMN CONCRETE CONDENSER; CONDENSATE CONNECT; CONNECTION CONSTRUCTION CONTRACTOR CONTROL DETAIL DIAMETER DIAGONAL DIMENSION DISCHARGE DIVISION DOWN DISCONNECT SWITCH; DOOR SWITCH DOUBLE WIDTH, DOUBLE INLET DRAWING DRAIN, WASTE, VENT EXISTING EACH ELECTRICAL CONTACTOR; END CAP ELEVATION ELECTRICAL ELEVATION ELECTRICAL PANEL; END PLUG EQUIPMENT EXTERNAL STATIC PRESSURE EXHAUST EXISTING FUTURE FAHRENHEFT FIRE ALARM FLOOR CLEANOUT FIRE DEPARTMENT CONNECTION FOUNDATION FIGURE FINISH FURNISHED AND INSTALLED BY OWNER FLEXIBLE FLANGE FLOOR FUEL OIL FIRE PROTECTION FEET PER MINUTE FOOT; FEET FOOTING FURNISH GAGE GALVANIZED GENERAL CONTRACTOR GENERATOR GALLONS PER MINUTE GYPSUM WALL BOARD HIGH HORSEPOWER; HIGH PRESSURE HEATING RETURN HEATING SUPPLY HEATING HEATER INSIDE DIAMETER /DIMENSION MAKE -UP AIR UNIT MAXIMUM 1000 BRITISH THERMAL UNITS PER HOUR MEDIUM MEZZANINE MANUFACTURER MANHOLE MINIMUM; MINUTE(S) MISCELLANEOUS MOUNTED NOT APPLICABLE NORMALLY CLOSED NEGATIVE NOT IN CONTRACT NORMALLY OPEN; NUMBER NOMINAL NOT TO SCALE OVERALL ON CENTER OUTSIDE DIAMETER OVERHEAD POINT OF CONNECTION PRELIMINARY POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH GAUGE RELOCATED RADIUS REQUIRED REVOLUTIONS PER MINUTE SECTION SQUARE FOOT SIMILAR SPECIFICATION SQUARE STANDARD STRUCTURAL TBD TI TOC TOS TYP UG UNO VAV VD VER VFD VSD W/ HVAC AC ACT AHU BDD BOD CC CRU CT CV DB DIFF DMPR EA EAT ECG EF FCU FD FM FP FTU HC HR HVAC PIPING BP CD CHW CHR CHS CT EWT TO BE DETERMINED TENANT IMPROVEMENTS TOP OF CONCRETE TOP OF STEEL TYPICAL UNDERGROUND UNLESS NOTED OTHERWISE VARIABLE AIR VOLUME VOLUME DAMPER VERIFY VARIABLE FREQUENCY DRIVE VARIABLE SPEED DRIVE WITH WITHOUT AIR CONDITIONING ACOUSTICAL CEILING TILE AIR HANDLING UNIT BACKDRAFT DAMPER BOTTOM OF DUCT COOLING COIL COMPUTER ROOM UNIT COOLING TOWER CONSTANT VOLUME DRY BULB DIFFUSER DAMPER EXHAUST AIR ENTERING AIR TEMPERATURE EGGCRATE GRILLE EXHAUST FAN FAN COIL UNIT FIRE DAMPER FREQUENCY MODULATION FIRE PROTECTION; FAN POWERED FAN TERMINAL UNIT GRD GRILLE, REGISTER, DIFFUSER HEATING COIL HEATING RETURN HEATING, VENTILATION AND AIR CONDITIONING LAT LEAVING AIR TEMPERATURE LD LINEAR DIFFUSER MC MECHANICAL CONTRACTOR MECH MECHANICAL MOD MOTOR OPERATED DAMPER; MODULATING MUA MAKE UP AIR OA OVERALL; OUTSIDE AIR OBD OPPOSED BLADE DAMPER RA RAT RCP RTU SA SAT SD SF S /FD SL SLSM SM SP TDH TG TOD TSP UH UNIT HEATER WB WC WG DCW DHW DHWC DSP WC WH WSP FHV LWT TOP RETURN AIR RETURN AIR TEMPERATURE REFLECTED CEILING PLAN ROOF TOP UNIT SUPPLY AIR SUPPLY AIR TEMPERATURE SMOKE DAMPER SUPPLY FAN SMOKE FIRE DAMPER SOUND LINED SOUND LINED SHEET METAL SHEET METAL STATIC PRESSURE TOTAL DYNAMIC HEAD TRANSFER GRILLE TOP OF DUCT TOTAL STATIC PRESSURE WET BULB WATER COLUMN WATER GAUGE PLUMBING AD AREA DRAIN CO CLEAN OUT; CARBON MONOXIDE DOMESTIC COLD WATER DOMESTIC HOT WATER DOMESTIC HOT WATER RECIRCULATION DRY STANDPIPE EWC ELECTRICAL WATER COOLER FD FLOOR DRAIN IE INVERT ELEVATION IN WC INCHES WATER COLUMN IW IONIZED WATER; INDIRECT WASTE NPCW NON POTABLE COLD WATER ORL OVERFLOW RAINWATER LEADER PD PLANTER DRAIN; PRESSURE DROP PERF PERFORATED PLBG PLUMBING PRV PRESSURE REDUCING VALVE RPBP REDUCED PRESSURE BACKFLOW PREVENTER SD STORM DRAIN SS SANITARY SEWER VTR VENT THROUGH ROOF WASTE WATER CLOSET WATER HEATER WET STANDPIPE BACKFLOW PREVENTER CONDENSATE DRAIN CHILLED WATER CHILLED WATER RETURN CHILLED WATER SUPPLY CONICAL TEE ENTERING WATER TEMPERATURE FIRE HOSE VALVE LEAVING WATER TEMPERATURE TOP OF PIPE PIPING IDENTIFICATION HVAC PLUMBING FIRE PROTECTION A COND -®-- CDR -. CDS CHS - - - CHR - G HR HS RL -. -RS --- ST GRW GAW ID IRR NP ORL PW PSD RWL ----RWL---- SD SS —UD - - W —W DSP FDC F FP FW WSP PIPING FITTINGS 1t1 I�{ 101 f' I +' ! f VALVES /pi 0?1 131 -10 4"" 4 AV 4 RAV T o1 1$1 PIPING ACCESSORIES 11 r nnn rfnnn # WATTS /LF 6L. i A COND CDR CDS CHS CHR G HR HS RL RS ST CW GRW GAW HW HWC ID IRR NPCW ORL PW PSD RWL RWL SD SS UD V W W DSP FDC F FP FW WSP COMPRESSED AIR PIPE CONDENSATE DRAIN PIPE CONDENSER WATER RETURN PIPE CONDENSER WATER SUPPLY PIPE CHILLED WATER SUPPLY PIPE CHILLED WATER RETURN PIPE NATURAL GAS PIPE HEATING WATER RETURN PIPE HEATING WATER SUPPLY PIPE REFRIGERANT LIQUID PIPE REFRIGERANT SUCTION PIPE STEAM SUPPLY COLD WATER PIPE (POTABLE) GREASE WASTE GARAGE WASTE HOT WATER PIPE (POTABLE) HOT WATER CIRCULATING (POTABLE) INDIRECT DRAIN IRRIGATION WATER PIPE NON - POTABLE CW PIPE OVERFLOW RAINWATER LEADER PUMPED WASTE PUMPED STORM DRAIN RAINWATER LEADER BELOW GRADE RAINWATER LEADER STORM DRAIN PIPE SANITARY SEWER PIPE (SITE) UNDERDRAIN PIPE VENT PIPE (SANITARY) WASTE PIPE WASTE PIPE BELOW GROUND DRY STAND PIPE FIRE DEPT. CONNECTION PIPE FIRE SPRINKLER PIPE FIRE PROTECTION WATER PIPE FIRE PROTECTION WASTE PIPE WET STAND PIPE TEE W /PIPE UP TEE DOWN W /ELBOW TEE UP W/ ELBOW TEE UP TEE DOWN 90' ELBOW UP 90° ELBOW DN CAP UNION FLANGE FLEX HOSE CONNECTION DOUBLE BELLOWS FLEX CONNECTION SINGLE BELLOWS FLEX CONNECTION FLOW ARROW CONCENTRIC REDUCER ECCENTRIC REDUCER SLOPE SYMBOL BREAK OR CONTNUATION SYMBOL DOWN SPOUT NOZZLE CLEANOUT 45' ELBOW 45° ELBOW 90' ELBOW 90° ELBOW CROSS TEE WYE TAP HOSE CONNECTION MOTORIZED 2 -WAY VALVE MOTORIZED 3 -WAY VALVE PRESSURE REDUCING VALVE CONTROL VALVE RELIEF VALVE BALL VALVE 3 -WAY GATE VALVE BUTTERFLY VALVE DIAPHRAGM VAVLE CHECK VALVE NEEDLE VALVE GLOBE VALVE GLOBE VALVE ANGLE GLOBE VALVE 3 -WAY GATE PLUG VALVE BALANCING VALVE HOSE BIBB PUMP MANUAL AIR VENT AUTOMATIC AIR VENT HIGH CAPACITY AIR VENT SHOCK ARRESTOR FLOW SWITCH VACUUM BREAKER PRESSURE GAUGE TEMPERATURE SENSOR TEMPERATURE INDICATOR AUTO FLOW VALVE FLOW METER Y STRAINER Y STRAINER W/ BALL VALVE PIPE SLEEVE STEAM TRAP PETES PLUG HEAT TRACING SUCTION DIFFUSER W/ STRAINER REDUCED PRESSURE BACKFLOW PREVENTOR FUNNEL DRAIN FLOOR DRAIN ROOF DRAIN ROOF OVERFLOW DRAIN FLOOR SINK DUCTWORK ACCESSORIES =1 AD 12x12 2 "SL DUCTWORK J t=1=} FM 12x12 SL cniwup RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT \I\ IA \ 00 SMOKE DETECTOR C� c \f) I\ I BIRDSCREEN OR SCREENED OPENING 1 INSTRUMENTATION AND CONTROLS THERMOSTAT SENSOR SUPPLY GRILLE RETURN OR EXHAUST GRILLE VOLUME DAMPER MOTOR OPERATED DAMPER AIRFLOW MONITOR REMOTELY OPERATED VOLUME DAMPER (YOUNG REGULATOR OR APPROVED) BACK DRAFT DAMPER COORDINATE WITH CEILING APPURTENANCES. FLEX CONNECTION FIRE DAMPER THROUGH WALL FIRE DAMPER THROUGH FLOOR FIRE /SMOKE DAMPER THROUGH WALL FIRE /SMOKE DAMPER THROUGH FLOOR ACCESS DOORS 1" ACOUSTICALLY LINED DUCT 2" ACOUSTICALLY LINED DUCT CHANGE OF ELEVATION RISE(R) DROP(D) TRANSITION TURNING VANES RETURN / EXHAUST / OUTSIDE AIR SUPPLY / TRANSFER AIR TERMINAL UNITS - SEE SCHEDULE FOR TYPE SUPPLY AIR DUCT TURNING UP OR TOWARD SUPPLY AIR DUCT TURNING DOWN OR AWAY EXHAUST OR RETURN AIR DUCT TURNING UP OR TOWARD EXHAUST OR RETURN AIR DUCT TURNING DOWN OR AWAY ROUND DUCT TURNING UP OR TOWARD ROUND DUCT TURNING DOWN OR AWAY OVAL DUCT TURNING UP OR TOWARD OVAL DUCT TURNING DOWN OR AWAY FLEXIBLE DUCT CARBON MONOXIDE SENSOR VISUAL ALARM LIGHT - WALL MOUNTED GRILLE /REGISTER /DIFFUSER DOUBLE LINE T C 1 LINEAR DIFFUSER (CEILING) LINEAR DIFFUSER (WALL) 1 LOUVER PLAN VIEW H\ /AC - ANNOTATION VAV BOX TAG S- C8 -09 -A 1 DUCT WORK EQUIPMENT TAG EF - 2 - 1 LOUVER TAG PB1 -1 CEILING RETURN, EXHAUST OR TRANSFER AIR GRILLE LOCATION / SITE MAP LEGAL DESCRIPTION CEILING SUPPLY AIR DIFFUSER CEILING SUPPLY AIR DIFFUSER (SHOWN WITH THROW ARROWS) LOUVER (ELEVATION VIEW) 0 ROUND DUCT SYMBOL FLOOR # - DISCRETE BOX # SEE BELOW PRIMARY CFM FAN CFM ACOUSTICAL ACCESSORIES (IF REQ'D) KW OF AUX. HEAT. VAV BOX SIZE; SEE SCHED. PARALLEL FAN FLAT OVAL DUCT SYMBOL °--- CONSECUTIVE EQUIP. # FLOOR OF EQUIP. LOCATION EQUIPMENT DESIGNATION GRILLE, REGISTER, OR DIFFUSER TAG DT5 - -618 CFM EACH SIZE TYPE CODE EQUIPMENT TAG LD5 /3 -300 LINEAR DIFFUSER GRILLE T — CFMEACH ACTIVE LENGTH IN FT. TOTAL LENGTH IN FT. TYPE CODE LOUVER TAG CONSECUTIVE LOUVER #. - FLOOR LOCATED FACADE DESIGNATION B - BANK M - MUSEUM NE 1/4 OF THE SE 1/4 AND SE 1/4 OF THE SE 1/4 OF SECTION 9 AND GOV'T LOT 15 AND SW 1/4 OF THE SW 1/4 OF SECTION 10, T23N., R4E., W.M. CITY OF TUKWILA, KING COUNTY, WASHINGTON. GENERAL INFORMATION SYMBOLS //50 /f//5//ff X X X X X X X X X X X X X GENERAL NOTES: DRAWING INDEX NEW MECHANICAL WORK FUTURE TI SCOPE & NEW WORK OTHER THAN MECHANICAL DEMO MECHANICAL WORK DETAIL OR DIAGRAM NUMBER SHEET NUMBER WHERE DETAIL /DIAGRAM SHOWN SECTION LETTER SHEET NUMBER WHERE SECTION SHOWN PLAN NUMBER SHEET NUMBER WHERE, PLAN SHOWN REVISION NUMBER - DENOTES NUMBER AND DATE WHEN REVISION OR ISSUE OCCURED REVISION CLOUD - DENOTES AREA OF CHAN E DETAIL REFERENCE OUTLINE WITH NUMBER AND SHEET LOCATION MATCHLINE PLUMBING FIXTURE CALL -OUT (SEE PLUMBING SCHEDULES) DRAWING NOTE REFERENCE POINT OF CONNECTION CENTERLINE STRUCTURAL BEAM PENETRATION (SEE M503 STRUCTURAL BEAM HAUNCH (SEE M503) 1. VERIFY LOCATIONS AND DIMENSIONS OF ALL EQUIPMENT AND COORDINATE ALL WORK PRIOR TO START OF CONSTRUCTION. 2.OBTAIN APPROVAL OF STRUCTURAL ENGINEER PRIOR TO INSTALLATION OF PENETRATIONS NOT PREVIOUSLY COORDINATED OR AGREED UPON, I.E. ANCHOR BOLT DEPTHS, ETC. 3.CONCRETE EQUIPMENT CURBS, PIPING RAT SLABS, SUMP BASINS, AND HO'..GEKEEPING PADS ARE SHOWN FOR APPROXIMATE LOCATION AND SIZE AND ARE TO BE PROVIDED F3Y THE GENERAL CONTRACTOR. WHERE PROVIDED, REFER TO STRUCTURAL INFO FON ADDITIONAL DETAILS. 4. COMPLETION AND COMMISSIONING FOR MECHANICAL SYSTEMS: A. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO THE OWNER (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.4.3) B. PROVIDE TO THE OWNER ALL NECESSARY SYSTEM OPERATION AND MAINTENANCE MANUALS (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.4.2) C. BALANCE ALL HVAC SYSTEMS AND PROVIDE TO THE OWNER A WRITTEN E_EALANCING REPORT (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.2.1) D. EQUIPMENT /SYSTEMS TESTING SHALL BE PERFORMED IN ACCORDANCE WITH APPROVED PLANS (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.3.1) E. TEST, CALIBRATE AND ADJUST ALL HVAC CONTROLS AND SEQUENCES Or • OPERATION IN ACCORDANCE WITH THE APPROVED PLANS (PER 2006 WASHINGTON STAT" ENERGY CODE SECTION 1416.2.3.2), NECESSARY TESTS ARE IDENTIFIED IN 2006 WASHINGTON ENERGY CODE SECTION 1416.2.3.1; PREPARE A PRELIMINARY COMMISSIONING REPORT OF TEST PROCEDURES AND RESULTS PRIOR TO ISSUANCE OF A FINAL CER 1' : OF OCCUPANCY (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1 4 1 P .2.5.1); PROVIDE TO THE OWNER A FINAL COMMISSIONING REPORT OF TEST PROCEDURES r \!T\ RESULTS (PER 2006 WASHINGTON STATE ENERGY CODE SECTION 1416.2.5.2). 5. PERFORMANCE OF ALL NEW BUILDING MECHANICAL SYSTEMS WILL COMPLY WITH OR EXCEED THE MINIMUM REQUIREMENTS AS SET FORTH IN THE 2006 WASHINGTON STATE ENERGY CODE SECTION 1410 - GENERAL REQUIREMENTS. 6. MINIMUM VENTILATION QUANTITIES WILL COMPLY WITH OR EXCEED THE 2006 INTERNATIONAL MECHANICAL CODE. 7.ALL MOTORS WILL COMPLY WITH CHAPTER 15 OF THE 2006 WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING SET. 8. ALL SYSTEMS WILL BE INSULATED AS PRESCRIBED IN CHAPTER 14, TABLE 14-5 OF THE 2006 WASHINGTON STATE ENERGY CODE. FOR ADDITIONAL DETAILS, SEE DUCTWORK AND PIPING SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET. 9. VERIFY THAT ALL NECESSARY INFORMATION HAS BEEN PROVIDED PRIOR TO CONNECTION OF EQUIPMENT FURNISHED BY THE OWNER OR OTHERS. 10. FOR ADDITIONAL SYSTEM AND EQUIPMENT SEISMIC REQUIREMENTS, REFER TO STRUCTURAL INFORMATION (WHERE PROVIDED) AND PROJECT SPECIFIC SEISMIC DESIGN INFORMATION SHEET CONTAINED WITHIN THIS DRAWING SET. REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. R WE FOR IGE CODE COMPLIANCE PROVED LIAR 1 ti `[1b FILE COPY Permit No. SEPARATE PERMIT REQUIRED FOR: CI Mechanical K Electrical Plumbing `g Gas Piping City of Tukwila BUILDING DIVISION Of Tukwila Plar review approval is subject to etrol8 and OMISS10119. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and acknoW1edged: B Date: _ City of Tukwila BUILDING DIVISION E •- CITY uF 1 USvv1LA MAR 0 7 2008 PERMIT CENTER 0(el SEP 2 2 2008 1 } • , t 1 .�:� ; . of .. s.4 {� <! �i � " ?it,.�' 3 k 'L '�rYl�_iio -� `� ` .<�,s'.� ;:�� +''s�4 ite Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1--800 -669- -6223 PORTLAND: 12021 NE AIRPORT WAY SUITE G PORTLAND, OR 97220 503-331.-0234 www.mckinstry.com PROJECT SABEY TUK 5 PHASE A SHELL HVAC DUCTWORK 3355 S. 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: NO DATE McKINSTRY DMSION: SHEET TITLE: SHEET NUMBER: EXPIRES: 07 -12 -09 J DESCRIPTION 03/06/08 PERMIT SET SEP 22innn ENGINEERING DESIGNED BY: T. MARINO DRAWN BY: B. HUCKINS CHECKED BY: M. WEBB JOB NUMBER: DATE: 03-06--2008 SCALE: SEE DRAWING DRAWING INDEX, SYMBOLS, AND ABBREVIATIONS M Q . MECHANICAL, PIPING, AND PLUMBING IMPORTANCE FACTOR TABLE COMPONENT DESCRIPTION STANDARD COMPONENT IP =1.0 CRITICAL COMPONENT IP =1.5 NOTES: HVAC - SHEETMETAL/EQUIPMENT g Load g Load, with Exp. Anchors HVAC SUPPLY - MEDIUM PRESSURE .26 g X .39 g HVAC SUPPLY - LOW PRESSURE Level 2 Ceiling X .44 g HVAC OUTSIDE AIR .65 g X .23 g HVAC RETURN .34 g X Level 1 HVAC EXHAUST .23 g X .34 g TRANSFER AIR DUCT X GARAGE EXHAUST X GREASE KITCHEN EXHAUST DUCT (TYPE 1 HOOD EXHAUST) X NON - GREASE KITCHEN EXHAUST DUCT (TYPE 2 HOOD EXHAUST) X FLUES - BOILERS, HW HEATERS X PIPING HEATING WATER X CONDENSER WATER X NATURAL GAS X MAKEUP WATER X REFRIGERANT X PLUMBING COLD WATER (POTABLE) X COLD WATER (NON - POTABLE) X HOT WATER (POTABLE) X HOT WATER RECIRC (POTABLE) X CONDENSATE INDIRECT WASTE X NATURAL GAS MEDIUM PRESSURE (2 -5 PSIG) X NATURAL GAS LOW PRESSURE ( <14" WC) X RAINWATER LEADER/ OVERFLOW RAINWATER LEADER X UNDERSLAB DRAINAGE X SANITARY VENT X SANITARY WASTE X Piping Systems - High deformability elements and attachments (Converted to ASD) Level Component Ip =1.0 Component Ip =1.5 g Load g Load, with Exp. Anchors g Load g Load, with Exp. Anchors Level 3 Ceiling / Roof .26 g .61 g .39 g .91 g Level 2 Ceiling .23 g .44 g .34 g .65 g Level 1 Ceiling .23 g .32 g .34 g .48 g Level 1 .23 g .23 g .34 g .34 g Piping Systems - Limited deformability elements and attachments (Converted to ASD) Level Component Ip =1.0 Component Ip =1.5 g Load g Load, with Exp. Anchors g Load g Load, with Exp. Anchors Level 3 Ceiling/Roof .36 g .61 g .55 g .91 g Level 2 Ceiling .26 g .44 g .39 g .65 g Level 1 Ceiling .23 g .32 g .34 g .48 g Level 1 .23 g .23 g .34 g .34 g Piping Systems - Low deformability elements and attachments (Converted to ASD) Level Component Ip - 1.0 Component Ip = 1.5 g Load g Load, with Exp. Anchors g Load g Load, with Exp. Anchors Level 3 Ceiling / Roof .61 g .61 g .91 g .91 g Level 2 Ceiling .44 g .44 g .65 g .65 g Level 1 Ceiling .32 g .32 g .48 g .48 g Level 1 .23 g .23 g .34 g .34 g General Mechanical Equipment - Pressure Vessels and skirts free standing (Converted to ASD) Level Component Ip =1A Component Ip =1.5 g Load g Load, with Exp. Anchors g Load g Load, with Exp. Anchors Level 3 Ceiling / Roof .91 g 1.21 g 1.36 g 1.82 g Level 2 Ceiling .65 g 1.09 g .98 g 1.63 g Level 1 Ceiling .48 g .8 g .72 g 1.2 g Level 1 .3 g .5 g .45 g .76 g General Mechanical Equipment - Boiler and furnaces, Other (Converted to ASD) Level Component Ip = 1.0 Component Ip = 1.5 g Load g Load, with Exp. Anchors g Load g Load, with Exp. Anchors Level 3 Ceiling / Roof .36 g .61 g .55 g .91 g Level 2 Ceiling .26 g .44 g .39 g .65 g Level 1 Ceiling .23 g .32 g .34 g .48 g Level 1 .23 g .23 g .34 g .34 g HVAC Systems - Non - vibration Isolated, Mounted in -line with ductwork, Other (Converted to ASD) Level Component Ip =1.0 Component Ip =1.5 g Load g Load, with Exp. Anchors g Load g Load, with Exp. Anchors Level 3 Ceiling / Roof .36 g .61 g .55 g .91 g Level 2 Ceiling .26 g .44 g .39 g .65 g Level 1 Ceiling .23 g .32 g .34 g . . Level 1 .23 g .23 g .34 g .76 g HVAC Systems - Vibration Isolated (Converted to ASD) Level Component Ip =1.0 Component Ip =1.5 g Load g Load, with Exp. Anchors g Load g Load, with Exp. Anchors Level 3 Ceiling / Roof .91 g 1.21 g 1.36 g 1.82 g Level 2 Ceiling .65 g 1.09 g .98 g 1.63 g Level 1 Ceiling .48 g .8 g .72 g 1.2 g Level 1 .3 g .5 g .45 g .76 g Piping Systems - Limited deformability elements and attachments Level Component 1p = 1.0 Component Ip = 1.5 SHL SHL, with Exp. Anchors SHL SHL, with Exp. Anchors Level 3 Ceiling / Roof A AA AA AA* Level 2 Ceiling B A A AA Level 1 Ceiling B A A A Levell B B A A Piping Systems - High deformability elements and attachments Level Component Ip = 1.0 Component Ip = 1.5 SHL SHL, with Exp. Anchors SHL SHL, with Exp. Anchors Level 3 Ceiling / Roof B AA A AA* Level 2 Ceiling B A A AA Level 1 Ceiling B A A A Level1 B B A A Piping Systems - Low deformability elements and attachments Level Component Ip =1.0 Component Ip =1.5 SHL SHL, with Exp. Anchors SHL SHL, with Exp. Anchors Level 3 Ceiling / Roof AA AA AA* AA* Level 2 Ceiling A A AA AA Level 1 Ceiling A A A A Levell B B A A General Mechanical Equipment - Boiler and furnaces, Other Level Component Ip = 1.0 Component Ip = 1.5 SHL SHL, with Exp. Anchors SHL, SHL with Exp. Anchors Level 3 Ceiling / Roof A AA AA AA* Level 2 Ceiling B A A AA Level 1 Ceiling B A A A Level1 B B A A General Mechanical Equipment - Pressure Vessels on skirts and free standing Level Component Ip = 1.0 Component Ip = 1.5 SHL SHL, with Exp. Anchors SHL, SHL with Exp. Anchors Level 3 Ceiling / Roof AA* AA* AA* - NA - Level 2 Ceiling AA AA* AA* - NA - Level 1 Ceiling A AA* AA* AA* Levell B AA A AA* HVAC Systems - Vibration Isolated Level Component Ip = 1.0 Component Ip = 1.5 SHL SHL, with Exp. Anchors SHL SHL, with Exp. Anchors Level 3 Ceiling / Roof AA* AA* AA* - NA - Level 2 Ceiling AA AA* AA* - NA - Level 1 Ceiling A AA* AA* AA* Level 1 B AA A AA* HVAC Systems - Non-vibration Isolated, Mounted in -line with ductwork, Other Level Component Ip = 1.0 Component Ip = 1.5 SHL SHL, with Exp. Anchors SHL SHL, with Exp. Anchors Level 3 Ceiling / Roof A AA AA AA* Level 2 Ceiling E3 A A AA Level 1 Ceiling B A A A Levell B A A A z 0 L. 0 0 0 0 r R n 0 0 0 c L2 0 C 0 Y_ 0 0 0 dr; 0 C 0 CO Cf (, 0 L SEIS OR J EISMC BASS OF SEISMIC RESTRAINTS IVAY BE EXCLUDED WHEN aR I.p = 1.5: DESIGN: BRACE ALL DUCTWORK AND PIPING PER SMACNA'S "SEISMIC RESTRAINT MANUAL" OR MASON INDUSTRIES "SEISMIC RESTRAINT MANUAL" IN ACCORDANCE WITH THE COMPONENT IMPORTANCE FACTOR AND THE SEISMIC HAZARD LEVEL (SHL) OR 'g' LOAD LISTED IN THE APPLICABLE TABLE. OBTAIN THE COMPONENT IMPORTANCE FACTOR FROM THE DUCT WORK OR PIPING MATRIX. VIC RESTRAINTS MAY BE EXCLUDED WHEN 1 = 1.0: • MECHANICAL AND ELECTRICAL COMPONENTS IN SEISMIC DESIGN CATEGORIES D, E, AND F WHERE Ip = 1.0 AND FLEXIBLE CONNECTIONS BETWEEN THE COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT ARE PROVIDED AND THAT ARE MOUNTED AT 4 FT (1.22M) OR LESS ABOVE A FLOOR LEVEL AND WEIGH 400 LB (1780 N) OR LESS. [ASCE 7 -02 SECTION 9.6.1 - EXCEPTION #5] • MECHANICAL AND ELECTRICAL COMPONENTS IN SEISMIC DESIGN CATEGORIES D, E, AND F WEIGHING 20 LB (95 N) OR LESS WHERE Ip = 1.0 AND FLEXIBLE CONNECTIONS BETWEEN THE COMPONENTS AND ASSOCIATED DUCTWORK, PIPING, AND CONDUIT ARE PROVIDED, OR FOR DISTRIBUTION SYSTEMS WEIGHT 5 LB /FT (7N /M) OR LESS. [ASCE 7 -02 SECTION 9.6.1 - EXCEPTION #6] SEISMIC RESTRAINTS ARE NOT REQUIRED FOR HVAC DUCTS WITH Ip = 1.0 IF EITHER OF THE FOLLOWING CONDITIONS ARE MET: A. HVAC DUCTS ARE SUSPENDED FROM HANGERS 12 IN. (305 MM) OR LESS IN LENGTH FROM THE TOP OF THE DUCT TO THE SUPPORTING STRUCTURE. THE HANGERS SHALL BE DETAILED TO AVOID SIGNIFICANT BENDING OF THE HANGERS AND THEIR ATTACHMENTS. B. HVAC DUCTS HAVE A CROSS - SECTIONAL AREA OF LESS THAN 6 FT (0.557M [ASCE 7 -02 SECTION 9.6.3.10] • DUCTILE PIPING IN SEISMIC DESIGN CATEGORIES D, E, OR F DESIGNATED AS HAVING AN Ip = 1.0 AND A NOMINAL PIPE SIZE OF 3 IN. (75 MM) OR LESS. [ASCE 7 -02 SECTION 9.6.3.11.D.3] • EQUIPMENT ITEMS INSTALLED IN -LINE WITH THE DUCT SYSTEM (E.G. FANS, HEAT EXCHANGERS, AND HUMIDIFIERS) WEIGHING LESS THAN 75 LB (344 N) DO NOT NEED TO BE BRACED INDEPENDENT OF THE DUCT SYSTEM. [INTERPRETED FROM ASCE 7 -02 SECTION 9.6.3.10] UNBRACED PIPING ATTACHED TO IN -LINE EQUIPMENT SHALL BE PROVIDED WITH ADEQUATE FLEXIBILITY TO ACCOMMODATE DIFFERENTIAL DISPLACEMENTS. [ASCE 7 -02 SECTION 9.6.3.10] a PIPING - ROD HANGERS SHALL NOT BE USED AS SEISMIC SUPPORTS UNLESS THE LENGTH OF THE HANGER FROM THE SUPPORTING STRUCTURE IS 12 IN. (305 MM) OR LESS. ROD HANGERS SHALL NOT FEE CONSTRUCTED IN A MANNER THAT SUBJECTS THE ROD TO BENDING MOMENTS . [ASCE 7-02 SECTION 9.6.3.11.4.C] * 1/2 Brace Spacing Required * 1/2 Brace Spacing Required HVAC S HVAC/SH SHL SEISV - I-TV is -ET V DESIG\ SMACNA SISMC TA L = QUIPVIE \T VALUES: * 1/2 Brace Spacing Required * 1/2 Brace Spacing Required SEISMIC ALLOWABLE STPLSS D ETAL FQI,I LOA: V T AZARD L =V SEISMIC DESIGN VALUES ARE CALCULATED IN ACCORDANCE WITH IBC 2003. IBC FORCES ARE "STRENGTH DESIGN" BASED. VALUES HAVE BEEN USED TO SELECT FROM SMACNA ADDENDUM NO. 1 TABLE M-10 "NEW' VALUES IN ORDER TO USE THE SMACNA SEISMIC RETRAINT MANUAL. * 1/2 Brace Spacing Required Highly Deformable Pipe Includes: Steel or Copper Piping with weld /braze /groove fitted joints. 1/2 Brace Spacing Required Limited Deformable Pipe Includes: PVC or PVDF Piping -L DFSIG -SIG\ PINK SHL W � VAL • SEISMIC DESIGN VALUES ARE CALCULATED IN ACCORDANCE WITH IBC 2003. IBC FORCES ARE "STRENGTH DESIGN" BASED. VALUES HAVE BEEN CONVERTED TO "ALLOWABLE STRESS DESIGN" VALUES IN ORDER TO UTILIZE MASON INDUSTRIES SEISMIC RESTRAINT GUIDELINES. • THESE VALUES CAN BE USED TO SELECT SEISMIC BRACING FROM MASON INDUSTRIES SEISMIC RESTRAINT GUIDELINES. J Limited Deformable Pipe Includes: PVC or PVDF Piping RR\C SiS Highly Deformable Pipe Includes: Steel or Copper Piping with weld /braze /groove fitted joints. VALJS: G A\ D DESIG\ 0 A\ V IC D RLMB\C VALJ-S: PLJ * 1/2 Brace Spacing Required Low Deformability Piping Includes: Cast Iron, Glass Pipe, FRP (Fiberglass Reinforced Pipe) V LOAD B Low Deformability Piping Includes: Cast Iron, Glass Pipe, FRP (Fiberglass Reinforced Pipe) 1 REVIEWED FOR CODE COMPLIANCE APP .OM MAR 1 7 2008 City Of Tukwila ._ L.A.LmagillI VISION CITY MAR 0 7 2008 PERMIT GENII ER PROJECT SABEY TUK 5 PHASE A SHELL HVAC DUCTWORK 3355 S. 120th Place Tukwila, WA 98168 REGISTRATION: EXPIRES: 07 -12 -09 REVISIONS: NO DATE DESCRIPTION 03/06/08 PERMIT SET SHEET NUMBER: McKINSTRY DMSION: DESIGNED BY: T. MARINO DRAWN BY: B. HUCKINS CHECKED BY: M. WEBB JOB NUMBER: DATE: SCALE: SHEET TITLE: SEISMIC INFORMATION i istry ife Of Your Building PORTLAND: 12021 NE AIRPORT WAY SUITE G PORTLAND, OR 97220 503- 331 -0234 SEP 2 2 2nno --L ovff ENGINEERING 03 -06 -2008 SEE DRAWING MOE2 SEATTLE: 5005 3RD AVENUE 5 PO BOX 24567 SEATTLE, WA 98124 1 -800 -669 -6223 www.mckinstry.com / L ...;....I 11 FUTURE DUCTWORK UP TO 3RD FLOOR (TYP) r CAP FOR FUTURE 99"x99" SUPPLY AND RETURN DUCTWORK UP TO 3RD FLOOR (FIELD VERIFY PENETRATION LOCATIONS) M4 SCALE : 1/8" HVAC 2ND FLOOR PLAN FUTURE DUCTWORK //- (TYP) CAP FOR FUTURE / • F1.4 _ 721 , , • • . llllthIr 420x70 • ••• • • •• •••••••• ••••••••• ••• • . • ••• I P ' "c:•.;:) BUILDING KEY PLAN NO SCALE REVIEWED FOR CODE COMPLIANCE APPROVED MAR 1 7 2008 City Of Tukwila UI EVISlIcA CITY OF TliKvvILA MAR 0 7 2008 PERMIT CENTER AREA OF WORK 3355 S. 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: NO DATE DESCRIPTION 03/06/08 PERMIT SET DESIGNED BY: T. MARINO DRAWN BY: B. HUCKINS CHECKED BY: M. WEBB JOB NUMBER: DATE: 03-06-2008 SCALE: SEE DRAWING SHEET TITLE: SHEET NUMBER: instry ife Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1-800-669-6223 PORTLAND: 12021 NE AIRPORT WAY SUITE G PORTLAND, OR 97220 503-331-0234 PROJECT SABEY TUK 5 PHASE A SHELL HVAC DUCTWORK EXPIRES: 07-12-09 www. main stry.com r•T SEP 2 2 20 McKINSTRY DMSION: ENGINEERING HVAC 2ND FLOOR PLAN M2 2 • _ 0 .• - V:1 0 0 0 0 r:!.7 0 0 02 s_ (.1 02 0 N FUTURE DUCTWORK DN TO 2ND FLOOR (T(P) 1 M2.3 99"x99" SUPPLY AND RETURN DUCTWORK DN TO 2ND FLOOR (FIELD VERIFY PENETRATION LOCATIONS) CAP FOR FUTURE SCALE : 1/8" 1'-0" FUTURE DUCTWORK (TYP) HVAC 3RD FLOOR PLAN S • ;;;; ;;;;;;;;;;;;;;;;;;;;;;;:::::".;;;;, 1 Et !`:!!'.:i I ,111111.1111.111.,:'111I.1.!11111/I1111111111111111111111111:11111■II.1,111 !!!!!!!! 1.1' 1 11. 11'1,11,11 1. !, !!!!!!!!!,111,,,,,,,IIII,1111111,11111,11;IIIILIIIIIIIIIIIIII■11111111111111111IIIIEE1111■III■11111!IIEIll I' EII !! 3 .. 11 `I! • ' AREA OF WORK iIIIIllilll „ . NO SCALE BUILDING KEY PLAN CITY 12 1 ., MAR 0 7 ZOod PERMIT CENTER PROJECT SABEY TUK 5 PHASE A SHELL HVAC DUCTWORK 3355 S. 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: NO DATE SHEET TITLE: r EXPIRES: 07 SHEET NUMBER: instry ife Of Your Building PORTLAND: 12021 NE AIRPORT WAY SUITE G PORTLAND, OR 97220 503-331-0234 DESCRIPTION 03/06/08 PERMIT SET SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1-800-669-6223 www. mckinstry.com DESIGNED BY: T. MARINO DRAWN BY: B. HUCKINS CHECKED BY: M. WEBB JOB NUMBER: DATE: 03-06-2008 SCALE: SEE DRAWING crID o o 9nnn LUUU McKINSTRY DIVISION: ENGINEERING HVAC 3RD FLOOR PLAN M23 I I F TURE T.I. 1' CTWORK ; • CAP FOR FUTURE 99x99 7 ,/ • / CAP FOR FUTURE 99x99 99x99 CAP FOR FUTURE 3PD FUTURE Ti. DUCTWORK 2 IN D H...0 k S HUC ID REAM REVIEWED FOR CODE COMPLIANCE APPROVED MAR 1 7 2008 SEP 2 2 2000 r un' r MAR 0 7 2008 PERMIT CENTER City Of Tukwila IL I DIVISION PROJECT: SABEY TUK PHASE A SHELL HVAC DUCTWORK 3355 S. 120th Place Tukwila, WA 98168 REGISTRATION: REVISIONS: NO DATE McKINSTRY SHEET TITLE: SECTIONS SHEET NUMBER: instry ife Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEAME, WA 98124 1-800-669-6223 PORTLAND: 12021 NE AIRPORT WAY SUITE G PORTLAND, OR 97220 503-331-0234 www.mckinstry.com DESCRIPTION EXPIRES: 07-12-09 03/06/08 PERMIT SET DESIGNED BY: T. MARINO DRAWN BY: B. HUCKINS CHECKED BY: M. WEBB JOB NUMBER: DATE: 03-06-2008 SCALE: SEE DRAWING ENGINEERING M4.0 Duct system or Section SMACNA Pressure & Dimensions Seal Classes Inside, overall Materials (duct, lining) Unlined galvanized duct, see submittal for gauge and reinforcement. Rectangular to have TDF connections, round may be spiral. Flex: 4' max. length, Thermaflex GKM or equal Fittings (shop built) 5 -gore elbows, cen- terline radius of 1.5e Conical tees for bidirectional flow. Purchased fittings (dampers, louvers) 1 -1/2 Hr airfoil smoke fire dampers per UL555S 110V N.C. operator outside duct Insulation (indoor, outdoor) Outdoor: R -7, alum. jacket Indoor: none Seismic (besides normal han• ers Rigid attachment to structure Testing requirement field testin• none required HVAC Supply medium pressure (From AHUs) SMACNA +4" pressure, seal class A Inside clear dimensions shown. Overall, allow 4" add'I for flanges on rect- angular, 2" insul. on round HVAC Return /Exhaust medium pressure (Inlet to AHUs/ Fans) SMACNA +4" pressure, seal class A Inside clear dimensions shown, also OD for round. Overall, allow 4" add'I for flanges on rectangular, plus Galvanized duct, 1" lining only where indicated on plans. See submittal for gauge and reinforcement. Rectangular to have TDFconnections, round may be spiral. Flex: ducts and 4" from sides of trench. 5 -gore elbows, cen- terline radius of 1.5o Conical tees for bidirectional flow. bidirectional flow. 1 -1/2 Hr airfoil smoke fire dampers per UL555S 110V N.C. operator outside duct Outdoor: R -7, alum. Jacket Indoor: R -3.3 Rigid attachment to structure none required C Cb L C. - 0 Cr; <r L L C; 0; 0 Ductwork Specification Notes: 1. Provide 3 feet minimum of flex duct wherever flex duct is used to connect a diffuser to the ductwork. 2. If these plans conflict with architectural plans for diffuser placement, use the architect's placement if space allows. 3. Fiberglass duct liner is used as an acoustical control measure only. 4. Provide and coordinate all access doors necessary to maintain, adjust and test HVAC components above the ceiling. 40' 0 REVIEWED FOR CODE COMPLIANCE APPROVED MAR 1 7 7009 ' City Of Tukwila 1yV, SEP 2 2 2008 r�- CITY MAR 0 71000 PERMIT CENTER 3355 S. 120th Place Tukwila. WA 98168 REGISTRATION: REVISIONS: NO DATE DESCRIPTION 03/06/08 PERMIT SET McKINSTRY DMSION: DESIGNED BY: T. MARINO DRAWN BY: B. HUCKINS CHECKED BY: M. WEBB JOB NUMBER: DATE: 03 -06 -2008 SCALE: SEE DRAWING SHEET TITLE: SHEET NUMBER: instry ife Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1- 800 - 669 -6223 PORTLAND: 12021 NE AIRPORT WAY SUITE G PORTLAND, OR 97220 503- 331 -0234 www.mckinstry.com SABEY TUK 5 PHASE A SHELL HVAC DUCTWORK EXPIRES: 07-12-09 ENGINEERING HVAC SPECIFICATIONS M7.0 .v- ti'�d1 "1