Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M08-141 - WESTFIELD SOUTHCENTER MALL - SOLSTICE
SOLSTICE 201 SOUTHCENTER MALL EXPIRED OS -OS -09 M08 -141 Parcel No.: 2623049023 Address: Suite No: 201 SOUTHCENTER MALL TUKW Tenant: Name: SOLSTICE Address: 201 SOUTHCENTER MALL , TUKWILA WA Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA Contact Person: Name: MARCIA PEDDICORD Address: 633 SOUTHCENTER MALL TRAILER #3 , TUKWILA WA Contractor: Name: ALTERNATIVE AIR & HEATING INC Address: 12924 205 AV NE , WOODINVILLE WA Contractor License No: ALTERAH923J9 DESCRIPTION OF WORK: NEW UNITS, DUCTWORK AND SYSTEM ACCESSORIES Value of Mechanical: $15,000.00 Type of Fire Protection: SPRINKLERS /AFA Furnace: <100K BTU > 100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial City if Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us MECHANICAL PERMIT EQUIPMENT TYPE AND QUANTITY 0 0 0 0 0 1 1 0 0 1 0 0 0 0 * *continued on next page ** • Permit Number: Issue Date: Permit Expires On: Phone: Phone: 206 - 802 -6071 Phone: 800 87 -6985 Expiration Date: 04/29/2010 M08 -141 09/16/2008 03/15/2009 Fees Collected: $338.75 International Mechanical Code Edition: 2006 Boiler Compressor: 0-3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 7 Thermostat 1 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 2 doc: I MC -10/06 M08 -141 Printed: 09 -16 -2008 Permit Center Authorized Signature: Signature: doc: I MC -10/06 • City of Tukwila Print Name: 1/'� Ld `1LP -1 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M08 -141 Issue Date: 09/16/2008 Permit Expires On: 03/15/2009 Date: 6c1 k(ei(1).1) I hereby certify that I have read and e$ami4ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied dlnth, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance o»ork. I am authorized to sign and obtain this mechanical permit. Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 - 141 Printed: 09 -16 -2008 Parcel No.: 2623049023 Address: 201 SOUTHCENTER MALL TURIN Suite No: Tenant: SOLSTICE 1: ** *BUILDING DEPARTMENT CONDITIONS * ** • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 -141 Status: ISSUED Applied Date: 05/13/2008 Issue Date: 09/16/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the CityofTukwila Permit Center. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) doc: Cond -10/06 M08 -141 Printed: 09 -16 -2008 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 14: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 18: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 19: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 20: Your cooperation in complying with the requirements of the International Fire Code is appreciated and obviously displays genuine interest in fire prevention. 21: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond - 10/06 * * continued on next page ** M08 -141 Printed: 09 -16 -2008 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Print Name: doc: Cond -10/06 M08 -141 Date: 9 6/ ordinances governing or local laws regulating Printed: 09-16 -2008 E -Mail Address: rn Company Name: Mailing Address: Revised: 9 -2006 bh CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Contact Person: E -Mail Address: Contractor Registration Number: Contact Person: TARA Yu 05 E -Mail Address: t0.•Yculln u. WI • V Lunt t S ENGINEER. OF RE Company Name: H E N V.RS 014 Mailing Address: 3 330 N. 16T11 rs Contact Person: KE.L.Ly Hype E -Mail Address: ke.1 l ed . �� het -enq • corn Q:\Applications\Forms- Applications On Lin 006 - P Application. oc J Building Permit No. .2-7 Mechanical Permit X10 PlumbingtGas Permit No Public Works P utt, No. Project No. City M Fa Number: ENGINEERS ING Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: 2.6 2304 - 9032- Site Address: 201 SOuTKCEN"rE.R MALL ,TU KW tt.l� S uiteNumber: Floor: si FLOO(� Tenant Name: WA 981$ SOLSTICE New Tenant: Er Yes ❑ ..No Property Owners Name: C Vir TFJ-_E Ltz N { T ER g G 3 . .P �,;�. �: _TP ARIt6 l AY 'T K 1M t_.11,-. ,� 't L it 8 Mailing Address: _ ° p it��.�lr�'�� � �,- � . ®�- City State Zip CONTACT :PERSON'- w ho do we contact when your dy to be issued Name: MA fZG P)D121CORP - t r 3 Day Telephone: Mailing Address: 633 500THGENT E R ?A R K WAY 1 'I'v 4C W ILA 1 IV A 9$18 - �• City State Zip • W " ?t ,. •(.OrY1ax Number: GENERAL CONTRACTOR INFORMATIO (Contractor Informatitm for 1VMechauical (pg 4) for Plumbing and Company Name: 't"0 8E VET ER Mt NED Mailing Address: State Zip City Day Telephone: Fax Number: Expiration Date: ARCHITECT O1 RS P A R CHIT nCTS, LTD. N 1TH TERRY w o K 502, 5 GOLLE6E AVENUE , SUITE 2D3, TEMPE, Az., 8'5251 State Zip Day Telephone: ii.So SS9 ZDq. -• �� - $g q • 2.099 STREET , SUITE A 110 / ?HOENt (, AZ 85020 Zip Day Telephone: 602.-33G-6231 Fax Number: 6 02 "' q S F -- 3 012. Page 1 of 6 City State ,Unit Type: , e: yp Qty Unit-Type: Qty: =. Upit Type: Qty Boiler /Compressor:, Qty Furnace <100KBTU 0 Air Handling Unit >10,000 CFM 0 •F•irs Damper 14010R,I 1 0-3 HP/100,000 BTU 0 Fumace>100K BTU 0 Evaporator Cooler 0 Diffuser } 3 -15 HP /500,000 BTU 0 Floor Furnace 0 Ventilation Fan Connected to Single Duct ' Thermostat 15 -30 HP /1,000,000 BTU 0 Suspended/Wall/Floor Mounted Heater v Ventilation System 0 Wood/Gas Stove 0 30 -50 HP /1,750,000 BTU O Appliance Vent 0 Hood and Duct O Emergency Generator 0 50+ HP /1,750,000 BTU 0 Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic 0 Other Mechanical Equipment ' COMtoRNS 0 Q 1 Air Handling Unit <10,000 CFM ' Incinerator — Comm/Ind Q O Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... ❑ Replacement ...� 1gtCHANICAL PERMIT INFORMATION -206431 � aJa 3 r yt 3 • MECHANICAL CONTRACTOR INFORMATION Company Name: 10 $ E D1ET E R M IN ED Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ Si I 000 Scope of Work (please provide detailed information): -re NAN T W 1 L L PRO vi D E N EN Li N L TS puGTWoRk ARP SYSTEM AGGESSOR1gS Fuel Type: Electric ....a Gas .... Other: Indicate type of mechanical work being installed and the quantity below: Q:Wpplications\Fonns- Applications On Line\3.2006 - Permit Application.doc Revised: 9 -2006 bh Page 4 of 6 PERMIT APPLICATION NOTES Applicable to all pe sin this: application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 ER OR AUTHORIZ D AGENT: Q �0 Signature: cjk„kAAAMf. Print Name: TA RA N tit u M y u N 05 Day Telephone: 4.80- Q. 84 Mailing Address: 502 3 GO LLE Gtr A vE KUE 4 TUN SM Plr j AZ Q 51 1 f City State 11 Zip Date Application Accepted: , 5 - c1 0 Q:\Applications\Fonns- Applications On Line'3 -2006 - Permit Application.doc Revised: 9 -2006 bh Date Application Expires: l- 13-68' Date: o3 d 41 oa Staff Initials: Page 6 of 6 n.,,.• arrcrre na RECEIPT NO: R08 -03269 Initials: WER User ID: 1655 Payee: SUMMIT RETAIL CONSTRUCTION SET ID: 0916 SET NAME: SOLSTICE SET TRANSACTIONS: Set Member Amount City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http://www.dtukwi/a.wa.us D08 -277 1,490.50 Plagg71 271.00 TOTAL: 1,761.50 TRANSACTION LIST: Type Method Description Amount Payment Check 2957 ACCOUNT ITEM LIST: Description BUILDING - NONRES MECHANICAL - NONRES STATE BUILDING SURCHARGE SET RECEIPT TOTAL: Payment Date: 09/16/2008 Total Payment: 1,761.50 1,761.50 1,761.50 Account Code Current Pmts 000/322.100 1,486.00 000.322.102.00.0 271.00 000/386.904 4.50 TOTAL: 1,761.50 Receipt No.: R08 -01604 Payee: RSP ARCHITECTS ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 77229 67.75 RECEIPT Account Code Current Pmts 000/345.830 67.75 Total: $67.75 Parcel No.: 2623049023 Permit Number: M08 -141 Address: 201 SOUTHCENTER MALL TUKW Status: PENDING Suite No: Applied Date: 05/13/2008 Applicant: SOLSTICE Issue Date: Payment Amount: $67.75 Initials: WER Payment Date: 05/13/2008 01:43 PM User ID: 1655 Balance: $271.00 2334 05/13 9711 TOTAL 67.75 doc: Receipt -06 Printed: 05 -13 -2008 Project: / r • c Type of Inspection: Addr i Sc /t-t + J f �` Date Called: Special Instructions: Date Wanted: �t - % - cad a.m. Err Requester: Phone No: 9 4 a - r -- 373 5 INSPECTION RECORD Retain a copy with permit INSPECTION N CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 M a1-1 -4 PERMIT NO. (206)431 -3670 Approved per applicable codes. 0-Corrections required prior to approval. COMMENTS: 1 ikA c Avio 5L, D 6. C S"A-e 1 _ 1 -Wit AyP vd InspectoC Date: `' c c • El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: /8 COMMENTS: I - A -,r5 - N caLAA n.J r r" ,,T dr - 1 - \') A S OM � ir ( D f s AA--■ (cP — Date Wanted: I .......s-_, Ur `�rr P• Requester: cM t .) r' Kt- i A 5 r\ Project:c^ I Type of Inspectipn: j Address: '7/0t SC Date Called: Special Instructions: Date Wanted: I .......s-_, Ur `�rr P• Requester: Phone No: 573 -37.35 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. PERMIT NO. ?'C (206)431 -3670 Corrections required prior to approval. !� Inspecte(r: Date: ) —5_ D fi $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: -°-- -- - -- - �.� COMMENTS: [1/ Type to -e 'J -C._' f f� s ( A -..A 03L‘i" -- (..� 1 ; L3 P /L,f tf' ' r '_ f Special Date Wanted: i♦ I'3 " JO ST . 103 k.0-eQ__-- , Requester: it Phone / - 6 1'73 -3'135 ae -5(e j . .. II Project: [1/ Type to -e 'J -C._' f f� (..� 1 ; Address: Sc f Y , J/ / � tructions Date Called: Special Date Wanted: i♦ I'3 " m p.m. Requester: Phone / - 6 1'73 -3'135 Inspeftor: INSPECTION RECORD Retain a copy with permit J 1/ Nt o ?_ /-1 PERMIT NO. /9L INSPECTION 0. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3 orrections required prior to approval! Date: El $60.00 REINSPECTION FEE R�`QUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Project: _ SOLSi• Type of Inspection: —. �2e. eJ.N< A lk.f; Address: I S r , / / Ali Date Called: Special Instructions: / Date Wanted: 71 a.m Requester: Phone No: x7 40 � 7 ` -33-3? INSPECTION RECORD Retain a copy with permit MAC -(4 I PERMIT NO. INSPECT I e ' NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. El Corrections required prior to approval. COMMENTS: f ai f tJef) . 1 ey Inspec I U - 2-7 _ J� Ej $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Projecct:. c _� L l 1C� Type of Inspection: 2.4. k I e 4 Address: 20 1 4,4ht I i ,/'° Date Called: to a¢ t I Special Instructions: Date ; ed f a Q • Requester: Phone No: 1 LW— 9 - 1 3' . 3 7 E5 INSPECTION RECORD 7 Retain a copy with permit INSPECT! NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -367 El Approved per applicable codes. Corrections required prior to approval. COMMENTS: 19 hi /elf PiteAuie 1 Date: 1 6 24° e ' r7 $6Q.0 pal . t� to inspection, D REINSPEC ION FEE II OUIRED. Pri fee must be t 6300 Southcenter Blvd, Suite 100. C LL to schedule reinspection. Receilit JVo.: J 'Date: Proj Type Address: 20t yvt VA- << Date Called: Special Instructions: Date Wanted: q —?--' a.firN Requester: Phone No: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION . 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 .Approved per applicable codes. (a° -11-1r ❑ Corrections required prior to approval. COMMENTS: I 6 x• 0.00 REINSPECTIO' FE REQUIRED. Prior to inspection, fee must be p: id at 6300 Southcenter B vd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Project: 0L s-nc. c Sprinklers: T _ nspechon : 1‘..A G. c 1 4 --[ 11/4 r4‘ Address: 7 .0\ 'SC Suite #: VV\ . . . o Permits: Special Instructions: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre- Fire: Permits: Occupancy Type: O' - INSPECTION NUMBER CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206- 575 -4407 pproved per applicable codes. INSPECTION RECORD Retain a copy with permit ERMIT NUMB RS Corrections required prior to approval. COMMENTS: s S P2 / NAC / A//n_ 0 , - Inspector: 115 / Date: Hrs.. . / $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from e City of Tukwila Finance Department. Call to schedule a reinspection. Word /Inspection Record Form.Doc 1/13/06 T.F.D. Form F.P. 113 Project: Sot, s c.� Sprinklers: Fire Alarm: Type of Inspection: .'' •- -� i Address: -2_0 Suite #: , C M 4, 4k _.... ;.Contact Person: Special Instructions: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: :•. 2 INSPECTION NUMBER CITY OF TUKWILA FIRE DEPARTMENT Approved per applicable codes. Word /Inspection Record Form.Doc INSPECTION RECORD Retain a copy with permit 1/13/06 PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 Corrections required prior to approval. COMMENTS: o tL ✓ g- � gf &L r4 61v 4-7_ - h) 171tri✓ 01< J Inspector: Li- Date: t(1 (o ■ Hrs.. $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. T.F.D. Form F.P. 113 Form #89030 EAGLE TEST & BALANCING COiYIP NY rIABC CERTIFIED 815 E. Main Cushing, OK 74023 Phone: (918) 2.25 -1668 Fax: (913)2_25 -1687 - TEST AND Bi1..LINCE REPORT roject: SOLSTICE SO ' CEt ht . MALL ocatlon: _ - �� MALL, "IUKWILA ( A ltect: 1 fitilati eCTS Engineer. t..IDEIZStN 'ELI ERS INC Con tractor: L 6 PL2.4 t CN. Project Number. 130475. E. 47th PL. Bellevue. WA 93006 Phone: (425) 747 -9256 Fax: (425) 641 -5662 • This is to certify that Eagle Test & Balance has balanced the systems described he rein to their optimum performance capabilities. The testing and balancing has been performed in accordance with the standard requirements and procedures of the Associated Air Balance Council and the results of these test are herein recorded. Associated Air Balance Council Certification Number 93 -02 -01 Date: Test & Balance Engineer: Stephen D. Barnes mos -itt ■ emarks r o1 e c t ystein V — 1 E-I' — I )rm N89040 AIR DISTRIBUTION TEST SHEET Dale Page of Terminal Number Room Number Terminal . Factor Design Test —FPM or CFM Flnal Type . Size FPM CFM Test 1 Test 2 Test 3 FPM CFM 5D - 2 :" 1. • ISO \GS ISS 165 ISS 2 5t. -2 150 1L15 160 1(00 CaO 1 3 SD-2. 9' -2 S" 1.0 1.0 ►St) ISo Rao I bS 180 1.5 I y 0 155 140 155 L4 8" S GD - Q"" 1.0 too ISO 1(6 IOS IC S ICE SD 3" 10 IOa 160 I l b 106 7 St- I 0 1O0 200 I00 1bS 105 tr- - I its 8"x8" 1, e 100 qo RO emarks r o1 e c t ystein V — 1 E-I' — I )rm N89040 AIR DISTRIBUTION TEST SHEET Dale Page of -. Specified Actual Total CFM1- Fan a WS Gi 25 Total Cat - outset q OO q25 R/A CFIA `720 - MD OIA CFI IRO 185 Total Static Pressure (TotaVErternal) O (p" SS i � — 0 . SG Wet Wet Pruxure • Discharge Pressure 0 1 Cf Fen RPM W11 N. SYSTEM y v -1 Equipment Location CetL1t∎l61 Area Served {ZENPAI PCB #201 Equipment Manufacturer . CA'MFR Model ' F X 1 - ILNFIY?.f`60B 2105A (91 • Serial Number Project Name S LST1 6 Motor Sheave & No. Grooves Fan Sheave & No. Grooves Betts em __11) lj t'I ve NNW .4 Date Page of g AIR MOVING EQUIPMENT TEST SHEET Motor lisrxrfacturar Specified Motor HP/BHP t /3 Voltage 205 Amperage Motor RPM Motor Service ,Factor Starter Hester FJemente 2 Actual 2.043 SFb DID Specified Actual Spe fled Actual Motor Sheave & No. Grooves Specified Actual Motor Manufacturer azOW blatN Motor HPIBHP - Area Served Phase ' I Voltage 1 ( t21 Amperage Model ��7 Motor RPM Serial Number Motor Service Factor Q . 0 Starter Heater Elements Discharge Pressure Motor Sheave & No. Grooves ' pD Fan Sheave & No. Grooves Pb Belts DD f SYSTEM e F ` 1 Actual Specified Equipment Location EEILAN(a , q(' Area Served BF V k cZY Total CFM - Outlet �� Equipment Manufacturer . Ezbjk1 Total Static Pressure' (Total /External) Model 6 2(0162F4 Serial Number Inlet Pressure Q . 0 Project Name IMF )L..sTlt_E,, S TI-\C,Ettr[ EXHAUST FAN DATA SHEET Not always required or applicable. Remarks 01CT DRIVE Form 1#89031 Date Page of Specified Actual Specified . Actual Specified Actual Total CFM - Fan - -• 1b0 q(' Total CFM - Outlet �� 90 , . . Total Static Pressure' (Total /External) 0.25 Inlet Pressure Q . 0 Discharge Pressure Fan RPM • IDA Project Name IMF )L..sTlt_E,, S TI-\C,Ettr[ EXHAUST FAN DATA SHEET Not always required or applicable. Remarks 01CT DRIVE Form 1#89031 Date Page of Specified Actual Project Info Project Address 201 South Center Mali Date 5/8/2008 Tukwila, WA 89188 For Building Department Use • • Applicant Name: chria Kelse Applicant Address: 7330 N. 16th St. Suite A110 Phoenix, AZ 85020 Applicant Phone: 602 - 336 -5251 2006 Washington State Nonresidential Energy Code Compliance Form Project Sum wary II. PRJ; -SUM 2006 Washington State Nonresidentlal Energy lode Compliance Foram FILE CO y Permit No • te ` ....7 C' b "�vt, r... • REVIEWED FOR CODE COMPLIANCE APPROVED MAY 2 8 20019 Of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA MAY , 13 2000 "EC.Mir CENTER Revised Judy 2007 Project Info Project Address 201 south center Mall Model No. CFM Date 5/8/2008 HP /BHP Tukwila, WA 89188 Location of Service EF -1 For Building Dept. Use SP -125 100 0.25 53W Applicant Name: Chris Kelsey 21 BOH Applicant Address: 7330 N. 16th st. Suite A210 Phoenix, AZ 85020 Applicant Phone: 602 - 336 -5251. Fan Equipment Schedule - Equip. ID Brand Name Model No. CFM SP HP /BHP Flow Control Location of Service EF -1 GREENHECR SP -125 100 0.25 53W CV RESTR00E1 21 BOH Cooling Equipment Schedule Equip. ID Brand Name Model No. Capacity Btu/h Total CFM . OSA CFM or Econo? SEER or EER IPLV Location on -1 CARRIER 24ABA324 30 900 160 13 SEER 21 BOH Heating Equipment Schedule • Equip. ID Brand Name' Model No. Capacity Btu/h Total CFM OSA dm or Econo? Input Btuh Output Btuh , Efftciency iv -1 CARRIER F84CNP030008 30 900 160 27 21 2006 Washington Slate Nonresidential Energy Cade Compliance Form Project Description Briefly describe mechanical system type and features. ❑ Indudes Plans 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary MECH; SUM Revised July 2007 The mechanical system includes a DX cooling split system unit with refrigerant and electric heat option. Include documentation requiring compliance with commissioning requirements, Section 1416. Compliance Option © Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. 'If available. 2 As tested according to Table 14-1A through 14-1G. 3 If required. 4 COP, HSPF Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: ❑ Constant vol? Split system? Air cooled? ❑ Packaged sys? ❑ <20,000 Btuh? ❑ Economizer included? i If Heating Only: ❑ <5000 dm? ❑ <70% outside air? Mechanical',Sum,mary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. ( START ) Heating Only 2006 Washington State Nonresidential Energy Code Compliance Form Simple System Allowed (section 1420) otal Ca . wo economize <240,000 Btuh r 10%? ( Reference Section 1421 Heating/Cooling or Cooling Only Reference Section 1423 Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Mechanical Permit 2006 Washington State Nonresidential Energy Code Plans Checklist MECH -CHK Compliance Forms Revised July 2007 Project Address 201 South Center Mall 'Date 5/8/2008 • The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance n.a. 1411.4 Pkg. elec. htg.& dg. List heat pumps on schedule yea 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency 14202 n.a. 1411.1 Combustion htg. Indicate intermittent ignition, flue/draft damper & jacket foss 1412 HVAC controls n.a. 1412.1 Temperature zones Indicate locations on plans n. a. 1412.2 Deadband control Indicate 5 degree deadband minimum n.a. 1412.3 Humidity control Indicate humidistat yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 Jiff. day types . 14301 yes 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage Mi01 n.a. 1412.4.2 Optimum Start Indicate optimum start controls 1412.5 Heat pump control Indicate microprocessor on thermostat schedule . n.a. 1412.6 Combustion htg. i Indicate modulating or staged control n. a. 1412.7 Balancing Indicate balancing features on plans 1412.8 Ventilation Control Indicate demand control ventilation for high - occupancy areas yea 1422 Thermostat interlock Indicate thermostat interlock on plans . M101 n.a. 1423 Economizers Equipment schedule 1413 Air economizers n. a. 1413.1 Air Econo Operation Indicate 100% capability on schedule n. a. 1413.1. Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb n.a. 1413.2 Water Econo Doc Indicate crg load & water econoe & clg tower performance n. a. 1413.3 Integrated operation Indicate capability for partial cooling n.a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems . • yes 1414.1 Duct sealing Indicate sealing necessary 14301 yes 1414.2 Duct insulation Indicate R -value of insulation on duct 14301 yes. . 1415.1 Piping insulation Indicate R -value of insulation on piping M301 1416 Completion Requirements n.a. 1416.2.1 Commissioning Provide commissioning plan yes 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing . 14301 yes 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training 14301 yes 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report 14301 n.a. 1434 Separate air sys. Indicate separate systems on plans yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) . 1440 Service water htg. n. a. 1441 Elec. water heater Indicate R -10 insulation under tank n . a. 1442 Shut -off controls Indicate automatic shut -off n:a. 1443 Pipe Insulation Indicate R -value of insulation on piping ' n.a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool heater efficiency n. a. 1453 • Pool heater controls Indicate switch and 65 degree control • n.a. 1454 Pool covers Indicate vapor retardant cover n.a. • 1454 Pools 90+ degrees Indicate R -12 pool cover no i c r or any question, proviae explanation: 2006 Washington State Nonresidential Energy Code Compliance Form 04 -02 -2009 MARCIA PEDDICORD 633 SOUTHCENTER MALL TRAILER #3 TUKWILA WA 98188 RE: Permit No. M08 -141 201 SOUTHCENTER MALL TUKW Dear Permit Holder: In reviewing our current records the above noted permit has not received a fmal inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or fmal inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 05/05/2009 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, c Bill Rambo Permit Technician xc: Permit File No. M08 -141 Cary of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director 6300 Southcenter Boulevard, Suite #100 • Tukwila. Washington 98188 • Phone. 206 - 411 - . 4670 o F. -• MA- d21 -2AAc ACTIVITY NUMBER: M08 -141 DATE: 5 -13 -08 PROJECT NAME: SOLSTICE SITE ADDRESS: 201 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: sion _ 'fig DYi ; 4 Public Works Complete Comments: • PERMIT COORD COP PLAN REVIEW /ROUTING SLIP ZU`DY FirePreve � Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ Planning Division ❑ Permit Coordinator DUE DATE: 5 -15 -08 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS RO TING: Please Route Structural Review Required No further Review Required 4 ❑ ❑ REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2-28-02 Approved with Conditions DATE: DUE DATE: 6 -12 -08 Not Approved (attach comments) ❑ DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 DEVELOPERS SURETY Et INDEM CO 792473C 04/11/2008 Until Cancelled 04/29/2008 $6,000.00 04/29/2008 Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date PRESIDENT HARTFORD COFFMAN, BREET SECRETARY 04/29/2008 1 CAS INS 52SBMIK7582 04/11/2008 04/11/2009 $1,000,000.0004 /29/2008 CO Name Role Effective Date Expiration Date MCDOWELL, ALLEN AGENT 04/29/2008 STECKLER, STEVE PRESIDENT 04/29/2008 COFFMAN, BREET SECRETARY 04/29/2008 Untitled Page General /Specialty Contractor A business registered as a construction contractor with Lai to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County ALTERNATIVE AIR Et HEATING INC 8008376985 12924 206TH AVE NE WOODINVILLE WA 98077 KING Business Type CORPORATION Parent Company UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License Next License Associated License Specialty 1 Specialty 2 602809038 ACTIVE ALTERAH923J9 CONSTRUCTION CONTRACTOR 4/29/2008 4/29/2010 COSMOCC936KA HTG /VENT/AI R CONDITIONING UNUSED Business Owner Information Bond Information Insurance Information https: // fortress .wa.gov /lni/bbip/Detail.aspx ?License= ALTERAH923J9 • Page 1 of 1 09/16/2008 CIO 101 STOCKROOM PLUMBING FLOOR PLAN 1/4 " =1 ' -0 .dr ';.. ar \\ r ■ ■� 1 ■■1 '■■1 1■■' IM Pr PLUMBING PLAN NOTES: DISCONNECT AND REMOVE EXISTING FIXTURE AND TRIM. CAP WASTE, VENT, COLD AND HOT WATER PIPING IN PREPARATION FOR NEW FIXTURES. ENSURE ANGLE STOP VALVES AND ASSOCIATED TUBING IS IN GOOD WORKING ORDER. REPLACE IF NEEDED. FURNISH FIXTURES AND TRIM ACCORDING TO FIXTURE SCHEDULE, CONNECT TO EXISTING WASTE, VENT, COLD AND HOT WATER PIPING IN WALL. CONTRACTOR TO VERIFY WATER HEATER IS IN GOOD WORKING ORDER. COORDINATE WITH ARCHITECT IF REPLACEMENT IS REQUIRED. PLUMBING GENERAL NOTES: 1 DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY THE ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF BID. 2. FURNISH TO THE ARCHITECT A COPY OF INSPECTION REPORTS AND APPROVAL CERTIFICATES FROM LOCAL AND STATE INSPECTIONS. 3. INSTALLATION SHALL COMPLY WITH LEGALLY CONSTITUTED CODES AND THE REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION. 4. PLANS AND SPECIFICATIONS GOVERN WHERE THEY EXCEED CODE REQUIREMENTS. 5. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION AND MOUNTING HEIGHTS OF PLUMBING FIXTURES. 6. VALVES SHALL BE LINE SIZE UNLESS OTHERWISE NOTED. 7. COORDINATE ALL WORK WITH OTHER TRADES AND CONTRACTORS. 8. CLEAN FAUCET AERATORS AND PIPE STRAINERS PRIOR TO TURNING BUILDING OVER TO THE OWNER. MAY 05 200! SEPARATE PERMIT REQUIRED FOR: El Mechanical p Electrical reflumbing Gas Piping City of Tukwila BUILDING DIVISION REVISIONS No changes shall be ride to the scope of work without prior approval of Tukwila Building Division. NOTE a evisions will require a new plan submittal and may include additional plan review fees FEE COPY Permit N©. Plan review approval Is subject to errors and omissions. Approval of construction documents dogs not authorize the violation of any adopted code or ordinance. Receipt 0 approved Field Copy and cone t s is acknowledged: By . ir Date:, City of Tukwila BUILDING DIVISION 0,20 fit I_I SPRINKLER SYSTEM: (PERFORMANCE - ONLY NOTES: 1. FIRE SPRINKLER SYSTEM DESIGN, INSTALLATION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE APPLICABLE EDITIONS OF NFPA #13, NFPA #24 (UNDERGROUND), AND NFPA 101. THIS SYSTEM SHALL ALSO MEET ALL APPLICABLE LOCAL /STATE CODES AND STANDARDS, AND THE REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION. FIRE SPRINKLER CONTRACTOR SHALL VERIFY REQUIREMENTS WITH LOCAL CODE OFFICIALS PRIOR TO BID. 2. ALL SPRINKLER INFORMATION ON CONTRACT DOCUMENTS IS GENERAL AND FOR BID PURPOSES ONLY. FIRE SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTUAL LAYOUT, PIPE ROUTING, HYDRAULIC CALCULATIONS, AND COORDINATION WITH OTHER TRADES. ADDITIONAL SPRINKLERS, MATERIALS AND LABOR REQUIRED DUE TO LACK OF COORDINATION OR TO MEET LOCAL CODES, AUTHORITY HAVING JURISDICTION AND /OR INSURANCE CARRIER REQUIREMENTS SHALL BE PROVIDED BY THE FIRE PROTECTION CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. 80 SD -2 150 80 SD -2 150 0 it I 3. FIRE SPRINKLER CONTRACTOR SHALL COORDINATE INSTALLATION OF FIRE PROTECTION SYSTEM WITH DUCTWORK, LIGHTING, CONDUIT, ETC. AND RESOLVE ANY CONFLICTS AT NO ADDITIONAL COST TO THE OWNER. 4. REFER TO PERFORMANCE SPECIFICATIONS AND LANDLORD ENGINEERING CRITERIA FOR ADDITIONAL REQUIREMENTS. ALL SPRINKLER WORK IS BY LANDLORD CONTRACTOR AT TENANT'S EXPENSE, AND SHALL BE COORDINATED WITH ON SITE OPERATIONS DIRECTOR. 80 SD -2 100 Iu -i 1 x ,r __ 14x8(E) 100 14x12 " 80 SD -2 150 80 SD -2 150 80 SD -2 100 rr alli 20 80 SD -1 100 16 u v. IF 1k 1■ ■1 t■ ■1 INEI IOW ' P PROVIDE SCREEN OVER RETURN AIR DUCT. , 1 7. ) DE CO Q 1 `2, "- 2.X£3 -Of W1011'6 MECHANICAL PLAN 1/4 " =1' -0" HVAC PLAN NOTES: TRANSFER AIR IS ACCOMPLISHED THROUGH UNDERSIDE OF DOOR. MOUNT ALL DUCT WORK AND MECHANICAL EQUIPMENT TIGHT TO STRUCTURE. DO NOT ROUTE DUCTWORK OVER ELECTRICAL PANELS. PROVIDE THERMOSTAT 48 "AFF AT LOCATION SHOWN ON PLAN. CONNECT TO MALL PROVIDED OUTSIDE AIR DUCT. VERIFY EXACT SIZE, LOCATION, AND DIRECTION OF AIR FLOW BEFORE CONNECTING. CONTRACTOR SHALL ROUTE NEW LIQUID AND SUCTION REFIGERANT LINES FROM OU -1 TO IU -1 AT THE SAME ROUTE AS EXISTING REFRIGERANT LINES. CONTRACTOR SHALL VERIFY LOCATION AND SIZE OF EXISTING HOUSEKEEPING PAD ON ROOF AND MOUNT NEW OU -1 ON PAD IF SAME SIZE. IF SIZE DOES NOT MATCH, CONTRACTOR SHALL PROVIDE NEW 4" HOUSEKEEPING PAD SAME SIZE AS NEW UNIT. EXISTING CONDENSATE TO REMAIN, CONTRACTOR SHALL VERIFY THE CONDITION AND VERIFY THE SIZE OF CONDENSATE MEETS LOCAL CODE. CONNECT EXISTING DUCT WORK TO EF -1, CONTRACTOR SHALL VERIFY EXISTING DUCT WORK IS IN GOOD WORKING ORDER, REPLACE IF NECESSARY. GENERAL NEW NOTES: 1 COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER TRADES TO ENSURE A NEAT AND ORDERLY INSTALLATION. COORDINATE INSTALLATION OF DUCTWORK AND PIPING TO AVOID CONFLICTS WITH ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. 2. AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT TO REMAIN FOR NEW INSTALLATION DURING WORK. REPAIR DAMAGE CAUSED DURING CONSTRUCTION AT NO EXTRA COST TO THE OWNER. 3. ALL MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE NOTED. 4. NEW MECHANICAL EQUIPMENT, DUCTWORK AND PIPING ARE SHOWN AT APPROXIMATE LOCATIONS. FIELD MEASURE FINAL DUCTWORK AND PIPING LOCATIONS PRIOR TO FABRICATION AND MAKE ADJUSTMENTS AS REQUIRED TO FIT THE DUCTWORK AND PIPING WITHIN THE AVAILABLE SPACE. VERIFY THAT FINAL EQUIPMENT LOCATIONS MEET MANUFACTURER'S RECOMMENDATIONS REGARDING SERVICE CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND EQUIPMENT. 5. REFER TO ARCHITECTURAL DRAWINGS FOR RELATED CONSTRUCTION DETAILS AS APPLICABLE TO THE HVAC SYSTEM. VERIFY CHASES AND PENETRATIONS SHOWN ON ARCHITECTURAL DRAWINGS THAT ARE INTENDED FOR DUCTWORK AND PIPING MEET REQUIREMENTS. 6. INSTALL DUCTWORK AND PIPING PARALLEL TO BUILDING COLUMN LINES UNLESS OTHERWISE SHOWN OR NOTED. 7. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT, DUCTWORK AND PIPING SHALL BE FASTENED TO BUILDING JOISTS OR BEAMS. DO NOT ATTACH HANGERS AND SUPPORTS TO THE ABOVE FLOOR SLAB OR ROOF. 8. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF EQUIPMENT ACCESS PANELS /DOORS TO ENABLE SERVICE OF EQUIPMENT AND /OR FILTER REPLACEMENT. 9. SEAL PENETRATIONS THROUGH THE BUILDING COMPONENTS IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. FIREPROOF PENETRATIONS THROUGH FIRE RATED COMPONENTS IN ACCORDANCE WITH U.L. REQUIREMENTS. 10. COORDINATE THE EXACT MOUNTING SIZE AND FRAME TYPE OF DIFFUSERS, REGISTERS AND GRILLES WITH THE SUPPLIER TO MEET THE CEILING, WALL AND DUCT INSTALLATION REQUIREMENTS. 11. ADJUST LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES AS REQUIRED TO ACCOMMODATE FINAL CEILING GRID AND LIGHTING LOCATIONS. 12. DUCTWORK CROSSING FIRE RATED WALLS OR OTHER FIRE RATED ASSEMBLIES SHALL BE MINIMUM 26 GAUGE SHEET METAL. 13. LOCATE AND SET THERMOSTATS AT LOCATIONS SHOWN ON PLANS. VERIFY EXACT LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION. INSTALL DEVICES 48" AFF TO MEET ADA REQUIREMENTS UNLESS NOTED OTHERWISE ON PLANS. PROVIDE INSULATED BACKING FOR THERMOSTATS MOUNTED ON EXTERIOR BUILDING WALLS. INSTALL WIRING IN CONDUIT PROVIDED BY DIVISION 16. 14. PROVIDE A MANUAL BALANCING DAMPER IN EACH BRANCH DUCT TAKEOFF FROM MAIN SUPPLY, RETURN, OUTDOOR AND EXHAUST AIR DUCTS. 15. PROVIDE A PREFABRICATED 45 DEGREE, HIGH EFFICIENCY, REC ANGULAR /ROUND BRANCH DUCT TAKEOFF FITTING WITH MANUAL BALANCING DAMPER AND LOCKING QUADRANT FOR BRANCH DUCT CONNECTIONS AND TAKE -OFFS TO INDIVIDUAL DIFFUSERS, REGISTERS AND GRILLES. 16. BRANCH DUCTWORK TO AIR OUTLETS SHALL BE SAME SIZE AS OUTLET NECK SIZE UNLESS OTHERWISE NOTED. 17. RIGID DUCTWORK INSULATION: PROVIDE 2" THICK, 3/4 LB DENSITY INSULATION WRAP ON RIGID ROUND AND RECTANGULAR, CONCEALED, SUPPLY AND RETURN AIR DUCTS AND ON OUTSIDE AIR DUCTS. 18. PROVIDE THERMAFLEX TYPE M -KE, FLEXMASTER TYPE 8, OR APPROVED EQUAL FLEXIBLE DUCTWORK. FLEXIBLE DUCTWORK SHALL BE LISTED UNDER UL 181 AS CLASS 1 AIR DUCT AND BE PROVIDED WITH INTEGRAL MINIMUM R -6.0 FIBERGLASS INSULATION. FLEXIBLE DUCTWORK SHALL NOT EXCEED 5' -0" IN LENGTH AND SHALL BE INSTALLED AND SUPPORTED TO AVOID SHARP BENDS AND SAGGING. 19. PROVIDE A NEW SET OF AIR FILTERS IN UNITS PRIOR TO TESTING, ADJUSTING AND BALANCING. AND BEFORE TURNING SYSTEM(S) OVER TO OWNER. 20. INDOOR AIR QUALITY MEASURES: PROTECT INSIDE OF (INSTALLED AND DELIVERED) DUCTWORK AND HVAC UNITS FROM EXPOSURE TO DUST, DIRT, PAINT AND MOISTURE. REPLACE INSULATION THAT HAS GOTTEN WET AT ANY TIME DURING CONSTRUCTION, DRYING THE INSULATION IS NOT ACCEPTABLE. SEAL ANY TEARS OR JOINTS OF INTERNAL FIBERGLASS INSULATION. REMOVE DEBRIS FROM CEILING /RETURN AIR PLENUM INCLUDING DUST. AN INDEPENDENT, PROFESSIONAL DUCT CLEANING COMPANY SHALL VACUUM CLEAN ANY DUCTWORK CONNECTED TO HVAC UNITS THAT WERE OPERATED DURING THE CONSTRUCTION PERIOD AFTER NEW FILTERS ARE INSTALLED AND PRIOR TO TURNING SYSTEM OVER TO THE OWNER. MAY 0 5 zoo9 NOTE: EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS & SITE VISITS AND MAY NOT REFLECT EXACT "AS- BUILT" CONDITIONS. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. HENDERSON J ENGINEERS "a 8325 LENEXA DRIVE LENEXA, KS 66214 TEL 913 742 5000 Fax 913 742 5001 www.hei eng.com 0750002188 RSP Architects 502 S. College Avenue Suite 203 Tempe, AZ 85281 Certification RSP Architects, Ltd. with Terry Wobken Washington No. 6634 Location Westfield Southcenter 201 SOuthuenter Mall Tukwila, WA 90188 Project For Project No. Drawn By Checked By Date 1688.005.02 CK /SS DH 05.06.08 480.889.2000 480.889.2099 fax www.rsparch.com © Copyright ASP Architects 2003. All rights reserved. MECHANICAL & PLUMBING PLANS 1 4dt M1O1 NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of ASP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. v v DUCT SIZE v l / 23 ", 19 ", 17" OR 1 1 " w —___, T N CA I- 0 D 0 A n n f OUTSIDE DIMENSION A l / 23 ", 19 ", 17" OR 1 1 " / INSIDE DIMENSION —___, T FLEX CONNECTOR TRANSITION FROM FAN DISCHARGE TO DUCT SIZE INDICATED EXHAUST FAN CONNECT TO SUPPORTING STRUCTURAL MEMBER DUCT SIZE PLATE WASHER 2 MAX 1 MIN TRANSVERSE BRACE 1/4" MAX TRANSVERSE HANGER Q BRACING DETAIL NO SCALE SUPPORT FROM STRUCTURE ABOVE WITH ALL — THREAD RODS AND VIBRATION ISO— LATION. SHEET METAL STRAP (MIN 2 -1/2 "x12 GA. STRAP) INTEGRAL GRILLE CEILING CEILING MOUNTED CABINET EXHAUST FAN DETAIL NO SCALE TRANSVERSE CABLE BRACE CONNECT TO SUPPORTING STRUCTURAL MEMBER LONGITUDINAL CABLE BRACE 3" LONG ANGLE PLATE WASHER DOUBLE HANGER SEISMIC CABLE BRACING FOR ROUND DUCTS UP TO 84" NO SCALE LONGITUDINAL CABLE BRACE LONGITUDINAL BRACES LONGITUDINAL HANGER BRACING DETAIL NO SCALE FOIL TAPE AT INSULATION JOINT SEE NOTE 1. PRE — INSULATED FLEXIBLE DUCT AS REQUIRED, INSTALL PERMANENTLY SEALED AND SUPPORTED TO PREVENT KINKING AND SHARP TURNS METAL BAND (TYPICAL) CEILING DIFFUSER WITH VOLUME DAMPER, FIRE DAMPER OR COMBINATION VOLUME /FIRE DAMPER AS SCHEDULED CEILING METAL BAND OVER INSULATION (TYPICAL) HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED, WITH VOLUME DAMPER AND DAMPER LOCK WITH EXTENSION J CE H w m : 0 1- I— Q • 0_ Q 0 nuuumuumultlm loou uomu.r MIAMI 000u E = NOTES: 1. EXTEND RIGID METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT EXCEED 5' -0 ". PROVIDE RIGID 90° ELBOW WHERE REQUIRED TO KEEP FLEXIBLE DUCT WITHIN 5—O" LENGTH LIMITATION. 0 LAY -IN CEILING DIFFUSER DETAIL NO SCALE i '1 i u CONNECT TO SUPPORTING r CONNECT TO SUPPORTING STRUCTURAL MEMBER 111' I� TRANSVERSE BRACE i // INSULATED DUCT 1/2" CLEARANCE MAXIMUM ANCHOR BOLT STRUCTURAL MEMBER /CLEARANCE MAXIMUM \ � 1 \\ 2 MAX VERTICAL HANGER LONGITUDINAL HANGER ONE EACH SIDE OF DUCT 2 7 — HORIZONTAL BRACE Q_ BOLTS EQUAL - OF ANGLES 1" TYPICAL 4 SIDES INSULATION WHERE REQUIRED NOTES: 1. CABLE BRACES MAY BE USED FOR SEISMIC RESTRAINT IN LIEU OF ANGLE BRACES. CENTER SEISMIC BRACING FOR RECTANGULAR DUCTS NO SCALE SUSPENDED EQUIPMENT DETAIL A EQUIPMENT SUSPENDED EQUIPMENT WITH VIBRATION MOUNT DETAIL C \ 1 MIN \ 25 1 /4 ", 21 1 /4 ", 19 1 /4" OR 13 1 /4" ROD BRACING (TYP 4 SIDES) 24 ", 20 ", 18" OR 12" VIBRATION ISOLATION 1 1/2" SUPPORT FRAMING ALTERNATE ` LOCATION `\ OF BRACE (TYP 4 ` CORNERS) HANGER ROD DIAGONAL BRACING (TYP. 4 SIDES) LOCK NUT BRACE FRAMING GAP ANGLE WITH RESILIENT PAD (TYP EACH CORNER) NOTE: ROUGH —IN OPENING SIZES: NOMINAL 12 "x 12" = 12 1/2"x 12 1/2" NOMINAL 24 "x 24" — 24 1/2"x 24 1/2" NOMINAL 24 "x 12" = 24 1/2"x 12 1/2" NOMINAL 18 "x 18" = 18 1/2"x 18 1/2" NOMINAL 20 "x 20" = 20 1/2"x 20 1/2" 25 1/4", 21 1/4", NOTES: 1.CABLE BRACES MAY BE USED RESTRAINT IN LIEU OF ANGLE 19 1/4" OR 13 1/4" DRYWALL MOUNTING FRAME DETAIL NO SCALE EQUIPMENT VIBRATION MOUNT WHERE APPLICABLE STEEL ,�' ,�' MOUNTING 1 1/8" FRAME SUSPENDED EQUIPMENT DETAIL B f ; - MOUNTING SCREW FIELD INSTALLED DIAGONAL BRACING (TYP 4 SIDES) FOR SEISMIC BRACES. ® SEISMIC SUPPORT DETAIL FOR HUNG EQUIPMENT NO SCALE NOTE 2 SUPPORT BY 4" HOUSEKEEPING PAD HANG FAN COIL UNIT FROM STRUCTURE SEE DETAIL 9.— STRUCTURE OUTSIDE AIR DUCT J DRYWALL CEILING METAL STUD REINFORCING BY G.C. AROUND OPENING. ROUGH OPENING BY G.C. RETURN AIR DUCT f SUPPORT DRAIN PAN FROM STRUCTURE INDEPENDENT OF FAN COIL UNIT. FAN COIL UNIT CONDENSING UNIT INSTALL PIPE PENETRATION CURB AND SEAL ALL AROUND WEATHERTIGHT FLEXIBLE CONNECTORS (TYP) REFRIGERANT LINES SUPPLY AIR DUCT PROVIDE AUXILIARY DRAIN AN, SEE NOTE 3 CONDENSATE DRAIN AND P —TRAP RE: PLUMBING DRAWINGS NOTES: 1. ARRANGEMENT SHOWN IS SCHEMATIC, ADJUST TO SUIT FIELD CONDITIONS OR MEET LOCAL CODE REQUIREMENTS. 2. INTERLOCK 2— POSITION MOTORIZED DAMPER WITH FAN TO OPEN WHEN FAN STARTS IN OCCUPIED MODE. SET OPEN POSITION TO MINIMUM OUTSIDE AIR CFM PER SCHEDULE. 3. EXTEND AUXILIARY DRAIN PAN MINIMUM 3" BEYOND UNIT ON ALL SIDES. PROVIDE WITH FLOAT SWITCH, SEE SEQUENCE OF OPERATION IN MECHANICAL SPECS. HORIZONTAL DX FAN COIL UNIT DETAIL WITH CONDENSING UNIT ON ROOF NO SCALE NOTE: EXTEND METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT EXCEED 5' —O" PRE — INSULATED FLEXIBLE DUCT AS REQUIRED, INSTALL PERMANENTLY SEALED AND SUPPORTED TO PREVENT KINKING AND SHARP TURNS METAL BAND (TYPICAL) CEILING DIFFUSER WITH VOLUME DAMPER, FIRE DAMPER OR COMBINATION VOLUME /FIRE DAMPER AS SCHEDULED HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED. NYLON BAND OVER INSULATION (TYPICAL) wimimu immmrjuoim um7w t0000000rm 00000000 E E I � I I I I I I L —L T° kww`a° MIO8 EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS & SITE VISITS AND MAY NOT REFLECT EXACT "AS— BUILT" CONDITIONS. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. T 18" LONG ORANGE MARKER TAPE ATTACHED TO DAMPER TO IDENTIFY LOCATION CEILING STEEL MOUNTING FRAME. RE: 6/M201 LAY -IN CEILING DIFFUSER E D IN S HARD CEILING DETAIL NO HviEwciri E • COMPLIANCE :APPROVED SAY 2 F. JCrr 1' INSULATED DUCT VOLUME DAMPER AND DAMPER LOCK WITH 3" EXTENDED SHAFT. INSTALL DAMPER HANDLE A MAXIMUM OF 2' VERTICAL FROM THE EDGE OF DIFFUSER. AND 2' HORIZONTAL MAY 05 2009 HENDERSON ENGINEERS= 8325 LENEXA DRIVE LENEXA, KS 66214 TEL 913 742 5000 FAX 913 742 5001 www.hei- eng.com 0750002188 1688.005.02 CK RSP Architects 502 S. College Avenue Suite 203 Tempe, AZ 85281 Certification K ; W RSP Architects, Ltd. with Terry Wo r ken Washington No. 6634 Location Westfield Southcenter 201 Southcenter Mall Tukwila, WA 98188 Project For Project No. Drawn By Checked By DH Date 05.06.08 MECHANICAL DETAILS 480.889.2000 480.889.2099 fax www.rsparch.com © Copyright ASP Architects 2003. All rights reserved. CE NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whale or in part, without express written permission of ASP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. M201 GRILLE, REGISTER AND DIFFUSER SCHEDULE MARK MANUFACTURER MODEL FACE TYPE MOUNTING LOCATION FACE SIZE (IN) MAX. NC DAMPER NOTES SD -1 PRICE SPD SQUARE PLAQUE LAY –IN 24x24 – – A –H SD -2 PRICE SPD SQUARE PLAQUE CEILING 24x24 – – A –G RG -1 PRICE PDR PERFORATED CEILING 24x24 16 – A, C –H RG -2 PRICE PDR PERFORATED LAY –IN 12x12 16 – A, C –G NOTES: A. NECK SIZE SHOWN ON DRAWINGS. B. 4 –WAY THROW PATTERN UNLESS OTHERWISE SHOWN ON DRAWINGS. C. BRANCH DUCT SIZE SHALL BE SAME AS NECK SIZE UNLESS OTHERWISE SHOWN ON DRAWINGS. D. BAKED ENAMEL FINISH, WHITE TO MATCH CEILING COLOR. E. PROVIDE NECK FOR DUCT CONNECTION. F. FRAME TYPE TO MATCH CEILING CONSTRUCTION, COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN. G. PROVIDE BORDER TYPE TO MATCH CEILING CONSTRUCTION. H. PROVIDE RAPID MOUNT FRAME FOR PLASTER AND GYP BOARD CEILING. OUTSIDE AIR REQUIREMENTS AREA PURPOSE GROSS FLOOR AREA (SQ. FT) CODE OUTSIDE AIR REQUIREMENTS (2006 IMC) SYSTEM NUMBER ACTUAL OUTSIDE AIR (CFM PER UNIT) 1 • • SQ. FT V REQD. CFM PER PERSON ISO. 5F PEOPLE CFM REQD. 1U -1 180 EF -1 EXHAUST SALES 496 0.30 149 0.250 DIRECT 0 1100 115/1 A –E NOTES: A. ELECTRICAL CONTRACTOR SHALL INTERLOCK FAN OPERATION WITH RESTROOM LIGHT SWITCH. B. DIVISION 16 CONTRACTOR TO PROVIDE DISCONNECT SWITCH. C. PROVIDE WITH BACKDRAFT DAMPER. BOH 136 0.20 27 0 RESTROOM 50 75 0 TOTAL = 180 TOTAL = 176 0 FAN SCHEDULE MARK SERVICE MANUFACTURER MOUNTING MODEL CFM ESP (IN) DRIVE HP RPM V /PH NOTES EF -1 EXHAUST GREENHECK CEILING SP –Al25 100 0.250 DIRECT 53W 1100 115/1 A –E NOTES: A. ELECTRICAL CONTRACTOR SHALL INTERLOCK FAN OPERATION WITH RESTROOM LIGHT SWITCH. B. DIVISION 16 CONTRACTOR TO PROVIDE DISCONNECT SWITCH. C. PROVIDE WITH BACKDRAFT DAMPER. PLUMBING PIPE MATERIAL SCHEDULE PIPING SYSTEM ABBREVIATION PIPING MATERIAL SANITARY DRAINAGE & VENT (ABOVE GRADE) S, W OR V HUBLESS CAST IRON SANITARY DRAINAGE & VENT (BELOW GRADE) 5, W OR V SERVICE WEIGHT CAST IRON POTABLE WATER (ABOVE GRADE) CW, HW OR HWR TYPE L HARD DRAWN COPPER REFER TO SPECIFICATIONS FOR FITTINGS, INSTALLATION REQUIREMENTS AND FURTHER INFORMATION PLUMBING SYMBOLS ANNOTATION 0 PLUMBING PLAN NOTE CALLOUT PLUMBING EQUIPMENT DESIGNATION. (CONTRACTOR FURNISHED AND INSTALLED). REFER TO PLUMBING FIXTURE OR EQUIPMENT SCHEDULES EQUIPMENT DESIGNATION (OWNER FURNISHED, CONTRACTOR INSTALLED) MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR FURNISHED AND INSTALLED UNLESS NOTED OTHERWISE) CONNECTION POINT OF NEW WORK TO EXISTING DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER LOWER NUMBER INDICATES SHEET NUMBER SECTION CUT DESIGNATION STANDARD MOUNTING HEIGHTS PLUMBING REFER TO THE ARCHITECTURAL DRAWINGS FOR PLUMBING FIXTURE MOUNTING HEIGHTS. UNO, INSTALL PLUMBING FIXTURES WITH THE MOUNTING HEIGHTS AS LISTED BELOW WITH FINAL APPROVAL BY THE ARCHITECT. ADA ACCESSIBLE DRINKING FOUNTAIN ADA ACCESSIBLE LAVATORIES ADA ACCESSIBLE SHOWER VALVES ADA ACCESSIBLE TUB VALVES ADA ACCESSIBLE URINALS ADA ACCESSIBLE WATER CLOSET ADA ACCESSIBLE WATER COOLER ADULT STANDARD DRINKING FOUNTAIN ADULT STANDARD WATER COOLER CHILD STANDARD DRINKING FOUNTAIN CHILD STANDARD WATER COOLER CHILD URINAL CLINIC SERVICE SINKS JANITOR'S SINK FAUCET FITTINGS HOSE BIBS ICE MAKER OUTLET BOXES LAVATORY OR SINK NON FREEZE HYDRANT SHOWER HEADS SHOWER VALVES STANDARD URINALS SURGEON'S SCRUB –UP SINKS TUB VALVES WASHING MACHINE OUTLET BOXES WATER CLOSET (AFF, AFG, UNLESS NOTED OTHERWISE) 17" FLOOR TO RIM 34" FLOOR TO RIM 38" MINIMUM TO 48" MAXIMUM FLOOR TO CENTERLINE CENTER BETWEEN GRAB BAR AND TUB RIM 17" FLOOR TO RIM 17" TO 19" FLOOR TO TOP OF SEAT 35" FLOOR TO RIM 40" FLOOR TO RIM 30" FLOOR TO RIM 30" FLOOR TO RIM 14" FLOOR TO RIM 14" FLOOR TO RIM 30" FLOOR TO RIM 42" FLOOR TO CENTERLINE 36" AFF TO CENTERLINE 24" FLOOR TO CENTER OF BOX 31" FLOOR TO RIM 18" AEG TO CENTERLINE 6' –O" MEN & 5' ----6" WOMEN FLOOR TO CENTERLINE 48" MEN & 42" WOMEN FLOOR TO CENTERLINE 22" FLOOR TO RIM 35" FLOOR TO FRONT RIM 32" FLOOR TO CENTELINE 42" FLOOR TO RIM 15" FLOOR TO RIM ABBREVIATIONS AFF AFG AHU BEE BFG BOP BOS BTU CPVC DN DFU DS ETR EWC FD FFA FFB FF FL FLA FLR GPM HD IE IN WC JB J —BOX kW MAU MAX MBH ABOVE FINISHED FLOOR ABOVE FINISHED GRADE AIR HANDLING UNIT BELOW FINISHED FLOOR BELOW FINISHED GRADE BOTTOM OF PIPE BOTTOM OF STRUCTURE BRITISH THERMAL UNIT CHLORINATED POLYVINYL CHLORIDE DOWN DRAINAGE FIXTURE UNIT DOWNSPOUT EXISTING TO REMAIN ELECTRIC WATER COOLER FLOOR DRAIN FROM FLOOR ABOVE FROM FLOOR BELOW FINISHED FLOOR FLOW LINE FULL LOAD AMPS FLOOR GALLONS PER MINUTE HEAD, HUB DRAIN INVERT ELEVATION INCHES OF WATER COLUMN JUNCTION BOX JUNCTION BOX KILOWATT MAKE —UP AIR UNIT MAXIMUM 1000 BTU PER HOUR MH MIN N/C N/0 ORD PDI PVC PRV RD RPM RTU SF SP SS TDH TFA TFB TYP UL UNO UPS V VCP VS VTR W/ W/0 WC WS WSFU MANHOLE MINIMUM NORMALLY CLOSED NORMALLY OPEN OVERFLOW ROOF DRAIN PLUMBING DRAINAGE INSTITUTE POLYVINYL CHLORIDE PRESSURE REDUCING VALVE ROOF DRAIN REVOLUTIONS PER MINUTE ROOFTOP UNIT SQUARE FEET, SUPPLY FAN SUMP PUMP STAINLESS STEEL, SANITARY SEWER, SOIL STACK TOTAL DYNAMIC HEAD TO FLOOR ABOVE TO FLOOR BELOW TYPICAL UNDERWRITERS LABORATORIES, INC. UNLESS NOTED OTHERWISE UNINTERRUPTIBLE POWER SUPPLY VOLT(S) VITRIFIED CLAY PIPE VENT STACK VENT THROUGH ROOF WITH WITHOUT WATER COLUMN WASTE STACK WATER SUPPLY FIXTURE UNIT I NOTE: THIS IS A MASTER LEGEND AND NOT ALL SYMBOLS, ABBREVIATIONS, ETC. ARE NECESSARILY USED ON THE DRAWINGS. PIPING SCW 140° T S —S W —W — GW -- -GW ST --- ST - ---�- OST —VBG— ID CDH CD ACD SPD G --- -G MPG MPG - -- NPW LPG WS FP PD iV X PA EJ 9 II 11 O I0 10 2 5 ITT 0 „A„ 3 DOMESTIC COLD WATER (CW) SOFTENED COLD WATER (SCW) DOMESTIC HOT WATER (HW) DOMESTIC HOT WATER RECIRC. (HWR) 140° DOMESTIC HOT WATER (140 °) TRAP PRIMER LINE (T) SOIL PIPING – ABOVE FLOOR (5) SOIL PIPING – BELOW FLOOR (5) WASTE PIPING – ABOVE FLOOR (W) WASTE PIPING – BELOW FLOOR (W) GREASE WASTE – ABOVE FLOOR (GW) GREASE WASTE – BELOW FLOOR (GW) STORM DRAIN – ABOVE FLOOR (ST) STORM DRAIN – BELOW FLOOR (ST) OVERFLOW STORM DRAIN – ABOVE FLOOR (OST) VENT BELOW GRADE (VBG) VENT BELOW FLOOR (VBF) INDIRECT DRAIN (ID) CONDENSATE DRAIN – HIGH EFFICIENCY RTU (CDH) CONDENSATE DRAIN (CD) AUXILIARY CONDENSATE DRAIN (ACD) SUMP OR SEWAGE PUMP DISCHARGE (SPD) NATURAL GAS (G) NATURAL GAS ON ROOF (0) MEDIUM PRESSURE NATURAL GAS (MPG) MEDIUM PRESSURE NATURAL GAS ON ROOF (MPG) NON POTABLE WATER (NPW) LIQUIFIED PETROLEUM GAS (LPG) WATER SERVICE (WS) FIRE PROTECTION (FP) CONDENSATE PUMP DISCHARGE (PD) EXISTING PIPING TO BE REMOVED EXISTING PIPING TO REMAIN SQUARE FLOOR DRAIN (FS), SIZE & TYPE ROUND FLOOR DRAIN (FD), SIZE & TYPE ROOF DRAIN (RD), SIZE & TYPE BALL VALVE CONTROL VALVE SHUTOFF VALVE CHECK VALVE BALANCING VALVE WITH PRESSURE PORTS WATER METER STRAINER STRAINER WITH BLOWOFF RELIEF /SAFETY VALVE SOLENOID VALVE PRESSURE REDUCING VALVE GAS PRESSURE REGULATOR THERMOSTATIC MIXING VALVE PIPE ANCHOR EXPANSION JOINT BACKFLOW PREVENTER PRESSURE GAUGE THERMOMETER UNION FLANGE CONNECTION HOSE BIBB (HB) NONFREEZE WALL HYDRANT (NW) MANUAL / AUTOMATIC AIR VENT OR VACUUM RELIEF VALVE CLEANOUT CAP WALL CLEANOUT (WCO) FLOOR CLEANOUT (ECO) EXTERIOR CLEANOUT (ECO) ELBOW UP ELBOW DOWN TEE UP TEE DOWN ELBOW UP WITH SHUT –OFF VALVE (SOV) ELBOW DOWN WITH SHUT –OFF VALVE (SOV) TEE UP WITH SHUT –OFF VALVE (SOV) TEE DOWN WITH SHUT –OFF VALVE (SOV) WATER HAMMER ARRESTER (WHA) WITH PDI SIZES, (A, B, C, D, & E) RECIRCULATION PUMP P –TRAP GAS COCK TRAP PRIMER TRAP PRIMER WITH DISTRIBUTION UNIT MECHANICAL SYMBOLS NOTE: THIS IS A MASTER LEGEND AND NOT ALL SYMBOLS, ETC. ARE NECESSARILY USED ON THE DRAWINGS. PIPING CD ACD RL RD RS HWS —HWR — CWS —CWR— HS ---- HR LPS —LPC— — Iii r1 Ot1 .. 9 111 CONDENSATE DRAIN (CD) AUXILIARY CONDENSATE DRAIN (ACD) REFRIGERANT LIQUID (RL) REFRIGERANT DISCHARGE (HOT GAS) (RD) REFRIGERANT SUCTION (RS) HEATING HOT WATER SUPPLY (HWS) HEATING HOT WATER RETURN (HWR) CHILLED WATER SUPPLY (CWS) CHILLED WATER RETURN (CWR) HEAT PUMP SUPPLY (HS) HEAT PUMP RETURN (HR) LOW PRESSURE STEAM SUPPLY (LPS) LOW PRESSURE STEAM CONDENSATE (LPC) EXISTING PIPING TO BE REMOVED EXISTING PIPING TO REMAIN DIRECTION OF FLOW BALL VALVE CONTROL VALVE THREE –WAY CONTROL VALVE SHUTOFF VALVE CHECK VALVE BALANCING VALVE WITH PRESSURE PORTS TRIPLE DUTY VALVE WITH PRESSURE PORTS WATER METER STRAINER SOLENOID VALVE PRESSURE GAUGE THERMOMETER PRESSURE AND TEMPERATURE TEST PLUG UNION FLANGE CONNECTION ELBOW UP ELBOW DOWN TEE UP TEE DOWN HVAC EQUIPMENT & DUCTWORK NOTE: ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE DIMENSIONS. SEE SECTION 15250 OF THE SPECIFICATION FOR DUCTWORK TO RECEIVE INSULATION OR LINER. I. L EXISTING DUCTWORK OR EQUIPMENT TO REMAIN 1 � EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED RD FD BRANCH DUCT WITH 45° RECTANGLE –ROUND BRANCH FITTING AND MANUAL VOLUME DAMPER ELBOW WITH TURNING VANES RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN SUPPLY AIR DUCT UP SUPPLY AIR DUCT DOWN EQUIPMENT WITH FLEXIBLE DUCT CONNECTION 10" CSD -1 300 CFM NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER OR REGISTER MANUAL VOLUME DAMPER SQUARE TO ROUND TRANSITION DUCT MOUNTED SMOKE DETECTOR (SD= SUPPLY /RD= RETURN) FIRE DAMPER FIRE SMOKE DAMPER SMOKE DAMPER VOLUME DAMPER MOTORIZED DAMPER BACKDRAFT DAMPER CO2 HS PS SP TS CARBON DIOXIDE SENSOR HUMIDITY SENSOR PULL STATION STATIC PRESSURE SENSOR TEMPERATURE SENSOR Q HUMIDISTAT 0 THERMOSTAT STANDARD MOUNTING HEIGHTS MECHANICAL THERMOSTATS (USER ADJUSTABLE) CONTROLS (CENTERLINE) (AFF, AFG, UNLESS NOTED OTHERWISE) 48" 48" ANNOTATION O1 MECHANICAL PLAN CALLOUT MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR FURNISHED AND INSTALLED UNLESS NOTED OTHERWISE) CONNECTION POINT OF NEW WORK TO EXISTING DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER LOWER NUMBER INDICATES SHEET NUMBER SECTION CUT DESIGNATION A. B. C. D. E. F. G. H. I . J. K. L. CONDENSING UNIT SCHEDULE MARK OU -1 NOTES: A. PROVIDE LOW AMBIENT CONTROL TO 25° F. B. EQUIPMENT SIZED FOR 85° F AMBIENT TEMPERATURE. C. COORDINATE WITH HE MANUFACTURER THE HORIZONTAL AND VERTICAL REFRIGERANT PIPE ROUTING TO DETERMINE PIPE SIZES FOR THE REFRIGERANT PIPING. MANUFACTURER SHALL PROVIDE DETAILED REFRIGERANT PIPING DIAGRAMS INCLUDING DIMENSIONAL DATA FOR ALL REFRIGERANT PIPING DEVICES. THE MANUFACTURER SHALL SIZE AND LOCATE THE ASSOCIATED REFRIGERANT TRAPS BASED ON THE ACTUAL ROUTING AND PROVIDE OTHER APPURTENANCES TO PROVIDE A FULLY FUNCTIONAL AND OPERATIONAL SYSTEM. COORDINATE WITH HE MANUFACTURER LOCATIONS FOR ALL REFRIGERANT PIPING DEVICES TO MAINTAIN SERVICEABILITY AND ACCESSIBILITY. D. PROVIDE LIQUID LINE FILTER DRYER AND SIGHT GLASS. E. PROVIDE CONCRETE HOUSEKEEPING PAD PER SPECIFICATIONS. F. DISCONNECT SWITCH FURNISHED BY DIVISION 16 CONTRACTOR. G. STARTERS FOR ALL MOTORS SHALL BE FURNISHED INTEGRAL WITH UNIT. H. COORDINATE SIZE OF CONDUCTOR TERMINATION LUGS WITH CONDUCTOR SIZES SHOWN ON ELECTRICAL DRAWINGS. MARK IU -1 NOTES: MANUFACTURER CARRIER MANUFACTURER CARRIER MODEL 24ABA324 FAN COIL UNIT SCHEDULE (DX COOLING, ELECTRIC HEAT) MODEL SUPPLY FAN FX4CNF030008 EQUIPMENT COMFONENTS SHALL BE BY THE SAME MANUFACTURER. EQUIPMENT SIZEC FOR 90° F AMBIENT TEMPERATURE. PROVIDE 1" THROWAWAY AIR FILTERS. PROVIDE WITH BACK INLET CONNECTION. PROVIDE WITH FRONT OUTLET CONNECTION. PROVIDE WITH 7 –DAY PROGRAMMABLE THERMOSTAT WITH HEATING COOLING CONTROLS. DISCONNECT SWITCH FURNISHED BY DIVISION 16 CONTRACTOR. STARTER SHALL BE INTEGRAL WITH THE UNIT. PROVIDE SINGLE POINT POWER CONNECTION. PROVIDE WITH SPRING VIBRATION ISOLATION AND ALL – THREAD HANGING RODS. SPECIFIED FAN ESP ACCOUNTS FOR DUCT LOSSES EXTERNAL TO UNIT. PROVIDE AUXILIARY DRAIN PAN WITH FLOAT SWITCH TO SHUT OFF UNIT WHEN WATER IS PRESENT IN DRAIN PAN. REFR. TYPE R410A CFM 900 MIN. HP 1/3 0.6 MAY 0 5 2009 TH (MBH) 29.5 29.5 t'WBH I SH (MBH) 20.5 20 MIN. NO. OF STAGES 1 78/67 57/56 20.5 SEER /COP 13 OUTPUT KW 8 MCA 13.4 0• 1 II r . 1 IV ESP (IN) TH (MBH) SH (MBH) EAT (DB /WB) LAT (DB /WB) OUTPUT (MBH) STAGES 5. COMPLIANCE \. Vtb MOCP 20 MIN. 0/A (CFM) 180 V /PFI 208/1 V /PH 208/1 MCA 28.9 MOCP 40 DISC TYPE FUSED PLUMBING FIXTURE SCHEDULE: NOTE: EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS & SITE VISITS AND MAY NOT REFLECT EXACT "AS– BUILT" CONDITIONS. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. CAREFULLY COORDINATE NEW WORK AND DEMOLITION WITH ALL OTHER DISCIPLINES AND EXISTING CONDITIONS. DEC. TYPE FUSED WEIGHT LBS 149 LBS 100 NOTES A– L NOTES A– H FIXTURES IN THIS SCHEDULE OR THEIR APPROVED EQUIVALENT ARE PROVIDED BY THE PLUMBING CONTRACTOR. SUBMIT SHOP DRAWINGS ON EACH OF THESE ITEMS. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION AND INSTALLATION REQUIREMENTS. VERIFY ROUGH –IN REQUIREMENTS WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS AND INSTALL PER MANUFACTURER'S RECOMMENDATIONS. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE PLUMBING FIXTURE MOUNTING HEIGHTS. LAVATORY ADA ACCESSIBLE) TOTO COMMERCIAL WALL HUNG LAVATORY MODEL #LT307.8 21" x 18 -1/4 ", VITREOUS CHINA FAUCET SPEAKMAN "COMMANDER' MODEL #SC- 3004 –LD WIDESPREAD GOOSENECK LAVATORY COMBINATION WITH PERFECT VALVES. 1/4 TURN CERAMIC CARTRIDGES, VANDAL – RESISTANT 4" WRIST HANDLES WITH COLOR CODED INDEXES. AND WATER CONSERVING AUTOFLO DEVICE. TRIM: McGUIRE # 155A GRID DRAIN WITH TAILPIECE, McGUIRE # 2165CCLK LOOSE KEY COMPRESSION ANGLE STOP VALVES WITH RISERS AND ESCUTCHEONS, McGUIRE # 8872CF 1 -1/4" 17 GAUGE TUBULAR CHROME PLATED BRASS ADJUSTABLE P –TRAP AND WASTE ARM WITH CLEANOUT PLUG AND ESCUTCHEON, CONCEALED ARM CARRIER WITH STANCHIONS TO FLOOR, AND TRUEBRO "HANDI LAV– GUARD" # 102 INSULATION KIT FOR WATER AND WASTE PIPES. FLOOR– MOUNTED WATER CLOSET (ADA ACCESSIBLE): TOTO "DRAKE" CLOSE COUPLE TOILET TANK TYPE WHITE VITREOUS CHINA FIXTURE WITH ELONGATED BOWL, 1.6 GALLON PER FLUSH, G –MAX TECHNOLOGY SIPHON JET ACTION AND SPEED CONNECT TANK /BOWL COUPLING SYSTEM. INSTALL SIDE MOUNTED CHROME TRIP LEVER ON THE WIDE SIDE OF THE STALL. BOWL: #CST744SL LEFT HAND TRIP LEVER TANK: #ST743S RIGHT HAND TRIP LEVER TANK: #ST743SR. REFERENCE DRAWINGS FOR EXACT NUMBER OF RIGHT AND LEFT HAND TRIP LEVER TANKS REQUIRED. TRIM: TOTO # SC134 WHITE OPEN –FRONT CONTOURED, SOLID PLASTIC, HEAVY DUTY, SEAT COVER WITH SELF – SUSTAINING CHECK HINGES AND STAINLESS STEEL BOLTS, McGUIRE # 2166CC ANGLE STOP VALVE WITH RISER AND CHROME– PLATED ESCUTCHEON. ri HENDERSON ENGINEERS 8325 LENEXA DRIVE LENEXA, KS 66214 TEL 913 742 5000 FAA 913 742 5001 www.hel- eng.com 0750002188 RSP Architects 502 S. College Avenue Suite 203 Tempe, AZ 85281 Certification n' RSP Architects, Ltd. with Terry. � Ko i Washington No. 6634 Location 201 Southcenter Mall Tukwila, WA 98188 Project For Project No. Drawn By Chocked By DH D ate 05.06.08 480.889.2000 480.889.2099 fax www.rspareh.com Westfield Southcenter Copyright RSP Architects 2003. All rights reserved. MECHANICAL & PLUMBING SCHEDULES CE 1688.005.02 CK /SS NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of ASP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. M202 15A: Heatin• Ventilatin• and Air Conditionin 15A 1 GENERAL INSTRUCTIONS 15A 1 -1 GENERAL REQUIREMENTS REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THESE SPECIFICATIONS SHALL BE A PART OF THIS SECTION. CONTRACTOR SHALL BECOME THOROUGHLY ACQUAINTED WITH ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR SECTION. THE WORK REQUIRED UNDER THIS SECTION INCLUDES MATERIAL, EQUIPMENT, APPLIANCES, TRANSPORTATION, SERVICES, AND LABOR REQUIRED TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS. THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY, AND PORTIONS OF THE WORK DESCRIBED IN ONE, SHALL BE PROVIDED AS IF DESCRIBED IN BOTH. IN THE EVENT OF DISCREPANCIES, NOTIFY THE ENGINEER AND REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK INVOLVED. 15A 1 -2 DEFINITIONS FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION AND SIMILAR OPERATIONS." INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT THE PROJECT SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS." PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE." FURNISHED BY OWNER OR FURNISHED BY OTHERS: THE ITEM WILL BE FURNISHED BY THE OWNER OR OTHERS. IT IS TO BE INSTALLED AND CONNECTED UNDER THE REQUIREMENTS OF THIS DIVISION, COMPLETE AND READY FOR OPERATION, INCLUDING ITEMS INCIDENTAL TO THE WORK, INCLUDING SERVICES NECESSARY FOR PROPER INSTALLATION AND OPERATION. THE INSTALLATION SHALL BE INCLUDED UNDER THE GUARANTEE REQUIRED BY THIS DIVISION. ENGINEER: WHERE REFERENCED IN THIS DIVISION, "ENGINEER" IS THE ENGINEER OF RECORD AND THE DESIGN PROFESSIONAL FOR THE WORK UNDER THIS DIVISION, AND IS A CONSULTANT TO, AND AN AUTHORIZED REPRESENTATIVE OF, THE ARCHITECT, AS DEFINED IN THE GENERAL AND /OR SUPPLEMENTARY CONDITIONS. WHEN USED IN THIS DIVISION, IT MEANS INCREASED INVOLVEMENT BY, AND OBLIGATIONS TO, THE ENGINEER, IN ADDITION TO INVOLVEMENT BY, AND OBLIGATIONS TO, THE "ARCHITECT ". AHJ: THE LOCAL CODE AND /OR INSPECTION AGENCY (AUTHORITY) HAVING JURISDICTION OVER THE WORK. THE TERMS "APPROVED EQUAL ", "EQUIVALENT ", OR "EQUAL" ARE USED SYNONYMOUSLY AND SHALL MEAN "ACCEPTED BY OR ACCEPTABLE TO THE ENGINEER AS EQUIVALENT TO THE ITEM OR MANUFACTURER SPECIFIED ". THE TERM "APPROVED" SHALL MEAN LABELED, LISTED, OR BOTH, BY A NATIONALLY RECOGNIZED TESTING LABORATORY (E.G. UL, ETL, CSA), AND ACCEPTABLE TO THE AHJ OVER THIS PROJECT. 15A 1 -3 PREBID SITE VISIT PRIOR TO SUBMITTING BID, VISIT THE SITE OF THE PROPOSED WORK AND BECOME FULLY INFORMED AS TO THE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. FAILURE TO DO SO WILL NOT BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND ABOVE THE CONTRACT PRICE. 15A 1 -4 MATERIAL AND WORKMANSHIP PROVIDE NEW MATERIAL, EQUIPMENT, AND APPARATUS UNDER THIS CONTRACT UNLESS OTHERWISE STATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN GOOD COMMERCIAL PRACTICE, AND FREE FROM DEFECTS. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT NECESSARILY INTENDED TO DESIGNATE THE REQUIRED TRIM, WRITTEN DESCRIPTIONS OF THE TRIM GOVERN MODEL NUMBERS. PIPE, PIPE FITTINGS, PIPE SPECIALTIES AND VALVES SHALL BE MANUFACTURED IN PLANTS LOCATED IN THE UNITED STATES. WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" APPEARANCE WHEN COMPLETED, TO THE SATISFACTION OF THE ARCHITECT AND ENGINEER. WORKMANSHIP SHALL BE THE FINEST POSSIBLE BY EXPERIENCED MECHANICS. INSTALLATIONS SHALL COMPLY WITH APPLICABLE CODES AND LAWS. THE COMPLETE INSTALLATION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT TO EFFICIENCY, CAPACITY, NOISE LEVEL, ETC. ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, PIPING, DUCTS, AIR DEVICES, AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. IN GENERAL, MATERIALS AND EQUIPMENT SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. LIGHT DUTY AND RESIDENTIAL TYPE EQUIPMENT WILL NOT BE ACCEPTED. REMOVE FROM THE PREMISES WASTE MATERIAL PRESENT AS A RESULT OF WORK, INCLUDING CARTONS, CRATING, PAPER, STICKERS, AND /OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC. CLEAN EQUIPMENT INSTALLED UNDER THIS CONTRACT TO PRESENT A NEAT AND CLEAN INSTALLATION AT THE TERMINATION OF THE WORK. REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING JURISDICTION. 15A 1 -5 COORDINATION COORDINATE WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF THE SYSTEMS WILL BE INSTALLED AT THE PROPER TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO THOSE ITEMS REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE ABOVE SHALL BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER. UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACTOR WILL PROVIDE CHASES AND OPENINGS IN BUILDING CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. CONTRACTOR SHALL FURNISH THE GENERAL CONTRACTOR WITH INFORMATION WHERE CHASES AND OPENINGS ARE REQUIRED. KEEP INFORMED AS TO THE WORK OF OTHER TRADES ENGAGED IN THE CONSTRUCTION OF THE PROJECT, AND EXECUTE WORK IN A MANNER AS TO NOT INTERFERE WITH OR DELAY THE WORK OF OTHER TRADES. FIGURED DIMENSIONS SHALL BE TAKEN IN PREFERENCE TO SCALE DIMENSIONS. CONTRACTOR SHALL TAKE HIS OWN MEASUREMENTS AT THE BUILDING, AS VARIATIONS MAY OCCUR. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS THAT COULD HAVE BEEN AVOIDED BY PROPER CHECKING AND INSPECTION. PROVIDE MATERIALS WITH TRIM THAT WILL PROPERLY FIT THE TYPES OF CEILING, WALL, OR FLOOR FINISHES ACTUALLY INSTALLED. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT INTENDED TO DESIGNATE THE REQUIRED TRIM. 15A 1 -6 ORDINANCES AND CODES WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A MINIMUM, BE IN CONFORMANCE WITH APPLICABLE NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. EQUIPMENT FURNISHED AND ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL AHJ INCLUDING ANY AMENDMENTS AND STANDARDS AS SET FORTH BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES (UL), OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS (ASHRAE), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AMERICAN SOCIETY OF TESTING MATERIALS (ASTM) AND OTHER NATIONAL STANDARDS AND CODES WHERE APPLICABLE. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREMENTS OF THE REFERENCED CODES, STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. PROCURE AND PAY FOR PERMITS AND LICENSES REQUIRED FOR THE ACCOMPLISHMENT OF THE WORK HEREIN DESCRIBED. WHERE REQUIRED, OBTAIN, PAY FOR AND FURNISH CERTIFICATES OF INSPECTION TO OWNER. CONTRACTOR WILL BE HELD RESPONSIBLE FOR VIOLATIONS OF THE LAW. 15A 1 -7 PROTECTION OF EQUIPMENT AND MATERIALS STORE AND PROTECT FROM DAMAGE EQUIPMENT AND MATERIALS DELIVERED TO JOB SITE. COVER WITH WATERPROOF, TEAR — RESISTANT, HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO PROTECT FROM PLASTER, DIRT, PAINT, WATER, OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL THAT HAS BEEN DAMAGED BY CONSTRUCTION ACTIVITIES WILL BE REJECTED, AND CONTRACTOR 15 OBLIGATED TO FURNISH NEW EQUIPMENT AND MATERIAL OF A LIKE KIND. KEEP PREMISES BROOM CLEAN FROM FOREIGN MATERIAL CREATED DURING WORK PERFORMED UNDER THIS CONTRACT. PIPING, EQUIPMENT, ETC. SHALL HAVE A NEAT AND CLEAN APPEARANCE AT THE TERMINATION OF THE WORK. PLUG OR CAP OPEN ENDS OF DUCTWORK AND PIPING SYSTEMS WHILE STORED AND INSTALLED DURING CONSTRUCTION WHEN NOT IN USE TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS. 15A 1 -8 SUBSTITUTIONS THE BASE BID SHALL INCLUDE ONLY THE PRODUCTS FROM MANUFACTURERS SPECIFICALLY NAMED IN THE DRAWINGS AND SPECIFICATIONS. NO SUBSTITUTION WILL BE CONSIDERED PRIOR TO RECEIPT OF BIDS UNLESS WRITTEN REQUEST FOR APPROVAL TO BID HAS BEEN RECEIVED BY THE ENGINEER AT LEAST TEN CALENDAR DAYS PRIOR TO THE DATE FOR RECEIPT OF BIDS. EACH SUCH REQUEST SHALL INCLUDE THE NAME OF THE MATERIAL OR EQUIPMENT FOR WHICH IT IS TO BE SUBSTITUTED AND A COMPLETE DESCRIPTION OF THE PROPOSED SUBSTITUTE INCLUDING DRAWINGS, CUTS, PERFORMANCE AND TEST DATA AND OTHER INFORMATION NECESSARY FOR AN EVALUATION. A STATEMENT SEIIING FORTH CHANGES IN OTHER MATERIALS, EQUIPMENT OR OTHER WORK THAT INCORPORATION OF THE SUBSTITUTE WOULD REQUIRE SHALL BE INCLUDED. THE BURDEN OF PROOF OF THE MERIT OF THE PROPOSED SUBSTITUTE IS UPON THE PROPOSER. THE ENGINEER'S DECISION OF APPROVAL OR DISAPPROVAL TO BID OF A PROPOSED SUBSTITUTION SHALL BE FINAL. THE TERMS "APPROVED ", "APPROVED EQUAL ", AND "EQUAL" REFER TO APPROVAL BY THE ENGINEER AS AN ACCEPTABLE ALTERNATE BID. NO SUBSTITUTIONS WILL BE CONSIDERED THAT ARE NOT BID AS AN ALTERNATE. NO MATERIAL SUBSTITUTIONS SHALL BE CONSIDERED FOR APPROVAL PRIOR TO AWARD OF CONTRACT. COORDINATE AND VERIFY WITH OTHER TRADES WHETHER OR NOT THE SUBSTITUTED EQUIPMENT CAN BE INSTALLED AS SHOWN ON THE CONSTRUCTION DRAWINGS WITHOUT MODIFICATION TO ASSOCIATED SYSTEMS OR ARCHITECTURAL OR ENGINEERING DESIGN. INCLUDE ADDITIONAL COSTS FOR ARCHITECTURAL AND ENGINEERING DESIGN FEES IN BID IF DRAWING MODIFICATIONS ARE REQUIRED BECAUSE OF SUBSTITUTED EQUIPMENT. 15A 1 -9 SHOP DRAWINGS UPON BEING AWARDED A CONTRACT, SUBMIT TO THE ARCHITECT FOR APPROVAL, SIX (6) COPIES OF MANUFACTURER'S SHOP DRAWINGS FOR EQUIPMENT TO BE FURNISHED UNDER THIS CONTRACT, ITEMS REQUIRING COORDINATION BETWEEN CONTRACTORS AND SHEET METAL DUCTWORK FABRICATION DRAWINGS. BEFORE SUBMITTING SHOP DRAWINGS AND MATERIAL LISTS, VERIFY THAT EQUIPMENT SUBMITTED IS MUTUALLY COMPATIBLE AND SUITABLE FOR THE INTENDED USE, AND WILL FIT THE AVAILABLE SPACE AND ALLOW AMPLE ROOM FOR MAINTENANCE. THE ENGINEER'S CHECKING AND SUBSEQUENT APPROVAL OF SUCH SHOP DRAWINGS WILL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS IN DIMENSIONS, DETAILS, SIZE OF MEMBERS, QUANTITIES, OMISSIONS OF COMPONENTS OR FITTINGS; COORDINATION OF ELECTRICAL REQUIREMENTS; OR FOR COORDINATING ITEMS WITH ACTUAL BUILDING CONDITIONS. PROCEED WITH THE PROCUREMENT AND INSTALLATION OF EQUIPMENT ONLY AFTER RECEIVING APPROVED SHOP DRAWINGS RELATIVE TO EACH ITEM. CATALOG DATA SHALL BE PROPERLY BOUND, IDENTIFIED, INDEXED AND TABBED IN A 3 —RING BINDER. EACH ITEM OR MODEL NUMBER SHALL BE CLEARLY MARKED AND ACCESSORIES INDICATED. LABEL THE CATALOG DATA WITH THE EQUIPMENT IDENTIFICATION ACRONYM OR NUMBER AS USED ON THE DRAWINGS AND INCLUDE PERFORMANCE CURVES, CAPACITIES, SIZES, MATERIALS, FINISHES, WIRING DIAGRAMS AND DEVIATIONS FROM SPECIFIED EQUIPMENT OR MATERIALS. MARK OUT INAPPLICABLE ITEMS. SHOP DRAWINGS WILL BE RETURNED WITHOUT REVIEW IF THE ABOVE MENTIONED REQUIREMENTS ARE NOT MET. 15A 1 -10 ELECTRONIC DRAWING FILES IN PREPARATION OF SHOP DRAWINGS, CONTRACTOR MAY, AT HIS OPTION, OBTAIN ELECTRONIC DRAWING FILES IN AUTOCAD OR DXF FORMAT ON 3.5 INCH FLOPPY DISK, 100 MB ZIP DISK OR CD —ROM DISK, AS DESIRED, FROM THE ENGINEER FOR A SHIPPING AND HANDLING FEE OF $200 FOR A DRAWING SET UP TO 12 SHEETS AND $15 PER SHEET FOR EACH ADDITIONAL SHEET. CONTRACTOR SHALL CONTACT THE ARCHITECT FOR WRITTEN AUTHORIZATION AND ENGINEER FOR THE NECESSARY RELEASE AGREEMENT FORM AND TO SPECIFY SHIPPING METHOD AND DRAWING FORMAT. IN ADDITION TO PAYMENT, ARCHITECT'S WRITTEN AUTHORIZATION AND ENGINEER'S RELEASE AGREEMENT FORM MUST BE RECEIVED BEFORE ELECTRONIC DRAWING FILES WILL BE SENT. 15A 1-11 OPERATION AND MAINTENANCE INSTRUCTIONS DURING THE COURSE OF CONSTRUCTION, COLLECT AND COMPILE A COMPLETE BROCHURE OF EQUIPMENT FURNISHED AND INSTALLED ON THIS PROJECT. INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, MANUFACTURER'S CATALOG SHEETS, WIRING DIAGRAMS, PARTS LISTS, APPROVED SHOP DRAWINGS, AND DESCRIPTIVE LITERATURE AS FURNISHED BY THE EQUIPMENT MANUFACTURER. INCLUDE AN INSIDE COVER SHEET THAT LISTS THE PROJECT NAME, DATE, OWNER, ARCHITECT, CONSULTING ENGINEER, GENERAL CONTRACTOR, SUB— CONTRACTOR, AND AN INDEX OF CONTENTS. SUBMIT THREE COPIES OF LITERATURE BOUND IN APPROVED BINDERS WITH INDEX AND TABS SEPARATING EQUIPMENT TYPES TO THE ARCHITECT AT THE TERMINATION OF THE WORK. PAPER CLIPS, STAPLES, RUBBER BANDS, AND MAILING ENVELOPES ARE NOT CONSIDERED APPROVED BINDERS. FINAL APPROVAL OF MECHANICAL SYSTEMS INSTALLED UNDER THIS CONTRACT WILL BE WITHHELD UNTIL THIS EQUIPMENT BROCHURE IS RECEIVED AND DEEMED COMPLETE BY THE ARCHITECT AND ENGINEER. INSTRUCT WORKMEN TO SAVE REQUIRED LITERATURE SHIPPED WITH THE EQUIPMENT ITSELF, FOR INCLUSION IN THIS BROCHURE. PROVIDE "AS— BUILT" DRAWINGS (SEE DIVISION 1 AND GENERAL CONDITIONS). 15A 1 -12 TRAINING AT A TIME MUTUALLY AGREED UPON BETWEEN THE OWNER AND CONTRACTOR, PROVIDE THE SERVICES OF A FACTORY TRAINED AND AUTHORIZED REPRESENTATIVE TO TRAIN OWNER'S DESIGNATED PERSONNEL ON THE OPERATION AND MAINTENANCE OF THE EQUIPMENT PROVIDED FOR THIS PROJECT. PROVIDE TRAINING TO INCLUDE BUT NOT BE LIMITED TO AN OVERVIEW OF THE SYSTEM AND /OR EQUIPMENT AS IT RELATES TO THE FACILITY AS A WHOLE; OPERATION AND MAINTENANCE PROCEDURES AND SCHEDULES RELATED TO STARTUP AND SHUTDOWN, TROUBLESHOOTING, SERVICING, PREVENTIVE MAINTENANCE AND APPROPRIATE OPERATOR INTERVENTION; AND REVIEW OF DATA INCLUDED IN THE OPERATION AND MAINTENANCE MANUALS. SUBMIT A CERTIFICATION LETTER TO THE ARCHITECT STATING THAT THE OWNER'S DESIGNATED REPRESENTATIVE HAS BEEN TRAINED AS SPECIFIED HEREIN. LETTER SHALL INCLUDE DATE, TIME, ATTENDEES AND SUBJECT OF TRAINING. THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL SIGN THE CERTIFICATION LETTER INDICATING AGREEMENT THAT THE TRAINING HAS BEEN PROVIDED. SCHEDULE OWNER TRAINING WITH AT LEAST 7 DAYS' ADVANCE NOTICE. 15A 1 -13 SPARE PARTS FURNISH TO OWNER, WITH RECEIPT, THE FOLLOWING SPARE PARTS FOR THE EQUIPMENT FURNISHED FOR THIS PROJECT: A. ONE SET OF SPARE FILTERS OF EACH TYPE REQUIRED FOR EACH UNIT. IN ADDITION TO THE SPARE SET OF FILTERS, INSTALL NEW FILTERS PRIOR TO TESTING, ADJUSTING, AND BALANCING WORK AND BEFORE TURNING SYSTEM OVER TO OWNER. B. FURNISH ONE COMPLETE SET OF BELTS FOR EACH FAN. C. FURNISH THREE OPERATING KEYS FOR EACH TYPE OF AIR OUTLET AND INLET THAT REQUIRE THEM. 15A 1 -14 WARRANTIES WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALL DEFECTS DUE TO FAULTY WORKMANSHIP, DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF SUBSTANTIAL COMPLETION, UNLESS SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S STANDARD WARRANTY EXCEEDS 12 MONTHS. REMEDY ALL DEFECTS, OCCURRING WITHIN THE WARRANTY PERIOD(S), AS STATED IN THE GENERAL CONDITIONS AND DIVISION 1. WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS OR REPLACEMENTS WITHOUT ANY ADDITIONAL COSTS TO THE OWNER. PERFORM THE REMEDIAL WORK PROMPTLY, UPON WRITTEN NOTICE FROM THE ENGINEER OR OWNER. AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN WRITING AND PROPERLY EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND THE ONE YEAR PERIOD, EACH WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND STATING THE COMMENCEMENT DATE AND TERM. 15A 1 -15 CUTTING AND PATCHING PERFORM CUTTING OF WALLS, FLOORS, CEILINGS, ETC. AS REQUIRED TO INSTALL WORK UNDER THIS SECTION. OBTAIN PERMISSION FROM THE ARCHITECT PRIOR TO CUTTING. DO NOT CUT OR DISTURB STRUCTURAL MEMBERS WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES AS SMALL AS POSSIBLE. GENERAL CONTRACTOR SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED BY WORK UNDER THIS SECTION. PATCHING SHALL MATCH THE ORIGINAL MATERIAL AND CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BY WORK TO THE CONDITION OF ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT. 15A 1-16 ROUGH —IN COORDINATE WITHOUT DELAY ROUGHING —IN WITH GENERAL CONSTRUCTION. CONCEAL PIPING AND CONDUIT ROUGH —IN EXCEPT IN UNFINISHED AREAS AND WHERE OTHERWISE SHOWN. 15A 1 -17 CONCRETE BASES PROVIDE CONCRETE BASES FOR EQUIPMENT WHERE INDICATED ON THE DRAWINGS AND AS SPECIFIED HEREIN. CONCRETE BASES SHALL HAVE CHAMFERED EDGES. SIZE OF PAD SHALL BE A MINIMUM OF 4" GREATER THAN THE FOOTPRINT OF THE EQUIPMENT THAT IT IS SUPPORTING AND SHALL HAVE A MINIMUM HEIGHT OF 4 ". CONSTRUCT EQUIPMENT BASES AND HOUSEKEEPING PADS OF A MINIMUM 28 DAY, 4000 PSI CONCRETE CONFORMING TO AMERICAN CONCRETE INSTITUTE STANDARD BUILDING CODE FOR REINFORCED CONCRETE (ACI 318 --99) AND THE LATEST APPLICABLE RECOMMENDATIONS OF THE ACI STANDARD PRACTICE MANUAL. CONCRETE SHALL BE COMPOSED OF CEMENT CONFORMING TO ASTM C 150 TYPE I, AGGREGATE CONFORMING TO ASTM C33, AND POTABLE WATER. EXPOSED EXTERIOR CONCRETE SHALL CONTAIN 5 TO 7 PERCENT AIR ENTRAINMENT. UNLESS OTHERWISE SPECIFIED OR SHOWN ON THE STRUCTURAL DRAWINGS, REINFORCE EQUIPMENT BASES AND HOUSEKEEPING PADS WITH NO. 4 REINFORCING BARS CONFORMING TO ASTM A 615 OR 6X6 — W2.9 X W2.9 WELDED WIRE MESH CONFORMING TO ASTM A185. PLACE REINFORCING BARS 24" ON CENTER WITH A MINIMUM OF TWO BARS EACH DIRECTION PROVIDE GALVANIZED ANCHOR BOLTS FOR EQUIPMENT PLACED ON CONCRETE EQUIPMENT BASES AND HOUSEKEEPING PADS OR ON CONCRETE SLABS. ANCHOR BOLTS SIZE, NUMBER AND PLACEMENT SHALL BE AS RECOMMENDED BY THE MANUFACTURER OF THE EQUIPMENT. 15A 1 -18 STRUCTURAL STEEL STRUCTURAL STEEL USED FOR SUPPORT OF EQUIPMENT, DUCTWORK AND PIPING SHALL BE NEW, CLEAN, AND CONFORM TO ASTM DESIGNATION A -36. SUPPORT MECHANICAL COMPONENTS FROM THE BUILDING STRUCTURE. DO NOT SUPPORT MECHANICAL COMPONENTS FROM CEILINGS, OTHER MECHANICAL OR ELECTRICAL COMPONENTS, AND OTHER NON— STRUCTURAL ELEMENTS. 15A 1 -19 PENETRATIONS SEAL MECHANICAL FLOOR, EXTERIOR WALL AND ROOF PENETRATIONS WATERTIGHT AND WEATHERTIGHT. SEAL AROUND MECHANICAL PENETRATIONS WITH 3M CP -25 FIRE BARRIER CAULK (THICKNESS AS REQUIRED AND RECOMMENDED BY MANUFACTURER) TO MAINTAIN FIRE RESISTANCE RATING OF FIRE —RATED ASSEMBLIES. 15A 1 -20 AIR FILTERS PROVIDE FARR 30/30 PLEATED, THROWAWAY TYPE FILTERS, UNLESS OTHERWISE INDICATED. AIR UNITS SHALL HAVE NEW FILTERS INSTALLED WHEN THEY ARE OPERATED BEFORE FINAL ACCEPTANCE. FILTERS SHALL BE MANUFACTURED BY AMERICAN AIR FILTER, FARR, FLANDERS, OR APPROVED EQUAL. IF HVAC EQUIPMENT IS USED DURING THE CONSTRUCTION PERIOD, CONTRACTOR SHALL PROVIDE ONE SET OF FILTERS WHEN THE UNIT IS STARTED AND REPLACE FILTERS WHEN NEEDED, BUT NOT LESS THAN EVERY MONTH. ON THE DAY OF SUBSTANTIAL COMPLETION, THE CONTRACTOR SHALL CLEAN THE UNIT AND PROVIDE A NEW SET OF FILTERS IN THE UNIT. 15A 1 -21 MOTORS AND STARTERS PROVIDE MOTORS AND STARTING EQUIPMENT WHERE NOT FURNISHED WITH THE EQUIPMENT PACKAGE. MOTORS SHALL HAVE COPPER WINDINGS, CLASS B INSULATION, AND STANDARD SQUIRREL CAGE WITH STARTING TORQUE CHARACTERISTICS SUITABLE FOR THE EQUIPMENT SERVED. MOTORS FOR AIR HANDLING EQUIPMENT SHALL BE SELECTED FOR QUIET OPERATION. EACH MOTOR SHALL BE CHECKED FOR PROPER ROTATION AFTER ELECTRICAL CONNECTION HAS BEEN COMPLETED. PROVIDE DRIPPROOF ENCLOSURE FOR LOCATIONS PROTECTED FROM WEATHER AND NOT IN AIR STREAM OF FAN; AND TOTALLY ENCLOSED FAN COOLED ENCLOSURE FOR MOTORS EXPOSED TO WEATHER. MOTORS SHALL BE MANUFAC - URED BY CENTURY, GENERAL ELECTRIC, WESTINGHOUSE, LOUIS ALLIS, OR APPROVED EQUAL. 15A 1 -22 ELECTRICAL WIRING LINE VOLTAGE WIRING SHALL BE PROVIDED BY DIVISION 16. LINE VOLTAGE CONTROL AND INTERLOCK WIRING FOR MECHANICAL SYSTEMS SHALL ALSO BE PROVIDED BY DIVISION 16 CONTRACTOR. LOW VOLTAGE CONTROL WIRING SHALL BE PROVIDED BY THE DIVISION 15 CONTRACTOR. FURNISH WIRING DIAGRAMS TO THE DIVISION 16 CONTRACTOR AS REQUIRED FOR PROPER EQUIPMENT HOOKUP. COORDINATE WITH THE DIVISION 16 CONTRACTOR THE ACTUAL WIRE SIZING AMPS FOR MECHANICAL EQUIPMENT (FROM THE EQUIPMENT NAMEPLATE) TO ENSURE PROPER INSTALLATION. 15A 1 -23 REFRIGERANT AND OIL PROVIDE FULL REFRIGERANT AND OIL CHARGE IN NEW AIR CONDITIONING REFRIGERATION SYSTEMS, AND MAINTAIN IT FOR FULL TERM OF THE GUARANTEE. 15A 1 -24 FINAL TESTING AND ADJUSTMENTS FINAL SYSTEM TESTING, BALANCING AND ADJUSTMENTS SHALL BE PERFORMED BY A CONTRACTOR CERTIFIED BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB), ASSOCIATED AIR BALANCE COUNCIL (MBC) OR OTHER APPROVED AGENCY. PERFORM TEST READINGS ON FANS, UNITS, COILS, ETC. AND ADJUST EQUIPMENT TO DELIVER SPECIFIED AMOUNTS OF AIR. PREPARE TESTING AND BALANCING REPORT LOG SHOWING AIR SUPPLY QUANTITIES, AIR ENTERING AND LEAVING TEMPERATURES AND PRESSURES, FAN AND UNIT TEST READINGS, MOTOR VOLTAGE AND AMP DRAWS, ETC., AND SUBMIT SIX COPIES OF THE FINAL COMPILATION OF DATA TO THE ARCHITECT FOR EVALUATION AND APPROVAL BEFORE FINAL INSPECTION OF THE PROJECT. BALANCE AIR SYSTEMS TO WITHIN PLUS OR MINUS 10 PERCENT FOR TERMINAL DEVICES AND BRANCH LINES AND PLUS OR MINUS 5 PERCENT FOR MAIN DUCTS AND AIR HANDLING EQUIPMENT OF THE AMOUNT OF AIR SHOWN ON THE DRAWINGS. FURTHER ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN SPACES. ADJUST EQUIPMENT TO OPERATE AS INTENDED BY THE SPECIFICATION. ALIGN BEARINGS AND REPLACE BEARINGS THAT HAVE DIRT OR FOREIGN MATERIAL IN THEM WITH NEW BEARINGS WITHOUT ADDITIONAL COST TO THE OWNER. BALANCE CONTRACTOR SHALL INCLUDE IN THE REPORT ANY IMPROPERLY INSTALLED OR MISSING BALANCING DEVICES THAT WOULD NEGATIVELY IMPACT THE SYSTEM OPERATION. ADJUST THERMOSTATS AND CONTROL DEVICES TO OPERATE AS INTENDED. ADJUST BURNERS, PUMPS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY TO ARCHITECT THAT ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. FURTHER ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN SPACES. CALIBRATE, SET, AND ADJUST AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF INTERLOCK SYSTEMS, AND OPERATION OF SAFETY CONTROLS. 15A 1 -25 EQUIPMENT FURNISHED BY OTHERS PROVIDE NECESSARY EQUIPMENT AND ACCESSORIES THAT ARE NOT PROVIDED BY THE EQUIPMENT SUPPLIER OR OWNER TO COMPLETE INSTALLATION OF COOKING EQUIPMENT, WASHING EQUIPMENT, ETC., FURNISHED BY OTHERS, IN LOCATIONS AS INDICATED ON THE DRAWINGS AND /OR DESCRIBED IN THE GENERAL NOTES TO THIS CONTRACTOR. EQUIPMENT AND ACCESSORIES NOT PROVIDED BY THE EQUIPMENT SUPPLIER MAY INCLUDE FLUES, VENTS, INTAKES, ASSOCIATED ROOF JACKS AND CAPS TD OUTDOORS, DAMPERS, IN —LINE FANS, ROOF FANS, CONTROL INTERLOCKS, ETC. AS REQUIRED FOR PROPER OPERATION OF THE COMPLETE SYSTEM IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECT ROUGH —IN DIMENSIONS, AND SHALL VERIFY SAME WITH ARCHITECT AND /OR EQUIPMENT SUPPLIER PRIOR TO SERVICE INSTALLATIONS. 15A 1 -26 MISCELLANEOUS REMODELING WORK REMOVE ALL UNUSED EQUIPMENT, DUCTWORK, PIPING AND ASSOCIATED SUPPORTS. CAP DUCTWORK AND PIPING AT MAINS AND SEAL AIR AND WATER TIGHT. PROVIDE ITEMS OF HVAC SYSTEMS MODIFICATION REQUIRED BECAUSE OF BUILDING REMODELING, AS NOTED ON THE DRAWINGS OR NECESSARY FOR PROPER OPERATION. MATCH EXISTING MATERIALS AND CONSTRUCTION TECHNIQUES WHEN MODIFYING EXISTING SYSTEMS UNLESS SPECIFIED OTHERWISE. COORDINATE ADDITIONAL REQUIREMENTS WITH GENERAL CONTRACTOR AND ARCHITECT. SEAL AIRTIGHT EXISTING DUCTWORK REQUIRED TO BE ABANDONED IN PLACE OR NOT IN USE AT THE TERMINATION OF THE WORK. CAP AND SEAL WEATHERTIGHT EXISTING ROOF CURBS AND ROOF OPENINGS TO BE ABANDONED IN PLACE AS A RESULT OF EQUIPMENT REMOVAL. CLEAN AND REBALANCE EXISTING DUCTWORK INTENDED FOR REUSE AS REQUIRED OR AS INDICATED ON DRAWINGS. 15A 1 -27 BUILDING OPERATION COMPLY WITH THE SCHEDULE OF OPERATIONS AS OUTLINED IN THE ARCHITECTURAL PORTIONS OF THIS SPECIFICATION. BUILDING SHALL BE IN CONTINUOUS OPERATION. ACCOMPLISH WORK REQUIRING INTERRUPTION OF BUILDING OPERATION AT A TIME WHEN THE BUILDING IS NOT IN OPERATION, AND ONLY WITH WRITTEN APPROVAL OF BUILDING OWNER AND /OR TENANT. COORDINATE INTERRUPTION OF BUILDING OPERATION WITH THE OWNER AND /OR TENANT A MINIMUM OF SEVEN DAYS IN ADVANCE OF WORK. 15A 1 -28 VIBRATION ISOLATION MANUFACTURERS: PROVIDE VIBRATION ISOLATION EQUIPMENT AND MATERIALS BY A SINGLE MANUFACTURER. APPROVED MANUFACTURERS PROVIDED THEIR SYSTEMS ARE IN COMPLIANCE WITH THE SPECIFIED DESIGN AND PERFORMANCE REQUIREMENTS INCLUDE AMBER BOOTH, KINETICS NOISE CONTROL, MASON INDUSTRIES, INC., VIBRATION ELIMINATOR CO., INC., AND VIBRATION MOUNTING AND CONTROLS. GENERAL REQUIREMENTS: SELECT VIBRATION ISOLATORS BY THE WEIGHT DISTRIBUTION TO PRODUCE UNIFORM DEFLECTION. VIBRATION ISOLATORS SHALL HAVE EITHER KNOWN UN— DEFLECTED HEIGHTS OR CALIBRATION MARKINGS SO THAT, AFTER ADJUSTMENT, THE STATIC DEFLECTION CAN BE VERIFIED, THUS DETERMINING THAT THE LOAD 15 WITHIN THE PROPER RANGE OF THE ISOLATOR. ISOLATORS SHALL OPERATE IN THE LINEAR PORTION OF THEIR LOAD VERSUS DEFLECTION CURVES. SPRING ISOLATORS SHALL HAVE 50 PERCENT EXCESS CAPACITY WITHOUT BECOMING COIL BOUND. COAT VIBRATION ISOLATORS WITH FACTORY— APPLIED PAINT. COAT VIBRATION ISOLATORS EXPOSED TO WEATHER AND OTHER CORROSIVE ENVIRONMENTS WITH FACTORY — APPLIED CORROSION RESISTANCE PROTECTION. INSTALL AND ADJUST VIBRATION ISOLATORS IN ACCORDANCE WITH MANUFACTURERS WRITTEN INSTRUCTIONS. ISOLATOR TYPES A. TYPE SPNH (SPRING AND NEOPRENE HANGERS): PROVIDE A STEEL SPRING IN SERIES WITH A NEOPRENE ISOLATING ELEMENT. THE SPRING SHALL HAVE A MINIMUM ADDITIONAL TRAVEL TO SOLID EQUAL TO 50 PERCENT OF THE SPECIFIED DEFLECTION. THE NEOPRENE ELEMENT SHALL HAVE A STATIC DEFLECTION OF NOT LESS THAN 0.3 INCHES WITH A STRAIN NOT EXCEEDING 15 PERCENT. UNLESS OTHERWISE SPECIFIED, THE STATIC DEFLECTION OF SPNH HANGERS SHALL BE 2 INCHES. SPRING DIAMETER AND HANGER BOX HOLE SIZE SHALL BE LARGE ENOUGH TO PERMIT THE HANGER ROD TO SWING THROUGH A 30 DEGREE ARC. PROVIDE NEOPRENE SLEEVE WHERE THE LOWER HANGER ROD PASSES THROUGH THE STEEL HANGER BOX, SUCH THAT THE HANGER ROD CANNOT CONTACT THE STEEL HANGER. THE DIAMETER OF THE CLEAR HOLE IN THE HANGER BOX SHALL BE AT LEAST 3/4 INCH LARGER THAN THE DIAMETER OF THE HANGER ROD. WHEN INSTALLED, DO NOT COCK THE SPRING ELEMENT AND DO NOT ALLOW THE HANGER BOX TO ROTATE THROUGH A FULL 360 DEGREE ARC WITHOUT ENCOUNTERING OBSTRUCTIONS. PROVIDE MASON INDUSTRIES TYPE 30N OR EQUAL. 15A 1 -29 PIPE MARKERS PROVIDE MANUFACTURER'S STANDARD PRE — PRINTED, SEMI— RIGID SNAP —ON OR PERMANENT ADHESIVE, PRESSURE — SENSITIVE VINYL PIPE MARKERS. COLOR CODE PIPE MARKERS TO COMPLY WITH ANSI A13.1. INSTALL PIPE MARKERS ON EACH HVAC PIPING SYSTEM AND INCLUDE ARROWS TO SHOW NORMAL DIRECTION OF FLOW. 15A 1 -30 SEISMIC REQUIREMENTS SEISMIC PROTECTION FOR SEISMIC CONCERNS OF ALL MECHANICAL AND ELECTRIC SYSTEMS EXCEPT FIRE PROTECTION SYSTEMS MUST MEET MINIMUM REQUIREMENTS OF 2006 IBC FOR BUILDINGS CLASSIFIED AS SEISMIC USE GROUP III AND SEISMIC DESIGN CATEGORY D. SEISMIC PROTECTION OF WATER PIPES FOR FIRE PROTECTION SYSTEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE PROVISIONS OF NFPA 13. SEISMIC RESTRAINTS, ISOLATORS, AND ISOLATION MATERIALS SHALL BE OF THE SAME MANUFACTURER, SHALL BE CERTIFIED BY THE MANUFACTURER AND SHALL BE BY AMBER /BOOTH COMPANY, INC., KINETICS NOISE CONTROL, INC., LOOS & COMPANY, INC., MASON INDUSTRIES, INC. OR UNI— STRUT. RESTRAINING DEVICES SHALL HAVE A PRE — APPROVAL NUMBER FROM CALIFORNIA OSHPD OR OTHER RECOGNIZED GOVERNMENT AGENCY SHOWING MAXIMUM RESTRAINT RATINGS. THE REQUIREMENTS FOR SEISMIC PROTECTION MEASURES TO BE APPLIED TO MECHANICAL /ELECTRICAL EQUIPMENT AND SYSTEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND /OR FEDERAL CODES AND WITH MANUFACTURER'S REQUIREMENTS, THE MOST STRINGENT SHALL APPLY. ALL ANCHOR CONNECTIONS TO STRUCTURE FOR SUPPORT OF MECHANICAL AND ELECTRICAL EQUIPMENT, REGARDLESS OF THE NEED FOR SEISMIC RESTRAINTS, SHALL BE SHOWN ON SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE TYPE AND LOCATION OF SEISMIC RESTRAINTS REQUIRED FOR THE MECHANICAL AND ELECTRICAL ELEMENTS SHOWN ON THE CONTRACT DRAWINGS BASED ON THE SEISMIC CODE CRITERIA STATED ABOVE, THE SIZE AND WEIGHT OF THE SUPPORTED ELEMENT AND THE DISTANCE FROM STRUCTURE THAT THE ELEMENT WILL BE INSTALLED. THE CONTRACTOR SHALL SUBMIT DESCRIPTIVE CATALOG DATA OF SEISMIC RESTRAINTS, SHOP DRAWINGS SHOWING THE TYPES, LOCATIONS AND INSTALLATION DETAILS OF SEISMIC RESTRAINTS AND CALCULATIONS SHOWING THAT THE SEISMIC RESTRAINTS MEET THE SEISMIC REQUIREMENTS TO THE ENGINEER OF RECORD AND TO THE LOCAL AUTHORITY HAVING JURISDICTION FOR REVIEW AND APPROVAL. CALCULATIONS SHALL BE SIGNED AND SEALED BY A REGISTERED PROFESSIONAL ENGINEER, LICENSED IN THE STATE OF THE PROJECT LOCATION AND EMPLOYED BY THE MANUFACTURER OF THE SEISMIC RESTRAINT PRODUCTS. CALCULATIONS SHALL INCLUDE DEAD LOADS, STATIC SEISMIC LOADS AND CAPACITY OF MATERIALS UTILIZED FOR CONNECTIONS TO EQUIPMENT AND STRUCTURE. 15A 2 INSULATION AND SHEET METAL WORK 15A 2 -1 DUCT INSULATION COVER CONCEALED RIGID ROUND AND RECTANGULAR SUPPLY AND RETURN AIR DUCTWORK, ROUND AND RECTANGULAR OUTSIDE AIR DUCTWORK, AND ROUND EXHAUST DUCTWORK WITHIN 10 FEET OF EXTERIOR DISCHARGE OUTLETS WITH 2" THICK, 3/4 POUND DENSITY, MINIMUM R -6.0 DUCT WRAP, CERTAINTEED OR EQUIVALENT OWENS— CORNING OR KNAUF WITH HEAVY —DUTY FOIL — SCRIM —KRAFT FACING, AND WITH JOINTS TAPED WITH 3" WIDE FOIL TAPE. INSULATING MATERIALS, ADHESIVES, COATINGS, ETC., SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATING OF 50 PER ASTM E 84. CONTAINERS FOR MASTICS AND ADHESIVES SHALL HAVE U.L. LABEL. 15A 2 -2 DUCTWORK PROVIDE GALVANIZED STEEL DUCTWORK AND HOUSINGS AS SHOWN ON DRAWINGS. CONSTRUCT DUCTWORK INCLUDING FITTINGS AND TRANSITIONS IN CONFORMANCE WITH CURRENT SMACNA STANDARDS RELATIVE TO GAUGE, BRACING, JOINTS, ETC. MINIMUM THICKNESS OF DUCT SHALL BE 26 —GAUGE SHEET METAL. REINFORCE HOUSINGS AND DUCTWORK OVER 30" WITH 1-1/4" ANGLES NOT LESS THAN 5' -6" ON CENTERS, AND CLOSER IF REQUIRED FOR SUFFICIENT RIGIDITY TO PREVENT VIBRATION. SUPPORT HORIZONTAL RUNS OF DUCT FROM STRAP IRON HANGERS ON CENTERS NOT TO EXCEED 8' —O ". DO NOT SUPPORT CEILING GRID, CONDUITS, PIPES, EQUIPMENT, ETC. FROM DUCTWORK. COORDINATE ROUTING OF DUCTWORK WITH OTHER CONTRACTORS SUCH THAT PIPING, ELECTRICAL CONDUIT, AND ASSOCIATED SUPPORTS ARE NOT ROUTED THROUGH THE DUCTWORK. CONSTRUCT SUPPLY DUCTS TO MEET SMACNA POSITIVE PRESSURE OF 2" W.G. CONSTRUCT RETURN, OUTDOOR AND EXHAUST DUCTWORK UPSTREAM OF FANS TO MEET SMACNA NEGATIVE PRESSURE OF 2" W.G. CONSTRUCT EXHAUST DUCTWORK DOWNSTREAM OF FANS TO MEET SMACNA POSITIVE PRESSURE OF 1" W.G. SEAL DUCTWORK WITH HEAVY LIQUID SEALANT, HARDCAST IRONGRIP 601, DESIGN POLYMER DP 1010 , UNITED MCGILL DUCT SEALER OR APPROVED EQUAL, APPLIED ACCORDING TO SEALANT MANUFACTURER'S INSTRUCTIONS. FOR DUCTS WITH PRESSURE CLASSIFICATION OF 2" W.C. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT TO MEET SMACNA CLASS B. FOR DUCTS WITH PRESSURE CLASSIFICATION LESS THAN 2" W.G. SEAL TRANSVERSE JOINTS AIRTIGHT TO MEET SMACNA CLASS C. TAPES AND MASTICS SHALL BE LISTED AND LABELED IN ACCORDANCE WITH UL 181A. PROVIDE RADIUS ELBOWS, TURNS, AND OFFSETS WITH A MINIMUM CENTERLINE RADIUS OF 1-1/2 TIMES THE DUCT WIDTH. WHERE SPACE DOES NOT PERMIT FULL RADIUS ELBOWS, PROVIDE SHORT RADIUS ELBOWS WITH A MINIMUM OF TWO CONTINUOUS SPLITTER VANES. VANES SHALL BE THE ENTIRE LENGTH OF THE BEND. PROVIDE MITERED ELBOWS WHERE SPACE DOES NOT PERMIT RADIUS ELBOWS, WHERE SHOWN ON THE DRAWINGS, OR AT THE OPTION OF THE CONTRACTOR WITH THE ENGINEER'S APPROVAL. MITERED ELBOWS LESS THAN 45 DEGREES SHALL NOT REQUIRE TURNING VANES. MITERED ELBOWS 45— DEGREES AND GREATER SHALL HAVE SINGLE THICKNESS TURNING VANES OF SAME GAUGE AS DUCTWORK, RIGIDLY FASTENED WITH GUIDE STRIPS IN DUCTWORK. VANES FOR MITERED ELBOWS SHALL BE PROVIDED IN ALL SUPPLY AND EXHAUST DUCTWORK AND IN RETURN AND OUTSIDE AIR DUCTWORK THAT HAS AN AIR VELOCITY EXCEEDING 1000 FPM. DO NOT INSTALL VANES IN GREASE DUCTWORK. DUCTS SHALL BE CONNECTED TO FANS, FAN CASINGS AND FAN PLENUMS BY MEANS OF FLEXIBLE CONNECTORS. FLEXIBLE CONNECTORS SHALL BE NEOPRENE COATED GLASS CLOTH CANVAS CONNECTIONS, DURO —DYNE, ELGEN, VENTFABRIC OR EQUAL. FLEXIBLE CONNECTORS SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE DEVELOPED RATING NOT HIGHER THAN 50. MAKE AIRTIGHT JOINTS AND INSTALL WITH MINIMUM 1— 1/2" SLACK. PROVIDE BALANCING DAMPERS, MANUFACTURED BY RUSKIN, GREENHECK, NAILOR INDUSTRIES, CESCO, LOUVERS & DAMPERS, POTTORFF OR APPROVED EQUAL, WHERE SHOWN ON DRAWINGS AND WHEREVER NECESSARY FOR COMPLETE CONTROL OF AIR FLOW. SPLITTER DAMPERS SHALL BE CONTROLLED BY LOCKING QUADRANTS; PROVIDE YOUNG REGULATOR OR VENTLOK END BEARINGS FOR THE DAMPER ROD. RECTANGULAR VOLUME DAMPERS SHALL BE OPPOSED BLADE INTERLOCKING TYPE. ROUND VOLUME DAMPERS SHALL BE BUTTERFLY TYPE CONSISTING OF CIRCULAR BLADE MOUNTED TO A SHAFT. DAMPER LEAKAGE FOR OUTSIDE AIR DAMPERS SHALL NOT EXCEED 6.5 CFM /SQUARE FOOT IN FULL CLOSED POSITION AT 4" WG PRESSURE DIFFERENTIAL ACROSS DAMPER. REFERENCE MANUFACTURER AND MODEL NUMBER FOR OUTSIDE AIR DAMPERS 15 RUSKIN MODEL CD -50. PROVIDE "SPIN —IN" FITTING WITH DOUBLE BEARING VOLUME DAMPER FOR ROUND DUCTWORK BRANCH TAKEOFFS TO INDIVIDUAL AIR DEVICES. WHERE ACCESS TO DAMPERS THROUGH A HARD CEILING IS REQUIRED, PROVIDE A FLEX CONNECTION FROM RIGID DUCT TO DIFFUSER TO ACCESS DAMPER BY MOVING DIFFUSER OUT THE WAY. ROUND OR OVAL DUCTWORK SHALL BE SEMCO, UNITED, WESCO OR EQUAL, SHEETMETAL, WITH SMOOTH INTERIOR SURFACE, WITH LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) ROUND DUCTWORK GAUGES PER THE FOLLOWING TABLE (REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS FOR GAUGES WHEN PRESSURES EXCEED 2" W.G.): SIZE 14" & UNDER 15" THRU 26" 28" THRU 36" 38" THRU 50" 52" THRU 60" LINDAB SPIROSAFE, LEWIS & LAMBERT OR APPROVED EQUAL FACTORY— MANUFACTURED ROUND DUCTWORK AND FITTINGS MAY BE SUBSTITUTED FOR SPECIFIED ROUND BRANCH DUCTWORK, AT CONTRACTORS OPTION. HEAVY LIQUID JOINT SEALANT MAY BE OMITTED ON FACTORY— MANUFACTURED ROUND DUCTWORK. LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) FITTINGS 24" IN DIAMETER AND LESS SHALL BE PREFABRICATED, SPOTWELDED AND INTERNALLY SEALED. CONTINUOUSLY WELD FITTINGS LARGER THAN 24" IN DIAMETER. FITTING GAUGE SHALL BE 22 GAUGE FOR 36" FITTINGS AND UNDER, 20 GAUGE FOR LARGER SIZES. 90 DEGREE TEE'S SHALL BE CONICAL TYPE. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT WITH HEAVY LIQUID SEALANT APPLIED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. PROVIDE GAUGE THICKNESS IN MEDIUM PRESSURE (DUCT PRESSURE CLASS 3" TO 6" W.G.) DUCTWORK AS RECOMMENDED BY SMACNA. 15A 2 -3 FLEXIBLE DUCT LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) AND MEDIUM PRESSURE (DUCT PRESSURE CLASS 2.1" TO 6" W.G.) FLEXIBLE DUCT SHALL BE FLEXMASTER TYPE 8B, THERMAFLEX TYPE M —KE, OR EQUAL (FIRE RETARDANT POLYETHYLENE) PROTECTIVE VAPOR BARRIER, U.L.181 CLASS 1, ACOUSTICAL INSULATED DUCT, R -6.0 FIBERGLASS INSULATION. PROVIDE CPE LINER WITH STEEL WIRE HELIX MECHANICALLY LOCKED OR PERMANENTLY BONDED TO THE LINER. FLEXIBLE DUCT RUNS SHALL NOT EXCEED 5 FEET IN LENGTH, AND SHALL BE INSTALLED FULLY EXTENDED AND STRAIGHT AS POSSIBLE AVOIDING TIGHT TURNS. INSTALL FLEXIBLE DUCT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. SUPPORT FLEXIBLE DUCT AT MAXIMUM 5 FEET ON CENTER AND WITHIN 6 INCHES OF BENDS. BENDS SHALL NOT EXCEED A CENTERLINE RADIUS OF ONE DUCT DIAMETER. DUCT SAG SHALL NOT EXCEED 1/2 INCH. SUPPORTING MATERIAL IN DIRECT CONTACT WITH THE DUCT SHALL NOT BE LESS THAN 1 -1/2 INCHES IN WIDTH. CONNECT FLEXIBLE DUCT TO RIGID METAL DUCT OR AIR DEVICES AS RECOMMENDED BY THE MANUFACTURER. AT A MINIMUM, INSTALL TWO WRAPS OF DUCT TAPE AROUND THE INNER CORE CONNECTION AND A METALLIC OR NON — METALLIC CLAMP OVER THE TAPE AND TWO WRAPS OF DUCT TAPE OR A CLAMP OVER THE OUTER JACKET. DUCT CLAMPS SHALL BE LABELED IN ACCORDANCE WITH UL-181B AND MARKED 181B—C. DUCT TAPE SHALL BE LABELED IN ACCORDANCE WITH UL 1816 AND MARKED 181B —FX. Y 9 5 Aoq GAUGE 26 24 22 20 18 8325 LENEXA DRIVE LENEXA, K566214 TEL 913 742 5000 FAX 913 742 5001 www.hei 0750002188 HENDERSON ENGINEERS RSP Architects 502 S. College Avenue Suite 203 Tempe, AZ 85281 Certification RSP Architects, Ltd. with Terry Wobken Washington No. 6634 Location Westfield Southcenter 201 Southcenter Mall Tukwila, WA 98188 Project For LE10E Project No. Drawn By Checked By D H D ate 1688.005.02 CK 05.06.08 P1AY 0 5 2009 NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of HSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright HSP Architects 2003. All rights reserved. MECHANICAL SPECIFICATIONS 480.889.2000 480.889.2099 fax www.rsparch.com M301 1 5A: Heatin• Ventilatini and Air Conditionin Continued 15A 2 INSULATION AND SHEET METAL WORK CONTINUED) 15A 2 -4 SCREENS PROVIDE INSECT SCREENS ON DUCTS OPEN TO THE RETURN PLENUM AS SCHEDULED AND /OR NOTED ON THE DRAWINGS. INSECT SCREENS SHALL BE ALUMINUM MESH. 15A2 -5 EXHAUST AIR SYSTEMS PROVIDE CEILING MOUNTED EXHAUST FANS AS SCHEDULED ON THE DRAWINGS, OR EQUAL COOK, GREENHECK, CARNES, TWIN CITY FANS, ACME OR PENNBARRY COMPLETE WITH ISOLATED BLOWER UNIT AND CEILING GRILLE. PROVIDE DISCONNECT SWITCH, BACKDRAFT DAMPER, DISCHARGE DUCT, EXISTING ROOF JACK, AND NEOPRENE VIBRATION ISOLATORS WITH ALL — THREAD HANGING RODS. 15A 3 HVAC EQUIPMENT 15A 3 -1 CONDENSING UNITS 11.5 -6 TONS] PROVIDE SPLIT SYSTEM, AIR COOLED CONDENSING UNITS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY TRANE, CARRIER, MCQUAY, LENNOX OR YORK, COMPLETE WITH FACTORY INSTALLED HERMETIC OR SEMI— HERMETIC MOTOR /COMPRESSOR ASSEMBLY WITH INTERNAL SPRING VIBRATION ISOLATION, BUILT —IN THERMAL OVERLOAD PROTECTION, AND CRANKCASE HEATER; TOP DISCHARGE CONDENSER FAN AND MOTOR LOW AMBIENT CONTROLS FOR OPERATION TO 25 °F; ANTI —SHORT CYCLE TIMERS; TIME DELAY RELAYS; FACTORY INSTALLED LIQUID LINE DRIER AND LOW PRESSURE SWITCH; FULL REFRIGERANT HOLDING CHARGE; AND WEATHERTIGHT HOUSING CONSTRUCTED OF ZINC COATED, HEAVY GAUGE, GALVANIZED STEEL WITH WEATHER— RESISTANT BAKED ENAMEL FINISH AND FACTORY INSTALLED CONDENSER COIL GUARDS. UNIT SHALL CARRY A FIVE YEAR GUARANTEE ON THE COMPRESSOR AND REFRIGERANT CIRCUIT, AND A ONE YEAR GUARANTEE ON THE REMAINING COMPONENTS. PROVIDE REFRIGERANT PIPING SIZED AS RECOMMENDED BY EQUIPMENT MANUFACTURER WITH FOAMED PLASTIC INSULATION ON THE SUCTION LINE AS SPECIFIED IN THIS SECTION. 15A 3 -2 FAN COIL UNITS [DIRECT EXPANSION 1.5 -5 TONS] PROVIDE SPLIT SYSTEM, FAN COIL UNITS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY TRANE, CARRIER, MCQUAY, LENNOX OR YORK, HORIZONTAL CONFIGURATION COMPLETE WITH ZINC COATED, HEAVY GAUGE, GALVANIZED STEEL CABINET WITH WEATHER — RESISTANT BAKED ENAMEL FINISH; INTERNALLY INSULATED; ACCESS DOORS; DIRECT EXPANSION COOLING COIL SECTION OF ALUMINUM /COPPER CONSTRUCTION; CONDENSATE DRAIN PAN; STATICALLY AND DYNAMICALLY BALANCED CENTRIFUGAL FAN SECTION WITH BUILT —IN MOTOR THERMAL OVERLOAD PROTECTION; FACTORY INSTALLED AND WIRED CONTROLS AND SINGLE POINT ELECTRICAL POWER CONNECTION; MAGNETIC MOTOR STARTERS AND CONTACTORS AS REQUIRED; AIR FILTER RACK WITH 1" THICK THROWAWAY FILTERS; FACTORY INSTALLED ELECTRIC HEATING COIL WITH CODE REQUIRED INTEGRAL SAFETY FEATURES AND CONTROLS. PROVIDE HONEYWELL OR EQUAL ELECTRONIC PROGRAMMABLE TYPE THERMOSTAT, SEVEN —DAY MODEL, MANUAL CHANGEOVER, SWITCHING SUBBASE, MULTI —STAGE AS REQUIRED TO MATCH UNIT COOLING /HEATING STAGING. PROVIDE SPRING VIBRATION ISOLATORS AND ALL — THREAD HANGING RODS FOR HORIZONTAL INSTALLATIONS. PROVIDE AN AUXILIARY DRAIN PAN FOR SUSPENDED UNITS WITH FLOAT SWITCH TO SHUT OFF UNIT WHEN WATER IS DETECTED IN AUXILIARY DRAIN PAN. FLOAT SWITCH SHALL BE AQUAHUB #FLT231 OR EQUAL BY COLE — PALMER, FLOWLINE, OMEGA OR SMD MICRO FLOAT SWITCH WITH POLYPROPYLENE BODY AND FLOAT WITH 1/2" NPT PIPE CONNECTION AND NORMALLY CLOSED CONTACT. CONTACT SHALL CLOSE WHEN FLOAT RAISES DUE TO WATER PRESENT IN DRAIN PAN MINIMUM 1" ABOVE BOTTOM OF PAN. INSTALL IN 1/2" COUPLING WELDED TO DRAIN PAN WITH CENTERLINE 1" ABOVE BOTTOM OF PAN. 15A 3 -3 REFRIGERANT PIPING AND INSULATION PROVIDE ASTM B 88, TYPE L OR ASTM B 280, TYPE ACR HARD DRAWN COPPER REFRIGERANT PIPING, CLEANED AND SEALED AT THE FACTORY, AND SPECIFICALLY DESIGNED FOR REFRIGERANT. FITTINGS SHALL BE HARD DRAWN AND HAVE LONG RADIUS TURNS. SOLDER JOINTS WITH "SILFOS" (15 PERCENT SILVER, 5 PERCENT PHOSPHORUS, 80 PERCENT COPPER, 1300 DEGREES FAHRENHEIT FLOW TEMPERATURE). SOLDER JOINTS WITH A SLOW STREAM OF DRY NITROGEN PASSING THROUGH THE PIPING. INSULATE SUCTION LINES WITH 1 -1/2" AND LIQUID LINES WITH 1/2" FOAMED PLASTIC INSULATION, ARMAFLEX OR EQUAL. PIPING INSULATION SHALL HAVE A FLAME SPREAD OF 25 OR LESS, AND A SMOKE DEVELOPED RATING OF 50 OR LESS WHEN TESTED IN ACCORDANCE WITH ASTM E84. COAT INSULATION THAT IS EXPOSED TO THE ELEMENTS WITH A PROTECTIVE SEALER. INSTALL AND SUPPORT PIPING TO KEEP NOISE AND VIBRATION TO A MINIMUM. SUPPORT AND SECURE PIPING TO UNISTRUT TYPE SUPPORTS SO THAT NO VIBRATION PASSES TO THE BUILDING STRUCTURE. PIPE ATTACHMENTS SHALL BE COPPER— PLATED OR HAVE NONMETALLIC COATING FOR ELECTROLYTIC PROTECTION WHERE ATTACHMENTS ARE IN DIRECT CONTACT WITH COPPER TUBING. INSTALL A SUPPORT WITHIN ONE FOOT OF EACH CHANGE OF DIRECTION. MOUNT PIPE HANGERS AROUND THE OUTSIDE OF THE INSULATION WITH SADDLES TO PREVENT HANGERS FROM RUPTURING THE INSULATION. REPLACE INSULATION THAT IS CUT OR BROKEN BY THE HANGERS. RUN REFRIGERANT LINES PARALLEL AND PERPENDICULAR TO WALL AND FLOOR LINES AND TO APPEAR STRAIGHT AND IN GOOD ORDER. PITCH SUCTION LINES DOWN SLIGHTLY (1" IN 20') TOWARDS THE COMPRESSOR. PROVIDE OIL TRAPS AT THE BASE OF VERTICAL SUCTION RISERS OVER 6 FEET HIGH. INSTALL LIQUID LINE SIGHT GLASSES IN LIQUID LINES NEAREST THE CONDENSING UNITS. FACTORY MOUNT EXPANSION VALVES WITH THE SENSING BULBS SHIPPED LOOSE. FIELD MOUNT EXPANSION VALVE BULB AFTER REFRIGERANT PIPING IS COMPLETE (DAMAGE MAY OCCUR IF BULBS COME IN CONTACT WITH HEAT). FOR SYSTEMS OF 5 TON CAPACITY AND SMALLER, THE CONTRACTOR SHALL HAVE THE OPTION TO PROVIDE COPPER REFRIGERANT TUBING LINE SET SIZED AS RECOMMENDED BY EQUIPMENT MANUFACTURER AND OF LENGTH AS REQUIRED FOR THE INSTALLATION. PROVIDE 1" THICK FOAMED PLASTIC INSULATION, ARMAFLEX OR EQUAL, ON THE SUCTION LINE. PROVIDE QUICK — CONNECT FLARE TUBING COMPRESSION FITTINGS OR SOLDER CONNECTIONS AS REQUIRED TO MATCH THE CONNECTIONS OF THE CONDENSING UNIT AND EVAPORATOR COIL. 15A 4 TEMPERATURE CONTROLS 15A 4 -1 GENERAL REQUIREMENTS PROVIDE A SYSTEM OF TEMPERATURE CONTROLS INCLUDING THERMOSTATS, CONTROL PANELS, TIME SWITCHES, OVERRIDE TIMERS, DAMPER MOTORS, AND RELAYS REQUIRED TO PROVIDE THE DESIRED SEQUENCE OF OPERATION. PROVIDE INTEGRATED WIRING DIAGRAMS SHOWING INTERCONNECTIONS BETWEEN FIELD INSTALLED EQUIPMENT AND PACKAGE WIRING FURNISHED WITH THE HVAC EQUIPMENT. PROVIDE SUPERVISION AND ON —JOB CHECKOUT SERVICE AS REQUIRED TO ENSURE THAT INSTALLATION MEETS REQUIREMENTS OF THE SPECIFICATION. THE SYSTEM SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING THE ACCEPTANCE OF THE SYSTEM BY THE ARCHITECT /ENGINEER. CORRECT DEFECTS OCCURRING DURING THIS PERIOD AT NO ADDITIONAL COST TO THE OWNER. 15A 4 -2 EQUIPMENT MANUFACTURERS AND MODEL NUMBERS ARE LISTED FOR REFERENCE AS TO QUALITY AND FEATURES REQUIRED FOR THE CONTROL DEVICES. PROVIDE CONTROL DEVICES BY BARBER — COLMAN, HONEYWELL, JOHNSON CONTROLS, TRANE OR WHITE RODGERS WITH QUALITY AND FEATURES AS INDICATED. SEVEN DAY PROGRAMMABLE, OCCUPIED /UNOCCUPIED THERMOSTATS FOR HEATING AND COOLING SHALL BE HONEYWELL SERIES T7351 OR EQUAL WITH INTEGRAL SUBBASE. INSTALL THERMOSTATS AT 48" AFF TO MEET ADA REQUIREMENTS UNLESS OTHERWISE NOTED ON THE PLANS. 15A 5 SEQUENCE OF OPERATION 15A 5 -1 FAN COIL UNIT CONTROL DURING OCCUPIED HOURS, OPERATE FAN COIL UNIT SUPPLY FAN CONTINUOUSLY AND OPEN OUTDOOR AIR DAMPER TO MAINTAIN MINIMUM VENTILATION. CYCLE STAGE(S) OF DX COOLING AND ELECTRIC HEATING TO MAINTAIN ROOM THERMOSTAT SET POINT (75 DEGREES FAHRENHEIT COOLING, 72 DEGREES FAHRENHEIT HEATING). DURING UNOCCUPIED HOURS, CYCLE THE FAN COIL UNIT SUPPLY FAN AND COOLING OR HEATING SYSTEM TO MAINTAIN UNOCCUPIED SETBACK TEMPERATURE SET POINTS. OUTDOOR AIR DAMPER SHALL BE CLOSED DURING UNOCCUPIED HOURS. PROVIDE FREEZESTAT IN THE SUPPLY AIR DUCT TO SHUT DOWN THE SUPPLY FAN AND CLOSE THE OUTDOOR AIR DAMPER IF TEMPERATURE IN THE SUPPLY DUCT DROPS BELOW 40 DEGREES FAHRENHEIT. 15A 5-2 TENANT RESTROOM EXHAUST FAN CONTROL EXHAUST FAN SHALL BE INTERLOCKED WITH RESPECTIVE RESTROOM LIGHT SWITCH EXISTING AND BE ENERGIZED WHEN LIGHT SWITCH IS 'ON' AND DE— ENERGIZED WHEN LIGHT SWITCH IS 'OFF'. SECTION 15B: PLUMBING: 1581 GENERAL INSTRUCTIONS 158 1 -1 GENERAL REQUIREMENTS REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THESE SPECIFICATIONS SHALL BE A PART OF THIS SECTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO BECOME THOROUGHLY ACQUAINTED WITH ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR SECTION. WORK REQUIRED UNDER THIS SECTION INCLUDES MATERIAL, EQUIPMENT, APPLIANCES, TRANSPORTATION, SERVICES AND LABOR REQUIRED TO COMPLETE THE ENTIRE PLUMBING SYSTEM AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS. THE SPECIFICATIONS AND THE DRAWINGS ARE COMPLEMENTARY, AND ANY PORTION OF WORK DESCRIBED IN ONE SHALL BE PROVIDED AS IF DESCRIBED IN BOTH. IN THE EVENT OF DISCREPANCIES ON THE DRAWINGS AND SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF SAME PRIOR TO PROCEEDING WITH THE WORK INVOLVED, IN ORDER THAT CORRECT PROGRESS OF THE WORK MAY BE PERFORMED. 15B 1 -2 DEFINITIONS FURNISH: "TO SUPPLY AND DELIVER TO THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION AND SIMILAR OPERATIONS." INSTALL: "TO PERFORM ALL OPERATIONS AT THE PROJECT SITE INCLUDING, BUT NOT LIMITED TO, THE ACTUAL UNLOADING, UNPACKING, ASSEMBLING, ERECTING, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, TESTING, COMMISSIONING, STARTING UP AND SIMILAR OPERATIONS, COMPLETE, AND READY FOR THE INTENDED USE." PROVIDE: "TO FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE." FURNISHED BY OWNER OR FURNISHED BY OTHERS: "AN ITEM FURNISHED BY THE OWNER OR UNDER CTHER DIVISIONS OR CONTRACTS, AND INSTALLED UNDER THE REQUIREMENTS OF THIS DIVISION, COMPLETE, AND READY FOR THE INTENDED USE, INCLUDING ALL ITEMS AND SERVICES INCIDENTAL TO THE WORK NECESSARY FOR PROPER INSTALLATION AND OPERATION. INCLUDE THE INSTALLATION UNDER THE WARRANTY REQUIRED BY THIS DIVISION." ENGINEER: WHERE REFERENCED IN THIS DIVISION, "ENGINEER" 15 THE ENGINEER OF RECORD AND THE DESIGN PROFESSIONAL FOR THE WORK UNDER THIS DIVISION, AND IS A CONSULTANT TO, AND AN AUTHORIZED REPRESENTATIVE OF, THE ARCHITECT, AS DEFINED IN THE GENERAL AND /OR SUPPLEMENTARY CONDITIONS. WHEN USED IN THIS DIVISION, IT MEANS INCREASED INVOLVEMENT BY, AND OBLIGATIONS TO, THE ENGINEER, IN ADDITION TO INVOLVEMENT BY, AND OBLIGATIONS TO, THE "ARCHITECT ". AHJ: THE LOCAL CODE AND /OR INSPECTION AGENCY (AUTHORITY) HAVING JURISDICTION OVER THE WORK. NRTL: NATIONALLY RECOGNIZED TESTING _ABORATORY, AS DEFINED AND LISTED BY OSHA IN 29 CFR 1910.7 (E.G., UL, ETL, CSA), AND ACCEPTABLE TO THE AHJ OVER THIS PROJECT. THE TERMS "APPROVED EQUAL ", "EQUIVALENT ", OR "EQUAL" ARE USED SYNONYMOUSLY AND SHALL MEAN "ACCEPTED BY OR ACCEPTABLE TO THE ENGINEER AS EQUIVALENT TO THE ITEM OR MANUFACTURER SPECIFIED ". THE TERM "APPROVED" SHALL MEAN LABELED, LISTED, OR BOTH, BY AN NRTL, AND ACCEPTABLE TO THE AHJ OVER THIS PROJECT. 15B 1 -3 PREBID SITE VISIT PRIOR TO SUBMITTING BID, VISIT THE SITE OF THE PROPOSED WORK AND BECOME FULLY INFORMED AS TO THE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. FAILURE TO DO SO WILL NOT BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND ABOVE THE CONTRACT PRICE. 15B 1 -4 MATERIAL AND WORKMANSHIP MATERIAL, EQUIPMENT, AND APPARATUS PROVIDED UNDER THIS CONTRACT SHALL BE NEW UNLESS OTHERWISE STATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN GOOD COMMERCIAL PRACTICE, AND FREE FROM DEFECTS. MODEL NUMBERS LISTED IN SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT NECESSARILY INTENDED TO DESIGNATE THE REQUIRED TRIM, WRITTEN DESCRIPTIONS OF THE TRIM GOVERN MODEL NUMBERS. PIPE, PIPE FITTINGS, PIPE SPECIALTIES AND VALVES SHALL BE MANUFACTURED IN PLANTS LOCATED IN THE UNITED STATES. WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" APPEARANCE WHEN COMPLETED, TO THE SATISFACTION OF THE ARCHITECT AND ENGINEER. WORKMANSHIP SHALL BE THE FINEST POSSIBLE BY EXPERIENCED MECHANICS. INSTALLATIONS SHALL BE MADE IN A MANNER THAT WILL COMPLY WITH APPLICABLE CODES AND LAWS. INSTALLATION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT TO EFFICIENCY, CAPACITY, AND NOISE LEVEL, ETC. ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT OR PIPING AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. MATERIALS AND EQUIPMENT SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. LIGHT DUTY AND RESIDENTIAL GRADE EQUIPMENT WILL NOT BE ACCEPTED UNLESS OTHERWISE INDICATED. REMOVE FROM THE PREMISES WASTE MATERIAL PRESENT AS A RESULT OF HIS WORK, INCLUDING CARTCNS, CRATING, PAPER, STICKERS, AND /OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC. GLEAN PIECES OF EQUIPMENT INSTALLED UNDER THIS CONTRACT TO PRESENT A NEAT AND CLEAN INSTALLATION AT THE TERMINATION OF THE WORK. REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING JURISDICTION. 15B 1 -5 COORDINATION COORDINATE WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF THE SYSTEMS WILL BE INSTALLED AT THE PROPER TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO THOSE ITEMS REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE ABOVE SHALL BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER. UNLESS NOTED ELSEWHERE, GENERAL CONTRACTOR WILL PROVIDE CHASES AND OPENINGS IN BUILDING CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. CONTRACTOR SHALL FURNISH THE GENERAL CONTRACTOR WITH INFORMATION REGARDING CHASES AND OPENINGS WHEN REQUIRED. CONTRACTOR SHALL KEEP INFORMED AS TO THE WORK OF OTHER TRADES ENGAGED IN THE CONSTRUCTION OF THE PROJECT, AND SHALL EXECUTE HIS WORK IN SUCH A MANNER AS NOT TO INTERFERE WITH OR DELAY THE WORK OF OTHER TRADES. FIGURED DIMENSIONS SHALL BE TAKEN IN PREFERENCE TO SCALED DIMENSIONS. CONTRACTOR SHALL TAKE HIS OWN MEASUREMENTS AT THE BUILDING, AS VARIATIONS MAY OCCUR. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS WHICH COULD HAVE BEEN AVOIDED BY PROPER CHECKING AND VERIFICATION. PROVIDE MATERIALS WITH TRIM THAT WILL PROPERLY FIT THE TYPES OF CEILING, WALL, OR FLOOR FINISHES ACTUALLY INSTALLED. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT INTENDED TO DESIGNATE THE REQUIRED TRIM. 15B 1 -6 ORDINANCES AND CODES WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A MINIMUM, BE IN CONFORMANCE WITH APPLICABLE NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. EQUIPMENT FURNISHED AND ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL AHJ INCLUDING ANY AMENDMENTS AND STANDARDS AS SET FORTH BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NEPA), UNDERWRITERS LABORATORIES (UL), OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS (ASHRAE), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AMERICAN SOCIETY OF TESTING MATERIALS (ASTM) AND OTHER NATIONAL STANDARDS AND CODES WHERE APPLICABLE. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREMENTS OF THE REFERENCED CODES, STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. PROCURE AND PAY FOR PERMITS AND LICENSES REQUIRED FOR THE ACCOMPLISHMENT OF THE WORK HEREIN DESCRIBED. WHERE REQUIRED, OBTAIN, PAY FOR AND FURNISH CERTIFICATES OF INSPECTION TO OWNER. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY VIOLATION OF THE LAW. MAINTAIN NECESSARY SIGNAL LIGHTS AND GUARDS FOR THE SAFETY OF THE PUBLIC. 15B 1 -7 PROTECTION OF EQUIPMENT AND MATERIAL STORE AND PROTECT FROM DAMAGE EQUIPMENT AND MATERIAL AFTER DELIVERY TO JOB SITE. COVER WITH WATERPROOF, TEAR — RESISTANT, HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO PROTECT FROM PLASTER, DIRT, PAINT, WATER, OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL DAMAGED BY CONSTRUCTION ACTIVITIES WILL BE REJECTED, AND CONTRACTOR IS OBLIGATED TO FURNISH NEW EQUIPMENT AND MATERIAL OF A LIKE KIND AT HIS OWN EXPENSE. KEEP PREMISES BROOM CLEAN OF FOREIGN MATERIAL CREATED UNDER THIS CONTRACT. PIPING, EQUIPMENT, ETC. SHALL HAVE A NEAT AND CLEAN APPEARANCE AT THE TERMINATION OF THE WORK. PLUG OR CAP OPEN ENDS OF PIPING SYSTEMS DURING CONSTRUCTION WHEN NOT IN USE, TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS. 15B 1 -8 SUBSTITUTIONS THE BASE BID SHALL INCLUDE ONLY THE PRODUCTS FROM MANUFACTURERS SPECIFICALLY NAMED IN THE DRAWINGS AND SPECIFICATIONS. NO SUBSTITUTION WILL BE CONSIDERED PRIOR TO RECEIPT OF BIDS UNLESS WRITTEN REQUEST FOR APPROVAL TO BID HAS BEEN RECEIVED BY THE ENGINEER AT LEAST TEN CALENDAR DAYS PRIOR TO THE DATE FOR RECEIPT OF BIDS. EACH SUCH REQUEST SHALL INCLUDE THE NAME OF THE MATERIAL OR EQUIPMENT FOR WHICH IT IS TO BE SUBSTITUTED AND A COMPLETE DESCRIPTION OF THE PROPOSED SUBSTITUTE INCLUDING DRAWINGS, GUTS, PERFORMANCE AND TEST DATA AND OTHER INFORMATION NECESSARY FOR AN EVALUATION. A STATEMENT SETTING FORTH CHANGES IN OTHER MATERIALS, EQUIPMENT OR OTHER WORK THAT INCORPORATION OF THE SUBSTITUTE WOULD REQUIRE SHALL BE INCLUDED. THE BURDEN OF PROOF OF THE MERIT OF THE PROPOSED SUBSTITUTE IS UPON THE PROPOSER. THE ENGINEER'S DECISION OF APPROVAL OR DISAPPROVAL TO BID OF A PROPOSED SUBSTITUTION SHALL BE FINAL. THE TERMS "APPROVED ", "APPROVED EQUAL ", OR "EQUAL ", REFER TO APPROVAL BY THE ENGINEER AS AN ACCEPTABLE ALTERNATE BID. NO SUBSTITUTIONS WILL BE CONSIDERED THAT ARE NOT BID AS AN ALTERNATE. NO MATERIAL SUBSTITUTIONS SHALL BE CONSIDERED FOR APPROVAL PRIOR TO AWARD OF CONTRACT. COORDINATE AND VERIFY WITH OTHER TRADES WHETHER OR NOT THE SUBSTITUTED EQUIPMENT CAN BE INSTALLED AS SHOWN ON THE CONSTRUCTION DRAWINGS WITHOUT MODIFICATION TO ASSOCIATED SYSTEMS OR ARCHITECTURAL OR ENGINEERING DESIGN. INCLUDE ADDITIONAL COSTS FOR ARCHITECTURAL AND ENGINEERING DESIGN FEES IN BID IF DRAWING MODIFICATIONS ARE REQUIRED BECAUSE OF SUBSTITUTED EQUIPMENT. 15B 1 -9 WARRANTIES COORDINATE WITH DIVISION 1 AND GENERAL CONDITIONS TO DETERMINE WHAT THE ACTUAL REQUIREMENTS ARE, AND MODIFY THE FOLLOWING AS REQUIRED SO AS TO NOT CONTRADICT THEM. WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALL DEFECTS DUE TO FAULTY WORKMANSHIP, DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF SUBSTANTIAL COMPLETION, UNLESS SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S STANDARD WARRANTY EXCEEDS 12 MONTHS. REMEDY ALL DEFECTS, OCCURRING WITHIN THE WARRANTY PERIOD(S), AS STATED IN THE GENERAL CONDITIONS AND DIVISION 1. WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS OR REPLACEMENTS WITHOUT ANY ADDITIONAL COSTS TO THE OWNER. PERFORM THE REMEDIAL WORK PROMPTLY, UPON WRITTEN NOTICE FROM THE ENGINEER OR OWNER. AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN WRITING AND PROPERLY EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND THE ONE YEAR PERIOD, EACH WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND STATING THE COMMENCEMENT DATE AND TERM. 15B 1 -10 SPARE PARTS FURNISH TO OWNER, WITH RECEIPT, THE SPARE PARTS TO INCLUDE FAUCET WASHERS AND 0— RINGS, FLUSHOMETER REPAIR KITS AND WATER CLOSET TANK REPAIR KITS FOR THE FIXTURES FURNISHED FOR THIS PROJECT. 15B 1-11 COINCIDENTAL DAMAGE CONTRACTOR SHALL REPAIR STREETS, SIDEWALKS, DRIVES, PAVING, WALLS AND FINISHES ETC. THAT HE DAMAGES IN THE COURSE OF THIS PROJECT. REPAIR MATERIALS SHALL MATCH EXISTING CONSTRUCTION. REPAIR WORK SHALL MEET REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING JURISDICTION AND MEET THE SATISFACTION OF THE ARCHITECT. 15B 1 -12 CUTTING AND PATCHING OBTAIN PERMISSION FROM THE ARCHITECT BEFORE CUTTING WALLS, FLOORS, CEILINGS, ETC. AS REQUIRED BY THE PROJECT. DO NOT DISTURB STRUCTURAL MEMBERS WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES AS SMALL AS POSSIBLE. GENERAL CONTRACTOR SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED BY WORK UNDER THIS SECTION. PATCHING SHALL MATCH ORIGINAL MATERIAL AND CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BY WORK TO THE CONDITION OF ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT. 15B 1 -13 BUILDING OPERATION COMPLY WITH THE SCHEDULE OF OPERATIONS AS OUTLINED IN THE ARCHITECTURAL PORTIONS OF THIS SPECIFICATION. BUILDING WILL BE IN OPERATION DURING NORMAL WORK —DAY HOURS. ACCOMPLISH WORK REQUIRING INTERRUPTION OF BUILDING OPERATION AT A TIME WHEN THE BUILDING IS NOT IN OPERATION, AND ONLY WITH WRITTEN APPROVAL OF BUILDING OWNER AND /OR TENANT. COORDINATE INTERRUPTION OF BUILDING OPERATION WITH THE OWNER AND /OR TENANT A MINIMUM OF SEVEN DAYS IN ADVANCE OF WORK. r5 IENVED rappR 9 15B 1 -14 GUARANTEE THE WORK TO BE PERFORMED UNDER THIS CONTRACT SHALL INCLUDE THE FURNISHING, INSTALLATION, AND CONNECTION OF PLUMBING SYSTEMS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS. BY SIGNING THE CONTRACT, THE CONTRACTOR ACKNOWLEDGES THAT HE HAS ACQUAINTED HIMSELF WITH THE SITE AND THE EXISTING CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED, AND THE DRAWINGS AND SPECIFICATIONS PERTAINING THERETO, AND HE INDICATES THAT HE WILL COMPLY WITH THE REQUIREMENTS AND INTENT OF PERTINENT DOCUMENTS IN THE PERFORMANCE OF THE WORK. GUARANTEE THAT THE PLUMBING INSTALLED UNDER THIS CONTRACT IS FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF JOB ACCEPTANCE BY THE OWNER. THIS SHALL INCLUDE A GUARANTEE OF FREE CIRCULATION OF LIQUIDS THROUGHOUT THE SYSTEM AS INTENDED WITHOUT LEAKS, EXCESSIVE NOISE, OR WATER HAMMER. IF DEFECTS OCCUR DURING THE ONE YEAR GUARANTEE PERIOD, REPAIR OR REPLACE SUCH DEFECTS AT NO EXPENSE TO THE OWNER, AND TO THE SATISFACTION OF THE OWNER, ARCHITECT AND ENGINEER. 15B2 PLUMBING PIPING 15B 2 -1 PIPING MATERIALS MATERIALS SPECIFIED OR NOTED ON THE DRAWINGS ARE SUBJECT TO THE APPROVAL OF LOCAL CODE AUTHORITIES. VERIFY APPROVAL BEFORE INSTALLING ANY MATERIAL OR JOINING METHOD. DOMESTIC WATER (COLD, HOT): DOMESTIC WATER PIPING INSTALLED ABOVE THE FLOOR SLAB INSIDE THE BUILDING SHALL BE TYPE "L" HARD TEMPER COPPER TUBE WITH WROUGHT COPPER FITTINGS AND SOLDERED CONNECTIONS MADE UP WITH 95/5 SOLDER. BRAZED MECHANICALLY FORMED TEE CONNECTIONS (T— DRILL) MAY BE USED IN COPPER LINES WHERE APPROVED BY CODE; CONNECTION SHALL BE MADE WITH BRAZED SILVER SOLDER (SILFOS) JOINTS IN CONFORMANCE WITH MANUFACTURER'S INSTRUCTIONS. INTERIOR WASTE AND VENT ABOVE SLAB: WASTE AND VENT PIPE ABOVE SLAB INSIDE BUILDING SHALL BE HUBLESS CAST IRON SOIL PIPE AND FITTINGS WITH HUBLESS COUPLINGS. 15B 2 -2 PIPING JOINTS COPPER TUBING: JOINTS IN HARD TEMPER TUBING SHALL BE SOLDERED JOINTS USING LEAD —FREE 95/5 SOLDER EXCEPT WHERE TUBING IS INSTALLED BELOW GRADE OR BELOW THE BASE SLAB, IN WHICH CASE JOINTS SHALL BE SOLDERED WITH SILVER SOLDER ( SILFOS). JOINTS IN SOFT TEMPER COPPER TUBING SHALL BE OF THE FLARED TYPE INSTALLED IN COMPLIANCE WITH THE FITTING MANUFACTURER'S RECOMMENDATIONS. CAST IRON PIPE ABOVE GRADE: JOINTS IN HUBLESS PIPE SHALL BE STANDARD CISPI 310 -85 COUPLING BY ANACO HUSKY OR APPROVED EQUAL. 15B 2 -3 PIPING INSTALLATION GENERAL: CLEAN PIPE THOROUGHLY PRIOR TO INSTALLATION. REAM ENDS OF PIPE TO REMOVE BURRS. CUT PIPE ACCURATELY TO MEASUREMENTS TAKEN ON THE JOB. INSTALL WITH ADEQUATE CLEARANCE FOR INSTALLATION OF COVERINGS WHERE REQUIRED. PIPE SHALL NOT BE SPRUNG OR BENT. NEATLY ALIGN PIPE, CONNECT IT SECURELY, AND SUPPORT IT FROM THE BUILDING STRUCTURE WITH HANGERS AS SPECIFIED BELOW. PROVIDE CHROME — PLATED ESCUTCHEONS ON PIPES PASSING THROUGH CEILINGS, FLOORS OR WALLS OF FINISHED SPACES. RUN PIPES FREELY THROUGH FLOOR AND WALL PENETRATIONS USING PIPE SLEEVES. DO NOT GROUT IN PLACE UNLESS REQUIRED FOR STRUCTURAL FIRE INTEGRITY. INSTALL PIPE CONCEALED IN FINISHED SPACES WHEREVER POSSIBLE. USE A DIELECTRIC UNION WHERE FERROUS AND COPPER PIPE CONNECT. DIELECTRIC UNION SHALL HAVE A ZINC— PLATED STEEL BODY, A THREADED NYLON INSERT, AND INSULATING PRESSURE GASKET. NO FERROUS METAL —TO— COPPER CONNECTION MADE WITHOUT INSULATING UNIONS WILL BE ALLOWED. 15B 3 -1 PLUMBING FIXTURES FURNISH AND INSTALL COMMERCIAL GRADE PLUMBING FIXTURES, SEE THE DRAWINGS FOR QUANTITIES AND DESCRIPTIONS. PROVIDE CHINA FIXTURES AS SCHEDULED BY AMERICAN — STANDARD OR APPROVED EQUAL BY CRANE, ELJER OR KOHLER. PROVIDE ELECTRIC WATER COOLERS AS SCHEDULED BY ELKAY OR APPROVED EQUAL BY EBCO, HALSEY TAYLOR OR HAWS. PROVIDE MOP SINKS AS SCHEDULED BY STERN — WILLIAMS OR EQUAL BY FIAT OR FLORESTONE. PROVIDE FIXTURES OF SAME MANUFACTURER WHERE POSSIBLE. FIXTURES SHOWN ON THE DRAWINGS OR SPECIFIED HEREIN SHALL BE FURNISHED AND INSTALLED, SET FIRM AND TRUE, CONNECTED TO REQUIRED PIPING SERVICES, THOROUGHLY CLEANED, LEFT CLEAN AND READY FOR USE. EXPOSED FITTINGS AND PIPING AT THE FIXTURES SHALL BE CHROME — PLATED, AND WATER SUPPLY PIPING SHALL BE VALVED AT EACH FIXTURE. VITREOUS CHINA FIXTURES SHALL BE OF THE BEST GRADE VITREOUS WARE, WITHOUT PIT HOLES OR BLEMISHES, AND THE OUTLINES SHALL BE GENERALLY TRUE. THE ENGINEER RESERVES THE RIGHT TO REJECT ANY PIECES WHICH, IN HIS OPINION, ARE FAULTY. FIXTURES SET AGAINST WALLS SHALL HAVE GROUND BACKS AND SHALL BE CAULKED WITH SILICONE SEALANT OF A MATCHING COLOR. 15B 3 -2 PLUMBING FIXTURE TRIM FAUCETS AND TRIM IN CONTACT WITH DRINKING WATER SHALL MEET OR EXCEED THE SAFE WATER DRINKING ACT (SWDA) LEAD —FREE STANDARDS OF ANSI /NSF STANDARD 61, SECTION 9. FIXTURE TRIM SHALL HAVE THE MANUFACTURER'S NAME STAMPED CLEARLY AND VISIBLY ON EACH ITEM. PROVIDE FAUCETS AS SCHEDULED ON DRAWINGS: BY CHICAGO, KOHLER, SPEAKMEN, ZURN, OR T &S BRASS. FIXTURE P —TRAPS SHALL BE 17 GAUGE BRASS BODY WITH CLEANOUT, 17 GAUGE SEAMLESS TUBULAR WALL BEND WITH CAST BRASS SLIP NUT, SHALLOW STEEL FLANGE, ALL CHROME PLATED: BY MCGUIRE, BRASS CRAFT, DEARBORN BRASS, EBC, PROFLO OR ZURN. LAVATORY AND WATER CLOSET SUPPLIES SHALL BE SOLID BRASS ANGLE OR STRAIGHT TYPE WITH FULL TURN BRASS STEM, WHEEL HANDLE OR LOOSE KEY TYPES AS NOTED ON DRAWINGS, SHALLOW STEEL FLANGE, 3/8" COPPER RISER FLANGE, ALL CHROME PLATED, FINAL CONNECTION AS REQUIRED: BY MCGUIRE, BRASS CRAFT, EBC OR ZURN. LAVATORY DRAINS SHALL BE GRID TYPE CHROME PLATED 17 GAUGE BRASS OPEN GRID WITH 1-1/4" X 6" LONG SEAMLESS BRASS TAILPIECE AND BRASS LOCKNUT WITH HEAVY RUBBER BASIN WASHER AND FIBER FRICTION WASHER, BY MCGUIRE, BRASS CRAFT, DEARBORN BRASS, EBC, PROFLO OR ZURN. PROVIDE HANDICAP INSULATION KITS FOR LAVATORIES AND SINKS ON EXPOSED WATER AND WASTE PIPES AND FITTINGS, INCLUDING OFFSET DRAIN AND CONTINUOUS WASTE COVERS WHERE REQUIRED: BY BROGAR, MCGUIRE, PLUMBEREX "PRO- 2000 ", TRAP —WRAP OR TRU —BRO. C ! Y.., f•,. Fly y rIA HENDERSON ENGINEERS 8325 LENEXA DRIVE LENEXA, KS 66214 TEL 913 742 5000 FAX 913 742 5001 www.hei 0750002188 RSP Architects 502 S. College Avenue Suite 203 Tempe, AZ 85281 Certification RSP Architects, Ltd. with Terry Wobken Washington No. 6634 Location Westfield Southcenter 201 Southcenter Mall Tukwila, WA 98188 Project For Project No. Drawn By Checked By DH D ate 05.06.08 480.889.2000 480.889.2099 fax www.rsparch.com © Copyright ASP Architects 2003. All rights reserved. Lti MAY 0 5 2009 1688.005.02 CK ST CE NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or camrnercially exploited, in whole or in part, without express written permission of ASP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. MECHANICAL SPECIFICATIONS CONTINUED & PLUMBING SPECIFICATIONS M302 Project Info Project Address 201 South Center Mali Model No. CFM • 0.25 Date 5/6/2008 Flow Control Tukwila, WA 89108 Location GREENHECK CARRIER 100 For Building Dept. Use 53W CV. RESTROOM 21 SOH Applicant Name: Chris Kelsey Equipment schedule with type, capacity, efficiency M202 . a . Applicant Address: 7330 N. 16th st. Suite A110 Phoenix, AZ 05020 Applicant Phone: 602 - 336 -5251 1412.1 Temperature zones Indicate locations on plans Fan Equipment Schedule Equip. ID Brand Name Model No. CFM • 0.25 HP /BHP Flow Control Location of Service Location GREENHECK CARRIER 100 30 53W CV. RESTROOM 21 SOH IIIMUN NM= Equipment schedule with type, capacity, efficiency M202 . a . 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss Cooling Equipment Schedule Equip. ID Brand Name Model No. Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location ot1-1 CARRIER 24ABA324 30 900 160 13 SEER 21 SOH 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M202 . a . 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls - 1412.1 Temperature zones Heatin; E . ui +.ment Schedule Equip. ID Brand Name' Model No. Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency" 1U -1 CARRIER FX4CNF030008 30 900 160 27 21 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M202 . a . 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls - 1412.1 Temperature zones Mechanical Permit Plans Checklist MECH-CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Address 201 south Center Mali (Date 5/6/2008 The following information is necessary to check a mechanical permit appficaaon for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Cade Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance .a. 1411,4 Pkg. elec. htg.& clg. List heat pumps on schedule 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M202 . a . 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls - 1412.1 Temperature zones Indicate locations on plans 1. 1412.2 Deadband control Indicate 5 degree deadband minimum 1412.3 Humidity control Indicate humidistat Automatic setback Indicate thermostat with night setback and 7 diff. day types M301 Dampers Indicate damper location and auto. controls & max. leakage 14101 la 1412.4.1 1412.4.2 Optimum Start Indicate optimum start controls 1412.5 Heat pump control Indicate microprocessor on thermostat schedule . a. 1412.6 Combustion htg, Indicate modulating or staged alliMMINIZI Balancing Indicate balancing features on plans Ventilation Control Indicate demand control ventilation for high - occupancy areas yes 1422 Thermostat interlock Indicate thermostat interlock on plans m101 . a. 1423 Economizers Equipment schedule 1413 Air economizers . a. 1413.1 Air Econo Operation Indicate 100 ° /a capability on schedule 1413.1 Wtr Econo Operation indicate 100% capacity at 45 degF db & 40 deg F wb 1413.2 Water Econo Doc Indicate clg load & water oconoe & clg tower performance 1413.3 Integrated operation Indicate capability for partial cooling . a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary m301 yes 1414.2 Duct insulation Indicate R -value of insulation on duct 14301 yes 1415.1 Piping insulation Indicate R -value of insulation on piping M301 1416 Completion Requirements a. 1416.2.1 Commissioning Provide commissioning plan yes 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing • M301 yes 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training M301 yes 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report M301 a. 1434 Separate air sys. Indicate separate systems on plans yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer =r ,t, . r . .,1 • 1 .1 • ec ions + 1440 ervice water htg. .a. 1441 lec. water heater Ir. .t: • - in . i.i ii-r . a . ® Shut -off controls Indicate automatic shut -off . a. 1443 Pipe Insulation Indicate R -value of insufatirsii on piping a. 1452 Heat Pump COP Indicate minimum COP of 4.0 a. 1452 Heater Efficiency Indicate pool heater efficiency . a. 1453 Pool heater controls Indicate switch and 65 degree control 1454 Pool covers Indicate vapor retardant Cover 1454 Pools 90+ degrees Indicate R -12 pool cover 2006 Washington State Nonresidential Energy Code Compliance Form no is circiea for any question, provide explanation: 2006 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. U Includes Plans 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary MECH -SUM include documentation requiring compliance with commissioning requirements, Section 1416. Revised July 2007 The mechanical system includes a DX cooling split system unit with R410A refrigerant and electric heat option. Compliance Option C) Simple System U Complex System Q Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. MAY 0 5 . NOQQ x'10 8- l'i I ABED FOR E M LIAN C � � R "w b �h l PPRO�J 0 y3 HENDERSON ENGINEERS= 8325 LENEXA DRIVE LENEXA, KS 66214 TEL 913 742 5000 FAX 913 742 5001 www.hei- eng.com 0750002188 RSP Architects 502 S. College Avenue Suite 203 Tempo, AZ 85281 Certification Location Project For Project No. Drawn By Checked By DH D ate RSP Architects, Ltd. with Terry Wobken Washington No. 6634 Westfield Southcenter 201 Southcenter Mall Tukwila, WA 98188 1688.005.02 CK 05.06.08 NOTICE: The designs shown and described herein including all technical drawings, graphics, and models thereof, are proprietary and cannot be copied, duplicated or commercially exploited, in whole or in part, without express written permission of HSP Architects. These are available for limited review and evaluation by clients, consultants, contractors, government agencies, vendors and office personnel only in accordance with this Notice. © Copyright HSP Architects 2003. All rights reserved. MECHANICAL ENERGY CALCULATIONS 480.889.2000 480.889.2099 fax www.rsparch.com ST CE M303