Loading...
HomeMy WebLinkAboutPermit M08-212 - WESTFIELD SOUTHCENTER MALL - T-MOBILET-MOBILE 715 SOUTHCENTER MALL M08 -212 Parcel No.: 6364200010 Address: Suite No: doc: IMC-10/06 CitAlef Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 718 SOUTHCENTER MALL TUKW Tenant: Name: T- MOBILE Address: 718 SOUTHCENTER MALL , TUKVVILA WA Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA Contact Person: Name: MICHAEL CADY Address: 19807 NORTH CREEK PKY N , BOTHELL WA Contractor: Name: DIAMOND CONSTRUCTION SERVICES LLC Address: 35420 MILITARY RD S , AUBURN WA Contractor License No: DIAMOCS956J2 DESCRIPTION OF WORK: HVAC FOR TENANT IMPROVEMENT OF NEW MALL SPACE Value of Mechanical: $11,527.00 Type of Fire Protection: SPRINKLERS Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat/Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial MECHANICAL PERMIT EQUIPMENT TYPE AND QUANTITY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 * *continued on next page ** M08 -212 Permit Number: Issue Date: Permit Expires On: Phone: Phone: 425 -785 -0444 Phone: Expiration Date: 04/22/2009 M08 -212 10/07/2008 04/05/2009 Fees Collected: $305.00 International Mechanical Code Edition: 2006 Boiler Compressor: 0-3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 Printed: 10 -07 -2008 Permit Center Authorized Signature: Signature: Print Name: doc: IMC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M08 -212 Issue Date: 10/07/2008 Permit Expires On: 04/05/2009 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this pe • does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the perrmanceof work. I am authorized to sign and obtain this mechanical permit. Date: 10 V This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -212 Printed: 10 -07 -2008 • City of Tukwila Parcel No.: 6364200010 Address: 718 SOUTBCENTER MALL TUKW Suite No: Tenant: T- MOBILE 1: ** *BUILDING DEPARTMENT CONDITIONS * ** Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 - 212 Status: ISSUED Applied Date: 08/21/2008 Issue Date: 10/07/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: ** *FIRE DEPARTMENT CONDITIONS * ** 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the doc: Cond -10/06 M08 -212 Printed: 10 -07 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us manufacturer's installation instructions. (IMC 606.1, 606.2.1) 15: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 16: Local U.L. central station supervision is required. (City Ordinance #2051) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 20: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 21: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 22: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 23: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond - 10/06 * *continued on next page ** M08 -212 Printed: 10 -07 -2008 Signature: Print Name: • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us lial Z.,/ doc: Cond -10/06 M08 -212 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. ordinances governing or local laws regulating Printed: 10 -07 -2008 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http...//www.ci.tukwila.1va.us Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION It Site Address: 718 Sout kc it t L t uktuIta T M Tenant Name: obi L Property Owners Name: laSESigi& Profit 6'04 Mailing Address: `o 80x 130940 Cex-/c6aai City CONTACT PERSON — who do we con ct when your permit is eady to be issued Name: )jtGli&gl Carly Mailing Address: 19007 kVelli Creek Parkway botitt E -Mail Address: M e e (. C t j t-t►robt(a GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Company Name: Mailing Address: Nau>k QvildtiNq go. &mot 231K Saner Aaek4i4 Contact Person: E -Mail Address: ,' • Contractor Registration Number: HAL K ac 1 039 P/i ARCHITECT OF RECORD - Alll plans must be we st amped by Ar of Record Contact Person: FaciA S hane_ Mol nar E -Mail Address: ‘kane., mothar COM Company Name: Mailing Address: 635 Westport port ati Sae ko Contact Person: ) '�1CIIQi Kea c Udktris E -Mail Address: trite tiggi (ins Q cknpenn . COM Q:Wpplications \Forms- Applications On Line3-2006 - Permit Application doc Revised 9 -2006 bh Building Permit No. Mechanical Permit N. o. 09— 2. Plumbing /Gas Permit No. - gyp_ l Public Works Permit No. Project No. (For office use only) King Co Assessor's Tax No.: L »c&iwvilli Suite Number: New Tenant: Company Name: Week �,�, ^ A _ r _ Road cc _,�,- n /� Mailing Address: 1015 Wes, ScottsciaLQ Rodd Su/ X95 S o City 63&4200010 Floor: ❑ Yes ❑..No CAL State Day Telephone: 425 785-041q +2i1 WA. �o ct City State Zip Fax Number: 425 3e{g- 71G2o Lb 13072 City Day Telephone: Fax Number: las 485 1SSS Expiration Date: State Zip 425 402- l*I Zip AIZ 65259 State Zip 480 die -4zoo Day Telephone: Fax Number: ISO q48- 7223 92 ENGINEER OF RECORI) — All p ped by gia of Record Grarriv. 7% 76051 City State Zip Day Telephone: 817 .410 "LS58 eat 217 Fax Number: 811 ZS! - 9411 Page 1 of 6 BUILDING PERMIT INFORMATION - 206-431-3670 Valuation of Project (contractor's bid price): $ 260, OCO Existing Building Valuation: $ 1604 I t t14MOtt ib) WdJ MACtee . Scope of Work (please provide detailed information): Will there be new rack storage? ❑ Yes ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact. Handicap: Will there be a change in use? ❑ Yes [' No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: [v]' Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes re No If 'yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q.'Applications\Forms- Applications On Line\3 -2006 - Permit Application.doc Revised 9 -2006 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per Type of Occupancy per IBC IBC l Floor I, 72S 116- FutilSp eMeftan t 2 Floor 3 Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck BUILDING PERMIT INFORMATION - 206-431-3670 Valuation of Project (contractor's bid price): $ 260, OCO Existing Building Valuation: $ 1604 I t t14MOtt ib) WdJ MACtee . Scope of Work (please provide detailed information): Will there be new rack storage? ❑ Yes ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact. Handicap: Will there be a change in use? ❑ Yes [' No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: [v]' Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes re No If 'yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Q.'Applications\Forms- Applications On Line\3 -2006 - Permit Application.doc Revised 9 -2006 bh Page 2 of 6 Sewer District ❑ ...Tukwila ❑ ...Sewer Use Certificate ❑ ...Total Cut ❑ ...Total Fill cubic yards cubic yards ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ ...Permanent Water Meter Size... ❑ ...Temporary Water Meter Size .. ❑ ...Water Only Meter Size ❑ ...Sewer Main Extension Public ❑...Water Main Extension Public I PUBLIC WORKS PERMIT INFORMATION — 206- 433 -0179 Scope of Work (please provide detailed information): iMiu©r LJaU6, efadvt a.l feJtiurra , Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ ...Tukwila ❑ ... Water District #125 ❑ ...Water Availability Provided Septic System: ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ ...Civil Plans (Maximum Paper Size — 22" x 34 ") ❑ ...Technical Information Report (Storm Drainage) ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) ❑ Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ ...Construction /Excavation/Fill - Right -of -way Non Right -of -way ❑• ❑ • ❑• ❑• Q:\Applications \Forms - Applications On Line\3 -2006 - Permit Application.doc Revised 9 -2006 bh ❑ ... Val Vue ❑ .. Renton 0... Sewer Availability Provided Call before you Dig: 1 800 - 424 - 5555 . Abandon Septic Tank . Curb Cut . Pavement Cut . Looped Fire Line WO # WO # WO# Private Private ❑ .. Highline Geotechnical Report .. Maintenance Agreement(s) ❑ .. Renton ❑ .. Seattle ❑ .. Right -of -way Use - Profit for less than 72 hours ❑ .. Right -of -way Use — Potential Disturbance ❑ .. Work in Flood Zone ❑ .. Storm Drainage ❑ ...Traffic Impact Analysis ❑ ...Hold Harmless — (SAO) ❑...Hold Harmless — (ROW) ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑ ...Deduct Water Meter Size FINANCE INFORMATION Fire Line Size at Property Line ❑ ...Water ❑ ...Sewer ❑ ...Sewa Treatment Monthly Service Billing to: Name: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: Number of Public Fire Hydrant(s) Day Telephone: City State Zip Day Telephone: City State Zip Page 3 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: 0 -3 HP /100,000 BTU Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper Furnace>100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall /Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig /Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/Ind Company Name: Mailing Address: MECHANICAL PERMIT INFORMATION - 206-431-3670 CONTRACTOR INFORMATION Per-formance tieatiin 7674'i S 18,0 '250 74 Ave S Contact Person: E -Mail Address: Contractor Registration Number: WCFbleOk450R/T City State Zip Day Telephone: 42 2I- 0.76 Fax Number: Expiration Date: 1„/► %OR. Valuation of Mechanical work (contractor's bid price): $ /66 2.62 Scope of Work (please provide detailed information): 'T @hjMi,* Ih/Ipfpy{ S f(t)A( c b Kaki r*late aP Use: Residential: New .... ❑ Commercial: New .... ❑ Replacement .... ❑ Replacement .... ❑ Fuel Type: Electric ❑ Gas....❑ Other: Indicate type of mechanical work being installed and the quantity below: Q:\Applications \Forms- Applications On Line\3 -2006 - Permit Application.doc Revised 9 -2006 bh Page 4 of 6 Fixture Type: Qty Fixture Type: Qty Fixture Type: € Qty Fixture Type: Qty Bathtub or combination bath/shower Drinking fountain or water cooler (per head) i Wash fountain Gas piping outlets Bidet Food -waste grinder, commercial Receptor, indirect waste Clothes washer, domestic Floor drain L Sinks 2- Dental unit, cuspidor Shower, single head trap Urinals Dishwasher, domestic, with independent drain Lavatory I Water Closet Building sewer or trailer park sewer Rain water system - per drain (inside building) Water heater and /or vent i 1 Additional medical gas inlets /outlets - six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Repair or alteration of water piping and/or water treating equipment I Repair or alteration of drainage or vent piping ( Medical gas piping system serving one to five inlets /outlets for specific gas PLUMBING AND GAS PIPING; PERMIT INFORMATION - 206 - 431 -3670 PLUMBING AND GAS PIPING CONTRACTOR INFORMATION American hezikahe.al 0 223 S Lp,ais *24) Company Name: Mailing Address: Contact Person: E - Mail Address: Contractor Registration Number: AllE *co71 BN Valuation of Plumbing work (contractor's bid price): $ 'q�/ (Q, Valuation of Gas Piping work (contractor's bid price): $ Scope of Work (please provide detailed information): PIUMbI.1 iwtpro(!N‘pit,t ol Ma S/Vj( Building Use (per Int'1 Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Q. 'Applications \Fortes- Applications On Line\3 -2006 - Permit Application.doc Revised 9 -2006 bh lionrce. Sewer: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: LOA %272 City State Zip Day Telephone: 204 167• ( Fax Number: Expiration Date: Page 5 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW i R i R• 1 HO Signature: Print Name: t 0.1 ae I Date Application Accepted: AGENT: Date: ��, ! ! 0 ,,y Day Telephone: 125 78S -0411 Mailing Address: I g$07 Nom Cr Pa/ 1444 Sc / ( L I •J City State Zip Q:\Applications \Forms - Applications On Line3-2006 - Permit Application.doc Revised 9 -2006 bh Date Application Expires: 4 ) 7 Staff Initials: Page 6 of 6 Receipt No.: R08 -03608 Initials: JEM User ID: 1165 Payee: HAWK BUILDING ACCOUNT ITEM LIST: Description City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Payment Cash 60.00 RECEIPT Parcel No.: 6364200010 Permit Number: M08 -212 Address: 718 SOUTHCENTER MALL TUKW Status: ISSUED Suite No: Applied Date: 08/21/2008 Applicant: T- MOBILE Issue Date: 10/07/2008 TRANSACTION LIST: Type Method Descriptio Amount Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.0 PLAN CHECK - NONRES 000/345.830 Payment Amount: $60.00 Payment Date: 10/24/2008 02:32 PM Balance: $0.00 364.88 - 304.88 Total: $60.00 _ r ' .;.Y27 70" 1 Y Vr1 J•r1 doc: Receipt-06 Printed: 10 -24 -2008 RECEIPT NO: R08 -03065 Initials: WER User ID: 1655 Payee: HAWK BUILDING SET TRANSACTIONS: Set Member Amount ACCOUNT ITEM LIST: Description City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us SET RECEIPT SET ID: 0827 SET NAME: T- MOBILE D08 -410 1,574.30 EL08 -1158 77.90 �MO'8_ 2123 365.88 PG08 -231 41.00 TOTAL: 2,059.08 Payment Date: 08/27/2008 Total Payment: 2,059.08 TRANSACTION LIST: Type Method Description Amount Payment Check 70034 2,059.08 TOTAL: 2,059.08 ELECTRICAL PLAN - NONRES PLAN CHECK - NONRES Account Code Current Pmts 000.345.832.00.0 77.90 000/345.830 1,981.18 TOTAL: 2,059.08 Project: Type o ntion 6 ` A Address C k(( Date Called A Q , Ji , 1,-,14 a Spedial Instructions: 0 ? 2.° Ri ;to 9t ) 0 k ` / Date Wanted: n / v f 27 p Requester: No: P h 42 5 - 2'7 3 - 1 • x 3 INSPECTION RECORD Retain a copy with permit INSPECTION O. CITY OF TUKWILA BUILDING DIVISION PERMIT NO. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3E7 pproved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: r Inspect r: I Date: I d9 _ (kr ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: 'Date: • Project: (_ �( P Typ c fe t� ion: S � `./ _5 �� fj c, � Address: ( Er S C / , ,� J /� "'1 /t�f / Date Called: Spec In structions: Date Wanted: l 0 .24 — p.m. Requester: Phone No: INSPECTION RECORD m Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. orrections required prior to approval. COMMENTS: AJ t / J —\ J f c f _ v.t i_,P / P P .r $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: COMMENTS: Type of Inspection: S� 4) EL— sC - C_.0 eL � r i J) { v •\. S !' 7 a r- 2)..., ?i c(.-„ lJ 7U L J2 J r .5- era /1/4:'.:.7".c., l J: an a" .0 "1- 14-k,k ra, Fr-Ls-7- Special Instructions: 07. I- ) ( .1°3 A » k 0 ( V / Date Wanted: 7 z / c� " L (�� . le e -,J,_6 e (k Lk e l e / -- "TK:s itA-4 if .:, • Phone No '42S -/-3 a n e I A Project . ` � ' r �- �fl Type of Inspection: S� 4) EL— sC \ Do Id . Address: 1 3 1 W •SC A ( Date Called: a F',., titte G _ Special Instructions: 07. I- ) ( .1°3 A » k 0 ( �C / Date Wanted: 7 z / c� " L (�� a.m P .m. Requester: Phone No '42S -/-3 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 El Approved per applicable codes. 1 lnspectc i Corrections required prior to approval. Date:, 2 3, , t/ El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: 1 —dTgassmiktu..._._ COMMENTS: c (kJ- osvReA ___ PA-41- -- c1/,.. / J j i)\-; k_ 1-i---- ,,J.As S / Date Called: �� ` M 49 f,r ,) L1 /0 14- =: --) .�5 p-P.. r AS el_ i104.. l c, L. 49,1-k ,t a.m. Requester: Phone No: S - 13 --- / ' 3 Pro : AA C . I S Type of Inspection: �c rt i E o - c � 7 te• o J .. / J j Address: G s � / Date Called: Special Instructions: Date Wanted: /0- Z2 a.m. Requester: Phone No: S - 13 --- / ' 3 INSPECTION RECORD Retain a copy with permit PERMIT NO. 7)1 �MpB.Z i2- 111"-• INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 ❑ Approved per applicable codes. El Corrections required prior to approval. Inspector I Date:' D -2,2 n $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: Project: ! "V ` /� / Type of nspe �� _ t vl / ddr ss: Ae - 7/g / Date Called: Instructions: Date Wanted: 10`2-1`0 Special ° -v.ri. Requester: Phone No;_ 4/Z 5 7 73 . / 9 h INSPECTION RECORD Retain a copy with permit INSP CTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -370 OMM'ENTS: Approved per applicable codes. El Corrections required prior to approval. ceipt No.: Date /a Z-1 $ • 0.00 REIN EE REOUI ' D. Prior to inspection, fee must be aid at 6300 Southcente Blvd., S ite 100. Call to schedule reinspection. !Date: Project At 0 61 f Type Inspectio9: et:3 Address: 1( ' Sc. s-t 1 Date Called: Special Instructions: Date Wanted: dye / J — lc." De p.m. Requester: Phone N . 3 — 7/ -A C7 M. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 14'. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Approved per applicable codes. D Corrections required prior to approval. COMMENTS: p A-n\ kok, p rN) ( fr— .J L ,,r A JD ( IDatei v 8' Li El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: (Date: rti•"yke.?i�„iyti:: Heating Equipment Schedule 0 ` * V Equip. ID Brand Name Model No. Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency4 ■ Building Dept. Use tr.' 31S 0.5 tad/ I ti4 Applicant Name: --r �/,���`/ _ +e l. . ! RW8 p►� �� :,,?7,-, 1 Applicant Address: I 7 . p /+_wlul _ I, A I �wi 'l C.l�y �r ? ,. f Applicant Phone: w � D44ti ." I''1 ` �� ^, ge \ ico AUG 212008 P -- Project Info Project Address 71 8 s _ I � r /, d N ' Branameodeo. Ml N Capacity Btu /h Date TO49 61 tiA %I et SEER or EEff \ e � � f39 . t F F Building Dept. Use tr.' 31S 0.5 tad/ I ti4 Applicant Name: --r �/,���`/ _ +e l. . ! RW8 p►� �� :,,?7,-, 1 Applicant Address: I 7 . p /+_wlul _ I, A I �wi 'l C.l�y �r ? ,. f Applicant Phone: w � D44ti ." I''1 ` �� ^, Cooling Equipment Schedule Equip. ID d N ' Branameodeo. Ml N Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EEff \ e � � f39 . t A Greal,nacit GB 011- 4 31S 0.5 tad/ I ti4 Pj RECEIVEC WO ge \ ico AUG 212008 P -- PERMIT CENTE .n, licin 1 , Fan Equipment Schedule Equip. ID Brand Name Model No. CFM Sp HP /BHP Flow Control Location of Service EFl Greal,nacit GB 011- 4 31S 0.5 tad/ I ti4 RECEIVEC • AUG 212008 -- PERMIT CENTE CITY OF TUKWILA - BUILDING DIVISION '2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary MECH -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms Project Description Briefly describe mechanical system type and features. EolbSIBdes Plans Revised July 2007 dtil"Itttdh 41(14 s P4 , d'etc c ioyk 1 f * fterwed a J coefois r Aft.v.„ il p : 47 N10 01 1 ; ninide. egkitta4rs. 6441-4 P.1614 Include documentation requiring compliance with commissioning requirements, Section 1416. Compliance Option Q Simple System Q Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. h System Description See Section 1421 for full description of Simple System qualificvtionsi If Heating /Cooling or Cooling Only: ❑ ❑ Constant vol? Split system? • Air cooled? • Packaged sys? • <20,000 Btuh? Economizer included? • If Heating Only: <5000 cfm? <70% outside air? • • CITY OF TUKWILA - BUILDING DIVISION 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary (back) MECH -SUM Decision Flowchart j Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only Reference Section 1421 Simple System Allowed (section 1420) No otal Ca . wo economize <240,000 Btuh or 10 %? Heating /Cooling or Cooling Only Yes Yes Reference `Section 1423 Yes Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. • of Use Complex Systems (section 1430) i Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Address sil . Odi hail. 8 � •r Date 8 21-0g The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls 1412.1 Temperature zones Indicate locations on plans M az 1412.2 Deadband control Indicate 5 degree deadband minimum 1412.3 Humidity control Indicate humidistat 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage 1412.4.2 Optimum Start Indicate optimum start controls 1412.5 Heat pump control Indicate microprocessor on thermostat schedule 1412.6 Combustion htg. Indicate modulating or staged control 1412.7 Balancing Indicate balancing features on plans 1412.8 Ventilation Control Indicate demand control ventilation for high- occupancy areas 1422 Thermostat interlock Indicate thermostat interlock on plans 1423 Economizers Equipment schedule 1413 Air economizers 1413.1 Air Econo Operation Indicate 100% capability on schedule 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance 1413.3 Integrated operation Indicate capability for partial cooling 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems 1414.1 Duct sealing Indicate sealing necessary L /" N7,�,� 1414.2 Duct insulation Indicate R -value of insulation on duct 1415.1 Piping insulation Indicate R -value of insulation on piping I i... O IMO 1416 Completion Requirements 1416.2.1 Commissioning Provide commissioning plan 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report 1434 Separate air sys. Indicate separate systems on plans Mechanical Completed and attached. Equipment schedule with types, Summary Form input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 - 1454) 1440 Service water htg. 1441 Elec. water heater Indicate R -10 insulation under tank 1442 Shut -off controls Indicate automatic shut -off 1443 Pipe Insulation Indicate R -value of insulation on piping 1452 Heat Pump COP Indicate minimum COP of 4.0 1452 Heater Efficiency Indicate pool heater efficiency 1453 Pool heater controls Indicate switch and 65 degree control 2006 Washin• ton State Nonresidential Energ ode Compliance Form 1411.4 Packag equipment prov ding both heating and cooling with a total cooling capacity greater than 20, Btu/h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and co oling energy to the zone is shut off or reduced to a minimum. Exceptions: 2006 Washin ton State Nonresidential Ener• Code Com•liance Form • Mechanical Permit Plans Checklist 2006 Washington State Nonresidential Energy Code Forms - - MECH -CHK Revised 'July 2007: • Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a produ ct covered in Tables 14 -1A through 14 -1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil-fired forced air furnaces with input ratings > 225,000 Btu/h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu/h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Sery ice Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu/h) or less may be controlled by readily accessible manual off -hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close au tomatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire a larm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 1412.8 ventilation Controls for high - Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mech anical cooling. Water economizers shalt be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb/40 ° F wet -bulb and below. For this calculati on, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS- 18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at stati c pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These re quirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimu m of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated EF CAE < 50 gal storage 0.58 031 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 1411.4 Packag equipment prov ding both heating and cooling with a total cooling capacity greater than 20, Btu/h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and co oling energy to the zone is shut off or reduced to a minimum. Exceptions: 2006 Washin ton State Nonresidential Ener• Code Com•liance Form • Mechanical Permit Plans Checklist 2006 Washington State Nonresidential Energy Code Forms - - MECH -CHK Revised 'July 2007: • Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a produ ct covered in Tables 14 -1A through 14 -1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil-fired forced air furnaces with input ratings > 225,000 Btu/h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu/h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Sery ice Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu/h) or less may be controlled by readily accessible manual off -hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close au tomatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire a larm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 1412.8 ventilation Controls for high - Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mech anical cooling. Water economizers shalt be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb/40 ° F wet -bulb and below. For this calculati on, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS- 18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at stati c pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These re quirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimu m of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated 2. Combustion air intakes. 2006 Washington State Nonreside 3. Gravity (nonmotorized) dampers are acceptable in buildings less • than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum start controls shall be designed to automatically adjust the start time of an HVAC system each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include microprocessor controls that minimize supplemental heat usage during start-up, set- up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 000 EXCEPTIONS: 1. Boilers. 2. Radiant heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. ntifignErterA§AeslelGanapkaratitecF06Fraces to a minimu m of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6. Exception: Piping installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAC 51 -26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for building completion and commissioning requirements.) MASTER SUBCONTRACT WORK ORDER WORK ORDER dated Thursday, September 25, 2008 The Contractor is: Hawk Building 425.402.1818 P.O. Box 2318 Woodinville, WA 98072 425.485.1555 fax and the Project Manager is: Ryan Adkins 425.273.1583 and the Subcontractor is: Diamond Construction Services LLC 253.797.3857 35420 Military Rd S. Auburn, WA 98001 253.736.0102 fax and the Architect is: Fitch 16435 N. Scottsdale Rd. #195 Scottsdale, AZ 85254 and the Project is: T- Mobile: Southcenter 718 Southcenter Mall, #1475 Tukwila, WA 98188 and the Drawings are dated: August 14, 2008 and the Addendums issued: Rev 01 206.623.4646 206.623.4625 fax SCOPE OF WORK: The work is referenced by drawings, specification sheets or materials lists, those documents are referenced above. You are directed to perform the following labor and/or furnish the following materials on the above - referenced project: Provide labor and materials per your proposal dated September 18, 2008. This includes all HVAC ductwork, VAV boxes, Thermostats, Exhaust Fans, and equipment. This also includes installing the Quest HVAC equipment and landing those HVAC wires at the Q3 box. DATES OF START /FINSISH: The work shall start on 09/30/2008 and be completed by 10/15/2008. PRICE: The price for the above work is $ '11,527.00 (Eleven Thousand Five Hundered Twenty Seven Dollars) RETAINAGE: The retainage percentage for this Work Order shall be 10% WILL THIS PROJECT BE COMPLETED IN PHASES? ❑ Yes ® No If yes, the scope of work in this Work Order applies only to the following phases: IS THIS WORK ORDER IS FOR WARRANTY WORK? ❑ Yes (There will NOT be any payment for warranty work) ® No MASTER SUBCONTRACT: This Work Order is subject to the terms and conditions of the Master Subcontract entered into between Hawk Building Contractors, Inc. and the undersigned Subcontractor. Date: 9 -16 -08 Date: By: )3' Diamond Constriction Services LLC Dale Fite / Owner Print Name 8 Title ' By: Hawk Building Contractors, Inc. 1 of 1 «ECENED CITY OF TUKWILA OCT 0 7 2008 PERMIT CENTER ACTIVITY NUMBER: M08 -212 PROJECT NAME: T- MOBILE SITE ADDRESS: 718 SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # DATE: 08 -21 -08 Revision # After Permit Issued • PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP DEPARTMENTS: B d ig tAk. vis i on ► Fire Prevention 4 k Planning Division Complete Documents/routing slip.doc 2 -28-02 Public Works ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 08 -26 -08 TUES/THURS R9UTING: Please Route REVIEWER'S INITIALS: 1 I iG q6-06. Structural ❑ Permit Coordinator Incomplete Structural Review Required APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ❑ No further Review Required DATE: DATE: Not Applicable n DUE DATE: 09-23-08 Not Approved (attach comments) n Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 2 CAPITOL INDEMITY CORP 919389 04/15/2006 Until Cancelled $6,000.00 04/13/2006 1 ACCREDITED SURETY Et CAS CO 10034563 04/15/2005 Until Cancelled 04/15/2006 $6,000.00 04/22/2005 Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 1 AMERICAN STATES INS CO 01CG766408 2 04/15/200 Until Cancelled $1,000,000.0004 /14/2006 Name Role Effective Date Expiration Date FITE, DALE AGENT 04/22/2005 Untitled Page Business Owner Information Bond Information Insurance Information • General /Specialty Contractor A business registered as a construction contractor with LEtI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County DIAMOND CONSTRUCTION SRVCS LLC 2537973857 35420 MILITARY RD. S AUBURN WA 98001 KING Business Type LIMITED LIABILITY COMPANY Parent Company UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License Next License Associated License Specialty 1 Specialty 2 602455426 ACTIVE DIAMOCS956J2 CONSTRUCTION CONTRACTOR 4/22/2005 4/22/2009 AIR CONDITIONING UNUSED https: // fortress .wa.gov /lni/bbip/Detail.aspx ?License= DIAMOCS956J2 Page 1 of 1 10/07/2008 PER 2006 IMC SEC'T'ION 606 Install smoke detector to shut down air distribution by VAV's when the total combined C F M of all VAV's (to include other tenants) sharing the same plenum space exceeds 2000 CFM. (See IMC 606.2.2 for approved method of detection) DEEEI'N IS BASED ON L.L. PROVIDING 55 DEGREE 565 DAYS PER YEAR WITH MORNING WARMUP CYCLE. T.G.G. SHALL MAINTAIN ALL L.L. RETURN AIR OPENINGS (W/FIRE DAMPERS IF RI61D) IN DEMISING WALLS TO ENSURE OPERATION OF LL.'S CENTRAL VAV SYSTEM. 71117117M1 . raver VAV NOTES " 1 VAV- l Ji',•�' 1 ®� IFAMIL SAW ., EF -I DUCT SMOKE DETECTOR PROVIDE INPUT VOLTAGE 18 TO 52 VDG POLARIZED FROM FIRE: ALARM .!UNCTION BOX INSIDE TENANT SPACE TO DETECTOR. PROVIDE MAPNET II CIRCUIT TO DUCT SMOKE DETECTOR PROM FIRE ALARM .JUNCTION BOX LOCATION. INSTALL REMOTE ALARM INDICATOR KEY SWITCH IN ELECTRICAL ROOM AND SUPPLY FOUR - CONDUCTOR PLENUM RATED WIRE TO DUCT DETECTOR. PROVIDE ADDRESSABLE SMOKE DETECTOR CONNECTED TO A 2I20 MULTIPLE COMMUNICATING DEVICE TRANSPONDER (CDT). ADDRESS EACH DETECTOR WHICH IDENTIFIES ITS PHYSICAL LOCATION WITHIN BUILDING. 6. INSTALL DUCT HOUSING IN A LOCATION OF RELATIVELY NON - TURBULENT AIRFLOW AS PER INSTALLATION ROUTINES. 1. CUT SELECTED INLET TUI5EES AS REQUIRED FOR DUCT WIDTH. 8. INSTALL EXHAUST TUBE IN HOUSING WITH MAXIMUM LENGTH OF ONEOHALF DUCT WIDTH. 9. INSTALL APPROPRIATE BAFFLE INTO DUCT HOUSING. 10. TAKE MEASUREMENTS FOR AIR DIFFERENTIAL PRESSURE TEST USING A DWYER INSTRUMENT @ .015" TO 1.55" W.C. IL INSTALL PHOTOELECTRIC HEAD INSIDE DUCT HOUSING. MECHANICAL PLAN CFM = 1250 SP x 0.30 CFM /SF CFM = 5`15 DEMOLITION NOTES I. COORDINATE DEMOLITION WORK WITH LANDLORD'S TENANT COORDINATOR. 2. COMPLETELY REMOVE ALL EXISTING UN -USED SUPPLY $ RETURN DUCTWORK SERVING THIS SPACE. VERIFY EXISTING MALL DUCTWORK TO REMAIN WITH MALL TENANT GQORDINATOR. . 5. COMPLETELY REMOVE EXISTING UNUSED HVAG EQUIPMENT. OUTSIDE AIR CALCULATION SALES, AREA = 1250 SF REQUIRED VENTILATION RATE = 0.30 CFM /SF STOCK /BACK AREA: AREA = 550 SF REQUIRED VENTILATION RATE = 0.15 CFM/SF CFM = 550 SF x 0.15 CFM /SF CFM = 83 TOTAL CFM REQUIRED = 458 TOTAL CFM PROVIDED = 460 1-- -1 I - _1 f — 1 LJ I _J Lrl NOT USED. NOT USED. 12 "XI2" GRILLE, RG-2 KEYED NOTES EXIST'G. 16" DIA. TAP FOR TENANT CONNECTION. OPENING ABOVE CEILING WITH FIRE DAMPERS VERIFY EXACT LOCATION. PROVIDE 1° PRIMARY CONDENSATE FROM CONDENSATE PUMP TO /INTO MOP `;+INK. SECONDARY DRAIN THRU TOILET CEILING 4 ". TO DRIP ABOVE LAVATORY. (TYP. AHU -I) T.6.C. SHALL COORDINATE EXACT LOCATION OF AC-I WITH LANDLORD. . MAINTAIN 1 -0" CLEARANCE FROM INTAKE OF RTU(9). PROVIDE A 2e) "X22" RETURN AIR OPENING THRU WALL AS HIGH AS POSSIBLE WITH UPSIDE DOWN LOUVER . 12 13 14 15 0 F CC 'P'� Permit No. __XV Par review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt e1 approved P d Copy and Mons Is > owledged: SEPARATE PERMIT REQUIRED FOR: CII Mechanical V Electrical t�if Iumhin0 [ , Gas Piping . City of Tukwila '131-i /L INN DIViSIO,N KEYED NOTES RE' !IS IONS made to the i1 1n1. prior approvqI of Building Division, ;inrt5 will require a new n! ?n sI Mfr "'nil` 1 7 an r 'ring• f s KLVItliVED FOR CODE COMPLIANCE APPROVED SEP - 5 2008 City Of Tukwila BUILEBILMI5ION RECEIVED AUG 2120 PERMIT CENTER O 24X24 ", 5"0 NECK CP -I. BALANCE TO CFM NOTED. 02 24X24 ", 8 NECK CD -2. BALANCE TO CFM NOTED. 0 24X24 ", ION NECK CD -5. BALANCE TO CFM NOTED. 24X24",12"0 NECK GD -4.. BALANCE TO CFM NOTED. a NOT USED. 0 INSTALL QUEST CONTROLS TEM SENSOR FOR T'STAT5 LOCATED IN DATA ROOM. PIVIEION 23 coNTRACTOR. SHALL PROVIDE ALL WIRING 8 RELAYS. MOUNT AT 48" AFF.(PROVIDE T -STAT AND SENSOR IF NOT PROVIDED WITH HVAG EQUIPMENT) -I INSTALL QUEST CONTROLS PROGRAMMABLE AUTO - CHANGE OVER THERMOSTAT TO CONTROL HVAG UNITS. MOUNT AT 48" AFF. ®8 NOT U`al =D. NOT USED. 0 FIE:LD VERIFY CLEARANCES PRIOR TO FABRICATING DUCTWORK. (TYPICAL) II ROUTE DUCT TIGHT TO STRUCTURE. COORDINATE CLEARANCES TO AVOID CONFLICTS WITH SALES AREA CEILING HEIGHT AND STOCK ROOM SHELVING. (TYPICAL) MAINTAIN MANUFACTURER RECOMMENDED CLEARANCES. CONTRACTOR SHALL PROVIDE: ALL ELBOWS AND TRANSITIONS AS REQUIRED TO MAINTAIN CEILING CLEARANCES AT DUCT CROSSINGS. (TYPICAL) UNDERCUT DOOR I" FOR TRANSFER AIR. PROVIDE CONDENSER LINES AND OIL LOOP PER MANUFACTURER'S REQUIREMENTS. MAX. DISTANCE 10 CONNECT EXHAUST FAN TO LL TOILET EXHAUST SYSTEM. COPYRIGHT NOTICE These drawings and specifications are copyrighted and subject to copyright protection as an "architectural work " under sec. 102 of the copyright act, 17 u.S.C. As amended december 1990. The protection includes, without limitation, the overall form, arrangement and composition of spaces, and elements of the design. Under such protection, unauthorized use of these drawings and specifications may result in cessation of construction. building seizure, and/or monetary liability. rilitaiREVA Afiate rone4rinalL, ksiMMITAA l0 4 00 00 o oo <In m m w rss w , + . m 8 GN m m o t N ' DATE: SCALE: DRAWN BY: PROJECT No.: CO 1 4 CO co szu a. 444 0 CD CI 7i; g IA � 0 W � t4 1 W .40 Z gg a ow 2 ciodow 0 0,5,14.05 SHEET: TMi30801 q U) v o cd ry CO © U 0 VI • b d! Z U • U m N N CO 00 U- 1/4' STAFF M1OO 5 MARK MANUFACTURER MODEL MODEL MIN MAX CFM CFM VOLT /PHASE VAV - I TiTUS ATQS - 16 500 3000 2050 120/1 MISCEL -- - - T.G.C. . UNIT AREA SERVED DESCRIPTION AHU -I TELEGOMM. ROOM INDOOR UNIT OF SPLIT SYSTEM MITSUBISHI PGA- A42GA,105 -5S0 CFM, 13.8 SEER, 4200 BTUH COOLING, DIMENSIONS: 21"Px521N"xIO "H, 85 LBS, CEILING SUSPENDED. I MCA, . 205/250V, IPH, 60HZ. PROVIDE PROGRAMMABLE 1-DAY T'STAT AND FILTER KIT: AC -I TELE;COMM. ROOM OUTDOOR UNIT OF SPLIT SYSTEM MITSUBISHI PUY- A42NHA, R -410o REFRIGANT, DIMENSIONS: 8 WxI5D x54H , RO01= MOUNTED. 26 MCA, 2E5 LEIS. PROVIDE LOW AMBIENT KIT POR 25 F OPERATION. CDP -1 TELEGOMM. ROOM CONDENSATE PUMP, LITTLE: GIANT MODEL 54C -5PT, 110 GPH S 20 FEET HEAD; 3.5 AMPS; 210 WATTS 115V /IPH /60. NEW EXHAUST FAN SCHEDULE . MARK AREA SERVED MANUFACTURER MODEL • GFM ESP. ( "N.G) MOTOR BACKDRAFT DAMPER SPEED CONTROL WATTS V/PH EF-I TOILET ROOM/ MOP SINK GREENt4 CK 65-0E1-4 515 0.5 21 120 /1 YES YES TITUS OMNI • STEEL 24X24 8"O TYPE -3 FLANGE 4 -WAY FIXED OPPOSED BLADE CD - 5 GirILING DIFFUSER TITUS OMNI STEEL 24X24 10"o TYPE -5 FLANGE: 4 -WAY FIXED OPPOSED BLADE G D -4 CEILING DIFFUSER MARK DESCRIPTION MANUFACTURER . MODEL MATERIAL MODULE: BACK PAN/ NECK SIZE: BORDER TYPE: FRONT BLADES DAMPER GD - I CEILING DIFFUSER TITUS OMNI STEEL 24X24 6.,4, TYPE-3 FLANGE 4 -WAY FIXED OPPOSED BLADE CD-2 CEILING DIFFUSER TITUS OMNI • STEEL 24X24 8"O TYPE -3 FLANGE 4 -WAY FIXED OPPOSED BLADE CD - 5 GirILING DIFFUSER TITUS OMNI STEEL 24X24 10"o TYPE -5 FLANGE: 4 -WAY FIXED OPPOSED BLADE G D -4 CEILING DIFFUSER TITUS OMNI STEEL 24X24 12 "4' TYPE -3. FLANGE 4 -WAY FIXED OPPOEEEP BLADES ° CEILING DIFFUSER TITUS OMNI STEEL 24X24 14 "4) TYPES FLANGE 4 -WAY FIXED OPPOSED BLADE R6-I RETURN GRILLE TITUS PAR STEEL 24 "x24" NECK SIZE AS SHOWN TYPE: -2 SURFACE - NONE R6-2 RETURN GRILLE TITUS PAR STEEL 125E 2" NECK SIZE: AS SWOWN TYPE-2 SURFACE: NONE O47-6 SIDE:WALL RIFF TITUS SOORL STEEL 20.5 "X14.5" IS "x12" TYPE -I SURFACE - NONE: CD -1 SIDEWALL RIFF TITUS 3OOSL STEEL I$ "x10" 16 546" TYPE -I SURFACE: - NONE .1 TRANSFER GRILLE TITUS • 355RL STEE L 14.5 "x12.5" 12 "xl0" TYPE-I SURFACEE LONG NONE TG -2 TRANSFER GRILLE • TITUS 3551EL STEEL 20.5 "x14.5'" IS "x12" TYPE -I SURFACE: LONG NONE TG -3 TRANSFER GRILLE: TITUS 355RL STEEL 20.5' "x16.5" IS "xl4" TYPE -I SURFACE LONG NONE T6-4 TRANSFER GRILLE TITUS 355RL STEEL 25.5 "x16.5" 24 "x14" TYPE: -I SURFACE LONG NONE SINGLE LINE DOUBLE LINE SERVICE EXHAUST: (MI /W BEFORE L TAPER W.O./ _AEPUCER W/ REDUCER E G P H Aus t RETURN SUPPLY EXHAUST OR ETTURN SUPPLY I xHAuE'r OR RETURN R =W SUPPLY EXHAUST R=l/ // IN OR RETURN I d DOUBLE WIDTH VANES (TYP.) NOTES: T.G .0 SHALL VERIFY ALL REQ 2. T.C.C. SI -4A1L PROVIDE AND NAME SUPPLY ao° ELBOW (45 EL. SIMILAR) EXHAUST OR RETURN 1O ELBOW (45 EEL. SIMILAR) RADIUS TAP -IN TERA (SAIL A L TAP -IN RADIUS TAP -IN W/ REDUCER (LATERAL TAP -IN SIMILAR) C.O TE SQUARE ELBOW (AVOID USING WHERE POSSIBLE) SYMBOLS I ABBREVIATIONS MAR SYMBOL DESIGNATES MECHANICAL TYPE AND 'V FLAG NOTE CALLOUT ABV CLC'ABOVE CEILING AFF ABOVE: FINISHED FLOOR BOP BOTTOM OF PUCT BOO BACK DRAFT•PAMPER C CELSIUS co CEILING DIFFUSER MCA CG CEILING GRILLE MOP CFM CUBIC FEET PER MINUTES MUA COMB COMBUSTION / GOMBINATION OA CONT CONTINUATION / CONTRACTOR CU CUBIC D CONDENSATE: DRAIN DEG PEGREE DIM DN DB (E) EER EF E:G EXH ELEG E=MS ESP MECHANICAL LEGEND GP is RR /ER v 3 TSTAT THERMOSTAT �BDD SENSOR TEMPERATURE SENSOR SECTION THRU SUPPLY AIR DUCT• FD OR SECTION THRU RETURN, EXHAUST OUTSIDE AIR DUCT SECTION THRU EXHAUST PUCT CEILING DIFFUSER afiZI RETURN OR EXHAUST AIR GRILLE FLEX FLEXIBLE DUCTWORK ROUND DUCT UP ROUND DUCT DOWN RECTANGULAR DUCT DOWN TO EXHAUST GRILLE OR PUCT UP PIAMEETER PLAT OVAL SUPPLY AIRFLOW RETURN / EXHAUST / RELIEF AIRFLOW DUCT SIZE (CLEAR INSIDE DIMENSIONS) VOLUME; DAMPER 1=15 BACKDRAFT DAMPER FIRE DAMPER MOTORIZED DAMPER TRANSITION - FROM RECTANGULAR TO ROUND COMBINATION FIRE /SMOKE PAMPER SMOKE DETECTOR (10" ROUND 8" ROUND) SOUNDLINING POINT OF CONNECTION TO EXISTING UNDE=RC DOR (FOR RE LIEF O / RETURN) FLEX CONNECTION RESPONSIBILITY SCHEDULE ITEM MECHANICAL SMOKE REMOVAL SYSTEM MODII =Y SPRINKLER SSYS. FURNISHED l INSTALLED 0 L T I- 4 W ct g T C EXIST. REMARKS • • SPLIT SYSTEM EERIE CONTROLS SUPPLY AND R/A DUCTWORK PE=R PLAN ALL DIFFUSERS / GRILLES THERMOSTATS GER. LOCKING GOVER(E) TOILET RM. EXHAUST FAN AIR BALANCE: REPORT BY INDEPENDENT CONTRACTOR FIRE DAMPERS (1) BY T.G.G. (I) BY T.G.G. (5) (2) (2) AS REQUIRED AS REQUIRED TYPICAL DUCT FITTINGS LOW PRESSURE DUCTS F PT FP DIMENSION DOWN PRY BULB EXISTING ENERGY EFFICIENCY RATIO EXHAUST FAN EXHAUST GRILLE EXHAUST ELE=CTRICAL ENERGY MANAGEMENT AND W CONTROL SYSTEM EXTERNAL . STATIC PRESSURE W.B. LBS RA REG RG RPM SA SEER �a6 55 TG TSB' UL V ST OR RETURN # FAHRENHEIT . . FEET FIRE DAMPER . FLEX FLEXIBLE DUCT GA. GUAGE HP HORSE POWER IE INVERT ELEVATION MBH MILLION BRITISH THERMAL UNIT /HOUR MG MECHANICAL CONTRACTOR MINIMUM CURRENT .AMPS MAXIMUM.OVERC,URRENT PROTECTION MAKE UP AIR OUTSIDE AIR . PHASE: POINT OF CONNECTION POUNDS RETURN AIR REGISTER RETURN GRILLE REVOLUTIONS PER MINUTE SUPPLY AIR SEASONAL ENERGY EFFICIENCY RATIO SUPPLY GRILLE STAINLE55 STEEL- TRANSFER GRILLE TOTAL STATIC PRESSURE UNDERWRITER LABORATORY VOLTS WATER GUAGE WET BULB 1 NOTE: PRIOR TO CONSTRUCTION/ BID THE CONTRACTOR SHALL VISIT THIS SITE AND FIELD VERIFY THE EXISTING LOCATIONS AND SIZES OF ANY LANDLORD PROVIDED, OR EXISTING, OUTSIDE AIR INTAKES THROUGH ROOF, LANDLORD PROVIDED CHILLED /HOT WATER PIPINGS MAINS, TOILET EXHAUST MAINS, OUTSIDE AIR DUCTWORK, CONDENSATE LINE MAINS, ETC. THE CONTRACTOR SHALL FiELD VERIFY ANY/ CONDITIONS WHICH MAY CONFLICT WITH THE DESIGN SHOWN ON THESE PLANS. NOTIFY ARCHITECT IMMEDIATELY. ROOF FLE=XIBLE DUCT MAX. 4' -0" LENGTH LAY -IN CEILING taikaarragIcal3M1fAIMIWIMINWITAZWILIM Md{ TAPE AROUND SNUOGLY Z WRAPS PRIOR TO INSTALLING LINE STRAP SPUN ALUMINUM ROOF EXHAUSTER BACKDRAFT PAMPER ALL ALUMINUM, SELF FLASHING CURB ELEGTRIGAL CONDUIT EXHAUST PUCT ALL. ROOF PENETRATIONS TO €3E SEALED IN ACCORDANCE WITH STANDARP TRAPE PROCEDURES. EXHAUST FAN -- ROOF TYPE 2' SQUARE SUPPLY AIR • DIFFUSER DETAIL NEW VAV UNIT 1 1REMENTS WITH LL. INSTALL L.L. COMF'ATIBLE CONTROLS. VERIFY PRIOfc'. TO ORDERING. NEW GRILLE, REGISTER, AND DIFFUSER SCHEDULE NOTES: . I. ALL DIFFUSERS AND GRILLES SHALL EE STANDARD #26 WHITE FINISH. 2. LIE-1 AND LP -2 SHALL BE "FIELD GUT" TYPE PIFFUSERS. PROVIDE•WITH X END BORDERS, SPACERS, u'- A ROUND S.A. DUCTWORK ABOVE CEILING. SEE PLAN FOR DUCT SIZE. I" WIPE x 20 GA. STRAP W/ TIGHTENING SCREW SECURE STRAP W/ SHEET METAL SCREWS 3" O.G. MAX. 24 "x24" "TITUS" MODEL #.Tf7C, ROUNP NECK (SEE: SHEET MI FOR NECK SIZE) BORDER TYPE 5-LAY-IN DIFFUSER NTS GYP BOARP CEILING FLEXIBLE DUCT. SEE PLAN FOR SIZE I/8" MAX. GAP PLENUM SPACE SQUARE RETURN AIR DUCT OR EQUIP. COLLAR TAPE AROUND SNUGGLY Z WRAPS PRIOR TO INSTALLING LINE STRAP I" WIDEx20 GA. STRAP W/ TIGHTENING SCREW. OUTER EDGE OF COLLAR SECURE STRAP W /SHEET METAL SCREWS 5" O.G. MAX. FLEXIBLE DUCT • CONNECTION 24 "x24" "TITUS TRM-RAPIP MOUNT FRAME NTS 24 "x24" "TITUS" MODEL # 25R SQUARE NECK (SEE SHEET MI FOR NECK SIZE) BORDER r i..feE E 3- LAY -IN DIFFUSER DIFFUSER DETAIL MECHANICAL GENERAL NOTES I. FIELD VERIFY ALL EXISTING HVAG EQUIPMENT, ROOF PENETRATIONS, DUCTWORK AND PLUMBING LOCATIONS PRIOR TO BIDDING OR BEGINNING WORK. 2. ALL WORK SHALL BE LOCATED TO AVOID CONFLICTS WITH OTHER TRADES. PROVIDE ADEQUATE CLEARANCE FOR ARCHITECTURAL DESIGN. PROPER OPERATION, SERVICING OF EQUIPMENT LOCAL CODE REQUIREMENTS. 5. START UP, TESTING AND COMMISSIONING OF HVAG EQUIPMENT SHALL BE PONE E3Y DIVISION 25. WHEN THE EQUIPMENT IS READY FOR START UP, CONTRACTOR SHALL OBTAIN AND COMPLETE THE START UP AND BALANCE FORMS. HVAG CONTRACTOR SHALL BE ON SITE DURING TESTING AND BALANCING AND SHALL PROVIPE ALL CORRECTIONS AND WORK NECESSARY AS DETERMINED NY T4B AGENCY. 4. THESE NOTES APPLY TO MECHANICAL DRAWINGS. S. PO NOT RUN ANY PIPES OR DUCTS OVER ANY ELECTRICAL PANEL OR SWITCH GEAR. COORDINATE PIPE AND DUCT LOCATIONS TO AVOID ELECTRICAL PANELS. 6. DIVISION I SHALL GOOIDINATE DIVISION 23 WORK WITH THAT OF OTHER TRADES (ELEGTRIGAL, ARCHITECTURAL, STRUCTURAL). REFER TO .ELEGTRIGAL, ARCHITECTURAL AND STRUCTURAL DRAWINGS AND SPECS. "1. PROVIDE MANUFACTURER'S RECOMMENDED AND CODE REQUIRED CLEARANCES AROUND ALL PIECES OF EQUIPMENT. PIPING AND CONDUIT SHALL NOT INTERFERE WITH REQUIRED ACCESS. S. EQUIPMENT LAYOUT BASED ON EQUIPMENT LISTED IN EQUIPMENT SCHEDULES . AWE OTHER EQUIPMENT USED IS SUBJECT TO MEETING PERFORMANCE REQUIREMENTS OF LISTED EQUIPMENT: DIVISION 25 SHALL MAKE ALL NECESSARY ADJUSTMENTS TO ASSURE OTHER WILL FIT IN AVAILABLE SPACE AND WILL NOT EXCEED WEIGHT AND ELECTRICAL REQUIREMENTS. . . NOTE ELECTRICAL EQUIPMENT AND WIRING REQUIREMENTS AND SPECIFICATION SECTION 200515 10. UNLESS NOTED TO USE LARGER SIZE DUCT PROVIDE THE FOLLOWING MINIMUM SIZE BRANCH PUCTS TO CEILING DIFFUSERS. 8" DIA FOR 100 -200 CFM 12" DIA FOR S16 -550 CFM 10" DIA FOR 201 -515 CFM 14" PIA FOR 551 -150 CFM II. ALL MECHANICAL EQUIPMENT DUCTWORK AND PIPING SHALL BE PROVIDED WITH SEISMIC RESTRAINTS IN AGGORPANGE WITH ea SEISMIC DESIGN CATEGORY P. DIVISION 25 SUBCONTRACTOR SHALL HIRE: (AT DIVISION 25 EXPENSE) A LICENSED PROFESSIONAL ENGINEER IN THIS STATE TO DESIGN COMPONENTS TO COMPLY WITH IBC. SECTION 1621 AND ASCE 1-02 SECTION E.6.5. 12. THIS BLEEPING AND ENERGY SYSTEMS HAVE BEEN PESIGNEP TO COMPLY WITH STATE ENERGY CODE. DIVISION 25 IS RESPONSIBLE FOR CORRECT INSTALLATION OF ENERGY CONSERVATION MEASURES. 13. REFER TO STRUCTURAL DRAWINGS FOR ALLOWABLE METHODS /LOADS FOR HANGING PIPING /DUCTS FROM STRUCTURAL MEMBERS. 14. IN GENERAL, LOCATE: DUCTWORK IN CEILING DIFFUSERS AND GRILLES IN ACCORDANCE WITH ARCHITECTURAL REFLECTED CEILING PLAN. ADJUST LOCATIONS SHOWN ON MECHANICAL PRAWINGS TO FIT WITHIN THE CEILING GRID AS REQUIRED AND FOR GOOD AIR PISTRIE3UTION. 15. IN GENERAL, LOCATE DUCTWORK IN CEILING SPACE IN ACCORDANCE WITH TRUSS AND BEAM LOCATIONS SHOWN ON MECHANICAL DRAWINGS TO FIT WITHIN CEILING GRIP AS REQUIREP AND FOR COOP DISTRIBUTION. I. PROVIDE PURABLE FLEXIBLE NEOPRENE COVERING AT ALL MECHANICAL DUETS, PINES, EQUIPMENT OR SUPPORTS THAT COULP BE CONSIDERED "HEADBANGER" OBSTRUCTIONS (LESS THAN 6' -6" APF) LOCATED IN AGMS PATHWAY AT MEGHANIGAL PLATFORMS. IT ALL PLUMBING VTR'S SHALL. BE A MINIMUM OF 5 FEET FROM FIRE RATED WALLS. I. PIVISION 25 SHALL PROVIDE COMPLETE INSTALLATION OF ALL DETAILS ON M200 TO EQUIPMENT INDIGATEP. REFER TO MALL MANUAL FOR APPITIONAL INFORMATION. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. I'. COORDINATE ROOF PENETRATIONS WITH STRUCTURAL E3EAMS. 20. PROVIDE: FILTERS AT ALL RETURN AIR INLETS DURING CONSTRUCTION. REPLACE FILTERS AS REQUIRE P. 21. ALL PUGTWORK IN SALES AREAS WITHOUT CEILINGS (WHICH WILL BE PAINTED) SHALL BE UN- .INSULATEP, SPIRAL DUCTWORK. 22. DUCT SIZE NOTEP IS CLEAR INSIDE DIMENSION; INCREASE METAL DUCT SIZE TO ACCOUNT FOR DUCT LINER (TYPICAL). 23. AIR BALANCE OF THE HVAG SYSTEM SHALL BE DONE BY A GEERTIFIEP BALANCING CONTRACTOR AT DIVISION I EXPENSE. PROVIDE A FINAL COPY OF REPORT TO MALL OPERATIONS P I RECTOR. NOTES: DIVISION 1= GENERAL CONTRACTOR DIVISION 25= MEGHANIGAL SUBCONTRACTOR WORK DIVISION 26= ELECTRICAL SUBCONTRACTOR WORK HVAC NOTES REVIEWED 1-:OR CODE COMPLIANCE APPROVE SEP - 5 2000 City • Of Tukwila BUILDING DVI,SION I. ALL WORK TO BE AS PER THE L.L. SPECS, ALL LOCAL CODES, RULES AND REGULATIONS. ALL WORK TO BE AS PER ASHRAE ANP SMAGNA GUIDELINES. 2. ALL DUCT SIZES SHOWN ARE CLEAR INSIDE. ALL DUCTS TO SE SHEET METAL DUCTS AS PER ASHRAE AND SMACNA GUIDELINES. 3. PROVIDE NECESSARY TURNING VANES, SPLITTER DAMPERS, VOLUME EXTRACTORS AND OTHER FEATURES NEEDED FOR A SMOOTH AND CONTROLLED FLOW OF AIR. 4. LOCATIONS SHOWN OF HVAG EQUIPMENT AND DUCTS ARE SCHE=MATIC ONLY. VERIFY STRUCTURAL DETAILS AND OTHER DETAILS THAT WILL AFFECT ROUTING AND PLACEMENT OP THESE COMPONENTS. IF MORE SUPPORTS ARE NEEDED FOR HVAG EQUIPMENT, COORDINATE WITH THE ARCHITECT. 5. PROVIPE PROPER DUCT TRANSITIONS FOR ACTUAL HVAG UNITS INSTALLED. ROOF PENETRATIONS, IF ANY, TO BE MADE AS PER L.L. SPECS. VERIFY DETAILS WITH L.L.. 6. PROVIDE ANP INSTALL THERMOSTATS AT LOCATIONS AS DIRECTED BY THE ARCHITECT. "1. COORDINATE ACTUAL LOCATIONS OF PIFFUSERS, REGISTERS AND GRILLES WITH CEILING DETAILS AND OTHER FEATURES SUCH AS LIGHTING FIXTURES ETC. THAT MAY AFFECT PLACEMENT OF THE HVAG SYSTEM COMPONENTS. S. GENERAL CONTRACTOR SHALL SUPPLY ALL EQUIPMENT CONTROLS AND WIRING. COORPINATE WITH MALL REPRESENTATIVE FOR INTERLOCKING WITH MALL CONTROL SYSTEM (AS RE=QUIRED). RECEIVED AUG 21 2008 PERMIT CENTER (a) FIEE4 E 0 co a cn 00 Q I Ar co LLJ m Ln LE u. co EE cn m o L LI n DATE: SCALE: DRAWN BY: PROJECT No.: 0 8 v W ° 2 ac ZEZ D w z eae a5 L - Icsiti (, o ® Co ) to co c L . w 4-N o w V mic ta Tv' to •- In Vi i 0 ce TMBOP DIGi COPYRIGHT NOTICE' These drawings and specifications are copyrighted and subject to copyright protection as an "architectural work" under sec. 102 of the copyright act, 17 u.S.C. As amended december 1990. The protection Includes, without limitation, the overall form, arrangement and composition of spaces, and elements of the design. Under such protection, unauthorized use of these . drawings and specifications may result In cessation of construction, building seizure, and /or monetary liability. 1111111111111111111111111111111111/ "11111 08.14.08 SHEEP: 1/4' =I' -O" STAFF M200 N 0 ° m FI 0 I o d vL 0 D:: 0 c : 0. E SECTION 15010 GENERAL PROVISIONS PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION I - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. B. INCLUDE ALL LABOR, MATERIAL EQUIPMENT, TRANSPORTATION AND SERVICES TO FURNISH AND INSTALL COMPLETE MECHANICAL `"SYSTEMS AND ALTERATIONS AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED. THE WORK INCLUDES, BUT IS NOT LIMITED TO: I. ALL PLUMBING WORK: 2. CONNECTION TO ALL UTILITIES. 5. HEATING AND AIR CONDITIONING. 4. INSULATION. 5. TEMPERATURE CONTROLS. 6. FIRE PROTECTION WORK. 1.02 DESCRIPTION OF WORK A. EXTENT OF MECHANICAL WORK IS INDICATED ON DRAWINGS OR SPECIFIED IN DIVISION 15 SECTIONS OF THE SPECIFICATION. PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SUPERVISION AND SERVICE NECESSARY FOR A COMPLETE MECHANICAL SYSTEM. 1.05 QUALITY ASSURANCE . A. ALL WORK ACCOMPLISHED UNDER THESE SPECIFICATIONS SHALL BE IN AGCORDANGE WITH REQUIREMENTS AND RECOMMENDATIONS OF THE LOCAL COUNTY, STATE, NATIONAL. FIRE PROTECTION ASSOCIATION, ACCEPTED MECHANICAL COPE, PLUMBING CODE, BUILDING CODE, ETC. UNDER THIS JURISDICTION. B. IN ADDITION, FOLLOW ALL REQUIREMENTS PERTAINING TO THE MALL TENANT DESIGN MANUAL. 1.04 SUBMITTALS A. DIVISION 15 SHALL SUL3MIT POR REVIEW, SIX COPIES OF SHOP DRAWINGS, LITERATURE, AND EQUIPMENT LIST WITHIN 50 DAYS AFTER CONTRACT IS LET. FIRE PROTECTION DRAWINGS SHALL BE SUBMITTED PER SECTION 15500. B. SUBMIT PRIOR TO F ABRICATION OR DELIVERY. G. SUBMIT COMPLETE, AT ONE TIME. PARTIAL SUBMITTALS WILL NOT BE CONSIDERED (EXCEPT AS NOTED ABOVE FOR CONTROLS, FIRE PROTECTION AND DUCTWORK). D. CATALOG SHEETS SHALL BE COMPLETE AND THE ITEM OR MODEL TO 'BE USED SHALL BE CLEARLY MARKED. . E. LIST SUBSTITUTE ITEMS SEPARATELY AND 50 IDENTIFIED. PART 2.00 - PRODUCTS 2.01 MATERIALS U A. ALL MATERIALS SHALL BE NEW AND OF MAN FA.TU RERS SPECIFIED HEREIN. THEY SHALL DE U.S. MADE (EXCEPT CANADIAN COPPER PIPE IS ACCEPTABLE) AND BEAR THE U.L., ETL OR GSA LABEL WHERE POSSIBLE. B. ALL. EQUIPMENT SHALL BE REGULARLY CATALOGUED ITEMS OF THE MANUFACTURER 2.01 MOTORS AND IN USE FOR AT LEAST TWO YEARS • AND SHALL BE SUPPLIED AS A COMPLETE UNIT IN ACCORDANCE WITH THE MANUFACTURER'S STANDARD SPECIFICATIONS AND ANY OPTIONAL ITMS REQUIRED E=OR PROPER INSTALLATION FOR THE EQUIPMENT UNLESS OTHERWISE NOTED. ALL EQUIPMENT AND MATERIALS SHALL BE INSTALLED IN AGGORDANGE WITH THE MANUFACTURER'S RECOMMENDATIONS AND BEST TRADE PRACTICES, 2.02 SUBSTITUTIONS A. IN ALL CASES IN THIS SPECIFICATION WHERE AN ARTICLE IS FOLLOWED BY THE WORDS "OR APPROVED EQUAL ", THE ARCHITECT IS THE SOLE JUDGE OF THE QUALITY OF THE PROPOSED SUE3STITUTI ON. B. WHEN THE ARCHITECT /OWNER APPROVES A SUBSTITUTION, THE APPROVAL IS GIVEN WITH THE UNDERSTANDING THAT DIVISION 15 GUARANTEES THE ARTICLE OR MATERIAL SUBSTITUTED TO BE EQUAL TO OR BETTER IN EVERY RESPECT THAN THE ARTICLE OR MATERIAL SPECIFIED. DIVISION 15 SHALL ALSO ASSUME COMPLETE RESPONSIBILITY THAT THE ARTICLE OR MATERIAL WILL F=IT THE JOB AS PAR AS SPACE, AGGESS AND SERVICING REQUIREMENTS. C. WHERE SEVERAL MATERIALS ARE SPECIFIED BY NAME FOR ONE USE, SELECT FOR USE ANY OF THOSE SO SPECIFIED. NOTE THAT EQUIPMENT LAYOUT IS BASED ON EQUIPMENT LISTED IN EQUIPMENT SCHEDULES. ANY OTHER EQUIPMENT USED MUST FIT IN AVAILABLE SPACE WITH ALL ACCESS AND SERVICING REQUIREMENTS MAINTAINED. IT IS DIVISION 15 RESPONSIBILITY TO CHECK THAT THIS EQUIPMENT WILL MEET THESE: REQUIREMENTS. D. WHENEVER ITEM OR GLASS OF MATERIAL IS SPECIFIED EXCLUSIVELY 13Y DETAIL SPECIFICATION, TRADE NAME, MANUFACTURER'S NAME OR BY CATALOG REFERENCE, USE ONLY SUCH ITEM, UNLESS WRITTEN APPROVAL 15 GIVEN FOR SUBSTITUTION PRIOR TO BID. PART 5.00 - EXECUTION 5.01 DRAWINGS A. THE MECHANICAL DRAWINGS ARE GENERALLY DIAGRAMMATIC. COMPLETE DETAILS OF THE BUILDING WHICH AFFECT THE MECHANICAL INSTALLATION MAY NOT BE SHOWN. FOR ADDITIONAL DETAILS, DIVISION I5 IS REFERRED TO THE ARCHITECTURAL STRUCTURAL, 8 ELEGTRIGAL DRAWINGS. 5.02 CODES, ORDINANCES AND PERMITS A. ALL WORK SHALL COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES. TAKE OUT AND PAY FOR ALL INSPECTION FEES AND PERMITS. COMPLIANCE WITH CODES AND ORDINANCES SHALL BE AT DIVISION 15'S EXPENSE. INCLUDE ALL CONNECTION AND PERMIT FEES IN BID. DIVISION 15 SHALL GONTAGT AHJ FOR INSPECTION OF ALL PRESSURE VESSELS . IN A TIMELY MANNER BEFORE OCCUPANCY OF THE BUILDING. 5.04 TESTING A. (WATER PIPING) TEST ALL WATER PIPING SYSTEMS AT 125 PSI WATER PRESSURE AND HOLD FOR FOUR (4) HOURS. TEST IN SECTIONS BEFORE COVERING. TEST ENTIRE SYSTEM WHEN COMPLETELY INSTALLED. REPAIR ANY DEFECTS SHOWN BY TEST AND RETEST UNTIL ENTIRELY TIGHT. B. (WASTE AND SEWER PIPING) TEST ALL WASTE, SEWER AND VENT PIPING BY FILLING WITH WATER TO ROOF. HOLD FOR F OUR HOURS. TEST IN SECTIONS AS WORK PROGRESSES. REPAIR ANY DEFECTS SHOWN BY TEST AND RETEST UNTIL ENTIRELY TIGHT. C. (VALVES) TEST ALL VALVE BONNETS FOR TIGHTNESS. OPERATE ALL VALVES AT LEAST ONCE FROM CLOSED -TO- OPEN -TO- CLOSED WHILE UNDER PRESSURE 3.05 CLEAN UP AND HOUSEKEEPING A. LEAVE ALL EQUIPMENT GLEAN AND READY FOR USE. B. REMOVE ALL LABELS, PAINT, PLASTER, ETC., FROM FIXTURES, EQUIPMENT AND PIPING. 3.06 OPERATING INSTRUCTIONS AND MAINTENANCE MANUALS. SCOPE A. SCOPE . I. PROVIDE: COMPLETE OPERATING AND MAINTENANCE INSTRUCTIONS AND CATALOG SHEETS FOR ALL EQUIPMENT. 2. PROVIDE FOUR COPIES OP EACH (SOUND INTO BOOKLET FORM. 5. DELIVER BOOKLETS TO THE ARGHITEGT BEFORE FINAL COMMISSIONING OF SYSTEMS AND BEFORE SUISSTANTIAL COMPLETION. . . B. CONTENTS: EACH E1OOKLET SHALL CONTAIN AT LEAST, BUT NOT LIMITED TO MAINTENANCE INSTRUCTIONS AND PARTS LIST AS FOLLOWS: C. MOTOR CHARACTERISTICS I. BASIC DESCRIPTION OF ALL SYSTEMS. . 2. DESCRIPTION OF ROUTINE MAINTENANCE REQUIRED FOR EACH COMPONENT, INCLUDING OILING INSTRUCTIONS, S. SUGGESTED FREQUENCY OF MAINTENANCE. 4. PARTS LIST OF ALL EQUIPMENT. 5. OPERATING INSTRUCTIONS AND WARRANTIES ON ALL EQUIPMENT. 6. CONTROLS: AS- i3UILT WIRING DIAGRAMS 'T. MECHANICAL AS -BUILT DRAWINGS. . P. TROUBLE - SHOOTING LIST. Gi. NAME, ADDRESS, PHONE NUMBER OF ALL DIVISION I5S AND SUPPLIERS PARTICIPATING IN PROJECT. 5.0"1 RECORD DRAWINGS A. PROVIDE THE ARCHITECT WITH RECORD DRAWINGS. REGCIRD DRAWINGS SHALL BE NEW, REPRODUCIBLE BOND PAPER AND SHALL SHOW THiE MEASURED LOCATIONS OF ALL CONCERNED PORTIONS OF THE WORK AND SHALL SHOW ALL CHANGES THE. DIVISION 15 HAS MADE. . B. DRAWINGS MUST SHOW ALL ADDENDUM ITEMS, GRANGE ORDERS AND DEVIATIONS FROM THE PLANS. . . . 5.10 SEISMIC RESTRAINTS A. DIVISION 15 ATTENTION IS GALLED TO THE RESTRICTED SPACE FOR INSTALLATION OF MECHANICAL SYSTEMS. OFFSETS, REROUTING AND COORDINATION WILL BE REQUIRED TO FIT ALL ELEMENTS IN AVAILABLE SPADE AND DIVISION 15 SHALL INCLUDE PROVISIONS FOR SUCH IN HIS BID. . B. DUCTWORK AND PIPING SHALL BE ROUTED TO GLEAR LIGHT FIXTURES. COORDINATE ROUTING OF DUCTWORK AND PIPING WITH EACH OTHER SO GRAPE OF PIPING CAN BE ACCOMPLISHED, AND TO FIT IN AVAILABLE SPACE. G. DUCTWORK SHALL BE INSTALLED AS REQUIRED TO CLEAR LIGHT FIXTURES AND TO FIT IN AVAILABLE SPACE. PROVIDE OFFSETS, V OR SLEEVES AS REQUIRED. MAINTAIN EQUIVALENT FREE AREA OF DUCTWORK. D. DUCTWORK TAKES PRECEDENCE OVER PIPING FOR AVAILABLE SPACE AND ROUTING. COORDINATE INSTALLATION BASED ON THIS PRECEDENCE. . E. DUCTWORK AND /OR PIPING SHALL NOT BE RUN OVER ELECTRICAL PANELS. F. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH BEST TRADE PRACTICE. ANY SUBSTANDARD WORKMANSHIP SHALL BE REMOVED AND REPLACED AT NO EXTRA COST TO THE OWNER. . 5.0 WORKMANSHIP A. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH 13E5T TRADE PRACTICE. ANY SUBSTANDARD WORKMANSHIP SHALL BE REMOVED AND REPLACED AT NO EXTRA COST TO THE OWNER. 5.10 SEISMIC RESTRAINTS A WITH A. ALL MEGHANIGAL EQUIPMENT, DUCTWORK AND PIPING SHALL EE PROVIDED W TH SEIS MIC RESTRAINTS IN ACCORDANCE WITH IBC SEISMIC DESIGN CATEGORY p. DIVISION 15 SUBCONTRACTOR SHALL HIRE (AT DIVISION 15 EXPENSE) A LICENSED PROFESSIONAL ENGINEER IN THIS STATE TO DESIGN ANY NECESSARY ANCHORAGE, BRACING, ETC. FOR 'MECHANICAL COMPONENTS TO COMPLY WITH I5C SECTION 1621 AND AS.E 1 - 02 SECTION -i.6.5. END OF SECTION 15010 SECTION 15050 ELEGTRIGAL PROVISIONS TO MECHANICAL WORK . PART 1.00 GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION I - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 STANDARDS A. FOR ELECTRICAL EQUIPMENT AND PRODUCTS, EMPLOY WITH APPLICABLE NEMA STANDARDS, AND REFER TO NEMA STANDARDS FOR DEFINITIONS OF TERMINOLOGY HEREIN. COMPLY WITH NATIONAL ELECTRICAL GODS (NFPA 10) FOR WORKMANSHIP AND INSTALLATION REQUIREMENTS AND TO APPLICABLE SECTIONS OF DIVISION 16 OF THE SPEC I F ICATI ONS. PART 2.00 - PRODUCTS A. MANUFACTURER . I. . EXCEPT WHERE ITEM OF MECHANICAL EQUIPMENT (WHICH OTHERWISE COMPLIES WITH REQUIREMENTS) MUST i5E INTEGRALLY EQUIPPED WITH MOTOR PRODUCED E3Y ANOTHER MANUFACTURER, PROVIDE MOTORS FOR MECHANICAL EQUIPMENT. B. MOTOR CHARACTERISTICS I. EXGEPT WHERE MORE STRINGENT REQUIREMENTS ARE INDICATED, AND EXCEPT WHERE REQUIRED ITEM OF MECHANICAL EQUIPMENT CANNOT BE OBTAINED WITH FULLY COMPLYING MOTOR, COMPLY WITH THE FOLLOWING REQUIREMENTS FOR MOTORS OF MECHANICAL WORK: • A. TEMPERATURE RATING: RATED FOR 40 DEG. C. ENVIRONMENT WITH MAXIMUM 50 DECD. G TEMPERATURE RISE FOR CONTINUOUS DUTY AT FULL LOAD (GLASS A INSULATION). 13. STARTING CAPABILITY: PROVIDE EACH MOTOR CAPABLE OF MAKING STARTS AS FREQUENTLY AS INDICATED EY AUTOMATIC CONTROL SYSTEM, . AND NOT LESS THAN 5 STARTS /HOUR FOR MANUALLY CONTROLLED MOTORS. C. PHASES AND CURRENT GHARAGTERISTICS: PROVIDE SQUIRREL -GAGE INDUCTION POLYPHASE MOTORS FOR I HP AND LARGER, AND PROVIDE CAPACITOR.-START SINGLE -PHASE MOTORS FOR 3/4 HP AND SMALLER, EXCEPT I/6 HP AND SMALLER MAY AT EQUIPMENT MANUFACTURER'S OPTION, BE SPLIT -PHASE TYPE. COORDINATE CURRENT CHARACTERISTICS WITH POWER SPECIFIED IN DIVISION -I6 SECTIONS, AND WITH INDIVIDUAL EQUIPMENT REQUIREMENTS SPECIFIED IN OTHER DIVISION -15 REQUIREMENTS. FOR 2 -SPEED MOTORS PROVIDE 2 SEPARATE WINDINGS ON POLYPHASE MOTORS. DO NOT PURCHASE MOTORS UNTIL POWER CHARACTERISTICS AVAILABLE AT LOCATIONS OF MOTORS HAVE BEEN CONFIRMED, AND UNTIL ROTATION DIREGTION5 HAVE BEEN CONFIRMED. D. SERVICE FACTOR: 1.15 FOR POLYPHASE MOTORS, AND I.55 FOR SINGLE -PHASE MOTORS. . MOTOR CONSTRUCTION I PROVIDE GENERAL PURPOSE, CONTINUOUS DUTY MOTORS, DESIGN "15" EXCEPT "G" WHERE REQUIRED FOR HIGH STARTING TORQUE. A. FRAMES: NEMA NO. 45. E5. BEARINGS: BALL OR ROLLER BEARINGS WITH INNER AND OUTER SHAFT SEALS, PERMANENTLY SEALED. WHERE BELT DRIVES AND OTHER DRIVES PRODUCE LATERAL OR AXIAL THRUST IN MOTOR, PROVIDE BEARINGS DESIGNED TO RESIST THRUST LOADING. REFER TO INDIVIDUAL SECTIONS OF DIVISION -IS FOR FRACTIONAL -HP LIGHT - DU'T'Y MOTORS WHERE SLEEVE -TYPE BEARINGS ARE PERMITTED. C. ENCLOSURE TYPE: EXCEPT AS OTHERWISE INDICATED PROOVIDE OPEN DROP -PROOF MOTORS FOR INDOOR USE WHERE SATISFACTORILY HOUSED OR REMOTELY LOCATED DURING OPERATION, AND PROVIDE GUARDED DRIP - PROOF MOTORS WHERE! EXPOSED TO CONTACT EBY EMPLOYEES OR BUILDING OCCUPANTS. PROVIDE WEATHER - PROTECTED TYPE I FOR OUTDOOR USE, TYPE II WHERE NOT HOUSED. !REFER TO INDIVIDUAL SECTIONS OF DIVISION- 15 FOR OTHER ENCLOSURE REQUIREMENTS. D. OVERLOAD PROTECTION: PROVIDE BUILT -IN THERMAL OVERLOAD PROTECTION FOR 120V MOTORS. E. EFFICIENCY: MOTORS ARE TO BE "ENERGY EFFICIENT" HAVING MINIMUM EFFICIENCY AS SCHEDULED IN.AGGOIRDANGE WITH IEEE STANDARD 112, TEST METHOD B. % POWER F. •PROVIDE MOTORS WITH MINIMUM Fay %, PROVIDE POWER FACTOR FACTOR. WHERE LESS THAN 55 % PER ENERGY CODES. • . CORRECTION TO MINIMUM 0E0 D. NAMEPLATE . I. PROVIDE METAL NAMEPLATE ON EACH MOTOR, INDICATING FULL IDENTIFICATION OF MANUFACTURER, RATINGS, CHARACTERISTICS, CONSTRUCTION, SPECIAL FEATURES, AND SIMILAR INFORMATION. 2.02 STARTERS, ELECTRICAL DEVICES. AND WIRING A. MOTOR STARTER MANUFACTURER I. EXCEPT WHERE ITEM OF MECHANICAL EQUIPMENT MUST BE INTEGRALLY FURNISHED WITH MOTOR STARTER PRODUCED BY ANOTHER MANUFACTURER, PROVIDE MOTOR STARTERS FOR MEGHANIGAL EQUIPMENT MANUFACTURED BY ONE OF THE FOLLOWING: CUTLER - HAMMER, GE OR SQUARE D. B. MOTOR STARTER GHARAGTERISTIGS I. COMPLY 10 NEMA STANDARDS AND NEC. PROVIDE TYPE I GENERAL PURPOSE ENCLOSURES WITH PAP LOCK EARS, AND WITH FRAMES AND SUPPORTS FOR MOUNTING ON WALL, FLOOR OR PANEL AS INDICATED. PROVIDE TYPE AND SIZE OF STARTER RECOMMENDED BY MOTOR MANUFACTURER AND EQUIPMENT MANUFACTURER FOR APPLICABLE PROTECTION . AND START -UP CONDITION; REFER TO INDIVIDUAL EQUIPMENT SECTIONS FOR BASIC LOAD REQUIREMENTS. A. MANUAL SWITCHES: PROVIDE MANUAL SWITCH AND PILOT LIGHT FOR MOTORS I/2 HP AND SMALLER, EXCEPT WHERE INTERLOCK OR AUTOMATIC OPERATION IS INDICATED. I. OVERLOAD PROTECTION: PROVIDE MELTING ALLOY TYPE THERMAL OVERLOAD RELAYS. B. MAGNETIC STARTERS: PROVIDE MAGNETIC STARTERS FOR 5 PHASE MOTORS AND FOR SMALLER MOTORS WHERE INTERLOCK OR AUTOMATIC •OPERATION IS INDICATED. INCLUDE THE FOLLOWING: . I. HAND -OFF -AUTO SWITCH AND PILOT LIGHTS, PROPERLY ARRANGED FOR SINGLE- -SPEED OR MULTI -SPEED OPERATION AS INDICATED. 2. TRIP-FREE THERMAL OVERLOAD RELAYS, EACH PHASE. 5. INTERLOCKS, PNEUMATIC SWITCHES, AND SIMILAR DEVICES AS REQUIRED FOR COORDINATION WITH CONTROL REQUIREMENTS OF DIVISION -I5 CONTROLS SECTIONS. 4. BUILT -IN 120 -VOLT. CONTROL GIR.UIT TRANSFORMER, FUSED FROM LINE SIDE, WHERE SERVICE EXCEEDS 240 VOLTS, WHEN A TRANSFORMER. ISN'T USED THE CONTROL COIL SHALL BE FUSED. 5. EXTERNALLY OPERATED MANUAL RESET. 6. UNDER VOLTAGE RELEASE OR PROTECTION FOR EACH PHASE. PART 3.00 - EXECUTION 3.01 STARTERS A. FURNISH STARTERS AND WIRING DEVICES FOR MOTORS. INSTALLATION BY DIVISION 16000. 5.02 MOTORS A. INSTALL MOTORS ON MOTOR MOUNTING SYSTEMS IN ACCORDANCE WITH MOTOR MANUFACTURER'S INSTRUCTIONS, SECURELY ANCHORED TO RESIST .TORQUE, DRIVE THRUSTS, AND OTHER EXTERNAL FORCES INHERENT IN MECHANICAL WORK. 5EGURE SHEAVES AND OTHER DRIVE UNITS TO MOTOR SHAFTS WITH KEYS AND ALLEN SET SCREWS, EXCEPT MOTORS OF I/3 HP AND LESS MAY BE SECURED WITH ALLEN SCREWS ON FLAT SURFACES OF SHAFT. UNLESS OTHERWISE INDICATED; SET MOTOR SHAFTS PARALLEL WITH MACHINE SHAFTS. 5.05 EQUIPMENT FABRICATION A. FABRICATE MECHANICAL EQUIPMENT FOR SECURE MOUNTING OF MOTORS AND OTHER ELECTRICAL ITEMS INCLUDING IN WORK. PROVIDE EITHER PERMANENT ALIGNMENT OF MOTORS WITH EQUIPMENT, OR. ADJUSTABLE MOUNTINGS AS APPLICABLE FOR BELT DRIVES, GE DRIVES, T G OF E PM N AR ES SPECIAL COUPLINGS AND SIMILAR INDIRECT COUPLING QUI >* T. PROVIDE SAFE, SECURE, DURABLE, AND REMOVABLE GUARDS FOR MOTOR DRIVES, ARRANGED FOR LUBRICATION AND SIMILAR RUNNING MAINTENANCE WITHOUT REMOVAL OF GUARDS, END OF SECTION 15050 SECTION 15050 MECHANICAL IDENTIFICATION PART 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINt'S AND GENERAL PROVISIONS OF THE.GONTRAGT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION I GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. . . 1.02 STANDARDS A. ANSI COMPLIANCE I. COMPLY WITH ANSI AI5.1 FOR LETTERING SIZE, COLORS, AND INSTALLED VIEWING ANGLES OF IDENTIFICATION DEVICES. PART 2.00 PRODUCTS 2.01 ENGRAVED PLASTIC - LAMINATE SIGNS .. A. PROVIDE ENGRAVED STOOK MELAMINE PLASTIC LAMINATE, COMPLYING WITH FS L- P -5.S1, i NGRAVED WITH ENGRAVER'S STANDARD LETTER STYLE OF SIZES AND WORDING, BLACK WITH WHITE GORE (LETTER COLOR) EXCEPT AS OTHERWISE INDICATED, PUNCHED FOR. MECHANICAL FASTENING EXCEPT WHERE ADHESIVE MOUNTING IS NECESSARY BECAUSE OF SUBSTRATE. PROVIDE 1/16" THICKNESS FOR UNITS UP TO 20 SQ.. N. OR 8" LENGTH; I/5" FOR LARGER UNITS. PROVIDE FASTENING. PER SELF- TAPPING STAINLESS STEEL SCREWS, EXCEPT CONTACT --TYPE PERMANENT ADHESIVE WHERE SCREWS CANNOT OR SHOULD NOT PENETRATE SUBSTRATE. PROVIDE' FOR ALL EQUIPMENT. 2.02 ELECTRICAL EQUIPMENT A. ON ALL MECHANICAL EQUIPMENT THAT HAS POWER. CONNECTORS, PROVIDE WITH PERMANENT MARKER, THE ELECTRICAL PANEL AND BREAKER NUMBER. MARK ON DISCONNECT. . PART 5.00 - EXECUTION . 5.01 MEGHANIGAL EQUIPMENT IDENTIFICATION A. MECHANICAL EQUIPMENT IDENTIFICATION INSTALL ENGRAVED PLASTIC LAMINATE SIGN ON OR NEAR EACH MAJOR ITEM OF MECHANICAL EQUIPMENT AND 'EACH OPERATING DEVICE. PROYIPE SIGNS FOR WATER HEATERS, FANS, HVAC UNITS AND OTHER OPERATIONAL DEVICES. SECTION 15250 MECHANICAL INSULATION PART 1.00 - G ENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION I - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. AT A MINIMUM, INSULATION VALUES SHALL MEET THE RE=QUIREMENTS OF THE STATE ENERGY CODE, IF APPLICABLE. 1.02 FLAME /SMOKE. RATINGS A. PROVIDE COMPOSITE. MEGHANIGAL INSULATION (INSULATION, JACKETS, COVERINGS, SEALER, MASTICS AND ADHESIVES) WITH FLAME SPREAD INDEX AT 25 OR LESS, AND SMOKE DEVELOPED INDEX OF 50 OR LESS, AS TESTED E3Y ASTM E54 (NFPA 225) METHOD PART 2.00 - PRODUCTS 2.01 MATERIALS A. GLASS FIBER PIPE INSULATION: ASTM C 1156 4 541 TYPE I. B. GLASS FIBE=R PIPE FITTING INSULATION: ASTM C 555. • . C. GLASS FIBER DUCT WRAP INSULATION: ASTM C 555 - 12 - D. GLASS FIBER DUCT WRAP INSULATION: ASTM G 555-12,1210-ME, 1156 4 II5 '- TO TYPE II. • 1156 it 1155 - TYPE II. 2.02 MANUFACTURERS • A. ONE OF THE FOLLOWING: I. CERTAINTEED CORP., KNAUF FIBER GLASS, MANVILLE CORP., OWENS- CORNING FIBERGLASS CORP,, IMCOA, NOMA.O. 2.05 PIPING INSULATION . A. OMIT INSULATION ON EXPOSED PLUMBING FIXTURE RUN -OUTS, (EXCEPT AT HANDICAPPED FIXTURES) FROM FACE OF WALL OR FLOOR TO FIXTURE ;. ON UNIONS, FLANGES, STRAINERS, FLEXIBLE CONNECTIONS, AND EXPANSION JOINTS. I. INSULATE THE FOLLOWING GOLD PIPING SYSTEMS: . A. DOMESTIC COLD WATER AND CONDENSATE DRAIN PIPING. 2. INSULATE THE ABOVE GOLD PIPING WITH THE FOLLOWING INSULATION: A. GLASS FIBER, I" THICK ON ALL PIPE SIZE EXCEPT I" DIAMETER AND LESS PIPE AND RUNOUTS UP TO 2" DIAMETER PIPE SIZE. 3. INSULATE THE FOLLOWING HOT PLUMBING PIPING SYSTEMS: A. DOMESTIC HOT WATER PIPING. 4. INSULATE THE A15OVEE HOT PIPING WITH ONE OF THE FOLLOWING INSULATIONS: A. DOMESTIC FIBERGLASS: I" THICK FOR UP TO 2" DIAMETER. PIPE SIZE AND 1.5" THICK FOR 2 -I /2" DIAMETER AND LARGER PIPE SIZES. 5. ALL PLUMBING SYSTEMS SHALL MEET OR EXCEED THE INSULATION REQUIREMENTS OF THE APPLICABLE ENERGY CODE. WHERE INSULATION THICKNESS SPECIFIED ARE LARGER THAN THOSE LISTED IN THE ENERGY CODE, THE LARGER VALUES SHALL DE USED. . 2.04 DUCT SYSTEM INSULATION A. INSULATE ALL SUPPLY AND RETURN DUCTWORK WITH FSK GLASS FIBER INSULATION HAVING A MINIMUM INSTALLED R -VALUE OF 1 AND. VAPOR BARRIER JACKET. UNLESS INDICATED W/ DUCT LINING. PART 5.00 - EXECUTION . 5.01 INSTALLATION - PIPE AND DUCT INSULATION A. EXAMINE AREAS AND CONDITIONS UNDER WHICH MECHANICAL INSULATION WILL BE INSTALLED. 00 NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. B. INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN • INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES TO ENSURE THAT INSULATION SERVES ITS INTENDED PURPOSE. G. INSTALL INSULATION ON MECHANICAL SYSTEMS SUBSEQUENT TO TESTING AND ACCEPTANCE OF TESTS. D. CLEAN AND DRY MECHANICAL SURFACES PRIOR TO INSULATING. BUTT INSULATION JOINTS FIRMLY TOGETHER TO ENSURE COMPLETE AND TIGHT FIT OVER SURFACES TO BE COVERED. E. MAINTAIN INTEGRITY OF VAPOR - BARRIER JACKETS ON MECHANICAL INSULATION, AND PROTECT. TO PREVENT PUNCTURE OR OTHER DAMAGE, F. COVER VALVES, FITTINGS AND SIMILAR ITEMS IN EACH PIPING SYSTEM WITH EQUIVALENT THICKNESS AND COMPOSITION OR EFFICIENCY OF INSULATION AS APPLIED TO ADJOINING PIPE RUN. G. EXTEND MECHANICAL INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS AND SIMILAR PIPING PENETRATIONS, EXCEPT WHERE OTHERWISE INDICATED, H. INSTALL PROTECTIVE METAL SHIELDS AND INSULATED SADDLES TO PREVENT COMPRESSION OF INSULATION. . I. REPAIR DAMAGED SECTIONS OF EXISTING MECHANICAL INSULATION, DAMAGED DURING THIS CONSTRUCTION PERIOD. USE INSULATION OF SAME THICKNESS AS EXISTING INSULATION, INSTALL NEW JACKET LAPPING AND SEALED OVER EXISTING. END OF SECTION 15250 SECTION 15400 - PLUMBING I. 00 - GENERAL 1.01 SCOPE OF WORK FURNISH AND INSTALL COMPLETE AND OPERATIONAL PLUMBING SYSTEM AS INDICATED ON THE DRAWINGS AND IN THIS SPECIFICATION. WORK SHALL INCLUDE, EUT NOT BE LIMITED TO THE FOLLOWING: 1.0/ ELECTRICAL WORK A. WATER, WASTE AND VENT PIPING SYSTEMS. B. VERIFYING LOCATION OF EXISTING AND CONNECTIONS TO BUILDING WATER AND SEWER SYSTEMS. C. ACCESS PANELS AS SHOWN AND REQUIRED BY .ODE. . D. • HANGERS, SUPPORTS AND GUIDES, . E. BACKING AND SECURING OF FLOOR AND WALL PENETRATIONS. F. CAULKING AND SEALING OF FLOOR AND WALL PENETRATIONS. G. PLUMBING FIXTURES, TRIM AND ACCESSORIES. H. GUTTING, DRILLING AND PATCHING FOR PLUMBING SYSTEMS. I. CLEANUP OF JOB SITE AND FIXTURES. J. LICENSES, PERMITS AND FEES. 1.02 RELATED WORK INCLUDED UNDER OTHER SECTIONS A. A.HVA. SECTION I5P'4O B. B.TESTING AND BALANCING SECTION 15 C. C.ELECTRICAL SECTION 16000 . D. D.FIRE PROTECTION SECTION 15500 1.05 EXAMINATION OF SITE A. A.GONTRAGTOR SHALL VISIT SITE AID VERIFY ALL EXISTING CONDITIONS PRIOR TO SUBMITTING DID TO FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS INCLUDING ENTRANCE AND EXIT FACILITIES, ELEVATOR LIMITATIONS, HOURS OF PERMITTED BY THE BUILDING FOR TRANSPORTATION OF EQUIPMENT AND MATERIALS. CONTRACTOR SHALL SATISFY HIMSELF AS TO THE NATURE AND SCOPE OF THE WORK AND DIFFICULTIES THAT AFFECT THE EXECUTION AND COMPLETION OF THE WORK. THE CONTRACTOR SHALL EXAMINE ALL EXISTING THE SITE AND DETERMINE WHERE THE EXISTING SEWER, WATER AND GAS ARE LOCATED FOR THE PURPOSE OF CONNOTING NEW SYSTEMS. 1.05 RULES AND REGULATIONS REVIEWED FOR CODE COMPLIANCE APPROVED SEP - 5 2008 City Of Tukwila INC DIVISION ION -- - B�llli� IVI .�..�. • B.SUDMISSION OF A BID WILL BE CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS REQUIRED, OR FOR ANY DIFFICULTIES ENCOUNTERED WHICH GOULD HAVE BEEN AVOIDED HAD A PROPER EXAMINATION BEEN MADE WILL.NOT BE COMPENSATED FOR OR RECOGNIZED. . 1.04 DRAWINGS A. A.THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF EQUIPMENT, PIPING, AND FIXTURES. B. B.THE CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL CONTRACT DRAWINGS AND DRAWINGS OF OTHER TRADES. C. ..THE CONTRACTOR SHALL WITHOUT EXTRA CHARGE, MAKE REASONABLE MODIFICATIONS IN THE LAYOUT AS NEEDED TO PREVENT CONFLICT WITH WORK OR OTHER TRADES AND STRUCTURAL MEMBERS OR FOR THE PROPER EXECUTION OF WORK. 1.05 RULES AND REGULATIONS A. A.THE WORK AND MATERIALS SHALL CONFORM AND COMPLY WITH THE ORDINANCES, PLUMBING CODE AND MECHANICAL C ODE OF THE AUTHORITY HAVING JURISDICTION INCLUDING THE NATIONAL ELECTRICAL CODE, NATIONAL FIRE PROTECTION ASSOCIATION AND LANDLORDS DESIGN CRITERIA MANUAL. . FURNISH WITHOUT ANY EXTRA CHARGE, ANY ADDITIONAL MATERIAL AND LABOR WHEN REQUIRED TO COMPLY WITH THESE LAWS, ORDINANCES AND CODES THOUGH THE WORK BE NOT MENTIONED IN THIS DIVISION OR SHOWN ON THE DRAWINGS. . . . . • B.CONTRACTOR SHALL OBTAIN ALL APPROVALS, TESTS, INSPECTIONS AND PERMITS, AND PAY ALL NECESSARY FEES FOR ALL WORK PERTAINING TO THIS PROJECT. ALL AGENCIES HAVING JURISDICTION SHALL BE COMPILED WITH: 1.06 SHOP DRAWINGS AND MATERIALS SUBMITTALS 1.06 SHOP DRAWINGS AND MATERIALS SUBMITTALS . A. A.SUI3MIT FOR REVIEW TO OWNER (6 COPIES) A COMPLETE AND ALL - INCLUSIVE LIST OF ALL EQUIPMENT AND MATERIALS PROPOSED FOR. USE, ACCOMPANIED BY MANUFACTURER *S DATA SHEETS GIVING SIZES, .APA.ITIES, ET.. DATA SHALL BE FORWARDED IN A SINGLE PACKAGE WRITTEN 15 DAYS AFTER AWARD OF CONTRACT. CONTRACTOR SHALL NOT INSTALL ANY EQUIPMENT WITHOUT ENGINEER'S APPROVAL. D. ES.A SET OF ''AS- BUILT" DRAWINGS SHALL BE PREPARED DY THE CONTRACTOR SHOWING ALL EQUIPMENT AND PIPING AS INSTALLED IN THE FIELD, INCLUDING ALL SIZES AND CHANGES TO THE ORIGINAL DESIGN. A SET OF REPRODUGIBLES, ALONG WITH ONE SET OF BLUEPRINTS OF THESE "AS- BUILTS" SHALL BE DELIVERED TO OWNER UPON COMPLETION OF THE WORK AND PRIOR TO FINAL ACCEPTANCE OF THIS PROJECT. G. G.THE CONTRACTOR SHALL COORDINATE THE WORK WITH ARGHITEEGTURAL DRAWINGS AND WORK OF OTHER TRADES. . COPYRIGHT NOTICE These drawings and specifications aro copyrighted and subject to copyright protection as an "architectural work" under sec. 102 of the copyright act, 17 u.S.C. As amended december 1990. The protection includes, without limitation, the overall form, arrangement and composition of spaces, and alemants of the design. Under such protection, unauthorized use of these drawings and specifications may result in cessation of construction, building seizure, and /or monetary liability. 14 F W W Woo z W (� Z? z t x - w E UM ri o 2: Z Q 6 f( w Q rn 4 �n co 1, • tV tit • w Q1 N C m 4n 1-- E 8 Ci 0 E ECEIVED ED AUG 21 2008 PERMIT CENTER DATE: SCALE: DRAWN BY: PROJECT Na.: -, 40 r.rr to 4 o CX) L al 1 5 it 0 CD 0 - ula fo VI V i R V oi) c ryzi 0 08.14.08 SHEET TM130501' 1. z 0 P LLJ In N In CO oa C N N rr E o. V Q � to h Q Q GC rt. Iv a H 0 t'0 E O IN 1/4" =1' -0 STAFF 1V1300 AREA/CEILING HEAD TYPE FLUSH TYPE CONCEALER HEAD FINISH PLAIN CAP /ESCUTCHEON FINISH WHITE SUSPENDED I HARD CEILING AREAS W/0 SUSPENDED CEILING UPRIGHT PLAIN - FALSE WOOD SOX BEAMS FLUSH TYPE CONCEALER PLAIN ANTIQUE BASS WHERE REQUIRED SIDE WALL SATIN CHROME SATIN CHROME SUBJECT TO FREEZING PRY PENDANT DRY SIDE WALL SATIN • CHROME SATIN CHROME 1.01 ELECTRICAL WORK A. • THE FOLLOWING ELECTRICAL WORK SHALL BE PAT OF DIVISION 13 PERFORMED IN ACCORDANCE WITH DIVISION 16 SPECIFICATIONS. B. PLUMBING CONTRACTOR SHALL VERIFY THE ELECTRICAL CHARACTERISTICS REQUIRED OF ALL EQUIPMENT WITH THE ELECTRICAL DRAWINGS, ELECTRICAL CONTRACTOR, AND FIELD CONDITIONS PRIOR TO ORDERING ANY EQUIPMENT. C.. ALL POWER WIRING SHALL BE BY ELECTRICAL CONTRACTOR. LOS OPERATION MANUALS AND OWNER INSTRUCTIONS A. CONTRACTOR SHALL FURNISH OPERATING AND MAINTENANCE INSTRUCTION AT THE COMPLETION OF THE INSTALLATION. SUBMIT THREE COPIES OF BOUND MANUALS. B. AT THE COMPLETION OP WORK THE CONTRACTOR SHALL IN THE CONJUNCTION WITH THE OWNER'S REPRESENTATIVES, ARRANGE A MEETING FOR FULL INSTRUCTION OF ALL DETAILS OF OPERATION AND MAINTENANCE FOR THE EQUIPMENT PROVIDED. CONTRACTOR SHALL PROVIDE EQUIPMENT CHECK LIST SHOWN ON THOSE DRAWINGS. LOCI CUTTING ANP PATCHING A. A.THE CONTRACTOR SHALL. DO ALL GUTTING, DRILLING AND PATCHING WHICH MAY BE REQUIRED FOR THE INSTALLATION OF THE WORK UNDER THIS SPECIFICATION. B. B.PATCHIN6 SHALL BE OF THE SAME WORKMANSHIP, MATERIAL AND FINISH, AND SHALL MATCH ACCURATELY ALL SURROUNDING CONSTRUCTION IN A MANNER SATISFACTORY TO THE ARCHITECT /ENGINEER. C. NO CUTTING OF THE STRUCTURE SHALL BE PERMITTED WITHOUT WRITTEN APPROVAL OF THE ARCHITECT /ENGINEER. D. EXISTING UTILITIES ETC. THAT ARE DAMAGED DURING THE CONSTRUCTION PERIOD, WHETHER OR NOT DUE TO THE CONTRACTOR'S NEGLIGENCE= SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AND LEFT IN A CONDITION SATISFACTORY TO THE ENGINEER. ' E. PROVIDE FIRE - SAFTING WHERE PENETRATIONS OCCUR IN RATED ASSEMBLIES. FIRE- SAFTING SHALL MAINTAIN THE INTEGRITY OF THE ASSEMBLY. 1.10 GUARANTEE . A. THE CONTRACTOR SHALL LEAVE THE ENTIRE INSTALLATION IN COMPLETE WORKING ORDER FREE FROM ANY DEFECTIVE MATERIAL, WORKMANSHIP OR FINISH. HE SHALL GUARANTEE TO REPAIR OR REPLACE, WITHOUT CHARGE, DEFECTS DUE TO FAULTY WORKMANSHIP OR MATERIALS FOR A PERIOD OP ONE YEAR FROM THE DATE OF FILING OF THE NOTICE OF COMPLETION. 2.00 - PRODUCTS 2.01 PIPE AND FITTINGS A. PIPE I. SANITARY WASTE AND VENT: STANDARD WEIGHT CAST IRON AND FITTINGS WITH "NO -HUB" COUPLINGS. A.TYPE DWV COPPER WITH SANITARY DRAINAGE FITTINGS MAY BE USED. . 2. DOMESTIC HOT AND COLD WATER PIPING: TYPE "L" HARD PRAWN . COPPER PIPE AND WROUGHT COPPER FITTINGS WITH 4 15 -5 TIN - ANTIMONY SOLDER. TYPE "K1' UNDERGROUND WITH SILVER SOLDER JOINTS. 2.02 HANGERS AND SUPPORTS A. SUPER STRUT, GRINNEL OR APPROVED EQUAL. PROVIDE WHERE REQUIRED BY CODE. A LAYER OF 15 LB. FELT SHALL BE PLACED BETWEEN COFFER AND FERROUS MATERIAL. 2.05 VALVES A. BALL VALVES: 2" AND SMALLER, STAINLESS STEEL iBALL. 4 STEM, BRONZE BODY, 600 PSI WOG RATED, FULL PORT; NIBCO OR WATTS. B. CHECK VALVES: 2 1/2" AND SMALLER, STOGKHAM B50 BRONZE VALVE, SWING. CHECK VALVE, CLASS 125. C. HOSE. SIBS: CHICAGO, WOODLAND MODE=L 24 OR EQUAL WITH VACUUM BREAKER AND TAMPER PROOF WITH LOOSE KEY. D. TRAP PRIMER: PRECISION PRODUCTS CO. P -1 OR P -2. 3.00 INSTALLATION AND EXECUTION 5.01 INSTALLATION A. GENERAL I. INSTALL PIPING AND APPURTENANCES IN ACCORDANCE. WITH MANUFACTURER *S INSTALLATION PROCEDURES, APPLICABLE GORES AND STANDARDS, AND AS SPECIFIED. 2. COORDINATE PIPING INSTALLATION WITH OTHER WORK TO AVOID INTERFERENCE. COORDINATE AS NECESSARY TO ENSURE THAT ALL HANGERS, SUPPORTS, SLEEVES, AND OTHER BUILT -IN DEVICES ARE INCORPORATED IN FORMS OR MASONRY TO AVOID NECESSITY OF GUTTING FINISHED STRUCTURE. 5. ALL MEASUREMENTS, BOTH HORIZONTAL AND VERTICAL, SHALL BE BASED ON ESTABLISHED LINES AND LEVELS. VERIFY ALL MEASUREMENTS AT SITE AND CHECK THE CORRECTNESS OF SAME AS RELATED TO THE WORK. 4. PROVIDE VALVES AT ALL EQUIPMENT SO THAT IT CAN 13E EASILY REMOVED. 5. ALL BRANCH PIPING SHALL HAVE ACCESSIBLE SERVICE VALVES. PROVIDE ACCESS PANELS AS REQUIRED. B. PIPING I. INSTALL PIPING AS SHOWN ON THE DRAWINGS AND STRAIGHT AND DIRECT AS POSSIBLE, FORMING RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS, NEATLY SPACED WITH RISERS PLUMB AND TRUE. NO COMPRESSION FITTINGS SHALL I3E ALLOWED. 2. PIPING SHALL PITCH BACK TOWARD SYSTEM DRAIN VALVE AND ANY INSTALLED LOW POINTS OR POCKETS SHALL HAVE A HOSE AND DRAIN VALVE. 3. ERECT ALL PIPING TO OBTAIN SUFFICIENT FLEXIBILITY TO PREVENT EXCESSIVE BENDING MOMENTS AT JOINTS OR CONNECTIONS. 4. ARRANGE WATER PIPING SO THAT SYSTEM CAN BE COMPLETELY DRAINER. WHERE LINES ARE PURPOSELY PITCHED FOR DRAINAE, A UNIFORM GRADE SHALL BE MAINTAINED: LINES SHALL BE SO SUPPORTED AS TO PREVENT POCKETING OF WATER, NO LINES SHALL HAVE POCKETS DUE TO CHANGES IN ELEVATION UNLESS PROPER PROVISIONS FOR DRAINAGE ARE MADE. 5. INSTALLED PIPING SHALL NOT INTERFERE WITH THE OPERATION OR ACCESSIBILITY OF DOORS AND WINDOWS SHALL NOT ENCROACH ON ARLES, PASSAGEWAYS ANP EQUIPMENT, AND SHALL NOT INTERFERE WITH THE SERVICING OR MAINTENANCE OF ANY EQUIPMENT. ADJACENT PIPELINES SHALL BE GROUPED IN THE SAME HORIZONTAL OR VERTICAL PLANE. S. INSTALL INSULATING UNIONS IN WATER PIPING BETWEEN COPPER PIPING AND FERROUS PIPING. 1. INSTALL UNIONS ADJACENT TO VALVES AND WHERE NECESSARY TO FACILITATE DISASSEMBLY OF PIPING. S. SUPPORT PIPING INDEPENDENTLY OF EQUIPMENT TO WHICH IT IS CONNECTED. 3.02 HYDROSTATIC TESTS A. STORM AND SANITARY DRAINAGE AND VENTS I. TIGHTLY CLOSE ALL OPENINGS IN THE ENTIRE SYSTEM AND PILL IT WITH WATER TO THE POINT OF OVERFLOWING ABOVE THE ROOF. THE WATER LEVEL SHALL ESE MAINTAINED FOR 24 HOURS. 2. WHEN PIPING IS TESTED IN SECTIONS, TEST PIPING WITH A PRESSURE EQUIVALENT TO A 10 FOOT WATER HEAD. THE WATER LEVEL SHALL BE MAINTAINED FOR 24 HOURS. 3. FOR PIPING ADDED, RELOCATED OR REPLACED ON EXISTING SYSTEM, INSTALL A TEST TEE AT THE LOWEST ELEVATION OF EACH ADDED,• RELOCATED OR .REPLACED PIECE OF PIPE AND PILL IT WITH WATER TO THE OVERFLOW LEVEL OF THE NEXT HIGHEST FIXTURE OUTLET OR DRAIN. THE WATER LEVEL SHALL SE MAINTAINED FOR 24 HOURS. B. 'DOMESTIC WATER I. CAP OR PLUG ALL OUTLETS, APPLY A HYDROSTATIC PRESSURE OP 150 PSI AND SUSTAIN SUCH PRESSURE FOR 24 HOURS. 2. FOR PIPING ADDED, RELOCATED OR REPLACED ON EXISTING SYSTEMS, APPLY A HYDROSTATIC PRESSURE OF SO PSI ABOVE THE EXISTING PRESSURE FOR 24 HOURS. END OF SECTION SECTION I55OO FIRE PROTECTION SYSTEM. PART I - GENERAL 1.01 DESCRIPTION A. GENERAL INFORMATION: I. THE OTHER CONTRACT DOCUMENTS COMPLEMENT THE REQUIREMENTS or THIS SECTION. 2. REQUIREMENTS OF DIVISION 0 AND DIVISION I APPLY TO THE WORK OF THIS SECTION. 1.02 WORK INCLUDED A. INSIDE AND OUTSIDE PIPING, INCLUDING SPRINKLER HEAPS, VALVES, HANGERS AND SUPPORTS, SLEEVES, AND ACCESSORIES. . B. THE DRAWINGS SHOW THE LOCATION OF SOME OF THE COMPONENTS. THE CONTRACTOR SHALL PROVIDE A COMPLETE DESIGN AND INSTALLATION TO PROVIDE SPRINKLER PROTECTION FOR THE AREAS SHOWN CONFORMING TO ALL NFPA 13 REQUIREMENTS AND LOCAL JURISDICTION REQUIREMENTS. C. SPRINKLER EQUIPMENT LAYOUT AND INSTALLATION APPROVED BY APPLICABLE FIRE DEPARTMENT. I. PROVIDE SPRINKLER PROTECTION FOR THE BUILDING, INCLUDING COMBUSTIBLE VOID SPACES, CEILING SPACES, ATTIC SPACES, AND IN AGGORDANCE WITH NFPA 13 AND LOCAL JURISDICTION REQUIREMENTS.. NOTE THAT SMOKE /HEAT DETECTORS WiLL NOT BE PROVIDED IN VOID SPADES, THEREFORE SPRINKLER PROTECTION IS REQUIRED ABOVE CEILINGS AND IN VOID SPACES. A. SPRINKLER EQUIPMENT LAYOUT AND INSTALLATION APPROVED BY APPLICABLE FIRE DEPARTMENT. B. EQUIPMENT AND INSTALLATION TO MEET REQUIREMENTS OF NFPA NO. 15, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS. C. ONLY CONTRACTORS AND WORKMEN EXPERIENCED IN, AND REGULARLY•ENGAGED IN, THE INSTALLATION OF FIRE SPRINKLER SYSTEMS SHALL BE PERMITTED TO INSTALL THE SPECIFIED SYSTEM(S). THE SPRINKLER CONTRACTOR SHALL MEET ALL LEGAL REQUIREMENTS REQUIRED E3Y THE STATE OR LOCAL JURISDICTION AND SHALL BE LICENSED TO PREPARE SPRINKLER DRAWINGS AND INSTALL FIRE PROTECTION SYSTEMS. D. THE GENERAL CONTRACTOR AND THE SPRINKLER SUB - CONTRACTOR SHALL MEET WITH THE LOCAL BUILDING DEPARTMENT AND FIRE DEPARTMENT TO REVIEW PROCEDURES FOR HANDLING SUBMITTALS:, INSPECTION, TESTING, AND FOR GENERAL GOOW INATI ON. E. PROVIDE ARCHITECT WITH A LETTER OF APPROVAL FROM THE FIRE MARSHAL AFTER INSTALLATION IS COMPLETE. 1.04 REFERENCE STANDARDS . A. NPPA STANDARD NO. 13, CURRENT EDITION: SPRINKLER SYSTEMS. S. UNDERWRITERS LABORATORIES APPROVEP FIRE PROTECTION EQUIPMENT LIST. 1.05 SU 3MITTALS A. SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH SECTION 01500. B. SUBMIT PRELIMINARY LAYOUT SHOWING ONLY HEAP LOCATIONS FOR REVIEW BY ARCHITECT/ENGINEER. FURNISH ADDITIONAL HEADS WHICH MAY BE REQUIRED FOR COORDINATED CEILING PATTERN WITHOUT ADDED COST, EVEN THOUGH NUMBER OF HEADS MAY EXCEED MINIMUM COPE REQUIREMENTS. AT 2. X 4 GRIP CEILINGS, HEADS SHALL BE LOCATED A MINIMUM OF 2" FROM ANY GRID MEMBER. . C. SUBMIT SHOP DRAWINGS STAMPED BY A LICENSED INDIVIDUAL (MINIMUM OF NIGET LEVEL III OR REGISTERED FIRE PROTECTION ENGINEER) OF THE ENTIRE SPRINKLER SYSTEM, FOR REVIEW SY ARCHITECT FOR HEAP LOCATIONS. AFTER ARCHITECTS COMMENTS HAVE SEEN ADDRESSED SUBMIT SHOP DRAWINGS TO BUILDING DEPARTMENT /FIRE MARSHAL FOR APPROVAL. COMPLETION OF SHOP DRAWINGS SHALL BE DONE SO THAT FIRE MARSHAL CAN REVIEW FIRE ALARM SHOP DRAWINGS WITH FIRE SPRINKLER SHOP DRAWINGS. COORDINATE AS REQUIRED WITH FIRE ALARM SUS- CONTRACTOR. D. OBTAIN AND SUBMIT FROM EACH AUTHORITY HAVING JURISDICTION WRITTEN CERTIFICATION THAT THE PERMANENT INSTALLATION HAS BEEN INSPEC'T'ED SY . THE AUTHORITY AND THAT IT COMPLIES WITH ALL DETAILS OF THE AUTHORITY'S PUBLISHED REGULATIONS AND REQUIREMENTS. . E. SUBMIT FOUR COPIES OP NFPA RECOMMENDED PRACTICE NO. 13A: CARE AND MAINTENANCE OF SPRINKLER SYSTEMS. 1.06 ADDITIONS OR DELETIONS A. NO CHANGE ORDERS WILL BE ISSUED FOR ADDITIONS OR DELETIONS OF SPRINKLERS EXCEPT AS SUCH ADDITIONS OR DELETIONS STEM FROM CHANGES IN BUILDING CONSTRUCTION MADE SUBSEQUENT TO APPROVAL OF SPRINKLER SYSTEM SHOP DRAWINGS. 1.07 SYSTEM DESIGN A. GENERAL: DESIGN AND INSTALL SYSTEMS SO THAT NO PARTS INTERFERE WITH DOORS, WINDOWS, HEATING, PLUMBING, AIR - CONDITIONING SYSTEMS, OR ELECTRICAL EQUIPMENT. COMPLY WITH REQUIREMENTS OF NFPA NO. 13. SPRINKLER SUB- CONTRACTOR IS REQUIRED TO FULLY COORDINATE SPRINKLER. WORK WITH ALL OTHER TRADES. PIPING SHALL NOT RUN OVER TOP OF ELECTRICAL PANELS OR SWITCH GEAR. . B. HYDRAULIC CALCULATIONS; PREPARE IN ACGORPANCE WITH CHAPTER '7 OF NPPA NO. 13. G. SYSTEM LAYOUT: . I. SPACE, LOCATE, AND POSITION SPRINKLER HEADS ACCORDING TO NPPA NO. 15 AND AS SHOWN ON THE DRAWINGS AND AS REQUIRED BY LOCAL FIRE DEPARTMENT AND BUILDING DEPARTMENT. 2. PIPE SIZES AND CONFIGURATIONS SHALL SE ON THE BASIS OF HYDRAULIC CALCULATIONS. 5. PROVIDE RISERS, FLOW SWITCHES, INSIDE SHUT -OFF VALVES, TAMPER SWITCHES, POST INDICATOR VALVES, SACK FLOW PREVENTERS AND VAULTS, ETC., AS REQUIRED: 4. PROVIDE IN GENERAL, ORDINARY HAZARD WET SPRINKLER COVERAGE. PROVIDE ORDINARY HAZARD COVERAGE WHERE REQUIRED BY AUTHORITIES HAVING JURISDICTION. 5. PROVIDE ALL TAMPER SWITCHES, VALVES, ETC. REQUIRED. THE SYSTEM SHALL HAVE CONTROL STATION SUPERVISION. 2.00 - PRODUCTS . 2.01 ACCEPTASLE MANUFACTURERS A. MANUFACTURER OF EQUIPMENT SPECIFIED IN THIS SECTION SHALL ESE REGULARLY ENGAGED IN THE MANUFACTURE OF COMPONENTS SPECIFIED AND SHALL PUBLISH CATALOGS LISTING ALL PERTINENT SPECIFICATIONS OF ITEMS MANUFACTURED.. B. MANUFACTURERS NAME AND MODEL IDENTIFICATION USED THROUGHOUT THIS SECTION IS TO ESTABLISH GENERAL CONFIGURATION, FUNCTION, SIZE, PERFORMANCE AND QUALITY. C. ALL EQUIPMENT, MATERIAL, AND COMPONENTS SHALL BE U.L. LISTED OR APPROVED BY THE LOCAL AUTHORITY. HAVING JURISDICTIONN. D. SUBSTITUTIONS: NOT ALLOWED. 2.02 SPRINKLER HEADS . A. • PROVIPE AUTOMATIC SPRAY TYPE SPRINKLER HEADS OF THE FOLLOWING TYPE AND FINISH FOR THE AREAS, AND CEILING CONSTRUCTION DESIGNATED: B. MANUFACTURER AND TYPE: I. FLUSH TYPE CONCEALER: VIKING HORIZON MIRAGE MODEL VK404 CONCEALED AUTOMATIC CEILING SPRINKLER. 2. UPRIGHT: RELIABLE MODEL G UPRIGHT OR APPROVED VIKING EQUAL. 3. SIPE WALL: RELIABLE MODEL PI WITH I/2 -INCH ORIFICE OR APPROVED VIKING EQUAL. 4. DRY PENDENT OR SIDE WALL: RELIABLE MODEL G3 AND GSA DRY SPRINKLERS WITH 1/2" ORIFICE OR APPROVEP VIKING EQUAL. C.. OPERATING TEMPERATURE: PER NFPA 13. SELECT TO COMPENSATE FOR THE MAXIMUM TEMPERATURES WHICH OCCUR IN A PARTICULAR AREA DURING EITHER WINTER OR SUMMER CONDITIONS FROM SUCH SOURCES AS UNIT HEATERS AND SUNLIGHT. D. EXTENDED COVERAGE SPRINKLERS MAY BE USED SUBJECT TO AUTHORITY HAVING JURISDICTION. 2.03 ESCUTCHEONS A. PROVIDE SELF - ADJUSTING TYPE, SPRING - LOADED, OR FRICTION FIT ON EACH PENDANT SPRINKLER HEAD FITTING AGAINST CEILING. 2.04 SPARE HEADS AND SPRINKLER WRENCHES A. PROVIDE SPARE HEADS AND ONE SET OF. WRENCHES. THE NUMSER OF SPARE HEADS FURNISHED SHALL BE NOT LESS THAN I PERCENT OF THE NUMSER OF EACH TYPE OF HEAD INSTALLED IN THE SYSTEM. HEADS AND WRENCHES MOUNTED IN A SHEET METAL CABINET MARKED ''AUTOMATIC SPRINKLERS - RESERVE SUPPLY ". 2.05 WAT FLOW INDICATORS (FLOW SWITCHES) . A. PROVIDE VANE TYPE FLOW SWITCH WHERE INDICATED ON DRAWINGS AND WHERE REQUIRED. GRINNELL MODEL F62O OR WFD. . 2.06 VALVE MONITORING SWITCHES . A. PROVIPE SUPERVISORY DEVICE FOR EACH 054Y GATE VALVE ANP EACH VALVE REQUIRING SUPERVISION. GRINNELL MODEL F640. PROVIDE ALSO FOR P.I.V.'S SHOWN ON CIVIL DRAWINGS. 2.01 DETECTION CHECK VALVE ASSEMBLY A. CENTRAL SPRINKLER CORPORATION, RISER CHECK VALVE WITH TRIM, MODEL C IO (SHOTGUN-10). PROVIDE DETECTION CHECK VALVES FOR WET SYSTEMS, COMPLETE WITH FITTINGS, INTERCONNECTING .PIPING, TAMPER SWITCHES AND DEVICES REQUIRED FOR VALVE OPERATION. . 5.00 - EXECUTION 5.01 INSTALLATION A. RUN PIPING CONGEALED ASOVE FURRED CEILINGS TO MINIMIZE OBSTRU CTIONS. EXPOSE ONLY HEADS. ONLY SPRINKLER PIPING SPECIFICALLY GALLED OUT ON DRAWINGS AS BEING EXPOSED SHALL BE BELOW CEILING CONSTRUCTION. RUN PIPING THROUGH HOLES IN SEAMS WHERE SO NOTED ON DRAWINGS. B. PROVIDE I-INCH DIAMETER NIPPLE AND I X 1/2 -INCH REDUCING FITTING FOR EACH UPRIGHT HEAD. G. INSTALL SYSTEM AND AUXILIARY DRAINS TO DISCHARGE TO THE OUTSIDE AT PLANTER AREAS, TO A SUITABLE WASTE WITHIN THE BUILDING OR TO OTHER LOCATIONS AS INDICATED OR REQUIRED BY THE AUTHORITY HAVING JURISDICTION. DRAINS SHALL NOT DISCHARGE ONTO WALKWAYS OR PAVING. DRAIN LOCATIONS SHALL BE APPROVED BY THE ARCHITECT. LABEL PANEL "SPRINKLER SYSTEM DRAIN VALVE 4 ;32, ETC. ".. PROVIDE MAIN SPRINKLER SYSTEM DRAIN. • D. INSTALL TEST PIPES PER NFPA AND THE LOCAL INSPECTION AUTHORITY, WITH DISCHARGE PIPE TO A SUITABLE DRAIN. NAMEPLATE LEGEND TO READ "WATER SUPPLY TEST VALVE ". REFER TO COORDINATION REQUIREMENTS IN PARAGRAPH 1.01. THE INSTALLER OF THE FIRE PROTECTION (SPRINKLERS) SHALL BE FAMILIAR WITH THE ARCHITECTURAL CONSTRUCTION OF THE BUILDING. THE INSTALLER SHALL REVIEW ALL CONTRACT DOCUMENTS. SPRINKLER PIPING SHALL NOT: a. REDUCE HEADROOM TO LESS THAN 11 -0" b. PROJECT INTO ANY CATWALK, PASSAGEWAY, LADDER RUN, Access E SS OR EGRESS. c. INTERFERE WITH ELECTRICAL EQUIPMENT OR ACCESS TO MECHANICAL UNITS (INCLUDING FILTERS). SPRINKLER PIPING WHICH, IN THE OPINION OP THE ARCHITECT, DOES NOT COMPLY WITH ANY OF THE. ABOVE SHALL BE RELOCATED IN A MANNER WHICH IS ACCEPTABLE TO THE ARCHITECT. SUCH RELOCATION MAY BE DIRECTED DURING SHOP DRAWING REVIEW AND /OR DURING CONSTRUCTION. IF DOUBT SHOULD EXIST AS TO THE COMPLIANCE OF THE ABOVE, THE CONTRACTOR OR INSTALLER SHALL REVIEW THE SITUATION WITH THE ARCHITECT PRIOR TO ROUGH -IN. G. NO FIRE PROTECTION WORK SHALL BE PONE WITHOUT APPROVED SHOP DRAWINGS. . . 5.02 IDENTIFICATION A. STANDARD SIGNS AS ADOPTED BY THE AUTOMATIC SPRINKLER INDUSTRY. SUBMIT SHOP DRAWINGS AND SPECIFICATIONS OF SIGNS. I. FOR COMBINATION TEST AND DRAIN: LEGEND TO REAP "WATER SUPPLY TEST AND DRAIN VALVE" E. F. 5.03 TESTING A. UPON COMPLETION OF THE FIRE SPRINKLER SYSTEM INSTALLATION, TEST AND RETEST THE COMPLETE INSTALLATION AND MAKE ALL CORRECTIONS AS NECESSARY TO SECURE ACCEPTANCE BY THE LOCAL FIRE MARSHAL. FURNISH ALL TEST EQUIPMENT AND PERSONNEL REQUIRED. . $.04 ACCEPTANCE . A. PRIOR TO THE OPENING DATE, INSTRUCT THE OWNERS AND 'THEIR SELECTED PERSONNEL IN THE OPERATION OF THE SPRINKLER SYSTEM. TAKE SPECIAL CARE TO ENSURE THAT THE OWNER WILL: I: IMMEDIATELY RECOGNIZE WHETHER THE MAIN VALV IS IN OPEN OR CLOSED POSITION. 2. KNOW HOW TO DRAIN THE SYSTEM. 3. KNOW HOW TO TEST THE ALARM VALVE. 4. SE FAMILIAR WITH THE EXISTENCE AND CONTENTS OF THE MATERIAL INCLUDED IN THE OPERATING AND MAINTENANCE MANUAL DESCRIBED HEREIN. . 1:04 JOB CONDITIONS • A. WORK WILL NOT PROCEED WITH TESTING, ADJUSTING AND BALANCING WORK UNTIL WORK HAS BEEN COMPLETE» AND IS OPERABLE. ENSURE THAT THERE IS NO LATENT. RESIDUAL WORK STILL TO DE COMPLETED. • INFORM ARCHITECT IN WRITING WHEN PROJECT IS READY FOR ADJUSTING AND BALANCING. . B. REFER TO LANDLORD TENANT CRITERIA MANUAL FOR SYSTEM BALANCING REQUIRED AS PART OF TENANT WORK. 2.00 - PRODUCTS 2.01 GENERAL A. MECHANICAL SUB CONTRACTOR SHALL PROVIDE ALL MOTORS, SHEAVES, BELTS, LADDERS, ETC.. AS , REQUIRED FOR BALANCER TO ACCOMPLISH WORK. B. BALANCING SUS CONTRACTOR SHALL SE HIRED BY THE DIVISION 0 AT THE DIVISION 0 EXPENSE. BALANCING CONTRACTOR SHALL SE AN INDEPENDENT CONTRACTOR, SEPARATE COMPANY FROM THE MECHANICAL SUS CONTRACTOR: COORDINATE WITH LANDLORD, LANDLORD MAY REQUIRE SPECIFIC CONTRACTOR FOR BALANCING. 5.00 - EXECUTION . 5.01 GENERAL END OP SECTION 15500 A. EXAMINE INSTALLED WORK AND CONDITIONS UNDER WHICH TESTING IS TO BE PONE TO ENSURE THAT WORK HAS BEEN COMPLETED, CLEANED AND IS OPERABLE. DO NOT PROCEED WITH TAB WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED IN MANNER ACCEPTABLE TO TESTER. • S. TEST, ADJUST AND BALANCE AIR CONDITIONING SYSTEMS AND COMPONENTS, AS INDICATED, IN ACCORDANCE WITH PROCEDURES OUTLINED IN APPLICABLE STANDARDS. REFER TO LANDLORD TENANT CRITERIA MANUAL FOR SYSTEM BALANCING REQUIRED AS PART OF TENANT WORK. C. PREPARE REPORT OF TEST RESULTS IN. FORMAT RECOMMENDED SY Al PLICASLE STANDARDS. . D. PATCH HOLES IN INSULATION, DUCTWORK. AND HOUSING, WHICH HAVE SEEN CUT OR DRILLED IN MANNER RECOMMENDED SY THE ORIGINAL INSTALLER. E. MARK EQUIPMENT SETTINGS, INCLUDING PAMPER. CONTROL POSITIONS,, VALVE INDICATORS, FAN SPEED CONTROL LEVERS, AND SIMILAR CONTROLS AND DEVICES, TO SHOW FINAL SETTINGS AT COMPLETION OF SALANCE WORK. PROVIDE MARKINGS WITH PAINT OR OTHER SUITABLE PERMANENT IDENTIFICATION MATERIALS. F. INITIAL BALANCING SHALL INCLUDE BALANCING ALL AIR QUANTITIES TO WITHIN 10% OF THOSE LISTED ON THE DRAWINGS. G. BALANCER SHALL THEN CHECK ALL BUILDING TEMPERATURES AND READJUST AIR QUANTITIES TO EVEN OUT SPACE TEMPERATURES. TO WITHIN I DEG. F WITHIN SPACES. H. TESTING, ADJUSTING AND BALANCING REPORT MUST BE COMPLETE AND TURNED OVER TO TENANT PROJECT MANAGER I WEEK PRIOR TO STORE TURNOVER. I. THE HVAC SUB CONTRACTOR SHALL SE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE. THE COMPLETE AIR SALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION, EXCEPT AS NOTED OTHERWISE. HVAC SUB CONTRACTOR SHALL ALSO INSTALL A NEW SET OP FILTERS AFTER PROJECT IS COMPLETE. J. BALANCE AIR TO WITHIN PLUS/MINUS 1096 OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS, PULLEYS OR THE ADDITION OF PAMPERS REQUIRED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFORMED BY THE HVAC SUB CONTRACTOR WITH NO ADDITIONAL COST TO TENANT. K. THE BALANCING SUB CONTRACTOR SHALL PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED ON THESE DRAWINGS. ALL SYSTEMS UNABLE TO BE COMPLETELY BALANCED AT THE TIME OP ORIGINAL BALANCE MUST BE BALANCED IN FUTURE AT NO ADDITIONAL EXPENSE TO TENANT. THE BALANCING CONTRACTOR SHALL RECHECK ANY ITEMS THAT TENANT DEEMS NECESSARY AT NO ADDITIONAL COST TO TENANT. . P. PROVIDE BALANCING OF NEW AND EXISTING (IP PRESENT) HVAC SYSTEMS. SECTION 150 CONTROLS SECTION IScicI5 COMMISSIONING: 2.00 - PRODUCTS 2.01 HVAC SYSTEMS SECTION 15840 DUCTWORK 1.00 - GENERAL 1.01 DESCRIPTION 2.00 - PRODUCTS 2.01 SHEET METAL WORK END OF SECTION 15180 I. IN ADDITION TO THERMOSTATS AND PNEUMATIC TUBING, 2. SET HVAC EQUIPMENT THERMOSTATS FOR 15 D.F. COOLING AND /0 D.F. HEATING INITIALLY. PROVIPE ALL CONTROLS, WIRING, CONDUIT, RELAYS, ETC TO PROVIDE COMPLETE AND OPERATIONAL CONTROL. SYSTEMS. PROVIDE CONNECTION TO LANDLORD BUILDING CONTROL SYSTEM PER LANDLORD TENANT CRITERIA. COORDINATE CAREFULLY WITH WITH LANDLORD CONTROLS SUS- CONTRACTOR. END OF SECTION 15gc10 1.00 GENERAL . I. PROVIDE MECHANICAL SYSTEMS COMMISSIONING IN ACCORDANCE WITH LOCAL ENERGY CODE AND THE REQUIREMENTS OF THIS SPECIFICATION. ALL CONTROL SEQUENCES SHALL BE FUNCTIONALLY TESTED TO ENSURE THEY OPERATE IN ACCORDANCE WITH THE THE PLANS AND SPECIFICATIONS. . 2. PROVIDE CHECK OUT OF ALL PLUMBING SYSTEMS FOR PROPER OPERATION, INCLUDING HOT AND GOLD WATER AT ALL FAUCETS, WATER HEATERS SET FOR PROPER TEMPERATURE, OPERATION OF ALL VALVES, GREASE TRAPS, GAS VALVES, MIXING VALVES. RECORD PATA ON ALL DEVICES CHECKED AND THE STATUS OF THEIR OPERATION. 3. VERIFY SMOKE DETECTOR SHUTDOWN OP ANY PAN UNITS SCHEDULED FOR SMOKE DETECTOR SHUTDOWN. 4. VERIFY PROPER OPERATION OF ANY OTHER HVAC EQUIPMENT THAT IS INTERLOCKED WITH OTHER EQUIPMENT. • PAMPER 6 HEATER CH CHECKOUT OF VAV fSOX 5. VAV UNITS: PROVIDE COMPLETE E , OPERATION. SECTION 15820 AIR DISTRIBUTION EQUIPMENT 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A, DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER , O S REQUIREMENTS SECTIONS, N_ AND DIVISION I - GENERAL Q , APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 COMPLIANCE . A. AMGA COMPLIANCE; TEST AND. RATE AIR DISTRIBUTION EQUIPMENT IN ACCORDANCE WITH AMCA STANDARDS, AND PROVIDE AMCA CERTIFIED RATINGS SEAL. B. UL COMPLIANCE: PROVIDE ELECTRICAL COMPONENTS OF AIR DISTRIBUTION EQUIPMENT WHICH HAVE SEEN LISTED AND LABELED BY UL. 1.05 SUBMITTALS A. SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA OP APPROVED EQUALS (SUBMITTALS ARE NOT REQUIRED IF PRODUCT MATCHES SPECIFIED ITEMS ON DRAWINGS), ASSEMSLY- TYPE SHOP DRAWINGS, LADDER -TYPE WIRING DIAGRAMS DIFFERENTIATING BETWEEN PORTIONS OF WIRING THAT ARE FACTORY INSTALLED AND PORTIONS TO SE FIELD - INSTALLED, AND MAINTENANCE PATA. A. PROVIPE EQUIPMENT AS SCHEDULED WITH ALL OPTIONS AS DESCRIBED ON THE MECHANICAL SCHEDULES ON THE MECHANICAL DRAWINGS. B. WHEREVER POSSIBLE, PROVIDE BELT DRIVEN EQUIPMENT AS SCHEDULED OR PROVIDED SY THE MANUFACTURER WITH ALL OPTIONS INCLUDED IN THE SCHEDULES OR REQUIRED TO MEET THE PERFORMANCES NOTED ON THE MECHANICAL DRAWINGS. 5.00 - EXECUTION 5.01 INSTALLATION . A. UNITS SHALL SE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, INSTRUCTIONS. AND DETAILS ON DRAWINGS, B. ALL EXHAUST FAN SYSTEMS TO HAVE SACK DRAFT OR MOTORIZED DAMPERS IN THE SYSTEM. G. PROVIPE FLEXIBLE DUCT CONNECTIONS TO ALL PANS. P. PROVIDE ROOF CURBS FOR ALL ROOF HOOPS, ROOF MOUNTED EQUIPMENT AND DUCT PENETRATIONS THRU ROOF.• . E. PROVIPE FACTORY AUTHORIZED STARTUP OF ALL EQUIPMENT. END OF SECTION 15520 R VIbWL:L) rut CODE COMPLY -1N APPROVED SEP - 5 2008 City Of Tukwila A. GENERAL REQUIREMENTS DRAWINGS AND GENERAL PROVISIONS OF THE pCitt.LFFWVING r I. INCLUDING GENERAL AND CONDITIONS ANP DIVISION I - GENERAL REQUIREME • SEGT"I -.NS; • APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 WORK INCLUDED A. INCLUDE. ALL LABOR, MATERIALS, EQUIPMENT TRANSPORTATION AND SERVICES TO FURNISH AND INSTALL COMPLETE ALL DUCTWORK AND RELATED SYSTEMS SPECIFIED HEREIN AND INDICATED ON THE DRAWING. . A. FURNISH ALL DUCTWORK AS SHOWN ON PLANS. ALL DUCTWORK CONSTRUCTION SHALL COMPLY WITH SMACNA STANDARDS AND LOCAL MECHANICAL COPE STANDARDS, WHICHEVER IS MORE STRINGENT. DUCT CONSTRUCTION SHALL SE IN ACCORDANCE WITH THE FOLLOWING PRESSURE VELOCITY CLASSIFICATIONS FOUND IN SMACNA HVAC DUCT CONSTRUCTION STANDARDS, THIRD EDITION (2006). I. DUCTWORK BETWEEN VAV AIR HANDLING UNITS AND TERMINAL BOXES:MAXIMUM +6" W.G., 4,000 F.P.M., VARIABLE AIR VOLUME. 2. DUCTWORK DOWNSTREAM OF TERMINAL BOXES: +2 "W.G., 2,500 F.P.M., VARIABLE AIR VOLUME. 5. EXHAUST DUCTWORK (ALL EXHAUST FAN SYSTEMS WHERE DESIGN FAN STATIC IS LISTED AT 1.0 W.G. OR ABOVE): +2" TO - 2 "W.G., 2500 F.P.M., CONSTANT VOLUME. 4. RETURN, RELIEF OR EXHAUST DUCTWORK WHERE FAN DESIGN STATIC IS LISTED BELOW I.O "W.G.: +I" TO -I" W.G., 2,500 F.P.M., CONSTANT VOLUME. 5. SUPPLY DUCTS NOT LISTED ASOVE: +2'! TO -2" . W.G., 2,500 F.P.M., CONSTANT VOLUME. S. TRANSFER DUCTS: +0.5" TO -0.5' W.G., 2,000 F.P.M., CONSTANT VOLUME. B. PRIOR TO ANY FABRICATING OF SHEET METAL WORK, THE MECHANICAL CONTRACTOR SHALL CAREFULLY MEASURE (AT THE SITE) AVAILAiLE SPACE FOR SHEET METAL WORK. HE SHALL PREPARE LARGE SCALE. SHOP DRAWINGS OF SHEET METAL WORK SHOWING ALL OTHER ELEMENTS OF THE BUILDING INCLUDING PIPING, STRUCTURAL AND ELECTRICAL SO ALL ARE COORDINATED AND FIT AVAILABLE SPACE. THE SHOP DRAWINGS WILL NOT 60 THROUGH A FORMAL SUBMITTAL PROCESS, BUT 2 COPIES SHALL SE GIVEN TO THE ARCHITECT AS EVIDENCE OF THEIR BEING COMPLETED. C. LONG IT. SEAMS IN DUCTS SHALL BE FLAT, DOUBLE LOCK TYPE -S DRIVE TYPE. P. TRANSVERSE SEAMS SHALL SiE OF TYPE AND SPACING AS FOLLOWS: MAX.. SIDE . TYPE SPACING UP TO 30" DRIVE SLIP 1' -10" 51" TO 60" I -I/2" POCKET SLIP 1' -10" 61" ANP UP I --I/2" POCKET SLIP 51 Te CROSS BREAK PANELS IS" AND OVER IN WIDTH. E. STANDING SEAMS ARE NOT ACCEPTASLE ON ANY DUCTWORK. RECEWED AUG 21 2000 PERMIT CENTER COPYRIGHT NOTICE; These drawings and specifications are copyrighted and subject to copyright protection as an "architectural work" under sea. 102 of the copyright clot, 17 u.S.C. As amended december 1990. The protection includes, without limitation, the overall form, arrangement and composition of spaces. and elements of the design. Under such protection, unauthorized use of these drawings and specifications may result in cessation of construction, building seizure, and /or monetary liability. ELI DATE: SCALE: DRAWN BY: PROJECT No.: a M RtEst Z14 KE wac 9 d i m 00 22 rr.r co ns co rr co u sa w r.w c u � � s 3 t rrrr vi co Ni g z 0 w ce 08.14.08 SHEET: 1 /4 „ STAFF TMi34801 c1 rn N cv cri CO a) N - o o w- cd U°1 cu^l CQ Q 0 N IM St E 00 V o 4) °6 m 4 r O M301 F. JOINT LOCKING: THE SLIP JOINT IN POCKET SLIP SEAMS SHALL E3E SCREWED USING NOT LESS THAN ONE SCREW PER FACE AND MAXIMUM SPACING OF 2' -0" G. PAMPERS - PROVIDE PAMPERS AND QUADRANTS IN DUCTWORK AS NECESSARY FOR BALANCING. PROVIDE ONE DAMPER IN THE DUCT LEAPING TO EACH SUPPLY OR RETURN/EXHAUST OPENING. DAMPERS SHALL BE LOCATED IN AN ACCESSIBLE LOCATION. DAMPERS SHALL SE FITTED WITH PARKER KALON DAMPER BEARINGS AND PARKER KALON NO. 1 QUADRANTS. DAMPERS SHALL BE OF 20 GA. G.I. SINGLE PLATE TYPE WITH EDGES HEMMED. FOR DAMPERS ABOVE "HARD" (GYP BOARD OR NON- ACCESSIBLE) CEILINGS, PROVIDE BOWDEN GABLE CONTROLLER WITH CONCEALED OPERATORS IN NEAREST RETURN GRILLE. SHOW LOCATION OF ALL REMOTE DAMPER OPERATORS VOLUME DAMPERS ON RECORD DRAWINGS. INCLUDE DRAWING IN/BALANCING REPORT. ADJUSTABLE SPLITTER. PAMPERS TO BE YOUNG REGULATOR SQOES. H. ACCESS POORS SHALL BE PROVIDED BY THIS CONTRACTOR IN FINISHED WALLS AND CEILINGS WHERE REQUIRED TO REACH MECHANICAL EQUIPMENT, MILGOR OR EQUAL. . I. INSULATED LOW PRESSURE FLEXIBLE DUCT SHALL BE A FACTORY FABRICATE ASSEMBLY CONSISTING OF A ZING- COATED SPRING STEEL HELIX, NON - PERFORATED INNER LINER, WRAPPED WITH A. NOMINAL I" THICK BY I LB /CU. FT. DENSITY FIBERGLASS INSULATION. THE ASSEMBLY SHALL BE SHEATHED IN A VAPOR BARRIER JACKET, 'FACTORY SEALED AT BOTH ENDS OF EACH SECTION, THUS ASSURING THE VAPOR RESISTANCE OF EACH SECTION AS WELL AS THE COMPLETED INSTALLATION. THE COMPOSITE ASSEMBLY INCLUDING INSULATION AND VAPOR BARRIER SHALL MEET THE GLASS I REQUIREMENTS OF NFPA BULLETIN NO. c10 -A AND 15E LABELED BY UL WITH A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPED RATING OF 50 OR UNDER. FLEXIBLE DUETS SHALL BE INSTALLED IN A FULLY EXTENDED LENGTH REQUIRED TO MAKE THE CONNECTION. WHERE HORIZONTAL SUPPORT IS REQUIRED, FLEXIBLE DUCT SHALL SE SUSPENDS ON 36" CENTERS WITH A MINIMUM 3/4" WIPE FLAT BANDING MATERIAL. ALL .JOINTS AND CONNECTIONS SHALL BE MADE WITH 1/2 WIDE POSITIVE LOOKING STEEL STRAPS, INSULATED LOW PRESSURE FLEXIBLE PUCT SHALL BE GREENFLEX TYPE SL -I OR EQUAL. PROVIDE CONICAL FITTINGS FOR CONNE=CTION TO TRUCK DUCT. MAXIMUM LENGTH OF FLEX DUET IS 5 FEET WITH ONE '10 DEGREE BEND. J. OFFSETS - PROVIPE OFFSETS AND TRANSITIONS AS REQUIRED TO FIT DUCTWORK INTO AVAILABLE SPACE. MAINTAIN EQUIVALENT FREE AREA OF DUCTWORK, AND TRANSITION SHALL BE SMOOTH (LESS THAN 15 Dl*GREES). 2.02 DUCT LINING A. JOHNS MANSVILLE I " THICK 1.5 LB /GU.FT. DENSITY (WHERE CALLED OUT ON DRAWINGS AND OR WHERE SPECIFIED) LINACOUSTIC. R -4 MIN.. OR 1,5" THICK 15 LB /CU.FT. DENSITY LINAGOUSTIC R -5 MIN.. WHERE "SOUND LINED" OR "LINED" DUCT IS GALLED OUT ON DRAWINGS OR SPECIFIED. SERVICE WITH GLUE AND CLIPS. SPACE CLIPS A MAXIMUM OF IS "O.C. LINE ALL RECTANGULAR DUCTS (INCLUDES OUTSIDE AIR, SUPPLY, RETURN, EXHAUST AND TRANSFER DUCTS). THE NET FREE AREA OF THE DUCT DIMENSIONS GIVEN ON THE DRAWINGS SHALL BE MAINTAINED. INCREASE METAL DUCT DIMENSIONS AS NECESSARY TO COMPENSATE FOR ADDITION OF THE LINER. 5. THE DUCT LINER SHALL t5E APPLIED WITH 100% COVERAGE OF APPROVED FIRE RESISTANT ADHESIVE. LINER SHALL Be ADDITIONALLY SECURED WITH MECHANICAL FASTENERS ON MAXIMUM 15" CENTERS. FASTENERS SHALL START WITHIN 2" OF THE LEADING EDGE OF EACH SECTION AND WITHIN 3." OF THE LEADING EDGE OF ALL CROSS JOINTS WITHIN THE DUCT SECTION. ALL .EXPOSED EDGES AND THE LEADING EDGE OF ALL CROSS JOINTS OF THE LINER SHALL BE HEAVILY COATED WITH AN APPROVED FIRE RESISTANT ADHESIVE. • THE DUCT LINER SHALL BE CUT TO ASSURE SNUG CLOSING CORNER JOINTS, THE BLACK SURFACE OF THE LINER SHALL FACE THE AIR STREAM, TRANSVERSE ,JOINTS SHALL 15E NEATLY BUTTED, AND ANY DAMAGED AREAS SHALL BE HEAVILY COATED WITH AN APPROVED FIRE RESISTANT ADHESIVE, . 2.03 BACK DRAFT DAMPERS A. GENERAL - PROVIDE DAMPERS AT ALL OUTSIPE AIR AND RELIEF DUCTS INTAKING OR EXHAUSTING TO ATMOSPHERE. B. TYPE BACK DRAFT PAMPERS ON FAN SYSTEMS SHALL BE GALVANIZED STEAL OR ALUMINUM MULTI BLADE TYPE.' BLADES SHALL HAVE FELT STRIPS RIVETED OR GRIPED IN PLACE. BLADES SHALL BE JOINED TOGETHER WITH CONNECTION BARS. EACH BLADE SHALL BE RIGIDLY ATTACHED TO A PIVOT POP. THE ROD SHALL EXTEND INTO OIL - IMPREGNATED BRONZE BUSHINGS OR ANTI FRICTION BEARINGS, LOCATED IN THE FRAMES. RUSKIN OR OR EQUAL. 2. FABRIC BACK DRAFT DAMPERS ON RELIEF DUCTS SHALL BE CONSTRUCTED TO INDUSTRY STANDARDS. . C. MANUFACTURER . 2.04 LOUVERS . A. FURNISH WONDER METAL MODEL 'SDL -4" DRAIN ABLE FORMED GALVANIZED STEEL STORM -PROOF MULLION NON - MECHANICAL FIXED WALL LOUVERS, OR AIR LOUVERS INC.., THE AIROLITE CO., CONSTRUCTION SPECIALTIES INC.., RUSKIN, OR •INDUSTRIAL. . LOUVERS INC.. EQUIVALENT, OR APPROVED; SIZES AND CONFIGURATIONS AS SHOWN, COMPLETE WITH FLAT BAR ORNAMENTAL SHAPES WERE SHOWN; REFER TO EXTERIOR BUILDING ELEVATIONS AND LOUVER SCHEULE, SECTION 22 OF PROJECT MANUAL VOLUME II. PROVIDE WITH BIRD SCREEN AND COLOR AS DESIGNATED i3Y ARCHITECT.. B. LOUVERS SHALL HAVE BEEN TESTED AND RATED TO HAVE MINIMUM 4% FREE OPENING EASE!" ON A 4X4 FOOT SIZE LOUVER. C. FRAME AND BLADES TO BE 16 GAUGE GALVANIZED STEEL. D. HEADS, SILLS AND JAMBS TO BE ONE PIECE STRUCTURAL MEMBERS AS DETAILED ANP SECURELY ANCHOR. TO WALL CONSTRUCTION AS APPROVED. E. SLIDE ABLE INTERLOCKED MULLIONS TO HAVE PROVISION TO EXPANSION AND CONTRACTION. F. FURNISH COMPLETE WITH MANUFACTURER'S STANDARD BIRD SCREEN MOUNTED IN FOLDED "u" TYPE FRAME ANP ATTACH TO INSIPE FACE, OF LOUVER FRAME WITH STEEL SCREWS AT ACTIVE (OPEN) PORTIONS OF LOUVERS AND WITH 20 GAUGE GALVANIZED STEEL FACED INSULATE 'BLANK -OFF' PANELS AT INACTIVE LOUVER AREAS, COMPLETE WITH PERIMETER GASKETS AND FINISHED TO MATCH LOUVER. INSULATION CORE SHALL BS I INCH THICK EXTRUDED POLYSTRYENE HAVING A MINIMUM THERMAL RESISTANCE "R" VALUE OF 5.0. G. ALL LOUVERS TO BE FREE OF SCRATCHES AND BLEMISHES AND SHALL BE FINISH PAINTED WITH i3AKEP -ON ENAMEL POWDER COATING. 2.05 FIRE DAMPERS A. DYNAMIC FIRE DAMPERS SHALL BE CONSTRUCTED AND TESTED IN ACCORDANCE WITH UL SAFETY STANDARD 555. EACH DAMPER SHALL HAVE A 11/2 HOUR RATING WITH 165 F FUSIBLE LINK AND BE LABELED PER UL 555 STANDARD. B. DYNAMIC COMBINATION FIRE /SMOKE DAMRERS,RUSKIN FSDS6, SHALL BE CONSTRUCTED OF MIN.. 16 GAUGE GALVANIZED STEEL WITH STAINLESS STEEL BEARINGS, JAMB SEALS AND 450 DEG. F RATED BLADE EDGE SEAL. DAMPERS SHALL BE I HR. • RATED UNDER UL STANDARD 555 AND UL 5555. ALL DAMPERS USED UNDER THIS SPECIFICATION MUST SE UL TESTED 4 QUALIFIED IN THE COMPLETE RANGE OF SIZES USED. A SINGLE PAMPER TESTED WITHIN THIS RANGE IS NOT ACCEPTABLE. LEAKAGE RATING SHALL BE GLASS II. INCLUDE A UL CLASSIFIED FIRE STAT. FIRESTAT SHALL ELECTRICALLY AND MECHANICALLY LOCK DAMPER CLOSED WHEN DUCT TEMPERATURE EXCEEDS 165 DEG. F. DAMPER MUST ISE OPERABLE ABOVE 250 DEG. F. FIRESTAT SHALL BE EQUIPPED WITH TWO PAMPER POSITION INDICATORS FOR RemoTE INTERFACING WITH SMOKE DETECTORS 4 FIRE ALARM SYSTEM. ALSO PROVIDE INTEGRAL FLOW RATED DUCT SMOKE DETECTORS FOR DUCTED FIRE /SMOKE DAMPERS AND NO -FLOW DUCT SMOKE DETECTORS FOR NON - DUCTED FIRE SMOKE DETECTORS. C. CEILING FIRE DAMPERS SHALL BE INSTALLED IN ALL CEILING REGISTERS ANP GRILLES. IN THE RATED CEILING. FIRE DAMPERS CONSIST OF A RADIANT DAMPER IN THE DIFFUSER NECK AND THERMAL INSULATING. BLANKET COVERING THE DIFFUSER PAN. THE ENTIRE SYSTEM SHALL BE UL RATED FOR FLOOR /CEILING ANP ROOF /CEILING SYSTEM. ' 5.00 - EXECUTION 5.01 SHEET METAL WORK A. PARTITIONS FORMING PLENUMS OR CASINGS SHALL BE #1e:. GA, WITH GALVANIZED IRON ANGLES AND RIVETS FOR S EAM CONNECTION AND STIFFENING. ALL JOINTS AND STANDING SEAMS SHALL BE SEALED WITH APPROVED DUCT SEALANT. CORK GASKETS SHALL BE INSTALLED BETWEEN ALL CONNECTIONS OF SHEET METAL TO COIL AND FILTER CASINGS. C. SHEET METAL CONNECTIONS OF PLENUMS AND AIR CHAMBERS TO WALL AND FLOORS SHALL E3E MADE WITH GALVANIZED ANGLES ANCHORED TO WALL OR FLOOR CONSTRUCTION WITH ANCHOR BOLTS WITH SHEET METAL BOLTED OR RIVETED TO ANGLES. MASTIC SEALER SHALL BE INSTALLED AT CONNECTION OF ANGLES TO SHEET METAL TO PROVIDE AIR -TIGHT JOINTS. PROVIDE ACCESS DOORS IN PLENUMS AND CHAMBERS WITH HANDLES OPERATED FROM BOTH SIDES, VENT LOCK NO. 205 OR APPROVED SUBSTITUTE. HINGED ACCESS DOORS IN SHEET METAL DUET FOR ACCESS TO DAMPERS SHALL BE #IS GA., FRAMED WITH STEEL ANGLE AND HEMMED EDGES. E. CONNECT ALL GRILLES TO DUCTWORK. PAINT THE INSIDE OF THE DUCT A DULL BLACK AT ALL GRILLES. F. ALL AIR INLETS AND OUTLETS TO OUTSIDE SHALL HAVE BIRD SCREENS. BACK DRAFT HAMPER SHALL BE PROVIDED WHERE MOTORIZED PAMPER IS NOT INDICATED. G. ALL DUCTS THROUGH ROOF SHALL BE FLASHED WATER - TIGHT. SEE DETAIL. DUETS THRU WALLS AND FLOORS /ROOFS SHALL HAVE ANGLE ENCLOSURES. H. CONNECTIONS OF ALL DUCTS TO ALL EQUIPMENT SHALL BE MADE WITH NEOPRENE. I. ELBOWS SHALL HAVE AN INSIDE RADIUS EQUAL TO 1/2 THE DUCT WIDTH. RECTANGULAR ELBOWS SHALL HAVE DUCT TURNS, T4 E3 OR APPROVED EQUAL. USE RECTANGULAR ELBOWS WHEREVER A ROUND ELBOW CANN0T BE USED ANP WHERE SHOWN ON DRAWINGS. SQUARE INSIDE ELBOW AND ROUND OUTSIDE ELBOW ARE NOT PERMITTED. DO NOT INSTALL TURNING VANES IN GREASE EXHAUST DUCTWORK. J. SUPPORTERS SHALL BE GALVANIZED STRAP OR ANGLE IRON HANGERS, ARRANGED TO PREVENT ANY BULGING, SENDING, OR SAGGING OF DUCTWORK. UNDER NO CONDITION SHALL HANGERS PIERCE THE DUCTS. VERTICAL DUCTS SHALL BE SUPPORTED AT EACH FLOOR WITH IS GA. FORMED ANGLE. K. SEAL ALL DUCT JOINTS WITH APPROVED DUCT SEALANT. L. HANGERS I. PROVIDE HANGERS ON ALL DUCTWORK. 2. HANGERS• FOR CIRCULAR PUCTS AND: TUBING: A #I5 GAUGE GALVANIZED SHEET STEEL STRAP SHALL BE WRAPPED AROUND THE DUCT AT EACH POINT OF SUPPORT. FOR CONCEALED WORK THIS STRAP SHALL BE BOLTED TO A STRAP HANGER OF SIMILAR GAUGE AND WIDTH FOR EXPOSED WORK, BOLTED TO A STEEL ROD HANGER IN EACH CASE, ROD HANGER 1/4" SIZE FOR DUCTS UP TO 10" SIZE, 3 /S" SIZE FOR LARGER DUCTS. WIDTH OF GALVANIZED STEEL. STRAP WRAPPED AROUND THE DUCT SHALL NOT E3E LESS THAN I" IN ANY CASE; WHERE DUCTS ARE IN EXCESS OF 10" IN DIAMETER SHALL BE 2 ". 5. SPACING OF HANGERS SHALL NOT EXCEED 10' -0" ON CENTERS IN ANY CASE; WHERE DUCTS ARE INSULATE AND ARE IN EXCESS OF 10" IN SIZE, SPACING SHALL NOT' EXCEED 8'-0" • M. MAXIMUM OF 5. FEET LENGTH OF FLEX DUCT WITH ONE c10 DEGREE BEND WILL SE ALLOWED AT CONNECTIONS TO DIFFUSERS, WHERE FLEX DUCT IS SHOWN ON DRAWINGS. N. PROVIDE FIRE STOP AROUND DUCTWORK AT ALL DUCT PENETRATION.OF RATED CONSTRUCTION. "FIRE STOP SEALANT" BY DOW CORNING. O. SACK DRAFT DAMPERS ON RELIEF DUCTS SHALL SE METAL BLADE TYPE. P. PROVIDE DUCT TRANSITIONS AS REQUIRED TO TRAPS AND ALL EQUIPMENT CONNECTIONS. . .Q. PROVIDE DUCT LINING ON RECTANGULAR DUCTS WHERE INDICATED ON DRAWINGS (OUTSIDE AIR, SUPPLY, REETURN,'EXHAUST AND TRANSFER AIR DUCTS). THE NET FREE AREA OF THE DUCT DIMENSION GIVEN ON THE DRAWINGS SHALL BE MAINTAINED. INCREASE METAL DUCT DIMENSIONS AS NECESSARY TO COMPENSATE FOR ADDITION OF THE LINER. R. ALL DUCTWORK, INCLUDING, BUT NOT LIMITED TO DUCTS, HANGERS, BRACKETS, FITTINGS AND JOINTS, SHALL BE INSTALLED IN A MANNER. WHICH NEITHER REDUCES HEADROOM ANP WALKWAY WIDTH NOR PROJECTS ANY SHARP EDGES INTO A CATWALK OR PASSAGE AREA ANY DUCTWORK WHICH, IN THE OPINION OF THE ARCHITECT, PRESENTS A POSSIBLE HAZARD TO PEOPLE IN THE CATWALK AREA, SHALL BE CHANGED TO AN ACCEPTABLE AND SAFE MANNER. SUCH CHANGES MAY INCLUDE: MOVING THE EQUIPMENT, CHANGING ITS. CONFIGURATION, AND /OR ADDING PROTECTIVE PADDING TO THE EQUIPMENT. S. INTAKE BACK DRAFT PAMPERS SHALL BE INSTALLED AT THE ENVELOPE OF THE BULDING. r. INSTALL FIRE DAMPERS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PROVIDE MIN.. 12X12 ACCESS PANEL IN DUCT AND LABEL "FIRE DAMPER ACCESS" W/ MIN.. 1/2" HIGH LETTERS. END OF SECTION 15840 SEC11.0N IS0"10 OUTLETS AND INLETS 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS - DRAWINGS AND GENERAL' PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND OTHER CONDITIONS AND DIVISION I - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 COMPLIANCE'S A. ADC COMPLIANCE - TEST AND RATE REGISTERS, GRILLES, AND DIFFUSERS IN ACCORDANCE WITH ADC •EQUIPMENT TEST GODS IO62R4, PROVIDE CERTIFIED RATINGS SEAL. ON EACH UNIT. B. AMGA COMPLIANCE - TEST AND RATE LOUVERS, DAMPERS, AND SHUTTERS IN ACCORPANCE WITH AMGA STANDARD 500, PROVIDE CERTIFIED RATINGS SEAL ON EACH UNIT. . 1.05 SUBMITTALS A. SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA UNLESS AS SPECIFIED ON DRAWINGS, ASSEMBLY -TYPE SHOP DRAWINGS, AND MAINTENANCE DATA. 2:00 - PRODUCTS 2.01 CEILING AIR DIFFUSERS A. GENERAL - EXCEPT AS OTHERWISE INDICATED, PROVIDE MANUFACTURER'S STANDARD CEILING AIR DIFFUSERS WITH FIRE PAMPERS; OF SIZE, SHAPE, CAPACITY AND TYPE INDICATED; CONSTRUCTED OF MATERIALS AND COMPONENTS INDICATED AND AS INDICATED ON DRAWINGS FOR COMPLETE INSTALLATION. B. CEILING COMPATIBILITY - PROVIPE DIFFUSERS WITH BORDER STYLES THAT ARE COMPATIBLE WITH ADJACENT CEILING SYSTEMS, AND THAT ARE SPECIFICALLY MANUFACTURED TO FIT INTO CEILING MODULE WITH ACCURATE FIT ANP ADEQUATE SUPPORT. REFER TO GENERAL CONSTRUCTION DRAWINGS AND SPECIFICATIONS FOR TYPES OF CEILING SYSTEMS. WHICH WILL CONTAIN EACH TYPE OF CEILING AIR DIFFUSER. . G. TYPES - PROVIDE TITUS CEILING DIFFUSERS OF TYPE, GAPAGITY, AND WITH ACCESSORIES AND FINISHES AS SCHEDULED. 2.02 REGISTERS AND GRILLES A. GENERAL - EPT AS OTHERWISE INDICATED, PROVIDE MANUFACTURER'S STANDARD WALL REGISTERS ANP GRILLES WITH FIRE PAMPERS; OF SIZE, SHAPE, CAPACITY AMP TYPE INDICATED; CONSTRUCTED OF MATERIALS AND COMPONENTS AS INDICATED ON DRAWINGS, AND AS REQUIRED FOR COMPLETE INSTALLATION. 8. PERFORMANCE - PROVIDE WALL REGISTERS AND GRILLES THAT HAVE, AS MINIMUM, TEMPERATURE ANP VELOCITY TRAVERSES, THROW AND DROP, AMP NOISE CRITERIA RATINGS FOR EACH SIZE DEVICE AS LISTED IN MANUFACTURER'S CURRENT DATA. C. COMPATISILITY - PROVIDE REGISTERS AMP GRILLES WITH BORDER STYLES THAT ARE COMPATIBLE WITH ADJACENT WALL OR CEILING SYSTEMS, AND THAT ARE SPECIFICALLY MANUFACTURED TO FIT INTO CONSTRUCTION WITH ACCURATE FIT AND ADEQUATE SUPPORT. REFER TO GENERAL CONSTRUCTION DRAWINGS AND SPECIFICATIONS FOR TYPES OF CONSTRUCTION WHICH WILL CONTAIN EACH TYPE OF WALL REGISTER AMP GRILLE. P. TYPES - PROVIDE WALL REGISTERS AMP GRILLES OF TYPE, CAPACITY, AMP WITH ACCESSORIES AND FINISHES AS SCHEDULED. . E. MANUFACTURERS: I. TITUS 5.00 - EXECUTION 5.01 INSTALLATION A. GENERAL - INSTALL OUTLETS AMP INLETS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES TO INSURE THAT PRODUCTS SERVE INTENDED FUNCTIONS. REFER TO INSTALLATION DETAILS REFERENCED IN PARAGRAPH 2.05A ABOVE. 13. COORDINATE WITH OTHER WORK, INCLUDING DUCTWORK AMP PUCT ACCESSORIES, AS NECESSARY TO INTERFACE INSTALLATION OF OUTLETS AND INLETS WITH OTHER WORK. G. LOCATE CEILING AIR DIFFUSERS, REGISTERS, AND GRILLES, AS INDICATED ON GENERAL CONSTRUCTION "REFLECTED CEILING PLANS" AND "INTERIOR ELEVATIONS ". UNLESS OTHERWISE INDICATED, LOCATE UNITS IN CENTER OF ACOUSTICAL CEILING MODULES. END OF SECTION 15870 SECTION 15880 FILTERS . 1.00 - GENERAL 1.01 GENERAL REQUIREMENTS A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERA AND OTHER CONDITIONS AND DIVISION 1 - GENERAL REQUIREMENTS SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. . 1.02 COMPLIANCE A. NFPA COMPLIANCE: INSTALL AIR TREATMENT EQUIPMENT IN ACCORDANCE WITH NFPA c(OA AND 0 105. B. UL COMPLIANCE: PROVIDE AIR FILTER UNITS WHICH HAVE BEEN LISTED AND LABELED BY UL. C. ASHRAE COMPLIANCE: TEST AIR FILTER UNITS IN ACCORDANCE WITH ARI 850. 2.00 - PRODUCTS 2.01 AIR FILTERS A. EXTENDED SURFACE FILTERS - PROVIDE FACTORY- FABRICATED, PRY, EXTENDED SURFACE FILTERS; WHERE SHOWN, IN SIZES INDICATED. EQUIP WITH UL GLASS I FIBROUS MEDIA MATERIAL FORMED INTO 2" PEEP V- SHAPED PLEATS AND HELP BY SELF - SUPPORTING FRAMES. FARR 30/30 OR EQUAL. 2.02 FILTER FRAMES A. PROVIDE METAL FILTER FRAMES AS DETAILED ON DRAWINGS. 5.00 - EXECUTION 5.01 INSTALLATION A. • INSTALL AIR FILTERS AND HOLDING DEVICES OF TYPES INDICATED, AND WHERE SHOWN; IN ACCORDANCE WITH AIR FILTER MANUFACTURER'S WRITTEN INSTRUCTIONS AND WITH RECOGNIZED INDUSTRY PRACTICES; TO ENSURE THAT FILTERS COMPLY WITH REQUIREMENTS AND SERVE INTENDED PURPOSES. COMPLY WITH APPLICABLE PORTIONS OF NFPA 70, c10A AMP 5, PERTAINING TO INSTALLATION OF AIR FILTERS. PROVIDE AS SCHEDULED ON THE DRAWINGS. B. INSTALL FILTERS IN PROPER POSITION TO PREVENT PASSAGE OF UNFILTERED AIR. C. PROVIDE CLEAN SET OF FILTERS FOR ALL PIECES OF EQUIPMENT: I. IMMEDIATELY PRIOR TO AIR BALANCING. 2. WHEN FINAL PUNCH LIST IS PONE. 3. IN ADDITION, FURNISH ONE COMPLETE EXTRA SET OF FILTERS TO OWNER WHEN FINAL PUNCH LIST IS DONE. THREE SETS OF FILTERS ARE REQUIRED (TWO INSTALLED, ONE TURNED OVER TO OWNER): LOCATE EXTRA SET IN MECHANICAL ROOMS WHERE FILTERS ARE LOCATED. P. FILTERS SHALL BE EASILY CHANGED FROM FRAMES AND SHALL SLIP! FREELY ON TRACKS� WITHOUT BINDING. MAINTAIN CLEAR ACCESS IN FRONT OF FILTER ACCESS DOOR TArkkia fUrt. WIDTH OF THE FILTER. a E. FILTER SECTIONS SHALL HAVE HINGED ACCESS DOORS WITH LATCHES. o END OF SECTION 15880 SECTION I5o18O BALANCING 1: 1.00 - GENERAL 1.01 DESCRIPTION A. GENERAL REQUIREMENTS. DRAWINGS AND GENERAL PROVISIONS OF THE CO INCLUDING 'GENERAL AND OTHER CONDITIONS AMP DIVISION I - GENERAL RE SECTIONS, APPLY TO THE WORK SPECIFIED IN THIS SECTION. 1.02 INDUSTRY STANDARDS • A. ALL TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE PERFORMED BY AN INDEPENDENT CONTRACTOR WHO IS CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABG) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NESS) BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL. BALANCING WORK MUST BE COMPLETE AND PONE IN ACCORDANCE WITH THE MOST REGENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING AND BALANCING SHALL SE DIVISION I. ALL BALANCING WORK SHALL BE PERFORMED WITH ACCORDANCE WITH LOCAL COPES AND THIS SECTION. 1.05 SUBMITTALS A. SUBMIT CERTIFIED TEST REPORTS SIGNED BY TEST AMP BALANCE SUPERVISOR WHO PERFORMED TAB WORK. SUBMIT RECORD HVAC PLAN SHOWING ALL VOLUME DAMPER 4 REMOTE VOLUME DAMPER OPERATOR LOCATIONS 4 CONNECTION LINKAGE. B. THE BALANCE REPORT SHALL BE ON THE AABG NATIONAL STANDARD REPORT FORMS OR THE NESS CERTIFIED REPORT FORMS AS PUBLISHED IN THEIR MOST CURRENT EDITIONS AND SHALL INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION. I. AABG OR NESS CERTIFICATION NUMBER AND SIGNATURE OF BALANCING CONTRACTOR. 2. COPY OF A CERTIFICATE OF CONFORMANCE WITH NATIONAL STANDARDS FOR THIS PROJECT. S. INSTRUMENTATION LIST WITH LAST CALIBRATION PATES. 4. MAKE ANP MODEL NUMBERS OF ALL HVAG EQUIPMENT. 5. AIR CFM AND STATIC PRESSURE READINGS (DISCHARGE AND SUCTION) AS MEASURED BY PITOT TUBE PUCT TRAVERSE AT THE UNIT. 6. MOTOR NAMEPLATE DATA WITH ACTUAL FIELD VOLTAGE AMP AMPERAGE READINGS FOR EACH LEG. 1. MOTOR AND FAN R.P.M.'S, SHEAVE SIZES AND BELT SIZES. 2r. OUTSIPE, RETURN, MIXED AMP SUPPLY AIR TEMPERATURES AND VOLUMES SHALL SE MEASURED AT FULL COOLING WITH MINIMUM OUTSIDE AIR. RETURN /RELIEF /SMOKE EVACUATION AIRFLOW SHALL BE BALANCED AND MEASUREMENTS RECORDED BY PITOT DUCT TRAVERSE AT FULL ECONOMIZER AMP POWER EXHAUST. 4 1. MAKE AND MODEL NUMBERS OF ALL AIR DISTRIBUTION EQUIPMENT. 10. FINAL BALANCER AIR VOLUMES AT ALL OUTLETS (INCLUDING RETURNS WHERE DUCTED). II. INDEXED PLAN WITH DIFFUSER ANP RETURN LOCATIONS. ALSO INDICATE IF DIFFUSER IS 5 -WAY OR 2 -1NAY. 12. BALANCING DATA FOR CONDENSER WATER, CHILLED WATER OR HEATING HOT WATER SYSTEM (WHERE APPLICABLE). C. FIVE COPIES OP THE BALANCE REPORT SHALL BE SUBMITTED TO THE OWNER FOR APPROVAL. PROVIDE ONE COPY OF APPROVED REPORT TO LANDLORD UPON COMPLETION OF CONSTRUCTION FOR THE PREMISE AS A REQUIREMENT TO OPEN FOR BUSINESS. ENERGY CODE COMPLIANCE NOTES A. FOR EACH RTU, PROVIDE TEMPERATURE SENSOR WITH TUX TIED INTO EXISTING EMS (SPRINGBROOK ONLY). PROVIPE 1 -PAY ADJUSTABLE SCHEDULE WITH NIGHT SETBACK ANP AN ADJUSTABLE DEADBANP NOT LESS THAN 10 PEG F. CONTROL SHALL MEET WASHINGTON STATE ENERGY COPE (WSEG) AMP SHALL HAVE OPTIMUM START FEATURES. S. PROVIPE SEAMS AND JOINTS TO MEET WSEG SECTION 505.10.2 . C. PROVIDE DUCT INSULATION TO MEET WSEG. SECTION 505.10.4 D. THE MECHANICAL WORK SHALL BE COMMISSIONED IN ACCORDANCE WITH SECTION 1416.4 OF THE WA STATE ENERGY CODE INCLUDING THE REQUIREMENTS FOR SIMPLE SYSTEMS, OTHER SYSTEMS, DOCUMENTATION, COMMISSIONING REPORTS (PRELIMINARY AND FINAL), AND ACCEPTANCE. THE BUILDING WILL NOT BE ACCEPTED AMP ISSUED A FINAL CERTIFICATE OF OCCUPANCY UNTIL THE BUILDING OFFICIAL DETERMINES THAT A PRELIMINARY COMMISSIONING REPORT HAS SEEN COMPLETED. AN AIR BALANCE REPORT IS REQUIRED SHOWING AIR ANP WATER FLOW RATES MEASURED AND ADJUSTED TO WITHIN 1096 %96 OF DESIGN RATES. TESTING AND BALANCING TO BE PERFORMED BY NESS OR AABG CERTIFIED TEST AND BALANCE SUPERVISOR. THREE COPIES OF SIGNED WRITTEN BALANCE REPORT SHALL BE PROVIDED TO THE OWNER, THE ARCHITECT ANE? THE ENGINEER. 0 4 M MANUALS ARE REQUIRED, INCLUDING SUBMITTAL DATA, 0 4 M MANUAL FOR EACH PIECE OF EQUIPMENT, NAME AND ADDRESS OF SERVICE AGENCY, HVAC CONTROL SYSTEM MAINTENANCE, CALIBRATION, WIRING DIAGRAMS, SCHEMATICS AND SEQUENCE. PROVIDE COMPLETE NARRATIVE OF HOW EACH SYSTEM SHOULD WORK INCLUDING SUGGESTED SET POINTS. E. 5. ALL DUCTWORK CONSTRUCTION SHALL COMPLY WITH SMACNA STANDARDS AMP UMC STANDARDS. PROVIDE DUCT HANGER AT MIN.. 10' -0" O.C. IN GENERAL, LOCATE DUCTWORK IN CEILING SPACE IN ACCORDANCE WITH STRUCTURE. • DUCTS MAY HAVE TO SE OFFSET FROM PLANS DUE TO STRUCTURE. ADJUST DUCT SIZE TO FIT WITHIN AVAILABLE SPACE. • ALL SUPPLY AND RETURN DUCTWORK SHALL BE :SEALED WITH APPROVED DUCT SEALANT (DUCT TAPE IS NOT ALLOWED). C PE COPYRIGHT NOTICE; These drawings and specifications are copyrighted and subject to copyright protection as an "architectural work" under sec. 102 of the copyright act, 17 u.S.C. As amended december 1990. The protection includes, without limitation, the overall form, arrangement and composition of spacos, and elements of the design. Under such protection, unauthorized use of these drawings and specifications may result in cessation of construction, building seizure, and /or monetary liability. 9 R a 0 efl Ln LU tst J LU LU co m LLI 0 rn N tr- 8 ai 0 141 a g itj - 4 EN m W 40x til ill ZI- W zE`"'9Q as-Iti ZQ�g a l,�, 0 Cloileco ECE VED \UG 21 200 8 RMIT CENTER DATE: SCALE: DRAWN BY: PROJECT No.: 0 Co 70° 4 :2 ! CO cn C (5 • 12 114 mic w • c in in V .a O u) • 00 TMB080IP 08.14.0E 5HEEF z 0 ta_ illy rr■■Ir m 'N N Lrl N 0 a , vti *• 0 C CO 00 • in (N cu 00 :a . 8 c o 0 r a t . E rn v Ln .a 0 • 9 4.Y as g g t31 � CU 3 E X s O e 'r EC7 1 /4" -1' -0" STAFF ■