Loading...
HomeMy WebLinkAboutPermit M08-258 - WHAT THE PHO172 0 SOUTHCENTER PY SUITE 132 WHAT THE P110 M08 -258 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: City ®f Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 2623049117 172:50 SOUTHCENTER PY TUICW WHAT THE PHO 17250 SOUTHCENTER PY SUITE 132 , TUKWILA WA WIG PROPERTIES LLC -SS 4811 134TH PL SE , BELLEVUE WA DALE HAWKESWORTH 2963 1ST AVE S , SEATTLE WA Contractor: Name: AFFORDABLE HOOD INTSALLATION INC Address: 2963 FIRST AV S , SEATTLE WA Contractor License No: AFFORHI951BS DESCRIPTION OF WORK: HANG (1) TYPE I AND (1) TYPE II HOODS WITH RETURN AIR Value of Mechanical: $32,000.00 Type of Fire Protection: Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 0 Appliance Vent 0 Repair or Addition to Heat/Refrig /Cooling System.... 0 Air Handling Unit <10,000 CFM 1 >10,000 CFM 0 Evaporator Cooler.... 0 Ventilation Fan connected to single duct 0 Ventilation System 0 Hood and Duct 2 Incinerator: Domestic 0 Commercial/Industrial 0 doc: IMC -10/06 MECHANICAL PERMIT EQUIPMENT TYPE AND OUANTITY * * continued on next page ** • Permit Number: M08 -258 Issue Date: 11/18/2008 Permit Expires On: 05/16/2009 Phone: Phone: 206 - 999 -5163 Phone: 206 -382 -0160 Expiration Date: 01/12/2009 Fees Collected: $530.00 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment 0 M08 -258 Printed: 11 -18 -2008 Permit Center Authorized Signature: I hereby certify that] have read and governing this work will be complie The granting construction o Signature: _ 1 Print N doc: IMC-10/06 'U Y City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us it does not pre rmanc Permit Number: M08 -258 Issue Date: 11/18/2008 Permit Expires On: 05/16/2009 Date: I (I v 4 ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. give authority to violate or cancel the provisions of any other state or local laws regulating authorized to sign and obtain this mechanical permit. Date: // This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 - 258 Printed: 11 -18 -2008 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 0 City of Tukwila Parcel No.: 2623049117 Address: 17250 SOUTHCENTER PY TUKW Suite No: Tenant: WHAT THE PHO Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 -258 Status: ISSUED Applied Date: 10/29/2008 Issue Date: 11/18/2008 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: A Type 1 hood shall be installed at or above all commercial cooking appliances and domestic cooking appliances used for commercial purposes that produce grease vapors. Each required commercial kitchen exhaust hood and duct system required by section 610 of the International Fire Code to have a Type 1 hood shall be protected with an approved automatic fire - extinguishing system installed in accordance with this code. (IFC 610.2, IFC 904.2.1 and IFC 904.11) Automatic fire - extinguishing systems shall comply with UL 300 or other equivalent standards and shall be installed in accordance with the requirements of the listing. (NFPA 96, 10.2.3) 13: Local U.L. central station supervision is required. (City Ordinance #2051) 14: All new automatic fire- extinguishing systems and all modifications to existing automatic fire- extinguishing systems shall have fire department review and approval of drawings prior to installation or modification. doc: Cond -10 /06 M08 -258 Printed: 11 -18 -2008 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 15: Type I hood systems shall be designed and installed to automatically activate the exhaust fan whenever cooking operations occur. The activation of the exhaust fan shall occur through an interlock with the cooking appliances, by means of heat sensors or by means of other approved methods. (WC 507.2.1.1) 16: Portable fire extinguishers shall be provided within a 30 -foot (9144 mm) travel distance of commercial -type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (IFC 904.11.5) 17: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 18: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6) 19: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 20: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 21: An electrical permit from the City of Tukwila Building Department Permit Center (206 - 431 -3670) is required for this project. 22: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 23: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 24: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. * *continued on next page ** doc: Cond -10/06 M08 -258 Printed: 11 -18 -2008 0 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the erformance of work. Signature: Print N doc: Cond -10/06 7 Date: G< ./a D � ordinances governing or local laws regulating M08 -258 Printed: 11 -18 -2008 _ ,� King Co Assessor's Tax No.: c)-(p_1301-1 --°( i t 7 Site Address: /72 C) Dri� � - .�11`�'1� -✓ ��iigegdi y/ Suite Number: Floor: Tenant Name: ) 7j9/ Property Owners Name W` / 1 415 . G`4 -£5 Mailing Address: �er// /99 G r j AT Name: Mailing Address ' 1 E -Mail Address Company Name: Mailing Address: Contact Person: Mailing Address: /V9" Contact Person: E -Mail Address: Company Name: E -Mail Address: CITY OF TUKWIL-1 Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** iagpkWg .fo r. Mailing Address: Contact Person/ ? r ��JVI..I- Q:Wpplications\Forms- Applications On Line\3 -2006 - Mechanical Permit Application.doc Revised: 4 -2006 bh Weil Mechanical Permit No. Project No City State Zip ay Telephone: Pal Zr Ctty State Zip L Fax Number: 06 5.7S .6 >b Fe) City D e 4 •9 .5 "7 ii Day Telephon E -Mail Addres /, lJ' /' AMPS6D rael/QaL � OP&Fax Number: 77 • .73 3 • 3 ff Q Contractor Registration Number s /W.ia 03 Expiration Date: City Day Telephone: Fax Number: M0 -42 r6 (For office use only) New Tenant: .6.... Yes ❑ ..No 91 2 City Day Telephone: Fax Number: State Zip 7°5 2t /P 4kr Page 1 of 2 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <I00K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended /Wall/Floor Mounted Heater Ventilation System Wood /Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct L Water Heater 50+ HP /1,750,000 BTU Repair or AdditioQ to R Hea • ' ' • - • ! incinerator - Domestic y Emergency',',••• i " ' Generator k"*. " N• ' *, • �„'+' ;. . •• " • A Air FIalldlir g Unit <l0,00QCFM • . ' t . . Inciner JIComs T ne1 3 • 'LT Other Mechanical :q ��� ` A t.' ° , ' ``_\ •. ' "' z +w. ± - Valuation of Project (contractor's bid price): $ Scope of Work (please pr9vide detailed information): / 717:3g -j / `�✓� � ,te? TIJfrd ,1 Use: Residential: New .... Replacement .... Commercial: New .... Replacement .... Fuel Type: Electric 0 Gas ....0 Other: Indicate type of mechanical work being installed and the quantity below: Signature: Print Name: Mailing Addr to possible revisict by the P s\ ermit Center to comply with current fee schedule • % , • ,• • Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME Tt »E TRUE UNDER PENALTY OF PE &.ILJK' THE LAWS O I F STAT F WASHINGTON, AND I AM AUTHORIZED TO APPIJ'IFOR THIS PERMIT. BUILDING OWNER OR AU HORIZ ., • ja r• , • Date Application Acceptgd: , • :P • • 4 tit t � • Q:\Applications\Forms- Applications On Line U-2006 - Mechanical Permit Application.doc Revised: 4 -2006 bh Afre - • a ' ; 4 i ,r. tit Date: /e - Z9 -6 Day Telephone: Se'" 9 ' 5/,4•9 City • - .. • r. `. tiff Initials: Zip Date Application Expires: Page 2 of 2 Receipt No.: R08 -03641 Initials: WER User ID: 1655 ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Payee: AFFORDABLE HOODS INSTALLATION TRANSACTION LIST: Type Method Descriptio Amount Payment Check 001980 530.00 RECEIPT Account Code Current Pmts 000.322.102.00.0 424.00 000/345.830 106.00 Total: $530.00 • Parcel No.: 2623049117 Permit Number: M08 -258 Address: 17250 SOUTHCENTER PY TUKW Status: PENDING Suite No: Applied Date: 10/29/2008 Applicant: WHAT THE PHO Issue Date: Payment Amount: $530.00 Payment Date: 10/29/2008 10:33 AM Balance: $0.00 doc: Receipt-06 Printed: 10 -29 -2008 Project �/4'� !1 r , 6 � (i r t � (T TYpe of. A e _ R^o /J r "jy Address: Date Called: Special Instructions: I Date Wanted: ' +-- frvJ7 A Requester: Phone No: INSPECTION RECORD a copy with permit *-7 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 12t 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 E S 4 Approved per applicable codes. 0 Corrections required prior to approval. /6 COMMENTS: eT ; (-e=tt Inspector: rate: 1 4 6 9 LI $60.00 REINSPECTION FEE REQUIRED.'Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: .... �,� - + Project: L ` 6ifJ4� 7 Pi (J Type of Inspection: / /Ng Address: / 72570 .S47/" / /Al• Date Called: / Special Instructions: _ Date Wanted: / — d a.m. Requester: Phone No: ' ,...K..) 4:-.1-3 cg2 `/6 EI Approved per applicable codes. INSPECTION RECORD Retain a copy with permit PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 14L:.. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Corrections required prior to approval. COMMENTS: r o Ltal Inspect I Date: 1 — (L J � ri $60.00 REINSPECR{9N FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: ./ � C oENTS: 6i e A fJ'Cam'' A J 7 Type of Inspe 4 14-€ Ai it-t-S NS l liNpi/ e k/- e - - 1 — Al ii-oP 1 4-4 341 ieli /1-.) - - Li _LT' P ' 7 ate Special Instructions: Wanted: .-.� a ry /2,3/ O p.m. 1 Phone No: ` 1611 —Si 63 n I ., Project: I _ J ^ !/ _ Type of Inspe n .. I ,� Address: I7ZSo SG Date Called: P ' 7 ate Special Instructions: Wanted: .-.� a ry /2,3/ O p.m. Requester: Phone No: ` 1611 —Si 63 4:1-0 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. F- CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (2 6)431 j36 0 El Approved per applicable codes. Corrections required prior to approval. Inspec $>i r: i d . A Dater - _ El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Projec : �• ,t r- Type of Inspection: V Addr s: 2-tO / Date Calle" d: Special Instructions: Date Wanted: - a Requester: Phone No: INSPECTION NO. INSPECTION RECORD Retain a copy with permit 114 2-is?1 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION P_ 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 - 6 0 Cigi A pproved per applicable codes. Corrections required prior to approval. COMMENTS: �.� L._ ho - ' c A0 s 0 $60.00 REINSPECTIO paid at 6300 Southcen E REQUIRED. Prior to inspection, fee must be r Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: • COMMENTS: 0 A-1 I' - I! d Al • J )) St., (il--1 ' —\ A- 1 d r 1 /i /lipid LM4 — Spe.��/� - 7Lam.. ,r/Is De c 7 7 .a !'1 o/! J' .Sf et aA pro I e 8 Date Wanted: _ V ! a.m. ' Q ` >m 0. -e_A--( 41 - r o k >7) ..- ("." ___ M C; ∎a `e‘ P r� 0 j r 1-e ✓ - ,'t— . ..s . n S Q-- - -. -A /d G i `' A 1 I Project: , il Type o In i92 SG? A.7 Date Called„ Jt� 't" i" `----- Special Instructions: �3°5z� - �t fj( �` Date Wanted: _ V ! a.m. ' Q ` >m Requester: Phone�]A f,, ` � �� 1S l43 (9� `�' INSPECTION NO. INSPECTION RECORD Retain a copy with permit M i S' PERMIT NO. CITY OF TUKWILA BUILDING DIVISION le- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -360 El Approved per applicable codes. Corrections required prior to approval. 1. El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Inspector: Date: i 2- Zj-'de Receipt No.: !Date: COMMENTS: k. 12 _ G re. .S A.-.-c :A (i.e Z. kO car .s k ' C? i A.l, AS 71.1 e I L- A - r. A 5 7 L4 -e c X Li lo T ( - 3' " U d CAJ T1) IA e 7.ef J Gt e-d 6.A Cf - ii0 C 0e-(,M : I.s ,p LC7 A p Jn £L 44P s - - rk.. , T 11 3Af. 3 a I` & (QAIQ 4 , ti, :_ tJ/ ,\/■s' P i�e � ..c..Ec —Slf ' J s �c.e- �t' . U n n� Mf f S e f�S ,/, _AT e `2. L A e ^ i - �J / .c , e1 Q ; S J �. L, .�- ex, 7I L : l/.-' e _ 14 Je f?J -- G 'p l /-e- s / Prolec`: ' R I TYp f Inspectit: I Address: I .4 1214 Date Called: Special Instructions: / f Date Wanted: )2 -( .S --a a.m.. _ p.m. Requester: Phone No: r - --- �,'G(I" 0 l7J .• � ( `P/ INSPECTrON NO. INSPECTION RECORD Retain a copy with permit /IQs - 2S 7 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3 Approved per applicable codes. Corrections required prior to approval. 4M- ri $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Inspec 6r: Date: ) Z i s - or Receipt No.: Date: • d o COMMENTS: Sprinklers: J ih "0 Type of Inspection: U Address: r? Z 0 Suite #: 13 ' " `'.. Contact Person: Special Instructions: r2 .r a rK t t t - Svc .7r, - 1 - g- , - 1 Phone No.: f A' ! by / /vivo t- w a1;� s :72 itA.. - i Z ( ; l;,qc E f i /! "7 c °J) /i1. ? -'i lJ 1i! G , r ) 4, -- j,`) J7 d Aic, - UY- 11 - [� e //, 7 , - j 9 st - (2.00 ;AA. - 0C)8 - O - 1-0 ti,_ h-? T) ;alvvk 12- i Atb ON 5'2;iklil -W A P- P \1. ? \NALV .Vii - O ; `? • '; ' ilr, U . - ? 7 0 Ft PA N Ci E-KTI N1 bk.) f 5 k,-1 L' yn1 Z-- . Z — ; )Q -2 )V )C2, Project: tA,'1- : 17 7)11_ Sprinklers: J ih "0 Type of Inspection: U Address: r? Z 0 Suite #: 13 ' " `'.. Contact Person: Special Instructions: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: ERMIT NUMBERS ' c G4 _ 2 :1-cl CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206 -575 -4407 INSPECTION NUMBER Approved per applicable codes. Word /Inspection Record Form.Doc INSPECTION RECORD Retain a copy with permit 1/13/06 Corrections required prior to approval. Date: 7 / A ./ Hrs.: Inspector: it ie , L.G. 76/Z- , $/0.00 REINSPECTION FEE REQUIRED. You will receive an invoice from t e City of Tukwila Finance Department. Call to schedule a reinspection. T.F.D. Form F.P. 113 poi COMMENTS: (),, Are Alarm: Type of Inspection: U Hoot) Address: Ill .),) 'Sc_ Suite #: , - 3 �. 5J, / r t fi .. Contact Person: Special Instructions: Phone No.: _ 'J4,,/ ) , / / /./...-),(/ : Tr- ill — - i,hf.4- . tom' Project: t ;- --114 (),, Are Alarm: Type of Inspection: U Hoot) Address: Ill .),) 'Sc_ Suite #: , - 3 �. 5J, `' Contact Person: Special Instructions: Phone No.: Needs Shift Inspection: Sprinklers: Are Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: INSPECTION RECORD Retain a copy with permit 0 ,_ f/ - 5 • E MIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 INSPECTION NUMBER n Approved per applicable codes. Corrections required prior to approval. Date: (2 / , l / lirs.s . Inspector: ,(/Ua- L "iil., /9 / 2_ j , I I $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from I I kthc City of Tukwila Finance Department. Call to schedule a reinspection. Word /Inspection Record Form.Doc 1/13/06 T.F.D. Form F.P. 113 and QTY penetrations for Type I hoods. O SEMI ❑ QUARTERLY ❑ MONTHLY CODE ❑ SERVICE ❑ NEW PRICE CALL EQUIPMENT AMOUNT OE DESCRIPTION / 145 if je>17C---7 ,Amtx. 4 77-i .4,Bav1" 5 . ,40,42)245<s //vsr / /E- / #, _�i-�_ _ _ _ 1 - : 1.- G /' - gyp S I ev... Reir..1-14 7"Z1E' /o'- - .I7 ■1 z 5 - Am; .►• D 44-7`" .slorAftiD. j (i c ., i i. - Gox.J r-r n_) vo v S r¢i1/410 TA/5 DES /NA- 77oA) /5 /Too V ,9 L(6W 7' ?&--5 7_ Div / Z. // 3 e-S --a9e* PuE5 ' .J S . f OL E70 -S E Gd- // / ic,/.fort.,o , !/ 7 ?-( 2.A - Ste' - 4Ts"X 62dx, iZ 7� , ,s D o - SUBTOTAL FREIGHT TAX PAYMENT DUE UPON RECEIPT OF THIS INVOICE TOTAL f R &T Hood and Duct Services, Inc. 6100 I 2th Ave. S. Phone (206) 726 -0940 Seattle,WA 98108 Fax (206) 767 -2607 SPECIAL INSPECTIONS FOR TYPE I HOOD & DUCT (RE: IBC 1704.13 Special Cases) Type I hood and ducts shall be inspected by a special inspection agency. Grease duct and grease hood test shall comply with 2006 IMC 506.3.3.1 Grease Duct Test per Washington State Amendments, and IMC 507.7.1 Hood joints, seams www.rthood.com • High Pressure Hood Cleaning • Fire Suppression Installation & Service • Fire Extinguisher Sales & Service • Range Hood and Fan Service & Repair • Filter Sales & Service ORIGINAL INVOICE NAME Authorized by: AUTHORIZED SIGNATURE NUMBER 5 6113 COMPLETE FIRE PROTECTION SVC LOC: DATE /2 5 Ocr Gv� -7- TAE file ADDRESS / 72 40 50 Pfw! CITY 7 Vk/.i i _j # /'w /ZIP ADDRESS CHANGE ONE TIME SL NEW ACCT. CUS NO • TITLE * / certify that I have read this entire document front and back, agree to all of its conditions, and I am authorized to sign this invoice. NOTE: Please put ACCOUNT NUMBER and INVOICE NUMBER(S) on your payment to insure proper credit. / and QTY penetrations for Type I hoods. LJ /AMY ❑ SEMI ❑ QUARTERLY ❑ MONTHLY VHL CODE ❑ SERVICE ❑ NEW PRICE CALL EQUIPMENT AMOUNT JOE H l I fill DESCRIPTION / mNS / °5 / ,Q.ein -- Zae — D tw Dvc-7 r ,*T 7 4E- Aso'vs Sec- ,4voi2 s /!E lr diAFic reoz .O.ft-a4 G !' S miv Iv - Pi- 77!E Sour>D. &" t4 ,' ' 1 .0. Pi D' .Z..5 Ave t re'vicD 77-64-7" kit'C $ TLC c-eiti r-,, , ve v S ALA/0 TA, t 5 0E7 72.4 -1 /Av 4- 7 /5 A$4 z_dd-s4'7' - - 7 7" eov a-/,3 0-5 --c L uE3 7 9A,IS ? f OLei's-SE G.'- /J / Z,Gf//L40 Lf9/ 7 -( .Z'cS See' - '3 • PIA, /z 7 11040 )^ Do , SUBTOTAL FREIGHT TAX 1 . I LE 1 TT :ILlE UP `., 'ECEDPT , FTC S D VODCE TAIL i f R www.rthood.com DIVOICE NUMBER 56113 ir nu{ 3 f nl {d4s r Y�5 fi+ vl & Hood and Duct Services, Inc 6100 12th Ave. S. Phone (206) 726 -0940 Seattle,WA 98108 Fax (206) 767 -2607 x� SPECIAL INSPECTIONS FOR TYPE I HOOD & DUCT NAME (RE: IBC 1704.13 Special Cases) ADDRESS 2 S O lj Type I hood and ducts shall be inspected by a — l3Z special inspection agency. Grease duct and grease - CITY tUkLt/!/ /'w /ZIP hood test shall comply with 2006 IMC 506.3.3.1 Grease Duct Test per Washington State ADDRESS CHANGE Amendments, and IMC 507.7.1 Hood joints, seams — ONE TIME SL I NEW ACCT. I CUS NO • • High Pressure Hood Cleaning • Fire Suppression Installation & Service • Fire Extinguisher Sales & Service • Range Hood and Fan Service & Repair • Filter Sales & Service ORIGINAL INVOICE SVC LOC: COMPLETE FIRE PROTECTION DATE /2-S 10q w/i,4 -7 TAE A Authorized by: AUTHORIZED SIGNATURE TITLE * I certify that I have read this entire document front and back, agree to all of its conditions, and I am authorized to sign this invoice. NOTE: Please put ACCOUNT NUMBER and INVOICE NUMBER(S) on your payment to insure proper credit. o� K 1 ' aLZaITE =� & ASSOCIATES, INC. February 16, 2009 GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION Mr. Dan Hawkesworth Affordable Hoods PO Box 24231 Seattle, WA 98134 RE: Special Inspection What the Pho Tukwila, WA Dear Mr. Hawkesworth, In accordance with your request and authorization, our firm performed special inspections for the above - referenced project. The inspections were performed by our inspectors from December 12 through December 22, 2008. Copies of our inspector's field reports are attached. Unless otherwise indicated, the structural activities noted on the attached daily field reports were in accordance with the approved project plans and specifications. A guarantee that the contractor has necessarily constructed the structure in full accord with the plans and specifications is neither intended nor implied. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office at (253) 939 -2500. Respectfully submitted, KRAZAN & ASSOCIATES, INC Randall Hansen Project Manager Puyallu.p Division CC: City of Tukwila FEB 20 . • i1N!Pf LLOPAgENT Offices Serving The Western United States KA No. 066 -08327 Permit No. M08 -258 922 Valley Avenue NW Suite 101 • Puyallup, Washington 98371 • (253) 939 -2500 • Fax: (253) 939 -2556 DFR Template ■ /2111 &ASSOCIATES,IN GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION FIELD REPORT NO: 76284 DATE: 12/12/08 CONTRACTOR: L & L PROJECT #: 066 -08327 JURISDICTION: Southcenter, WA PROJECT: What the Pho PERMIT #: M08 -258 LOCATION: 17250 Southcenter Blvd KRAZAN PROJECT MANAGER: KEG Superintendent/Representative: 1501 Field Report.doc INSPECTOR: WEATHER: Inside adequate as per AWS D1.3 & above mentioned code where accessible. Technician: Offices Serving the Western United States Mike Sorantino & James Bland 0 TEMP: Visually inspected seam welding of duct work over stove in kitchen where accessible only, (approximately 30% of total duct work over stove). As per mechanical code 506.3.3.1 Flaws found were repaired during inspection by contractor and duct work seam welding appeared Equipment/Asset Number(s): To the best of my knowledge the above WAS ® / WAS NOT 0 performed in accordance with the approved plans, specifications, and regulatory requirements. Mike Sorantino & James Bland Revision I Effective Date: 525/05 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates ESAU ia 1(1 Laz &ASSOCIATES,INC. GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE: 12/22/08 PROJECT #: 066-08327 PROJECT: What the Pho LOCATION: 17250 Southcenter Pkwy, Ste 132 KRAZAN PROJECT MANAGER: KEG FIELD REPORT NO: 89604 CONTRACTOR: Affordable Hood JURISDICTION: City of Tukwila PERMIT #: M08-258 INSPECTOR: James Bland & Jonathan Pink WEATHER: Overcast TEMP: 33° Inspectors on site to perform visual inspection on the grease duct per section 503.3.3.1 mechanical code. Contractor removed all fire wrapping to expose the seam welding, checked the seams for visible light from the top of the hood to roof exhaust fan. The seam welding is adequate and pass the light testing requirements per the mechanical code. Equipment/Asset Number(s): To the best of my knowledge the above WAS ® / WAS NOT ❑ performed in accordance with the approved plans, specifications, and regulatory requirements. Superintendent/Representative: Technician: James Bland & Jonathan Pink Offices Serving the Western United States 1501 Field Report.doc Revision I Effective Date: 525/05 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krazan & Associates. .*LIKrazan & Associates Superintendent /Representative: GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING AND INSPECTION DATE: /o2 //t OS' PROJECT #: Q - O 3 '7 PROJECT: WI-147 7iV4" RA/C/ LOCATION: /72570 Sov77-/C ,TER 241/.0. KRAZAN PROJECT MANAGER: Equipment/Asset Number(s): To the best of my knot' edge, the abo 1501 Field Report.doc The information provided on this report is prepared for the exclusive used nc. FIELD REPORT NO: 76284 CONTRACTOR: L' L JURISDICTION: SC)I/TWCE/VTER, WA, PERMIT #: NO? - es's' INSPECTOR: N SORANT /NQ Y BLRXD WEATHER: /N.S /p TEMP: V /.S &'ALLY //Y.SPECTL:L> 5S 4 k'EIL> /-4 , O DUGrIYOR.K v V. R 57ay IN K /7"C'NEN WN4R.E"ACC,3S.SA LE O/VLY 69,, 0)64m' jrELY 30% Or 7 DG/C7dv0Re OVER 57-0)-4, 45 PEP /t t 0/4/sOCAG CODE' 5'46,3..3,1 L�9Gt/S FOUND 1471 - rPE" R4'P.9 // ' L> ,LOR / /VG /A/SPEC 770N 6'Y CGno 4Crote AND DUG714/0RA' SEA A, h'0/A'6. , 'JP,'EAR - i> /4224 c ,,q rE #45 •0/S 1V. 3 'k A8avE frf1 tWt /oA D COPZ Wt/EREACCE. s'54it. °. WAS NOT performed in accordance with the approved plans, specifications, and regulatory requirements. Technician: Serving the Western United States client. This report may not be reproduced in any format without Revision 1 Effective Date: 5/25/05 fission of the client and Krazan & Associates. Ae p ko - B )4A-AcE. re_/03i=f MO 25S PSP Supply CFM Worksheet for Shortridge VelGrid Job Number = 847408 Job Name = Allen L Construction rev. 4 PSP Number 1 Information PSP Length = PSP Width = Number of Blanks = 108 inches inches Notes: SUPPLY READING TAKEN EVERY 12" 16 w __ Reading #1 Reading #1 Reading #2 Reading #3 Reading #4 Reading #5' Reading #6 Reading #7 Reading #8 Reading #9 CFM Velocity I 286 301 315 190 183 201 242 199 242 2550 PSP Number 2 Information PSP Length = PSP Width = Number of Blanks = _ 84_ 16 • inches inches Note: 18 Reading #1 Reading #2 Reading #3 Reading #4 Reading #5 Reading #6 Reading #7 Reading #8 Reading #9 CFM Velocity I 200 206 195 208 200 243 213 1711 PSP Number 3 Information PSP Length = PSP Width = Number of Blanks = inches inches Notes: 18 Reading #1 Reading #2 Reading #3 Reading #4 Reading #5 Reading #6 Reading #7 Reading #8 Reading #9 CFM Velocity I 0 I 0 _ 0 PSP Number 4 Information PSP Length = PSP Width = Number of Blanks = inches inches Notes: 18 v Reading #1 Reading #2 Reading #3 Reading #4 Reading #5 Reading #6 Reading #7 Reading #8 Reading #9 CFM Velocity I 0 _ 0 Total Supply CFM's = 4262 CFM Exhaust Baffle Filter CFM Worksheet for Shortridge VelGrid Job Number = 847408 Job Name = Allen L Construction rev. 4 Hood Number 1 Information Model = 5424ND -2 -PSP -F Length = 16 Notes: Filter #1 Filter #2 Filter #3 Filter #4 Filter #5 Filter #6 Filter #7 Filter #8 16 "x20 "iV Filter #9 Filter #10 Filter #11 Total CFM Filter Size '16 "x16" v 16 "x16" v 16 "x20 ";v 16 "x20 "IV 16 "x20" v ^16 "x20 "vI _ 16 "x20" v 16 "x20" v 16 "x20" v No Filter v No Filter Iv Velocity 259 162 181 195 206 181 205 150 184 205 CFM 420 262 376 405 428 376 426 311 382 426 0 3811 Hood Number 2 Information Model = 4824ND -2 -PSP -F Length = 5 Notes: Filter #1 Filter #2 Filter #3 Filter #4 Filter #5 Filter #6 Filter #7 Filter #8 Filter #9 Filter #10 Filter #11 Total CFM Filter Size � 16" x 20" v 16" x 20" �_ 16" x 20" v No Filter ' v .. No Filter v No Filter v No Filter v No Filter i v ; No Filter F` No Filter v No Filter Iv Velocity 183 168 154 0 0 0 CFM 380 349 320 0 0 0 0 0 0 0 0 1048 Hood Number 3 Information Model = Length = Notes: Filter #1 Filter #2 Filter #3 Filter #4 Filter #5 Filter #6 Filter #7 Filter #8 Filter #9 Filter #10 Filter #11 Total CFM Filter Size No Filter v _ No Filter v No Filter v ^ No Filter v No Filter : v No Filter v _ No Filter v No Filter v No Filter v No Filter v No Filter v Velocity CFM 0 0 0 0 0 0 0 0 0 0 0 0 Hood Number 4 Information Model = Length = Notes: Filter #1 Filter #2 Filter #3 Filter #4 Filter #5 Filter #6 Filter #7 Filter #8 Filter #9 Filter #10 Filter #11 Total CFM Filter Size No Filter v No Filter v No Filter v No Filter v _ No Filter v No Filter v No Filter v No Filter I v No Filter v No Filter 1 v No Filter v Velocity CFM 0 0 0 0 0 0 0 0 0 0 0 0 Total Exhaustt CFM's = 4859 CFM imamn Ammaimms A Engineering ° Design Criteria: TSE 2006 IBC Seismic S =134 %g Floor Live Load= 100psf Allowable Soil Bearing= 1500psf r STRUCTURAL CuALCtLATNS' WHAT THE PHO MEZZANINE, 17250 Southcenter Parkway Tukwila, WA REVIEWED FOR CODE COMPLIANCE APPROVED OV 14 20 C ALCULATIONS REVISED 8/20/08 TO ACCOUNT FOR REVISED MEZZANINE LAYOUT. SEE SHEETS 4 THROUGH 17 FOR VARIOUS REVISED BEAM. COLUMN AND FOOTING CALCS. • Mob - 258 12930 N.E. 178th Street ® Woodinville, WA. 98072 -5708 (425) 481 -6601 A FAX (425) 481 -6371 FILE COPY Pr No. RECEIVED OCT 292008 PERMIT CENTER a . c .�� 7-59).- PROJECTWhat•The Pho M'e2zanine,: CLIENT : : EI-7giryaarit JOB NO. 6437: . • DATE : :4/13/2008 S YS Si P / . N '2046Ke i l :eI'�la = � itr hail elks:O rtiO i t) 1 t �s s �D O . c:..� ut t t t INPUT DATA Typical floor height Typical floor weight Number of floors Importance factor (ASCE 11.5.1) Building location Site class (A, B, C, D, E, F) The coefficient (ASCE Tab 12.8 -2) The coefficient(ASCE Tab. 12.2.1) Level No. 1 Level Floor to floor Name Height ft Roof '10.50 Ground 'h= 10,5 1 f wx= 30 k n = .1• I = : 1.00 (IBC Tab.1604.5) 98188 D (If no soil report, use D) 0.02 R = 6.50 Zip Code 0.0 C, h = 10.5 ft W = 30 k VERTICAL DISTRIBUTION OF LATERAL FORCES Height Weight hx Wx Wxhx k Cvx ft k 10.5 315 1.000 TY k = 1.00 , (ASCE 12.8.3, pg 130) X = 0.75 , (ASCE Tab 12.8 -2) Ew = 315 � /ENO OF MEZZANINE WBr74 STEEL BEAM sw1 E HEADER IMO WALL PER DETAIL D /5 -1, TOP. Sw1 -END OF MEZZANINE MEZZANINE FRAMING PLAN` w /MAIN FLOOR SHEARWALLS DESIGN SUMMARY Total base shear V = 0.14 W, (SD) _ 0.10 W, (ASD) = Seismic design category Latitude: 47.447736 Longitude: - 122.2735 S = 133.737 %g , Sms = S = 45.962 %g . Sm1 = Sips = 0.892 g , Lateral force A each level F k 4.1 V O. M. k k -ft 4.1 T = Ct(hn) x = 43 PAGE: DESIGN BY : itl REVIEW BY : g, F 1.000 g , F„ = 1.540 SDI = 0.472 1.337 0.708 g i' - r r4&e S/J i 2 W LL Dc5I6N 4 k, (SD) 3 k, (ASD) D 0.12 Sec, (ASCE 12.8.2.1) Diaphragm force EF EW, F px k k k 4.1 30 5 WX : 3'CIA(0', o3 K5 30K PROJECT What The Pho Mezzanine • ; CLIENT • '�.. rr ;� i n e ®ring JOB NO. 6437 DATE :.4/13/2008 • SEISMIC( /JNP001.S;BA$EVANIIBRt i haft .af (itGrct P„ro' edure; ASCEi7:05f0:80a z5H6M P - f)55/1 - (p A151) 43 el A-1 9)(1 p4rl T A / frau; 10/575 //) T - 61M di6DL 1; f iM' AT Kit qJ J /H'> C; (croi575 /7) ISoo vti _ ►- ' 19c S 3 ' 13r id 23� �pL ov6eToP.it lG Ma1 DTM L () is (6, 413 23 3 = 1413- 4/40 00 PAGE : DESIGN BY : :t113 REVIEW BY : � = 65pli oK 1S u5is5 /mu4 1522., P o� t315 r 13,6' - O0' 6DC = 1905 4p6-f'(1o)(tA6 17 /) �^ ti sE s /NDV4 r�6 X410") 0,Se Sim 5y) "SIODLI4 Jdor,��15 � P P .eQh of /.ea l/s ►i/ 5 76''0 80 -om eclJed sit' 1 )1 *' - { : 6197; I/ 5/1 5 % - A "5e. Udhe5111 . . b`i be J , 2 � ' t7� 61)0i -bled 4� f4G --GIs / 1 0 4 v , 7 17-/-7/1 / 1/ • PROJECT: j7fsi6A) JOB #: BY: DATE: • REV ag NEW c4 N 1bI g4' T iffin oui �Il NI /I/ 1/N% .II% M/Gllrt /�f MW IIMIIWI•: Ir/ /. IIIIIM W8x24 SIttL BEAM FRAME HEADER INTO WALL PER DETAIL D /S -1, TYP. E FRArvING PLAN -i 2 7 rt — __4 I I I 1 1 . t cut,47704s vn1 ETS 5£ 7 /2 , / S > > \ t(t E 136E1. p vrso (G if CCc IV MEZz (Ai e 1-,/5-ya47' TSE • Engineering • 12930 N.E. 178th Street Woodinville, WA 98072 • (425)481 -6601 0/1119 CANITIt Oik MEZZANIN iii 6;itcK KR - 1721b /ft -ft - 1721b /ft - 172Ib /ft 1685.1 floor joist Aug 20, 2008 at 10:36 AM PHO STEELJOIST.r2d 445.1 Loads: LC 2, DL +LIVE Results for LC 2, DL +LIVE Reaction units are lb and lb Tri State Engineering, Inc. 1 N1 0 0 0 2 N2 5.5 0 0 3 N3 9.5 0 0 4 N4 14.5 0 0 1 N1 Reaction Reaction CF1A 2 N2 A570 33 Reaction 2 M2 3 N3 Reaction I Beam 1 M'1 N1 N2 CF1A Beam CU A570 33 Typical 2 M2 N2 N3 CF1A Beam CU A570 33 Typical 3 M3 N3 N4 CF1A Beam CU A570 33 Typical Company Designer Job Number Cold Formed Steel Properties Label E [psi] 1 ] A570 33 Cold Formed Steel Section Sets Member Primary Data 1 2 3 1 2 1 2 3 1 2 Label M1 M2 M3 Basic Load Cases Tri State Engineering, Inc. KR G [psi] floor joist Nu Therm (\1E5 F) Densityflb /ft ^3 Aug 20, 2008 /) 10:35 AM /`J Checked By: Yieldfosil Ultimate[psi] 2.95e +7 1.1346e +7 .3 .65 1 490 33000 52000 Type Design List Material Design Rules A fin2l I (90.270) fi... I (0.180) [in4] Beam CU A570 33 Typical .836 .235 7.089 Label Shape 1 ] CF1A 18005162 -68 Joint Coordinates and Temperatures Joint Boundary Conditions Cold Formed Steel Design Parameters CF1A CF1 A 5.5 4 2 2 5 2 0 y CF1 A pt None None y 3 3 BLC Descri DL LIVE Member Distributed Loads (BLC 1 : DL) Y Y Y -39 -39 -39 g -39 -39 -39 0 0 0 0 0 0 Member Label M1 M2 M3 Member Label M1 M2 ion Category Member Distributed Loads (BLC 2 : LIVE) RISA -2D Version 8.0.3 [K : \PHO STEELJOIST.r2d] X Gravity Direction Start Magnitude[Ib /ft.... End Ma e Rotation [ k -ft/rad Y[ft Y Gravi Design List Shape Length[... Lb- out[ft] Lb- in[ft] Lcomp top.. Lcomp bot.. K -out K -in Cm Cb R Joint Poin Direction Start Magnitude[Ib /ft.... End Magnitude[Ib /ft,d.. Start Location[ft. %1 -133 I 0 l 0 em o fF Footin Material Design Rules ut s... I n swa Distributed nitude[Ib /ft,d... Start Locationfft. %] End Location[ft, %] End Location[ft, %] Y -133 -133 -133 0 Page 1 1 2 CI M 1-131,G1 v1 0 980.063 O - 0 2 2 0 2 0 - 44.202 3957.095 - 3957.095 3 3 0 0 - 3 0 - 1068.466 - 747.591 747.591 4 2 M2 1 0 - 358.24 - 747.591 747.591 5 - 501.008 7 774.115 2 0 - 1103.159 - 5241.573 5241.573 6 2114.441 7 2 3 0 - 1848.079 - 14316.993 14316.993 7 2 M3 1 0 1862.299 - 14316.993 14316.993 8 2 0 931.149 - 3579.248 3579.248 9 3 0 0 0 0 1 2 2 M M1 1 1 0 0 4 445.102 0 0 2 2 2 0 0 - - 20.075 - - 584.413 3 3 3 0 0 - - 485.252 1 110.41 4 2 2 M M2 1 1 0 0 - - 162.697 1 110.41 5 2 2 0 0 - - 501.008 7 774.115 6 3 3 0 0 - - 839.318 2 2114.441 7 2 2 M M3 1 1 0 0 8 845.776 2 2114.441 8 2 2 0 0 4 422.888 5 528.61 9 3 3 0 0 0 0 0 0 UV.. i , -uv,., • - . - 1 2 N1 .0 445.102 0 2 2 N2 0 322.554 0 3 2 N3 0 1685.095 0 4 2 Totals: 0 2452.752 5 2 COG (ft): X: 7.25 Y: 0 LLJ IVIQI I IUQI L.nuoI v.... .. l'.'' J ,... 1 2 M1 1 0 0 NC 2 2 0 -.015 4420.956 3 3 0 0 NC 4 2 M2 1 0 0 NC Company : Tri State Engineering, Inc. Designer : KR Job Number : Member Distributed Loads (BLC 2 : LIVE) (Continued) Member Label 3 1 M3 Joint Loads and Enforced Displacements Load Combinations Description Solve PD... SR... BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor 1 DL 2 DL +LI \/E Joint Reactions Y -133 -133 0 0 Joint Label Yes Yes Y Y 1 1 1 1 1 1 Member Section Forces Member Section Stresses Member Section Deflections (By Combination) RISA -2D Version 8.0.3 [K: \PHO STEELJOIST.r2d] floor joist Aug 20, 2008 c... 10:35 AM Checked By: Direction Start Magnitude[lb/ft ... End Magnitudeflb /ft d... Start Location[ft, %1 End Location[ft, %] L,D,M Direction Magnitudeflb,lb -ft in.rad Ib *s ^2 /ft] No Data to Print ... 1 MZ flb-ft Page 2 LLJ IVIQI I IUQI L.nuoI v.... .. l'.'' J ,... 1 2 M1 1 0 0 NC 2 2 0 -.015 4420.956 3 3 0 0 NC 4 2 M2 1 0 0 NC Company : Tri State Engineering, Inc. Designer : KR Job Number : Member Distributed Loads (BLC 2 : LIVE) (Continued) Member Label 3 1 M3 Joint Loads and Enforced Displacements Load Combinations Description Solve PD... SR... BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor 1 DL 2 DL +LI \/E Joint Reactions Y -133 -133 0 0 Joint Label Yes Yes Y Y 1 1 1 1 1 1 Member Section Forces Member Section Stresses Member Section Deflections (By Combination) RISA -2D Version 8.0.3 [K: \PHO STEELJOIST.r2d] floor joist Aug 20, 2008 c... 10:35 AM Checked By: Direction Start Magnitude[lb/ft ... End Magnitudeflb /ft d... Start Location[ft, %1 End Location[ft, %] L,D,M Direction Magnitudeflb,lb -ft in.rad Ib *s ^2 /ft] No Data to Print ... 1 MZ flb-ft Page 2 Company : Tri State Engineering, Inc. Designer : KR Job Number : Member Distributed Loads (BLC 2 : LIVE) (Continued) Member Label 3 1 M3 Joint Loads and Enforced Displacements Load Combinations Description Solve PD... SR... BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor 1 DL 2 DL +LI \/E Joint Reactions Y -133 -133 0 0 Joint Label Yes Yes Y Y 1 1 1 1 1 1 Member Section Forces Member Section Stresses Member Section Deflections (By Combination) RISA -2D Version 8.0.3 [K: \PHO STEELJOIST.r2d] floor joist Aug 20, 2008 c... 10:35 AM Checked By: Direction Start Magnitude[lb/ft ... End Magnitudeflb /ft d... Start Location[ft, %1 End Location[ft, %] L,D,M Direction Magnitudeflb,lb -ft in.rad Ib *s ^2 /ft] No Data to Print ... 1 MZ flb-ft Page 2 5 2 M1 800S162 -68 2 0 .014 5.5 3497.316 27588 4770.006 1 .85 C5.2.1.. ':� 2.;.: . . M2 800S1 = .740 .4 . 7 2 ;18027 8,. M3 1 0 0 c$.2.1.... NC 2 „'8.1:::. ,"; ... 0 2 p. -.094 :' 634:961 ' .. 9 . .1.. 3 0 -.221 271.693 1 2 M1 800S162 -68 . 205 2.638 .115 5.5 18027.8... 27588 4770.006 1 .85 C5.2.1.. ':� 2.;.: . . M2 800S1 = .740 .4 . ':1.99' .. 4'. ;18027 8,. °27588.; 0:.006' -,-1 -.85 c$.2.1.... 3 2 M3 800S162 -68 .740 0 .200 0 18027.8.. 27588 4770.006 1 .85 C5.2.1.. Company : Tri State Engineering, Inc. Designer : KR Job Number : Member Section Deflections (By Combination) (Continued) Member Cold Formed Steel Code Checks (By Combination) Member floor joist "? NOTE: A SINGLE JOIST CAN CARRY DESIGN STESSES HOWEVER DOUBLE JOIST ARE USED TO REDUCE DEFLECTION THAT OCCURS WHEN UNBALANCED LOADS ARE CONSIDERED Aug 20, 2008 LA 10:35 AM .7' Checked By: -ftl Cb Cm RISA -2D Version 8.0.3 [K: \PHO STEELJOIST.r2d] Page 3 ®m TS PROJECT: °'�® CLIENT : JOB NO. : Er�,gir�eari rig Joist Design Based on AISI 2001 & ICBO ER -4943P INPUT DATA & DESIGN SUMMARY SECTION & SPACING 800S162 -68 @ 16 in o.c (50 ksi) JOIST SFAN L = 11 ft DEAD LOAD LIVE LOAD LATERAL SUPPORTED? (0 =No, 1= compression flange, 2= tension flange) DEFLECTION LIMITATION FOR LIVE LOAD ? (0 =No., 1= L /240, 2= L /360, 3= L /180, 4= L /120) ANALYSIS SECTION PROPERTIES OF EACH METAL STUD (SSMA page 7 & 8) t = h = A= CHECK MAX WEB DEPTH -TO- THICKNESS RATIO (AISI B1.2) h / t = 112.20 < 200 [Satisfactory] CHECK FLEXURAL CAPACITY (AISI C3.1) Mn/lb 0.0713 8 0.836 in in in J = 0.001416 in 59.57 in -kips DL = 30 psf LL = 100 psf Fy = 50 Wt = 2.84 r = 2.913 C = 3.047 Where M = [(DL +LL) S + Wt ] L / 8 = 31.98 in -kips S = 16 in o.c., spacing as given. CHECK SHEAR CAPACITY (AISI C3.2) V„ /S2v = 4048 lbs > V [Satisfactory] Where V = [(DL +LL) S + Wt ] L / 2 = 969 lbs CHECK LATERAL- TORSIONAL BUCKLING (AISI C3.1.2) CASE 1: BOTH TOP & BOTTOM FLANGES UNSUPPORTED Fe = C S oA J6ev 7t _ Where F Cb = 1.0 o =( r 2 +r +X °.5 x y o) Sf = 1.77 E = 29500 G = 11300 Ky = 1.0 K 1.0 L = 132 in L = 132 in 9.1 ksi 3.101 in in ksi (AISI pg 18) ksi (AISI pg 21) DATE: 1 compression flange 2 L /360 ksi lb /ft in in s > M [Satisfactory] Fy , for F 10 ( 1OF F ,I 1 36F , for 2.78>F 9 ) l e, F , for F <_0.56F Ixx = Sxx = r y = < == Does not apply. < 2.78 F = < 0.56 F = ,r ( (K 7.089 in M /fl = 59.57 in -kips 1.757 in V„ /d2„ = 4048 lbs 0.53 in x = -0.921 in GJ + EC "' �KtLt = 9.1 ksi 139.0 ksi 28.0 ksi PAGE: DESIGN BY : REVIEW BY : THE DESIGN IS ADEQUATE. 4.694 ksi = 8.325 ksi ��✓ /2d/' a 8 CHECK DEFLECTION M„ /f/b = 9.70 Where S nb = Mn = M /nb = Where i QbM Mn M= [(DL +LL)S /12 +Wt]L /8= 34.85 Se = �b = R= Mn = = 0.54 in -kips < M [Satisfactory] 1.77 in from SSMA page 7 & 8 1.67 S = 16.20 in -kips > 0.5 31.98 in -kips CASE 2: BOTTOM FLANGE SUPPORTED ONLY <== Does not apply. in -kips > M [Satisfactory] 1.76 in from S 1.67 0.66 (AISI Table C3.1.3 -1) RS = 58.20 in -kips CHECK CAPACITY COMBINED BENDING & SHEAR AT ANY SAME SECTION (AISI C3.3.1) (. nblvi )2 +iovV)2 0.3454 < 1.0 [Satisfactory] M \• Vn Where M = 31.98 in -kips V = 969 lbs V /i2,, = 4048 lbs n = 1.67 M = MIN( Bending , Buckling) = 99.482 in -kips M /n = 59.57 in -kips, from SSMA page 7 & 8 for bending only. v 0.6I M Hayti = 0.5614 < 1.3 [Satisfactory] Vn 5(LL S)L ALL- 384E1xx DETERMINE SCREWS AT EACH LEG OF CONNECTION (SSMA page 48) Vmax = 969 lbs Vauow = 0 lbs / screw, for # 8 screws. 523 lbs / screw, for # 10 screws. 557 lbs / screw, for # 12 screws. 0.24 < 0.7 0.21 in < L /360 = 0.37 in [Satisfactory] #8 screws inadequate. (2)- # 10 screws required. (2)- # 12 screws required. Technical References: 1. AISI STANDARD, 2001 Edition. American Iron and Steel Institute. 2. SSMA, Product Technical Information, ICBO ER- 4943P, Steel Stud Manufactures Association, 2001. 6q (cont'd) KEITH -9801 b /ft .9 -ft - 1260Ib /ft STEEL BEAM 17240 7 4,/ $IZo1o8 Aug 20, 2008 at 2:21 PM PHO STEEL BEAM.r2d amian � n AAAAAAAA 9 BIM 8269 Loads: LC 2, DL +LIVE Results for LC 2, DL +LIVE Reaction units are lb and k Tri State Engineering, Inc. 1 �N1 0 0 0 2 N2 3.25 0 0 3 N3 23.75 0 0 4 N4 28.75 0 0 1 V,C , M �a4G, M 1 .,.••■■•, ., .. . Y ..,..... .. •........ -. .. ` . . -100 . . _.._ ._._,... -1 00 0 0 2 M2 Y -100 -100 0 4 3 M2 Y -280 -280 4 0 4 M3 Y -360 -360 0 . 0 1 L - UCl M I u� Ni v a.vn.. N2 ..vw.v.....7� ........ v ... .a ...... -� BM �.-- Beam - -- —' -- Wide Flange - --- HR STL — Typical 2 M2 N2 N3 Gravity BM Beam Wide Flange HR STL Typical 3 M3 N3 N4 BM Beam Wide Flange HR STL Typical 1 M1 BM 3.25 2 Gravity 2 M2 BM 20.5 2 Gravity 3 M3 BM 5 2 Gravity Company : Tri State Engineering, Inc. Designer : KEITH Job Number : Hot Rolled Steel Properties 1 Label BM Label HR STL Hot Rolled Steel Section Sets Shape W1 OX30 Joint Coordinates and Temperatures Joint Boundary Conditions Joint Label 1 N2 N3 2 Member Primary Data Hot Rolled Steel Design Parameters -UUL IL LU- Basic Load Cases 1 2 Member Distributed Loads (BLC 1 : DEAD) 2 BLC Description DEAD LIVE Member Distributed Loads (BLC 2 : LIVE) M-mber Label M1 M2 E [ksi] 29000 Type Beam X Win Category Design List Wide Flange STEEL BEAM G [ksi] Nu .3 Material HR STL YkM X Gravity Y Gravity RISA -2D Ve rsion 8.0.3 [K: \RISA FILES \PHO STEEL BEAM.r2d] Therm ( \1 E5 F) Density[k/ft^31 Design Rules Typical .65 .49 Rotation k- ft/rad Joint Poin 0 74 Aug 20, 2008 2:21 PM Checked By: A fin2l I (90,270) fi... I (0,180) fin41, 8.84 I 16.7 170 Temp f F Footin Yield[ksil 50 Reaction Reaction Reaction Distributed None None 1 4 4 0 Direction Start Magnitude[Ib /ft.... End Magnitude[Ib /ft.d.. Start Location[ft.%] End Location[ft %] Y Y -200 -200 -200 -200 0 0 0 4 Page 1 1 2 M1 1 0 0 0 0 2 0 2 2 0 -.171 -.161 .161 3 I 0 3 0 -.342 -.644 .644 4 2 M2 1 0 2.291 -.644 .644 5 - 436.233 - 41.406 2 0 -.139 15.301 - 15.301 6 I 7 3 0 -3.435 -5.959 5.959 7 2 M3 1 0 2.054 -5.959 5.959 8 2 0 1.027 -1.49 1.49 9 I 3 0 0 0 0 1 I 2 M1 1 0 0 0 2 N3 0 2 0 - 536.381 .436 3 0 25509.816 3 0 - 1072.762 1.743 4 2 M2 1 0 7197.093 1.743 5 2 0 - 436.233 - 41.406 6 3 0 - 10789.558 16.126 7 2 M3 1 0 6450.403 16.126 8 2 0 3225.201 4.032 9 3 0 0 0 1 I 2 N2 0 8269.855 0 2 2 N3 0 17239.961 0 3 2 Totals: 0 25509.816 NC 4 2 COG (ft): X: 17.104 Y: 0 NC L. 1 2 !VII 1-.C.....,41 M1 1 0 .301 NC 2 I 2 0 .151 NC 3 I 3 0 0 NC 4 1 2 M2 1 0 0 NC Company Designer Job Number Member Label 3 M2 4 M3 1 2 DL +LIVE Member Section Forces Tri State Engineering, Inc. KEITH Member Distributed Loads BLC 2 : LIVE Continued Y Y -700 -900 -700 -900 4 0 0 0 Direction Start Magnitude[Ib /ft ... End Magnitudejlb /ft.d.. Start Location[ft. %1 Joint Loads and Enforced Displacements (BLC 1 : DEAD) 0 Joint Label N1 Load Combinations Description Solve PD... SR... BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor BLC Factor D Yes Y Y Y -1 - 1 1 1 1 1 2 2 1 Joint Reactions (By Combination) Member Section Stresses STEEL BEAM LDM Member Section Deflections (By Combination) RISA -2D Version 8.0.3 [K: \RISA FILES \PHO STEEL BEAM.r2d] Direction Magnitudeflb.k -ft in.rad Ib *s ^2/ft] L 1 Y Aug 20, 2008 2:21 PM Checked By: End Location[ft. %] -f B Page 2 v .! .... — . - -_ -- - 5 2 0 -.601 409.431 6 3 0 0 NC 7 2 M3 1 0 0 NC 8 2 0 .187 NC 9 3 0 .365 NC LL! MCI IW V, 1 2 M1 W 10X30 .019 3.25 .017 3.25 258835.508 91.317 2.339 H1-lb 2 2 M2 W 10X30 .454 9.832 .172 20.5 210271.277264670.659 91.317 1.183 H1 -1 b 3 2 M3 W 10X30 .177 0 .103 0 258835.508 91.317 2.312 H1-lb •a Cornpany Designer Job Number Tri State Engineering, Inc. KEITH STEEL BEAM Member Section Deflections B Combination Continued Sec finl 16 Aug 20, 2008 2:21 PM Checked By: Member RISC 13th ASD Steel Code Checks (By Combination) GIST loA' 3 ,0 RISA -2D Version 8.0.3 [K: \RISA FILES \PHO STEEL BEAM.r2d] Page 3 Llr I IVICI I IIJCI LQUCI v LL! MCI IW V, 1 2 M1 W 10X30 .019 3.25 .017 3.25 258835.508 91.317 2.339 H1-lb 2 2 M2 W 10X30 .454 9.832 .172 20.5 210271.277264670.659 91.317 1.183 H1 -1 b 3 2 M3 W 10X30 .177 0 .103 0 258835.508 91.317 2.312 H1-lb •a Cornpany Designer Job Number Tri State Engineering, Inc. KEITH STEEL BEAM Member Section Deflections B Combination Continued Sec finl 16 Aug 20, 2008 2:21 PM Checked By: Member RISC 13th ASD Steel Code Checks (By Combination) GIST loA' 3 ,0 RISA -2D Version 8.0.3 [K: \RISA FILES \PHO STEEL BEAM.r2d] Page 3 •a Cornpany Designer Job Number Tri State Engineering, Inc. KEITH STEEL BEAM Member Section Deflections B Combination Continued Sec finl 16 Aug 20, 2008 2:21 PM Checked By: Member RISC 13th ASD Steel Code Checks (By Combination) GIST loA' 3 ,0 RISA -2D Version 8.0.3 [K: \RISA FILES \PHO STEEL BEAM.r2d] Page 3 7�- PROJECT: PHO -° CLIENT : JOB NO. : Box Beani Design Based on AISI 2001 & ICBO ER- 4943P INPUT DATA & DESIGN SUMMARY VERT. MEMBERS 2 x 800S162-68 (TOTAL SECTION: 4 x 8 , 50 ksi ) L= 7 ft SPAN DEAD LOAD LIVE LOAD t = 0.0713 in h = 8 in A = 0.836 in2 J = 0.001416 in4 Fc = DL = 0.3 kips / ft LL = 1 kips / ft CHECK LATERAL- TORSIONAL BUCKLING (AISI C3.1.2.2) 0.36Cbn Lu = VEGJj = 1.16 ft F y Sf Fy = 50 ksi Wt = 2.84 lb /ft r = 2.913 in C = 3.047 in TYPICAL HEADER DATE: COMPRESSION FLANGE SUPPORTED ? (O =No, 1 =Yes) 1 compression flange supported DEFLECTION LIMITATION FOR LIVE LOAD ? 2 L /360 (O = =No., 1= L /240, 2= L /360, 3= L /180, 4= L /120) THE DESIGN IS ADEQUATE. ANALYSIS SECTION PROPERTIES OF EACH VERTICAL STUD (SSMA page 7 & 8) CHECK MAX WEB DEPTH -TO- THICKNESS RATIO (AISI B1.2) h / t = 112.20 < 200 [Satisfactory] CHECK FLEXURAL CAPACITY (AISI C3.1) M„ /a = 9.93 ft-kips > M [Satisfactory] Where M = (DL + LL + Wt ) L / 8 = 8.00 ft-kips CHECK SHEAR CAPACITY (AISI C3.2) V„ /Sly = 8.10 kips > V [Satisfactory] Where V = (DL + LL + Wt ) L / 2 = 4.57 kips <== Does not apply. < L PAGE : 8 DESIGN BY : REVIEW BY : Fy , for F >- 2.78F 10 y ( 1- 1 0 F ' y / 9 F 36F for 2.7�F = 23.0 ksi e F , for F <_0.56F BEAM / HEADER. SECTION I = 7.089 in4 S, = 1.757 in' T = 0.53 in Where Cb = 1.0 Sf = 3.54 in' (total vertical studs, SSMA page 7 & 8.) E = 29500 ksi (AISI page 18) G = 11300 ksi (AISI page 21) l = 5.033 in (neglecting top & bottom tracks conservatively.) J = 0.003 in F Cbr - f EGJ j y = 23.0 ksi < 2.78 Fy = 139.0 ksi K f `f < 0.56 Fy = 28.0 ksi Where K = 1.0 L = 84 in M„ /fb = 59.57 in -kips V /52, = 4048 lbs xo = -0.921 in M /fib = Where CHECK CAPACITY COMBINED BENDING & SHEAR AT ANY SAME SECTION (AISI C3.3.1) 1 2 + 2 ( ovV 0.9674 < 1.0 [Satisfactory] C /1 , 1 � n/ ( Where M = 8.00 ft-kips V = 4.57 kips V = 8.10 kips C/b = 1.67 M = MIN( Bending Buckling) = 16.58 ft-kips 1 M„ /Q = 9.93 ft-kips, for bending only. C �i I = > 0.5 [nv 0.81 = 0.56 < 0.7 MM J Vn 0.6 i2 +( = 1.0478 < 1.3 [Satisfactory] C lVn CHECK DEFLECTION 4.07 S = nb ° ft-kips < M [Satisfactory] 3.54 in (total vertical studs, SSMA page 7 & 8.) 1.67 M = S = 81.52 in -kips M = (DL + LL + Wt ) L 8 = 8.00 ft-kips 5(LL)L ALL = = 0.13 in < L /360 = 0.23 in [Satisfactory] 384E1 Technical References: 1. AISI STANDARD, 2001 Edition. American Iron and Steel Institute. 2. SSMA, Product Technical Information, ICBO ER- 4943P, Steel Stud Manufactures Association, 2001. (cont'd) HEADER INPUT: Uniform Loading w (DL) w (LL) Roof (psf) 0 0 Tributary (ft) 0 0 Wall (psf) Tributary (ft) Floor (psf) 30 100 Tributary (ft) 1 1 Other (pif) 10 pif RESULTS: VI (DL) Vr (DL) 265 635 Ibs. Ibs. 0 0 0 0 0 40 100 pif VI (LL) 625 Ibs. TSE Engineering w (TL) 140 plf Span Length L 4 ft Load 1 2 Concentrated Loading Xc P (DL) P (LL) 3 740 1700 ft Ibs Ibs Vr (LL) VI (TL) Vr (TL) M (DL) 1475 890 2110 635 Ibs. Ibs. Ibs. ft.lbs. M (LL) 1475 ft.lbs. Job* By: Page: 9 0 P (TL) 2440 0 Ibs M (TL) . 2110 ft.lbs. 211a (i _ //)777 6 b � 245 y Use N55 4x 2 . s x 3 /i( 76) PROJECT: PHO ®® CLIENT : JOB NO. Stud Design Based on AISI 2001 & ICBO ER -4943P INPUT DATA & DESIGN SUMMARY SECTION & SPACING 350S125 -54 @ 16 in o.c (50 ksi ) WALL HEIGHT h = 10 ft h = 0 ft SERVICE GRAVITY LOAD P = 1240 lbs / ft SERVICE LATERAL LOAD w = 5 psf SERVICE PARAPET LOAD w = 0 psf ECCENTRICITY e = 0 in DEFLECTION LIMITATION ? 1 h /240 (0 =No., 1= h /240, 2= h /360, 3= h /180, 4= h /120) ANALYSIS SECTION PROPERTIES OF EACH METAL STUD (SSMA page 7 & 8) thk = 0.0566 in Fy = 50 ksi I,, = 0.603 in M /S2 = 9.71 in -kips t = 3.5 in Wt = 1.15 lb /ft S, = 0.324 In V = 3446 lbs A = 0.337 in r = 1.344 in r = 0.402 in x = -0.781 in J = 0.00036 in C = 0.127 in CHECK MAX WEB DEPTH -TO- THICKNESS RATIO (AISI B1.2) t / (thk) = 61.84 < 200 [Satisfactory] CHECK FLEXURAL CAPACITY (AISI C3.1) M /S2b = 9.71 Where x = h+ hr Where in -kips / stud (h +hr) Pe 2h hw, S = 5.00 ft (h +h) Pe (h +h)w,- 2h + h DATE: M, = 2w1h2 [Pe+ = S = 1.333 ft o.c., spacing as gaven. w2hp S = 0.00 in -kips / stud M 2= 2 M = 0.75 MAX( M , M = CHECK SHEAR CAPACITY (AISI C3.2) V /S2 = 3446 lbs / stud > V [Satisfactory] V2 = h w S - V = 33 lbs / stud V = h w S = 0 lbs / stud V= 0.75 MAX( V I , V2,V3)= 25 lbs/stud TYPICAL STUD > M [Satisfactory] 1.00 in -kips / stud lbs / stud CHECK CAPACITY COMBINED BENDING & SHEAR AT ROOF /FLOOR SECTION (AISI C3.3.1) C n 1 2 +1 ovV J 2 = 5E -05 < 1.0 [Satisfactory] Mn V Where M = 0.00 in -kips / stud, (0.75 included) V = 25 lbs / stud, (0.75 included) V„/Sl = 3446 lbs / stud, from SSMA page 7 & 8. M /O = 9.71 in -kips / stud, from SSMA page 7 & 8 PAGE: f0 DESIGN BY : REVIEW BY : wi plf /ft) Shear Moment THE DESIGN IS ADEQUATE. W2 (pig I) Shear Moment 0.75 in -kips / stud, (0.75 for wind /seismic, from AISI App. A4.1.2, typical) (In) 0.00 < 0.5 I 47 = 0.01 < 0.7 \ \l 0.6 SZ + S2 = 0.0073 < 1.3 [Satisfactory] Mn) Vn CHECK COMPRESSION CAPACITY WITH, AT LEAST, ONE FLANGE THROUGH- FASTENED TO SHEATHING (AISI C4.6) = 3.62 kips / stud > P [Satisfactory] Where S2 = 1.8 P„ = C AE / 29500 = 6.51 kips / stud C� = (0.79 x + 0.54) = 0.959 C2= (1.17 at +0.93)= 0.996 C3 = a (2.5b - 1.63d) + 22.8 = 20.220 E = 29500 ksi (AISI pg 18) P = 1.77 kips / stud (included wall weight, 18psf.) CHECK CAPACITY COMBINED AXIAL LOAD & BENDING (AISI C5.2.1) S2 + S bC P„ M,a Where M = 0.75 P = 1.77 P = 3.62 M /S2 = 9.71 C 1.0 n .2E ix PEx = 2 - 12.19 kips / stud (KxLx) a = 1 - CcP - 0.738 CHECK DEFLECTION PE 0.59 < 1.0 [Satisfactory] in -kips / stud, (0.75 included) kips / stud kips / stud in -kips / stud 5( = = 0.08 in < h /240 = 0.50 in [Satisfactory] 384EI NOTE : 1. STUD FLANGES SHALL BE FASTENED TO SHEATHING AT EACH SIDE OF WALL BEFORE VERTICAL LOAD ADDED. 2. THE LATERAL LOADS MAY BE REDUCED BY 0.75 PER AISI APPENDIX A.4.1.2 . Technical References: 1. AISI STANDARD, 2001 Edition. American Iron and Steel Institute. 2. SSMA, Product Technical Information, ICBO ER- 4943P, Steel Stud Manufactures Association, 2001. 0" /Pa (cont'd) -.C1:0130mm ■amt® Err,ginaar7ng JOBNO.: DATE: Jamb /Column Design Based on AISI 2001 & ICBO ER -4943P INPUT DATA & DESIGN SUMMARY VERT. MEMBERS 2 X 350S125 -54 (TOTAL SECTION: 3.5 x 3 , INSIDE 3.5 in THK. WALL) HEIGHT ��, PROJECT: PHO CLIENT : h= 9 ft SERVICE GRAVITY LOAD P = 4 kips SERVICE LATERAL LOAD w = 0.005 kips / ft DEFLECTION LIMITATION 7 1 h /240 (0 =No., 1= h /240, 2= h /360, 3= h /180, 4= h /120) ANALYSIS SECTION PROPERTIES OF EACH VERTICAL STUD (SSMA page 7 & 8) thk = 0.0566 in Fy = 50 ksi I, = 0.603 in M = 9.71 in -kips t = 3.5 in Wt = 1.15 lb /ft S, = 0.324 in V, = 3446 lbs A = 0.337 in r = 1.344 in T = 0.402 in x = -0.781 in J = 0.00036 in C, = 0.127 in CHECK MAX WEB DEPTH -TO- THICKNESS RATIO (AISI B1.2) t / (thk) = 61.84 < 200 [Satisfactory] CHECK FLEXURAL CAPACITY (AISI C3.1) M, = 1.62 ft-kips > M [Satisfactory] Where M = 0.75 w h / 8 = 0.04 ft-kips, (0.75 for wind /seismic, from AISI App. A4.1.2, typical) CHECK SHEAR CAPACITY (AISI C3.2) V„K2 = 6.89 kips > V [Satisfactory] Where V = 0.75 w L / 2 = 0.02 kips CHECK COMPRESSION CAPACITY WITH, AT LEAST, ONE FLANGE THROUGH - FASTENED TO SHEATHING (AISI C4.6) P„ /12„ = 7.24 kips > P [Satisfactory] Where S2 = 1.8 P, = C AE / 29500 = 13.03 kips C = (0.79 x + 0.54) = 0.959 C (1.17 at +0.93)= 0.996 C3 = a (2.5b - 1.63d) + 22.8 = 20.220 E = 29500 ksi (AISI pg 18) P = 4.02 kips (included studs weight.) CHECK CAPACITY COMBINED BENDING & SHEAR AT ANY SAME SECTION (AISI C3.3.1) (nbAl � = 0.0003 < 1.0 [Satisfactory] Mn n Where M = V= V, /S2 = M /O = i bM S2 _ Mn. ■ 0.03 ft-kips, (0.75 included) 0.01 kips, (0.75 included) 6.89 kips 1.62 ft-kips 0.02 < 0.5 BUILT - UP COLUMN IN WALL (50 ksi) M n Vn 0.0124 < 1.3 [Satisfactory] C - ° = 0.00 < 0.7 V n J) PAGE : I DESIGN BY : REVIEW BY : JAMB / WALL COLUMN SECTION THE DESIGN IS ADEQUATE. CHECK CAPACITY COMBINED AXIAL LOAD & BENDING (AISI C5.2.1) 0.58 < 1.0 [Satisfactory] P M,a Where M = 0.03 ft-kips, (0.75 included) P = 4.02 kips P = 7.24 kips M„ /O = 1.62 in -kips C = 1.0 CHECK DEFLECTION FEY = , r ZE Ix (KxLx) — 1 �� PRY 5wL4 =- 384E/ 30.10 kips 0.760 0.02 in < h /240 = 0.45 in [Satisfactory] NOTE : 1. STUD FLANGES SHALL BE FASTENED TO SHEATHING AT EACH SIDE OF WALL BEFORE VERTICAL LOAD ADDED. 2. THE LATERAL LOADS MAY BE REDUCED BY 0.75 PER AISI APPENDIX A.4.1.2 . Technical References: 1. AISI STANDARD, 2001 Edition. American Iron and Steel Institute. 2. SSMA, Product Technical Information, ICBO ER- 4943P, Steel Stud Manufactures Association, 2001. (cont'd) Er- �gi�aarT�g JOB NO.: DATE: Tube / Pipe Column Design Based on AISC Manual 13th Edition (AISC 360 -05) INPUT DATA & DESIGN SUMMARY COLUMN SECTION (Tube or Pipe) COLUMN YIELD STRESS DIMENSIONS AXIAL LOAD, ASD 7 9 ' PROJECT: PHO CLIENT : STRONG AXIS BENDING ? (1 =Yes, 0 =No) BENDING LOAD, ASD THE DESIGN IS ADEQUATE. ANALYSIS CHECK: COMBINED COMPRESSION AND BENDING CAPACITY (AISC 360 -05, H1) { p,. + 8 (M , for 9 P M M Pr + [111 rx M 2Pc M Mcy Where KL, = (KL / r)max = P = M, = 114, = CHECK LATERAL DEFLECTION 5wH L Mra — 384EI P = P / nc = M M / £7, = M = M n /12 = Where E = Ix= I = for 10 87 10 0 0.125 HSS3.5X3.5X1/8 Tube F = 46 ksi H = 10 ft P = 10 kips P >0.2 P Pr — < Pc 0.03 in 29000 ksi 2.9 in4 2.9 in4 TUBE STEEL COLUMN = > 0 no, weak axis, y -y, bending. w= 0.01 k/ft = 0.42 < 4/3 [Satisfactory] KL y = 10 ft, for y -y axial load. ft, for x -x axial load. < 200 [Satisfactory] kips ft -kips, at middle of column ft-kips, at middle of column 42 / 1.67 = 25.361 kips, (AISC 360 -05 Chapter E) > P [Satisfactory] 7.3983 / 1.67 = 4.4301 ft-kips, (AISC 360 -05 Chapter F) > 3/4 M, [Satisfactory] 7.3983 / 1.67 = 4.4301 ft-kips, (AISC 360 -05 Chapter F) > 3/4 M, [Satisfactory] L / 240 = 0.50 in [Satisfactory] PAGE: '2 DESIGN BY : REVIEW BY : w P TisE- PROJECT: CLIENT : g . -'BB' 1 "g JOB NO. : Tube / Pipe Column Design Based on AISC Manual 13th Edition (AISC 360 -05) INPUT DATA & DESIGN SUMMARY COLUMN SECTION (Tube or Pipe) HSS3.5X3.5X1 /8 Tube COLUMN YIELD STRESS Fy = 46 ksi DIMENSIONS H = 10 ft AXIAL LOAD, ASD P = 18 kips STRONG AXIS BENDING ? (1 =Yes, 0 =No) _ > 0 no, weak axis, y -y, bending. BENDING LOAD, ASD w = 0 k / ft THE DESIGN IS ADEQUATE. ANALYSIS CHECK COMBINED COMPRESSION AND BENDING CAPACITY (AISC 360 -05, H1) Pr 8 M ` x M for P ? 0.2 P 9,M Ma, P, + / M rx +M , for P' <0.2 2P \ Mcx N1cp Pc CHECK LATERAL DEFLECTION 5wH Amid — 384E1 Where KL x = 10 ft, for x -x axial load. KL y = 10 ft, for y -y axial load. (KL / r)max = 87 < 200 [Satisfactory] P, = 18 kips M, = 0 ft -kips, at middle of column M, = 0 ft -kips, at middle of column P = P / 17 = 42 / 1.67 = 25.361 kips, (AISC 360 -05 Chapter E) > P [Satisfactory] M = M / 12b = 7.3983 / 1.67 = 4.4301 ft -kips, (AISC 360 -05 Chapter F) > 3/4M, [Satisfactory] M = M / !2b = 7.3983 / 1.67 = 4.4301 ft -kips, (AISC 360 -05 Chapter F) > 3/4 M, [Satisfactory] 0.00 in L / 240 Where E = 29000 ksi I = 2.9 in4 = 2.9 'n4 DATE: = 0.71 < 4/3 [Satisfactory] = 0.50 in [Satisfactory] PAGE: DESIGN BY : REVIEW BY : TsE PROJECT : CLIENT : Enginaaring Tube Base Plate Design Based on AISC Manual 13th Edition (AISC 360 -05) INPUT DATA & DESIGN SUMMARY AXIAL LOAD OF COMPRESSION P = 17 kips, ASD STEEL PLATE YIELD STRESS F = 60 ksi CONCRETE STRENGTH f 2.5 ksi COLUMN SIZE _> HSS3.5X3.5X1/8 BASE PLATE SIZE N = 6 in B = 6 in AREA OF CONCRETE SUPPORT A = 2304 in (geometrically similar to and concentric with the loaded area.) USE 6 x 6 /4 in thick plate ANALYSIS CHECK BEARING PRESSURE (AISC 360 -05 J8) 12 c JOB NO.: DATE : = 2.50 x.33 po rmn = 0.22 in F ,,BN Where /= MAX(m,n, 2n')= 1.34 in p p l ,2 c = f c A I MIN 0.85MAX 11 1.7 = Where A, = 36 in actual area of base plate. DETERMINE VALUES OF m, n, n', X , and X (AISC 13th Page 14 -5) m = 0.5 (N - 0.95 d) = 1.34 in n= 0.5(B- 0.95b) = 1.34 in n' = 0.25 (d b ) = 0.88 in X = MIN 4db ii pa 1 = 0.28 ,(d +b) P 2 = MIN 2,X , 1 = 0.57 ( 1+ 1 –X 1 Where d = 3.50 in, depth of column section. b = 3.50 in, width of column section. DETERMINE REQUIRED THICKNESS OF BASE PLATE (AISC 13th Page 14 -6) 61.20 kips "D PAGE: DESIGN BY : REVIEW BY : l3 B 0.95 b 1 n [Satisfactory] b > Pa ®® 7:5 PROJECT: PHO imam® _sm.= CLIENT : E rglrraarTr-ig JOB NO.: DATE: Tube / Pipe Column Design Based on AISC Manual 13th Edition (AISC 360 -05) INPUT DATA & DESIGN SUMMARY COLUMN SECTION (Tube or Pipe) HSS4X2.5X3/16 Tube TUBE STEEL COLUMN COLUMN YIELD STRESS F = 46 ksi DIMENSIONS H = 10 ft AXIAL LOAD, ASD P = 2.5 kips STRONG AXIS BENDING ? (1 =Yes, 0 =No) _ > 0 no, weak axis, y -y, bending. BENDING LOAD, ASD w = 0.01 k / ft THE DESIGN IS ADEQUATE. ANALYSIS CHECK COMBINED COMPRESSION AND BENDING CAPACITY (AISC 360 -05, H1) Pr Mm ry for PT ? 0.2 P + 9 8 � Mcx +M Mcy Pc Pr + . M,x +M for Pr < 0.2 2P CM Mcy P = 0.09 < 4/3 [Satisfactory] PAGE: DESIGN BY : REVIEW BY : 14 Where KL x = 10 ft, for x -x axial load. KL y = 10 ft, for y -y axial load. (KL / r)max = 120 < 200 [Satisfactory] P = 2.5 kips M = 0 ft-kips, at middle of column M = 0.125 ft-kips, at middle of column Pc = P,, / � c = 36 / 1.67 = 21.502 kips, (AISC 360 -05 Chapter E) > P [Satisfactory] Mcx = M / 2 b = 10.235 / 1.67 = 6.1287 ft-kips, (AISC 360 -05 Chapter F) > 3/4 M [Satisfactory] M = Mn / S2 = 7.3983 / 1.67 = 4.4301 ft-kips, (AISC 360 -05 Chapter F) > 3/4 M, [Satisfactory] CHECK LATERAL DEFLECTION 5wH - 0.04 in D Mid = 384E/ L / 240 = 0.50 in [Satisfactory] Where E S = 29000 ksi I = 4.3 in a = 2.06 in4 L O sE PROJECT: ...6=1M1 o CLIENT : E r,grir - iea rir , n Tube Base Plate Design Based on AISC Manual 13th Edition (AISC 360 -05) INPUT DATA & DESIGN SUMMARY AXIAL LOAD OF COMPRESSION STEEL PLATE YIELD STRESS CONCRETE STRENGTH COLUMN SIZE BASE PLATE SIZE AREA OF CONCRETE SUPPORT JOB NO. : USE 8 x 2.5 in thick plate ANALYSIS l l� CHECK BEARING PRESSURE (AISC 360 -05 J8) A =MIN r _ 1 3.33Pa = 0.17 in F Where / = MAX (m, n, .1n') = DATE: P = 2.5 kips, ASD Fy = 60 ksi f = 2.5 ksi => HSS4X2.5X3/16 N = 8 in B = 2.5 in A = 24 in (geometrically similar to and concentric with the loaded area.) DETERMINE VALUES OF m, n, n', X , and X. (AISC 13th Page 14 -5) m= 0.5(N- 0.95d) = 2.10 in n= 0.5(B- 0.95b) = 0.06 in n'= 0.25 (d b ) O.5 = 0.79 in X_ 4db 2 S2,Pa 11= 0.13 L ll (d +b) 1 C 2-17 1 1 +./1 —X Where d = 4.00 in, depth of column section. b = 2.50 in, width of column section. 0.37 DETERMINE REQUIRED THICKNESS OF BASE PLATE (AISC 13th Page 14 -6) 2.10 in PAGE : l� DESIGN BY : REVIEW BY : 0.95 b p p / oc _ f ` mliv 0.85MAX I \/ , 1 I , 1.7 = 18.62 kips > C2c Al Where A = 20 in actual area of base plate. [Satisfactory] S2� = 2.50 B Pa TE- PROJECT: CLIENT F_rr girree ri ng Pad Footing Design Based on ACI 318 -05 INPUT DATA COLUMN WIDTH COLUMN DEPTH BASE PLATE WIDTH BASE PLATE DEPTH FOOTING CONCRETE STRENGTH REBAR YIELD STRESS AXIAL DEAD LOAD AXIAL LIVE LOAD LATERAL LOAD (0 =WIND, 1= SEISMIC) WIND AXIAL LOAD SURCHARGE SOIL WEIGHT FOOTING EMBEDMENT DEPTH FOOTING THICKNESS ALLOW SOIL PRESSURE FOOTING WIDTH FOOTING LENGTH BOTTOM REINFORCING p 0.85f� 1 JI �i 0.383bdV M f JOB NO.. c, = b, = C2 b2 f f y = PDL = PLL = qs = W S = Df = T= 08 = B = L = PLAT THE PAD DESIGN IS ADEQUATE. 3.5 in 3.5 in 6 in 6 in 2.5 ksi 40 ksi 5.2 k 12 k 0 Wind,ASD 0 k, ASD 0 ksf 0.11 kcf 1.33 ft 10 in 1.5 ksf 3.5 ft 3.5 ft 4 ANALYSIS DESIGN LOADS (IBC SEC.1605.3.2 & ACI 318 -05 SEC.9.2.1) CASE 1: DL + LL P = 17 kips CASE 2: DL + LL + 1.3 W P = 17 kips CASE 3: DL + LL + 0.65 W P = 17 kips CHECK SOIL BEARING CAPACITY (ACI 318 -05 SEC.15.2.2) CASE 1 1.44 ksf, MAX P +9 +(0.15 - ws )T = BL P MAX q MAX DATE: < k 0 a , [Satisfactory] where k = 1 for gravity loads, 4/3 for lateral loads. DESIGN FOR FLEXURE (ACI 318 -05 SEC.15.42, 102, 10 3.5, 10 5 4, 7.12.2, 122, & 12.5) 0.85)3,f c Eu f y Eu + Et DESIGN SUMMARY FOOTING WIDTH FOOTING LENGTH FOOTING THICKNESS LONGITUDINAL REINF. 4 TRANSVERSE REINF. 4 CASE 2 1.44 ksf, 1.2 DL+ 1.6 LL 1.2DL +LL +1.6W 0.9 DL +1.6W CD CASE 3 1.44 ksf 1 Pu Pu Pu PAIN =MIN(0.0018 4 pl C/= JJ PAGE: DESIGN BY : REVIEW BY : B = 3.50 ft L = 3.50 ft T = 10 in # 4 4 12 in o.c. 4 4 @ 12 in o.c. L 25 kips 18 kips 5 kips LONGITUDINAL TRANSVERSE d 6.75 6.50 b 42 42 q u,max 2.08 2.08 M 8.75 8.75 p 0.002 0.002 Pmin 0.002 0.002 A 0.58 0.61 ReqD 3 # 4 4 4 4 Max. Spacing 18 in o.c. 18 in o.c. USE 4 # 4 @ 12 in o.c. 4 # 4 @ 12 in o.c. Pmax 0.019 0.019 Check pprod < Pmax [Satisfactory] [Satisfactory] TE- PROJECT: CLIENT F_rr girree ri ng Pad Footing Design Based on ACI 318 -05 INPUT DATA COLUMN WIDTH COLUMN DEPTH BASE PLATE WIDTH BASE PLATE DEPTH FOOTING CONCRETE STRENGTH REBAR YIELD STRESS AXIAL DEAD LOAD AXIAL LIVE LOAD LATERAL LOAD (0 =WIND, 1= SEISMIC) WIND AXIAL LOAD SURCHARGE SOIL WEIGHT FOOTING EMBEDMENT DEPTH FOOTING THICKNESS ALLOW SOIL PRESSURE FOOTING WIDTH FOOTING LENGTH BOTTOM REINFORCING p 0.85f� 1 JI �i 0.383bdV M f JOB NO.. c, = b, = C2 b2 f f y = PDL = PLL = qs = W S = Df = T= 08 = B = L = PLAT THE PAD DESIGN IS ADEQUATE. 3.5 in 3.5 in 6 in 6 in 2.5 ksi 40 ksi 5.2 k 12 k 0 Wind,ASD 0 k, ASD 0 ksf 0.11 kcf 1.33 ft 10 in 1.5 ksf 3.5 ft 3.5 ft 4 ANALYSIS DESIGN LOADS (IBC SEC.1605.3.2 & ACI 318 -05 SEC.9.2.1) CASE 1: DL + LL P = 17 kips CASE 2: DL + LL + 1.3 W P = 17 kips CASE 3: DL + LL + 0.65 W P = 17 kips CHECK SOIL BEARING CAPACITY (ACI 318 -05 SEC.15.2.2) CASE 1 1.44 ksf, MAX P +9 +(0.15 - ws )T = BL P MAX q MAX DATE: < k 0 a , [Satisfactory] where k = 1 for gravity loads, 4/3 for lateral loads. DESIGN FOR FLEXURE (ACI 318 -05 SEC.15.42, 102, 10 3.5, 10 5 4, 7.12.2, 122, & 12.5) 0.85)3,f c Eu f y Eu + Et DESIGN SUMMARY FOOTING WIDTH FOOTING LENGTH FOOTING THICKNESS LONGITUDINAL REINF. 4 TRANSVERSE REINF. 4 CASE 2 1.44 ksf, 1.2 DL+ 1.6 LL 1.2DL +LL +1.6W 0.9 DL +1.6W CD CASE 3 1.44 ksf 1 Pu Pu Pu PAIN =MIN(0.0018 4 pl C/= JJ PAGE: DESIGN BY : REVIEW BY : B = 3.50 ft L = 3.50 ft T = 10 in # 4 4 12 in o.c. 4 4 @ 12 in o.c. L 25 kips 18 kips 5 kips CHECK FLEXURE SHEAR (ACI 318 -05 SEC 9 3 2 3, 15 5 2, 11 1 3 1, & 11 3) OV = 2 Obd fc CHECK PUNCHING SHEAR (ACI 318 -05 SEC 15 5 2, 11 12 1 2, 11 12.6, & 13.5.3.2) �V ( 2+ y)0F.A where 45.22 kips = 0.75 (ACI 318 -05, Section 9.3.2.3 ) Pc = ratio of long side to short side of concentrated load = 1.00 b = c + c + b + b2 + 4d = 45.5 in A = b = 301.4 in2 y = MIN(2, 4 /p 40d /bp) = 2.0 Vf BL ( b 2c +d�l b2 +d11 u = Pu, max [23.57 kips < 0 V„ [Satisfactory] (cont'd) LONGITUDINAL TRANSVERSE V 7.19 7.34 0.75 0.75 (1)V 21.3 20.5 Check V,<@V [Satisfactory] [Satisfactory] CHECK FLEXURE SHEAR (ACI 318 -05 SEC 9 3 2 3, 15 5 2, 11 1 3 1, & 11 3) OV = 2 Obd fc CHECK PUNCHING SHEAR (ACI 318 -05 SEC 15 5 2, 11 12 1 2, 11 12.6, & 13.5.3.2) �V ( 2+ y)0F.A where 45.22 kips = 0.75 (ACI 318 -05, Section 9.3.2.3 ) Pc = ratio of long side to short side of concentrated load = 1.00 b = c + c + b + b2 + 4d = 45.5 in A = b = 301.4 in2 y = MIN(2, 4 /p 40d /bp) = 2.0 Vf BL ( b 2c +d�l b2 +d11 u = Pu, max [23.57 kips < 0 V„ [Satisfactory] (cont'd) w j t aserszta Ts E PROJECT: CLIENT : E r�gir eer -ir Pad Footing Design Based on ACI 318 -05 INPUT DATA COLUMN WIDTH COLUMN DEPTH BASE PLATE WIDTH BASE PLATE DEPTH FOOTING CONCRETE STRENGTH REBAR YIELD STRESS AXIAL DEAD LOAD AXIAL LIVE LOAD LATERAL LOAD (0 =WIND, 1= SEISMIC) WIND AXIAL LOAD SURCHARGE SOIL WEIGHT FOOTING EMBEDMENT DEPTH FOOTING THICKNESS ALLOW SOIL PRESSURE FOOTING WIDTH FOOTING LENGTH BOTTOM REINFORCING CASE 1: DL + LL CASE 2: DL +LL +1.3W CASE 3: DL + LL + 0.65 W P= THE PAD DESIGN IS ADEQUATE. 0.85f�11 i Mu • ll v 0.3836d'f f y , JOB NO. : C, C2 b, b f f PDL PLL PLAT CIS w Of T O B L P = P= P = = 3.5 in = 3.5 in 5.5 in = 5.5 in 2.5 ksi 40 ksi = 3 k = 5.5 k 0 Wind,ASD = 0 k, ASD 0 ksf = 0.11 kcf = 1.33 ft 10 in = 1.5 ksf = 3 ft 3 ft # 4 ANALYSIS DESIGN LOADS (IBC SEC.1605.3.2 & ACI 318 -05 SEC.9.2.1) 9 kips 9 kips 9 kips CHECK SOIL BE:ARING CAPACITY (ACI 318 -05 SEC.15.2.2) CASE 1 g MAX = -P +q + (0.15 - ws)T = 0.98 ksf, BL DATE: DESIGN FOR FLEXURE (ACI 318 -05 SEC.15.4 2, 102 10 3 5, 10 5 4, 7 12 2, 12 2, & 12 5) 0.85f i E P MAX = t y Eu + EI DESIGN SUMMARY FOOTING WIDTH FOOTING LENGTH FOOTING THICKNESS LONGITUDINAL REINF. TRANSVERSE RFINF. CASE 2 0.98 ksf, 1.2DL +1.6LL 1.2 DL +LL +1.6W 0.9 DL +1.6W q MAX < k Q a , [Satisfactory] where k = 1 for gravity loads, 4/3 for lateral loads. B = L= T = 3 5 4 3 # 4 CO CASE 3 0.98 ksf Pu = Pu = Pu = PMrN,= M/N(0.0018 7 , - pJ PAGE: DESIGN BY : REVIEW BY 3.00 ft 3.00 ft 10 in C b L 12 kips 9 kips 3 kips I 7 LONGITUDINAL TRANSVERSE d 6.75 6.50 b 36 36 q u,max 1.38 1.38 M 3.56 3.56 p 0.001 0.001 Pmin 0.001 0.001 A 0.24 0.24 ReqD 2 # 4 2 # 4 Max. Spacing 18 in o.c. 18 in o.c. USE 3 # 4 @ 15 in o.c. 3 # 4 CO 15 in o.c. Pmax 0.019 0.019 Check Pprod < Pmax [Satisfactory] [Satisfactory] w j t aserszta Ts E PROJECT: CLIENT : E r�gir eer -ir Pad Footing Design Based on ACI 318 -05 INPUT DATA COLUMN WIDTH COLUMN DEPTH BASE PLATE WIDTH BASE PLATE DEPTH FOOTING CONCRETE STRENGTH REBAR YIELD STRESS AXIAL DEAD LOAD AXIAL LIVE LOAD LATERAL LOAD (0 =WIND, 1= SEISMIC) WIND AXIAL LOAD SURCHARGE SOIL WEIGHT FOOTING EMBEDMENT DEPTH FOOTING THICKNESS ALLOW SOIL PRESSURE FOOTING WIDTH FOOTING LENGTH BOTTOM REINFORCING CASE 1: DL + LL CASE 2: DL +LL +1.3W CASE 3: DL + LL + 0.65 W P= THE PAD DESIGN IS ADEQUATE. 0.85f�11 i Mu • ll v 0.3836d'f f y , JOB NO. : C, C2 b, b f f PDL PLL PLAT CIS w Of T O B L P = P= P = = 3.5 in = 3.5 in 5.5 in = 5.5 in 2.5 ksi 40 ksi = 3 k = 5.5 k 0 Wind,ASD = 0 k, ASD 0 ksf = 0.11 kcf = 1.33 ft 10 in = 1.5 ksf = 3 ft 3 ft # 4 ANALYSIS DESIGN LOADS (IBC SEC.1605.3.2 & ACI 318 -05 SEC.9.2.1) 9 kips 9 kips 9 kips CHECK SOIL BE:ARING CAPACITY (ACI 318 -05 SEC.15.2.2) CASE 1 g MAX = -P +q + (0.15 - ws)T = 0.98 ksf, BL DATE: DESIGN FOR FLEXURE (ACI 318 -05 SEC.15.4 2, 102 10 3 5, 10 5 4, 7 12 2, 12 2, & 12 5) 0.85f i E P MAX = t y Eu + EI DESIGN SUMMARY FOOTING WIDTH FOOTING LENGTH FOOTING THICKNESS LONGITUDINAL REINF. TRANSVERSE RFINF. CASE 2 0.98 ksf, 1.2DL +1.6LL 1.2 DL +LL +1.6W 0.9 DL +1.6W q MAX < k Q a , [Satisfactory] where k = 1 for gravity loads, 4/3 for lateral loads. B = L= T = 3 5 4 3 # 4 CO CASE 3 0.98 ksf Pu = Pu = Pu = PMrN,= M/N(0.0018 7 , - pJ PAGE: DESIGN BY : REVIEW BY 3.00 ft 3.00 ft 10 in C b L 12 kips 9 kips 3 kips I 7 CHECK FLEXURE SHEAR (ACI 318 -05 SEC 9 3 2 3, 15 5 2, 11.1.3.1, & 11.3) oVn = fc CHECK PUNCHING SHEAR (ACI 318 -05 SEC 15 5 2, 11 12 1 2, 11 12.6, & 13.5.3.2) OVnr= ( +y) 44.22 kips where = 0.75 (ACI 318 -05, Section 9.3.2.3 ) P. = ratio of long side to short side of concentrated load = 1.00 b = c + c + b + b2 + 4d = 44.5 in A = b0 d = 294.8 4-12 y = MIN(2, 4/ (3 c , 40d /b = 2.0 lrb, +c, 11_ Vu — Pu, max r (b1 l 8! + 2 +d 11.22 kips < 0 V [Satisfactory] (cont'd) /�A LONGITUDINAL TRANSVERSE V 3.10 3.19 0.75 0.75 (1)V 18.2 17.6 Check V„ < o [Satisfactory] [Satisfactory] CHECK FLEXURE SHEAR (ACI 318 -05 SEC 9 3 2 3, 15 5 2, 11.1.3.1, & 11.3) oVn = fc CHECK PUNCHING SHEAR (ACI 318 -05 SEC 15 5 2, 11 12 1 2, 11 12.6, & 13.5.3.2) OVnr= ( +y) 44.22 kips where = 0.75 (ACI 318 -05, Section 9.3.2.3 ) P. = ratio of long side to short side of concentrated load = 1.00 b = c + c + b + b2 + 4d = 44.5 in A = b0 d = 294.8 4-12 y = MIN(2, 4/ (3 c , 40d /b = 2.0 lrb, +c, 11_ Vu — Pu, max r (b1 l 8! + 2 +d 11.22 kips < 0 V [Satisfactory] (cont'd) /�A • PERMIT COO ` D COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M08 -258 DATE: 10 -29 -08 PROJECT NAME: WHAT THE PHO SITE ADDRESS: 17250 SOUTHCENTER PY #132 X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Buildi K! Division Public VVorks Comments: TUES/THURS ROUTING: Please Route Documents/routing slip.doc 2 -28-02 APPROVALS OR CORRECTIONS: Structural Review Required 61 We/ Fire Prevention Planning Division ❑ Structural ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 1 0-30 -08 - 171 Complete Incomplete ❑ Not Applicable ,Permit Center Use.Onl : , �:�.;, •.... ;.:: ' • �" :' k ,. . r ssi : w ���,,: , INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ❑ No further Review Required REVIEWER'S INITIALS: DATE: DUE DATE: 11 -27 -08 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: PermitCenter Use'Only • CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 3 COLONY INS CLS1209626 01/05/2008 01/05/2009 $1,000,000.0012 /11 /2007 2 COLONY INS GL338124 01/05/2007 01/05/2008 $1,000,000.00 01/22/2007 1 INTERSTATE FIRE £t CAS CO CLP6274919 01/05/2005 01/05/2007 $1,000,000.0012 /18/2006 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 CBIC SF9353 01 /05/2005 Until Cancelled $6,000.00 01 /12/2005 Name Role Effective Date Expiration Date JOHNSTON, ED PRESIDENT 01 /10/2005 JOHNSTON, CHAD VICE PRESIDENT 01 /12/2005 Untitled Page General /Specialty Contractor A business registered as a construction contractor with L£&I to perform construction work w ithin the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Bond Information SEATTLE WA 98134 KING Business Type CORPORATION Parent Company Business Owner Information Insurance Information 0 AFFORDABLE HOOD INSTALLTN INC 2063820160 2963 1ST AVE. S. UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License Next License Associated License Specialty 1 Specialty 2 602426086 • ACTIVE AFFORHI951 BS CONSTRUCTION CONTRACTOR 1/12/2005 1/12/2009 SHEET METAL UNUSED https: / /fortress.wa. gov /1ni/bbip/Detail. aspx ?License= AFFORH1951 B S Page 1 of 1 11/18/2008 i %i'lilisr rrw, { •:,,.r ,.., /rr� :: • r • FAN -3 MAKE-UP AIR FAN r 10 -0" TO ANY AIR INTAKE FAN -1 EXHAUST FAN HOOD -2 TYPE II EXHAUST HOOD 1 THERMAL CERAMICS DUCT INSULATION 16 GAU { ';E WELDED EXHAUST DUCTWORK TWO HOUR FIRE FIREMASTER DUCT INSULATION RATED DUCT PROTECTION No Scale -, ,rrrrr STAINLESS STEEL FLASHING ON METAL STUD WALL CONSTRUCTION 10-0" TO ANY AIR INTAKE HOOD- TYPE I EXHAUST HOOD GREASE DUCT WRAP SHALL BE INSTALLED ONE (1) LAYER AS PER CERTIFIED APPLICATION INSTRUCTIONS - THERMAL CERAMICS SPECIFICATION THIS TWO HOUR APPLICATION SHALL INCLUDE ALL TYPE I EXHAUST DUCTWORK AS SHOWN ON THIS PLAN TO BE ROUTED FROM THE FINISHED CEILING TO A POINT 18" ABOVE THE FINISHED ROOF SURFACE WITHIN A WELDEfI GALVANIZED EQUIPMENT CURB FAN -1 EXHAUST FAN NORTH PLAN VIEW 506.3.12.1 Termination above the roof. Exhaust outlets that terminate above the roof shall have the discharge opening located not less than 40 inches (1016 mm) above the roof surface. 1. Scale 3/16" =1' -0" ELECTRICAL NOTE FIRE SUPPRESSION NOTE GENERAL CONSTRUCTION NOTES The General Contractor shall provide all structure penetrations for equipment curbs for all exhaust and make -up air systems. 2. The General Contractor shall be responsible for maintaining structural integrity and provide required structural su r " supports as required by the International pp q Y Building Code and /or as required by City the Cit of Tukwila. 3. The General Contractor shall be responsible for other trades below unless otherwise stated by the conditions of the general contract with the project owner. 1. The electrical contractor shall install exhaust fan and make up air system motor relays and contactors. Check for proper fan rotation. 1. All Type I hoods and exhaust ductwork systems require RIO2 - UL 300 wet chemical fire suppression systems. This is to be provided by others under separate permit. EXHAUST SYSTEM WEIGHTS HOOD -1 EXHAUST HOOD HOOD -2 EXHAUST HOOD HOOD -3 EXHAUST HOOD FAN -1 EXHAUST DUCTWORK FAN -2 EXHAUST DUCTWORK FAN -1 EXHAUST FAN FAN -2 EXHAUST FAN FAN -3 MAKE -UP AIR DUCTWORK FAN -3 MAKE -UP AIR FAN = 692 LBS. 279 LBS. = 155 LBS. = 588 LBS. = 95 LBS. 594 LBS. = 57 LBS. = 420 LBS. = 1,164 LBS. TOTAL = 4,044 LBS. THE SHOWN WEIGHT INCLUDE AN ESTIMATE OF ACCESSORY COMPONENT WEIGHTS SUCH AS HANGING HARDWARE, WALL MOUNTED, FIRE RATED PAD, AND EXHAUST DUCT FIRE RATED INSULATION SEPARATE PERMIT REQUIRED FOR: 0 Mechanical gif Electrical Plumbing Gas Pipin City of Tukwila l E3LIILDING DIVISION yw R -- No charm ' — ___.�� es shall be made to thr+ snoop of work without prior a Tukwila Building visional of NOTE: Revisions will require a plan submittal and may include additional plan review tees FIE ram Permit No. Pl4 r review approval is subject to errors and mill E,ppro a l of construction documents does not a the viorlat on r! of any adopted CM' r ordinance. 11 of approve opy oy r, c; +` pions is ackrowt •, ts�•iV zt�aiE;f By 0 De C Tukwila afiT�l a B DING DIVISION TYPEAr EXHAUST FAN FAN -2 t 4' -0" e r DISH WASHER VICINITY PLAN 3vAbu �r 2 :4 ' MINIMUM SPECIAL INSPECTIONS I+OR TYPE I HOOD & DUCT (RE: IBC 1704.13 Special Cases) Type I hood and ducts shall be inspected by a special inspection agency. Grease duct and grease hood test shall comply with 2006 IMC 506.3.3.1 Grease Duct Test per `'Washington State Amendments, and IMC 507.7.1 Hood joints, seams and penetrations for Type I hoods. 6" MIN SECTION / ELEVATION ?r. r i ? << 4' -0" 3' -9" ii_. r COOKLINE EQUIPMENT CLEAN -OUT ACCESS [ f Ions. i� fC'44c � � o � CC RC y y . r3 "•' 21304 fc €'. 0 2625041061, t .22504 1 r PROJECT ADDRESS 17250 SOUTHCENTER PARKWAY, SUITE 132 TUKWILA, WA 98188 -3301 CONTACT: DUKE PHAM TEL: (206) 769 -2012 k t2 ]YYlfG Y rr'f7 f: v : Not to Scale 4' -O" 4' -3° COOKLINE EQUIPMENT F MIN 6" 18" V Scale 3/8° =1' -0° !3F- /. •r4 sx 4°3/./ i •," k9 ? F : / " •te i Y7X q c/✓ F oW Q? We "io ZYi e" {f1 fae 3 slv ?i be, °sY' ✓!/ : ✓fit 4. , yi �/f !/ %/f >� "r,. /1 /hfi l / ?�% r/OW/a f :::? Y? Y3 dFY1'T /r'FfJ's4l // r/r Y F/? /Y1rr /r /r /tY hi iirs*X i /.• - ?•". :: ice .. n.ii Err T I JU. 'r' � ffr�`,rnf'.f rfr `/. i tr /, � r, .,/ r.. r/ �• �G.. .:FiS. Y 1�f.:::y„� ,r l YrI.:G,. ryrr:� WIXO •.r .. , gsA /. : /.......✓t . rdrn.Y/ *An r /l!C r/r &;;O:.0 rHi i ri / SY ,J ri J . fir.% Yr 7 5s'rr f r /:4.iri .t ifr /rr r•','s f r�rr r stI % /JIF a0;,1i0)A / f f Y 7 s ;; :y' ?.7//.i "/..r.:.KM:Rri ,;0 ki tir/gil/f/7/ r'}u fig "y}i r,: l ,4 %.d/,0,,. /p WA. TWO HOUR FIRED RATED DUCT WRAP LANDLORD INFORMATION WIG PROPERTIES LLC —SS 4811 134TH PLACE SE BELLEVUE, WA 98006 CONTACT: LESHYA WIG TEL: (425) 957 -4774 SLOPE DUCTWORK STAINLESS STEEL FLASHING ON METAL STUD WALL CONSTRUCTION 18" s ¢h% : i . r Y, , .;W V 'r.. s'. AFFORDABLE HOOD INSTALLATIONS, INC. 2963 1ST AVE S. Seattle, WA 98134 206 -999 -5163 Contractor Lic. AFFORHI951BS DATE TYPEI EXHAUST FAN FAN -1 40" MIN Y V Ktv CODE COMPLIANC APPROVED NO11470B Of Tu ila �i DIVATLI OCCUPANT SHEET lof2 2006 IMC 507.2.1.1 OPERATION. Type I Hood systems shall be designed and installed to automatically activate the exhaust fan whenever cooking operations occur. The activation of the exhaust fan shall occur through an interlock with the cooking appliance, by means of heat sensors or by means of other approved methods. 508.1 MAKEUP AIR. For mechanical makeup air systems, the exhaust and makeup air systems shall be electrically interlocked to insure that makeup air is provided when ever the exhaust system is in operation. Makeup air intake opening locations shall comply with Sections 401.4 and 401.4.1. r ti. rq ^� :: rr3G��f�' : 7i✓/!h7 ?. , ; * ,-.W 4in %.£'l'. Y6 ';rfr '•W rr . s.r .�i �4 /%%i'r/' /J?'r /r'r lam •:l !j.•'.9i Chi % sfC7rl 7•r *K0 W'/ yY!r/ !s' r f As j r 1f J �; F Y y�:O !y V u/i Y .. a e J / i.( r1,?: r. �F• �f,! tifrG, c;lrfi.s.'n2; A/ ii.:S3h;./ 1:f. F+.:£v.dc z i74 u'.! _ r'* ,ifi': F..,/rl; -. 7.` ? /fi:.•,? n/r / "6 3 Y/ �5�,<'Y ¢Y,3.'1f /rY /ff /sYrxri/i ' 'ir3'r/ 7 /r'. rl ir i/ s• r 1f7�% s 7€!:! %/ r7ia Yl / i ✓: !17x.' ,f;:.� ' 044 SS3i13 r :: ,iihf 'r'S', 7 Y O $ "/ Y! %; *.7` , % lr fr0 :4 /llrf h Yb$, !:0*% .? /,,, ; irk, if ms's . :0V 4 % 7 gf17 rr /S /ifd �/?v lYsP f lyre''` ' 'yy;. f r 1 ; R j' r1 : ?9 nE ED / p ,- Y �: T uKWILA r ! Y/�%•' }'//� F ': :N /�nf// "• r:..rr. .. r....J.:/rit /. i!%"f/r•C..: °b.. , S'! !✓ :Z ' Sc , / ; ' ¢'i , /.i/ ff/i " OCT 2 9 200th CETER SHEET INDEX SHEET 1 VICINITY MAP, SITE PLAN, FLOOR PLAN VIEW, ELEVATION, AND SECTION SHEET 2 CAPTIVE AIR HOOD AND FAN INFORMATION, AND SYSTEM WEIGHTS WHAT THE PH0 17250 Sauthcenter Parkway Suite 132 Tukwila, WA 98188 October 22, 2008 CONTRACTOR DALE HAWKSWORTH 2 ETL LISTING DESCRIPTION BLOCK MODEL THE �CAPTI CAPTIVE AIRE MODEL SND "' SND2 HAS BEEN E.T.L. C C TESTED, LISTED, AND APPROVED TO EXHAUST A MINIMUM OF 228 CFM PER LINEAR FOOT OVER 400 DEGREE COOKING EQUIPMENT MAX COOKING TEMP. 1/2" DIA. CONNECTED THROUGH ANGLE �1- 1 -1/2" II ALL THREAD ROD TO ROOF JOIST ANOTHER HANGING 1/2 " + 7 ', f .II I I II IIIIIIIII I n k a 1/2" ONE HANGING v. I „III 7t1 I III III DIA. HEAVY DUTY NUT ABOVE AND ONE DELOW ANGLE VIII / ,,,VIII , STEEL HANGING ANGLE TOTAL EXH. CFM - - -- CAPTIVE -AIRE HOODS HAVE OPTIONAL CLEARANCE RISE LENG. *ROD AND NUTS TO BE SUPPLIED BY INSTALLING CONTRACTOR HANGING ANGLE IS PRE PUNCHED AT FACTORY HANGING ANGLE DETAIL REDUCTION SYSTEMS AVAILABLE AS FOLLOWS: RISER(S) MATERIAL CLEARANCE REDUCTION SYSTEM NON - COMBUSTIBLE NONE REQUIRED LIMITED - COMBUSTIBLE 3" UNINSULATED STANDOFF COMBUSTIULE 3" UNINSULArED STANDOFF LENG, 1/2" DIA. ALL THREAD ROD CONNECTED TO ROOF JOIST THROUGH ANOTHER HANGING ANGLE _.- 1 / 2 " DIA. HEAVY DUTY NUT ONE ABOVE AND ONE BELOW HANGING ANGLE 1 CLEARANCE TO COMBUSTIBLES *ROD AND NUTS TO BE SUPPLIED HANGING ANGLE IS PRE PUNCHED 600 Deg NY INSTALLING CONTRACTOR AT FACTORY INSTALLATION 1. ALL ELECTRICAL "FIELD" CONNECTIONS AND RELATED INTERCONNECTIONS BY ELECTRICAL CONTRACTORS. 2. ALL PLUMBING "FIELD" CONNECTIONS AND RELATED INTERCONNECTIONS BY PLUMBING CONTRACTORS. 3. HANGING BRACKETS LOCATED AND WELDED AS SHOWN ON PLANS. ALL OTHER HANGER MATERIALS PROVIDED BY INSTALLING CONTRACTORS. 4, ALL CONNECTIONS FROM CAPTIVE -AIRE DUCT PER MECHANICAL CONTRACTORS'S PLANS. 5. COOKING EQUIPMENT TO SHUTOFF IN EVENT OF FIRE. 6. EXHAUST FANS TO TURN ON IN EVENT OF FIRE. 7. ALL LIGHTS FIXTURE SHOWN INSTALLED BY CAPTIVE -AIRE ARE FACTORY PREWIRED. INTERCONNECTIONS BETWEEN HOODS AND TO SWITCHES BY ELECTRICAL CONTRACTORS. 8. LAMPS FOR LIGHT FIXTURES BY INSTALLING CONTRACTORS. 9. SEISMIC RESTAINTS ARE RESPONSIBILITY OF INSTALLING CONTRACTOR. 10. INSTALLING CONTRACTORS ASSUME ALL RELATED REPONSIHILITY FOR VERIFICATION OF DIMENSIONAL DATA CONTAINED ON THESE DOCUMENTS FOR ACCURACY, INTEGRATION, AND ADMINISTRATION OF CODE REQUIREMENTS IN EFFECT PRIOR TO ANY RELEASE FOR PRODUCTION OF EQUIPMENT SHOWN. BALANCE 2000 ND -2 HANGING ANGLE DETAIL 3600 10" I�- LOCATIONS ND2 HANGING !ANGING ANGLE (LOCATIONS 1200 0.149" 1 111 4.16 10" 4.16 2000 - 0.450" 10" 28" 0.149" Field Cut U. L. Listed Incandescent �} 28" 1200 11. KITCHEN HOODS MUST BE BALANCED WITH KITCHEN. 12, KITCHEN SHALL BE NEGATIVE WITH RESPECT TO DINING AREA. 13. RESTAURANT SHALL BE POSITIVE WITH RESPECT TO AMBIENT PRESSURE. ADDITIONAL Light Fa 2 14. WRITTEN HOOD DIMENSIONS HAVE PRECEDENCE OVER SCALE. 15. SIGNED AND "APPROVED" COPIES OF THIS DOCUMENT MUST BE RECEIVED BY THE FACTORY PRIOR TO COMMENCEMENT OF FABRICATION - CENERAL_ \0TES 1125 10" - �- 2.25' EXHAUST CFM = LENGTH OF HOOD X CFM /LIN.FT. (LOAD) SUPPLY CFM = EXHAUST CFM X PERCENTAGE REQUIRED TOTAL DUCT AREA= 144 X CFM 2,25 - 1013 . . . . . 1013 - ' ' • • 7 2.75 . 3 4824 VHB -G FPM( *) 'TOTAL DUCT AREA DUCT - 700 Deg. 600 f . 10" ' -� - 0.075" LENGTH= DACT DEPTH * VELOCITY I OF 1500-1800 0 FPM AND A VELOCITY OF 1000 FPM. 430 SS Where Exposed -- +! i� �. r �l I 2.15 CALCU_ATIONS UTILIZED CAPTIVE -AIRE HOODS ARE BUILT IN COMPLIANCE WITH: - - 5.00/_- f 1 Ly-- 1 5.00"- 1 NFPA X96 I.G.B.G 4416 * NSF * SBCCI PST Sc ESI NO. 93137 PSP HANGING ANGLE LOCATIONS * B.O.C.A. }�93 -1 6 * ETL LISTED FILE 3054804 -001 U L LISTED E D LI G H T DETAIL �-�- �s 01), # L55 -200 I0, # L55- 2004 -CSA \S r L NSFW NFPA UL C.S.A. ETL. RATINGS (PER UL 710): FILE # 3054804 -DO T MAX. TEMP. MIN. EXH. CFM /FT MAX. MAU. CFMIFT LENGTH RANGE MAX. LEN. FOR 1 RISER WIDTH RANGE WIDTH INCR. SIDE FRONT OVERHANG OVERHANG VERT, CLEARANCE (WITH LIGHTS) VERT. CLEARANCE (W /O LIGHTS) MODEL: ND & ND2 (WITH & W/O PSP) 400 DEG. 150 CFMIFT - 3' -16' 16' 39" -78" 1" 6" 6" 33 " -48" 600 DEG. 200 CFM /FT - 3' -16' 16' 39" -78" 1" 6" 6" 33 " -48" -- APPROVED FILTER TYPES: ALUM. BAFFLE, SS BAFFLE, HE SS BAFFLE, CAPTRATE (2 STAGE), AND HV CARTRIDGE PERFORMANCE: ND & \D2 (WITH & W/O PSP MAX. AVG. COOKING SURFACE TEMPERATURE (DEG. F) I COOKING SURFACES CONFIGURATION MIN. EXHAUST CFM /FT SUGGESTED SUPPLY CFM /FT. VIA FRONT SUPPLY PLENUM 450 DEG.-OVENS, STEAMERS, KETTLES, OPEN - BURNER RANGES GRIDDLES, AND FRYERS WALL HOOD 150 120 2 PIECE ISLAND BACK TO BACK WALL HOODS 300 240 600 DEG.-GAS CHARBROILERS ELECTRIC CHARBROILERS, AND WOKS WALL HOOD 200 160 2 PIECE ISLAND BACK TO BACK WALL HOODS 400 320 * *SUPPLY CFM /FT CONSULT FACTORY REPRESENTIVE IF HIGHER VALUES ARE REQUIRED MODEL: SND & SND2 (WITH & W/O PSP 400 DEG. 228 CFM /FT - 3' -16' 16' 39" -78" 1" 6" 6" 36 " -47" 600 DEG. 294 CFM /FT - 3' -16' 16' 39" -78" 1" 6' 6" 36 " -47" -- APPROVED FILTER TYPES: ALUM. BAFFLE, SS BAFFLE, HE SS BAFFLE, CAPTRATE (2 STAGE), AND HV CARTRIDGE PERFORMANCE: SND & SND2 (WITH & W/O PSP) MAX. AVG. COOKING SURFACE TEMPERATURE (DEG. F) / COOKING SURFACES CONFIGURATION MIN. EXHAUST CFM/FT SUGGESTED SUPPLY CFMIFT. VIA FRONT SUPPLY PLENUM 450 DEG.- OVENS, STEAMERS, KETTLES, OPEN - BURNER RANGES GRIDDLES, AND FRYERS WALL HOOD 228 160 2 PIECE ISLAND BACK TO BACK WALL HOODS 456 320 600 DEG :GAS CHARBROILERS ELECTRIC CHARBROILERS, AND WOKS WALL HOOD 294 205 2 PIECE ISLAND BACK TO BACK WALL HOODS 588 410 **SUPPLY CFM /FT CONSULT FACTORY REPRESENTIVE IF HIGHER VALUES ARE REQUIRED HOOD N0. MODEL LENGTH MAX COOKING TEMP. EXHAUST PLENUM SUPPLY PLENUM HOOD CONSTRUCTION HOOD WEIGHT TOTAL EXH. CFM WEIGHT RISE LENG. CFM S.P. TOTAL SUP. CFM RISER(S) WIDTH WIDTH LENG, CFM S.P. 1 5424 ND -2 -PSP -F 16' 0.00" 600 Deg 4000 10" 19" 2000 - 0,450" 3600 10" 28" 1200 0.149" 430 SS Were Exposed 692 LBS. 10" 19" 2000 - 0.450" 10" 28" 1200 0.149" 10" 28" 1200 0.149" 2 4824 ND 2 PSP F 5' 0.00" 600 Deg. 1125 10" 10" 1125 - 0.383" 1013 10" 24" 1013 0.126" 430 SS Where Exposed 279 LBS. 3 4824 VHB -G 4' 0.00" 700 Deg. 600 10" 10" 600 - 0.075" 430 SS Where Exposed 155 LBS. FAN FAN UNIT CFM S.P. RPM H.P. 0 VOLT FLA WEIGHT UNIT NO. MODEL# FL 4 (LBS.) 1 CB24BIRM 5125 2.000 1009 5000 3 208 14.1 594 2 DU25FHA 600 0.850 1079 1.500 1 115 3.4 57 FAN FAN UNIT CFM S.P. RPM H.P. 0 VOLT FLA WEIGHT UNIT NO. MODEL # (LBS.) 3 A3D750G18 4613 1.000 732 3.000 3 208 9.5 1164 FAN UNIT NO. BTU'S TEMP. RISE GAS TYPE 3 270909 55 deg F Natural 54.0000 16,0000 3.0000 FAN MODEL CB24B1 7 HOOD INFORMA 110 r 10.0000 Iran j 32.0000 RESTAURANT DUTY UTILITY SET DIMENSIONAL DATA 10.0000 U.L. Listed Incandescent Light Fixture U 19.0000 28.0000 --I VHB -G Series Specification The VHB -G series heat/condensate hood is a single wall vent hood used in non - grease applications for the removal of heat, vapor etc. Hood shall have the size, shape and performance specified on the drawings. Exhaust duct collar to be 4" high with 1" flanges. Duct sizes, CFM and static pressure requirements shall be as shown on the drawings. Hood shall be recognized by NSF. Construction shall be type 304 stainless steel with a #3 or #4 polish where exposed. Hood shall have a full perimeter gutter with a 1/2" OD Bolt thread drain connection. Hood shall be wall or island type with fully welded 10 gauge corner hanging angles. Corner hanging angles have a .625 x 1.500 slot pre - punched at the factory, allowing hanging rods to be used for quick and 48.0000 safe installations. Hanging rod and connection is provided by and installed by others. The hood manufacturer shall supply complete submittal drawings including hood section views(s) and hood plan view(s). These drawings must be made available to the engineer, architect and owner for their use in construction, operation and maintenance, CBBI SERIES RESTAURANT DUTY UTILITY SET PLAN VIEW - Hood #1 W CLEAN OUT DOOR 64.0000 V 10.0000 E T F FF 28.0000 16' 0.00'INom. /16' 0.00 "OD 16' 0.00" LONG 5424ND -2 -PSP -F NOTE: Additional hanging angles provided for hoods longer than 12 ft. 4' 0.00 "Nam, /4' 0.00 "0D PLAN VIEW - Hood #3 4' 0.00" LONG 4824VHB -G 5 P 8.0000 10.0030 64.00W WEATHER COVER STANDARD FEATURES: 10.0000 19.0000 Field Cut 28.0000 - FULL AMCA CLASS 1 OPERATION - VENTED MOTOR COVER FOR WEATHER PROTECTION - UL762 LISTED FOR RESTAURANT DUTY - UPBLAST DISCHARGE DIRECTS AIR AWAY FROM FLOOR - CON TINUOUSLY WELDED HOUSING - CLEANOUT DOOR WITH LATCHES PROVIDE EASY ACCESS I WITHOUT TOOLS - 2" GREASE DRAIN WILL NOT CLOG - EMERGENCY DISCONNECT SWITCH 12.0000 48.0000 32.0000 AU 49 9/16 D 26 3/16 E 19 5/8 F 451 /16 G 277/8 H 39 15/16 K 261/8 0 25 7/8 P 23 3/16 S 16 1/2 T 21 15/16 V 21/4 SHAFT DIA, 13116 APPROX SHIPPING (LBS) 380 HH 10 W 6 FF 48 r1 ° n 6.0000 9.5000 5' 0.00 "Nom. /5' 0,00 "OD 24.0000 F - 10.0000_ U.L. Listed Incandescent Light Fixture 10.0 31.5000 FEATURES: - RESTAURANT MODEL - UL762 - UL705 - WEATHERPROOF DISCONNECT - THERMAL OVERLOAD PROTECTION (SINGLE PHASE) - HIGH HEAT OPERATION 300 °F (149 ° C) - GREASE CLASSIFICATION TESTING NORMAL TEMPERATURE TEST EXHAUST FAN MUST OPERATE CONTINUOUSLY WHILE EXHAUSTING AIR AT 300 °F (149 °C) UNTIL ALL FAN PARTS HAVE REACHED THERMAL EQUILIBRIUM, AND WITHOUT ANY DETERIORATING EFFECTS TO THE FAN WHICH WOULD CAUSE UNSAFE OPERATION. ABNORMAL FLARE -UP TEST EXHAUST FAN MUST OPERATE CONTINUOUSLY WHILE EXHAUSTING BURNING GREASE VAPORS AT 600 ° F (316 °C) FORA PERIOD OF 15 MINUTES WITHOUT THE FAN BECOMING DAMAGED TO ANY EXTENT THAT COULD CAUSE AN UNSAFE CONDITION, 3.0000 zzAt, z zzzrmz riv 3 0000 PLAN VIEW - Hood #2 5' 0.00" LONG 4824ND -2 -PSP -F EXUA US'T FAN INFORMATION MAKE - UP AIR FAN INFORMATION GAS' FIRED MAKE -UP AIR UNIT TYPICAL CAPTIVE AIRE VENTILATED EQUIPMENT CURB WITH BOLT ON HINGE ASSEMBLY TO EXHAUST FAN BASE CONFIGURATION MAY VARY TO ACCOMMODATE PROJECT CONDITIONS 25 25" 6" U.L. CLASSIFIED BAFFLE -TYPE GREASE FILTERS EQUIPMENT BY OTHERS 25,5" 12.125" 17.5" 21" EXHAUST RISER 4" GREASE DRAIN WITH REMOVABLE CUP 48" & 54" SUPPLY RISER WITH VOLUME DAMPER SECTION VIEW - MODEL 4€ 24 ?c 5424 -ND -2 'w'cth, PSP Accessory 100W VAPORPROOF INCANDESCENT LIGHT 18.5" 23.5% OPEN STAINLESS STEEL PERFORATED PANEL 33" MIN 48" MAX - 2.75" Modular Direct -Fired Heater (Fan #2 A3- D.750 -G18) - (Model #: EC -0 A3DF) Evaporative Cooler for Size # 3 Modular Heater. 40.75" Wide x 72.313" Long x 43.375" High. Includes adjustable legs and screened intake. - (Model #: A3- D.750 -G18) Direct Gas Fired Heated Make Up Air Unit with 18" Blower and 18" Burner. - Down Discharge - Air Flow Right -> Left 22" 41.375" 10.375' 6.5 5 25" 43.375" 24" NOM 75" - 84" CURB OUTER WALL BLOWER/ MOTOR ACCESS DOOR AFFORDABLE HOOD INSTALLATIONS, INC. 2963 1ST AVE S. Seattle, WA 98134 206 -999 -5163 Contractor Lic. k AFFOREII951BS ND -2 Series with PSP Accessory Specification The ND -2 series hood with PSP accessory is a compensating canopy hood system rated for all types of cooking equipment. The hood shall have the size, shape and performance specified on drawings. Construction shall be type 430 stainless steel with a #3 or 44 polish where exposed. Individual component construction shall be determined by the manufacturer, ETL, and NSF. Construction shall be dependent on the structural application to minimize distortion and other defects. All seams, joints and penetrations of the hood enclosure to the lower outermost perimeter that directs and captures grease -laden vapor and exhaust gases shall have a liquid -tight continuous external weld in accordance with NFPA 96. Hood shall be wall type with fully welded 10 gauge corner hanging angles. Corner hanging angles have a .625 x 1.500 slot pre- punched at the factory, allowing hanging rods to be used for quick and safe installations. Hanging rod and connect is provided by and installed by others. Ventilator shall be furnished with U.L. classified aluminum baffle filters, supplied in size and quantity as required by ventilator. The filters shall extend the full length of the hood and the filler panels shall not be more than 6" in width. The hood manufacturer shall supply complete computer generated submittal drawings including hood section view(s) and hood plan view(s). These drawings must be available to the engineer, architect and owner for their use in construction, operation and maintenance. Exhaust duct collar to be 4" high with 1" flange. Duct sizes, CFM and static pressure requirements shall be as shown on drawings. Static pressure requirements shall be precise and accurate; air velocity and volume information shall be accurate within 1 -ft increments along the length of the ventilator. U.L. incandescent light fixtures and globes shall be installed and pre -wired to ajunction box. The light fixtures shall be installed with a maximum of 4'0" spacing on center and allow up to a 100 watt standard light bulb. The hood shall have:- A double wall insulated front to eliminate condensation and increase rigidity. The insulation shall have a flexural modulus of 475 El, meet UL 181 requirements and be in accordance with NFPA 90A and 90B. - An integral front baffle to direct grease laden vapors toward the exhaust filter bank. - A built -in wiring chase provided for outlets and electrical controls on the hood face and shall not penetrate the capture area or require an external chaseway. - Low velocity make -up air (up to 90 %) provided through front and side plenums (PSP accessory). - A removable grease cup for easy cleaning. The hood shall be ETL Listed as "Exhaust Hood Without Exhaust Damper", NSF Listed and built in accordance with NFPA 96. The hood shall be listed for 450 °F cooking surfaces at 150 CFM /ft, 600 ° F cooking surfaces at 200 CFM /ft, and 700 °F cooking surfaces at 250 CFM /ft. 7 ROOF OPENING 2" SMALLER THEN CURB DIMENSION 84 81.375" NI 0 a:259 Ktv C COMPLIANCE OMPLII NCE APPROVED NOV 14 20011 City Of Tukwila BI ILDING IISIOM 19" - DISCHARGE OPENING FLEX CONDUIT FOR FIELD WIRING - SERVICE DISCONNECT SWITCH OCCUPANT DATE 125.5" 1" DIRECT FIRED MODULE 77.6875" 01/2 IN " NPT WATER CONNECTION � LIFTING LUGS 4 PLACES FILTER/ CONTROL ACCESS DOOR 20 IN HIGH EQUIPMENT CURB SHEET 2 of 2 7. Ye- 125 "-f CONTRACTOR DALE HAWKSWORTH 4. 2 RECEIVED MTV OP TUKWILA OCT 29200:' ® P 4 ,11`I CENTEIR air ar - ,_ ® NORTHWEST REGIONAL OFFICE www.caplivaaira.com 2804 GRAND AVE. SUITE 303 EVERET WA. 98201 PH: (888 )-338 -5225 FAX: (425).212 -5998 EMAIL: reg85@captiveaire.com WHAT THE PHO 17250 Southcenter Parkway Suite132 Tukwila, WA 98188 October 22, 2008