Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M08-133 - WESTFIELD SOUTHCENTER MALL - BATH AND BODY WORKS
BATH AND BODY WORKS 231 SOUTHCENTER MALL M08 -133 Parcel No.: 6364200010 Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Cityf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us 231 SOUTHCENTER MALL TUKW BATH AND BODY WORKS 231 SOUTHCENTER MALL , TUKWILA WA WESTFIELD PROPERTY TAX DEPT PO BOX 130940 , CARLSBAD CA Contact Person: Name: TIM SCHENK Address: 1120 E 80 ST, SUITE 211 , BLOOMINGTON, MN Contractor: Name: MECHANICAL & CONTROL SRVCS INC Address: 301 PORTER WAY , MILTON WA Contractor License No: MECHACS962BT MECHANICAL PERMIT DESCRIPTION OF WORK: INSTALL 1 NEW AHU, TEMPERATURE AND CARBON DIOXIDE SENSORS, EXHAUST FAN, DUCTWORK. Value of Mechanical: $40,000.00 Type of Fire Protection: SPRINKL.FRS /AFA Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial doc: IMC - 10/06 EQUIPMENT TYPE AND QUANTITY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *continued on next page ** • Permit Number: Issue Date: Permit Expires On: Phone: Phone: 800- 541 -0821 Phone: 253 926 -9777 Expiration Date: 02/26/2010 M08 -133 09/0S/2008 03/04/2009 Fees Collected: $620.00 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP/1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 M08 -133 Printed: 09 -05 -2008 Permit Center Authorized Signature: Signature: Print Name: doc: IMC-10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M08 -133 Issue Date: 09/05/2008 Permit Expires On: 03/04/2009 Date: C I — 5 ` 00 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not resume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performan ge gf�work. I am authorized to sign and obtain this mechanical permit. Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -133 Printed: 09 -05 -2008 Parcel No.: 6364200010 Address: Suite No: Tenant: 1: ** *FIRE DEPARTMENT CONDITIONS * ** doc: Cond -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 231 SOUTHCENTER MALL TUKW BATH AND BODY WORKS PERMIT CONDITIONS * *continued on next page ** • Permit Number: Status: Applied Date: Issue Date: M08 -133 ISSUED 05/01/2008 09/05/2008 2: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 3: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 4: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 5: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 6: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 7: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 8: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 9: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 10: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 11: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 12: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. M08 -133 Printed: 09 -05 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Print Name: J VI L A,A- doc: Cond -10/06 M08 -133 ordinances governing or local laws regulating Printed: 09 -05 -2008 CITY OF TUKWIL• Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Building Perm Mechanical Permit No. Plumbing /Gas Permit No. Public Works Permit No. Project No. 'XS Noy -I� Pcfoti-- 14-c (For office use on! Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: Zg ► Scs.x. c_2:1 to Tenant Name: ( frk ? c.3 W]L°A S Property Owners Name: it\s ■e_\c1 Cpacc,orak1 cA Mailing Address: 11GOI Wh\S\n:r acyuAeNtosa, t_OS E -Mail Address: -tirN‘4__e\dfr3oanp . t -OY1n Contact Person: E -Mail Address: Contractor Registration Number: Company Name: (n e j forrw-ve Contact Person: a*\V\ Ve. V-C) Contact Person: 1'Y rli C.Q 3c, ry cx C11 Company Name Namerhor aCtkPr ? Pis-ricireres, Mailing Address: . O C t.►-P.Sk" S \ E -Mail Address: Q:Wpplications\Forms- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bb King Co Assessor's Tax No.: t'p ? (47 - 60\ b Suite Number: Co I-$ Floor: Aram \es CPI claU2 J City City Day Telephone: Fax Number: New Tenant: ❑ Yes ® .. No State State Mailing Address: 2. '6 x ` "CA-P • 1. l Pt\a' - 2 -t D_ CPI q gSC•I City State Day Telephone: S\O I Woe- A:43 E - Mail Address: Fax Number: SIO I Cgo5 - i6 t 1 12\cklP \d , C)'i 4 Qz8•Cv City State Day Telephone: 30 1 659 - (v (cg' Fax Number: GC'? Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Name: `T'o - _ In\G Day Telephone: Ro0 \ S4 \ • OR 2.1 Mailing Address: 1120 1- S\ alkirx S - a k • ui.ite - em , F3 ■c3:::cvn ∎ r• -kbr\ M M s 2.O City J State Zip Fax Number: 9s 8'S 49Oc GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: 7 g. b Mailing Address: Zip Expiration Date: ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Zip ENGINEER OF RECORD - Al plans must be wet stamped by Engineer of Record Zip Page 1 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler Diffuser ps-k 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall /Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/Ind MECHANICAL PERMIT INFOATION - 206 - 431 -3670 • MECHANICAL CONTRACTOR INFORMATION Company Name: -T. b Mailing Address: City State Zip Contact Person: Day Telephone: E - Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ LiO, OO Scope of Work (please provide detailed information): p ne_u3 A kW., +e,m pev a_ here ? C, ri a.t>>c d,e c cs e etry Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... Replacement .... ❑ Fuel Tvpe: Electric ig Gas ....0 Other: Indicate type of mechanical work being installed and the quantity below: Q:Wpplications\Forms- Applications On Lne'3 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 4 of 6 PERMIT APPLICATION NOTE — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUT ORIZED AGENT: Signature: Print Name: i rvn S r \ e Day Telephone: ' t O ISIA1 - CR2-1 Mailing Address: 11 ZO sOm S *v2? - Sup\--2 Z \1 \e c v�G 4t��t1 ►V '" z4 City J State Zip Date Application Accepted: 5l (OS Date Application Expires: Q:Wpplications\Fonns- Applications On L inel3 -2006 - Permit Application.doc Revised: 9 -2006 bh Date: 4 Q 3o log Page 6 of 6 Parcel No.: 6364200010 Permit Number: M08 -133 Address: 231 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 05/01/2008 Applicant: BATH AND BODY WORKS Issue Date: Receipt No.: R08 -03151 Initials: WER User ID: 1655 Payee: MECHANICAL & CONTROLS TRANSACTION LIST: Type Method Descriptio Amount Payment Check 21326 496.00 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Account Code Current Pmts 000.322.102.00.0 496.00 Total: $496.00 Payment Amount: $496.00 Payment Date: 09/05/2008 01:03 PM Balance: $0.00 967 39/05 7707 TOTAL 566.00 doc: Receiot -06 Printed: 09 -05 -2008 Dnr.: REC;SETS -OR RECEIPT NO: R08 -01455 Initials: BLH User ID: ADMIN Payee: ELDER -JONES • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: //www. ci. tukwila. wa. us SET ID: S000001023 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member Amount D08 -254 1,761.50 EL08 -512 255.50 M08 -133 124.00 PG08 -145 35.00 TOTAL: 2,176.00 TRANSACTION LIST: Type Method Description Amount Payment Check 51377 2,176.00 TOTAL: 2,176.00 ACCOUNT ITEM LIST: Description ELECTRICAL PLAN - NONRES PLAN CHECK - NONRES SET RECEIPT Account Code Current Pmts 000.345.832.00.0 255.50 000/345.830 1,920.50 TOTAL: 2,176.00 Payment Date: 05/01/2008 Total Payment: 2,176.00 1939 05/02 9710 TOTAL 2176.00 Pro je A—ALA ((�� n { Type of Inspectio : i Address: ) SC A ft Date Called s c t K . - ' r ) cX. Special Instructions: Q 6 t 1 I 73 k� ° ( Date Wanted: if:m / (- - t ! AV p.m. Requester: Phone No: 2 -f4 — 53r --3Scac INSPECTION RECORD Retain a copy with permit 1NSEEETf NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. U Corrections required prior to approval. ❑ $60.00'(2EINSPECTIdN FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: 'Date: COMMENTS: 1/Y ,S4 ,o• dfere/ ■ t. .1 ,v...,•• • «,mot Pro' ct: S k Type of I spectio f Ad 1 ( Sc. 71 ( Date Called: Special Instructions: 02 9) (91- 0( e Mwt< . e6-1 Ail Date Wanted: 11-3 -0A/ m. Requester: Phone No Z -331- 4c El Approved per applicable codes. ,OL m a6-- 133 INSPECTION RECORD Retain a copy with permit INSPECTION O. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3 7 Corrections required prior to approval. COMMENTS: 103 I�f� I Date: /1 -3- OcY ri $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: COMMENTS: ' s,i0 1 £ A4 P --- L /wE. a / k! �,Qf S e Sr ,� J ,E N,�- g e h / / °A J 1( '` .-' -e de :I Y of a /.1/t5 f i.c.<< LA 1, (I /lJr 4J i e sr li j ( .) /dfl Si- eu 1,J' 14 ' z - p l eft' < it ' A 1 it :' e t:1 ert / /—A k (11 4 0 Ale-J. r-,',.d ("AI � "/ i S vc.- -/ CI" L/4fd . rt. e.. -e ( j : C N'( stL ti, - �� p.m. /L E - 3 61 .4 e A F Project: . (� A 8 0e1- Wal PS Type of Inspection: (fi I\ A -4 A e r Addr Sr ] ( Date Callet M d I s t'- 40 Special Instructions: CJ C - °I Z a e ' re a W C/ �� L1 Date Wanted: 7 J a �� p.m. Requester: Phone No: 2-( 2 ` 3,3 1 " 3 74 Approved per applicable codes. Inspect¢r INSPECTION RECORD Retain a copy with permit M 0b -133 PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 orrections required prior to approval. 'Date: ( 0 $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: !Date: I- COMMENTS: 0 G ec/ Re 76-1 i- iwitoi 1.hhcs AJ. i e p lbw G F / U - t ) I9 vu . e - ,F ArkoY Tf4f7JA / f / /Jv I hgv4 // Type of sp 'on: � /�- l e 41/7 te gi Date Calle 79/1914 11 ��S ` Ad r s: *Al/ Special Instructions: Date Wanted: / 0 7 —e Requester: • x Phone No: _`7 0/75 C INSPECTION RECORD Retain a copy with permit INSP ION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. Inspect Rec ipt/lo.: Date: 60.00 REINSPECTION FE ` REQUIRED. 'rior to inspection, fee must be paid a 630 Southcenter Blvd., Suite 100. Call to schedare reinspection. (Date: C INSPECTION RECORD Retain a copy with permit INSP ION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. Inspect Rec ipt/lo.: Date: 60.00 REINSPECTION FE ` REQUIRED. 'rior to inspection, fee must be paid a 630 Southcenter Blvd., Suite 100. Call to schedare reinspection. (Date: Proj t: 6a MP tO Inspection: Type of Inspect Address: '..3 t yv\pit1 Date Called: Special Instructions: Date Wanted: C G — i "' ©Q�j p.m. C Requester: Phone No ..1._S 3 -3 - 01C( 7 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -367 Approved per applicable codes. Corrections required prior to approval. COMMENTS f -� *11 4}-e"v i�t ai A Inspe o ma8- 33 = v $60.p0 REINSPECTION PEE REQUIRED. Prior to inspection, fee must be pal at 6300 Southcenter Blvd., Suile 100. Call to schedule reinspection. Re -ipt No.: IDate: Project: 1-:4e. .7 . Ty of Inspection: / . . i 6 Address: ? > --:: Suite #: iti1 A i.-t... Contact Person: Special Instructions: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 - Approved per applicable codes. Corrections required prior toyapproval. COMMENTS: } iL 1 Vii iAr �_ lL_ Inspector: Hrs.: Date: j ; i ; f.,. $84.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Word /Inspection Record Form.Doc 1/13/06 T.F.D. Form F.P. 113 DATA ITEM INITIAL TEST FINAL TEST VOLTS 2O) Z.. a? Ur Q a`? 20T Za AMPS S. 3 5.4/ 5.5 s."? s. c, S.? BHP 6 ii 1.s g. fi1rJ Ph /SF FAN RPM Vi Si 15 ESP- 0 ... "... O • r� ESP+ 0 • O O.d TOTAL ESP 6 7 0 .11 . PRf Ri#e C Ex k 6n .00 oi <15 ? MOTOR NAMEPLATE Mfg. 1 j r.,J N rl ; P/ L, odel HP I itch - 1 FR 1=1 s-r : elt # /C.L. RPM i47 ' is ushing Volt 2.0 'sop pL, r O PE k Amp • Z. 6 ii 1.s g. fi1rJ Ph /SF 3 7 1 , ?� Efficency �-- Power Fact. FAN SHEAVE fg. 1 j r.,J N rl ; P/ L, odel A :,:, =; 't ■ r, I itch - 1 1: ore IIKIMIll HEIMITA : elt # /C.L. I: ushing FAN NAMPLATE nit Ga , EN C-00 odel AG3(.. — I F0 ize itch _.. ..s' l 405c:31 MOTOR SHEAVE fg. Q . )1 odel U IP 1 6 itch _.. ..s' ore 3 =z 2 is ushing C.0'VTR. 0 L NOT' AIR HANDLING UNIT TEST SHEET S�•,r�t ►vrE AREA SERVED S-r' S (4 o N PROJECT eArt,3 eon's SYS (,4; Fr °T- o'0so r REMARKS 1 ) EX la A s'i FA iJ V O .N 4T <AppLI5D t - V 4 Z Q J C C o- o PF+ oryv S e-n) ORA. NI iv Lc s 2 5m c 1 R a R' C.0'VTR. 0 L NOT' 'sop pL, r O PE k s ..r !Atvc. of or' io'l ,., 6 ii 1.s g. fi1rJ AIR HANDLING UNIT TEST SHEET S�•,r�t ►vrE AREA SERVED S-r' S (4 o N PROJECT eArt,3 eon's SYS (,4; Fr °T- o'0so r DATA ITEM INITIAL TEST FINAL TEST VOLTS 2. Z07 Z. oT 2L 1 3`1. U.) 5 AMPS /2•- ro, g, 10,5 11.1 )6.,(, BHP Ph/SF FAN RPM I P r ] 162.6 ESP- /, 93, /,zy ESP+ c>, 13 0,3Y TOTAL ESP / ,g / /,5 4 SUPPLY AIR CFM 5tpb 0 -UP? RETURN AIR CFM "55' Filter SP (In/Out) Q yg Ioi�.. O. m c� IL ($10) - O i _/ /./R 0.01/. Fi In/Out) / t.SA cZ/ MOTOR NAMEPLATE Mfg. ,Al.-1) 0 VZ odel P - !, 51' FR 1 3`1. $ : ushing RPM 1 Belt # / C.L. Volt ; ; U —Z'3 0 Amp (LI. Ph/SF ,3 f I. /5 Efficency - 7 , S Power Fact. MOTOR SHEAVE fg. ON WON odel WP 6 • itch 51' : ore /4 $ : ushing Van/- STARTER NAMPLATE fg. - L TSP ' 0 P eaters -- i• ating ,200-4 SUBMITTAL DATA CFM SOav TSP 1,0 RPM • itch MIN OSA 555 FAN NAMPLATE nitflit■l- 8 04.JNr odel ►-Pc. AA I OP 70 • itch erial # 60 F47:::::.... FAN SHEAVE fg. 8 04.JNr odel 70 • itch `7 3/ ore t Belt # / C.L. 20$ ushing +4 Lo Go O AIR HANDLING UNIT TEST SHEET 84-N 4 game woJ AREA SERVED SI'OR SMMopp, A $ A PROJECT X14 CE►VTrP slpp,A4;. Ag£yA. < SYSTEM fl H Vl- I REMARKS Pr S. a..J ,� \ ROOM OUTLET K/F DESIGN INITIAL � £�� FINAL NO. TYPE SIZE FPM CFM FPM CFM - PR( _ y CFM sv,prcy S T n (LE 1 513- ) 1/ 1) S.' 0 S fl 52 3g3 s`roR5 Z s0 -) !0 3 -s 52 5Z1 3$0 - 3 S D-) 10 7 3 Co 0 'S 2S g°$/ / t -E. 4 4 / ► r A 3 S 16 Si r,2.. S 5 / t 2 '' 'S G 7 5'19 ! 9S SSe#2g'. ~' )0" 57 S' .t./ 7 / -- T6 I - ' 1t ©'' 3is 625 5?r S S1) t e v 3 K 5�z. X3.5 / s -r6R._ ! 9 CD )t 3l",..6 S ?� 50 _ 396 11.1111.. liWil /0/ a l' Cf VA 2 0 z`/ 0 gE'tu 4/\) 155 OSt'► 2.vx3O /3 A SS i5 Y .62.. ., 0 . e.,0 J r; AREA SERVED: .To R 5 H o P°f AJ AA 4412E11 • REMARKS: () 0 tk Lz-rs wIi+4 Low 14000 AC+ 760 U'!n s I 02 -fl tk. k 1 v, ®v/ Pt -roi - r2 Av t2.s AIR OUTLET TEST SHEET 5044714 C_*NTEfL PROJECT: 114T $ool( wokt45 UNIT: Ai- u — t MOTOR NAMEPLATE f9• tlt.1: (Jr. I R I s---r PM f ?.S oit a V mp 'h/SF fficency i • owner Fact. FAN SHEAVE 9. tlt.1: (Jr. i itch I. 1 : ore is eit # / C.L. is ushing_ AREA SERVED -,� RALS. 6 AIR HANDLING UNIT TEST SHEET S�.nr�t '4►v STOQc S1 oPP ,N a » PROJECT Ett" -: 8 6V'•; 711 SYSTEM t✓ - DATA ITEM VOLTS AMPS BHP FAN RPM ESP- ESP+ TOTAL ESP REITIRKFAHMRM O Esc! -t ' 'fl INITIAL TEST ad) S. Zo? s, -! •5.s Li51 • O K 4 .3 7 247 .7 7 - o S.�O REMARKS E X ►a A h5 FAN) V O .NDT <ai PPL I5_0 .k 5 .'44> n EN) Cz o-e• 0 Pi+kia'ri u tv S o.1\) OR A o A, s STA c 13 RF & t2E COOT 061 5viPPL, 5.0 P& ',�: ��,+� of9a2.0m 6 1J �' ttY1•(I . ictA k Project Info Project Address Westfield Southcenter Date 4/25/2008 633 Southcenter Parkway - Space #644 For Building Department Use Tukwila, WA 98188 Applicant Name: Jeffery M Zunt Applicant Address: 3030 W Streetsboro Road, Richfield, OH 44286 Applicant Phone: 330 - 659 -6688 2006 Washington State Nonresidential Energy Code Compliance Forms 2006 Washington State Nonresidential Energy Code Compliance Form Project Summary PRJ -SUM r REVIEWE4 FOR CO : DE COMPLIANCE APPROVED MAY 1 5 2008 CI T Of Tukwila BUILDIN DIVISION P/ RES JUN 1 20 09 FILE C '� PY w c t` Fi oe LL„ aEC �wi�► c Ito ,0 pERmkic MO8 I 33 Revised July 2007 L Cooling Equipment Schedule Equip. ID Brand Name' Model No. Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location AHU -1 Trane LPCA10 167 5000 Econo 11.00 13.70 Indoor CU -1 Trane TTA150 146 5000 Econo 11.00 13.70 Mall Roof Fan Equipment Schedule Equip. ID Brand Name Model No. CFM Spt HP /BHP Flow Control Location of Service AHU -1 Trane LPCA10 5000 1.00 5.00 CV Tenant Space EF -1 Cook ACSC180 5000 0.25 2.00 VS Roof Heating Equipment Schedule Equip. ID Brand Name Model No. Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency' AHU -1 Trane s LPCA10 75133 5000 Applicant Name: 22 kw 75133 100.000 Applicant Address: 3030 W Streeteboro Road, Richfield, OH 44286 Applicant Phone: 330 - 659 -6688 Project Info Project Address Westfield Southcenter Date 4/25/2008 633 Southcenter Parkway - Space #644 For Building Dept. Use Tukwila, WA 98188 Applicant Name: Jeffery M Zunt Applicant Address: 3030 W Streeteboro Road, Richfield, OH 44286 Applicant Phone: 330 - 659 -6688 Mechanical Summary MECH -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. Includes Plans 2006 Washington State Nonresidential Energy Code Compliance Form New split air handling system with outdoor condenser and indoor air handling unit. Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 Revised July 2007 Compliance Option QQ Simple System O Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. 1 If available. 2 As tested according to Table 14 -1A through 14-1G. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: Constant vol? LI Split system? Air cooled? Packaged sys? <20,000 Btuh? Economizer included? If Heating Only: <5000 cfm? <70% outside air? Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only No 2006 Washington State Nonresidential Energy Code Compliance Form Reference Section 1421 Yes — Simple System Allowed (section 1420) otal Ca +. wo economize <240,000 Btuh or 10 %? Heating /Cooling or Cooling Only I Reference Section 1423 Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Fan Equipment Schedule Equip. ID Brand Name' Model No.' CFM SP' HP /BHP Flow Control Location of Service Location Tukwila, WA 98188 Applicant Name: Jeffery M Zunt Applicant Address: 3030 W streetaboro Road, Richfield, OH 44286 Applicant Phone: 330 - 659 -6688 Cooling Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location Tukwila, WA 98188 Applicant Name: Jeffery M Zunt Applicant Address: 3030 W streetaboro Road, Richfield, OH 44286 Applicant Phone: 330 - 659 -6688 Heating Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency Tukwila, WA 98188 Applicant Name: Jeffery M Zunt Applicant Address: 3030 W streetaboro Road, Richfield, OH 44286 Applicant Phone: 330 - 659 -6688 Project Info Project Address Westfield Southcenter Date 4/25/2008 633 Southcenter Parkway - Space #644 For Building Dept. Use Tukwila, WA 98188 Applicant Name: Jeffery M Zunt Applicant Address: 3030 W streetaboro Road, Richfield, OH 44286 Applicant Phone: 330 - 659 -6688 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary MECH -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. ❑ Includes Plans Include documentation requiring compliance with commissioning requirements, Section 1416. 'If available. 2 As tested according to Table 14 -1A through 14 -1G. 3 If required. ° COP, HSPF Combustion Efficiency, orAFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). Revised July 2007 Compliance Option Q Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: ❑ Constant vol? ❑ Split system? ❑ Air cooled? ❑ Packaged sys? ❑ <20,000 Btuh? ❑ Economizer included? If Heating Only: 9 Y ❑ 5000 cfm? <5000 ❑ <70 /o outside air? <70% Mechanical Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only 2006 Washington State Nonresidential Energy Code Compliance Form Reference Section 1421 otal Ca . wo economize <240,000 Btuh or 10 %? Heating /Cooling or Cooling Only Simple System Allowed (section 1420) r Reference Section 1423 Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Address Westfield Southcenter 'Date 4/25/2008 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance n.a 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency MO2.4 n.a. 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans MO2.1 yes 1412.2 Deadband control Indicate 5 degree deadband minimum M04.1 n.a. 1412.3 Humidity control Indicate humidistat yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types M04 yes 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage 1402.1 yes 1412.4.2 Optimum Start Indicate optimum start controls M04.1 yes 1412.5 Heat pump control Indicate microprocessor on thermostat schedule 1404 n. a. 1412.6 Combustion htg. Indicate modulating or staged control yes 1412.7 Balancing Indicate balancing features on plans 1402.4 1412.8 Ventilation Control Indicate demand control ventilation for high- occupancy areas M04.1 yes 1422 Thermostat interlock Indicate thermostat interlock on plans MO2.1 yes 1423 Economizers Equipment schedule 1402.4 1413 Air economizers yes 1413.1 Air Econo Operation Indicate 100% capability on schedule MO2.4 yes 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb n.a. 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance n.a. 1413.3 Integrated operation Indicate capability for partial cooling n.a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary M01.1 yes 1414.2 Duct insulation Indicate R -value of insulation on duct M01.1 yes 1415.1 Piping insulation Indicate R -value of insulation on piping 1401.1 1416 Completion Requirements yes 1416.2.1 Commissioning Provide commissioning plan MO2.4 yes 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing 1402. yes 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training MO2.4 yes 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report 1402.4 n.a. 1434 Separate air sys. Indicate separate systems on plans yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. n.a. 1441 Elec. water heater Indicate R -10 insulation under tank n.a. 1442 Shut -off controls Indicate automatic shut -off yes 1443 Pipe Insulation Indicate R -value of insulation on piping P01.1 n. a 1452 Heat Pump COP Indicate minimum COP of 4.0 n. a 1452 Heater Efficiency Indicate pool heater efficiency n. a 1453 Pool heater controls Indicate switch and 65 degree control n. a 1454 Pool covers Indicate vapor retardant cover n.a. 1454 Pools 90+ degrees Indicate R -12 pool cover 2006 Washington State Nonresidential Energy Code Compliance Form no is circled Tor any question, provlae explanation: • 11 - 1 • • 2006 Washington State Nonresidential Energy Code Compliance Form 2006 Washington State Nonresidential Energy Code Compliance Forms Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14-1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply • • Revised July 2007 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.8 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2 Static pressure. 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 • 11 - 1 • • 2006 Washington State Nonresidential Energy Code Compliance Form 2006 Washington State Nonresidential Energy Code Compliance Forms Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14-1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply • • Revised July 2007 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.8 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2 Static pressure. 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying 2006 Washington State Nonresidential Energy Code Compliance Form 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2. are isolated from the exterior with an automatic shut -off damper complying air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum with Section 1412.4.1. start controls shall be designed to automatically adjust the start time of an HVAC Once outside air ducts meet the above listed requirements, any runs within system each day to bring the space to desired occupied temperature levels conditioned space shall comply with Table 14 -5 requirements. immediately before scheduled occupancy. The control algorithm shall, as a Other ducts and plenums shall be thermally insulated per Table 14 -5. minimum, be a function of the difference between space temperature and occupied Exceptions: setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include 1. Within the HVAC equipment. microprocessor controls that minimize supplemental heat usage during start-up, set- 2. Exhaust air ducts not subject to condensation. up, and defrost conditions. These controls shall anticipate need for heat and use 3. Exposed ductwork within a zone that serves that zone. compression heating as the first stage of heat. Controls shall indicate when 1415 Piping Systems supplemental heating is being used through visual means (e.g., LED indicators). 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment Exception: Piping installed within unitary HVAC equipment. with a capacity over 225,000 Btu /h shall have modulating or staged combustion Water pipes outside the conditioned space shall be insulated in accordance with control. 000 Washington State Plumbing Code (WAG 51 -26) EXCEPTIONS: 1. Boilers. 2. Radiant heaters. 1416 Completion Requirements (Refer to NREC Section 1416 and the Building 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have Commissioning Guidelines, published by the Building Commissioning Association, a means for balancing, including but not limited to, dampers, temperature and for complete text and guidelines for building completion and commissioning pressure test connections and balancing valves. requirements.) PERMIT COORD COPY PLAN REVIEW /ROU SLIP ACTIVITY NUMBER: M08 - 133 DATE: 5 - - PROJECT NAME: BATH AND BODY WORKS SITE ADDRESS: 231 SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: (2t G 6 i: ng l ivision Public Works Documents/routing slip.doc 2 -28-02 611 4WL C1 Fire Prevention Structural Planning Division TUES/THURS R UTING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: ❑ Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 5-6-08 Complete 1 Incomplete ❑ Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 6 -3 -08 Approved n Approved with Conditions Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 3 DEVELOPERS SURETY I't INDEM CO 791184C 02/06/2008 Until Cancelled $12,000.00 02/10/2008 2 DEVELOPERS SURETY & IND 572212C 01/23/2006 Until Cancelled $12,000.00 02/27/2006 1 DEVELOPERS SURETY & INDEM CO 572212CO2/01/200401/23/2006 $6,000.00 01/30/2004 Name Role Effective Date Expiration Date DICKSON, PAUL TREASURER 01 /30/2004 GROVER, HAROLD VICE PRESIDENT 01/30/2004 Untitled Page General /Specialty Contractor A business registered as a construction contractor with LW to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County MECHANICAL a CONTROL SRVCS INC 2539269777 301 PORTER WAY MILTON WA 98354 PIERCE Business Type CORPORATION Parent Company UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License Next License Associated License Specialty 1 Specialty 2 602338440 ACTIVE MECHACS962BT CONSTRUCTION CONTRACTOR 1/30/2004 2/26/2010 ARASSI`981 KO GENERAL UNUSED Business Owner Information Bond Information • • Insurance Information Page 1 of 2 https: // fortress. wa. gov /lni/bbip/Detail.aspx ?License= MECHACS962BT 09/05/2008 1. GATE VAL , ENDS, INTEGRAL BALL VALVES A 2. GATE VALVES, 2 -1/2 INCH AND LARGER: CLA STEM, FLANGED ENDS, AND RE- PACKABLE UNDER PRE 3. SWING CHECK VALVES, 2 -INCH AND SMALLER: CLA HORIZONTAL SWING, Y- PATTERN, RENEWABLE 4. SWING CHECK VALVE, 2 BRONZE DISC, F 5. • RONZE SEATS AND SOLID WEDGE DISC, RISING Y AND CAP CONFORMING TO ASTM B 62 WITH SOLDERED ENDS. D OR SOLDER E UNDER PRESSURE. TAL SWING, RENEWABLE G INSULATION TER AND /OR HEATING WATER NOT INCLUDING S SHALL BE INSULATED. SERVICE J :. S•� .• l SECTION 230000 BASIC MECHANICAL REQUIREMENTS A. NOTE 1. THE ABBREVIATION LSD &C WHEREVER IT APPEARS IN THESE MECHANICAL DRAWINGS AND /OR SPECIFICATIONS SHALL REFER TO "LIMITED STORE DESIGN AND CONSTRUCTION ". ANY REFERENCE TO TENANT'S PROJECT MANAGER OR FURNISHED BY ANY OF THE ABOVE REFERS TO LSD &C. 2. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. 3. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF HIS SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THIS CONTRACTORS RESPONSIBILITY TO PROVIDE HIS SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. 4. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THIS WORK TO COMPLY WITH THE LSD &C SCHEDULE AND THE PROJECT COMPLETION DATE. 5. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID. SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF HIS WORK. 6. REFER TO RESPONSIBILITY SCHEDULE ON SHEET M04.1 OF THIS SET FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT THE BID. B. GENERAL REQUIREMENTS 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR LSD &C SHALL BE PROVIDED BY THIS CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD AND THE LSD &C PROJECT MANAGER, AS REQUIRED. 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF CONTRACT. 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 4. ALL WORK IN THIS SECTION SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. 5. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD CONSTRUCTION PRACTICES. 6. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW, UNDERWRITERS LABORATORIES LISTED AND LABELED AND SIZED IN CONFORMITY WITH REQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT. 7. THIS CONTRACTOR SHALL DO ALL CUTTING, CHASING AND CHANNELING REQUIRED FOR ANY WORK UNDER THIS DIVISION. CUTTING SHALL HAVE PRIOR APPROVAL BY LSD &C PROJECT MANAGER AND THE LANDLORD. ALL PATCHING SHALL BE BY G.C. AND SHALL MATCH THE SURROUNDING SURFACES. 8. THE MECHANICAL CONTRACTOR SHALL MAKE ALL FINAL MECHANICAL CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATING SYSTEM. A. THE MECHANICAL CONTRACTOR SHALL NOTIFY THE GENERAL CONTRACTOR TO CONTACT LSD &C'S DESIGNATED COMPANY (EMS) FOR START -UP. (REFER TO SHEET MO2.3). C. CODES 1. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATE'S, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THIS CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID. AFTER CONTRACT IS AWARDED, CHANGE ORDERS FOR INCREASED COSTS DUE TO CODE ISSUES WILL NOT BE ACCEPTED BY LSD &C. D. LICENSES, PERMITS, INSPECTIONS & FEES 1. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO HIS WORK. 2. FURNISH TO THE LSD &C'S PROJECT MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT. E. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM FOR THE BASE BID. MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE SUBJECT TO APPROVAL IN WRITING BY LSD &C'S PROJECT MANAGER THROUGH SHOP DRAWING SUBMITTAL PROCESS FOR ACCEPTANCE PRIOR TO INSTALLATION. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 2. GENERAL CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO LSD &C PROJECT MANAGER FOR APPROVAL. SUBMISSIONS SHALL BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR LSD &C PROJECT MANAGER'S REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP AND /OR THE SIGNATURE OF THE GENERAL CONTRACTOR AND THE SUBCONTRACTOR SHOWING THAT HE HAS REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. F. GUARANTEE 1. THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER HIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY LSD &C'S PROJECT MANAGER. EXTENDED WARRANTIES ARE AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. 2. THE EQUIPMENT MANUFACTURER SHALL GUARANTEE AND PROVIDE A 12 MONTH GUARANTEE TO LSD &C FROM THE DATE OF ACCEPTANCE. THIS CONTRACTOR SHALL WARRANTY THE INSTALLATION OF THIS EQUIPMENT AND WILL BE RESPONSIBLE FOR ANY DAMAGE AND /OR MALFUNCTION CAUSED BY THE INSTALLATION. THIS CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM. G. RECORD DRAWINGS 1. THIS CONTRACTOR SHALL MAINTAIN ONE SET OF DRAWINGS ON THE JOB SITE UPDATED WEEKLY TO RECORD ALL DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS: A. B. C. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. REVISIONS, ADDENDUM, AND CHANGE ORDERS. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER TRADES. 2. AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THIS CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. FAILURE TO KEEP THESE RECORDS WILL ALLOW LSD &C TO DIRECT THE GENERAL CONTRACTOR TO PROVIDE THESE RECORDS AT HIS EXPENSE PRIOR TO FINAL PAYMENT. H. DISCREPANCIES IN DOCUMENTS 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) _ATE ( , ) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE GENERAL CONTRACTOR IN WRITING, PRIOR TO SUBMITTAL OF BID. THE GENERAL CONTRACTOR IS RESPONSIBLE TO ADVISE LSD &C'S PROJECT MANAGER, IN WRITING, OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, LSD &C PROJECT MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. I. PHASING REQUIREMENTS 1. THIS CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S HVAC, PLUMBING AND SPRINKLER SERVICE IN OPERATION. CONTRACTOR MUST SCHEDULE IN WRITING WITH LSD &C'S PROJECT MANAGER AND THE LANDLORD ONE WEEK PRIOR TO ANY SHUT DOWN OF THE HVAC, PLUMBING OR FIRE PROTECTION SYSTEMS. J. DEMOLITION 1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND THE DEMOLITION PROVIDED BY THE GENERAL CONTRACTOR. COORDINATE WITH THE GENERAL CONTRACTOR ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. 2. THIS CONTRACTOR SHALL INCLUDE, AND WILL BE HELD RESPONSIBLE FOR, THE REMOVAL OF ALL EXISTING HVAC UNITS, HYDRONIC PIPING, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT TO BE REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK, AND EQUIPMENT PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF /WALL /FLOOR PATCHED /REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY LANDLORD OR CODES, ABANDONED PIPING AND /OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION PRIOR TO BID AND INCLUDE IN BID PROPOSAL. K. SLEEVES 1. THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2" ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND /OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING. 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. L. SCOPE OF WORK 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE HVAC SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: MECHANICAL SPECIFICATIONS A. B. C. D. E. F. G. HVAC UNITS, ALL RELATED EQUIPMENT AND ACCESSORIES (UNLESS NOTED OTHERWISE). DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. HYDRONIC PIPING. (AS APPLICABLE, REFER TO PLANS). REFRIGERANT PIPING (AS APPLICABLE, REFER TO PLANS). CURBS, ROOFING, AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). TESTING, ADJUSTING, AND BALANCING. KEEPING A RECORD SET AND PREPARE AS- BUILTS DRAWINGS. 2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL VISIT THE JOB SITE AND EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 3. RELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. M. HVAC EQUIPMENT 1. PRIMARY HEATING AND AIR CONDITIONING UNITS ARE TO BE FURNISHED BY LSD &C AS SCHEDULED UNLESS NOTED OTHERWISE. REFER TO PLANS FOR REQUIREMENTS. ALL EQUIPMENT SHALL INCLUDE A FIVE (5) YEAR COMPRESSOR AND TEN (10) YEAR HEAT EXCHANGER WARRANTY. 2. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. 3. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. N. 1. EQUIPMENT FURNISHED BY LIMITED STORE DESIGN AND CONSTRUCTION THE FOLLOWING EQUIPMENT IS FURNISHED BY LSD &C AND INSTALLED BY THIS CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE. REFER TO RESPONSIBILITY SCHEDULE AND PLANS FOR APPLICABILITY. A. B. C. D. HVAC UNITS. TOILET EXHAUST FANS. DIFFUSERS, GRILLES AND REGISTERS. TEMPERATURE CONTROLS. 2. ALL DUCTWORK, ROOF OPENINGS AND CAPS NECESSARY TO PROVIDE A COMPLETE TOILET EXHAUST SYSTEM SHALL BE FURNISHED AND INSTALLED BY THIS CONTRACTOR. 0. CURBS FOR SUPPORT 1. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL NECESSARY CURBS REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED ON THE DRAWINGS. CURBS SHALL BE A MINIMUM OF 14" HIGH (SEE M04.1 "LOCAL AREA REQUIREMENTS" ITEM # 5), OF THE SAME MANUFACTURER OF THE EQUIPMENT UNLESS NOTED OTHERWISE. ALL CURBS SHALL BE INSTALLED SUCH THAT TOP OF CURBS ARE LEVEL. ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE IN ACCORDANCE WITH THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPENSE. THIS CONTRACTOR SHALL RECEIVE LSD &C PROJECT MANAGER'S WRITTEN APPROVAL BEFORE ANY WORK TAKES PLACE. THIS CONTRACTOR IS ALSO RESPONSIBLE FOR ALL SEISMIC, HURRICANE OR OTHER SECURING DEVICES REQUIRED BY LOCAL OR OTHER CODES. P. LABELS/PIPE MARKERS 1. FURNISH AND INSTALL PIPE IDENTIFICATION MARKERS ON ALL PIPES INSTALLED UNDER THIS CONTRACT. MARKERS SHALL BE A MINIMUM OF 1 -1/2" X 8" AND IDENTIFIED IN ACCORDANCE WITH THE BACKGROUND AND LETTER COLORS ISSUED BY THE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI). 2. PIPING SHALL BE IDENTIFIED AS FOLLOWS: CHILLED WATER RETURN, CHILLED WATER SUPPLY, CONDENSATE, HOT WATER RETURN, HOT WATER SUPPLY, CONDENSER WATER RETURN, CONDENSER WATER SUPPLY, REFRIGERANT LIQUID, REFRIGERANT SUCTION, AND DIRECTIONAL ARROWS. ALL IDENTIFICATIONS MUST BE VISIBLE AT EQUIPMENT. Q. FINAL HVAC INSPECTIONS 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, LSD &C SHALL HAVE AN INDEPENDENT HVAC CONTRACTOR INSPECT THE FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS. END OF SECTION 230000 SECTION 230500 COMMON WORK RESULTS FOR HVAC A. HANGERS 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C- CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO SUBJECT TO LANDLORD CRITERIA. 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI- ELECTRICALLY SEPARATED. B. VIBRATION ISOLATION DEVICES 1. SPRING VIBRATION ISOLATION DEVICES SHALL BE FURNISHED AND INSTALLED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) AND STRUCTURE. ISOLATORS TO BE SIZED ACCORDING TO LOAD WITH A MIN. 1" DEFLECTION. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. 2. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID "GROUNDING" THE ISOLATOR. 3. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. 4. CONSULT MANUFACTURER FOR APPLICATION DATA. C. TESTING, ADJUSTING, AND BALANCING 1. TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR WHO IS A CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BE ACCEPTED. ALL BALANCING WORK MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THEIR SOCIETY AND AS A MINIMUM SHALL INCLUDE THE INFORMATION AS SHOWN IN THE AIR BALANCE REVIEW CHECKLIST IN THE GC PROJECT MANUAL. PAYMENT OF ALL COSTS FOR TESTING AND BALANCING SHALL BE INCLUDED IN THE BID. HOWEVER, IT WILL BE THE G.C. THAT WILL CONTRACT DIRECTLY WITH THE AIR BALANCING COMPANY. 2. FINAL TESTING, ADJUSTING AND BALANCING REPORT MUST BE COMPLETE AND SUBMITTED WITH FINAL CLOSE -OUT DOCUMENTS TO LSD &C 1 WEEK PRIOR TO MERCHANDISING DATE. 3. THE HVAC CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. HVAC CONTRACTOR SHALL ALSO INSTALL A NEW SET OF FILTERS ONE DAY PRIOR TO MERCHANDISING. 4. BALANCE LANDLORD MEDIA QUANTITIES TO WITHIN 5% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS OR PULLEYS NEEDED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC CONTRACTOR WITH NO ADDITIONAL COST TO LSD &C. 5. ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND OPERATING STATUS RECORDED IN THE BALANCE REPORT. 6. AIR BALANCING CONTRACTOR IS TO CONFIRM OVERRIDE OF MINIMUM OUTSIDE AIR INTAKE UPON CO2 MONITORING CONFIRMATION. FOR CO2 MONITORING CONTACT, SEE, CONTACT INFORMATION ON SHEET MO2.3. 7. THREE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED THROUGH THE GENERAL CONTRACTOR TO LSD &C FOR APPROVAL. THE GENERAL CONTRACTOR SHALL VERIFY THE COMPLETENESS OF THE REPORTS PRIOR TO SUBMITTING TO LSD &C. SUBMIT ONE COPY OF FINAL APPROVED AIR BALANCE REPORT TO MALL GENERAL MANAGER. 8. THE BALANCING CONTRACTOR SHALL PERFORM. ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED ON THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OF ORIGINAL BALANCE MUST BE BALANCED IN FUTURE AT NO ADDITIONAL EXPENSE TO LSD &C THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT LSD &C DEEMS NECESSARY AT NO ADDITIONAL COST TO LSD &C, VALVES -INCH AND SMALLER: CLASS 150, BODY AND UNION BONNET OF ASTM B 62 CAST BRONZE WITH T S , NEWABLE SOLID BRONZE WEDGE DISC, RISING STEM, SCREWED BONNET AND RE -P . • RE ACCEPT i N EQUAL SUBSTITUTION. CAST IRON BODY, RENEW SS +, CAST BRON '! E DISC, AND HAVING THREAD H AND LARGER: CLASS 125 CAST IRON BODY AND BOLTED CAP, ` ! ENDS AND CAPABLE OF BEING REFITTED WHILE THE VALVE REMAINS IN THE LINE. ATION BALANCING AND SHUTOFF VALVES: BELL & GOSSETT CIRCUIT SETTER WITH LOCKING SET POINT. A CIRCUIT SETT BALANCE WHEEL MUST BE INCLUDED WITH 0 & M MANUAL. TACO OR GRISWOLD ARE CONSIDERED AS EQUAL. END OF SECTION 230500 SECTION 230700 HVAC INSULATION A. DUCTWORK INSULATION 1. FURNISH AND INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NFPA 90A. 2. DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. ALL RECTANGULAR DUCTWORK (SUPPLY AND RETURN) SHALL BE INTERNALLY INSULATED WITH 1" THICK, 1 -1/2 LB. DENSITY LINER (C =0.28 0 75 DEGREE F). WHEN A COMPLETE DUCTED RETURN AIR SYSTEM IS INDICATED ON THE DRAWINGS, ONLY THE 15' -0" OF THE RETURN AIR DUCT CLOSEST TO THE AIR HANDLING UNIT IS TO BE INSULATED. LINER IS TO HAVE A COATED SURFACE EXPOSED TO AIRSTREAM TO PREVENT EROSION. APPLY ADHESIVES AND MECHANICAL FASTENERS AS RECOMMENDED BY SMACNA AND THE MANUFACTURER TO PREVENT LINER SEPARATION FROM THE DUCT. ALL TRANSVERSE EDGES TO BE COATED WITH ADHESIVE. 3. ALL OUTDOOR AIR (ROUND, OVAL, AND RECTANGULAR) AND ROUND /OVAL SUPPLY AIR DUCTWORK SHALL BE EXTERNALLY INSULATED WITH A MINIMUM OF 1 1/2" THICK, 1# DENSITY (R =5.6) DUCT WRAP WITH VAPOR BARRIER. VAPOR BARRIER IS TO BE MAINTAINED THROUGHOUT DUCT SYSTEM, EXCEPT LINED DUCTWORK SPECIFIED ELSEWHERE AND EXHAUST DUCTWORK. ALL JOINTS MUST BE OVERLAPPED AND TUCKED SO THAT NO INSULATION FIBER IS VISIBLE. EXTEND DUCTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS AND OTHER PENETRATIONS. 4. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAN 50 WHEN TESTED IN ACCORDANCE WITH ASTM E 84 -05, OR AS REQUIRED BY LOCAL CODES. B. HYDRONIC 2. INSULATION AT ALL HANGERS FOR PIPING INCHES AND LARGER SHALL BE 3. ALL INSULATION SHALL 50 TO CONFO C. REFRIGERANT PIPING INSULATION END OF SECTION 230700 SECTION 230900 INSTRUMENTATION AND CONTROL FOR HVAC A. WORK RESPONSIBILITY 1. LSD &C HVAC SUPPLIER WILL FURNISH NECESSARY CONTROL DEVICES TO THE FIELD. FOR ALL DEVICES NOT FACTORY INSTALLED, IT WILL BE THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO INSTALL. END OF SECTION 230900 SECTION 232100 A. 1. FURNIS ND INSTALL A COMPLETE HYDRONIC PIPING SYSTEM IF APPLICABLE. REFER TO PLANS TO DETERMINE IF A HYDRO IS REQUIR i. 2. PIPING 3. PIPING SPECIALTIES 2. DRONIC PIPING AND PUMPS H A. HYDRONIC PIP G FOR CHILLED WATER, CONDENSER WATER AND /OR HEATING WATER SHALL BE ASTM A 3, SCHEDULE 40, ERW, BLACK STEEL PIP WITH PLAIN ENDS. INSTALL STEEL PIPE WITH WELDED JOINTS WHERE PIPE IS 2 -1 INCH AND LARGER. INSTALL STEEL PIPE ITH THREADED JOINTS AND FITTINGS. INSTALL TYPE "K" COPPER PIPE FOR NCH AND SMALLER PIPE. PROVIDE DIELECTRIC U INS BETWEEN DISSIMILAR METALS. ALL PIPING SHALL BE IN STRICT CO IRMANCE WITH ASTM, ASA, AND LANDLORD'S REQUIREMEN WHICHEVER IS MOST STRINGENT. UNIONS OR FLANGES MUST BE ED AT EQUIPMENT CONNECTIONS WHERE SERVICE OR REMOVA MAY BE REQUIRED. B. ALL PIPING AND EQUIPMENT SHA BE PRESSURE TESTED WITHOUT LEAKAGE AT A MI MUM PRESSURE OF 125 PSI. C. ALL HYDRONIC PIPING AND EQUIPMEN CONNECTED TO THE HVAC PIPING SYSTE SHALL BE CLEANED AND FLUSHED. REMOVE, CLEAN, AND REPLACE STRAINER SCREENS. FILL TENANT'S SYSTEM WITH DOME C WATER AND VENT ALL PIPING AND EQUIPMENT PRIOR TO CONNECTION TO THE LANDLORD'S YSTEM. CONTRACTOR SHALL FILL TENANT'S SYSTEM WITH WATER FROM THE LANDLORD'S SYSTEM UNLESS SPECIFICALLY INS ; UCTED TO DO SO FRO HE LANDLORD'S FIELD REPRESENTATIVE. ANY RUNS THRU A CHASE OR SHAFT WILL BE DONE WITH F EST JOINTS POSSI E USING THE LONGEST LENGTH OF HARD COPPER PIPE AVAILABLE. SHOULD A JOINT BE REQUIRED, CONTRA OR SHALL M ALL EFFORTS TO KEEP THE JOINTS IN ACCESSIBLE AREAS. D. PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM, CO R ' OR SHALL OBTAIN WRITTEN CONFIRMATION FROM THE LANDLORD'S FIELD REPRESENTATIVE, THAT ALL TESTING, FLUSHING, AND ' zOPER FILLING OF THE TENANT'S SYSTEM HAS BEEN COMPLETED IN ACCORDANCE TO THE LANDLORD'S REQUIREMENTS AND T AT T TENANT'S SYSTEM IS READY TO BE CONNECTED TO THE LANDLORD'S SYSTEM. A. PRESSURE /TEMPERATURE TEST PLUGS (PE 5 PLUG) - 1/4 INCH NPT FIT •GS TO RECEIVE EITHER A TEMPERATURE OR PRESSURE PROBE, 1/8 INCH 0.D. FITTI ' AND CAPS SHALL BE BRASS WITH VE CORE OF NORDEL, RATED AT 400 PSIG, 0 TO 200 DEGREES F. B. ALL HYDRONIC PIPING FOR CHI OTHERWISE), VALVES, FITTINGS, AND ACC THICK (K =0.23 0 75'F) FIBERGLASS INSULATION WI LARGER, INSULATE WITH 1 -1/2 INCH THICK (K =0.23 0 75'F FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEV THE REQUIREMENTS OF THE NFPA. VIDE ZESTON OR EQUAL INSULATION FITTINGS FOR ALL TEES, ELLS OR SPECIALTY FITTINGS. INSULATE THE REFRIGERANT SUCTION LINES AND CONDENSATE LINES WITH RUBATEX OR ARMSTRONG 1 INCH THICK PIPE INSULATION WITH FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NOT MORE THAN 50 IN ACCORDANCE WITH LIQUID INDUSTRY STANDARDS. DO NOT INSULATE THE HOT GAS (LIQUID) LINES OR ANY HOT GAS BYPASS. RONIC PIPING STRAINERS - "Y" PATTERN ST' NERS, 125 PSIG, CAST IRON BODY WITH PERFORATED TAINLESS STEEL SCREEN, THREADED FOR 2 INCHES AND SMALLER, FLA ED FOR 2 -1/2 INCHES AND LARGER. SCREEN OPENING 5 AT 0.033 INCH FOR HEATING AND 1/8 INCH FOR CHILLED 0' CONDENSER WATER. PROVIDE WITH BLOWDOWN VALVE WITH HOS END FITTING. 4. GENERAL INSTALLATION A. B. INSTALL WATER AINS WITHOUT PITCH. USE ECCENTRIC REDUCING COUPLINGS AT CHANGES IN SIZE W THE TOP OF PIPES AT SAME ELEVATI BRANCH ' TO UNITS BELOW MAINS TO BE TAKEN FROM BOTTOM OF MAINS AT A 45 DEGREE ANGLE, PITCH D NWARD TOWARD UNITS :RANCHES TO UNITS ABOVE MAINS TO BE TAKEN FROM TOP OF MAINS AT A 45 DEGREE ANGLE PITCHED PWARD TO RDS UNITS. PITCH NOT LESS THAN 1" TO 10 FEET. SEE MECHANICAL DETAIL DRAWINGS FOR APPLICABLE DETAILS. PROVIDE UL LISTED FIRE STOPPING SYSTEM AROUND ALL PIPING PENETRATIONS THROUGH RATED WALLS. PENETRATIONS SHAL MEET THE REQUIREMENTS OF UL DETAILS WL1001 (UNINSULATED WALL) AND WL5039 (INSULATED WALL). END OF SECTION 232100 SECTION 232300 REFRIGERANT PIPING A. REFRIGERANT PIPING: THIS CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE REFRIGERANT PIPING SYSTEM BETWEEN THE INDOOR FAN UNITS AND OUTDOOR CONDENSING UNITS. REFER TO PLANS TO DETERMINE IF A REFRIGERANT SYSTEM IS REQUIRED. NEW PIPING IS REQUIRED. REUSE OF EXISTING PIPING IS NOT ALLOWED. PIPING A. REFRIGERANT PIPING SHALL BE TYPE ACR COPPER TUBING. TUBING SHALL BE CLEAN AND CLEAR OF DEBRIS, AND EVACUATED WITH A DEEP VACUUM PRIOR TO REFRIGERANT CHARGE. THE CONTRACTOR SHALL CONFIRM THE DIAMETER OF THE REFRIGERANT PIPING RUNS IN EXCESS OF 50 EQUIVALENT FEET WITH THE ARCHITECT, ENGINEER, AND MANUFACTURER FOR ALL SPLIT SYSTEMS. NO REFRIGERANT PIPING RUNS EXCEEDING 100 EQUIVALENT FEET ARE TO BE INSTALLED WITHOUT LIMITED BRANDS' PERMISSION. THE MANUFACTURER SHALL PROVIDE ALL FINAL PIPE SIZING AND COIL SELECTIONS FOR ALL REFRIGERANT PIPING SYSTEMS. B. ALL FITTINGS AND JOINTS SHALL BE WROUGHT COPPER OR CAST BRONZE (ANSI 816.22). ALL COPPER TO COPPER JOINTS SHALL BE BRAZED WITH A COPPER - PHOSPHORUS ALLOY AND ALL OTHER JOINTS SHALL BE BRAZED WITH SILFOS -5 ALLOY. C. 3. INSTALLATION ALL ELBOWS ARE TO BE LONG RADIUS TYPE. A. REFRIGERANT PIPE SIZING SHALL BE THE RESPONSIBILITY OF THE HVAC SUPPLIER. CONTRACTOR WILL PROVIDE A SCHEMATIC PROPOSED LAYOUT OF THE SYSTEM INCLUDING ALL ELBOWS, RISES, RUNS, ETC., WITH DIMENSIONS. THE HVAC SUPPLIER WILL THEN PROVIDE WRITTEN DOCUMENTATION OF PIPE SIZES AND ADDITIONAL REQUIRED SYSTEM COMPONENTS TO THE FIELD. B. SUCTION LINES SHALL HAVE ADEQUATE LIFT TRAPS AND /OR DOUBLE SUCTION RISERS TO MEET THE REQUIREMENTS OF FIELD CONDITIONS AND EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. C. BRAZE ALL JOINTS WITH SILFOS -5 STARTING AT THE INDOOR UNIT AND WORKING TOWARD THE OUTDOOR UNIT. THE SEALS ON THE OUTDOOR UNIT SHALL BE BROKEN LAST. A NITROGEN BLEED SHALL BE USED DURING ALL BRAZING AND ANY TIME THE SYSTEM IS OPEN. ALL OPEN LINES SHALL BE CAPPED AND SEALED BEFORE LEAVING THE SITE DURING CONSTRUCTION. PRESSURE TEST FOR LEAKS WITH AN INERT GAS UP TO 245 PSIG. REDO LEAKING JOINTS AND RETEST UNTIL SYSTEM IS TIGHT. EVACUATE ENTIRE SYSTEM TO 200 MICRONS OF MERCURY. CHARGE SYSTEM WITH 25 PSI OF R -22 AND A INERT GAS TO 245 PSI AND RETEST SYSTEM. ENERGIZE CRANK CASE HEATERS 24 HOURS PRIOR TO STARTING COMPRESSOR TO ENSURE THAT ALL REFRIGERANT LIQUID IS OUT OF THE COMPRESSOR. UPON COMPLETION OF TESTING, BUT BEFORE THE REFRIGERANT PIPING INSULATION IS APPLIED, THE PIPING MUST BE INSPECTED BY A REPRESENTATIVE OF THE LOCAL GOVERNING AUTHORITY AS NECESSARY. E. INSULATE THE REFRIGERANT SUCTION LINES AND CONDENSATE LINES WITH RUBATEX OR ARMSTRONG 1 INCH THICK PIPE INSULATION WITH FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NOT MORE THAN 50 IN ACCORDANCE WITH INDUSTRY STANDARDS. DO NOT INSULATE THE HOT GAS (LIQUID) LINES OR ANY HOT GAS BYPASS. F. PROVIDE UL LISTED FIRE STOPPING SYSTEM AROUND ALL PIPING PENETRATIONS THROUGH RATED WALLS. PENETRATIONS SHALL MEET THE REQUIREMENTS OF UL DETAILS WL1001 (UNINSULATED WALL) AND WL5039 (INSULATED WALL). 4. INSPECTION A. CONTRACTOR MUST PREPARE AND SUBMIT A COMPLETE PIPING SCHEMATIC TO THE LOCAL MANUFACTURER REPRESENTATIVE FOR APPROVAL PRIOR TO BEGINNING INSTALLATION. UPON COMPLETION OF PIPING, THIS CONTRACTOR MUST CALL THE LOCAL REPRESENTATIVE FOR FIELD INSPECTION OF WORK PERFORMED . ALL ITEMS FOUND TO BE INADEQUATE FOR PROPER PERFORMANCE BY MANUFACTURER REPRESENTATIVE MUST BE CORRECTED. THIS INSPECTION IS PERFORMED AT LSD &C EXPENSE. END OF SECTION 232300 SECTION 233100 HVAC DUCTS AND CASINGS CONDE ' ATER UNLESS SPECIFICALLY NOTED FOR PIPE UP TO 2 INCHES, INSULATE WITH 1 INCH AC _ ' D VAPOR BARRIER. FOR PIPE SIZES 2 -1/2 INCHES AND LASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. ND NON- COMPRESSIBLE. RATING OF NO HIGHER THAT SYSTEM A. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED 1. NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND APPROVAL BY THE GENERAL CONTRACTOR. A SKETCH MUST BE SUBMITTED INDICATING DEVIATIONS FROM DESIGN AND MUST BE APPROVED BY LSD &C'S PROJECT MANAGER PRIOR TO FABRICATION OR INSTALLATION. 2. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION. WHERE OTHER CODES ARE ENFORCED, (1E. UMC, BOCA, ETC.) USE THE MOST STRINGENT CODE FOR DUCT CONSTRUCTION STANDARDS. 3. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: SUPPLY DUCTS: 2" W.G., POSITIVE RETURN AND EXHAUST DUCTS: 2" W.G., NEGATIVE EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEALANTS OF THE FOLLOWING PRESSURE CLASSIFICATIONS: SUPPLY DUCTS: CLASS B - 3" W.G. RETURN AND EXHAUST DUCTS: CLASS C - 2" W.G. IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5% AS REQUIRED FOR FINAL AIR BALANCE APPROVAL. 4. ROUND DUCTWORK SHALL BE GALVANIZED STEEL WITH SPIRAL LOCKSEAM CONSTRUCTION FOR ALL SIZES 14" DIAMETER AND LARGER. ROUND DUCTWORK SIZES 13" DIAMETER AND SMALLER MAY BE SNAP -LOCK CONSTRUCTION. ALL SNAP -LOCK SEAMS SHALL BE SEALED AS DESCRIBED IN THESE SPECIFICATIONS. ROUND FITTINGS SHALL BE GALVANIZED STEEL WITH SPOT WELDED AND BONDED CONSTRUCTION. 5. ROUND SPIRAL GALVANIZED STEEL DUCTWORK MAY BE USED IN PLACE OF RECTANGULAR DUCTWORK IN HORIZONTAL APPLICATION WHEN ABOVE CEILING CLEARANCES PERMITS AND EQUIVALENT FREE AREA IS MAINTAINED, WITH THE FOLLOWING EXCEPTION; ALL SUPPLY AND RETURN DUCTWORK WITHIN 15 FEET OF THE AIR HANDLER MUST BE RECTANGULAR AND INTERNALLY LINED. ONCE A TRANSITION IN THE DIRECTION OF THE AIRFLOW TO SPIRAL HAS BEEN DONE, DUCT WILL NOT BE ALLOWED TO REVERT TO RECTANGULAR. WHERE ROUND DUCT SUBSTITUTION WILL TAKE PLACE, SUBMIT A SKETCH AND CHART SHOWING EQUIVALENT ROUND CONVERSIONS OF RECTANGULAR DUCTWORK TO LSD &C PROJECT MANAGER'S FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION. 6. INSTALL FACTORY MANUFACTURED DOUBLE THICKNESS TURNING VANES IN RIGHT ANGLE ELBOWS IN MAIN DUCT PER LATEST EDITION OF SMACNA. 7. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. 8. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1- 1/2 "X1 -1/2" X1/8" STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. 9. ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2" WIDE, GLASS - FIBER- FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGILL CORP., DOW CORNING, MIRACLE ADHESIVES AND SUREBOND INC. WILL BE ACCEPTED IN LIEU OF TAPE. 10. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. 11. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. 12. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS, FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY LSD &C'S PROJECT MANAGER PRIOR TO INSTALLATION. IN HARD CEILINGS, LAY -IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS WHEN WITHIN 3' -O" OF DEVICE. 13. ALL DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS AS NOTED ON DRAWINGS. WHERE DUCTWORK SIZE IS LARGER THAN CONNECTED DEVICE (IE. VAV BOX, DIFFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE TO TAKE PLACE JUST PRIOR TO DEVICE CONNECTION. SEE MECHANICAL DRAWINGS FOR DETAIL. B. M 1. 2. 3. 4. WHERE DUCTWORK IS ' - LLY NOTED AS MEDIUM PRESSURE, IT SHALL BE CONSTRUCTED IN A STANDARDS FOR A PRESSURE RA ALL GAUGES AND REINFORCEMENT MUST MEET WITH ST EDITI WITH THE LANDLORD'S CRITERIA. CONNECTIONS TO THE LANDLORD'S OTHERWISE REQUIRED BY ALL 0 • . MS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO THIS SECTION, WITH THE EXCEPTION T • MEDIUM SSURE DUCTWORK MUST BE WRAPPED WITH INSULATION, NOT LINED. END OF SECTION 233100 SECTION 233300 AIR DUCT ACCESSORIES A. FLEXIBLE CONNECTIONS 1. FLEXIBLE COLLARS SHALL BE FURNISHED AND INSTALLED IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) AND DUCTS OR CASINGS. ALSO, FURNISH AND INSTALL FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. 2. FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF NEOPRENE - COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. B. FLEXIBLE AIR DUCT 1. FLEXIBLE AIR DUCT SHALL BE 1" IN5U .TED CLASS 1, UL LISTED AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN THE BID. 2. FLEXIBLE AIR DUCT SHALL BE ATTACHED PER DETAILS ON THE DRAWINGS. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS. 3. FLEXIBLE DUCT SHALL NOT EXTEND OVER 4' -O" IN LENGTH AT ANY ONE LOCATION. C. SUPPLY AIR TAKE -OFF FITTINGS 1. FURNISH AND INSTALL CONICAL, TAPERED OR 45 DEGREE SADDLE TAKEOFFS FROM MAIN DUCTWORK TO ROUND BRANCHES. INSTALLATION SHALL BE PER SMACNA LATEST EDITION. D. DAMPERS 1. WHERE DESIGNATED, FURNISH AND INSTALL MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE OPERATORS AS SHOWN ON PLANS TO FACILITATE AIR BALANCING. DAMPER SHALL BE DURODYNE MODEL NO: K SERIES QUADRANT OR LSD &C APPROVED EQUAL. 2. OPERATING HANDLES ON ALL DAMPERS SHALL BE TAGGED WITH A MINIMUM 18" LONG ORANGE MARKER TAPE. 3. WHERE ACCESS TO BALANCING DAMPER IS RESTRICTED, A REMOTE DEVICE, MANUALLY OPERATED SHALL BE USED. UNITS SHALL BE ORDERED THREE WEEKS BEFORE INSTALLATION TO ALLOW FOR DELIVERY LEAD TIME. / SMOKE DAMPERS IMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES. DAMPERS SHA = R AS REQUIRED. FIRE DAMPERS SHALL BE UL LABELED M A 1. FURNISH AND I RESSURE DUCT HORIZONTAL OR VERTICAL F 3. FURNISH AND INSTALL ALL N END OF SECTION 233300 LORD. 2. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF TH AND INSTALL ACCESS DOORS AS NECESSARY. 4 INCHES WATER COLUMN MINIMUM OR GREATER . IUIRED BY LANDLORD. RESSURE DUCTWORK SHALL BE MADE WIT ' !- 055" SADDLE TEE TAPS OR AS FRAMING AND SLEEVES FOR DAMPER MOUNTING PER 4. FIR e AMPERS SHALL BE FURNISHED AND INSTALLED WITH ELECTRIC POWERED MECHANISM. COORDINATE WITH ONTRACTOR FOR POWER REQUIREMENTS. EPARATE PERMIT REQUIRED FOR: 0 Mechanical Ge P Iectrical lumbing LjGas Piping City of Tukwila BUILDING DIVISION SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND DEGREE F FUSIBLE LINK, TYPE B, AS MINIMUM. FURNISH FILE COPY Permit No Plar review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or +'+inane©. Receipt of approved Field Copy and y is acknowledged: City of Tukwila BUILDING DIVISION No chang shall be of work without prior ap to the scope Tukwila Building Divisvii o of NOTE Revisions will require rl. and may include additional plan rev a submittal CE WITH SMACNA IGNED FOR ALL CODE REQUIREMENTS. ODE REQUIREMENTS. REV EWED F CODE COMPLIANCE. `E APPROVED MAY 1 5 2008 C NTS Of Tukt - . NC D r0r C1 OF E T I . . vi m 01 ° nfig THORSON BAKER & Associates, Inc. Consulting Engineers 3030 West Streetsboro Roat f ra 430 859 -6688 Ph. Richfield, Ohio 44286 7 v l ) 59.6675 Fax 1 MINEINNIMINE �wc } m U U• v W o Z <0',2 , 0- KO 'i Z z zw C o - ww u -E a 0 O w Z Q Z a ZVla O O w W Z a! n ct° a w , LE72 5: - )7° , - 1 dc- 0 7)1 L act ! c;1 1 :: ' 7 : ui l E 6 y, , , : C C M - j(;)= 0 !: ' ' C Z nWC ) 2 :-H 2 : . of) 0 0 C\I 144 0 Lu z LLI 00 0 0 0 0 I- I c7c-) c" M Co o wz CI ~ 2 t!! In ( CC LL� C I BY: DATE • INDICATES NO REVISION TO THIS SHEET DATE ISSUED: DESIGNED BY: DRAWN BY: CHECKED BY: �w w d w Z a > ~ ,, m 2 wz � s w ~ = q O w I- - w O w F W Z 402j1 - O ° 1= Z OZ F O J 4 0 Z 0 U O U W 0 j En ww(f < U Z w 0 O w w Z OM= bill!' 03 O-Z.= u Z U - w vl wW�w � (101 -.0 ° Q W W W J = 1-m Z q 0 Z V) i F - W -1 0 w F ° ° >- = W H M - F- U -1 w U w �Q J m .� N I 4 z OI 1 61 J O�° V ZOLJ � d :w>- Q U N V) i-Z 4 w J W c ,-“,10 0 W 0 w , O a O wZp W!L O ° [L :C I- Z 0 Z O Y Q1 C7 _ Z • 07D 0 W - °i w m V) a I y rn O a U 0 U O,_ l° w I U 4 ° :v w 0 J uJ Z L 1 O i Ui i ii N wZ W i 0 CJ V1 ° w O O 0 Z Zw0 a VI p - a - N=U9X � � l-- `UUUl 1 O W 1 Ul J W 1 w f` g O F- :01: z w 0 n O 01 O J= O Z LL U 4 H p w Z�!4� w N F- k-~ I- - a Z C7 t� 2 Q )- 7-(Y F = O F- q -(/I rr1 00 in d w !Lm U J a V' O= O O • w Z w U1- UU 4 :07 U REVISIONS: MECHANICAL SPECIFICATIONS DRAWING NUMBER: 1 1 I-- C w � 0 CD At W C) 2E LIJ O 0 Z 00 I- ca 0 w w 0 C� CD 0 X w I- CJ I li La OIL 0 I- D W U a- CD old CD cn p C3WV) (n o � 04/25/08 TBA TBA TBA 6" TOILET EXHAUST THROUGH DECK EXST'G 3" SPKLR 0 14' -0" A.F.F. EXISTING SD -3 TOILET ROOM 405 CFM SD -3 405 CFM SD -3 405 CFM N x EXISTING RESTROOM EXHAUST TO REMAIN. REFURBISH EXISTING FAN TO LIKE NEW CONDITION. REPLACE WITH EQUAL AS REQUIRED. RG -2 PVAV -1 18x12 EXST'G SPKLR 14' -6" A.F.F. RG -1 R H H Il RG -3 (TO RG -1 SD -1 SD -2 } 0 4 EXST'G FRESH AIR INTAKE THRU DECK 30x20 OA SD -3 165 CFM 385 CFM 10"0 22x12 A 11° 1 11V 11 I I I A D; V 10 "0 10 "0 EXST'G 4" SPKLR 0 15' -0" A.F.F. SD-1 385 CFM SD-1 385 CFM DO NOT ROUTE DUCTOWRK TO INTERFERE WITH ACCESS TO AHU -1. RAISE ABOVE OR LOWER BELOW FOR CLEARANCE. FIELD VERIFY. 5000 CFM REFRIGERANT LINES THRU ROOF. SEE DETAIL ON M03.1. G M03.1 16x12 RG -1 L RG -1 0 PER 2006 IMC SECTION 606 Install smoke detector to shut down air distribution by VAV's when otl,c e ) h� r,n M of all VAV's (to include g the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection 30x20 B M03.1 A M03.1 H H ii _.___ 2" SD -1 385 CFM SD -1 385 CFM EXST'G 3" SPKLR 0 14' -6" A.F.F. I If H H H 11 I 111 1 RG -3 (,1 RG -1 RG— 1 28x16 22x14 L T JI SD-1 10 "0 385 CF S SD -1 385 CFM ( 10 "0 EXST'G MALL DUCTS 0 15' -4 A.F.F. EXST'G 3" ROOF DRAIN THRU DECK EXST'G 3" SPKLR 0 13' -0" A.F.F. EXST'G 3" ROOF DRAIN A 14' -6" A.F.F. II RG -1 I EXST'G MALL DUCTS 4 15' -4" A.F.F. 10 "0 • i1T -- Ill II Ii 10 °0 O DESIGN OF THE NON— DUCTED RETURN AIR PLENUM CEILING IS BASED ON THE REQUIREMENT THAT ALL MATERIALS IN THE RETURN AIR PLENUM CEILING ARE ALL LABELED AS PLENUM RATED AND MEET THE FLAME & SMOKE SPREAD REQUIREMENTS FOR PLENUM INSTALLATION AND THE APPROVAL OF A RETURN AIR PLENUM FROM THE LANDLORD. IF THE ABOVE CONDITIONS CANNOT BE MET, THIS CONTRACTOR SHALL STATE THE AMOUNT TO BE ADDED TO HIS BASE BID FOR A TOTALLY DUCTED RETURN AIR SYSTEM. I" ✓ • RG -1 SD -1 385 CFM SD -1 390 CFM RG -1 LO 1�1 HVAC CONTRACTOR IS RESPONSIBLE TO INQUIRE WITH THE LANDLORD'S REPRESENTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE AT THE MALL AT THE TIME OF THE BID. IF THE SAID SYSTEM IS NOT ADEQUATELY DESCRIBED ON THE DRAWINGS, THE MECHANICAL CONTRACTOR IS RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE COST AS A SEPARATE LINE ITEM IN THE BID. NO ADDITIONAL MONEYS SHALL BE AWARDED FOR TIE —IN REQUIREMENTS TO A LANDLORD'S SMOKE EVACUATION SYSTEM THAT IS IN EXISTENCE AT THE TIME OF THE BID, WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE EVACUATION SYSTEM AT THE TIME OF THE BID. EXST'G 3" SPKLR 0 13' -0" A.F.F. N1oeI "VERIFY ALL FIELD CONDITIONS PRIOR TO BID" .RE'JIE1E COMPLIANCE. CODE APPROVED MA Y 1 5 7006 ct'I Of - Tukwila iii SiON RECEIVED )TN OF TUKWILA MAY 0 1 200B NOTE: ANY EXISTING DEMISING WALL OPENINGS ARE TO REMAIN. NOTE: SEE ARCHITECTURAL DRAWINGS FOR CEILING HEIGHTS 17 18 19 MECHANIC I ALJosR,L AN 1/4" - 1' -O" ■■ THORSON 3030 West StrrA Richfield, Oh g I- 0 w 0 Ct O.. w 4UJ 7 7 Z d cn Z0 `t0 O - r, 41 SC O w 0 W W fY E: , E › t) In z a k LEI U7 -- OL 4 O ii $wO�z 7 z � wU1 ;oe Z w U) Z � O :O U z ° W � � 4 , U Xc, _ N m O � 0 - V p w Z O tL o- J L T O Z Z D . t>_HVOd J :. BAKER & Associates, Inc. Consulting Engineers I'll REQUIRED BY: DATE ISSUED: DESIGNED BY: DRAWN BY: CHECKED BY: � }t set F26�� end 2 0.. y330; 659 -8675 Fax JUN 1 8 2009 Z �_ )- o d :-E2-"-upc;v: o Vl U) O a Z Z U) f— o=' 2 o J W Z C7 J W I- U W � 4 ~Z U d I-- U °- Z W O „U F- :LLl C- t- 3: J V) 0 � 0 ] 0c, a0 O r8 J a W U � Z Z w Z_ Z 4 �—::w!. � O Z� d O w [L? O a U- L 7 U Z O _ W z w2� V w4 - w <z ~ � 0 O Sw MHO `'L cwil x W =t--w7- Q W O 0 - a J U 7 U 1 I n f H w 0 U' O p t ,, ?OW QTZ W Ow 2 OW O pc .., � �z0 `r V) r £L -a4Z d ! mz�0 Et Ld HLe L. H o o--a7 Q O `Z >- ww0 W : � �,,�tnU\ l y J ww WO a"HZ rZ Z � ' - 04 � � O Q S w W o 2 o o H _ C7 p x r g w U d W HH W L?; a. >. F -EE a 2 a W Ud W' ° a Sw ZU I- m 0707 W a CC i. X w 7 w a J w w x °-ww w� =dpw w O d !Ili- W i - I L H i- Z p= N 0 U � 2'10 � � �pJ w w r `��a Z � _ d Et ©a j I- o Q W F W U 1 V 1 W H � � W( � Cn� O S w w cn t O O Z Z 7 o w Z U � W W Z H m cc .f-7. O LpU � -F-O - Lt o a OU J L.. Z [Y z pw LL w U) a p z 47- CJ vl F® w W O >- JWOm O 0 7 XJWo a d Z= J O .. a );Z: N o H w w W N W w w 7 Vl z_� oow � - °oar ww Z I C) OZ U d�aO w O Q o d z d w i'L a H U) az o� a��u x az C7 CD C7ww Q ,, m L H L p w� a taF =OaH a U10U d'w rU) rrs JSn7 V) w LJ Y a W a_a < V7 I LU Jwo OX OOL U o v) UH UU C O O CD CC 0 cc Ul z Ci W °0 0 I �.y—y W 1 Z 0 cn C W Z J wv) - _ u- F- • cn — LU REVISIONS: * INDICATES NO REVISION TO THIS SHEET DRAWING NUMBER: 0 < �- m N 00 m 0 . . Z W 0 -, w j 0 < c a- Y Z J Z co a 0 Ca 0 U7 N Li w Q m Q O X W w a_ 0 U N MECHANICAL PLAN w 0 >- I- w 0 0 Z W J DATE 04/25/08 TBA TBA TBA NATIONAL ACCOUNTS HVAC SUPPLIER GENERAL NOTES MARK HVAC EQUIPMENT NOTED HAS BEEN PREPURCHASED BY LIMITED STORE DESIGN & CONSTRUCTION. WITHIN THE FIRST WEEK OF CONSTRUCTION, THE GENERAL CONTRACTOR OR THEIR MECHANICAL SUBCONTRACTOR SHALL NOTIFY SUPPLIER VIA EMAIL. THE EMAIL SHALL STATE THE PHONE NUMBER, EMAIL ADDRESS AND DELIVERY ADDRESS OF THE CONTACT PERSON RESPONSIBLE FOR SCHEDULING AND RECEIVING THE HVAC EQUIPMENT AND ACCESSORIES. EQUIPMENT AND ACCESSORIES ARE TO BE SHIPPED BY ANY SPECIAL SHIPPING INSTRUCTIONS REQUIRED OR REQUESTED. ALLOW A MINIMUM OF TWO WEEKS AFTER CONSTRUCTION STARTS FOR DELIVERY UNLESS SPECIAL ARRANGEMENTS ARE MADE PRIOR TO THE START OF CONSTRUCTION. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ANY ADDITIONAL SHIPPING COST INCURRED IF DELIVERY IS REQUIRED PRIOR TO THE STANDARD TWO WEEKS SCHEDULED. IF THIS INFORMATION IS NOT SENT TO NATIONAL ACCOUNT SUPPLIER, THEN THE EQUIPMENT AND ACCESSORIES WILL BE SHIPPED IN ACCORDANCE WITH THE PURCHASE ORDER DATE AND INSTRUCTIONS ISSUED BY LSD &C AND THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR UNLOADING AND STORAGE OF EQUIPMENT UNTIL SUCH TIME AS REQUIRED FOR INSTALLATION ON PROJECT. IF OWNER'S REPRESENTATIVE IS PERFORMING START UP, THEN GC AND /OR MECHANICAL CONTRACTOR MUST COORDINATE WITH MANUFACTURER REP. 2 WEEKS PRIOR TO CONSTRUCTION END DATE. CONTACT INFORMATION SD -3 JIM HOOVLER JODY SOWERS VICKI TAYNER TRANE NATIONAL ACCOUNTS REPRESENTATIVE TRANE TECHNICAL SUPPORT, PRIMARY HVAC COMMISSIONING EMAIL: JEHOOVLERUTRANE.COM EMAIL: JSOWERSOTRANE.COM EMAIL: VICKLTAYNEROTRANE.COM PHONE NO: 866.415.2499 PHONE NO: 866.415.2499 PHONE NO: 866.415.2499 SCOTT CRABTREE DAN SCHONDELMAYER TRANE NATIONAL ACCOUNTS REPRESENTATIVE TRANE SHIPPING EMAIL: SECRABTREEOTRANE.COM (OR TECHNICAL SUPPORT, SECONDARY) PHONE NO: 866.415.2499 EMAIL: DCSCHONELMAYER @TRANE.COM PHONE NO: 866.415.2499 GRILLE, REGISTER, AND DIFFUSER SCHEDULE MARK SD -1 SD -2 SD -3 MANUFACTURER TITUS TITUS TITUS MODEL OMNI TMSA 300 -RS NECK SIZE (L "XW ") SEE PLAN SEE PLAN 12 "X10" FRAME SIZE (L "XW") 24 "X24" 24 "X24" 14 "X12" FRAME TYPE SURFACE LAY -IN SURFACE FINISH TITUS #27 TITUS #27 TITUS #27 <30 NOISE CRITERIA LEVEL <30 <30 ACCESSORIES 1, 6 2 1, 6 NOTES 1, 3 1, 3 3 MARK RG -1 RG -2 RG -3 MANUFACTURER TITUS TITUS TITUS MODEL 355 -RL 50F 355 -RL NECK SIZE (L"XW") - 20 "X18" FRAME SIZE (L "XW") 24 "X12" 24 "X12" 22 "X20" FRAME TYPE SURFACE LAY -IN SURFACE FINISH TITUS #27 <30 TITUS #27 <30 TITUS #27 <30 NOISE CRITERIA LEVEL ACCESSORIES 1, 6 1 1, 6 NOTES 2, 3 3 2, 3 ACCESSORIES: 1. OBD- OPPOSED BLADE DAMPER 2. LQD- LOCKING QUADRANT VOLUME DAMPER (PROVIDED BY MECHANICAL CONTRACTOR). SEE MECHANICAL SPECIFICATIONS SECTION 233300.D.1, SHEET M01.1 3. CFD- RUSKIN MODEL CFD OR CFDR FIRE DAMPER WITH VOLUME CONTROL 4. YRD- YOUNG'S REGULATOR REMOTE DAMPER WITH CABLE CONTROL SYSTEM (MODEL 5020 -CC) 5. LSP- INSULATED LINEAR SLOT PLENUM 6. TRM -RAPID MOUNT FRAME FOR GYPSUM CEILINGS NOTES: 1. 4 -WAY DIFFUSER (UNLESS 2 -WAY OR 3 -WAY AS INDICATED ON PLAN). 2. INSTALL BLADES FACING THE BACK OF STORE, CABINET, OR WALL. 3. GC TO FIELD PAINT DIFFUSERS TO MATCH CEILING OR WALL WITH ENAMEL FINISH. A THORSON BAKER & Associates, Inc. Consulting Engineers 3430 tsbo � �1 3 p 659 -6688 Ph. Richfield, Went Ohio Stree k 9b9.ro � 6ss�,Vy -. - ' /.(30) 659 -6675 Fax Dw 4 } 2 Q1a i V vl r v1 w vl� Z w Z Z a U-- Z 0 V w - 0 o-0 <wwo vl p N v 2 J W W m in ,,_-,W0 ® w ' I- Z 0 }° -F <4z W r F o a' z wz a W W YX u Z2$ Ot' a -w w ~w 9 Y 4 00 L. w 4 j0 $w ~Z °X� O 4 C - _O 0 Z 4 w w -" W 0 Nv 7 p S w z0 V7 a � m � F _ $ F. T' Ow g 0 17- o z oo U W W tY ,, Uw Y O o :00F. J U vl Z z_ U Z J OO LLI- H e Q 41wga W - UL4 U vl �Fbm� N' w $w °�I a_U} v)O 0 }$ J w0 m w a J I Q m 4 a Z 4�- 0 m V7 Z8 w2m w utQv)z��000 Z z w U 4 ? O 0 O _ Z Z$ a w `f }a w 4 w 4 4 4 ZZ w O D m O m I ° O a_ :04m0 U 0 mO 0 Ld T{ }- < 2 W Y. ( aw Z 0 Jl X 2 0 Z Z a_: . E Ld LJ F a. l- U 0 4 a ::... w mwo v1 O m Z w m $ Z U 0 4 U 0 a awowce v1 O 0 0 w z 60na.?O Z W I O 0 0 I- w w Z z W (11 i O0 4 H 0 0 0 Z O N L.- CC CC 0 4 w0 0 4 } �J Li 4 = :a o W ~ 1 vl LO 0 O oki Tim 36ff: JUN 1 8 2009 4..) 0 } 0 IS it REQUIRED BY: DATE ISSUED: DESIGNED BY: DRAWN BY: CHECKED BY: cc W I- z Ill 00 0 C O op D 0 to w I' -1 w UJ 1.7 co UJ N z 0 z V) REVISIONS: INDICATES NO REVISION TO THIS SHEET Z 0 !-'1L I- Z� :6: Z_ 2 J -O 4 460' w 7 z w 0 0 O Z w m v ig; I $wODS } m<p w za 0_ JI (S O I; 0 J 0 O w J Z Z w F �t' 4 W ©H W N N r w V> w U U (1 20QT OO Z Z � Q4�z22 <- 4 4 p m U 47 ° w w zN rYZpw aa� o vi U a< N W 0 w N O 4 Z 2 0 a U U Z H U Z VI UI L • 0 O z X J w O 0 w4U - -.wwz w W O ( JO 0 $000 U ~Oz U a � a O w ( 75 n : N O iF-a W Q' Z 2 ::jo 2SUVlVOO U S_U�Q 42 v) )- )-- a } } 2 0 V) O v l 0 0 0 0 Z 0 U J 4 0 02 00=_ w V H U U 4? On U DRAWING NUMBER: Is 0 d ED CD CV 00 0_ O J w Q w 0 LL! ILL Z CD H- U) w 0 I- z N w MECHANICAL PLAN NOTES 7 ul U N J DATE 04/25/08 TBA IBA IBA • GENERAL NOTES ALL NOTES INCLUDED HEREIN ARE MADE PART OF EACH AND ALL MECHANICAL, ELECTRICAL AND PLUMBING SECTIONS OF WORK. 1. REFER TO LANDLORD'S SPECIFICATIONS AND TENANT DESIGN CRITERIA FOR NECESSARY INFORMATION AND COORDINATION WITH OTHER TRADES. 2. THE ABBREVIATION LSD &C WHEREVER IT APPEARS IN THE DRAWINGS, SHALL REFER TO "LIMITED STORE DESIGN AND CONSTRUCTION ". ANY REFERENCE TO TENANT, BRAND SPECIFIC (EXPRESS, ETC.) OR FURNISHED BY ANY OF THE ABOVE REFERS TO LSD &C. 3. ANY DISCREPANCY BETWEEN LSD &C DRAWINGS AND TENANT CRITERIA, LSD &C DRAWINGS SHALL TAKE PRECEDENCE. 4. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL INSTALLED ITEMS AND LOCATIONS ARE NOT EXACTLY PLACED AND ARE NOT TO BE SCALED. 5. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELATED PERMITS AND INSPECTION FEES. 6. BEFORE COMMENCING ANY WORK, CONTRACTORS SHALL REVIEW THE LATEST NATIONAL, STATE AND LOCAL CODE REQUIREMENTS INCLUDING LANDLORD CRITERIA AND PERFORM THE WORK IN STRICT ACCORDANCE WITH THESE. IN CASE OF CONFLICT THE STRICTER REQUIREMENTS WILL PREVAIL. 7. NO ADDITIONAL COMPENSATION SHALL BE MADE FOR ANY CHANGE ORDERS DUE TO CONTRACTOR'S FAILURE TO VISIT THE JOBSITE AND /OR PREDETERMINE ALL EXISTING CONDITIONS BEFORE SUBMITTING HIS BID. A. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO SUBMITTING A BID. FOR THE PURPOSE OF SURVEYING EXISTING CONDITIONS, WHICH MAY AFFECT THE WORK TO BE DONE UNDER THIS SECTION, ANY DISCREPANCIES SHALL BE IMMEDIATELY REPORTED TO THE GENERAL CONTRACTOR, LSD &C OR THE LANDLORD'S FIELD REPRESENTATIVE FOR CLARIFICATION. B. AFTER BID, ANY QUESTIONS RELATING TO SPECIFIC M, E, OR P ISSUES ARE TO BE DIRECTED AS RFI'S THROUGH THE LSD &C PROJECT MANAGER. C. SHOULD THE SPACE HAVE BEEN INACCESSIBLE FOR INSPECTION CONTRACTOR MUST INDICATE SO ON HIS BID. 8. THE GENERAL CONTRACTOR'S FIRE SPRINKLER SUBCONTRACTOR SHALL DESIGN AND INSTALL FIRE SPRINKLER SYSTEM CONFORMING TO LANDLORD'S CRITERIA, TENANT'S REQUIREMENTS AND PER LOCAL CODES AND NFPA STANDARDS. 9. THE CONTRACTOR, WITHIN FIFTEEN (15) DAYS OF THE AWARD OF THE CONTRACT, SHALL SUBMIT TO THE OWNER, SIX (6) COPIES OF A COMPLETE LIST OF MATERIALS AND EQUIPMENT PROPOSED FOR THE JOB INCLUDING ALL DATA, PART NUMBERS, RATING CAPACITY, SIZE, DIMENSIONS, ELECTRICAL DATA, GRADE, MANUFACTURER, AND ANY OTHER DESCRIPTIVE DATA FOR ALL EQUIPMENT OR SYSTEMS THAT DEVIATE FROM SPECIFIED ITEMS. ANY DELAYS OR COSTS DUE TO THESE DEVIATIONS, WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF ALL UNUSED OR ABANDONED MATERIALS AND EQUIPMENT, AND ITS REMOVAL OFF THE LANDLORD'S PREMISES. 11. OWNER RESERVES THE RIGHT TO HAVE CONSTRUCTION REVIEWED BY AN OUTSIDE CONSULTANT PRIOR TO ACCEPTANCE OF THE PROJECT. 12. EACH CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORKMANSHIP RELATED TO HIS WORK FOR A MINIMUM PERIOD OF ONE YEAR FROM THE DATE WHICH THE OWNER ACCEPTS THE PROJECT. THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER OR TENANT SHALL CORRECT ANY DEFECTS IN MATERIALS OR WORKMANSHIP DURING THIS GUARANTEE PERIOD. 13. EACH CONTRACTOR SHALL BE RESPONSIBLE AND ENSURE A CLEAN INSTALLATION ESPECIALLY IN EXPOSED CEILING AREAS. THE FINAL APPROVAL OF THIS WORK WILL BE ISSUED BY LSD &C PROJECT MANAGER. 14. PROVIDE THREE SETS OF "AS- BUILT" DRAWINGS AND TWO BOUND SETS OF ALL OPERATIONS MANUALS, DIAGRAMS, SERVICE CONTRACTS AND GUARANTEES TO LSD &C PRECEDENT TO FINAL PAYMENT. A REPORT PREPARED BY AN INDEPENDENT AIR BALANCE CONTRACTOR, HIRED BY GC, MUST BE INCLUDED IN THE CLOSE -OUT PACKAGE. HVAC GENERAL NOTES 1 THESE PLANS MAY BE USED FOR CONSTRUCTION ONLY AFTER APPROVAL IS OBTAINED FROM THE BUILDING DEPARTMENT MECHANICAL PLAN CHECK DIVISION AND THAT DIVISION'S STAMPED APPROVAL AND AUTHORIZED SIGNATURE APPEAR ON THE PLANS. 2. COORDINATE ALL WORK WITH ALL TRADES INCLUDED BUT NOT LIMITED TO ELECTRICAL, PLUMBING, FIRE PROTECTION AND STRUCTURAL CONTRACTORS. INSTALL ALL WORK TO CLEAR NEW AND EXISTING ARCHITECTURAL AND STRUCTURAL MEMBERS. NO ITEM SUCH AS PIPE, DUCT, ETC. IS TO COME IN CONTACT WITH ANY EQUIPMENT. 3. REFER TO ARCHITECTURAL DRAWINGS FOR DEMOLITION WORK. 4. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT FIXTURE LOCATION. 5. CONTRACTOR SHALL PROVIDE CUT SHEETS TO LSD &C FOR ALL EQUIPMENT AND DEVICES FURNISHED BY THE CONTRACTOR THAT DEVIATE FROM SPECIFIED ITEM FOR REVIEW AND APPROVAL PRIOR TO THE PURCHASE OF ANY SUCH EQUIPMENT OR DEVICES. 6. HVAC CONTRACTOR IS RESPONSIBLE TO INQUIRE WITH THE LANDLORD'S REPRESENTATIVE ON ANY SMOKE EVACUATION SYSTEM IN USE AT THE MALL AT THE TIME OF THE BID. IF THE SAID SYSTEM IS NOT ADEQUATELY DESCRIBED ON THE DRAWINGS, THE MECHANICAL CONTRACTOR IS RESPONSIBLE TO INFORM THE GENERAL CONTRACTOR AND INCLUDE THE COST AS A SEPARATE LINE ITEM IN THE BID. NO ADDITIONAL MONEYS SHALL BE AWARDED FOR TIE -IN REQUIREMENTS TO A LANDLORD'S SMOKE EVACUATION SYSTEM THAT IS IN EXISTENCE AT THE TIME OF THE BID, WITHOUT HAVING IDENTIFIED A SEPARATE LINE ITEM FOR THE SMOKE EVACUATION SYSTEM AT THE TIME OF THE BID. 7. ACCESS TO ALL COMPONENTS AND EQUIPMENT MUST BE PROVIDED TO MEET CODE AND SERVICE /MAINTENANCE EASE. 8. PRIOR TO STARTUP OF HVAC EQUIPMENT, MECHANICAL CONTRACTOR WILL CONFIRM WITH ONE OF THE LISTED HVAC MANUFACTURER REPRESENTATIVES THAT CORRECT POWER FOR EQUIPMENT HAS BEEN PROVIDED TO LSD &C PROVIDED HVAC UNITS AND HAS BEEN TURNED ON FOR A MINIMUM OF 24 HOURS. LSD &C RESERVES THE RIGHT TO CHECK CONSTRUCTION COMPLIANCE WITH PLANS AND SPECIFICATIONS. SHOULD THE OWNER FIND CORRECTIVE WORK TO BE NECESSARY, HE WILL NOTIFY CONTRACTOR OF SUCH WORK IN WRITING AND EXPECT COMPLIANCE PERFORMED WITH DUE DILIGENCE. IF ANY CORRECTIVE WORK IS DEEMED TO BE NECESSARY, THE COST OF REINSPECTIONS WILL BE BORNE BY THE CONTRACTOR. THE MECHANICAL CONTRACTOR WILL THEN ENSURE THAT THE EQUIPMENT IS POWERED FOR A MINIMUM OF 24 FIRS BEFORE START -UP. 9. IF WORK IS REQUIRED BY LSD &C IN ORDER TO IMPROVE, CHANGE OR CORRECT AIR CONDITIONING OPERATIONAL CONDITIONS DUE TO: PART MALFUNCTION, WARRANTY OR OTHER INABILITY TO PROVIDE THE COMFORT CONDITIONS REQUIRED BY THE STORE, CONTRACTOR SHALL BE DIRECTED BY LSD &C TO ADDRESS THIS WORK IN A TIMELY MANNER. IF IT BECOMES EVIDENT THAT THE CONTRACTOR CANNOT ACCOMPLISH THE TASK, THEN AFTER 72 HOURS OF WRITTEN NOTICE THE OWNER MAY, AT HIS DISCRETION, TAKE OVER SUCH WORK AND BACK CHARGE THE CONTRACTOR FOR ANY CORRECTIVE WORK THAT WAS REQUIRED DUE TO LACK OF PERFORMANCE, WORKMANSHIP AND /OR ADHERENCE TO PLANS AND SPECIFICATIONS. 10. UPON COMPLETION OF THE WORK, CONTRACTOR SHALL VERIFY THE PROPER WORKING ORDER OF THE SYSTEM(S) AND MAKE ANY ADJUSTMENTS AS REQUIRED. 11. PROVIDE FILTER CHANGES THROUGHOUT CONSTRUCTION AS REQUIRED FOR ALL HVAC EQUIPMENT. PROVIDE FILTER CHANGES AT LEAST TWICE MONTHLY ONCE STARTED, PRIOR TO TEST AND BALANCE, AND LASTLY, PRIOR TO MERCHANDISING. ANY EQUIPMENT OR DUCTWORK THAT BECOMES SOILED DUE TO A LACK OF FILTER CHANGES, AS DETERMINED SOLELY BY THE LSD &C PROJECT MANAGER, SHALL BE CORRECTED ON BEHALF OF THE CONTRACTOR AND CHANGES BILLED TO THE CONTRACTOR. 12. NOTES TO EQUIPMENT SCHEDULES USE THE WORDS "FURNISH" AND "PROVIDE ". WHERE THE WORD "FURNISH" IS USED, SOME FIELD INSTALLATION IS REQUIRED BY THE CONTRACTOR. WHERE THE WORD "PROVIDE" IS USED, NO FIELD INSTALLATION IS REQUIRED AS THE DEVICES OR ACCESSORIES ARE FURNISHED AND INSTALLED BY THE MANUFACTURER AS PART OF THE EQUIPMENT WHEN SHIPPED. 13. UNLESS OTHERWISE SPECIFIED, CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIAL, LABOR AND SUPERVISION NECESSARY TO COMPLETE THE HEATING, VENTILATING AND AIR CONDITIONING WORK IN ACCORDANCE WITH THE SPECIFICATIONS AND STANDARDS AS OUTLINED HEREIN. SEE RESPONSIBILITY SCHEDULE ON SHEET M04.1. 14. MECHANICAL CONTRACTOR SHALL FIELD MEASURE EXISTING ROOF CURB(S) FOR CURB ADAPTER(S), WHERE APPLICABLE, AND SHALL SUPPLY DIMENSIONS TO LSD &C HVAC SUPPLIER PRIOR TO START OF CONSTRUCTION. 15. ALL HEATING VENTILATING AND AIR CONDITIONING EQUIPMENT SHALL BE CLEARLY IDENTIFIED WITH TENANT'S NAME, SPACE NUMBER AND UNIT DESIGNATION AND SHALL BE STENCILED IN 4" HIGH BLACK LETTERS. 16. FURNISH AND INSTALL ALL NEW DUCTWORK INCLUDING INSTALLATION OF OWNER SUPPLIED PLENUM BOOTS, SUPPLY AIR DIFFUSERS, AND RETURN AIR GRILLES. (SEE AIR DEVICE SCHEDULE ON THIS SHEET). A. ALL MATERIAL SHALL BE NEW AND OF COMMERCIAL GRADE AND BEAR UNDERWRITER'S LABORATORY AND UNION LABELS WHERE SUCH LABELING APPLIES. B. ALL PLENUMS SHALL BE FABRICATED FROM GALVANIZED SHEET METAL OF THE APPROPRIATE GAUGE AND BE INSULATED WITH A MINIMUM OF 1" THICK, 0.75 LB /CU.FT. DENSITY FIBERGLASS INSULATION WITH ALUMINUM FOIL BACKED VAPOR BARRIER. C. WHERE DESIGNATED, BRANCHES FROM MAIN LOW VELOCITY TRUNK DUCTWORK SHALL BE FURNISHED WITH SPLITTERS, DAMPERS OR SIMILAR BALANCING DEVICES IN ACCORDANCE WITH THE STANDARDS OF SMACNA. D. ALL DUCTS FOR FINAL CONNECTION TO DIFFUSERS SHALL BE CLASS 1. U.L. LISTED (SL 181) FLEXIBLE AIR DUCT NOT TO EXCEED 4' -0" IN LENGTH (THERMAFLEX, GLASFLEX, OR APPROVED EQUAL). E. SUPPLY AND RETURN DUCTWORK SHALL BE LINED AND WITH CODE COMPLYING BLANKET INSULATION. ACOUSTICAL LINER MAY BE PROVIDED. ALL MATERIALS SHALL COMPLY WITH N.F.P.A. 90A AND 90B. SEE SPECIFICATIONS ON SHEET M01.1. F. HANGER WIRES, DUCT STRAPS, FASTENING DEVICES, ETC. SHALL BE FASTENED TO THE STEEL JOISTS AND /OR BEAMS ABOVE. DO NOT ATTACH ANY SUCH ITEMS DIRECTLY TO FLOOR SLABS, PIPING, OTHER DUCTWORK, ELECTRICAL CONDUITS OR THE ROOF DECK ABOVE. G. ADDITIONAL FIRE DAMPERS SHOULD BE INSTALLED AS REQUIRED BY ANY APPLICABLE CODES AND /OR JURISDICTIONAL AUTHORITIES. 16. SEAL AROUND PIPES AND DUCTS PENETRATING FIRE SEPARATIONS WITH LISTED AND APPROVED FIRE SEAL MATERIAL. ONLY LISTED AND APPROVED SEALANTS AND METHODS FOR THE SPECIFIC USE WILL BE PERMITTED. 17. MECHANICAL CONTRACTOR SHALL INSTALL TEMPERATURE SENSORS AND AS SHOWN ON THE PLAN (VERIFY LOCAL CODES. IF PLAN LOCATION IS NOT ACCEPTABLE, IMMEDIATELY CONTACT LSD &C PROJECT MANAGER FOR DIRECTION.) 18. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL FULLY PRESSURE CHECK AND CHARGE ALL REFRIGERANT SYSTEMS (IF REQUIRED). 19. THE CONTRACTOR SHALL ENGAGE THE SERVICES OF AN INDEPENDENT, AIR /WATER BALANCING COMPANY THAT IS A NEBB CERTIFIED CONTRACTOR OR HAS AN AABC CERTIFIED TEST & BALANCE ENGINEER. THIS COMPANY SHALL PERFORM THE BALANCING OF AIR /WATER SYSTEM(S) AND MAKE ANY REQUIRED ADJUSTMENTS TO ENSURE PROPER WORKING ORDER. UPON COMPLETION, THE BALANCING COMPANY SHALL PROVIDE A COMPLETE SYSTEM REPORT. INCLUDED AS A COVER TO THIS REPORT SHALL BE A COMPLETED LIMITED BRANDS HVAC BALANCE CERTIFICATION FORM. MECHANICAL NOTES AND SPECIFICATIONS HVAC EQUIPMENT COMMISSIONING DETAILED HVAC COMMISSIONING INFORMATION IS INCLUDED IN THE LSD &C SITE MANUAL PROVIDED TO THE CONTRACTOR AT THE START OF THE PROJECT. MANUFACTURER WILL CONTACT THE CONTRACTOR EARLY IN THE PROJECT TO SET PRELIMINARY DATES FOR HVAC INSPECTION, COMMISSIONING AND HVAC CONTROLS COMMISSIONING. PRIOR TO HVAC INSPECTION j COMMISSIONING (TO BE COMPLETED BY MECHANICAL SUBCONTRACTOR) 1. CONNECT AND BLEED CONDENSATE, DUCTWORK, NATURAL GAS, CHILLED WATER PIPING, AND /OR CONDENSER WATER PIPING. 2. CHARGE HVAC SYSTEMS WITH REFRIGERANT FOLLOWING MANUFACTURERS' GUIDELINES AND INSTRUCTIONS. COLD WEATHER CONDITIONS REQUIRE SPECIFIC PROCESSES, CONTACT MANUFACTURER FOR TECHNICAL SUPPORT. 3. CONNECT POWER TO THE HVAC EQUIPMENT FOR A MINIMUM OF 24 HOURS. NOTE: IN COLD WEATHER SITUATIONS, DO NOT OPERATE THE UNITS PRIOR TO COMMISSIONING! HVAC EQUIPMENT SHOULD BE STARTED UP EARLY IN THE PROJECT. COORDINATE EARLY START UP OF EQUIPMENT WITH MANUFACTURER. NOTE: THE GC MAY BE BACK CHARGED FOR ADDITIONAL AC SITE VISITS BEYOND THE FIRST THREE (3) NECESSARY TO DOCUMENT THE RESOLUTION OF THE HVAC PUNCHLIST ITEMS. HVAC COMMISSIONING PROCESS VISIT 1: HVAC EQUIPMENT START UP 1. CONTRACTOR SHALL HAVE THE MECHANICAL AND ELECTRICAL SUBCONTRACTOR ON SITE DURING THE HVAC INSPECTION AND COMMISSIONING. BUDGET 5 HOURS FOR THE HVAC INSPECTION AND COMMISSIONING. (NOTE: THESE HOURS ARE TO BE USED FOR THE COMPLETION OF THE COMMISSIONING PROCESS ONLY. ADDITIONAL HOURS WILL NOT BE APPROVED FOR WORK THAT WAS IN SCOPE AND NOT COMPLETED PRIOR TO THE COMMISSIONING PROCESS.) 2. CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE HVAC EQUIPMENT START UP SURVEY TO MANUFACTURER PRIOR TO THE HVAC STARTUP. 3. MANUFACTURER COORDINATES THE HVAC EQUIPMENT COMMISSIONING. CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE DATE CHANGES TO MANUFACTURER AND SUBCONTRACTORS. 4. PROVIDED THERE ARE NO HVAC INSTALLATION ISSUES. SYSTEMS SHALL BE STARTED FOR TEMPORARY OPERATION ON LOCAL CONTROL. 5. IF THERE ARE HVAC INSTALLATION PUNCHLIST ITEMS, THE GC MUST CORRECT THEM AND RESCHEDULE COMMISSIONING WITH MANUFACTURER. VISIT 2: HVAC CONTROLS COMMISSIONING THE CONTROLS COMMISSIONING IS PERFORMED BY THE MANUFACTURER IN MECHANICAL AND ELECTRICAL SUBCONTRACTORS. ALLOW FOR 4 HOURS TO ARE TO BE USED FOR THE COMPLETION OF THE COMMISSIONING PROCESS THAT WAS IN SCOPE AND NOT COMPLETED PRIOR TO THE COMMISSIONING CONJUNCTION WITH THE GENERAL CONTRACTOR AND THE COMPLETE THE CONTROLS COMMISSIONING. (NOTE: THESE HOURS ONLY. ADDITIONAL HOURS WILL NOT BE APPROVED FOR WORK PROCESS.) FOLLOW THE CONSTRUCTION DRAWINGS AND MANUFACTURER'S DETAILS AND DRAWINGS DURING THE INSTALLATION OF THE HVAC CONTROL EQUIPMENT. 1. CONTRACTOR TO COMPLETE AND EMAIL, OR FAX, THE CONTROLS COMMISSIONING SURVEY TO MANUFACTURER PRIOR TO THE CONTROL COMMISSIONING. 2. CONNECT THE HVAC CONTROLS TO AN OPERATIONAL ANALOG PHONE LINE OR ETHERNET CONNECTION TO ALLOW COMMUNICATION. IF NECESSARY, UTILIZE SITE FAX LINE TO CONNECT TO THE CONTROLS MODEM IN THE IFS PANEL. 3. CONTACT MANUFACTURER AT THE SCHEDULED TIME FOR THE CONTROLS COMMISSIONING. 4. PROVIDED THERE ARE NO OPEN ISSUES, VISIT 2 IS COMPLETE. IN THE EVENT THERE ARE OPEN ITEMS, THE GC MUST CORRECT THEM AND RESCHEDULE THE CONTROLS COMMISSIONING. VISIT 3: FINAL HVAC INSPECTION THIS VISIT IS TO DO A FINAL INSPECTION OF THE HVAC EQUIPMENT AND CONTROL INSTALLATION. THIS VISIT MUST TAKE PLACE PRIOR TO CONSTRUCTION COMPLETION. THE FOLLOWING ITEMS MUST BE COMPLETED PRIOR TO THE INSPECTION: 1. HVAC SYSTEM INSTALLATION IS COMPLETE - NO OPEN PUNCHLIST ITEMS EXCEPT FOR POSSIBLY THE PERMANENT PHONE LINE. 2. AIR BALANCE IS COMPLETE. NOTE: AIR BALANCE IS IN THE CONTRACTOR'S SCOPE OF WORK. THE GC MUST COMPLETE TRANE'S SITE VISIT #3 SURVEY PRIOR TO THE VISIT BEING SCHEDULED. THE CONTRACTOR IS RESPONSIBLE FOR HAVING THE MECHANICAL SUBCONTRACTOR AND THE ELECTRICAL SUBCONTRACTOR ON SITE DURING THE FINAL INSPECTION. BUDGET 4 HOURS FOR THE FINAL INSPECTION. 1. THE CONTRACTOR IS RESPONSIBLE FOR COMMUNICATING SCHEDULE DATE CHANGES FOR THE FINAL INSPECTION 2. FILTERS ARE TO BE REPLACED DURING THIS VISIT. FILTERS ARE TO BE PROVIDED BY THE CONTRACTOR AND SHALL BE ON SITE WHEN THE TRANE TECHNICIAN ARRIVES. 3. WHEN COMPLETE AND ALL OPEN CONTRACTOR HVAC ISSUES ARE RESOLVED A CONTROL NUMBER IS ISSUED BY THE MANUFACTURER. IT IS RECORDED INSIDE THE CONTROL PANEL DOOR IN THE IFS ELECTRICAL PANEL AND ON THE FINAL VISIT CHECK LIST. 4. IN THE EVENT THERE ARE OPEN ITEMS, THE CONTRACTOR MUST CORRECT THEM AND RESCHEDULE THE FINAL INSPECTION WITH MANUFACTURER. GC IS RESPONSIBLE FOR REPLACEMENT OF SHEAVES, PULLEYS, AND BELTS, IF NEEDED. 5. THE HVAC CONTROL NUMBER WILL BE ISSUED AT THE END OF THE VISIT PROVIDED THERE ARE NO UNRESOLVED HVAC PUNCHLIST ITEMS. THE TRANE TECHNICIAN WILL WRITE THE HVAC CONTROL NUMBER ON THE STICKER INSIDE THE WR CONTROLS PANEL (IFS PANEL) AND ON THE FINAL VISIT CHECK LIST. NTS AIR HANDLING UNIT SCHEDULE (SPLIT DX) MARK (AHU -No.) TRANE PACKAGE NUMBER MODEL AIR FLOW (CFM) OA FLOW / MIN. OA FLOW (CFM)* EXT. SP. (IN W.C.) DX COOLING COIL EAT ('FDB /WB) TOTAL (BTU /HR) SENSIBLE (BTU /HR) ELECTRIC HEAT INPUT (WATTS) OUTPUT (BTU /HR) STAGES ELECTRICAL VOLTS /0 /HZ MOTOR HP MCA (AMPS) MOCP (AMPS) APPROX. WEIGHT (LBS) ACCESSORIES NOTES ACCESSORIES ( "S" INDICATES STANDARD; "0" INDICATES OPTIONAL): 1. S- COMBINATION FAN CONTACTOR /DISCONNECT SWITCH (IN HEATER CONTROL CABINET WHERE APPLICABLE). 2. S- FACTORY PROVIDED 1" MATT INSULATION. 3. S- FACTORY FURNISHED MIXING BOX WITH ACTUATOR AND 0 -10 VOLT ADAPTER. 4. S- FACTORY FURNISHED VIBRATION ISOLATORS. 5. S- FACTORY FURNISHED FAN PROOVING SWITCH. 6. S- FACTORY PROVIDED CONDENSATE PAN OVERFLOW SWITCH. 7. S- FACTORY FURNISHED THERMAL EXPANSION VALVE. 8. S -SIX ROW DX COIL 9. 0 -TWO ROW HOT WATER COIL 10. 0- FACTORY PROVIDED ELECTRIC HEATER WITH SINGLE POINT CONNECTION (REHEAT POSITION). NOTES: 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. * MINIMUM OA FLOW IS THE AREA COMPONENT OF THE MINIMUM VENTILATION RATE BASED ON ASHRAE STANDARD 62.1 -2004 FOR RETAIL SALES SPACE (0.12 CFM /SQFT), TABLE6 -1. CONDENSING UNIT SCHEDULE MARK (CU -No) TRANE PACKAGE NUMBER MODEL / SEER (EER) AMBIENT OA TEMP (DEG F DB) TOTAL CAPACITY (BTU /HR) PHYSICAL DATA NO. OF FANS NO. OF COMP. ELECTRICAL VOLTS 0 /HZ MCA (AMPS) MOCP (AMPS) APPROX. WEIGHT (LBS) ACCESSORIES NOTES ACCESSORIES ( "S" INDICATES STANDARD; "O" INDICATES OPTIONAL): 1. S- FACTORY FURNISHED TRANSFORMER FOR FIELD APPLIED CONTROLS. 2. S- PROVIDE DUAL COMPRESSORS WITH SEPARATE CIRCUITS FOR ALL UNITS 10 TONS & ABOVE. 3. S- FACTORY PROVIDED 5 MINUTE DELAY OFF TIMING ON COMPRESSOR RESTART. 4. S- FACTORY FURNISHED LOW AMBIENT CONTROL. 5. S- FACTORY PROVIDED HIGH AND LOW PRESSURE SWITCHES. NOTES: MODEL TYPE FAN TERMINAL UNIT SCHEDULE MARK (SPVAV -No) TRANE PACKAGE NUMBER MODEL FAN SIZE INLET SIZE MAXIMUM PRIMARY AIR FLOW (CFM) MINIMUM AIR FLOW ICFM) FAN PERFORMANCE DRIVE TYPE MAXIMUM AIR FLOW (CFM) EXTERNAL STATIC IN W.C. FAN MOTOR HP ELECTRIC HEAT POWER INPUT (WATTS) HEAT OUTPUT (BTU /HR) STAGES ELECTRICAL VOL1S fd HZ FAN MOTOR AMPS ELECTRIC HEATER AMPS MCA (AMPS) MOCP (AMPS APPROX. WEIGHT (LBS) ACCESSORIES NOTES MARK (EF -No) MANUFACTURER PERFORMANCE AIR FLOW (CFM) EXT. STATIC (IN W.C. FAN SPEED (RPM ELECTRICAL V)LTS /H HZ FAN MOTOR HP APPROX. WEIGHT ILBS) SERVES ACCESSORIES NOTES AIR DEVICE SCHEDULE B15 LPCAAI0 5000 1210 / 555 1.0 80.0 / 67.0 166,900 126,700 22,000 75,133 460/3/60 5 795 1 -8, 10 615 TTA150B / 10.3 95 146,000 460/3/60 27.4 35 500 1 -5 D15 VSEF 05SQ 14" DIA. 1,530 240 0.65 1/2 1530 5,000 17,075 1 ) 277 - 480/3/60 2.4 147 1 -2 ACCESSORIES ( "S" INDICATES STANDARD; "0" INDICATES OPTIONAL): 1. S- FACTORY PROVIDED DISCONNECT SWITCH. 2. S- FACTORY PROVIDED CONTROL TRANSFORMER. NOTES: 1. REFER TO CONTROL WIRING SCHEMATICS FOR ANY FIELD INSTALLED CONTROL DEVICES NOT FACTORY INSTALLED. EXHAUST AND VENTILATION FAN SCHEDULE 1 LOREN COOK ACSC -180 ROOF EXHAUST BELT 5000 0.25 1355 460/3/60 2.0 114 TENANT SPACE ACCESSORIES ( "S" INDICATES STANDARD; "0" INDICATES OPTIONAL): 1. S -BIRD SCREEN, S- ALUMINUM CURB, S- DISCONNECT SWITCH, S- STANDARD FINISH, S -VFD. NOTES: 1. SEE SEQUENCE OF OPERATIONS ON M04.1 FOR FAN SEQUENCE. MECHANICAL EQUIPMENT SCHEDULES NTS OODMO24F4SCHD NTS AABC A/C ABV AD AFD AFF AHU AP ASHRAE BDD BEL BHP BLDG GOD BOP BTUH CAP CD CFM CHWR CHWS CLG CONN CONT CONTR COP CSFD CWR CWS DB DEG DET DIA DIM DISCH DL DN DTR DWG EA EAG EAR EAT EC EER EF EFF EG ELEC ELY ENCL EQUIV ESP EWC EXH (E) F ICU FLA FLEX FLR FPM FPS G GAL GALV GC GPM HD HP HTR HVAC HWR HWS S.D. NEW SUPPLY AIR DIFFUSER NEW R.G. RETURN AIR GRILLE E.A. EXHAUST AIR REGISTER CARBON DIOXIDE SENSOR TEMPERATURE SENSOR DUCT SMOKE DETECTOR MOTOR DAMPER CONNECT TO EXISTING LEGEND AND SYMBOLS 01 TEMPERATURE AND CARBON DIOXIDE SENSORS INSTALLED 48" A.F.F. SEE SHEET M04.1 FOR RESPONSIBILITY SCHEDULE. O DUCT MOUNTED RETURN AIR SMOKE DETECTOR. INTERLOCK TO SHUT DOWN UNIT ON SIGNAL FROM FIRE ALARM SYSTEM. SEE RESPONSIBILITY SCHEDULE ON M04.1. TENANT CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL HVAC EQUIPMENT. COORDINATE WITH LANDLORD ENGINEER PRIOR TO BID AND CONSTRUCTION. (4) MOUNT TRANSFER GRILLE AS HIGH AS POSSIBLE, ABOVE THE CEILING OF THE SALES SPACE. PROVIDE POWER EXHAUST FAN. RE -USE EXISTING ROOF OPENING. FIELD VERIFY EXACT LOCATION. SEE MO2.4, M03.1 & M04.1. MOTOR OPERATED DAMPER SEE M04.1. CODED NOTES AMERICAN AIR BALANCE COUNCIL AIR CONDITIONING UNIT ABOVE ACCESS DOOR APPROVED FIRE DAMPER ABOVE FINISH FLOOR AIR HANDLING UNIT ACCESS PANEL AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR CONDITIONING ENGINEERS BACK DRAFT DAMPERS BELOW BRAKE HORSEPOWER BUILDING BOTTOM OF DUCT BOTTOM OF PIPE BRITISH THERMAL UNIT PER HOUR CAPACITY CEILING DIFFUSER OR CONDENSATE DRAIN CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY CEILING, COOLING CONNECTION OR CONNECTOR CONTINUOUS CONTRACTOR COEFFICIENT OF PERFORMANCE COMBINATION FIRE /SMOKE DAMPER CONDENSER WATER RETURN CONDENSER WATER SUPPLY DRY BULB, DECIBEL DEGREE DETAIL DIAMETER DIMENSION DISCHARGE DOOR LOUVER DOWN DOWN THRU ROOF DRAWING EXHAUST AIR EXHAUST AIR GRILLE EXHAUST AIR REGISTER ENTERING AIR TEMPERATURE ELECTRICAL CONTRACTOR ENERGY EFFICIENCY RATIO EXHAUST FAN EFFICIENCY EXHAUST GRILLE ELECTRIC ELEVATION ENCLOSURE EQUIVALENT EXTERNAL STATIC PRESSURE ELECTRIC WATER COOLER EXHAUST EXISTING FAHRENHEIT FAN COIL UNIT FULL LOAD AMPS FLEXIBLE FLOOR FEET PER MINUTE FEET PER SECOND GAS GALLONS GALVANIZED GENERAL CONTRACTOR GALLONS PER MINUTE HEAD HORSEPOWER HEATER HEATING VENTILATING AND AIR CONDITIONING HOT WATER RETURN HOT WATER SUPPLY ID IN KW L LB LE LIN RIFF MAX MBH MCA MD MECH MFR MOCP MTD MTR NEBB N.C. N.I.C. N.O. N/A NTS (N) OBD OD OPNG OSA PD PLBG POC PRY PSI RA RAG RAR RG RH RPM SA SAG SAR SCH SENS SF SMACNA SOV SP SQ SQ FT SS TEMP TG TSP TSTAT TYP UC UH UON UTR VAV VENT VFD VTR WB WCO WG WT (N) INSIDE DIAMETER INCH KILOWATT LONG POUND LINEAR FEET LINEAR DIFFUSER MAXIMUM THOUSAND BTU PER HOUR MINIMUM CIRCUIT AMPACITY MOTORIZED DAMPER MECHANICAL MANUFACTURER MAXIMUM OVER CURRENT PROTECTION MOUNTED MOTOR NATIONAL ENVIRONMENTAL BALANCING BUREAU NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN NOT APPLICABLE NOT TO SCALE NEW OPPOSED BLADE DAMPER OUTSIDE DIMENSION OR DIAMETER OPENING OUTDOOR AIR PUMP PRESSURE DROP PLUMBING POINT OF CONNECTION PRESSURE REDUCING VALVE POUNDS PER SQUARE INCH RETURN AIR RETURN AIR GRILLE RETURN AIR REGISTER RETURN GRILLE RELATIVE HUMIDITY REVOLUTIONS PER MINUTE TEMPERATURE TRANSFER GRILLE TOTAL STATIC PRESSURE THERMOSTAT TYPICAL UNDERCUT UNIT HEATER UNLESS OTHERWISE NOTED UP THRU ROOF VARIABLE AIR VOLUME VENTILATION, VENTILATOR VARIABLE FREQUENCY DRIVE VENT THRU ROOF MECHANICAL ABBREVIATION DEFINITIONS NEW DUCTWORK NEW DUCTWORK MANUAL VOLUME DAMPER UNDERCUT DOOR WATT WET BULB WALL CLEANOUT WATER GAUGE WEIGHT 0 3 3 NTS OODMO24DOSYMB NTS OODMO24COCODE RES+IONED FOR C',ODE COMPLIANCE, PR VIED A SUPPLY AIR SUPPLY AIR GRILLE SUPPLY AIR REGISTER SCHEDULE SENSIBLE SUPPLY FAN, SQUARE FOOT SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SHUT -OFF VALVE STATIC PRESSURE SQUARE SQUARE FEET STAINLESS STEEL PLAY 1 . 201 City Of Tukwila NTS RECEIVED CITY OF IOW/1U. ,O . 21111B SECURE BASE TO CUR W/ LAG SCREWS 12' O.C. MINIMUM OF 2 PER SIDE DUCT INSULATION SEE SPECIFICATION NOTED METAL DECK OUTSIDE AIR INTAKE DETAIL I DUCT c 1, H,V,A,C, CONTRACTOR TO COORDINATE INSTALLATON WITH ROOFER FOR PROPER SEQUENCE TO PERMIT FLASHING AND COUNTERFLASHING INSTALLATION. COOK TR20 RESILIENT GASKET SEAL PREFABRICATED ROOF CURB ROOFING SECURE CURB TO DECK W/ SCREWS 12' O.C, MIN, OF 2 PER SIDE 3'x3'x1/4' ANGLE FRAMING (4) SIDES NOTE: WOOD NAILER COUNTERFLASHING EQUIPMENT SUPPORT RAIL (PATE ES -5 OR APPROVED EQUAL.) ROOF INSULATION ROOF STRUCTURE BASE PLATE NOTE: FILTER DRIER CONDENSING UNIT NCI illy'!.......... '' � PROVIDE RUBBER FLOOR MATTS AROUND ALL ROOFTOP EQUIPMENT MOUNTING DETAIL FOR CONDENSING UNIT FAN COIL UNIT PITCH a Q IF INDICATED CONDENSING UNIT ROOF -\ TXV SIGHT GLASS 1/4" / LIN. FT. SLOPE OIL TRAP (TYP AT EVERY SUCTION RISER) 1 IF MUFFLER IS INDICATED, REVIEW THE ADDITIONAL OPTIONS OF SOUND JACKET OVER COMPRESSOR. SUCTION LINE LIQUID LINE IF APPLICABLE Iv I�i59 lI II ! III I i 6�R L air i 1.1i,T1..i LAG BOLT NEOPRENE WASHER NAIL LAG BOLTS ROOFING 0 RECEIVER ® MUFFLER NOTE: SIZING OF REFRIGERANT LINES SHALL BE DETERMINED BY MANUFACTURER. CONTRACTOR SHALL PROVIDE A DIMENSIONED SKETCH SHOWING RISES, RUNS, ELBOWS, ETC. MANUFACTURER WILL PROVIDE WRITTEN DOCUMENTATION TO CONTRACTOR VERIFYING THE APPROPRIATE LINE SIZES TO BE USED. ONLY RIGID COPPER PIPING SHALL BE INSTALLED. SEE SPECIFICATION (SHEET M01.1) FOR MORE DETAILS. LIQUID LINE FROM COMPRESSOR ( TO CONDENSER IN HOT GAS LINE. LOCATE AS CLOSE AS POSSIBLE TO COMPRESSOR DISCHARGE. SECURE BASE TO CURB WITH LAG SCREWS 12' O.C, MIN. OF 2 PER SIDE ONE PIECE WELDED ALUMINUM FAN SUB -BASE CONTINUOUS PIANO TYPE PIANO HINGE FABRICATED CUR EXISTING ROOF DECK RIGID CONDUIT BY ELECTRIC MOTOR OPERATED DAMPER CORNER TO BE CUT FOR CONDUIT ROUTING DUCT 1 filtrAMI AIIMEIRMOIMIF 1 WM Plat 1 NOTES: 1, H,V.A.C. CONTRACTOR TO COORDINATE INSTALLATON W /LANDLORD'S ROOFER FOR PROPER SEQUENCE TO PERMIT FLASHING & COUNTERFLASHING INSTALLATION. ALUMINUM ROOF UPBLAST FAN RESILIENT GASKET SEAL FAN BASE HOLD DOWN CLIP EXISTING INSULATION SECURE CURB TO DECK W/ SCREWS 12' O.C. MIN, OF 2 PER SIDE, 3'x3'xl /4' ANGLE FRAMING (4) SIDES, POWER RELIEF FAN DETAIL NTS N DOUBLE CIRCUIT REFRIGERANT PIPING DETAIL PIPE TROUGH ROOF DETAIL NTS NTS OODM031LOUNIT NTS OODMO31KOPIPE NTS !!I'11,', [01'31 J [I] 2I M L K NEW 24 GA. G.I. COVER PLATE - NOTCH TO F PIPES NEW 24 GA. G.I. MULTIPLE PIPE ENCLOSURE ASSEMBLY - FASTEN TO CURB USING NEW 3/8" HEAD SCREWS THROUGH 5/8" STEEL/ NEOPRENE WASHERS - MIN. 3 PER SIDE. NEW 4" FIREPROOF INSULATION STRIP NEW 2x10 WOOD CURB f CAVITY TO BE FOAM FILLED 2x4 WOOD NAILER SECURED TO UNDERLYING DECK EXISTING BUILT -UP ROOFING EXISTING STEEL DECK NEW PIPES NEW FIBERGLASS BASE SHEET - MECHANICALLY FASTENED NEW MODIFIED BITUMEN FLASHING MEMBRANE - TORCH- APPLIED NEW 3"x3" CONTINUOUS 20 GA. G.I. METAL - SECURE TO DECK USING SCREWS SPACED AT 8" O.C. EXISTING ROOF INSULATION NOTES: ALL PIPES ENTERING THE PIPE ENCLOSURE ASSEMBLY SHALL BE SLOPED UPWARD AS THEY ENTER THE FLASHING SO THAT WATER WILL NOT BE ABLE TO RUN INTO THE BUILDING. H SUPPORT FROM STRUCTURE ABOVE WITH CHANNEL AND THREADED ROD. HANG PER SMACNA. FAN SECTION BY UNIT SUPPLIER FLEXIBLE DUCT CONNECTOR INSULATE SUCTION LINE WITH 1/2" FLEXIBLE UNICELLULAR INSULATION. NOTE: REFER TO COIL PIPING DETAILS FOR ADDITIONAL REQUIREMENTS. OUTSIDE AIR DUCT III�l ECONOMIZER / MIXING BOX SECTION FLAT FILTER SECTION L CONDENSATE DRAIN. REFER TO PLAN FOR SIZE AND ROUTE. INTEGRAL OVERFLOW LEVEL FLOAT SWITCH BY HVAC SUPPLIER. PARALLEL BLADE DAMPERS (TYP.) RETURN AIR DUCT. (LINE IF REQUIRED) SPLIT DX AHU MOUNTING DETAIL 25 1/4" OR 13 1/4" 24" OR 12" / REVIEWED FOR CODE COMPUANC APP WED MY 1.5 200€i — City tikwila MILIAN DIVISION NOTE: ROUGH -IN OPENING SIZES: NOMINAL 12 "x 12 = 12 1/2 "x 12 1/2" NOMINAL 12 "x 24" m 12 1/2 "x 24 1/2" NOMINAL 24 "x 24" = 24 1/2 "x 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED GYP. BD. CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFF. MTG. FRAME DETAIL NTS OODM031G2UNIT CONCENTRIC TRANSITION 0 - MAX. 45' DIVERGING, 60' CONVERGING RECTANGULAR DUCT AIR FLOW 45' SADDLE TAP 45 0 RECTANGULAR TO ROUND AIR FLOW ROUND TO ROUND (6) ECCENTRIC TRANSITION L.- 0 - MAX. 30' (EXCEPT 45' IS PERMITTED AT ROUND TO FLAT OVAL) RECTANGULAR DUCT 0 RECTANGULAR TO ROUND AI FLOW OW CONICAL FITTING SEAL AIRTIGHT W /MASTIC ROUND DUCT BRANCH DUCT 0 RECTANGULAR TO RECTANGULAR DUCT DETAILS CEILING DIFFUSER MOUNTING DETAIL NTS OODM031BODUCT DAMPER HANDLE TO BE INSTALLED MAXIMUM OF 3' -O" ABOVE CEILING. MARKER TAPE R TO IDENTIFY FLEXIBLE CONNECTION ROUND DUCT 18" LONG ORANGE M ATTACHED TO DAMPER INSULATED FLE (MIN. 3 FT., MAX. 4 FT.) FIRE DAMPER WHERE INDICATED ON PLANS. TITUS MODEL "DB" DIRECTIONAL BLOW PLATE CLIPPED ON DIFFUSER RODS. SEE NOTE BELOW. SUPPLY AIR DIFFUSER (LAY -IN FRAME) WITH MANUAL VOLUME DAMPER PROVIDE VOLUME DAMPER WITH LOCKING QUADRANT. PROVIDE WITH 3" EXTENDED SHAFT AND HANDLE (SEE SPEC SECTION 233300 D. 1.) SHT. MTL. ELBOW REQUIRED SECURELY TAPE VINYL FLEX DUCT TO SHT. MTL. W/ MIN. OF (2) CONTINUOUS WRAPS OF DUCT TAPE. STRAP CLAMP OVER FLEX DUCT INSULATION & VINYL TO SHT. MTL. TAPE INSULATION TO DUCT TO FORM A GOOD SEAL 8" LONG SHT. MTL. SECTION SECURED TO DIFFUSER COLLAR W/ MIN. (3) SHT. MTL. SCREWS, DUCT TAPE AND MASTIC. TRANSITION FROM DUCT SIZE TO DIFFUSER NECK SIZE AS NECESSARY THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. CEILING MOUNTING FRAME FOR GYP. BD. APPLICATION TITUS MODEL TRM, SEE DETAIL E THIS SHEET NOTE: ALL DIFFUSERS ARE 4 -WAY BLOW UNLESS NOTED OTHERWISE. PROVIDE OPTIONAL DIRECTIONAL BLOW, TITUS MODEL "DB" TO CONVERT DIFFUSER FROM STANDARD 4 -WAY TO 1 -WAY, 2 -WAY OR 3 -WAY BLOW AS DESIGNATED ON PLANS BY SHADED AREA. THORSON BAKER & Associates, Inc. Consulting Engineers e W H Vl W 0 CD O] Z ° zv� Q ° o o U a t`- V) Q W 0 N < I Q 0 z U Z W a' 0 ~ w w p Z W 2 N 2 V) p 0 w = - LE W I J Z U 1 a L. J Lu La LE W w • ,--. 0 X a2 Mw 0 w'- F w � v� LE 2 X aw w- W p I n -J 3,,,a Z V l a O= W U LT Z Z a ti + - - a � - V) - U 0 4 U ei 3 w ° � Z w I - Z � � V) U p wa V , d Z c O Z O 0Zt'0 zzw a 0az <Ce - Z W z : ww 4 p ° p - E- : 0o.- E W W V1 = W 0 T VI I- `i I F- tr X 0 Z Z o J tLF -UU4o_ Jv .'•k m 1 8 2009 F_ U 0 0 t- Z J N J Q w arz2 xma� -Zv ` p J UU J Z w L a Z Uwe 6 ▪ Z U7 r (n o N d U J W W d V) W Q W o LJ 0� 2 , yg r 4 F .. Z a w w WQ Z tZ r ��2 lJ Z D � ~ 2 g p W W F Z ° 2 w 0 � � w z p V) °Q UZ,_ 0 � 3 y � oo°© �' w V) a U Z Z J ° W o_42 LO J v) I_ m Q r uo Z a Ct Q a Q ( U O w C7 ° W V, I•- Z °Z Jp ESL' wUQ 4 5 F-ZZ _ co Li ,_ Q W LE w ° W J � ` ;W ; d J W H rm�+�amU LO O 0 T41° CO 0 >un L " QO O T J m J z 0 do ce W J wV Li < `n REVISIONS: REQUIRED BY: • INDICATES NO REVISION TO THIS SHEET DATE ISSUED: DESIGNED BY: DRAWN BY: CHECKED BY: z 0 W F- O 4 z fJ C JQ U - T N F � 4 W 2 W Z r Z ° 0 w Zp St) p U a z 4t S ° p g r 2 Q w. la. 0 0 Z Q a! Q ° q z p Vl g W Q J Z z N H O Q a a U W pwVVI - 09Cp U p Z UZO- �CC- a = a p U W �' Li U a FQ) w ° Ll < .0HZN U Z V • 0 w U a �° F- W 0 = 00 O ° °p °Z �Ugra ®W N ° F -�F- -w0 C 9 CC)OW oQa a CL 0 Q 1p N o- w Q o 0 a ut 02Q0o^_ W UF- UUa?02U MECHANICAL DETAILS DRAWING NUMBER: � < N m co 0_ o Z U .. C7 W I- Q a CL W < • to Q w a_ 0 w a_ H Z CA W 0 DATE 04/25/08 TBA TBA TBA OUTSIDE DIMENSION A A a / 23" OR 11 / 1 INSIDE DIMENSION / ? 1 SECURE BASE TO CUR W/ LAG SCREWS 12' O.C. MINIMUM OF 2 PER SIDE DUCT INSULATION SEE SPECIFICATION NOTED METAL DECK OUTSIDE AIR INTAKE DETAIL I DUCT c 1, H,V,A,C, CONTRACTOR TO COORDINATE INSTALLATON WITH ROOFER FOR PROPER SEQUENCE TO PERMIT FLASHING AND COUNTERFLASHING INSTALLATION. COOK TR20 RESILIENT GASKET SEAL PREFABRICATED ROOF CURB ROOFING SECURE CURB TO DECK W/ SCREWS 12' O.C, MIN, OF 2 PER SIDE 3'x3'x1/4' ANGLE FRAMING (4) SIDES NOTE: WOOD NAILER COUNTERFLASHING EQUIPMENT SUPPORT RAIL (PATE ES -5 OR APPROVED EQUAL.) ROOF INSULATION ROOF STRUCTURE BASE PLATE NOTE: FILTER DRIER CONDENSING UNIT NCI illy'!.......... '' � PROVIDE RUBBER FLOOR MATTS AROUND ALL ROOFTOP EQUIPMENT MOUNTING DETAIL FOR CONDENSING UNIT FAN COIL UNIT PITCH a Q IF INDICATED CONDENSING UNIT ROOF -\ TXV SIGHT GLASS 1/4" / LIN. FT. SLOPE OIL TRAP (TYP AT EVERY SUCTION RISER) 1 IF MUFFLER IS INDICATED, REVIEW THE ADDITIONAL OPTIONS OF SOUND JACKET OVER COMPRESSOR. SUCTION LINE LIQUID LINE IF APPLICABLE Iv I�i59 lI II ! III I i 6�R L air i 1.1i,T1..i LAG BOLT NEOPRENE WASHER NAIL LAG BOLTS ROOFING 0 RECEIVER ® MUFFLER NOTE: SIZING OF REFRIGERANT LINES SHALL BE DETERMINED BY MANUFACTURER. CONTRACTOR SHALL PROVIDE A DIMENSIONED SKETCH SHOWING RISES, RUNS, ELBOWS, ETC. MANUFACTURER WILL PROVIDE WRITTEN DOCUMENTATION TO CONTRACTOR VERIFYING THE APPROPRIATE LINE SIZES TO BE USED. ONLY RIGID COPPER PIPING SHALL BE INSTALLED. SEE SPECIFICATION (SHEET M01.1) FOR MORE DETAILS. LIQUID LINE FROM COMPRESSOR ( TO CONDENSER IN HOT GAS LINE. LOCATE AS CLOSE AS POSSIBLE TO COMPRESSOR DISCHARGE. SECURE BASE TO CURB WITH LAG SCREWS 12' O.C, MIN. OF 2 PER SIDE ONE PIECE WELDED ALUMINUM FAN SUB -BASE CONTINUOUS PIANO TYPE PIANO HINGE FABRICATED CUR EXISTING ROOF DECK RIGID CONDUIT BY ELECTRIC MOTOR OPERATED DAMPER CORNER TO BE CUT FOR CONDUIT ROUTING DUCT 1 filtrAMI AIIMEIRMOIMIF 1 WM Plat 1 NOTES: 1, H,V.A.C. CONTRACTOR TO COORDINATE INSTALLATON W /LANDLORD'S ROOFER FOR PROPER SEQUENCE TO PERMIT FLASHING & COUNTERFLASHING INSTALLATION. ALUMINUM ROOF UPBLAST FAN RESILIENT GASKET SEAL FAN BASE HOLD DOWN CLIP EXISTING INSULATION SECURE CURB TO DECK W/ SCREWS 12' O.C. MIN, OF 2 PER SIDE, 3'x3'xl /4' ANGLE FRAMING (4) SIDES, POWER RELIEF FAN DETAIL NTS N DOUBLE CIRCUIT REFRIGERANT PIPING DETAIL PIPE TROUGH ROOF DETAIL NTS NTS OODM031LOUNIT NTS OODMO31KOPIPE NTS !!I'11,', [01'31 J [I] 2I M L K NEW 24 GA. G.I. COVER PLATE - NOTCH TO F PIPES NEW 24 GA. G.I. MULTIPLE PIPE ENCLOSURE ASSEMBLY - FASTEN TO CURB USING NEW 3/8" HEAD SCREWS THROUGH 5/8" STEEL/ NEOPRENE WASHERS - MIN. 3 PER SIDE. NEW 4" FIREPROOF INSULATION STRIP NEW 2x10 WOOD CURB f CAVITY TO BE FOAM FILLED 2x4 WOOD NAILER SECURED TO UNDERLYING DECK EXISTING BUILT -UP ROOFING EXISTING STEEL DECK NEW PIPES NEW FIBERGLASS BASE SHEET - MECHANICALLY FASTENED NEW MODIFIED BITUMEN FLASHING MEMBRANE - TORCH- APPLIED NEW 3"x3" CONTINUOUS 20 GA. G.I. METAL - SECURE TO DECK USING SCREWS SPACED AT 8" O.C. EXISTING ROOF INSULATION NOTES: ALL PIPES ENTERING THE PIPE ENCLOSURE ASSEMBLY SHALL BE SLOPED UPWARD AS THEY ENTER THE FLASHING SO THAT WATER WILL NOT BE ABLE TO RUN INTO THE BUILDING. H SUPPORT FROM STRUCTURE ABOVE WITH CHANNEL AND THREADED ROD. HANG PER SMACNA. FAN SECTION BY UNIT SUPPLIER FLEXIBLE DUCT CONNECTOR INSULATE SUCTION LINE WITH 1/2" FLEXIBLE UNICELLULAR INSULATION. NOTE: REFER TO COIL PIPING DETAILS FOR ADDITIONAL REQUIREMENTS. OUTSIDE AIR DUCT III�l ECONOMIZER / MIXING BOX SECTION FLAT FILTER SECTION L CONDENSATE DRAIN. REFER TO PLAN FOR SIZE AND ROUTE. INTEGRAL OVERFLOW LEVEL FLOAT SWITCH BY HVAC SUPPLIER. PARALLEL BLADE DAMPERS (TYP.) RETURN AIR DUCT. (LINE IF REQUIRED) SPLIT DX AHU MOUNTING DETAIL 25 1/4" OR 13 1/4" 24" OR 12" / REVIEWED FOR CODE COMPUANC APP WED MY 1.5 200€i — City tikwila MILIAN DIVISION NOTE: ROUGH -IN OPENING SIZES: NOMINAL 12 "x 12 = 12 1/2 "x 12 1/2" NOMINAL 12 "x 24" m 12 1/2 "x 24 1/2" NOMINAL 24 "x 24" = 24 1/2 "x 24 1/2" "C" CHANNEL REINFORCING BY G.C. AROUND OPENING MOUNTING SCREW FIELD INSTALLED GYP. BD. CEILING STEEL MOUNTING FRAME DRYWALL CEILING DIFF. MTG. FRAME DETAIL NTS OODM031G2UNIT CONCENTRIC TRANSITION 0 - MAX. 45' DIVERGING, 60' CONVERGING RECTANGULAR DUCT AIR FLOW 45' SADDLE TAP 45 0 RECTANGULAR TO ROUND AIR FLOW ROUND TO ROUND (6) ECCENTRIC TRANSITION L.- 0 - MAX. 30' (EXCEPT 45' IS PERMITTED AT ROUND TO FLAT OVAL) RECTANGULAR DUCT 0 RECTANGULAR TO ROUND AI FLOW OW CONICAL FITTING SEAL AIRTIGHT W /MASTIC ROUND DUCT BRANCH DUCT 0 RECTANGULAR TO RECTANGULAR DUCT DETAILS CEILING DIFFUSER MOUNTING DETAIL NTS OODM031BODUCT DAMPER HANDLE TO BE INSTALLED MAXIMUM OF 3' -O" ABOVE CEILING. MARKER TAPE R TO IDENTIFY FLEXIBLE CONNECTION ROUND DUCT 18" LONG ORANGE M ATTACHED TO DAMPER INSULATED FLE (MIN. 3 FT., MAX. 4 FT.) FIRE DAMPER WHERE INDICATED ON PLANS. TITUS MODEL "DB" DIRECTIONAL BLOW PLATE CLIPPED ON DIFFUSER RODS. SEE NOTE BELOW. SUPPLY AIR DIFFUSER (LAY -IN FRAME) WITH MANUAL VOLUME DAMPER PROVIDE VOLUME DAMPER WITH LOCKING QUADRANT. PROVIDE WITH 3" EXTENDED SHAFT AND HANDLE (SEE SPEC SECTION 233300 D. 1.) SHT. MTL. ELBOW REQUIRED SECURELY TAPE VINYL FLEX DUCT TO SHT. MTL. W/ MIN. OF (2) CONTINUOUS WRAPS OF DUCT TAPE. STRAP CLAMP OVER FLEX DUCT INSULATION & VINYL TO SHT. MTL. TAPE INSULATION TO DUCT TO FORM A GOOD SEAL 8" LONG SHT. MTL. SECTION SECURED TO DIFFUSER COLLAR W/ MIN. (3) SHT. MTL. SCREWS, DUCT TAPE AND MASTIC. TRANSITION FROM DUCT SIZE TO DIFFUSER NECK SIZE AS NECESSARY THERMAL INSULATING BLANKET REQUIRED FOR FIRE RATED CEILINGS ONLY. CEILING MOUNTING FRAME FOR GYP. BD. APPLICATION TITUS MODEL TRM, SEE DETAIL E THIS SHEET NOTE: ALL DIFFUSERS ARE 4 -WAY BLOW UNLESS NOTED OTHERWISE. PROVIDE OPTIONAL DIRECTIONAL BLOW, TITUS MODEL "DB" TO CONVERT DIFFUSER FROM STANDARD 4 -WAY TO 1 -WAY, 2 -WAY OR 3 -WAY BLOW AS DESIGNATED ON PLANS BY SHADED AREA. THORSON BAKER & Associates, Inc. Consulting Engineers e W H Vl W 0 CD O] Z ° zv� Q ° o o U a t`- V) Q W 0 N < I Q 0 z U Z W a' 0 ~ w w p Z W 2 N 2 V) p 0 w = - LE W I J Z U 1 a L. J Lu La LE W w • ,--. 0 X a2 Mw 0 w'- F w � v� LE 2 X aw w- W p I n -J 3,,,a Z V l a O= W U LT Z Z a ti + - - a � - V) - U 0 4 U ei 3 w ° � Z w I - Z � � V) U p wa V , d Z c O Z O 0Zt'0 zzw a 0az <Ce - Z W z : ww 4 p ° p - E- : 0o.- E W W V1 = W 0 T VI I- `i I F- tr X 0 Z Z o J tLF -UU4o_ Jv .'•k m 1 8 2009 F_ U 0 0 t- Z J N J Q w arz2 xma� -Zv ` p J UU J Z w L a Z Uwe 6 ▪ Z U7 r (n o N d U J W W d V) W Q W o LJ 0� 2 , yg r 4 F .. Z a w w WQ Z tZ r ��2 lJ Z D � ~ 2 g p W W F Z ° 2 w 0 � � w z p V) °Q UZ,_ 0 � 3 y � oo°© �' w V) a U Z Z J ° W o_42 LO J v) I_ m Q r uo Z a Ct Q a Q ( U O w C7 ° W V, I•- Z °Z Jp ESL' wUQ 4 5 F-ZZ _ co Li ,_ Q W LE w ° W J � ` ;W ; d J W H rm�+�amU LO O 0 T41° CO 0 >un L " QO O T J m J z 0 do ce W J wV Li < `n REVISIONS: REQUIRED BY: • INDICATES NO REVISION TO THIS SHEET DATE ISSUED: DESIGNED BY: DRAWN BY: CHECKED BY: z 0 W F- O 4 z fJ C JQ U - T N F � 4 W 2 W Z r Z ° 0 w Zp St) p U a z 4t S ° p g r 2 Q w. la. 0 0 Z Q a! Q ° q z p Vl g W Q J Z z N H O Q a a U W pwVVI - 09Cp U p Z UZO- �CC- a = a p U W �' Li U a FQ) w ° Ll < .0HZN U Z V • 0 w U a �° F- W 0 = 00 O ° °p °Z �Ugra ®W N ° F -�F- -w0 C 9 CC)OW oQa a CL 0 Q 1p N o- w Q o 0 a ut 02Q0o^_ W UF- UUa?02U MECHANICAL DETAILS DRAWING NUMBER: � < N m co 0_ o Z U .. C7 W I- Q a CL W < • to Q w a_ 0 w a_ H Z CA W 0 DATE 04/25/08 TBA TBA TBA SPLIT DX AIR HANDLING UNIT WITH CONDENSING UNIT RESPONSIBILITY SCHEDULE ITEM FURNISHED BY INSTALLED OR PERFORMED BY RE -USE N/A REMARKS LSD &C VENDOR LANDLORD CONTR. LANDLORD CONTR. OTHER EXISTING AIR HANDLING UNIT AC - 0 ft - MC Wall Transmission 0 ft 0 - AIR HANDLING UNIT DISCONNECT/ FAN CONTACTOR AC - Roof Transmission 4591 ft 8361 AC 4591 ft 11857 - HIGH AND LOW PRESSURE SWITCHES (FACTORY INSTALLED) AC 0 0 ft 0 AC Skylight Transmission 0 ft FACTORY INSTALLED ELECTRIC HEATER WITH SINGLE POINT CONNECTION AND CONTACTOR AC 0 - Door Loads MC 0 - 0 ft 0 MIXING BOX WITH ACTUATOR AND 0 -10 VOLT ADAPTER Floor Transmission 4591 ft 0 - MC 0 Partitions INTERCONNECTIVE WIRING BY MC HOT WATER COIL - 0 ft2 0 - Ceiling 0 ft 0 - 0 ft2 THERMAL EXPANSION VALVE AC Overhead Lighting 905 W 3088 MC 0 0 - Task Lighting BAS CONTROLLER AC - 0 0 - AC 6950 W 23713 - SUPPLY AIR TEMPERATURE SENSOR AC - People 89 21908 AC 0 0 0 SPACE TEMPERATURE SENSOR AC 0 0 - MC 0 Miscellaneous - 0 CARBON DIOXIDE SENSOR AC 0 0 Safety Factor MC 4271 917 5% 593 CONDENSATE PAN OVERFLOW SWITCH AC - 89698 19248 - AC 0 Zone Conditioning - FAN PROOVING SWITCH AC - 12388 0 Plenum Wall Load AC 0 - 0 HOT WATER VALVE WITH ACTUATOR - Plenum Roof Load 0% 0 - 0 0 - Plenum Lighting Load VIBRATION ISOLATORS AC - 0 0 MC Return Fan Load 4504 CFM 0 - AIR COOLED CONDENSING UNIT AC - Ventilation Load 1209 CFM MC -2442 1209 CFM 60163 0 CONDENSING UNIT DISCONNECT SWITCH 4504 CFM 8347 EC 4504 CFM EC - Space Fan Coil Fans - o CONDENSING UNIT GROUND FAULT OUTLET - 0 EC Duct Heat Gain / Loss EC 0 - 0% 0 OUTSIDE AIR TEMPERATURE SENSOR AC - 106523 16806 MC 64204 0 Central Cooling Coil ONE PER PROJECT LOW AMBIENT KIT AC - -13057 0 MC - -7800 - - SPLIT SYSTEM COMMISSIONING AC » Total Conditioning - 106523 16820 AC 64204 0 CALL HVAC SUPPLIER Zone Name I Space Name DESIGN COOLING DESIGN HEATING FURNISHED BY COOLING DATA AT Jun 1500 COOLING OA DB / WB 84.0 °F / 65.0 °F HEATING DATA AT DES HTG HEATING OA DB / WB 23.0 °F / 19.2 °F ZONE LOADS Details Sensible (BTU /hr) Latent (BTU /hr) Details Sensible (BTU /hr) Latent (BTU /hr) Window & Skylight Solar Loads 0 ft 0 - 0 ft - - Wall Transmission 0 ft 0 - 0 ft 0 - Roof Transmission 4591 ft 8361 - 4591 ft 11857 - Window Transmission 0 ft 0 0 ft 0 - Skylight Transmission 0 ft 0 - 0 ft 0 - Door Loads 0 ft 0 - 0 ft 0 - Floor Transmission 4591 ft 0 - 4591 ft 0 Partitions 0 ft 0 - 0 ft2 0 - Ceiling 0 ft 0 - 0 ft2 0 - Overhead Lighting 905 W 3088 - 0 0 - Task Lighting 8311 W 28357 - 0 0 - Electric Equipment 6950 W 23713 - 0 0 - People 89 21908 18331 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 5% / 5% 4271 917 5% 593 0 » Total Zone Loads - 89698 19248 - 12449 0 Zone Conditioning - 88570 19248 - 12388 0 Plenum Wall Load 0% 0 - 0 0 - Plenum Roof Load 0% 0 - 0 0 - Plenum Lighting Load 0% 0 - 0 0 - Return Fan Load 4504 CFM 0 - 4504 CFM 0 - Ventilation Load 1209 CFM 9607 -2442 1209 CFM 60163 0 Supply Fan Load 4504 CFM 8347 - 4504 CFM -8347 - Space Fan Coil Fans - o - - 0 - Duct Heat Gain / Loss 0% 0 - 0% 0 - Total System Loads - 106523 16806 - 64204 0 Central Cooling Coil - 114324 16820 - -13057 0 Central Heating Coil - -7800 - - 77261 - » Total Conditioning - 106523 16820 - 64204 0 Key: Positive values are clg loads Negative values are htg loads Positive values are htg loads Negative values are clg loads Zone Name I Space Name SERIES POWERED VARIABLE AIR VOLUME (SPVAV) & VARIABLE AIR VOLUME (VAV) BOX RESPONSIBILITY SCHEDULE ITEM FURNISHED BY INSTALLED OR PERFORMED BY -USE EXISTING N/A N/A REMARKS REMARKS LSD&C VENDOR LANDLORD CONTR. LANDLORD CONTR. OTHER SERIES ARRANGEMENT FAN POWERED VAV BOX (WITH HEAT AND NO HEAT OPTIONS) AC Sales MC 3471.0 69.4 2976 6 0.00 0.30 SERIES ARRANGEMENT FAN POWERED VAV BOX AC Zone 2 Non - Sales -1 1 305 0 MC 1213.7 0.00 0.15 0.0 FAN POWERED BOX ELECTRICAL DISCONNECT AC AC NON -FAN POWERED BOX ELECTRICAL DISCONNECT AC 815 0 10.0 313.4 0 00 AC 0.0 / N A 122.3 BAS CONTROLLER WITH INTEGRATED ACTUATOR AC 4503.7 1209.3 AC SUPPLY AIR TEMPERATURE SENSOR AC MC SPACE TEMPERATURE SENSORS AC MC TERMINAL UNIT COMMISSIONING AC AC CALL HVAC SUPPLIER BCD REVIEWED F6 ' A cOMRiimmC PROVED MAY 1 5 2008 ..... 11' . DIVISION HVAC RESPONSIBIL SCHEDULE ITEM FURNISHED BY INSTALLED OR PERFORMED BY -USE EXISTING N/A N/A REMARKS REMARKS LSD&C VENDOR LANDLORD CONTR. LANDLORD CONTR. OTHER ROOFING CUT & PATCH, INSULATED TOE KICK & CURB LEVELING. MC MC MC TO HIRE LANDLORD APPROVED ROOFING CONTRACTOR DUCT SMOKE DETECTOR FAC MC IF NO FIRE ALARM SYSTEM, FURNISHED AND INSTALLED BY AC SMOKE SYSTEM ACCESSORIES, ETC, MC MC UNLESS FACTORY INSTALLED DIFFUSERS AND GRILLES LD M DIFFUSERS /GRILLES FIRE DAMPERS MC MC N/A WALL FIRE DAMPERS MC MC N/A COMBINATION FIRE /SMOKE DAMPERS MC MC N/A LOW PRESSURE DUCTWORK MC MC HIGH /MEDIUM PRESSURE DUCTWORK MC MC N/A DUCT SUPPORTS MC MC SEISMIC BRACING MC MC DUCT HEATER(S) MC MC TOILET EXHAUST FANS) WITH TOGGLE DISCONNECT SWITCH LD MC N/A TOILET EXHAUST DUCTWORK WALL OR ROOF CAP MC MC N/A PIPING AND PIPING APPURTENANCES (CIRCUIT SETTERS, ETC.) MC MC N/A BALANCE CONTRACTOR REPORT GC AABC OR NEBB CERTIFIED AS -BUILT DRAWINGS MC LANDLORD CONTROL SYSTEM MC MC N/A TEMPERATURE CONTROL SYSTEM COMPONENTS AC MC TEMPERATURE CONTROL SYSTEM WIRE AC MC FINAL CONN. BY MC LOCKING QUADRANT VOLUME DAMPER MC MC PNEUMATIC TUBING MC MC N/A FIRE ALARM SHUTDOWN RELAY FAC FAC WHERE APPLICABLE FOR FIRE ALARM S RELIEF AIR DAMPER AND ACTUATOR MC MC RELIEF AIR FAN OR RETURN AIR FAN AC MC 1LSEWEt3 iT B t`; O: SMOKE EVACUATION MC MC s N 1 (-) 1 1° OUTSIDE AIR INTAKE HOOD /LOUVER WITH DAMPER MC MC OUTSIDE AIR INTAKE DAMPER ACTUATOR MC MC N/A RELIEF AIR HOOD OR LOUVER WITH COUNTER- BALANCED BACKDRAFT DAMPER MC MC N/A ECONOMIZER DAMPER MC MC N/A ECONOMIZER DAMPER ACTUATOR AC MC N/A OUTSIDE AIR DAMPER MC MC N/A OUTSIDE AIR DAMPER ACTUATOR AC � MC N/A Zone Name I Space Name Mult Floor Area Maximum (ft Occupants Maximum Supply Air (CFM) Required Outdoor Air (CFM/person) Required Outdoor Air (CFMIfF) Required Outdoor Air (CFM) Required Outdoor Air (% of supply) Uncorrected Outdoor Air (CFM) Zone 1 Sales 1 3471.0 69.4 2976 6 0.00 0.30 0.0 0.0 1041 3 Zone 2 Non - Sales -1 1 305 0 10.0 1213.7 0.00 0.15 0.0 0.0 45.8 Zone 3 Non - Sales -2 1 815 0 10.0 313.4 0 00 0.15 0.0 0.0 122.3 Totals (incl. Space Multipliers) 4503.7 1209.3 A •• THORSON BAKER Sc Associates, Inc, Con Engineers 3030 West Streetsboro R acj , ( o x .659 -6688 Ph. Richfield, Ohio 44288 t a 30 659,8675 Fox 9y), I � crio O O CC 0 Z W too 0 z o) m J 0 z 0 z w LaJ W 3C REQUIRED BY: DATE ISSUED: DESIGNED BY: DRAWN BY: CHECKED BY: 361:61. '1 ° Ilk ' ` ry rs g a lq r, g � i e w I- I- (� z -. Diwv) r ° OF 0 V) C- cn Z Z vJ VI W H W 7 i E Z J W - O O Co , E 7S ) a zT V -.- Z1- W,_ w- ( SmGf - V) �- c7 J °- 0�c� v) i of O wFS m V) 0 w 0 r In p a (7 0 p - N ° 0 -O `E CE z <0waZ ° L V ZL U� ". or w^oZN Z 2 U C x O )'- a Z O w Z Wba:0 W Q -W - W Q Q1 O Z E,. 2 N z 0 i- 0 N w V) w Z? L F- 4 �-- ( % ) F- `Y N W witvai0 v) 3 w0.2 i 7 O w z v O 0 t Y O L Q: Z v) Q 2 (Z7 0 0 W 2 f0 W 0 w z g W a V J O Z W W z 7 vJ o- I- 4 O < 0u-''' . a Z= C) r >�° - a 4 W Yw'° 0 ti "' I__ W n Q ° , - X=D O O X -1w w 2 ° zc.oz w rn E qww OEn GY 0-T I 2 �' -0 LY -- z 0 I- C 2 0 ,,,001- _ c7 ® Fs iw a W ~ ~wd a _ U�CY }w Q0Z CL Er [Y X w Z D 5 J- ° t" C J 0 0 J W a Z O W w Q WI Q� V) 1- Hz00 x UJ0 U W �J z N w O O w aO 2z W y°U`t z j `Y VJ Q O J w q gomQ�O Q� ? w�(� V) v, .r, 7z 00\ v) V) OZ - W v) Y0E Z Z v, ; 0 R J Z 7 z f - O J z L �' - W w Z+ rs! O ce0 W Q 0 OO ' z00 O a =F -- F - O Uw f_ " V WOVc 20;C: E? E5 v) Z U J °Z 'J `` QY vwi Z w 2 <2- - w 70 E,, U a N W cL ~ • Urr4 (D aF )J07 J ' 2 - a 4U U W v J - 0U- N v. W CD w ® )- O Z z e �wO 0 7 Y - rW O H W z -Jccv)O z 4 1:11 F-<L f) - Z F ,,` v) ( z O O O W w Z Z V1 Q � � U a vJ O O w U N IW -� 00� ° O z W Z0 v J ~ 0 O Z Q 0 = I - < c 3 u J p 0 ▪ 0 w C w �0 Q r� 4 4 Q Z Z w h Q w I_. H V 1i O C00 D 0 09J.Z Varh$ U0!/ W w .- w w��- `` []wa O a` Oiir ~ a Q O 4 r (n _-2-:‹ 5 nw rv)t-' �rs vJ O IC::: W WJ 2 aW 0 a° v) a Er . �VOQii :.. H-cn (nam0 Oi- OO <?oo0 REVISIONS: INDICATES NO REVISION TO THIS SHEET � ) 1J 1 8 ?009 DRAWING NUMBER: 1 ra 0< L.. m Cal 00 0 0 04/25/08 TBA TBA TBA MECHANICAL RESPONSIBILITY SCHEDULES fib F-- Z U 0 L�J 0 Q I a- Y Lit [L 0 < -� Z CO re) 0 V) c' LUj W CD o a:: C 10* 7G W I- U Ili 14 0- 0 c LI.J zD t;,.) 0 LN o o DATE Design Parameters: City Name Seattle IAP Location Washington Latitude 47.5 Deg. Longitude 122.3 Deg. Elevation 449.0 ft Summer Design Dry -Bulb 85,0 °F Summer Coincident Wet -Bulb 65.0 ° F Summer Daily Range 18.3 °F Winter Design Dry -Bulb 23M °F Winter Design Wet -Bulb 19.2 °F Atmospheric Clearness Number 1.05 Average Ground Reflectance 0.20 Soil Conductivity 0.800 BTU /(hr -ft- °F) Local Time Zone (GMT +1- N hours) 8.0 hours Consider Daylight Savings Time No Simulation Weather Data noneN /A Current Data is 2001 ASHRAE Handbook Design Cooling Months January to December Sizing Calculation Information Zone and Space Sizing Method: Central Cooling Coil Sizing Data Central Heating Coil Sizing Data Supply Fan Sizing Data 2. Space Ventilation Analysis Table DESIGN WEATHER PARAMETERS HVAC LOAD CALCULATIONS Air System Information Air System Name Total Equipment Class SPLT AHU Air System Type 2DMZ Zone CFM Sum of space airflow rates Space CFM Individual peak space loads Total coil load 10.9 Tons Total coil load 131.1 MBH Sensible coil load 114.3 MBH Coil CFM at Jun 1500 4257 CFM Max block CFM 4504 OEM Sum of peak zone CFM 4504 CFM Sensible heat ratio 0.872 ft /Ton 420.1 BTU /(hr -ft 28.6 Water flow @ 10.0 °F rise N/A Max coil load 77.3 MBH Coil CFM at Des Htg 1425 CFM Max coil CFM 1425 CFM Water flow @ 20.0 °F drop N/A Actual max CFM 4504 CFM Standard CFM 4431 CFM Actual max CFM /ft 0.98 CFM/ft Outdoor Ventilation Air Data Design airflow CFM 1209 CFM CFM /ft 0.26 CFM/ft 1. Summary Ventilation Sizing Method Sum of Space OA Airflows Design Ventilation Airflow Rate 1209 CFM HVAC LOAD CALCULATIONS Number of zones 3 Floor Area 4591.0 ft Location Seattle IAP, Washington Calculation Months Jan to Dec Sizing Data Calculated Load occurs at OADB /WB.... 84.0 Jun /65,0 1500 F Entering DB / WB 80.3 / 64.2 °F Leaving DB / WB 55.0 / 53.5 °F Coil ADP 52.2 °F Bypass Factor 0.100 RH 48 % Design Resulting supply temp. 55.0 °F Zone T -stat Check 3 or 3 OK Max zone temperature deviation 0.0 °F Load occurs at Des Htg BTU /(hr -ft 16.8 Ent. DB / Lvg DB 59.0 1 110.0 °F Fan motor BHP 3.28 BHP Fan motor kW 2.45 kW Fan static 2.50 in wg CFM/person 13.52 CFM /person NTS 0 U a a N NOTES: SETPOINTS: LINE VOLTAGE BY EC SPLIT DX AIR HANDLING UNIT WITH ELECTRIC HEAT NETWORK WIRING AND SEQUENCE 18/3 CABLE 22/2 COMMUNICATION CABLE SENSOR(S)1 18/3 CABLE TE COMMUNICATION FRONT END TERMINATE NETWORK WIRES ON THE LIGHTING CONTROLLER NETWORK TERMINALS LOCATED IN THE IFS ELECTRICAL PANEL SYSTEM. FPVAv -1 VV550 ( ACLU -1 AHU -11 2212 COMMUNICATION CABLE u 18/3 CABLE •.__- _gyp L ZONE CO2 SENSOR SENSOR (1) ALL WIRE SHALL BE 18/3 UNLESS OTHERWISE INDICATED. (2) NUMBER OF CABLES FURNISHED BY HVAC MANUFACTURER IS INDICATED BY NUMBER OF TICK MARKS ACROSS THE LINE. (3) PURPLE 22/2 WIRE IS PROVIDE BY HVAC SUPPLIER AND IS PLENUM RATED. (4) SCHEMATIC IS FOR REFERENCE ONLY. AT TIME OF CONSTRUCTION, THE HVAC SUPPLIER WILL PROVIDE A COMPLETE DIAGRAM FOR INSTALLATION. SEE RESPONSIBILITY SCHEDULES, THIS SHEET, FOR A LIST OF ALL COMPONENTS AND SENSORS REQUIRING FIELD INSTALLATION. SPLIT DX AIR HANDLING UNIT (AHU) SEQUENCE OF OPERATIONS MANUFACTURER SHALL FURNISH AND /OR INSTALL ALL NECESSARY CONTROL DEVICES TO ACCOMPLISH THE FOLLOWING SEQUENCE OF OPERATION (REFER TO RESPONSIBILITY SCHEDULE FOR FIELD INSTALLATION REQUIREMENTS): DURING OCCUPIED HOURS THE SUPPLY FANS SHALL OPERATE CONTINUOUSLY, AND THE OUTSIDE AIR DAMPER SHALL OPEN TO THE MINIMUM SCHEDULED POSITION (ADJUSTABLE). WHEN THE OUTDOOR TEMPERATURE IS ABOVE 55 DEGREES FAHRENHEIT (ADJUSTABLE), AND THE SPACE TEMPERATURE IS 1'F ABOVE COOLING SETPOINT, COOLING SHALL BE ENERGIZED IN STAGES (WHERE APPLICABLE) UNTIL 1'F BELOW SETPOINT IS ACHIEVED. WHEN THE OUTDOOR TEMPERATURE IS BELOW 55 DEGREES FAHRENHEIT (ADJUSTABLE), AND SPACE TEMPERATURE IS ABOVE COOLING SETPOINT, COOLING SHALL DEENERGIZE, AND OUTSIDE AIR DAMPERS AND RETURN AIR DAMPERS SHALL MODULATE TO PROVIDE A SUPPLY AIR TEMPERATURE TO SATISFY THE DEMAND FOR COOLING. IF THE SPACE TEMPERATURE FALLS 1'F BELOW THE HEATING SETPOINT, AND THE OUTDOOR DAMPER IS AT THE MINIMUM POSITION, ELECTRIC HEAT SHALL BE ENERGIZED IN STAGES (WHERE APPLICABLE) UNTIL 17 ABOVE SETPOINT IS ACHIEVED. DURING UNOCCUPIED HOURS, THE SUPPLY FANS SHALL DEENERGIZE AND THE OUTDOOR DAMPER SHALL CLOSE. IF THE SPACE TEMPERATURE RISES 1'F ABOVE THE COOLING SETPOINT, THE FANS SHALL ENERGIZE, AND THE OUTSIDE AIR DAMPERS SHALL REMAIN CLOSED. COOLING SHALL BE ENERGIZED IN STAGES (WHERE APPLICABLE). WHEN THE SPACE TEMPERATURE FALLS BELOW COOLING SETPOINT, COOLING AND FANS SHALL DEENERGIZE. IF THE SPACE TEMPERATURE FALLS BELOW THE HEATING SETPOINT, THE FANS SHALL ENERGIZE, AND THE OUTSIDE AIR DAMPERS SHALL REMAIN CLOSED, ELECTRIC HEAT SHALL BE ENERGIZED IN STAGES (WHERE APPLICABLE). WHEN THE SPACE TEMPERATURE RISES ABOVE THE HEATING SETPOINT, ELECTRIC HEAT AND FANS SHALL BE DEENERGIZED. RELIEF FAN (WHERE APPLICABLE) SHALL BE ENERGIZED WHENEVER THE SUPPLY FANS ARE OPERATING, AND THE UNIT IS IN THE ECONOMIZER MODE OF OPERATION. THE RELIEF FAN SPEED SHALL BE VARIED THROUGH A VARIABLE FREQUENCY DRIVE CONTROLLED BY SPACE PRESSURE DIFFERENTIAL RELATIVE TO OUTDOOR PRESSURE. FAN SPEED SHALL MODULATE TO MAINTAIN A SPACE PRESSURE OF 0.05" POSITIVE RELATIVE TO OUTDOOR PRESSURE. RELIEF DAMPER SHALL OPEN WHENEVER RELIEF FAN IS ENERGIZED. MANUFACTURER PROVIDED PAN OVERFLOW SWITCH WILL DISABLE ALL FANS, COOLING, HEATING, AND CLOSE OUTDOOR AIR DAMPER IF HIGH WATER IS SENSED IN THE PAN. A FIELD INSTALLED CO2 SENSOR SHALL MODULATE THE OUTDOOR AIR DAMPER DURING OCCUPIED OPERATION BETWEEN SCHEDULED OA FLOW CFM AND MIN SCHEDULED OA FLOW TO MAINTAIN A CO2 CONCENTRATION BETWEEN 1000PPM AND 500PPM. A DUCT MOUNTED SMOKE DETECTOR SHALL DEENERGIZE THE SUPPLY AND RELIEF FAN, AND CLOSE THE OUTDOOR AIR DAMPER WHEN ACTIVATED. OCCUPIED HEATING: 707 COOLING: 74'F UNOCCUPIED HEATING: 60'F COOLING: 85'F SERIES POWERED VAV (SPVAV) SEQUENCE OF OPERATIONS MANUFACTURER SHALL FURNISH AND /OR INSTALL ALL NECESSARY CONTROL DEVICES TO ACCOMPLISH THE FOLLOWING SEQUENCE OF OPERATION (REFER TO RESPONSIBILITY SCHEDULE FOR FIELD INSTALLATION REQUIREMENTS): DURING OCCUPIED HOURS THE VARIABLE AIR VOLUME TERMINAL UNIT FAN SHALL BE ENERGIZED AND DAMPER SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE. IF THE SPACE TEMPERATURE DROPS ONE DEGREE BELOW SETPOINT AND THE DAMPER IS AT MINIMUM POSITION, THE UNIT'S ELECTRIC HEAT SHALL ENERGIZE. THE HEAT WILL REMAIN ON UNTIL THE SPACE TEMPERATURE IS SATISFIED. THE TERMINAL UNIT DAMPER SHALL FULLY (CLOSE /OPEN) AND THE FAN SHALL (ENERGIZE /DEENERGIZE) UPON A SIGNAL FROM THE FIRE ALARM SYSTEM. DURING THE UNOCCUPIED SCHEDULE, THE DAMPER SHALL CLOSE AND FAN /HEATER WILL DEENERGIZE. THE DAMPER SHALL OPEN AND THE FAN SHALL ENERGIZE IF UNOCCUPIED COOLING SETPOINT IS REACHED. THE FAN AND HEATER SHALL ENABLE IF UNOCCUPIED TEMPERATURE IS 27 BELOW UNOCCUPIED SETPOINT, FAN AND HEATER SHALL STOP WHEN SETPOINT IS REACHED, MECHANICAL RESPONSIBILITY SCHEDULES NETWORK WIRING AND SEQUENCE NOTE TO CONTRACTOR ITEM(S) NOT SHOWN ON ANY OF THE RESPONSIBILITY SCHEDULES ARE THE RESPONSIBILITY OF THE CONTRACTOR. LOCAL AREA REQUIREMENTS YES NO ❑ ❑ ❑ ❑ ❑ ❑ 1. SMOKE EVACUATION 2. CARBON DIOXIDE MONITORING 3. HURRICANE ZONE 4. SEISMIC ZONE YES NO ❑ ❑ ❑ ❑ ❑ ❑ 5. SPECIAL CURB HEIGHT REQUIREMENTS 6. FIVE MILE COASTAL PROXIMITY 7. OTHERS, I.E. METHANE, CARBON MONOXIDE, SOUND SENSITIVE, ETC. DESCRIPTION. . . ABBREVIATIONS, RESPONSIBILITY SCHEDULES AC AHJ BAS EC FAC HVAC EQUIPMENT SUPPLIER AUTHORITY HAVING JURISDICTION BUILDING AUTOMATION SYSTEM ELECTRICAL CONTRACTOR FIRE ALARM CONTRACTOR GC GENERAL CONTRACTOR LC LANDLORD CONTRACTOR LD LIGHTING PACKAGE DISTRIBUTOR LL LANDLORD LSD &C LIMITED STORE DESIGN & CONSTRUCTION MC MECHANICAL CONTRACTOR