Loading...
HomeMy WebLinkAboutPermit M08-096 - WESTFIELD SOUTHCENTER MALL - BODY JEWELRY PLUSBODY JEWELRY PLUS 2896 SOUTHCENTER MALL M08 -096 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: KEITH SMITH Value of Mechanical: $30,000.00 Type of Fire Protection: Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial doc: IMC -10/06 Cityif Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 6364200010 2896 SOUTHCENTER MALL TURIN BODY JEWELRY PLUS 2896 SOUTHCENTER MALL , TUKWILA WA WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD CA Contractor: Name: OKITSU CONSTRUCTION INC. Address: 1428 WHITWORTH AV S , RENTON WA Contractor License No: OK1TSCI959L8 MECHANICAL PERMIT Address: 1725 WESTLAKE AVE N SUITE 210 , SEATTLE WA EOUIPMENT TYPE AND QUANTITY 0 0 0 0 0 0 0 0 0 1 0 0 0 0 * * continued on next page ** Permit Number: Issue Date: Permit Expires On: Phone: Phone: 206 - 713 -4076 Phone: 206 714 -9969 Expiration Date: 06/28/2009 DESCRIPTION OF WORK: LANDLORD WORK FOR A VANILLA SHELL SPACE FOR FUTURE RETAIL TENANT. NEW VAV BOX, TOILET EXHAUST AND DUCT DISTRIBUTION M08 -096 06/11/2008 12/16/2008 Fees Collected: $567.50 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment M08 -096 Printed: 07 -10 -2008 Permit Center Authorized Signature: doc: IMC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M08 -096 Issue Date: 06/11/2008 Permit Expires On: 12/16/2008 Date: `7-10-Or I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit. / Signature: Date: ? / f c /o Print Name: G t c - .d (a- This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -096 Printed: 07 -10 -2008 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: 6364200010 2896 SOUTHCENTER MALL TUKW Contractor: Name: OKITSU CONSTRUCTION INC. Address: 1428 WFIITWORTH AV S , RENTON WA Contractor License No: OKITSCI959L8 DESCRIPTION OF WORK: LANDLORD WORK FOR A VANILLA SHELL SPACE FOR FUTURE RETAIL TENANT. NEW VAV BOX, TOILET EXHAUST AND DUCT DISTRIBUTION Value of Mechanical: $30,000.00 Type of Fire Protection: Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 0 Appliance Vent 0 Repair or Addition to Heat/Refrig /Cooling System.... 0 Air Handling Unit <10,000 CFM 0 >10,000 CFM 0 Evaporator Cooler 0 Ventilation Fan connected to single duct 1 Ventilation System 0 Hood and Duct 0 Incinerator: Domestic 0 Commercial/Industrial 0 doc: IMC -10/06 qty of Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us WESTFIELD - VANILLA BOX 2896 SOUTHCENTER MALL , TUKWILA WA WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD CA MECHANICAL PERMIT KEITH SMITH 1725 WESTLAKE AVE N SUITE 210 , SEATTLE WA EQUIPMENT TYPE AND QUANTITY * *continued on next page ** M08 -096 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 206 - 713 -4076 Phone: 206 714 -9969 Expiration Date: 06/28/2009 M08 -096 06/11/2008 12/08/2008 Fees Collected: $507.50 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment Printed: 06 -11 -2008 Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complied doc: IMC -10/06 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us x vv Permit Number: MO8 -096 Issue Date: 06/11/2008 Permit Expires On: 12/08/2008 Date: g Q d / 1 5 7 ned this permit and know the same to be true and correct. All provisions of law and ordinances , whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or t perfo e of wo I am authorized to sign and obtain this mechanical permit. Signature: Date: 4///0 ?7 Print Name: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -096 Printed: 06 -11 -2008 Parcel No.: 6364200010 Address: Suite No: Tenant: 2896 SOUTHCENTER MALL TUKW BODY JEWELRY PLUS 1: ** *BUILDING DEPARTMENT CONDITIONS * ** • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: M08 -096 ISSUED 04/04/2008 06/11/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 14: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) doc: Cond -10/06 M08 -096 Printed: 07 -10 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 18: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 19: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 20: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 21: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond -10/06 * *continued on next page ** M08 -096 Printed: 07 -10 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: Date: / °%$. Print Name: Ca doc: Cond -10/06 M08 -096 Printed: 07 -10 -2008 Parcel No.: 6364200010 Address: Suite No: Tenant: 1: ** *BUILDING DEPARTMENT COND1TiONS * ** • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 2896 SOUTHCENTER MALL TUKW WESTFIELD - VANILLA BOX PERMIT CONDITIONS Permit Number: Status: Applied Date: Issue Date: 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 10: ** *FIRE DEPARTMENT CONDITIONS * ** M08 -096 ISSUED 04/04/2008 06/11/2008 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 14: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) doc: Cond -10/06 M08 -096 Printed: 06 -11 -2008 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http : / /www.ci.tukwila.wa.us 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 18: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 19: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 20: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 21: These plans were reviewed by Inspector 511. 1f you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond -10/06 * *continued on next page ** M08 -096 Printed: 06 -11 -2008 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Print Name: a a,„4-6 doc: Cond -10/06 M08 -096 Date: 01 /0e ordinances governing or local laws regulating Printed: 06 -11 -2008 SITE LOCATION Site Address: Tenant Name: Property Owners Name: Name: Company Name: Mailing Address: • CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tulcwila.wa.us Building Permit No. DOB loci Mechanical Permit No. MO Public Works Permit No. Project No. co05 -1Y11 (For office use only) 0-D I !o Plumbing /Gas Permit No. 16 0 g — 10 s Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** K Co Assessor's Tax No.: �3 s `71 - D) / df/ l /�i� / Suite Number. Floor: ga-e-�_ I- F(4 04-11; //- New Tenant: Yes Mailing Address: Zip CONTACT PERSON - who do we contact when your permit is ready to be issued L7 Mailing Address: ,r�� E -Mail Address: 4�r �'2(; (�l(� L 121 A 4. C(I. a 1 City City Fax Number: State Day Telephone:' 1( ,& State GENERAL CONTRACTOR INFORMATION — " (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: . ' 1 2 Mailing Address: Contact Person: E -Mail Address: Contractor Registration Number: State Zip City Day Telephone: Fax Number: Expiration Date: ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: Mailing Address: Contact Person: K-C/G I v) ill E -Mail Address: e_5 G a 5/0704/4 (0 , 0 ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Kroi Contact Person: E -Mail Address: Q: Applications\Porms- Applications On Linel3 -2006 - Permit Application.doc Revised: 9 -2006 bh L' City Day Telephone: Fax Number: City State Zip Day Telephone: Fax Number: Page 1 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Fumace<100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct I Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Other Mechanical Equipment ?D E i/t Gt . / 1 Air Handling Unit <10,000 CFM Incinerator — Comm/Ind MECHANICAL PERMIT INFORMATION - 206 - 431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: /, C Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ 0 U Scope of Work lease provide detailed information • !/4 1 ' t / V 1" 1 / V 4 Val* ill Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... Replacement .... ❑ Fuel Type: Electric , Gas ....0 Other: Indicate type of mechanical work being installed and the quantity below: Q: Applications\Forms- Apphcanons On Lme\3 -2006 - Permit Apphcation.doc Revised: 9 -2006 bh Page 4 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. BUILDING OW Signature: Print Name: Mailing Address: Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. Date Application Expires: to -2c -O 8' Date Application Accepted: 4 - - QMpphcations\Fmms- Appltcanons On Line'3 -2006 - Permit Application.doc Revised: 9 -2006 bh E Staff Initials: Page 6 of 6 Parcel No.: Address: Suite No: Applicant: Receipt No.: R08 -02501 Initials: WER User ID: 1655 Payee: 6364200010 2896 SOUTHCENTER MALL TUKW BODY JEWELRY PLUS CHAD CONE TRANSACTION LIST: Type Method Descriptio doc: Receipt -06 Payment Check 1157 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http.• / /www.ci.tukwila.wa.us RECEIPT Amount ACCOUNT ITEM LIST: Description Account Code 60.00 MECHANICAL - NONRES 000.322.102.00.0 Permit Number: Status: Applied Date: Issue Date: Payment Amount: $60.00 Payment Date: 07/10/2008 09:26 AM Balance: $0.00 Current Pmts 60.00 Total: $60.00 M08 -096 ISSUED 04/04/2008 06/11/2008 4664 07/10 9711 TOTAL 655.V0 Printed: 07 -10 -2008 3�� RECEIPT NO: R08 -02074 Initials: WER User ID: 1655 Payee: OKITSU CONSTRUCTION, INC. SET ID: 0611 SET NAME: VVESTFIELD MECHANICAL SET TRANSACTIONS: Set Member Amount Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us M08 -081 406.00 M08 -082 406.00 M08 -083 406.00 M08 -095 406.00 __M0EZE99 406.00 M08 -112 811.00 M08 -113 811.00 M08 -114 811.00 M08 -115 811.00 M08 -116 811.00 M08 -152 244.00 TOTAL: 6,329.00 TRANSACTION LIST: Type Method Description Amount Payment Check 1664 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES City of Tukwila SET RECEIPT TOTAL: Payment Date: 06/11/2008 Total Payment: 6,329.00 6,329.00 6,329.00 Account Code Current Pmts 000.322.102.00.0 4,529.00 000/345.830 1,800.00 TOTAL: 6,329.00 3540 06/11 9711 TOTAL 6329.00 Payee: ERIK BARTH ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 222 101.50 RECEIPT Parcel No.: 6364200010 Permit Number: M08 -096 Address: 2896 SOUTHCENTER MALL TUKW Status: PENDING Suite No: Applied Date: 04/04/2008 Applicant: WESTFIELD VACANT SPACE Issue Date: Receipt No.: R08 -01041 Payment Amount: $101.50 Initials: WER Payment Date: 04/04/2008 02:26 PM User ID: 1655 Balance: $406.00 Account Code Current Pmts 000/345.830 101.50 Total: $101.50 T' ;:4/04 •771i TOTAL 1138.16 doc: Receiot -06 Printed: 04 -04 -2008 Project: I � / elee Type of Inspection: �, how / \__J J Address � / / Gg � Date Called: Special Instructions: Date Wanted: X 2'345 a.m. P.m. Requester: Phone No: y INSPECTION RECORD Retain a copy with permit 1'r e6 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION .. �\ 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431. 54 Approved per applicable codes. Corrections required prior to approval. COMMENTS: gA,47-46 6 r'4 c Peat/ .4 y 1,4} Inspector: Date:.y t 3 / ri $60.0OREINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Project: �' Project: , jeye Type of Inspection: in 0 4 4 — Sc..4- ► OLD ain Address: 2-g9(- 4-L Date Called: Special Instructions: Date Wanted: /r I a.m. p.m. Requester: Phone No: 3 Ea Approved per applicable codes. Inspect • INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. N CITY OF TUKWILA BUILDING DIVISION It 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 oF -a9' Corrections required prior to approval. COMMENTS: v �lv- i (2.4- 44, --1. , Pio. 23o — Pa% c.a.,/ rQ vF 1 f L4c— 2 F Date: 1 l ig, /07 ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Project: Type of Inspection Date Called: ,/ Address: Special Instructions: Date Wanted / / p m .� Requester: Phone No: PERMIT NO. CITY OF TUKWILA BUILDING DIVISION IL-- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 INSPECTION NO. INSPECTION RECORD Retain a copy with permit l�dest' —D�� Approved per applicable codes. El Corrections required prior to approval. COMMENTS: r , Por Inspector: t 113 r ate: 7/ jee ❑ $60.00 I PECTION FEE REQUIRED. Prior to inspection, fee must be paid at 63 0 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: !Date: Proj ct� 6.5 / v7� TypepfInspecttion: A g lrl`f f \) rAddress: S6 � , I A--/ YJ Date Called: Special Instructions: Date anted: -- / � ', - Qg rr p.m. Requester: Ph5 Q CO - L g 5Z O -- INSPECTION RECORD Retain a copy with permit 6 INSPECTION NO. ilERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 0 Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: 77/4 (g. i dl5 ( c f n (wind ji n/ ) Date: / / $r REINSPECTION FEE REQUIRED. Prior to inspection, fee must be Ord at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Project: ' , CG S 3 Cu - a Sprinklers: R '/' P(k5 Type of Inspection: ce" E� �' 5 'V 7 C-4' - ' Address: `} Suite #: t t- A(A -)L, Contact ersbn: Permits: Occupancy Type: p cy yp Special Instructions: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: p cy yp �•- �° INSPECTION NUMBER F4 Approved per applicable codes. Inspector: INSPECTION RECORD Retrain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT Word /Inspection Record Form.Doc 1/13/06 Date: Og 4 et cR 7 7140 5? - C3`-r(_, PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206- 575 -4407 Cprr€etions required prior to approval. COMMENTS: — OK H A,i`ri $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. T.F.D. Form F.P. 113 Project Info Project Address 2896 Southcenter Mail Date 4/3/2008 Tukwila, WA 98188 For Building Department Use Applicant Name: Keith L. Smith Applicant Address: 1725 WeetlakeAve. N., Suite 210 Applicant Phone: seattla, wA 98109 2006 Washington State Nonresidential Energy Code Compliance Forms 2006 Washington State Nonresidential Energy Code Compliance Form Project Summary PRJ -SUM t1O8 O% ALE COPY Permit No. Revised July 2007 „_'731 re tii.f ! °:^ ?.ih�n ^• ¢,J F' t ^ ,^ .t9.� ". . � , REVIEWED FOR CODE COMPLIANCE APPROVED City •i f Tukwila B ILDING DIVISION APR 1 7 2008 RECEIVED APR 04 2008 PERMIT CENTER Cooling Equipment Schedule Equip. ID Brand Name' Model No. Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location FMB -1 TITUS DTFS SIZE D 80 500 Econo M -1 Applicant Name: M -1 Applicant Address: 1725 WestlakeAve. N., Suite 210 Applicant Phone: Seattle, WA 98109 Fan Equipment Schedule Equip. ID Brand Name' Model No. CFM SP' HP /BHP Flow Control Location of Service EF -1 GREENHECK SP-B110 100 3 80 W cv M -1 Applicant Name: Keith L. Smith Applicant Address: 1725 WestlakeAve. N., Suite 210 Applicant Phone: Seattle, WA 98109 Heating Equipment Schedule Equip. ID Brand Name' Model No. Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency FMB -1 TITUS 3 Applicant Name: Keith L. Smith Applicant Address: 1725 WestlakeAve. N., Suite 210 Applicant Phone: Seattle, WA 98109 Project Info Project Address 2896 Southcenter Mall Date 4/3/2008 Tukwila, WA 98188 For Building Dept. Use Applicant Name: Keith L. Smith Applicant Address: 1725 WestlakeAve. N., Suite 210 Applicant Phone: Seattle, WA 98109 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary MECH -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. Includes Plans Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 'If available. 2 As tested according to Table 14 -1A through 14 -1G. 3 If required. ' COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). Revised July 2007 Compliance Option 0 Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: ❑ Constant vol? ❑ Split system? ❑ Air cooled? ❑ Packaged sys? ❑ <20,000 Btuh? ❑ Economizer included? If Heating Only: < ❑ 5000 cfm? o ❑ <70% outside air? Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only 2006 Washington State Nonresidential Energy Code Compliance Form Reference Section 1421 1 otal Ca . wo economize <240,000 Btuh or 10 %? Heating /Cooling or Cooling Only t Reference Section 1423) Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Address 2896 Southcenter Mall !Date 4/3/2008 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance 1411.4 Pkg. elec. htg.& dg. List heat pumps on schedule yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M - 2 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans M -1 1412.2 Deadband control Indicate 5 degree deadband minimum 1412.3 Humidity control Indicate humidistat 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage 1412.4.2 Optimum Start Indicate optimum start controls 1412.5 Heat pump control Indicate microprocessor on thermostat schedule 1412.6 Combustion htg. Indicate modulating or staged control 1412.7 Balancing Indicate balancing features on plans 1412.8 Ventilation Control Indicate demand control ventilation for high- occupancy areas 1422 Thermostat interlock Indicate thermostat interlock on plans 1423 Economizers Equipment schedule 1413 Air economizers 1413.1 Air Econo Operation Indicate 100% capability on schedule 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance 1413.3 Integrated operation Indicate capability for partial cooling 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems 1414.1 Duct sealing Indicate sealing necessary 1414.2 Duct insulation Indicate R -value of insulation on duct 1415.1 Piping insulation Indicate R -value of insulation on piping 1416 Completion Requirements 1416.2.1 Commissioning Provide commissioning plan 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report 1434 Separate air sys. Indicate separate systems on plans yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. 1441 Elec. water heater Indicate R -10 insulation under tank 1442 Shut -off controls Indicate automatic shut -off 1443 Pipe Insulation Indicate R -value of insulation on piping 1452 Heat Pump COP Indicate minimum COP of 4.0 1452 Heater.Efficiency Indicate pool heater efficiency 1453 Pool heater controls Indicate switch and 65 degree control 1454 Pool covers Indicate vapor retardant cover 1454 Pools 90+ degrees Indicate R -12 pool cover 2006 Washington State Nonresidential Energy Code Compliance Form no is circiea tror any question, proviae explanation: 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (110), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time fora power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4 Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4 Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry -bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W C or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (110), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time fora power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4 Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4 Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry -bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W C or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying VULICM III Lilt III DI awry 0111.l10111,1* UQIVW uIe uim away uI umoulllya three or more stories in he i006 Washington State Nonresidential Eller §9n(tO O® ll`f12ef4yfilequipment, or 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2. are isolated from the exterior with an automatic shut -off damper complying air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum start controls shall be designed to automatically adjust the start time of an HVAC system each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include microprocessor controls that minimize supplemental heat usage during start -up, set- up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 000 EXCEPTIONS: 1. Boilers. 2. Radiant heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6. Exception: Piping installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAC 51 -26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for budding completion and commissioning requirements.) ACTIVITY NUMBER: M08 -096 DATE: 6 -24 -08 PROJECT NAME: BODY JEWELRY PLUS SITE ADDRESS: 2896 SOUTHCENTER MALL Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # X Revision # 1 After Permit Issued DEPARTMENTS: 7-& Public Works Complete n Comments: Documents/routing slip.doc 2 -28 -02 PE •4 MIT CO o D COPY PLAN REVIEW /ROUTING SLIP T1 APPROVALS OR CORRECTIONS: Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 6 -26-08 Incomplete ❑ Not Applicable ;.. Permit Center Use Only '; :t, .L.• • . • INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route n Structural Review Required n No further Review Required ❑ REVIEWER'S INITIALS: DATE: DUE DATE: 7 -24 -08 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ACTIVITY NUMBER: M08 -096 DATE: 04 -04 -08 PROJECT NAME: WESTFIELD VACANT SPACE SITE ADDRESS: 2896 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: g Complete Comments: TUES/THURS ROUTING: Please Route (vision REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 • • • • p {i. `, I COORD COPY PLAN � I EW /ROUTING SLIP 6d0 1 'Mt 4 Fire Prevention Public Works ❑ Structural Incomplete Structural Review Required ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 04-08-08 u Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ❑ No further Review Required DATE: DATE: Planning Division Not Applicable U DUE DATE: 05-06 -08 Not Approved (attach comments) ❑ Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS 1 L...11 -0t UAL- - 1 - � fr t° � - 0 r L2 Summary of Revision: vre, C0t}}-w k Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS 1 L...11 -0t UAL- - 1 - � fr t° � - 0 r L2 Summary of Revision: vre, C0t}}-w k Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS 1 L...11 -0t UAL- - 1 - � fr t° � - 0 r L2 Summary of Revision: vre, C0t}}-w k Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS 1 L...11 -0t UAL- - 1 - � fr t° � - 0 r L2 Summary of Revision: vre, C0t}}-w k Received by: REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS 1 L...11 -0t UAL- - 1 - � fr t° � - 0 r L2 Summary of Revision: C vy,e 4,p j - re an vre, C0t}}-w k . Received by: (:1. .,). ,ie- REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: PROJECT NAME: (( t� PERMIT NO: ��S l0 g - Oq �ay SITE ADDRESS: 1�S (�� S - C' . � ORIGINAL ISSUE DATE: tp - bi --U�1 REVISION LOG (please print) (please print) (please print) (please print (please print) City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite # 100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http : //www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 6/2 ❑ Response to Incomplete Letter # ❑ Response to Correction Letter # [Revision # j after Permit is Issued O Revision requested by a City Building Inspector or Plans Examiner Project Name: Project Address: 2g Contact Person t177 r �_ ..«4..Q 1 Phone Number: '6 - a 2-- CO 7 / Summary � of Revision: di., f-I-7' o a_e.A.. � J 7[ Sheet Number(s): /7) / n7 --2 "Cloud" or highlight all areas of'revision including date of revisi ' n Received at the City of Tukwila Permit Center by: k r — Entered in Permits Plus on tf 'x_ O' %applications\fomu- applications on Iine\revision submittal Created: 8 -13 -2004 INACPIi• • • Plan Check/Permit Number: 6) — 6q 4 C Steven M. Mullet, Mayor Steve Lancaster, Director A CITY OF TUKWILA 1 JUN 2 4 2008 i`� • NIT r•rne7ws. d 14.-V License Information License OKITSCI959L8 Licensee Name OKITSU CONSTRUCTION INC Licensee Type CONSTRUCTION CONTRACTOR UBI 602515973 Ind. Ins. Account Id PRESIDENT Business Type CORPORATION Address 1 1428 WHITWORTH AVE S Address 2 City RENTON County KING State WA Zip 98055 Phone 2067149969 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 6/28/2005 Expiration Date 6/28/2009 Suspend Date Separation Date Parent Company Previous License OKITSC•030R3 Next License Associated License Business Owner Information Name Role Effective Date Expiration Date OKITSU, RODNEY STERLING AGENT 06/28/2005 Bond Amount OKITSU, RODNEY STERLING PRESIDENT 06/28/2005 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date Look Up a Contractor,'lectrician or Plumber License Detail Washington State Department of Labor and Industries General/Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. • Page 1 of 2 https: // fortress .wa.gov /lni/bbip /printer.aspx ?License= OKITSCI959L8 06/11/2008 SHEET METAL NOTES 2J. I 9.DUCTED EXHAUST AND RETURN GRILLES SHALL BE HARD CONNECTED. L THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL INTENT OF THE WORK, PROVIDE SHEET METAL SYSTEMS COMPLETE AND PER APPLICABLE CODES INCLUDING ALL NECESSARY OFFSETS, FITTINGS, SPECIAL RADIUS OR MITERED ELBOWS WHICH ARE REQUIRED DUE TO SPACE CONSTRAINTS OR OTHER C❑NDITI ❑NS. 4. THE CONTRACTOR SHALL PR ❑VIDE ALL MISCELLANE ❑US SUPPORTING STEEL, ETC, FUR THE PROPER INSTALLATI ❑N OF ALL MECHANICAL SYSTEMS, 2. CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF ALL OTHER TRADES. VERIFY ALL CLEARANCES PRIOR TO THE FABRICATI ❑N OF ANY WORK, 3. DUCTWORK SHALL NOT BE LOCATED OVER ELECTRICAL EQUIPMENT /PANELS. PROVIDE REQUIRED CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT. DUCTWORK SHALL NOT INTERFERE WITH ELECTRICAL EQUIPMENT CLEARANCE, 5. COORDINATE FLOOR, WALL, ROOF PENETRATIONS, LOUVER SIZES, PAD LOCATIONS, ETC. WITH ARCHITECTURAL TRADES, 6. THE CONTRACTOR SHALL REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF GRILLES, REGISTERS, AND DIFFUSERS. 7. INSTALL MANUAL VOLUME DAMPERS AT ALL SUPPLY AIR BRANCH DUCTS TO THE DIFFUSER, BRANCH RETURN AIR DUCT, EXHAUST AIR DUCT, AND OTHER LOCATIONS AS SHOWN ON PLANS, 8. PROVIDE FLEXIBLE CONNECTION AT DIFFUSER NECK. ALL FLEXIBLE DUCT SHALL BE INSULATED AND LIMITED TO 5' -0" IN LENGTH, 10.C❑❑RDINATE AND PR ❑VIDE ACCESS DOORS IN HARD CEILING AREAS FOR ACCESS TO TERMINAL UNITS, BALANCING DAMPERS, TERMINAL UNIT HEATING COIL PIPING, ETC. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. 11, CONTRACTORS SHALL VERIFY THERE ARE NO COMBUSTIBLES IN THE RETURN AIR PLENUM, IF COMBUSTIBLES ARE PRESENT CONTRACTOR SHALL COORDINATE WITH ARCHITECT /ENGINEER /OWNER'S REPRESENTATIVE COURSE OF ACTION (HARD DUCT RETURN SYSTEM OR ELIMINATE COMBUSTIBLES - FIREPR ❑OF, WRAP, ETC.) 12,ALL SHEET METAL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSI ❑NS, + 1 3' - O ( A 9 NPhANlQAL MECHANICAL NOTES L DUCT LINING IS NOT ALLOWED ROVIDE AND INSTALL NEW DUCT SMOKE DETECTO N SA /RA DUCT AS REQUIRED BY LOCAL CODE TO PROVIDE FAN SHUTDOWN 2. ALL SUPPLY AIR DUCTWORK SHALL BE WRAPPED WITH 1' INSULATI ❑N TO MATCH EXISTING. 3, PROVIDE AND INSTALL FIRE DAMPERS WHERE DUCTS PENETRATE RATED CONSTRUCTION, ALL DUCTS PENETRATING SHAFTS (SMOKE BARRIERS) SHALL HAVE C❑MBINATI ❑N FIRE /SMOKE DAMPERS ACTIVATI ❑N OF DAMPER SHALL BE SIGNALED TO FIRE ALARM PANEL. 4, MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, C ❑RING AND PATCHING REQUIRED FOR PROPER INSTALLATI ❑N OF THE SYSTEM, 5. PROVIDE BALANCING DAMPERS IN ALL BRANCH DUCTWORK AS REQUIRED FOR PROPER BALANCING OF THE SYSTEM. 6, THE ENTIRE CONSTRUCTION SHALL CONFORM TO THE LATEST EDITI ❑N OF N,F,P,A, SMACNA, THE LOCAL MECHANICAL CODE, LOCAL ORDINANCE, AND AUTHORITIES HAVING JURISDICTI ❑N, 7. EACH CONTRACTOR SHALL COORDINATE INSTALLATION OF HIS WORK WITH ALL OTHER TRADES TO AV ❑ID CONFLICTS AND INTERFERENCES DURING CONSTRUCTI ❑N. 8. CONTRACTOR SHALL NOT RUN ANY PVC, PLASTIC MATERIALS OR ANY OTHER COMBUSTIBLE MATERIAL INSIDE THE RETURN AIR PLENUM. 9. MECHANICAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL EQUIPMENT ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRI ❑R TO ANY EQUIPMENT PURCHASE. 10,TESTING & BALANCING - ENGAGE THE SERVICES OF AN INDEPENDENT CERTIFIED TEST AND BALANCE AGENCY THAT SPECIALIZED IN AND WHO'S BUSINESS IS LIMITED TO THE TESTING AND BALANCING OF HVAC SYSTEMS AND HYDRONIC SYSTEMS, THE AGENCY SELECTED SHALL BE CERTIFIED BY ASSOCIATED AIR BALANCE COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). AGENCY SHALL SUBMIT A COMPLETE REPORT BASED ON SMACNA "BALANCING AND ADJUSTMENT MANUAL ". THE HVAC SYSTEM SHALL BE TESTED AND BALANCED TO DEMONSTRATE THAT SPECIFIED CAPACITY AND PROPER CONTROL FUNCTIONING HAS BEEN ATTAINED. 11.START -UP FOR ALL EQUIPMENT SHALL BE CONDUCTED BY EACH MANUFACTURER'S START -UP REPRESENTATIVE, INCLUDE FINAL REPORT AND CERTIFICATE, PR ❑VIDE OWNER'S MANUAL AND TRAINING FOR MAINTENANCE PERSONNEL FOR EACH TYPE OF EQUIPMENT, 12.ALL EQUIPMENT AND COMBUSTION VENT TERMINATION ETC. SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS. VERIFY AND LOCATE EQUIPMENT BASED ON MANUFACTURERS RECOMMENDED CLEARANCES. 13.CONTRACTOR SHALL PROVIDE RETURN AIR TRANSFER DUCTWORK FOR ALL ROOMS WITH WALLS FROM FINISHED FLOOR TO BOTTOM OF DECK. COORDINATE WALL LOCATIONS WITH ARCHITECTURAL TRADES. 8' O " / ` p GENERAL NOTE + 13' 9 Al I 1. CONTRACTORS SHALL PR ❑VIDE EQUIPMENT AND SPECIALTIES INDICATED HERE -IN TO PROVIDE A COMPLETE AND WORKING SYSTEM. 2. CONTRACTORS SHALL COMPLY WITH ALL LAWS, LOCAL ORDINANCES AND CODES OF THE STATE, FEDERAL AGENCIES AND MUNICIPALITY. CONTRACTORS SHALL SECURE AND PAY FOR ALL NECESSARY FEES AND PERMITS REQUIRED IN THE PERFORMANCE OF HIS WORK. ALL CUTTING AND PATCHING FOR NEW WORK SHALL BE DONE BY THIS CONTRACTOR WITH THE APPROVAL OF THE OWNER'S REPRESENTATIVE, 3. CONTRACTOR SHALL VISIT THE SITE AND CHECK THE EXISTING CONDITIONS BEFORE SUBMISSION OF BIDS, NO ALLOWANCE SHALL BE MADE IN BEHALF OF EXTRA EXPENSES DUE TO THE FAILURE TO MAKE SUCH AN EXAMINATION. 4. CONTRACTOR SHALL PROVIDE A COMPLETED OPERABLE SYSTEM AS HERE -IN DESCRIBED. IF THE DOCUMENTATION IS UNCLEAR OR INCOMPLETE TO THE CONTRACTOR HE SHALL SO STATE IN WRITING TO THE OWNER'S REPRESENTATIVE /ENGINEER AND REQUEST CLARIFICATION ON THOSE ITEMS REQUIRING CLARIFICATI ❑N. IF NO SUCH STATEMENT IS MADE IT SHALL BE PRESUMED THAT THE CONTRACTOR FULLY UNDERSTANDS THE INTENT OF A FUNCTI ❑N OF THE SYSTEM DESCRIBED. 5. ANY CLAIMS FOR ADDITIONAL SERVICES BASED UPON UNDERSTANDING OF THE SYSTEMS WILL NOT BE ALLOWED. CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENT OF EQUIPMENT. D❑ NOT SCALE DRAWINGS. 6. CONTRACTOR SHALL C ❑ORDINATE HIS WORK WITH ALL OTHER TRADES. CONTRACTOR SHALL SECURE FINAL OCCUPANCY INSPECTI ❑N AND SUBMIT CERTIFICATES TO THE OWNER'S REPRESENTATIVE, CONTRACTOR SHALL FURNISH THE OWNER WITH A WRITTEN GUARANTEE TO CORRECT ALL IMPERFECTIONS IN MATERIALS AND WORKMANSHIP, WHICH MAY DEVELOP IN THE SYSTEMS INSTALLED AND UNDER NORMAL USE FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE BY THE OWNER. 7. BASE BID FOR EQUIPMENT IS TO BE UNITS SCHEDULED. PRICING USING ALTERNATE ACCEPTED AND LISTED MANUFACTURES SHALL STATE ALTERNATE MANUFACTURER AND MODEL NUMBER AS PART OF BID. VOLUNTARY ALTERNATES FOR EQUIPMENT NOT LISTED SHALL ONLY BE WITH WRITTEN ACCEPTANCE OF THE ENGINEER PRIOR TO BIDDING, VOLUNTARY ALTERNATES WILL NOT BE REVIEWED FOR ACCEPTANCE BY THE ENGINEER DURING THE 7 DAYS PRIOR TO BID DATE. 8. CONTRACTOR SHALL PR ❑VIDE, STORE, PLACE AND INSTALL ALL NECESSARY EQUIPMENT REQUIRED. ALL EQUIPMENT SHALL BE INSTALLED PER THE MANUFACTURER'S RECOMMENDATIONS AND IN SUCH A MANNER AS TO FUNCTI ❑N IN ITS INTENDED USE, 8, CONTRACTOR SHALL SUBMIT SUBMITTALS FOR ALL EQUIPMENT AND MATERIALS FOR REVIEW PRIOR TO PURCHASE. 9, AFTER INSTALLATION IS COMPLETE, CONTRACTOR SHALL BE RESPONSIBLE FOR STARTUP, INSPECTORS' APPROVAL AND CLEAN UP. 2 x ■ CONTROLS NOTE V CT) -R Fl Y FMB CONTROLS SHALL MATCH MALL CONTROLS SYSTEM. CONTROLS CONTRACTOR SHALL TIE -INTO EXISTING CONTROLS FOR ❑PERATI ❑N. MECHANICAL KEYED NOTES: (MECHANICAL KEYED NOTES APPLY TO THIS SHEET ONLY) CONNECT TO EXISTING SUPPLY AIR MAIN (VERIFY IN FIELD). CONNECT EXHAUST FROM TOILET EXHAUST FAN TO MALL EXHAUST DUCT MAIN (VERIFY IN FIELD). MECHANICAL SYMBOL LEGEND: NOTE: THE FOLLOWING SYMBOLS SHALL BE AS INDICATED, UNLESS NOTED OTHERWISE ON PLANS. SD -1: 24 "x24" SUPPLY DIFFUSER RG -1: 24 "x24" RETURN GRILLE a THERMOSTAT 1\P1 DUCT FLEX CEILING MOUNTED INLINE EXHAUST FAN. By � ` t r y r Permit Project Name the violation of any adopted code or ordin a Fscd' cription )! approved Field Co d conditions is ackno rloti� ud: Cate �1� /o City of Tukwila BUILDING DiVIS!ON 2896 Southcenter Mall Tukwila, WA 98188 smith co. 1725 westlake ave. n. suite 210 Seattle, washington 98109 206.838.5485 p 206.713.4076 m 206.464.0700 f ksmith@smithco.org http: / /www.smithco.org/ Consultant Consultant Registration Issues and Revisions No. Date 1 03.31.08 2 04.15.08 05.28.08 Pinr review approval Is subject to errors end orr Issinns. Approval of construction documents does not authoJ !Qject Number REVIEWED FOR MPLIAN-CE ADS ':' r' Template All ideas, represented JUL 01 2008 ty ukwila 1=ganiaP_IV .151014 Scale As NOTED Issues I IL, V UlV11 it ti WESTFIELD SOUTHCENTER MALL 02008018.00 MECHANICAL PLAN Computer File CW05- 2008— M1,DWG :1 I REGISTERED ARCHITECT KEI I STATE OF WASHINGTON 6294 1 - 111 G„ 0 Architect Registration PERvIT PERv1IT CORRECTIONS ISSUE By Check M -1 � CM Fi designs, arrangements, and plans indicated or by this drawing are owned by and the property of smith co. Ilc and were created, evolved, and developed for use on and in connection with the specified project. None of —smch ideas, designs, arrangements or plans shall be used REVISIONS by or disclosed to any person, firm, or corporation for any No Changes shall be made to the scope purpose whatsoever without the written permission of smith co. Ilc. of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees 1 < LS <LS KLS 0 N; p 5: 0 ......... SHEET METAL NOTES f : r: ...................:..:.. mr. rrrrrxxrrrxxxvrxrrxxxxxxrxxxxxxM• .... €.x . I • • • • • • • • • 1, THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL INTENT OF THE WORK, PR ❑VIDE SHEET METAL SYSTEMS COMPLETE AND PER APPLICABLE CODES INCLUDING ALL NECESSARY OFFSETS, FITTINGS, SPECIAL RADIUS OR MITERED ELBOWS WHICH ARE REQUIRED DUE TO SPACE CONSTRAINTS OR OTHER C❑NDITI ❑NS. 2, CONTRACTOR SHALL C ❑ORDINATE HIS WORK WITH THE WORK OF ALL OTHER TRADES. VERIFY ALL CLEARANCES PRI ❑R TO THE FABRICATION OF ANY WORK, 3. DUCTWORK SHALL NOT BE LOCATED OVER ELECTRICAL EQUIPMENT /PANELS. PR ❑VIDE REQUIRED CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT. DUCTWORK SHALL NOT INTERFERE WITH ELECTRICAL EQUIPMENT CLEARANCE. 4. THE CONTRACTOR SHALL PR ❑VIDE ALL MISCELLANEOUS SUPPORTING STEEL, ETC, FOR THE PROPER INSTALLATI ❑N OF ALL MECHANICAL SYSTEMS. 5. COORDINATE FLOOR, WALL, ROOF PENETRATI❑NS.. LOUVER SIZES, PAD LOCATIONS, ETC. WITH ARCHITECTURAL TRADES, 6. THE CONTRACTOR SHALL REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF GRILLES, REGISTERS, AND DIFFUSERS. 7. INSTALL MANUAL VOLUME DAMPERS AT ALL SUPPLY AIR BRANCH DUCTS TO THE DIFFUSER, BRANCH RETURN AIR DUCT, EXHAUST AIR DUCT, AND OTHER L❑CATI ❑NS AS SHOWN ON PLANS. 8. PROVIDE FLEXIBLE CONNECTION AT DIFFUSER NECK. ALL FLEXIBLE DUCT SHALL BE INSULATED AND LIMITED TO 5' -0" IN LENGTH. 9, DUCTED EXHAUST AND RETURN GRILLES SHALL BE HARD CONNECTED. 10.CO❑RDINATE AND PR ❑VIDE ACCESS DOORS IN HARD CEILING AREAS FOR ACCESS TO TERMINAL UNITS, BALANCING DAMPERS, TERMINAL UNIT HEATING C ❑IL PIPING, ETC. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. 11. CONTRACTORS SHALL VERIFY THERE ARE NO COMBUSTIBLES IN THE RETURN AIR PLENUM. IF COMBUSTIBLES ARE PRESENT CONTRACTOR SHALL COORDINATE WITH ARCHITECT /ENGINEER /OWNER'S REPRESENTATIVE COURSE OF ACTION (HARD DUCT RETURN SYSTEM OR ELIMINATE COMBUSTIBLES - FIREPROOF, WRAP, ETC.) 12.ALL SHEET METAL DUCT SIZES SHOWN ARE CLEAR INSIDE DIMENSI ❑NS. SCALE: 1/4" = 1' -0" MECHANICAL NOTES 1. DUCT LINING IS NOT ALLOWED PROVIDE AND INSTALL NEW DUCT SMOKE DETECT O- IN RA DUCT AS REQUIRED BY LOCAL CODE TO PROVIDE FAN SHUTDOWN MECHANICAL PLAN 4 ,. if' // r %/r///Y .O /f /, ,. O///// i �% s :.:_.. - 2, ALL SUPPLY AIR DUCTWORK SHALL BE WRAPPED WITH 1' INSULATION TO MATCH EXISTING, 3. PR ❑VIDE AND INSTALL FIRE DAMPERS WHERE DUCTS PENETRATE RATED C❑NSTRUCTI ❑N. ALL DUCTS PENETRATING SHAFTS (SMOKE BARRIERS) SHALL HAVE COMBINATION FIRE /SMOKE DAMPERS ACTIVATI ❑N OF DAMPER SHALL BE SIGNALED TO FIRE ALARM PANEL. 4, MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, C ❑RING AND PATCHING REQUIRED FOR PROPER INSTALLATION OF THE SYSTEM, 5, PR ❑VIDE BALANCING DAMPERS IN ALL BRANCH DUCTWORK AS REQUIRED FOR PROPER BALANCING OF THE SYSTEM. 6. THE ENTIRE CONSTRUCTION SHALL CONFORM TO THE LATEST EDITION OF N.F,P,A, SMAGNA, THE MICHIGAN MECHANICAL CODE, LOCAL ORDINANCE, AND AUTHORITIES HAVING JURISDICTI ❑N. 7, EACH CONTRACTOR SHALL COORDINATE INSTALLATION OF HIS WORK WITH ALL OTHER TRADES TO AV ❑ID CONFLICTS AND INTERFERENCES DURING C❑NSTRUCTI ❑N. 8. CONTRACTOR SHALL NOT RUN ANY PVC, PLASTIC MATERIALS OR ANY OTHER COMBUSTIBLE MATERIAL INSIDE THE RETURN AIR PLENUM. 9, MECHANICAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL EQUIPMENT ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRI ❑R TO ANY EQUIPMENT PURCHASE. 10. TESTING & BALANCING - ENGAGE THE SERVICES OF AN INDEPENDENT CERTIFIED TEST AND BALANCE AGENCY THAT SPECIALIZED IN AND WHO'S BUSINESS IS LIMITED TO THE TESTING AND BALANCING OF HVAC SYSTEMS AND HYDR❑NIC SYSTEMS, THE AGENCY SELECTED SHALL BE CERTIFIED BY ASSOCIATED AIR BALANCE COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB), AGENCY SHALL SUBMIT A COMPLETE REPORT BASED ON SMACNA 'BALANCING AND ADJUSTMENT MANUAL'. THE HVAC SYSTEM SHALL BE TESTED AND BALANCED TO DEMONSTRATE THAT SPECIFIED CAPACITY AND PROPER CONTROL FUNCTIONING HAS BEEN ATTAINED. 11, START - UP FOR ALL EQUIPMENT SHALL BE CONDUCTED BY EACH MANUFACTURER'S START - UP REPRESENTATIVE. INCLUDE FINAL REPORT AND CERTIFICATE. PR ❑VIDE OWNER'S MANUAL AND TRAINING FOR MAINTENANCE PERSONNEL FOR EACH TYPE OF EQUIPMENT. 12.ALL EQUIPMENT AND COMBUSTION VENT TERMINATION ETC. SHALL BE INSTALLED PER MANUFACTURERS REC❑MMENDATI ❑NS. VERIFY AND LOCATE EQUIPMENT BASED ON MANUFACTURERS RECOMMENDED CLEARANCES. 13.0 ❑NTRACT ❑R SHALL PROVIDE RETURN AIR TRANSFER DUCTWORK FOR ALL ROOMS WITH WALLS FROM FINISHED FLOOR TO BOTTOM OF DECK. COORDINATE WALL L❑CATI ❑NS WITH ARCHITECTURAL TRADES. GENERAL NOTES 1. CONTRACTORS SHALL PR ❑VIDE EQUIPMENT AND SPECIALTIES INDICATED HERE -IN TO PROVIDE A COMPLETE AND WORKING SYSTEM, 2. CONTRACTORS SHALL COMPLY WITH ALL LAWS, LOCAL ORDINANCES AND CODES OF THE STATE, FEDERAL AGENCIES AND MUNICIPALITY, CONTRACTORS SHALL SECURE AND PAY FOR ALL NECESSARY FEES AND PERMITS REQUIRED IN THE PERFORMANCE OF HIS WORK. ALL CUTTING AND PATCHING FOR NEW WORK SHALL BE DONE BY THIS CONTRACTOR WITH THE APPROVAL OF THE OWNER'S REPRESENTATIVE, 3. CONTRACTOR SHALL VISIT THE SITE AND CHECK THE EXISTING CONDITI ❑NS BEFORE SUBMISSION OF BIDS. NO ALLOWANCE SHALL BE MADE IN BEHALF OF EXTRA EXPENSES DUE TO THE FAILURE TO MAKE SUCH AN EXAMINATI ❑N. 4, CONTRACTOR SHALL PR ❑VIDE A COMPLETED OPERABLE SYSTEM AS HERE -IN DESCRIBED. IF THE D ❑CUMENTATION IS UNCLEAR OR INCOMPLETE TO THE CONTRACTOR HE SHALL SO STATE IN WRITING TO THE OWNER'S REPRESENTATIVE /ENGINEER AND REQUEST CLARIFICATION ON THOSE ITEMS REQUIRING CLARIFICATION, IF NO SUCH STATEMENT IS MADE IT SHALL BE PRESUMED THAT THE CONTRACTOR FULLY UNDERSTANDS THE INTENT OF A FUNCTI ❑N OF THE SYSTEM DESCRIBED. 5. ANY CLAIMS FOR ADDITIONAL SERVICES BASED UPON UNDERSTANDING OF THE SYSTEMS WILL NOT BE ALLOWED. CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO CONVEY THE SCOPE OF WORK AND GENERAL ARRANGEMENT OF EQUIPMENT. DO NOT SCALE DRAWINGS, 6. CONTRACTOR SHALL C ❑ORDINATE HIS WORK WITH ALL OTHER TRADES. CONTRACTOR SHALL SECURE FINAL OCCUPANCY INSPECTION AND SUBMIT CERTIFICATES TO THE OWNER'S REPRESENTATIVE, CONTRACTOR SHALL FURNISH THE OWNER WITH A WRITTEN GUARANTEE TO CORRECT ALL IMPERFECTI ❑NS IN MATERIALS AND WORKMANSHIP, WHICH MAY DEVELOP IN THE SYSTEMS INSTALLED AND UNDER NORMAL USE FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE BY THE OWNER, 7. BASE BID FOR EQUIPMENT IS TO BE UNITS SCHEDULED. PRICING USING ALTERNATE ACCEPTED AND LISTED MANUFACTURES SHALL STATE ALTERNATE MANUFACTURER AND MODEL NUMBER AS PART OF BID. VOLUNTARY ALTERNATES FOR EQUIPMENT NOT LISTED SHALL ONLY BE WITH WRITTEN ACCEPTANCE OF THE ENGINEER PRIOR TO BIDDING, VOLUNTARY ALTERNATES WILL NOT BE REVIEWED FOR ACCEPTANCE BY THE ENGINEER DURING THE 7 DAYS PRIOR TO BID DATE. 8. CONTRACTOR SHALL PR ❑VIDE, STORE, PLACE AND INSTALL ALL NECESSARY EQUIPMENT REQUIRED. ALL EQUIPMENT SHALL BE INSTALLED PER THE MANUFACTURER'S REC❑MMENDATI ❑NS AND IN SUCH A MANNER AS TO FUNCTION IN ITS INTENDED USE, 8. CONTRACTOR SHALL SUBMIT SUBMITTALS FOR ALL EQUIPMENT AND MATERIALS FOR REVIEW PRIOR TO PURCHASE, 9. AFTER INSTALLATI ❑N IS COMPLETE, CONTRACTOR SHALL BE RESPONSIBLE FOR STARTUP, INSPECTORS' APPROVAL AND CLEAN UP. x REVISIONS °! P No chances shall be marle to thn shop+ i of work without prior approval of Tukwila Building ng Division El x -' DUCT FLEX Q THERMOSTAT I I N OTE: Revisions will require a new plan submittal and may include additional plan review #gec NiTROLS NOTE FMB CONTROLS SHALL MATCH MALL CONTROLS SYSTEM. CONTROLS CONTRACTOR SHALL TIE -INTO EXISTING CONTROLS FOR OPERATI ❑N. MECHANICAL KEYED NOTES: (MECHANICAL KEYED NOTES APPLY TO THIS SHEET ONLY) CONNECT TO EXISTING SUPPLY AIR MAIN (VERIFY IN FIELD), CONNECT EXHAUST FROM TOILET EXHAUST FAN TO MALL EXHAUST DUCT MAIN (VERIFY IN FIELD), MECHANICAL SYMBOL LEGEND: NOTD THE F ❑LL ❑WING SYMBOLS SHALL BE AS INDICATED, UNLESS NOTED OTHERWISE ON PLANS. SD -1: 24'x24' SUPPLY DIFFUSER RG - 1+ 24 °x24' RETURN GRILLE 11 CEILING MOUNTED INLINE EXHAUST FAN. PER 2006 IMC SECTION 606 Install smoke detector to shut down air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. See IMC 606.2.2 for approved method of detection) S Date:. City of Tukwila BUILDING DIVIS FILE COPY Permit No. Plar review approval is subject to errors and otrons. Approval of construction on documents does not authodze the violation of any adopted code or Whence. Receipt of approved Fie • .'.- , d - ~ , Consultant Registration acialowled REVIEWED FOR CODE COMPLIANCE APPROVED APR 1 7 ?008 I Or iu;lja ` SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical jg Electrical ` Plumbing or Gas Piping City of Tukwila - E$V. F'li 3G DIVISION RECEIVED APR 0 4 2000 PERMIT CENTER Mob -09b 2896 Southcenter Mall Tukwila, WA 98188 smith co. 1725 westlake ave. n. suite 210 seattle, washington 98109 206.838.5485 p 206.713.4076 m 206.464.0700 f ksmith©smithco.org http: / /www.smithco.org/ Consultant Issues and Revisions No. Date 1 03.31.08 Project Name WESTFIELD SOUTHCENTER MALL Project Number Scale AS NOTED Issues 02008018.00 Template 4.3 (120101) M -1 PERMIT 6294 Description MECHANICAL PLAN Computer File CW05- 2008— M1,DWG Architect Registration By Check All ideas, designs, arrangements, and plans indicated or represented by this drawing are owned by and the property of smith co. Ilc and were created, evolved, and developed for use on and in connection with the specified project. None of such ideas, designs, arrangements or plans shall be used by or disclosed to any person, firm, or corporation for any purpose whatsoever without the written permission of smith co. Ilc. KLS FAN POWERED VARIABLE AIR VOLUME BOX SCHEDULE MARK FMB -1 FMB -2 FMB -3 FMB-4 FMB -5 INLET SIZE 6'0 8 "0 10 "0 12 "0 14 "0 PRIMARY AIR CFM RANGE: MINIMUM 80 145 230 325 450 MAXIMUM 500 900 1400 2000 3000 DESIGN PRIMARY AIR FLOW (MAXIMUM COOLING CFM) SEE PLAN SEE PLAN SEE PLAN SEE PLAN SEE PLAN MINIMUM DESIGN PRIMARY AIR INLET S.P. (in. w.g.) 0.5" 0.5" 0.5" 0.5" 0.5" FAN DESIGN AIR FLOW (CFM) 300 500 700 950 1500 MINIMUM DOWNSTREAM S.P. (in. w.g.) (FAN S.P.) 0.5" 0.5" 0.5" 0.5" 0.5" NC DISCHARGE @ PRIMARY AIR A PS =1.5" 15 20 22 26 26 REHEAT COIL: TYPE ELECTRIC ELECTRIC ELECTRIC ELECTRIC ELECTRIC KW 3.0 5.0 10.0 15.0 15.0 VOLT /PHASE 277/10 277/10 480/30 480/30 480/30 ELECTRICAL DATA: HP 1/6 1/4 1/4 1/3 1/3 VOLT /PHASE 277/10 277/10 277/10 277/10 277/10 F.L.A. 0.8 1.4 1.4 3.0 3.0 BASED ON: MANUFACTURER TITUS TITUS TITUS TITUS TITUS DTFS DTFS SIZE B DTFS SIZE C DTFS SIZE C DTFS SIZE D DTFS SIZE D APPLICABLE NOTES 1,2,3,4,5,6,7 1,2,3,4,5,6,7 1,2,3,4,5,6,7 1,2,3,4,5,6,7 1,2,3,4,5,6,7 AIR DEVICE SCHEDULE . MARK DESCRIPTION SIZE MAXIMUM CFM MAX. P.D. (in. w.g.) MAXIMUM NC LEVEL BASED ON APPLICABLE NOTES MANUFACTURER MODEL SD -1 SQUARE LOUVER FACED CEILING DIFFUSER 24 "x24" SEE CAPACITY SCHEDULE 0.1" 30 TITUS TMSA 1, 2, 3 SR -1 WALL AND /OR DUCT MOUNTED SUPPLY REGISTER, DOUBLE DEFLECTION SEE PLANS SEE PLANS 0.1" 30 TITUS 300RL 1, 3, 4 RG -1 EGGCRATE RETURN GRILLE SEE PLANS SEE PLANS 0.1" 30 TITUS 50F 1, 3, 4 EG -1 EGGCRATE EXHAUST GRILLE 12 "x12" SEE PLANS 0.1" 30 TITUS 50F 1, 2, 3, 4 FAN SCHEDULE MARK EF -1 SERVES RESTROOM LOCATION CEILING TYPE CEILING CFM 100 EXTERNAL STATIC PRESSURE (in. w.g.) 0.6" ELECTRICAL DATA: DRIVE DIRECT HP 80 WATTS VOLTS /PHASE 115/10 FAN RPM 950 BASED ON: MANUFACTURER GREENHECK MODEL SP -B110 APPLICABLE NOTES 1, 2 AIR DEVICE CAPACITY SCHEDULE MARK CFM RANGE FACE SIZE (inches) SR -1 (272 RL) 0 - 135 6 "x6" 136 - 240 10 "x6" 241 - 340 14 "x6" 341 - 450 18 "x6" 451 - 775 18 "x10" AIR DEVICE CAPACITY SCHEDULE MARK CFM RANGE NECK SIZE (inches) SD -1 0 - 250 8 "0 251 - 425 10 "0 426 - 700 12 "0 701 - 1000 14 "0 AIR DEVICE NOTES: 1. DESIGN CFM AS NOTED ON PLANS. 2. SEE AIR DEVICE CAPACITY SCHEDULE FOR NECK SIZE. DUCT SIZE TO DIFFUSER/REGISTER/GRILLE SHALL BE EQUAL TO NECK NECK SIZE, UNLESS OTHERWISE NOTED. 3. PROVIDE MOUNTING FRAME AND BORDER STYLE TO ACCOMMODATE THE ARCHITECT'S REFLECTED CEILING PLAN AND /OR WALL CONSTRUCTION. 4. PROVIDE VOLUME DAMPER. 5. RETURN, EXHAUST, AND TRANSFER GRILLES SHALL BE 24 "x24 ", UNLESS OTHERWISE NOTED ON PLANS. FAN MIXING BOX PLAN INFORMATION: REHEAT COIL MAXIMUM DESIGN PRIMARY AIR CFM OTHERWISE NOTED MIN. STOP @ ( )% OF DESIGN PRIMARY AIR CFM «FAN MIXING BOXES ARE ALSO AVAILABLE IN 208 -240 VOLTS AND 277 VOLTS. THE FLA WILL CHANGE ACCORDINGLY. SEE CATALOG FOR CHANGES. »» 6. PROVIDE WITH MODULINEAR DIFFUSER PLENUM. 8. ALL AIR DEVICES SHALL HAVE OFF -WHITE FINISH UNLESS OTHERWISE NOTED. 7. TRANSFER GRILLES ON PLANS INDICATED BY TG -1 (XX "0) SHALL BE PROVIDE WITH A RECTANGULAR TO ROUND NECK ADAPTER. FAN MIXING BOX NOTES: 1. FURNISH WITH 1" THROWAWAY FILTERS, INTAKE PLENUM, HANGER RODS, AND SINGLE POINT POWER CONNECTION. 2. DESIGN PRIMARY COOLING AIR CFM MINIMUM STOP @ 33% OF DESIGN PRIMARY COOLING AIR, FOR ALL EXPOSURES OTHER THAN NORTH (USE 66% FOR NORTH). 3. PROVIDE DISCONNECTS. STARTER MOUNTED AT THE UNIT SUITABLE FOR THE MOTOR HORSEPOWER. 4. DDC BOX CONTROLLER TO BE FURNISHED BY T.C.C. TO THE BOX MANUFACTURER, TO BE INSTALLED AS FACTORY. FIELD CONTROL WIRING AND CONTROL TRANSFORMER BY T.C.C. FMB -1 500 (50) 5. CONTRACTOR SHALL NUMBER ALL FAN MIXING BOXES, SO THAT EACH BOX HAS AN UNIQUE NUMBER. COORDINATE NUMBERING SYSTEM WITH ELECTRICAL TRADES. 6. FOR THOSE FMB BOXES, WHICH AT THIS TIME ARE NOT PROVIDED WITH THERMOSTAT LOCATIONS AND SUPPLY AIR DUCTWORK, PROVIDE 50' -0" OF CONTROL WIRING/TUBING AND THERMOSTAT COILED UP AT FMB BOX. 7. PROVIDE INLET AIR PROVING SWITCH TO PROTECT ELECTRICAL REHEAT COIL. FAN NOTES: 1. PROVIDE DISCONNECT. 2. PROVIDE THE FOLLOWING ACCESSORIES: A. DESIGNER GRILLE. B. BACKDRAFT DAMPER. C. MOUNTING BRACKETS. RECTANGULAR SUPPLY DUCT CEILING 45" CLINCH COLLAR OR ROUND SPIN -IN FITTING CONNECTION WITH MANUAL VOLUME DAMPER AND LOCKING QUADRANT. (SEE PLAN) TRANSITION TO ROUND OR ROUND DUCT SAME AS DIFFUSER NECK UNLESS NOTED OTHERWISE. (SEE PLAN) MAX. 5' -0" LONG (EXTENDED) ROUND FLEXIBLE DUCT CONNECTION SAME AS DIFFUSER NECK DIA. (1 -90° BEND. MAX.) CEILING DIFFUSER (SEE PLAN) STANDARD DIFFUSER AND DUCT CONNECTION DETAIL NOT TO SCALE MANUAL AIR VOLUME DAMPER W/ LOCKING QUADRANT (TYPICAL) TRANSITION TO ROUND Ci`3! Of Tukwila WHEN REQUIRED (SEE 9LLAfy )JILDING DIVIs of j REVIEWED FOR CODE COMPLIANCE APPROVED APR 1 7 2008 R CENE APR 04 ZO 2896 Southcenter Mall Tukwila, WA 98188 smith co. 1725 westlake ave. n. suite 210 seattle, washington 98109 206.838.5485 p 206.713.4076 m 206.464.0700 f ksmith @smithco.org http: / /www.smithco.org/ Consultant PM (, Consultant Registration Issues and Revisions No. Date 1 03.31.08 Project Number 02006088.00 Computer File Scale AS NOTED Issues Description GENERAL INFORMATION CW05- 2008- T1.DWG Template 4.3 (12 0101) Architect Registration By Check PERMIT KLS Project Name WESTFIELD SOUTHCENTER MALL All ideas, designs, arrangements, and plans indicated or represented by this drawing are owned by and the property of smith co. Ilc and were created, evolved, and developed for use on and in connection with the specified project. None of such ideas, designs, arrangements or plans shall be used PERMIT �F 4TE by or disclosed to any person, firm, or corporation for any urpose whatsoever without the written permission of smith co. 11c. MECHANICAL SPECIFICATIONS 15010: GENERAL PROVISIONS: (THE WORD "CONTRACTOR" IN THIS ACTION SHALL REFER TO TENANTS PLUMBING, FIRE SPRINKLER AND HVAC MECHANICAL CONTRACTORS). A. GENERAL 1. THE GENERAL CONDITIONS OF THE CONTRACT, CURRENT EDITION PUBLISHED IN STANDARD FORM BY AMERICAN INSTITUTE OF ARCHITECTS, SHALL BE PART OF THIS CONTRACT. 2. THE ARTICLES CONTAINED IN THIS DIVISION AND IN ARCHITECTURAL SPECIFICATIONS MAY AMEND, MODIFY, SUPERSEDE, VOID OR SUPPLEMENT THE ARTICLES OF THE GENERAL CONDITIONS NOTED IN PARAGRAPH 15010(A) ABOVE, AND SHALL TAKE PRECEDENCE OVER THE PROVISIONS OF THE GENERAL CONDITIONS IN 15010(A). 3. THIS CONTRACTOR IS REFERRED TO THE ARCHITECTURAL, STRUCTURAL AND ELECTRICAL PLANS AND SPECIFICATIONS WHICH ARE HEREBY MADE PART OF THE CONTRACT. 4. THIS CONTRACTOR SHALL TAKE OUT ALL NECESSARY PERMITS, LICENSES AND CERTIFICATES AND PAY ALL FEES CONNECTED THEREWITH. 5. BIDDERS SHALL VISIT THE SITE AND FAMILIARIZE THEMSELVES, WITH ALL CONDITIONS SURROUNDING THE WORK PRIOR TO SUBMITTING THE BID. 6. DRAWINGS ARE DIAGRAMMATIC AND INTENDED TO SHOW APPROXIMATE LOCATIONS UNLESS SPECIFICALLY DIMENSIONED. COORDINATE THE WORK WITH THE OTHER TRADES TO AVOID INTERFERENCE. SHOULD MECHANICAL WORK BE INSTALLED SUCH THAT IT INTERFERES WITH THE WORK OF OTHER CONTRACTORS, SUCH WORK SHALL BE REDONE AT NO ADDITIONAL COST TO TENANT. 7. AT THE COMPLETION OF THE WORK THIS CONTRACTOR SHALL REMOVE ALL RUBBISH, DIRT AND STAINS CAUSED BY HIS WORK AND SHALL THOROUGHLY CLEAN ALL MECHANICAL WORK INCLUDING EQUIPMENT, FIXTURES, DUCTWORK, PIPING, APPLIANCES, ETC. 8. THIS CONTRACTOR SHALL TOUCH UP OR REFINISH THE FACTORY FINISH OF EQUIPMENT MARRED DURING SHIPMENT OR INSTALLATION. 9. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR SUCH EQUIPMENT AND MATERIAL AS THE OWNER MAY REQUIRE FOR HIS REVIEW. THE OWNERS REVIEW MUST TAKE PLACE BEFORE CONSTRUCTION BEGINS. 10. "RECORD" DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR IF INSTALLATION DEVIATES FROM THE ORIGINAL LAYOUT. 11. MOTORS SHALL BE DESIGNED FOR SUPPLY VOLTAGES AS SCHEDULED AND SHALL COMPLY WITH AIEE AND NEMA REQUIREMENTS. PROVIDE ACROSS THE LINE STARTERS AN ALL MOTOR UNLESS NOTED OTHERWISE. MOTORS 1.0 HP AND LARGER SHALL BE HIGH EFFICIENCY. B. CODES ALL WORK SHALL CONFORM TO ALL NATIONAL, STATE, COUNTY, CITY, HEALTH AND SAFETY AND ENERGY CODES THAT APPLY, AS WELL AS WITH ALL LANDLORD CRITERIA. THIS CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED TO THE CONTRACTOR. C. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS WHERE TRADE NAMES AND MANUFACTURES ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM FOR THE BASE BID. MANUFACTURES CONSIDERED AS AN EQUAL OR BETTER IN AT ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL IN WRITING BY CLIENT'S PROJECT MANAGER OR ENGINEER THROUGH SHOP DRAWING SUBMITTAL PROCESS FOR ACCEPTANCE PRIOR TO EQUIPMENT BEING ORDERED. IF THE MECHANICAL CONTRACTOR WISHES TO SUBMIT ON ALTERNATE EQUIPMENT, THE CONTRACTOR SHALL SUPPLY CUT SHEETS DESCRIBING DIMENSIONAL DATA, UNITS OPERATING WEIGHTS AND ELECTRICAL CHARACTERISTICS TO THE ENGINEER. IN ADDITION, CONTRACTOR WILL SUPPLY ENGINEER WITH COMPUTER GENERATED PERFORMANCE DATA FROM CONTRACTORS EQUIPMENT REPRESENTATIVE FOR ALTERNATE EQUIPMENT. PERFORMANCE DATA SHALL BE CALCULATED FROM DESIGN CONDITIONS LISTED ON THE EQUIPMENT SCHEDULES. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ADDITIONAL COSTS INCURRED BY OTHER CONTRACTORS AS A RESULT OF USING EQUIPMENT NOT SPECIFIED OR SCHEDULED. EXAMPLES WOULD BE LARGER WIRE OR CIRCUIT BREAKER SIZES OR ADDITIONAL STRUCTURAL SUPPORT. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTS EXPENSE. 15020 DEMOLITION: A. REMOVE ALL PIPING, DUCTWORK AND EQUIPMENT NOT BEING REUSED. PIPING AND ACCESSORIES ASSOCIATED WITH EQUIPMENT BEING REMOVED, BUT NOT NECESSARILY NOTED ON DRAWINGS, SHALL ALSO BE REMOVED. B. EQUIPMENT AND MATERIALS BEING REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER. THE OWNER SHALL INDICATE WHICH ITEMS IF ANY ARE TO BE RETAINED. ITEMS TO BE SALVAGED SHALL BE MOVED TO A STORAGE AREA THAT IS DESIGNATED BY THE OWNER. ALL OTHER MATERIALS AND EQUIPMENT, NOT WANTED BY THE OWNER, SHALL BE REMOVED FROM THE SITE AND BE PROPERLY DISPOSED OF. C. WHERE EXISTING WALLS, FLOORS OR OTHER PORTIONS OF THE BUILDING REQUIRE PATCHING AFTER REMOVAL OF MATERIAL OR EQUIPMENT, THE PATCHING SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR. D. NO ASBESTOS WORK OF ANY NATURE SHALL BE PERFORMED BY THE CONTRACTOR PURSUANT TO THIS CONTRACT. IF DURING THE CONSTRUCTION OF THIS PROJECT, WORK INVOLVING ASBESTOS IS SUSPECTED OR ENCOUNTERED, PROMPTLY NOTIFY THE OWNER, AND THE OWNER, WITH HIS OWN FORCES OR BY SEPARATE CONTRACT SHALL BE RESPONSIBLE FOR COMPLETE REMOVAL AND DISPOSITION OF THE ASBESTOS. IF THE CONTRACTOR CLAIMS THAT DELAY AND ADDITIONAL COST IS INVOLVED BECAUSE OF THIS ACTION, HE SHALL MAKE CLAIM AS PROVIDED ELSEWHERE IN THE CONTRACT DOCUMENTS. 15400 PLUMBING: (THE WORD CONTRACTOR IN THIS SECTION SHALL REFER TO TENANTS PLUMBING CONTRACTOR.) A. SCOPE UNLESS NOTED OTHERWISE, THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT FOR THE INSTALLATION OF A COMPLETE AND TENANT ACCEPTABLE OPERATING PLUMBING SYSTEM HEREIN DESCRIBED INCLUDING: HOT AND COLD WATER SYSTEMS, CONNECTION TO EXISTING SANITARY SEWER SYSTEMS, PLUMBING FIXTURES, MISCELLANEOUS PLUMBING AND INSULATION. B. MATERIALS UNDERGROUND SANITARY SEWER AND VENT PIPING: BELL AND SPIGOT COST IRON WITH LEAD AND OAKUM OR NEOPRENE COMPRESSION JOINTS OR HUBLESS CAST IRON WITH TYPE MG CAST IRON COUPLINGS. STAINLESS STEEL BONDS ARE ACCEPTABLE IF COATED WITH BITUMASTIC. ABOVE GROUND SANITARY SEWER AND VENT PIPING: BELL AND SPIGOT CAST IRON WITH LEAD AND OAKUM OR NEOPRENE COMPRESSION JOINTS: OR HUBLESS CAST IRON PIPE AND JOINTING SYSTEM EXCEPT THAT TYPE MG CAST COUPLINGS SHALL BE USED FOE STOCKS MANE THAN 25 FT. HIGH. VENT PIPING MAY ALSO BE SCHEDULE 40 GALVANIZED STEEL WITH CAST IRON SCREWED DRAINAGE FITTINGS. VENT PIPING PASSING THROUGH ROOF: CAST IRON WITH NOT LESS THAN 12" PROJECTION ABOVE ROOF WITH APPROVED FROST JACKETS. WATER PIPING — TYPE L HARD COPPER WITH WROUGHT COPPER FITTINGS AND SHUT —OFF VALVE AT EACH FIXTURE. PIPING OF DISSIMILAR METALS MUST BE DIELECTRIC ALLY ISOLATED. CONDENSATE DRAIN PIPING: SAME AS WATER PIPING. PIPE HANGERS: CONFORM TO ANSI /MSS SP58. CONSTRUCT HANGERS OF CORROSION RESISTANT GALVANIZED STEEL (MICHIGAN #100), EXCEPT PROVIDE COPPER PLATED HANGERS SUPPORTING COPPER PIPING (MICHIGAN #100). SPACE HANGERS AS REQUIRED BY CODE, WITH A MINIMUM OF ONE HANGER PER PIPE JOIST. SUPPORT HANGER FROM TOP OF STRUCTURAL MEMBER. DO NOT SUPPORT FROM ROOF DECK OR OTHER EQUIPMENT. VERTICAL PIPING SHALL BE SUPPORTED WITH STANDOUT HANGERS AT EACH JOINT AND RISER CLAMPS AT FLOOR AND ROOF. SMALL PIPING (3/4" OR LESS) IN WALLS MAY BE SUPPORTED FROM METAL WASTE OR VENT PIPING USING WEJ —IT "ADJUSTABLE SPACER SYSTEM" COMPONENTS. C. TESTING TEST ALL PLUMBING PIPES AS REQUIRED BY STATE, CITY OR LOCAL CODES AND ORDINANCES. TESTS SHALL BE MADE IN THE PRESENCE OF THE PROPER INSPECTION AUTHORITIES, AUTHORIZED REPRESENTATIVE OF TENANTS ARCHITECT AND /OR THE LANDLORD'S ARCHITECT. FURNISH ALL NECESSARY TEST CERTIFICATES TO THE ARCHITECT. D. DISINFECTING WATER PIPES DISINFECT THE ENTIRE WATER SUPPLY SYSTEM, FILLING WITH A SOLUTION OF 50 PPM OF AVAILABLE CHLORINE AND ALLOW TO STAND SIX HOURS BEFORE FLUSHING AND RETURNING TO SERVICE. E. PIPING INSULATION: EDIT FOR THICKNESS REQUIRED. INSULATE DOMESTIC HOT WATER, COLD WATER AND CONDENSATE PIPING WITH 1/2" FIBERGLASS, WITH ALL PURPOSE JACKET: SEAL ALL JOINTS. INSULATE FITTINGS WITH MITERED SEGMENTS AND VAPOR SEALS, INSULATE ALL EXPOSED WASTE AND WATER PIPING ON HANDICAP FIXTURES USING TRUBRO KIT NO. 102W WITH ACCESSORY NO. 105, OR APPROVED EQUAL. F. CUTTING AND PATCHING THIS CONTRACTOR SHALL DO ALL CUTTING AND PATCHING REQUIRED TO INSTALL ANY PORTION OF THIS WORK. PATCH WITH NEW MATERIALS OF THE SAME TYPE THAT WAS REMOVED. REFINISH PATCHED SURFACE TO MATCH EXISTING ADJACENT SURFACES. ALL ROOF PENETRATION BY LANDLORD'S ROOF CONTRACTOR AT FIFE CONTRACTOR'S EXPENSE. G. SANITARY SEWAGE CONNECT NEW WASTE PIPING TO EXISTING SANITARY WASTE AT THE APPROXIMATE LOCATION SHOWN. VERIFY EXACT LOCATION AND INVERT ELEVATION BEFORE COMMENCING WORK. H. COLD WATER SERVICE FURNISH AND INSTALL NEW COLD WATER PIPING FROM EXISTING PIPING TO, AND INCLUDING CONNECTION TO, NEW PLUMBING FIXTURES AND HOT WATER HEATER AS SHOWN ON PLANS. I. DOMESTIC HOT WATER FURNISH AND INSTALL ONE (I) A.O. SMITH ELSE -10 OR EQUAL GLASS LINED ELECTRIC WATER HEATER HAVING ONE 3000 WATT ELEMENT COMPLETE WITH SAFETY CONTROLS, AN ASME LABELED TEMPERATURE AND PRESSURE RELIEF VALVE PIPED AS INDICATED ON PLANS AND TWO (2) SHUT —OFF VALVES. VERIFY VOLTAGE WITH ELECTRICAL CONTRACTOR BEFORE ORDERING. OPERATING WEIGHT 80 LBS. FURNISH AND INSTALL ONE (1) AMITROL, THERMAL EXPANSION TACK. 2 GALLON CAPACITY MODEL: THERM—X—TROL—ST-5. J. GAS PIPING FURNISH AND METAL A COMPLETE GAS PIPING SYSTEM AS SHOWN ON PLANS. GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40. ASTM A -120, WITH MALLEABLE THREADED FITTINGS FOR 2" AND SMALLER, AND WITH STANDARD BUTT— WELDED JOINTS FOR 2-1/2" AND LARGER. FURNISH AND INSTALL A GAS COCK, DIRT LEG, AND UNION CONNECTION TO EACH PIECE OF EQUIPMENT. PAINT ALL PIPING EXPOSED ON ROOFTOP WITH RUST — INHIBITING PAINT. PITCH PIPING AT A UNIFORM GRADE OF 1/4" IN 15 FEET UPWARD IN DIRECTION OF FLOW. SUPPORT PIPING EVERY 5 FEET MIN. SUPPORT AS REQUIRED BY LANDLORD CRITERIA OR BY STANDARD INDUSTRY PRACTICE, IF LANDLORD HAS NO REQUIREMENTS. TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE REQUIREMENTS OF THE LOCAL GAS COMPANY, LOCAL CODES, AND APPLICABLE NPFA 54 CODES. CONTACT AND COORDINATE GAS SERVICE, METER AND REGULATOR REQUIREMENTS WITH THE LOCAL GAS UTILITY COMPANY AND THE MALL'S OPERATIONS MANAGER. INCLUDE INSTALLATION COST OF GAS METER AND REGULATOR IN BID IF NOT PROVIDED BY UTILITY COMPANY. K. MISCELLANEOUS PWMBING ACCESSORIES BACKFLOW PREVENTER: FURNISH AND INSTALL WATTS SERIES 7, OR APPROVED EQUAL BACKFLOW PREVENTER WHERE SHOWN ON DRAWING. 15030 FIRE SPRINKLERS: A. SYSTEMS THE FIRE SPRINKLER SYSTEM AND HEAD LOCATIONS SHALL BE PER TENANTS FIXTURES, PARTITIONS, SOFFITS, DROPS, CEILING HEIGHTS, ETC. SPRINKLER SYSTEM TO INCLUDE DROPS, HEADS AND FACILITIES FOR PROPER DRAINAGE. DESIGN WET SPRINKLER SYSTEM FOR ORDINARY HAZARD GROUP 2 PER LATEST EDITION OF NFPA 13. THE SPRINKLER SYSTEM SHALL BE DESIGNED AND INSTALLED BY A LICENSED FIRE PROTECTION CONTRACTOR IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE LANDLORD, LANDLORD'S FIRE INSURANCE UNDERWRITER, AND ALL GOVERNMENTAL AGENCIES AND AUTHORITIES HAVING JURISDICTION OVER THE PREMISES. COMPREHENSIVE SHOP DRAWINGS AND CALCULATIONS SHALL BE SUBMITTED BY THE CONTRACTOR FOR THE APPROVAL BY THE OWNER LANDLORD. LANDLORDS FIRE INSURANCE UNDERWRITER, AND THE FIRE RATING INSPECTION BUREAU (FACTORY MUTUAL). SPRINKLER SHOP DRAWINGS SHALL BE SUBMITTED TO THE LOCAL FIRE MARSHALL'S OFFICE AND RECEIVE THEIR APPROVAL BEFORE ANY INSTALLATION CAN BEGIN. APPROVED DRAWINGS MUST BE AT THE JOB SITE DURING CONSTRUCTION. AFTER RECEIPT OF APPROVAL AND BEFORE PROCEEDING WITH ANY INSTALLATION WORK. TENANT SHALL FORWARD TWO (2) SPRINKLER SHOP DRAWING BLUELINE PRINTS BEARING THE FIRE INSURANCE UNDERWRITERS STAMP OF APPROVAL TO THE LANDLORD FOR HIS RECORDS. SPRINKLER HEADS LOCATED AT THE STOREFRONT, IN SHOWCASE WINDOWS AND IN HARD SURFACE CEILINGS MUST BE CONCEALED TYPE. HEADS LOCATED IN ACOUSTIC CEILING MAY BE SEMI—RECESSED TYPE. SURFACE MOUNTED HEADS ARE PERMITTED IN NON— CUSTOMER AREAS ONLY. UNLESS OTHERWISE NOTED, ALL FIRE PROTECTION SPRINKLER HEADS SHALL BE QUICK RESPONSE (OR) TYPE. SPRINKLER HEAD TYPES SHALL BE AS FOLLOWS: ALL SPRINKLER HEADS IN AREAS WITH FINISHED CEILINGS TO BE RELIABLE MODEL G4QR CONCEALED PENDANT WITH STANDARD WHITE FINISH. ALL SPRINKLER HEADS IN AREAS WITH UNFINISHED CEILING TO BE RELIABLE MODEL F1FR UPRIGHT WITH CHROME FINISH. SPRINKLER IN TOILET ROOMS, OFFICE AND NON — CUSTOMER AREAS WITH FINISHED CEILING TO BE RELIABLE MODEL F1FR SEMI— RECESSED PENDANT TYPE. VERIFY TYPES AND FINISHES WITH ARCHITECT. SHUT DOWN OF LANDLORD'S SPRINKLER MAIN SHALL BE ONLY DONE ON A SCHEDULE ESTABLISHED BY LANDLORD. ANY DAMAGE CAUSED BY THIS CONTRACTOR TO LANDLORD'S SPRINKLER SYSTEM WILL BE REPAIRED BY LANDLORDS CONTRACTOR AT THIS CONTRACTORS EXPENSE. THE SPRINKLER SYSTEM SHALL BE TESTED AT WATER PRESSURE OF 200 PSIG FOR A PERIOD OF TWO (2) HOURS IN THE PRESENCE OF LANDLORDS REPRESENTATIVE OR AS REQUIRED BY LANDLORD. SPRINKLER PIPING SHALL BE SCHEDULE 10 AND SCHEDULE 40 BLOCK STEEL. HANGERS SHALL BE AS REQUIRED BY NFPA 13. UPON COMPLETION OF THE SYSTEM AND ON POSSESSION OF PREMISES, SUBMIT A WRITTEN CERTIFICATE TO LANDLORD FROM THE UNDERWRITER STATING THAT THE SYSTEM WAS INSPECTED AND APPROVED. 15040 HEATING, VENTING AND AIR CONDITIONING: (THE WORD CONTRACTOR IN THIS SECTION SHALL REFER TO TENANT MECHANICAL CONTRACTOR). A. SCOPE UNLESS STATED OTHERWISE, THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS AND EQUIPMENT FOR THE INSULATION OF A COMPLETE AND TENANT ACCEPTABLE OPERATING HEATING AND AIR CONDITIONING SYSTEM HEREIN DESCRIBED, AND AS SHOWN ON PLANS. THE SPACE IN GENERAL SHALL BE HEATED AND COOLED BY MEANS OF A PACKAGED ROOFTOP AIR CONDITIONING UNIT(S) WITH GAS HEAT AND UTILIZING A DX COIL AND PACKAGED AIR COOLED CONDENSING COMPRESSING UNIT(S) FOR COOLING. B. ROOFTOP AIR CONDITIONING UNIT(S) PROVIDE CARRIER, TRANE, OR APPROVED EQUAL ROOFTOP AIR CONDITIONING UNIT(S) AS SCHEDULED ON THE DRAWINGS. UNIT(S) SHALL BE COMPLETE WITH BELT — DRIVEN FAN, ADJUSTABLE DRIVE, INTERNALLY INSULATED HOUSING, DIRECT EXPANSION COOLING COIL, GAS HEAT, COMPRESSOR, AIR COATED CONDENSER, DRIP PAN, FILTER SECTION WITH THROWAWAY PLEATED FILTERS, INTERNAL VIBRATION ISOLATORS, AND 14" HIGH ROOF CURB. FURNISH UNIT(S) WITH ADDITIONAL ACCESSORIES AS SCHEDULED ON THE DRAWINGS. VERIFY OPERATING VOLTAGE WITH ELECTRICAL CONTRACTOR BEFORE ORDERING. C. CONTROLS PROVIDE ALL CONTROLS, WIRING, SENSORS, RELAYS. ETC. FOR A COMPLETE OPERATING SYSTEM THAT IS COMPATIBLE WITH INSTALLED EQUIPMENT ARID ALL LANDLORD REQUIREMENTS, INCLUDING EMERGENCY SHUTDOWN OF HVAC EQUIPMENT, UNLESS NOTED OTHERWISE. PROVIDE MULTI —STAGE HEAT /COOLED PROGRAMMABLE THERMOSTAT COMPATIBLE WITH INSTALLED EQUIPMENT AND LANDLORDS SYSTEM. THERMOSTAT SHALL BE HONEYWELL T-7300 OR EQUIVALENT PRODUCT FURNISHED BY THE MANUFACTURER OF THE INSTALLED EQUIPMENT. THERMOSTAT SHALL BE MOUNTED 5' -6" ABOVE FINISHED FLOOR, UNLESS NOTED OTHERWISE ON THE DRAWINGS. D. SEQUENCE OF OPERATION OCCUPIED HOURS: SUPPLY FAN SHALL OPERATE CONTINUOUSLY AND THE OUTSIDE AIR DAMPER SHALL BE OPEN TO THE MINIMUM POSITION. DX COIL OR GAS SHALL CYCLE TO MAINTAIN SPACE TEMPERATURE SETPOINT. UNOCCUPIED HOURS: OUTSIDE AIR DAMPER SHALL BE CLOSED. SUPPLY FAN AND CONDENSING UNIT OR ELECTRIC HEATING SHALL CYCLE TO MAINTAIN SPACE TEMPERATURE SETPOINT. ECONOMIZER MODE: DIFFERENTIAL ENTHALPY CONTROLLED ECONOMIZER SHALL ACTIVATE WHENEVER THE OUTSIDE AIR ENTHALPY IS LOWER THAN THE ENTHALPY CONTROL SETTING. ECONOMIZE, DAMPERS SHALL MODULATE TO FULL OPEN POSITION, AS REQUIRED, TO MAINTAIN DISCHARGE AIR TEMPERATURE BETWEEN 52 AND 58 DEGREES FAHRENHEIT. MECHANICAL COOLING /HEATING SHALL BE LOCKED OUT OF ECONOMIZER MODE. WHEN THE SPACE TEMPERATURE SETPOINT IS SATISFIED, THE DAMPER SHALL RETURN TO THE MINIMUM OUTSIDE AIR POSITION DURING OCCUPIED MODE AND CLOSE COMPLETELY DURING UNOCCUPIED MODE. SMOKE ALARM MODE: UPON A SIGNAL FROM THE DUCT SMOKE DETECTORS OR ZONE SMOKE EXHAUST /FIRE ALARM SYSTEM, UNIT(S) SHALL SHUT DOWN, AND THE OUTSIDE AIR DAMPER SHALL CLOSE. E. CUTTING AND PATCHING THIS CONTRACTOR SHALL DO ALL CUTTING AND PATCHING REQUIRED TO INSTALL ANY PORTION OF THIS WORK. PATCH NEW MATERIALS OF THE SAME TYPE THAT WAS REMOVED. REFINISH PATCHED SURFACE TO MATCH EXISTING ADJACENT SURFACES. ALL ROOF PENETRATIONS BY LANDLORD ROOF CONTRACTOR AT THIS CONTRACTOR'S EXPENSE. F. DUCTWORK CONSTRUCT ALL LOW VELOCITY DUCTWORK OF APPROPRIATE GAUGE SHEET METAL FOR INDICATED SIZES IN ACCORDANCE WITH SMACNA STANDARDS. ROUTE DUCTWORK SUBSTANTIALLY AS SHOWN ON THE CONTRACT DOCUMENTS. ALL BENDS AND CURVES SHALL BE LONG RADIUS. SEAL ALL DUCTWORK IN ACCORDANCE WITH SMACNA STANDARDS: ABOVE 2" W.G. STATIC PRESSURE — SEAL CLASS ° A" BETWEEN 1" AND 2" W.G. — SEAL CLASS "B" LESS THAN 1" W.G. — SEAL CLASS "C" DUCT SIZES SHOWN ON DRAWINGS OR INSIDE DIMENSIONS. INSTALL RIGID ALL METAL DUCT SUPPORT SYSTEMS AS INDICATED IN SMACNA STANDARD. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. FLEXIBLE DUCTWORK SHALL BE WIREMOLD WCK OR WK. THERMAFLEX M —KE. FLEXMASTER 3M OR NORFLEX NT -25M. MAXIMUM FLEXIBLE DUCT LENGTHS SHALL BE 5 FT. FLEXIBLE DUCTWORK SHALL BE EXTERNALLY INSULATED WITH UL LISTED 1" FLEXIBLE FIBERGLASS AND NON— COMBUSTIBLE VAPOR BARRIER . INSTALL ADJUSTABLE QUADRANT DAMPERS IN ALL BRANCH DUCTS, AND AS REQUIRED TO BALANCE THE AIR SYSTEM. G. BALANCING AIR SYSTEMS TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR WHO A IS CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AACD) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. THE MECHANICAL CONTRACTOR CAN NOT BE USED TO BALANCE THE SYSTEM. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING AND BALANCING SHALL BE BY THE GENERAL CONTRACTOR. THE HVAC CONTRACTOR SHALL BE PRESENT FOR THE AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES. THE MECHANICAL CONTRACTOR SHALL REMOVE AIR FILTER USED DURING CONSTRUCTION AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE WORK BEING DONE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. HVAC CONTRACTOR SHALL ALSO INSTALL A NEW SET OF FILTERS AT THE TIME OF PROJECT TURNOVER. ALL CONTROL SEQUENCES SHALL BE TESTED AND CORRECTED /ADJUSTED AS REQUIRED FOR CORRECT OPERATION AS SPECIFIED (INTERLOCKED EQUIPMENT SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER. ETC.) AND OPERATING STATUS RECORDED IN THE REPORT. G.C. TO PROVIDE A COPY OF THE FIND BALANCING REPORT TO LANDLORD, TENANT, CODE OFFICIALS (IF REQUIRED) AND 3 COPIES TO THE ENGINEER. NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. H. START UP OF SYSTEMS. GUARANTEE AND INSTRUCTIONS THIS CONTRACTOR SHALL GUARANTEE AND MAINTAIN THE STABILITY OF ALL WORK AND MATERIALS FOR A PERIOD OF ONE (I) YEAR AFTER THE FINAL PAYMENT FOR COMPLETION OF THE WORK AS EVIDENCED BY FINAL APPROVAL OF TENANT'S ARCHITECT. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS APPEARING DURING THE ABOVE—MENTIONED PERIOD MUST BE IMMEDIATELY CORRECTED BY THIS CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF TENANT'S ARCHITECT AND ENGINEERS. SUCH RECONSTRUCTION AND REPAIRS SHALL INCLUDE ALL DAMAGE TO THE FINISH OR FURNISHINGS OF THE BUILDING RESULTING FROM THE ORIGINAL DETECTOR REPAIRS THERETO. TENANTS DESIGNATED OPERATING PERSONNEL SHALL BE FULLY INSTRUCTED BY THIS CONTRACTOR IN THE OPERATION OF EACH MECHANICAL SYSTEM AT THE TIME IT IS BEING PUT IN SERVICE. ASSEMBLE IN PORTFOLIO FORM AND DELIVER TO TENANT BEFORE FINAL PAYMENT IS MADE FOUR (4) COMBINED SETS OF SHOP DRAWINGS, MANUFACTURERS BULLETINS OR OTHER DATA AS REQUIRED COVERING THE CARE, MAINTENANCE, AND OPERATION OF EACH PIECE OF EQUIPMENT FURNISHED. I. DIFFUSERS. GRILLES AND REGISTERS FURNISH AND INSTALL: TITUS, OR APPROVED EQUAL CEILING DIFFUSERS AS SCHEDULED. IF CONTRACTOR WISHES TO SUBMIT DIFFERENT GRILLES, REGISTERS, OR DIFFUSERS, CONTRACTOR WILL SUBMIT SHOP DRAWINGS TO ENGINEER PRIOR TO PURCHASING ANY MATERIAL. L. EXHAUST SYSTEM FURNISH AND INSTALL COOK. PENN, GREENHECK OR EQUAL, CEILING EXHAUST FAN WITH BACKDRAFT DAMPERS AND DUCTWORK COMPLETE AS SHOWN ON DRAWINGS. M. INSULATION 1. ALL CONCEALED SUPPLY DUCTWORK SHALL BE EXTERNALLY INSULATED. a. MATERIAL: OWENS— CORNING OR APPROVED EQUAL 1/2" REINFORCED FOIL FACED FIBERGLASS (VAPOR SEALED) INSULATION. INSTALL IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. 2. EXPOSED SUPPLY DUCTWORK SHALL BE ACOUSTICALLY LINED 10' -0" MINIMUM FROM ANY FAN OR SHOWN ON THE PLANS. a. ACOUSTICAL INTERNAL INSULATION SHALL BE I" OWENS— CORNING FIBERGLASS COATED DUCT LINER BOARD OR APPROVED EQUAL. DUCT SIZES SHOWN ON PLANS ARE INSIDE CLEAR DIMENSIONS. APPLY INSULATION WITH MANUFACTURER'S APPROVED ADHESIVES, MASTICS AND MECHANICAL FASTENERS. 3. ALL RETURN EXPOSED OR CONCEALED SHALL BE ACOUSTICALLY LINED 10' -0" MINIMUM FROM ANY FAN OR AS SHOWN ON THE PLANS. a. ACOUSTICAL INTERNAL INSULATION SHALL BE 1" OWENS — CORNING FIBERGLASS COATED DUCT LINER BOARD OR APPROVED EQUAL. DUCT SIZES SHOWN ON PLANS ARE INSIDE CLEAR DIMENSIONS. APPLY INSULATION WITH MANUFACTURER'S APPROVED ADHESIVES, MASTICS AND MECHANICAL FASTENERS. N. SMOKE DETECTORS CONTRACTOR TO FURNISH AND INSTALL PYROTRONICS OR APPROVED EQUAL, IONIZATION TYPE DUCT SMOKE DETECTOR IN RETURN AIR DUCT TO DE— ENERGIZE SUPPLY AIR UNIT UPON ACTIVATION. ELECTRICAL CONTRACTOR TO PROVIDE POWER TO SMOKE DETECTOR. APR 1 '7 ,';UJ 2896 Southcenter Mall Tukwila, WA 98188 math co. 1725 westlake ave. n. suite 210 seattle, washington 98109 206.838.5485 p 206.713.4076 m 206.464.0700 f ksmith @smithco.org http: / /www.smithco.org/ Consultant T 0 1 (f Consultant Registration Issues and Revisions No. Date 1 03.31.08 E W COD COMPLIAN rnR C APPROVED City Of Tu iaviiii BUILDING DIVISIG_ Project Name Project Number Description Computer File Scale 02008018.00 CW05- 2008-- M2,DWG AS NOTED Template 4.3 (120101) M -3 6294 Architect Registration Issues By Check PERMIT KLS WESTFIELD SOUTHCENTER MALL MECHANICAL SPECIFICATIONS All ideas, designs, arrangements, and plans indicated or represented by this drawing are owned by and the property of smith co. IIc and were created, evolved, and developed RECEIVED for use on and in connection with the specified project. None of /TR 042008 such ideas, designs, arrangements or plans shall be used by or disclosed to any person, firm, or corporation for any PERMIT CENTER purpose whatsoever without the written permission of smith co. IIc.