Loading...
HomeMy WebLinkAboutPermit M08-087 - AT&T MOBILITYAd ItEIiLMDHJf1OS ggj A,LPIIgON DULY Parcel No.: Address: Suite No: Cityif Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 5379200290 16425 SOUTHCENTER PY TUKW Tenant: Name: AT &T MOBILITY Address: 16425 SOUTHCENTER PY , TUKVVILA WA Owner: Name: ARGUS GROUP LTD Address: C/O METROVATION , 225 108TH AVE NE #520 Value of Mechanical: $15,000.00 Type of Fire Protection: Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall /Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial doc: I MC -10/06 MECHANICAL PERMIT Contact Person: Name: SAMSON HU Address: 4 HUTTON PLACE DR STE 800 , SANTA ANA CA Contractor: Name: PACIFIC MECHANICAL SYSTEMS INC Address: 2100 196TH STREET SW #123 , LYNNWOOD, WA Contractor License No: PACIFMS034B7 DESCRIPTION OF WORK: RELOCATE DUCT & DIFFUSER LOCATIONS FOR NEW TENANT IMPROVEMENT LAYOUT EOUIPMENT TYPE AND QUANTITY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *continued on next page ** M08 -087 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 714- 327 -4203 Phone: 425 771 -2495 Expiration Date: 02/10/2010 M08 -087 05/15/2008 11/11 /2008 Fees Collected: $338.75 International Mechanical Code Edition: 2006 Boiler Compressor: 0-3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP/1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment Printed: 05 -15 -2008 Permit Center Authorized Signature: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the of work. Ipn authorized to sign and obtain this mechanical permit. Signature: Print Name: doc: IMC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us (,) Permit Number: M08 -087 Issue Date: 05/15/2008 Permit Expires On: 11/11/2008 Date: (,S 8 Date: ( .6 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -087 Printed: 05 -15 -2008 1: ** *BUILDING DEPARTMENT CONDITIONS * ** • City of Tukwila Parcel No.: 5379200290 Address: 16425 SOUTHCENTER PY TUICW Suite No: Tenant: AT &T MOBILITY Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 - 087 Status: ISSUED Applied Date: 03/21/2008 Issue Date: 05/15/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Readily accessible access to roof mounted equipment is required. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206 431- 3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the • Building Official from requiring the correction of errors in the construction documents and other data. 12: ** *FIRE DEPARTMENT CONDITIONS * ** 13: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 14: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 15: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the doc: Cond -10/06 M08 -087 Printed: 05-15 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us air - moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 16: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 20: An electrical permit from the City of Tukwila Building Department Permit Center (206 - 431 -3670) is required for this project. 21: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 22: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 23: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond - 10/06 * *continued on next page ** M08 -087 Printed: 05-15 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Print Name: /.2---/ (14.7 - 6 Cosh /3S doc: Cond -10/06 M08 -087 Date: 6 ( -5 -- a a ordinances governing or local laws regulating Printed: 05-15 -2008 CITY OF TUKWILP" Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION ,{ King Co Assessor's Tax No.: Site Address: ( 47s 4yf r - / e 2 ' it )A'( Tenant Name: AT - r- Property Owners Name: -AT -T Mailing Address: 1 7 6 G- -1A e - C,f /AM ur Name: Mailing Address: E -Mail Address: Company Name: Company Name: Mailing Address: Contact Person: E -Mail Address: Company Name: Mailing Address: Contact Person: E -Mail Address: 6;"4/14 celq Contact Person: E -Mail Address: Contractor Registration Number: Q:\Applications\Forms- Applications On Linet3 -2006 - Mechanical Permit Application.doc Revised: 4 -2006 bh Mechanical 1-ermit No. 1( ) 0 1S ros Q Project No. (For office use only) Suite Number: City New Tenant: E .... Yes El ..No State Day Telephone: 4 tiT/r) r N i vow h'd6 (ir7 A1M GA State Floor: Zip CONTACT PERSON - who do we contact when your permit is ready to be issued City State /2 7 Zip Fax Number: MECHANICAL CONTRACTOR INFORMATION - Mailing Address: City Day Telephone: Fax Number: Expiration Date: Zip ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record CMC City State Day Telephone: Fax Number: Zip ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record 4 7 /f e't ' J molt qr 'fit N AkA o 6 City State Z i p Day Telephone: Fax Number: Page 1 of 2 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended /Wall/Floor Mounted Heater Ventilation System Wood /Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Water Heater 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig /Cooling System Incinerator - Domestic Emergency Generator Air Handling Unit <10,000 CFM Incinerator — Comm /Ind Other Mechanical Equipment Valuation of Project (contractor's bid price): $ Scope of Work (please provide detailed information): Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... [✓ Replacement .... ❑ Fuel Type: Electric ❑ Gas ....0 Other: Indicate type of mechanical work being installed and the quantity below: PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: Date: >j/2 / 4/ 3 � Day Telephone: /04 Z 7 4:2 il Mailing Address: L titre/ i lZ 6". U AO- L% { � 7/ 1 City State Zip Signature: Print Name: 123a/iL, Date Appli tion Expires: & 61—;-1-6-1)61-- Date Application Accepte : ) i e Q:IApplicationsWForms Applications On Line\3-2006 - Mechanical Permit Application.doc Revised. 4 -2006 bh Staff Initials: Page 2 of 2 RECEIPT NO: R08 -02983 Initials: WER User ID: 1655 Payee: CB BOVENKAMP, INC. SET TRANSACTIONS: Set Member Amount D08 -149 60.00 G 08 '08;? 60.00 TOTAL: 120.00 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us SET RECEIPT SET ID: 0819 SET NAME: AT &T MOBILITY TRANSACTION LIST: Type Method Description Amount Payment Check 43358 120.00 TOTAL: 120.00 Account Code Current Pmts 000.322.102.00.0 60.00 000/345.830 60.00 TOTAL: 120.00 Payment Date: 08/19/2008 Total Payment: 120.00 :5(V :r" 1O TOTAL. vin RECEIPT NO: R08 -01579 Initials: WER User ID: 1655 Payee: CB BOVENKAMP, INC. SET ID: 0513 SET NAME: AT &T MOBILITY SET TRANSACTIONS: Set Member Amount • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us D08 -149 1,056.50 M08� aa0 271.00 PGd8 1 09 188.00 TOTAL: 1,515.50 TRANSACTION LIST: Type Method Description Amount Payment Check 42109 ACCOUNT ITEM LIST: Description BUILDING - NONRES MECHANICAL - NONRES PLUMBING - NONRES STATE BUILDING SURCHARGE SET RECEIPT TOTAL: O Payment Date: 05/13/2008 Total Payment: 1,515.50 1,515.50 1,515.50 Account Code Current Pmts 000/322.100 1,052.00 000.322.102.00.0 271.00 000.322.103.00.0 188.00 000/386.904 4.50 TOTAL: 1,515.50 2339 05/13 9711 TOTAL 1515.50 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http://www.ci.tukwila.wa.us Parcel No.: 5379200290 Permit Number: M08 -087 Address: 16425 SOUTHCENTER PY TUKW Status: PENDING Suite No: Applied Date: 03/21/2008 Applicant: AT &T MOBILITY Issue Date: Receipt No.: R08 -00977 Initials: WER User ID: 1655 Payee: DAN GRUBB TRANSACTION LIST: Type Method Descriptio Amount rinr.• Rar tint -nA Payment Check 1013 67.75 ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES RECEIPT Account Code Current Pmts 000/345.830 67.75 Total: $67.75 0 Payment Amount: $67.75 Payment Date: 03/31/2008 09:45 AM Balance: $271.00 0580 03/31 9711 TOTAL 789.55 Printari• n3- 31 -7nnR Proj ct: '1 o � ` . � y <�.Type of Inspecti n: � (---\ "- Address: Lo 42-- ( - 1- `r Date Called: ',`/ - Special Instructions: Jo Date Wanted: f _. ' d ,- (.3 6 �.11:1-4 p.m. Requester: Phone No: INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION PERMIT NO. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -367 Approved per applicable codes. Corrections required prior to approval. COMMENTS: 2f Inspefrfor: Date: /> $60.00 REINSPECTION FE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Project: Type of Ins ectior: S t) �Ct� J �' Address: . n i t iki ,V k' Dat Called: P `'� J c 7.. Special Instructions: Date anted: jj a.m. Req ester: Phone No: ( - c;7, ` 1 5-3/ . INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION otioe PERMIT NO. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -367 COMMENTS: Date: ri $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Approved per applicable codes. Corrections required prior to approval. Receipt No.: Date: Pro ct: _ �-b I Type of Inspection: i f? {+ f Y ' i t t ,, 7 , ) .1 ___ ,- t I A'1 J . f r Address: its 4 ZC Date Called: Special Instructions: Date Wanted: / %.fir d _,a„,,. p.m. Requester: Phone No: INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -36 Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: >0 Inspector: IDate:/ 'a-' ,•7r/ $60.00 REINSPECTION FEE REQU R. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Sti Call to schedule reinspection. Receipt No.: 'Date: Project: ./ , 16 0, / 1 (1 Type ohInspection: , \- Address: i b 1 -7 1 2. 7:> i A i t-i Date Called: , )) L/ Special Instructions: Date Wanted: --)/ L.., ,, ... t p.m. •-____ Requester: Phone No: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION V 6300 Southcenter Blvd., #100, Tukwila, WA 981 88 (206)431-3 El Approved per applicable codes. Corrections required prior to approval. COMMENTS: / Ins ctor: Date:1_ -) L„ ri $60.00 REINSPECTION FEE RtalUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Proje t. /Ry , -.- { -. yam, P (✓{ L 7 < I Typ of Inspe Lion: 7C.-11-/ / /y{J '} ., l./ iq l..F . t_ ^Y I Address: f _ Date Calledi Special Instructions: (Date Wanted: 7 { a.m. Requester: Phone No: 3 - S — ID INSPECTION NO. INSPECTION RECORD Retain a copy with permit Mob o b 1 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 1 2-- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 ID Approved per applicable codes. Corrections required prior to approval. COMMENTS: Ai v -e f Date: ri $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Project: 4-7- q r Sprinklers: Type of Inspection: L' `C ,4 4/Doe„--7 Address: 1 y 2 - Suite #: S c,ge cv y' Contact Person: C ,..-ct F Occupancy Type: Special Instructions: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: INSPECTION NUMBER [ ' Approved per applicable codes. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 Word /Inspection Record Form.Doc 1/13/06 PERMIT NUMBERS Corrections required prior to approval. COMMENTS: Inspector: Date: fc Hrs.: 2e 4 $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from C of Tukwila Finance Department. Call to schedule a reinspection. T.F.D. Form F.P. 113 Copyright 2004 Carrier Corporation Product Data R�64t�i ue Uv tl4 Ykr ti,y WEATHERMAKER® 48TM004 -028 WEATHERMASTER® 48HJ004 -028 Single- Package Rooftop Units Gas Heating /Electric Cooling F L COPY 3 to 25 Nominal Tons u CORREQTION LTR# ED FOR MAN CE* ®VED • MAY - 8 2008 Au r' Of Tukwila — 1UUNG DIVISION • 48HJ015,017 48TM016 -025 48TMO28 ASHTOE CzY COMPLIANT MOB 087 iECEIVED APR 2 3 2008 PERMIT CENTER Standard - Efficiency (TM) units meet minimum ASHRAE 90.1 ener- gy efficiency requirements. High - Efficiency (HJ) units well exceed ASHRAE 90.1 energy efficiency requirements. Gas heating with electric cooling rooftop units offer: Pre - painted galvanized steel cabinet for long life and quality appearance Commercial strength base rails with built -in rigging capability •A Convertible design for vertical or hori- zontal supply /return (004 -014 only) Non - corrosive, sloped condensate drain pan, meets ASHRAE 62 (IAO) Two -inch return -air filters •H A wide assortment of factory - installed options available, including high- static drives that provide additional performance range Optional factory- installed COBRATM energy recovery unit (option on 48HJ004 -014 units only) • Factory- installed PremierLinkTM digital communicating controls • Factory- installed optional gear driven EconoMi$er+ (vertical return only) for use with standard rooftop unit controls (includes CO2 sensor control capability) • Factory- installed optional gear driven EconoMi$er2 (vertical return only) for use with PremierLink DDC controls (includes 4 to 20 mA actuator for demand control ventilation) • Humidi- MiZerTM adaptive dehumidi- fication system (48HJ004 -014) • MoistureMi$erTM dehumidification package Heat Options • Exclusive integrated gas control board with diagnostics • AlumagardTM heat exchanger coating • Induced -draft fan for gas combustion • Tubular, dimpled heat exchangers • Natural gas • LP conversion kits • Low NOx (size 004 -006 only) • Optional stainless steel heat exchangers. Form 48H,T -6PD UNIT SIZE 48TM D/E/F008 D/E/F009 ( D /E/F012� D/E014 NOMINAL CAPACITY (tons) 7'/2 8 ` 16 12'/2 OPERATING WEIGHT (lb) Unit Al/AI* Al/Cu* Cu/Cu* EconoMi$er+ EconoMi$er2 Roof Curbt 870 881 893 75 71 143 880 896 907 75 71 143 1035 1080 71 143 1050 1077 1100 75 71 143 COMPRESSOR Reciprocating Scroll Scroll Scroll Quantity 2 2 2 2 No. Cylinders (per Circuit) 2 2 2 2 Oil (oz) (each compressor) 42 53 50 60 REFRIGERANT TYPE R -22 Expansion Device Acutrolt" Metering Device Operating Charge (lb -oz) Circuit 1 7 -10 7 -14 8-10 9-8 I Circuit 2 8 -2 8-5 8 -8 9 -5 CONDENSER FAN Propeller Type Nominal Cfm 6500 6500 7000 7000 Quantity...Diameter (In.) 2...22 2...22 2...22 2...22 Motor Hp...Rpm '/4...1100 '/4•..1100 '/4.1100 '/4•..1100 Watts Input (Total) 650 650 650 650 CONDENSER COIL Enhanced Copper Tubes, Aluminum Lanced Fins Rows...Fins/in. 2...17 2...17 2...17 2...17 Total Face Area (sq ft) 20.50 20.50 25.00 25.00 EVAPORATOR FAN Centrifugal Type Quantity...Size (in.) Std 1...15 x 15 1...15 x 15 1...15 x 15 1...15 x 15 Alt 1...15x15 - 1...15x15 1...15x15 High- Static 1...15 x 15 1...15 x 15 1...15 x 15 - Type Drive Std Belt Belt Belt Belt Alt Belt - Belt Belt High - Static Belt Belt Belt - Nominal Cfm 2900 3000 3200 5000 Maximum Continuous Bhp Std 2.40 2.40 2.40 3.70 Alt 2.40 - 2.90 5.25 High- Static 3.70 3.70 5.25 - Motor Frame Size Std 56 56 56 56 Alt 56 - 56 56 High- Static 56 56 56 - Fan Rpm Range Std 590 -840 685 -935 685 -935 860 -1080 Alt 685 -935 - 835 -1085 830 -1130 High- Static 860 -1080 860 -1080 830 -1130 - Motor Bearing Type Ball Ball Ball Ball Maximum Allowable Rpm 1500 1500 1500 1500 Motor Pulley Pitch Diameter Min/Max (In.) Std 2.4/3.4 2.8/3.8 2.8/3.8 4.0/5.0 Alt 2.8/3.8 - 3.4/4.4 3.1/4.1 High - Static 4.0/5.0 4.0/5.0 2.8/3.8 Nominal Motor Shaft Diameter (In.) Std 5 /8 5 /8 5 /8 7/ Alt 5 /8 - 7 /8 7 /8 High - Static 7 /e 7 /8 7 /8 - Fan Pulley Pitch Diameter (in.) Std 7.0 7.0 7.0 8.0 Alt 7.0 - 7.0 5.9 High- Static 8.0 8.0 5.8 - Belt, Quantity...Type...Length (In.) Std 1...A...48 1...A...48 1...A...49 1...A...53 Alt 1...A...48 - 1...A...51 1...BX...48 High- Static 1...A...53 1...A...53 1...BX...48 - Pulley Center Line Distance (in.) Std 16.75 -19.25 16.75 -19.25 15.85 -17.50 15.85 -17.50 Alt 16.75-19.25 - 15.85 -17.50 15.85 -17.50 High - Static 16.75 -19.25 16.75 -19.25 15.85 -17.50 - Speed Change per Full Turn of Std 50 50 50 44 Movable Pulley Flange (rpm) Alt 50 - 50 50 High - Static 60 60 60 - Movable Pulley Maximum Full Turns Std 5 5 5 5 From Closed Position Alt 5 - 5 6 High - Static 5 5 6 - Factory Setting Std 5 5 5 5 Factory Speed Setting (rpm) Alt Hi 5 5 590 - 5 685 5 5 685 5 - 860 Alt 685 - 835 887 High - Static 860 860 887 Fan Shaft Diameter at Pulley (in.) 1 1 1 1 EVAPORATOR COIL Enhanced Copper Tubes, Aluminum Double -Wavy Fins, Face Split Rows...Fins/in. 3...15 3...15 3...15 4...15 Total Face Area (sq ft) 8.9 8.9 10.0 11.1 Physical data 48TM008 -014 30 LEGEND Al - Aluminum Bhp - Brake Horsepower Cu - Copper *Evaporator coil fin materiaVcondenser coil fin material. Contact your local repre- sentative for details about coated fins. - Weight of 14 -in. roof curb. "Rollout switch lockout is manually reset by interrupting power to unit or resetting thermostat. ECEWED APR 232008 JERMIT CENTEw 1836 IICP April 30, 2008 Samson Hu 4 Hutton Center Drive, Suite 800 Santa Ana, CA 92707 RE: Letter of Incomplete Application # I — Correction Letter #1 Development Permit Application M08 -087 AT & T Mobility — 16425 Southcenter Py Dear Mr. Hu, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on March 24, 2008 is determined to be incomplete. Before your application can continue the plan review process the following items from the following department needs to be addressed: Building Department: Allen Johannessen at 206 433 -7163 if you have any questions concerning the following comments. 1. Provide engineers calculation and details per previous letter dated April 9, 2008. Please address the comment above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Brenda Holt Permit Coordinator Enclosures File: M08 -087 City of Tukwila oaf— P:\Permit Center\lncomplete Letters\2008\M08 -087 Incomplete Ltr #1-Corr # 1.DOC jem Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 -if April 9, 2008 Samson Hu 4 Hutton Center Drive, Suite 800 Santa Ana, CA 92707 RE: CORRECTION LETTER #1 Mechanical Application Number M08 -087 AT & T Mobility —16425 Southcenter Py Dear Mr. Hu, This letter is to inform you of corrections that must be addressed before your plumbing permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire Department has no comments. Building Department: Allen Johannessen, at 206 433 -7163 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that two (2) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. S'ncerely, ren• a olt Permit Coordinator Encl xc: File No. M08 -087 • Cizj' of Tukw Department of Community Development P:\Pennit Center\Correction Letters \2008\M08 -087 Correction Ltr # 1.DOC wer 0 Jim Haggerton, Mayor Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Building Division Review Memo Date: April 9, 2008 Project Name: AT &T Mobility Permit #: M08 -087 Plan Review: Allen Johannessen, Plans Examiner Tukwila Building Division Allen Johannessen, Plan Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. The mechanical equipment located on the roof is indicated as weighing 1110 pounds. Provide details with the engineer's calculations to show the roof structural members are sufficient for the additional loads imposed by the RTU. All engineer's documents shall be original wet stamped and signed by the engineer. Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. ACTIVITY NUMBER: M08 -087 DATE: 07 -18 -08 PROJECT NAME: AT &T MOBILITY SITE ADDRESS: 16425 SOUTHCENTER PY Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # X Revision # 1 after Permit Issued DEPARTMENTS: Bull �• �ig Isl n Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete 110 Incomplete n Comments: 411 0ERMIT COORD COPY 41110 PLAN REVIEW /ROUTING SLIP Structural Permit Center Use Only . . INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROU NG: Please Route m Structural Review Required REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28 -02 J110o /WG 1' re Prevention a Planning Division n n Permit Coordinator n DUE DATE: 07-22 -08 Not Applicable n No further Review Required DATE: DUE DATE: 08-19-08 Approved I I Approved with Conditions n Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only • • • CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: DEPARTMENTS: g ivi ion ib' Bui Public Works Comments: APPROVALS OR CORRECTIONS: HERMIT COORD COPY 15 PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: M08 -087 DATE: 05 -06 -08 PROJECT NAME: AT &T MOBILITY SITE ADDRESS: 16425 SOUTHCENTER PY Original Plan Submittal X Response to Correction Letter # 1 X Response to Incomplete Letter # 1 Revision # After Permit Issued Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROU NG: Please Route Structural Review Required REVIEWER'S INITIALS: Approved Approved with Conditions Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 n n DUE DATE: 05-08-08 No further Review Required DATE: DATE: Planning Division n Permit Coordinator Not Applicable n DUE DATE: 06-05-08 Not Approved (attach comments) n Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: • PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M08 -087 X Response to Correction Letter # 1 DATE: 04 -23 -08 PROJECT NAME: AT &T MOBILITY SITE ADDRESS: 16425 SOUTHCENTER PY Original Plan Submittal Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: 412 Ding 'vision VA Public Works Complete Comments: Documents/routing stip.doc 2 -28-02 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) REVIEWER'S INITIALS: Fire Prevention Structural ❑ Incomplete APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: n Permit Center Use Only INCOMPLETE LETTER MAILED: 4-14-0) LETTER OF COMPLETENES Departments determined incomplete: Bldg P3 Fire ❑ Ping ❑ PW ❑ Staff Initials: Planning Division ❑ Permit Coordinator DUE DATE: 04-29-08 Not Applicable LED: TUES/THURS ROUTING: Please Route n Structural Review Required ❑ No further Review Required DATE: DATE: DUE DATE: 05 -27 -08 Not Approved (attach comments) n Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ACTIVITY NUMBER: M08 -087 DATE: 03 -28 -08 PROJECT NAME: AT &T MOBILITY SITE ADDRESS: 16425 SOUTHCENTER PY X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Public Works ?EMT COORD COPY PLAN REVIEW/ROUTING SUP 6 AtiveJ 4 -`x 00 Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: TUES/THURS ROUTING: Please Route REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 Incomplete Structural Review Required APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions ❑ Notation: REVIEWER'S INITIALS: Planning Division Permit Coordinator DUE DATE: 04 -01-08 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Ti No further Review Required DATE: DATE: n DUE DATE: 04 -29 -08 n Not Approved (attach comments) Permit Center Use Only CORRECTION LETTER MAILED: L I & Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF IN TI S 1 dr vg-o1 -' 0 in Summary of Revision: S ummary of Revision: rt et , fin, r d 6 p p m Received by: V Received by: („0,,, 6; »i q REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: REVISION . NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: REVISION . NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS S ummary of Revision: Received by: PROJECT NAME: SITE ADDRESS: REVISION LOG 0 PERMIT NO: ORIGINAL ISSUE DATE: OS (please print) (please print) (please print) (please print) (please print) Date: 7 /� Plan Check/Permit Number: ❑ Response to Incomplete Letter # ❑ Response to Correction Letter # [ Revision # 4' after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: City of Tukwila \applications \forms- applications on line\revision submittal Created: 8 -13 -2004 Revised: Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 0 Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. 7 Project Address: I J 6 4TI-{ t T - 17 A)/1 `rikauhl.A 4 Contact Person: M6,1\ 3-4(, f Phone Number: 74 Summary of Revision: - to . eITV O tA JUL 18 1008 PERMIT CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on 0 ti • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: Plan Check/Permit Number: M08-087 ® Response to Incomplete Letter # 1 ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: AT &T Mobility Project Address: 16425 Southcenter Py Contact Person: Summary of Revision: 11•611 -A (-VV l ('Y> IN ( Ifs -C 010, StAp* l [XL ( 6 w " - 1\ xuc e) Sheet Number(s): "Cloud" or highlight all areas of revision including date o Received at the City of Tukwila Permit Center by: Entered in Permits Plus on (4 leA \applications \forms- applications on line\revision submittal Created: 8 -13 -2004 Revised: ision Steven M. Mullet, Mayor Steve Lancaster, Director RECEIVED CITY OF TUKWILA MAY 0 6 2008 PERMIT CENTER Phone Number: 'I't t2' • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: Plan Check/Permit Number: 1V108 -087 ❑ Response to Incomplete Letter # ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: AT & T MOBILITY Project Address: 16425 Southcenter Py Contact Person: Samson Hu Phone Number: Summary of Revision: Fxis4 frrj r/m1f S earrrer !. min? (lo civ,, w;l1 62, 144.04:5441 and 4c FeP /ace/ 6y in plgo pooh I Carr; L.j T MD .ir fa (!v Jokts"). - rAe i.p yrF T�csc D UH, +S tir t Xi Same . IVO 4 I w,; h-i. w;11 seo 1 / _ i D ,,, , �j >�r: cdv Z 7- f U eves l et,G tA. r �Cl� _ ' ) ki 'I 5 V e-2 _ e / Pe G .01i i'. A Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision C. Received at the City of Tukwila Permit Center by: Entered in Permits Plus on t -)3-O b \applications\forms - applications on line\revision submittal Created: 8 -13 -2004 Revised: CITY OF TUKWILA APR 2 3 2006 " EBMrfi CENTER License Information License PACIFMS034B7 Licensee Name PACIFIC MECHANICAL SYSTEMS INC Licensee Type CONSTRUCTION CONTRACTOR UBI 601764457 Ind. Ins. Account Id #4 Business Type CORPORATION Address 1 2100 196TH ST SW #123 Address 2 City LYNNWOOD County SNOHOMISH State WA Zip 98036 Phone 4257712495 Status ACTIVE Specialty 1 HTGNENT /AIR CONDITIONING Specialty 2 UNUSED Effective Date 1/27/1997 Expiration Date 2/10/2010 Suspend Date Separation Date Parent Company Previous License GREENHI077KO Next License Associated License Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date #4 CBIC SA6688 01/10/2002 Until Cancelled $6,000.00 12/20/2001 #3 CBIC SA6688 01/10/1998 01/10/2002 $4,000.00 #2 CBIC SA6688 01/10/1997 01/10/1998 $4,000.00 Business Owner Information Name Role Effective Date Expiration Date GREEN, MICHAEL D 01/01/1980 Look Up a Contractor, Electric or Plumber License Detail Washington State Department of Labor and Industries General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. 0 Page 1 of 2 https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= PACIFMS034B7 05/15/2008 V ECHA n SCALE: 1/4" = 1' -0" \ICAL FL -R PLA\ 3 20O CFM 24 0 HVAC PLAN NOTES: 0 INSTALL NEW EXHAUST FAN. REFER TO SCHEDULE ON SHEET M -600 & DETAIL 6/M -400 FOR MORE INFORMATION. 0 INSTALL NEW THERMOSTAT AS SHOWN AT 48" AFF. BOX AND CONDUCE BY ELECTRICAL. C INSTALL NEW ROOF TOP UNIT ON EXISTING 10 TON ROOF CURB. THE NEW ROOF TOP UNIT CARRIER 48TMD012 IS THE DIRECT REPLACEMENT MODEL OF THE EXISTING CARRIER 48TJDO12 UNIT. THE WEIGHT OF THESE UNITS ARE THE SAME. NOTIFY ENGINEER OF ANY DISCREPANCIES. i 4 INSTALL NEW DIFFUSER. BORDER TO MATCH CEILING TYPE. REFER TO DIFFUSER SCHEDULE ON SHEET M -600. 0 INSTALL NEW RETURN REGISTER. BORDER TO MATCH CEILING TYPE. REFER TO DIFFUSER SCHEDULE ON SHEET M -600. 0 RUN R -410 REFRIGERANT LINES FROM FAN COIL UNITS UNDER ROOF TO CONDENSING UNIT ON ROOF. SEE MECHANICAL SCHEDULE ON SHEET M -600 FOR LINE SIZES. 0 ROUTE 3/4" CONDENSATE LINE ABOVE CEILING TO THE TAIL PIECE OF THE LAVATORY. SEE DETAIL 8/M -400. 0 FAN COIL UNIT LOCATED IN CEILING SPACE. 0 REFRIGERANT LINES UP THRU ROOF TO CONDENSING UNIT. SEE DETAIL 1/M -400. GANG 10 8 "0 OUTSIDE AIR DUCT UP THROUGH ROOF W/ ROOF CAP. PROVIDE INSECT SCREEN AT TERMINATION, 11 PROVIDE 1 -1/4" GAS PIPE CONNECTION TO UNIT. CONNECT TO EXISTING MAIN GAS PIPING ON ROOF. VERIFY THAT GAS SERVICE IS OPERATIONAL. NOTIFY ENGINEER OF ANY DISCREPANCIES. 12 UPON ACTIVATION OF THE SMOKE DETECTOR, THE UNIT SHALL AUTOMATICALLY SHUT DOWN AND AN ALARM SHALL BE SENT TO THE FIRE ALARM SYSTEM. FILE COPY Permit No. 0 Mechanical IYElectrical V Iumbing Was Piping City of Tukwila ! - :;U LDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED JUL 2 8 2008 Fj C Of Tukwila g y Date: g ,C! 0 City of Tukwila BUILDING DIVISION Plar review approval Is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt o+ approved F Id Copy and conditi9ns is acknowledged: • REVISIONS e No changes shall ba to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fee ,RATE PERMIT r o iQU!RED FOR: RECEIVED CITY OF TUKWILA JUL 18 2008 PERMIT CENTER REV1SLONNOI I . at &t WIRELESS - 16425 SOUTHCENTER PARKWAY TUKWILA, WA TOTAL FLOOR AREA -4368 S.F. OUTSIDE AIR PROVIDED - RTU -1: SALES FLOOR FC -1: MANAGER'S OFFICE OPEN OFFICE INVENTORY RESTROOMS OUTSIDE AIR SCHEDULE MINIMUM OA 0.20 CFM /S.F. 20 CFM /PERSON 50 CFM /TOILET CALCULATION 3712 S.F. x 0.20 CFM /S.F.= 743 20 CFM /PERSON x 3 PERSON= 60 50 CFM /TOILET x 2 TOILETS= 100 TOTAL: 750 CFM 75 CFM 100 CFM 925 CFM TABLE IS BASED FROM 2006 WASHINGTON STATE VENTILATION AND INDOOR AIR QUALITY CODE. MO:1OVr COPYRIGHT 10 2008 CARTER & BURGESS. INC. at &t CarternBurgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 EXPIRES AUGUST 1, 2008 ISSUES /REVISIONS 07 -15 -08 TENANT CHANGES 1 03 -29 -08 TENANT CHANGES - 03 -19 -08 ISSUE FOR PERMIT NO. DATE DESCRIPTION 16425 Southcenter Parkway TUKWILA, WA DRAWN BY: KL PROJECT NUMBER: SCALE: NORTH DESIGNED BY: KL CHECKED BY: APPROVED BY: MV 441805.011.028.0001 1/4 " =1' -0" MECHANICAL FLOOR PLAN PLUvBI\G FLT =R PLA SCALE: 1/2" = 1' -0" SCALE: 1 /2" = 1' -0" SA ITARY PLUS BIB SCALE: 1/2" = 1' -0" G FLT =R PLA\ N ATER PLUMBING PLAN NOTES: 0 FIND THE SHORTEST DISTANCE TO ROUTE THE SANITARY PIPING TO THE NEAREST SANITARY MAIN. SLOPE AT A 1% MINIMUM. NOTIFY ENGINEER OF ANY DISCREPENCIES. CI CONNECT NEW VENT TO EXISTING VENT IN CEILING SPACE. FIELD TO VERIFY EXACT LOCATION. C3 INSTALL NEW INSTANTANEOUS WATER HEATER (IWH -1) BELOW LAVATORY FOR HOT WATER CONNECTION. SEE DETAIL 5/M -400. 4 PROVIDE NEW SHUT -OFF VALVE W /ACCESS. 0 SAWCUT FLOOR AND PATCH AS REQUIRED. CONNECT NEW DOMESTIC WATER TO EXISTING DOMESTIC WATER IN CEILING SPACE. FIELD TO VERIFY EXACT LOCATION. HOs CI Y T JLA JUL OF 1 8 UK 2008 PE RMIT CENTER Carterieurgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 DRAWN BY: KL COPYRIGHT 2008 CARTER & BURGESS, INC. EXPIRES AUGUST 1, 2008 PROJECT NUMBER: SCALE: at &t ISSUES /REVISIONS 03 -29 -08 TENANT CHANGES 03 -19 -08 ISSUE FOR PERMIT NO, DATE DESCRIPTION 16425 Southcenter Parkway T U KW I LA, WA NORTH DESIGNED BY: KL CHECKED BY: MV PLUMBING FLOOR PLANS APPROVED BY: 441805.011.028.0001 AS NOTED M -201 DIFFUSER SCHEDULE MARK NO. MANUFACTURER & MODEL NO. TYPE CFM RANGE MODULE SIZE (IN) NECK SIZE (IN) OPPOSE BLADE DAMPER MAX NC MAX PD MATERIAL MARK NO. - F.U. TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 0 -100 24X24 6 NO 25 0.1 STEEL 1/2" CD 1 - TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 101 -200 24X24 8 NO 25 0.1 STEEL 4" CD 3/4" - TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 201- 325 24X24 10 NO 25 0.1 STEEL L AVATORY CD 2" 1 -1/2" TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 326 -400 24X24 12 NO 25 0.1 STEEL CD MOP SINK FLORESTONE TriUS PCS ADJUSTABLE BLADE PERFORATED FACE 401 -550 24X24 14 NO 25 0.1 STEEL MODEL # 95 NEO ANGLE DROP FRONT TERRAllO MOP RECEPTOR. CD 1 C K__ : ) THUS PCS ADJUSTABLE BLADE PERFORATED FACE 551 -700 24X24 16 NO _ 25 0.1 STEEL 0.5 0.5 - -- TITUS PAR PERFORATED FACE 0 -160 24X24 6 NO 25 0.1 STEEL RG ALL FIXTURES TO BE SUPPLIED & INSTALLED BY PLUMBING CONTRACTOR. TITUS PAR PERFORATED FACE 161 -280 24X24 8 NO 25 0.1 STEEL RG W TITUS PAR PERFORATED FACE 281 -380 24X24 10 NO 25 0.1 STEEL RG 3 TITUS PERFORATED FACE 381 -530 24X24 12 NO 25 0.1 STEEL RG 4 TITUS PAR PERFORATED FACE 531 -640 24X24 14 NO 25 0.1 STEEL RG 5 TITUS PAR PERFORATED FACE 641 -720 24X24 16 NO 25 0.1 STEEL RG 6 TITUS PAR PERFORATED FACE 721 -1500 24X24 22X22 NO 25 0.1 STEEL RG 7 NOTES: PROVIDE ROUND TO SQUARE ADAPTOR AS NEEDED. PLUVIBING FIXTURE SCHEDULE ITEM DESCRIPTION MANUFACTURER W V CW HW QTY. W &V CW &HW REMARKS AND SPECIFICATIONS - F.U. TOTAL F.U. TOTAL TWIN CITY T100 INSTANTANEOUS WATER HEATER CHRONOMITE LABORATORIES, INC. - - 1/2" 1/2" 3 - - - - #M -20L, TANKLESS ELECTRIC WATER HEATER, FLOW ACTIVATED, STAINLESS STEEL HEATING COILS, ONE -4160 WATT, 208/1/60 VOLT, SINGLE PHASE, 20 AMP, 1/2" WATER CONNECTION, 6 "HX9 "WX2 -1/2 ", 80'F -105'F TEMPERATURE RANGE. IWH 1 TWIN CITY T100 RESTROOM WATER CLOSET KOHLER 4" 2" 3/4" - 2 4 8 2,5 5 #K -3465, 16 -1/2" HIGH ELONGATED RIM VITREOUS CHINA TWO -PIECE TOILET, COMPLETE WITH INGENIUM FLUSHING SYSTEM, BOWL: K -4278, TANK: K -4609, 2 -1/8" PASSAGEWAY, ULTRA -LOW CONSUMPTION TOILET, FLUSHES ON 1.6 GAL. OF WATER. MIL w 0 L AVATORY KOHLER 2" 1 -1/2" 1/2" 1/2" 2 1 2 1 2 #K -2005, VITREOUS CHINA WALL -HUNG LAVATORY WITH HANGER, DRILLED FOR CONCEALED ARM CARRIER WITH FAUCET HOLES ON 4" CENTERS, FRONT OVERFLOW; FAUCET: #501 - WFHDF, SINGLE HANDLE LAVATORY DECK FAUCET; METAL POP -UP DRAIN AND LIFT HOLE IN POLISHED CHROME. 1 -1/4" TAILPIECE. PROVIDE 3/8" WALL SUPPLIES WITH STOP AND 1 -1/4" OFFSET DRAIN, METAL GRID STRAINER, (FURNISH AND INSTALL "BROCAR" #C500R -B TRAP WRAP FOR PF -2H) BROCAR TEL: (800) 827 -1207 AillIL MOP SINK FLORESTONE 3" 2" 3/4" - 1 4 4 2.5 2.5 MODEL # 95 NEO ANGLE DROP FRONT TERRAllO MOP RECEPTOR. MS 1 DR HALSEY TAYLOR HACBFSBL -Q ADA „ 2 1 -1/2 1/2 - 1 0.5 0.5 0.5 0.5 BI -LEVEL WATER COOLER: SURFACE MOUNT ELECTRIC WATER COOLER, 8.0 GPH AT ALL 120 /1 / ADA 4.0REQUIREMONTSATTS ENTIRE INSTALLATION SHALL COMPLY WITH TEMP., DF 1 FIXTURE UNIT (F.U.) TOTALS 14.5 10.0 ALL FIXTURES TO BE SUPPLIED & INSTALLED BY PLUMBING CONTRACTOR. PIPING MATERIAL LEGEND DOMESTIC WATER SS, VENT AND STORM PIPING UNDERGROUND PIPING UNDERGROUND PIPING 2" AND SMALLER -SOFT DRAWN COPPER, TYPE K, NO JOINTS BELOW FLOOR 2 -1/2" AND LARGER -HARD DRAWN COPPER, TYPE K SERVICE WEIGHT CAST IRON PIPING, HUB AND SPIGOT TYPE ABOVE GROUND PIPING ABOVE GROUND PIPING 1/2" AND LARGER - HARD DRAWN COPPER, TYPE L 1 -1 /2" AND SMALLER - HARD DWV COPPER DRAINAGE TUBE 2" AND LARGER - SERVICE WEIGHT CAST IRON PIPING HUB AND SPIGOT TYPE, HUBLESS SERVICE WEIGHT CAST IRON, PVC PIPE, SCHEDULE 40, SOCKET TYPE DWV PATTERN (WHERE PERMITTED BY LOCAL JURISDICTION . EXHAUST FAN SCHEDULE MARK NO. MANUFACTURER & MODEL N0. SERVICE LOCATION TYPE CFM ESP (IN WG) QTY. DRIVE MOTOR OPER WEIGHT (LBS) REMARKS WATTS VOLTS /PH /HZ QUANTITY TWIN CITY T100 RESTROOM CEILING BATHROOM ROOM 100 0.1 1 DIRECT 87 120/1/60 25 �' ® W 2 TWIN CITY T100 RESTROOM CEILING BATHROOM ROOM 100 0.1 1 DIRECT 87 120/1/60 25 1 efil Alik © NOTES: INTERLOCK WITH LIGHT SWITCH. 0 FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR. PROVIDE BACKDRAFT DAMPER. 0 AIR- COOLED CONDENSING U \IT SCHEDULE MARK NO. MANUFACTURER & MODEL NO. LOCATION AMBIENT DRY BULB ('F) NOMINAL CAPACITY (TON) COMPRESSOR CONDENSER FAN UNIT ELECTRICAL REFRIG. LINE SIZE REFRIG. TYPE UNIT DIMENSIONS L x W x H (IN) OPER WEIGHT (LBS) REMARKS QUANTITY RLA ( LRA (EA) QUANTITY HP (EA) MOTOR RPM MCA (AMP) MOCP (AMP) VOLTS /PH /HZ GAS LINE LIQUID LINE CEILING CARRIER 25HCA324A ROOF 80 2 1 12.8 58.3 1 1/10 800 16.7 25 208/1/60 5/8 3/8 R -410 31X31X29 183 AL w NOTES: Q HEAT PUMP UNIT. FAN COIL UNIT SCHEDULE MARK NO. MANUFACTURER & MODEL NO. LOCATION MIN OSA CFM ESP (IN WC) MOTOR HP COOLING COIL ELECTRICAL UNIT UNIT DIMENSIONS L x W x H IN) 48X18X22 OPER WEIGHT (LBS) 117 REMARKS 00 TOTAL CAPACITY (MBH) SENSIBLE CAPACITY (MBH) EAT LAT VOLTS /PH /HZ 208/1/60 MCA (AMP) 26.1 MOCP (AMP) 30 DB ('F) 80 WB ('F) 64 DB ('F) 60 WB ('F) 55 Ali CARRIER FX4CNF024 CEILING 175 0.3 1/3 24 24 W NOTES: PROVIDE 3/4" CONDENSATE DRAIN CONNECTION TO UNIT. PROVIDE FACTORY INSTALLED 6.0KW SUPPLEMENTAL ELECTRIC HEATER MODEL# KFCEH0501NO5. 4J l2 PIPE SIZE GPM FT /SEC MAX FU 1/2" 2.3 2.9 3 3/4" 5.5 3.8 7 1" 12 4.5 16 1-1/4" 20 5.2 30 1-1/2" 30 6.0 54 2" 70 7.5 225 MARK NO. RTU\ 1 /) MANUFACTURER & MODEL NO. CARRIER 48TMD012 LOCATION ROOF SERVICE SALES NOMINAL CAPACITY (TONS) 10 REFRIG TYPE R -22 AMBIENT DRY BULB CF) 80 MIN OSA CFM 750 CFM 4000 NOTES: UNIT SHALL COMPLETE WITH INTERNAL VIBRATION ISOLATORS AND ECONOMIZER. PROVIDE SMOKE DETECTOR IN RETURN DUCT PER 2006 INTERNATIONAL MECHANICAL CODE. SMOKE DETECTOR SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. FACTORY INSTALLED PACKAGE UNIT WITH ONE POINT POWER CONNECTION. SUPPLY FAN ESP (IN WG) 0.8 FAN RPM 900 BHP 2.30 TOTAL CAPACITY (MBH) 119.3 SENSIBLE CAPACITY (MBH) 113.5 EER PACKAGED ROOF TOP UNIT SCHEDULE COOLING EAT DB WB (T) CF) DB ('F) LAT WB CF) MAX FACE VELOCITY (FPM) 10.1 80.0 64.0 60.6 56.0 500 INPUT CAPACITY (MBH) 120/180 NOTES: MAX VELOCITY IN WATER PIPE 8 FT /SEC. FOR COLD WATER. MAX VELOCITY IN WATER PIPE 5 FT /SEC. FOR HOT WATER. PLUMBING CONTRACTOR TO VERIFY AND COORDINATE EXACT STREET PRESSURE AND NOTIFY ENGINEER OF ANY DISCREPANCIES. PLUMBING CONTRACTOR TO PROVIDE A PRESSURE REDUCING VALVE (PRV) ON CUSTOMER SIDE OF WATER METER IF THE STREET PRESSURE EXCEEDS 80 PSI, PRV TO BE SET AT 60 PSI. THE FOLLOWING CHART IS USED TO SIZE THE TYPE L COPPER, COLD WATER PIPING IN ACCORDANCE WITH CPC APPENDIX A AT 4.0 P.S.I. / 100 FT. LOSS HEATING MAX. OUTPUT CAPACITY (MBH) 144 AFUE ( %) 80.0 0 PROVIDE BURGLAR BARS AT SUPPLY AND RETURN AIR DUCTS. ®5 PROVIDE MICRO METL #4682 -0202 POWER EXHAUST. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. EAT ( 41.0 LAT (" F) 73.9 QUANTITY COMPRESSOR 2 RLA 16.0 LRA 125.0 QUANTITY 2 CONDENSER FAN HP (EA) 1/4 MOTOR RPM 1100 FLA (EA) 1.4 MCA 49.4 UNIT MOCP 60 ELECTRICAL VOLTS /PH /HZ 208/3/60 EFF 30% FILTERS TYPE PLEATED UNIT DIMENSIONS L x W x H (IN) 88 X 58 X 50 OPER WEIGHT (LBS) 1110 REMARKS 00000 of it ED OK. C DE APPROVED 11.110Ala RECEIVED CITY OF TUKWILA JUL 18 2008 PERMIT CENTER DRAWN BY: KL COPYRIGHT 0 2008 CARTER & BURGESS. INC. at &t CarternBurgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 ISSUES /REVISIONS 07 -15 -08 TENANT CHANGES 1 03- 29--08 TENANT CHANGES 03 -19 -08 ISSUE FOR PERMIT NO. DATE DESCRIPTION 16425 Southcenter Parkway TUKWILA, WA DESIGNED BY: PROJECT NUMBER: SCALE: KL 9 CHECKED BY: APPROVED BY: MV 441805.011.028.0001 NONE MECHANICAL AND PLUMBING SCHEDULES M -600 coPIThoKr d zoo& CARTER & BURGESS, INC. atsit Carter:Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327-1601 I EXPIRES 03/15/10 I ISSUES /REVISIONS 03 - 19 - 08 ISSUE FOR PERMIT NO. DATE DESCRIPTION 16425 Southcenter Parkway TU KW I LA, WA DRAWN BY: KL PROJECT NUMBER: SCALE: ECEIVED MAR 2 8 2008 PERMIT CENTER DESIGNED BY: KL CHECKED BY: APPROVED BY: MV MV 441805.011.028.0001 NONE MECHANICAL AND PLUMBING LEGEND, SYMBOLS AND ABBREVIATIONS M -001 HVAC ABBREVIATIONS (ALL ABBREVIATIONS SHOWN ARE NOT NECESSARILY USED ON THE DRAWINGS) PLUMBING G E N E R A E NOTES: H VAC SYMBOLS (ALL SYMBOLS SHOWN ARE NOT NECESSARILY USED ON THE DRAWINGS) 1. THESE DOCUMENTS WERE PREPARED PER AVAILABLE AS -BUILT DOCUMENTS. CONTRACTOR SHALL TO BECOME FULLY FAMILIAR WITH THE SCOPE OF WORK AND REVIEW EXISTING CONDITIONS PRIOR 2. EXACT LOCATION OF PLUMBING FIXTURES SHALL BE DETERMINED FROM ARCHITECTURAL DRAWINGS. 3. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS (SIZE, LOCATION, PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE TO NOTIFY THE ARCHITECT /ENGINEER OF ANY DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS. 4. CONTRACTOR SHALL VERIFY IN FIELD, EXACT SEWER WASTE AND COLD WATER PIPE LOCATIONS, 5. CONTRACTOR SHALL VERIFY INVERT ELEVATIONS OF SEWER POINTS OF CONNECTION PRIOR TO THE INSTALLATION OF NEW WASTE SYSTEM. 6. CONTRACTOR SHALL VERIFY AND COORDINATE LOCATION OF ALL PLUMBING LINES WITH DUCT WORK ELECTRICAL SERVICES. 7. THE INSTALLATION OF ALL VALVES, UNIONS, THERMOMETERS, GAUGE, OR OTHER INDICATING OR EQUIPMENT, OR SPECIALTIES REQUIRING FREQUENT READING, REPAIRS, ADJUSTMENT, INSPECTION, OR REPLACEMENT SHALL BE CONVENIENTLY AND ACCESSIBLY LOCATED WITH REFERENCE TO THE BUILDING. 8. ALL VENTS THROUGH ROOF SHALL BE 10 " -0" FROM ALL A/C UNITS OR AIR INTAKES, ETC. 9. CONTRACTOR SHALL NOT CUT, NOTCH AND /OR BORE EXISTING JOIST, BEAMS AND /OR JOIST WITHOUT SEDURING WRITTEN APPROVAL FROM ARCHITECT. 10. CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT ALL CONNECTIONS WITH DISSIMILAR METALS. 11. CONTRACTOR SHALL ROUGH -IN ALL WASTES AND SUPPLIES TO SPECIAL EQUIPMENT ACCORDING MANUFACTURER'S SHOP DRAWINGS AND MAKE FINAL CONNECTIONS. ALL SUPPLIES SHALL BE VALVED. 12. SEISMIC RESTRAINTS SHALL BE REQUIRED ON SEVERAL PIECES OF EQUIPMENT WITHIN THIS PLUMBING PLAN AND ALL REQUIREMENTS SHALL BE OBTAINED FROM THE AUTHORITY HAVING JURISDICTION. 13. INSULATE ALL EXPOSED SUPPLY AND WASTE PIPING AT HANDICAPPED ACCESSIBLE SINKS. 14. REFER TO SHEET M -003 AND M -004 FOR ALL PLUMBING SPECIFICATIONS AND WORK REQUIREMENTS. 15. CONTRACTOR SHALL PERFORM ALL WORK IN A COMPLETE AND WORKMANLIKE WAY IN COMFOMANCE ALL CODES, AND MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR SHALL COORDINATE WITH ARCHITECTS, ELECTRICAL AND STRUCTURAL. ALL WORK TO BE PERFORMED TO PROVIDE A COMPLETE AND WORKING SYSTEM. gi. 16. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS, FEES, TESTING, ETC. CONTRACTOR' SHA 1 PRrth OVID YEAR WARRANTY GURANTEE FOR ALL WORK PERFORMED UNDER THIS CONTRACT. / (; D OP ��y �!�)� HVAC GENERAL NOTES: VISIT SITE TO BID. ETC.) AND RECORDING REMOVAL FINISHED FIRST TO FLOOR WITH ° ° 61\0 � . r t - $ Z�� .._. _ �� ti� ^ . DUCTWORK A F P P PUMP ABV ABOVE FA FIRE ALARM PC PUMPED CONDENSATE AC ACLU AIR CONDITIONING AIR COOLED CONDENSING UNIT FRCP FC FIRE ALARM CONTROL PANEL FAN COIL PD PRESSURE DROP ADJ ADJUSTABLE FCO FLOOR CLEANOUT PH PHASE AD ACCESS DOOR PIV POST INDICATOR VALVE FD FIRE DAMPER, FLOOR DRAIN PLBG PLUMBING AFF ABOVE FINISHED FLOOR FLA FULL LOAD AMPS AH FPI FPM FEET PER MINUTE FLOOR PNL PANEL AL AIR HANDLING ALUMINUM FLR FINS PER INCH POD POINT OF CONNECTION AMPS AMPERES POINT OF DISCONNECT POD AP ACCESS PANEL PRESS PRESSURE FS FLOW SWITCH, FLOOR SINK PRS PRESSURE REDUCING STATION APD AIR PRESSURE DROP FSD FIRE -SMOKE DAMPER APPROX APPROXIMATE PRV PRESSURE REDUCING VALVE FT FOOT, FEET ARCH ARCHITECT, ARCHITECTURAL 'F DEGREE FAHRENHEIT PS PRESSURE SWITCH AS AIR SEPARATOR PSF POUNDS PER SQUARE FOOT FV FACE VELOCITY ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING PSI POUNDS PER SQUARE INCH FW FEED WATER PSIA POUNDS PER SQUARE INCH ABSOLUTE AND AIR CONDITIONING ENGINEERS PSIG POUNDS PER SQUARE INCH GAUGE AUX AUXILIARY AV AIR VENT C PSV PRESSURE SAFETY VALVE G (NATURAL) GAS PV PLUG VALVE GA GAUGE PVC POLYVINYL CHLORIDE B GAL GALLON GALV GALVANIZED Q B BOILER CC GENERAL CONTRACTOR BDD BACKDRAFT DAMPER GPH GALLONS PER HOUR QTY QUANTITY BD BLOW -DOWN GPM GALLONS PER MINUTE BEL BELOW GV GRAVITY VENTILATOR R BFF BELOW FINISHED FLOOR RAD RADIANT BFV BUTTERFLY VALVE H RA RETURN AIR BFW BOILER FEED WATER RCP REFLECTED CEILING PLAN, BHP BRAKE HORSEPOWER H HEIGHT, HUMIDISTAT REINFORCED CONCRETE PIPE BKR BREAKER HB HOSE BIBB RD ROOF DRAIN BLDG HD HEATING COIL HEAD, HUB DRAIN RE: RECIRC REFERENCE, REFER BOTTOM OF DUCT HC BOD BUILDING RECIRCULATE BOP BOTTOM OF PIPE HHWR HEATING HOT WATER RETURN REFRIG REFRIGERANT BOS BOTTOM OF STEEL HHWS HEATING HOT WATER SUPPLY REINF REINFORCING BTU BRITISH THERMAL UNIT HHWP HEATING HOT WATER PUMP READ REQUIRED BV BALL VALVE HOA HAND - OFF - AUTOMATIC REV REVISION, REVISE HORIZ HORIZONTAL RG RETURN GRILLE HP HORSEPOWER, HEAT PUMP RH RELATIVE HUMIDITY C HS HUMIDITY SENSOR RHG REFRIGERANT HOT GAS HSTAT HUMIDISTAT RL REFRIGERANT LIQUID CA COMPRESSED AIR CAP CAPACITY HSTM HIGH PRESSURE STEAM RLA RUNNING LOAD AMPS CAV CONSTANT AIR VOLUME HTG HEATING RM ROOM CD COOLING COIL HTR HEATER RPM REVOLUTIONS PER MINUTE HVAC HEATING, VENTILATING AND AIR CONDITIONING RS REFRIGERANT SUCTION CD CEILING DIFFUSER HW HOT WATER RTU ROOF TOP UNIT CFH CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE HYD HYDRANT RWR RETURN WALL REGISTER CH CHILLER HX HEAT EXCHANGER CHWR CHILLED WATER RETURN HZ HERTZ S CHWS CHILLED WATER SUPPLY CHWP CHILLED WATER PUMP I SA SUPPLY AIR CI CAST IRON SAN SANITARY SEWER CIRC CIRCULATING ID INSIDE DIAMETER SD SMOKE DAMPER, STORM DRAIN CENTERLINE SEER SECTION INCH SECT IN INVERT ELEVATION CEILING IE CLG SEASONAL ENERGY EFFICIENCY RATIO CMU CONCRETE MASONRY UNIT IN WG INCHES WATER GAUGE SF SUPPLY FAN CO CLEANO T IN WC INCHES OF WATER COLUMN SQ FT SQUARE FEET COL COLUMN SHT SHEET COP COEFFICIENT OF PERFORMANCE J SIM SIMILAR COND CONDENSATE SHT MTL SHEET METAL CP CONDENSATE PUMP J -BOX JUNCTION BOX SMACNA SHEET METAL AND AIR CONDITIONING CPVC CHLORINATED POLYVINYL CHLORIDE CONTRACTORS NATIONAL ASSOCIATION CR CONDENSATE RECEIVER K SOV SHUT OFF VALVE CT COOLING TOWER SP STATIC PRESSURE CU CONDENSING UNIT KW KILOWATT SPEC SPECIFICATION CW COLD WATER KWH KILOWATT-HOUR SQ SQUARE CWS CONDENSER WATER SUPPLY SS STAINLESS STEEL, SERVICE SINK CWR CONDENSER WATER RETURN ST SOUND TRAP, STEAM TRAP CWP CONDENSER WATER PUMP L STM STEAM 'C DEGREES CELSIUS L LENGTH STD STANDARD LAT LEAVING AIR TEMPERATURE STL STEEL LB(S),# POUND(S) STRUC STRUCTURAL D LDB LEAVING DRY BULB SURF SURFACE LF SUSP SUSPEND D DEPTH LP LOW PRESSURE SV SUPPLY VALVE DB DRY BULB LRA LOCKED ROTOR AMPS SWR SUPPLY WALL REGISTER dB DECIBEL LSTM LOW PRESSURE STEAM (15 PSIG) SYM SYMBOL DDC DIRECT DIGITAL CONTROL LTG LIGHTING DESIG DESIGNATION LWB LEAVING WET BULB T DEG DEGREE LWT LEAVING WATER TEMPERATURE DIA DIAMETER TAU THERMAL AIR UNIT DIM DIMENSION TEMP TEMPERATURE DISC DISCONNECT M TDH TOTAL DYNAMIC HEAD X SUPPLY DIFFUSER, 4 -WAY SUPPLY DIFFUSER, 2 -WAY RETURN GRILLE EXHAUST GRILLE - r - j SUPPLY WALL REGISTER RETURN /EXHAUST WALL REGISTER _ H LINEAR SLOT F 12 "� d ROUND DUCTWORK. DIAMETER INDICATED IN INCHES 12 ( ( RECTANGULAR DUCTWORK. SIZE INDICATED IN 20X12 20X12 INCHES FIRST NUMBER IS SIDE SHOWN ( RECTANGULAR DUCTWORK. SIZE INDICATED IN 20X12 INCHES FIRST NUMBER IS SIDE SHOWN. DASHED } 20X12 LINES INDICATE ACOUSTICAL LINER. DIMENSIONS 1 INDICATES CLEAR INSIDE DIMENSIONS : 1:::;:z:: SUPPLY OR OUTSIDE AIR DUCT RETURN AIR DUCT RELIEF OR EXHAUST AIR DUCT =II SUPPLY OR OUTSIDE AIR DUCT UP 1/2 SUPPLY OR OUTSIDE AIR DUCT DOWN � I RETURN AIR DUCT UP � RETURN AIR DUCT DOWN C)--Z 1. PRIOR TO STARTING THE WORK, CONTRACTOR SHALL VERIFY THAT EXIST AIR CONDITIONING UNITS WORK PROPERLY AND CAN DELIVER THE CFM SPECIFIED. SUBMIT TO ENGINEER FOR REVIEW. 2, COORDINATE LOCATIONS OF DIFFUSERS AND GRILLES WITH SUSPENDED CEILING AND LIGHT FIXTURES. 3. WHERE DUCTS ARE USED FOR BOTH HEATING AND COOLING, THE MINIMUM INSULATION SHALL BE PER SECTION 15250 OF THE SPECIFICATION ON M -003. 4. TRANSVERSE JOINTS FOR ALL AIR SUPPLY DUCTS INSTALLED SHALL BE SEALED WITH APPROVED MASTIC. 5. VERIFY LOCATIONS AND SIZES OF EXISTING EQUIPMENT PRIOR TO COMMENCEMENT OF THE WORK. INFORM THE ENGINEER OF DISCREPANCIES. 6. COORDINATE THE LOCATION AND ELEVATION OF EQUIPMENT, DUCTWORK AND PIPING WITH OTHER TRADES, TO AVOID INTERFERENCES. 7. CONNECTION, DEMOLITION OR INTERRUPTION TO EXISTING SERVICES SHALL BE MINIMIZED AND COORDINATED WITH THE OWNER'S REPRESENTATIVE. 8. EQUIPMENT SHALL BE INSTALLED, DUCTED AND /OR PIPED IN ACCORDANCE WITH APPLICABLE CODES AND MANUFACTURERS RECOMMENDATIONS. 9. EQUIPMENT DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FASTENED IN PLACE. 10. ALL SHEET METAL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH SMACNA DESIGN AND CONSTRUCTION STANDARDS. 11. AT COMPLETION OF INSTALLLATION, BALANCE MECHANICAL UNITS AND DIFFUSERS /REGISTERS TO PROVIDE SUPPLY AIR CFM INDICATED ON PLANS. BALANCE UNIT TO PROVIDE OUTSIDE AIR AS STATED. SUBMIT 4 COPIES OF AIR BALANCE REPORT FOR APPROVAL. 12. THE LOCATION OF ACCESS PANELS FOR CONCEALED VALVES, FUSIBLE LINKS, DAMPER OPERATORS AND EQUIPMENT SHALL BE COORDINATED WITH THE ARCHITECTURAL TRADES. 13. THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR PATCHING AND REPAIRING WORK AREAS, AS A RESULT OF THEIR WORK. REPAIR TO MATCH EXISTING FINISHES. "AS- 'R RELIEF OR EXHAUST AIR DUCT UP Ii RELIEF OR EXHAUST AIR DUCT DOWN 11111 IN -LINE 90 DEGREE DROP (RISE) IN DUCT UP il UP INCLINED RISE IN DUCT C C DN DN DN --� INCLINED DROP IN DUCT t ELBOW WITH VANES ( ,„ FLEXIBLE DUCT FIRE DAMPER MOTORIZED DAMPER &AN .- IA S BDD BACKDRAFT DAMPER POINT OF DISCONNECT POINT OF CONNECTION - NEW TO EXISTING L _- ® TERMINAL AIR UNIT I ........ \ \ \ \ ITS ID HHW (AS APPLICABLE) \\ DEMOLITION TEMPERATURE SENSOR THERMOSTAT DUCT MOUNTED SMOKE DETECTOR DISCH DISCHARGE THRU THROUGH MAX MAXIMUM THRU DN DOWN MBH 1000 BTU PER HOUR TP TOTAL PRESSURE DP DIFFERENTIAL PRESSURE MCA MINIMUM CIRCUIT AMPACITY TS TEMPERATURE SENSOR DPS DIFFERENTIAL PRESSURE SWITCH MCC MOTOR CONTROL CENTER TSP TOTAL STATIC PRESSURE DS DOWNSPOUT MD MOTORIZED DAMPER T THERMOSTAT DWG(S) DRAWING(S) MECH MECHANICAL TYP TYPICAL DX DIRECT EXPANSION MFR MANUFACTURER MG MOTOR GENERATOR U E MH MANHOLE, METAL HALIDE U/C UNDER CUT MIN MINIMUM Pat REQUIRED El Mechanical L Electrical Plumbing ,� El Gas Piping ►�/ of Tukwila L II,I)ING DIVISION . 3I 3N 4. ACCURATE BUILT" DRAWINGS SHALL BE MAINTAINED DURING CONSTRUCTION AND SUBMITTED FOR APPROVAL UPON COMPLETION OF INSTALLATION. INDICATE DUCT AND EQUIPMENT SIZES AND LOCATIONS. 5. CONTRACTOR SHALL PERFORM ALL WORK IN A COMPLETE AND WORKMANLIKE WAY IN CONFORMANCE WITH ALL CODES, AND MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR SHALL COORDINATE WITH ARCHITECTS, ELECTRICAL AND STRUCTURAL. ALL WORK TO BE PERFORMED TO PROVIDE A COMPLETE AND WORKING SYSTEM. 6. CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS, FEES, TESTING, ETC. CONTRACTOR SHALL PROVIDE A ONE YEAR WARRANTY /GUARANTEE FOR ALL WORK PERFORMED UNDER THIS CONTRACT. 7. THIS TENANT IMPROVEMENT PROJECT HAS NOT MODIFIED THE THERMAL CHARACTERISTICS OF THE ENVELOPE. SD (E) EXISTING TO REMAIN MTD MOUNTED U/F UNDERFLOOR EER ENERGY EFFICIENCY RATIO MU MAKE -UP U/G UNDERGROUND EA EXHAUST AIR, EACH MUA MAKE -UP AIR UNIT U/S UNDERSLAB EAT ENTERING AIR TEMPERATURE MZ MULTI -ZONE UNIT UTR UP THROUGH ROOF ECC ECCENTRIC UL UNDERWRITERS LABORATORIES, INC. EDB ENTERING DRY BULB UON UNLESS OTHERWISE NOTED EF EXHAUST FAN N UPS UNINTERRUPTIBLE POWER SUPPLY EFF EFFICIENCY EG EXHAUST GRILLE N/A NOT APPLICABLE V EL ELEVATION NC NOISE CRITERIA, NORMALLY CLOSED V VOLT, VENT ELEC ELECTRICAL NEMA NATIONAL ELECTRICAL VAC VACUUM ENCL ENCLOSURE MANUFACTURER'S ASSOCIATION VAV VARIABLE AIR VOLUME EQUIP EQUIPMENT NIC NOT IN CONTRACT VD VOLUME DAMPER ESP EXTERNAL STATIC PRESSURE NO NORMALLY OPEN VEF VEHICLE EXHAUST FAN ET EXPANSION TANK NO. NUMBER EV EXHAUST VALVE NOM NOMINAL VERT VER CA EWB ENTERING WET BULB NTS NOT TO SCALE EWR EXHAUST WALL REGISTER VFD VARIABLE FREQUENCY DRIVE VTR VENT THROUGH ROOF EXH ENTERING EXHAUST WATER TEMPERATURE 0 EXT EXTERNAL W� EXP. JOINT EXPANSION JOINT OBD OPPOSED BLADE DAMPER W WATT, WIDTH OC ON CENTER W/ WITH OD OUTSIDE DIAMETER W/0 WITHOUT / OF OVERFLOW WB WET BULB OH OVERHEAD WC WATER COLUMN OPNG OPENING WPD WATER PRESSURE DROP OPER OPERATING WP WEATHER PROOF OSA OUTSIDE AIR WR WATER RISER OSHA U.S. DEPARTMENT OF LABOR OCCUPATIONAL WSHP WATER SOURCE HEAT PUMP SAFETY AND HEALTH ORGANIZATION WT WATERTIGHT, WEIGHT w � ® ohs of t hl ? ! s nnri ma - �� 18. CONTRACTOR SHALL VERIFY THE EXISTING ADJUST DAMPERS TO MATCH THE MECHANICAL 19. THESE DOCUMENTS WERE PREPARED BECOME FULLY FAMILIAR WITH THE 20. CONTRACTOR IS RESPONSIBLE FOR PRIOR TO THE START OF CONSTRUCTION. ARCHITECT /ENGINEER OF ANY DISCREPANCIES 21. CONT SH NOT CUT, NOTCH SE DURING WRITTEN APPROVAL FROM FE�JISIbNS qes shall be m cis to the scope pork w ithout rukwila Buil Division. I of vision will require a new plan submii ±el include acdditionai flan review fees. 1 --- . - BUILDING'S OUTSIDE AIR SHAFT INTO THE BUILDING. VENTILATION REQUIREMENTS IN THESE DRAWINGS. PER AVAILABLE AS -BUILT DOCUMENTS. CONTRACTOR SHALL VISIT SITE TO SCOPE OF WORK AND REVIEW EXISTING CONDITIONS PRIOR TO BID. FIELD VERIFICATION OF ALL EXISTING CONDITIONS (SIZE, LOCATION, ETC.) CONTRACTOR SHALL BE RESPONSIBLE TO NOTIFY THE BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS. AND /OR BORE EXISTING JOIST, BEAMS AND /OR JOIST WITHOUT FIRST ARCHITECT. F" Per it No. �.► ., �. Plat- review approval is �, subject to errors and o i s1 ,1l Approval of o��astrtttlor� documents do � not the violation of n adopted code or ordinance Rear, of approved FI,-)d Copy and rynditionf is k , g - � v DRAWING/DETAIL REFERENCE KEY REFER TO DRAWING /DETAIL NUMBER R E: 2/ M0.01 2 M0.01 SHEET NUMBER OF DRAWING /DETAIL \ 1 PLAN NOTE REFERENCE 0 M FURNISHED & INSTALLED BY MECHANICAL 0' FURNISHED BY MECHANICAL INSTALLED BY ELECTRICAL EM FURNISHED BY ELECTRICAL INSTALLED BY MECHANICAL Q 0 FURNISHED & INSTALLED BY ELECTRICAL Date: /. City of Tukwila BUILDING DIVISION MO 9 isoin- 08-41 coPIThoKr d zoo& CARTER & BURGESS, INC. atsit Carter:Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327-1601 I EXPIRES 03/15/10 I ISSUES /REVISIONS 03 - 19 - 08 ISSUE FOR PERMIT NO. DATE DESCRIPTION 16425 Southcenter Parkway TU KW I LA, WA DRAWN BY: KL PROJECT NUMBER: SCALE: ECEIVED MAR 2 8 2008 PERMIT CENTER DESIGNED BY: KL CHECKED BY: APPROVED BY: MV MV 441805.011.028.0001 NONE MECHANICAL AND PLUMBING LEGEND, SYMBOLS AND ABBREVIATIONS M -001 2006 iECC Report Date: 03/14/08 Data filename: R :'JOB \Cingular \Washington State116425 Southcenter, WAtcalcslmech.cck Section 1 Project Information Project Title: at &t Construction Site: 16425 Southeenter Parkway Tukwila, WA Section 2: General Information Building Location (for weather data): Climate Zone: Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 50 degrees F): Project Type: Section 3: Mechanical Systems List C tantity S_ystem Type & Descriptlo 1 HVAC System 1: Heating: Central Furnace, Gas / Cooling: Rooftop Package Unit, Capacity >=90 <135 kBtu /h, Air- Cooled Condenser / Single Zone 1 HVAC System 2: Split System Heat Pump, Cooling Capacity <54 kBtu/h, Air - Cooled Condenser / Single Zone Section 4: Requirements Checklist Requirements Specific To: HVAC System 1 i �rj 1. Newly purchased heating equipment meets the heating efficiency requirements 'EZ 2. Equipment minimum efficiency: Rooftop Package Unit: 10.1 EER 3. Cooling system provides a means to relieve excess outdoor air during economizer operation. 0 4, integrated air economizer required Requirements Specific To: HVAC System 2 : 7xf 1. Equipment minimum efficiency: Heat Pump: 6.8 HSPF, 10.0 SEER K 2. Heat pump thermostat required when supplemental electric resistance heat is installed Generic Requirements: Must be met by all systems to which the requirement is applicable: ' 1. Load calculations per 2001 ASHRAE Fundamentals 2. Plant equipment and system capacity no greater than needed to meet loads Exception: Standby equipment automatically off when primary system is operating - Exception: Multiple units controlled to sequence operation as a function of load t 3. Minimum one temperature control device per system (0 4. Minimum one humidity control device per installed humidification /dehumidification system 0 5. Thermostatic controls has 5 degrees F deadband Exception: Thermostats requiring manual changeover between heating and cooling Automatic Controls: Setback to 55 degrees F (heat) and 85 degrees F (cool); 7-day clock, 2 -hour occupant override, 10 - hour backup Tukwila, Washington 4c 5524 1686 Addition COMcheck Software Version 3.4.1 Mechanical Compliance Certificate Owner /Agent: Designer /Contractor: at &t Mobility, L.L.C. Jacobs Cater Burgess 1920 Customer Care Way 4 Hutton Centre Drive, Suite 800 Atwater, CA 95301 Santa Ana, CA 92707 Page 1 of 2 - Exception: Continuously operating zones - Exception: 2 kW demand or less, submit calculations 7. Outside -air source for ventilation; system capable of reducing OSA to required minimum 8. R -5 supply and return air duct insulation in unconditioned spaces R -8 supply and return air duct insulation outside the building R - insulation between ducts and the building exterior when ducts are part of a building assembly Exception: Ducts located within equipment Exception: Ducts with interior and exterior temperature difference not exceeding 15 degrees F. Exception: Continuously welded and locking -type longitudinal joints and seams on ducts operating at static pressures less than 2 inches w.g, pressure classification '9. Mechanical fasteners and sealants used to connect ducts and air distribution equipment K iO,Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181B tapes and mastics a 11.Hot water pipe insulation: 1 in. for pipes <=1.5 in. and 2 in. for pipes >1.5 in. Chilled water /refrigerant/brine pipe insulation: 1 in. for pipes < =1.5 in. and 1.5 in. for pipes >1.5 in. Steam pipe insulation: 1.5 in. for pipes < =1.5 in. and 3 in. for pipes >1.5 in, Exception: Piping within HVAC equipment Exception: Fluid temperatures between 55 and 105 degrees F Exception: Fluid not heated or cooled w1 - Exception: Runouts <4 ft in length 12,Operation and maintenance manual provided to building owner 13.Balancing devices provided in accordance with iMC 603.16 4.Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings Exception: Gravity dampers acceptable in buildings <3 stories Exception: Gravity dampers acceptable in systems with outside or exhaust air flow rates less than 300 cfm where dampers are interlocked with fan 0 15.Stair and elevator shaft vents are equipped with motorized dampers Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2006 IECC requirements in COMcheck Version 3.4.1 and to comply with the mandatory requirements In the Requirements Checklist. Na Xecka t taiLtette- me - Titl Signature 3 - lY.or Date Page 2 of 2 MOS' 03 BUI � Y. COPYRIGHT C 2008 CARTER & BURGESS, INC. Carter:Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 I EXPIRES 03/15/10 - 03 -19 -08 ISSUE FOR PERMIT NO. DATE ISSUES /REVISIONS '16425 Southcenter Parkway TU KW I LA, WA DRAWN BY: KL KL ECEMEP MR 2 8 2000 PERMIT CENTER DESIGNED BY: PROJECT NUMBER: SCALE: MECHANICAL COMPLIANCE FORMS at &t DESCRIPTION CHECKED BY: 3 -18 -08 APPROVED BY: MV MV 441805.011.028.0001 NONE M -002 SECTION 15010 GENERAL PROVISIONS PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. B. INCLUDE ALL LABOR, MATERIAL EQUIPMENT, TRANSPORTATION AND SERVICES TO FURNISH AND INSTALL COMPLETE MECHANICAL SYSTEMS AND ALTERATIONS AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED. THE WORK INCLUDES, BUT IS NOT LIMITED TO: 1. ALL PLUMBING WORK. 2. CONNECTION TO ALL UTILITIES. 3. HEATING AND AIR CONDITIONING. 4. INSULATION. 5. TEMPERATURE CONTROLS. 1.02 DESCRIPTION OF WORK A. EXTENT OF MECHANICAL WORK IS INDICATED ON DRAWINGS OR SPECIFIED IN DIVISION 15 SECTIONS OF THE SPECIFICATION. PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION AND SERVICE NECESSARY FOR A COMPLETE MECHANICAL SYSTEM. 1.03 QUALITY ASSURANCE A. ALL WORK ACCOMPLISHED UNDER THESE SPECIFICATIONS SHALL BE IN ACCORDANCE WITH REQUIREMENTS AND RECOMMENDATIONS OF THE LOCAL COUNTY, STATE, ACCEPTED MECHANICAL CODE, PLUMBING CODE, BUILDING CODE, ETC. UNDER THIS JURISDICTION B. IN ADDITION, FOLLOW ALL REQUIREMENTS PERTAINING TO THE MALL TENANT DESIGN MANUAL. 1.04 SUBMITTALS A. CONTRACTOR SHALL SUBMIT FOR REVIEW, SIX COPIES OF SHOP DRAWINGS, LITERATURE, AND EQUIPMENT LIST WITHIN 30 DAYS AFTER CONTRACT IS LET. FIRE PROTECTION DRAWINGS SHALL BE SUBMITTED PER DIVISION 1. B. SUBMIT PRIOR TO FABRICATION OR DELIVERY. C. SUBMIT COMPLETE, AT ONE TIME. PARTIAL SUBMITTALS WILL NOT BE CONSIDERED (EXCEPT AS NOTED ABOVE FOR CONTROLS AND DUCTWORK). D. CATALOG SHEETS SHALL BE COMPLETE AND THE ITEM OR MODEL TO BE USED SHALL BE CLEARLY MARKED. E. LIST SUBSTITUTE ITEMS SEPARATELY AND SO IDENTIFIED. PART 2.00 - PRODUCTS 2.01 MATERIALS A. ALL MATERIALS SHALL BE NEW AND OF MANUFACTURERS SPECIFIED HEREIN. THEY SHALL BE U.S. MADE (EXCEPT CANADIAN COPPER PIPE IS ACCEPTABLE) AND BEAR THE U.L., ETL OR CSA LABEL WHERE POSSIBLE. B. ALL EQUIPMENT SHALL BE REGULARLY CATALOGUED ITEMS OF THE MANUFACTURER AND IN USE FOR AT LEAST TWO YEARS AND SHALL BE SUPPLIED AS A COMPLETE UNIT IN ACCORDANCE WITH THE MANUFACTURER'S STANDARD SPECIFICATIONS AND ANY OPTIONAL ITEMS REQUIRED FOR PROPER INSTALLATION FOR THE EQUIPMENT UNLESS OTHERWISE NOTED. ALL EQUIPMENT AND MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND BEST TRADE PRACTICES. 2.02 SUBSTITUTIONS A. IN ALL CASES IN THIS SPECIFICATION WHERE AN ARTICLE IS FOLLOWED BY THE WORDS "OR APPROVED EQUAL ", THE ARCHITECT IS THE SOLE JUDGE OF THE QUALITY OF THE PROPOSED SUBSTITUTION, B. WHEN THE ARCHITECT /OWNER APPROVES A SUBSTITUTION, THE APPROVAL IS GIVEN WITH THE UNDERSTANDING THAT THE CONTRACTOR GUARANTEES THE ARTICLE OR MATERIAL SUBSTITUTED TO BE EQUAL TO OR BETTER IN EVERY RESPECT THAN THE ARTICLE OR MATERIAL SPECIFIED. THE CONTRACTOR SHALL ALSO ASSUME COMPLETE RESPONSIBILITY THAT THE ARTICLE OR MATERIAL WILL FIT THE JOB AS FAR AS SPACE, ACCESS AND SERVICING REQUIREMENTS. C. WHERE SEVERAL MATERIALS ARE SPECIFIED BY NAME FOR ONE USE, SELECT FOR USE ANY OF THOSE SO SPECIFIED. NOTE THAT EQUIPMENT LAYOUT IS BASED ON EQUIPMENT LISTED IN EQUIPMENT SCHEDULES. ANY OTHER EQUIPMENT USED MUST FIT IN AVAILABLE SPACE WITH ALL ACCESS AND SERVICING REQUIREMENTS MAINTAINED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK THAT THIS EQUIPMENT WILL MEET THESE REQUIREMENTS. D. WHENEVER ITEM OR CLASS OF MATERIAL IS SPECIFIED EXCLUSIVELY BY DETAIL SPECIFICATION, TRADE NAME, MANUFACTURER'S NAME OR BY CATALOG REFERENCE, USE ONLY SUCH ITEM, UNLESS WRITTEN APPROVAL IS GIVEN FOR SUBSTITUTION PRIOR TO BID. PART 3.00 - EXECUTION 3.01 DRAWINGS A. THE MECHANICAL DRAWINGS ARE GENERALLY DIAGRAMMATIC. COMPLETE DETAILS OF THE BUILDING WHICH AFFECT THE MECHANICAL INSTALLATION MAY NOT BE SHOWN. FOR ADDITIONAL DETAILS, THE CONTRACTOR IS REFERRED TO THE ARCHITECTURAL, STRUCTURAL, & ELECTRICAL DRAWINGS. 3.02 CODES, ORDINANCES AND PERMITS A. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES. TAKE OUT AND PAY FOR ALL INSPECTION FEES AND PERMITS. COMPLIANCE WITH CODES AND ORDINANCES SHALL BE AT THE CONTRACTOR'S EXPENSE. INCLUDE ALL CONNECTION AND PERMIT FEES IN BID. CONTRACTOR SHALL CONTACT L &I FOR INSPECTION OF ALL PRESSURE VESSELS IN A TIMELY MANNER BEFORE OCCUPANCY OF THE BUILDING. 3.04 TESTING A. WATER PIPING TEST ALL WATER PIPING SYSTEMS AT 125 PSI WATER PRESSURE AND HOLD FOR FOUR (4) HOURS. TEST IN SECTIONS BEFORE COVERING. TEST ENTIRE SYSTEM WHEN COMPLETELY INSTALLED. REPAIR ANY DEFECTS SHOWN BY TEST AND RETEST UNTIL ENTIRELY TIGHT. B. WASTE AND SEWER PIPING TEST ALL WASTE, SEWER AND VENT PIPING BY FILLING WITH WATER TO ROOF. HOLD FOR FOUR HOURS. TEST IN SECTIONS AS WORK PROGRESSES. REPAIR ANY DEFECTS SHOWN BY TEST AND RETEST UNTIL ENTIRELY TIGHT. C. VALVES TEST ALL VALVE BONNETS FOR TIGHTNESS. OPERATE ALL VALVES AT LEAST ONCE FROM CLOSED -TO- OPEN -TO- CLOSED WHILE UNDER PRESSURE. 3.05 CLEAN UP AND HOUSEKEEPING A. LEAVE ALL EQUIPMENT CLEAN AND READY FOR USE. B. REMOVE ALL LABELS, PAINT, PLASTER, ETC., FROM FIXTURES, EQUIPMENT AND PIPING. 3.06 OPERATING INSTRUCTIONS AND MAINTENANCE MANUALS A. SCOPE: 1. PROVIDE COMPLETE OPERATING AND MAINTENANCE INSTRUCTIONS AND 2. PROVIDE FOUR COPIES OF EACH BOUND INTO BOOKLET FORM. 3. DELIVER BOOKLETS TO THE ARCHITECT BEFORE FINAL INSPECTION. B. CONTENTS: EACH BOOKLET SHALL CONTAIN AT LEAST, BUT NOT LIMITED TO MAINTENANCE INSTRUCTIONS AND PARTS LIST AS FOLLOWS: 1. BASIC DESCRIPTION OF ALL SYSTEMS. 2. DESCRIPTION OF ROUTINE MAINTENANCE REQUIRED FOR EACH COMPONENT, 3. SUGGESTED FREQUENCY OF MAINTENANCE. 4. PARTS UST OF ALL EQUIPMENT. 5. OPERATING INSTRUCTIONS AND WARRANTIES ON ALL EQUIPMENT. 6. CONTROLS: AS -BUILT WIRING DIAGRAMS 7. MECHANICAL AS -BUILT DRAWINGS. 8. TROUBLE - SHOOTING LIST. 9. NAME, ADDRESS, PHONE NUMBER OF ALL CONTRACTORS AND SUPPLIERS 3.07 RECORD DRAWINGS A. PROVIDE THE ARCHITECT WITH RECORD DRAWINGS. RECORD DRAWINGS SHALL BE NEW, REPRODUCIBLE MYLARS AND SHALL SHOW THE MEASURED LOCATIONS OF ALL CONCERNED PORTIONS OF THE WORK AND SHALL SHOW ALL CHANGES THE CONTRACTOR HAS MADE. B. DRAWINGS MUST SHOW ALL ADDENDUM ITEMS, CHANGE ORDERS AND DEVIATIONS FROM THE PLANS. 3.08 INTERFERENCE A. THE MECHANICAL CONTRACTOR'S ATTENTION IS CALLED TO THE RESTRICTED SPACE FOR INSTALLATION OF MECHANICAL SYSTEMS. OFFSETS, REROUTING AND COORDINATION WILL BE REQUIRED TO FIT ALL ELEMENTS IN AVAILABLE SPACE AND THE MECHANICAL CONTRACTOR SHALL INCLUDE PROVISIONS FOR SUCH IN HIS BID. B. DUCTWORK AND PIPING SHALL BE ROUTED TO CLEAR LIGHT FIXTURES. COORDINATE ROUTING OF DUCTWORK AND PIPING WITH EACH OTHER SO GRADE OF PIPING CAN BE ACCOMPLISHED, AND TO FIT IN AVAILABLE SPACE. C. DUCTWORK SHALL BE INSTALLED AS REQUIRED TO CLEAR LIGHT FIXTURES AND TO FIT IN AVAILABLE SPACE. PROVIDE OFFSETS, V OR SLEEVES AS REQUIRED. MAINTAIN EQUIVALENT FREE AREA OF DUCTWORK. D. DUCTWORK TAKES PRECEDENCE OVER PIPING FOR AVAILABLE SPACE AND ROUTING. COORDINATE INSTALLATION BASED ON THIS PRECEDENCE. E. DUCTWORK AND /OR PIPING SHALL NOT BE RUN OVER ELECTRICAL PANELS. 3.09 WORKMANSHIP A. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH BEST TRADE PRACTICE. ANY SUBSTANDARD WORKMANSHIP SHALL BE REMOVED AND REPLACED AT NO EXTRA COST TO THE OWNER. END OF SECTION 15010 3.10 SEISMIC RESTRAINTS A. PROVIDE SEISMIC RESTRAINTS ON ALL PIPING AND DUCTWORK IN ACCORDANCE WITH THE "GUIDLINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEMS" AS PREPARED BY SMACNA AND THE PLUMBING PIPING INSTITUTE COUNCIL. B. PROVIDE SEISMIC RESTRAINTS ON ALL EQUIPMENT AND PROVIDE SLACK CABLE RESTRAINTS ON ALL SUSPENDED EQUIPMENT. COMPLETE RESTRAINT SYSTEM SHALL BE SELECTED, SHOP DRAWINGS SEALED BY AND CERTIFICATION PROVIDED BY A PROFESSIONAL STRUCTURAL ENGINEER. SECTION 15030 ELECTRICAL PROVISIONS TO MECHANICAL WORK PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 STANDARDS A. FOR ELECTRICAL EQUIPMENT AND PRODUCTS, EMPLOY WITH APPLICABLE NEMA STANDARDS, AND REFER TO NEMA STANDARDS FOR DEFINITIONS OF TERMINOLOGY HEREIN. COMPLY WITH NATIONAL ELECTRICAL CODE (NFPA 70) FOR WORKMANSHIP AND INSTALLATION REQUIREMENTS AND TO APPLICABLE SECTIONS OF DIVISION 16 OF THE SPECIFICATIONS. PART 2.00 - PRODUCTS A. MANUFACTURER 1. EXCEPT WHERE ITEM OF MECHANICAL EQUIPMENT (WHICH OTHERWISE COMPLIES WITH REQUIREMENTS) MUST BE INTEGRALLY EQUIPPED WITH MOTOR PRODUCED BY ANOTHER MANUFACTURER, PROVIDE MOTORS FOR MECHANICAL EQUIPMENT. MOTOR CHARACTERISTICS 1. EXCEPT WHERE MORE STRINGENT REQUIREMENTS ARE INDICATED, AND EXCEPT WHERE REQUIRED ITEM OF MECHANICAL EQUIPMENT CANNOT BE OBTAINED WITH FULLY COMPLYING MOTOR, COMPLY WITH THE FOLLOWING REQUIREMENTS FOR MOTORS OF MECHANICAL WORK: A. TEMPERATURE RATING: RATED FOR 40 DEG. C ENVIRONMENT WITH MAXIMUM 50 DEG. C TEMPERATURE RISE FOR CONTINUOUS DUTY AT FULL LOAD (CLASS A INSULATION). B. STARTING CAPABILITY: PROVIDE EACH MOTOR CAPABLE OF MAKING STARTS AS FREQUENTLY AS INDICATED BY AUTOMATIC CONTROL SYSTEM, AND NOT LESS THAN 5 STARTS /HOUR FOR MANUALLY CONTROLLED MOTORS. C. PHASES AND CURRENT CHARACTERISTICS: PROVIDE SQUIRREL -CAGE INDUCTION POLYPHASE MOTORS FOR 1 HP AND LARGER, AND PROVIDE CAPACITOR -START SINGLE -PHASE MOTORS FOR 3/4 HP AND SMALLER, EXCEPT 1/6 HP AND SMALLER MAY, AT EQUIPMENT MANUFACTURER'S OPTION, BE SPLIT -PHASE TYPE. COORDINATE CURRENT CHARACTERISTICS WITH POWER SPECIFIED IN DIVISION -16 SECTIONS, AND WITH INDIVIDUAL EQUIPMENT REQUIREMENTS SPECIFIED IN OTHER DIVISION -15 REQUIREMENTS. FOR 2 -SPEED MOTORS PROVIDE 2 SEPARATE WINDINGS ON POLYPHASE MOTORS. DO NOT PURCHASE MOTORS UNTIL POWER CHARACTERISTICS AVAILABLE AT LOCATIONS OF MOTORS HAVE BEEN CONFIRMED, AND UNTIL ROTATION DIRECTIONS HAVE BEEN CONFIRMED. D. SERVICE FACTOR: 1.15 FOR POLYPHASE MOTORS, AND 1.35 FOR SINGLE -PHASE MOTORS. C. MOTOR CONSTRUCTION 1. PROVIDE GENERAL PURPOSE, CONTINUOUS DUTY MOTORS, DESIGN "B ", EXCEPT " C " WHERE REQUIRED FOR HIGH STARTING TORQUE. A. FRAMES: NEMA NO, 48. B. BEARINGS: BALL OR ROLLER BEARINGS WITH INNER AND OUTER SHAFT SEALS, PERMANENTLY SEALED. WHERE BELT DRIVES AND OTHER DRIVES PRODUCE LATERAL OR AXIAL THRUST IN MOTOR, PROVIDE BEARINGS DESIGNED TO RESIST THRUST LOADING. REFER TO INDIVIDUAL SECTIONS OF DMSION-15 FOR FRACTIONAL -HP LIGHT -DUTY MOTORS WHERE SLEEVE -TYPE BEARINGS ARE PERMITTED. C. ENCLOSURE TYPE: EXCEPT AS OTHERWISE INDICATED PROVIDE OPEN DROP -PROOF MOTORS FOR INDOOR USE WHERE SATISFACTORILY HOUSED OR REMOTELY LOCATED DURING OPERATION, AND PROVIDE GUARDED DRIP PROOF MOTORS WHERE EXPOSED TO CONTACT BY EMPLOYEES OR BUILDING OCCUPANTS. PROVIDE WEATHER- PROTECTED TYPE I FOR OUTDOOR USE, TYPE II WHERE NOT HOUSED. REFER TO INDIVIDUAL SECTIONS OF DIVISION -15 FOR OTHER ENCLOSURE REQUIREMENTS. D. OVERLOAD PROTECTION: PROVIDE BUILT -IN THERMAL OVERLOAD PROTECTION FOR 120V MOTORS. E. EFFICIENCY: MOTORS ARE TO BE "ENERGY EFFICIENT" HAVING MINIMUM EFFICIENCY AS SCHEDULED IN ACCORDANCE WITH IEEE STANDARD 112, TEST METHOD B. F. PROVIDE MOTORS WITH MINIMUM 85% POWER FACTOR. WHERE LESS THAN 85 %, PROVIDE POWER FACTOR CORRECTION TO MINIMUM 90% PER ENERGY CODES. D. NAMEPLATE PROVIDE METAL NAMEPLATE ON EACH MOTOR, INDICATING FULL IDENTIFICATION OF MANUFACTURER, RATINGS, CHARACTERISTICS, CONSTRUCTION, SPECIAL FEATURES, AND SIMILAR INFORMATION. 2.02 STARTERS, ELECTRICAL DEVICES AND WIRING A. MOTOR STARTER MANUFACTURER 1. EXCEPT WHERE ITEM OF MECHANICAL EQUIPMENT MUST BE INTEGRALLY FURNISHED WITH MOTOR STARTER PRODUCED BY ANOTHER MANUFACTURER, PROVIDE MOTOR STARTERS FOR MECHANICAL EQUIPMENT MANUFACTURED BY ONE OF THE FOLLOWING: CUTLER - HAMMER, GE OR SQUARE D. B. MOTOR STARTER CHARACTERISTICS 1. COMPLY WITH NEMA STANDARDS AND NEC. PROVIDE TYPE I GENERAL PURPOSE ENCLOSURES WITH PAD LOCK EARS, AND WITH FRAMES AND SUPPORTS FOR MOUNTING ON WALL, FLOOR OR PANEL AS INDICATED. PROVIDE TYPE AND SIZE OF STARTER RECOMMENDED BY MOTOR MANUFACTURER AND EQUIPMENT MANUFACTURER FOR APPLICABLE PROTECTION AND START -UP CONDITION; REFER TO INDIVIDUAL EQUIPMENT SECTIONS FOR BASIC LOAD REQUIREMENTS. A. MANUAL SWITCHES: PROVIDE MANUAL SWITCH AND PILOT LIGHT FOR MOTORS 1/2 HP AND SMALLER, EXCEPT W HERE INTERLOCK OR AUTOMATIC OPERATION IS INDICATED. 1) OVERLOAD PROTECTION: PROVIDE MELTING ALLOY TYPE THERMAL OVERLOAD RELAYS. B. MAGNETIC STARTERS: PROVIDE MAGNETIC STARTERS FOR 3 PHASE MOTORS AND FOR SMALLER MOTORS WHERE INTERLOCK OR AUTOMATIC OPERATION IS INDICATED. INCLUDE THE FOLLOWING: 1) HAND -OFF -AUTO SWITCH AND PILOT LIGHTS, PROPERLY ARRANGED FOR SINGLE -SPEED OR MULTI -SPEED OPERATION AS INDICATED. 2) TRIP -FREE THERMAL OVERLOAD RELAYS, EACH PHASE. 3) INTERLOCKS, PNEUMATIC SWITCHES, AND SIMILAR DEVICES AS REQUIRED FOR COORDINATION WITH CONTROL REQUIREMENTS OF DMSION -15 CONTROLS SECTIONS. 4) BUILT -IN 120 -VOLT CONTROL CIRCUIT TRANSFORMER, FUSED FROM LINE SIDE, WHERE SERVICE EXCEEDS 240 VOLTS. WHEN A TRANSFORMER ISN'T USED THE CONTROL COIL SHALL BE FUSED, 5) EXTERNALLY OPERATED MANUAL RESET. 6) UNDERVOLTAGE RELEASE OR PROTECTION FOR EACH PHASE. PART 3.00 - EXECUTION 3.01 STARTERS A. PROVIDE STARTERS AND WIRING DEVICES FOR MOTORS. INSTALLATION BY DIVISION 16000. 3.02 MOTORS A. INSTALL MOTORS ON MOTOR MOUNTING SYSTEMS IN ACCORDANCE WITH MOTOR MANUFACTURER'S INSTRUCTIONS, SECURELY ANCHORED TO RESIST TORQUE, DRIVE THRUSTS, AND OTHER EXTERNAL FORCES INHERENT IN MECHANICAL WORK. SECURE SHEAVES AND OTHER DRIVE UNITS TO MOTOR SHAFTS WITH KEYS AND ALLEN SET SCREWS, EXCEPT MOTORS OF 1/3 HP AND LESS MAY BE SECURED WITH ALLEN SCREWS ON FLAT SURFACES OF SHAFT. UNLESS OTHERWISE INDICATED, SET MOTOR SHAFTS PARALLEL WITH MACHINE SHAFTS. 3.03 EQUIPMENT FABRICATION A. FABRICATE MECHANICAL EQUIPMENT FOR SECURE MOUNTING OF MOTORS AND OTHER ELECTRICAL ITEMS INCLUDING IN WORK. PROVIDE EITHER PERMANENT ALIGNMENT OF MOTORS WITH EQUIPMENT, OR ADJUSTABLE MOUNTINGS AS APPLICABLE FOR BELT DRIVES, GEAR DRIVES, SPECIAL COUPLINGS AND SIMILAR INDIRECT COUPLING OF EQUIPMENT. PROVIDE SAFE, SECURE, DURABLE, AND REMOVABLE GUARDS FOR MOTOR DRIVES, ARRANGED FOR LUBRICATION AND SIMILAR RUNNING MAINTENANCE WITHOUT REMOVAL OF GUARDS. END OF SECTION 15030 SECTION 15050 MECHANICAL IDENTIFICATION PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 STANDARDS A. ANSI COMPLIANCE COMPLY WITH ANSI A13.1 FOR LETTERING SIZE, COLORS, AND INSTALLED VIEWING ANGLES OF IDENTIFICATION DEVICES. PART 2.00 PRODUCTS 2.01 ENGRAVED PLASTIC - LAMINATE SIGNS A. PROVIDE ENGRAVED STOCK MELAMINE PLASTIC LAMINATE, COMPLYING WITH FS L- P -387, ENGRAVED WITH ENGRAVER'S STANDARD LETTER STYLE OF SIZES AND WORDING, BLACK WITH WHITE CORE (LETTER COLOR) EXCEPT AS OTHERWISE INDICATED, PUNCHED FOR MECHANICAL FASTENING EXCEPT WHERE ADHESIVE MOUNTING IS NECESSARY BECAUSE OF SUBSTRATE. PROVIDE 1/16 THICKNESS FOR UNITS UP TO 20 SQ. IN. OR 8" LENGTH; 1/8" FOR LARGER UNITS. PROVIDE FASTENING PER SELF - TAPPING STAINLESS STEEL SCREWS, EXCEPT CONTACT -TYPE PERMANENT ADHESIVE WHERE SCREWS CANNOT OR SHOULD NOT PENETRATE SUBSTRATE. PROVIDE FOR ALL EQUIPMENT. 2.02 ELECTRICAL EQUIPMENT A. ON ALL MECHANICAL EQUIPMENT THAT HAS POWER CONNECTORS, PROVIDE WITH PERMANENT MARKER, THE ELECTRICAL PANEL AND BREAKER NUMBER. MARK ON DISCONNECT. PART 3.00 - EXECUTION 3.01 MECHANICAL EQUIPMENT IDENTIFICATION A. MECHANICAL EQUIPMENT IDENTIFICATION INSTALL ENGRAVED PLASTIC LAMINATE SIGN ON OR NEAR EACH MAJOR ITEM OF MECHANICAL EQUIPMENT AND EACH OPERATING DEVICE. PROVIDE SIGNS FOR WATER HEATERS, FANS, HVAC UNITS AND OTHER OPERATIONAL DEVICES. END OF SECTION 15050 SECTION 15060 PIPE TUBE & FITTINGS PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 QUALITY ASSURANCE A. CERTIFY BRAZING PROCEDURES, BRAZERS, AND OPERATORS IN ACCORDANCE WITH ANSI 831.5. PART 2.00 - PRODUCTS 2.01 PIPING MATERIALS A. COPPER TUBE: ASTM 888. B. DWV COPPER TUBE: ASTM B 306. C. HUBLESS CAST -IRON SOIL PIPE: CISPI 301, WITH COUPLING ASSEMBLY, CISPI 310. D. STEEL PIPE: ASTM 106B, SCH 40, TREADED. 2.02 PIPE /TUBE FITTINGS A. CAST -IRON FLANGED FITTINGS: ANSI B16.1. B. CAST -IRON THREADED FITTINGS: ANSI B16.4. C. D. E. F. G. H. J. K. L, M. N. 0. MALLEABLE IRON THREADED UNIONS: ANSI B16.3; GALVANIZED PIPING SYSTEMS. MALLEABLE IRON THREADED UNIONS: ANSI B16.39. DUCTILE IRON PRESSURE PIPING FITTINGS: ANSI A21.10; AWWA C110 THREADED PIPE PLUGS: ANSI B16.14. CAST -IRON THREADED DRAINAGE FITTINGS: ANSI 816.12. PIPE NIPPLES: SAME PIPING MATERIAL AS CONNECTING PIPING; SCHEDULE 80 FOR 1 -1/2" UNTHREADED LENGTH WITH PIPE SIZES LESS THAN 1 -1/4 "; NO CLOSE NIPPLES ALLOWED. WROUGHT- COPPER SOLDER -JOINT FITTINGS: ANSI B16.22. CAST - COPPER SOLDER -JOINT DRAINAGE FITTINGS: ANSI 816.23. WROUGHT- COPPER SOLDER -JOINT DRAINAGE FITTINGS: ANSI B16.29. COPPER -TUBE UNIONS: ANSI 816.15. RUBBER - GASKET JOINTS: ANSI A21.11; AWWA C111. HUBLESS CAST -IRON SOIL PIPE FITTINGS: CISPI 301. HUB -AND SPIGOT CAST -IRON PIPE FITTINGS: ASTM A74. 2.03 MISCELLANEOUS PIPING MATERIALS /PRODUCTS A. SOLDERING MATERIALS: PROVIDE ONE OF THE FOLLOWING FOR EACH SERVICE: TIN -LEAD SOLDER: ASTM B32, GRADE 50A; FOR DRAINAGE PIPING OR TIN - ANTIMONY SOLDER: ASTM B32, GRADE 95TA FOR PRESSURE PIPING. B. PIPING CONNECTORS FOR DISSIMILAR NON- PRESSURE PIPE ELASTOMERIC ANNULAR RING INSERT, OR ELASTOMERIC FLEXIBLE COUPLING SECURED AT EACH END WITH STAINLESS STEEL CLAMPS, SIZED FOR EXACT FIT TO PIPE ENDS AND SUBJECT TO APPROVAL BY PLUMBING CODE. PART 3.00 - EXECUTION 3.01 GENERAL A. INSTALL PIPE, TUBE AND FITTINGS IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES WHICH WILL ACHIEVE PERMANENTLY LEAKPROOF PIPING SYSTEMS, CAPABLE OF PERFORMING EACH INDICATED SERVICE WITHOUT PIPING FAILURE. INSTALL EACH RUN WITH MINIMUM JCINTS AND COUPLINGS, BUT WITH ADEQUATE AND ACCESSIBLE UNIONS FOR DISASSEMBLY AND MAINTENANCE REPLACEMENT OF VALVES AND EQUIPMENT. REDUCE SIZES (WHERE INDICATED) BY USE OF REDUCING FITTINGS. ALIGN PIPING ACCURATELY AT CONNECTIONS, WITH 1/16" MISALIGNMENT TOLERANCE. 3.02 THREAD PIPE A. THREAD PIPE IN ACCORDANCE WITH ANSI B2.1. APPLY PIPE JOINT COMPOUND OR PIPE JOINT TAPE (TEFLON) ON MALE THREADS AND TIGHTEN JOINT TO LEAVE NOT MORE THAN 3 THREADS EXPOSED. 3.03 SOLDER JOINTS A. COMPLY WITH APPLICABLE PROVISIONS OF "COPPER TUBE HANDBOOK" BY CDA. 3.04 HUBLESS CAST -IRON JOINTS A. COMPLY WITH CISPI 310. 3.05 CLEANING, FLUSHING, AND INSPECTING A. GENERAL CLEAN EXTERIOR SURFACES OF INSTALLED PIPING SYSTEMS OF SUPERFLUOUS MATERIALS, AND PREPARE FOR APPLICATION OF SPECIFIED COATINGS (IF ANY). FLUSH OUT PIPING SYSTEMS WITH TEST MEDIA BEFORE PROCEEDING WITH REQUIRED TESTS. INSPECT EACH RUN OF EACH SYSTEM FOR COMPLETION OF JOINTS, SUPPORTS, AND ACCESSORY ITEMS. 1. INSPECT PRESSURE PIPING IN ACCORDANCE WITH PROCEDURES OF ANSI B31. 2. DISINFECT WATER MAINS AND WATER SERVICE PIPING IN ACCORDANCE WITH AWWA C601. 3.06 PIPING TESTS A. GENERAL PROVIDE EQUIPMENT FOR TESTING, TEST BEFORE INSULATION IS INSTALLED, REMOVE CONTROL DEVICES BEFORE TESTING. TEST EACH SECTION OF EACH PIPING SYSTEM INDEPENDENTLY. FILL EACH SECTION WITH WATER, AND TEST PER SECTION 15010 3.04. B. REPAIR PIPING SYSTEMS SECTION WHICH FAIL TEST, BY DISASSEMBLY AND RE- INSTALLATION, USING NEW MATERIALS TO OVERCOME LEAKAGE. DO NOT USE CHEMICALS, STOP -LEAK COMPOUNDS, MASTICS, OR OTHER TEMPORARY REPAIR METHODS. END OF SECTION 15060 SECTION 15100 VALVES PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. PART 2.00 - PRODUCTS 2.01 GENERAL A. PROVIDE FACTORY - FABRICATED VALVES RECOMMENDED BY MANUFACTURER FOR USE IN SERVICE INDICATED. PROVIDE VALVES OF TYPES AND PRESSURE RATINGS INDICATED; PROVIDE PROPER SELECTION AS DETERMINED BY INSTALLER TO COMPLY WITH INSTALLATION REQUIREMENTS. PROVIDE SIZES AS INDICATED, AND CONNECTIONS WHICH PROPERLY MATE WITH PIPE, TUBE, AND EQUIPMENT CONNECTIONS. WHERE MORE THAN ONE TYPE IS INDICATED, SELECTION IS INSTALLER'S OPTION. 2.02 BALL VALVES A. SELECT WITH PORT AREA EQUAL TO OR GREATER THAN CONNECTING PIPE AREA, INCLUDE SEAT RING DESIGNED TO HOLD SEALING MATERIAL. COMPLY WITH THE FOLLOWING STANDARDS: 1. BRONZE VALVES: MILWAUKEE "BUTTERBALL" OR EQUAL. 2. MANUFACTURER: CRANE, FAIRBANKS, MILWAUKEE OR NIBCO. 2.03 AUTOMATIC FLOW CONTROL VALVES PART 3.00 - EXECUTION 3.01 INSTALLATION A. INSTALL VALVES WHERE REQUIRED FOR PROPER OPERATION OF PIPING AND EQUIPMENT, INCLUDING VALVES IN BRANCH LINES WHERE NECESSARY TO ISOLATE SECTIONS OF PIPING. LOCATE VALVES SO AS TO BE ACCESSIBLE AND SO THAT SEPARATE SUPPORT CAN BE PROVIDED WHEN NECESSARY. B. INSTALL VALVES WITH STEMS POINTED UP, IN VERTICAL POSITION DOWNWARD FROM HORIZONTAL PLANE. END OF SECTION 15100 SECTION 15250 MECHANICAL INSULATION PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. AT A MINIMUM, INSULATION VALUES SHALL MEET THE REQUIREMENTS OF THE STATE ENERGY CODE, IF APPLICABLE. 1.02 FLAME /SMOKE RATINGS A. PROVIDE COMPOSITE MECHANICAL INSULATION (INSULATION, JACKETS, COVERINGS, SEALER, MASTICS AND ADHESIVES) WITH FLAME SPREAD INDEX AT 25 OR LESS, AND SMOKE DEVELOPED INDEX OF 50 OR LESS, AS TESTED BY ASTM E84 (NFPA 225) METHOD. PART 2.00 - PRODUCTS 2.01 MATERIALS A. GLASS FIBER PIPE INSULATION: ASTM C 1136 & 547 TYPE I. B. GLASS FIBER PIPE FITTING INSULATION: ASTM C 553. 2.02 MANUFACTURERS A. ONE OF THE FOLLOWING: 1. CERTAINTEED CORP., KNAUF FIBER GLASS, MANVILLE CORP., OWENS - CORNING FIBERGLASS CORP., IMCOA, NOMACO. 2.03 PIPING INSULATION A. OMIT INSULATION ON EXPOSED PLUMBING FIXTURE RUN -OUTS, (EXCEPT AT HANDICAPPED FIXTURES) FROM FACE OF WALL OR FLOOR TO FIXTURE; ON UNIONS, FLANGES, STRAINERS, FLEXIBLE CONNECTIONS, AND EXPANSION JOINTS. 1. INSULATE THE FOLLOWING COLD PIPING SYSTEMS: A) DOMESTIC COLD WATER AND CONDENSATE DRAIN PIPING. 2. INSULATE THE ABOVE COLD PIPING WITH THE FOLLOWING INSULATION: A) GLASS FIBER, 1" THICK ON ALL PIPE SIZE EXCEPT 1" DIAMETER AND LESS PIPE AND RUNOUTS UP TO 2" DIAMETER PIPE SIZE. 3. INSULATE THE FOLLOWING HOT PLUMBING PIPING SYSTEMS: A) DOMESTIC HOT WATER PIPING. 4. INSULATE THE ABOVE HOT PIPING WITH ONE OF THE FOLLOWING INSULATIONS: A) DOMESTIC FIBERGLASS: 1" THICK FOR UP TO 2" DIAMETER PIPE SIZE AND 1.5" THICK FOR 2 -1/2" DIAMETER AND LARGER PIPE SIZES. 5. PROVIDE ASJ (ALL SERVICE JACKET) ON ALL PIPING, EXCEPT PIPING EXPOSED TO THE OUTSIDE SHALL HAVE AN ALUMINUM JACKET. 6. ALL PLUMBING SYSTEMS SHALL MEET OR EXCEED THE INSULATION REQUIREMENTS OF THE APPLICABLE CALIFORNIA ENERGY CODE. WHERE INSULATION THICKNESS SPECIFIED ARE LARGER THAN THOSE LISTED IN THE ENERGY CODE, THE LARGER VALUES SHALL BE USED. 2.04 DUCT SYSTEM INSULATION _STEM NS _CATION A. INSULATE ALL SUPPLY & VENTILATION AIR DUCTWORK WITH FSK GLASS FIBER INSULATION HAVING A MINIMUM INSTALLED R -VALUE OF 7. B. DO NOT WRAP SOUNDLINED DUCT. PART 3.00 - EXECUTION 3.01 INSTALLATION - PIPE AND DUCT INSULATION A. EXAMINE AREAS AND CONDITIONS UNDER WHICH MECHANICAL INSULATION WILL BE INSTALLED. DO NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. B. INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES TO ENSURE THAT INSULATION SERVES ITS INTENDED PURPOSE. C. INSTALL INSULATION ON MECHANICAL SYSTEMS SUBSEQUENT TO TESTING AND ACCEPTANCE OF TESTS. D. CLEAN AND DRY MECHANICAL SURFACES PRIOR TO INSULATING. BUTT INSULATION JOINTS FIRMLY TOGETHER TO ENSURE COMPLETE AND TIGHT FIT OVER SURFACES TO BE COVERED. E. MAINTAIN INTEGRITY OF VAPOR BARRIER JACKETS ON MECHANICAL INSULATION, AND PROTECT TO PREVENT PUNCTURE OR OTHER DAMAGE. F. COVER VALVES, FITTINGS AND SIMILAR ITEMS IN EACH PIPING SYSTEM WITH EQUIVALENT THICKNESS AND COMPOSITION OR EFFICIENCY OF INSULATION AS APPLIED TO ADJOINING PIPE RUN. G. EXTEND MECHANICAL INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS AND SIMILAR PIPING PENETRATIONS, EXCEPT WHERE OTHERWISE INDICATED. H. INSTALL PROTECTIVE METAL SHIELDS AND INSULATED SADDLES TO PREVENT COMPRESSION OF INSULATION. I. REPAIR DAMAGED SECTIONS OF EXISTING MECHANICAL INSULATION, DAMAGED DURING THIS CONSTRUCTION PERIOD. USE INSULATION OF SAME THICKNESS AS EXISTING INSULATION, INSTALL NEW JACKET LAPPING AND SEALED OVER EXISTING. END OF SECTION 15250 SECTION 15401 WATER PIPING PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIV 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 COMPLIANCE A. COMPLY WITH APPLICABLE PLUMBING CODE STANDARDS PERTAINING TO MATERIALS, PRODUCTS, AND INSTALLATION OF DOMESTIC WATER PIPING. COMPLY WITH APPLICABLE PLUMBING AND MECHANICAL CODE STANDARDS PERTAINING TO MATERIALS, PRODUCTS, AND INSTALLATION OF PROCESS WATER PIPING (INCLUDING CONDENSER WATER). PART 2 - PRODUCTS 2.01 GENERAL A. BASIC PIPING MATERIALS AND PRODUCTS REQUIRED FOR WORK OF THIS SECTION, ARE SPECIFIED IN DIVISION -15 BASIC MATERIALS AND METHODS SECTIONS. PROVIDE PRODUCTS OF SIZES, RATINGS, AND CHARACTERISTICS INDICATED, WHICH COMPLY WITH MANUFACTURER'S STANDARD MATERIALS, DESIGN, AND CONSTRUCTION IN ACCORDANCE WITH PUBLISHED PRODUCT INFORMATION; PROVIDE PROPER QUANTITY OF PIPING AND EQUIPMENT AS REQUIRED FOR COMPLETE INSTALLATION. - lefieta 2.02 PIPE, TUBE AND FITTINGS A. DOMESTIC WATER PIPING 1. COPPER TUBE: TYPE L HARD -DRAWN TEMPER; WROUGHT- COPPER FITTINGS; SOLDERED JOINTS WITH 95 -5 2.03 PIPING SPECIALTIES A. PIPE ESCUTCHEONS INSTALL ON EACH PIPE PENETRATION EXPOSED TO VIEW IN OCCUPIED SPACES. B. DRIP PANS INSTALL UNDER PIPES PASSING OVER ELECTRICAL EQUIPMENT. " C. SUPPORTS, ANCHORS, AND SEALS PROVIDE FACTORY- FABRICATED HANGERS, SUPPORTS, AND ANCHOR COMPLYING WITH MSS SP -69. INSTALL COMPLYING WITH MSS SP -89. PART 3.00 - EXECUTION 3.01 PIPING RUNOUTS TO FIXTURES A. PROVIDE HOT AND COLD WATER PIPING RUNOUTS TO FIXTURES OF SIZES INDICATED, BUT IN NO CASE SMALLER THAN REQUIRED BY THE PLUMBING CODE. 3.02 MECHANICAL EQUIPMENT CONNECTION A. CONNECT HOT AND COLD WATER PIPING SYSTEM TO MECHANICAL EQUIPMENT AS INDICATED, AND COMPLY WITH EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS. PROVIDE SHUTOFF VALVE AND UNION FOR EACH CONNECTION, PROVIDE DRAIN VALVE ON DRAIN CONNECTION. END OF SECTION 15401 SECTION 15405 SOIL & WASTE PIPING SYSTEM PART 1.00 -- GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. CODE COI OLDER. P MA . 1.02 STANDARDS A. COMPLY WITH APPLICABLE PLUMBING CODE STANDARDS PERTAINING TO MATERIALS, PRODUCTS, AND INSTALLATION OF DRAINAGE PIPING AND EQUIPMENT. B. COMPLY WITH APPLICABLE PDI STANDARDS PERTAINING TO PRODUCES AND INSTALLATION OF SOIL AND WASTE PIPING SYSTEMS. PART 2.00 - PRODUCTS 2.01 GENERAL A. BASIC PIPING MATERIALS AND PRODUCTS REQUIRED FOR THIS SECTION, ARE SPECIFIED IN DIVISION 15 PIPE, TUBE & FITTINGS SECTION. PROVIDE PRODUCTS OF TYPES, SIZES, RATINGS, AND CHARACTERISTICS INDICATED, WHICH COMPLY WITH MANUFACTURER'S STANDARD MATERIALS, DESIGN, AND CONSTRUCTION IN ACCORDANCE WITH PUBLISHED PRODUCT INFORMATION; PROVIDE PROPER QUANTITY OF PIPING AND EQUIPMENT AS REQUIRED FOR COMPLETE INSTALLATION. 2.02 PIPES, TUBES AND FITTINGS GENERAL: PROVIDE ONE OF THE FOLLOWING SELECTIONS AT INSTALLER'S OPTION A. ABOVE GROUND BUILDING PIPING AND FITTINGS: 1. CAST -IRON HUB- AND - SPIGOT SOIL PIPE: SERVICE WEIGHT, CAST IRON HUB- AND - SPIGOT SOIL PIPE FITTINGS WITH COMPRESSION GASKETS. 2. CAST -IRON HUBLESS SOIL PIPE: SERVICE WEIGHT CAST -IRON HUBLESS SOIL PIPE FITTINGS; HUBLESS JOINTS. B. UNDERGROUND BUILDING DRAIN PIPING 1. CAST -IRON HUB - AND - SPIGOT SOIL PIPE FITTINGS, COMPRESSION GASKETS. 2. CAST -IRON HUBLESS SOIL PIPE: SERVICE WEIGHT; CAST -IRON HUBLESS SOIL PIPE FITTINGS; HUBLESS JOINTS. C. SUPPORTS, ANCHORS AND SEALS PROVIDE FACTORY- FABRICATED HANGERS, SUPPORTS AND ANCHORS COMPLYING WITH MSS SP -69. INSTALL, COMPLYING WITH MSS SP -89. D. DRAINAGE PIPING PRODUCTS 1. CLEANOUT PLUGS: CAST - BRONZE OR BRASS, THREADS COMPLYING WITH ANSI B2.1, COUNTERSUNK HEAD. INSTALL IN CLEANOUTS AS INDICATED AND AS REQUIRED BY THE PLUMBING CODE. E. FLOOR CLEANOUTS CAST -IRON BODY AND FRAME; ADJUSTABLE ROUND TOP AS FOLLOWS: 1. NICKEL - BRONZE TOP: PATTERN TO SUIT ADJACENT FLOOR FINISH. INSTALL IN OCCUPIED AREAS. 2. CAST -IRON TOP: PATTERN TO SUIT ADJACENT FLOOR FINISH. INSTALL IN UNOCCUPIED AREAS. F. WALL CLEANOUTS CAST -IRON BODY ADAPTABLE TO PIPE WITH CLEANOUT PLUG, STAINLESS STEEL ROUND COVER AND SCREW. G. DRAINAGE PIPING PRODUCTS MANUFACTURER JOSAM, SMITH, WADE OR ZURN, H. FLOOR DRAINS: AS SPECIFIED ON DRAWINGS. PROVIDE TRAP PRIMER CONNECTION. cm( r Cartereurgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 IPL1P age '. nn 03 -19 -08 ISSUE FOR PERMIT NO, DATE DESCRIPTION 16425 Southcenter Parkway TU KWI LA, WA DESIGNED BY: KL CHECKED BY: MV DRAWN BY: KL PROJECT NUMBER: SCALE: COPYRIGHT 2006 CARTER & BURGESS, INC, at &t EXPIRES 03/15/10 ISSUES /REVISIONS ECI IEP MAR 2 8 2008 PERMIT CENTh MECHANICAL AND PLUMBING SPECIFICATIONS APPROVED BY: MV 441805.011.028.0001 NONE M -003 PART 3,00 - EXECUTION 3.01 GENERAL A. EQUIPMENT CONNECTIONS PROVIDE SOIL AND WASTE PIPING RUNOUTS TO PLUMBING FIXTURES AND DRAINS, WITH APPROVED TRAP, OR SIZES INDICTED; BUT IN NO CASE SMALLER THAN REQUIRED BY THE LOCAL PLUMBING CODE. B. LOCATE PIPING RUNOUTS AS CLOSE AS POSSIBLE TO BOTTOM OF FLOOR SLAB SUPPORTING FIXTURES OR DRAINS. C. TEST SOIL AND WASTE PIPING SYSTEM IN ACCORDANCE WITH REQUIREMENTS OF LOCAL PLUMBING CODES. D. COORDINATE WITH SOIL AND WASTE PIPING AS NECESSARY TO INTERFACE FLOOR DRAINS WITH DRAINAGE PIPING SYSTEMS. E. INSTALL FLOOR DRAINS IN ACCORDANCE WITH WRITTEN MANUFACTURER'S INSTRUCTIONS, AT LOW POINTS OF SURFACE AREAS TO BE DRAINED, OR AS INDICATED. SET TOPS OF DRAINS FLUSH WITH FINISHED FLOOR. COORDINATE WITH ARCHITECTURAL DRAWINGS. F. INSTALL DRAIN FLASHING COLLAR OR FLANGE SO THAT NO LEAKAGE OCCURS BETWEEN DRAIN AND ADJOINING FLOORING. MAINTAIN INTEGRITY OF WATERPROOF MEMBRANES, WHERE PENETRATED. 3.02 SEWER LINES A. INSTALLATION INSTALL UNDERGROUND BUILDING DRAINS AS INDICATED AND IN ACCORDANCE WITH THE PLUMBING CODE. LAY UNDERGROUND BUILDING DRAINS BEGINNING AT LOW POINT OF SYSTEMS, TRUE TO GRADES AND ALIGNMENT INDICATED WITH UNBROKEN CONTINUITY OF INVERT. PLACE BELL ENDS OF PIPING FACING UPSTREAM. INSTALL REQUIRED GASKETS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS FOR USE OF LUBRICANTS, CEMENTS, AND OTHER SPECIAL INSTALLATION REQUIREMENTS. CLEAN INTERIOR OF PIPING OF DIRT AND OTHER SUPERFLUOUS MATERIAL AS WORK PROGRESSES. MAINTAIN SWAB OR DRAG IN UNE AND PULL PAST EACH JOINT AS IT IS COMPLETED. PLACE PLUGS IN ENDS OF UNCOMPLETED PIPING AT END OF DAY OR WHENEVER WORK STOPS. B. INSTALL SOIL AND VENT PIPING PITCHED TO DRAIN AT MINIMUM SLOPE OF 1/4" PER FOOT (2 %) AND 1/8" PER FOOT WHERE INDICATED ON DRAWINGS. VENT PIPING MAY BE INSTALLED HORIZONTAL IF REQUIRED TO AVOID CONFLICT WITH BUILDING ELEMENTS. C. PROVIDE TRAP PRIMER AT ALL FLOOR DRAINS. TRAP PRIMERS SHALL HAVE EASY MAINTENANCE ACCESS. D. CONDENSATE DRAIN PIPING SHALL BE PVC, UNLESS LANDLORD REQUIRES COPPER PER TENANT CRITERIA. 3.03 PIPING SPECIALITIES A. PIPE ESCUTCHEONS: INSTALL ON EACH PIPE PENETRATION EXPOSED TO VIEW IN OCCUPIED SPACES. B. DRIP PANS: INSTALL UNDER PIPES PASSING OVER ELECTRICAL EQUIPMENT. END OF SECTION 15405 SECTION 15410 PLUMBING PART 1.00 - GENERAL 1,01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 WORK INCLUDED A. PROVIDE AND INSTALL ALL PLUMBING FIXTURES AND EQUIPMENT SPECIFIED HEREIN AND INDICATED ON THE DRAWINGS. 1.03 SUBMITTALS A. SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA, ASSEMBLY -TYPE SHOP DRAWINGS, AND MAINTENANCE DATA, IN ACCORDANCE WITH SECTION 01300 IF SUBMITTING AS APPROVED EQUAL. PART 2.00 - PRODUCTS 2.01 PLUMBING FIXTURES A. PROVIDE ALL PLUMBING FIXTURES INDICATED AND SPECIFIED ON DRAWINGS. ALL FAUCETS AND DRINKING FOUNTAINS, ETC., SHALL BE LEAD FREE AS DEFINED BY THE SAFE DRINKING WATER ACT AMENDMENTS FO 1986 AND THE LEAD CONTAMINATION CONTROL ACT OF 1988. CONTAMINATION CONTROL ACT OF 1988. 2.02 ELECTRIC WATER HEATER A. PROVIDE ALL WATER HEATERS INDICATED AND SPECIFIED ON DRAWINGS. 2.03 WATER HAMMER ARRESTOR A. PROVIDE ALL WATER HAMMER ARRESTORS INDICATED AND SPECIFIED ON DRAWINGS. PART 3.00 - EXECUTION 3.01 FIXTURES A. FIXTURES SHALL BE INSTALLED WHERE SHOWN ON PLANS, COMPLETE WITH TRAPS, VALVES, STOPS AND ALL FITTINGS. ALL FIXTURES SHALL BE FIRMLY ANCHORED AGAINST MOVEMENTS. LOCATE IN CENTER OF AREA ALLOWED UNLESS NOTED OTHERWISE. FIXTURES SHALL BE INSTALLED COMPLETE WITH ALL FITTINGS AND NUMBERS SHALL INCLUDE THE FITTINGS AS IF THEY WERE COMPLETELY LISTED AND SPECIFIED WITH EACH FIXTURE. PROVIDE CAULKING BETWEEN WALL AND FIXTURE ON ALL WALL HUNG FIXTURES. USE RESILIENT (FLEXIBLE) PRODUCT SUCH AS GE SILILCONE BATHTUB SEALANT. PROVIDE SEALED WATER HAMMER ARRESTORS ON HW AND CW SUPPLY PIPES AT EACH FIXTURE OR BANK OF FIXTURES. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. B. SEE ARCHITECTURAL PLANS FOR MOUNTING HEIGHTS OF ALL FIXTURES NOT NOTED IN THIS SPECIFICATION. COMPLY WITH HANDICAPPED ACCESSIBILITY CODE REQUIREMENTS. C. TRAP PRIMERS SHALL BE EASILY ACCESSIBLE. PROVIDE ACCESS PANEL IN WALL. END OF SECTION 15410 SECTION 15820 AIR DISTRIBUTION EQUIPMENT PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 COMPLIANCE A. AMCA COMPUANCE: TEST AND RATE AIR DISTRIBUTION EQUIPMENT IN ACCORDANCE WITH AMCA STANDARDS, AND PROVIDE AMCA CERTIFIED RATINGS SEAL. B. UL COMPLIANCE: PROVIDE ELECTRICAL COMPONENTS OF AIR DISTRIBUTION EQUIPMENT WHICH HAVE BEEN LISTED AND LABELED BY UL 1.03 SUBMITTALS A. SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA OF APPROVED EQUALS (SUBMITTALS ARE NOT REQUIRED IF PRODUCT MATCHES SPECIFIED ITEMS ON DRAWINGS), ASSEMBLY - TYPE SHOP DRAWINGS, LADDER -TYPE WIRING DIAGRAMS DIFFERENTIATING BETWEEN PORTIONS OF WIRING THAT ARE FACTORY INSTALLED AND PORTIONS TO BE FIELD - INSTALLED, AND MAINTENANCE DATA. PART 2.00 - PRODUCTS 2.01 HVAC SYSTEMS A. PROVIDE EQUIPMENT AS SCHEDULED WITH ALL OPTIONS AS DESCRIBED ON THE MECHANICAL SCHEDULES ON THE MECHANICAL DRAWINGS. B. WHEREVER POSSIBLE, PROVIDE BELT DRIVEN EQUIPMENT AS SCHEDULED OR PROVIDED BY THE MANUFACTURER WITH ALL OPTIONS INCLUDED IN THE SCHEDULES OR REQUIRED TO MEET THE PERFORMANCES NOTED ON THE MECHANICAL DRAWINGS. PART 3.00 - EXECUTION 3.01 INSTALLATION A. UNITS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, INSTRUCTIONS AND DETAILS ON DRAWINGS. B. ALL EXHAUST FAN SYSTEMS TO HAVE BACKDRAFT OR MOTORIZED DAMPERS IN THE SYSTEM. C. PROVIDE FLEXIBLE DUCT CONNECTIONS TO ALL FANS. D. PROVIDE ROOF CURBS FOR ALL ROOF HOODS, ROOF MOUNTED EQUIPMENT AND DUCT PENETRATIONS THRU ROOF. E. PROVIDE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT. END OF SECTION 15820 SECTION 15840 DUCTWORK PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND CONDITIONS AND DIVISION 1 - GENERML REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 WORK INCLUDED A. INCLUDE ALL LABOR, MATERIALS, EQUIPMENT TRANSPORTATION AND SERVICES TO FURNISH AND INSTALL COMPLETE ALL DUCTWORK AND RELATED SYSTEMS SPECIFIED HEREIN AND INDICATED ON THE DRAWING. PART 2.00 - PRODUCTS 2.01 SHEETMETAL WORK A. FURNISH ALL DUCTWORK AS SHOWN ON PLANS. ALL DUCTWORK CONSTRUCTION SHALL COMPLY WITH SMACNA STANDARDS AND LOCAL MECHANICAL CODE STANDARDS, WHICHEVER IS MORE STRINGENT. DUCT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FOLLOWING PRESSURE VELOCITY CLASSIFICATIONS FOUND IN SMACNA HVAC DUCT CONSTRUCTION STANDARDS, FIRST EDITION (1985). 1. DUCTWORK BETWEEN VAV AIR HANDLING UNITS AND TERMINAL BOXES: MAXIMUM +6" W.G., 4,000 F.P.M., VARIABLE AIR VOLUME. 2. DUCTWORK DOWNSTREAM OF TERMINAL BOXES: +2"W.G., 2,500 F.P.M., VARIABLE AIR VOLUME. 3. EXHAUST DUCTWORK (ALL EXHAUST FAN SYSTEMS WHERE DESIGN FAN STATIC IS LISTED AT 1.0" W.G. OR ABOVE): +2" TO - 2"W.G., 2500 F.P.M., CONSTANT VOLUME. 4. RETURN, RELIEF OR EXHAUST DUCTWORK WHERE FAN DESIGN STATIC IS LISTED BELOW 1.0"W.G.: +1" TO -1" W.G., 2,500 F.P.M., CONSTANT VOLUME. 5. SUPPLY DUCTS NOT LISTED ABOVE; +2" TO -2" W.G., 2,500 F.P.M., CONSTANT VOLUME. 6. TRANSFER DUCTS; +0.5" TO -0.5" W.G., 2,000 F.P.M., CONSTANT VOLUME. B. PRIOR TO ANY FABRICATING OF SHEET METAL WORK, THE MECHANICAL CONTRACTOR SHALL CAREFULLY MEASURE (AT THE SITE) AVAILABLE SPACE FOR SHEET METAL WORK. HE SHALL PREPARE LARGE SCALE SHOP DRAWINGS OF SHEET METAL WORK SHOWING ALL OTHER ELEMENTS OF THE BUILDING INCLUDING PIPING, STRUCTURAL AND ELECTRICAL SO ALL ARE COORDINATED AND FIT AVAILABLE SPACE. THE SHOP DRAWINGS WILL NOT GO THROUGH A FORMAL SUBMITTAL PROCESS, BUT 2 COPIES SHALL BE GIVEN TO THE ARCHITECT AS EVIDENCE OF THEIR BEING COMPLETED. C. LONGITUDINAL SEAMS IN DUCTS SHALL BE FLAT, DOUBLE LOCK TYPE. S AND DRIVE TYPE. D. TRANSVERSE SEAMS SHALL BE OF TYPE AND SPACING AS FOLLOWS: MAX. SIDE TYPE SPACING UP TO 30" DRIVE SLIP 7' -10" 31" TO 60" 1 -1/2" POCKET SLIP 7' -10" 61" AND UP 1 -1/2" POCKET SLIP 3'- 9" CROSS BREAK PANELS 18" AND OVER IN WIDTH. E. STANDING SEAMS ARE NOT ACCEPTABLE ON ANY DUCTWORK. F. JOINT LOCKING: THE SLIPJOINT IN POCKET SLIP SEAMS SHALL BE SCREWED USING NOT LESS THAN ONE SCREW PER FACE AND MAXIMUM SPACING OF 2' -0 ". G. DAMPERS PROVIDE DAMPERS AND QUADRANTS IN DUCTWORK AS NECESSARY FOR BALANCING. PROVIDE ONE DAMPER IN THE DUCT LEADING TO EACH SUPPLY OR RETURN /EXHAUST OPENING. DAMPERS SHALL BE LOCATED IN AN ACCESSIBLE LOCATION. DAMPERS SHALL BE FITTED WITH PARKER KALON DAMPER BEARINGS AND PARKER KALON NO. 195T QUADRANTS. DAMPERS SHALL BE OF 20 GA. G.I. SINGLE PLATE TYPE WITH EDGES HEMMED. FOR DAMPERS ABOVE "HARD" (GYPBOARD OR NON- ACCESSIBLE) CEILINGS, PROVIDE BOWDEN CABLE CONTROLLER WITH CONCEALED OPERATORS IN NEAREST RETURN GRILLE. SHOW LOCATION OF ALL REMOTE DAMPER OPERATORS & VOLUME DAMPERS ON RECORD DRAWINGS. INCLUDE DRAWING W /BALANCING REPORT. ADUSTABLE SPUTTER DAMPERS TO BE YOUNG REGULATOR HOB. H. ACCESS DOORS SHALL BE PROVIDED BY THIS CONTRACTOR IN FINISHED WALLS AND CEILINGS WHERE REQUIRED TO REACH MECHANICAL EQUIPMENT, MILCOR OR EQUAL. I. INSULATED LOW PRESSURE FLEXIBLE DUCT SHALL BE A FACTORY FABRICATED ASSEMBLY CONSISTING OF A ZINC - COATED SPRING STEEL HELIX, NON - PERFORATED INNER LINER, WRAPPED WITH A NOMINAL 1" THICK BY 1 LB /CU. FT. DENSITY FIBERGLASS INSULATION. THE ASSEMBLY SHALL BE SHEATHED IN A VAPOR BARRIER JACKET, FACTORY SEALED AT BOTH ENDS OF EACH SECTION, THUS ASSURING THE VAPOR RESISTANCE OF EACH SECTION AS WELL AS THE COMPLETED INSTALLATION. THE COMPOSITE ASSEMBLY INCLUDING INSULATION AND VAPOR BARRIER SHALL MEET THE CLASS 1 REQUIREMENTS OF NFPA BULLETIN NO. 90 -A AND BE LABELED BY UL WITH A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPED RATING OF 50 OR UNDER. FLEXIBLE DUCTS SHALL BE INSTALLED IN A FULLY EXTENDED LENGTH REQUIRED TO MAKE THE CONNECTION. WHERE HORIZONTAL SUPPORT IS REQUIRED, FLEXIBLE DUCT SHALL BE SUSPENDED ON 36" CENTERS WITH A MINIMUM 3/4" WIDE FLAT BANDING MATERIAL. ALL JOINTS AND CONNECTIONS SHALL BE MADE WITH 1/2" WIDE POSITIVE LOCKING STEEL STRAPS. INSULATED LOW PRESSURE FLEXIBLE DUCT SHALL BE GREENFLEX TYPE SL -1 OR EQUAL. PROVIDE SPIN -IN FITTINGS FOR CONNECTION TO TRUCK DUCT. MAXIMUM LENGTH OF FLEX DUCT IS 5 FEET WITH ONE 90 DEGREE BEND. J. OFFSETS PROVIDE OFFSETS AND TRANSITIONS AS REQUIRED TO FIT DUCTWORK INTO AVAILABLE SPACE. MAINTAIN EQUIVALENT FREE AREA OF DUCTWORK, AND TRANSITION SHALL BE SMOOTH (LESS THAN 15 DEGREES). 2.02 DUCT UNING A. JOHNS MANSVILLE 1 " THICK 1.5 LB /CU.FT. DENSITY (WHERE CALLED OUT ON DRAWINGS AND OR WHERE SPECIFIED) LINACOUSTIC R -4 MIN. OR 1.5" THICK 1.5 LB /CU.FT. DENSITY LINACOUSTIC R -5 MIN. WHERE "SOUNDLINED" "LINED" LINED " DUCT IS CALLED OUT ON DRAWINGS OR SPECIFIED. SERVICE WITH GLUE AND CUPS. SPACE CLIPS A MAXIMUM OF 18 "O.C. LINE ALL RECTANGULAR DUCTS (INCLUDES OUTSIDE AIR, SUPPLY, RETURN, EXHAUST AND TRANSFER DUCTS). THE NET FREE AREA OF THE DUCT DIMENSIONS GIVEN ON THE DRAWINGS SHALL BE MAINTAINED. INCREASE METAL DUCT DIMENSIONS AS NECESSARY TO COMPENSATE FOR ADDITION OF THE LINER. B. THE DUCT LINER SHALL BE APPLIED WITH 100% COVERAGE OF APPROVED FIRE RESISTANT ADHESIVE. LINER SHALL BE ADDITIONALLY SECURED WITH MECHANICAL FASTENERS ON MAXIMUM 15" CENTERS. FASTENERS SHALL START WITHIN 2 OF THE LEADING EDGE OF EACH SECTION AND WITHIN 3 OF THE LEADING EDGE OF ALL CROSS JOINTS WITHIN THE DUCT SECTION. ALL EXPOSED EDGES AND THE LEADING EDGE OF ALL CROSS JOINTS OF THE LINER SHALL BE HEAVILY COATED WITH AN APPROVED FIRE RESISTANT ADHESIVE. THE DUCT LINER SHALL BE CUT TO ASSURE SNUG CLOSING CORNER JOINTS, THE BLACK SURFACE OF THE LINER SHALL FACE THE AIR STREAM, TRANSVERSE JOINTS SHALL BE NEATLY BUTTED, AND ANY DAMAGED AREAS SHALL BE HEAVILY COATED WITH AN APPROVED FIRE RESISTANT ADHESIVE. 2.03 BACKDRAFT DAMPERS A. GENERAL PROVIDE DAMPERS AT ALL OUTSIDE AIR AND RELIEF DUCTS INTAKING OR EXHAUSTING TO ATMOSPHERE. B. TYPE 1. BACKDRAFT DAMPERS ON FAN SYSTEMS SHALL BE GALVANIZED STEEL OR ALUMINUM MULTIBLADE TYPE. BLADES SHALL HAVE FELT STRIPS RIVETED OR CRIMPED IN PLACE. BLADES SHALL BE JOINED TOGETHER WITH CONNECTION BARS. EACH BLADE SHALL BE RIGIDLY ATTACHED TO A PIVOT ROD. THE ROD SHALL EXTEND INTO OIL- IMPREGNATED BRONZE BUSHINGS, OR ANTIFRICTION BEARINGS, LOCATED IN THE FRAMES. RUSKIN CBD2 OR EQUAL. 2. FABRIC BACKDRAFT DAMPERS ON RELIEF DUCTS SHALL BE CONSTRUCTED TO INDUSTRY STANDARDS. C MANUFACTURER 2.04 LOUVERS A. FURNISH WONDER METAL MODEL 'SDL -4" DRAINABLE FORMED GALVANIZED STEEL STORM -PROOF MULLION NON - MECHANICAL FIXED WALL LOUVERS, OR AIR LOUVERS INC., THE AIROLITE CO., CONSTRUCTION SPECIALTIES INC., RUSKIN, OR INDUSTRIAL LOUVERS INC. EQUIVALENT, OR APPROVED; SIZES AND CONFIGURATIONS AS SHOWN, COMPLETE WITH FLAT BAR ORNAMENTAL SHAPES WERE SHOWN; REFER TO EXTERIOR BUILDING ELEVATIONS AND LOUVER SCHEDULE, SECTION 22 OF PROJECT MANUAL VOLUME II. PROVIDE WITH BIRD SCREEN AND COLOR AS DESIGNATED BY ARCHITECT. B. LOUVERS SHALL HAVE BEEN TESTED AND RATED TO HAVE MINIMUM 45% FREE OPENING BASED ON A 4X4 FOOT SIZE LOUVER. C. FRAME AND BLADES TO BE 16 GAUGE GALVANIZED STEEL. D. HEADS, SILLS AND JAMBS TO BE ONE PIECE STRUCTURAL MEMBERS AS DETAILED AND SECURELY ANCHOR TO WALL CONSTRUCTION AS APPROVED. E. SUDEABLE INTERLOCKED MULLIONS TO HAVE PROVISION TO EXPANSION AND CONTRACTION. F. FURNISH COMPLETE WITH MANUFACTURER'S STANDARD BIRD SCREEN MOUNTED IN FOLDED "U" TYPE FRAME AND ATTACH TO INSIDE FACE OF LOUVER FRAME WITH STEEL SCREWS AT ACTIVE (OPEN) PORTIONS OF LOUVERS AND WITH 20 GAUGE GALVANIZED STEEL FACED INSULATED `BLANK -OFF' PANELS AT INACTIVE LOUVER AREAS, COMPLETE WITH PERIMETER GASKETS AND FINISHED TO MATCH LOUVER. INSULATION CORE SHALL BE 1 INCH THICK EXTRUDED POLYSTRYENE HAVING A MINIMUM THERMAL RESISTANCE " R " VALUE OF 5.0. G. ALL LOUVERS TO BE FREE OF SCRATCHES AND BLEMISHES AND SHALL BE FINISH PAINTED WITH BAKED -ON ENAMEL POWDER COATING. 2.05 FIRE DAMPERS A. DYNAMIC FIRE DAMPERS SHALL BE CONSTRUCTED AND TESTED IN ACCORDANCE WITH UL SAFETY STANDARD 555. EACH DAMPER SHALL HAVE A 1 1/2 HOUR RATING WITH 165 DEGREE F FUSABLE LINK AND BE LABLED PER UL 555 STANDARD. B. DYNAMIC COMBINATION FIRE /SMOKE DAMPERS,RUSKIN FSD36, SHALL BE CONSTRUCTED OF MIN. 16 GAUGE GALVANIZED STEEL WITH STAINLESS STEEL BEARINGS, JAMB SEALS AND 450 DEG. F RATED BLADE EDGE SEAL DAMPERS SHALL BE 1 HR. RATED UNDER UL STANDARD 555 AND UL 555S. ALL DAMPERS USED UNDER THIS SPECIFICATION MUST BE UL TESTED & QUALIFIED IN THE COMPLETE RANGE OF SIZES USED. A SINGLE DAMPER TESTED WITHIN THIS RANGE IS NOT ACCEPTABLE. LEAKAGE RATING SHALL BE CLASS 11. INCLUDE A UL CLASSIFIED FIRE STAT. FIRESTAT SHALL ELECTRICALLY AND MECHANICALLY LOCK DAMPER CLOSED WHEN DUCT TEMPERATURE EXCEEDS 165 DEG. F. DAMPER MUST BE OPERABLE ABOVE 250 DEG. F, FIRESTAT SHALL BE EQUIPPED WITH TWO DAMPER POSITION INDICATORS FOR REMOTE INTERFACING WITH SMOKE DETECTORS & FIRE ALARM SYSTEM. ALSO PROVIDE INTEGRAL FLOW RATED DUCT SMOKE DETECTORS FOR DUCTED FIRE/ SMOKE DAMPERS AND NO -FLOW DUCT SMOKE DETECTORS FOR NON- DUCTED FIRE SMOKE DETECTORS. C. CEILING FIRE DAMPERS SHALL BE INSTALLED IN ALL CEILING REGISTERS AND GRILLES. IN THE RATED CEILING. FIRE DAMPERS CONSIST OF A RADIANT DAMPER IN THE DIFFUSER NECK AND THERMAL INSULATING BLANKET COVERING THE DIFFUSER PAN. THE ENTIRE SYSTEM SHALL BE UL RATED FOR FLOOR /CEILING AND ROOF /CEILING SYSTEM. PART 3.00 - EXECUTION 3.01 SHEET METAL WORK A. PARTITIONS FORMING PLENUMS OR CASINGS SHALL BE #18 GA., WITH GALVANIZED IRON ANGLES AND RIVETS FOR SEAM CONNECTION AND STIFFENING. ALL JOINTS AND STANDING SEAMS SHALL BE SEALED WITH APPROVED DUCT SEALANT. B. CORK GASKETS SHALL BE INSTALLED BETWEEN ALL CONNECTIONS OF SHEET METAL TO COIL AND FILTER CASINGS. C. SHEET METAL CONNECTIONS OF PLENUMS AND AIR CHAMBERS TO WALL AND FLOORS SHALL BE MADE WITH GALVANIZED ANGLES ANCHORED TO WALL OR FLOOR CONSTRUCTION WITH ANCHOR BOLTS WITH SHEET METAL BOLTED OR RIVETED TO ANGLES. MASTIC SEALER SHALL BE INSTALLED AT CONNECTION OF ANGLES TO SHEET METAL TO PROVIDE AIR -TIGHT JOINTS. PROVIDE ACCESS DOORS IN PLENUMS AND CHAMBERS WITH HANDLES OPERATED FROM BOTH SIDES, VENTLOCK NO. 205 OR APPROVED SUBSTITUTE. D. HINGED ACCESS DOORS IN SHEET METAL DUCT FOR ACCESS TO DAMPERS SHALL BE #18 GA., FRAMED WITH STEEL ANGLE AND HEMMED EDGES. E. CONNECT ALL GRILLES TO DUCTWORK. PAINT THE INSIDE OF THE DUCT A DULL BLACK AT ALL GRILLES. F. ALL AIR INLETS AND OUTLETS TO OUTSIDE SHALL HAVE BIRDSCREENS. BACKDRAFT DAMPER SHALL BE PROVIDED WHERE MOTORIZED DAMPER IS NOT INDICATED. G. ALL DUCTS THROUGH ROOF SHALL BE FLASHED WATER - TIGHT. SEE DETAIL ALL DUCTS THRU WALLS AND FLOORS /ROOFS SHALL HAVE ANGLE ENCLOSURES. H. CONNECTIONS OF ALL DUCTS TO ALL EQUIPMENT SHALL BE MADE WITH NEOPRENE. I. ELBOWS SHALL HAVE AN INSIDE RADIUS EQUAL TO 1/2 THE DUCT WIDTH. RECTANGULAR ELBOWS SHALL HAVE DUCT TURNS, T &B OR APPROVED EQUAL. USE RECTANGULAR ELBOWS WHEREVER A ROUND ELBOW CANNOT BE USED AND WHERE SHOWN ON DRAWINGS. SQUARE INSIDE ELBOW AND ROUND OUTSIDE ELBOW ARE NOT PERMITTED. DO NOT INSTALL TURNING VANES IN GREASE EXHAUST DUCTWORK. J. SUPPORTERS SHALL BE GALVANIZED STRAP OR ANGLE IRON HANGERS, ARRANGED TO PREVENT ANY BULGING, BENDING, OR SAGGING OF DUCTWORK. UNDER NO CONDITION SHALL HANGERS PIERCE THE DUCTS. VERTICAL DUCTS SHALL BE SUPPORTED AT EACH FLOOR WITH 18 GA. FORMED ANGLE. K. SEAL ALL DUCT JOINTS WITH APPROVED DUCT SEALANT. L HANGERS 1. PROVIDE HANGERS AND SEISMIC RESTRAINTS ON ALL DUCTWORK. 2. HANGERS FOR CIRCULAR DUCTS AND TUBING: A #18 GAUGE GALVANIZED SHEET STEEL STRAP SHALL BE WRAPPED AROUND THE DUCT AT EACH POINT OF SUPPORT. FOR CONCEALED WORK THIS STRAP SHALL BE BOLTED TO A STRAP HANGER OF SIMILAR GAUGE AND WIDTH; FOR EXPOSED WORK, BOLTED TO A STEEL ROD HANGER IN EACH CASE, ROD HANGER 1/4" SIZE FOR DUCTS UP TO 10" SIZE, 3/8" SIZE FOR LARGER DUCTS. WIDTH OF GALVANIZED STEEL STRAP WRAPPED AROUND THE DUCT SHALL NOT BE LESS THAN 1" IN ANY CASE; WHERE DUCTS ARE IN EXCESS OF 10" IN DIAMETER SHALL BE 2 ". 3. SPACING OF HANGERS SHALL NOT EXCEED 10' -0" ON CENTERS IN ANY CASE; WHERE DUCTS ARE INSULATED AND ARE IN EXCESS OF 10" IN SIZE, SPACING SHALL NOT EXCEED 8' -O ". M. A MAXIMUM OF 5 FEET LENGTH OF FLEX DUCT WITH ONE 90 DEGREE BEND WILL BE ALLOWED AT CONNECTIONS TO DIFFUSERS, WHERE FLEX DUCT IS SHOWN ON DRAWINGS. N. PROVIDE FIRE STOP AROUND DUCTWORK AT ALL DUCT PENETRATION OF RATED CONSTRUCTION. "FIRE STOP SEALANT" BY DOW CORNING. 0. BACKDRAFT DAMPERS ON RELIEF DUCTS SHALL BE METAL BLADE TYPE. P. PROVIDE DUCT TRANSITIONS AS REQUIRED TO SOUND TRAPS AND ALL EQUIPMENT CONNECTIONS. Q. PROVIDE DUCT LINING ON RECTANGULAR DUCTS WHERE INDICATED ON DRAWINGS (OUTSIDE AIR, SUPPLY, RETURN, EXHAUST AND TRANSFER AIR DUCTS). THE NET FREE AREA OF THE DUCT DIMENSION GIVEN ON THE DRAWINGS SHALL BE MAINTAINED. INCREASE METAL DUCT DIMENSIONS AS NECESSARY TO COMPENSATE FOR ADDITION OF THE LINER. R. ALL DUCTWORK, INCLUDING, BUT NOT LIMITED TO DUCTS, HANGERS, BRACKETS, FITTINGS AND JOINTS, SHALL BE INSTALLED IN A MANNER WHICH NEITHER REDUCES HEADROOM AND WALKWAY WIDTH NOR PROJECTS ANY SHARP EDGES INTO A CATWALK OR PASSAGE AREA. ANY DUCTWORK WHICH, IN THE OPINION OF THE ARCHITECT, PRESENTS A POSSIBLE HAZARD TO PEOPLE IN THE CATWALK AREA, SHALL BE CHANGED TO AN ACCEPTABLE AND SAFE MANNER. SUCH CHANGES MAY INCLUDE: MOVING THE EQUIPMENT, CHANGING ITS CONFIGURATION, AND /OR ADDING PROTECTIVE PADDING TO THE EQUIPMENT. S. INTAKE BACKDRAFT DAMPERS SHALL BE INSTALLED AT THE ENVELOPE OF THE BUILDING. T. INSTALL FIRE DAMPERS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. END OF SECTION 15840 SECTION 15870 OUTLETS AND INLETS PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 COMPLIANCES A. ADC COMPLIANCE TEST AND RATE REGISTERS, GRILLES, AND DIFFUSERS IN ACCORDANCE WITH ADC EQUIPMENT TEST CODE 1062R4, PROVIDE CERTIFIED RATINGS SEAL ON EACH UNIT. B. AMCA COMPLIANCE TEST AND RATE LOUVERS, DAMPERS, AND SHUTTERS IN ACCORDANCE WITH AMCA STANDARD 500, PROVIDE CERTIFIED RATINGS SEAL ON EACH UNIT. 1.03 SUBMITTALS A. SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA UNLESS AS SPECIFIED ON DRAWINGS, ASSEMBLY -TYPE SHOP DRAWINGS, AND MAINTENANCE DATA. PART 2.00 - PRODUCTS 2.01 CEILING AIR DIFFUSERS A. GENERAL EXCEPT AS OTHERWISE INDICATED, PROVIDE MANUFACTURER'S STANDARD CEILING AIR DIFFUSERS WITH FIRE DAMPERS; OF SIZE, SHAPE, CAPACITY AND TYPE INDICATED; CONSTRUCTED OF MATERIALS AND COMPONENTS INDICATED AND AS INDICATED ON DRAWINGS FOR COMPLETE INSTALLATION. B. CEILING COMPATIBILITY PROVIDE DIFFUSERS WITH BORDER STYLES THAT ARE COMPATIBLE WITH ADJACENT CEILING SYSTEMS, AND THAT ARE SPECIFICALLY MANUFACTURED TO FIT INTO CEILING MODULE WITH ACCURATE FIT AND ADEQUATE SUPPORT. REFER TO GENERAL CONSTRUCTION DRAWINGS AND SPECIFICATIONS FOR TYPES OF CEILING SYSTEMS WHICH WILL CONTAIN EACH TYPE OF CEILING AIR DIFFUSER. C. TYPES PROVIDE TITUS CEILING DIFFUSERS OF TYPE, CAPACITY, AND WITH ACCESSORIES AND FINISHES AS SCHEDULED. 2.02 REGISTERS AND GRILLES A. GENERAL EXCEPT AS OTHERWISE INDICATED, PROVIDE MANUFACTURER'S STANDARD WALL REGISTERS AND GRILLES WITH FIRE DAMPERS; OF SIZE, SHAPE, CAPACITY AND TYPE INDICATED; CONSTRUCTED OF MATERIALS AND COMPONENTS AS INDICATED ON DRAWINGS, AND AS REQUIRED FOR COMPLETE INSTALLATION. B. PERFORMANCE PROVIDE WALL REGISTERS AND GRILLES THAT HAVE, AS MINIMUM, TEMPERATURE AND VELOCITY TRAVERSES, THROW AND DROP, AND NOISE CRITERIA RATINGS FOR EACH SIZE DEVICE AS LISTED IN MANUFACTURER'S CURRENT DATA. C. COMPATIBILITY PROVIDE REGISTERS AND GRILLES WITH BORDER STYLES THAT ARE COMPATIBLE WITH ADJACENT WALL OR CEILING SYSTEMS, AND THAT ARE SPECIFICALLY MANUFACTURED TO FIT INTO CONSTRUCTION WITH ACCURATE FIT AND ADEQUATE SUPPORT. REFER TO GENERAL CONSTRUCTION DRAWINGS AND SPECIFICATIONS FOR TYPES OF CONSTRUCTION WHICH WILL CONTAIN EACH TYPE OF WALL REGISTER AND GRILLE. D. TYPES PROVIDE WALL REGISTERS AND GRILLES OF TYPE, CAPACITY, AND WITH ACCESSORIES AND FINISHES AS SCHEDULED. E. MANUFACTURERS: 1. TITUS PART 3.00 - EXECUTION 3.01 INSTALLATION A. GENERAL INSTALL OUTLETS AND INLETS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES TO INSURE THAT PRODUCTS SERVE INTENDED FUNCTIONS. REFER TO INSTALLATION DETAILS REFERENCED IN PARAGRAPH 2.03A ABOVE. B. COORDINATE WITH OTHER WORK, INCLUDING DUCTWORK AND DUCT ACCESSORIES, AS NECESSARY TO INTERFACE INSTALLATION OF OUTLETS AND INLETS WITH OTHER WORK. C. LOCATE CEILING AIR DIFFUSERS, REGISTERS, AND GRILLES, AS INDICATED ON GENERAL CONSTRUCTION "REFLECTED CEILING PLANS" AND "INTERIOR ELEVATIONS ". UNLESS OTHERWISE INDICATED, LOCATE UNITS IN CENTER OF ACOUSTICAL CEILING MODULES. END OF SECTION 15870 SECTION 15880 FILTERS PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 COMPLIANCE A. NFPA COMPLIANCE: INSTALL AIR TREATMENT EQUIPMENT IN ACCORDANCE WITH NFPA 90A AND 9011 B. UL COMPLIANCE: PROVIDE AIR FILTER UNITS WHICH HAVE BEEN LISTED AND LABELED BY UL. C. ASHRAE COMPLIANCE: TEST AIR FILTER UNITS IN ACCORDANCE WITH ARI 850. PART 2.00 - PRODUCTS 2.01 AIR FILTERS A. EXTENDED SURFACE FILTERS PROVIDE FACTORY - FABRICATED, DRY, EXTENDED SURFACE FILTERS; WHERE SHOWN, IN SIZES INDICATED. EQUIP WITH UL CLASS 1 FIBROUS MEDIA MATERAL FORMED INTO 2" DEEP V- SHAPED PLEATS AND HELD BY SELF- SUPPORTING FRAMES. FARR 30/30 OR EQUAL. 2.02 FILTER FRAMES A. PROVIDE METAL FILTER FRAMES AS DETAILED ON DRAWINGS. PART 3.00 - EXECUTION 3.01 INSTALLATION A. INSTALL AIR FILTERS AND HOLDING DEVICES OF TYPES INDICATED, AND WHERE SHOWN; IN ACCORDANCE WITH AIR FILTER MANUFACTURER'S WRITTEN INSTRUCTIONS AND WITH RECOGNIZED INDUSTRY PRACTICES; TO ENSURE THAT FILTERS COMPLY WITH REQUIREMENTS AND SERVE INTENDED PURPOSES. COMPLY WITH APPLICABLE PORTIONS OF NFPA 70, 90A AND B, PERTAINING TO INSTALLATION OF AIR FILTERS. PROVIDE AS SCHEDULED ON THE DRAWINGS. B. INSTALL FILTERS IN PROPER POSITION TO PREVENT PASSAGE OF UNFILTERED AIR. C. PROVIDE CLEAN SET OF FILTERS FOR ALL PIECES OF EQUIPMENT: 1. IMMEDIATELY PRIOR TO AIR BALANCING. 2. WHEN FINAL PUNCHLIST IS DONE. 3. IN ADDITION, FURNISH ONE COMPLETE EXTRA SET OF FILTERS TO OWNER WHEN FINAL PUNCHLIST IS DONE. THREE SETS OF FILTERS ARE REQUIRED (TWO INSTALLED, ONE TURNED OVER TO OWNER). LOCATE EXTRA SET IN MECHANICAL ROOMS WHERE FILTERS ARE LOCATED. D. FILTERS SHALL BE EASILY CHANGED FROM FRAMES AND SHALL SLIDE FREELY ON TRACKS WITHOUT BINDING. MAINTAIN CLEAR ACCESS IN FRONT OF FILTER ACCESS DOOR TO FULL WIDTH OF THE FILTER. E. FILTER SECTIONS SHALL HAVE HINGED ACCESS DOORS WITH LATCHES. END OF SECTION 15880 SECTION 15980 BALANCING PART 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 INDUSTRY STANDARDS A. ALL TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE PERFORMED BY AN INDEPENDENT CONTRACTOR WHO IS CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING AND BALANCING SHALL BE BY THE GENERAL CONTRACTOR. ALL BALANCING WORK SHALL BE PERFORMED WITH ACCORDANCE WITH LOCAL CODES AND THIS SECTION. 1.03 SUBMITTALS A. SUBMIT CERTIFIED TEST REPORTS SIGNED BY TEST AND BALANCE SUPERVISOR WHO PERFORMED TAB WORK. SUBMIT RECORD HVAC PLAN SHOWING ALL VOLUME DAMPER & REMOTE VOLUME DAMPER OPERATOR LOCATIONS & CONNECTION LINKAGE. B. THE BALANCE REPORT SHALL BE ON THE AABC NATIONAL STANDARD REPORT FORMS OR THE NEBB CERTIFIED REPORT FORMS AS PUBLISHED IN THEIR MOST CURRENT EDITIONS AND SHALL INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION. 1, AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF BALANCING CONTRACTOR. 2. COPY OF A CERTIFICATE OF CONFORMANCE WITH NATIONAL STANDARDS FOR THIS PROJECT. 3. INSTRUMENTATION LIST WITH LAST CALIBRATION DATES. 4. MAKE AND MODEL NUMBERS OF ALL HVAC EQUIPMENT. 5. AIR CFM AND STATIC PRESSURE READINGS (DISCHARGE AND SUCTION) AS MEASURED BY PITOT TUBE DUCT TRAVERSE AT THE UNIT. 6. MOTOR NAMEPLATE DATA WITH ACTUAL FIELD VOLTAGE AND AMPERAGE READINGS FOR EACH LEG. 7. MOTOR AND FAN R.P,M.'S, SHEAVE SIZES AND BELT SIZES. 8. OUTSIDE, RETURN, MIXED AND SUPPLY AIR TEMPERATURES AND VOLUMES SHALL BE MEASURED AT FULL COOLING WITH MINIMUM OUTSIDE AIR. RETURN /RELIEF /SMOKE EVACUATION AIRFLOW SHALL BE BALANCED AND MEASUREMENTS RECORDED BY PITOT DUCT TRAVERSE AT FULL ECONOMIZER AND POWER EXHAUST. 9. MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. 10. FINAL BALANCED AIR VOLUMES AT ALL OUTLETS (INCLUDING RETURNS WHERE DUCTED). 11. INDEXED PLAN WITH DIFFUSER AND RETURN LOCATIONS, ALSO INDICATE IF DIFFUSER IS 3 -WAY OR 2 -WAY. A. FIVE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED TO HOLD EVERYTHING PROJECT MANAGER FOR APPROVAL. PROVIDE ONE COPY OF APPROVED REPORT TO LANDLORD UPON COMPLETION OF CONSTRUCTION FOR THE PREMISE AS A REQUIREMENT TO OPEN FOR BUSINESS. 1.04 JOB CONDITIONS A. WORK WILL NOT PROCEED WITH TESTING, ADJUSTING AND BALANCING WORK UNTIL WORK HAS BEEN COMPLETED AND IS OPERABLE. ENSURE THAT THERE IS NO LATENT RESIDUAL WORK STILL TO BE COMPLETED. INFORM ARCHITECT IN WRITING WHEN PROJECT IS READY FOR ADJUSTING AND BALANCING. B. REFER TO LANDLORD TENANT CRITERIA MANUAL FOR SYSTEM BALANCING REQUIRED AS PART OF TENANT WORK. PART 2.00 - PRODUCTS 2.01 GENERAL A A E N A L SUB CONTRACTOR SHALL PROVIDE ALL MOTORS, SHEAVES, BELTS, LADDERS, ETC. AS REQUIRED FOR BALANC l B. BALANCING SUB CONTRACTOR SHALL BE HIRED BY THE DIVISION 0 AT THE DIVISION 0 EXPENSE. BALANCING CONTRAQA QR,SHALC BE AN INDEPENDENT CONTRACTOR, SEPARATE COMPANY FROM THE MECHANICAL SUB CONTRACTOR. COORDINATE WITH I NlDLORD LANDLORD MAY REQUIRE SPECIFIC CONTRACTOR FOR BALANCING. END OF SECTION 15980 SECTION 15990 CONTROLS 1. IN ADDITION TO THERMOSTATS AND REMOTE ROOM TEMPERATURE SENSORS, 2. SET RTU'S & AHU'S THERMOSTATS FOR 73 D.F. COOLING AND 70 D.F. HEATING INITIALLY. END OF SECTION 15990 SECTION 15995 COMMISSIONING: PART 1.00 GENERAL 1. PROVIDE MECHANICAL SYSTEMS COMMISSIONING IN ACCORDANCE WITH LOCAL ENERGY CODE AND THE REQUIREMENTS OF THISSPECIFICATION. ALL CONTROL SEQUENCES SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN ACCORDANCE WITH THE 2. HVAC UNITS: OPERATE SYSTEM IN COOLING MODE; RECORD OUTSIDE TEMPERATURE, MIXED AIR TEMPERATURE, SUPPLY AIR TEMPERATURE. WHERE ECONOMIZERS ARE SPECIFIED, DEMONSTRATE PROPER OPERATION OF CHANGEOVER FROM ECONOMIZER DAMPER OPERATION (FREE COOLING WITH OUTSIDE AIR) TO MECHANICAL COOLING (MINIMUM OUTSIDE AIR WITH COMPRESSOR COOLING). VERIFY THAT COOLING COIL SENSIBLE CAPACITY MATCHES THE TEMPERATURE DROP ON THE COOLING COIL VIA THE FORMULA COOLING CAPACITY (BTUH) = AIRFLOW (CFM) X (1.1) X DELTA T (MIXED AIR TEMP - SUPPLY AIR TEMP DEGREES F). OPERATE UNITS IN HEATING MODE: RECORD OUTSIDE AIR TEMPERATURE, MIXED AIR TEMPERATURE, SUPPLY AIR TEMPERATURE. VERIFY THAT HEATING COIL CAPACITY MATCHES THE TEMPERATURE RISE ON THE HEATING COIL VIA THE FORMULA HEATING CAPACITY (BTUH) AIRFLOW (CFM) X (1.1) X DELTA T (MIXED AIR TEMP - SUPPLY AIR TEMP DEGREES F). VERIFY THE OPERATION OF ANY CONTROL VALVES WHERE PRESENT (CHILLED WATER OR HEATING WATER VALVES). VERIFY THAT EACH UNIT OPERATES WITH THE CORRECT THERMOSTAT/ SENSOR. SET THERMOSTATS FOR 70 F HEATING SETPOINT AND 72 F COOLING SETPOINT. UNIT FANS SHALL RUN CONTINUOUSLY DURING OCCUPIED MODE AND CYCLE ON /OFF DURING UNOCCUPIED MODE. SETUP AND VERIFY HOURS ON OPERATION (TIME SCHEDULE) FOR OCCUPIED /UNOCCUPIED MODE AND HOLIDAY /WEEKEND SCHEDULING. 3. VERIFY SMOKE DETECTOR SHUTDOWN OF ANY FAN UNITS SCHEDULED FOR SMOKE DETECTOR SHUTDOWN. 4. VERIFY PROPER OPERATION OF ANY OTHER HVAC EQUIPMENT THAT IS INTERLOCKED WITH OTHER EQUIPMENT. 5. PROVIDE CHECK OUT OF ALL PLUMBING SYSTEMS FOR PROPER OPERATION, INCLUDING HOT AND COLD WATER AT ALL FAUCETS, WATER HEATERS SET FOR PROPER TEMPERATURE, OPERATION OF ALL VALVES, GREASE TRAPS, GAS VALVES, MIXING VALVES. RECORD DATA ON ALL DEVICES CHECKED AND THE STATUS OF THEIR OPERATION. END OF SECTION 15995 (1103 6)S7 PART 3.00 - EXECUTION 3.01 GENERAL A. EXAMINE INSTALLED WORK AND CONDITIONS UNDER WHICH TESTING IS TO BE DONE TO ENSURE THAT WORK HAS BEEN COMPLETED, CLEANED AND IS OPERABLE. DO NOT PROCEED WITH TAB WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEN Cit CORRECTED IN MANNER ACCEPTABLE TO TESTER. B. TEST, ADJUST AND BALANCE AIR CONDITIONING SYSTEMS AND COMPONENTS AS INDICATED TH PROCEDU F � IN ACCORDANCE WI - - --� OUTLINED IN APPUCABLE STANDARDS. REFER TO LANDLORD TENANT CRITERIA MANUAL FOR SYSTEM BALANCING REQUIRED AS PART OF TENANT WORK. C. PREPARE REPORT OF TEST RESULTS IN FORMAT RECOMMENDED BY APPLICABLE STANDARDS. D. PATCH HOLES IN INSULATION, DUCTWORK AND HOUSING, WHICH HAVE BEEN CUT OR DRILLED IN MANNER RECOMMENDED BY THE ORIGINAL INSTALLER. E. MARK EQUIPMENT SETTINGS, INCLUDING DAMPER CONTROL POSITIONS, VALVE INDICATORS, FAN SPEED CONTROL LEVERS, AND SIMILAR CONTROLS AND DEVICES, TO SHOW FINAL SETTINGS AT COMPLETION OF BALANCE WORK. PROVIDE MARKINGS WITH PAINT OR OTHER SUITABLE PERMANENT IDENTIFICATION MATERIALS. F. INITIAL BALANCING SHALL INCLUDE BALANCING ALL AIR QUANTITIES TO WITHIN 10% OF THOSE LISTED ON THE DRAWINGS. G. BALANCER SHALL THEN CHECK ALL BUILDING TEMPERATURES AND READJUST AIR QUANTITIES TO EVEN OUT SPACE TEMPERATURES TO WITHIN 1 DEG. F WITHIN SPACES. H. TESTING, ADJUSTING AND BALANCING REPORT MUST BE COMPLETE AND TURNED OVER TO HOLD EVERYTHING PROJECT MANAGER 1 WEEK PRIOR TO STORE TURNOVER. I. THE HVAC SUB CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. HVAC SUB CONTRACTOR SHALL ALSO INSTALL A NEW SET OF FILTERS AFTER PROJECT IS COMPLETE. J. BALANCE AIR TO WITHIN PLUS /MINUS 10% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS, PULLEYS OR THE ADDITION OF DAMPERS REQUIRED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC SUB CONTRACTOR WITH NO ADDITIONAL COST TO HOLD EVERYTHING. K. THE BALANCING SUB CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED ON THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OF ORIGINAL BALANCE MUST BE BALANCED IN FUTURE AT NO ADDITIONAL EXPENSE TO HOLD EVERYTHING. THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT HOLD EVERYTHING DEEMS NECESSARY AT NO ADDITIONAL COST TO HOLD EVERYTHING. 2008 CARTER At BURGESS, INC. at &t Carter:Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 NO. DRAWN BY: KL. EXPIRES 03/15/10 DATE ISSUES /REVISIONS ED F9 4 03 -19 -08 ISSUE FOR PERMIT 16425 Southcenter Parkway TU KW I LA, WA RECEIVErt lIAR 2 8 2008 PERMIT CENT& DESIGNED BY: KL PROJECT NUMBER: SCALE: DESCRIPTION CHECKED BY: MV MECHANICAL AND PLUMBING SPECIFICATIONS APPROVED BY: MV 441805.011.028.0001 NONE M -004 2 250 CFM 3/4 "COND 2 200 CFM (7) 200 CFM RG 2 250 CFM 350 CFM 8'0. 12 "0 10 "0 vEHA \I :AL LL-_R PLA\ SCALE: 1/4" = 1' -0" 1 " L CD 3 250 CFM 24 "0 24 "0 CD 3 200 CFM 24 "0 22"0 CD 4 350 CFM 10 "0 12 "0 12"0 DROP 10 "0 RTU -1 CD 3 200 CFM CD` 3 200 CFM 20 "0 0 4- (TYP) 18 "0 8 "0 350 CFM (7) 350 CFM RG 5 12"0 0 (TYP) / CD 3 250 CFM 16 "0 10 "0 10 "0 350 CFM 16 "0 12 "0 14 "0 RG 5 12 "0 10 "0 10 "0 (7) 350 CFM HVAC PLAN NOTES: • INSTALL NEW EXHAUST FAN. REFER TO SCHEDULE ON SHEET M -600 & DETAIL 6/M -400 FOR MORE INFORMATION. • INSTALL NEW THERMOSTAT AS SHOWN AT 48" AFF. SEE DETAIL 1/M -400. GANG BOX AND CONDUIT BY ELECTRICAL. 3 INSTALL NEW ROOF TOP UNIT ON EXISTING 10 TON ROOF CURB. NOTIFY ENGINEER OF ANY DISCREPANCIES. • INSTALL NEW DIFFUSER. BORDER TO MATCH CEILING TYPE. REFER TO DIFFUSER SCHEDULE ON SHEET M -600. • INSTALL NEW RETURN REGISTER. BORDER TO MATCH CEILING TYPE. REFER TO DIFFUSER SCHEDULE ON SHEET M -600. • RUN R -410 REFRIGERANT LINES FROM FAN COIL UNITS UNDER ROOF TO CONDENSING UNIT ON ROOF. SEE MECHANICAL SCHEDULE ON SHEET M -600 FOR LINE SIZES. 0 ROUTE 3/4" CONDENSATE LINE ABOVE CEILING TO THE TAIL PIECE OF THE LAVATORY. SEE DETAIL 8/M -400. • FAN COIL UNIT LOCATED IN CEILING SPACE. 0 REFRIGERANT LINES UP THRU ROOF TO CONDENSING UNIT. 10 THERMOSTAT TO TURN ON EXHAUST FAN WHEN TEMPERATURE REACHES 90T. 11 8 "0 OUTSIDE AIR DUCT UP THROUGH ROOF W/ ROOF CAP. PROVIDE INSECT SCREEN AT TERMINATION. 12 PROVIDE 1 -1/4" GAS PIPE CONNECTION TO UNIT. CONNECT TO EXISTING MAIN GAS PIPING ON ROOF. VERIFY THAT GAS SERVICE IS OPERATIONAL. NOTIFY ENGINEER OF ANY DISCREPANCIES. 13 UPON ACTIVATION OF THE SMOKE DETECTOR, THE UNIT SHALL AUTOMATICALLY SHUT DOWN AND AN ALARM SHALL BE SENT TO THE FIRE ALARM SYSTEM. at &t WIRELESS — 16425 SOUTHCENTER PARKWAY TUKWILA, WA TOTAL FLOOR AREA --4368 S.F. OUTSIDE AIR PROVIDED — RTU -1: MINIMUM OA SALES FLOOR FC -1: MANAGER'S OFFICE OPEN OFFICE INVENTORY RESTROOMS OUTSIDE AIR SCHEDULE 0.20 CFM /S.F. 20 CFM /PERSON 50 CFM /TOILET CALCULATION 3712 S.F. x 0.20 CFM/S.F.= 743 20 CFM /PERSON x 3 PERSON= 60 50 CFM /TOILET x 2 TOILETS= 100 TOTAL: 750 CFM 75 CFM 100 CFM 925 CFM TABLE IS BASED FROM 2006 WASHINGTON STATE VENTILATION AND INDOOR AIR QUALITY CODE. fl` Carter::Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1 601 r, r,( A DRAWN BY: KL NO. DATE RECEIVE MAR 2 8 2000 PERMIT CENTER PROJECT NUMBER: SCALE: COPYRIGHT Q'� 300E CARTER & BURGESS, INC. p at &t I EXPIRES 03/15/10 ISSUES /REVISIONS 03 - 19 - 08 ISSUE FOR PERMIT DESCRIPTION 16425 Southcenter Parkway TUKWILA, WA NORTH DESIGNED BY: KL CHECKED BY: MV APPROVED BY: MV 441805.011.028.0001 1/4"=V-0" MECHANICAL FLOOR PLAN M -200 PLUVBI \G PL =OR PLA SCALE: 1/2" = 1' -0" SA ITARY PLU V BI SCALE: 1/2" = 1' -0" G FLOOR PLA rJATER PLUMBING PLAN NOTES: FIND THE SHORTEST DISTANCE TO ROUTE THE SANITARY PIPING TO THE NEAREST SANITARY MAIN. SLOPE AT A 1% MINIMUM. NOTIFY ENGINEER OF ANY DISCREPENCIES. CONNECT NEW VENT TO EXISTING VENT IN CEILING SPACE. FIELD TO VERIFY EXACT LOCATION. 3 INSTALL NEW INSTANTANEOUS WATER HEATER (IWH -1) BELOW LAVATORY FOR HOT WATER CONNECTION. SEE DETAIL 5/M -400. 'J PROVIDE NEW SHUT -OFF VALVE W /ACCESS. 0 SAWCUT FLOOR AND PATCH AS REQUIRED. 0 CONNECT NEW DOMESTIC WATER TO EXISTING DOMESTIC WATER IN CEILING SPACE. FIELD TO VERIFY EXACT LOCATION. 0/16 COPYRIGHT 2008 CARTER & BURGESS. INC. at &t Carter::Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1 600 FAX: (714) 327 -1601 I EXPIRES 03/15/10 1 03 -19 -08 ISSUE FOR PERMIT NO. DATE DESCRIPTION ECEIVED MR 2 8 2008 PERMIT CENTEV NORTH DRAWN BY: KL PROJECT NUMBER: SCALE: PLUMBING FLOOR PLANS ISSUES /REVISIONS 16425 Southcenter Parkway TU KW I LA, WA DESIGNED BY: KL CHECKED BY: KL APPROVED BY: MV 441805.011.028.0001 AS NOTED M -201 COPYRIGHT m 2008 cpaTER & BURGESS. INC. Carter:Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 DRAWN BY: NO. DATE RECEIVEr MAR 2 8 2000 PERMIT CENTE KL PROJECT NUMBER: SCALE: at &t WV I EXPIRES 03/15/10 ISSUES /REVISIONS - 03 -19 -08 ISSUE FOR PERMIT DESCRIPTION 16425 Southcenter Parkway TU KW I LA, WA DESIGNED BY: KL CHECKED BY: MV MECHANICAL AND PLUMBING DETAILS 3 -18 -08 APPROVED BY: MV 441805.011.028.0001 NONE M -400 ROOFCAP WITH INTEGRAL BIRDSCREEN (PROVIDED BY FAN MFR) ROOF TWO SHEET METAL ROOF JOIST, SEE SELF TAPPING ARCHITECTURAL FOR SCREWS ROOF TYPE RA DUCT W/ 1" THICK LINER EXISTING ROOF CURB PACKAGED ROOF TOP UNIT ►. SA DUCT W/ 1" THICK LINER -ROOF r -- ,I TWO SHEET METAL SEE ARCH FOR FLASHING , : SELF TAPPING SCREWS TWIST STRAP /-- FLEX CONNECTION SOLID -LINED CEILING \ EXHAUST FAN CABINET SEE MECHANICAL EQUIP. SCHEDULE FOR SIZE. BRACING (TYP) , `� ROUND DUCTWORK ) "= i �jI '"'"'"'"'"'"'" RECTANGULAR � NOTES FLEXIBLE CONNECTION FOR FUTURE CONNECTIONS SPLITTER FITTING W unuimuunu muumuu IIii A SEISMIC NOTES PROVIDE CAP UNIT AND DUCTWORK. EACH BRANCH DUCT SIZE THROUGH FITTING. 1. ALL DUCT & SUPPORTS PER IMC. 6" RIGID METAL REFER TO ARCHITECTURAL FOR CEILING DUCT BACKDRAFT DAMPER TYPE EXHAUST GRILLE (PROVIDED BY FAN MFR) 1. PROVIDE FLEXIBLE DUCT CONNECTION BETWEEN AIR CONDITIONING 2. WHERE SINGLE SUPPLY DUCTS SPLIT INTO TWO DUCTS MAINTAIN AND PROVIDE SINGLE TRANSITION ON UPSTREAM SIDE OF SPLITTER 3. PROVIDE CAP ON DUCT AFTER PENTRATION THRU ROOF. NOT USED SCALE: I 2 DUCT PENETRATION DETAIL SCALE: 9 CEILING MOUNTED EXHAUST FAN DETAIL SCALE: 6 DUCT HANGER DETAIL SCALE: 3 N.T.S. NONE N.T.S. N.T.S. HOT OUTLET COLD INLET INSTANT FLOW 110V BY ELEC MIN 3 SHEET METAL CONDENSATE FAN COIL P -TRAP REQUIRED W/ SEPARATE DRAIN TO EXISTING TRAP I SECURE TO STRUCTURE ABOVE 3" WIDE SHEET METAL r \-/TIGHT STRAP 4' -0" OC (2) 12 GA HANGER 45' SCREWS PER CONNECTION. SEAL AIR 4 DRAIN PAN _ Y OPPER THREE WAY STOP VALVE / Q_ OVERFLOW PIPED -- SUPPORT TO DECK ABOVE, TYP SEPARATELY TO CONSPICUOUS LOCATION COLD 1 CONNECT TO STRUCTURE ABOVE ' SUSPENDED CEILING S r GALV CLAMP • CONDENSATE DRAIN FROM ABOVE (1 =1/2" MAX SIZE) 3/8" ill \- -ROUND METAL TUBING HEATER -__,,_ 1/2" y HOT COLD � ANGLE S m DUCT, TYP Allih P r ACOUSTICAL FLEX DUCT CEILING DIFFUSER /RETURN GRILLE 5'-O" MAXIMUM LENGTH SUSPENDED CEILING ' 0 1"� ' EXISTING FIXTURE �� J -BOX ATTACH FLEX TO DUCT AND CEILING DIFFUSER USING MIN OF 3 SHEET v. ‘,I,. METAL AIR c — GASKET AIR GAP FITTING SCREWS. SEAL TIGHT j IA ° B 2" �� CMS �I ), - ' IT EXISTING TRAP EXISTING P -TRAP NOT USED SCALE: , I CONDENSATE DRAIN TO SINK DETAIL SCALE: INSTANTANEOUS WATER HEATER PIPING DETAIL SCALE: CEILING DIFFUSER/RETURN GRILLE CONNECTION DETAIL SCALE: 2 NTS NONE N.T.S. N.T.S. BRASS CLEANOUT PLUG CONSTRUCTION 48" 30" 24" MAIN SUPPLY DUCT OR + MAIN EXHAUST /RETURN DUCT (OR SUB -MAIN) SUB -MAIN) / / 1/4 W, 4" MIN 1/4 W, 4" MIN. l PROVIDE VOLUME DAMPER - ,.,___ -_ -_- _ -WALL TAPPED CLEANOUT TEE JR SMITH No. 4530, ZURN No. Z -1446 OR ZURN PROVIDE VOLUME BRANCH DUCT- DAMPER __-__ I BRANCH DUCT - W w --01-- AIR DUCT / 0 THERMOSTAT, t TOP OF THERMOSTAT, S SUPPLY AIR DUCT EXHAUST /RETURN - VOLUME DAMPER AIR FLOW DUCT MAIN TO ROUND DUCT TAKEOFF GAUGE VOLUME DAMPER WITH QUADRANT SET (TYP ALL SUPPLY / RETURN/ AIR BRANCH RUNOUTS) STAINLESS STEEL CLEANOUT COVER II SWITCH, OUTLET, CONTROL SWITCH, OUTLET, CONTROL \ _ / — P �� 111110111111 4inr: 10 I II o + tr� FINISHED FLOOR i� RECTANGULAR ` . SIDE 18 _ BRANCH 0703/. og z CONICAL TAP MAIN - I LOCKING FOR EXHAUST NOT USED SCALE: I 0 WALL CLEAN OUT DETAIL SCALE: 7 BRANCH TAKE -OFF DETAIL SCALE: 1 MOUNTING HEIGHT OVER OBSTRUCTION SCALE: I N.T.S N.T.S. N.T.S. NONE COPYRIGHT m 2008 cpaTER & BURGESS. INC. Carter:Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327 -1600 FAX: (714) 327 -1601 DRAWN BY: NO. DATE RECEIVEr MAR 2 8 2000 PERMIT CENTE KL PROJECT NUMBER: SCALE: at &t WV I EXPIRES 03/15/10 ISSUES /REVISIONS - 03 -19 -08 ISSUE FOR PERMIT DESCRIPTION 16425 Southcenter Parkway TU KW I LA, WA DESIGNED BY: KL CHECKED BY: MV MECHANICAL AND PLUMBING DETAILS 3 -18 -08 APPROVED BY: MV 441805.011.028.0001 NONE M -400 DIFFUSER SCHEDULE MARK NO. MANUFACTURER & MODEL NO. TYPE CFM RANGE MODULE SIZE (IN) NECK SIZE (IN) OPPOSE BLADE DAMPER MAX NC MAX PD MATERIAL MARK NO. CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 0 -100 24X24 6 NO 25 0.1 STEEL FAN RPM 1 CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 101 -200 24X24 8 NO 25 0.1 STEEL LAT ('F) 2 RLA CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 201 -325 24X24 10 NO 25 0.1 STEEL DB ('F) 3 CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 326 -400 24X24 12 NO 25 0.1 STEEL 4000 4 CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 401 -550 24X24 14 NO 25 0.1 STEEL - _ 5 CD TITUS PCS ADJUSTABLE BLADE PERFORATED FACE 551 -700 24X24 16 NO 25 0.1 STEEL 49.4 6 RG TITUS PAR PERFORATED FACE 0 -160 24X24 6 NO 25 0.1 STEEL 1 RG TITUS PAR PERFORATED FACE 161 =280 24X24 8 NO 25 0.1 STEEL 2 RG TITUS PAR PERFORATED FACE 281 -380 24X24 10 NO 25 0.1 STEEL 3 RG TITUS PAR PERFORATED FACE 381 -530 24X24 12 NO 25 0.1 STEEL T RG TITUS PAR PERFORATED FACE 531 -640 24X24 14 NO 25 0.1 STEEL Ilir RG TITUS PAR PERFORATED FACE 641 -720 24X24 16 NO 25 0.1 STEEL RG TITUS PAR PERFORATED FACE 721-1500 24X24 22X22 NO 25 0.1 STEEL 7 NOTES: D PROVIDE ROUND TO SQUARE ADAPTOR AS NEEDED. PACKAGED ROOF TOP UNIT SCHEDULE MARK NO. MANUFACTURER & MODEL N0. LOCATION SERVICE NOMINAL CAPACITY (TONS) REFRIG TYPE AMBIENT DRY BULB CO MIN OSA CFM SUPPLY FAN COOLING HEATING COMPRESSOR CONDENSER FAN UNIT ELECTRICAL FILTERS UNIT DIMENSIONS L x W x H (IN) OPER WEIGHT (LBS) REMARKS CFM ESP (IN WG) FAN RPM BHP TOTAL CAPACITY (MBH) SENSIBLE CAPACITY (MBH) EER EAT -_ LAT_ MAX FACE VELOCITY (FPM) INPUT CAPACITY (MBH) MAX. OUTPUT CAPACITY (MBH) AFUE �') EAT CF) LAT ('F) QUANTITY RLA LRA QUANTITY HP (EA) MOTOR RPM FLA (EA) MCA MOCP VOLTS /PH /HZ % EFF TYPE DB ('F) WB ('F) DB CO WB ('F) K R.tJ) C8TMD0 2 ROOF SALES 10 R -22 80 750 4000 0.8 900 2.30 119.3 113.5 10.1 80.0 64.0 60.6 56.0 500 120/180 144 80.0 41.0 73.9 2 16.0 125.0 2 1/4 1100 1.4 49.4 60 208/3/60 30% PLEATED 88 X 58 X 50 1110 00000 OF NOTES: UNIT SHALL COMPLETE WITH INTERNAL VIBRATION ISOLATORS AND ECONOMIZER. 0 PROVIDE BURGLAR BARS AT SUPPLY AND RETURN AIR DUCTS. PROVIDE SMOKE DETECTOR IN RETURN DUCT PER 2006 INTERNATIONAL MECHANICAL CODE. 0 PROVIDE MICRO MEN_ #4682 -0202 POWER EXHAUST. INSTALL PER MANUFACTURER'S SMOKE DETECTOR SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. RECOMMENDATIONS. FACTORY INSTALLED PACKAGE UNIT WITH ONE POINT POWER CONNECTION. 0 PLUMBING FIXTURE SCHEDULE ITEM DESCRIPTION MANUFACTURER W V CW HW QTY W &V DRIVE REMARKS AND SPECIFICATIONS F.U. TOTAL F.UU. TO. TOW TAL EF INSTANTANEOUS WATER HEATER CHRONOMITE LABORATORIES, INC. - - 1/2" 1/2" 3 - - - - #M -20L, TANKLESS ELECTRIC WATER HEATER, FLOW ACTIVATED, STAINLESS STEEL HEATING COILS, ONE -4160 WATT, 208/1/60 VOLT, SINGLE PHASE, 20 AMP, 1/2" WATER CONNECTION, 6 HX9 " WX2 -1/2 , 80'F -105'F TEMPERATURE RANGE. A W TWIT CITY RESTROOM WATER CLOSET KOHLER 4" 2" 3/4" - 2 4 8 2.5 5 #K- 3465, 16 -1/2" HIGH ELONGATED RIM VITREOUS CHINA TWO -PIECE TOILET, COMPLETE WITH INGENIUM FLUSHING SYSTEM, BOWL: K -4278, TANK: K -4609, 2 -1/8" PASSAGEWAY, ULTRA -LOW CONSUMPTION TOILET, FLUSHES ON 1.6 GAL. OF WATER. Ai 0 ELECTRICAL ROOM CEILING LAVATORY KOHLER 2 " 1 -1/2" 1/2" 1/2" 2 1 2 1 2 #K -2005, VITREOUS CHINA WALL -HUNG LAVATORY WITH HANGER, DRILLED FOR CONCEALED ARM CARRIER WITH FAUCET HOLES ON 4" CENTERS, FRONT OVERFLOW; FAUCET; #501 - WFHDF, SINGLE HANDLE LAVATORY DECK FAUCET; METAL POP -UP DRAIN AND LIFT HOLE IN POLISHED CHROME. 1 -1/4" TAILPIECE. PROVIDE 3/8" WALL SUPPLIES WITH STOP AND 1 -1/4" OFFSET DRAIN, METAL GRID STRAINER. (FURNISH AND INSTALL "BROCAR" #C500R -B TRAP WRAP FOR PF -2H) BROCAR TEL: (800) 827 -1207 AIL W MOP SINK FLORESTONE 3" 2" 3/4" - 1 4 4 2.5 2.5 MODEL # 95 NEO ANGLE DROP FRONT TERRAllO MOP RECEPTOR. AA MT DRINKING FOUNTAIN HALSEY TAYLOR HAC8FSBL -Q ADA 1 -1/2" 1/2" - 1 0.5 0.5 0.5 0.5 BI -LEVEL WATER COOLER: SURFACE MOUNT ELECTRIC WATER COOLER, 8.0 GPH AT 50 DEG F TEMP., 120/1/60, 4.0 F.L.A., 400 WATTS. ENTIRE INSTALLATION SHALL COMPLY WITH ALL CURRENT ADA REQUIREMENTS. OF 1 FIXTURE UNIT (F.U.) TOTALS 10.0 ALL FIXTURES TO BE SUPPLIED & INSTALLED BY PLUMBING CONTRACTOR. EXHAUST FA\ SCHEDULE MARK NO. MANUFACTURER & MODEL NO. SERVICE LOCATION TYPE CFM ESP (IN WG) QTY. DRIVE MOTOR OPER WEIGHT (LBS) REMARKS WATTS VOLTS /PH /HZ EF TWIN 100T' RESTROOM CEILING BATTHOROOOM 100 0.1 1 DIRECT 87 120/1/60 25 000 VW EF TWIT CITY RESTROOM CEILING BATHROOM M 100 0.1 1 DIRECT 87 120/1/60 25 000 2 183 Ai TWIN CITY T100 ELECTRICAL ROOM CEILING BATHROOM ROOM 100 0.1 1 DIRECT 87 120/1/60 25 0 i0 ® NOTES: Q INTERLOCK WITH LIGHT SWITCH. 0 FURNISHED AND INSTALLED BY MECHANICAL CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR. PROVIDE BACKDRAFT DAMPER. 0 INTERLOCK WITH TEMPERATURE SENSOR. PIPING MATERIAL LEGEND DOfvESTIC WATER SS, VENT AND STORM PIPING UNDERGROUND PIPING UNDERGROUND PIPING 2" AND SMALLER -SOFT DRAWN COPPER, TYPE K, NO JOINTS BELOW FLOOR 2 -1/2" AND LARGER -HARD DRAWN COPPER, TYPE K SERVICE WEIGHT CAST IRON PIPING, HUB AND SPIGOT TYPE ABOVE GROUND PIPING ABOVE GROUND PIPING 1/2" AND LARGER - HARD DRAWN COPPER, TYPE L 1 -1 /2" AND SMALLER - HARD DWV COPPER DRAINAGE TUBE 2" AND LARGER - SERVICE WEIGHT CAST IRON PIPING HUB AND SPIGOT TYPE, HUBLESS SERVICE WEIGHT CAST IRON, PVC PIPE, SCHEDULE 40, SOCKET TYPE DWV PATTERN (WHERE PERMITTED BY LOCAL JURISDICTION). AIR - COOLED CONDENSING UNIT SCHEDULE MARK NO. MANUFACTURER & MODEL NO. LOCATION AMBIENT DRY BULB CO NOMINAL CAPACITY (TON) COMPRESSOR CONDENSER FAN UNIT ELECTRICAL REFRIG. LINE SIZE REFRIG. TYPE UNIT DIMENSIONS L x W x H (IN) OPER WEIGHT (LBS) REMARKS QUANTITY RLA (EA) LRA (EA) QUANTITY HP (EA) MOTOR RpM MCA (AMP) MOCP (AMP) VOLTS /PH /HZ GAS LINE LIQUID LINE CEILING CARRIER 25HCA324A ROOF 80 2 1 12.8 58.3 1 1 10 / 800 16.7 25 208/1 /60 5 8 / 3/8 R -410 31X31 X29 183 PROVIDE 3/4" CONDENSATE DRAIN CONNECTION TO UNIT. PROVIDE FACTORY INSTALLED 6.0KW SUPPLEMENTAL ELECTRIC HEATER MODEL# KFCEH0501N05. ® v NOTES: :1 HEAT PUMP UNIT. t FAN COIL UNIT SCHEDULE MARK NO. MANUFACTURER & MODEL NO. LOCATION MIN OSA ESP (IN WC) MOTOR HP COOLING COIL ELECTRICAL UNIT UNIT DIMENSIONS L x W x H IN OPER WEIGHT (LBS) REMARKS TOTAL CAPACITY (MBH) SENSIBLE CAPACITY (MBH) EAT LAT VOLTS /PH /HZ MCA (AMP) MOCP (AMP) DB CF) WB CF) DB CF) WB CF) 2" CARRIER FX4CNF024 CEILING 175 0.3 0 . 1/3 24 24 80 64 60 55 208/1/60 26.1 30 48X18X22 117 00 NOTES: PROVIDE 3/4" CONDENSATE DRAIN CONNECTION TO UNIT. PROVIDE FACTORY INSTALLED 6.0KW SUPPLEMENTAL ELECTRIC HEATER MODEL# KFCEH0501N05. PIPE SIZE GPM FT /SEC MAX FU 1/2" 2.3 2.9 3 3/4" 5.5 3.8 7 1" 12 4.5 16 1-1/4" 20 5.2 30 1-1/2" 30 6.0 54 2" 70 7.5 225 NOTES: MAX VELOCITY IN WATER PIPE 8 FT /SEC. FOR COLD WATER. MAX VELOCITY IN WATER PIPE 5 FT /SEC. FOR HOT WATER. PLUMBING CONTRACTOR TO VERIFY AND COORDINATE EXACT STREET PRESSURE AND NOTIFY ENGINEER OF ANY DISCREPANCIES. PLUMBING CONTRACTOR TO PROVIDE A PRESSURE REDUCING VALVE (PRV) ON CUSTOMER SIDE OF WATER METER IF THE STREET PRESSURE EXCEEDS 80 PSI, PRV TO BE SET AT 60 PSI. THE FOLLOWING CHART IS USED TO SIZE THE TYPE L COPPER, COLD WATER PIPING IN ACCORDANCE WITH CPC APPENDIX A AT 4.0 P.S.I. / 100 FT. LOSS /4// • C PYRIGHr C woe c#RrER & BURG EM INC. at &t Carter:Burgess Carter & Burgess, Inc. 4 Hutton Centre Drive, Suite 800 Santa Ana, California 92707 TEL: (714) 327-1600 FAX: (714) 327-1601 DRAWN BY: KL PROJECT NUMBER: SCALE: I EXPIRES 03/15/10 RECEIVE MAR 2 8 2000 PERMIT CENTER ISSUES /REVISIONS - 03 -19 -08 ISSUE FOR PERMIT NO. DATE DESCRIPTION 16425 Southcenter Parkway TUKWILA, WA DESIGNED BY: KL CHECKED BY: MV APPROVED BY: MV 441805.011.028.0001 NONE MECHANICAL AND PLUMBING SCHEDULES M -600