Loading...
HomeMy WebLinkAboutPermit M08-186 - BOEING #11-14BOEING #11 -14 11201 TUKWILA INTERNATIONAL BL M08 -186 Parcel No.: Address: Suite No: Owner: Name: Address: CityOf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 11201 TUKWILA INTERNATIONAL BL TUKW MECHANICAL PERMIT Tenant: Name: BOEING #11 -14 Address: 11201 TUKVVILA INTERNATIONAL BL , TUKWILA WA Contact Person: Name: MARK CLEMENT Address: PO BOX 3707 MS 1 W -09 , SEATTLE WA Contractor: Name: BOEING COMPANY, THE Address: 100 N RIVERSIDE, M/C 5003 -4027 , CHICAGO IL Contractor License No: BOEINC *294ML Permit Number: Issue Date: Permit Expires On: DESCRIPTION OF WORK: REPLACE CAFETERIA GAS FIRED HOT WATER HEATER AND ADD (1) ELECTRIC BOOSTER HEATER FOR CAFETERIA DISHWASHER. Value of Mechanical: $40,500.00 Type of Fire Protection: Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 0 Appliance Vent 0 Repair or Addition to Heat/Refrig /Cooling System.... 2 Air Handling Unit <10,000 CFM 0 >10,000 CFM 0 Evaporator Cooler 0 Ventilation Fan connected to single duct 0 Ventilation System 0 Hood and Duct 0 Incinerator: Domestic 0 Commercial/Industrial 0 doc: IMC - 10/06 EQUIPMENT TYPE AND OUANTITY * * continued on next page ** Phone: Phone: 206 617 -2944 Phone: 312 544 -2535 Expiration Date: 01/14/2009 M08 -186 09/02/2008 03/01/2009 Fees Collected: $631.25 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP/ 1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment M08 -186 Printed: 09 -02 -2008 Permit Center Authorized Signature: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of w I authorized to sign and obtain this mechanical permit. Signature: Print Name: doc: IMC -10/06 i\NP • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us Permit Number: MO8 -186 Issue Date: 09/02/2008 Permit Expires On: 03/01/2009 Date: - o 1- 0 O Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -186 Printed: 09 -02 -2008 Parcel No.: Address: Suite No: Tenant: BOEING #11 -14 1: ** *BUILDING DEPARTMENT CONDITIONS * ** • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 11201 TUKWILA INTERNATIONAL BL TUKW PERMIT CONDITIONS Permit Number: M08 -186 Status: ISSUED Applied Date: 07/17 /2008 Issue Date: 09/02/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Manufacturers installation instructions shall be available on the job site at the time of inspection. 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 10: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 11: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. doc: Cond -10/06 * * continued on next page ** M08 -186 Printed: 09 -02 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Signature: Print Name: doc: Cond -10106 Date: C Z M08 -186 Printed: 09 -02 -2008 SITE LOCATION King Co Assessor's Tax No.: � Ol-A 9 15 5 \ \a. C ,c� � nl� v N �A; 0-0 !a1\00 �►ati t 5 Site Address: Site Number: ' 1 Floor: Tenant Name: Q 1 - v1 C Name: V\ '\& CA c C1 f +J� Q o � b*%}. 1701 Ms \U -o9 Mailing Address: E -Mail Address: V "1(• a • L, t M ( \ O ■ '\ ) CPO Company Name: Mailing Address: CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** Contact Person: Q ON) y L E -Mail Address: l ) . \) \.) y� • � ' . o ccD Or 1 . ( or '` Contractor Registration Number: % b 2A IA fob E -Mail Address: Company Name: b C t r C Mailing Address: PU • IQ -0 9 0 311 X Contact Person: C Pi l � 0 nos 1 ]' E -Mail Address: L e a• P. -r v r► ti S I )fit �G (pm Q:\Applications\Fonns- Applications On Line \3 -2006 - Permit Application.doc Revised: 9 -2006 bh Building Permit No. ,, f Mechanical Permit No. #1,0q 1 PlumbinglGas Permit No. Public Works Permit No. Project No. (For office use only) New Tenant: ❑ Yes ❑ .. No Property Owners Name: `J t ` 'Al) Mailing Address: Q b d o; 3 .3 0 1 5 e \'\ \( M S 1 V -09 St..MI W 14 9v L u City State Zip CONTACT PERSON who do we contact when your permit is ready to be issued Day Telephone: 20 b I 1 S t w % � Qli -%l City State Zip Fax Number: Tot 655 - 53 9 5 GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping 5)) � ac ,av) cc) 1.1 tcv Ce co s'tvoc't ►o ...O 5 U./A 7$/z/-1 City / State Zip Day Telephone: 2.O L g SS -00 3 Fax Number: '2., O C 6-r s '" 29 19 Expiration Date: 1 / / 2 d d 1 ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: Mailing Address: City State Zip Contact Person: Day Telephone: Fax Number: ENGINEER OF RECORD - All plans must be wet stamped by Engin r of Record Fax Number: r'kt*Ic u/a (371 City Day Telephone: State Zip 7,64 Lss 1D-t,3 Zo C Gs's - 53 s' Page 1 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall /Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat /Refrig /Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm /Ind MECHANICAL PERMIT INFORMATION 206- 431 -3670 Contact Person: E -Mail Address: Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... Replacement .... Q:\Applications\ ones- Applications On Linc\ -2006 - Permit Application.doc Revised: 9 -2006 bh p O S \mss l. V30( Ay.cac'\ Contractor Registration Number: ,J OC1i-fC, Mt- Indicate type of mechanical work being installed and the quantity below: MECHANICAL CONTRACTOR INFORMATION Company Name: a0 t y C b T-'t t J a 1 c Stiu e v Mailing Address: S t 11 " r) Q 9 y v IS ON( 370'7 5 C 1 % It WIN 76 IL Li N9 t City State Zip Day Telephone: 26 4. s d 6. 0 3, Fax Number: ' i 0 L t S 1 231 Expiration Date: l L1 / 2 Valuation of Mechanical work (contractor's bid price): $ t 4 0 1 ' St O //' �+ Scope of Work (please provide detailed information): g c p H C L C QA C� ; 6 c. s 1' ► Nit \Ne ',J Y \-k c.,Acv PpO (1) E I e 'C. QpaS"1tv \\(.w Cc.4t'c 4. Q,S Fuel Type: Electric p Gas .... Other: Page 4 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 international Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGENT: / Signature: Z2/ � J L Date: 7 ib / 6 Print Name: M A V I( C 1 e M C r4'1 Day Telephone: Mailing Address: M H . D. C 1 c Me ,(1 63 QO r� /4 .(dry �C^�"l k LjA 9W' L City State Zip Date Application Accepted: *I a Li)? Q:\Applications \Forms- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh Date Application Expires: Staff Initials: Page 6 of 6 Receipt No.: R08 -02627 Initials: JEM User ID: 1165 Payee: BOEING TRUST ACCT 000.386.908.03 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http. //www.ci.tukwila.wa.us Payment Other 631.25 TRANSACTION LIST: Type Method Descriptio Amount RECEIPT Parcel No.: Permit Number: M08 -186 Address: 11201 TUICWILA INTERNATIONAL BL TUB:W Status: PENDING Suite No: Applied Date: 07/17/2008 Applicant: BOEING #11 -14 Issue Date: Account Code Current Pmts 000.322.102.00.0 505.00 000/345.830 126.25 Total: $631.25 Payment Amount: $631.25 Payment Date: 07/17/2008 11:29 AM Balance: $0.00 4978 07/17 9710 TOTAL 0.00 ring Raraint -OR Printpri 07 -17 -2008 Proj Type of Inspection : k Address: Date Called: Special Instructions: Date Wanted: a.m. Requester: Phone No: 1---/?7 ' -3l-c Z 6, INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION PERMIT NO. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3600 Approved per applicable codes. LJ Corrections required prior to approval. COMMENTS: A p tk,k; ( e)ti 1 Inspe jtell Date: 3 0 —01 n $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: IDate: !v� COMMENTS: Type of I pection- dLL�C3� , v Address: 1 12 6 / , s� r te/ P. f (A-NS 5 _.,-, L._ b i JJ kk L 7 G “O cr v G .. '< < ( J A 6 U n- S n P - Ls Phone No: 4 2S 2- /..rO Vu, 1 --- (7„ 1. , 5 l l S p C (1 i )) , l♦ p I ProD (( ' 14 Type of I pection- dLL�C3� , v Address: 1 12 6 / , s� Date Called: Special Instructions: mil. Ae2.� LA' Ne.e . , 1 Tt,— T� A.d7` A?) ,,,Al Date Wanted: I 2 v G 2 _. Requester: Phone No: 4 2S 2- -5 2 b' <_ INSPECTION NO. El Approved per applicable codes. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3 7 Corrections required prior to approval. Inspectr: Date: $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must b paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: , COMMENTS: (0 P/6 Vide )4/11%athet hal---5 . r-g -cUer' 21 " ; f 2 5 67F-...}-1N3 ar-irt Pvrekik 3 -.9 ?nth L , .1.1sp -,'g -A.J c:1%, -it - 1 . ----Tar tit ot ->"...) - flp,IW-S m fktz.,,s L / ' 4 -5 4 Phone No: 4 /2 - 5 Z / - 42 l Project: POE /AZ //- ii Type of Inspection: P Dch -hv Address: /126/ 7 3 Date Called: Special Instructions: Date Wanted: a m. . 3 - - d 9 Requester: Phone No: 4 /2 - 5 Z / - 42 l C 1'' /gt INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION Y 2-- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 J Approved per applicable codes. rz Corrections required prior to approval. ID � (00 REINSPECTION FE REQUIRED. rior to inspection, fee must be d at 6300 Southcenter Blvd., Suite 1 0. Call to schedule reinspection. 1 Receipt No.: 'Date: P1 & P2 PRE -CYCLE FAN PROVER STATUS CHECK Pre -Cycle Prover Status Check Activated ENTHOODwLOCATION ` rk.,.., *,=' This section only applies if using a Power Venter to Sidewall vent. If using Power Venter to exhaust the flue gases vertically, skip to the section titled "POWER VENTER MOUNTING" below. If possible, locate the Vent Hood on a wall that does not face the direction of prevailing winds. This will diminish the possibility of appliance interruption during periods of extreme winds. If possible, locate the Vent Hood no closer than 3 feet from an inside corner of an L- shaped structure. CODE REQUIREMENTS Terminate the vent system so that proper minimum clearances are maintained as cited in the latest edition of the National Fuel Gas Code (NFPA # 54) and the latest edition of Chimneys, Fireplaces, Vents, and Solid Fuel Burning Appliances, (NFPA #211), or as follows: • Not be less than 7 feet above grade when located adjacent to public walk ways. • At least 3 feet above any forced air inlet located within 10 feet. • At least 4 feet below, 4 feet horizontally from or 1 foot above any door, window or gravity air inlet into any building. • At least 1 foot above grade. • So that the flue gases are not directed so as to jeopardize people, overheat combustible structures or enter buildings, and • Not Tess than 2 feet from an adjacent building. i u k h GL REVIEWED FOR CODE COMPLIANCE APPROVED AUG 2T8a12068Z MIN � 4 41 uM , J6i, CORRECTION LTR# 9 HS3 F,O WER ti VEN TER MO UNTIN I The installer must supply plumber's strap or 1/4" threaded rod with nuts and washers for mounting. The Venter may be mounted in any position as long as the shaft of the motor remains horizontal. The Venter housing is single wall, 6 inches must be maintained from all combustible materials. It is recommended that the Venter be mounted as close as possible to the point of termination. PLUMBERS STRAP OR THREADED ROD I f HORZONTAL INSTALLATION The Pre -Cycle Prover Status Check is activated from the factory. When activated the UC1 Universal Control checks across P1 & P2'safety circuit-(Venter FaA tgv� �1 � `rr • Prover switch is "Open" upon a call for heat and not stuck "Cloed".'; VERTICAL INSTALLATION VI TJERNLUND VENT HOOD MOST BE MOUN ONE FOOT M NIML,M ABOVE 000R$ AND WINDOW; 6 FILE COPY f e!>v ftNo., • Q I TJERNI_L.ND VENT HOOD -- 'OUS BE MOVITED FOUR -EET M■Nt.MUM AWAY F ROM DOOFS AND WINDOWS ti RECEIVED DL R; M: UNC V E N T O HOOD M MIN �VJ t�' UG 1 A AAM BE :)U•d -ED rOL�E SEE MIr; 8 3 L /�VNW�{ NE. OW WINDOWS. HS4, HS5 PLUMBERS STRAP OR THREADED ROD PERMIT CENTEF HORZONTAL INSTALLATION VERTICAL INSTALLATION CIRCUIT FRAMES & AMPS WIRE SIZE LOAD a b c LOCATION 1a 1P -20 #12 LIGHTS, RECEPTACLES ' ELEV.PIT, ELEC.CLOSET 3b 1P -20 #12 RECEPTACLE, - SYSTEMS FURNITURE )y 5c 1P-20 #12 (5) BADGE READERS 7a 1P-20 #12 LIGHTS, ELEV. LOBBIES,FRT FOYER OE Y GND -5TH FLR 9b 1P -20 #12 LIGHTS, WOMEN'S REST ROOM ROOM. . 'OM 1ST -5TH FLR 11c 1P -20 #12 LIGHTS, MEN'S REST ROOM MI . CM 1ST -5TH FLR 13a 1P -20 #12 (1) FLUORESCENT LIGHT ' • ;<: ELEC. CLOSET 15b 1P-20 #12 CMCS MBC -07 agffa HEAAT & VENT CRIB 17c 1P-20 - SPARE 1 .., , 19a 1P -20 SPARE -z" 21b 1P -20 - SPARE Mt 23c 1P -20 - SPARE 2a 1P-20 #12 AIR DRYER VALVE/STORAGE RM 4b 1P -20 #12 . (7) DUPLEX RECEPTACLES '"i x , 'WiJefi - ECiC QSE Si(ALLg ll 6c 1P -20 #12 DUPLEX RECEPTACLES- ELEC. & MECH. RMS tj 1ST -5TH FLR, MECH.RMS 8a 1P -20 - SPARE , i 10b 1P-20 - SPARE 12c 1P -20 #12 DUPLEX RECEPTACLES- ELECTRICAL ROOM= 1 PARKING LEVEL 14a 3P -20 #12 AIR COMPRESSOR SPRINKLER SYSTEM T" VALVE ROOM PARKING LEVEL 16b #12 ME K 18c #12 we avic 20a - - SPACE f % aza 22b - - SPACE )kris, = 24c - - SPACE ELECTRICAL PANEL SCHEDULE BLDG. 11.14 -N DATE 05/17/88 PANEL NXP = EMERGENCY PANEL LOCATION PARKING LEVEL ELECTRICAL CLOSET TYPE IEM w /GE BREAKERS FEEDERS 1 1/4 4 # 4, THHN, CU MAIN BKR. 60 AMP, 3POLE FROM PANEL NXL VIA TRANSFORMER ( NXT) BUS RATIN 125 AMP, 120/208V, 3PH, 4W SHORT CKT. RTG. Isc REF DWG E11.14N -0E62 REVISION B ENGINEER STEWART REVISED CKT. 15 DATE REVISED 6.30.08 JOB NO. 586000 -00 CONNECTED kVA= file: NO NXP.XLS RECEIVEr AUG 13 2008 PERMIT CENTE PANEL NP TYPE I.E.M. WITH G.E. C.B.'S FEEDERS 1 1/4 C, 4 #4 THHN CU MAIN BKR. 60 AMP, 3POLE FROM PANEL NH/ CKT 2,4,6 VIA XFMR NT RATING 125A, 208Y/120V, 3P, 4W SHORT CKT. RTG. Isc REF DWG 11.14 -0E62 REVISION B ENGINEER STEWART CIRCUIT 1a 3b 5c 7a 9b 11c 13a 15b 17c 19a 21b 23c 2a 4b 6c 8a 10b 12c 14a 16b 18c 20a 22b 24c CONNECTED kVA= • DOUBLE -WIRED BREAKER file: NO NP.XLS ELECTRICAL PANEL SCHEDULE BLDG. 11.14N DATE 5/17/1988 LOCATION PARKING LEVEL, VAULT ROOM REVISED CKT. 17 DATE REVISED 6.30.08 JOB NO. 586000 -00 FRAMES & AMPS THQB 1 P -20 THQB 1P-20 THQB 1P -20 THQB 1P-20 THQB 1P-20 THQB 1 P -20 THQB 1P -20 THQB 1 P -20 THQB 1 P -20 SPACE SPACE SPACE THQB 1 P -20 THOB 1P-20 THQB 1P-20 THQB 2P -30 THQB 1P-20 THQB 1P -20 THQB 1P -20 THQB 1P-20 SPACE SPACE SPACE WIRE SIZE #12 2 #12 #12 #12 #10 #10 #10 #12 #12 #12 #12 #12 #10 #10 #12 #12 LOAD BOILER POWER RECEPTACLE & SPRINKLER CONTROLLER LIGHTING LIGHTING HEAT TRACE AIR DRYER (2) 4-PLEX ELECTRICAL ROOM RECEPTACLE, DUPLEX HW HEATER CONTROLS, MAKE UP FANS BLANK SPACE WITH HARDWARE BLANK SPACE WITH HARDWARE BLANK SPACE WITH HARDWARE RECEPTACLES, BREAK ROOM RECEPTACLES,CARPENTER SHOP RECEPTACLES,CARPENTER SHOP HEAT TAPE SPARE RECEPTACLES, BREAK ROOM (3) 2T T8 LIGHTS SPARE BLANK SPACE WITH HARDWARE BLANK SPACE WITH HARDWARE BLANK SPACE WITH HARDWARE a roxi i rv ^ x VSENt b cam r EFfa fi^ ti c Ez 017.0 WRIM MLA RIVES LOCATION VALVE ROOM STOAGE, CORE LOBBY FREIGHT FOYER VALVE ROOM VALVE ROOM HHSO LEFT OF PANEL PLUMBERS CRIB PARKING LEVEL PARKING LEVEL PARKING LEVEL VALVE STORAGE ROOM PARKING LEVEL GG50 ECE V EH-' AUG 13 2008 PERMIT CENTEI BOEING JOB 586000 -00 11 -14 REPLACE HOT WATER BOILER MECHANICAL EQUIPMENT CUT SHEETS FOR TUKWILA PERMIT V%LS C mkt 4 O . - 4 •t 1'4: =' RECEIVED CITY OF TUKWILA JUL 1.7 2008 PERMIT CENTER ommercial Electric Water Heaters Dura'nwver® Dura- Power® commercial electric water heaters are designed to boost the water temperatures for applications such as commercial dishwashers, which require very high temperature sanitizing rinse — typically 180 °F. Both 5- gallon countermount "CMC" models and 20- gallon "SU" models are available with inputs up to 54 kW. All models are also _ available with an optional stainless steel tank for use with deionized water. INCOLOY SHEATH HEATING ELEMENTS STANDARD • Industrial -grade Incoloy sheathed heating elements are designed for rugged long- lasting commercial service and can withstand sheath temperatures up to 1500 °F • Each heating element has three separate heating loops, which provides more heating surface, lower watt density and maximum recovery efficiency • Pre -wired leads provide excellent protection against oxidation and scaling • Input options from 6 kW to 54 kW, recoveries from 25 to 221 gallons per hour (gph) at 100 °F rise • Deionized models equipped with stainless steel standard elements A. O. SMITH GOLDENROD ELEMENTS OPTIONAL • Patent - pending 24k gold - plated sheath plus medium watt- density ensures -A even longer element life • 600% higher resistance to scale build -up, compared to Incoloy elements •Three -year warranty against failure due to lime scale build -up • Not available on deionized models STANDARD VOLTAGES FOR EASY INSTALLATION • Single -phase and three -phase • Single -phase 208V and 240 V are field - convertible to three -phase • CMC models only, 208 V and 240 V at 24 kW and below are supplied as phase - convertible units (single- to three -phase and vice versa) • 277 V single -phase also available - Contact A. O. Smith for 120 V circuit availability IMMERSION THERMOSTAT FOR EFFICIENT CONTROL • Close- differential, immersion -type thermostat for superbly accurate temperature control • Adjustable from 140 °F to 185 °F • Manual reset, high- temperature cutoff HEAVY MAGNETIC CONTACTORS • UL - rated 100,000 cycles FACTORY - WIRED, 120 V CIRCUIT CONTROLS • 120 V control circuit powered by fused transformer • Eliminates need for 120 V service connection 180 °F BOOSTER MODELS POWER- CIRCUIT FUSING FOR SYSTEM PROTECTION • Safeguards elements and contactors from short circuits, overloading and line surges • Required by National Electric Code and UL when current draw exceeds 120 A November 2006R 1 CMC /SU -6 through CMC /SU -54 1 Certified to NSF /ANSI 61 A ©OOSmith Page 1 of 4 ACESS00706 ura!uwver® GLASS -LINED TANK, ASME TANK CONSTRUCTION 180 °F BOOSTER MODELS ALL STAINLESS STEEL JACKET • Cleans easily, corrosion resistant, hinged for easy serviceability • Standard on CMC models, optional on SU models • Specifically developed for high- temperature water heater use • Provides long- lasting protection against corrosion • Equipped with anode rod for additional corrosion protection • Stainless steel tank on deionized models MAXIMUM HYDROSTATIC WORKING PRESSURE: 150 PSI FACTORY - INSTALLED TEMPERATURE & PRESSURE RELIEF VALVE 4 MEETS ASHRAE /IESNA 90.1 -1999 THREE -YEAR LIMITED TANK WARRANTY • For complete information, consult written warranty or contact A. O. Smith OTHER DURA -POWER CMC AND SU SERIES STANDARD FEATURES: • SIMPLIFIED, COLOR -CODED CIRCUITRY FOR EASE OF SERVICE • ASME T &P RELIEF VALVE • PRESSURE REDUCING VALVE WITH BYPASS CHECK AND STRAINER • TEMPERATURE /PRESSURE GAUGES OTHER DURA - POWER CMC AND SU SERIES OPTIONS: D SILICON BRONZE TANK O STAINLESS STEEL TANK • For deionized water D LOW - WATER CUTOFF c< • Probe -type electric low -water cutoff • Prevents energizing of elements when low -water condition exists (automatic reset) O UNDERCOUNTER MOUNTING PAN FOR CMC MODELS O DUAL INDICATING /PILOT LIGHTS AND SWITCH • Lights indicate when elements are on, switch gives positive on -off control of control circuit ° SHOCK ABSORBER REDUCES WATER HAMMER - 3 Page 2 of 4 ACESS00706 INPUT AVAILABLE MODEL' NUMBER OF IMMERSION HEATERS IMMERSION HEATER WATTAGE FULL LOAD CURRENT IN AMPERES CMC SERIES SU SERIES SINGLE PHASE THREE PHASE 208V 240V 277V 480V 208V 240V 480V 6 CMC -6 SU -6 1 6,000 28.8 25 21.7 12.5 16.7 14.4 7.2 9 CMC -9 SU -9 1 9,000 43.3 37.5 32.5 18.8 25 21.7 10.8 12 CMC -12 SU -12 1 12,000 57.7 50 43.3 25 33.3 28.9 14.4 15 CMC -15 SU -15 1 15,000 72.1 62.5 54.2 31.3 41.6 36.1 18 18 CMC -18 SU -18 1* 18,000 86.5 75 65 37.5 50 43.3 21.7 20 CMC -20 SU -20 2 10,000 96.2 83.3 72.2 41.7 55.5 48.1 24.1 24 CMC -24 SU -24 2 12,000 115.4 100 86.6 C 66.6 57.7 28.9 30 CMC -30 SU -30 2 15,000 144.2 125 108.3 62.5 83.3 72.2 . 36.1 36 CMC -36 SU -36 2* 18,000 173.1 150 130 75 99.9 86.6 43.3 45 CMC -54 SU -45 3 15,000 216.3 187.5 162.5 93.8 124.9 108.3 54.1 54 CMC -54 SU -54 3 18,000 N/A 225 194.9 112.5 149.9 129.9 65 MODEL NUMBER STANDARD KW INPUT GPH R LPH RECOVERY - GALLONS OR LITRES PER HOUR AT * DEGREE RISE 40 °F 22 °C 100 °F 56 °C 140 °F 78 °C CMC -6 SU -6 6 GPH 62 25 18 LPH 234.7 94.6 68.1 CMC -6 SU -6 9 GPH 92 37 26 LPH 348.2 140 98.4 CMC -6 SU -6 12 GPH 123 49 35 LPH 465.6 185.5 132.5 CMC -6 SU -6 15 GPH 154 61 44 LPH 582.9 230.9 166.5 CMC -6 SU -6 18 GPH 184 74 53 LPH 696.4 280.1 200.6 CMC -6 SU -6 20 GPH 205 82 58 LPH 775.9 310.4 219.5 CMC -6 SU -6 24 GPH 246 98 70 LPH 931.1 370.9 265 CMC -6 SU -6 30 GPH 307 123 88 LPH 1162 465.6 333.1 CMC -6 SU -6 36 GPH 369 148 105 LPH 1396.7 560.2 397.4 CMC -6 SU -6 45 GPH 461 184 132 LPH 1744.9 696.4 499.6 CMC -6 SU -6 GPH 554 221 158 LPH 2096.9 836.5 598 MODEL NUMBER GALLONS OR LITRES CAPACITY DIMENSIONS IN INCHES SHIPPING WEIGHT HEIGHT A WIDTH B DEPTH C INLET/ OUTLET STANDARD CMC -6 through CMC -18 U.S. Gallons 5 13.75 13 23.5 3/4 80 Lbs. Litres 34.9 33 55.2 1.91 36.4 Kq CMC -20 through CMC -54 U.S. Gallons 5 12 18 23.5 3/4 96 Lbs. Litres 30.5 45.7 57.2 1.91 43.6 Kg SU -6 through SU -54 U.S. Gallons 20 25 22.25 23 3/4 200 Lbs. Litres 63.5 56.5 58.4 1.91 90.9 Kg Commercia� ectric Water Heaters INPUT CAPACITY AND RECOVERY For deionized wate models with stainless steel tanks, add "D" to model number. Examples CMCQ -6, SUQ -6. NSF recovery ratings = above ratings x .98. DIMENSIONS AND WEIGHT WATTAGE AND VOLTAGE *208V models use on additional Immersion hea er " Each imme sion heater contains three electric elements '9UIt OELS 0 0 tam um us 5 , 4tr _. c Lai cc ca�Pu- u.V^non 11 1_i 2• :K. 51 ntL LI bra a `� id i)i l 4 ,E 1 A rvtCHCP 4 ViP:3KM \ 1 1 1-`'t Ew Q-3 Page 3 of 4 ACESS00706 ADO Smith 02008 A. 0. Smith Corporation www.h otwater. corn 500 Tennessee Waltz Parkway, Ashland City, TN 37015 Printed in U.S.A. 180 °F BOOSTER MODELS SUGGESTED SPECIFIC 1N The water heater(s) shall be A. 0. Smith Dura -Power Model( CM /SU 7—LA rated at 2_4 KWM 74 volts, 3 - phase, 50/60 cycle AC, and constructed in accor ance with ASME Code and shall bear appropriate symbol and be listed with the National Board as required. Heater shall be listed with Underwriters Laboratories an by National Sanitation Foundation. Glass -lined tank(s) shall be. gallon capacity with 150 psi maximum working pressure /ASME Code. Tank shall be cathodically protected with adequate extruded magnesium rod. All internal surfaces of the heater(s) exposed to water shall be glass -lined with an alkaline borosilicate composition fused to steel. For deionized, substitute: Stainless tank(s) shall be _ gallon capacity with 150 psi working pressure /ASME Code. Elements shall be commercial - grade, medium watt density, triple -loop construction Incoloy sheathed or Goldenrod elements . EoLdelonized substitute:.E�entsstraii %,uttnttet.,ial= grade, type — _,316- 6-stain less- steelsbaat ed-Elements shall be switched through magnetic contactor(s). Fused 120 V control circuit shall include manual reset, high- temperature cut -off switch and immersion -style operating thermostat(s). Low -water cut -off (optional) to prevent element burnout due to possible low -water conditions, Straight -line rectangular cabinet shall be baked enamel with stainless steel front panel (SU models only). All stainless steel jacket (CMC models only) shall provide full -size access to control and elements for ease in servicing and shall enclose tank with fiber -class insulation. Heater tank shall have a three (3) year limited warranty as outlined in the written warranty. For Technical Information and Automated Fax Service, call 800- 527 -1953. A 0 Smith reserves the right to make product changes or Improvements without prior notice. AOSC-108143-7M Page 4 of 4 ACESS00706 ONSERVATION!ST® COMMERCIAL BOILERS HW -300 THRU HW -670 Domestic Hot Water Supply Boiler Ca Jo $1 A-A mj - j : I Enem9y Awing P,ockc 82% THERMAL EFFICIENCY" 6 k- 14 LB Meets or exceeds the requirements of ASHRAE 90.1b -1992 New York and California Energy Codes. FEATURES ALL NON - FERROUS WATERWAYS — All castings are made of Bronze or Brass. All water tubes are made from copper. Brazed joints or flare union construction make the heater immune to the effects of thermal shock and thermal cycling. A great boiler for domestic hot water supply systems. EFFICIENT COPPER COIL COMBUSTION CHAMBER — The combustion chamber is a heat exchanger formed from a two passage coil of tightly wound continuous copper tube. Water circulating through this coil surrounds the main burner and captures the radiant heat. A wrap of insulation on the outside of the coil retains the heat captured by the circulating water. COPPER HEAT EXCHANGER — Directly above the coil and the main burner is a compact, horizontal, copper fin tube heat exchanger. The flue gases must pass through this efficient heat exchanger before leaving the boiler. This unique Burkay coil and heat exchanger design provide maximum heat transfer and proven field durability. BURKAY BURNER MAXIMIZES EFFICIENCY — The patented Burkay burner uses primary air injection at up to 72 individual orifices plus secondary entrainment of air. Approved for installation on combustible floors as shipped from factory. GAS VALVES — Slow opening redundant gas valves ensure smooth light -off without flame roll -out or pilot outage. THERMAL BALANCER — Patented pump delay system that allows boiler and pump to run simultaneously but delays pump shut off at end of heating cycle to remove usable heat from the heat exchanger and reduce the scale forming tendencies of motionless hot water. AUTOMATIC SAFETY CONTROLS AND ELECTRONIC IGNITION — Proven pilot ignition system provides flame failure response in under one (1) second. Redundant high limit controls and gas valves assure safe shutoff in the event of overheating or flame failure. Requires 120V 60Hz, maximum inlet gas pressure of 14" WC and activation of heater by external temperature control. OPTIONAL POWERED VENT HOOD — for sidewall venting.' WORKING PRESSURE — ASME approved, hydrostatically teste and certified for 160 psi. *Except model HW -399 is 81 %. Revised January 1999 HW - INDOOR INSTALLATION ONLY Not approved for instantaneous applications. For applications see A 024.0. USA F CANADA HW MODELS CERTIFICATION & APPROVAL LIMITED WARRANTY OUTLINE If the heat exchanger modules should fail within 5 years, under the terms of the warranty; A. O. Smith will furnish a replacement part; installation, labor, handling and local delivery extra. THIS OUTLINE IS NOT A WARRANTY. For complete information, consult the written warranty or A. O. Smith Water Products Company. A 011.0 NOTE: TOP MANIFOLD HAS EXTRA OPENINGS FOR AND RELIEF VALVE (1 ") (HW -520 AND -670 —' THERMOMETER ONLY) F (3/4') 4 �� D = V - - O A (L) EMI OUTLET , NPT 1 0 i GAS INLET A — �-41111111;1 P� + C —► F — �; P (FEMALE) NPT INLET H NPT q B A ---H FM' G - V 4 i I 1 " E lb_ HW-670 ONLY HW- INDOOR MODELS HW -300 ONLY ALL DIMENSIONS IN INCHES Models A B C D E F G H J K L M N P 0 R S V Approx. Ship. Wt. Lbs. HW -300 65 431 /4 251/4 295/8 161 /2 8 12 36 9 11/4 11/4 3/4 265/8 14 1 101 /8 53/8 5 240 HW-399 571 /8 451 /8 27 31 1/2 16 3/4 10 12 38 3/4 9 1 1/2 1 1/2 1 271 /2 14 1 11 1/4 51 /2 5 291 HW-420 571 /8 451 /8 27 31 1/2 16 3/4 10 12 38 3/4 9 1 1 /2 1 1/2 1 271 /2 14 1 11 1/4 5 1/2 5 291 HW-520 68 5116 56174 27 361 /2 18 10 '12 - 46 1 /2 9 2 2 1 1/4 241 /2 11 3 1/2 12 5 3/4 7 361 HW-670 67 561 /4 27 38 1/4 17 3/4 12 12 461 /2 9 2 2 1 1/4 26 3/4 131 /4 31 /2 12 5 3/4 7 361 7 Model Input Rating AGA BTUH Natural and Propane Gas Temperature Rise - Degrees F 20 30 40 50 60 70 80 90 100 110 120 130 140 HW -300 300,000 GPH 1,484 989 742 594 495 424 371 330 297 270 247 228 212 HW -399 399,000 GPH 1,938 1,292 969 775 646 554 484 431 388 352 323 298 277 HW -420 420,000 GPH 2,067 1,378 1,034 827 689 591 517 459 413 376 345 318 295 R J4 3zu bzu uuu urri 4 T8 1, TT T 1,288 1,030 858 136 644 572 515 468 429 396 368 HW - 670 Nat. 660,000 GPH 3,264 2,176 1,632 1,306 1,088 933 816 725 653 593 544 502 466 - � - - .. 1 _ . , - • i ,iii : , • , , • : • • . , . , t r. - :: • . - . : - c • • SUGGESTED SPECIFFJ T Boiler(s) for hot water supply purposes shall be Model(s) No: w( V as manufactured by A. O. Smith or an approved equal. Boiler khall be gas- fired, and design certifie by an ANSI ppro a /a redited independent ra ab ratory, capable of supplying O N gph at 100 °F temperature rise equipped to burn Mill UKA'as, with input rating of ' TU /hr. and bearing the ASME code symbol. Boiler(s) shall be up flow type having all non - ferrous waterways, and employing a copper finned heat exchanger and a tightly wound copper coil combustion chamber with 160 psi working pressure rating. Boiler(s) shall be equipped with an electric gas valve of the step- opening type, an adjustable limit control which will break the electric circuit on temperature rise, intermittent ignition with one (1) second shutdown in the event of pilot flame failure, a gas pressure regulator properly set for the gas to be supplied, and a coil limit switch for shut off in event of excessive water temperature, a certified draft diverter and a fully illustrated instruction manual. Certified for combustible flooring. Outer jacket shall be of baked enamel finish. The coil, heat exchanger and burner shall have a five year limited warranty as outlined in the written warranty. A.O. Smith Water Products Co., Inc. On Line www.hotwater.com For Technical Information and Automated Fax Service, Phone: 800 -527 -1953 A. O. Smith Water Products Company Irving, TX A Division of A. 0. Smith Corporation A. 0. Smith Corporation reserves the right to make product changes or improvements at any time without notice. A 011.1 © A. 0. Smith Corp., 1999 Printed in U.S.A. FEATURES Exceeds ASHRAE 90.1b-1992. /' Ft j i 6 A. O. Smith storage tanks are ideal for use with gas -fired copper heat exchanger equipment for storage of any potable water at temperatures up to 180 °F. GLASS -LINED TANK - Alkaline borosilicate composition permanently fused to steel by firing at a temperature of 1600 °F, providing years of corrosion protection and dependable use. HEAVY GAUGE STEEL JACKET - With baked enamel finish. THREADED OPENINGS - All tanks furnished with threaded openings for thermometer, relief valve, 2" recirculation lines, tankstat, and drain valve. 5 YEAR WARRANTY TJ -80S, TJ -80A, TJV -120M and TJV -120A • Fits through 30" door • Magnesium anode • for anti- corrosion protection TJ -80A • 80 gallons • exceeds ASHRAE requirements • saves fuel, helps reduce standby heat loss • 160 psi ASME standard working pressure. TJV -120A • 119 gallons • exceeds ASHRAE requirements • saves fuel, helps reduce standby heat loss • 160 psi ASME standard working pressure. TJ -80S • 80 gallons • exceeds ASHRAE requirements • 150 psi working pressure. TJV -120M • 119 gallons • exceeds ASHRAE requirements • 150 psi working pressure. OPTIONS Perfectly balanced manifold kits (120 gallon models) allow installation where 240 to 480 gallons of stored water is required. TJV -200 -M - 175 GALLONS • 150 psi ASME working pressure • 2" foam insulation • Handhole cleanout (Standard) • Fits through 33" door • Storage is downsized to 175 gallons for a 32" x 77" envelope for space restrictive installations. Model TJV -200 is available with 200 gallons of storage • Magnesium anodes for extra corrosion protection. Revised February 2000 COMMERCIAL HOT WATER STORAGE TANKS TJ -80S, TJ -80A, TJV -120A, TJV -120M & TJV -200M 120 GALLON MODEL LIMITED WARRANTY OUTLINE If the tank should leak any time during the first 5 years, under the terms of the warranty, A. O. Smith will repair or replace the tank; installation, labor, handling and local delivery extra. THIS OUTLINE IS NOT A WARRANTY. For complete information, consult the written warranty or A. O. Smith Water Products Company. A 402.3 50 1/4" 3/4" (REAR) TJV -120M (SHIPPING WT. 320 LBS.) TJ -80A II 3/4" (REAR) 3/4" 2" FPT (FRONT & REAR) 2" NPT (FRONT & REAR) 119 GALLONS 2" NPT 1" NPT (IN TOP HEAD) (TJV -120A) 2" (FRONT & REAR) 54" 631 441/2" 11 112" ASME PLATE ON TJV -120A 3 f6 T &P OPENING TJV- 120M/TJV -120A Insulated Jacket 1 -1/4" NPT PLUG ANODE (2) TANK MANIFOLD KIT #170354 120 GALLON MODELS TJV -120A (SHIPPING WT. 400 LBS.) FLOOR SPACE REQUIREMENTS 2" NPT (FRONT & REAR) ASME 119 GALLONS 314" NPT PLUG ANODE (4) TANK MANIFOLD KIT #170356 120 GALLON MODELS 56 314" 77" 2" NPT (IN T • P HEAD) CLEANOUT DRAIN & - 3 5' AQUASTAT /15 " \7.&P CIRCULATING OPENING FITTINGS TJV -200M TJ -80S 1 62 1/4" 314" NPT PLUG ANODE 2" FRONT TJV -200M (SHIPPING WT. 560 LBS.) (3) TANK MANIFOLD KIT #170355 120 GALLON MODELS 2" NPT (FRONT) ASME 176 GALLONS 3 5/8" 2" FRONT • l l ANODE 231/4' H I � DATA PLATE UNDER COVER $ 16" HAND HOLE CLEANOUT 44 1/2" Insulated Jacket SUGGESTED SPECIFICATIONS Storage tank shall be A. 0. SMITH glass -lined storage tank. Tank shall be(; ") " x t CC " and have a nominal capacity ail 2 g allons. Tank(s) shall have threaded openings as shown on drawings. Interior of tank(s) shall be glass -lined with an alkaline borosilicate composition which has been fused to the steel by firing at a temperature of 1600 °F. Glass coating shall be continuous over the entire inner surface of the tank. Outer jacket shall have a baked enamel finish. Foam insulation to meet or exceed ASHRAE 90.1 b -1992 efficiency requirements. Cathodic protection shall be provided. Tank shall have a working pressure of psi. Tank shall have a five year limited warranty as outlined in the written warranty. A.O. Smith Water Products Co., Inc. On Line www.hotwater.com For Technical Information and Automated Fax Service, Phone: 800 -527 -1953 A. 0. Smith Water Products Company Irving, TX A Division of A. 0. Smith Corporation A. 0. Smith Corporation reserves the right to make product changes or improvements at any time without notice. A 402.4 © A. O. Smith Corp., 2000 Printed in U.S.A HS4 MOTOR SPECIFICATIONS ELECTRICAL DATA VOLrs HER E.' PPM 111= AMP:. EHf RM MECHANICAL DATA [;E _;CRIPTION' '.P1 IT PHASE CAP ';TAPT(ES (1PT'1 F; 'NT. FAN COOLED NO ("A ;ING• `)141411[0 (IN' , 1.0:T/48 FR NOM, I.CN01H (IN) 3.58 014,117E0 (IN) .500 f Ii M. E ENGTH (IN) 1.!)2. 0 APING' : 'YE'E `11 EEVE' MAFLRIAI. UADB172)1 STEEL UC1 UNIVERSAL CONTROL Maximum Power Consumption 1/2 Amp @ 120 VAC 50/60 Hz + Venter motor load Pre - Purge: Options (0,15,30,60 seconds) Post- Purge: Factory set at 2 minutes Options (0,30 seconds; 1,2,4,8,16 minutes) Dimensions: 5" x 8' (2' electrical whip inc.) FAN PROVING SWITCH 5 VDC UC1 board supplied power switched through Fan Prover. UC1 bumer / gas valve interlock rated for 1 H.P. @ 120 VAC. [ . .'i Ei'U - 1 - 1 115 6 1, 8 1 T. F5 C.i 2.2 - 2.0 { 1.8 1.6 1.4 1.2 1.0 0.8 0.6 0.2 0. HS4 POWER VENTER SPECIFICATIONS 13" TJERNLUND PRODUCTS, INC. 1601 Ninth Street • White Bear Lake, MN 55110 -6794 PHONE (800) 255 -4208 • (651) 426 -2993 • FAX (651) 426 -9547 Visit our web site • www.tjernlund.com HS4 FAN CURVE WITH DAMPER OPEN .-1 1 '( I I 00 0' 0.4 06 0 13" SIDE VIEW CFM O 77 010 1- , (THOdSANDS) �-\ / a I : 1 1 � I 1 ms's I H - - DAMPLR ADJUSTMENT ROD 14 3/4" MODEL NUMBERS 1 1 L' VAC 1/.3 HP 5.8 AMP HS4 DESCRIPTION OF APPLICATION Used as a means of Side Wall Venting commercial gas appli- ances. Used also to co-vent multiple heaters within combined BTU/hr. input listed below (requires accessory controls). Includes a Fan Proving Switch and the UC1 Universal Control for 24V, 115V or "dry contact' actuation. LED diagnostics and Pre / Post -purge options are standard with the UC1. HS (Discontinued 7/02) Replace with model HS4. Note: Tjemlund Products, Inc. reserves the right to make changes to specifications without notification. VENT P1PE DIA. 8" 10" 12" 8) U /HR INPUT 700,000 800.000 900.000 1,000.000 1.100, 000 1,200,000 700 ,000 .801.000 801),000 1.000,000 1,100,000 1,1'00,000 00,000 800,000 900,000 1,000,000 1,100,000 1,200.000 MAXIMUM PIPE LENGTH (Fr) Af srACI' TEMP 100% 011 UTION, 300'r 2t 6ILUTION, 400•F END VIEW GAS FIRE D ATMOSPHF RIC WIII DRAFT HOOD OR DRAFT DIVERTER 100' 100' 100' /0' 31' 100' 100' 100' 100' 0 /' 14' 100' inn' 100' 100' 100' 34' GAS FIRED POWER BURNER WI1H BAPOIv0f_1 RIC DRAFT CONTROL 100' 10(1' 100 100' 100' 100' 00' 00' 00' 00' 00' 00' 00' 00' 00' 00' 00' 01' HS- Series Power Venter with (1) 24 or 115 VAC Gas Heater - System Overview Components Needed: 1 - HS- Series Power Venter (Includes UC1 Control) 1 - VH1-Series Vent Hood 1 - Barometric Draft Control (necessary if draft hood or diverter is not on gas heater) UC1 - Universal Control The UC1 comes standard with the HS- Series Power Venters. Provides for automatic Power Venter operation and safety interlock for a single heater. Includes Pre & Post -Purge timing options and LED function and troubleshooting lights. Interlocks with any 24 or 115 VAC heater. Tjemlund Products, Inc. • 1601 Ninth Street • White Bear Lake, MN 55110 • (800) 255 -4208 • FAX (651) 426 -9547 • www.tjemlund.com INTERNAL CONTROLS OF FURNACE /BOILER I B2 .4 Aquastat —► B1 I I COM ■ T -stat —b. HOT I I — I 1 1 I L 4- 24V OR 115V GAS VALVE SUPPLY 115 VAC 50/60 Hz L GROUND IMPORTANT: CRIMP GROUND WIRE TO GROUNDING SPADE TERMINAL IN ELECTRICAL BOX. r!1 HS3, 4, 5 WITH INCLUDED UC1 CONTROL CONNECTED WITH A 24 OR 115 VAC STANDING PILOT h-n r z aII) \ IMPORTANT: RED JUMPER POSITION MUST BE THE SAME \ AS APPLIANCE INTERLOCK VOLTAGE. < < /— CALL / JUMPER LEGEND: 115 VAC 24 OR 115 VAC — — — DM 9183048-1 1. Remove the wire on TH or HOT of gas valve and connect it on #1 on UC1 terminal block. 2. Connect #2 on UC1 terminal block to TR or Common. 3. Connect #4 on UC1 terminal block to TH or HOT on gas valve. 4. Make sure RED voltage jumper on UC1 is on 24V or 115V depending on control voltage. 5. Connect 115 VAC supply voltage to L & N terminals on UC1. Crimp Ground wire to grounding spade terminal in UC1. Important: Installer must supply overload and disconnect protection. 6. If not completed, connect ground from UC1 whip to Venter ground in Fan Prover j -box. Connect Black & White leads from UC1 whip to Venter motor leads. Connect Blue and Yellow leads from UC1 whip to Fan Prover switch. Prover Leads are not polarity sensitive. NOTE: If burner control goes out on lockout, the Venter will continue to run as long as a call for heat is present. IMPORTANT: Refer to I/O manual for complete installation and safety interlock procedures. All draft, system operational checks and safety interlock procedures in the the I/O manual must be performed to verify proper operation. Tjemlund Products, Inc. • 1601 Ninth Street • White Bear Lake, MN 55110 • (800) 255 -4208 • FAX (651) 426 -9547 • www.tjemlund.com MARK CLEMENT PO BOX 3707 MS 1 W -09 SEATTLE WA 98124 Dear Permit Holder: City of Tukwila Department of Community Development RE: Permit No. M08 -186 11201 TUKWILA INTERNATIONAL BL TUKW Jim Haggerton, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 09/21/2009. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 09/21/2009, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. er M all P t Technician File: Permit File No. M08 -186 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 .I. March 3, 2009 Mark Clement The Boeing Company PO Box 3707 MS 1 W -09 Seattle, WA 98124 RE: Request for Permit Extension Mechanical Permit No. M08 -186 Boeing #11 -14 —11201 Tukwila International Bl Dear Mr. Clement, city of Tukwila Department of Community Development Jack Pace, Director This letter is in response to your written request for an extension to Permit Number M08 -186. The Building Official has reviewed your letter and considered your request to extend the above referenced permit. The City of Tukwila Building will be extending your permit an additional 180 days from the date of expiration, through August 29, 2009. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, File: M08 -186 CI" Marshall t Technician P:\Permit Center\Extension Letters \Permits\2008\M08 -186 Permit Extension.doc jem Jim Haggerton, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206- 431 -3665 p rawAsfar RE: M08 -186 Building Official Dept. of Community Development City of Tukwila Please extend Permit number M08 -186. The permit will expire 3/01/09. Boeing has one last item to install on the copper installation work. We are waiting on materials with an ecd date of mid march 2009. Please extend the Permit 90 days, for project completion and inspections final. Thank You, Mark Clem - t Permit Administrator Shared Services Group Boeing Company Cellular 206 617 -2944 a K . cio 2/23/2009 CCTV OF ILA FEB 2 4 2009 PERMIT CENTER !16 dir .,/ D? D o j Cp bqoilos c¢ D q28Id1 02 -02 -2009 MARK CLEMENT PO BOX 3707 MS 1 W -09 SEATTLE WA 98124 City of Tukwila Department of Community Development Jack Pace, Director RE: Permit No. M08 -186 11201 TUKWILA INTERNATIONAL BL TUKW Dear Permit Holder: Jim Haggerton, Mayor In reviewing our current records the above noted permit has not received a fmal inspection by the City of Tukwila Building Division. Per the International Building Code and/or the International Mechanical Code, every permit issued by the Building Division under the provisions of this code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the Building Code does allow the Building Official to approve one or more extensions of time for additional periods not exceeding 90 days each. Extension requests must be in writing and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 03/01/2009 , your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, 1>j—Q RCIAX Bill Rambo Permit Technician xc: Permit File No. M08 -186 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 1 July 31, 2008 Mark Clement PO Box 3707 MS 1W-09 Seattle, WA 98124 Dear Mr. Clement: Permit Coordinator Encl xc: File No. M08 -186 • RE: CORRECTION LETTER #1 Mechanical Application Number M08 -186 Boeing #11 -14 —11201 Tukwila International BI • Department of Community Development Jack Pace, Director This letter is to inform you of corrections that must be addressed before your plumbing permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire Department has no comments. Building Department: Dave Larson at 206 431 -3678 if you have questions regarding the attached comments. If you have any questions, please contact me at (206) 431 - 3670. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that two (2) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. P:\Permit Center \Correction Letters\2008\M08 -186 Correction Ltr #1.DOC wer Jim Haggerton, Mayor 6300 Southcenter Boulevard, Suite #100 0 Tukwila, Washington 98188 0 Phone: 206 - 431 -3670 0 Fax: 206 - 431 -3665 • Building Division Review Memo Date: July 28, 2008 Project Name: Boeing 11 -14 Permit #: M08 -186 Plan Review: Dave Larson, Senior Plans Examiner • Tukwila Building Division Dave Larson, Senior Plan Examiner 1 The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and /or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. On sheet M333 there is a note #8 that directs contractor to block off combustion air openings in the existing mechanical room door. This room appears to be constructed as a fire rated enclosure and this measure would not bring this door into compliance with the required fire rating for this door. The door would need to be replaced. Please change all references accordingly or provide code justification for leaving as proposed. 2. Please provide manufacturers installation specs for exterior termination of the power vent kit. Confirm clearances to openings, gas meters or regulators, structural barriers or other factors that may be noted in manufacturers specs. 3. Please refer to section 706 of the International Mechanical Code for forced combustion air supply. Per this section, you would need slightly more than twice the amount proposed in the table on sheet M2H. 4. Typically, B -vent is not approved for use on the positive pressure side of a power venter within the building. Please provide manufactures specs. for vent material requirements Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. ACTIVITY NUMBER: M08-186 DATE: 08-13-08 PROJECT NAME: BOEING #11-14 SITE ADDRESS: 11201 TUKWILA INTERNATIONAL BL Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: Vir P)(i. Building g vision Public Works Complete • o PE BAIT COORD COPY PLAN REVIEW/ROUTING SLIP TUES/'THURS 7UTING: Please Route REVIEWER'S INITIALS: Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete Comments: INCOMPLETE LETTER wiAiLE6: LETTER - . OF COMPLETENESS MAILED: Departments determined incomplete: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: Structural Review Required APPROVALS OR CORRECTIONS: Approved Approved with Conditions Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2-28-02 Fire Prevention rV n DATE: DATE: Planning Division Permit Coordinator DUE DATE: 08-14-08 Not Applicable No further Review Required Lil DUE DATE: 09-11-08 Not Approved (attach comments) n Permit Center,Use Only: .." • ' . . CORRECTION LETTER MAILED: Departments issued corrections: Bldg 0 Fire 0 Ping 0 PW 0 Staff Initials: ACTIVITY NUMBER: M08 -186 DATE: 07 -17 -08 PROJECT NAME: BOEING #11 -14 SITE ADDRESS: 11201 TUKWILA INTERNATIONAL BL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: Building !vision Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: APPROVALS OR CORRECTIONS: Documents/routing slip.doc 2 -28 -02 •khffE COORD COPY II PLAN REVIEW /ROUTING SLIP 015 Vlno 1 -*'°' Fire Prevention Planning Division Structural Incomplete n TUES/THURS ROU NG: Please Route Structural Review Required REVIEWER'S INITIALS: DUE DATE: 07-22-08 Not Applicable ❑ Permit Center Use Only • . INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: No further Review Required DATE: DATE: Permit Coordinator n DUE DATE: 08-19-08 Approved ❑ Approved with Conditions I Not Approved (attach comments) pi Notation: REVIEWER'S INITIALS: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: 1Ti Date: City of Tukwila Department of Conzmiiiiity Development 6300 Southcenter Boulevard. Suite 4100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http../Annv.citukwila.lva.us REVISION SUBMITTAL Revision submittals trust be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Plan Check/Permit Number: M08-186 ❑ Response to Incomplete Letter # _ • Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: BOEING #11-14 Project Address: 11201 Tukwila International BI Contact Person: Mark Clement Summary of Revision: De 51(.01) VPtCA( ,( PLC - o 01 ,IA —' S ' )1 - t✓ Cc� t'"tE TS . I k) Ne - u 15E 1 0 Sk+ T �l33 To 0 ete - L - E PRt 5 Ko 0 o - U.9C6 t c & LouvlT"L_ p4,3 0 bk-ttV Door ‘WS - UA-L. 1 k.t /0 oven• - - 1'TE 2.) C..0, r i e-0 S t+e; e t 5( -t 51-0 L) e T Rlo (( kb tJ o G (c u- V e ms -[ VtI o d i I4 YL 61T E L\ 0 Y' E\ 3) Le (9( s ►- : � M 2.14 Tu �M L 2-(v'S , ti 0 1-vt1/4- W oMk.E' NkeQ o 1 vk E O , L T E N I f) is -co Spe -AF'e LLRSS ? j 12-1 et U e %PVTVA O Q1 \uu lit= SEk�� S S Us C� 02 v- 1EZa -L -Fa' C«n.A- /6v -0 a-c t�sz�LL� -1.$ Sheet Number(s): RECEIVED CITY OFTUKWILA AUG i 3 NOB "Cloud" or highlight all areas of revision including date of revision 'R5v cS EO t-t� � --- � S \a c ) 1`x'3 3 r 1) Received at the City of Tukwila Permit Center by: Entered in Permits Plus on `o -- C S - t/ D \applications. applications on linelrevision submittal Phone Number: e c-ikut S u St P-cLotJ Name Role Effective Date Expiration Date SHRONTZ, F A Cancel Date 01/01/1980 Bond Amount CONDIT, P M 5 01/01/1980 81312466 GIVAN, B E Until Cancelled 01/01/1980 WOODARD, R B 01/14/2002 01/01/1980 FEDERAL INS CO CRUZE, D D 01/01/1998 01/01/1980 KING, C G $6,000.00 01/01/1980 BEIGHLE, D P 01/01/1980 COLLINS, T J 01/01/1980 BUDINICH, T M 01/01/1980 READ, PAUL SECRETARY 01/01/2001 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 5 FEDERAL INS CO 81312466 01/01/2002 Until Cancelled $12,000.00 01/14/2002 4 FEDERAL INS CO 81312466 01/01/1998 01/01/2002 $6,000.00 Untitled Page General /Specialty Contractor A business registered as a construction contractor with Lai to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. M/C 5003 -4027 City State Zip County Business Type Parent Company BOEING COMPANY, THE 3125442535 100 N RIVERSIDE CHICAGO IL 606061596 OUT OF STATE CORPORATION UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License Next License Associated License Specialty 1 Specialty 2 178005030 ACTIVE BOEINC`294ML CONSTRUCTION CONTRACTOR 7/13/1971 1/14/2009 GENERAL UNUSED Business Owner Information • • Bond Information https: / /fortress.wa. gov /lni/bbip/Detail. aspx ?License =B OEINC* 294ML Page 1 of 3 09/02/2008 PRO _ C S BAR DESCRIPTION OF WORK: REPLACE CAFETERIA GAS FIRED HOT WATER ELECTRIC BOOSTER HEATER FOR CAFETERIA DISHWASHER, REVISED HEATER COMBUSTION AIR SUPPLY, PLACE RECIRC PUMP ON OCCUPANCY SCHEDULE, BUILDING CMCS MONITORING. CONTRACTOR: BOEING GENERAL CONSTRUCTION UNIT ESTIMATED COST: $40,000 SITE ADDRESS: 11201 TUKWILA INTERNATIONAL BLVD. OWNER: BOEING COMMERCIAL AIRPLANE SEATTLE DISTRICT P.O. BOX 3707, M / / S: 1W-10 SEATTLE, WA. 98124 -2207 OWNER CONTACT: MARK CLEMENT (206) 617 -2944 HEATER, ADD DEDICATED EXHAUST AND AND ADD I ..vb- CODE COMPLIANCL APPROVED AUG 2 8 2008 KINK COUNTY PARCEL NO 0923049155 City Of TU Ma BUILDING IVI , _RAW \G \DIX IMaU I1 sE DRAWING NO. SHEET NO. DRAWING TITLE REV DATE ARCH IT=CTU RAL • 11- 14N -AO AO COVER SHEET 0 )7/01 /OF • 11- 140 -0A4 0A4 GARAGE LEVEL COMP PLAN 11 -14N, -14S, 14L REF )NLY • M ECHANICAL • 11-14N-1M7 1M7 1ST FLOOR N AND LOBBY COMP PLUMBING PLAN REF ONLY • 11-14L-1M110 1 M 110 1ST FLOOR LOBBY PLUMBING PLAN 0 )7/01/0E O 11- 140 -0M 12 0M12 GARAGE LEVEL HVAC PARTIAL PLAN B J7/01 /OF • 11- 140 -0M 112 0M112 GARAGE LEVEL HVAC PARTIAL PLAN D )7/01/08 )7/01/08 • 11- 140 -0E212 0E212. GARAGE LEVEL HVAC CONTROLS PARTIAL PLAN D • 11- 14 -M2G M2G EQUIPMENT SCHEDULE - HVAC C )7/01/08 )8/08/08 )7/01/08 • 11- 14 -M2H M2H EQUIPMENT SCHEDULE - PLUMBING A.1 • 11- 14 -M332 M332 CAFETERIA HOT WATER CONTROL DIAGRAM 0 • 11- 14 -M333R M333R PLUMBING CRIB PIPING ENLARGED PLAN R 37/01/0E • 11- 14 -M333 M333 PLUMBING CRIB PIPING ENLARGED PLAN 0.1 J8 /08 /0F • 11- 14 -M517 M517 CAFETERIA /DISHWASHER PLUMBING PLANS E )7/01/0E )NLY • 11- 14 -M518 M518 CAFETERIA /DISHWASHER PLUMBING PLANS REF • 11- 14 -M563 M563 BOILER VENT STACK LOCATION - EXTERIOR WALL 0 )8/08/OF )7/01/0E • 11- 14 -E549 E549 SECTIONS AND DETAILS, SCHEDULES 0 ELECTRICAL • 11- 140 -0E62 0E62 208/120 VOLT POWER B )7/01/0E • 11- 140 -0E112 0E112 277/480 VOLT POWER B J7/01/0F • 11- 14 -E550 E550 PILOT RELAY BOX ASSEMBLY 0 )7/01/0E )7/01/OF • 11- 14N -E4 E4 ONE LINE DIAGRAMS D REPLACE HOT WATER BOILER REVISION 5945820 BY LM THOMAS APPROVED CFH OCATO DATE 07,07.08 SYM REVISION Lf1 APPROVED DATE v C TY NAP PROJECT AREA GARAGE LEVEL / CAFETERIA Z 1:1 11 -14L / 11 -140 BUILDING REPLACE HOT WATER BOILER JOB # 586000 -00 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittaI and may include additional plan review fees. COD S vv ARY BUILDING CODE: SEISMIC DESIGN: OCCUPANCY GROUP: CONSTRUCTION TYPE: TOTAL BUILDING AREA: CONSTRUCTION AREA: BUILDING HEIGHT: STORIES: IBC INTERNATIONAL BUILDING CODE 200, AS ADOPTED BY THE CITY OF TUKWILA GROUP = 1 CATEGORY = D LATITUDE = 47,33 LONGITUDE = -122.5 B� OFFICE, kr PARKING TYPE 1 189,064 SQ FT 390 SQ FT 103 FT 5 SPECTRAL ACCELERATION: SHORT PERIOD Ss 1.25g 1SEC. S1= .42g =GA D - SCR P o\ THAT PORTION OF GOVERNMENT LOT 2, SECTION 9, TOWNSHIP 23 NORTH, RANGE 4 EAST W.M., IN KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE NORTH LINE OF SAID GOVERNMENT LOT 2 AND THE WESTERLY MARGIN OF STATE ROAD NO.1; AND RUNNING THENCE ALONG SAID WESTERLY MARGIN OF STATE ROAD NO.1. S 18d57'20 "W. 972.08 FEET MORE OR LESS, TO THE NORTH BANK OF THE DUWAMISH RIVER; THENCE WESTERLY, NORTHWESTERLY, AND NORTHERLY ALONG SAID BANK OF THE DUWAMISH RIVERTO ITS INTERSECTION WITH THE NORTH LINE OF SAID GOVERNMENT LOT 2; THENCE N 89d30'S0 "E ALONG THE NORTH LINE OF SAID GOVERNMENT LOT 2, 845 FEET, MOE OR LESS, TO THE TRUE POINT OF BEGINNING. CORRECTION LTR# RECEIVED AUG 13 2008 PERMIT CENTER MO9 15(0 ISSUED FOR PERMIT JOB 586000 -00 08/0812008 DRAWN LM THOMAS CKED DATE 12.10.07 SUBTITLE TITLE FILE E01 F Permit No. /W Plar review approval is subject to errors and omiss1on3. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and conditi Is acknowledged: By :/Y Data: 1 City of Tukwila BULL BINC DIVJSION COVER SHEET REPLACE HOT WATER BOILER BUILDING 11 -14N ARCHITECTURAL MASTER COL. X -X /X -X DUWAMISH CURRENT REVISION 5945820 SHEET JOB NO. DWG NO. SEPARATE PERMIT REQUIRED FOR ❑ echanical N ectrical umbing IlGas Piping City of Tukwila GILDING DIVISION AO 5945820 SYMBOL 11- 14N -A0 DATE 07.07.08 DUWA(SH_COVER.DWC INITIAL RELEASE REVISION 150550 -00 BY LM THOMAS APPROVED DATE 06.06.08 SYM REVISION GARAGE LEVEL CO PLA\ -LOBBY A\ SCALE: 3/64 " =1'0" AREA OF C❑NSTRUCTI ❑N, GARAGE LEVEL BY v POSITE \ORTH TOW APPROVED DATE -R ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN LM THOMAS CHECKED ENGINEER LM THOMAS CHECKED APPROVED APPROVED DATE 06.06.08 06.06.08 SUBTITLE TITLE ARCHITECTURAL MASTER COL. A- G/1 -12 11- 0140 -0A11 11- 0140 -0Al2 11- 0140 -0A13 11- 0140 -0A16 11- 0140 -0A17 L R REFERENCE ONLY JOB #586000 -00 GARAGE LEVEL COMPOSITE PLAN 11-14N, 11-14S, AND LOBBY DESIGN / INSTALL HVAC SYSTEM BUILDING 11 -0140 GE \ERAL \GTES DUWAMISH, WA FER\CE IRAW\GS GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN CO REVIEWED FOR CODE COMPLIANCE PPROVED AUG 2 8 2008 SHEET CURRENT REVISION JOB NO. DWG NO. City Of Tukwila BUILDING DIVISION KEY -PLAN SCALE: NONE ECEIvED AUG 13 2000 PERMIT CENTEF SYMBOL 0A4 567893 -00 11 \OYES 0140 -0A4 DATE COMP NO. _I 4 o /// 0 / 0A17 / 0A15 OA 0A16 0A21 0A20 0A19 0A18 0A23 0A22 INITIAL RELEASE REVISION 150550 -00 BY LM THOMAS APPROVED DATE 06.06.08 SYM REVISION GARAGE LEVEL CO PLA\ -LOBBY A\ SCALE: 3/64 " =1'0" AREA OF C❑NSTRUCTI ❑N, GARAGE LEVEL BY v POSITE \ORTH TOW APPROVED DATE -R ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN LM THOMAS CHECKED ENGINEER LM THOMAS CHECKED APPROVED APPROVED DATE 06.06.08 06.06.08 SUBTITLE TITLE ARCHITECTURAL MASTER COL. A- G/1 -12 11- 0140 -0A11 11- 0140 -0Al2 11- 0140 -0A13 11- 0140 -0A16 11- 0140 -0A17 L R REFERENCE ONLY JOB #586000 -00 GARAGE LEVEL COMPOSITE PLAN 11-14N, 11-14S, AND LOBBY DESIGN / INSTALL HVAC SYSTEM BUILDING 11 -0140 GE \ERAL \GTES DUWAMISH, WA FER\CE IRAW\GS GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN GARAGE LEVEL ARCHITECTURAL PARTIAL PLAN CO REVIEWED FOR CODE COMPLIANCE PPROVED AUG 2 8 2008 SHEET CURRENT REVISION JOB NO. DWG NO. City Of Tukwila BUILDING DIVISION KEY -PLAN SCALE: NONE ECEIvED AUG 13 2000 PERMIT CENTEF SYMBOL 0A4 567893 -00 11 \OYES 0140 -0A4 DATE COMP NO. _I 4 o SYM 1/2 DOMESTIC COLD WATER 3/8 DOMESTIC HOT WATER REM 1/2 DOMESTIC HOT WATER IN yw% KO! : E ,� AM .27 ��- OBI -1. T• � T ��' 1 . AREA OF C❑NSTRUCTI❑ IRST FLR EVEL PIPINI DOWN TO GARAGE LEVEL SEE 11 -14D -0112 OPS CENTER MECH. UPGRADE 150689 -00 LM THOMAS A CAS ITAR /HOTEL CENTER REVISION 150685 -00 LM THOMAS BY APPROVED WDH DATE 06.08.06 SYM REVISION BY APPROVED DATE �• CCPPmPUMPED CONDENSATE g)L APPATEAIAW m � MEETING ROOM 1 13B2 I ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN LM THOMAS CHECKED ENGINEER LM THOMAS CHECKED APPROVED APPROVED DATE REFERENCE ONLY JOB #586000-00 SUBTITLE TITLE X108 COMPOSITE 1ST FLOOR PLUMBING PLAN MECHANICAL MASTER CAS ITAR /HOTEL CENTER BUILDI \G 11.14\ COL. A— G/1 -12 LEGE \D GE \ERAL \OTES REFERENCE DRAW\GS 11-14N-1M110 1ST FLOOR PLUMBING PARTIAL PLAN — 11-14N-1M111 1ST FLOOR PLUMBING PARTIAL PLAN — 11- 0140 —OM111 GARAGE LEVEL PLUMBING PARTIAL PLAN 11-0140-0M112 GARAGE LEVEL PLUMBING PARTIAL PLAN 11- 14 —S5 -2 POST TENSIONING SCHEDULE AND DETAILS CO \STRUCTION \OTES DUWAMISH REVIEWED FOR CODE COMPLIANCE APPROVED AUG 2 8 2008 City Of Tukwila BUILDING DIVISION 1M7 1M7 / A .41 0 RECEIV PLA\ ALE: NONE AUG 1 3 7008 • PERMIT CENTEs ALE: REVISION 150685 -00 SYMBOL A DATE SHEET 1V 7 JOB NO. 150685 -00 NORTH END SOUTH END 06.08.06 COMP NO. DWG NO, 11.14N -1M7 N ATA OOM ERA -D WO MAIL' ROOM 12E9 WAITIN ROO GC OPERATIONS ROOM Al ■■■■a ■ ■� AIM iggiumw i■■■■■■■i■■■11■► i■■■■■■■■■■■■■c, .■1111■■■ ■■■■■■■ ■■■■i I■11■■■■•■•■■■11■■,z /1111■ ■■ •1111■ •1111 ■ ■ii ,iiiiiiiiiiiiiii� 1.11•11.1111111111•11111 a■■■■■■■■ ■■■■r' ■■1111■■■■■ ■ ■ ■�� 111111111111111111•11111111111/' 11■ ■ ■■ ■ ■ ■■ •MV nummuneur ■■■■■■■■.- ■■■■■■■ . uu 11111111111/' 11 REPLACE HOT WATER BOILER REVISION 586000 -00 LM THOMAS APPROVED DATE 07.08.08 REVISION APPROVED DATE DINING ROOM SEE SHEET 11 -140 -1M10 R UNDER SLAB LO :Y HEATING SYSTEM Q� BOE /NG� o' DIRECTORS • FICE ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. CORRIDOR DRAWN LM THOMAS CHECKED CF HARRAH ENGINEER LM THOMAS CHECKED CF HARRAH APPROVED APPROVED DATE 06.16.08 07.08.08 06.16.08 07.08.08 SUBTITLE TITLE COF RO( MECHANICAL MASTER —cw— DOMESTIC WATER -Hw— DOMESTIC HOT WATER -Hwe— HOT WATER CIRCULATING -4— BALL VALVE -4 GATE VALVE GLOBE VALVE -A SOLENOID VALVE — WATER FAUCET & VALVE ASSEMBLY -44— FLOW CONTROL VALVE % /METERING PORTS AVB ATMOSPHERIC VACUUM BREAKER PVB PRESSURE VACUUM BREAKER ocvA DOUBLE CHECK VALVE ASSEMBLY REDUCED — PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY ABOVE FINISHED FLOOR RPBP AFF 1/2" PRESSURE VACUUM BREAKER, WATTS, MODEL 800M 3/4" PRESSURE VACUUM BREAKER, WATTS, MODEL 800M 3/4" DOUBLE CHECK VALVE ASSEMBLY, WATTS, MODEL 007M2QT 3/8" REDUCED PRESSURE BACKFLOW PREVENTOR, CONBRACO, MODEL 4020202 3/4" REDUCED PRESSURE BACKFLOW PREVENTOR, WATTS, MODEL 909 1/2" ATMOSPHERIC VACUUUM BREAKER, WATTS, MODEL 9D 11- 014N -1M111 11- 014S -1M110 11- 0140 —OM112 11- 0140 —OM116 11- 14L -M517 11- 14 -M2H INSTLL NEW 40F RATED ELECTRIC HOT WATER BOOSTER HEATER EWH -1 N -3 IN LINE TO DISHWASHER TO ALLOW DOMESTIC HOT WATER LOOP TO BE RESET TO 120F. UNIT TO BE LOCATED IN PLUMBERS CRIB IN GARAGE TIE IN NEW 140E LINE ROUTED AT GARAGE LEVEL TO CONNECT TO EXISTING HOT WATER LINE TO CONVEYOR DISH WASHER REVIEWED' FOR CODE COMPLIANCE PP 7.OVED AUG 2 8 2008 CO \STRUCTIG 1ST FLOOR LOBBY PLUMBING PLAN REPLACE HOT WATER BOILER 11 -014L LEGE\ CE\ERAL \OTES REFERE \C COL. 1 -4 DUWAMISH, WA 1ST FLOOR PLUMBING PARTIAL PLAN — SOUTH HALF 1ST FLOOR PLUMBING PARTIAL PLAN — WEST HALF GARAGE LEVEL PLUMBING PARTIAL PLAN GARAGE LEVEL PLUMBING PARTIAL PLAN 1ST FLOOR CAFETERIA ENLARGED PLUMBING PLAN EQUIPMENT SCHEDULE - PLUMBING CURRENT REVISION SHEET � \OTES DWG NO. RAW\CS SYMBOL 586000 -00 DATE 11.14L -1M110 07.08.08 WATER HEATER GFWH -1A ( REPLACED BY GFWH -1 B ) WAS 8 INCH DIAMETER DOUBLE WALL FLUE UPSIZED TO 10' RELIEF LOUVER IN DOOR 8 INCH TJERNLUND 1 -8 VENT - 110017 - 0 3 S B 24X48 BIRDSCREEN COMBINATION AIR IN AKE ~'\_____ SEPARATE 24 X 4 DUCT IN 1 HR HORIZONTAL UCT SHAFT 0M12 M333 lit RA sinot - If On I I■l WT.l EIl FIRE DA "ER RELIEF MPE EXHAU' FAN RF -2S EXHAU FAN RF -IS FAN ROOK' INTAKE FROM 1ST FLOOR UP EXHAUST SHAFT FROM 5TH FLOOR DOWN EXHAUST SHAFT FROM 5TH FLOOR DOWN RELIEF / T'A �NC5 ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 LM THOMAS LM THOMAS LM THOMAS WDH 07/27/06 02.12.08 SYM B C D INITIAL RELEASE CAS OPS CENTER MECH REPLACE HOT WATER BOILER DESIGN / INSTALL HVAC SYSTEM REPLACE HOT WATER BOILER REVISION BY 150689 -00 5955820 567893 -00 586000 -00 LM THOMAS APPROVED DATE SYM CFH 07.08.08 REVISION BY APPROVED DATE Q BOE m d ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY REUEF / ACCESS PANEL DEPT, DATE DRAWN J. BATSCHI CHECKED NCINEER CHECKED APPROVED APPROVED L J DATE SUBTITLE 02/04/91 TITLE MECHANICAL MASTER GE \ERAL \OT -S ELECTRIC UNIT HEATERS (UH) TWO IN STORAGE N0.3 AND ONE IN STORAGE ROOM NO.1. EACH UNIT HEATER SHALL BE TRANE MODEL NO. UHEC- 033DOB0, 3.3 KW 480 VOLTS 3 PHASE 60 HZ WITH 24 VOLTS CONTROL TRANSFORMER AND CONTACTORS. MOUNTING BRACKET NO. HB005, UNIT MOUNTED THERMOSTAT AND WALL MOUNTED DISCONNECT SWITCH FOR EACH UNIT. HORIZONTAL CABINET HEATER (CAB) TRANE FORCE -FLO MODEL NO, D14E004 ELECTRIC COIL WITH DUAL 7.5/2.5 KW HEATING ELEMENT 480 VOLTS, 3 PHASE, 60 HZ. DUAL HEAT SWITCH / MOTOR SWITCH (OFF -VENT, HIGH -LOW) CONTROLLER NO. H216 AND WALL MOUNTED THERMOSTAT. FRONT INTERGRAL DISCHARGE GRILLE AND BACK INLET DUCT COLLAR. COMBINATION SMOKE /FIRE DAMPER INTERFAACED TO AC -ON SMOKE DETECTION VIA CMCS SYSTEM. 1 -i HR DYNAMIC RATED UL 555S 0M12 M5XX • ORIGINAL UNIT: POWER VENTER PV -1A, TJERNLUND MODEL HS115 -2, 120 V 1 PH INTERLOCKED TO BOILER. 6" STACK 94 LF MAX AT 550,000 BTU /HR, 235 CFM AT 0.50 IN WC REPLACEMENT UNIT: POWER VENTER PV-1B, TJERNLUND MODEL HS4, 120 V 1 PH INTERLOCKED TO BOILER. 10" STACK 100 LF MAX AT 900,000 BTU /HR, 425 CFM AT 0.50 IN WC SBT MBC -24 ADDED FOR GARAGE LEVEL CMCS CONTROLS. CONNECTED TO BUILDING CMCS TRUNK THROUGH ADJACENT INSIGHT CMCS WORK STATION. SEE SHEET E549 FOR PANEL DETAILS GARAGE LEVEL HVAC PARTIAL PLAN REPLACE HOT WATER BOILER BUILDING 11 -0140 COL. A- G/6 -12 CO r SEE SHEET °M112 FOR REPLACEMENT OF EXISTING GAS FIRED BOILER Ir REPLACE EXISTING 8" CLASS B FLUE WITH NEW 10 ". ALSO REPLACE POWER VENTILATOR IN FLUE WITH NEW UNIT SHOWN INSTALL NEW SUPPLY AIR FANS IN EXISTING TRANSFER DUCTS SUPPLYING PLUMBERS CRIB. UNITS TO BE INTERFACED TO RUN WHEN EXHAUST VENTILATOR IS COMMENDED ON BY BOILER INSTALL SURPLUS PLANT 2 MBC 24 TO SUPPORT ADDITIONAL CONTROL REQUIRMENTS ON 1ST FLOOR AND GARAGE LEVELS (A MBC 40 CAN BE USED IF AVAILABLE. REFERENCE DRAWI \GS 11- 14 -M2A EQUIPMENT SCHEDULES 11- 14 -M2H EQUIPMENT SCHEDULES - PLUMBING 11-0140 0M11 GARAGE LEVEL HVAC PARTIAL PLAN 11-0140 -0M112 GARAGE LEVEL PLUMBING PARTIAL PLAN D0497_2731 _M 10A TIF FILE REVIEWED FOR CODE COMPLIANCE APPROVED AUG 2 8 2008 City Of Tukwila BUILDING DIVISION AUG, 13 2OrI. i PERMIT CEN1 t DUWAMISH. WA STRLCTO\ C SHEET JOB NO. DWG NO. \OT CURRENT REVISION 4EY -PLA\ SCALE: NONE 586000 -00 SYMBOL 0M12 586000 -00 S 11- 0140 -0M12 DATE COMP NO. 07.08.08 00 0 CNI o' M13 ��j �/� 1 OM11 / _ OM10 0M17 0M16 0M15 OM�4 OM1� 1M2 0M21 0M20 0M19 0M2 WATER HEATER GFWH -1A ( REPLACED BY GFWH -1 B ) WAS 8 INCH DIAMETER DOUBLE WALL FLUE UPSIZED TO 10' RELIEF LOUVER IN DOOR 8 INCH TJERNLUND 1 -8 VENT - 110017 - 0 3 S B 24X48 BIRDSCREEN COMBINATION AIR IN AKE ~'\_____ SEPARATE 24 X 4 DUCT IN 1 HR HORIZONTAL UCT SHAFT 0M12 M333 lit RA sinot - If On I I■l WT.l EIl FIRE DA "ER RELIEF MPE EXHAU' FAN RF -2S EXHAU FAN RF -IS FAN ROOK' INTAKE FROM 1ST FLOOR UP EXHAUST SHAFT FROM 5TH FLOOR DOWN EXHAUST SHAFT FROM 5TH FLOOR DOWN RELIEF / T'A �NC5 ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 LM THOMAS LM THOMAS LM THOMAS WDH 07/27/06 02.12.08 SYM B C D INITIAL RELEASE CAS OPS CENTER MECH REPLACE HOT WATER BOILER DESIGN / INSTALL HVAC SYSTEM REPLACE HOT WATER BOILER REVISION BY 150689 -00 5955820 567893 -00 586000 -00 LM THOMAS APPROVED DATE SYM CFH 07.08.08 REVISION BY APPROVED DATE Q BOE m d ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY REUEF / ACCESS PANEL DEPT, DATE DRAWN J. BATSCHI CHECKED NCINEER CHECKED APPROVED APPROVED L J DATE SUBTITLE 02/04/91 TITLE MECHANICAL MASTER GE \ERAL \OT -S ELECTRIC UNIT HEATERS (UH) TWO IN STORAGE N0.3 AND ONE IN STORAGE ROOM NO.1. EACH UNIT HEATER SHALL BE TRANE MODEL NO. UHEC- 033DOB0, 3.3 KW 480 VOLTS 3 PHASE 60 HZ WITH 24 VOLTS CONTROL TRANSFORMER AND CONTACTORS. MOUNTING BRACKET NO. HB005, UNIT MOUNTED THERMOSTAT AND WALL MOUNTED DISCONNECT SWITCH FOR EACH UNIT. HORIZONTAL CABINET HEATER (CAB) TRANE FORCE -FLO MODEL NO, D14E004 ELECTRIC COIL WITH DUAL 7.5/2.5 KW HEATING ELEMENT 480 VOLTS, 3 PHASE, 60 HZ. DUAL HEAT SWITCH / MOTOR SWITCH (OFF -VENT, HIGH -LOW) CONTROLLER NO. H216 AND WALL MOUNTED THERMOSTAT. FRONT INTERGRAL DISCHARGE GRILLE AND BACK INLET DUCT COLLAR. COMBINATION SMOKE /FIRE DAMPER INTERFAACED TO AC -ON SMOKE DETECTION VIA CMCS SYSTEM. 1 -i HR DYNAMIC RATED UL 555S 0M12 M5XX • ORIGINAL UNIT: POWER VENTER PV -1A, TJERNLUND MODEL HS115 -2, 120 V 1 PH INTERLOCKED TO BOILER. 6" STACK 94 LF MAX AT 550,000 BTU /HR, 235 CFM AT 0.50 IN WC REPLACEMENT UNIT: POWER VENTER PV-1B, TJERNLUND MODEL HS4, 120 V 1 PH INTERLOCKED TO BOILER. 10" STACK 100 LF MAX AT 900,000 BTU /HR, 425 CFM AT 0.50 IN WC SBT MBC -24 ADDED FOR GARAGE LEVEL CMCS CONTROLS. CONNECTED TO BUILDING CMCS TRUNK THROUGH ADJACENT INSIGHT CMCS WORK STATION. SEE SHEET E549 FOR PANEL DETAILS GARAGE LEVEL HVAC PARTIAL PLAN REPLACE HOT WATER BOILER BUILDING 11 -0140 COL. A- G/6 -12 CO r SEE SHEET °M112 FOR REPLACEMENT OF EXISTING GAS FIRED BOILER Ir REPLACE EXISTING 8" CLASS B FLUE WITH NEW 10 ". ALSO REPLACE POWER VENTILATOR IN FLUE WITH NEW UNIT SHOWN INSTALL NEW SUPPLY AIR FANS IN EXISTING TRANSFER DUCTS SUPPLYING PLUMBERS CRIB. UNITS TO BE INTERFACED TO RUN WHEN EXHAUST VENTILATOR IS COMMENDED ON BY BOILER INSTALL SURPLUS PLANT 2 MBC 24 TO SUPPORT ADDITIONAL CONTROL REQUIRMENTS ON 1ST FLOOR AND GARAGE LEVELS (A MBC 40 CAN BE USED IF AVAILABLE. REFERENCE DRAWI \GS 11- 14 -M2A EQUIPMENT SCHEDULES 11- 14 -M2H EQUIPMENT SCHEDULES - PLUMBING 11-0140 0M11 GARAGE LEVEL HVAC PARTIAL PLAN 11-0140 -0M112 GARAGE LEVEL PLUMBING PARTIAL PLAN D0497_2731 _M 10A TIF FILE REVIEWED FOR CODE COMPLIANCE APPROVED AUG 2 8 2008 City Of Tukwila BUILDING DIVISION AUG, 13 2OrI. i PERMIT CEN1 t DUWAMISH. WA STRLCTO\ C SHEET JOB NO. DWG NO. \OT CURRENT REVISION 4EY -PLA\ SCALE: NONE 586000 -00 SYMBOL 0M12 586000 -00 S 11- 0140 -0M12 DATE COMP NO. 07.08.08 00 0 CNI o' SANITARY (SUSPENDED M 1ST FLOOR SLAB UP THROUGH SLAB TO KITCHEN, SEE SHEET 1 3/4" KITCHEN HOT WATER SUSPENDED FROM 1ST FLOOR SLAB, INSULATED AND HEAT TRACED 1-1/4" GAS 120 GAL STORAGE TANK /, " KITCHEN HOT W TER SU PENDED FROM 1S FLOOR SLAB, INSULAT AN HEAT TRACED 4" SANItA Y SUSPEN EI FROM 1ST FLO R SLAB 2 „ TO SE REEL SYM B C D 51 17 53 15 13 INITIAL RELEASE CAS (TAR AREA CAS OPERATIONS CENTER REPALCE HOT WATER BOILER REVISION CAS OPS CENTER MECH UPGRADES 150550 -00 150550 -00 150685 -02 150689 -00 5945820 BY LM THOMAS LM THOMAS LM THOMAS LM THOMAS LM THOMAS APPROVED CFH DATE 10.13.05 10/14/05 08/17/06 07/27/06 07.08.08 SYM 112 M51 REVISION APPROVED 2" SA SUSPE 1ST F ITARY NDED FROM OOR SLAB DATE 2" SAN (TAR" UP SEE 1M111 FOR CONTINUATI e ifirate / NG° EXHAUST FAN RF -2S EXHAUST FAN RF -IS FAN ROOM 1 0'—O" NTAKE SHAFT FROM 1ST FLOOR UP EXHAUST SHAFT FROM 5TH FLOOR DOWN • • s • C ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT, DATE DRAWN LM THOMAS CHECKED ENGINEER LM THOMAS CHECKED APPROVED APPROVED tW8 I8(O ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 DATE 10.13.05 10.13.05 SUBTITLE TITLE MECHANICAL MASTER < > ) ECEIVIED AUG 13 2009 PERMIT CENTE1 GARAGE LEVEL PLUMBING PARTIAL PLAN REPLACE HOT WATER BOILER BUILDING 11 -0140 COL . A—G/ 6-12 LEGEND COLUMN NUMBERS FOR 1ST FLOOR AND ABOVE. COLUMN NUMBERING SCHEME ROTATES 90 DEGREES AT THE GARAGE LEVEL GENERAL NOTES ) ALL SANITARY SEWER, RAINLEADER AND VENT PIPE IS INSTALLED USING NO —HUB CAT IRON PIPE AND FITTINGS ALL SANITARY TRAPS EXPOSED IN THE GARAGE ARE TRACE HEATED. WRAP TRAP WITH 1/2" THICK CLOSED CELL FOAM AFTER INSTALLATION OF TRACE HEAT. BASIS FOR INSULATION DESIGN IS 1/2" THICK AP ARMAFLEX SHEET AT K =0.27 SEE ELECTRICAL DRAWING FOR HEATER INSTALLATION. BASIS FOR DESIGN IS LINE MAINTAINED AT 50F AT 19F MINIMUM OSA THIS DRAWING SUPERCEDES DRAWING 11- 014N —OM111 AS OF 10 /g AND ALSO INCORPORATES NATURAL GAS LINE INFORMATION FROM RASTER SHEET 11 -14_1 M112.tif LINE LOCATED ABOVE GROUND LEVEL SLAB AND BELOW 1ST FLOOR SLAB SEISMIC SHUT OFF VALVE INSTALLED DOWNSTREAM OF GAS METER. VALVE PER STANDARD ASCE 25 -97 REFERENCE DRAWINGS 11- 14 -M517 CAFETERIA / DISHWASHER PLUMBING PLAN 11- 14 -M518 CAFETERIA / DISHWASHER PLUMBING PLAN 11- 14 —M544 PLUMBING SECTIONS AND DETAILS 11- 14N -1A11 COMPOSITE YARD PLAN - DUWAMISH TOWERS PLUMBING 11- 14N -1M111 1ST FLOOR PLUMBING PARTIAL PLAN SOUTH END 11- 14.1 —UGM 110 1ST FLOOR PLUMBING PARTIAL PLAN SOUTH END ( SEPIA PRINT ) 11-0140-0M12 GARAGE LEVEL HVAC PARTIAL PLAN 11-0140 —0M111 GARAGE LEVEL PLUMBING PARTIAL PLAN O CONSTRUCTION NOTES REPLACE EXISTING RAYTHERM MODEL 514 WATER BOILER WITH NEW AO SMITH MODEL HW -670. REPLACE EXISTING 33 GALLON STORAGE TANK WITH NEW 120 GALLON TANK. SEE SCHEDULE SHEET M2H FOR RATINGS AND SHEET M333 FOR PLUMBING CHANGES IN THE PLUMBING CRIB r INSTALL NEW KITCHEN HOT WATER BOOSTER AND NEW SUPPLY LINE TO 1ST FLOOR KITCHEDN CONVEYOR DISHWASHER. INSULATED AND TRACE HEAT LINE AFTER INSTALLATION. SEE SCHEDULE SHEET M2H FOR RATINGS. DUWAMISH REVIEWED FOR CODE COMPLIANCE PP ;s4VED AUG 2 8 2000 City Of Tukwila BUILDING DIVISION_ 1 CURRENT REVISION 5945820 SHEET JOB NO. 586000 -00 DWG NO. Y —PLA\ SCALE: NONE SYMBOL 0M112 11- 0140 —OM112 DATE COMP NO. 07.08.08 1 1 1 1<1�3 ?///,// mg) ! 1 71 01� A1111 ' 1 Q1�1� 'u0 0M417 011 )1116 0MA15 OMB 4 0021 f •i a mo OM 11p Od 1 SANITARY (SUSPENDED M 1ST FLOOR SLAB UP THROUGH SLAB TO KITCHEN, SEE SHEET 1 3/4" KITCHEN HOT WATER SUSPENDED FROM 1ST FLOOR SLAB, INSULATED AND HEAT TRACED 1-1/4" GAS 120 GAL STORAGE TANK /, " KITCHEN HOT W TER SU PENDED FROM 1S FLOOR SLAB, INSULAT AN HEAT TRACED 4" SANItA Y SUSPEN EI FROM 1ST FLO R SLAB 2 „ TO SE REEL SYM B C D 51 17 53 15 13 INITIAL RELEASE CAS (TAR AREA CAS OPERATIONS CENTER REPALCE HOT WATER BOILER REVISION CAS OPS CENTER MECH UPGRADES 150550 -00 150550 -00 150685 -02 150689 -00 5945820 BY LM THOMAS LM THOMAS LM THOMAS LM THOMAS LM THOMAS APPROVED CFH DATE 10.13.05 10/14/05 08/17/06 07/27/06 07.08.08 SYM 112 M51 REVISION APPROVED 2" SA SUSPE 1ST F ITARY NDED FROM OOR SLAB DATE 2" SAN (TAR" UP SEE 1M111 FOR CONTINUATI e ifirate / NG° EXHAUST FAN RF -2S EXHAUST FAN RF -IS FAN ROOM 1 0'—O" NTAKE SHAFT FROM 1ST FLOOR UP EXHAUST SHAFT FROM 5TH FLOOR DOWN • • s • C ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT, DATE DRAWN LM THOMAS CHECKED ENGINEER LM THOMAS CHECKED APPROVED APPROVED tW8 I8(O ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 DATE 10.13.05 10.13.05 SUBTITLE TITLE MECHANICAL MASTER < > ) ECEIVIED AUG 13 2009 PERMIT CENTE1 GARAGE LEVEL PLUMBING PARTIAL PLAN REPLACE HOT WATER BOILER BUILDING 11 -0140 COL . A—G/ 6-12 LEGEND COLUMN NUMBERS FOR 1ST FLOOR AND ABOVE. COLUMN NUMBERING SCHEME ROTATES 90 DEGREES AT THE GARAGE LEVEL GENERAL NOTES ) ALL SANITARY SEWER, RAINLEADER AND VENT PIPE IS INSTALLED USING NO —HUB CAT IRON PIPE AND FITTINGS ALL SANITARY TRAPS EXPOSED IN THE GARAGE ARE TRACE HEATED. WRAP TRAP WITH 1/2" THICK CLOSED CELL FOAM AFTER INSTALLATION OF TRACE HEAT. BASIS FOR INSULATION DESIGN IS 1/2" THICK AP ARMAFLEX SHEET AT K =0.27 SEE ELECTRICAL DRAWING FOR HEATER INSTALLATION. BASIS FOR DESIGN IS LINE MAINTAINED AT 50F AT 19F MINIMUM OSA THIS DRAWING SUPERCEDES DRAWING 11- 014N —OM111 AS OF 10 /g AND ALSO INCORPORATES NATURAL GAS LINE INFORMATION FROM RASTER SHEET 11 -14_1 M112.tif LINE LOCATED ABOVE GROUND LEVEL SLAB AND BELOW 1ST FLOOR SLAB SEISMIC SHUT OFF VALVE INSTALLED DOWNSTREAM OF GAS METER. VALVE PER STANDARD ASCE 25 -97 REFERENCE DRAWINGS 11- 14 -M517 CAFETERIA / DISHWASHER PLUMBING PLAN 11- 14 -M518 CAFETERIA / DISHWASHER PLUMBING PLAN 11- 14 —M544 PLUMBING SECTIONS AND DETAILS 11- 14N -1A11 COMPOSITE YARD PLAN - DUWAMISH TOWERS PLUMBING 11- 14N -1M111 1ST FLOOR PLUMBING PARTIAL PLAN SOUTH END 11- 14.1 —UGM 110 1ST FLOOR PLUMBING PARTIAL PLAN SOUTH END ( SEPIA PRINT ) 11-0140-0M12 GARAGE LEVEL HVAC PARTIAL PLAN 11-0140 —0M111 GARAGE LEVEL PLUMBING PARTIAL PLAN O CONSTRUCTION NOTES REPLACE EXISTING RAYTHERM MODEL 514 WATER BOILER WITH NEW AO SMITH MODEL HW -670. REPLACE EXISTING 33 GALLON STORAGE TANK WITH NEW 120 GALLON TANK. SEE SCHEDULE SHEET M2H FOR RATINGS AND SHEET M333 FOR PLUMBING CHANGES IN THE PLUMBING CRIB r INSTALL NEW KITCHEN HOT WATER BOOSTER AND NEW SUPPLY LINE TO 1ST FLOOR KITCHEDN CONVEYOR DISHWASHER. INSULATED AND TRACE HEAT LINE AFTER INSTALLATION. SEE SCHEDULE SHEET M2H FOR RATINGS. DUWAMISH REVIEWED FOR CODE COMPLIANCE PP ;s4VED AUG 2 8 2000 City Of Tukwila BUILDING DIVISION_ 1 CURRENT REVISION 5945820 SHEET JOB NO. 586000 -00 DWG NO. Y —PLA\ SCALE: NONE SYMBOL 0M112 11- 0140 —OM112 DATE COMP NO. 07.08.08 WAS 8 INCH DIAMETER DOUBLE WALL FLUE UPSIZED TO 10' RELIEF LOU 1 -8 VENT FIRE DAVE REVISION A HVAC FOR MULTI- FUNCTION ROOM B DESIGN / INSTALL HVAC SYSTEM C REPLACE HOT WATER BOILER 150685 -03 567893 -00 586000 -00 LM THOMAS LM THOMAS LM THOMAS APPROVED DATE 02.12.08 REVISION APPROVED SEPARATE 24 X HR HORIZONTAL 0M12 M333 4 DUCT IN 1 UCT SHAFT Q� BOE /NG o' EXHAUST FAN RF -2S EXHAW T FAN RF -1S FAN ROD/ INTAKE SHAFT FROM 1ST FLOOR UP EXHAUST SHAFT FROM 5TH FLOOR DOWN APPROVED BY ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN GM CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE GARAGE LEVEL HVAC CONTROLS PARTIAL PLAN TITLE MECHANICAL MASTER DUWAMISH, WA CURRENT REVISION 586000 -00 SHEET SYMBOL DATE 11- 0140 -0E212 COMP NO. 02.12 08 R IN DOOR RELIEF RELIEF / ACCESS PANEL LEGE \D Mob- 1B ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 ALL CONDUIT TO BE 3/4 "GALVANIZED RIGID STEEL UNLESS OTHERWISE NOTED. ALL WIRE TO BE #12 THHN UNLESS OTHERWISE NOTED THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL 208Y/120V CIRCUITS: 'A'PHASE (LEFT BUS IN PANEL) 'B'PHASE (CENTER BUS IN PANEL) 'C'PHASE (RIGHT BUS IN PANEL) NEUTRAL GROUND ISOLATED GND DYMO LABEL ALL RECEPTACLES,JUNCTION BOXES, SWITCHES, ETC. WITH CIRCUIT IDENTIFICATION. INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3. SIEMENS MBC 24 ADDED UNDER JOB 586000 -00. SEE SHEET 11- 14 -E549 FOR CONFIGURATION 11-14N-1E210 11- 140 -0M12 11- 140 -0M212 11- 14N -E4 11- 14 -0E62 11- 14 -0E112 11 -14 -E549 11- 14 -E550 R= FERE \CE DRAWI \GS 1ST FLOOR CMCS CONTROLS PARTIAL PLAN GARAGE LEVEL HVAC PARTIAL PLAN GARAGE LEVEL PLUMBING PARTIAL PLAN ONE LINE DIAGRAMS 208 / 120 VOLT POWER 277 / 480 VOLT POWER SECTIONS AND DETAILS, SCHEDULES PILOT RELAY BOX ASSEMBLY CO \STRJCTIO\ OYES 1›,, INSTALL SURPLUS MBC -24 AND CONNECT TO BUILDING TRUNK AT ADJACENT INSIGHT COMPUTER STATION. INSTALL NEW RUN OF 2 - ' DIA EMT CONDUIT FROM MBC -24 TO FAN COIL EDC -2N TO TO SUPPORT CMCS WORK UNDER JOB 567893-00. INSTALL CONDUIT IN PARALLEL WITH NEW DEDICATED HOT WATER LINE SHOWN ON SHEET 0M112 USING EXISTING ANCHORS FOR SANITARY SEWER LINE. FLEX JOINT IN CONDUITS AT CROSSING OF ANY SIESMIC JOINT [2> INSTALL FLOW SWITCH AND WATER TEMPERATURE SENSOR IN EXISTING HOT WATER SUPPLY LINE AND CONNECT EXISTING HOT WATER CIRCULATION PUMP TO NEW MBC. INSTALL FLOW SWITCH IN NEW HIGH TEMP HOT WATER LINE. PROGRAM HOT WATER PUMP TO RUN ON CAFETERIA OCCUPANCY SCHEDULE OR WHEN FLOW SWITCHES ACTIVATE OFF HOURS I CONNECT REPLACEMENT STACK EXAUSTER TO NEW HOT WATER BOILER CONTROLS TO RUN EXHAUSTER WHEN BOILER FIRES. ALSO CONNECT THIS SIGNAL TO NEW MBC. PROVIDE 2" EMT FROM MBC TO PILOT RELAY CABINET - SEE SHEET E500 FOR DETAILS CONNECT NEW SUPPLY AIR FANS TO RUN WHEN BOILER STACK EXHAUSTER IS COMMANDED ON. REVIEVVE CODE COMP FOR PRPROVE t$3 2 s 2006 ECEIVED AUG 13 2000 PERMIT CENTER GE \ERAL 1 BLACK RED BLUE WHITE GREEN GRN /YELLOW \ OT G -S (0) (T) Y -PLA\ SCALE: NONE D213 21 ®t�8 11q au= J 9 OD217 0D216 00215 0 D 2 14 0E221 00220 0E219 0E21 OQ223 - `01}22 WAS 8 INCH DIAMETER DOUBLE WALL FLUE UPSIZED TO 10' RELIEF LOU 1 -8 VENT FIRE DAVE REVISION A HVAC FOR MULTI- FUNCTION ROOM B DESIGN / INSTALL HVAC SYSTEM C REPLACE HOT WATER BOILER 150685 -03 567893 -00 586000 -00 LM THOMAS LM THOMAS LM THOMAS APPROVED DATE 02.12.08 REVISION APPROVED SEPARATE 24 X HR HORIZONTAL 0M12 M333 4 DUCT IN 1 UCT SHAFT Q� BOE /NG o' EXHAUST FAN RF -2S EXHAW T FAN RF -1S FAN ROD/ INTAKE SHAFT FROM 1ST FLOOR UP EXHAUST SHAFT FROM 5TH FLOOR DOWN APPROVED BY ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN GM CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE GARAGE LEVEL HVAC CONTROLS PARTIAL PLAN TITLE MECHANICAL MASTER DUWAMISH, WA CURRENT REVISION 586000 -00 SHEET SYMBOL DATE 11- 0140 -0E212 COMP NO. 02.12 08 R IN DOOR RELIEF RELIEF / ACCESS PANEL LEGE \D Mob- 1B ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 ALL CONDUIT TO BE 3/4 "GALVANIZED RIGID STEEL UNLESS OTHERWISE NOTED. ALL WIRE TO BE #12 THHN UNLESS OTHERWISE NOTED THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL 208Y/120V CIRCUITS: 'A'PHASE (LEFT BUS IN PANEL) 'B'PHASE (CENTER BUS IN PANEL) 'C'PHASE (RIGHT BUS IN PANEL) NEUTRAL GROUND ISOLATED GND DYMO LABEL ALL RECEPTACLES,JUNCTION BOXES, SWITCHES, ETC. WITH CIRCUIT IDENTIFICATION. INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3. SIEMENS MBC 24 ADDED UNDER JOB 586000 -00. SEE SHEET 11- 14 -E549 FOR CONFIGURATION 11-14N-1E210 11- 140 -0M12 11- 140 -0M212 11- 14N -E4 11- 14 -0E62 11- 14 -0E112 11 -14 -E549 11- 14 -E550 R= FERE \CE DRAWI \GS 1ST FLOOR CMCS CONTROLS PARTIAL PLAN GARAGE LEVEL HVAC PARTIAL PLAN GARAGE LEVEL PLUMBING PARTIAL PLAN ONE LINE DIAGRAMS 208 / 120 VOLT POWER 277 / 480 VOLT POWER SECTIONS AND DETAILS, SCHEDULES PILOT RELAY BOX ASSEMBLY CO \STRJCTIO\ OYES 1›,, INSTALL SURPLUS MBC -24 AND CONNECT TO BUILDING TRUNK AT ADJACENT INSIGHT COMPUTER STATION. INSTALL NEW RUN OF 2 - ' DIA EMT CONDUIT FROM MBC -24 TO FAN COIL EDC -2N TO TO SUPPORT CMCS WORK UNDER JOB 567893-00. INSTALL CONDUIT IN PARALLEL WITH NEW DEDICATED HOT WATER LINE SHOWN ON SHEET 0M112 USING EXISTING ANCHORS FOR SANITARY SEWER LINE. FLEX JOINT IN CONDUITS AT CROSSING OF ANY SIESMIC JOINT [2> INSTALL FLOW SWITCH AND WATER TEMPERATURE SENSOR IN EXISTING HOT WATER SUPPLY LINE AND CONNECT EXISTING HOT WATER CIRCULATION PUMP TO NEW MBC. INSTALL FLOW SWITCH IN NEW HIGH TEMP HOT WATER LINE. PROGRAM HOT WATER PUMP TO RUN ON CAFETERIA OCCUPANCY SCHEDULE OR WHEN FLOW SWITCHES ACTIVATE OFF HOURS I CONNECT REPLACEMENT STACK EXAUSTER TO NEW HOT WATER BOILER CONTROLS TO RUN EXHAUSTER WHEN BOILER FIRES. ALSO CONNECT THIS SIGNAL TO NEW MBC. PROVIDE 2" EMT FROM MBC TO PILOT RELAY CABINET - SEE SHEET E500 FOR DETAILS CONNECT NEW SUPPLY AIR FANS TO RUN WHEN BOILER STACK EXHAUSTER IS COMMANDED ON. REVIEVVE CODE COMP FOR PRPROVE t$3 2 s 2006 ECEIVED AUG 13 2000 PERMIT CENTER GE \ERAL 1 BLACK RED BLUE WHITE GREEN GRN /YELLOW \ OT G -S (0) (T) Y -PLA\ SCALE: NONE PUVP SCHDJLE SIZE DESCRIPTION MARK LOCATION SERVICE PUMP FLUID MOTOR (1) MANUFACTURER AND MODEL NOTES 900H F/B FLOW (CFM) TYPE FLOW TOTAL TYPE TEMP (GPM) HEAD (FT) ('F) BHP HP V PH HZ RPM P -7S 1 SOUTH 1ST FLR MECH RM CONDENSER WATER IN —LINE CENTR. 360 107 WATER 90 13 15 460 3 60 1750 PACO VL 4012 -1 11.4 INCH IMPELLER (2) (3) (4) (5) (6) KRUEGER 6500 P 240 CFM @ NC 30 MECH SHAFT 10" DIA T —BAR CEILING SUPPLY DIFFUSER KRUEGER 6500 P 325 CFM O NC 31 72" DIA T —BAR CEILING SUPPLY DIFFUSER KRUEGER 6500 P 390 CFM @ NC 30 14" DIA T —BAR CEILING SUPPLY DIFFUSER P 1 1 SOUTH PH MECH RM CONDENSER WATER IN —LINE CENTR. 650 132 WATER 90 -- 40 460 3 60 1750 PACO VL 4012 -7 11.5 INCH IMPELLER (2) (3) (4) (5) (6) P -2S 1 SOUTH PH MECH RM CONDENSER WATER IN —LINE CENTR. 650 132 WATER 90 -- 40 460 3 60 1750 PACO VL 4012 -7 11.5 INCH IMPELLER (2) (3) (4) (5) (6) P -3S 1 SOUTH PH MECH RM CONDENSER WATER IN —LINE CENTR. 300 68 WATER 90 -- 15 460 3 60 1750 PACO VL 4012 -7 xx.x INCH IMPELLER (2) (3) (4) (5) (6) SF -OL —M -19.1 GARAGE LEVEL MAKE UP AIR FOR IN —LINE 50 TO 0.5 AIR 95 F 0.5 1/20 115 1 60 2950 FANTECH FRD 16 -8 MAKE UP AIR FAN FOR GAS FIRED SF —OL -M -19.2 GAS FIRED WATER CENTR. 499 P 1N NORTH PH MECH RM CONDENSER WATER IN—LINE CENTR. 922 104 WATER 90 — — 40 460 3 60 1750 PACO VL 4012 7 11.0 INCH IMPELLER �2� �3; �4; �5� �6� P -2N 1 NORTH PH MECH RM CONDENSER WATER IN —LINE CENTR. 922 104 WATER 90 -- 40 460 3 60 1750 PACO VL 4012 -7 11.0 INCH IMPELLER P -6N 1 NORTH PH MECH RM CONDENSER WATER IN —LINE CENTR. 400 75 WATER 91 -- 10 460 3 60 1750 PACO L 3095 -5 xx.x INCH IMPELLER (2) (3) (4) (5) (6) P -3N 1 NORTH PH MECH RM COOL TWR WATER IN —LINE CENTR. 1152 75 WATER 90 -- 40 460 3 60 1750 PACO VL 4012 -7 10.6 INCH IMPELLER (2) (3) (4) (5) (6) P -4N 1 NORTH PH MECH RM COOL TWR WATER IN —LINE CENTR. 1152 75 WATER 90 -- 40 460 3 60 1750 PACO VL 4012 -7 10.6 INCH IMPELLER (2) (3) (4) (5) (6) P -5N 1 NORTH PH MECH RM COOL TWR WATER IN —LINE CENTR. 340 104 WATER 81 -- 15 460 3 60 1750 PACO VL 3095 -5 xx.x INCH IMPELLER (2) (3) (4) (5) (6) DIFFUSER SCHEUL- SIZE DESCRIPTION MANUFACTURER VENDOR P/N CFM 8c NOISE PERFORMANCE NOTES — SURFACE MOUNTED EXHAUST REGISTER SHOEMAKER 900H F/B FLOW (CFM) TOTAL HEAD (IN WC) — SURFACE MOUNTED TRANSFER GRILLE SHOEMAKER 900H F/B V PH — SIDEWALL MOUNTED SUPPLY REGISTER SHOEMAKER 900 HVO OSA TO AC— ON —P16 IN -LINE CENTR. 5000 6" DIA T —BAR CEILING SUPPLY DIFFUSER KRUEGER 6500 P 155 CFM @ NC 30 3 8" DIA T —BAR CEILING SUPPLY DIFFUSER KRUEGER 6500 P 240 CFM @ NC 30 MECH SHAFT 10" DIA T —BAR CEILING SUPPLY DIFFUSER KRUEGER 6500 P 325 CFM O NC 31 72" DIA T —BAR CEILING SUPPLY DIFFUSER KRUEGER 6500 P 390 CFM @ NC 30 14" DIA T —BAR CEILING SUPPLY DIFFUSER KRUEGER 6500 P 425 CFM @ NC 30 15" DIA T —BAR CEILING SUPPLY DIFFUSER KRUEGER 6500 P 490 CFM @ NC 32 SF— OL- G.2 -12 GARAGE LEVEL WARM AIR TO LOBBY IN —LINE 590 TO 0.5 AIR 95 F 0.5 1/2 277 1 60 1750 TPI ( MARKEL ) ALSO SEE ELECTRIC DUCT HEATER EDC -3N CENTR. 1470 FA\ SC - - D U L MARK LOCATION SERVICE FAN FLUID MOTOR (1) MANUFACTURER AND MODEL NOTES TYPE FLOW (CFM) TOTAL HEAD (IN WC) TYPE TEMP ( °F) BHP HP V PH HZ RPM SF —ON -017 GARAGE LEVEL OSA TO AC— ON —P16 IN -LINE CENTR. 5000 0.5 AIR 55 1.5 2 460 3 60 1750 GREENHECK BSQ- 180 -20 1437 NOM FAN RPM (2) (3) (4) (5) (6) MECH SHAFT SF— OL- G.2 -12 GARAGE LEVEL WARM AIR TO LOBBY IN —LINE 590 TO 0.5 AIR 95 F 0.5 1/2 277 1 60 1750 TPI ( MARKEL ) ALSO SEE ELECTRIC DUCT HEATER EDC -3N CENTR. 1470 MFH— E- 1500 -11KW 2 3 6 7 T T T T T T T T T T T T T T 'T T T T T T T T T T T T T T T T T T T T, T T T T r T r' 'r T T T T T T SF -OL —M -19.1 GARAGE LEVEL MAKE UP AIR FOR IN —LINE 50 TO 0.5 AIR 95 F 0.5 1/20 115 1 60 2950 FANTECH FRD 16 -8 MAKE UP AIR FAN FOR GAS FIRED SF —OL -M -19.2 GAS FIRED WATER CENTR. 499 HO I WAI Lk HEAI L.K LUCA I ED IN HEATER PLUMBERS CRIB SYM B c CD. CD' INITIAL RELEASE CAS -HVAC FOR MULTI - FUNCTION ROOM DESIGN / INSTALL HVAC SYSTEM REPLACE HOT WATER BOILER SCHEDULE NOTES: (1) PROVIDE PREMIUM EFFICIENCY MOTOR PER WASHINGTON STATE ENERGY CODE, (2) PROVIDE INLET SUCTION DIFFUSER WITH STRAINER. (3) PROVIDE FLOOR STAND AND PIPE STANDS. (4) WEIGHT 572 LBS. (5) PUMP SIZED FOR FUTURE DATA CENTER EXPANSION, WITH REQUIREMENT OF 360 GPM. AT PRESENT, FLOW RATE IS ADJUSTED TO 315 GPM. (6) PROVIDE PUMP SUBMITTAL FOR APPROVAL PRIOR TO STARTING CONSTRUCTION. SCHEDULE NOTES: (1) PROVIDE PREMIUM EFFICIENCY MOTOR PER WASHINGTON STATE ENERGY CODE. (2) WITH INLET FILTER BOX (3) HORIZONTAL HANGING BASE WITH NEOPRENE ISOLATORS (4) WITH MOTOR COVER AND BELT GUARD (5) WITH VARIABLE INLET GUIDE VANES FOR AUTOMATIC OPERATION (6) SCR MOTOR SPEED CONTROL (7) WITH DISCONNECT BY LM THOMAS LM THOMAS LM THOMAS LM THOMAS APPROVED DATE WDB 04.24.06 SYM WDH 02.12.08 CFH 07.08.08 REVISION BY REVISION 150686 -00 150685 -03 567893 -00 586000 -00 APPROVED DATE ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN LM THOMAS CHECKED ENGINEER LM THOMAS CHECKED APPROVED APPROVED DATE 04.18.06 04.18.06 ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 SUBTITLE TITLE MECHANICAL MASTER Mo S- (8(Q ADD IN LINE BOOSTER FANS TO EXISTING AIR INTAKE DUCTS AND INTERFACE START / STOP OPERATION IN PARALLEL TO EXHAUST STACK EXHAUSTER. BOILER TO BE LOCKED FROM FIRING UNLESS MAKEUP FANS ARE RUNNING REVIEWED FOR CODE COMPLIANCE AP ROVED AUG 2 8 2008 City Of Tukwila BUILDING DIVISION _. CO\STRCTO\ \OTES EQUIPMENT SCHEDULE - HVAC REPLACE HOT WATER BOILER BUILDING 11 -14 LEG GENERAL \OTES. SEE SHT M326 AND M533 PUMP SUPPLIED WITH STANDBY POWER TO RUN DURING UTILITY OUTAGES COMBUSTION SIZED SIZED PER 200 IMC SECTION 706, MINIMUM FAN DELIVERY OF 275 CF R DUWAMISH -F SHEET \J JOB NO. DWG NO, \CE RAW\CS RECEIVED AUG 13 2000 PERMIT CENTER CURRENT REVISION 586000 -00 SYMBOL M2G 586000 -00 11 -14 —M2G DATE COMP NO 07.08.08 to WATER HEATERS MARK N0. DESCRIPTION WASTE VENT COLD ER 'WAT W 'R MARK NO STORAGE CAGAPITY (GAL) RECOVERY RATE GPH ° F RISE ELECTRIC ELEMENT GAS FIRED WALL HUNG SAFETY DEVICES COMBUSTION AIR REQD -CFM REMARKS LOCATION /REF DWG KW VOLTS PHASE HERTZ MBTU /HR INPUT GAS INLET FLOW PRESS MOTOR (HP; VENT (IN) 1" FLOOR MOUNTED WA . CLOSET P -2 URI 2" 1` 1/2" 3/4" WALL HUNG P -3A LAVATOR 2„ 1 1/2" 1 /2" 1 /2" WALL MOUNTED EWH -1 N -1 50 46.4 ©80 °F RISE 9.0 '40/20a 1 60 N/A N/A 2" N/A 1/2" N/A CABINET MOUNTED T &P RELIEF JANITOR SINK 3" 1 1/2" RHEEM, MODEL 3WA71 1ST FLR JANITORS CLOSET / 11- 14N -1M110 EWH -2N -1 50 46.4 ©80 °F RISE 9.0 P40/20•• 1 60 N/A N/A P -6A N/A ,, N/A 1/2" T &P RELIEF P -6B SHOWER RHEEM, MODEL 1PZ75 2ND FLR JANITORS CLOSET / 11- 14N -2M110 EWH -3N -1 50 46.4 ©80 °F RISE 9.0 ► 40/20•. 1 60 N/A N/A 36" CIRC A R N/A SHOWER /EYE WASH N/A T &P RELIEF FREE , ANDING RHEEM, MODEL 1 PZ75 3RD FLR JANITORS CLOSET / 11- 14N -3M110 EWH -4N -1 50 230 ©80 °F RISE 9.0 ►40/20► 1 60 N/A N/A HOSE BIBB N/A N/A T &P RELIEF RHEEM, MODEL 1PZ75 4TH FLR JANITORS CLOSET / 11- 14N -4M110 EWH-5N--1 50 230 ©80 °F RISE 9.0 P40/20; 1 60 N/A N/A KITCHEN SINK N/A 1 1/2" N/A 1 " T &P RELIEF P -12A FLOOR SINK 2" RHEEM, MODEL 1PZ75 5TH FLR JANITORS CLOSET / 11- 14N -5M110 WADE MODEL W- 9102 -9 -15 -EG8 P -12B FLOOR SINK 3" 2" WADE MODEL W- 9103 -9 -15 -EG8 P -13 FLOOR TROUGH 2" 2" SIGNERS CHOICE FT- 1230''. -SG9 EWH -1S- 1 50 46.4 ©80 °F RISE 9.0 ►40/208 1 60 N/A N/A P -15 N/A N/A 3/8" T &P RELIEF FURN ED, INSTALLED BY CONTRACTOR RHEEM, MODEL 3WA71 1ST FLR JANITORS CLOSET / 11- 14S -1M110 EWH -2S -1 50 46.4 ©80°F RISE 9.0 ►40/208 1 60 N/A N/A P -17 N/A N/A 1 /2" T &P RELIEF FURNISHED B EC & INSTALLED BY MECH CONTR RHEEM, MODEL 1PZ75 2ND FLR JANITORS CLOSET / 11- 14S -2M110 EWH -3S -1 50 46.4 ©80 °F RISE 9.0 ' 40/20•• 1 60 N/A N/A 1/2" N/A FURNISHED BY KEC :, INSTALLED BY MECH CONTR N/A T &P RELIEF GARBAGE DISPOSER 2" 1 1/2" RHEEM, MODEL 1PZ75 3RD FLR JANITORS CLOSET / 11- 14S -3M110 EWH -4S -1 50 230 ©80 °F RISE 9.0 ►40/20z 1 60 N/A N/A N/A P -22 N/A 2" T &P RELIEF 3/4" 3/4" FURNISHED, INSTALLED BY CO ' ACTOR RHEEM, MODEL 1PZ75 4TH FLR JANITORS CLOSET / 11- 14S -4M110 EWH -5S -1 50 230 ©80 °F RISE 9.0 ►40/204 1 60 N/A N/A PART WASH SINK - !'AVITY DRAIN TO HAZARDOUS TE TANK N/A 1 1 /2" N/A 1 /2" T &P RELIEF P -25 HAND /FAC ASH SINK - GRAVITY DRAIN i HAZARDOUS WASTE TANK 1 1/2" RHEEM, MODEL 1PZ75 5TH FLR JANITORS CLOSET / 11- 14S -5M110 1/2" SPOKANE STAINLESS PRODUCTS MODEL WMHS -1 WITH P.:: . TAL 1ST FLR OPS CNTR / 11- 14N -1M111 1 GFWH -1A 21 409 © 120 F RISE N/A N/A N/A N/A 511.5 7"W.C,- 1 0.5"W.C. N/A 5 T &P RELIEF 215 CFM RAYTHERM MODEL 514 GARAGE PLUMBERS CRIB 11- 140 -0M112 GFWH-1B 120 816 ©80 F RISE N/A N/A N/A N/A 660 4.5 "W.C,- 13.8 "W.C. N/A 10 T &P RELIEF 275 CFM AO SMITH HW -670, 81% EFFICENT GARAGE PLUMBERS CRIB 11- 140 -0M112 ``I `! '`I '"I " - v `'I 7 T `: 'I ' T `. �I 7 '''I '', 'I ''I r "I r ''I `► ' 'I ,, ,� "� `- 7 ` � I ` 'II ''I `I • `L rI "Ir '"I EWH -1 N -3 10 372 ©40 F RISE 36.0 480 3 60 N/A N/A N/A N/A T &P RELIEF AO SMITH CMC -36 1ST FLR CAFETERIA 11- 14N -1M111 PLUMBING FIXTURES - NOTE 2 MARK N0. DESCRIPTION WASTE VENT COLD ER 'WAT W 'R REMARKS P-1A WATER CLOSET 4 ,, 2,, 1" WALL HUNG P -1 B TER CLOSET 4" 2" 1" WALL HUNG HANDICAP P -1 C 4 " 2" 1" FLOOR MOUNTED WA . CLOSET P -2 URI 2" 1` 1/2" 3/4" WALL HUNG P -3A LAVATOR 2„ 1 1/2" 1 /2" 1 /2" WALL MOUNTED P -3B LAVATORY 2" 1 1 /2" 1 /2" 1 /2" WALL MOUNTED HANDICAP P -3C LAVATORY 2" 1 1/2" 1/2" 1/2 CABINET MOUNTED P -4 JANITOR SINK 3" 1 1/2" 1/2" 1/2" MOP SERVICE BASIN P -5 WATER COOLER 2" 1 1/2" 1/2" WALL MOUNT HANDI - • P -6A SHOWER ,, 1 1/2" 1/2" 1/2" P -6B SHOWER 2 1 1/2" 1/2" 1/2" HANDICAP P -7 WASH FOUNTAIN 2 1/2" 1 „ 1 „ 36" CIRC A R P -8A SHOWER /EYE WASH F.D. 1 1/4" FREE , ANDING P -8C EYE WASH F.D. 1/2" F , STANDING P -9 HOSE BIBB 4" f / VACUUM BREAKER P -10 WALL HYDRANT 3/4" FREEZE PROOF W/ VACUUM BREAKER P -1 1 KITCHEN SINK 2" 1 1/2" 1/2" 1 " SINGLE COMPARTMENT /BREAK P -12A FLOOR SINK 2" 1 1/2" WADE MODEL W- 9102 -9 -15 -EG8 P -12B FLOOR SINK 3" 2" WADE MODEL W- 9103 -9 -15 -EG8 P -13 FLOOR TROUGH 2" 2" SIGNERS CHOICE FT- 1230''. -SG9 P -14 MOP SINK 3 " 1 1/2" 1/2" 1/2" W/ • UCET P -15 COFFEE BREWER 3/8" FURN ED, INSTALLED BY CONTRACTOR P -16 ICE & BEV DISPENSOR 1 /2" FURNISH INSTALLED BY CONTRACTOR P -17 FILLER FAUCET 1 /2" 1 /2" FURNISHED B EC & INSTALLED BY MECH CONTR P -18 HANDSINK 1 1 „ 1 1 /2" 1/2" 1/2" FURNISHED, INS • . ED BY CONTRACTOR P -19 PREP SINK FAUCET 1/2" 1/2" FURNISHED BY KEC :, INSTALLED BY MECH CONTR P -20 GARBAGE DISPOSER 2" 1 1/2" 3/4" FURNISHED, INSTALLED : CONTRACTOR P -21 PRE- RINSE FAUCET 1/2" 1/2" FURNISHED BY KEC & INSTA ED BY MECH CONTR P -22 3 -COMPT SINK 2" 1 1/2" 3/4" 3/4" FURNISHED, INSTALLED BY CO ' ACTOR P -23 ICE CUBER H 1/2" FURNISHED & INSTALLED BY KITC EQUIP CONTR P -24 PART WASH SINK - !'AVITY DRAIN TO HAZARDOUS TE TANK 1 1 /2" 1 1 /2" 1 /2" 1 /2" SPOKANE STAINLESS PRODUCTS P -25 HAND /FAC ASH SINK - GRAVITY DRAIN i HAZARDOUS WASTE TANK 1 1/2" -- 1/2" 1/2" SPOKANE STAINLESS PRODUCTS MODEL WMHS -1 WITH P.:: . TAL SYM REVISION INITIAL RELEASE REPLACE HOT WATER BOILER 5945820 BY LM THOMAS LM THOMAS APPROVED CFH DATE SYM REVISION BY APPROVED DATE 11.20.07 07.08.08 BOE /NG° - ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT, DATE DRAWN LM THOMAS CHECKED ENGINEER LM THOMAS CHECKED APPROVED APPROVED DATE SUBTITLE 11.20.07 11.20.07 TITLE MECHANICAL MASTER LEGE \D MD b —t 8(ap ISSUE FOR PERMIT REV1 JOB 586000 -00 08/08/08 EQUIPMENT SCHEDULE - PLUMBING REPLACE HOT WATER BOILER BUILDING 11 -14 GENERAL NOTES N/A DUWAMISH, WA DWG NO. PLUMBING FIXYRUE SCHEDULE THIS SHEET WAS COPIED FROM THE 22 -01 AND HAS NOT BEEN AS BUILT FOR THIS BUILDING AS OF 11 / 20 / 2007 NATURAL GAS WITI I 20% EXCESS AIR. NOMINAL GAS FLOW OF 1000 BTUH PER 1 CFM OF CAS FORCED COMBUSTION AIR CALCULATED AT 1 CFM MIN PER 2,400 BTUH INPUT APPLIANCE RATING PER IMC 200A SECTION 706 11- 140 -OM 112 11- 14N -1M110 11- 14N -2M110 11- 14N -3M110 11- 14N -4M110 11- 14N -5M110 11- 14S -1M111 11- 14S -2M111 11- 14S -3M111 11- 14S -4M111 11- 14S -5M111 REFERENCE DRAWINGS GARAGE LEVEL PLUMBING PARTIAL PLAN 1ST FLOOR PLUMBING PARTIAL PLAN, NORTH END 1ST FLOOR PLUMBING PARTIAL PLAN, NORTH END 1ST FLOOR PLUMBING PARTIAL PLAN, NORTH END 1ST FLOOR PLUMBING PARTIAL PLAN, NORTH END 1ST FLOOR PLUMBING PARTIAL PLAN, NORTH END 1ST FLOOR PLUMBING PARTIAL PLAN, EAST END 1ST FLOOR PLUMBING PARTIAL PLAN, EAST END 1ST FLOOR PLUMBING PARTIAL PLAN, EAST END 1ST FLOOR PLUMBING PARTIAL PLAN, EAST END 1ST FLOOR PLUMBING PARTIAL PLAN, EAST END REPLACE EXISTING RAYTHERM MODEL 514 HOT WATER GENERATOR AND 21 GALLON STORAGE TANK WITH NEW AO SMITH HW670 AND MATCHING 119 GALLON TANK. LOOP TEMPERATURE TO BE DROPPED FROM 160E TO 120E ADD NEW 40F ELECTRIC HOT WATER BOOSTER TO PROVIDE 140 INLET HOT WATER. CONSTRUCTION NOTES RE COMPLIANCE CE I ' APPROVED Aug 2 8 2008 City Of Tukwila BUILDING DIVISION CURRENT REVISION 5945820 ECEIVED AUG 1 3 2008 PERMIT CENTE SYMBOL SHEET M2H JOB NO. 586000 -00 11 -14 -M2H DATE 07.08.08 COMP NO. LO THE HOT WATER GENERATOR PROVIDES 120F DEGREE WATER AS A SOURCE FOR THE CAFETERIA AND THE OPERATIONS CENTER BAR SINK USING A RETURN LINE AND A HOT WATER RECIRCULATION PUMP. ORIGINALLY HOT WATER FOR THE CAFTERIA DISHWASHER WAS ALSO DIRECTLY SUPPLIED FROM THIS SYSTEM WHICH REQUIRED OPERATING THE SYSTEM AT 160F. TO REMEDY THIS SITUATION, AN ELECTRIC HOT WATER BOOSTER DEDICATED TO THE DISHWASHER HAS BEEN ADDED ALONG WITH A KITCHEN HOT WATER LINE TO THE CONVEYER DISHWASHER. THE 120 DEGREE PUMPED (DWCP -1) LOOP SERVES THE KITCHEN EQUIPMENT AND ACTS AS A FEED FOR THE 40F BOOSTER HEATER. RESTROOM HOTWATER ON ALL FLOOR IS SUPPLIED BY ELECTRIC HOT WATER HEATERS LOCATED IN THE JANITOR'S CLOSETS ON EACH FLOOR. CONTROL SEQUENCE HOT WATER GENERATOR GAS BURNERS ARE CONTROLLED BY ON BOARD CONTROLS TO MAINTAIN SETPOINT TEMPERATURE IN THE 120 GALLON STORAGE TANK. SET AT 120 DEGREES F. HOT WATER CIRC PUMP DWCP -1 SHALL BE ENABLED BY A DIGITAL OUTPUT POINT FROM THE CMCS CABINET TO RUN ON SCHEDULED CAFTERIA OCCUPANCY OR A WATER FLOW INPUT FROM EITHER FLOW SWITCH IF OFF HOURS. THE PUMP RUN STATUS SHALL BE MONITORED AS A CMCS DIGITAL INPUT POINT THE WATER HEATER SHALL BE CONTROLLED BY ITS ON BOARD CONTROLS BASED ON THE TEMPERATURE IN THE 120 GALLON STORAGE TANK. THE TANK TEMPERATURE SHALL BE MONITORED AS AN ANALOG INPUT POINT TO THE CMCS SYSTEM REPLACE HOT WATER HEATER =TERIA -OT WATER CO \TROL SEQ,E \CE GENERAL DESCRIPTION • THE HOT WATER HEATER STACK EXHAUSTER SHALL BE COMMANDED ON AND OFF BY THE HOT WATER HEATER ON BOARD CONTROLS AND MONITORED BY THE CMCS SYSTEM AS A DIGITAL INPUT POINT THE COMBUSTION AIR MAKE UP FANS SHALL BE MONITORED BY THE CMCS CABINET AS A DIGITAL POINT AND SLAVED TO THE STACK EXHAUSTER OPERATION. THE FAN OPERATION SHALL BE INTERLOCKED TO PREVENT BOILER OPERATION UNLESS THE FANS ARE RUNNING. ITERA -OT WATER CO \TR3L 1" CAFTERIA HOT WATER RETURN LINE BUILDING HOT WATER RECIRC PUMP — CONTROLLED BY BUILDING CMCS SYSTEM CHECK VALVE — TO PREVENT BACKFEEDING RETURN LINE 2" HOT WATER SUPPLY FROM HW -670 BOILER — AO SMITH CER -TEMP 80 CONFIGURATION NEW REDUCED PRESSURE BACKFLOW PREVENTER BUILDING REVISION 586000 -00 LM THOMAS APPROVED DATE 07.08.08 SI\S HET WATER CONTROLS SENSOR TABLE SENSOR TYPE SERVICE INTERFACED TO RANGE VENDOR P/N BOOSTER HEATER EXTERNAL 212F MAX WATER SIEMENS MBC -24 / 0.3 FPS / 0,5 GPM AMERITR ❑L MODEL FLOW SWITCH,' LINE SIZE DRY CONTACT FM- 0750D -01 MAIN HEATER EXTERNAL FLOW 212F MAX WATER SIEMENS MBC -24 / 0.1 FPS / 1.0 GPM _ AMERITR ❑L MODEL SWITCH, 2' LINE SIZE DRY CONTACT FM- 1000D -02 CAFETERIA DOMESTIC H❑T 140F MAX HOT SIEMENS MBC -24 / 70F TO 200F SIEMENS P/N WATER TEMPERATURE WATER 100 OHM RTD / 4 — SURFACE MOUNT 536 -780 20 MA SIGNAL PIPE TEMPERATURE SENSOR. CAFETERIA DISH WASHER HOT 140F MAX HOT SIEMENS MBC -24 / 70F TO 200F SIEMENS P/N WATER TEMPERATURE WATER 100 OHM RTD / 4 - SURFACE MOUNT 536 -780 20 MA SIGNAL PIPE TEMPERATURE SENSOR. CO \ \EC SC INCOMING COLD DOMESTIC WATER 2" SUPPLY CONNECTION TO CAFETERIA HOT WATER PIPING 2" HOT WATER OUTLET FROM STORAGE TANK AO SMITH CER -TEMP 80 CONFIGURATION 3/4" HOT WATER SUPPLY TO BOOSTER HEATER AO SMITH CMC -36 CONFIGURATION 2" COLD WATER SUPPLY TO STORAGE TANK - AO SMITH CER —TEMP 80 CONFIGURATION 2" CITY WATER SUPPLY TO BOILER - AO SMITH CER —TEMP 80 CONFIGURATION - 1= VATIC REVISION !CAL TA RATER SUP TY FLrIrSW1TCH OTECT THE 'BOLE INTERRUPTION OR ►t T` '3N B JLDING COLD WATER SUPPL 4C LO .P.RE E IT ER, C HECK V, LVE O ETE WITH CHEC VAL 1E PROVISI N FO ALE ANN Of 3 : WATER IN THE H T Y'STEM MUST":BE.PROVI ED :: :': `< : vIT- BUR4EY PLJv CIR-TEVP 80 CO\ APPROVED DATE BI \G SCHIV FIGLRATIO\ Q,�BOE /NG tpMOST OPTIO ER CON TR OL CI RCUIT HMOSTAT W /L WAfER.: lII' TO TH P C AO SMIT CVC36 WIR\G ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. iW OO 14W -299; HW.420:, 111/500 & iIQY -670 MATURALGAS) CONNECTION 1�G Vxc t..z b '" VSC .4 ..ot 4 OW rt,sro . daeON+te►tt $1wITCH IN NORt%11#Aptt6PTl ' ORK11 W►1PNPE „.. GUSz tivATN!'M6APPI:I'tMC> : pun' 06E Mri.00M rr NusTat, Rowt4to Ion tt rerP fOreAMrPC a n ni; . £su«r�invr, : rfl/ Vt..Vt*PLAbrt tY4SCunWXKP *rxu�,awr+►r,H . rs �►oawlE QeW++ref€ata Taaw ttsjat acs . SCHEMA /1C DIAGRAM MOM IONIC tora ront •ta cs rrcrc�rs incur: 3; KI$th V Nanutc ONY*tctr. SINGLE STAGEU,ED ROBERYSHAW GAS VALVE .. HW -300 - 399: -420, 520 MODELR FIGi1REj1R < Y WIRI \G SC ITH CVC36 PLUMBI \G SC DRAWN LM THOMAS CHECKED ENGINEER LM THOMAS CHECKED APPROVED APPROVED EVA11C ENATIC EvATIC DATE 06.27.08 06.27.08 SUBTITLE TITLE CAFETERIA HOT WATER CONTROL DIAGRAM MECHANICAL MASTER REPLACE HOT WATER BOILER COL. X -X /X -X LECE\D GE \ERAL \OTES ) GAS FIRED WATER BOILER GFWH-1B CONNECTED PER AO SMITH CERTEMP 80 CONFIGURATION MODIFICATION SHOWN IN DETAIL TO ALLOW FOR HOT WATER RECIRC LINE AND ELECTRIC BOOSTER HEATER CONNECTION 11- 14L -1M110 11- 140 -0M12 11- 140 -0M112 11- 14 —M2G' 11- 14 -M2H 11- 14 —M333 11- 14 —M517 11- 14 —M518 RIPRE\C DUWAMISH. WA 1ST FLOOR LOBBY PLUMBING PLAN GARAGE LEVEL HVAC PARTIAL PLAN GARAGE LEVEL PLUMBING PARTIAL PLAN EQUIPMENT SCHEDULE HVAC EQUIPMENT SCHEDULE PLUMBING PLUMBING CRIB ENLARGED PARTIAL PLAN CAFETERIA /DISHWASHER PLUMBING PLANS CAFETERIA /DISHWASHER PLUMBING PLANS STRLCTC\ ) LOCATE NEW GAS FIRED AO SMITH HW -670 HOT WATER BOILER IN PLUMBERS CRIB AND PLUMB UNIT PER DIAGRAM PROVIDED ) LOCATE ELECTRIC HEATED AO SMITH CMC36 HOT WATER BOOSTER IN PLUMBERS CRIB AND PLUMB UNIT PER DIAGRAM PROVIDED. CONNECT BOOSTER HEATER TO BE SUPPLIED OFF GAS FIRED HOT WATER BOILER ) CONNECT NEW AO SMITH BOILER TO SUPPLY EXISTING CAFETERIA HOT WATER SYSTEM ) ROUTE NEW KITCHEN HOT WATER LINE FROM ELECTRIC BOOSTER TO SUPPLY CAFTERIA CONVEYOR DISH WASHER IN OVERHEAD OF GARAGE LEVEL. INSULATE AND HEAT TRACE NEW WATER LINE ) MOUNT NEW BUILDING CMCS PANEL IN CARPENTERS SHOP AND INTERFACE TO MODIFIED HOT WATER SYSTEM AS CALLED OUT SHEET ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 CURRENT REVISION 586000 -00 SYMBOL JOB NO. 586000 -00 DWG NO. IRAW\CS 11- 0140 -M332 COMP NO. 07.08.08 SYM SIEMENS INSIGHT COMPUTER WITH TRUNK INTERFACE TO NETWORK, ON EMERGENCY POWER SYSTEM 1" KITCHEN HOT WATER RECIRC LINE, CONTINUED THRU SLAB ON SHEET M517 2" KITCHEN CITY WATER LINE, CONTINUED THRU SLAB ON SHEET M517 2" KITCHEN HOT WATER LINE, CONTINUED THRU SLAB ON SHEET M517 3 " COPPER KITCHEN HI -TEMP HOT WATER LINE, INSULATED AND TRACE HEATED, ROUTED ON BOTTOM OF 1ST FLOOR SLAB OVER TO VICINITY OF DISHWASHER ALL PENETRATIONS THRU SLAB 2 HR RATED 43 " 160F HW F OM BOOSTER TO DISHWASHE TEMPERATURE SENSOR - MONITORED BY CMCS SIEMENS MBC -24 CMCS CABINET, ON EMERGENCY POWER SYSTEM 3 " 120F HW TO BOOSTER FROM STORAGE TANK s i" FLOW SWITCH - MONITORED BY CMCS HW RECIRC PUMP - CONTROLLED BY CMCS 11 %iin ram • 41 rid 4' -10" 2' -11" 4' -10" 8' -11 1/2" AO SMITH -MODEL CMC t...i 36 WATER HEATER, - PR VALVE PLUMBER - 0 FLOOR DRAIN SHOCK ARRESTER 10" VENT HOOD TJERLUND VH1 - 10 AO SMITH MODEL HW -670 WATER HEATER, PLUMBED PER AO SMITH CER -TEMP CONFIGURATION, WITH CER -TEMP KIT AND POWER VENT KIT SUPPLIED WITH BOILER, 10" DOUBLE WALL VENT PIPE PV 1A AO SMITH MODEL TJV -120 120 GALLON HOT WATER STORAGE TANK, TPR VALVE PLUMBER TO FLOOR DRAIN PV 1B PLUMBERS CRIB AIR FLOW SWITCH - MONITORED BY CMCS COMBUSTION MA SUPPLIED THROUG X 24" DOOR LOUVE AIR 24" x sF —or{ M -19.1 I'' SF -ON M-19,. A M33 M563 REVISION BY APPROVED - REPLACE HOT WATER BOILER 586000 -00 LM THOMAS CFH DATE 07.08.08 SYM REVISION BY PLUvBI\G E\LARCED PARTIAL PLA\ - HOT WATER SCALE: 1 /4 " =1'0" APPROVED DATE 30' -0" 28' -0" 15' -0" Q BOE /NG V 1 OM112 M333 Mod - \BCP ISSUE FOR PERMIT REV1 JOB 586000 -00 08108/08 BRAWN LM THOMAS CHECKED ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED ENCINEER APPROVED BY DEPT. DATE LM THOMAS CHECKED APPROVED APPROVED DATE 11.30.07 11.30.07 24X48 BIRDSCREEN COMBINATION AIR INTAKE TITLE ( 18.2 REti PLIANCE COD� pR OVED PU6 2 8 20 City Of Tuk w �� WILDING DIVISION � -"'" (DISCIPLINE) MASTER RECEIVE AUG 13 2008 PERMIT CENTEF, SUBTITLE PLUMBING CRIB PIPING ENLARGED PARTIAL PLAN LECE\D GE \ERAL \OTES 1) PV-1B: TJERLUND HS -4 115 VAC, 1725 RPM MOTOR, HP, 5.8 AMPS 10" VENT PIPE, 700,000 BTUH AT 100 FT MAX PIPE LENGTH. INCLUDES 24 / 115 VAC SWITCHING RELAY AND FAN PROOF SWITCH. NOMINAL RATING AT 70F, 925 CFM AT 0" IN WC, 800 CFM AT .50 IN WC, 620 CFM AT 1.0" IN WC VENT STACKS SHALL BE ASSEMBLED USING UL '1738 CLASS 3 RATED COMPONENTS. PARTS SHALL CARRY A UL TYPE DGSH LISTING RATED FOR A MAXIMUM APPLIANCE OUTLET OF 480F WITH A MINIMUM CLEARANCE TO COMBUSTIBLES OF 4 INCHES. o. REPLACE HOT WATER BOILER BUILDING 11 -14 COL. X -X /X -X 11- 14 -M2h 11 -14 -M332 11- 14 -M517 11- 14 -M518 11- 14L -1M110 11- 140 -0M12 11- 140 -0M112 11- 140 -0E212 REFERENCE DRAWI \GS EQUIPMENT SCHEDULE PLUMBING CAFETERIA HOT WATER CONTROL DIAGRAM CAFETERIA /DISHWASHER PLUMBING PLAN CAFETERIA /DISHWASHER PLUMBING PLAN 1ST FLOOR LOBBY PLUMBING PARTIAL PLAN GARAGE LEVEL HVAC PARTIAL PLAN GARAGE LEVEL PLUMBING PARTIAL PLAN GARAGE LEVEL HVAC CONTROLS PARTIAL PLAN INSTALL NEW 120 GALLON AO SMITH PREINSUALATED STORAGE TANK TO REPLACE 21 GALLON RAYTHERM TANK I::» INSTALL NEW AO SMITH HW 670 HOT WATER BOILER AT APPROXIMATE LOCATION SHOWN. INSTALL 10" CLASS B VENT PIPE TO REPLACE EXISTING CX:= RECONNECT NEW HOT WATER HEATER AND STORAGE TANK TO PIPING AS SHOWN ON SHEET M332. ROUTE TEMP /PRESSURE RELIEFS TO FLOOR DRAIN AND CONNECT EXPANSION TANK. REPLACE EXISTING STACK AND POWER VENTILATOR FROM Et=> RAYTHERM WATER HEATER WITH NEW 10" STACK AND POWER VENTILATOR TO MATCH AO SMITH WATER HEATER ) C0\STRUCTIO \ \OTES NOTE FASTEN WATER HEATER COMPONENTS DIRECTLY TO THE GARAGE FLOOR SLAB WITH EXPANSION BOLTS FOR SEISMIC RESTRAINT. ADD SURPLUS SBT MBC -24 AT LOCATION SHOWN. SEE CMCS SHEETS FOR ADDITIONAL DETAILS. MBC TO BE INTERFACED INITALLY WITH REVISED HOT WATER SYSTEM INSTALL 36 KW BOOSTER HEATER AT LOCATION SHOWN. Et>, CONNECT TO ADJACENT 120E HOT WATER SYSTEM FOR SUPPLY THEN EXTEND NEW SUPPLY LINE ACROSS GARAGE TO CONVEYOR DISHWASHER IN CAFETERIA, ROUTE TPR RO FLOOR DRAIN INSTALL BOOSTER FANS INTO EXISTING TRANSFER DUCTS THAN BC> SUPPLY BOILER ROOM. SLAVE FANS TO BOILER STACK EXHAUSTER AND PROOF SWITCHES TO LOCK OUT BOILER. REPLACE EXISTING DOOR WITH TRANSFER GRILLE WITH DOOR Ut>. ASSEMBLY RATED FOR 1 HOUR WALL CONSTRUCTION. REINSTALL EXISTING PUSH BUTTON COMBINATION LOCK INSTALL NEW VENT STACK FOR BOILER USING PARTS RATED ID%'' PER GENERAL NOTE 2. ACCEPTABLE PRODUCTS INCLUDE SELKIRK SAF -T -VENT CI PLUS, SECURITY FAS N SEAL W2, AND METAL -FAB CORR /GUARD CURRENT REVISION SYMBOL 586000 -00 SHEET JOB NO. SITE DWG NO. M333 586000 -00 11 -14 -M333 DATE COMP NO. 07.08.08 65 • CO \STRUCTION \OTES SHUT DOWN EXISTING RAYTHERM HOT WATER HEATER. THIS Et> WILL SHUT DOWN ALL 140E HOT WATER SUPPLY FOR THE CAFETERIA DC> REMOVE THE EXISTING RAYTHERM 21 GALLON STORAGE TANK AND RAYTHERM MODEL 514 HEATER AFTER DISCONNECTING EXISTING HOT WATER SUPPLY AND RETURN LINES, NATURAL GAS SUPPLY, EXHAUST STACK, AND PRESSURE / RELIEF VALVE LINES REMOVE EXISTING WATER HAMMER ARRESTER AND SAVE FOR CI> REUSE 4) NOTE EXISTING WATER HEATER COMPONENTS ARE DIRECTLY BOLTED TO THE GARAGE FLOOR SLAB. SYM R RAYTHERM MODEL 514 HOT WATER GENERATOR SHOCK ARRESTER LINES ROUTED UP THROUGH SLAB IN CAFETERIA MECHANICAL ROOM. ALL PENETRATIONS 2 HR RATED 5" POWER STACK VENTILATOR TJERLUND HSUL -2 DOOR WITH 24" X 24" DOOR LOUVER REVISION REPLACE HOT WATER BOILER 586000 -00 BY LM THOMAS APPROVED CFH DATE SYM REVISION 07.08.08 BY PLUVBI \G ENLARGED PARTIAL PLAN - HOT WATER SCALE: 1/4"=1'0" APPROVED DATE OM 1121M333R Q BOE /NG ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN LM THOMAS CHECKED ENGINEER LM THOMAS Mob CHECKED APPROVED APPROVED DATE 1 1.30.07 11.30.07 (go ) PV -1: TJERLUND HSUL -2. 115 VAC, 3300 RPM MOTOR, 166 WATTS 6" VENT PIPE, 550,000 BTUH AT 94 FT MAX PIPE LENGTH. INCLUDES 24 / 115 VAC SWITCHING RELAY AND FAN PROOF SWITCH. NOMINAL RATING AT 300F, 1.2 IN WC 80 CFM, 0.95 IN 150 CFM, 0.60 IN WC 200 CFM 11- 14 -M2h 11- 14 -M332 11- 14 -M517 11- 14 -M518 11- 14N -1M111 11- 140 -0M12 11- 140 -OM112 LEGE \D ISSUED FOR PERMIT JOB 586000 -00 08/0812008 SUBTITLE TITLE PLUMBING CRIB ENLARGED PARTIAL PLAN MECHANICAL MASTER REPLACE HOT WATER BOILER BUILDING 11 -14 COL X-X/X-X DUWAMISH, WA CE\ERAL \OTES REFERE \CE DRAWI\OS EQUIPMENT SCHEDULE PLUMBING CAFETERIA HOT WATER CONTROL DIAGRAM CAFETERIA /DISHWASHER PLUMBING PLAN CAFETERIA /DISHWASHER PLUMBING PLAN 1ST FLOOR PLUMBING PARTIAL PLAN - SOUTH HALF GARAGE LEVEL HVAC PARTIAL PLAN GARAGE LEVEL PLUMBING PARTIAL PLAN CURRENT REVISION 586000 -00 SHEET M333R JOB NO. 586000 -00 DWG NO. RECEIVED AUG 1 3 2008 PERMIT CENTEF SYMBOL n DATE 11 -14 -M333R COMP NO. 07.08.08 INSTALL ISOLATION VALVES ACC EPTAB I LITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED ENLARGED INSTLL NEW 40F RATED ELECTRIC HOT WATER BOOSTER HEATER EWH —1N —3 IN LINE TO DISHWASHER TO ALLOW DOMESTIC HOT WATER LOOP TO BE RESET TO 120F I 1/2" PRESSURE VACUUM BREAKER, WATTS, MODEL 800M 3/4" PRESSURE VACUUM BREAKER, WATTS, MODEL 800M 3/4" DOUBLE CHECK VALVE ASSEMBLY, WATTS, MODEL 007M2QT 4 3/8" REDUCED PRESSURE BACKFLOW PREVENTOR, CONBRACO, MODEL 4020202 3/4" REDUCED PRESSURE BACKFLOW PREVENTOR, WATTS, MODEL 909 6 > 1/2" ATMOSPHERIC VACUUUM BREAKER, WATTS, MODEL 9D --CW-- —+IW —HWC— KI AVB PVB DCVA RPBP AFF DOMESTIC WATER DOMESTIC HOT WATER HOT WATER CIRCULATING BALL VALVE GATE VALVE GLOBE VALVE SOLENOID VALVE WATER FAUCET (Sc VALVE ASSEMBLY FLOW CONTROL VALVE W/M ETERI NG ATMOSPHERIC VACUUM BREAKER PRESSURE VACUUM BREAKER DOUBLE CHECK VALVE ASSEMBLY REDUCED—PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY ABOVE FINISHED FLOOR SUBTITLE CAFETERIA / DISHWASHER PLUMBING PLAN CONSTRUCTION NOTES: CURRENT REVISION 586000-00 REPALCE HOT WATER BOILER 586000-00 LM THOMAS CFH 07.08.08 el APPROVED TITLE MECHANICAL MASTER REPLACE HOT WATER BOILER BUILDING 11-014 COL. A —E/8 —11 DUWAMISH, WA DWG NO. 11-14—M517 a 0 CN CO LJ IMP' All 111111111ra iilir111111 NM% 111E1 I 1"HW Ti KITCHEN VEG SINK 0 DOWN THRU F OOR ■� wt ' MIlliiiii4111 r �- =� ��a ll 3 / 4 HOSE W ICI 3 /4„ FIRST FLOOR SYM A B C D ., REVISION AS BUILT PROVIDE BACKFLOW PREVENTION INSTALL ISOLATION VALVES INSTALL ICE MACHINE 57094 D99F2077 20553 BY EISI EISI EFL EFL APPROVED DATE 11/09/90 10/16/99 06/12/00 SYM 11167M.11111KaliM - iw E p RE; irN� N � /HOSE COFFEI t 4#> 4 /1 4IrLrL) REVISION SCALE: 1/4"= 1 - ITC APPROVED DATE ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN RMYHRE CHECKED ENCINEER CHECKED APPROVED APPROVED SCALE:NONE DATE 11/06/90 HOSE REEL 1/2"PVB - LOCATED APPROX 8'AFF DETAIL TITLE MECHANICAL MASTER 1M1131M113 REPLACE HOT WATER BOILER BUILDING 11 -14 COL. A- C/8 -10 IN -D-7-- - 6d AVB PVB DCVA RPBD AFF ODE CDiypu1 c! CODE WED A 2 B 200 City of Tukwii I BUILDING DIV1,S pK Bip SUBTITLE CAFETERIA / DISHWENLASHER ARGED PLUMBING PLAN LEGEND GENERAL NOTES: REFERENCE ONLY JOB #586000 -00 DOMESTIC WATER DOMESTIC HOT WATER HOT WATER CIRCULATING HOT WATER HI TEMP BALL VALVE GATE VALVE GLOBE VALVE SOLENOID VALVE WATER FAUCET & VALVE ASSEMBLY FLOW CONTROL VALVE W /METERING PORTS ATMOSPHERIC VACUUM BREAKER PRESSURE VACUUM BREAKER DOUBLE CHECK VALVE ASSEMBLY REDUCED- PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY ABOVE FINISHED FLOOR DUWAMISH, WA 1/2" PRESSURE VACUUM BREAKER, WATTS, MODEL 800M 3/4" PRESSURE VACUUM BREAKER, WATTS, MODEL 288A 3/4" DOUBLE CHECK VALVE ASSEMBLY, WATTS, MODEL 007M2QT 3/8" REDUCED PRESSURE BACKFLOW PREVENTOR, CONBRACO, MODEL 4020202 3/4" REDUCED PRESSURE BACKFLOW PREVENTOR, WATTS, MODEL 909 CONSTRUCTION NOTES: ECEIVEP AUG 13 2000 PERMIT CENTE REVISION SHEET JOB NO. DWG NO. NORTH TOWER <EY PLAN SYMBOL M518 5586000 -00 11- 14 -M518 DATE 06/12/00 COMP NO a no co 0 0 0 ..1 0 1- SYM ENTRANCE TO PARKING AREA REVISION A -8 1ST FLOOR EXTERIOR WINDOWS M 19 REPLACE HOT WATER BOILER 586000 -00 BY LM THOMAS APPROVED DATE SYM 14\ \G EAST - PLUvIBERS CRIB REVISION EXTERIOR ELEVATION BY APPROVED DATE 15' -6" I � 1 M333 M563 g ® A- 7 L -" 9 3' -0" ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT, CAFETERIA INTAKE / EXHAUST LOUVER DATE LANDSCAPING CONCRETE RETAINING WALL DRAWN LM THOMAS CHECKED ERCINEER LM THOMAS CHECKED STEEL GAS LINE TO PSE METER AND SEISMIC VALVE 08.07.08 APPROVED APPROVED ORIGINAL 8" BOILER VENT STACT UPSIZED TO 10" DIAMETER FOR NEW BOILER CO\STRUCTO\ \OT DATE SUBTITLE 08.07.08 BOILER VENT STACK LOCATION - EXTERIOR WALL TITLE MECHANICAL MASTER REPLACE HOT WATER BOILER BUILDING 11 -014 COL . x -x /x -x SITE LECE\D GE \ERAL STACK PENETRATION AND EXHAUST CAP FOR HOT WATER BOILER LOCATED IN PLUMBERS CRIB REFERE \C ISSUE FOR PERMIT REVI JOB 586000 -00 08108/08 \CTES CURRENT REVISION 586000 -00 3RAW\GS RECEIVE AUG 13200B PERMIT CENTER SYMBOL SHEET M563 JOB NO. 586000 -00 DATE COMP NO. DWG NO. 11- 014 -M563 r c 1ST FLOOR CONCRETE SPANDREL PANEL cV a• 15' -O ( PARKING LEVEL CONCRETE WALL (PLUMBERS CRIB INSIDES i PAVEMENT 1 33' -6" SYM ENTRANCE TO PARKING AREA REVISION A -8 1ST FLOOR EXTERIOR WINDOWS M 19 REPLACE HOT WATER BOILER 586000 -00 BY LM THOMAS APPROVED DATE SYM 14\ \G EAST - PLUvIBERS CRIB REVISION EXTERIOR ELEVATION BY APPROVED DATE 15' -6" I � 1 M333 M563 g ® A- 7 L -" 9 3' -0" ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT, CAFETERIA INTAKE / EXHAUST LOUVER DATE LANDSCAPING CONCRETE RETAINING WALL DRAWN LM THOMAS CHECKED ERCINEER LM THOMAS CHECKED STEEL GAS LINE TO PSE METER AND SEISMIC VALVE 08.07.08 APPROVED APPROVED ORIGINAL 8" BOILER VENT STACT UPSIZED TO 10" DIAMETER FOR NEW BOILER CO\STRUCTO\ \OT DATE SUBTITLE 08.07.08 BOILER VENT STACK LOCATION - EXTERIOR WALL TITLE MECHANICAL MASTER REPLACE HOT WATER BOILER BUILDING 11 -014 COL . x -x /x -x SITE LECE\D GE \ERAL STACK PENETRATION AND EXHAUST CAP FOR HOT WATER BOILER LOCATED IN PLUMBERS CRIB REFERE \C ISSUE FOR PERMIT REVI JOB 586000 -00 08108/08 \CTES CURRENT REVISION 586000 -00 3RAW\GS RECEIVE AUG 13200B PERMIT CENTER SYMBOL SHEET M563 JOB NO. 586000 -00 DATE COMP NO. DWG NO. 11- 014 -M563 Z t. 00 9 L 9 g 4D20 1 004 (I 4D20 1 004 4D20 1 006 1 "A "HWP.DCWP01 CIRCULATION PUMP 2 logical descriptor 3 "A "HW.FLOW HOT WATER USE 4 logical descriptor 1 "A "PVA1 MAKEUP AIR FAN 2 "A "PVA2 MAKEUP AIR FAN 3 "A "BLR BOILER STATUS 4 LOGICL (DESCRIPTOR) -vo MAKEUP AIR FAN MAKEUP AIR FAN ON O h to °� 0 Z t. 00 9 L 9 g 4D20 1 004 1 "A "PVA1 MAKEUP AIR FAN 2 "A "PVA2 MAKEUP AIR FAN 3 "A "BLR BOILER STATUS 4logical descriptor i7 Z OO 8 L 9 g ®00 4D20 1 006 1 "A "HWP.DCWP01 CIRCULATION PUMP 2 logical descriptor 3 "A "HW.FLOW HOT WATER USE 4 logical descriptor 1£ZL 00 8 L 9 g 000 202501 005 1 "A "HWP.DCWP01 CIRCULATION PUMP 2 logical descriptor - 7£Z 8L 9S p p 2Q2501 005 1 "A "PVA1 2 "A "PVA2 MAKEUP AIR FAN MAKEUP AIR FAN COL. L/19 00 ®1 O(0 to 21420 1 016 1 "A "DHWPT TEMPERATURE 2 logical descriptor POWER SUPPLY VODUL CIRCUIT ID NXP -15b CONTROLLER V 09,L TRK /PANEL# DUW /07 "A" - DUW.11N.OFL19. " _ 24 Vac RA1 a 11 RA2a 120 Vac OL'S OL'S N 10`t —_ 00 1 1 2 N 1 " RA1b LI I RA2b 11 1 004 2 LOGICL (DESCRIPTOR) 2Q250M 1 LOGICL (DESCRIPTOR) O N LATCHING STARTER CIRCUIT "LDO" (Typical) "CERTEMP 80" JUNCTION BOX (Typical) DIGITAL INPUT POINT "L I" (Typical) TO CIRC PUMP TO DRAFT INDUCER G \ - RAL VOTES: 1. TERMINATE WIRE PER MANUACTURERS' DIRECTION AT SENSOR AND MODULES. CO\STRLCTO\ MOUNT NEW ENCLOSED RELAY AND CONNECT TO DRAFT INDUCER OUTPUT CIRCUIT OF THE BOILER CONTROL. REFER TO DRAWING E550 AND TO MANUFACTURER'S LITERATURE FOR DETAILED TERMINATION. CONTACT PLANT ENGINEERING ON ANY QUESTIONS. REF .R \C RI= VIEWFOR CODE COMPLIANCE MP MED AUG 2 8 2x08 City Of Tukwila BUILDING DIVISION_ DRAWI \GS: ECEIvE AUG 13 2008 PERMIT CENTER \OYES: SYM A REVISION REVISED TERMINATION DETAILS AET BY APPROVED DATE 08.07.08 SYM REVISION BY APPROVED DATE FACILITIES DEPARTMENT ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN BY TURNBULL CHECKED AET CHECKED APPROVED APPROVED DATE 06.30.08 06.30.08 SUBTITLE SECTIONS AND DETAILS, SCHEDULES TITLE ELECTRICAL MASTER COL BUILDI \G 11 -14 DUWAMISH LAST REVISION SYMBOL SHEET -549 JOB NO. 586000 -00 DATE 08.07.08 OF COMP NO. DWG NO. 11- 14 -E549 cr M , c // G< 1 g Ge4 2 G. G G. Q (J V I IRRIGATION CONTROL W.P. al 2 R H i 1 T, d c� 2 0V ©TRASH COMPACTOR � �''' U O LEGEND - , . ..� EQUIPMENT —� ii - . �r i i - --■ =- N xP 2 DRYER RELAY — — — — _ — - �+ �NXP /15b 1 : � NP _ © TRANSFORMER -DRAWN TO SCALE ON PLANS 1� PANEL- 120/240V, 1 PHASE, 3 WIRE OR 208Y/120V,_3 PHASE, 4 WIRE PANEL- 480Y/277V, 3 PHASE, 4 WIRE OR 480V, 3 PHASE, 3 WIRE ® DISTRIBUTION SWITCHBOARD OR GEAR AS NOTED CONNECTION - , . . I �� CP 1 � FO R AIR (1 ) III 4 ® ■ � CMCS PILOT ■� 6 4 6 'mint ■ .� 3 BAL 17 ENCLOSURE NP /17 ( RP 1 0/2 3 • 3 I04� .!t (( FLEXIBLE WIRE AND CIRCUITS CMCS MBC -07 m . IRRIGATION CONTOL CKT. SEE E -2 FOR CONTROL WIRE VALVES. .� - RACEWAY AND WIRE CONCEALED IN CEILING OR 18:2 1 8 51 WALL. HASH MARKS INDICATE NUMBER 12 AWG WIRE UNLESS OTHERWISE NOTED. 2 WIRES IF NO HASH MARKS ARE SHOWN. LONG HASH MARK DENOTES NEUTRAL. ROUND DOT DENOTES GROUND WIRE. ' 4 6 'r ■ ■ RACEWAY EXPOSED RACEWAY UP 4 - . - RACEWAY DOWN I 4 1 (l■ ■ ■ ■■ • — ■ ■ ■■ HOMERUN TO PANEL ■�' - F NP /4,6 0J JUNCTION BOX —LV— CLASS II WIRING GENERAL NOTES 1 " - 16 14 1) ALL CONDUIT TO BE 1/2" E.M.T. UNLESS OTHERWISE NOTED 2) ALL WIRE TO BE THWN UNLESS OTHERWISE NOTED 3) THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS, 120/208V 277/480V N "A" PHASE LEFT BUS IN PANEL) BLACK BROWN "B" PHASE CENTER BUS IN PANEL) RED ORANGE "C" PHASE RIGHT BUS IN PANEL) BLUE YELLOW NEUTRAL WHITE GREY EQUIPMENT GROUND GREEN 4 ) LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY 1 #14 G D 0 •1 - • ii //1/1/// 1 " -12 #14, 1 14 GND l ■■ ■■ • ■� OP' APPROPIATELY COLORED TAPE. R ` u 5 ) ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO B ACK TO SOURCE. INCLUDING PLUG -IN CIRCUIT BREAKERS 6) SHE E � AND E3 AND BUSWAYS SHOWN ON 7) DYMO LABEL ALL RECEPTACLES, J- BOXES, SWITCHES, • V 'IT �' / • • _.0 R R \VITCH NO A EXHAUST FAN :.: ► r:� �u r �L � ■ o M isT � • P ; ,I • UP a wpm _ / / 1 11 EXHAUST SHAFT FROM 5 FLOOR _ FAN ROOM FAN _ — or - ,� I, �� � O c T `S R I I T I O\ T E TC., WITH CIRCUIT IDENTIFICATION, \ O I�� I _ Oa �� SO EXHAUST FAN - I I\ V 1 - ;) INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. \ i ( � No..- DISCONNECT POWER TO THE POWER VENTER FAN MOTOR TO FACILITATE ITS REMOVAL. SAVE THE CIRCUIT AND RECONNECT TO THE NEW EXHAUST FAN 5 3, i i 1 6 .. 1 / / NP /19a ROUTE 1/2" EMT, 2#124120 FROM THE SPARE CIRCUIT BREAKER AT PANEL NXP /15b TO THE NEW CMCS MBC AND WIRE TO POWER THE MBC. ©r►- FABRICATE AND INSTALL A PILOT RELAY PANEL FOR THE NEW SUPPLY -4. \ 0 %. FANS. SEE SHEET E550 FOR PANEL. ROUTE 1/2" EMT, 2#12, #12G BACK i 0. / / 4 T STAT FO HEAT TRACE TO PANEL NP TO THE SPARE CIRCUIT BREAKER AT POSITION 17. SEE SHEET 0E212 FOR CMCS CONTROL, 4 INSTALL THE FUSED DISCONNECT SWITCH SUPPLIED WI WITH THE BOILER „ APPROX WHERE SHOWN. EXTEND PANEL NP /17, 1/2 _ EMT, 2 #12, #12G AS SHOWN AND WIRE UP THE DISCONNECT. INSTALL THE TERMINAL BARRIER JUNCTION BOX SUPPLIED WITH THE BOILER NEXT TO THE FUSED DISCONNECT SWITCH. ROUTE 1/2" EMT, #12 WIRE AS INDICATED FROM THIS BOX TO THE FUSED DISCONNECT SWITCH, THE TANK TEMPERATURE CONTROL, THE SAFETY FLOW SWITCH, THE HOT WATER CIRCULATING PUMP, THE THERMAL BALANCER, AND THE PRIMARY OF THE BOILER CPT. SEE SHEET 11- 140 -M332 AND WIRE UP THE UNITS. 0 o� 1 \ la / t ■■ M I-F 1 ED fort Revitt cope cvr. so 200 AIG 2 cot u ' .-� G2 00 G 0Z 1 _ I 3 ; ; •• 0E61 0E60 1 3 • • \ ♦ / est �� •• 8 1-_) 0 0E67 ecE66 ®i ,..5 oil . r @RI OEM e1, 69 O OED 7 1 e 8 ,.---- VIII ISSUED FOR PERMIT 586000-00 8 08 zoo8 JOB 0 / / G 0 ■■ 1 1 1 Z. 6:j , _ Y P LA ��, AUG ?_ SCALE: NONE PERMIT CENTE ��.a��° SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE gLAMIGKEZAKIff® ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN S. HITCHCOCK DATE 8/29/05 SUBTITLE 208Y/1 20 VOLT POWER CURRENT REVISION 586000 -00 SYMBOL � DATE 06,30.08 CHECKED A CAS OPS CENTER SSH CAS 9/8/05 SHEET 0 E 6 2 ENGINEER TITLE BUILDING 11-14 ELECTRICAL MASTER COL. A— G/6 -12 DUWAMISH, WA B REPLACE HW BOILER 586000 -00 STEWART 06.30.08 APPROVED BY DEPT, DATE CHECKED JOB NO COMP N0: APPROVED DWG NO. 11- 14 -0E62 APPROVED SEE 1E61 NSWBD-1/ AC 1N 6.4A COND 1/2" 4#14 TO FAN COIL UNIT ON 1ST FLOOR CAS OPS DATA ROOM SEE 1E61 EXHAUST FAN RF -2S EXHAU FAN RF -1S FAN ROOM INTAKE SHAFT FROM 1ST FLOOR UP EXHAUST SHAFT FROM 5TH FLOOR DOWN SYM A B` G4 a2 'G.6 G.8 REVISION OPS CENTER MECH UPGRADES REPLACE HOT WATER BOILER J #150689 586000 -00 BY SSH STEWART APPROVED CAS DATE SYM REVISION BY APPROVED DATE 7/27/06 6.26.08 Q,�BOE /NG� o' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE 3/4" 3 #10 TO NXX/13,15,17 ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 DRAWN SSH CHECKED ENCINEER CHECKED APPROVED APPROVED D T SUBTITLE 7/17/06 TITLE ELECTRICAL MASTER B(p 277/480 VOLT POWER BUILDING 11 -14 COL. G- N/12.6 -19 1) ALL CONDUIT TO BE 1/2" E.M.T. UNLESS OTHERWISE NOTED 2) ALL WIRE TO BE STRANDED COPPER CONDUCTOR INSULATION TYPE THWN OR THHN, SIZE #12 AWG UNLESS OTHERWISE NOTED. THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V "A" PHASE (LEFT BLACK BROWN BUS IN PANEL) "B" PHASE (CENTER RED ORANGE BUS IN PANEL) "C" PHASE (RIGHT BLUE YELLOW BUS IN PANEL) NEUTRAL WHITE GREY EQUIPMENT GROUND GREEN GREEN ISOLATED GROUND GRN /YEL* GRN /YEL* * GREEN WITH YELLOW TRACER * GREEN WITH YELLOW TRACER LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPIATELY COLORED TAPE. ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG —IN CIRCUIT BREAKERS ON BUSWAYS. 6) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3. 7) DYMO LABEL ALL RECEPTACLES, J— BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. LEGEND O EX GENERAL NOTES HEATER 3KW,277VAC, 1 PHASE, WALL MOUNTED, EXPLOSION -PROOF PCN 268701 CHROMALOX CAT.# FTEP -3 THERMOSTAT SINGLE STAGE SPST LINE VOLTAGE 277V 18AMP, 500 WATT 40 — 90 F, EXPLOSION PROOF PCN 266124 CHROMALOX CAT.# WR -80EP A CONDUIT SEAL. CROUSE HINDS CAT.# EYS116 CD EX CONSTRUCTION NOTES INSTALL A 60A FUSED DISCONNECT SWITCH FOR THE BOOST HEATER APPROX WHERE SHOWN. ROUTE 1 "C, 3 #6 TO THE HEATER AND CONNECT. RECEIVE AUG 13 200B PERMIT CENTEF REVIEWED FOR CODE COMPLIANCE PR VED AUG 2 8 2008 City Of Tukwila BUILDING DIVISION 1 0.5 K CURRENT REVISION 586000 -00 G.2 - Y-PLA\ SCALE: NONE SYMBOL SHEET 0E112 JOB NO. DUWAMISH, WA DWG N0 11- 14 -0E112 DATE (�1 6.26.08 COMP NO. ei,• 1 �3 � � O�D� 111 1 0e11c0 OD 1,7 O D11165 96X11t5 GE I OE1211 f ` f OUZO OED1<10 DEx11 all 1 SEE 1E61 NSWBD-1/ AC 1N 6.4A COND 1/2" 4#14 TO FAN COIL UNIT ON 1ST FLOOR CAS OPS DATA ROOM SEE 1E61 EXHAUST FAN RF -2S EXHAU FAN RF -1S FAN ROOM INTAKE SHAFT FROM 1ST FLOOR UP EXHAUST SHAFT FROM 5TH FLOOR DOWN SYM A B` G4 a2 'G.6 G.8 REVISION OPS CENTER MECH UPGRADES REPLACE HOT WATER BOILER J #150689 586000 -00 BY SSH STEWART APPROVED CAS DATE SYM REVISION BY APPROVED DATE 7/27/06 6.26.08 Q,�BOE /NG� o' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE 3/4" 3 #10 TO NXX/13,15,17 ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 DRAWN SSH CHECKED ENCINEER CHECKED APPROVED APPROVED D T SUBTITLE 7/17/06 TITLE ELECTRICAL MASTER B(p 277/480 VOLT POWER BUILDING 11 -14 COL. G- N/12.6 -19 1) ALL CONDUIT TO BE 1/2" E.M.T. UNLESS OTHERWISE NOTED 2) ALL WIRE TO BE STRANDED COPPER CONDUCTOR INSULATION TYPE THWN OR THHN, SIZE #12 AWG UNLESS OTHERWISE NOTED. THE FOLLOWING COLOR CODING OF CONDUCTORS SHALL BE OBSERVED ON ALL CIRCUITS 600 VOLTS OR LESS. 120/208V 277/480V "A" PHASE (LEFT BLACK BROWN BUS IN PANEL) "B" PHASE (CENTER RED ORANGE BUS IN PANEL) "C" PHASE (RIGHT BLUE YELLOW BUS IN PANEL) NEUTRAL WHITE GREY EQUIPMENT GROUND GREEN GREEN ISOLATED GROUND GRN /YEL* GRN /YEL* * GREEN WITH YELLOW TRACER * GREEN WITH YELLOW TRACER LARGE SIZE CONDUCTORS WHICH DO NOT HAVE COLORED JACKETS SHALL BE IDENTIFIED WHEREVER VISIBLE BY APPROPIATELY COLORED TAPE. ALL UNUSED CONDUIT AND WIRE TO BE REMOVED BACK TO SOURCE. INCLUDING PLUG —IN CIRCUIT BREAKERS ON BUSWAYS. 6) FEEDERS TO PANELS AND BUSWAYS SHOWN ON SHEETS E2 AND E3. 7) DYMO LABEL ALL RECEPTACLES, J— BOXES, SWITCHES, ETC., WITH CIRCUIT IDENTIFICATION. INSTALL REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. LEGEND O EX GENERAL NOTES HEATER 3KW,277VAC, 1 PHASE, WALL MOUNTED, EXPLOSION -PROOF PCN 268701 CHROMALOX CAT.# FTEP -3 THERMOSTAT SINGLE STAGE SPST LINE VOLTAGE 277V 18AMP, 500 WATT 40 — 90 F, EXPLOSION PROOF PCN 266124 CHROMALOX CAT.# WR -80EP A CONDUIT SEAL. CROUSE HINDS CAT.# EYS116 CD EX CONSTRUCTION NOTES INSTALL A 60A FUSED DISCONNECT SWITCH FOR THE BOOST HEATER APPROX WHERE SHOWN. ROUTE 1 "C, 3 #6 TO THE HEATER AND CONNECT. RECEIVE AUG 13 200B PERMIT CENTEF REVIEWED FOR CODE COMPLIANCE PR VED AUG 2 8 2008 City Of Tukwila BUILDING DIVISION 1 0.5 K CURRENT REVISION 586000 -00 G.2 - Y-PLA\ SCALE: NONE SYMBOL SHEET 0E112 JOB NO. DUWAMISH, WA DWG N0 11- 14 -0E112 DATE (�1 6.26.08 COMP NO. NAMEPLATE SCHEDULE NP1 HOT WATER HEATER MAKE UP AIR PILOT RELAY PANEL 4 "x2" PHENOLIC LABEL NP2 24 VDC TB2 2"x1" PHENOLIC LABEL NP3 120 VAC TB1 2 "x1" PHENOLIC LABEL SYM ] ] REVISION J J 1 NP2 SCALE: NTS NP1 (ON FACE OF DOOR) 12 ,, 0000 RA Om00 RA2 DOOR NOT SHOWN FOR CLARITY RELAY PA \EL LAYOUT BY APPROVED NP3 TB1 120VAC DATE M1E66 SYM E544 REVISION BY APPROVED 120 VAC FROM PANEL NP N A B C DATE TB1/ H1 r TB1/ H3 TB1/ H4 24 VDC SCALE: NTS RA1 /1 TB1/ RA1 /2 H3A 1 Q E SPARE TB1 /L3 ❑ SPARE RA2 /2 PANEL WIRING, TYP. 120 VAC WRI\G SC el .. .araterzw ® TB1/ H1A TB1 /L1 TB1/ H2A ■ T67 /L2 SPARE TB1/ H4A 1:1 SPARE TB1 /L4 SPARE IC \- PANEL TERMINAL, NP, FIELD WIRING, TYP. -a- SUPPLY FAN SF -OL -M -19.1 _._ SUPPLY FAN SF -OL -M -19.2 BENEATH EXIT T62/7 ❑ - - CMCS MBC -07 (-- y SEE DRAWING 11- 14 -E549 EvATIC J ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN STEWART CHECKED ENGINEER CHECKED APPROVED APPROVED EA ALLEN BRADLEY ALLEN BRADLEY 700HA -32A24 700 - HN125 DPDT, 24VAC COIL TUBE BASE SOCKET ITEM NO. QTY. UNIT MANUFACTURER CATALOG NO. DESCRIPTION BY EA WIEGMANN B121206CH 12 "Hx12 "Wx6 "D, NEMA 12 ENCLOSURE, WITH W/ P1212 PANEL BACKPANEL AND CONTINUOUS HINGED COVER, AS REQ'D EA ALLEN- BRADLEY 199 -DR1 DIN RAIL (35MM) EA MARATHON 1612 H 12 POLE TERMINAL BLOCK WITH HINGED COVER 10 EA ALLEN BRADLEY 1492 -HM1 600V, 30A TERMINAL, WHITE EA ALLEN BRADLEY 1492 -N23 END ANCHOR 0 PER LAYOUT EA ALLEN BRADLEY 1492 -GM35 GROUP MARKER DA E SUBTITLE 7.01.08 ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 TITLE ELECTRICAL MASTER PILOT RELAY BOX ASSY BUILDING 11 -14 BILL OF MATERIALS GE \ERAL \OT * ELECTRICAL CONTRACTOR / PANEL FABRICATOR R{EVl'EV P CODE COMPLIANCE A El MMED AUG 2 8 2ooa City Of Tukwila BUILDING DIVISION_ CURRENT REVISION IS CCNSTRUCTO\ \OT ECE VE AUG 1 2000 PERMIT CENTS SHEET E550 JOB NO. 586000 -00 S SYMBOLO RIG DATE DUWAMISH, WA DWG NO. 11- 1 - E550 COMP NO, 7.01.08 Cs CO Q POWER FEEDER SCHEDULE FEEDER NUMBER # OF CONDUITS PER RUN CONDUIT SIZE # OF CONDUCTORS PER RUN CONDUCTOR SIZE INSULATION TYPE AL /CU 1 1 2" 3 4/0 THW AL 2 2 1 1/2" 3 3/0 THHN CU 3 1 3 1/2" 4 500MCM THW CU 4 2 3 1/2" 4 500MCM XHHW AL 5 1 2' 3 250MCM XHHW AL 6 1 1 1/2" 3 2/0 THW CU 7 1 3 1/2" 6 350MCM XHHW ALL 8 1 1 1/2" 3 3/0 THHN CU 9 1 1 1/2" 4 1/O THHN CU 10 1 2 1/2" 4 2 OMCM THW CU 11 1 2' 4 2/0 THW CU 12 1 2" 3 4/0 THW CU 13 2 3" 4 350MCM THW CU 14 1 1 1 {4" 4 2 THHW CU 15 1 2' 4 3/0 THW CU 16 1 1 4 4 THHW CU 17 1 114" 1/2" 3 /10 THHW CU 18 1 3" 6 O XHHW AL 19 1 1 1(4" 3 2 THW CU 20 1 3' 8 310 THW CU 21 1 1'" 3 #4 THW CU 22 1 1 1/2" 3 #1 THHW CU 23 1 3' 4 350MCM THW CU 24 1 3 1 2" 4 500MCM THHN CU ' rr� 2. ' 1 1 '2 3 -' _ r 1 0 i �� THIN Nom► CU 27 1 1" 3 ;6 THWN CU FROM SEATTLE — CITY LIGHTS — COLLECTOR BUS FOR SCL TERMINATION DRILL PER NEMA STD. TO PROVIDE (6) CONDUCTORS PER PHASE tio CAS OPS MECH UPGRADES DUW GENERATOR REPLACE TOWER SWITCH REPLACE HW BOILER A REVISION CB 3000A BUSWAY / 480Y/277V,30, 4W, AL (TYP) ©© NSWBD -2 4000AF 3000AT 3000A BUSWAY 480Y/277V,30, 4W, AL (TYP) N1 -1 200/125 N2 -1 Z1' 200/175 N3 -2 Zu 400/225 N4 -2 ' 200/175 11 N5 -2 2f-' 400/225 N6 -2 2P 400/250 N7 - ZI' 400/225 N8 -3 7J-' N9 - 3 x'200/200 N10 -3ZF' N11 N12 -471 N13 -�i�' N15 -5Z- N 17 -Aa' 200/175 400/250 400/225 200/150 200/200 N14 -42P 400/250 400/225 N16-52P 200/150 200/200 N 18 -, 400/400 SCALE:NONE J #150687 -01 J #576371 -00 586000 - 00 NT2 12II 150KVA BY SSH SSH SSH STEWART z ]IlE J z J z z IIE .J z 0 0 NT1 I[ 75KVA AC -2N AC -3N m� z1 AC -4N. mix u_ AC -5N z NORTH TOWER BUS APPROVED CAS NT3 150KVA NT4 150KVA NT5 150KVA DATE 7/27/06 9/28/06 2/7/08 6.26.08 DNP DNP2 z DNP3 DNP4 DNP5 SYM a N 0 z 0 z a ce REVISION FROM SEATTLE CITY LIGHTS 3000A BUSWAY 480Y/277V,3 , 4W, AL (Tr) I o 0 M mot ° l COLLECTOR BUS FOR SCL TERMINATION DRILL PER NEMA STD. TO PROVIDE (6) CONDUCTORS PER PHASE BY (1) 500 MCM, CU GND PER NEC 100A /3P COMB. STARTER /NF DISC. SW. APPROVED N19 -B N20 -B N21 -B N22 -R N23 -1 N24 -1 N25 -R N26 -B 100A 100A FANS O 50HP,3i, 50HP,3 100A /3P, NEMA 3 50HP, 30 NORT SCALE:NONE NEMA 3R 100A 600A 400A 90A 90A 100A 500A 225A 600A NT 5KVA #8CU AN AC -1N REF.DWG. E2A WI REWAY 15HP, 30 AC -6 Q,� BOE /NG C' 600A 200A 3 " -3 #500MCM, THW, CU RT1 225KVA 2/0 CU 0 V 0 ce 0 ce 30A /3P, NEMA 3R 5KW PAN HTR 480V, 39' NSWBD -1 175A 400A 400A 4 ce 3- TO EMERG. PWR. DIS SWBD. TO EM DISTRI NXT 15KVA #8, CU APPROVED BY NCY P N PANEL TOWER SWITCHBOARD _C1NSWBD -1 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. N d U z 1/4' -3 #4,CU 1 #2,CU,NEUTRAL 1 4,CU,GND DATE NDP1 M d V RAWN RMYHRE CHECKED ENGINEER CHECKED APPROVED APPROVED 3 " -3 #500MCM, CU NTC1 225KVA #2/0 CU GND O U DATE D NOTE A: (2) 4 " -3 # 1 #500MCM,CU,GND & 1 #750MCM,CU,NEUTRAL r1 1/4 " - 5 #4,CU PS3 .-3 " -3 #4 /0,CU 1 #300MCM,CU,NEUTRAL & 1 #4 /0,CU,GND � - 2 " -3 #1/0,CU 1 #3/ ,CU,NEUTRAL & 1 # 1 /0,CU,GND DATE 07 -10 -90 FOR REMAINDER OF EMERGENCY SYSTEM, SEE DWG.# E11.14 -E5. 1110 • CO\STRUCTIC\ OHS: INSTALL 50A FRS -R FUSES AND ROUTE 1 "C, 3 #6 TO LOCATION OF NEW BOILER BOOST UNIT. SEE SHEET 11- 14- 0E112. ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 SU BTIT TITLE E ELECTRICAL MASTER ONE LINE DIAGRAMS BUILDING 11 -14N COL. DUWAMISH, WA REVIEWED FOR CODE COMPLIANCE A ROVE AUG 2 8 2008 City Of Tukwila BUILDING DIVISION CURRENT REVISION 586000 -00 SHEET JOB NO. DWG NO. RECEIVED AUG 1 3 2008 PERMIT CENTEI- E4 SYMBOL 11- 14N -E4 COMP NO. 6.26.08 CD ( _1 0 REVISION IVI J TB1 BY APPROVED DATE L A l SYM 1 1 ILIVVLIV LI'IULL REVISION BY APPROVED DATE Q� BOE /NG C' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN STEWART CHECKED ENGINEER CHECKED APPROVED APPROVED DATE 7.01.08 ISSUED FOR PERMIT JOB 586000 -00 08/08/2008 SUBTITLE TITLE ELECTRICAL MASTER PILOT RELAY BOX ASSY BUILDING 11 -14 DUWAMISH, WA CURRENT REVISION SHEET JOB NO. DWG NO. E550 586000 -00 SYMBOL) R 1 G 11- 14 -E550 DATE COMP NO. 7.01.08