HomeMy WebLinkAboutPermit M08-195 - PANATTONIPANATTONI
6840 FORT DENT WAY
M08.195
Parcel No.:
Address:
Suite No:
Tenant:
Name:
Address:
Owner:
Name:
Address:
Contact Person:
Name:
Address:
Contractor:
Name:
Value of Mechanical: $5,636.00
Type of Fire Protection:
doc: IMC - 10/06
2954900425
6840 FORT DENT WY TUKW
Citylf Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tukwila.wa.us
PANATTONI
6840 FORT DENT WAY , TUKVVILA WA
PEPPERWOOD HOLDINGS LLC
2835 82ND AVE SE #300 , MERCER ISLAND WA
NASH PATWARDHAN
7717 DETROIT AVE SW , SEATTLE WA
MACDONALD /MILLER FAC SOL INC
Address: PO BOX 47983 , SEATTLE, WA
Contractor License No: MACDOFS980RU
Furnace: <100K BTU
>100K BTU
Floor Furnace
Suspended/Wall/Floor Mounted Heater
Appliance Vent
Repair or Addition to Heat/Refrig /Cooling System....
Air Handling Unit <10,000 CFM
>10,000 CFM
Evaporator Cooler
Ventilation Fan connected to single duct
Ventilation System
Hood and Duct
Incinerator: Domestic
Commercial/Industrial
MECHANICAL PERMIT
DESCRIPTION OF WORK:
RELOCATE 14 EXISTING DIFFUSERS, RELOCATE 7 EXISTING GRILLS, ADD 5 DIFFUSERS
WITH INTEGRAL FIRE DAMPERS, ADD 7 GRILLS WITH INTEGRAL FIRE DAMPERS AND 5
SOUNDLINE RETURN AIR BOOTS. MISCELLANEOUS DUCTWORK
EQUIPMENT TYPE AND QUANTITY
0
0
0
0
0
0
0
0
0
0
0
0
0
0
* *continued on next page **
M08 -195
Permit Number:
Issue Date:
Permit Expires On:
Phone:
Phone: 206 -786 -4128
Phone: 206 -768 -4180
Expiration Date: 12/31/2008
M08 -195
08/04/2008
01/31/2009
Fees Collected: $237.50
International Mechanical Code Edition: 2006
Boiler Compressor:
0 -3 HP /100,000 BTU 0
3 -15 HP /500,000 BTU 0
15 -30 HP /1,000,000 BTU.. 0
30 -50 HP/1,750,000 BTU.. 0
50+ HP /1,750,000 BTU 0
Fire Damper 12
Diffuser 33
Thermostat 0
Wood/Gas Stove 0
Water Heater 0
Emergency Generator 0
Other Mechanical Equipment
Printed: 08 -04 -2008
doc: IMC -10/06
The granting of this pe
construction or the
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
Permit Center Authorized Signature:
Permit Number: M08 -195
Issue Date: 08/04/2008
Permit Expires On: 01/31/2009
Date: oe //O (//0,"
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
't doe not pre ume to give authority to violate or cancel the provisions of any other state or local laws regulating
of wor authorized to sign and obtain this mechanical permit.
Signature: Date: Si /0
Print Name: ‘/OivGo /2'7 166
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
M08 -195 Printed: 08-04 -2008
Parcel No.: 2954900425
Address: 6840 FORT DENT WY TUKW
Suite No:
Tenant: PANATTONI
1: ** *BUILDING DEPARTMENT CONDITIONS * **
• •
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
PERMIT CONDITIONS
Permit Number: M08 - 195
Status: ISSUED
Applied Date: 07/23/2008
Issue Date: 08/04/2008
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center
(206/431- 3670).
4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary
sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other
excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of
this requirement.
6: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
7: Manufacturers installation instructions shall be available on the job site at the time of inspection.
8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building
Department (206- 431 - 3670).
9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
10: ** *FIRE DEPARTMENT CONDITIONS * **
11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the
following concerns:
12: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire
Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC
104.2)
13: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this
project.
14: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and
#2051)
doc: Cond -10/06
M08 -195 Printed: 08 -04 -2008
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
15: This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed
description of intended use.
16: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of
such condition or violation.
17: These plans were reviewed by Inspector 0700. If you have any questions, please call Tukwila Fire Prevention Bureau at
(206)575 -4407.
doc: Cond -10/06
* *continued on next page **
M08 -195 Printed: 08-04 -2008
• •
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and
this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work
construction or the performance of work.
Signature:
Print Name: r >��Go/Ly C� , J 2 I ' -2 _cc/1AI
doc: Cond -10/06 M08 -195
Date:
ordinances governing
or local laws regulating
Printed: 08-04 -2008
GENERAL CONTRALTO]
(Contractor Info nnation for X4'Iechal
Company Name:
Mailing Address:
ARCHITECT 0
Company Name:
Mailing Address:
Company Name:
Mailing Address:
CORD- Au
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http; //www. ci. tukwila. wa.us
CONTACT PERSON
Name: 1■. QS � czAW o r kcLr Da
Mailing Address: - 1- 1 1 1 C.'! c it A✓t S W S+2 x,11 It L T R I Q (p
City State Zip
E -Mail Address: Fax. Number:
Site Address: (pica or4 • eye 1 ( J
Tenant Name: For} -- c,lnnV - at
-- -- c:k.r.a. ) h ► New Tenant: ❑ Yes n
Property Owners Name: 17 a \ ck4. + d n 1 l r ■ 5 +p- r) Cf (f) l--, .. ("
Mailing Address ./tog S- ts.,, - �i„ GP Aft,- 6 63 `I it S O2 �tr kW 1 1- w la 9 K g
City State Zip
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
QMpplicationsTorms- Applications On Line 3-2006 - Pcrmit Applicaiion.doc
Revised: 4-2006
6h
mustbewet
Contact Person:
E -Mail Address:
ENGINEER OF RECORD - Alt pla must bewet stamped
King Co Assessor's Tax No.: .2.n s- ( I 9 at) t (4
Suite Number: 3 So Floor:
City
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
Contractor Registration Number:
of
tamped by Arch'
State
Z
p
• tion Date:
City
Day Telephone:
Fax Number:
s
z
tp
eer of Recurt
City
Contact Person: Day Telephone:
E -Mail Address: ""' x Number:
Zip
Page 1 of 6
Unit Type:
Qty
Unit Type:
Qty
Unit Type:
Qty
Boiler/Compressor:
Qty
Furnace<100K BTU
Air Handling Unit >10,000
CFM
Fire Damper
0-3 HP/100,000 BTU
Furnace>100K BTU
Evaporator Cooler
Diffuser
'2
3-15 HP/500,000 BTU
Floor Furnace
Ventilation Fan Connected
to Single Duct
Thermostat
15-30 HP/I ,000,000 BTU
Suspended/Wall/Floor
Mounted Heater
Ventilation System
Wood/Gas Stove
30-50 HP/1,750,000 BTU
Appliance Vent
Hood and Duct
Water Heater
50+ HP/I,750,000 BTU
Repair or Addition to
Heat/Refrig/Cooling
System
Incinerator - Domestic
Emergency
Generator
Air Handling Unit
<10,000 CFM
Incinerator — Comm/Ind
Other Mechanical
Equipment
MECHANICAI, PERMIT INFORMATION — 206.431-3670
MECHANICAL CONTRACTOR INFORMATION
Company Name: (IA at. >or.\,,..1 a m,\\R„,
Mailing Address: V1 1 - C;) ekrt.41-}- 1 t S w
Contact Person: )■,3 CVS cps_
E-Mail Address:
Contractor Registration Number: MAr...rioes 9%0 Ko
Valuation of Project (contractor's bid price): $ j
Expiration Date:
Op a 9. t ' r& d
cUtt duo.° ric
&C3T 1 .+J C ri ) CAD
City State Zip
Day Telephone( 2-2) — 7 ct1V L fj Z?
Fax Number: ( (f, )
) a-31- 0?
u....4 19,4
)
Scope of Work (please provide detailed information): (2-szA 0 CCL-V e_._ / 4 1' e.Y...t
1 42-k Ns)- ) c)- 11 Li° 0 c ct,
k
-I- to r r, 0.4r ).--t-ro7 - 7 .s .
Use: Residential: New .... 0 Replacement .... 0
Commercial: New .... 0 Replacement
Fuel Type: Electric TS( Gas ..., 0 Other:
Indicate type of mechanical work being installed and the quantity below:
Q:VspplicationstForms•Applicatinns On LineO-2006 - Permit Applination.doe
Revised: 4-2006
bl
Page 4 of 6
PERMIT APPLICATION NOTES ; — ,Applicable to all permits in'thisQapplication
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING 3WNER OR A • RIZED AGENT:
Signature:
Print Name:
— e (U ..A, \ \\
Mailing Address: - in S
Date Application Accepted:
Date Application Expires:
Staff Initials:
t,Gik I
Q:1ApplicntionsTo ms- Applications Oo Lined -2006 - Permit Appllcation.doc
Revised: 42006
bh
Date: 1 — Z 3
Day Telephone: ( 2 : ( - 7-17 ) 7 $ " y27 4)
City State Zip
Page 6 of 6
Parcel No.: 2954900425
Address: 6840 FORT DENT WY TUKW
Suite No:
Applicant: PANATTONI
Receipt No.: R08 -02722
Initials: WER
User ID: 1632
Payee: MACDONALD MILLER
ACCOUNT ITEM LIST:
Description
MECHANICAL - NONRES
PLAN CHECK - NONRES
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: http://www.atukwila.wa.us
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 1803 237.50
RECEIPT
Account Code Current Pmts
000.322.102.00.0 190.00
000/345.830 47.50
Total: $237.50
Permit Number: M08 - 195
Status: PENDING
Applied Date: 07/23/2008
Issue Date:
Payment Amount: $237.50
Payment Date: 07/23/2008 11:45 AM
Balance: $0.00
5224 07/23 9710 TOTAL 341.50
doc: Receipt -06 Printed: 07 -23 -2008
Project:
p /f "✓
Type of Inspection:
c7e /�1 /
Address:
60 1 /1.2 r;/t oc&jt
Date Called:
Special Instructions:
Date Wanted: /5 -QG
rn-
Requester:
•
2 e /
z - 72- 1 -/- (�
J
/31
INSPECTION RECORD
Retain a copy with permit
IN PECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION e
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
Inspector:
(Date:
LI $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
Pro t: r
Type of nspection:
i i A \J
Address:
Date ailed:
(
� � -ft7 i-D T
Special Instructions:
Date Wanted:
1 S. Op
Requester:
Phone No:
IqS
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION *-
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 3 70
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
Approved per applicable codes.
Corrections required prior to approval.
COMMENTS:
(Fr 'e ItJ
1 _
A_Af)
Inspectop`
Date: _ ` J
❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
'Date:
COMMENTS:
Type nspectio
d\� i&l
3 1"J s 4 C) Q fi bg k
l
Date Called:
P :
Dat Wanted:
--�--
1
Requester:
Phone o:
Z� Go —
—Co c 3 1
1 "1 , `h1(
.6-2e_A
(r : ) -L
6.01 ( Al
1M /179 C
A
Pro 4q
Mk)ATa _
Type nspectio
d\� i&l
3 1"J s 4 C) Q fi bg k
l
Date Called:
Special Instructions:
/
Dat Wanted:
--�--
i � � �a.n-
p.m.
Requester:
Phone o:
Z� Go —
—Co c 3 1
$� 2
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION I'
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
Approved per applicable codes. ❑ Corrections required prior to approval.
inspec or:
60.00 R EINSPECTIO FEE
REQUIRED. (.)(r
$ . Prior to inspection, fee must be
Paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
'Date:
COMMENTS:
Type o Inspection:
Chkc IQ
Ad ' j O rOek .
ailed:
Special Instructions:
--44 2 , _
bate Wanted: 5
_ 0
Requester:
6
—
(ti (
J e
ii -u ti S _
G „ , ti.. -),
r-e -1.) -c
A
A f k j ck ('t et.
�
.) ,
J ( k
(
/ /
re
- , (\ C./ ; ',A
p(
.
h
Proj t:
141 Pr rozS
Type o Inspection:
Chkc IQ
Ad ' j O rOek .
ailed:
Special Instructions:
--44 2 , _
bate Wanted: 5
_ 0
Requester:
Phone No
.i
7i — 40(3(
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
PERMIT NO.
. 1
(206)431 -3670
Approved per applicable codes.
Corrections required prior to approval.
..� e
❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Inspect
Date:
Receipt No.:
'Date:
Panattoni
TRAM'
Location
Building owner
Program user
Company
Comments
By
Dataset name
Calculation time
TRACE® 700 version
Location
Latitude
Longitude
Time Zone
Elevation
Barometric pressure
Air density
Air specific heat
Density - specific heat product
Latent heat factor
Enthalpy factor
Summer design dry bulb
Summer design wet bulb
Winter design dry bulb
Summer clearness number
Winter clearness number
Summer ground reflectance
Winter ground reflectance
Design simulation period
Cooling load methodology
Heating load methodology
Fort Dent II Tukwila
FILE COPY
Permlt No.
MacDon¢-,Millgr,
C: ICDSITRACE700AIRojebte7.}386526 _WII, ¢52¢ Taf
09:36 AM on 07/18/2008 - • - "� ' ` ''
6.0
Seattle, Washington
47.0 deg
122.0 deg
8
386 ft
29.5 in. Hg
0.0749
0.2444
1.0988
4,836.9
4.4953
82
66
24
0.95
0.95
0.20
0.20
lb/cu ft
Btu /Ib - °F
Btu /h•cfm• °F
Btu - min /h -cu ft
lb- min /hr.cu ft
°F
°F
°F
January - December
CLTD -CLF (ASHRAE TFMI
UATD
11o&' l95
CODE COMPLIA
NCE
JUL 3 1 2008
BUILDING Tukwila
NG DIVISION
RECEIVED
JUL 2 3
PERMIT CENTER
7RACEno
comprehensive b ilm,° analysts
software from Trn..
VAV -351
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Peaked at Time:
Outside Air.
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Grand Total = =>
COOLING COIL PEAK
Space
Sens. + Lat.
Btu /h
CLG SPACE PEAK
Mo /Hr: 8 / 12 Mo /Hr: 9 / 12
OADB/WB /HR: 76 / 64 / 73 OADB: 74
Plenum Net Percent Space Percent
Sens. + Lat Total Of Total Sensible Of Total
Btu /h Btu /h ( %) Btu /h ( %)
0 0 0 0 0 0
0 0 0 0 0 0
0 94 94 0 0 0
16,771 0 16,771 61 17,963 74
-103 0 -103 0 -697 -3
1,118 1,037 2,155 8 1,159 5
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
17,787 1,131 18,918 68 18,424 76
1,545 386 1,932 7 1,545 6
2,250 2,250 8 1,250 5
2,966 0 2,966 11 2,966 12
6,761 386 7,148 26 5,761 24
199 -199 0 0 178 1
0 0 1,380 5 0 0
0 0
0 0 0 0 0
-122 -122 0
320 1
0 0 0
0 0 0
0 0
24,747 1,196 27,643 100.00 24,364 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total =_>
HEATING COIL PEAK
Mo /Hr: Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu /h Btu /h ( %)
0 0 0.00
0 0 0.00
0 -911 2.96
0 0 0.00
- 10,157 - 10,157 32.94
-1,007 -1,935 6.27
0 0 0.00
0 0 0.00
-2,146 -2,146 6.96
- 13,309 - 15,148 49.13
0 0 0.00
0 0 0.00
-1,415 -1,415 4.59
-1,415 -1,415 4.59
-228 0 0.00
0 -5,055 16.40
-9,411 -9,411 30.53
199 -0.65
0 0.00
0 0.00
0 0.00
- 24,364 - 30,830 100.00
Main CIg 2.3
Aux Clg 0.0
Opt Vent 0.0 0.0
Total
COOLING COIL SELECTION
Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR
ton MBh MBh cfm °F °F gr/lb
27.6
0.0
2.3 27.6
25.4
0.0
0.0
1,080.6 76.1
0 0
0 0.0
60.9 56.6
0 0
0.0 0.0
Leave DB/WB/HR
°F °F gr /Ib
54.7 51.8 53.5
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name:
C: \CDS \TRACE7001Projects \7386526 -00 \7386526.TRC
System Checksums
By MacDonald - Miller
Floor
Part
ExFir
Roof
Wall
AREAS
Gross Total Glass
ft ( %)
566
0
0
566 0 0
593 288 49
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 76.1 68.7
Return 76.1 68.7
Ret/OA 76.1 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Infil
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
100
0
1,109
100
1,109
100
0
0
Heating
100
42
1,109
100
142
142
0
0
% OA
cfm /ft
cfm/ton
ft /ton
Btu/hr-ft
No. People
ENGINEERING CKS
Cooling Heating
9.0 9.0
1.96 1.96
481.26
245.70
48.84 -54.47
5
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh cfm °F
Lvg
°F
Main Htg -27.5 1,108.6 67.5 90.0
Aux Htg 0.0 0 0 0
Preheat -3.4 100 24 55
Humidif 0.0 0 0.0 0.0
Opt Vent 0.0 0 0.0 0.0
Total -30.8
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Altemative - 1 System Checksums Report Page 1 of 10
VAV -352
System Checksums
By MacDonald - Miller
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Grand Total = =>
COOLING COIL PEAK
Peaked at Time:
Outside Air.
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Space
Sens. + Lat.
Btu /h
Mo /Hr. 8 / 12
OADB/WB /HR: 76 / 64 / 73
Plenum Net Percent
Sens. + Lat Total Of Total
Btu/h Btu /h ( %)
0 0 0 0
0 0 0 0
0 68 68 0
10,027 0 10,027 51
-62 0 -62 0
674 623 1,297 7
0 0 0
0 0 0
0 0 0
10,640 691 11,331 58
1,100 275 1,375 7
2,500 2,500 13
2,888 0 2,888 15
6,488 275 6,763 34
131 -131 0 0
0 0 1,502 8
0 0
0 0 0
-136 -136 -1
219 1
0 0 0
0 0 0
0 0
17,259 699 19,679 100.00
CLG SPACE PEAK
Mo /Hr. 9 / 12
OADB: 74
Space
Sensible
Btu/h
10,739
-417
699
0
1,100
1,480
2,888
Percent
Of Total
( %)
0 0
0 0
0 0
65
-3
4
0
0 0
0 0
11,021 66
7
9
17
5,468 33
116 1
0 0
0 0
16,605 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
WaII Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total =>
HEATING COIL PEAK
Mo /Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu /h Btu /h ( %)
0 0 0.00
0 0 0.00
0 -650 2.76
0 0 0.00
-6,066 -6,066 25.79
-607 -1,163 4.95
0 0 0.00
0 0 0.00
-1,528 -1,528 6.50
-8,201 -9,407 40.00
0 0 0.00
0 0 0.00
-1,008 -1,008 4.28
-1,008 -1,008 4.28
-155 0 0.00
0 -6,065 25.79
-7,241 -7,241 30.79
201 -0.85
0 0.00
0 0.00
0 0.00
- 16,605 - 23,520 100.00
Main Cig
Aux Clg
Opt Vent
Total
COOLING COIL SELECTION
Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR
ton MBh MBh cfm °F °F gr /Ib
1.6
0.0
0.0
19.7
0.0
0.0
1.6 19.7
17.3
0.0
0.0
738.9 76.1
0 0
0 0.0
61.5 59.3
0 0
0.0 0.0
Leave DB/WB /HR
°F °F gr /Ib
54.7 52.1 54.7
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name: C: \CDS \TRACE700\ Projects \7386526- 00 \7386526.TRC
Floor
Part
ExFIr
Roof
Wall
AREAS
Gross Total Glass
ft ( %)
403
0
0
403 0 0
355 172 48
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 76.0 68.8
Return 76.0 68.8
Ret/OA 76.1 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Infil
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
120
0
756
120
756
120
0
0
Heating
120
30
756
120
150
150
0
0
% OA
cfm /ft'
cfm /ton
ft' /ton
Btu /heft'
No. People
ENGINEERING CKS
Cooling Heating
15.9 15.9
1.87 1.87
460.73
245.74
48.83 -58.36
6
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh cfm °F
-19.5 755.6 66.6 90.0
0.0 0 0 0
-4.1 120 24 55
0.0
0.0
-23.5
Lvg
°F
0 0.0 0.0
0 0.0 0.0
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Altemative - 1 System Checksums Report Page 2 of 10
VAV -353
System Checksums
By MacDonald - Miller
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total =_>
Internal Loads
Lights
People
Misc
Sub Total = =>
Peaked at Time:
Outside Air.
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Grand Total =_>
COOLING COIL PEAK
Space
Sens. + Lat.
Btu /h
Mo /Hr. 8 / 15
OADB/WB /HR: 80 / 66 / 73
Plenum Net Percent
Sens. + Lat Total Of Total
Btu /h Btu /h ( %)
0 0 0 0
0 0 0 0
0 254 254 1
10,547 0 10,547 47
495 0 495 2
693 639 1,333 6
0 0 0
0 0 0
0 0 0
11,735 893 12,628 56
1,447 362 1,809 8
3,200 3,200 14
2,104 0 2,104 9
6,752 362 7,113 32
202 -202 0 0
0 0 2,823 13
0 0
0 0 0
-226 -226 -1
235 1
0 0 0
0 0 0
0 0
18,689 827 22,574 100.00
CLG SPACE PEAK
Mo /Hr. 9 / 15
OADB: 77
Space
Sensible
Btu /h
1,447
1,960
2,104
5,512
171
0
0
Percent
Of Total
( %)
0 0
0 0
0 0
11,650 64
37 0
708 4
0 0
0 0
0 0
12,394 69
8
11
12
30
1
0
0
18,077 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total =>
HEATING COIL PEAK
Mo /Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu /h Btu /h ( %)
0 0 0.00
0 0 0.00
0 -851 3.04
0 0 0.00
-8,138 -8,138 29.08
-802 -1,542 5.51
0 0 0.00
0 0 0.00
-2,009 -2,009 7.18
- 10,949 - 12,540 44.80
0 0 0.00
0 0 0.00
-1,325 -1,325 4.73
-1,325 -1,325 4.73
-237 0 0.00
0 -8,613 30.77
-5,837 -5,837 20.85
325 -1.16
0 0.00
0 0.00
0 0.00
- 18,347 - 27,989 100.00
Main Clg
Aux Clg
Opt Vent
Total
COOLING COIL SELECTION
Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR
ton MBh MBh cfm °F °F gr/lb
1.9 22.6 19.5 794.0 77.0 62.0 60.4
0.0 0.0 0.0 0 0 0 0
0.0 0.0 0.0 0 0.0 0.0 0.0
1.9 22.6
Leave DB/WB/HR
°F °F gr/lb
54.7 52.1 54.6
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name: C: \CDS \TRACE700 \Projects \7386526-00 \7386526.TRC
Floor
Part
ExFir
Roof
Wall
AREAS
Gross Total Glass
ft ( %)
530
0
0
530 0 0
474 231 49
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 76.2 68.6
Return 76.2 68.6
Ret/OA 77.0 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Intl!
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
170
0
823
170
823
170
0
0
Heating
170
40
835
170
210
210
0
0
ENGINEERING CKS
% OA
cfm /ft
cfm /ton
ft /ton
Btu/hr-ft
No. People
Cooling
20.7
1.55
437.25
281.74
42.59
8
Heating
20.4
1.58
-52.81
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh cfm °F
Lvg
°F
Main Htg -22.2 834.9 65.8 90.0
Aux Htg 0.0 0 0 0
Preheat -5.8 170 24 55
Humidif 0.0 0 0.0 0.0
Opt Vent 0.0 0 0.0 0.0
Total -28.0
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Alternative - 1 System Checksums Report Page 3 of 10
VAV -354
Envelope Loads
Skylite Solar
Skylite Cond
COOLING COIL PEAK
Peaked at Time: Mo /Hr: 8 / 16
Outside Air. OADB/WB /HR: 79 / 65 / 71
Roof Cond 0 123 123
Glass Solar 7,270 0 7,270
Glass Cond 296 0 296
Wall Cond 724 523 1,247
Partition 0 0
Exposed Floor 0 0
Infiltration 0 0
Sub Total =_> 8,289 647 8,936
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Space
Sens. + Lat.
Btu /h
Grand Total => 12,876
Plenum Net Percent
Sens. + Lat Total Of Total
Btu /h Btu/h
0 0 0
0 0 0
560 140 700 5
2,400 2,400 16
1,550 0 1,550 10
4,510 140 4,649 30
77 -77 0
0 0 1,738
0
0 0
-157 -157
161
0 0
0 0
0
( %)
0
1
47
2
8
0
0
0
58
0
11
0
0
-1
0
0
0
553 15,328 100.00
CLG SPACE PEAK
Mo /Hr. 9 / 16
OADB: 77
Space
Sensible
Btu /h
0
0
0
7,952
20
717
0
0
0
8,689
560
1,470
1,550
3,580
68
0
0
Percent
Of Total
( %)
0
0
0
64
0
6
0
0
0
70
5
12
13
29
0
0
12,336 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total = =>
HEATING COIL PEAK
Mo /Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu /h Btu /h ( %)
0 0 0.00
0 0 0.00
0 -330 1.74
0 0 0.00
-5,052 -5,052 26.58
-752 -1,295 6.81
0 0 0.00
0 0 0.00
-777 -777 4.09
-6,581 -7,454 39.22
0 0 0.00
0 0 0.00
-513 -513 2.70
-513 -513 2.70
-81 0 0.00
0 -6,065 31.91
-5,162 -5,162 27.16
186 -0.98
0 0.00
0 0.00
0 0.00
- 12,336 - 19,008 100.00
Main Cig
Aux Clg
Opt Vent
Total 1.3
COOLING COIL SELECTION
Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR
ton MBh MBh cfm °F °F gr/lb
1.3 15.3 13.3 543.6 76.9 61.9 60.0
0.0 0.0 0.0 0 0 0 0
0.0 0.0 0.0 0 0.0 0.0 0.0
15.3
Leave DB/WB/HR
°F °F gr /Ib
54.7 52.0 54.4
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name: C: \CDS \TRACE700 \Projects \7386526- 00 \7386526.TRC
System Checksums
By MacDonald - Miller
Floor
Part
ExFIr
Roof
Wall
AREAS
Gross Total Glass
ft ( %)
205
0
0
205 0 0
347 143 41
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 76.2 68.8
Return 76.2 68.8
Ret/OA 76.9 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Infil
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
120
0
561
120
561
120
0
0
Heating
120
15
561
120
135
135
0
0
ENGINEERING CKS
% OA
cfm /ft
cfm /ton
ft /ton
Btu /heft
No. People
Cooling
21.4
2.74
439.46
160.49
74.77
6
Heating
21.4
2.74
-92.72
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh cfm °F
Lvg
°F
Main Htg -15.0 561.3 65.8 90.0
Aux Htg 0.0 0 0 0
Preheat -4.1 120 24 55
Humidif 0.0 0 0.0 0.0
Opt Vent 0.0 0 0.0 0.0
Total -19.0
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Altemative - 1 System Checksums Report Page 4 of 10
VAV -355
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Grand Total = =>
COOLING COIL PEAK
Peaked at Time:
Outside Air.
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Space
Sens. + Lat.
Btu /h
Mo /Hr: 8 / 17
OADB/WB /HR: 78 / 64 / 66
Plenum Net Percent
Sens. + Lat Total Of Total
Btu /h Btu /h ( %)
0 0 0 0
0 0 0 0
0 234 234 1
8,947 0 8,947 55
280 0 280 2
896 681 1,577 10
0 0 0
0 0 0
0 0 0
10,123 915 11,038 67
909 227 1,137 7
1,350 1,350 8
2,068 0 2,068 13
4,327 227 4,555 28
151 -151 0 0
0 0 688 4
0 0
0 0 0
-94 -94 -1
189 1
0 0 0
0 0 0
0 0
14,601 897 16,376 100.00
CLG SPACE PEAK
Mo /Hr. 8 / 17
OADB: 78
Space Percent
Sensible Of Total
Btu /h ( %)
O 0
O 0
O 0
8,947 64
280 2
896 6
0 0
0
0
10,123
909
750
2,068
3,727
151
0
0
0
72
6
5
15
27
1
0
0 0
14,001 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total = =>
HEATING COIL PEAK
Mo /Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu /h Btu /h ( %)
0 0 0.00
0 0 0.00
0 -535 2.87
0 0 0.00
-6,088 -6,088 32.68
-842 -1,475 7.92
0 0 0.00
0 0 0.00
-1,262 -1,262 6.78
-8,192 -9,360 50.24
O 0 0.00
O 0 0.00
-833 -833 4.47
-833 -833 4.47
-142 0 0.00
0 -3,033 16.28
-5,531 -5,531 29.69
126 -0.67
0 0.00
0 0.00
0 0.00
- 14,697 - 18,630 100.00
Total Capacity
ton MBh
Main Cig 1.4 16.4
Aux Clg 0.0 0.0
Opt Vent 0.0 0.0
Total 1.4 16.4
COOLING COIL SELECTION
Sens Cap. Coil Airflow Enter DB/WB /HR
MBh cfm °F °F gr /Ib
15.3 637.1 76.6 60.9 56.1
0.0 0 0 0 0
0.0 0 0.0 0.0 0.0
Leave DB/WB /HR
°F °F gr
54.7 51.8 53.6
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name: C: \CDS \TRACE700 \Projects \7386526- 00 \7386526.TRC
System Checksums
By MacDonald - Miller
Floor
Part
ExFIr
Roof
Wall
AREAS
Gross Total Glass
ft (%)
0
333 0 0
405 173 43
333
0
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 76.4 68.7
Return 76.4 68.7
Ret/OA 76.6 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Infil
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
60
0
637
60
637
60
0
0
Heating
60
25
669
60
85
85
0
0
% OA
cfm /ft
cfm /ton
ft /ton
Btu /hrft
No. People
ENGINEERING CKS
Cooling Heating
9.4 9.0
1.91 2.01
466.86
244.02
49.18 -55.95
3
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
HEATING COIL SELECTION
Capacity Coll Airflow Ent Lvg
MBh cfm °F °F
-16.6 668.8 67.4 90.0
0.0 0 0 0
-2.0 60 24 55
0.0
0.0
-18.6
0 0.0 0.0
0 0.0 0.0
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Altemative - 1 System Checksums Report Page 5 of 10
VAV -356
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total =_>
Peaked at Time:
Outside Air.
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Grand Total =_>
COOLING COIL PEAK
Space
Sens. + Lat.
Btu /h
Mo /Hr. 7 / 18
OADB/WB /HR: 78 / 62 / 59
Plenum Net Percent
Sens. + Lat Total Of Total
Btu /h Btu /h ( %)
0 0 0 0
0 0 0 0
0 166 166 2
6,988 0 6,988 66
248 0 248 2
634 507 1,141 11
0 0 0
0 0 0
0 0 0
7,870 674 8,544 80
461 115 577 5
450 450 4
788 0 788 7
1,700 115 1,815 17
80 -80 0 0
0 0 163 2
0 0
0 0 0
-33 -33 0
127 1
0 0 0
0 0 0
0 0
9,650 676 10,616 100.00
CLG SPACE PEAK
Mo /Hr. 7 / 18
OADB: 78
Space
Sensible
Btu /h
6,988
248
634
0
7,870
461
250
788
1,500
80
0 0
0 0
0 0
74
3
7
0
0 0
0 0
0
0
Percent
Of Total
( %)
83
5
3
8
16
1
0
0
9,450 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total = =>
HEATING COIL PEAK
Mo /Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu /h Btu /h ( %)
0 0 0.00
0 0 0.00
0 -271 2.44
0 0 0.00
-5,084 -5,084 45.77
-627 -1,130 10.17
0 0 0.00
0 0 0.00
-641 -641 5.77
-6,351 -7,125 64.15
0 0 0.00
0 0 0.00
- 423 -423 3.80
- 423 -423 3.80
-77 0 0.00
0 -1,011 9.10
-2,600 -2,600 23.41
51 -0.46
0 0.00
0 0.00
0 0.00
-9,450 - 11,107 100.00
Total Capacity
ton MBh
Main Cig 0.9 10.6
Aux CIg 0.0 0.0
Opt Vent 0.0 0.0
Total 0.9 10.6
COOLING COIL SELECTION
Sens Cap. Coil Airflow Enter DB/WB /HR
MBh cfm °F °F gr /Ib
10.3 430.0 76.6 60.1 52.4
0.0 0 0 0 0
0.0 0 0.0 0.0 0.0
Leave DB/WB /HR
°F °F gr /Ib
54.7 51.2 51.2
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name: C: \CDS \TRACE700 \Projects \7386526- 00 \7386526.TRC
System Checksums
By MacDonald - Miller
Floor
Part
ExFIr
Roof
Wall
AREAS
Gross Total Glass
ft' ( %)
169
0
0
169 0 0
322 144 45
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 76.5 68.6
Return 76.5 68.6
Ret/OA 76.6 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Infil
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
20
0
430
20
430
20
0
0
Heating
20
13
430
20
33
33
0
0
% OA
cfm /ft'
cfm /ton
ft' /ton
Btu/hi-ft'
No. People
ENGINEERING CKS
Cooling Heating
4.7 4.7
2.54 2.54
486.07
191.03
62.82 -65.72
1
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh cfm °F
-10.4 430.0 67.9 90.0
0.0 0 0 0
-0.7 20 24 55
0.0
0.0
Lvg
°F
0 0.0 0.0
0 0.0 0.0
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Altemative - 1 System Checksums Report Page 6 of 10
VAV -357
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
WaII Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Grand Total =_>
COOLING COIL PEAK
Peaked at Time: Mo /Hr. 71 18
Outside Air. OADB/WB /HR: 78 / 62 / 59
Space
Sens. + Lat.
Btu /h
0
0 0
0 442 442 3
8,112 0 8,112 47
343 0 343 2
864 684 1,548 9
O 0 0
O 0 0
O 0 0
9,320 1,126 10,445 61
1,231
1,800
2,770
5,801
235
0
0
15,356
Plenum
Sens. + Lat
Btu /h
0
308
0
308
-235
0
-145
0
0
1,053
Net Percent
Total Of Total
Btu /h ( %)
0 0
0 0
1,539 9
1,800 11
2,770 16
6,109 36
0 0
479 3
0 0
0 0
-145 -1
196 1
0 0
0 0
0 0
17,084 100.00
CLG SPACE PEAK
Mo /Hr. 7 / 18
OADB: 78
Space
Sensible
Btu /h
0
0
0
8,112
343
864
0
0
0
9,320
1,231
1,000
2,770
5,001
235
0
0
Percent
Of Total
( %)
0
0
0
56
2
6
0
0
0
64
8
7
19
34
2
0
0
14,556 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total = =>
HEATING COIL PEAK
Mo /Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu /h Btu /h ( %)
O 0 0.00
O 0 0.00
0 -722 3.68
0 0 0.00
-6,997 -6,997 35.70
-874 -1,568 8.00
0 0 0.00
0 0 0.00
-1,710 -1,710 8.72
-9,580 - 10,995 56.11
0 0 0.00
0 0 0.00
-1,128 -1,128 5.75
-1,128 -1,128 5.75
-223 0 0.00
0 -4,044 20.63
-3,625 -3,625 18.50
195 -0.99
0 0.00
0 0.00
0 0.00
- 14,556 - 19,597 100.00
Main Clg
Aux Clg
Opt Vent
Total
COOLING COIL SELECTION
Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR
ton MBh MBh cfm °F °F gr /Ib
1.4 17.1 16.1 662.3 76.8 60.9 55.6
0.0 0.0 0.0 0 0 0 0
0.0 0.0 0.0 0 0.0 0.0 0.0
1.4 17.1
Leave DB/WB /HR
°F °F gr /Ib
54.7 51.7 53.3
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name: C: \CDS \TRACE7001Projects \7386526- 00 \7386526.TRC
System Checksums
By MacDonald - Miller
Floor
Part
ExFIr
Roof
Wall
AREAS
Gross Total Glass
ft ( %)
451
0
0
451 0 0
446 199 45
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 76.7 68.4
Return 76.7 68.4
Ret/OA 76.8 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Infil
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
80
0
662
80
662
80
0
0
Heating
80
34
662
80
114
114
0
0
% OA
cfm /ft
cfm /ton
ft
Btu /heft°
No. People
ENGINEERING CKS
Cooling Heating
12.1 12.1
1.47 1.47
465.23
316.79
37.88 -43.45
4
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
HEATING COIL SELECTION
Capacity Coil Airflow Ent Lvg
MBh cfm °F °F
-16.9
0.0
-2.7
0.0
0.0
-19.6
662.3 66.8 90.0
0 0 0
80 24 55
0 0.0 0.0
0 0.0 0.0
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Alternative - 1 System Checksums Report Page 7 of 10
VAV -361
System Checksums
By MacDonald - Miller
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Grand Total =_>
COOLING COIL PEAK
Peaked at Time:
Outside Air.
Space
Sens. + Lat.
Btu /h
0
0
0
0
0
0
0
0
0
0
3,001
3,150
5,375
11,526
12,042
Mo /Hr: 7 / 14
OADB/WB /HR: 81 / 66 / 74
Plenum
Sens. + Lat
Btu /h
Net Percent
Total Of Total
Btu /h ( %)
0 0 0
0 0 0
553 553 4
O 0 0
O 0 0
0 0 0
0 0
0 0
0 0
553 553 4
750 3,751 24
3,150 21
0 5,375 35
750 12,276 80
516 -516 0 0
0 0 2,627 17
0 0
0 0 0
-239 -239 -2
143 1
0 0 0
0 0 0
0 0
549 15,361 100.00
CLG SPACE PEAK
Mo /Hr. 7 / 20
OADB: 73
Space
Sensible
Btu /h
0
0
0
0
0
0
0
0
0
0
3,001
1,750
5,375
Percent
Of Total
( %)
0
0
0
0
0
0
0
0
0
0
28
16
49
10,126 93
751 7
0 0
0 0
10,877 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total =_>
HEATING COIL PEAK
Mo /Hr. Heating Design
OADB: 24
Space Peak
Space Sens
Btu /h
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-680
0
- 10,196
- 10,877
Coil Peak Percent
Tot Sens Of Total
Btu /h ( %)
O 0.00
O 0.00
-1,743 9.15
O 0.00
O 0.00
0 0.00
0
0
0
-1,743
0.00
0.00
0.00
9.15
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
-7,420 38.96
- 10,196 53.54
315 -1.65
0 0.00
0 0.00
0 0.00
- 19,044 100.00
Main Clg
Aux CIg
Opt Vent
Total
COOLING COIL SELECTION
Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR
ton MBh MBh cfm °F °F gr /Ib
1.3
0.0
0.0
15.4
0.0
0.0
1.3 15.4
12.4
0.0
0.0
484.2 78.0
0 0
0 0.0
62.9 62.9
0 0
0.0 0.0
Leave DB/WB/HR
°F °F gr /Ib
54.7 51.9 54.0
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name: C: \CDS \TRACE7001Projects \7386526- 00 \7386526.TRC
Floor
Part
ExFIr
Roof
Wall
AREAS
Gross Total Glass
ft ( %)
1,099
0
0
1,099 0 0
0 0 0
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 76.5 68.1
Return 76.5 68.1
Ret/OA 78.0 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Infil
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
147
0
495
147
495
147
0
0
Heating
147
0
495
147
147
147
0
0
ENGINEERING CKS
% OA
cfm /ft'
cfm /ton
ft' /ton
Btu /heft'
No. People
Cooling
29.7
0.45
386.63
858.51
13.98
7
Heating
29.7
0.45
-17.33
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
HEATING COIL SELECTION
Capacity Coil Airflow Ent
MBh cfm °F
-14.1
0.0
-5.0
0.0
0.0
-19.0
Lvg
°F
494.9 64.1 90.0
0 0 0
147 24 55
0 0.0 0.0
0 0.0 0.0
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Altemative - 1 System Checksums Report Page 8 of 10
VAV -362
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Grand Total =_>
COOLING COIL PEAK
Peaked at Time:
Outside Air.
Space
Sens. + Lat.
Btu /h
0
0
0
0
0
0
0
0
0
0
997
2,250
5,623
8,869
8,969
Mo /Hr. 7 / 14
OADB/WB /HR: 81 / 66 / 74
Plenum
Sens. + Lat
Btu /h
Net Percent
Total Of Total
Btu /h ( %)
0 0 0
0 0 0
192 192 2
0 0 0
0 0 0
0 0 0
0 0
0 0
0 0
192 192 2
249 1,246 11
2,250 20
0 5,623 51
249 9,119 82
99 -99 0 0
0 0 1,798 16
0 0
0 0 0
-94 -94 -1
107 1
0 0 0
0 0 0
0 0
248 11,122 100.00
CLG SPACE PEAK
Mo /Hr. 7 / 20
OADB: 73
Space
Sensible
Btu /h
997
1,250
5,623
7,869
146
0
0
Percent
Of Total
( %)
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
12
16
70
98
2
0
0
8,015 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total = =>
HEATING COIL PEAK
Mo /Hr. Heating Design
OADB: 24
Space Peak Coil Peak Percent
Space Sens Tot Sens Of Total
Btu/ Btu /h ( %)
0
0
0
0
0
-132
0
-7,883
-8,015
0 0.00
0 0.00
-589 4.40
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
-590 4.40
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
-5,055 37.72
-7,883 58.82
125 -0.94
0 0.00
0 0.00
0 0.00
- 13,402 100.00
Main Clg
Aux Clg
Opt Vent
Total
COOLING COIL SELECTION
Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR
ton MBh MBh cfm °F °F gr /Ib
0.9 11.1 9.0 362.6 77.4 62.6 62.4
0.0 0.0 0.0 0 0 0 0
0.0 0.0 0.0 0 0.0 0.0 0.0
0.9 11.1
Leave DB/WB/HR
°F °F gr/lb
54.7 51.9 54.1
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name: C: \CDS \TRACE700\ Projects \7386526- 00 \7386526.TRC
System Checksums
By MacDonald - Miller
Floor
Part
ExFIr
Roof
Wall
AREAS
Gross Total Glass
ft ( %)
365
0
0
365 0 0
0 0 0
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 75.9 68.9
Return 75.9 68.9
Ret/OA 77.4 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Infil
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
100
0
365
100
365
100
0
0
Heating
100
0
365
100
100
100
0
0
ENGINEERING CKS
% OA
cfm /ft'
cfm /ton
ft= /ton
Btu /hrfe
No. People
Cooling
27.4
1.00
393.51
393.82
30.47
5
Heating
27.4
1.00
-36.72
HEATING COIL SELECTION
Capacity Coil Airflow Ent Lvg
MBh cfm °F °F
Main Htg -10.0 364.7 65.0 90.0
Aux Htg 0.0 0 0 0
Preheat -3.4 100 24 55
Humidif 0.0 0 0.0 0.0
Opt Vent 0.0 0 0.0 0.0
Total -13.4
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Altemative - 1 System Checksums Report Page 9 of 10
VAV -365
System Checksums
By MacDonald - Miller
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Dehumid. Ov Sizing
Ov /Undr Sizing
Exhaust Heat
Sup. Fan Heat
Ret. Fan Heat
Duct Heat Pkup
Reheat at Design
Grand Total =_>
COOLING COIL PEAK
Peaked at Time:
Outside Air:
Space
Sens. + Lat.
Btu /h
0
0
0
0
0
0
0
0
0
0
2,635
2,700
8,870
14,205
362
0
0
14,568
Mo /Hr. 7 / 14
OADB/WB /HR: 81 / 66 / 74
Plenum
Sens. + Lat
Btu /h
0
0
496 49
0
0
0
496 496
Net Percent
Total Of Total
Btu/ ( %)
0
0
3
0
0
0
0
0
0
3
659 3,294
2,700
0 8,870
659 14,864 83
-362
0
-170
0
0
18
15
50
0 0
2,498 14
0 0
0 0
-170 -1
180 1
0 0
0 0
0 0
622 17,869 100.00
CLG SPACE PEAK
Mo /Hr. 7 / 20
OADB: 73
Space
Sensible
Btu /h
0
0
0
0
0
0
0
0
0
0
Percent
Of Total
( %)
0
0
0
0
0
0
0
0
0
0
2,635 19
1,500 11
8,870 66
13,005 96
530 4
0 0
0 0
13,535 100.00
Envelope Loads
Skylite Solar
Skylite Cond
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Exposed Floor
Infiltration
Sub Total = =>
Internal Loads
Lights
People
Misc
Sub Total = =>
Ceiling Load
Ventilation Load
Ov /Undr Sizing
Exhaust Heat
OA Preheat Diff.
RA Preheat Diff.
Additional Reheat
Grand Total =_>
HEATING COIL PEAK
Mo /Hr. Heating Design
OADB: 24
Space Peak
Space Sens
Btu /h
0
0
0
0
0
0
0
0
-1
-1
0
0
0
0
-480
0
- 13,054
- 13,535
Coil Peak Percent
Tot Sens Of Total
Btu /h ( %)
0
-1,543
0
0
0
0
0
-1
0 0.00
0.00
7.36
0.00
0.00
0.00
0.00
0.00
0.00
-1,544 7.36
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
-6,594 31.45
- 13,054 62.26
225 -1.07
0 0.00
0 0.00
0 0.00
- 20,967 100.00
Main CIg
Aux CIg
Opt Vent
Total
COOLING COIL SELECTION
Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR
ton MBh MBh cfm °F °F gr /Ib
1.5 17.9 15.1 608.3 77.3 62.1 60.1
0.0 0.0 0.0 0 0 0 0
0.0 0.0 0.0 0 0.0 0.0 0.0
1.5 17.9
Leave DB/WB/HR
°F °F gr /Ib
54.7 51.8 53.5
0 0 0
0.0 0.0 0.0
Project Name: Panattoni
Dataset Name: C: \CDS \TRACE700 \Projects \7386526- 00 \7386526.TRC
Floor
Part
ExFlr
Roof
Wall
AREAS
Gross Total Glass
ft ( %)
965
0
0
965 0 0
0 0 0
Series Fan - Powered VAV
TEMPERATURES
Cooling Heating
SADB 55.0 90.0
Plenum 76.2 68.4
Return 76.2 68.4
Ret/OA 77.3 24.0
Fn MtrTD 0.0 0.0
Fn BIdTD 0.1 0.0
Fn Frict 0.2 0.0
Vent
Infil
Supply
MinStop /Rh
Return
Exhaust
Rm Exh
Auxiliary
AIRFLOWS
Cooling
130
0
616
130
616
130
0
0
Heating
130
0
616
130
130
130
0
0
ENGINEERING CKS
% OA
cfm /ft
cfm /ton
ft /ton
Btu /hrft
No. People
Cooling
21.2
0.64
413.62
648.06
18.52
6
Heating
21.2
0.64
-21.73
Main Htg
Aux Htg
Preheat
Humidif
Opt Vent
Total
HEATING COIL SELECTION
Capacity Coil Airflow Ent Lvg
MBh cfm °F °F
-16.6 615.9 65.5 90.0
0.0 0 0 0
-4.4 130 24 55
0.0
0.0
-21.0
0 0.0 0.0
0 0.0 0.0
TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008
Utemative - 1 System Checksums Report Page 10 of 10
ACTIVITY NUMBER: M08 -195
PROJECT NAME: PANATTONI
SITE ADDRESS: 6840 FORT DENT WAY
X Original Plan Submittal
Response to Correction Letter #
DATE: 07 -23 -08
Response to Incomplete Letter #
Revision # After Permit Issued
DEPARTMENTS
B i d l g ivision
Public Works
Complete
Comments:
TUES/THURS ROIOTING:
Please Route
REVIEWER'S INITIALS:
Documents/routing slip.doc
2 -28-02
*P ERMIT COORD COPY •
PLAN REVIEW /ROUTING SLIP
Structural Review Required
APPROVALS OR CORRECTIONS:
Approved ❑ Approved with Conditions
Notation:
REVIEWER'S INITIALS:
np 2
Ire Prevention
Structural
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 07 -24 -08
Incomplete
k!
❑ Permit Coordinator
Permit.Cente► U se:Only:' , ••-•;,.• . ..
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
❑ No further Review Required
DATE:
DUE DATE: 08 -21 -08
Not Approved (attach comments) n
DATE:
Planning Division
Not Applicable
❑
Permit Center Use'Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Name
Role
Effective Date
Expiration Date
TURLEY, DOUGLAS
CHIEF EXECUTIVE OFFICER
02/13/2008
Bond
Amount
TURLEY, DOUGLAS
CHIEF OPERATING OFFICER
02/13/2008
023006951
SIGMUND, FREDRIC
PRESIDENT
12/31/2002
HACK, RICHARD
SECRETARY
02/13/2008
KOPET,TYLER
TREASURER
12/31 /2002
LOVELY, STEVE C
VICE PRESIDENT
12/31/2002
Bond
Bond
Company
Name
Bond
Account
Number
Effective
Date
Expiration
Date
Cancel
Date
Impaired
Date
Bond
Amount
Received
Date
1
LIBERTY
MUTUAL
INS CO
023006951
12/11/2002
Until
Cancelled
$12,000.00
12/31/2002
Untitled Page
General /Specialty Contractor
A business registered as a construction contractor with Lal to perform construction work
within the scope of its specialty. A General or Specialty construction Contractor must
maintain a surety bond or assignment of account and carry general liability insurance.
MACDONALD /MILLER FAC SOL INC
Business and Licensing Information
Name MACDONALD /MILLER FAC
SOL INC
Phone 2067684180
Address PO BOX 47983
Suite /Apt.
City
State
Zip
County
Business Type CORPORATION
Parent
Company
SEATTLE
WA
98106
KING
UBI No.
Status
License No.
License Type
Effective Date
Expiration Date
Suspend Date
Separation Date
Previous
License
Next License
Associated
License
Specialty 1
Specialty 2
602254260
ACTIVE
MACDOFS980RU
CONSTRUCTION
CONTRACTOR
12/31/2002
12/31/2008
DIVCOI`988RC
GENERAL
UNUSED
Business Owner Information
Bond Information
Insurance Information
I Company I
•
•
I Effective I Expiration ICancelllmpairedl
Page 1 of 2
Received
https:// fortress .wa.gov /lni/bbip/Detail.aspx ?License= MACDOFS980RU 08/04/2008
3RD FLOOR SERIES VAV BOX SCHEDULE
UNIT
NO,
MFG & MODEL NO.
INLET
SIZE
FAN
CFM
VALVE CFM
HEATER
FAN
NOTES
MAX
MIN
KW
DT
CFM
VOLT /PH
STGS
HP
VOLT /PH
SPD
300
ENVIROTECH CVEH II
8
1
FLAT OVAL FLAT SHEETMETAL W/ INSULATION (1 ")
MM METAL EGGCRATE
3
RETURN /EXH
14/12 -&W
277/1PH
-
1/4
277/1PH
-
EXISTING 2
301
ENVIROTECH CVEH II
8
810
740
110
6.5
25
810
460/3PH
-
1/4
277/1PH
-
EXISTING 2
302
ENVIROTECH CVEH II
8
710
645
105
5
22
710
277/1PH
-
1/4
277/1PH
-
EXISTING 2
303
ENVIROTECH CVEH II
8
565
470
195
4
22
565
277/1PH
-
1/4
277/1 PH
-
EXISTING 2
304
ENVIROTECH CVEH II
6
325
270
95
3
29
325
277/1PH
-
1/4
277/1PH
-
EXISTING 2
305
ENVIROTECH CVEH II
8
885
800
105
6.5
23
885
460/3PH
-
1/4
277/1PH
-
EXISTING 2
306
ENVIROTECH CVEH II
6
-
-
-
3
-
-
277/1PH
-
1/4
277/1PH
-
EXISTING 2, 4
307
ENVIROTECH CFFQEH II
12
1985
1805
200
7.5
12
1985
460/3PH
-
1/4
277/1PH
_
EXISTING 2
308
ENVIROTECH CVEH II
8
945
860
160
5
17
945
277/1PH
-
114
277/1PH
-
EXISTING 2
309
ENVIROTECH CVEH II
8
755
630
-
6.5
27
755
460/3PH
-
1/4
277/1PH
-
EXISTING 2
310
ENVIROTECH CVEH II
8
860
780
115
6.5
24
860
460/3PH
-
1/4
277/1PH
-
EXISTING 2
311
ENVIROTECH CVEH II
8
825
765
140
6.5
27
770
460/3PH
-
1/4
277/1PH
-
EXISTING 2
351
ENVIROTECH CVEH II
10
1195
1090
300
7
18
1195
460/3PH
-
114
277/1PH
-
EXISTING 2
352
ENVIROTECH CVEH II
10
800
730
200
7.5
29
800
460 /3PH
-
1/4
277/1PH
-
EXISTING 2
353
ENVIROTECH CVEH II
8
900
820
230
4
14
900
277/1PH
-
1/4
277/1PH
-
EXISTING 2
354
ENVIROTECH CVEH II
8
800
730
200
3
12
800
277/1PH
-
1/4
277/1PH
-
EXISTING 2
355
ENVIROTECH CVEH II
8
740
680
190
3
13
740
277/1PH
-
1/4
277/1PH
-
EXISTING 2
356
ENVIROTECH CVEH II
6
430
400
110
3
22
430
277/1PH
-
1/4
277/1PH
-
EXISTING 2
357
ENVIROTECH CVEH II
8
700
640
180
4.5
20
700
277/1PH
-
1/4
277/1PH
-
EXISTING 2
358
ENVIROTECH CVEH II
6
455
380
95
3
21
455
277/1PH
-
1/4
277/1PH
-
EXISTING 2
359
ENVIROTECH CVEH II
8
925
770
295
6.5
22
925
460/3PH
-
1/4
27711 PH
-
EXISTING 2
360
ENVIROTECH CVEH II
8
790
660
-
7
28
790
460/3PH
-
1/4
277/1PH
-
EXISTING 2
361
ENVIROTECH CVEH II
8
515
470
130
4.5
27
515
277/1PH
-
1/4
277/1PH
-
EXISTING 2
362
ENVIROTECH CVEH II
8
540
500
140
4.5
26
540
46013PH
-
1/4
277/1PH
-
EXISTING 2
363
ENVIROTECH CVEH II
6
245
200
2.0
25
245
277/1
-
1/6
277/1
-
EXISTING 2
364
ENVIROTECH CVEH II
8
750
625
3
750
277/1
1/6
277 /1
EXISTING 2
365
ENVIROTECH CVEH II
10
1050
960
270
4.5
13
1050
277/1
1/6
277 /1
EXISTING 2
366
ENVIROTECH CVEH II
8
600
540
200
4
21
600
277/1PH
-
1/4
277/1PH
-
EXISTING 2
367
ENVIROTECH CVEH 11
8
620
565
180
4
20
620
277/1PH
-
1/4
277/1PH
-
EXISTING 2
368
ENVIROTECH CFREH 0811
8
550
500
105
4
25
500
277/1PH
2
1/4
277/1 PH
-
EXISTING 1, 3
369
ENVIROTECH CFREH 0811
8
550
500
200
4
25
500
277/1PH
2
1/4
277/1PH
-
EXISTING 1, 3
DUCT LEGEND
DESCRIPTION
SYMBOL
DESCRIPTION
SYMBOL
BARE SHEETMETAL
SIZE
ROUND SHEETMETAL WRAPPED W/ INSULATION (1")
AS NOTED
14/12
120W
.
NOTES
SOUNDLINE SHEETMETAL (1" LINING)
AS NOTED
BARE FLAT OVAL SHEETMETAL
NEW 1
14/12 SL
14/12$
MM METAL EGGCRATE
12/24
SHEETMETAL WRAPPED W/ INSULATION (1 ")
1
FLAT OVAL FLAT SHEETMETAL W/ INSULATION (1 ")
MM METAL EGGCRATE
14/12 W
RETURN /EXH
14/12 -&W
IN LINE
640
BARE ROUND SHEETMETAL
985
DUCTBOARD (V FIBERGLASS)
115/1PH
120
14/12 DB
EXISTING 1-4
EF -303
EXAMPLE OF NEW
BROAN L700L
FLEX DUCT
640
14/12
985
EXAMPLE OF DEMO
xxxxxxxx
FLEX CONNECTOR
34
EXISTING 1-4
3
x x x x x x x x
EXAMPLE OF EXISTING
1 4/1 2
DIFFUSER/GRILLE SCHEDULE
SYMBOL
MANUFACTURER & MODEL NUMBER
SIZE
TYPE
NOTES
SIZE
SHOEMAKER 900 H F/B
AS NOTED
T -BAR LAY -IN DIFFUSER
EXISTING 1
CFM
NOTES
SHOEMAKER 780 -FR
AS NOTED
T -BAR LAY -IN DIFFUSER
NEW 1
QA CAM
r--.]
MM METAL EGGCRATE
12/24
RETURN /EXH
1
\
MM METAL EGGCRATE
24/24
RETURN /EXH
1
3RD FLOOR TRANSFER FAN SCHEDULE
UNIT
NO.
AREA SERVED
MFG & MODEL NO.
TYPE
CFM
ESP
RPM
HP
VOLT/PH
BDD
WT
LBS
NOTES
EF -301
SERVER ROOM 310
BROAN L700L
IN LINE
640
0.375
985
2.9A
115/1PH
INTGR
34
EXISTING 1-4
EF -302
SERVER ROOM 302
BROAN L700L
IN LINE
640
0.375
985
2.9A
115/1PH
INTGR
34
EXISTING 1-4
EF -303
SERVER ROOM 305
BROAN L700L
IN LINE
640
0.375
985
2.9A
115/1PH
INTGR
34
EXISTING 1-4
IN LINE
O
0
N
c
NO SCALE
FORT DENT WAY
VICINITY MAP
n
NOTES:
1. GRILLES & DIFFUSERS TO BE FIRE RATED W/ INTERGRAL FIRE DAMPERS.
DRAWING SHEET INDEX
NAME TITLE
REV
DATE NAME TITLE
TM0.01 SCHEDULES - HVAC
DM2.03 3RD FLOOR DEMO PLAN - HVAC
TM2.03 3RD FLOOR PLAN - HVAC
CONTACT LIST
TITLE
NAME
COMPANY
PHONE NUMBER
FAX NUMBER
ACCOUNT EXECUTIVE
PROJECT ENGINEER
SHEET METAL FOREMAN
FIELD ENGINEERING FOREMAN
STEVE FLINK
NASH PATWARDHAN
BRETT KILEKAS
STEVE BAKER
MACDONALD MILLER
MACDONALD MILLER
MACDONALD MILLER
MACDONALD MILLER
253- 680 -3172
206- 768 -4128
206 - 768 -4018
206- 768 -3824
206 - 768 -4129
206- 768 -4019
206 - 768 -3825
SCOPE OF WORK
RELOCATE (14) EXISTING DIFFUSERS & (7) EXISTING GRILLES & (6) EXISTING T -STATS
INSTALL (5) NEW DIFFUSERS WITH INTEGRAL FIRE DAMPERS, (7) NEW GRILLES W /INTEGRAL FIRE DAMPERS
& (5) NEW SOUNDLINED RA BOOTS.
MISC DUCTWORK & AIR BALANCE (10) VAV BOXES.
NOTES:
1. DISCONNECT BY ELECTRICAL CONTRACTOR
2. MOTOR STARTER BY ELECTRICAL CONTRACTOR.
3. PROVIDE SPEED CONTROLLER, INSTALLED ON FAN BY EC
4. CONTROL W/ LINE VOLTAGE T'STAT INSTALLED BY EC, PROVIDED BY MC. TSTAT TO BE SET AT 80° F
NOTES:
1. DISCONNECT BY ELECTRICAL.
2. EXISTING SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE DEPENDENT
3. SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE:
- FACTORY INSTALLED 1" THROW -AWAY FILTERS
- CONTROLS BY OTHERS
- W/ SCR CONTROL FOR MOTOR
- 24V TRANSFORMER, 48 VA MIN RATING
4. EXISTING UNIT TO BE RELOCATED TO CORRECT CROSS ZONING. COMFORT BALANCE UNIT. EC TO DISCONNECT & RECONNECT LINE VOLTAGE WIRING.
MM RECONNECT TO LOW VOLTAGE WIRING. RECONNECT TO EXISTING DIFFUSSER.
NOTE TO ELECTRICAL:
- 460V /3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1 PH POWER TO THE FAN MOTOR
p 0� s ^_r fa view
tpprp al of
the vi t latior
of approved
MacDonald- Miller
FACILITY SOLUTIONS
7717 Detroit Avenue SW
Seattle, WA 98106
Phone: 206 -763 -9400
Fax: 206 -767 -6773
www.rnacrniller.com
WA Lic No: MACDOFS980RU
• royal is subject to errors end omission
on , , . :. , w does not not aut pr
of :1 g d :f • , ;r . Receipt
1 ,.C.../� dF� � "
/
City of Tukwila
BUILDING DIVISION
CD /PERMIT ISSUE NP 07- 18--08
REVISIONS:
FORT DENT II
PANATTONI TI
SUITE 350
6840 FORT DENT WAY
TUKWILA, WA 98188
SCHEDULES
- HVAC
CAD:
D IKERD
DRAWING NUMBER:
C- 0832 - 7386526 -00
ISSUED FOR
CONSTRUCTION
SHEET NUMBER:
TMOEO1
1. THE HVAC SYSTEM FOR THIS PROJECT IS BASED ON THE FOLLOWING CRITERIA.
ROOF "U" VALUE (BTUH/S.F. °F) = .053
WALL "U" VALUE (BTUH /S.F. °F) = .5
FLOOR "U" VALUE (BTUH /S.F. ° F) = .5
GLASS "U" VALUE (BTUH /S.F. °F) = .72
GLASS SHADE COEFF. _ .53 (STRIP WINDOW) .38 (CURTAIN WALL)
LIGHTING (WATTS /S.F.) = 1.2
MISC. EQUIP. (WATTS /S.F.) = .5
PEOPLE DENSITY (S.F. /PERSON) = PER PLAN
COOLING INDOOR DESIGN TEMP ( °F) = 74
COOLING OUTDOOR DESIGN TEMP (°F) = 85
HEATING INDOOR DESIGN TEMP ( °F) 70
HEATING OUTDOOR DESIGN TEMP ( °F) = 24
HVAC GENERAL NOTES
2. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE
WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK.
3. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2006 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL
BUILDING CODE, INTERNATIONAL. FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES.
4. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2006 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS
28° DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12° BELOW STRUCTURAL SYSTEM.
5. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT.
6. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2006 WSEC.
- DUCT WRAP, WHERE INDICATED, SHALL BE 1 1/2" 0.75 LB /CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL
VAPOR BARRIER (R-4.2 MIN.).
- SOUND LINING, WHERE INDICATED, SHALL BE 1' 1.5 LB /CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO
6000 FPM (R-4.2 MIN.).
- DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID ERK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R-4.3 MIN.).
7. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON - PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT
SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 8' IN LENGTH UNLESS NOTED OTHERWISE.
8. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2006 IBC.
9. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE/SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.5 OF THE 2006 IBC.
PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.6.2 OF THE 2006 IBC. INSTALL FIRE DAMPERS SMOKE DAMPERS
AND FIRE/SMOKE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CODE.
10.PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY
AND RATING OF THE FLOOR OR WALL.
11.HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED
ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR.
12. MOTOR STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY THE ELECTRICAL CONTRACTOR.
13. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER.
RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF
DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES.
14. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE
SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM.
15.COMMISSIONING I5 REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC) SECTION 1416 AND WITH LEED NC -2.1 FUNDAMENTAL
BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING.
16.A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER.
17 DAMPERS USED FOR OUTDOOR AIR INTAKE, EXHAUST, OR RELIEF SHALL HAVE THE FOLLOWING MAXIMUM LEAKAGE RATES AT 1" W.G. (PER AMCA STANDARD 5
MOTORIZED DAMPERS: 10 CFM /S.F. GRAVITY DAMPERS: 20 CFM /S.F. (40 CFM /S.F. FOR DAMPERS SMALLER THAN 24 INCHES IN EITHER DIMENSION).
ABBV FULL NAME ABBV
A
AC
AFF
AL
BDD
BOB
BOD
BOTT
BTU
BTUH
BWG
BWR
C
CAP
CC
CFM
CHWR
CHWS
COMB
CONN
CWR
CWS
DB
DIFF
DMPR
DN
EC
EGC
EER
ELEV
EMS
COMPRESSED AIR LINE
AIR CONDITIONING UNIT
ABOVE FINISHED FLOOR
ALUMINUM
BACKDRAFT DAMPER
BOTTOM OF BEAM
BOTTOM OF DUCT
BOTTOM
BRITISH THERMAL UNITS
BRITISH THERMAL UNITS PER HOUR
BOTTOM WALL GRILLE
BOTTOM WALL REGISTER
CONDENSATE
CAPACITY
CONTROLS CONTRACTOR
CUBIC FEET PER MINUTE
CHILLED WATER RETURN
CHILLED WATER SUPPLY
COMBUSTION
CONNECT
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
DUCT BOARD
DIFFUSER
DAMPER
DOWN
ELECTRICAL CONTRACTOR
EGGCRATE
ENERGY EFFICIENCY RATIO
ELEVATION
ENERGY MANAGEMENT SYSTEM
APN # 2954900440
ESP
EXH
EXTR
FAC
FD
FLA
FOB
FOT
FSD
G
GALV
GC
GPM
GR
GWB
HO
HP
HWR
HWS
ID
INT
LIQ
M-M
MBH
MC
MCA
MD
MIN
MT
MUA
NOM
HVAC ABBREVIATIONS
FULL NAME
EXTERNAL STATIC PRESSURE
EXHAUST
EXTRACTOR
FIRE ALARM CONTRACTOR
FIRE DAMPER
FULL LOAD AMPS
FLAT ON BOTTOM
FLAT ON TOP
FIRE SMOKE DAMPER
GAS LINE
GALVANIZED
GENERAL CONTRACTOR
GALLONS PER MINUTE
GRILLE
GYPSUM WALL BOARD
HOT GAS LINE
HORSE POWER
HOT WATER RETURN
HOT WATER SUPPLY
INSIDE DIMENSION
INTERLOCK
LIQUID LINE
MACDONALD - MILLER
ONE THOUSAND BTUH
MECHANICAL CONTRACTOR
MINIMUM CIRCUIT AMPACITY
MOTORIZED DAMPER
MINIMUM
MOUNT
MAKE -UP AIR
NOMINAL
LEGAL DESCRIPTION
ABBV FULL NAME
OSA
OBD
OD
RA
REG
REQ'D
RIO
SA
SCD
SD
SL
SM
SP
SS
SSSC
STL
SUC
SUSP
TSTAT
TC
TOD
TOS
TV
TWG
TWR
TYP
UNO
VD
VFD
0
OUTSIDE AIR
OPPOSED BLADE DAMPER
OUTSIDE DIMENSION
RETURN AIR
REGISTER (GRILLE WITH DAMPER)
REQUIRED
ROUGH IN ONLY
SUPPLY AIR
SMOKE CONTROL DAMPER
SMOKE DAMPER
SOUND LINING
SHEET METAL
STATIC PRESSURE
START /STOP
SOLID STATE SPEED CONTROLLER
STEEL
SUCTION LINE
SUSPENDED
THERMOSTAT
TEMPERATURE CONTROL
TOP OF DUCT
TOP OF STEEL
TURN VANES
TOP WALL GRILLE
TOP WALL REGISTER
TYPICAL
UNLESS NOTED OTHERWISE
VOLUME DAMPER
VARIABLE FREQUENCY DRIVE
VOLTAGE PHASE & DUCT DIAMETER
, ErARATE PERMIT
REQUIRED FOR:
0 Mechanical
g i Electrical
( Iumbin9
C Gas Piping
City of Tukwila
BUILDING DIVISIO
r--
No changes shall be made to the scope
of work withnlrt ma c, app roval ui
Tukwila Building Division.
NOTE: Revisions will require a new plan e
, and aY in��uoe additional plan review fees.
LEGAL DESCRIPTION: PORGUNDRAKERS INTERURBAN ADDPARCEL 2 LESS BEG MOSTWLY CORNER OF PARCEL 1 TH N 63 -35-49 E 237.32 FTTH 5 26 -24-11 E 227.32 FTTO
COMMON COR BTW PARCELS 1 & 2TH N 63 -35-49 E 252.25 FT TH N 26 -24-11 W 77.65 FTTH N 56 -15 -11 W 234.09 FTTH N 31 -12-43 W 82.39 FT TOINTSN WITH
NWLY LN OF PARCEL 2 TH S 58 -47 -17 E 102.77 FTTH S 55-39 -53 W 63.16 FTTH S 48 -39 -58 W 55.63 FTTH S 39 -21 -15 W 88.24 FT TH S 30 -04-58 W 85.21 FTTO
MOST WLY COR OF PARCEL 2TH S 37 -36-40 E 20.92 FTTO POB - OF CITY OF TUKWILA SHORT PLAT NO 79- 7- SSRECORDING NO 7908210370 SDSHORT
PLAT BEING A POR OFGUNDAKERS INTERURBAN ADD IN SW 1/4 OF NW 1/4 OFSEC 24 -23-04 - AS PER CITYOF TUKWILA BDRY LINE ADJNO 90 -2 -BLA
RECORDING NO 9008151101
M08- I Is
RECEIVED
JUL 2 3 2008
PERMIT CENTER
Ey
0
z
w
0
z
11
Do
1•
CO
0
C
A .)
z
ilm• ar fl
SO _I\L!
UP TO
ATTENUATOR
DB 8/12 DB
,••
• • •
41
IE
7
I I
16/10 D5
(B
B
'
Of FCC
NI
PTN
f
ON FERENC::
OFF ICE
Ji ,; MUJ
LI 7 •
r;N. P TN. P I N
I L 30
OFF [E L)f• I ICL
. 3r-9
OFFI
Lri
["
MU[.
PIN 1
OFFICE
nTN.
_
D F.
N 0 .= I
s =
— r
HtV19 sL..sm=ita
7F
22/12( SM DN
'1
08x 8
1,0x14 DB
1 2_0 W
140
12x12
\---/
(TYP 2)
F
3RD FLOOR DEMO PLAN - HVAC
SCALE: 1 /8" = • '-0"
2
1 0 v.
4/18
NG
8x8
12x12
\El/ 335
100
80 W
W
1 00 W
E..
280W DN
SOUND ATTENUATOR
UP TO
ON
rIEF-- 303 I
210
335
a_x12
1
-
raz5Vi
8x8
,.-12x12 120
'''335
\CAP
I
0
N
14x12
2-0/10- ga
MacDonald-Miller
FACILITY SOLUTIONS
7717 Detroit Avenue SW
Seattle, WA 98106
Phone: 206-763-9400
Fax: 206-767-6773
www.macmillencom
WA Lic No: MACDOFS980RU
A ppp,OVED
JUk_ A 2r61?i
FORT DENT II
PANATTONI TI
SUITE 350
6840 FORT DENT WAY
TUKWILA WA 98188
3RD FLOOR DEMO PLAN
-HVAC
ISSUE DATE:
D IKERD 07-18-08
DRAWING NUIABER:
C-0832-7386526-00
ISSUED FOR
CONSTRUCTION
SHEET NUMBER:
0M2903
8x8
205
140W
(T(P 2)
120 L
120W
(0
- CAP
[
8 • 175 1.1
12<12
500
RECEIVEr
JUL 2 3 2008
PERMIT GENTEh
z
L.1
0
oo
w
z
uJ
LJ—
CO
0
0
co
0
0)
0
A ;1
•
B
312, .1
OFT cI
-
pF
,•F ;CP
,..., ).1 ■.I
/ r 10 1 ,1 11 41
r. S lh .Osiz,..
. LL. T.-• - - •
. / ;10x10 lax 1 0
H ; , 315
(TYP 2) ' r;,,11..i; ,; i
,..•:. ;;;;;;
FIRE HOSE
J
• / - \ 10x10i
4'
lOxlO
10)00 301
240 : m1 24
L .
Cif IICE
Pi N
I F 1 CE
OF I- ;CIF
ATTENUATOR
AC-1
'7=
( D)
L
,
10/
,32 Cr M
IMP DE
12/10
/
/ "-
1 0 x 1 0
275
x8
200
:
2x
100
2 DB
x12 D8
120
a
14x14
\---/ 550
L (
4.
.11.•■■
305
18»12 DB
z
8x8
90
r r
100W
Irk 369 111 P11111111178:111%
a. 120W
100
/T
v=/ 335
0
Y)
310
309
366
AIL
•
• I
8x8
90
80 W
Fl
100
E
SE
1
1
/-12x12
300
(TYP 2)
9 19
EF,4 1 i
22/12i SM DN
\
,
\ f; ,, \
,
[i
0 8x8
140
—=-
1,Dx14 DB—
12
r 7
( F )
1
--P
20/14 DB
CAP
3RD FLOOR PLAN - HVAC
SCALE: 1/8" = 1'-0"
12x12
275
2
A 18
0-139 NG
100/
//
CT,
80W
GENERAL NOTES: 7386526-00
1. ALL NEW & RELOCATED DIFFUSERS
& GRILLES TO HAVE INTEGRAL FIRE
DAMPERS.
2. ROOMS- 300, 306, 307,308 & 310
HAVE FULL HEIGHT WALLS. FIELD TO
INSTALL SOUNLINED RA BOOTS AS
SHOWN.
FL_
12x12
335
N
100W
EF —303 I
8x8
210
MOW
335
r: 3 • .
12x12
I
CAP
80W
250W DN
SOUND ATTENUATOR
UP TO FA
TT r
140W
I N . -
I 0
2x12
\-/ 575
(TYP 2) --- _ 12., 4 --
SHEET NOTES: 7386526-00
0 FIELD VERIFY VAV BOX LOCATION.
RELOCATE IF THE BOX IS ON THE
FULL HEIGHT WALL
0 FIELD VERIFY VAV BOX LOCATION.
RELOCATE IF NECESSARY TO MEET
N.E.0
- CAP
MacDonald-Miller
FACILITY SOLUTIONS
7717 Detroit Avenue SW
Seattle, WA 98106
Phone: 206-763-9400
Fax: 206-767-6773
www.macmiller.com
WA Lic No: MACDOFS980RU
CD/PERMIT ISSUE NP
REVISIONS: DATE
07-18-08
FORT DENT II
PANATTONI TI
SUITE 350
6840 FORT DENT WAY
TUKWILA WA 98188
3RD FLOOR PLAN
-HVAC
LAST REVISED:
N PATWARD HAN 07-18-08
CHECKED Ere: DATE PLOTTED:
B GEZON 07-18--08
CAD: ISSUE DATE:
D IKERD 07-18-08
DRAWING NUMBER:
0-0832-7386526-00
ISSUED FOR
CONSTRUCTION
SHEET NUMBER:
TM2.03
1 Ox1 0
165
17
1/N
RECEIVED
JUL 232008
PERMIT CENTEF
7
0
z
1.1.1
0
0
CO
N
;
z
IJJ
_1
0
0