Loading...
HomeMy WebLinkAboutPermit M08-195 - PANATTONIPANATTONI 6840 FORT DENT WAY M08.195 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Value of Mechanical: $5,636.00 Type of Fire Protection: doc: IMC - 10/06 2954900425 6840 FORT DENT WY TUKW Citylf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us PANATTONI 6840 FORT DENT WAY , TUKVVILA WA PEPPERWOOD HOLDINGS LLC 2835 82ND AVE SE #300 , MERCER ISLAND WA NASH PATWARDHAN 7717 DETROIT AVE SW , SEATTLE WA MACDONALD /MILLER FAC SOL INC Address: PO BOX 47983 , SEATTLE, WA Contractor License No: MACDOFS980RU Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial MECHANICAL PERMIT DESCRIPTION OF WORK: RELOCATE 14 EXISTING DIFFUSERS, RELOCATE 7 EXISTING GRILLS, ADD 5 DIFFUSERS WITH INTEGRAL FIRE DAMPERS, ADD 7 GRILLS WITH INTEGRAL FIRE DAMPERS AND 5 SOUNDLINE RETURN AIR BOOTS. MISCELLANEOUS DUCTWORK EQUIPMENT TYPE AND QUANTITY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *continued on next page ** M08 -195 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 206 -786 -4128 Phone: 206 -768 -4180 Expiration Date: 12/31/2008 M08 -195 08/04/2008 01/31/2009 Fees Collected: $237.50 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP/1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 12 Diffuser 33 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment Printed: 08 -04 -2008 doc: IMC -10/06 The granting of this pe construction or the • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Center Authorized Signature: Permit Number: M08 -195 Issue Date: 08/04/2008 Permit Expires On: 01/31/2009 Date: oe //O (//0," I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. 't doe not pre ume to give authority to violate or cancel the provisions of any other state or local laws regulating of wor authorized to sign and obtain this mechanical permit. Signature: Date: Si /0 Print Name: ‘/OivGo /2'7 166 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -195 Printed: 08-04 -2008 Parcel No.: 2954900425 Address: 6840 FORT DENT WY TUKW Suite No: Tenant: PANATTONI 1: ** *BUILDING DEPARTMENT CONDITIONS * ** • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 - 195 Status: ISSUED Applied Date: 07/23/2008 Issue Date: 08/04/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 13: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 14: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) doc: Cond -10/06 M08 -195 Printed: 08 -04 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 15: This review limited to speculative tenant space only - special fire permits may be necessary depending on detailed description of intended use. 16: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 17: These plans were reviewed by Inspector 0700. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond -10/06 * *continued on next page ** M08 -195 Printed: 08-04 -2008 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Print Name: r >��Go/Ly C� , J 2 I ' -2 _cc/1AI doc: Cond -10/06 M08 -195 Date: ordinances governing or local laws regulating Printed: 08-04 -2008 GENERAL CONTRALTO] (Contractor Info nnation for X4'Iechal Company Name: Mailing Address: ARCHITECT 0 Company Name: Mailing Address: Company Name: Mailing Address: CORD- Au CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http; //www. ci. tukwila. wa.us CONTACT PERSON Name: 1■. QS � czAW o r kcLr Da Mailing Address: - 1- 1 1 1 C.'! c it A✓t S W S+2 x,11 It L T R I Q (p City State Zip E -Mail Address: Fax. Number: Site Address: (pica or4 • eye 1 ( J Tenant Name: For} -- c,lnnV - at -- -- c:k.r.a. ) h ► New Tenant: ❑ Yes n Property Owners Name: 17 a \ ck4. + d n 1 l r ■ 5 +p- r) Cf (f) l--, .. (" Mailing Address ./tog S- ts.,, - �i„ GP Aft,- 6 63 `I it S O2 �tr kW 1 1- w la 9 K g City State Zip Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION QMpplicationsTorms- Applications On Line 3-2006 - Pcrmit Applicaiion.doc Revised: 4-2006 6h mustbewet Contact Person: E -Mail Address: ENGINEER OF RECORD - Alt pla must bewet stamped King Co Assessor's Tax No.: .2.n s- ( I 9 at) t (4 Suite Number: 3 So Floor: City Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: of tamped by Arch' State Z p • tion Date: City Day Telephone: Fax Number: s z tp eer of Recurt City Contact Person: Day Telephone: E -Mail Address: ""' x Number: Zip Page 1 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler/Compressor: Qty Furnace<100K BTU Air Handling Unit >10,000 CFM Fire Damper 0-3 HP/100,000 BTU Furnace>100K BTU Evaporator Cooler Diffuser '2 3-15 HP/500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15-30 HP/I ,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30-50 HP/1,750,000 BTU Appliance Vent Hood and Duct Water Heater 50+ HP/I,750,000 BTU Repair or Addition to Heat/Refrig/Cooling System Incinerator - Domestic Emergency Generator Air Handling Unit <10,000 CFM Incinerator — Comm/Ind Other Mechanical Equipment MECHANICAI, PERMIT INFORMATION — 206.431-3670 MECHANICAL CONTRACTOR INFORMATION Company Name: (IA at. >or.\,,..1 a m,\\R„, Mailing Address: V1 1 - C;) ekrt.41-}- 1 t S w Contact Person: )■,3 CVS cps_ E-Mail Address: Contractor Registration Number: MAr...rioes 9%0 Ko Valuation of Project (contractor's bid price): $ j Expiration Date: Op a 9. t ' r& d cUtt duo.° ric &C3T 1 .+J C ri ) CAD City State Zip Day Telephone( 2-2) — 7 ct1V L fj Z? Fax Number: ( (f, ) ) a-31- 0? u....4 19,4 ) Scope of Work (please provide detailed information): (2-szA 0 CCL-V e_._ / 4 1' e.Y...t 1 42-k Ns)- ) c)- 11 Li° 0 c ct, k -I- to r r, 0.4r ).--t-ro7 - 7 .s . Use: Residential: New .... 0 Replacement .... 0 Commercial: New .... 0 Replacement Fuel Type: Electric TS( Gas ..., 0 Other: Indicate type of mechanical work being installed and the quantity below: Q:VspplicationstForms•Applicatinns On LineO-2006 - Permit Applination.doe Revised: 4-2006 bl Page 4 of 6 PERMIT APPLICATION NOTES ; — ,Applicable to all permits in'thisQapplication Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 3WNER OR A • RIZED AGENT: Signature: Print Name: — e (U ..A, \ \\ Mailing Address: - in S Date Application Accepted: Date Application Expires: Staff Initials: t,Gik I Q:1ApplicntionsTo ms- Applications Oo Lined -2006 - Permit Appllcation.doc Revised: 42006 bh Date: 1 — Z 3 Day Telephone: ( 2 : ( - 7-17 ) 7 $ " y27 4) City State Zip Page 6 of 6 Parcel No.: 2954900425 Address: 6840 FORT DENT WY TUKW Suite No: Applicant: PANATTONI Receipt No.: R08 -02722 Initials: WER User ID: 1632 Payee: MACDONALD MILLER ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http://www.atukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 1803 237.50 RECEIPT Account Code Current Pmts 000.322.102.00.0 190.00 000/345.830 47.50 Total: $237.50 Permit Number: M08 - 195 Status: PENDING Applied Date: 07/23/2008 Issue Date: Payment Amount: $237.50 Payment Date: 07/23/2008 11:45 AM Balance: $0.00 5224 07/23 9710 TOTAL 341.50 doc: Receipt -06 Printed: 07 -23 -2008 Project: p /f "✓ Type of Inspection: c7e /�1 / Address: 60 1 /1.2 r;/t oc&jt Date Called: Special Instructions: Date Wanted: /5 -QG rn- Requester: • 2 e / z - 72- 1 -/- (� J /31 INSPECTION RECORD Retain a copy with permit IN PECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION e 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3 Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspector: (Date: LI $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: Pro t: r Type of nspection: i i A \J Address: Date ailed: ( � � -ft7 i-D T Special Instructions: Date Wanted: 1 S. Op Requester: Phone No: IqS PERMIT NO. CITY OF TUKWILA BUILDING DIVISION *- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 3 70 INSPECTION NO. INSPECTION RECORD Retain a copy with permit Approved per applicable codes. Corrections required prior to approval. COMMENTS: (Fr 'e ItJ 1 _ A_Af) Inspectop` Date: _ ` J ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: COMMENTS: Type nspectio d\� i&l 3 1"J s 4 C) Q fi bg k l Date Called: P : Dat Wanted: --�-- 1 Requester: Phone o: Z� Go — —Co c 3 1 1 "1 , `h1( .6-2e_A (r : ) -L 6.01 ( Al 1M /179 C A Pro 4q Mk)ATa _ Type nspectio d\� i&l 3 1"J s 4 C) Q fi bg k l Date Called: Special Instructions: / Dat Wanted: --�-- i � � �a.n- p.m. Requester: Phone o: Z� Go — —Co c 3 1 $� 2 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION I' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 INSPECTION NO. INSPECTION RECORD Retain a copy with permit Approved per applicable codes. ❑ Corrections required prior to approval. inspec or: 60.00 R EINSPECTIO FEE REQUIRED. (.)(r $ . Prior to inspection, fee must be Paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: COMMENTS: Type o Inspection: Chkc IQ Ad ' j O rOek . ailed: Special Instructions: --44 2 , _ bate Wanted: 5 _ 0 Requester: 6 — (ti ( J e ii -u ti S _ G „ , ti.. -), r-e -1.) -c A A f k j ck ('t et. � .) , J ( k ( / / re - , (\ C./ ; ',A p( . h Proj t: 141 Pr rozS Type o Inspection: Chkc IQ Ad ' j O rOek . ailed: Special Instructions: --44 2 , _ bate Wanted: 5 _ 0 Requester: Phone No .i 7i — 40(3( INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. . 1 (206)431 -3670 Approved per applicable codes. Corrections required prior to approval. ..� e ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Inspect Date: Receipt No.: 'Date: Panattoni TRAM' Location Building owner Program user Company Comments By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density - specific heat product Latent heat factor Enthalpy factor Summer design dry bulb Summer design wet bulb Winter design dry bulb Summer clearness number Winter clearness number Summer ground reflectance Winter ground reflectance Design simulation period Cooling load methodology Heating load methodology Fort Dent II Tukwila FILE COPY Permlt No. MacDon¢-,Millgr, C: ICDSITRACE700AIRojebte7.}386526 _WII, ¢52¢ Taf 09:36 AM on 07/18/2008 - • - "� ' ` '' 6.0 Seattle, Washington 47.0 deg 122.0 deg 8 386 ft 29.5 in. Hg 0.0749 0.2444 1.0988 4,836.9 4.4953 82 66 24 0.95 0.95 0.20 0.20 lb/cu ft Btu /Ib - °F Btu /h•cfm• °F Btu - min /h -cu ft lb- min /hr.cu ft °F °F °F January - December CLTD -CLF (ASHRAE TFMI UATD 11o&' l95 CODE COMPLIA NCE JUL 3 1 2008 BUILDING Tukwila NG DIVISION RECEIVED JUL 2 3 PERMIT CENTER 7RACEno comprehensive b ilm,° analysts software from Trn.. VAV -351 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Peaked at Time: Outside Air. Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total = => COOLING COIL PEAK Space Sens. + Lat. Btu /h CLG SPACE PEAK Mo /Hr: 8 / 12 Mo /Hr: 9 / 12 OADB/WB /HR: 76 / 64 / 73 OADB: 74 Plenum Net Percent Space Percent Sens. + Lat Total Of Total Sensible Of Total Btu /h Btu /h ( %) Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 0 94 94 0 0 0 16,771 0 16,771 61 17,963 74 -103 0 -103 0 -697 -3 1,118 1,037 2,155 8 1,159 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17,787 1,131 18,918 68 18,424 76 1,545 386 1,932 7 1,545 6 2,250 2,250 8 1,250 5 2,966 0 2,966 11 2,966 12 6,761 386 7,148 26 5,761 24 199 -199 0 0 178 1 0 0 1,380 5 0 0 0 0 0 0 0 0 0 -122 -122 0 320 1 0 0 0 0 0 0 0 0 24,747 1,196 27,643 100.00 24,364 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 -911 2.96 0 0 0.00 - 10,157 - 10,157 32.94 -1,007 -1,935 6.27 0 0 0.00 0 0 0.00 -2,146 -2,146 6.96 - 13,309 - 15,148 49.13 0 0 0.00 0 0 0.00 -1,415 -1,415 4.59 -1,415 -1,415 4.59 -228 0 0.00 0 -5,055 16.40 -9,411 -9,411 30.53 199 -0.65 0 0.00 0 0.00 0 0.00 - 24,364 - 30,830 100.00 Main CIg 2.3 Aux Clg 0.0 Opt Vent 0.0 0.0 Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr/lb 27.6 0.0 2.3 27.6 25.4 0.0 0.0 1,080.6 76.1 0 0 0 0.0 60.9 56.6 0 0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 54.7 51.8 53.5 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE7001Projects \7386526 -00 \7386526.TRC System Checksums By MacDonald - Miller Floor Part ExFir Roof Wall AREAS Gross Total Glass ft ( %) 566 0 0 566 0 0 593 288 49 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 76.1 68.7 Return 76.1 68.7 Ret/OA 76.1 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 100 0 1,109 100 1,109 100 0 0 Heating 100 42 1,109 100 142 142 0 0 % OA cfm /ft cfm/ton ft /ton Btu/hr-ft No. People ENGINEERING CKS Cooling Heating 9.0 9.0 1.96 1.96 481.26 245.70 48.84 -54.47 5 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F Main Htg -27.5 1,108.6 67.5 90.0 Aux Htg 0.0 0 0 0 Preheat -3.4 100 24 55 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -30.8 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Altemative - 1 System Checksums Report Page 1 of 10 VAV -352 System Checksums By MacDonald - Miller Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Grand Total = => COOLING COIL PEAK Peaked at Time: Outside Air. Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Space Sens. + Lat. Btu /h Mo /Hr. 8 / 12 OADB/WB /HR: 76 / 64 / 73 Plenum Net Percent Sens. + Lat Total Of Total Btu/h Btu /h ( %) 0 0 0 0 0 0 0 0 0 68 68 0 10,027 0 10,027 51 -62 0 -62 0 674 623 1,297 7 0 0 0 0 0 0 0 0 0 10,640 691 11,331 58 1,100 275 1,375 7 2,500 2,500 13 2,888 0 2,888 15 6,488 275 6,763 34 131 -131 0 0 0 0 1,502 8 0 0 0 0 0 -136 -136 -1 219 1 0 0 0 0 0 0 0 0 17,259 699 19,679 100.00 CLG SPACE PEAK Mo /Hr. 9 / 12 OADB: 74 Space Sensible Btu/h 10,739 -417 699 0 1,100 1,480 2,888 Percent Of Total ( %) 0 0 0 0 0 0 65 -3 4 0 0 0 0 0 11,021 66 7 9 17 5,468 33 116 1 0 0 0 0 16,605 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond WaII Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total => HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 -650 2.76 0 0 0.00 -6,066 -6,066 25.79 -607 -1,163 4.95 0 0 0.00 0 0 0.00 -1,528 -1,528 6.50 -8,201 -9,407 40.00 0 0 0.00 0 0 0.00 -1,008 -1,008 4.28 -1,008 -1,008 4.28 -155 0 0.00 0 -6,065 25.79 -7,241 -7,241 30.79 201 -0.85 0 0.00 0 0.00 0 0.00 - 16,605 - 23,520 100.00 Main Cig Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr /Ib 1.6 0.0 0.0 19.7 0.0 0.0 1.6 19.7 17.3 0.0 0.0 738.9 76.1 0 0 0 0.0 61.5 59.3 0 0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 54.7 52.1 54.7 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE700\ Projects \7386526- 00 \7386526.TRC Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 403 0 0 403 0 0 355 172 48 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 76.0 68.8 Return 76.0 68.8 Ret/OA 76.1 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 120 0 756 120 756 120 0 0 Heating 120 30 756 120 150 150 0 0 % OA cfm /ft' cfm /ton ft' /ton Btu /heft' No. People ENGINEERING CKS Cooling Heating 15.9 15.9 1.87 1.87 460.73 245.74 48.83 -58.36 6 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -19.5 755.6 66.6 90.0 0.0 0 0 0 -4.1 120 24 55 0.0 0.0 -23.5 Lvg °F 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Altemative - 1 System Checksums Report Page 2 of 10 VAV -353 System Checksums By MacDonald - Miller Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Peaked at Time: Outside Air. Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total =_> COOLING COIL PEAK Space Sens. + Lat. Btu /h Mo /Hr. 8 / 15 OADB/WB /HR: 80 / 66 / 73 Plenum Net Percent Sens. + Lat Total Of Total Btu /h Btu /h ( %) 0 0 0 0 0 0 0 0 0 254 254 1 10,547 0 10,547 47 495 0 495 2 693 639 1,333 6 0 0 0 0 0 0 0 0 0 11,735 893 12,628 56 1,447 362 1,809 8 3,200 3,200 14 2,104 0 2,104 9 6,752 362 7,113 32 202 -202 0 0 0 0 2,823 13 0 0 0 0 0 -226 -226 -1 235 1 0 0 0 0 0 0 0 0 18,689 827 22,574 100.00 CLG SPACE PEAK Mo /Hr. 9 / 15 OADB: 77 Space Sensible Btu /h 1,447 1,960 2,104 5,512 171 0 0 Percent Of Total ( %) 0 0 0 0 0 0 11,650 64 37 0 708 4 0 0 0 0 0 0 12,394 69 8 11 12 30 1 0 0 18,077 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total => HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 -851 3.04 0 0 0.00 -8,138 -8,138 29.08 -802 -1,542 5.51 0 0 0.00 0 0 0.00 -2,009 -2,009 7.18 - 10,949 - 12,540 44.80 0 0 0.00 0 0 0.00 -1,325 -1,325 4.73 -1,325 -1,325 4.73 -237 0 0.00 0 -8,613 30.77 -5,837 -5,837 20.85 325 -1.16 0 0.00 0 0.00 0 0.00 - 18,347 - 27,989 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr/lb 1.9 22.6 19.5 794.0 77.0 62.0 60.4 0.0 0.0 0.0 0 0 0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 1.9 22.6 Leave DB/WB/HR °F °F gr/lb 54.7 52.1 54.6 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE700 \Projects \7386526-00 \7386526.TRC Floor Part ExFir Roof Wall AREAS Gross Total Glass ft ( %) 530 0 0 530 0 0 474 231 49 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 76.2 68.6 Return 76.2 68.6 Ret/OA 77.0 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Intl! Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 170 0 823 170 823 170 0 0 Heating 170 40 835 170 210 210 0 0 ENGINEERING CKS % OA cfm /ft cfm /ton ft /ton Btu/hr-ft No. People Cooling 20.7 1.55 437.25 281.74 42.59 8 Heating 20.4 1.58 -52.81 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F Main Htg -22.2 834.9 65.8 90.0 Aux Htg 0.0 0 0 0 Preheat -5.8 170 24 55 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -28.0 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Alternative - 1 System Checksums Report Page 3 of 10 VAV -354 Envelope Loads Skylite Solar Skylite Cond COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 16 Outside Air. OADB/WB /HR: 79 / 65 / 71 Roof Cond 0 123 123 Glass Solar 7,270 0 7,270 Glass Cond 296 0 296 Wall Cond 724 523 1,247 Partition 0 0 Exposed Floor 0 0 Infiltration 0 0 Sub Total =_> 8,289 647 8,936 Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Space Sens. + Lat. Btu /h Grand Total => 12,876 Plenum Net Percent Sens. + Lat Total Of Total Btu /h Btu/h 0 0 0 0 0 0 560 140 700 5 2,400 2,400 16 1,550 0 1,550 10 4,510 140 4,649 30 77 -77 0 0 0 1,738 0 0 0 -157 -157 161 0 0 0 0 0 ( %) 0 1 47 2 8 0 0 0 58 0 11 0 0 -1 0 0 0 553 15,328 100.00 CLG SPACE PEAK Mo /Hr. 9 / 16 OADB: 77 Space Sensible Btu /h 0 0 0 7,952 20 717 0 0 0 8,689 560 1,470 1,550 3,580 68 0 0 Percent Of Total ( %) 0 0 0 64 0 6 0 0 0 70 5 12 13 29 0 0 12,336 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total = => HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 -330 1.74 0 0 0.00 -5,052 -5,052 26.58 -752 -1,295 6.81 0 0 0.00 0 0 0.00 -777 -777 4.09 -6,581 -7,454 39.22 0 0 0.00 0 0 0.00 -513 -513 2.70 -513 -513 2.70 -81 0 0.00 0 -6,065 31.91 -5,162 -5,162 27.16 186 -0.98 0 0.00 0 0.00 0 0.00 - 12,336 - 19,008 100.00 Main Cig Aux Clg Opt Vent Total 1.3 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr/lb 1.3 15.3 13.3 543.6 76.9 61.9 60.0 0.0 0.0 0.0 0 0 0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 15.3 Leave DB/WB/HR °F °F gr /Ib 54.7 52.0 54.4 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE700 \Projects \7386526- 00 \7386526.TRC System Checksums By MacDonald - Miller Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 205 0 0 205 0 0 347 143 41 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 76.2 68.8 Return 76.2 68.8 Ret/OA 76.9 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 120 0 561 120 561 120 0 0 Heating 120 15 561 120 135 135 0 0 ENGINEERING CKS % OA cfm /ft cfm /ton ft /ton Btu /heft No. People Cooling 21.4 2.74 439.46 160.49 74.77 6 Heating 21.4 2.74 -92.72 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Lvg °F Main Htg -15.0 561.3 65.8 90.0 Aux Htg 0.0 0 0 0 Preheat -4.1 120 24 55 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -19.0 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Altemative - 1 System Checksums Report Page 4 of 10 VAV -355 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Grand Total = => COOLING COIL PEAK Peaked at Time: Outside Air. Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Space Sens. + Lat. Btu /h Mo /Hr: 8 / 17 OADB/WB /HR: 78 / 64 / 66 Plenum Net Percent Sens. + Lat Total Of Total Btu /h Btu /h ( %) 0 0 0 0 0 0 0 0 0 234 234 1 8,947 0 8,947 55 280 0 280 2 896 681 1,577 10 0 0 0 0 0 0 0 0 0 10,123 915 11,038 67 909 227 1,137 7 1,350 1,350 8 2,068 0 2,068 13 4,327 227 4,555 28 151 -151 0 0 0 0 688 4 0 0 0 0 0 -94 -94 -1 189 1 0 0 0 0 0 0 0 0 14,601 897 16,376 100.00 CLG SPACE PEAK Mo /Hr. 8 / 17 OADB: 78 Space Percent Sensible Of Total Btu /h ( %) O 0 O 0 O 0 8,947 64 280 2 896 6 0 0 0 0 10,123 909 750 2,068 3,727 151 0 0 0 72 6 5 15 27 1 0 0 0 14,001 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total = => HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 -535 2.87 0 0 0.00 -6,088 -6,088 32.68 -842 -1,475 7.92 0 0 0.00 0 0 0.00 -1,262 -1,262 6.78 -8,192 -9,360 50.24 O 0 0.00 O 0 0.00 -833 -833 4.47 -833 -833 4.47 -142 0 0.00 0 -3,033 16.28 -5,531 -5,531 29.69 126 -0.67 0 0.00 0 0.00 0 0.00 - 14,697 - 18,630 100.00 Total Capacity ton MBh Main Cig 1.4 16.4 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 1.4 16.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 15.3 637.1 76.6 60.9 56.1 0.0 0 0 0 0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr 54.7 51.8 53.6 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE700 \Projects \7386526- 00 \7386526.TRC System Checksums By MacDonald - Miller Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft (%) 0 333 0 0 405 173 43 333 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 76.4 68.7 Return 76.4 68.7 Ret/OA 76.6 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 60 0 637 60 637 60 0 0 Heating 60 25 669 60 85 85 0 0 % OA cfm /ft cfm /ton ft /ton Btu /hrft No. People ENGINEERING CKS Cooling Heating 9.4 9.0 1.91 2.01 466.86 244.02 49.18 -55.95 3 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coll Airflow Ent Lvg MBh cfm °F °F -16.6 668.8 67.4 90.0 0.0 0 0 0 -2.0 60 24 55 0.0 0.0 -18.6 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Altemative - 1 System Checksums Report Page 5 of 10 VAV -356 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Peaked at Time: Outside Air. Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total =_> COOLING COIL PEAK Space Sens. + Lat. Btu /h Mo /Hr. 7 / 18 OADB/WB /HR: 78 / 62 / 59 Plenum Net Percent Sens. + Lat Total Of Total Btu /h Btu /h ( %) 0 0 0 0 0 0 0 0 0 166 166 2 6,988 0 6,988 66 248 0 248 2 634 507 1,141 11 0 0 0 0 0 0 0 0 0 7,870 674 8,544 80 461 115 577 5 450 450 4 788 0 788 7 1,700 115 1,815 17 80 -80 0 0 0 0 163 2 0 0 0 0 0 -33 -33 0 127 1 0 0 0 0 0 0 0 0 9,650 676 10,616 100.00 CLG SPACE PEAK Mo /Hr. 7 / 18 OADB: 78 Space Sensible Btu /h 6,988 248 634 0 7,870 461 250 788 1,500 80 0 0 0 0 0 0 74 3 7 0 0 0 0 0 0 0 Percent Of Total ( %) 83 5 3 8 16 1 0 0 9,450 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total = => HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 -271 2.44 0 0 0.00 -5,084 -5,084 45.77 -627 -1,130 10.17 0 0 0.00 0 0 0.00 -641 -641 5.77 -6,351 -7,125 64.15 0 0 0.00 0 0 0.00 - 423 -423 3.80 - 423 -423 3.80 -77 0 0.00 0 -1,011 9.10 -2,600 -2,600 23.41 51 -0.46 0 0.00 0 0.00 0 0.00 -9,450 - 11,107 100.00 Total Capacity ton MBh Main Cig 0.9 10.6 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.9 10.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 10.3 430.0 76.6 60.1 52.4 0.0 0 0 0 0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 54.7 51.2 51.2 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE700 \Projects \7386526- 00 \7386526.TRC System Checksums By MacDonald - Miller Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft' ( %) 169 0 0 169 0 0 322 144 45 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 76.5 68.6 Return 76.5 68.6 Ret/OA 76.6 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 20 0 430 20 430 20 0 0 Heating 20 13 430 20 33 33 0 0 % OA cfm /ft' cfm /ton ft' /ton Btu/hi-ft' No. People ENGINEERING CKS Cooling Heating 4.7 4.7 2.54 2.54 486.07 191.03 62.82 -65.72 1 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -10.4 430.0 67.9 90.0 0.0 0 0 0 -0.7 20 24 55 0.0 0.0 Lvg °F 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Altemative - 1 System Checksums Report Page 6 of 10 VAV -357 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond WaII Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total =_> COOLING COIL PEAK Peaked at Time: Mo /Hr. 71 18 Outside Air. OADB/WB /HR: 78 / 62 / 59 Space Sens. + Lat. Btu /h 0 0 0 0 442 442 3 8,112 0 8,112 47 343 0 343 2 864 684 1,548 9 O 0 0 O 0 0 O 0 0 9,320 1,126 10,445 61 1,231 1,800 2,770 5,801 235 0 0 15,356 Plenum Sens. + Lat Btu /h 0 308 0 308 -235 0 -145 0 0 1,053 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 1,539 9 1,800 11 2,770 16 6,109 36 0 0 479 3 0 0 0 0 -145 -1 196 1 0 0 0 0 0 0 17,084 100.00 CLG SPACE PEAK Mo /Hr. 7 / 18 OADB: 78 Space Sensible Btu /h 0 0 0 8,112 343 864 0 0 0 9,320 1,231 1,000 2,770 5,001 235 0 0 Percent Of Total ( %) 0 0 0 56 2 6 0 0 0 64 8 7 19 34 2 0 0 14,556 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total = => HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) O 0 0.00 O 0 0.00 0 -722 3.68 0 0 0.00 -6,997 -6,997 35.70 -874 -1,568 8.00 0 0 0.00 0 0 0.00 -1,710 -1,710 8.72 -9,580 - 10,995 56.11 0 0 0.00 0 0 0.00 -1,128 -1,128 5.75 -1,128 -1,128 5.75 -223 0 0.00 0 -4,044 20.63 -3,625 -3,625 18.50 195 -0.99 0 0.00 0 0.00 0 0.00 - 14,556 - 19,597 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr /Ib 1.4 17.1 16.1 662.3 76.8 60.9 55.6 0.0 0.0 0.0 0 0 0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 1.4 17.1 Leave DB/WB /HR °F °F gr /Ib 54.7 51.7 53.3 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE7001Projects \7386526- 00 \7386526.TRC System Checksums By MacDonald - Miller Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 451 0 0 451 0 0 446 199 45 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 76.7 68.4 Return 76.7 68.4 Ret/OA 76.8 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 80 0 662 80 662 80 0 0 Heating 80 34 662 80 114 114 0 0 % OA cfm /ft cfm /ton ft Btu /heft° No. People ENGINEERING CKS Cooling Heating 12.1 12.1 1.47 1.47 465.23 316.79 37.88 -43.45 4 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F -16.9 0.0 -2.7 0.0 0.0 -19.6 662.3 66.8 90.0 0 0 0 80 24 55 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Alternative - 1 System Checksums Report Page 7 of 10 VAV -361 System Checksums By MacDonald - Miller Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total =_> COOLING COIL PEAK Peaked at Time: Outside Air. Space Sens. + Lat. Btu /h 0 0 0 0 0 0 0 0 0 0 3,001 3,150 5,375 11,526 12,042 Mo /Hr: 7 / 14 OADB/WB /HR: 81 / 66 / 74 Plenum Sens. + Lat Btu /h Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 553 553 4 O 0 0 O 0 0 0 0 0 0 0 0 0 0 0 553 553 4 750 3,751 24 3,150 21 0 5,375 35 750 12,276 80 516 -516 0 0 0 0 2,627 17 0 0 0 0 0 -239 -239 -2 143 1 0 0 0 0 0 0 0 0 549 15,361 100.00 CLG SPACE PEAK Mo /Hr. 7 / 20 OADB: 73 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 3,001 1,750 5,375 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 28 16 49 10,126 93 751 7 0 0 0 0 10,877 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total =_> HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -680 0 - 10,196 - 10,877 Coil Peak Percent Tot Sens Of Total Btu /h ( %) O 0.00 O 0.00 -1,743 9.15 O 0.00 O 0.00 0 0.00 0 0 0 -1,743 0.00 0.00 0.00 9.15 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -7,420 38.96 - 10,196 53.54 315 -1.65 0 0.00 0 0.00 0 0.00 - 19,044 100.00 Main Clg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr /Ib 1.3 0.0 0.0 15.4 0.0 0.0 1.3 15.4 12.4 0.0 0.0 484.2 78.0 0 0 0 0.0 62.9 62.9 0 0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 54.7 51.9 54.0 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE7001Projects \7386526- 00 \7386526.TRC Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 1,099 0 0 1,099 0 0 0 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 76.5 68.1 Return 76.5 68.1 Ret/OA 78.0 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 147 0 495 147 495 147 0 0 Heating 147 0 495 147 147 147 0 0 ENGINEERING CKS % OA cfm /ft' cfm /ton ft' /ton Btu /heft' No. People Cooling 29.7 0.45 386.63 858.51 13.98 7 Heating 29.7 0.45 -17.33 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F -14.1 0.0 -5.0 0.0 0.0 -19.0 Lvg °F 494.9 64.1 90.0 0 0 0 147 24 55 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Altemative - 1 System Checksums Report Page 8 of 10 VAV -362 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total =_> COOLING COIL PEAK Peaked at Time: Outside Air. Space Sens. + Lat. Btu /h 0 0 0 0 0 0 0 0 0 0 997 2,250 5,623 8,869 8,969 Mo /Hr. 7 / 14 OADB/WB /HR: 81 / 66 / 74 Plenum Sens. + Lat Btu /h Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 192 192 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 192 192 2 249 1,246 11 2,250 20 0 5,623 51 249 9,119 82 99 -99 0 0 0 0 1,798 16 0 0 0 0 0 -94 -94 -1 107 1 0 0 0 0 0 0 0 0 248 11,122 100.00 CLG SPACE PEAK Mo /Hr. 7 / 20 OADB: 73 Space Sensible Btu /h 997 1,250 5,623 7,869 146 0 0 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 16 70 98 2 0 0 8,015 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total = => HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/ Btu /h ( %) 0 0 0 0 0 -132 0 -7,883 -8,015 0 0.00 0 0.00 -589 4.40 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -590 4.40 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -5,055 37.72 -7,883 58.82 125 -0.94 0 0.00 0 0.00 0 0.00 - 13,402 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr /Ib 0.9 11.1 9.0 362.6 77.4 62.6 62.4 0.0 0.0 0.0 0 0 0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.9 11.1 Leave DB/WB/HR °F °F gr/lb 54.7 51.9 54.1 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE700\ Projects \7386526- 00 \7386526.TRC System Checksums By MacDonald - Miller Floor Part ExFIr Roof Wall AREAS Gross Total Glass ft ( %) 365 0 0 365 0 0 0 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 75.9 68.9 Return 75.9 68.9 Ret/OA 77.4 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 100 0 365 100 365 100 0 0 Heating 100 0 365 100 100 100 0 0 ENGINEERING CKS % OA cfm /ft' cfm /ton ft= /ton Btu /hrfe No. People Cooling 27.4 1.00 393.51 393.82 30.47 5 Heating 27.4 1.00 -36.72 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg -10.0 364.7 65.0 90.0 Aux Htg 0.0 0 0 0 Preheat -3.4 100 24 55 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -13.4 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Altemative - 1 System Checksums Report Page 9 of 10 VAV -365 System Checksums By MacDonald - Miller Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Reheat at Design Grand Total =_> COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h 0 0 0 0 0 0 0 0 0 0 2,635 2,700 8,870 14,205 362 0 0 14,568 Mo /Hr. 7 / 14 OADB/WB /HR: 81 / 66 / 74 Plenum Sens. + Lat Btu /h 0 0 496 49 0 0 0 496 496 Net Percent Total Of Total Btu/ ( %) 0 0 3 0 0 0 0 0 0 3 659 3,294 2,700 0 8,870 659 14,864 83 -362 0 -170 0 0 18 15 50 0 0 2,498 14 0 0 0 0 -170 -1 180 1 0 0 0 0 0 0 622 17,869 100.00 CLG SPACE PEAK Mo /Hr. 7 / 20 OADB: 73 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 2,635 19 1,500 11 8,870 66 13,005 96 530 4 0 0 0 0 13,535 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass Cond Wall Cond Partition Exposed Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Grand Total =_> HEATING COIL PEAK Mo /Hr. Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 -1 -1 0 0 0 0 -480 0 - 13,054 - 13,535 Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 -1,543 0 0 0 0 0 -1 0 0.00 0.00 7.36 0.00 0.00 0.00 0.00 0.00 0.00 -1,544 7.36 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -6,594 31.45 - 13,054 62.26 225 -1.07 0 0.00 0 0.00 0 0.00 - 20,967 100.00 Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr /Ib 1.5 17.9 15.1 608.3 77.3 62.1 60.1 0.0 0.0 0.0 0 0 0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 1.5 17.9 Leave DB/WB/HR °F °F gr /Ib 54.7 51.8 53.5 0 0 0 0.0 0.0 0.0 Project Name: Panattoni Dataset Name: C: \CDS \TRACE700 \Projects \7386526- 00 \7386526.TRC Floor Part ExFlr Roof Wall AREAS Gross Total Glass ft ( %) 965 0 0 965 0 0 0 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating SADB 55.0 90.0 Plenum 76.2 68.4 Return 76.2 68.4 Ret/OA 77.3 24.0 Fn MtrTD 0.0 0.0 Fn BIdTD 0.1 0.0 Fn Frict 0.2 0.0 Vent Infil Supply MinStop /Rh Return Exhaust Rm Exh Auxiliary AIRFLOWS Cooling 130 0 616 130 616 130 0 0 Heating 130 0 616 130 130 130 0 0 ENGINEERING CKS % OA cfm /ft cfm /ton ft /ton Btu /hrft No. People Cooling 21.2 0.64 413.62 648.06 18.52 6 Heating 21.2 0.64 -21.73 Main Htg Aux Htg Preheat Humidif Opt Vent Total HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F -16.6 615.9 65.5 90.0 0.0 0 0 0 -4.4 130 24 55 0.0 0.0 -21.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.0 calculated at 09:36 AM on 07/18/2008 Utemative - 1 System Checksums Report Page 10 of 10 ACTIVITY NUMBER: M08 -195 PROJECT NAME: PANATTONI SITE ADDRESS: 6840 FORT DENT WAY X Original Plan Submittal Response to Correction Letter # DATE: 07 -23 -08 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS B i d l g ivision Public Works Complete Comments: TUES/THURS ROIOTING: Please Route REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28-02 *P ERMIT COORD COPY • PLAN REVIEW /ROUTING SLIP Structural Review Required APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: np 2 Ire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 07 -24 -08 Incomplete k! ❑ Permit Coordinator Permit.Cente► U se:Only:' , ••-•;,.• . .. INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ❑ No further Review Required DATE: DUE DATE: 08 -21 -08 Not Approved (attach comments) n DATE: Planning Division Not Applicable ❑ Permit Center Use'Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Name Role Effective Date Expiration Date TURLEY, DOUGLAS CHIEF EXECUTIVE OFFICER 02/13/2008 Bond Amount TURLEY, DOUGLAS CHIEF OPERATING OFFICER 02/13/2008 023006951 SIGMUND, FREDRIC PRESIDENT 12/31/2002 HACK, RICHARD SECRETARY 02/13/2008 KOPET,TYLER TREASURER 12/31 /2002 LOVELY, STEVE C VICE PRESIDENT 12/31/2002 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 LIBERTY MUTUAL INS CO 023006951 12/11/2002 Until Cancelled $12,000.00 12/31/2002 Untitled Page General /Specialty Contractor A business registered as a construction contractor with Lal to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. MACDONALD /MILLER FAC SOL INC Business and Licensing Information Name MACDONALD /MILLER FAC SOL INC Phone 2067684180 Address PO BOX 47983 Suite /Apt. City State Zip County Business Type CORPORATION Parent Company SEATTLE WA 98106 KING UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Separation Date Previous License Next License Associated License Specialty 1 Specialty 2 602254260 ACTIVE MACDOFS980RU CONSTRUCTION CONTRACTOR 12/31/2002 12/31/2008 DIVCOI`988RC GENERAL UNUSED Business Owner Information Bond Information Insurance Information I Company I • • I Effective I Expiration ICancelllmpairedl Page 1 of 2 Received https:// fortress .wa.gov /lni/bbip/Detail.aspx ?License= MACDOFS980RU 08/04/2008 3RD FLOOR SERIES VAV BOX SCHEDULE UNIT NO, MFG & MODEL NO. INLET SIZE FAN CFM VALVE CFM HEATER FAN NOTES MAX MIN KW DT CFM VOLT /PH STGS HP VOLT /PH SPD 300 ENVIROTECH CVEH II 8 1 FLAT OVAL FLAT SHEETMETAL W/ INSULATION (1 ") MM METAL EGGCRATE 3 RETURN /EXH 14/12 -&W 277/1PH - 1/4 277/1PH - EXISTING 2 301 ENVIROTECH CVEH II 8 810 740 110 6.5 25 810 460/3PH - 1/4 277/1PH - EXISTING 2 302 ENVIROTECH CVEH II 8 710 645 105 5 22 710 277/1PH - 1/4 277/1PH - EXISTING 2 303 ENVIROTECH CVEH II 8 565 470 195 4 22 565 277/1PH - 1/4 277/1 PH - EXISTING 2 304 ENVIROTECH CVEH II 6 325 270 95 3 29 325 277/1PH - 1/4 277/1PH - EXISTING 2 305 ENVIROTECH CVEH II 8 885 800 105 6.5 23 885 460/3PH - 1/4 277/1PH - EXISTING 2 306 ENVIROTECH CVEH II 6 - - - 3 - - 277/1PH - 1/4 277/1PH - EXISTING 2, 4 307 ENVIROTECH CFFQEH II 12 1985 1805 200 7.5 12 1985 460/3PH - 1/4 277/1PH _ EXISTING 2 308 ENVIROTECH CVEH II 8 945 860 160 5 17 945 277/1PH - 114 277/1PH - EXISTING 2 309 ENVIROTECH CVEH II 8 755 630 - 6.5 27 755 460/3PH - 1/4 277/1PH - EXISTING 2 310 ENVIROTECH CVEH II 8 860 780 115 6.5 24 860 460/3PH - 1/4 277/1PH - EXISTING 2 311 ENVIROTECH CVEH II 8 825 765 140 6.5 27 770 460/3PH - 1/4 277/1PH - EXISTING 2 351 ENVIROTECH CVEH II 10 1195 1090 300 7 18 1195 460/3PH - 114 277/1PH - EXISTING 2 352 ENVIROTECH CVEH II 10 800 730 200 7.5 29 800 460 /3PH - 1/4 277/1PH - EXISTING 2 353 ENVIROTECH CVEH II 8 900 820 230 4 14 900 277/1PH - 1/4 277/1PH - EXISTING 2 354 ENVIROTECH CVEH II 8 800 730 200 3 12 800 277/1PH - 1/4 277/1PH - EXISTING 2 355 ENVIROTECH CVEH II 8 740 680 190 3 13 740 277/1PH - 1/4 277/1PH - EXISTING 2 356 ENVIROTECH CVEH II 6 430 400 110 3 22 430 277/1PH - 1/4 277/1PH - EXISTING 2 357 ENVIROTECH CVEH II 8 700 640 180 4.5 20 700 277/1PH - 1/4 277/1PH - EXISTING 2 358 ENVIROTECH CVEH II 6 455 380 95 3 21 455 277/1PH - 1/4 277/1PH - EXISTING 2 359 ENVIROTECH CVEH II 8 925 770 295 6.5 22 925 460/3PH - 1/4 27711 PH - EXISTING 2 360 ENVIROTECH CVEH II 8 790 660 - 7 28 790 460/3PH - 1/4 277/1PH - EXISTING 2 361 ENVIROTECH CVEH II 8 515 470 130 4.5 27 515 277/1PH - 1/4 277/1PH - EXISTING 2 362 ENVIROTECH CVEH II 8 540 500 140 4.5 26 540 46013PH - 1/4 277/1PH - EXISTING 2 363 ENVIROTECH CVEH II 6 245 200 2.0 25 245 277/1 - 1/6 277/1 - EXISTING 2 364 ENVIROTECH CVEH II 8 750 625 3 750 277/1 1/6 277 /1 EXISTING 2 365 ENVIROTECH CVEH II 10 1050 960 270 4.5 13 1050 277/1 1/6 277 /1 EXISTING 2 366 ENVIROTECH CVEH II 8 600 540 200 4 21 600 277/1PH - 1/4 277/1PH - EXISTING 2 367 ENVIROTECH CVEH 11 8 620 565 180 4 20 620 277/1PH - 1/4 277/1PH - EXISTING 2 368 ENVIROTECH CFREH 0811 8 550 500 105 4 25 500 277/1PH 2 1/4 277/1 PH - EXISTING 1, 3 369 ENVIROTECH CFREH 0811 8 550 500 200 4 25 500 277/1PH 2 1/4 277/1PH - EXISTING 1, 3 DUCT LEGEND DESCRIPTION SYMBOL DESCRIPTION SYMBOL BARE SHEETMETAL SIZE ROUND SHEETMETAL WRAPPED W/ INSULATION (1") AS NOTED 14/12 120W . NOTES SOUNDLINE SHEETMETAL (1" LINING) AS NOTED BARE FLAT OVAL SHEETMETAL NEW 1 14/12 SL 14/12$ MM METAL EGGCRATE 12/24 SHEETMETAL WRAPPED W/ INSULATION (1 ") 1 FLAT OVAL FLAT SHEETMETAL W/ INSULATION (1 ") MM METAL EGGCRATE 14/12 W RETURN /EXH 14/12 -&W IN LINE 640 BARE ROUND SHEETMETAL 985 DUCTBOARD (V FIBERGLASS) 115/1PH 120 14/12 DB EXISTING 1-4 EF -303 EXAMPLE OF NEW BROAN L700L FLEX DUCT 640 14/12 985 EXAMPLE OF DEMO xxxxxxxx FLEX CONNECTOR 34 EXISTING 1-4 3 x x x x x x x x EXAMPLE OF EXISTING 1 4/1 2 DIFFUSER/GRILLE SCHEDULE SYMBOL MANUFACTURER & MODEL NUMBER SIZE TYPE NOTES SIZE SHOEMAKER 900 H F/B AS NOTED T -BAR LAY -IN DIFFUSER EXISTING 1 CFM NOTES SHOEMAKER 780 -FR AS NOTED T -BAR LAY -IN DIFFUSER NEW 1 QA CAM r--.] MM METAL EGGCRATE 12/24 RETURN /EXH 1 \ MM METAL EGGCRATE 24/24 RETURN /EXH 1 3RD FLOOR TRANSFER FAN SCHEDULE UNIT NO. AREA SERVED MFG & MODEL NO. TYPE CFM ESP RPM HP VOLT/PH BDD WT LBS NOTES EF -301 SERVER ROOM 310 BROAN L700L IN LINE 640 0.375 985 2.9A 115/1PH INTGR 34 EXISTING 1-4 EF -302 SERVER ROOM 302 BROAN L700L IN LINE 640 0.375 985 2.9A 115/1PH INTGR 34 EXISTING 1-4 EF -303 SERVER ROOM 305 BROAN L700L IN LINE 640 0.375 985 2.9A 115/1PH INTGR 34 EXISTING 1-4 IN LINE O 0 N c NO SCALE FORT DENT WAY VICINITY MAP n NOTES: 1. GRILLES & DIFFUSERS TO BE FIRE RATED W/ INTERGRAL FIRE DAMPERS. DRAWING SHEET INDEX NAME TITLE REV DATE NAME TITLE TM0.01 SCHEDULES - HVAC DM2.03 3RD FLOOR DEMO PLAN - HVAC TM2.03 3RD FLOOR PLAN - HVAC CONTACT LIST TITLE NAME COMPANY PHONE NUMBER FAX NUMBER ACCOUNT EXECUTIVE PROJECT ENGINEER SHEET METAL FOREMAN FIELD ENGINEERING FOREMAN STEVE FLINK NASH PATWARDHAN BRETT KILEKAS STEVE BAKER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER 253- 680 -3172 206- 768 -4128 206 - 768 -4018 206- 768 -3824 206 - 768 -4129 206- 768 -4019 206 - 768 -3825 SCOPE OF WORK RELOCATE (14) EXISTING DIFFUSERS & (7) EXISTING GRILLES & (6) EXISTING T -STATS INSTALL (5) NEW DIFFUSERS WITH INTEGRAL FIRE DAMPERS, (7) NEW GRILLES W /INTEGRAL FIRE DAMPERS & (5) NEW SOUNDLINED RA BOOTS. MISC DUCTWORK & AIR BALANCE (10) VAV BOXES. NOTES: 1. DISCONNECT BY ELECTRICAL CONTRACTOR 2. MOTOR STARTER BY ELECTRICAL CONTRACTOR. 3. PROVIDE SPEED CONTROLLER, INSTALLED ON FAN BY EC 4. CONTROL W/ LINE VOLTAGE T'STAT INSTALLED BY EC, PROVIDED BY MC. TSTAT TO BE SET AT 80° F NOTES: 1. DISCONNECT BY ELECTRICAL. 2. EXISTING SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE DEPENDENT 3. SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE: - FACTORY INSTALLED 1" THROW -AWAY FILTERS - CONTROLS BY OTHERS - W/ SCR CONTROL FOR MOTOR - 24V TRANSFORMER, 48 VA MIN RATING 4. EXISTING UNIT TO BE RELOCATED TO CORRECT CROSS ZONING. COMFORT BALANCE UNIT. EC TO DISCONNECT & RECONNECT LINE VOLTAGE WIRING. MM RECONNECT TO LOW VOLTAGE WIRING. RECONNECT TO EXISTING DIFFUSSER. NOTE TO ELECTRICAL: - 460V /3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1 PH POWER TO THE FAN MOTOR p 0� s ^_r fa view tpprp al of the vi t latior of approved MacDonald- Miller FACILITY SOLUTIONS 7717 Detroit Avenue SW Seattle, WA 98106 Phone: 206 -763 -9400 Fax: 206 -767 -6773 www.rnacrniller.com WA Lic No: MACDOFS980RU • royal is subject to errors end omission on , , . :. , w does not not aut pr of :1 g d :f • , ;r . Receipt 1 ,.C.../� dF� � " / City of Tukwila BUILDING DIVISION CD /PERMIT ISSUE NP 07- 18--08 REVISIONS: FORT DENT II PANATTONI TI SUITE 350 6840 FORT DENT WAY TUKWILA, WA 98188 SCHEDULES - HVAC CAD: D IKERD DRAWING NUMBER: C- 0832 - 7386526 -00 ISSUED FOR CONSTRUCTION SHEET NUMBER: TMOEO1 1. THE HVAC SYSTEM FOR THIS PROJECT IS BASED ON THE FOLLOWING CRITERIA. ROOF "U" VALUE (BTUH/S.F. °F) = .053 WALL "U" VALUE (BTUH /S.F. °F) = .5 FLOOR "U" VALUE (BTUH /S.F. ° F) = .5 GLASS "U" VALUE (BTUH /S.F. °F) = .72 GLASS SHADE COEFF. _ .53 (STRIP WINDOW) .38 (CURTAIN WALL) LIGHTING (WATTS /S.F.) = 1.2 MISC. EQUIP. (WATTS /S.F.) = .5 PEOPLE DENSITY (S.F. /PERSON) = PER PLAN COOLING INDOOR DESIGN TEMP ( °F) = 74 COOLING OUTDOOR DESIGN TEMP (°F) = 85 HEATING INDOOR DESIGN TEMP ( °F) 70 HEATING OUTDOOR DESIGN TEMP ( °F) = 24 HVAC GENERAL NOTES 2. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 3. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2006 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL. FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 4. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2006 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28° DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12° BELOW STRUCTURAL SYSTEM. 5. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 6. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2006 WSEC. - DUCT WRAP, WHERE INDICATED, SHALL BE 1 1/2" 0.75 LB /CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-4.2 MIN.). - SOUND LINING, WHERE INDICATED, SHALL BE 1' 1.5 LB /CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-4.2 MIN.). - DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID ERK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R-4.3 MIN.). 7. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON - PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 8' IN LENGTH UNLESS NOTED OTHERWISE. 8. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2006 IBC. 9. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE/SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.5 OF THE 2006 IBC. PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.6.2 OF THE 2006 IBC. INSTALL FIRE DAMPERS SMOKE DAMPERS AND FIRE/SMOKE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CODE. 10.PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 11.HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. 12. MOTOR STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. 13. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 14. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 15.COMMISSIONING I5 REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC) SECTION 1416 AND WITH LEED NC -2.1 FUNDAMENTAL BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING. 16.A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER. 17 DAMPERS USED FOR OUTDOOR AIR INTAKE, EXHAUST, OR RELIEF SHALL HAVE THE FOLLOWING MAXIMUM LEAKAGE RATES AT 1" W.G. (PER AMCA STANDARD 5 MOTORIZED DAMPERS: 10 CFM /S.F. GRAVITY DAMPERS: 20 CFM /S.F. (40 CFM /S.F. FOR DAMPERS SMALLER THAN 24 INCHES IN EITHER DIMENSION). ABBV FULL NAME ABBV A AC AFF AL BDD BOB BOD BOTT BTU BTUH BWG BWR C CAP CC CFM CHWR CHWS COMB CONN CWR CWS DB DIFF DMPR DN EC EGC EER ELEV EMS COMPRESSED AIR LINE AIR CONDITIONING UNIT ABOVE FINISHED FLOOR ALUMINUM BACKDRAFT DAMPER BOTTOM OF BEAM BOTTOM OF DUCT BOTTOM BRITISH THERMAL UNITS BRITISH THERMAL UNITS PER HOUR BOTTOM WALL GRILLE BOTTOM WALL REGISTER CONDENSATE CAPACITY CONTROLS CONTRACTOR CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY COMBUSTION CONNECT CONDENSER WATER RETURN CONDENSER WATER SUPPLY DUCT BOARD DIFFUSER DAMPER DOWN ELECTRICAL CONTRACTOR EGGCRATE ENERGY EFFICIENCY RATIO ELEVATION ENERGY MANAGEMENT SYSTEM APN # 2954900440 ESP EXH EXTR FAC FD FLA FOB FOT FSD G GALV GC GPM GR GWB HO HP HWR HWS ID INT LIQ M-M MBH MC MCA MD MIN MT MUA NOM HVAC ABBREVIATIONS FULL NAME EXTERNAL STATIC PRESSURE EXHAUST EXTRACTOR FIRE ALARM CONTRACTOR FIRE DAMPER FULL LOAD AMPS FLAT ON BOTTOM FLAT ON TOP FIRE SMOKE DAMPER GAS LINE GALVANIZED GENERAL CONTRACTOR GALLONS PER MINUTE GRILLE GYPSUM WALL BOARD HOT GAS LINE HORSE POWER HOT WATER RETURN HOT WATER SUPPLY INSIDE DIMENSION INTERLOCK LIQUID LINE MACDONALD - MILLER ONE THOUSAND BTUH MECHANICAL CONTRACTOR MINIMUM CIRCUIT AMPACITY MOTORIZED DAMPER MINIMUM MOUNT MAKE -UP AIR NOMINAL LEGAL DESCRIPTION ABBV FULL NAME OSA OBD OD RA REG REQ'D RIO SA SCD SD SL SM SP SS SSSC STL SUC SUSP TSTAT TC TOD TOS TV TWG TWR TYP UNO VD VFD 0 OUTSIDE AIR OPPOSED BLADE DAMPER OUTSIDE DIMENSION RETURN AIR REGISTER (GRILLE WITH DAMPER) REQUIRED ROUGH IN ONLY SUPPLY AIR SMOKE CONTROL DAMPER SMOKE DAMPER SOUND LINING SHEET METAL STATIC PRESSURE START /STOP SOLID STATE SPEED CONTROLLER STEEL SUCTION LINE SUSPENDED THERMOSTAT TEMPERATURE CONTROL TOP OF DUCT TOP OF STEEL TURN VANES TOP WALL GRILLE TOP WALL REGISTER TYPICAL UNLESS NOTED OTHERWISE VOLUME DAMPER VARIABLE FREQUENCY DRIVE VOLTAGE PHASE & DUCT DIAMETER , ErARATE PERMIT REQUIRED FOR: 0 Mechanical g i Electrical ( Iumbin9 C Gas Piping City of Tukwila BUILDING DIVISIO r-- No changes shall be made to the scope of work withnlrt ma c, app roval ui Tukwila Building Division. NOTE: Revisions will require a new plan e , and aY in��uoe additional plan review fees. LEGAL DESCRIPTION: PORGUNDRAKERS INTERURBAN ADDPARCEL 2 LESS BEG MOSTWLY CORNER OF PARCEL 1 TH N 63 -35-49 E 237.32 FTTH 5 26 -24-11 E 227.32 FTTO COMMON COR BTW PARCELS 1 & 2TH N 63 -35-49 E 252.25 FT TH N 26 -24-11 W 77.65 FTTH N 56 -15 -11 W 234.09 FTTH N 31 -12-43 W 82.39 FT TOINTSN WITH NWLY LN OF PARCEL 2 TH S 58 -47 -17 E 102.77 FTTH S 55-39 -53 W 63.16 FTTH S 48 -39 -58 W 55.63 FTTH S 39 -21 -15 W 88.24 FT TH S 30 -04-58 W 85.21 FTTO MOST WLY COR OF PARCEL 2TH S 37 -36-40 E 20.92 FTTO POB - OF CITY OF TUKWILA SHORT PLAT NO 79- 7- SSRECORDING NO 7908210370 SDSHORT PLAT BEING A POR OFGUNDAKERS INTERURBAN ADD IN SW 1/4 OF NW 1/4 OFSEC 24 -23-04 - AS PER CITYOF TUKWILA BDRY LINE ADJNO 90 -2 -BLA RECORDING NO 9008151101 M08- I Is RECEIVED JUL 2 3 2008 PERMIT CENTER Ey 0 z w 0 z 11 Do 1• CO 0 C A .) z ilm• ar fl SO _I\L! UP TO ATTENUATOR DB 8/12 DB ,•• • • • 41 IE 7 I I 16/10 D5 (B B ' Of FCC NI PTN f ON FERENC:: OFF ICE Ji ,; MUJ LI 7 • r;N. P TN. P I N I L 30 OFF [E L)f• I ICL . 3r-9 OFFI Lri [" MU[. PIN 1 OFFICE nTN. _ D F. N 0 .= I s = — r HtV19 sL..sm=ita 7F 22/12( SM DN '1 08x 8 1,0x14 DB 1 2_0 W 140 12x12 \---/ (TYP 2) F 3RD FLOOR DEMO PLAN - HVAC SCALE: 1 /8" = • '-0" 2 1 0 v. 4/18 NG 8x8 12x12 \El/ 335 100 80 W W 1 00 W E.. 280W DN SOUND ATTENUATOR UP TO ON rIEF-- 303 I 210 335 a_x12 1 - raz5Vi 8x8 ,.-12x12 120 '''335 \CAP I 0 N 14x12 2-0/10- ga MacDonald-Miller FACILITY SOLUTIONS 7717 Detroit Avenue SW Seattle, WA 98106 Phone: 206-763-9400 Fax: 206-767-6773 www.macmillencom WA Lic No: MACDOFS980RU A ppp,OVED JUk_ A 2r61?i FORT DENT II PANATTONI TI SUITE 350 6840 FORT DENT WAY TUKWILA WA 98188 3RD FLOOR DEMO PLAN -HVAC ISSUE DATE: D IKERD 07-18-08 DRAWING NUIABER: C-0832-7386526-00 ISSUED FOR CONSTRUCTION SHEET NUMBER: 0M2903 8x8 205 140W (T(P 2) 120 L 120W (0 - CAP [ 8 • 175 1.1 12<12 500 RECEIVEr JUL 2 3 2008 PERMIT GENTEh z L.1 0 oo w z uJ LJ— CO 0 0 co 0 0) 0 A ;1 • B 312, .1 OFT cI - pF ,•F ;CP ,..., ).1 ■.I / r 10 1 ,1 11 41 r. S lh .Osiz,.. . LL. T.-• - - • . / ;10x10 lax 1 0 H ; , 315 (TYP 2) ' r;,,11..i; ,; i ,..•:. ;;;;;; FIRE HOSE J • / - \ 10x10i 4' lOxlO 10)00 301 240 : m1 24 L . Cif IICE Pi N I F 1 CE OF I- ;CIF ATTENUATOR AC-1 '7= ( D) L , 10/ ,32 Cr M IMP DE 12/10 / / "- 1 0 x 1 0 275 x8 200 : 2x 100 2 DB x12 D8 120 a 14x14 \---/ 550 L ( 4. .11.•■■ 305 18»12 DB z 8x8 90 r r 100W Irk 369 111 P11111111178:111% a. 120W 100 /T v=/ 335 0 Y) 310 309 366 AIL • • I 8x8 90 80 W Fl 100 E SE 1 1 /-12x12 300 (TYP 2) 9 19 EF,4 1 i 22/12i SM DN \ , \ f; ,, \ , [i 0 8x8 140 —=- 1,Dx14 DB— 12 r 7 ( F ) 1 --P 20/14 DB CAP 3RD FLOOR PLAN - HVAC SCALE: 1/8" = 1'-0" 12x12 275 2 A 18 0-139 NG 100/ // CT, 80W GENERAL NOTES: 7386526-00 1. ALL NEW & RELOCATED DIFFUSERS & GRILLES TO HAVE INTEGRAL FIRE DAMPERS. 2. ROOMS- 300, 306, 307,308 & 310 HAVE FULL HEIGHT WALLS. FIELD TO INSTALL SOUNLINED RA BOOTS AS SHOWN. FL_ 12x12 335 N 100W EF —303 I 8x8 210 MOW 335 r: 3 • . 12x12 I CAP 80W 250W DN SOUND ATTENUATOR UP TO FA TT r 140W I N . - I 0 2x12 \-/ 575 (TYP 2) --- _ 12., 4 -- SHEET NOTES: 7386526-00 0 FIELD VERIFY VAV BOX LOCATION. RELOCATE IF THE BOX IS ON THE FULL HEIGHT WALL 0 FIELD VERIFY VAV BOX LOCATION. RELOCATE IF NECESSARY TO MEET N.E.0 - CAP MacDonald-Miller FACILITY SOLUTIONS 7717 Detroit Avenue SW Seattle, WA 98106 Phone: 206-763-9400 Fax: 206-767-6773 www.macmiller.com WA Lic No: MACDOFS980RU CD/PERMIT ISSUE NP REVISIONS: DATE 07-18-08 FORT DENT II PANATTONI TI SUITE 350 6840 FORT DENT WAY TUKWILA WA 98188 3RD FLOOR PLAN -HVAC LAST REVISED: N PATWARD HAN 07-18-08 CHECKED Ere: DATE PLOTTED: B GEZON 07-18--08 CAD: ISSUE DATE: D IKERD 07-18-08 DRAWING NUMBER: 0-0832-7386526-00 ISSUED FOR CONSTRUCTION SHEET NUMBER: TM2.03 1 Ox1 0 165 17 1/N RECEIVED JUL 232008 PERMIT CENTEF 7 0 z 1.1.1 0 0 CO N ; z IJJ _1 0 0