Loading...
HomeMy WebLinkAboutPermit M08-267 - WESTFIELD SOUTHCENTER MALL - CHAMPSCHAMPS 1030 SOUTHCENTER MALL M08 -267 Parcel No.: 6364200010 Address: Suite No: 1030 SOUTHCENTER MALL TUKW Tenant: Name: CHAMPS Address: 1030 SOUTHCENTER MALL , TUKWILA WA Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA Contact Person: Name: JENNIFER MIRELES Address: 1327 POST AV #H , TORRANCE CA Contractor: Name: AIRE PRO INC Address: 1112 S 344TH ST STE 303 , FEDERAL WAY Contractor License No: AIREPI *032RU DESCRIPTION OF WORK: MECHANICAL WORK FOR TENANT REMODEL Value of Mechanical: $20,000.00 Type of Fire Protection: Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 2 Appliance Vent 0 Repair or Addition to Heat /Refrig /Cooling System.... 0 Air Handling Unit <10,000 CFM 1 >10,000 CFM 0 Evaporator Cooler 0 Ventilation Fan connected to single duct 0 Ventilation System 0 Hood and Duct 2 Incinerator: Domestic 0 Commercial/Industrial 0 doc: IMC -10/06 Cityllif Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us MECHANICAL PERMIT EQUIPMENT TYPE AND QUANTITY * *continued on next page ** M08 -267 Permit Number: M08 -267 Issue Date: 02/03/2009 Permit Expires On: 08/02/2009 Phone: Phone: 310 328 -6300 X 105 Phone: 253 942 -7028 Expiration Date: 03/18/2010 Fees Collected: $395.00 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP/1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 4 Diffuser 39 Thermostat 1 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment Printed: 02 -03 -2009 Permit Center Autho I hereby certify that governing this work The granting of this construction or the Signature: Print Name: doc: IMC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us nature: S 64T l�tCNC� Permit Number: M08 -267 Issue Date: 02/03/2009 Permit Expires On: 08/02/2009 Date: a. ad and examined this permit and know the same to be true and correct. All provisions of law and ordinances complied with, whether specified herein or not. does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating ance of work. I am authorized to sign and obtain this mechanical permit. Date: a- - `' This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M08 -267 Printed: 02 -03 -2009 Parcel No.: 6364200010 Address: 1030 SOUTHCENTER MALL TUKW Suite No: Tenant: CHAMPS 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDMONS * ** • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M08 - 267 Status: ISSUED Applied Date: 11/05/2008 Issue Date: 02/03/2009 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 14: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) doc: Cond -10/06 M08 -267 Printed: 02 -03 -2009 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 18: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 19: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 20: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 21: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: Cond -10/06 * * continued on next page ** M08 -267 Printed: 02 -03 -2009 I hereby certify that I hav this work will be compli The granting of this pe construction or the pe Signature: Print Name: doc: Cond -10/06 • S City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us ead these conditions and will comply with them as outlined. All provisions of law and h, whether specified herein or not. es not presume to give authority to violate or cancel the provision of any other work ce of work. 5 -4 coi M08 -267 Date: — / ordinances governing or local laws regulating Printed: 02 -03 -2009 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 1; ri, : is ".4'i?. [. [ - L•LCSt - - -U. iL'. • Building Permit No. Mechanical Permit No. (For office use only) Plumbing/Gas Permit No. Public Works Permt.No. Project No. ti 909) — b1S1 Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION g , / n A n Suite Nu King Co Assessor's Tax No.: ( 1 1 / C- 11 4 ) —. 2,0(., a Site Address I U ` C i''(/V \ mber: 3Z i] Floor: Tenant Name: C f/Ci )W\ o f New Tenant: ❑ Yes X Property Owners Name: &i "rut Esr. Amir j WP„(t' e,f ci MailingAddress:II110I Ul/l'S ✓-e- P5IvciQ,' Lc- it CONTACT PERSON - who do we contact when your permit is ready to be issued Name: Mailing Address: I '2 0;1 fa st me — Tar, V 4.44. Ge Ctf �I Cit ^� State Zip E -Mail Address: � i1 VI 1 f"( / &44 ,Q X prttJS 7 Vh4,, {3. Sax Number: 310 375 U � J 3 L GENERAL CONTRACTOR INFORMATION — (Contractor information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: <(J, ID Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: ( , . 4 i ) f f r q�•l Mailing Address: '1ll I' • Vitl. g-0A, Contact Person: . F- Sµ (1 E -Mail Address: ity s C q ua z,s State Zip Day Telephone: 3/ C) 3 Z' Vi 2U X • /05 4t 60 Cit State Zip Day Telephone: O I r Gs* Gf to 0 Fax Number: $n G3 019 ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Company Name: M ' ?{V V Wc90 ON ¢3o B J /, City State Zip Contact Person: Nye_ 4D&t'1.t.2 Day Telephone: 6lt p t'o • Z-3 Z3 E -Mail Address: Fax Number: 6.(f St 2337 Mailing Address: '7 / 'cola 4(i fV V . QAIApplicarionsWor ms- Applicarions On Linen -2006 - Permit Application.doc Rcviscd: 9.2006 bh Page 1 of 6 • Valuation of Project (contractor's bid price): $ ) ODD Scope of Work lease provide detailed information): Will there be new rack storage? Yes Q Applientions \Forms- Appiications On Line j -2006 - Permii Applicanon.doc Revised: 9 -2006 bh s BUILDING PERMIT INFORMATION — 206- 431 -3670 Existing Building Valuation: $ Inipiroulaum ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: 'Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If "ves ', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Sqfety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC I ' Floor 5/ 5 11 r) M 2n Floor 3 Floor Floors thru Basement Accessory Structure' Attached Garage Detached Garage Attached Carport Detached'Carport Covered Deck Uncovered Deck • Valuation of Project (contractor's bid price): $ ) ODD Scope of Work lease provide detailed information): Will there be new rack storage? Yes Q Applientions \Forms- Appiications On Line j -2006 - Permii Applicanon.doc Revised: 9 -2006 bh s BUILDING PERMIT INFORMATION — 206- 431 -3670 Existing Building Valuation: $ Inipiroulaum ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: 'Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If "ves ', attach list of materials and storage locations on a separate 8-1/2" x 11" paper including quantities and Material Sqfety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Page 2 of 6 PUBLIC WORKS PERMIT INFORMATION - 206 - 433 -0179 Scope of Work (please provide detailed information): OrT191O9t/ 1/3004 6Td1V A 1 S vef wti acorns-, z_. r District T ukwila 0... Water District #125 ...Water Availability Provided Sewer District Tukwila .Sewer Use Certificate Septic System: ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ ...Civil Plans (Maximum Paper Size — 22" x 34 ") ❑ ...Technical Information Report (Storm Drainage) ❑ .. Geotechnical Report p ❑ ...Traffic Impact Analysis ❑ ...Bond ❑ .. Insurance ❑ .. Easement(s) ❑ .. Maintenance Agreement(s) ❑...Hold Harmless — (SAO) ❑...Hold Harmless — (ROW) Proposed Activities (mark boxes that apply): ❑ ...Right -of -way Use - Nonprofit for less than 72 hours ❑ .. Right -of -way Use - Profit for less than 72 hours ❑ ...Right -of -way Use - No Disturbance ❑ .. Right -of -way Use — Potential Disturbance ❑ ...Construction/Excavation/Fill - Right -of -way Non Right -of -way ❑ ...Total Cut ❑...Total Fill • Please refer to Public Works Bulletin #1 for fees and estimate sheet. cubic yards cubic yards ❑ ...Sanitary Side Sewer ❑ ...Cap or Remove Utilities ❑ ...Frontage Improvements ❑ ...Traffic Control ❑ ...Backflow Prevention - Fire Protection Irrigation Domestic Water ❑ ...Permanent Water Meter Size... ❑ ...Temporary Water Meter Size .. ❑ ...Water Only Meter Size ❑ ...Sewer Main Extension Public ❑ ...Water Main Extension Public FINANCE INFORMATION Fire Line Size at Property Line ❑ ...Water ❑ ...Sewer Monthly Service Billing to: Name: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: Number of Public Fire Hydrant(s) ❑ ...Sewage Treatment Day Telephone: City State Zip Day Telephone: City State Zip Qi Applicationstrorms- .Applicanons On Linc3- - Pcrmit Applic iion.doc Rcviscd: 9 -2006 bh Call before you Dig: 1- 800 - 424 -5555 WO # WO # WO # Private Private ❑ .. Highline ❑ ... Val Vue ❑ .. Renton ❑...Sewer Availability Provided ❑ .. Work in Flood Zone ❑ .. Storm Drainage ❑ .. Abandon Septic Tank ❑ .. Curb Cut ❑ .. Pavement Cut ❑ .. Looped Fire Line • ❑ .. Renton ❑ .. Seattle ❑ .. Grease Interceptor ❑ .. Channelization ❑ .. Trench Excavation ❑ .. Utility Undergrounding ❑...Deduct Water Meter Size Page 3 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace>100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat I 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater a Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct � Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig /Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM I Incinerator — Comm/Ind MECHANICAL PERMIT INFORMATION - 206 -431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: '-( Y Mailing Address: City State Zip Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ �d, c z t' Scope of Work (please provide detailed information): AA6rAt PCIACA1/ * Vt14 0 f/ i. Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... Replacement .... ❑ Fuel Type: Electric tY4 Gas .... Other: Indicate type of mechanical work being installed and the quantity below: Q:\ Applications \Fo`ms- Applications On Line13 -2006 - Permit Application.doc Revised: 9 -2006 bh Page 4 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING O ER 0 ^ 011 A ENT: Ar Signature: (% / r Print Name: J&I /~ 4J/ /7 rt /CJ Mailing Address: / S 7 Po s-t Ac ## Date Application Accepted: W) Q:\Applications\Fortns- Applications On Line\3 -2006 - Permit Application.doc Revised: 9 -2006 bh Date Application Expires: Date: " 7 1 // 1 4 4 Day Telephone: 3/6 3 ZiSr Co .3 X./65 o� a/0 re *561 City State Zip cfilt 0 Staff Initials: Page 6 of 6 Receipt No.: R09 -00184 Initials: User ID: Payee: WER 1655 AIRE PRO ACCOUNT ITEM LIST: Description MECHANICAL - NONRES PLAN CHECK - NONRES City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http://www.ci.tukwila.wa.us Payment Check 16984 395.00 TRANSACTION LIST: Type Method Descriptio Amount RECEIPT Parcel No.: 6364200010 Permit Number: M08 -267 Address: 1030 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 11/05/2008 Applicant: CHAMPS Issue Date: Account Code Current Pmts 000.322.102.00.0 316.00 000/345.830 79.00 Total: $395.00 Payment Amount: $395.00 Payment Date: 02/03/2009 03:39 PM Balance: $0.00 doc: Receiot -06 Printed: 02 -03 -2009 Project L " y 10,-7-, Type of Inspection: ..St Pi'id K4' .Shoff: 4 Address: /1)30 5 e.104 Ai l Date Called: Special Instructions: Date Wanted: .5 a 5 p.m. Requester: t i Phone No ta s3-3i0 - 2Lj/ L INSPECTI N NO. INSPECTION RECORD Retain a copy with permit m 4 4 -26 7 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION ' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 lg Approved per applicable codes. ❑ Corrections required prior to approvals f� COMMENTS: &' 37,14Okt S4»r/ - nspect El 60 � IDat AAAi O 0 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be d at 6300 Southcente Blvd., Suite 100. Call to schedule reinspection. Receipt No.: 'Date: Project: 11 Type o lnsp ,ttign: 11�1 e,p�.- Address: 1 0 3 (:) An >4 t ' Date Called: 0 1 Special Instructions: Date ted: -. 6C p.m. Requester: Phone No: ms, • • 2 5 3 -3 t v --2 LI Gy 0168 -261 INSPECTION RECORD Retain a copy with permit INS CTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION �-- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 pproved per applicable codes. ❑ Corrections required prior to approval. _ COMMENTS: • 9• $ J 00 REINSPECT! r N FEE RE UIRE i . Prior tp spection, fe must be p• d at 6300 Southcenter Blvd., : -uit- ' 00. Call to schedule reinspection. Rec pt No.: 'Date: Project: ( '4411tf, Type ofdnspection: f{C t /. U Address: led c / % ''' /4/ Date Called: / / Special Instructions: Date Wanted: �c —0tom -0 a. p.m. Requester: Phone No: g'.3 --3JO — Z 77 . -26-7 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION F te- 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 - 6 0 )23.Approved per applicable codes. El Corrections required prior to approval. COMMENTS: '13 r t r: 1Rece No.: (Date: El $6 0.00 EINSPECTION FEE R UIRED. Pri r to inspection, fee must be pai' a 6300 Southcenter Blvd., Suite 100. all to schedule reinspection. Project: , Sprinklers: Type of Inspection: 1 074-C ; Address: : F4 v r Suite #: .; . , „ ;-a , ea ,, Contact Person: Special Instructions: Pre -Fire: Phone No.: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: ' Permits: w Occupancy Type: l INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206- 575 -4407 � Approved per applicable codes. ri Corrections required prior to approval. COMMENTS: Inspector: Date: Hrs.: $80.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Word /Inspection Record Form.Doc 1/13/06 T.F.D. Form F.P. 113 COMMENTS: (,1 5 Are Alarm: Type of Inspection: Address: % Suite #: , NI e r6-. ,4 -x4 1 '/ Contact Person: Ali- Special Instructions: Phone No.: 4L sad , �0%. -ifS tx�-j x ; . .^ t ., � l �a tsra' s r+�.f6� R r , „A. . , �- •.1 Project: C. h ,.; , (,1 5 Are Alarm: Type of Inspection: Address: % Suite #: , NI e r6-. ,4 -x4 1 '/ Contact Person: Ali- Special Instructions: Phone No.: Needs Shif °Inspection: 1 Sprinklers: Are Alarm: Hood & Duct: Monitor: Pre-Fire: Permits: Occupancy Type: , v I Approved per applicable codes. INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA FIRE DEPARTMENT Word/Inspection Record Form.Doc 1/13/06 o d° • ‘3 OF- 7 PERMIT NUMBERS 444 Andover Park East, Tukwila, Wa. 98188 206 -575 -4407 LI Corrections required prior to approval. nspector: Date: Hrs.: $80.00 REINSPECTION FEE REQUIRED. You will recgive an invoice:: from City of Tukwila Finance Department. Call to schedule a reinspection. T.F.D. Form F.P. 113 Project Info Project Address 633 SOUTHCENTER MALL Date 10/30/2008 SUITE 1120 For Building Department Use COPY FILE COP H TUKWILA, WA 98118 Applicant Name: M- Retail Engineering, Inc Applicant Address: 750 Brooksedge Blvd., Westerville, Oh 43081 Applicant Phone: 614 -818 -2323 Project Description g� ❑ New Building ❑ Addition ❑ Alterati F rnillia ct -- -- ^^-v^ Refer to WSEC Section 1513 for controls and commissioning requirements. Compliance Option 0 Prescriptive Q Lighting Power Allowance 0 Systems Analysis (See Qualification Checklist (over). Indicate Prescriptive & LPA spaces clearly on plans.) Alteration Exceptions (check appropriate box - sec. 1132.3) ❑ No changes are being made to the lighting ❑ Less than 60% of the fixtures new, installed wattage not increased, & space use not changed. Location (floor /room no.) Occupancy Description Allowed Watts per ft Area in ft Allowed x Area Area #1 RETAIL SALES /FITT'G AREAS 1.50 5535.0 8302.5 Area #1 RETAIL SALES / FITT'G AREAS /NOTE #10 1.50 5535.0 8302.5 Area #1 CD (DOWNLIGHT PAR38 /FL) 14 44.0 616.0 ** From Table 15 -1 (over) - document all exceptions on form LTG -LPA Total Allowed Watts 16605.0 Location (floor /room no.) Fixture Description Number of Fixtures Watts/ Fixture Watts Proposed Area #1 A4 ( TRACKHEAD PAR38 /FL) 7 44.0 308.0 Area #1 TF2 (WALL WASH TRACKHEAD MHC100) 170 50.0 8500.0 Area #1 CD (DOWNLIGHT PAR38 /FL) 14 44.0 616.0 Area #1 F3 (PENDANT MOUNTED FIXTURE MCH100) 38 110.0 4180.0 Area #1 RD (COMPACT FLUORESCENT DOWNLIGHT (2)26W) 7 55.0 385.0 Area #1 Fl (8' - 2LITE TANDEM FLUORESCENT S'''RIP uuClitVdt a runt 28 62.0 1736. 0 Area #1 EF (FAN /LIGHT UNIT WITH (1) 100W BU COMPLIANCE 1 100.0 100.0 APPM ED I NOV 1 8 20 ' hi Total Proposed Watts may not exceed T( • ' 0 . i '' =}.' -Y *IN i I I - A116 Total Proposed Watts 15825.0 Interior Lighting Summary ;,LTG -I Nit 2006 Washington State Nonresidential Energy Code Compliance Forms Maximum Allowed Lighting Wattage Proposed Lighting Wattage 2006 Washington State Nonresidential Energy Code Compliance Form Notes: ww , 1. For proposed Fixture Description, indicate fixtur G ��l f amps in the fixture, and ballast type (if included). For track lighting, list the length of the track (in feet) in addition to the fixture, lamp, and ballast information. 2. For proposed Watts /Fixture, use manufacturer's listed maximum input wattage of the fixture (not simply the lamp wattage) and other criteria as specified in Section 1530. For hard -wired ballasts only, the default table in the NREC Technical Reference Manual may also be used. For track lighting, list the greater of actual luminaire wattage or length of track multiplied by 50, or as applicable, the wattage of current limiting devices or of the transformer. 3. List all fixtures. For exempt lighting, note section and exception number, and leave Watts /Fixture blank. Revised July 2007 RECEIVED CITY OF TUKWILA NOV 0 5 2008 PERMIT CENTER Use' LPA` (W /sf) Use' LPA` (W /sf) Automotive facility 0.9 Office buildings, office /administrative areas in facilities of other use types (including but not limited to schools hospitals, institutions, museums, banks, churches) 1.0 Convention center 1.2 Penitentiary and other Group 1 -3 Occupancies 1.0 Courthouse 1.2 Police and fire stations" 1.0 Cafeterias, fast food establishments', restaurants /bars' 1.3 Post office 1.1 Dormitory 1.0 Retail retail banking, mall concourses, wholesale stores . allet rack shelving) 1.5 Exercise center 1.0 School buildings (Group E Occupancy only), school classrooms, day care centers 1.2 Gymnasia ", assembly spaces" 1.0 Theater, motion picture 1.2 Health care clinic 1.0 Theater, performing arts 1.6 Hospital, nursing homes, and other Group I -1 and 1 -2 Occupancies 1.2 Transportation 1.0 Hotel /motel 1.0 Warehouses storage areas 0.5 Hotel banquet/conference /exhibition hall" 2.0 Workshops 1.4 Laboratory spaces (all spaces not classified laboratory" shall meet office and other appropriate categories) 1.8 Parking garages 0.2 Laundries 1.2 Libraries' 1.3 Plans Submitted for Common Areas Only Manufacturing facility 1.3 Main floor building lobbies (except mall concourses) 1.2 Museum 1.1 Common areas, corridors, toilet facilities and washrooms, elevator lobbies 0.8 Prescriptive Spaces Occupancy: 0 Warehouses, storage areas or aircraft storage hangers 0 Other Qualification Checklis Note: If occupancy type is "Other" and fixture answer is checked, the number of fixtures in the space is not limited by Code. Clearly indicate these spaces on plans. If not qualified, do LPA Calculations. Lighting Fixtures: (Section 1521) Check if 95% or more of fixtures comply with 1,2 or 3 and rest are ballasted. 1. Fluorescent fixtures which are non - lensed with a) 1 or 2 two lamps, b) reflector or louvers, c) 5-60 watt T -1, T -2, T-4, T -5, T -8 lamps, and d) hard -wired elec- tronic dimming ballasts. Screw -in compact fluorescent fixtures do not qualify. 2. Metal Halide with a) reflector b) ceramic MH lamps <= 150w c) electronic ballasts 3. LED lights. Interior Lighting Summary (back) LTG - I NT 2006 Washington State Nonresidential Energy Code Compliance Forms TABLE 15 - Unit Liahtina Power Allowance (LPA 2006 Washington State Nonresidential Energy Code Compliance Form Revised July 2007 Footnotes for Table 15 -1 1) In cases in which a general use and a specific use are listed, the specific use shall apply. In cases in which a use is not mentioned specifically, the Unit Power Allowance shall be determined by the building official. This determination shall be based upon the most comparable use specified in the table. See Section 1512 for exempt areas. 2) The watts per square foot may be increased, by two percent per foot of ceiling height above twenty feet, unless specifically directed otherwise by subsequent footnotes. 3) Watts per square foot of room may be increased by two percent per foot of ceiling height above twelve feet. 4) For all other spaces, such as seating and common areas, use the Unit Light Power Allowance for assembly. 5) Watts per square foot of room may be increased by two percent per foot of ceiling height above nine feet. 6) Reserved. 7) For conference rooms and offices less than 150ft with full height partitions, a Unit Lighting Power Allowance of 1.10 w /ft may be used. 8) Reserved. 9) For indoor sport tournament courts with adjacent spectator seating over 5,000, the Unit Lighting Power Allowance for the court area is 2.60 W /ft 10) Display window illumination installed within 2 feet of the window, provided that the display window is separated from the retail space by walls or at least three - quarter- height partitions (transparent or opaque). and lighting for free - standing display where the lighting moves with the display are exempt. An additional 1.5 w /ft of merchandise display luminaires are exempt provided that they comply with all three of the following: a) located on ceiling- mounted track or directly on or recessed into the ceiling itself (not on the wall). b) adjustable in both the horizontal and vertical axes (vertical axis only is acceptable for fluorescent and other fixtures with two points of track attachment). c) fitted with LED, tungsten halogen, fluorescent, or high intensity discharge lamps. This additional lighting power is allowed only if the lighting is actually installed. 11) Provided that a floor plan, indicating rack location and height, is submitted, the square footage for a warehouse may be defined, for computing the interior Unit Lighting Power Allowance, as the floor area not covered by racks plus the vertical face area (access side only) of the racks. The height allowance defined in footnote 2 applies only to the floor area not covered by racks. Mechanical Permit Plans Checklist MECH;CHK ' 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Address sout•.ncenter Mall !Date 10/30/2008 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 j Equipment performance /te n op C OP 1411.4 Pkg. elec. htg.& dg. List heat pumps on schedule �1 e ffcien If 1411.1 Minimum efficiency Equipment schedule with type, capacity, 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls 1412.1 Temperature zones Indicate locations on plans 1412.2 Deadband control Indicate 5 degree deadband minimum ",' ^.,. . 1412.3 Humidity control Indicate humidistat 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage 1412.4.2 Optimum Start Indicate optimum start controls 1412.5 Heat pump control Indicate microprocessor on thermostat schedule 1412.6 Combustion htg. Indicate modulating or staged control 1412.7 Balancing Indicate balancing features on plans 1412.8 Ventilation Control Indicate demand control ventilation for high - occupancy are s�® V ruk 1422 Thermostat interlock Indicate thermostat interlock on plans E COMPNCE 1423 Economizers Equipment schedule APp G3 ®��® 1413 Air economizers 1413.1 Air Econo Operation Indicate 100% capability on schedule NOV 1 8 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb V 2na ti U 1413.2 Water Econo Doc Indicate clg load & water econoe & cig tower performance it 1413.3 Integrated operation Indicate capability for partial cooling C y Or u . h a 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer WTI f jI► ^�,y * ,�_ � 1414 Ducting systems 8dw! g A�l ' 111 1414.1 Duct sealing Indicate sealing necessary 1414.2 Duct insulation Indicate R -value of insulation on duct 1415.1 Piping insulation Indicate R -value of insulation on piping 1416 Completion Requirements 1416.2.1 Commissioning Provide commissioning plan 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report 1434 Separate air sys. Indicate separate systems on plans Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 - 1454) 1440 Service water htg. 1441 Elec. water heater Indicate R -10 insulation under tank 1442 Shut -off controls Indicate automatic shut -off ECEIVED 1443 Pipe Insulation Indicate R -value of insulation on piping CI OF TUKWIL A 1452 Heat Pump COP Indicate minimum COP of 4.0 oY 0 5 2008 1452 Heater Efficiency Indicate pool heater efficiency 1453 Pool heater controls Indicate switch and 65 degree control MIT C T R 1454 Pool covers Indicate vapor retardant cover 1454 Pools 90+ degrees Indicate R -12 pool cover iAn sor n If "no" is circled for any auestinn_ nrnvidp AYnlanatinn. 2006 Washington State Nonresidential Energy Code Compliance Form 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist MECI,H -01K 20015 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1G, and it includes provisions for venfication and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following. a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. At a minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: If a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist MECI,H -01K 20015 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1G, and it includes provisions for venfication and challenge of equipment efficiency ratings, then the product shall be listed in the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an intermittent ignition or interrupted device (IID), and have either mechanical draft (including power venting) or a flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), including electric furnaces, that are not located within the conditioned space shall have jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) or a CAE of not less than the following: 1412.8 Ventilation Controls for High- Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following. a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water - cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 inch W.C. or greater. 1414.2 Insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include insulation installation, moisture control, air leakage, and building envelope insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying • 2006 Washington State Nonresidential Energy Code Compliance Form 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2. are isolated from the exterior with an automatic shut -off damper complying with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6. Exception: Piping installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAC 51 -26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for building completion and commissioning requirements.) air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum 4 art controls shall be designed to automatically adjust the start time of an HVAC sjstem each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include microprocessor controls that minimize supplemental heat usage during start-up, set- up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall indicate when supplemental heating is being used through visual means (e.g., LED indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 000 EXCEPTIONS: 1. Boilers. 2. Radiant heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. ACTIVITY NUMBER: M08 -267 DATE: 11 -05 -08 PROJECT NAME: CHAMPS SITE ADDRESS: 1030 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: uding Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Documents/routing slip.doc 2 -28-02 110 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ! _,, ❑ Structural 511 Fire Prevention I `���'� / r Incomplete APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: Planning Division ❑ Permit Coordinator ❑ DUE DATE: 11-06-08 Not Applicable Permit' Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS RO TING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: DUE DATE: 12-04-08 Not Approved (attach comments) ❑ DATE: Permit. Center UseOnly • CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 4 FEDERATED MUTUAL INS CO 9360682 02/05/2008 Until Cancelled 01/01/1980 06/11/2001 $12,000.0002/14 /2008 3 CBIC SB7063 10/13/200102/05 /2008 $6,000.00 08/01/2001 2 CBIC 567063 10/13/199910/13 /2001 $4,000.00 1 AMERICAN BANKERS INS CO LPM473147 10/11 / 1997 Until Cancelled 10/13/1999 $4,000.00 Name Role Effective Date Expiration Date RAEDER, SCOTT W Cancel Date 01/01/1980 Amount JENNINGS, RICHARD M AGENT 01/01/1980 KENNETH, BROECK AGENT 01/01/1980 06/11/2001 Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date FEDERATED Untitled Page General /Specialty Contractor A business registered as a construction contractor with Lltl to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company AIRE PRO INC 2539427028 2921 MERIDIAN AVE E EDGEWOOD WA 98371 PIERCE Corporation UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License Next License Associated License Specialty 1 Specialty 2 601771753 ACTIVE AIREPI *032RU CONSTRUCTION CONTRACTOR 12/31/1997 3/18/2010 AIREP* 040P4 GENERAL UNUSED Business Owner Information Bond Information Insurance Information • • Page 1 of 2 https: / /fortress.wa. gov /lni/bbip/Detail.aspx ?License= AIREPI *032RU 02/03/2009 3/4' DRAIN FROM PAN Q 2' VTR 2 rZ _ 2 SUPPLY AIR SPIN -IN TAP, SEAL JOINTS IN ROUND RIGID TRUNK DUCT DUCT AND AT TAPS W/ MAIN SUPPLY TO S.A. MAIN INSULATED ROUND DUCT ALL DUCT LINER FLANGED AND GASKETED JOINT TRANSVERSE EDGES TO 13E OR DUCT CONNECTION AND RE- COATED W/ ADHESIVE IN INFORCEMENT IN ACCORDANCE W/ ACCORDANCE W/ SMACNA SMACNA 2' WA. CLASS, SEAL STANDARDS (fl.) NON- GASKETEQ TRANS - VERSE JOINTS IN ACCORDANCE W/ SMACNA CLASS 'C" (TYP.) DATE: 10 -30 -08 JOB N0: 0813130 DRAWN: CHECKED: GROSS AREA 5,535 SQ. FT. SALES AREA 3,278 SQ. FT. I I 1 AIR III AUXILIARY FLOAT SHUT -OFP A.H.J. MIN. 3/4' COPPER DRAIN TO FLR. 2" FCC) LAY I 1/2' © 4' SAN - 2 " SWITCH DRAIN, MOP BASIN OR AS DIRECTED BY CODED NOTES STRAP CLAMP MAIN DUCT OLUME DAMPER - (TYPICAL) ROUND FLEXIBL DUCT CONNECTION, SAME SIZE AS DIFFUSER NECK (MAX. SIZE lMX. 5 FT,) FIRE DAMPER WHERE REQUIRED FLOW IN ■ % 1/2' E2 TO I - POSITIONS - AUXILIARY DRAIN PAN UNDER A.N.U. MIN, 6' LARGER THAN A,HJU, 4 6 ' DAMPER TO PLACED PERPENDICULAR TO AIR STREAM THERMAL INSULATING BLANKET BLANKET WHERE REQUIRED, i CONDENSATE TRAP -- PROVIDE R 45• l ---- -z DAMPER LOCATION DEEP, SEAL ALL SEAMS DEPTH TO BE 1 1/2 WATERTIGHT WG 4 , 3 , f TIMES UNIT OPERATING STATIC PR SURE (MIN. 2') 4" g @ OR EXTERNAL /'f WRAP INSULATION i KVOLUME \ I WHERE ABOVE LAY -IN CEILINGS, PROVIDE W/ LOCKING QUADRANT AS SPECIFIED i �\ ` � BRANCH DUCT ----- C :- - I � 1S' LONG ORANGE MARKER TAPE ATTACHED TO DAMPER t0 IDENTIFY LOCATION � ... _ - - -- _ � m - -- - - SUPPLY AIR DIFFUSER Q ID IFFUSER MOUNTING CEILING PLASTER FRAME Emphasis On Excellence M•Retail Engineering, Inc. 750 Brooksedge Blvd. Westerville, Ohio 43081 TEL: 614.818.2323 FAX: 614.818.2337 AUX IL I AIRY DRAIN FAN SCI-1EM4T IC • SANITARY STACK (NTS) SCIIEMAT IC (NTS) A TYPICAL SQUARE E D UCT TAKE -OFF (NTS) NOTES: 1. PROVIDE ACCESS DOOR IN ADJACENT DUCTWORK FOR RESETTING DAMPER. 2, DAMPER MUST BE SUPPORTED IN DRAFT STOP BY SLEEVE AND RETAINING ANGLES, DAMPER MUST REMAIN IN PLACE IF DUCT COLLAPSES, SEAL BETWEEN EEN DRAFT SLOP AND SLEEVE SHALL BE FIRE RATED MATERIAL, DAMPER SHALL BE ONE SIZE LARGER THAN DUCT SIZE. 3/4 `. �,C,, L AV VANES PRE - ASSEMBLED ON RUNNER PLATES USE GALVANIZED VANES FOR GALVANIZED OR ALUMINUM DUCTS � e T V ' j r _ ; - , ' , �# MB , f1 112m r I ` M2,0 3/ 4' ATTACH DAMPER TO MOUNT SLEEVE IN BLDG. CONSTRUCTION. SLEEVE TO BE OF GAUGE AS REG. BY A A O f / ' � SAN 0A " '` v 4' SAN 1 ® r PLATE SAME GAUGE AS DUCT � - MANUFACTURER FOR U.L. / (TYP) # u I 1 •� AIR FLOW l TO EXISTING UTILITIES MUST BE AND SCI-IEDULED IN WITH THE MALL OPERATIONS VENT PIPING SHALL BE CAST IRON OR STEEL 'PVC' PIPING NOT AS PER LANDLORD CRITERIA, f NM N. r CO \ 1/2' CW �.�" THE CONNECTION COORDINATED ADVANCE 'PVC' MANAGER ALL. GALVANIZED IRON ALLOWED W �. DUCT t \_ DUCT L�4V TO �Q ,.. .� tii '/2' NOTES; PLUMBING SHALL NOT SE INSTALLED IN DEMISING WALLS OF THE LEASE SPACE. ALL WATER PIPING SHALL 8E COPPER PIPING NOT ALLOWED AS PER LANDLORD CRITERIA. ALL SANITARY PIPING SHALL BE CAST 'PVC' PIPING NOT ALLOWED AS PER LANDLORD CRITERIA. ALL PIPING SYSTEMS SHALL BE PRESSURE TESTED IN ACCORD y�10E WITH LANDLORD CRITERIA. s NM OD N 3 1/4' 1112' s �- -- ti \__L �4 314' TUC I YALVE (TYP) UNION (TYP) R =2 11111111Mil ( al 1-1-1 ') NO DUCT SIZE OVER 36'X36' DUCT SIRE 36 "X36' OR UNDER SQ. ELBOW WITH TYPE A SGT, ELBOW WITH SINGLE DOUBLE THICKNESS VANES THICKNESS VANES ig ° 4g 21t1 TYPICAL CONNECTION STEEL BLADES ® _ I� BOLT TO SLEEVE (TYP.) W - .1 \� RETAINING ANGLE. SIZE AS RECOMENDED BY OO GRAFT STOP - 1.1.1 P.) CONSTRUCTION MANUFACTURER (T Y129 -) = 0 0 COMBINATION F I R E / SMOKE DAMPER SCHEMATIC ,, WATER FR I SE " (NTS) PLUMBING 'LAN 5 TURNING ING VANE SCHEMATIC , 0 v I 0 ALL WATER LINES, VENT LINES, DRAIN LINES, SPRINKLER LINES, ETC. SHALL BE OFFSET BELOW PLATFORM AND CONCEALED IN WALL ABOVE PLATFORM. DO NOT ROUTE PIPING, ETC. THROUGH STORAGE SPACE ABOVE PLATFORM OR ABOVE ELECTRICAL EQUIPMENT, 0 CONNECT NEW SANITARY LINE INTO THE LANDLORD'S EXISTING SANITARY SERVICE. FIELD VERIFIES EXACT LOCATION OF LANDLORD'S MAIN PRIOR TO BIDDING. INSTALL CLEAN OUT AT CONNECTION TO LANDLORD'S MAIN AND COORDINATE LOCATION AND TYPE OF COVER REQUIRED TO MATCH FLOOR FINISH, REFER TO STACK DIAGRAM AND PLUMBING SPECIFICATIONS FOR FURTHER INFORMATION, EXTEND NEW VENT THROUGH ROOF, REFER TO STACK DIAGRAM ANp PLUMBING SPECIFICATIONS FOR FURTHER INFORMATION, 0 CONNECT NEW COLD WATER LINE INTO THE EXISTING COLD WATER TAP. REFER TO RISER DIAGRAM AND PLUMBING SPECIFICATIONS FOR FURTHER INFORMATION. FURNISH AND INSTALL WATER HAMMER ARRESTORS IN THE DOMESTIC COLD AND HOT WATER PIPING AS SHOWN ON THE WATER RISER DIAGRAM. WATER HAMMER ARRESTORS TO BE LOCATED IN AN ACCESSIBLE LOCATION. UNITS AS MANUFACTURED BY SIOUX OR PRECISION PLUMBING PRODUCTS ARE ACCEPTABLE. ALL PLUMBING FIXTURES SHALL BE INSTALLED WITH STOP VALVES To ISOLATE EACH FIXTURE, REFER TO RISER DIAGRAM AND PLUMBING SPECIFICATIONS FOR FURTHER INFORMATION, EACH SIDE FOR SUPPORT INSULATE ALL PIPING IN I 1 - HANGERS INSTALLED OF EXP. TANK STORE NO. � C I �S y 14498 ��'� ��xi� � 00N,74/ ; � �. :� � ;' * ,,(' t.; i 3 � r , �� 0 �.�� �'� ' la �} ' m�e II. 4 ;: :.: HW 3/4' � _ T NOTES: 1. SYMBOL KEY- 4. VOLUME DAMPER - FIRST LETTER: S SUPPLY R RETURN E -EXH FACTORY FURNISHED, OPPOSED BLADE OR T- TRANSFER BUTTERFLY WHERE AVAILABLE. ADJUSTABLE SECOND LETTER: D- DIFFUSER R- REGISTER FROM FACE. G GRILLE 5. BORDER STYLE- 2, PROVIDE OPTIONAL DIRECTIONAL SLOW 'A' SURFACE MOUNTED FEATURE FOR OTHER THAN 4 -WAY. '5' LAY -IN, PROVIDE WITH PLASTER FRAME FOR DRYWALL CEILING MOUNTING. 3, FINISH "C' LAY -IN FRAME FOR T -BAR CEILING, 'A" WHITE, 'B' WHITE - GC. TO FIELD PAINT TO MATCH 6. PROVIDE BOOT FOR DUCT MOUNTING. CEILING OR WALL WITH ENAMEL FINISH, VACUUM AMTROL ST -5 T4-IERMAL EXPANSION ABSORBER ACCORDANCE WITH SPECIFICATIONS, UNION BY P.C. ( TYP.) WATER NEATER - SEE PLUMBING FIXTURE SCHEDULE 2" WIDE. 20 GA, SWEET METAL SAND, SECURE TO WALL FOR SEISMIC BRACING WHERE REQUIRED BY CODE. (BY P.CJ GALV, DRIP PAN BY P,G. BREAKER BY P.G. -- CU _ I \ 3/4' SYMBOL (1X2) MANUFACTURE CATALOG NUMBER NOMINAL SIZE MOUNTING MATERIAL FINISH «1 QPR (4) BORDER (5) REMARKS GATE/SALL VALVE BY P.G. (TYP.) 3/4'T 4 P R VALVE BY P,C, 3/4' RUN FULL SIZE TO MOP SINK , MOD. NECK " OTHER STEEL ALUM. I � J' SD -1 TITUS TMS 12'x12' 6'0 • • A A SG -I TITUS 300RL 10'x10' 8'x:3' DUCT • A • A DU MOUNTED TG -1 TITUS 355RL 38'x18' 36'x16' DUCT A A DU MOUNTED DRAIN VALVE BY P.C. -°°- -- SEP ERATE 3/4' DRAINS TO ��d� � RHG -1 TITUS 48 "x24" 42'x18" 0 A A - a 91 �y j \ �I I/ fie✓ r I SHELF ABOVE MOP SINK, SHELF 4 BRACKETS BY GENERAL CONTRACTOR TO MOP SINK X 11 07 /11/09 REVISIONS PLUMBING COIDEID NOTES Q WATER �IEr4TE '. � �Ei`�f14TIC 0 � 1 ZOd Q AI DEVICE SCHEDULE (NTS) 1- WC WATER CLOSET - AMERICAN STANDARD 'CADET' MODEL 4'216$.100, (1.6 GAL/FA.) FLOOR MOUNTED, ELONGATED BOWL, TANK TYPE, CHROME TRIP LEVER, WATE SAVER, VITEOUS CHINA, MEETS ADA AND ANSI REQUIREMENTS WHEN INSTALLED WITH TOP OF SEAT BETWEEN IT AND Is'. FURNISH WITH WHITE AMERICAN STANDARD MODEL "5325.024 OPEN FRONT SEAT WITH COVER AND CHROME SUPPLY STOPS. EQUALS BY KOHLER OR CRANE. J.AV LAVATORY - AMERICAN STANDARD 'COMRADE' MODEL 4 '0124 .024 WITH a 'WING DIVISION NO. DESCRIPTION DATE FAN COIL UNIT SCHEDULE AMERICAN STANDARD FAUCET 'RELIANT' MODEL 402385.000 WITH POLISHED CHROME FINISH. EQUALS BY KOHLER OR CRANE. WN WATER HEATER - A.O. A® SMITH ENERGY SAVER LOWBOY MODEL "DEL -6, ELECTRIC WITH GLASS LINED TANK, 6 GALLON, 1500 W., 120V., 1 PH. EQUALS BY RHEEM OR RUUD. FC0 FLOOR CLEAN OUT - ZURN MODEL 4 7-1400 'LEVEL TROL' ADJUSTABLE, DURA- COATED CAST -IRON BODY, WITH GAS LUATERTIGHT ABS TAPERED THREADED PLUG, AND ROUND SCORIATED SECURED TOP ADJUSTABLE TO FINISHED FLOOR EQUALS BY J.R. SMITH OR WADE. WHA WATER HAMMER ARRESTER - SIOUX CHEIF =150 SERIES OR EQUAL BY k ILLN7ilta UNIT NUMBER YORK MODEL SUPPLY FAN ELECTRIC HEAT TOTAL CLG. SENS. CLG. N � � � E 2 O.A. CFM NOTES I 4- .0 ------ EXIST. BAR JOISTS (TYP.) SNOT .ION HP Z SP RPM VOLTAGE/ PHASE KW STEPS I AHU -I K3EU180 15 3 6100 1.0 181 — 208-3 26 2 156 123 - 1305 0 NOTES: I. Unit to be provided with field Installed spring leolatore. SHEET NUMBER MECHANICAL DETAILS AND SCHEDULES M200 5/8'0 A36 ROD, DOUBLE NUT AT C6, WELD NUTS TO ROD APTh IS SET AHU PRECISION PLUMBING PRODUCTS, INC. � h�I FLOOR DRAIN - ZU MODEL 4 7-415, 3' PIPE SIZE WITH TYPE '5' POLISHED NICKEL BRONZE STRAINER. (PROVIDE WITH TRAP PRIMER IF REQUIRED BY CODE OR SHOWN ON DRAWINGS) EQUALS BY J.R. SMITH OR WADE. TE CRAP PRIMER - PRECISION PLUMBING PRODUCTS, INC. MODEL 4 'P2 -500 WITH ADJUSTABLE FLOW RATE, INTEGRAL VACUUM BREAKER AND INTEGRAL BACKFLOW PREVENTER. MOUNT IN AN ACCESSIBLE LOCATION PER MANUFACTURERS PRINTED INSTRUCTIONS. t MOP BASIN - FIAT 4 iMS5 -2424 MOLDED STONE MOP BASIN WITH VINYL BUMPERCSUARD. FURNISH WITH AMERICAN STANDARD *5344.111 FAUCET WITH INTEGRAL V ACUUM BREAKER AND STOPS. EQUALS 5Y STERN - WILLIAMS O MUSTEE. DRINKING FOUNTAIN - OASIS WH MODEL " WALL MOUNTED. FURNISH WALL HANGER PLATE, CHROME P -CRAP AND SUPPLY SLOP. MOUNT To 'ANSI' STANDARD FOR HANDICAPPED AT 34 1/2' MAX. FROM FLOOR TO SPOUT OUTLET. CONDENSING UNIT SCHEDULE - AIR COOLED (Tl - P,) �` `�� J.l J1Nb'nt� UNIT N UMBER YORK MODEL +' SNOT WON COMPRESSOR VOLTAGE/ PHASE CONDENSER FANS CAP. MBH 3ZIS a Wfl1- 1IXb`W O.A. TEMP NOTES REF TYPE CAPACITY STEPS NO. HP EACH I ACCU -I HICE150 15 R - 22 I 156 208 - 3 2 1/2 156 85 000 DOUBLE NUT AND SPRING ISOLATOR AT AHU'S FROM JOIST AHU AHU MAX.) L3 x 3 x 3/16 AT 1/1 SLOPE TOP SUSPENSION BRACKET t0 O BOTTOM OF USING 3/16 FILLET WELD ALL AROUND. (TYP.) SUPPORT HANGER SHALL SE SPACED MANUFACTURER'S RECOMMENDATIONS SUSPENSION BRACKET. WELD NUTS TO ROD AFTER UNIT IS SET. (TYP.) PER (4' -0' 1, PROVIDE WITH FIELD INSTALLED LOW AMBIENT CONTROLLER FOR 0 DEGREE OPTERATION 2. PROVIDE PROGRAMMABLE NIGHT SETBACK THERMOSTAT. 3. INSTALLING CONTRACTOR SHALL PROVIDE ALL LOW VOLTAGE WIRING. RECEIVED CITY OF TUKWILA - - -- k. „r n nnn PERMif CENTER ( 141-4 &IF: FO T SCI-IEMAT IC - SEISMIC ( PLUM'S ING FIXTURE SC-IE ID UL E I) I-IVAC UNIT SCI-IE I UL E D ACCU -1 SHOWN HERE FOR INTENT ONLY 1 12 1P� IH - 1 42'x18' DN GENERAL HVAC NOTES {4 AM 0 M2.0 M20 / 0 M C14N I CAL FLAW 150 150 E f 11 NO FIBERGLASS OR FIBERBOARD DUCTWORK ALLOWED. 1 10'X12 " TRANS, 13TH OP I?UCT TO 13' 6' AFP 1 REMOVE ALL EXISTING DUCTWORK, DIFFUSERS, GRILLES, CONTROLS, ETC., AS REQUIRED TO FACILITATE NEW INSTALLATIONS. 2 NEW DUCTS USED TO CONVEY THE CONDITIONED AIR SUPPLY AND VENTILATION AIR ARE TO 5E MADE OF CONTINUOUS SHEET METAL. DUCT LININGS (THERM O FLEXIBLE VIBRATION AN ACOUSTICAL LE BLE BRA TI A L D , ISOLATION CONNECTORS, DUCT CONNECTORS, AND DUCT TYPE TO BE APPROVED BY CODE AND LANDLORD. 6'0 150 r-- 150 VERIFY ALL AS - BUILT SITE CONDITIONS PRIOR TO BID AND INCLUDE IN BID ALL COSTS TO MAKE FIELD COORDINATION AND ADJUSTMENT TO DUCTWORK FOR FIT INTO EXISTING STRUCTURE. CONTRACTOR MALL VERIFY AND FIELD COORDINATE FINAL LOCATION OF MECHANICAL EQUIPMENT. 1 ALL DUCTWORK SHALL BE SHEET METAL FABRICATED IN ACCORDANCE WITH ASHRAE GUIDE AND SMACNA MANUAL LATEST EDITIONS. NO FIBERGLASS OR FIBERBOARD DUCTWORK ALLOWED. FOR EXISTING HVAC TO BE REUSED, PROVIDE ONE- TIME MAINTENANCE ON EXISTING EQUIPMENT, SUCH AS REPLACING FAN BELTS, OILING MOTORS, CLEANING COILS, CHANGING OUT FILTERS, ETC. AS MAY BE REQUIRED. CHECK OUT UNIT AT BEGINNING OF CONSTRUCTION AND REPORT PROBLEMS TO ARCHITECT. G.C. TO PROVIDE IN THEIR CLOSE -OUT DOCUMENTATION, DETAILED EVIDENCE (TICKETS, PARTS LISTS, SUMMARY REPORT, ETC.) THAT THIS WORK HAS BEEN PERFORMED. HVAC SYSTEM IS TO BE NEW, BY MECHANICAL CONTRACTOR, WITH NEW DUCTWORK HVAC SYSTEM IS TO BE NEW, BY LANDLORD'S MECHANICAL CONTRACTOR, DUCTWORK 15Y THIS CONTRACTOR HVAC SYSTEM IS EXISTING TO REMAIN, MECHANICAL CONTRACTOR TO PROVIDE NEW DUCTWORK AND PROVIDE SERVICE AND RE- BALANCE AIR -SIDE AND HYDRONICS AS PER LANLORD CRITERIA. HVAC SYSTEM IS EXISTING TO REMAIN. MECHANICAL CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS. ALL RECTANGULAR RETURN AIR, RELIEF AIR AND SUPPLY AIR DUCTWORK. SHALL BE LINED WITH 1' THICK ACOUSTICAL LINER. LINED DUCTWORK DOES NOT REQUIRE EXTERIOR INSULATION. DUCT DIMENSIONS SHOWN ARE INSIDE NET DIMENSIONS, ADD TO SHEET METAL SIZE FOR INSULATION. IN GENERAL, HOLD RETURN AIR DUCT TIGHT TO UNDERSIDE OF STRUCTURE UNLESS OTHERWISE NOTED OR REQUIRED BY FIELD CONDITIONS. SUPPLY AIR DUCT SHALL BE MOUNTED JUST ABOVE HIGHEST LIGHTING FIXTURE. COORDINATE EXACT MOUNTINGS HEIGHT IN FIELD. ROUND RIGID SUPPLY, RETURN, OUTSIDE AIR AND RELIEF AIR DUCTS SHALL BE EXTERNALLY INSULATED WITH I' THICK, 1.5 L. DENSITY FOIL FACED FIBERGLASS INSULATION. 6 FURNISH AND INSTALL ALL LOW VOLTAGE WIRING AND CONDUIT REQUIRED FOR MECHANICAL EQUIPMENT. RESPONSIBLE FOR COORDINATING ALL WIRING AND CONDUIT REQUIRED FOR EQUIPMENT OPERATION AND CONTROL. IF INSTALLATION VARIES FROM THE CONTRACT DRAWINGS, OBTAIN AS- BUILT DRAWINGS AND SUBMIT SAME TO OWNER 10 CONICAL BELLMOUTH FITTINGS WITH MANUAL BALANCING DAMPER TO BE USED FOR ALL ROUND BRANCH TAPS ABOVE ACCESSIBLE LAY-IN CEILINGS. CONICAL BELLMOUTH FITTINGS WITHOUT MANUAL BALANCING DAMPERS TO BE USED FOR ALL ROUND BRANCH TAPS ABOVE INACCESSIBLE DRYWALL CEILINGS WITH BALANCING REQUIRED WITHIN 2 FT. OF DIFFUSER WITH PLASTER FRAME. AH - \. ' 0 42'X18! 20'><14' `�• --- ... .. ... .......... ........_ 150 LN 1 14'X12' 1,0 ... SG_1 150 14'X12' 150 42'x18'; DN TO GRILLE Ii r 5 1 32'X18' SG -1 150 10 "X12' 150 (TYP) An -1 T -STAT 465(16' TRANER DUCT • I3'-gg MIN. - TG -1 ' , M2.p W � 36 . XI6 ' 13 SECURE AND PAY FOR ALL REQUIRED PERMITS AND INSPECTIONS AND PERFORM ALL TESTS CALLED FOR OR REQUIRED AS A PART OF HIS WORK. FURNISHED APPROVED CERTIFICATE OF FINAL INSPECTION, AND TURN OVER TO OWNER AT COMPLETION OF PROJECT. 14 MECHANICAL PLANS ARE DIAGRAMMATIC, NOT SHOWINGS EVERY ITEM IN EXACT LOCATION OR DETAIL. MEASUREMENTS AND LOCATIONS MUST BE FIELD VERIFIED AND COORDINATED WITH ARCHITECTURAL, HVAC, FIRE PROTECTION, STRUCTURAL, ELECTRICAL AND OTHER BUILDING DRAWINGS. 15 EXISTING SPRINKLER SYSTEM TO BE MODIFIED AS REQUIRED FOR COVERAGE TO MEET LOCAL CODES AND LANDLORD REQUIREMENTS APPROVAL ALSO REQUIRED BY LANDLORD'S INSURER 16 SHALL BE RESPONSIBLE FOR COORDINATION OF ALL TRADES, LANDLORD REQUIREMENTS, CEILING HEIGHTS AND EXISTING: STRUCTURAL CONDITIONS PRIOR TO FABRICATION OF ANY DUCTWORK OR ORDERING OF ANY EQUIPMENT ALL WORK SHALL BE IN STRICT ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDINANCES. FLEXIBLE INSULATED DUCTS SHALL BE MAXIMUM 5' - LONG AND SHALL MEET INSTALLATION AND MATERIAL REQUIREMENTS OF LOCAL. CODES. PROVIDE TENANT WITH AS -BUILT DRAWINGS, ALL EQUIPMENT SHOP DRAWINGS, INFORMATION ON THERMOSTATS, CONTROL WIRING DIAGRAMS AND OTHER PERTINENT INFORMATION AT COMPLETION OF PROJECT. 20 ALL BRANCH TAKE -OFFS SHALL SE PROVIDED WITH MANUAL BALANCING DAMPERS. 0 150 0 21 FURNISH AND INSTALL A COMPLETE TEMPERATURE CONTROL SYSTEM TO INCLUDE: PANELS, MODULES, RELAYS, WIRING, THERMOSTATS, :SENSORS, DAMPERS, ACTUATORS AND ALL MISCELLANEOUS ITEMS AS REQUIRED TO FULFILL THE DESIGN INTENT AS INDICATED ON THE PLANS AND IN THE CODED NOTES. 22 ALL TEMPERATURE CONTROLS, FIRE ALARM COMPONENTS, EQUIPMENT NAMEPLATES, LABELS, OR COLOR CODED COMPONENTS SHALL BE MASKED DURING PAINTINGS TO PREVENT DAMAGE FROM OVER -SPRAY OR OBSCURING INFORMATION. 23 PROVIDE AND INSTALL FIRE DAMPERS IN ANY EXISTING OR NEW DUCTWORK THAT PENETRATES A FIRE RATED PARTITION AS REQUIRED BY CODE. 24 ROUND RIGID SUPPLY AIR DUCTS SHALL BE EXTERNALLY INSULATED WITH 1' NICK, 1.5 LBS. DENSITY FOIL FACED FIBERGLASS INSULATION. &X1 -' L .. I,.,,... 50 6'o 0 SD -1 50 0 0 0 •6'0 T 11 6'0 DN TG- I •2.4'X14;' 24'X14 (TYP) r 5 �,- 3■'x16' TRANSFER DUCT :• I3' 42' MIN. ; AFF 1 Imi III / .. y . ..... a • N ei AI-4 -1 T -'TAT "I 100 215 215 T ' g&FAI 111 20'><14' — • ZRumrameec W —:.. mrc x -•4Pi-1 .-VMSORM. MECHANICAL CODED NOTES FURNISH AND INSTALL A 'LIGHT STAT' TMC -AV1.1 PROGRAMMABLE (HEATING AND COOLING) AUTO CHANGE OVER THERMOSTAT WITH SUB -BASE AND CLEAR LOCKING COVER AT 4' -0' AFF. PO NOT MOUNT THERRMOSTAT BELOW NIGHT LIGHTS. COORDINATE EXACT LOCATION WITH TENANT'S GENERAL CONTRACTOR. LIGHT STATS ARE AVAILABLE THRU DYNELCO ,s, 1- 800 -292 -2444. (FOR BTU'S, SPLIT SYSTEMS AND DX UNITS) FURNISH AND INSTALL A TOILET EXHAUST FAN COMPLETE WITH INTEGRAL BACKDRAFT DAMPER. EXHAUST CAPACITY 51-IALL BE 150 CFM UP TO 0.625' S.P. FURNISH AND INSTALL EXHAUST DUCT, ROOF CAP AND ACCESSORIES AS REQUIRED. (REFER TO PLANS FOR LOCATIONS). INSTALL TOILET EXHAUST FAN IN LOWER DRYWALL CEILING. SEE ARCHITECTURAL PLAN 46.0 FOR MANUFACTURE AND MODEL INFORMATION. UH- 1 4 2: Q -MARK SERIES MUH UNIT HEATER SHALL BE A HORIZONTAL PROJECTION 205v., 3 PHASE WITH A CAPACITY OF 5 KW, UNIT TO BE COMPLETE WITH HANGERS AND INTEGRAL THERMOSTAT. FIELD COORDINATE EXACT LOCATION. MOUNT TOP OF U.H. AT 6' BELOW CEILING IN NON -SALES AREA, AIM AS SHOWN. CIRCUITING AND DISCONNECT SWITCH EY ELECTRICAL CONTRACTOR INSTALL CONDENSATE DRAIN FROM AHU -1. MINIMUM DRAIN SIZE TO BE 3/4 ". CONDENSATE DRAIN TO BE TRAPPED WITH A TRAP DEPTH OF 15 X UNITS TOTAL STATIC PRESSURE, MINIMUM 5' DEEP. DRAIN SHALL SE EXTENDED (AT A SLOPE OF 1' PER 40') TO THE MOP BASIN INTERIOR PIPING SHALL BE COPPER WITH WROUGHT FITTINGS UNLESS NOTED OTHERWISE, INSULATE ALL INTERIOR CONDENSATE PIPING PER SPECIFICATIONS. SMOKE DETECTOR FURNISHED AND INSTALLED BY GENERAL CONTRACTOR SMOKE DETECTOR MUST BE IN AN ACCESSIBLE LOCATION IN AIR DUCT. WIRE THE SHUT DOWN SEQUENCE OF THE HVAC UNIT UPON SENSING: SMOKE, AND SHALL WIRE THE LANDLORD INTERFACE TO SIGNAL THE MALL'S FIRE /SMOKE ALARM SYSTEM. REFER TO ELECTRICAL PLANS FOR FURTHER INFORMATION. AHU -1: FURNISH AND INSTALL A SPLIT- SYSTEM DX AIR HANDLING COOLING UNIT WITH MATCHING AIR COOLED CONDENSING UNIT. INSTALL WITH PROPER SERVICE CLEANANCE AREA AS RECOMMENDED BY MANUFACTURER. UNIT SHALL INCLUDE TWO SETS OF FILTERS. FILTERS IN UNIT TO BE REPLACED PRIOR TO STORE OPENING. MOUNT UNIT AS SHOWN ON PLANS. UNIT IS SUSPENDED FROM STRUCTURE, FURNISH ADDITIONAL STEEL AS REQUIRED TO MAINTAIN LANDLORD'S STRUCTURAL ENGINEER'S SPECIFICATIONS AS TO LOAD BEARING LIMITS. PROVIDE IN -LINE SPRING ISOLATORS AS REQUIRED. SEE 'HVAC UNIT SCHEDULE' ON SHEET M2.0 FOR FURTHER INFORMATION ACCU -1: FURNISH AND INSTALL AN AIR COOLED DX CONDENSING UNIT. UNIT SHALL BE MOUNTED ON FULL LENGTH MOUNTING CURBS. INSTALL WITH PROPER SERVICE CLEARANCE AREA AS RECOMMENDED BY MANUFACTURER. REFER TO 'HVAC UNIT SCHEDULE' ON SHEET M2.0 FOR ADDITIONAL INFORMATION. AWARDED CONTRACTOR MUST ARRANGE DELIVERY WITHIN THE FIRST WEEK OF CONSTRUCTION TO SCHEDULE DELIVERY DATE. ALL ROOFING WORK SHALL BE DONE BY THE LANDLORD'S ROOFING CONTRACTOR AT THE GENERAL CONTRACTOR'S EXPENSE. PROVIDE ANY ADDITIONAL STRUCTURAL MEMBERS REQUIRED TO SUPPORT UNIT PER LANDLORDS REQUIREMENTS, COORDINATE WITH LANDLORD. COORDINATE UNIT LOCATION WITH THE LANDLORD AND MAKE ADJUSTMENTS AS REQUIRED AT NO ADDITIONAL CHARGE TO THE TENANT. VERIFY MODEL NUMBERS AND ELECTRICAL REQUIREMENTS PRIOR TO INSTALLATION. a 5. l O l4' .............. r 2O. "X14' ................... n 200 215 215 200 Sty -1 i-7 1&X14' 2 215 215 200 • DUCTWORK IS TO BE INSTALLED AT 13' -6' ABOVE THE FINISHED FLOOR SPRINKLER 1-1EAD RETAIN THE SERVICES OF A STATE LICENSED FIRE PROTECTION CONTRACTOR TO PROVIDE COMPLETE DESIGN SERVICES AND MODIFICATIONS TO THE EXISTING FIRE SPRINKLER SYSTEM. FIRE PROTECTION CONTRACTOR MUST BE LANDLORD APPROVED. SPRINKLER LOCATIONS MUST BE COORDINATED WITH TENANT REFLECTED CEILING PLAN. ALL MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM MUST BE COORDINATED AND SCHEDULED IN ADVANCE WITH THE MALL OPERATIONS MANAGER, SPRINKLER SYSTEM SHALL BE FULLY CHARGED AND OPERATIONAL WHEN THE CONTRACTOR IS OFF THE JOB SITE. VERIFY ALL EXISTING CONDITIONS AND LOCAL CODE REQUIREMENTS PRIOR TO BIDDING. ALL SPRINKLER WORK IS BY LANDLORD CONTRACTOR, AT TENANT EXPENSE, AND SHALL BE COORDINATED WITH ON SITE OPERATIONS DIRECTOR ALL SPRINKLER WORK SHALL BE APPROVED BY THE LANDLORD'S INSURER. Armusosock :st 14 GENERAL CONTRACTOR TO UNDER CUT DOOR, 1' FOR AIR FLOW. frzxe /� 12'X1.4 SGS�1� 21 FURNISH AND INSTALL A FIRE DAMPER WITH ACCESS DOOR IN DUCT PENETRATING FIRE -RATED PARTITION. LABEL ACCESS DOOR WITH 2' HIGH LETTERS DESIGNATING 'FIRE DAMPER ACCESS.' 12 PROVIDE AN OPENING, SIZE AS NOTED ON PLANS, IN WALL ABOVE CEILING FOR RETURN AIR (FURNISH AND INSTALL A FIRE DAMPER) - 13 FURNISH AND INSTALL ZONE DAMPER, TRANSFORMER AND THERMOSTAT. INSTALL 24V/120V 40 VA TRANSFORMER AT J -BOX LOCATION. SEE 51-IEET E1.0 FOR ADDITIONAL INFORMATION. FURNISH AND INSTALL TWO CONDUCTOR, 24v CONTROL WIRE BETWEEN TRANSFORMER, THERMOSTAT AND DAMPER MOTOR PROVIDE 120V POWER TO TRANSFORMER FROM NIGHT LIGHT CIRCUIT. INSTALL THERMOSTAT AT 48' ABOVE FINISHED FLOOR IN LOCATION AS APPROVED BY GENERAL CONTRACTOR. 215 OS FURNISH AND INSTALL NEW REFRIGERANT LINES FROM THE AIR HANDLING UNIT'S DX COIL TO AIR COOLED DX CONDENSING UNIT AND MAKE FINAL CONNECTIONS. REFER TO MECHANICAL SPECIFICATION, 'REFRIGERANT PIPING' ON SHEET GI2 FOR ADDITIONAL REQUIREMENTS. 0 RH -I: (COOK MODEL NO. TR -36) FURNISH AND INSTALL A ROOF MOUNTED RELIEF HOOD. UNIT SHALL HAVE A CAPACITY OF 6100 CFM MAXIMUM 0.1' PRESSURE DROP. UNIT SHALL SE COMPLETE WITH A GRAVITY BACKDRAFT TYPE DAMPER, INTEGRAL METAL BIRD SCREEN, BEROMETRIC RELIEF DAMPER AND ROOF CURB. ROOF CURB AND RELIEF 1400D SHALL BE MOUNTED BY THE CONTRACTOR REFER TO SHEET G12 FOR SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 10 114-1: (COOK MODEL NO. TR -36) FURNISH AND INSTALL A ROOF MOUNTED INTAKE HOOP. INTAKE HOOD SHALL HAVE A CAPACITY OF 6100 CFM * MAXIMUM 0.1' PRESSURE DROP. UNIT SHALL BE COMPLETE WITH INTEGRAL METAL BIRD SCREEN AND ROOF CURB. THIS CONTRACTOR SHALL MOUNT ROOF CURB AND INTAKE HOOD. REFER TO SHEET GI2 FOR SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 15 MOTORIZED OUTDOOR AIR DAMPER. PROVIDE LOW- LEAKAGE DAMPERS SIZED TO MATCH DUCT SHOWN AND MODULATING ACTIVATOR SUPPLY LINKAGE TO MATCH. WIRE DAMPER TO ASSOCIATED UNIT CONTROLS SO DAMPER IS OPEN IN OCCUPIED MODE AND CLOSED IN UNOCCUPIED MODE. ALL WIRING EQUIPMENT AND MISCELLANEOUS CONTROL DEVICES BY GENERAL CONTRACTOR, 200 12'X14' S YM8OL x 4E HSW LSW MC. EC. -r YORK NATIONAL ACCOUNTS HVAG EQUIPMENT PAGKA6E YORK NATIONAL ACCOUNTS HVAC EQUIPMENT PACKAGE FOOT LOCKER HAS A NATIONAL HVAC AGREEMENT WITH YORK. ALL BIDDING CONTRACTORS ARE DIRECTED TO CONTACT YORK NATIONAL ACCOUNTS •0 800 481 - 9738, FAX 866 - 406 -9675 FOR PRICING. FOR ALL OTHER INEQUIERIES, PLEASE CONTACT DAVID BABEY, NATIONAL ACCOUNT SALES MANAGER PHONE: 104- 341 -8492, FAX: 104- 341 - 8912, EMAIL: daviclebabe"jci.com THE COMPLETE LISTED BILL OF MATERIAL WILL BE PURCHASED AND PROVIDED BY THE GENERAL CONTRACTOR THE G.C. 514ALL BE RESPONSIBLE FOR COORDINATING AND ACCEPTING NE EQUIPMENT, VERIFYING PROPER QUANTITIES AND TYPES OF EQUIPMENT AND PROVIDING TEMPORARY STORAGE OF EQUIPMENT. YORK WILL PROVIDE START -UP AND A ONE YEAR LABOR WARRANTY ON ALL HVAC EQUIPMENT PROVIDED BY THE GENERAL CONTRACTOR. INSTALLING CONTRACTOR IS RESPONSIBLE FOR PROVIDING AN NABB AIR BALANCE REPORT ON ALL PROVIDED AND FURNISHED EQUIPMENT. AIR BALANCE MUST BE FURNISHED THROUGH AN INDEPENDENT FIRM, BALANCER MUST NOT BE ON THE STAFF OF THE MECHANICAL CONTRACTOR. 5 =1 215 200 (go 6G -I 215 v. DESCRIPTION 0 SYMBOL SCHEDULE ENSURE THAT THE MECHANICAL EQUIPMENT COMPONENTS ARE INSTALLED AT THE LOCATIONS AND ELEVATIONS WHICH MAKE THEM READILY ACCESSIBLE FOR ROUTINE MAINTENANCE WITHOUT REQUIRING ANY EXTRAORDINARY MEASURES. PROVIDE ANY ADDITIONAL STRUCTURE SUPPORT REQUIRED BY TENANT'S EQUIPMENT. VERIFY ALL EXISTING SERVICES AND CONDITIONS AT THE JOB SITE. THE TENANT'S HVAC SYSTEM SHALL BE FURNISHED AND INSTALLED IN STRICT ACCORDANCE WITH THE LANDLORD'S DESIGN AND CONSTRUCTION CRITERIA AND ALL APPLICABLE STATE AND LOCAL CODES. THE MOST STRINGENT REQUIREMENTS SHALL GOVERN. NOTE: THE TENANT'S CONTRACTOR MUST RETAIN THE SERVICES OF A LOCAL. REGISTERED, PROFESSIONAL ENGINEER TO DETERMINE EXISTING ROOF FRAMING CONDITIONS AND PROVIDE COMPLETE DESIGN / SHOP DRAWINGS FOR METHOD OF SUPPORT FOR NEW ROOFTOP A/C UNITS. SHOP DRAWINGS / CALCULATIONS MUST BE SUBMITTED TO THE LANDLORD, FOR APPROVAL, PRIOR TO COMMENCING WORK. ALL REQUIRED ROOFING WORK MUST BE PERFORMED BY THE LANDLORD'S DESIGNATED ROOFING CONTRACTOR IN ORDER TO MAINTAIN THE WARRANTY AND INTEGRITY OF THE ROOFING SYSTEM SCALE: 3/16 II DESIGN DRAWINGS ARE SCHEMATIC, VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. CONTACT THE OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND CLARIFICATIONS OF THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE OUJNER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. HAVE A WORKING KNOWLEDGE OF LOCAL CODES AND ORDINANCES. INCLUDED IN BIDS, THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CO LI/ THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALE T EE 8 i OWNER OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DES GzN D' INTENT. �Mp� ENSURE THAT ALL EQUIPMENT, PIPING AND DUCTWORK, NOT SHOWN TO REMAIN IS ULLY 0 V4 REMOVED AND NOT ABANDONED. FIELD VERIFY ALL CONED ITIONS ALL ROOFING WORK SHALL BE PERFORMED BY THE LANDLORD'S cGNTRACTOR AT THE MANT CONTRACTOIQ'8 ExPENBE, IN ORDER TO MAINTAIN THE WARRANTY AND INTEGRITY OF THE ROOF SYSTEM. THIS CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT, PIPING AND DUCTWORK, NOT SHOWN TO REMAIN IS FULLY REMOVED AND NOT ABANDONED. SUPPLY AIR DIFFUSER SHADING DENOTES BLANK -OFF DUCT MOUNTED DIFFUSER RETURN AIR GRILLE OR DUCT SUPPLY AIR DUCT RISE SIMILAR FOR RETURN AIR SUPPLY AIR DUCT DROP SIMILAR FOR RETURN AIR HIGH SIDE WALL LOW SIDE WALL MECHANICAL CONTRACTOR ELECTRICAL CONTRACTOR SYP ILL / L_ 0 J J r TV DESCRIPTION Noy 8 nr,, , City Of rU ROOF MOUNTED EQUIPMENT AS NOTED ORGAN MODEL' COMBINATION LIGHT/ TOILET EXHAUST FAN THERMOSTAT (S- DENOTES SENSOR) TURNING VANES DUCT TRANSITIONS FD- FIRE DAMPER EX. DUCT TO BE REMOVED DUCT SMOKE DETECTOR I RECEIVED CITY OF TUKWII A NOV 0 5 2001 PERMIT CENTER DATE: JOB NO: 0813130 DRAWN: CHECKED: GROSS AREA: 5,535 SQ. FT. SALES AREA: 3,278 SQ. FT. Emphasis On Excellence M -Retail Engineering, Inc. 750 Brooksedge Blvd. Westerville, Ohio 43081 TEL: 614.818.2323 FAX: 614,818.2337 STORE NO. NOV 0 3 26 ,11 10 -30 -08 REVISIONS SHEET NUMBER Champs: 14498 Ex I 07 /11/09 NO. DESCRIPTION DATE MECHANICAL PLAN M1.0 FURNISH ALL LABOR, MATERIALS, TOOLS, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE HEATING, VENTILATING, AIR CONDITIONING SYSTEM. INCLUDE ANY LABOR AND MATERIAL NOT SPECIFICALLY MENTIONED, BUT NECESSARY TO PROVIDE A COMPLETE AND OPERATING SYSTEM. ALL WORK SHALL BE INSTALLED IN A PROFESSIONAL MANNER AND SHALL MEET ALL THE REQUIREMENTS OF THE STATE BUILDING CODE, CITY BUILDING COPE, SAFETY AND HEALTH CODES, NFPA CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. ALL COSTS FOR SAID REQUIREMENTS SHALL BE INCLUDED IN THIS CONTRACTORS BID PRICE. MECHANICAL GENERAL NOTES MECHANICAL COD NOTES SEC. 16000 - MECHANICAL GENERAL PROVISIONS A. SLEEvES I. THE CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN TI-E INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH IT'S RESPECTIvE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES TI-IAT f'ENETRATE THE FLOOR WHICH SHALL EXTEND 2' ABovE THE FLOOR 2. ALL SLEEvES AND OPENINGS TI-ROUGI-1 FIRE RATED WALLS AND/OR FLOORS SHALL ME FIRE sEALED WITH CALCIUM SILICATE, SILICONE 'RTVI FOAM, '3M' FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THE FIRE RATING OF THE FLOOR OR WALL CONFORM TO UL. ASSEMBLY RATING OF FLOOR OR WALL. 3. SLEEvES IN BEARING AND MAS0NW WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD UJEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGI4 SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE No. 22 U.S.G. GALvANIZED STEEL MINIMUM. 4. DUCT SLEEVES TO BE MINIMUM 14 GAUGE STEEL. 15. HANGERS: DIVISION XV MECHANICAL HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH .45 ANGLE IRON, BANDS, C-CLAMPS WITH RETAINING CLIPS, CHANNELS, SIANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OP UJORK. 2. SIANGERS SHALL BE FASTENED TO IBUILDNG STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING OR DUCTWORK HANGING FROM METAL DECK IS NOT PERMITTED. HANGERS MUST 5E ATTACHED TO UPPER CHORD OF IBAR JOIST. UJHERE INTERFERENCES OCCUR, IN ORDER To SUPPORT DUCTUJORC OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL 15E LOCATED WHERE TI-ET DO NOT NTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, ACCESS DOORS AND OTHER ECzUIPMENT SERVICE !REQUIREMENTS AND/OR OTHER TRADES. HER TYPES AND INSTALLATION METHODS ARE SUBJECT TO LANIDLoRD CRITERIA 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER oF INSULATION. INSTALL 6' LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI-ELECTRICALLY SEPARATED FFROM ONE ANOTHER. C. ELECTRICAL MOTORS: I. FURNISH INSTALL AND ALIGN ALL MOTORS REQUIRED FOR THIS EQUIPMENT. UNLESS THEY ARE FACTORY INSTALLED ON THE UNIT, ALL STARTERS AND ASSOCIATED WIRING AND SAFETY SWITCHES FOR SUCH MOTORS SHALL BE FURNISHED AND INSTALLED IBY THE ELECTRICAL CONTRACTOR. STARTERS SHALL MEET ALL REQUIREMENTS AS DEFINED IN THE ELECTRICAL DIVISION OP THE SPECIFICATIONS. 2. DESIGN, CONSTRUCTION AND PERFO11ANCE CHARACTERISTICS OF MOTORS SHALL CONFORM TO ALL APPLICABLE PROVISIONS OF LATEST NEMA, ANSI, ISEE STANDARDS FOR ELECTRICAL EQUIPMENT. ALL MOTORS SHALL BE SUITABLE FOR OPERATION ON VOLTAGE VARIATION OF PLUS OR MINUS 10%, 40 DEGREES C AMBIENT TEMPERATURE± HAVE A SERVICE FACTOR OF NOT LESS THAN LI& D. LOW VOLTAGE (24 VOLT) WIRING: I. THE CONTRACTOR IS TO INSTALL ALL LOW VOLTAGE WIRING REQUIRED FOR HIS EQUIPMENT. THIS WORK INCLUDES ALL TRANSFoRMERS AND DEVICES TO MAKE THIS A COMPLETE FUNCTIONAL SYSTEM. 2. ALL WORK IS TO CONFORM TO THE LATEST ADDITION NE.0 AND TO DIVISION 16 ELECTRICAL SPECIFICATIONS. 3. ANY CONDUIT REQUIRED 5Y CODE OR THE LANDLORD WILL BE INSTALLED BY THE ELECTRICAL SUBCONTRACTOR. 4. FLASHING SHALL 15E SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE LANDLORD'S CRITERIA USE A LANDLORD APPROVED ROOFING CONTRACTOR WHERE APPLICABLE. E. RELOCATION OF EQUIPMENT: 1. RELOCATION OF EXISTING WATER, GAS, WASTE, VENT, OR DRAINAGE LINES TO FACILITATE STORE DESIGN CRITERIA MUST BE INcLuDEP IN BID PROPOSAL. SEC. 15300 - SPRINKLER SYSTEMS A SPRINKLER SYSTEM: I. SUBMITTALS: a. PROVIDE DATA ON SPRINKLERS, VALVES, AND SPECIALTIES, INCLUDING MANUFACTURERS CATALOG INFORMATION. SUBMIT PERFoR1ANcE RATNS, ROUGH-IN DETAILS, WEIGHTS, SUPPORT REQUIREMENTS, AND PIPING CONNECTIONS. I,. SHOP DRAWINGS: 1. SUBMIT SHOP DRAWINGS OP FINISHED CEILING AREAS INDICATING ONLY SPRINKLER LOCATIONS COORDINATED WITH CEILING INSTALLATION. 2. INDICATE HYDRAULIC CALCULATIONS DETAILED PIPE LAYOUT, HANGERS AND SUPPORTS, SPRINKLERS, COMPONENTS AND ACCESSORIES. INDICATE SYSTEM CONTROLS. C. SUBMIT SHOP DRAWINGS, PRODUCT DATA, HYDRAULIC CALCULATIONS TO AUTHORITIES HAVING JURISDICTION (INCLUDING BUT NOT LIMITED TO THE FIRE MARSHALL AND LANDLORD) FOR APPROVAL. SEC. 16400 - PLUMBING A. PLUMBING EQUIPMENT: I. REFER TO 11 SHEETS FOR EQUIPMENT AND FIXTURE SCHEDULES B. GENERAL PIPING REQUIRIENTS: 2. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED By cops& 3. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT ALL PIPE PENETRATIONS AT WALLS, FLOORS, AND CEILINGS IN FINISHED AREAS. 1. GENERALLY, SANITARY AND POTABLE WATER TAPS WILL 5E PROVIDED BY THE LANDLORD. FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO SUBMITTING BID AND NOTIFY THE TENANT'S CONSTRUCTION MANAGER IF CONDITIONS ARE NOT AS Ss OM ON THE PLANS OR AS STATED IN THE SPECIFICATION& CONTRACTOR MUST VERIFY THE OPERABILITY OF ENTIRE SYSTEM PRIOR TO TIE IN AS FOLLOWS: a. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE. b. TEST WATER PRESSURE TO INSURE MINIMUM OF 50 PSI. 4. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE LANDLORD'S CRITERIA USE A LANDLORD APPROVED ROOFING CONTRACTOR WHERE APPLICABLE. C. PIPING: I. SANITARY PIPING - NO PVC ALLOWED (STORM PIPING AS REQUIRED). 4. GAS PIPING: a. WASTE, DRAIN AND VENT PIPING SHALL BE SERVICE WEIGHT, CAST IRON SOIL PIPE. VENT PIPING ABOVE FLOOR 2' OR SMALLER MAY BE GALVANIZED STEEL. b. JOINTS: BELOW FLOOR SLAB - COMPRESSION TYPE PLASTIC SEAL (HUB AND SPIGOT). ABOVE FLOOR SLAB - NEOPRENE SEALING SLEEVE WITH STAINLESS STEEL SHIELD AND CLAMIs WITH APPROVED NEOPRENE - BASED LUBRICANT, (4-IUBLEsS). GALVANIZED VENT - SCREWED JOINTS WITH TEFLOW TAPE ON MALE THREADS. C. PITCH WASTE LINES 2' AND SMALLER NOT LESS THAN 1/4' PER FOOT. PITCH LARGER MAINS NOT LESS THAN 1/0' PER FOOT. d. INSTALL A CLEANOUT AT BASE OF EACH 50 IL STACK., AT EACH CHANGE IN DIRECTION, AT INTERVALS NOT OVER 50 FEET, AND ELSEWHERE AS SHOUN ON DRAWINGS OR REQUIRED BY LOCAL CODE. cLEANoUTS SHALL NOT BE INSTALLED IN PUBLIC AREAS WITHOUT SPECIFIC pERMISSIoN By TENANT'S CONSTRUCTION MANAGER± BUT WHERE NECESSARY, THE WALL covER5 ARE TO BE STAINLESS STEEL AND THE FLOOR COVERS ARE TO BE BRASS (FLUSH WITH FINISHED FLOOR). PROVIDE COVERS WITH INSET AREA FOR CARPETED FLOOR LOCATIONS. ALL CLEAN-OUT LOCATIONS SHALL BE APPROVED BY THE TENANT'S CONSTRUCTION MANAGER. e. INSULATE ALL HORIZONAL RUNS OF PIPING LOCATED IN CEILING SPACES WHEN APPLICABLE. INSULATION TO BE AS SPECIFIED FOR WATER PIPING. F. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH 1/2' ARMSTRONG 'ARMAFLEX' PIPING INSULATION OR TRJEBRo MODEL IO2W 'HANDI LAY GUARD' INSULATION KIT. 2. CONDENSATE PIPING: a. 3. POTABLE WATER PIPING; CONDENSATE PIPING SHALL BE TYPE 'L' DRAUJN COPPER TUBE WITH S5-5 TIN-ANTIMONY SOLDERED JOINTS AND WROUGHT COPPER FITTINGS WITH DIELECTRIC SEPARATION BETWEEN DISSIMILAR METALS a. BELOW GRADE: TYPE 'K', ANNEALED TEMF'ERED COPPER TUBE FOR PIPE SIZES 2 INCHES AND SMALLER BRAZE ALL JOINTS. b. ABOVE GRADE: TYPE 'L' DRAUJN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND '55-5 TIN-ANTIMONY SOLDER C. INSTALL AIR CHAMBER SHOCK ABSORBERS IN PIPING SYSTEM TO PREVENT NOISE AND DAMAGE DUE TO WATER HAMMER. d. ALL BRANCH PIPING SYSTEM SHALL HAVE ACCESSIBLE SERVICE VALVE. PROVIDE SHUT OFF VALVES IN THE SUPPLY PIPING TO EVERY FIXTURE. PROVIDE ACCESS DOORS WHERE NECESSARY. e. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL UTILITIES REQUIREMENTS IF APPLICABLE. REFER TO PLANS TO DETER-IINED IF WATER METER IS REQUIRED. SECURE PIPE AT ANGLE STOPS. PROVIDE FLEXIBLE INSERTS AT ALL PIPE PENETRATIONS THROUGH FRAMING TO KEEP PIPES FROM HITTING FRAME WHEN IN OPERATION. a. PROVIDE A COMPLETE OAS PIPING SYSTEM IF APPLICABLE. REFER TO PLANS TO DETERMINE IF A GAS SYSTEM IS REQUIRED. b. LOW PRESSURE (14' W.C. AND BELOW) GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A-I20, WITH MALLEABLE THREADED FITTINGS FOR 2' AND SMALLER, AND WITH WELDED JOINTS FOR 2-1/2' AND LARGER. MEDIUM PRESSURE (A130vE 14' W.C.) SHALL HAVE WELDED JOINTS. s. PROVIDE A GAS COCK, DIRT LEG, AND UNION CONNECTION TO EACH PIECE OF EQUIPMENT. PROVIDE GAS METER AND/OR REGULATOR AS REQUIRED. REGULATOR TO BE VENTED TO THE EXTERIOR. d. iorra-i PIPING AT A UNIFORM GRADE CF 1/4' IN 5 FEET UPWARD IN DIRECTION OF FLOW. SUPPORT PIPING EVERY 5 FEET. SUPPORT AS REQUIRED BY LANDLORD CRITERIA, AS DETAILED ON DRAWINGS, OR BY STANDARD INDUSTRY PRACTICE, WHICHEVER IS MORE STRINGENT. e. GAS PIPING EXPOSED ON ROOF MUST BE PAINTED WITH RUST-INHIBITING PAINT. f. INSTALLATION, TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE REQUIREMENTS OF THE LOCAL GAS COMPANY, LOCAL CODES, AND APPLICABLE NEPA 54 CODES. e. CONTACT AND COORDINATE GAS SERVICE AND METER REQUIREMENTS WITH THE LOCAL GAS COMPANY AND THE MALL'S MANAGER PRIOR TO 151D. EciFicATIoNS DIVISION XV MECHANICAL (CONT.) SEC. 16400 - PLUMBING (CONT) C. PIPING (CONT.): 5. INSULATION: a. INSULATE ALL WATER AND INTERIOR CONDENSATE PIPING WITH I' THICK (K20,23 1 5 F) SNAP-ON FIBERGLASS PIPE INSULATION WITH AN ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATINGS OF W. APPROVED MANUFACTURER MANVILLE MICRO-LOK 6. TEST 4 STERILIZATION: a. LEAKAGE TESTS SHALL BE PER LOCAL CODES, MINIMUM AS FOLLOWS: 5. INLINE PUMPS: g- 1. TEST POTABLE WATER PIPING AND CONDENSATE PIPING AT 125 PSIG FOR SIX HOURS. 2. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS. ALL JOINTS SHALL BE GAS AND WATER TIGHT. 3. TEST GAS PIPING PER NEPA 54 CODES. 4. STERILIZE POTABLE HOT AND COLD WATER LINES UPON COMPLETION OF SYSTEM. STERILIZE WATER SYSTEM IN ACcoRDANcE WITH LOCAL CODES. SEC. 1S100 - HEATING, vENTILATION 4 AIR CONDITIONING A. 1-IvAC EQUIPMENT: I. PRIMARY HEATING, VENTILATION AND AIR CONDITIONING UNITS: a. PRIMARY HEATING, VENTILATION, AND AIR CONDITIONING UNITS ARE TO BE BY TIRANE CORPORATION AS ScHEDULED. ALL COMPRESSORS ARE TO INCLUDE A 5-YEAR EXTENDED WARRANTY. b. EQUALS EQUIPMENT AS MANUFACTURED BY CARRIER OR YORK IF NOT AVAILABLE THROUGH REASONABLE EFFORT. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, APPURTENANCE% AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. cl. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUSTHAVE A CONDENSATE DRAIN AND BE TRAPPED IN ACCORDANCE WITH MANUFACTURERS DATA. SEE DRAWINGS FOR ADDITIONAL DETAILS. e. SECONDARY DRAIN PANS ARE REQUIRED TO BE INSTALLED BENEATH ALL INDOOR AIR CONDITIONING EQUIPMENT WITH THE EXCEPTION OF vAV BOXE& SECONDARY PANS ARE To PROTECT ENTIRE UNIT. PROVIDE CONDENSATE PUMPS, AS REQUIRED. CONDENSATE SHALL BE DIRECTED TO MOP SINK OR AS SPECIFIED ON PLANS. 2. VARIABLE AIR VOLUME BOXES (vAv): a. WHERE 51-10U.N ON DRAWINGS, PROVIDE VAV BOXES COMPLETE WITH CONTROLS, HEATING COILS (FANS AS REQUIRED). ALL DUCT CONNECTIONS FLEXIBLE DUCT/PIPE CONNECTIONS SHALL BE PROVIDED BY THE CONTRACTOR 3. TOILET EXHAUST FANS: a. WHERE SHOU.N ON DRAWINGS, PROVIDE A TOILET EXHAUST FAN UNIT COMPLETE WITH GRAVITY BACK DRAFT DAMPERS. ALL DUcTuJoRK, ROOF OPENINGS AND CAPS NECESSARY TO PROVIDE A COMPLETE EXHAUST SYSTEM SHALL BE PROVIDED BY THE CONTRACTOR REFER TO PLANS FOR APPLICABILITY. 4. BASEBOARD, CABINET, AND UNIT HEATERS: a. WHERE SHOWN ON DRAWINGS, PROVIDE ELECTRIC HEATERS COMPLETE WITH ELECTRIC HEATING COIL, CONTROLS, AND INTEGRAL THERMOSTAT. a. WHERE SSIOLUN ON DRAWINGS PROVIDE AN INLINE CLOSE COUPLED PUMP(S), BRONZE FITTED, PUMPS SHALL BE FURNISHED WITH BRONZE CASE WEARING RINGS, 15RDNIZE SHAFT SLEEVE AND MECHANICAL SHAFT SEAL RATED FOR PUMPS TO BE SO CONSTRUCTED THAT THEY MAY BE MOUNTED IN A HORIZONTAL OR VERTICAL PIPE LINE. MOTOR TO BE 1150 RPM UNLESS NOTED OTHERUJISE. 6. IERATION ISOLATION DEVICES: a. VIBRATION ISOLATION DEVICES SHALL BE PROVIDED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, AIR HANDLERS, FAN POWERED vAv BOXES, ETC.) AND STRUCTURE. I,. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. C. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID 'GROUNDING' THE ISOLATOR. d. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. e. CONSULT MANUFACTURER FOR APPLICATION DATA. 1. CURBS AND STEEL FRAMING FOR SUPPORT: a. THIS CONTRACTOR WILL PROVIDE ALL NECESSARY CURBS AND STEEL FRAMING REQUIRED To INSTALL ALL HvAc EQUIPMENT AS DESCRIBED OR IMPLIED ON THE DRAWINGS. CURBS SSIALL BE A MINIMUM OF 14' HIGH, OF THE SAME MANUFACTURER OF THE EQUIPMENT SUPPORTED. INSULATE UNDER THE COMPRESSOR SECTION TO PREVENT CONDENSATION. ALL CURBS MUST BE INSTALLED SO THAT TOP OF CURBS ARE 'DEAD' LEVEL ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE IN ACCORDANCE TO THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPENSE. METAL LDUCTWORK: a. NO FIBERGLASS pUcT ALLOLED. b. NO DUCTWOR‹ SHALL BE FABRICATED PRIOR TO APPROVAL BY THE TENANT'S CONSTRUCTION MANAGER SIGNIFICANT DEVIATIONS FROM DESIGN MUST BE APPROVED BY TENANT'S CONSTRUcTIoN MANAGER PRIOR To FABRICATION OR INSTALLATION. ALL DUCT MAINS ARE TO BE RECTANGULAR UNLESS NOTES OTHERWISE. ALL DUCT BRANCHES TO DIFFUSERS ARE TO BE ROUND RIGID DUCT. (FLEXIBLE DUCT CONNECTIONS TO THE DIFRJSER ARE NOT TO EXCEED 5 C. EXCEPT AS OTSERLUISE INDICATED, FABRICATE AND INSTALL RECTANGULAR DUCTS WITH GALVANIZED SHEET STEEL, IN ACCORDANCE WITH SMACNA '14vAC DUCT CONSTRUCTION STANDARDS' OF THE LATEST EDITION. CONFORM TO THE REQUIREMENTS IN THE REFERENCED STANDARD FOR METAL THICKNESS, REINFoRcING TYPES AND INTERVALS, TIE ROD APPLICATIONS, AND JOINT TYPES AND INTERVALS. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: (VERIFY WHETHER RETURN OR EXHAUST DUCT IS POSITIVE OR NEGATIVE PRESSURE). 1. SUPPLY DUCTS: 2 INCHES WATER GAUGE, POSITIVE PRESSURE. 2. RETURN AND EXHAUST DUCTS: 2 INCHES WATER GAUGE, NEGATIVE PRESSURE. PRESSURE TEST DUCTS FOR LEAKAGE. REMAKE LEAKING JOINTS AND APPLY SEALANTS AS REQUIRED TO FABRICATE A SYSTEM THAT DOES NOT EXCEED 5% LEAKAGE OR LESS AS STATED BY PRESSURE CLASS RATINGS IN SMACNA STANDARDS. 0. AS A MINIMUM, CROSSEREAK ALL FLAT SURFACES OR REINFORCE WITH A BEAD APPROXIMATELY 3/0' WIDE X 3/16' DEEP ON 12' CENTERS TO PREVENT VIBRATIONS. INSTALL DOUBLE THICKNESS TURNING VANES IN ALL RIGHT ANGLE ELBOWS. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUF'POR SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS: ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR NO WOOD SHALL BE USED TO SUPPORT OR !BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. h WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1-1/2 XI/9 STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. ALL TRAVERSE JOINTS AND SEAMS IN SUPPLY AIR DUCT SHALL BE SEALED AIR TIGHT WITH DAP 0I10 DUCT SEALER JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. PROVIDE ACCESS TO ALL MOTORIZED DAMPERS FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY THE TENANT'S CONSTRUCTION MANAGER PRIOR TO INSTALLATION. LAY-IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS. m. FLEXIBLE CONNECTIONS: 1. FLEXIBLE COLLARS SHALL BE PROVIDED IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, ROOFTOP UNITS, AIR HANDLERS, FAN POWERED VAV BOXES, ETC.) AND DUCTS OR CASINGS. ALSO, PROVIDE FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. 2. FLEXIBLE CONNECTIONS SHALL CONSTRUCTED OF NEOPRENE-COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. 3. FLEXIBLE CONNECTION IS TO BE RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. n. FIRE DAMPERS: 1. PROVIDE PRIMARY FIRE DAMPERS WHERE INDICATED OR REQUIRED BY CODES. DAMPERS SHALL BE DESIGNED FOR HORIZONTAL OR VERTICAL FLOW OF AIR AS REQUIRED. FIRE DAMPERS SHALL BE UL LABELED. 2. FIRE DAMPERS SHALL HAVE THE BLADES OUT OF THE AIRSTREAM AND A 1650F FUSIBLE LINK, TYPE A, AS MINIMUM. 3. PROVIDE ALL NECESSARY FRAMING AND SLEEVES FOR DAMPER MOUNTING PER UL AND CODE REQUIREMENTS. 4. PROVIDE DUCT ACCESS DOORS IN AN ACCESSABLE LOCATION FOR ALL FIRE DAMPERS. DOOR IS TO BE 20 GA GALVANIZED DOOR WITH QUICK-OPENING LATCH AND PIANO HINGE. FZLE enrrif Permit No. rcylcmf approve constris thc. vidation 01 any pproved Field By Data: blect to erfOrS and ongssions. ocuments does not atilhoTize d coda or ordinanoc• Receipt d conditions is acknowledged: City of Tukwila BUILDING DIVISION SEPARi REQU1 0. P. r. a. SEC. 15100 - I4EATING, VENTILATION 4 AIR CONDITIONING (CONT.) METAL DUCTWORK (CONT) t. U. • HYDRONIC PIPING: a. b. C. d. e. F. e- TE PERMIT RED FOR: )thaniCal El 3CtriCal IPi IMbing WO is Piping City of Tukwila BUILDIt' G DIVISION DIVISION XV MECHANICAL (CONT.) FLEXIBLE AIR DUCT: I. FLEXIBLE AIR DUCT SHALL BE I' INSULATED CLASS 1 AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN THE BID. 2. FLEXIBLE AIR DUCT MAY ONLY BE USED IN VERTICAL APPLICATIONS WITH PRIOR APPROVAL FROM TENANT'S CONSTRUCTION MANAGER. 3. FLEXIBLE DUCT SHALL NOT EXTEND OVER 5'-0' IN LENGTH AT ANY ONE LOCATION. SUPPLY AIR TAKE-OFF FITINGS: 1. PROVIDE CONICAL OR 'BELL-MOUTH' TAKE-OFFS FROM MAIN DUcTI.U0SX. TO ROUND BRANCHES. INSTALL PER MANUFACTURER'S INSTRUcTIoNS. 2. PROVIDE 45. RECTANGULAR TAKE-OFFS FROM MAIN DUCTUJORK TO RECTANGULAR BRANCHES. DAMPERS: 1. PROVIDE MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE OPERATORS IN EACH BRANCH DUCT AND AS SHOWN ON PLANS TO FACILITATE AIR BALANCING. 2. WHERE ACCESS To BALANCING DAMPER IS RESTRICTED, YOUNG'S REGULATORS SHALL BE USED. 3. ALL RECTANGULAR DAMPERS IN OUTSIDE AIR, RELIEF AIR, OR RETURN AIR DUCTS ARE To BE OF OPPOSED BLADE TYPE. ALL OUTSIDE AIR DUCT DAMPERS MUST ALSO BE OF THE LOW LEAK.AGE TYPE. ALL MOTORIZED PAMPERS NOT FURNISHED WITH EQUIPMENT ARE To BE HONEYWELL DAMPERS. DIFFUSERS, GRILLES AND REGISTERS: 1. PROVIDE DIFFUSERS GRILLES AND REGISTERS AS SCHEDULED. DEVICES TO BE COMPLETE WITH DAMPERS FRAMES AND ALL ACCESSORIES. FINISH AS INDICATED. 2. INSTALL ALL AIR DEVICES AS LOCATED ON THE ARCHITECTURAL REFLECTED CEILING PLAN. 3. APPROVED MANUFACTURERS: TITUS IS SPEcIFIED, EQUALS BY METALA1RE OR KREGER IS ACCEPTABLE. MEDIUM PRESSURE DUCT I. WHERE DUCTWORK IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, IT SHALL BE CONSTRUCTED IN ACCORDANCE WITH SMACNA STANDARDS FOR A PRESSURE RATING OF 3 INCHES WATER COLUMN MINIMUM OR LARGER AS REQUIRED BY LANDLORD. 2. ALL GAUGES AND REINFORCEMENT MUST MEET WITH THE LATEST EDITION OF SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND WITH THE LANDLORD'S CRITERIA. 3. ALL OTHER ITEMS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO THIS SECTION DUCTUADIRK INSULATION 1. INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NEPA WA. 2. DUCT SIZES SHOUN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. INSULATE SUPPLY AND RETURN AIR RECTANGULAR DUCTUJOW. WHERE SHOWN ON PLAN. DUCTUJORK SHALL BE INTERNALLY INSULATED WITH 1' THICK, I-1/2 LB. DENSITY LINER (C2029 • 15F). LINER IS To WAVE A COATED SURFACE EXPOSED To AIRSTREAM To PREVENT EROSION. APPLY ADHESIVES AND MECHANICAL FASTENERS AS RECOMMENDED BY SMACNA AND THE MANUFACTURER TO PREVENT LINER SEPARATION FROM THE DUCT. ALL TRANSVERSE EDGES TO BE COATED WITH ADHESIVE. 3. ALL ROUND AND OUTSIDE AIR DUCTWORK ABOVE THE CEILING SHALL BE EXTERNALLY INSULATED WITH A MINIMUM OF 1 I-1/2 LB. DENSITY (R.5.6) DUCT WRAP WITH VAPOR BARRIER VAPOR BARRIER IS TO BE MAINTAINED THROUGHOUT DUCT SYSTEM. ALL JOINTS MUST BE TAPED SO THAT NO INSULATION FIBER IS VISIBLE. EXTEND DUcTWORK INSULATION WITHOUT INTERRUPTION THROUGH WALLS, FLOORS, AND SIMILAR PENETRATIONS. 4. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 WHEN TESTED IN ACCORDANCE WITH ASTM C 411, OR AS REQUIRED BY LOCAL CODES. SYSTEM CLEANOUT I. DucTwow AND AIR HANDLING EQUIPMENT IS TO BE cLE.4NEID OUT AND 151-01.LN OUT BEFORE PAINTING IS STARTED BY THE GENERAL CONTRACTOR 2. FILTERS MUST BE IN UNITS AT ANY TIME FANS ARE OPERATED. PROVIDE A COMPLETE HYDRONIC PIPING SYSTEM IF APPLICABLE. REFER TO PLANS TO DETERI-IINE IF A HYDRONIc SYSTEM IS REQUIRED. HYDRONIC PIPING FOR CHILLED WATER AND/OR HEATING WATER AND/OR CONDENSER WATER SHALL BE ASTM A-I20, SCHEDULE 40, ERUJ, BLACK STEEL PIPE WITH PLAIN ENDS. INSTALL STEEL pIpE WITH WELDED JOINTS WHERE FIFE IS 2-1/2 INCH AND LARGER. INSTALL STEEL PIPE WITH THREADED JOINTS AND FITTINGS OR INSTALL TYPE 'K' ANNEALED TEMPERED COPPER TUBE WITH SILFOS JOINTS FOR 2 INCH AND SMALLER PIPE. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS. ALL PIPING SHALL BE IN STRICT CONFORMANcE WITH ASIM, ASA, AND LANDLORD'S REQUIREMENTS WHICHEVER IS MOST STRINGENT. UNIONS OR FLANGES MUST BE USED AT EQUIPMENT CONNECTIONS WHERE SERVICE OR REMOVAL MAY BE REQUIRED. ALL PIPING AND EQUIPMENT SHALL BE PRESSURE TESTED WITHOUT LEAKAGE AT A MINIMUM PRESSURE OF 125 PSI. ALL HYDRONIC PIPING AND EQUIPMENT CONNECTED TO THE HVAC PIPING SYSTEM SHALL BE CLEANED AND FLUSHED. REMOVE, CLEAN, AND REPLACE STRAINER SCREENS. PILL TENANT'S SYSTEM WITH DOMESTIC WATER AND VENT ALL PIPING AND EQUIPMENT PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM. CONTRACTOR SHALL NOT FILL TENANT'S SYSTEM WITH WATER FROM THE LANDLORD'S SYSTEM UNLESS SPECIFICALLY INSTRUCTED TO PO SO FROM THE LANDLORD'S FIELD REPRESENTATIVE. PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM, CONTRACTOR SHALL OBTAIN WRITTEN CONFIRMATION FROM THE LANDLORD'S FIELD REPRESENTATIVE, THAT ALL TESTING, FLUSHING, AND PROPER FILLING OF THE TENANT'S SYSTEM HAS BEEN COMPLETED IN ACCORDANCE TO THE LANDLORD'S REQUIREMENTS AND THAT THE TENANT'S SYSTEM IS READY TO BE CONNECTED TO THE LANDLORD'S SYSTEM. VALVES: I. GATE VALVES, 2-INCH AND SMALLER: CLASS 150, BODY AND UNION BONNET OF ASTM 5 62 CAST BRONZE WITH THREADED OR SOLDER ENDS, INTEGRAL SEAT, RENEWABLE SOLID BRONZE WEDGE DISC, RISING STEM, SCREWED BONNET AND RE-PACKABLE UNDER PRESSURE. BALL VALVES ARE ACCEPTED AS AN EQUAL SUBSTITUTION. 2. GATE VALVES, 2-1/2 INCH AND LARGER CLASS 125 CAST IRON BODY, RENEWABLE BRONZE SEATS AND SOLID WEDGE DISC, RISING STEM, FLANGED ENDS, AND RE-PACKABLE UNDER PRESSURE. 3. SWING CHECK VALVES, 2-INCH AND SMALLER: CLASS 150, CAST BRONZE BODY AND CAP CONFORMING TO ASTM B 62 WITH HORIZONTAL SWING, Y-PATTERN, RENEWABLE BRONZE DISC, AND HAVING THREADED OR SOLDERED ENDS. 4. SWING CHECK VALVE, 2-1/2 INCH AND LARGER: CLASS 125 CAST IRON BODY AND !BOLTED CAP, HORIZONTAL SWING, RENEWABLE BRONZE DISC, FLANGED ENDS AND CAPABLE Of BEING REFITTED WHILE THE VALVE REMAINS IN THE LINE. 5. COMBINATION BALANCING AND SHUT-OFF VALVES: BELL 4 GoSSErr CIRCUIT SETTER WITH LOCKING SETPOINT. A CIRCUIT SETTER BALANCE WHEEL MUST BE INCLUDED WITH 0 4 N MANUAL. s. FLOW METER. BELL AND GOSSETT THERMOFLO INDICATOR MODEL IFI. PIPING SPECIALTIES: I. PRESSURE/TEMPERATURE TEST PLUGS ( FETE'S PLUG) - 1/4 INCH NPT FITTINGS TO RECEIVE EITHER A TEMr-'kRATURE OR PRESSURE PROBE, I/8 INCH O.D. FITTING AND CAPS SHALL BE BRASS WITH VALVE CORE OF NORDEL, RATED AT 400 PSIG, OF TO 200f. 2. STRAINERS - 'Y'lpATTERN STRAINERS, 125 PSIG, CAST IRON popr WITH PERFORATED STAINLESS STEEL SCREEN, THREADED FOR 2 INCHES AND SMALLER, FLANGED FOR 2-I/2 INCHES AND LARGER. SCREEN OPENING SIZE AT 0.033 INCH FOR HEATING AND I/S INCH FOR CHILLED OR CONDENSER WATER. PROVIDE WITH IBLOWDOIN VALVE WITH HOSE END FITTING. 3. THERMOMETERS - PIE CAST ALUMINUM, 9' INDUSTRIAL MERCURY THERMOMETER, FULLY ADJUSTABLE WITH CLEAR ACRYLIC WINDOW AND BRASS SEPARABLE SOCKET. 4. MANUAL AIR VENTS - 1/8' COIN-OPERATED VENT. PROVIDE AN AIR CHAMBER CONSISTING OF A 3/4' NIPPLE AND BUSHINGS. Ft GENERAL INSTALLATION: I. INSTALL WATER MAINS WITHOUT PITCH. USE ECCENTRIC REDUCING COUPLINGS AT CHANGES IN SIZE WITH THE TOP of PIPES AT SAME ELEVATION. MAKE CHANGES IN DIRECTION WITH FITTINGS. 2. BRANCHES TO UNITS BELOW MAINS TO BE TAKEN FROM BOTTOM OF MAINS AT A 45 DEGREE ANGLE, PITCH IDOUJNWARD TOWARD UNITS. BRANCHES TO UNITS ABOVE MAINS TO BE TAKEN FROM TOP OF MAINS AT A 45 DEGREE ANGLE PITCHED UPWARD TOWARDS UNITS. PITCH NOT LESS THAN 1' TO 10 FEET. 3. HANGERS SHALL BE SIZED AND INSTALLED FOR THE OUTSIDE DIAMETER OF THE INSULATED PIPE. INSTALL 6' LONG SPLIT CIRCLE GALVANIZED SADDLE !BETWEEN THE HANGER AND PIPE INSULATION. 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DIELECTRICALLY SEPARATED FROM ONE ANOTHER. 5. SEE PLANS FOR APPLICABLE DETAILS. 6. ALL PRESSURE PIPING SYSTEMS INSTALLED SHALL CONFOW TO THE REQUIREMENTS OF THE STATE PIPING AND WELDING CODES. 1. INSTALL VALVES AT LOW POINTS FOR DRAINING EACH SYSTEM MD INSTALL MANUAL VENTS AT ALL HIGH POINTS OF EQUIPMENT AND PIPING IN THE SYSTEM TO PROPERLY REMOVE ENTRAPPED AIR. INSULATION: I. ALL HYDRONIC PIPING FOR CHILLED WATER AND/OR HEATING WATER, VALVES, FITTINGS, AND ACCESSORIES SHALL BE INSULATED. FOR PIPE SIZES UP TO 2 INCHES, INSULATE WITH 1 INCH THICK (K.023 • 15f FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. FOR PIPE SIZES 2-1/2 INCHES AND LARGER, INSULATE WITH I-1/2 INCH THICK (K•023 • 15f) FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER 2. INSULATION AT ALL HANGERS FOR PIPING 2-1/2 INCHES AND LARGER SHALL BE HARD AND NON-COMPRESSIBLE. 3. ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 TO CONFOR1 WITH THE REQUIREMENTS OF THE NEPA . ------__ REVISIONS \--- No changes sW - n 7 le - de to the scope of work without prior approval of Tukwila Building Division. i NOTE: Revisions will require a new plan submittal I and may include additional plan review fees. B. C. P. DIVISION XV MECHANICAL (CONT.) 10. REFRIGERANT PIPING: SEC. 15920 - TESTING, ADJUSTING 4 'BALANCING A. SYSTEM TESTING, ADJUSTING, AND BALANCING: 1. 2. INSTALL NEW FILTERS IN ALL UNITS PRIOR TO THE AIR BALANCE. THE COMPLETE AIR BALANCE SHALL TAKE PLACE WITH OUTSIDE AIR DAMPERS IN MINIMUM POSITION. 3. BALANCE AIR AND WATER QUANTITIES TO WITHIN + 5% OF THAT INDICATED ON THE DRAWINGS. ANY REQUIRED CHANGES IN SHEAVES, BELTS, PULLEYS, OR THE ADDITION OF DAMPERS REQUIRED TO ACHIEVE SPECIFIED FLOW RATES SHALL BE PERFOR BY THE SIVAC CONTRACTOR WITH NO ADDITIONAL COST TO THE TENANT. 4. THE BALANCE REPORT SHALL INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION: 6. 1. S. I. PAN 1. 1. 1. C. INSTALLATION: TESTING, ADJUSTING AND BALANCING OF ALL WORK SHALL BE MADE BY AN INDEPENDENT CONTRACTOR WHO IS CURRENTLY LICENSED ASSOCIATED AIR BALANCING COUNCIL (AABC) OR NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) BALANCING CONTRACTOR. NO OTHER BALANCE REPORTS WILL BE REVIEWED OR ACCEPTED. ALL BALANCING WOW, MUST BE COMPLETE AND DONE IN ACCORDANCE WITH THE MOST RECENT STANDARDS OF THEIR SOCIETY. PAYMENT OF ALL COSTS FOR TESTING SHALL BE MADE BY THE SIVAC CONTRACTOR a. b. C. cl. e. e- h. PROVIDE A COMPLETE REFRIGERANT PIPING SYSTEM BETWEEN INDOOR FAN UNITS AND OUTDOOR CONDENSING UNITS, IF APPLICABLE. PROVIDE OIL, REFRIGERANT CHARGE AND TEST SYSTEM. REFER TO PLANS TO DETERMINE IF A REFRIGERANT PIPING SYSTEM IS REQUIRED. MATERIALS: I. REFRIGERANT PIPING SHALL BE TYPE '1_ DRAWN COPPER TUBING (ASTI-I WS), WROUGHT COPPER OR CAST BRONZE FITTINGS (ANSI 51622), WITH SILFOS-5 SOLDERED JOINTS. 2. SERVICE VALVES, cHARGING PORTS, FILTER-DRIER, SIGHT GLASS, AND A THERMOSTATIC EXPANSION VALVE (TXv) SHALL BE INSTALLED FOR EACH SYSTEM AS A MINIMUM. I. SIZE LINES WITH ADEQUATE LIFT TRAPS AND DOUBLE SUCTION RISERS AS NECESSARY TO MEET THE NEEDS OF EQUIPMENT SPECIFIED, FIELD CONDITIONS, AND EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. 2. PRESSURE TEST FOR LEAKS WITH AN INERT GAS AT 250 PSIG. REDO LEAKING JOINTS AND RETEST UNTIL SYSTEM IS TIGHT. EVACUATE GAS AND CHARGE SYSTEM. RE-TEST SYSTEM AND CHECK FOR LEAKS WITH HALIDE LEAK DETECTOR. ALL LEAKING JOINTS MUST BE COMPLETELY RE-DONE UNTIL NO LEAKS EXIST. 3. UPON COMPLETION OF TESTING, BUT BEFORE INSULATION IS APPLIED, PIPING MUST BE INSPECTED BY A REPRESENTATIVE OF THE LOCAL GOVERNING AUTHoRITY AS NECESSARY. 4. REFRIGERANT LINES SHALL BE INSULATED WITH 1 INCH THICK RUBATEX OR ARMSTRONG REFRIGERANT PIPE INSULATION IN ACCORDANCE WITH INDUSTRY STANDARDS. AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE GP BALANCING CONTRACTOR. INSTRUMENTATION LIST WITH LAST CALIBRATION DATES. MAKE AND MODEL NUMBERS OF ALL HVAC EQUIPMENT TESTED. AIR CFM AND STATIC PRESSURE READINGS (DISCI-LARGE AND SUCTION) AS MEASURED BY PITOT TUBE DUCT TRAVERSE AT THE UNIT. MOTOR NAMEPLATE DATA WITH ACTUAL FIELD VOLTAGE AND AMPERAGE READINGS FOR EACH LEG. MOTOR AND FAN RPMS, SHEAVE SIZES AND BELT SIZES. OUTSIDE, RETURN, MIXED AND SUPPLY AIR TEMPERATURES AT FULL COOLING. WATER BALANCE DATA INCLUDING GPM WITH INLET AND OUTLET TEMPERATURE AND PRESSURE READINGS (WHERE APPLICABLE). MAKE AND MODEL NUMBERS CF ALL AIR DISTRIBUTION EQUIPMENT. J. FINAL BALANCED AIR VOLUMES AT ALL OUTLETS (INCLUDING RETURNS WHERE DUCTED). INDEXED PLAN WITH DIFFUSER AND RETURN LOCATIONS. 5. ALL CONTROL SEQUENCES SHALL BE TESTED (INTERLOCKED EQUIPMENT, SMOKE DETECTORS, SMOKE EVACUATION, ECONOMIZER, ETC.) AND OPERATING STATUS RECORDED IN THE REPORT. THREE COPIES OF THE BALANCE REPORT SHALL BE SUBMITTED TO THE TENANT'S CONSTRUCTION MANAGER FOR APPROVAL. SEC. 16920 - TESTING, ADJUSTING 4 'BALANCING (CONT.) A. SYSTEM TESTING, ADJUSTING, AND BALANCING (CONT.): BOXES: PERFORM ALL APPLICABLE TESTING AND BALANCING FUNCTIONS REQUIRED FOR THE SYSTEM DESIGNED IN THESE DRAWINGS. RECHECK ANY ITEMS THAT THE TENANT DEEMS NECESSARY AT NO ADDITIONAL COST TO THE TENANT. FINAL BALANCE REPORT SHALL BE INCLUDED IN THE OPERATION 4 MAINTENANCE MANUALS. 15. FINAL HvAC INSPECTION: ASIDE FROM NOR INTERIM INSPECTIONS OF WORK IN PLACE, THE TENANT SHALL HAVE THE RIGHT TO AN INDEPENDENT HVAC CONTRACTOR INSPECT THE FINISHED HVAC INSTALLATION UPON COMPLETION FOR COMPLIANCE WITH THE PLANS, SPECIFICATIONS, AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY THE INDEPENDENT HVAC CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS AT NO COST TO TENANT. A. WIRE DEVICES: STEP-DOM TRANSFOIRMER.: LIGHTING CONTACTORS: DIVISION XVI ELECTRICAL SEC. 16050 - I5ASIC ELECTRICAL MATERI,ALS 4 mEtwoos 1. COLOR OF WIRING DEVICES AND cOVERPLATES SHALL BE SELECTED BY OUNER (SEE PLAN NOTES FOR ADDITIONAL INFORMATION). a. RECEPTACLES SHALL BE 20 AMP, 3-WIRE GROUNDING TYPE EQUAL TO HUBBELL D362. b. SWITCHES SHALL BE 20 AMP SPECIFICATION GRADE, RATED AT 120 OR 211 VOLT AS REQUIRED. C. SPECIAL DEVICES SHALL BE A SPECIFICATION GRADE. • ALL DEVICE COVERPLATES SHALL BE STAINLESS STEEL. e. FLOOR BOXES TO SE HUBBEL 1B-2521/29 WITH S-3925 BRASS COVER (OR EQUAL BY 'STEEL CITY') AND HUBBELL 5362 RECEPTACLE (UNLESS OTHER)JISE NOTED). f. EQUAL BY ARROW-HART, GENERAL ELECTRIC, BRYANT, PASS 4 SEYMOUR, OR SIERRA. EL BOARDS AND SAFETY SWITCHES: PROVIDE BRANCH CIRCUIT PANELS WHICH SHALL BE OF THE BOLTED CIRCUIT BREAKER TYPE WITH SOLID COPPER BUSSING FULL SIZED NEUTRAL, 25% GROUND BUSSING, OVERALL HINGED/LOCKABLE DOOR, AND TYPUJRIrrEN DIRECTORY INSIDE POOR ALL SERVICE ENTRANCE EQUIPMENT SHALL BEAR THE MANUFACTURER'S LABEL WHICH SHALL STATE THAT THE EQUIPMENT IS RATED FOR SERVICE ENTRANCE APPLICATION IN ACCORDANCE WITH N.E.C. *230-10. LOAD BALANCE ALL ELECTRICAL PHASES AT PANELS AND SWITCHBOARDS TWO AND THREE POLE BREAKERS SHALL BE COMMON TRIP TYPE. WHEN USED AS SWITCHES IN 120V. AND 211V. LIGHTING CIRCUITS, FURNISH TYPE 'SW" BREAKERS IN ACCORDANCE WITH N.E.C. *240-838. SQUARE D OR EQUAL BY GoULD ITE, CUTLER-HAMMER, WESTINGHOUSE, CHALLENGER FEDERAL PACIFIC OR GENERAL ELECTRIC (OR APPROVED EQUAL) 2. PROVIDE SAFETY AND DISCONNECT SWITCHES, FUSED OR NONFUSED, AS CALLED FOR ON DRAWINGS AND AS REQUIRED BY CODE. (FUSES AS MANUFACTURED BY IBUSSMAN, CHASE SI-IASI-UT, WESTINGHOUSE, ECONOMY FUSE CO, OR LITTLE FUSE CO, ARE ACCEPTABLE) DISCONNECT SWITCHES THAT ARE INSTALLED AT AIR CONDITIONING EQUIPMENT, HEAT PUMPS, ETc. SHALL BE FUSED IN ACCORDANCE WITH THE EQUIPMENT'S NAME PLATE REQUIRMENTS PER N.E.C. 440-21 4 110-315. SWITCHES SHALL BE HEAVY DUTY, QUICK MAKE/QUICK BREAK TYPE, FUSIBLE OR NON-FUSIBLE, WEATHERPROOF AS INDICATED ON THE DRAWINGS, OR AS REQUIRED BY LOCAL CODES. LOAD AND HORSEPOWER RATED AS MANUFACTURED BY SQUARE P. GOULD ITE, CHALLENGER, CUTLER HAMMER, WESTINGHOUSE, FEDERAL PACIFIC, OR GENERAL ELECTRIC (OR APPROVED EQUAL). MANUAL MOTOR STARTERS WITH OVERLOAD PROTECTION MAY BE USED FOR FRACTIONAL HORSEPOWER MOTORS THAT DO NOT REQUIRE AUZILIARY CONTROL. SINGLE PHASE STARTERS SHALL BE SQUARE ID OR EQUAL. THREE PHASE STARTERS SHALL BE PROVIDED WITH OVERLOAD DEVICE IN EACH PHASE MATCHED TO MOTOR NAMEPLATE RATING. MAGNETIC MOTOR STARTERS (MINIMUM SIZE *I) SHALL BE USED FOR ALL SINGLE PHASE AND THREE PHASE MOTORS RATED ABOVE 1/2 HP OR THAT REQUIRED AUZILIARY CONTROL. PROVIDE CONTROL DEVICES (CONTACTS, TRANSFORMERS, ETC) IN STARTERS AS REQUIRED FOR INTERLOCKS. COMBINATION STARTERSWHEN USED, SHALL CONTAIN FUSIBLE SWITCHES. OUTLET BOXES AND COVERS SHALL BE GALVANIZED, ONE-PIECE PRESSED STEEL KNOCKOUT. 2. JUNCTION, FULL BOXES AND COVERS SHALL BE GALVANIZED STEEL, CODE GAUGE SIZE. 3. INSTALL BOXES RIGIDLY ON BUILDING STRUCTURE AND SUPPORT INDEPENDENTLY OF THE CONDUIT SYSTEM. ALSO PROVIDE SUITABLE/PROPER BOX ENTENSIONS TO EXTEND BOXES TO FINISHED FACES OF WALLS ETC. ALL OUTLET !BOXES TO WAVE SUITABLE BLOCKING !BEHIND THEM TO MINIMIZE THE DEFLECTION THAT occURS WHEN PLUGGING/UNPLUGGING INTO THESE DEVICES. 4. WHERE A 211 VOLT LIGHT SWICI-I IS GANGED WITH A 120 VOLT RECEPTACLE PROVIDE A SUITABLE DIVIDER OR SEPARATE JUNCTION BOXES IN ACCORDANCE WITH N.E.C. AND LOCAL CODES. PROVIDE A DRY-TYPE TRANSFORMER OF THE ENCLOSED VENTILATED TYPE WITH KVA AND VOLTAGE RATINGS AS CALLED FOR ON THE DRAWINGS AND WITH COILS DESIGNED FOR 150 DEGREES C. RISE ABOVE A 40 DEGREE C. AMBIENT WITH 100 96 OF RATED LOAD CONNECTED TO THE SECONDARY, CLASS H INSULATION AND MINIMUM OF SIX STANDARD FULL CAPACITY TAPS (TWO ABOVE AND FOUR BELOW NORMAL) SOUND LEVEL/DECIBELS SHALL BE IN ACCORDANCE WITH NEMA' STANDARDS, AND INSTALLATION SHALL INCLUDE KORFOUN1D OR EQUAL VIBRATION-DAMPENING MOUNTS AND FLEXIBLE STEEL CONDUIT FOR PRIMARY AND SECONDARY CONNECTIONS TO MINIMIZE SOUND TRANSMISSION. (MOUNT TRANSFORMER ON SEPARATE VIBRATION ISOLATORS, THESE ARE ADDITONAL VIBRATION ISOLATORS AND ARE USED IN CONJUNCTION WITH ANY INTEGRAL FACTORY INSTALLED VIBRATION ISOLATORS) AS MANUFACTURED BY SQUARE P. HEAVY Day, ACME, GENERAL ELECTRIC OR WESTINGHOUSE. CONTACTORS FOR CONTROL OF LIGHTING AND SIGNS SHALL BE SQUARE V', CLASS 5W3, TYPE 'L', ELECTRICALLY HELD. EQUIVALENT PRODUCTS BY OTHER MANUFACTURERS ARE PERMITTED. TIME SWITCHES SHALL BE USED FOR CONTROL OF SHOW WINDOW LIGHTING, SIGNS, AND IF REQUIRED/DESIRED OTHER LIGHTING. THE ELECTRONIC DIGITAL TIME SWITCH SHALL BE A TOR( MODEL DWZI00A OR EQUIVALENT WITH A 1-DAY FORMAT, 365 DAY ADVANCED HOLIDAY SCHEDULE, CAPABLE OF DIFFERENT SETTINGS EACH DAY OF THE WEEK, AND HAVE AN ASTRONOMIC FEATURE, OR EQUIVALENT PRODUCTS BY OTHER MANUFACTURERS ARE PERMITTED B. A DIVISION XVI ELECTRICAL (CONT.) INSTALLATION: I. 2. ALL LINE AND LOW VOLTAGE POWER AND CONTROL WIRING (EXCEPT HvAC LOW VOLTAGE WIRING) INCLUDING CONNECTIONS TO MOTORS, DAMPERS, INTERLOCKING, ETC., SHALL BE PROVIDED. (RESPONSIBLE FOR ALL LINE VOLTAGE WIRING, CONDUIT, AND FINAL CONNECTIONS FROM THE POWER SOURCE THRU THE STARTER/DISCONNECT ETC. TO THE MOTOR OR EQUIPMENT. ALL HvAC RELATED LOW VOLTAGE CONTROL WIRING, CONDUIT AND NAL CONNECTIONS IS THE RESPONSIBILITY OF THE MEcHANICALTFEMPERATURE CONTROL CONTRACTOR, UNLESS OTHERWISE NOTED ON THE PLANS). 3. DO ALL CUTTING, CHASING OR CHANNELING AND PATCHING REQUIRED FOR ANY WORK UNDER THE ELECTRICAL DIVISION, AND GUTTING SHALL HAVE PRIOR APPROVAL OF THE LANDLORD. SLEEVES SHALL EXTEND AT LEAST TWO (29 INCHES ABOVE FINISHED FLOOR AND ALL SLEEVES, OPENINGS, ETC., THRU FIRE RATED WALLS AND FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SLICONE 'RTY' FOAM, '3M' FIRE RAID SEALANTS OR EQUAL BY HILT! AFTER CONDUIT/CABLES INSTALLATION SO AS TO RETAIN THE FIRE RATING. 4. THE FOLLOWING EQUIPMENT SHALL BE IDENTIFIED WITH ENGRAVED BAKELITE NAMEPLATES AS To NAME AND/OR FUNCTION± DISTRIBUTION PANELS, LIGHTING PANELS, MOTOR STARTERS AND DISCONNECT SWITCHES. NAMEPLATES TO BE APPROXIMATELY I' x 2' IN SIZE AND BE FASTENED WITH Pots RIVETS OR SCREWS. 5. 1. a. SEC. 16100 - WIRING METHODS A. CONDUITS: I. 2. ALL ELECTRIC WORK SHALL BE INSTALLED so As TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS CHANNELS, RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK AND SHALL BE FASTENED TO BUILDING STEEL, CONCRETE OR MASONRY, BUT NOT PIPING OR DUCTWORK ALL CONDUIT SHALL BE CONCEALED WHEREVER POSSIBLE. EXPOSED CONDUITS SHALL BE IN STRAIGHT LINES PARALLEL WITH OR AT RIGHT ANGLES TO COLUMN LINES OR BEAMS AND SEPARATED AT LEAST 3 INCHES FROM WATER LINES WHEREVER THEY RUN ALONGSIDE OR ACROSS SUCH LINES ALL CONDUCTORS SHALL BE IN CONDUIT, DUCTS OR OTHER CODE APPROVED RACEWAYS. THE LOCATION OF OUTLETS AND EQUIMENT SHOUN ON THE DRAWINGS ARE APPR OXIMATE AND THE ARCHITECT/TENANT PROJECT MANAGER SHALL WAVE THE RIGHT TO RELOCATE ANY OUTLETS OR FIXTURES BEFORE THEY ARE INSTALLED WITHOUT ADDITIONAL COST. PROTECT ALL FIXTURES/EQUIPMENT AGAINST DAMAGE FROM LEAKS, ABUSE, ETC, AND PAY COST OF REPAIR OR REPLACMENT OF FIXTURES OR EQUIPMENT MADE NECESSARY BY FAILURE TO PROVIDE SUITABLE SAFEGUARDS OR PROTECTION. MAKE ALL FINAL ELECTRICAL CONNECTIONS AS REQUIRED FOR A COMPLETE AND OPERATING SYSTEM. AFTER ALL EQUIPMENT HAS BEEN INSPECTED AND APPROVED, THOROUGHLY CLEAN ALL EQUIPMENT PROVIDED UNDER THIS WORK JUST PRIOR To COMPLETION OF PROJECT. PERFORM ANY/ALL NECESSARY ELECTRICAL DEMOLTION WOW THAT IS REQUIRED TO FACILITATE THE NEW INSTALLATION FIELD COORDINATE PRIOR TO BIDS. REMOVE AND/OR MODIFY EQUIPMENT, ETC. AS REQUIRED FOR A COMPLETE INSTALLATION. ANY EQUIPMENT OR DEVICE REMAINING IN USE AFTER PART OF THE EQUIPMENT OR DEVICES HAVE BEEN REMOVED ARE TO BE RECONNECTED TO EXISTING OR NEW CIRCUITS AND LEFT IN WOKING ORDER FEEDERS TO PANELS AND WIRING TO OTHER EQUIPMENT TO BE ROUTED CONCEALED IN FINISHED AREAS. COORDINATE ANY DISRUPTION OF ELECTRICAL OR TELEPHONE SERVICES WITH LANDLORD AND TENANT PROJECT MANAGER TO AVOID CONFLICTS. CONDUIT SHALL BE STANDARD STEEL RIGID, MC OR EMT (THIN WALL) ACCORDING TO LOCAL CODE AND LANDLORD REQUIREMENTS. CONDUIT SHALL BE CONCEALED IN FINISHED AREAS, EXCEPT AS OTHERWISE APPROVED BY ARCHITECT. EMT CONNECTIONS SHALL BE COMPRESSION OR SET SCREW TYPE. FLEXIBLE CONDUIT OR TYPE MC CABLE SHALL BE USED FOR FINAL CONNECTIONS TO LIGHT FIXTURES, MOTORS AND VIBRATING EQUIPMENT ONLY± AND WHERE SO USED TO BE GROUNDED WITH A SEPARATE FULL SIZED GREEN GROUNDING CONDUCTOR FINAL TYPE MC/FLEX CONNECTIONS SHALL BE LIMITED TO 5 IN LENGTH (ARRANGE CIRCUITS SO AS TO AVOID THE USE OF JUNCTION BOXES ABOVE DRYWALL CEILING AREAS, JUNCTION BOXES LOCATED ABOVE LAY-IN CEILINGS ARE ACCEPTABLE). a. MINIMUM SIZES OF CONDUITS SHALL BE 3/4' FOR STANDARD CONDUIT, AND 1/2' FOR FLEX CONDUIT (I/2' STANDARD CONDUIT AND 3/9' MC CABLE MAY BE USED AS SPECIFIED ABOVE, IF ACCEPTABLE WITH LANDLORD AND LOCAL CODES, ELECTRICAL CONTRACTOR SHALL FIELD COORDINATE WITH LANDLORD 4 INSPECTION AGENCIES PRIOR TO INSTALLATION). ELECTRIC METALLIC TUBING (EMT) SHALL BE GALVANIZED OR ELECTRO-GALVANIZED. FITTINGS SHALL BE SET SCREW OR COMPRESSION TYPE, FITTING SHALL BE AS MANUFACTURED BY REGEL, STEEL CITY, RAcO, T 4 B, EFC0FR OR EQUAL. EMT SHALL BE USED FOR FEEDERS AND BRANCH CIRCUITS RUN ABOVE SUSPENDED CEILINGS OR CONCEALED IN INTERIOR PARTITIONS. E . PAINT ELECTRICAL CONDUITS, ETC., IF REQUIRED, 3. THE USE OF ROMEX OR BX IS NOT PERIITTED. 4. MANIMUM CONDUIT HANGER SPACING SHALL BE 5 FOR 3/4' THRU 1-1/4' AND 10 FOR I-1/2' THRU 4' CONDUITS. PO NOT SUPPORT CONDUIT FROM THE CEILING SYSTEM. S. LEAVE A 310 AU. G FULL WIRE OR NYLON FULL STRING IN ALL EMPTY CONDUITS. ■ SECURE ALL RACEWAYS TO THE BUILDING STRUCTURE IN A RIGID AND SECURE MANNER, USING FASTENERS SUCH AS 'CADDY CLIPS' OR EQUAL. 1. WIRE: 1. 3. 1. B. SERVICES: 1. LIGHTING: FLASH AND COUNTER FLASH ALL RACEWAYS WHICH PENETRATE THE ROOF OR USE PITCH POCKETS. INSURE THAT PENETRATIONS ARE COMPETELY WEATHERPROOF. ALL RACEWAY SYSTEMS EXPOSED TO THE WEATHER SHALL BE WEATHERPROOF. PRIOR AppgrA By LANDLORD IS REQUIRED TO ADD ADDITIONAL EQUIPMENT LOADS TO STRUC TURE OR TO MAKE HOLES IN EXISTING RiDoF. NOTIFY LANDLORD'S ROOFING CONTRACTOR AT LEAST 12 HOURS PRIOR TO ANY REQUIRED ROOF WOK. WIRE SHALL BE !SINGLE CONDUCTOR COPPER WITH 600 VOLT INSULATION. MINIMUM WIRE SIZE SHALL BE *12 AWG, ALL WIRE AND CABLE SHALL BE NEW AND SHALL BE BROUGHT TO THE SITE IN UNBROKEN PACKAGES. ALL WIRING OF ANY TYPE SHALL BE IN CONDUIT. NO STRANDED WIRE ALLOWED FOR *10 AND *12 AWS SIZES. (INCREASE CONDUCTOR BY ONE SIZE FOR EVERY 150' INCREMENT OF DISTANCE FROM THE PANEL BOARD FOR 120 VOLT CIRCUITS) . GENERAL WIRING SHALL BE THUN OR TI-11-1N. ALUMINUM CONDUCTORS ARE NOT PERMITTED 2. WIRE CONNECTORS SHALL BE EQUAL TO SCOTHLOCK FOR S3 AND SMALLER, AND EQUAL TO T I • 'LOCK-TITS' FOR *6 AND LARGER. THE USE OF SHARED NEUTRALS IS ACCEPTABLE FOR LIGHTING AND RECEPTACLE CIRCUITS IF INSTALLED IN ACCORDANCE WITH N.E.C. *310, AND LOCAL CODES. SEC. 16300 - TRANSMISSION 4 DISTRI8UTION A. WIRED GROUND SYSTEM: FURNISH AND INSTALL A COMPLETE WIRED GROUNDING SYSTEM FOR ELECTRICAL EQUIPMENT AND CIRCUITS AS SHOWN1 ON THE DRAWINGS AND DESCRIBED GENERALLY BELOW. 2. ALL GROUNDING CONDUCTORS SHALL BE GREEN, WHERE EXPOSED IN PANEL, SWITCHBOARD, OUTLET, eoxEs, ETC. 3. ALL ENCLOSURES AND NON-CURRENT CARRYING METALS TO BE GROUNDED. CONDUIT SYSTEM TO BE ELECTRICALLY CONTINUOUS. ALL LOCK NUTS MUST CUT THROUGH ENAMELED OR PAINTED SURFACES ON ENCLOSURES. WHERE ENCLOSURES AND NON-CURRENT CARRYING METALS ARE ISOLATED FROM THE CONDUIT SYSTEM, USE BONDING JUMPERS WITH APPROVED CLAMPS. 4. RN A SEPARATE GROUNDING CONDUCTOR IN EACH CONDUIT, *12 MINIMUM, OR AS SSIOWN ON DRAWINGS. FOR PANEL FEEDERS BOND THE GROUNDING CONDUCTOR TO THE CONDUIT, WHERE ENTERING AND LEAVING THE CONDUIT. ALL GROUND CLAMPS SHALL BE PENN-UNION OR EQUAL, SIMILAR TO I GPL' TYPE. CONDUIT GROUND BUSHINGS SHALL BE THOMAS 4 BETTS OR EQUAL, SIMILAR TO *3800 SERIES WITH NYLON INSULATED THROAT. S. ALL DEVICES SHALL BE BONDED TO THE CONDUIT SYSTEM. USE A BONDING JUMPER BETWEEN THE OUTLET BOX AND THE DEVICE GROUNDING TERMINAL. METAL TO METAL CONTACT BETWEEN THE DEVICE YOKE AND THE OUTLET Box IS NOT ACCEPTABLE AS A BOND FOR EITHER SURFACE MOUNTED BOXES OR FLUSH TYPE BOXES. ALL JUNCTION BOXES, OUTLET BOXES AND FULL BOXES SHALL BE BONDED TO THE CONDUIT SYSTEM. ALL FLEXIBLE CONDUIT SHALL BE JUMPERED WITH A GROUND CONDUCTOR SHALL PROVIDE TEMPORARY SERVICE FROM LANDLORD'S DESIGNATED LOCATION AND PROVIDE LIGHTING, POWER AND WIRING AS REQUIRED TO FACILITATE APPLICABLE TEMPORARY WIRING, FUSES, ETC., SHALL BE REMOVED UPON COMPLETION OF THE PROJECT. PROVIDE GROUND FAULT PROTECTION AS REQUIRED BY N.E.C. AND LOCAL CODES. 2. PROVIDE ELECTRICAL SERVICE AS SHOU.N ON THE DRAWINGS, FIELD VERIFY EXACT REQUIRMENTS PRIOR TO BIDS. RESPONSIBLE TO PROVIDE ALL UJORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR POWER COMPANY. CLOSELY COORDINATE ENTIRE INSTALLATION WITH LANDLORD AND POWER COMPANY AS REQUIRED. (PROVIDE EQUIPMENT THAT IS coMPATABLE WITH AVAILABLE FAULT CURRENT LEVELS, PROVIDE 'CABLE LIMITERS' IF NECESSARY FOR SYSTEM COORDINATION). FIELD VERIFY EXACT TYPE, SIZE, LOCATION, REQUIREMENTS, ETC. OF EXISTING POWER AND TELEPHONE FACILITIES PRIOR TO BIDDING PROJECT. 3. MAKE rRovisIoNS FOR NEW TELEPHONE SERVICE AS REQUIRED, AND AS INDICATED ON THE DRAWINGS D. CONDUIT SYSTEM FOR TELEPHONE DISTRIBUTION WITHIN TENENT'S PREMISES SHALL BE PROVIDED AS REQUIRED FOR A COMPLETE TELEPHONE SYSTEM. OUTLET BOXES SHALL BE 4' SQUARE MINIMUM WITH SINGLE DEVICE COVER AND TELEPHONE PLATE. CLOSWCE NED FIELD COORDINAT4 WITH TENANT'S PROJECT MANAGER TO AVOID CONFLICTS. CITY OF "UKWILI SEC. 16600 - LIGI4TING 1. LIGHTING FIXTURES AND LAMPS SHALL BE FURNISI-ED AS SCHEDULED. INSTALL ALL FIXTURES AND LAMPS FLUORESCENT FIXTURES SHALL HAVE HFP BALLASTS WITH EFFICIENCY FACTORS IN ACCORDANCE WITH 'NATIONAL APPLIANCE ENERGY CONSERVATION ACT OF lees!, AMENDMENTS OF 1S8'. 2. LIGHT FIXTURES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE VIA ALL THREAD AND UNI-STRUT, AND NOT SUPPORTED BY CEILING SYSTEM. DESIGN DRAWINGS ARE SCHEMATIC. VISIT THE SITE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT EXISTING FIELD CONDITIONS. THIS CONTRACT SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE TO EXISTING CONDITIONS. CONTACT THE OMER PRIOR TO BIDDING FOR NTERPRETATIONS AND CLARIFICATIONS CP THE DESIGN AND INCLUDE IN HIS BID ALL COSTS TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE OU.NER AFTER BIDDING WILL BE FINAL AND SHALL BE IMPLEMENTED AT CONTRACTORS COST. HAVE A WORKING KNOUJLEDGE. OF LOCAL CODES AND ORDINANCES. INCLUDED IN BIDS, THE , COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH GOVERNING CODES, THE PLANS AND SPECIFICATIONS NOT WITHSTANDING. THE CONTRACTOR SHALL ALERT OWNER OF ANY APPARENT DISCREPANCIES BETWEEN GOVERNING CODES AND DESIGN INTENT. FIELD vERIFY ALL c0NEDITIoNS NUV 0 PERMIT ENSURE THAT ALL EQUIPMENT, PIPING AND DUCTUJORK NOT SHOWN TO REMAIN IS FULLY REMOVED AND NOT ABANDONED. 5 2008 ENTE DATE: JOB NO: 0813130 DRAWN: CHECKED: GROSS AREA: 5,535 SQ. FT. SALES AREA: 3,278 SQ. FT. STORE NO. NOV 0 3 2638 10-30-08 .... . Empluisie On Excellence M • Retail Engineering, 'Inc. 750 Brooksedge Blvd. Westerville, Ohio 43081 TEL: 614.818.2323 FAX: 61 4.81 8.2337 Champs: 14498 07 / / 09 REVISIONS NO. DESCRIPTION DATE SHEET NUMBER 2-44 MECHANICAL AND ELECTRICAL SPECIFICATIONS 01 .2