Loading...
HomeMy WebLinkAboutPermit PG08-298 - WESTFIELD SOUTHCENTER MALL - WETZEL'S PRETZELSWE 2800 S EL'S PRETZELS UTHCENTER MALL K-2678 PGO8-.298 Parcel No.: 6364200010 Address: Suite No: City Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PLUMBING /GAS PIPING PERMIT 2800 SOUTHCENTER MALL TUKW Permit Number: Issue Date: Permit Expires On: PG08 -298 02/12/2009 08/11/2009 Tenant: Name: WETZEL'S PRETZELS Address: 2800 SOUTHCENTER MALL, K -2678 , TUKWILA WA Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA Contact Person: Name: CHAI CHAO Address: 10821 RAINIER AVE S , SEATTLE WA Contractor: Name: ENDURABUILT INC Address: 851 SE SOMERS DR , SHELTON WA Contractor License No: ENDURI *930BH Phone: Phone: 206 - 228 -1498 Phone: 360 - 427 -1581 Expiration Date: 01/08/2011 DESCRIPTION OF WORK: PLUMBING FOR FIXTURES IN NEW KIOSK Value of Plumbing /Gas Piping: Fees Collected: $10,000.00 $157.00 Plumbing Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountain or water cooler (per head) Food -waste grinder, commercial Floor drain Shower, single head trap Lavatory Wash fountain Receptor, indirect waste Sinks Urinals Water Closet Uniform Plumbing Code Edition: 2006 International Fuel Gas Code Edition: 2006 FIXTURE TYPE AND QUANTITY Plumbing (cont.) 0 Building sewer and each trailer park sewer 0 0 Rain water system - per drain (inside bldg) 0 0 Water heater and /or vent 1 0 Industrial waste treatment interceptor, including 0 its trap and vent, except for kitchen type 0 grease interceptors 0 0 Repair or alteration of water piping and/or water 1 treatment equipment 0 0 Repair or alteration of drainage or vent piping 0 0 Medical gas piping system serving (1 -5) 0 inlets /outlets for a specific gas 0 0 Medical gas piping (6 +) inlets /outlets 0 2 Gas Piping 0 Gas piping outlets (0 -5) 0 0 Gas piping outlets (6 +) 0 * *continued on next page ** doc: UPC -10/06 PG08 -298 Printed: 02 -12 -2009 City ("Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us Permit Number: PG08 -298 Issue Date: 02/12/2009 Permit Expires On: 08/11/2009 Permit Center Authorized Signature: Date: I hereby certify that I have read and ej'ined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied it , whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constructi• o`. .perjrmance of work. I am authorized to sign and obtain this plumbing /gas piping permit. Date Signature: Print Name: _+ G This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: UPC -10/06 PG08 -298 Printed: 02 -12 -2009 Parcel No.: 6364200010 Address: Suite No: Tenant: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS 2800 SOUTHCENTER MALL TUKW WETZEL'S PRETZELS Permit Number: Status: Applied Date: Issue Date: PG08 -298 ISSUED 12/18/2008 02/12/2009 1: ** *PLUMBING AND GAS PIPING * ** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the.job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 8: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 9: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 10: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 11: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 12: 13: ** *PUBLIC WORKS DEPARTMENT CONDITIONS * ** 14: Provide access to grease interceptor for maintenance per manufacture pumping frequency recommendation. * *continued on next page ** doc: Cond -10/06 PG08 -298 Printed: 02 -12 -2009 0 City of Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: (--a-Th›^-'— Print Name: P -E Date3 _P— O1 ordinances governing or local laws regulating doc: Cond -10/06 PG08 -298 Printed: 02 -12 -2009 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci. tukwila. wa. us SITE LOCATJO Site Address: Tenant Name: Plumbing /Gas Permit No. ?&t Project No. PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print* * V10 King Co Assessor's Tax No.: (1a/1 7/9 -CD (i7 AAe, ' /ire f-�e Property Owners Name: Suite Number: / (0 Floor: UA Mailing Address: /66 2 / fair! / if MAL - New Tenant: ®- Yes ..No City w 4--- Wl 2" State Zip Mailing Address: -C- E-Mail Address: 114 L' / rory .Y l) ,(4 Day Telephone: City Fax Number: State Zip Company Name: Mailing Address: Contact Person: E -Mail Address: Contractor Registration Number: Company Name: Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: Expiration Date: State Zip Company Name: Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip Q:Applications\Ponns- Applications On Line \3 -2006 - Plumbing -Gas Piping Permit Application doc Revised: 4 -2006 city Day Telephone: Fax Number: State Zip • • Valuation of Project (contractor's bid price): $ /9 Ord Scope of Work (please provide detailed information): 344 r ®�w� b,� -, 4,4-p-77 Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type `'' , :Qky Fixture Type,,:, .:.:. Type 4`.: »`», . ".: ;.Qty - ,� - Eixture;,TYPe i r, - . "'; ,Qty �Figture�Type ITT. r �1Qty Bathtub or combination bath/shower Drinking fountain or water cooler (per head) Wash fountain ^/ Gas piping outlets , Bidet Food -waste grinder, commercial Receptor, indirect waste Clothes washer, domestic Floor drain Sinks Dental unit, cuspidor Shower, single head trap Urinals Dishwasher, domestic, with independent drain Lavatory Water Closet Building sewer or trailer park sewer Rain water system - per drain (inside building) Water heater and /or vent t Additional medical gas inlets/outlets - six or more Industrial waste pretreatment interceptor, including its trap and vent, except for kitchen type grease interceptors Repair or alteration of water piping and /or water treating equipment Repair or alteration of drainage or vent piping Medical gas piping system serving one to five inlets/outlets for specific gas Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNE Signature: Print Name: Mailing Address: AUTHORIZED AGENT: (0J2 / io/or /c r Date: t21 / 9—/ ;— Day Telephone:( 24 () -1 Z(% r/ City State IDate Application Accepted: Date Application Expires: Staff Initials: 12-11 kl ots it ^/ Q: 1Applicationaorms- Applications On Line13-2006 - Plumbing -Gas Piping Permi Application.doc Revised: 4-2006 Page 2 of 2 Cr* of Tukwila, Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.u.s SET RECEIPT RECEIPT NO: R08 -03957 Initials: JEM User ID: 1165 Payee: JCHAO- PRETZEL, INC. Payment Date: 12/18/2008 Total Payment: 382.50 SET ID: S000001149 SET TRANSACTIONS: Set Member EL08 -1525 PG08 -298 TOTAL: Amount 225.50 157.00 225.50 TRANSACTION LIST: Type Method Description SET NAME: Tmp set/Initialized Activities Amount Payment Check 2259 ACCOUNT ITEM LIST: Description TOTAL: 382.50 382.50 Account Code Current Pmts ELECTRICAL PERMIT - NONR ELECTRICAL PLAN - NONRES PLAN CHECK - NONRES PLUMBING - NONRES 000.322.101.00.0 000.345.832.00.0 000/345.830 000.322.103.00.0 TOTAL: 180.40 45.10 29.00 128.00 382.50 0648 12/18 9707 TOTAL 382.50 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431- PGDe- 25° Project:, e+g et, 1k. Pfc-i- Is Type of pection: 1(4A i j) 14Nt61 k....-NJ , CiNlit.A.c..,0 Addr ss: 7 joo VA A I ( Date Called: Special Instructions: Date Wanted: _ ui p.m. Requester: Phor�e No: (x'71 I-' 7L ?''' ri)c17.f. ;--i 64.11-,\AI Approved per applicable codes. El Corrections required prior to approval. COMMENTS: j) 14Nt61 k....-NJ , CiNlit.A.c..,0 off,iv_.-- 9 P ri)c17.f. ;--i 64.11-,\AI Rie 4 C1(A,..) (1 .- ‘v(` i D e: Jflnwu� ! U .00 REINSPECTION FEE REO RED. Prior to inspection, fee must be id at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Inspe cto : Receipt No.: Date: INSPECTION RECORD Retain a copy witA permit p60?- 21ff INSPECTION NO. PERMIT NO. tisif CITY OF TUKWILA BUILDING DIVISION ' 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -360 Project: k Type of I . specti (: I Address: 200 S'G .u/ .D Date Called: T rs- Special Instructions: ) (4./1-.:Tr- 4./1-. ! 'r( ( Date Wanted:2 ' Z C) i ,a.ni`.. p.m. Requester: Der -f;x �r Phone No: '7q( 3 Zr Approved per applicable codes. orrections required prior to approval. COMMENTS: y ( i J 4 . . /t A-6 f .D u AT e I c-- - ( f' / T rs- A A.c. -f j I) Ji---- ) (4./1-.:Tr- 4./1-. ! 'r( ( iuoa 3 -i `, Der -f;x �r 1 A . Inspect r: Date: ri $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: /g k. C INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 INSPECTION RECORD - Retain a copy with permit PERMIT NO. gi?) (206)431 -3670 Project: ref 2�1 S frekeis Type of Inspect) a: �-I � Adr��ASS� 1 Date Called: n CFI Sper_ial Instructions: Date Wanted � a:m: Reque ster: a i 1 14. Ph3._?ci 1,_.3�� Approved per applicable codes. El Corrections required prior to approval. 'COMMENTS: -I19.1- )Yak ar?5 /DE 4c&i(5 . Inspector: Dc7 Date: 712-V01 01 $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: L SPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. 1 I \\ (206)431 - 6 Project: j��PIJ /l�'�r /S Type of nspection: , , 63)/ 0- i/v \J 6 /9// Date Called: Date Wanted: -26. -0, p, SSppAddre e�cial Instructions: Requester: 4 c'-1'' Phone o: .36c- ' / -6)32& Approved per applicable codes. El Corrections required prior to approval. CO ENTS: P 44 W►gltS a(SX ._) ice ;t.)S;cce a a., , ‘A.)-15 w, L...--i- (4.4" 1,.) 4 c'-1'' ) {� e. �t 3 V3 C (,5v� o-{ PcJ s--r --0 c (I t ( �.:& (..\ t),-Y\ Inspectoj Date: z -z. $ 0 REINSPECTION FEE. EQUIRED rior to inspection, fee must be at 6300 Southcenter Blvd., Suite 00. Call to schedule reinspection. tot No.: 'Date: -. a�1111.i. = - E INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 4- i` 630() Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: 6Ve1 -2F1- ' 007e71.0 `a Type of 1 spection: . /ff Iii d%- A1J P /tom b Address: O �'4 // Date Called: Special Instructions: a,� i ate Wanted: a. D2— /7 -D�-r Requester: Phone No: 364 --A W/ - �9.32,q 0 Approved per applicable codes. Corrections required prior to approval. COMMENTS: /4.21 4s — A/07— 42 ■iA / evif /J_s c_ t y \tit/ ti s .1-iv 3 s- / ?vcfvy hi/L- :5 0 ae___ Gfiy�' /mss ek i- r 45 P r -i specto Date: 4A 00 REINSPECTION FEE QUIWI). Prior to inspection, fee must be at 6300 Southcenter Blvd Suite 100. Call to schedule reinspection. t No.: 'Date: MICHAEL R. BLACK, AIA February 4. 2009 Allen Johannessen Tukwila Building Division 6300 Southcenter Blvd, Suite #100 Tukwila, WA 98188 / RE: Wetzel's Pretzels (Southcenter Mall, K-2678) — Permit /tplication PGO8-298 Dear Mr, Allen, The grease interceptor originally specified for this project was a Shier Products PATG-20-LO. This item is not available quickly enough to fit within the schedule of this project. In its place, we have substituted a Watts model WD-20-L. The new Watts interceptor is capable of 20 GPM flow and has a capacity of 40 pounds of grease. We have verified that this model may be used with air admittance .valves and have provided the manufacturer's approval under separate cover, II you have any questions regarding this substitution, please feel free to contact me. Thank you, Michael R. Black, Washington Reg, No. 9205 RCTIIf L.TIVO „Ltvirvvtu vuDECOMPLIANcE APpRovE P&064• 290 FEB 1 1 ?fifig atY0frulovila GDIVISIoN RECEIVED FEB 042009 PERMIT CENTER 3100 E. RANDOL MILL RD. ARL(NGTON. TEXAS 76011 Phone I 7) -4200 Fax (817)644-4153 WD-L Series Tag: PDI Certified Low-Rough-In Grease Interceptor SPECIFICATION: Walls Droinago WD.) Series PDI Certified recessed or floor mounted epoxy coated steel low-tough-in grease inten:eptor with gasketed epoxy coated steel skid-proof rover secured with hex head center bolt(cl, removable baffle assembly, deep sect trap with zleanout, external cost iron flow control fitting, and no hub (standard) connections, D (Length) x E Inlet Flow Restrictor w/vent Connection Flow Rote (SeIect One) Suffix Description 20 20 GPM 35 35 GPM 50 50 GPM 111 Options (Seiect One or Marc) Suffix Description -11 -E -FC tStit) Sediment SOCIO, Extension Flange & Clomp Devise Inter A Outlet other Pion Stoccinisi Sizo Snrininsii Steel Tin-coder: Connect uns 0 1-1 Interceptor Cato loy Number now I Grease gate lCapcciry GPM 1 Lb:: A 8 C 0 8 F Inlet & Oudot Bose to Center Top to Center Length Width Height WD-20-1. 20 i 40 3" (76) 7-1/21191) 4-1 /e (108) 34-7/818861 22-7/80(5811 11-3/493051 WD-35-1. 35 1 70 4" )102) 7(178) 4-1/2(114) 40.7/8" (1038) 32-7/81835) 11-7/81302) 'W1)-50-1 50 1 100 4(102) 8-1 /r (216) 5-1/29140) 5511397) 33" (838) 14" (356) ' NOTE: NOT PD) CERTIFIED Jab I,10!fie _ Eng ;wrier - - — - — COrlItOCI^r Contrectot's D.0. No Representative WATTS Drainage reitorcas itt right to modify or charge product design or construction without pior notice and without incurring any obligation to make similar changes and modilications la products subsequently sold. See your WATTS Drainage tepresentative for any clarification. Deneniinns are orkincl nt rneInvInets:rittolole,nne.s 4k, le *V iFt'irk sac 0 Specification Drainage Products USA: lUOVVAILS Road, Snindale. NC, 28160-7298: TEL: 828-230-21 78 TOLL-FREE: 1-800:338-25131 www.wattscem ES-WD-WD-L SERIES USA 0535 WD-L SERIES oai SOS 0) 0)3 c 0)a) -0 0 0 T1 U.0 E _p mac O U E E N'p Remove cover. D m . ai 00 Dag) a'E O •C E ao "000 Ca)0 0-0 0 ()E0 00 O N O C 07,0 `o`c a) Qo o u q) 3 w o.� —00 OC h a) cc 0)c 0 O L.,L_ v,3F- 0 126 "5 a pc c•5) o= zo c O co O o 02 I0 TROUBLESHOOTING TIPS: 0) c C _cC 0 p-0 0 _ 0 0 0 0 E0p m 5DE CD a) �p0 DLO c -per O p ` U 71)613 0- 7 p C p p 000 O N N U T O C a) 0 = O0)L (1).00 peal O0)O 0 0 0 O c 0 op DE Up Up a) 1T. .4)- PUMPING FREQUENCY: : 60 a) UE00 0Q)UC 06E8- QLOQ 3E a)a00)o )—o2 6- C —.- p >cc 00.50 6 °E20 . p E U ON -0p 0> C = 0 � N c�'p cD.7, 0) Q 0 00 ao .-- O 0 o22.321-_, �� C,D 0 2 O w o-'6 a) E3p0 O� �� . U_OCN Oca) -coO6 Eo_ O 0 o�.2 0E3 � -o a) 00 o a) 6 a) N� 2`3 ° (Dom OO 0) T30-,20 .p 0— c D• c V O • a V :: 0.E00 C aC --• 7 C x)0)0) c'E0-00 D U E ]L CL 01-,-- -0 a)p.OU L.0,1; Q a)E., 0 0 c8 o0 N m 30 L O 3Q 2E ao O o U- p C U DmW E EN o- • V N_ '0 N ut N^P`u ''OS OnN.•D o r UNN O tll m a ._=c2,0.. 0 0 E O 5cocet 0V1Z=X0 oolol N a! Z Made in the U.S.A cn 1— Z w w 0z i=cn < w CU w Z 0Z V) w w F— Z w < QZ 0_ Q z: 0 1- 0 LLI V1 CI MATT: HDPE REV: 1 - 2/8/08 PART NUMBER: N ui DWG BY: TEU 3E, >0 U d0 03 W_ 0 Z W SECTION A -A SPECIFICATION SHEET 4 p �= 3to a� ate) v co 03 Lo-00 c5 N '^ O C N 0-.-L L•T a)'� —='C' L O•C— (1) -p of p— O a) ,p a)E -cN3 U� Ua)a)�^.` —j" �- o a O T 3 C o C� N - 7Y • L a) 4-)ca-0 '622 � 3M 445 �,,, ,,� c0 c -2cpoc:6- C- app)° 3 n°'�000 30 5 - E“), }°0D0° p.�o j °' o o O C c a) 0 aN 'a° a °• cjO O U N U O NZ O 3 cc, N c N �iJ N o� o00 °ooaa���~ aaQO o o co a'p�� ,�aoi —° "'u3c.)0— °°;3>. 'S0o> U a) Cc_ Q U ,,,—= aT, O� N O o P . a) Q M co ..22 O N a) Tot a)_6 U-pp j 0.�� -per O OU N O Q)� 00 r2 E o-1 p.o O. a) a) j �� N C .,;"'`S' �_ c C a)>'c-p C "- �- (� N O + ON N T C+ 6 JcU 6� N O'NO.�L O�.`V��` 'alp O O.— O D_ d � •c Q.0 O T._ O N TOE C O o 0 a) a) OLL Q Z o, c E C ��-p O o N O,Cc_ U' ,2_ o 0) -O a)= N 7 - a O -O UD 0 x-C_ —< O L C O 3 + +.� O a)?p C C Q� C a o �— U U C a) U p)`^ CL N (1)— co--. •+ 0)O)N L• U O•- O L a)�L 1-NSONo -d a0 a) Cp OQoO0)_�� ZCa)+ 7 N�� Q,,,UU00°a) 0.,c 00:E a) N o C N _ <=.a.. j,0.+ o 15Z -8'C O 0.2+ 71) .2 O •c O+ T.� Q N C m= p p ,O U n C O 0 W C O O ao U o 0_ 6 0 6 me_ a) ..c O 0 U a,�., U� J V c O N p O = 0.� 6 p a� 0)6 0-6 p E p'Qa) Z op0a)»-O cp- �a)LZa)am-oa)"`N�5Na•` 16—= 02 -0OO Warp' O rm6 =p� °ANN C U d,^L C p,_ Q)— a)+ C Q ] a) a) .; O 0 • U a) ,C N+ C —_ O p� 3 p p �E p a). -.� U a) DE c 0.�'p p— O O L -p N N O N a) f2o O „U,� a) 7o\ p U �'� p E mZ'O +'- E O „, p o a) a) C -U p w`n, ni+ 7-6� U;,..Qa)= -po)E .'_^W O o O0.��- Cp"'•,,a)_ -pm !-fl! .L- -YN� N U-O w`'0- 0000per N . . , C p o� o. p C U moCp j p C p•�E O O apj U° a a o 6 c 7 p p pp Z O �L p N U 0°1 Z I- cha _ zC 6 C N o 0 L C 0 0 �J C O00> Va)CC�CCpp)OCC WLLCN a O 203LOj.!2 �.-O2 Z2p�•'a opm000 d • • • • N • csiri4ui`O Z NM V Lr)`O n WO: W � U+--O H =� O- 'Liz.' CLLn_� U�J U U v, O Made In the U.S.A w z w J 2 CY w 0 ›- J p_ Ow QO w w U_ OZ CY w CL V), w O IaInn J V Z 0 H U N W 0 MATL: HDPE O uJ PART NUMBER: PATG -20 -LO DATE: 11/29/07 DWG BY: TEU N O o �Q 0 c_0 L "- 0 0c 6 0)_ • -O'UO 5. —o • p D0oOc '5.R.0 O p c UO o 'a) UN co- Oc�° O°mNEo0 ,O1)0 D.-.,, o c U 0 5:,>_,,y.- C »- o-......= D-5,7)13 c 0. O.O0)-oaa) _DU�oxr.o C� m0N UO U C 4) 0 o O- O o)T52 <4==(,15.. a� o M C O O..0 o T aoQO•tU\a) UC :E224,>118 H y o 30-00 g„, 000..._0- a0i°— ''a�°— 'ODco- 0oQ3oa,rnEoa) .fltCO.O.5 aa)= -grn3E. cooaos;0a _UCox'�x :_x :. CIE UOU_ LL Zo6ocs,c, y1`c000- =�0 U —2:_-,22< + LL mY VI W O1 Y) c•c• o )v J)-r- Z . cNr) v W O H ❑ PS3 - 3" Inlet and Outlet connections SECTION A -A Date of Approval: w Z w J r 1 ~O w } - CL Ow aU w J _ w —I-- 0— CY w a_Vj � O tenr� J V Z O 0 c y 13 O W 7q o U g8 ST, LIP MICHAEL R. BLACK, AIA January 22, 2009 Allen Johannessen Tukwila Building Division 6300 Southcenter Blvd, Suite #100 Tukwila, WA 98188 PILE copy Pennit No, Plain rnwriptl,,, RE: Wetzel's Pretzels (Southcenter Mall, K -2678) — Permit Application PG08 -298 Dear Mr. Allen, In response to your completeness memo dated January 28, 2009 we have revised the drawings as follows. 1. The vent piping at the grease interceptor has been revised. In addition to the vent line connected to the inlet flow controller, a vent line has been added to the discharge side of the grease interceptor. These vent lines will be connected to a single air admittance valve. To prevent wastewater from bypassing the grease interceptor, the vent lines must connect a minimum of 6" above the flood rim of the 3- compartment sink. A letter from the grease interceptor manufacturer (Watts Drainage) has been included to indicate that this arrangement will not compromise the effectiveness of the grease interceptor. 2. A second vent has been added near FS #1. Per our discussions, this vent will exit the waste line from the top and offset horizontally to the wall of the kiosk. Once above the floor slab, this vent line will terminate with an air admittance valve. Drainage fittings will be used for this vent line to help prevent blockage. If you have any questions regarding these revisions, please feel free to contact me. Thank you, OORRB CTBO chael R. Black, A.I.A. LTR# Washington Reg. No.: 9205 9205 REGISTERED ARCHITECT MICHAEL R. BLACK STATE OF WASHINGTON PGOB296 7,i At 4612ROVED Ed E8 1 ?�►; a COMp Of IflIGD pu RECEti FEB 042009 PERMIT CENTEF 3100 E. RANDOL MILL RD. ARLINGTON. TEXAS 76011 Phone (817)633 -4200 Fax (817)644 -4153 Date: February 2, 2009 To: Dan From: Roy Hetzler RE: Interceptor Venting Dan — The type of vent used will not effect the performance of Watts WD Series Grease Interceptors. Recommended venting is for odor control, and lack of specific venting does not alter the function or separation efficiency. Watts Drainage Products Inc. 100 Watts Rd. Spindale, NC 28160 Phone: (800) 338 -2581 Fax: (828) 288 -2187 1 MICHAEL R. BLACK, AIA January 22, 2009 Allen Johannessen Tukwila Building Division 6300 Southcenter Blvd, Suite #100 Tukwila, WA 98188 Permit No. FILE COpy Plan review approval Is subject to A, oval of conor� 1 errors and Ct.on �01r►��nG� ,r,,,, amps_ RE: Wetzel's Pretzels (Southcenter Mall, K -2678) — Permit Application PG Dear Mr. Allen, In response to your completeness memo dated December 23, 2008, we hay following information. adtitu rut( COM COMP/IMO! APPIRWED -298 f: E8 1 1 i10,4 �D�Tu ja MSION The original plan used air admittance valves which are normally not allowed. In an attempt to use another venting system such as island venting or a combination waste /vent system, we discovered that the clearances available between the second floor and ceiling below were to shallow to allow enough room for an island venting system. The existing structural members also will not allow a combination waste /vent system to be vented properly. This issue was discussed between Bob Benedicto (City of Tukwila) and Wayne Johnson (Westfield Development). It was decided that for the Wetzel's kiosk, Studor vents would be allowed. Although they have not been allowed in all kiosks at Southcenter Mall, they have been used where structural issues have been a problem such as the case with the Wetzel's kiosk. The drawings have been revised to show two Studor vents. One serves the inlet side of the grease interceptor and the second is to vent the horizontal 4" combination waste /vent pipe. Both valves will be installed within the kiosk walls using a Studor provided wall box. The wall box allows airflow to the valve and provides a means of access while shielding it from view. The connection locations have also been revised and are now shown accurately on the drawing. A 4" waste pipe and a 3/4" cold water line have been stubbed to the kiosk area by the base building contractor. Since the connection points are directly under or very near the kiosk, no pipe will be run to the service corridor as initially planned. If you have any questions regarding these revisions, please feel free to contact me. Thank you, ichael R. Black, A.I.A. Washington Reg. No.: 9205 REGISTERED ARCHITECT MICHAEL R. BLACK STATE OF WASHINGTON X608- 2,98 INCOMPLETE RECEIVED I JAN 28200A PERMIT CENTEI 3100 E. RANDOL MILL RD. ARLINGTON. TEXAS 76011 Phone (817)633 -4200 Fax (817)644 -4153 Feb 09 09 02:59p Keys Nit YAWED FOR SEC COMPLIANCE APPROVED FEB Tukwila _DOING DIVISION GREASE TRAP OR INTERCEPTOR Customer Attention Address Wetzel's Pretzels Chaff Choe 633 South Center 9240 Seattle, WA 98188 949 #215#2161 p.2 FILE COPY Permit No. Plan review approval is subject to errors and onlssk Approval of construction documents does not autho the violation of any adopted code or ordinance. Roc of approved Firt ra d ci conditions ; �l::tr�n1�,�e.r SERVICE AGR EIW Date 04 February 2009 This agreement is made between the above named customer (Customer") and Baker Commodities Inc., 57955 South 130th Place, Seattle, WA 98178, a Delaware corporation_ Customer is in the business of operating an ,establishment which generates used restaurant cooking grease and vegetable oils ('cooking grease"), and is in need of having its grease interceptor or grease bap pumped and serviced. Baker Commodities Inc. is in the business of pumping and servicing grease interceptors and grease traps as required by Customer. IT 'IS AGREED AS FOLLOWS: 1. Baker Commodities Inc. shall pump and otherwise service-Customers grease trap as needed. Customer will keep a log onsfte to monitor inspections and cleanings. 2. The Service charge for regular scheduled pumping and servicing Customers grease trap shall be $150.00 per service. This rate is subject to all State and local taxes. Non scheduled emergency service will be charged at $85.00 per hour to include travel time and per service charge. 3. This rate includes all pumping and disposal cost. • 4. Baker Commodities Inc. shall not be responsible foranyy logged sewer thesmam the kitchen sink to the grease trap sewer line or in the main sewer line. 5. Customer shall take care to prevent the contamination of the grease trap waste water with solvents, poisens and other hazardous substances which would prevent the disposal or recycling of the waste water, nAIKER commonrnsgs vac. Quday •rd Y�,..Ina P.O. Box 56568, Sc.41e, WA 98158 OM 7A9- 7367 PAX r2O81 24.3-3412 ,.,,.2 Feb 09 09 03:OOp Keys 949 #215#2161 of the waste water in the trap until such time as O. Customer shall retain ownership tar or grease trap, at which point Baker Balser Comrnoditias pumps the irrter�P water (unless it is found to be Commodities shall become the owner of the waste Customer. contaminated in which. case it shalt remain the property of n 90 days ptiorwritten notice. 7_ Until this agreement Is terminated by either party in9 and servicing snap be Customer agrees that all of its grease intercept or u p n 9 P perf°mved only by Baker CoMModities Inc_ Baker Co i me to t have the e right to match any terms proposed by potential competitors of this contrail. W. Baker Commodities Inc. agrees to indemnify and hold harmless and t11 lia its m officers. &rectors, agents and employees. fro and againSt any claims, judgments, casts and demands arising kerb the negligence of Baker Cdnimodities, its age. subcontractors or employees, in the performance of its service here under. Batter Commodities Inc. agrees to obtain and maintain. at all times during the performance of the described senribea the following described insurance coverage: a. Commercial General Liability with a minimum combined single limit of $1.000,000' per occurrence.; D. - Automolaile liability with a $1,000,000 combined single limit for bodily injury and property damage; and o limits for state or states c.• Workers' Compensation insurance with statut statutory Liability with a in which the work is to be perforated, and. Employers minimum limit of $1.000.000. 10. Baker Commodities Inc. warrants that all uncontaminated waste wate f roved from the grease trap by Baker Commodities. will be legally disposed 11. This agreement shall be governed by the laws of the State of Washington_ • Baker Commodities Inc. Michael L Bulled Wetze' .P -tzets BY Chai Choe p.3 141112 Feb 09 09 02:59p Keys LAURIE KEYS PROJECT COORDINATOR (949) 21 5 -31 87 (949) 21'5-2161 FAX ELK_F.Y 0 C_(")X.N_L..'1' 949;1215;21 b 1 p.) FACSIMILE TRANSMITTAL SHEET TO: Greg FAX NUMBER: 206 4313665 COMPANY: FROM: Laurie Keys Tukwila Building Dept PONE NUMNF.R: 206 571 6321 RE: DATT1: 2 /9/09 TOTAL NO. OF PAGES INCLUDING COVER: 3 CC: Wetzel's Pretzels South Center YOUR REPERLNCri NUMBER: Permit # PG08 -298 XURCENT ❑ FOR REVIEW ❑ PLEASE COMMENT ❑ PLEASE, REPLY ❑ PLEASE RECYCLE NOTES/COMMENTS: Greg, Per your request attached is a copy of the service agreement from Baker Commodities that is signed by both parties., Thank you, Laurie Keys PHONE: 949 215 -3187 • FAX: 949 215 -21G1 • • City of Tukwila Jim Haggerton, Mayor February 3, 2009 Department of Community Development Jack Pace, Director Chai Chao 10821 Rainier Ave S Seattle, WA 98178 RE: CORRECTION LETTER #1 Plumbing/Gas Piping Application Number PG08 -298 Wetzel's Pretzel — 2800 Southcenter Mall, K -2678 Dear Mr. Chao, This letter is to inform you of corrections that must be addressed before your plumbing permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building and Public Works Departments. Building Department: Allen Johannessen at 206 433 -7163 if you have questions regarding the attached comments. Public Works Department: Greg Villanueva at 206 431 -2442 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that two (2) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, fer Marshall it Technician encl xc: File No. PG08 -298 P:\Permit Center \Correction Letters \2008\PG08 -298 Correction Ltr #1.DOC jem 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washinkton 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • • Tukwila Building Division Allen Johannessen, Plan Examiner Determination of Completeness Memo Date: January 28, 2009 Project Name: Wetzel's Pretzels Permit #: PG08 -298 Plan Review: Allen Johannessen, Plans Examiner The Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. The letter submitted with the correction, references issues discussed with Bob Benedicto and Wayne Johnson to allow the use of an Air Admittance Valve (Studor Vent). However the design submitted apparently does not reflect a clear picture or understanding of that which was discussed and the plumbing plan has been since arranged differently. Two main issues still need to be addressed. a. The use of a grease interceptor (grease trap) vent shall be installed downstream of the grease interceptor. Also the grease interceptor installation shall be designed in a way that it will not become air -bound and shall be properly vented. Since the Studor vent is designed to only allow air in and does not allow the fluctuation of air, the potential is for the interceptor to be air - bound. Also since the grease interceptor is considered a separate fixture, it shall be individually trapped and vented. Therefore a design shall be necessary to show that the grease interceptor installation shall meet the intent of the code and documentation from the manufacture of the grease interseptor to show Studor vents are allowable for this type of installation with the grease trap. In addition provide a method or documentation to show Studor vents shall not be adversely affected by the reverse pressure fluctuation. (2006 UPC 1009.4, 1014.1.1 & 1014.2) b. Secondly a vent shall be required for floor sink #1 (FS -1). Show or provide for a means of venting at that vicinity of the FS -1 floor sink. (2006 UPC 901.0, 1002.1 & 1002.2) Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. • • CITY OF TUKWILA PUBLIC WORKS DEPARTMENT REVIEW COMMENTS DATE: February 2, 2009 PROJECT: Wetzel's Pretzels PERMIT NO: PG08 -298 PLAN REVIEWER: Contact Greg Villanueva at (206) 431 -2442, if you have any questions regarding the following comments. 1. Provide proposed grease interceptor , Shier Products /Manufacturer, catalogue information. 2. Provide maintenance agreement with proposed company to remove grease waste from grease interceptor. r December 23, 2008 • cJt,yoiTh Jim Haggerton, Mayor Department of Community Development Chai Chao 10821 Rainier Ave S Seattle, WA 98178 RE: Letter of Incomplete Application # 1 Development Permit Application PG08 -298 Wetzel's Pretzels — 2800 Southcenter Mall, K -2678 Dear Mr. Chao, Jack Pace, Director This letter is to inform you that your permit application received at the City of Tukwila Permit Center on December 18, 2008 is determined to be incomplete. Before your application can continue the plan review process the following items from the following department needs to be addressed: Building Department: Allen Johannessen at 206 433 -7163 if you have any questions concerning the attached comments. Please address the comment above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Sincerely, 'fer M.rshall t Technician Enclosures File: PG08 -298 P:\Permit Center\lncomplete Letters \2008\PG08 -298 Incomplete Ltr #1.DOC wer 6300 Southcenter Boulevard, Suite #100 0 Tukwila, Washington 98188 o Phone: 206 - 431 -3670 0 Fax: 206 - 431 -3665 1 Tukwila Building Division Allen Johannessen, Plan Examiner Determination of Completeness Memo Date: December 23, 2008 Project Name: Wetzel's Pretzels Permit #: PG08 -298 Plan Review: Allen Johannessen, Plans Examiner The Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. The plumbing plan shows an "Air Admittance Valve" (Studor Vent) proposed to vent the drain system for the kiosk. Studor vents are not allowed. Revise plan to show method for direct venting the kiosk sanitary sewer (drain pipe). 2. Identify location in the mall corridor point of connection for the sanitary sewer and domestic water supply for this kiosk. Should there be questions concerning the above requirements, contact the Building Division at 206 -431 -3670. No further comments at this time. • PER WORDD C PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: PG08 -298 DATE: 02 -04 -09 PROJECT NAME: WETZEL'S PRETZELS SITE ADDRESS: 2800 SOUTHCENTER MALL K -2678 Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: A-S i'Va- ?- Building Division ► �j j wc' OZ r oil ublic Works I!J Fire Prevention Structural Planning Division ❑ Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 02-05-09 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route Structural Review Required n No further Review Required REVIEWER'S INITIALS: DATE: n APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 03-05-09 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 PERK CO COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: PG08 -298 DATE: 01 -23 -09 PROJECT NAME: WETZEL'S PRETZELS SITE ADDRESS: 2800 SOUTHCENTER MALL K -2678 Original Plan Submittal Response to Correction Letter # X Response to Incomplete Letter # 1 Revision # After Permit Issued DEPARTMENTS: 1 431--19-°Y J uildi Divisi n r Public orks Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete n DUE DATE: 01 -27 -09 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route Structural Review Required No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Notation: L Approved with Conditions n DUE DATE: 02 -24 -09 Not Approved (attach comments) REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: C)- 1094t A Departments issued corrections: Bldg Fire ❑ Ping ❑ PW'' Staff Initials: /' ✓ Documents/routing slip.doc 2 -28 -02 • PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: PG08 -298 PROJECT NAME: WETZEL'S PRETZELS DATE: 12 -18 -08 SITE ADDRESS: 2800 SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter.# Response to Correction Letter # Revision # After Permit Issued DEPA TMENTS: ui 1 g Division Public Works Fire Prevention Structural Planning Division nPermit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete n Comments: Incomplete DUE DATE: 12-23-08 Not Applicable ❑ Permit Center Use Only 11 ��,, ,p INCOMPLETE LETTER MAILED: ill L ? LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route n Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DUE DATE: 01-20-09 DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: -406 Plan Check/Permit Number: PGO8-298 ❑ Response to Incomplete Letter # ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Wetzel's Pretzel Project Address: 2800 Southcenter Mall, K -2678 Contact Person: o,6u) Phone Number: C20-0 ZZ g vtr-1 Summary of Revision: ple .-ee c„-- -t1 Le, r, CITY OF TUKWILA FEB 04 2009 a €PJI CSNTGP Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: kr Entered in Permits Plus on 1' \applications \forms- applications on line\revision submittal Created: 8 -13 -2004 Revised: • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: Plan Check/Permit Number: © "sponse to Incomplete Letter # r ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued 0 Revision requested by a City Building Inspector or Plans Examiner We/17/€4,ff elf.O&C c4' 33 _. . ' 440 'Aka) Phone Number: !fib 7 Project Name: Project Address: Contact Person: 4; Summary of Revision: A RECEIVED CiTy of 009 pERnaly CAA Sheet Number(s): "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on \applications \forms- applications on line\revision submittal Created: 8 -13 -2004 Revised: Untitled Page • • General /Specialty Contractor A business registered as a construction contractor with LEtI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company ENDURABUILT INC 3604271581 851 SE SOMERS DR SHELTON WA 98584 MASON Corporation UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License ENDUR * *964CQ Next License Associated License Specialty 1 GENERAL Specialty 2 UNUSED 602673124 ACTIVE ENDURI *930BH CONSTRUCTION CONTRACTOR 1/8/2007 1/8/2011 Business Owner Information Name Role Effective Date Expiration Date LAWSON, CRAIG PRESIDENT 01/08/2007 Bond Amount LAWSON, MARCIA SECRETARY 01/08/2007 SG1707 LAWSON, MARCIA VICE PRESIDENT 01/08/2007 Bond Information Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 CBIC SG1707 12/14/2006 Until Cancelled $12,000.00 01/08/2007 Insurance Information Page 1 of 1 Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 2 OHIO CAS INS CO BHO0953052113 06 /08/2008 06/08/2009 $1,000,000.00 06 /02/2008 1 OHIO CAS INS CO BH00753052413 06/08/200606/08 /2008 $1,000,000.0005 /25/2007 https:// fortress .wa.gov /lni/bbip/Detail. aspx ?License= ENDURI *930BH 02/12/2009 Q EXISTING L = LANDLORD DESCRIPTION 0 = OWNER • NEW C = CONTRACTOR FURNISH BY INSTALL BY GENERAL L 0 C L o c BUILDING PERMIT BY TENANT (PICKED UP AND PAID FOR BY T.G.C.) DAR • A PLAN CHECK FEES • A ALL OTHER PERMITS • INSPECTIONS AND INSURANCE • TEMPORARY POWER 0 BARRICADE, IF REQUIRED 0 • CLEAN UP • CONCRETE SLAB 0 0 CONCRETE SLAB WORK —SAW CUT SLAB & CORE DRILLING • KIOSK a •• KITCHEN EQUIPMENT (REFER TO KITCHEN EQUIPMENT SCHEDULE) • • MALL FLOORING KIOSK AS REQUIRED 0 • C 0 ILLUMINATED KIOSK SIGN GENERAL CONTRACTOR TO COORDINATE INSTALLATION WITH VENDOR 40 • KIOSK ANCHORAGE TO FLOOR 4 0 KIOSK INTERIOR /EXTERIOR TILE BASE • ID PREZEL MOSAIC ON EXTERIOR OF KIOSK FACE(S) • • A\ Date 12/09/08 Description CITY COMMENTS By MTC L 1/22/09 CITY COMMENT DAR A A A A PROJECT TEAM WETZELS PRETZELS FRANCHISEE ARCHITECT: LANDLORD: PROJECT MANAGER: BUILDING INFOI vIATION PROJECT ADDRESS: TENANT OCCUPANCY: NUMBER OF STORIES: APPLICABLE CODES: PROPOSED USE: KIOSK LEASE AREA NUMBER OF EMPLOYEES (AT ONE TIME): EGRESS REQUIREMENTS: TOILETS REQUIRED: CI1AI CHAO 10821 RAINIER AVENUE SOUTH SEATTLE, WA 98178 TEL: (206) 228 -1498 MICHAEL R. BLACK 3100 E. RANDOL MILL RD. ARLINGTON, TX TEL: (817) 701 -4819 FAX: (817) 633 -4153 WESTFIELD, LLC 11601 WILSHIRE BLVD., 14TH FLOOR LOS ANGELES, CA 90025 ATTN: SUZANNE ESCABAR PHONE: (310) 689 -5643 LAURIE KEYS 11 WELLINGTON PLACE ALISO VIEJO, CA 92656 PHONE (949) 215-3187 FAX (949) 215-2161 SOUTHCENTER MALL 633 SOUTHCENTER KIOSK SPACE #9240 SEATTLE, WA 98188 M, MERCANTILE LEVEL 2 OF 2 BUILDING: 2006 INTERNATIONAL BUILDING CODE MECHANICAL: 2006 INTERNATIONAL MECHANICAL CODE PLUMBING: 2006 INTERNATIONAL PLUMBING CODE ELECTRICAL: 2005 NATIONAL ELECTRICAL CODE FIRE: 2006 INTERNATIONAL FIRE CODE ENERGY: 2006 WA STATE ENERGY CODE FOOD RETAIL 180 SQUARE FEET 3 MAX. 1 REQUIRED, 1 PROVIDED PUBLIC RESTROOMS PROVIDED BY LANDLORD ABBREVIATIONS ABV ADJ AFT' ACT A/C ALT ARCH BLKG BD BLDG CLR CLG CONC COL CMU CONST DTL DIAM DIM DR DWG DISP (E), EX EA EL, ELEV ELECT EQ EXT FES FF FLR FLUOR FOF FOS FIN FRP FO GA GC GL GYP HORIZ INT INSUL MAX MECH MIN (� NIC NTS 0/ 0.C. 0.S.C.I. PSI PLAN PLYWD R.G.P. SHT SIM SQ SS TBD TYP UBC UON UTR VIF WH ABOVE ADJACENT ABOVE FINISHED FLOOR ACOUSTICAL CEILING TILE AIR CONDMONING ALTERNATE ARCHITECTURAL) BLOCKING BOARD BUILDING CLEAR CEILING CONCRETE COLUMN CONCRETE MASONRY UNIT CONSTRUCTION DETAIL DIAMETER DIMENSION DOOR DRAWING DISPENSER EXISTING EACH ELEVATION ELECTRICAL EQUAL EXTERIOR FIXTURE EQUIPMENT SUPPLIER FINISHED FLOOR FEET FLOOR FLUORESCENT FACE OF FINISH FACE OF STUD FINISH(ED) FIBERGLASS REINFORCED PANEL FACE OF GAUGE GENERAL CONTRACTOR GLAZING, GLASS GYPSUM HORIZONTAL INTERIOR INSULATION MAXIMUM MECHANICAL MINIMUM METAL NEW NOT IN CONTRACT NOT TO SCALE OVER ON CENTER OWNER SUPPLIED/ CONTRACTOR INSTALLED POUNDS PER SQUARE INCH PLASTIC LAMINATE PLYWOOD REFLECTED CEILING PLAN SHEET SIMILAR SQUARE STAINLESS STEEL TO BE DETERMINED TYPICAL UNIFORM BUILDING CODE UNLESS OTHERWISE NOTED UP THROUGH ROOF VERIFY IN FIELD WATER HEATER KEY PLAN VENDOR UST FRESH PRETZELS LEMONADE HOT DOGS SOUTHCENTER MALL SEATTLE, WA KIOSK: EQUIPMENT: SCOPE JDpDVAtJEl THE CARRIAGE WORKS, INC. 1877 MALLARD LANE KLAMATH FALLS, OR 97601 ATTN: DAN DAWSON PHONE: (541) 882 -0700 EDWARD DON & CO. 2500 S. HARLEM AVE. N. RIVERSIDE, IL 60546 ATTN: STEVE WISHON PHONE (800) 677 -4366 EXT. 8526 INSTALLATION OF U.L. AND N.S.F. LISTED KIOSK. UTILITIES TO KIOSK BY LANDLORD. FINAL CONNECTIONS BY G.C. G.C. SHALL PATCH /REPAIR MALL FLOORING AT NEW PLUMBING /ELECTRICAL WORK. ALL MATERIALS NOT PART OF PREFABRICATED KIOSK, SUPPLIED /INSTALLED BY G.C. G.C. SHALL TURN —OVER FULLY OPERATIONAL KIOSK. RECEIPT OF OWNER PROVIDED ITEMS NOTE: ITEMS PROVIDED BY TENANT: THE TENANTS GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR RECEIPT AND SUBSEQUENT PROTECTION OF ALL ITEMS WHICH ARE FURNISHED BY TENANT AND ARE TO BE INSTALLED BY TENANT'S GENERAL CONTRACTOR. ITEMS PROVIDED BY TENANT WILL BE INDICATED ON THE EQUIPMENT RESPONSIBILITY SCHEDULE SHEET AND THE MECHANICAL AND ELECTRICAL SCHEDULE SHEET. IN AN EFFORT TO BETTER ASSIST YOU IN THE EVENT OF POSSIBLE FREIGHT DAMAGE, WE ARE REQUESTING THAT YOU DO THE FOLLOWING PRIOR TO SIGNING THE CARRIER'S PROOF OF DELIVERY. WITHOUT ANY NOTATION OF DAMAGES ON THIS DOCUMENT, WE CANNOT PURSUE THE CARRIER FOR REPLACEMENT AND /OR REPAIR COSTS FOR THE ITEM(S). IN THE EVENT THAT DAMAGES ARE NOT NOTED, EDWARD DON & COMPANY WILL NOT BE HELD LIABLE FOR THESE ASSOCIATED COSTS. • INSPECT, THOROUGHLY, THE OUTER PACKAGING OF THE FOOD SERVICE EQUIPMENT PRIOR TO SIGNING THE CARRIER'S PROOF OF DELIVERY. • IF THERE IS VISIBLE DAMAGE TO THE PACKAGING, NOTE THE EXCEPTION, IN DETAIL, THE DAMAGE WHICH SHOULD INCLUDE THE MAKE, MODEL, AND QUANITY. THERE SHOULD NEVER BE STATEMENTS WRITTEN SUCH AS "JUST A SCRATCH, OR DAMAGED BOX ". STATEMENTS LIKE THESE GIVES THE CARRIER JUSTIFICATION FOR DENYING CLAIMS IF WE HAVE TO REPLACE OR REPAIR THE DAMAGED ITEM. • IF THE SHIPMENT IS LABELED AS "FRAGILE ", YOU HAVE THE RIGHT TO OPEN AND INSPECT THE CONTENTS BEFORE SIGNING THE CARRIER'S PROOF OF DELIVERY. THIS SHOULD ALWAYS BE THE CASE WHEN YOU ARE RECEMNG DISPLAY GLASS CASES. • APPARENT EXTREME DAMAGES TO FREIGHT SHOULD ALWAYS BE REFUSED. IF FREIGHT IS REFUSED, EDWARD DON & COMPANY SHOULD BE NOTIFIED IMMEDIATELY SO THAT WE CAN ENSURE THAT A REPLACEMENT IS SHIPPED. • DAMAGES TO TRUE SHIPMENTS SHOULD ALWAYS BE REFUSED. NOTIFY EDWARD DON & COMPANY AND A REPLACEMENT WILL BE SHIPPED. • IT IS IMPERATIVE THAT ALL FREIGHT BE OPENED WITHIN 15 DAYS OF DELIVERY. THIS IS THE CUT —OFF POINT FOR FILING FREIGHT CLAIMS IN THE EVENT OF A CONCEALED DAMAGE ISSUE. AFTER THIS 15 DAY TIME PERIOD HAS LAPSED, WE HAVE NO RECOURSE IN FILING A FREIGHT CLAIM AGAINST THE CARRIER. EDWARD DON & COMPANY W,LL NOT BE HELD LIABLE IN THE EVENT THAT WE ARE NOT NOTIFIED OF CONCEALED DAMAGES WITHIN 15 DAYS OF THE DELIVERY. FRESH PRETZELS LEMONADE HOT DOGS KIOSK SPACE #9240 �at..w fu t 11 H iluilLE VICINITY MAP SEPARATE PERMIT REQUIRED FOR: Mechanical Electrical [ Plumbing Et Gas Piping City of Tukwila BUILDING DIVISION REVISIONS No changes shall be d to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. 1 DRAWING INDEX ARCHITECTURAL A0.1 RESPONSIBILITIES, INDEX, AND BLDG. INFO A0.2 SPECIFICATIONS A0.3 SPECIFICATIONS A1.1 MALL KEY PLAN AND STORAGE PLAN KI.1 KIOSK DRAWINGS K1.2 KIOSK DRAWINGS K1.3 KIOSK DRAWINGS K1.4 KIOSK DRAWINGS ELECTRICAL El POWER PLAN AND LIGHTING PLAN ES1 ELECTRICAL SPECIFICATIONS PLUMBING P1 PLUMBING PLANS AND DETAILS PS1 PLUMBING SPECIFICATIONS AND DETAILS RESPONSIBILITIES MAP ST' L Ik" J a .+ cy {I I itl IVI,V ^av t. r' "gip ���4r ".i ILtlalLir,u ultlui:'V tlh�,t4tl xrgsr, ,pr,nos iilt>'r itti 3f ! "itf'I a 16 ist ^,r 1640 St i1 Ph at •l s 16th Ln 691 2000 e, +n¢ "a 1.w•sl int I,2nd St INCOMPLETE GO n 5rr hQ 11 hl IIWtl����Y�7 it 7 +ir�rrm.,, r , s 1'..2nd 6.1 ,jam " COMPL i+ tititD FUR � aCr�,/p E 1 I PPROVE FEB 11 24111c1 City 1 1 kwila I / BUILDI 0 VLSI( By Date: _ City Of Tukwila BUILDING DIVISION lW W +SmId F liasvvriis xsrile ur' I ° 'l l ll , l� IPI ° I tll p ll' ll i l ��l lll ll llli � ltll � l l %vans f.IISCk Lir f {, Lt I rt•ck Ur FILE COPY Permit Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approve i ield Copy and conditions is acknowledged 5 �. R CEIVIED JAN 2 3 2008 PERMIT CENTER T6 dedgn gm] This document contains information proprietary to PDMS Design Group and is furnished in confidence for the limited purpose of evolution, bidding, review, or construction. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the prior written consent of PDMS Design Group Project Address Weasel's Preizels Southcenter 633 Sou hcenter Kiosk Space #9240 Seattle, WA 98188 Issue Date Revisions MICHAEL R. BLACK, AIA 3100 E. RANDOL MILL ARLINGTON, TEXAS 76011 817.701.4819 WASHINGTON REGISTRATION NO.: 9205 Sea rrrb 9205 1M9 Job Number RECO 2 7 itiIiy rUKV1 /I `�d By RER PUBLIC JAN W RKS APp Sheet Title Responsibilities, Drawing Index & Bldg. Info. Drawn By 3100 East Randal Mill Road Arlington, Texas 76011 817.633.4200 p • 817.633.4153 f 0 z w 0 0 w Sheet Number 1 O/14/08 C I ARCHITECT HAEL R. BLACK T E OF WASHINGTON 0 1 m • u u • tn v.) v) O 080294 ds A0.1 KIOSK PLUMBING FIXTURE SCHEDULE TAG DESCRIPTION MANUFACTURER MODEL # ACCESSORIES PLUMBING REMARKS WASTE I.W. VENT HS -1 HAND SINK PROVIDED AND INSTALLED BY KIOSK VENDOR TBD — — 2" — INDIRECT WASTE CONNECTION BY T.G.C. FS -1 FLOOR SINK JOSAM 49000 SERIES — 2" — 2" PROVIDE FLANGE AS REQUIRED. MS-1 MOP SINK STERN— WILUAMS MTB -2424 T -10 —VB SINK FITTING 3" - 2" FAUCET SHALL INCLUDE INTEGRAL VACUUM BREAKER 3C -1 3 —COMP SINK PROVIDED AND INSTALLED BY KIOSK VENDOR TBD — — 3" — INDIRECT WASTE CONNECTION BY T.G.C. WH -1 WATER HEATER PROVIDED AND INSTALLED BY KIOSK VENDOR TBD _ — 3/4" - INDIRECT WASTE CONNECTION BY T.G.C. 1+' GI -1 GREASE INTERCEPTOR SHIER PRODUCTS PATG -20 —LO INTEGRAL FLOW CONTROLLER 2" - 2" 20 GPM, 80 LB, 2" INLET, LOW PROFILE GREASE INTERCEPTOR FCO -1 FLOOR CLEANOUT JOSAM 56000 — * -- — PROVIDE FLANGE AS REQUIRED (* —SEE PLAN FOR SIZE) WCO -1 WALL CLEANOUT JOSAM 58790 — * — — PROVIDE FLANGE AS REQUIRED (* —SEE PLAN FOR SIZE) SD -1 SODA DISPENSER PROVIDED AND INSTALLED BY KIOSK VENDOR — — — — 3/4" INDIRECT WASTE CONNECTION BY T.G.C., PROVIDE WITH BFP— IM-1 ICE MACHINE PROVIDED AND INSTALLED BY KIOSK VENDOR — — — — 3/4" INDIRECT WASTE CONNECTION BY T.G.C., PROVIDE WITH BFP - HWD -1 HOT WATER DISPENSER PROVIDED AND INSTALLED BY KIOSK VENDOR — — — — — PROVIDE WITH BFP -2 BACKFLOW PREVENTER SCHEDULE EQUIP. MARK SERVICE TYPE WATTS MODEL NO. BFP -1 MAIN SERVICE RPZ SERIES 009 BFP -2 HWD -1, IM -1 DUAL CHECK SERIES 7 BFP -3 SD -1 DUAL CHECK SERIES 9BD PROVIDE A RPZ BACKFLOW PREVENTER (WATTS SERIES 009) AT THE MAIN WATER SERVICE LINE ENTRANCE (VERIFY SIZE WITH DRAWINGS). PIPE DISCHARGE TO FLOOR SINK OR MOP SINK USING MANUFACTURER'S AIR GAP FITTING. PROVIDE BACKFLOW PREVENTION DEVICES AT ALL FOOD PREP SINKS, ICE MACHINES, CARBONATORS AND SIMILAR TYPES OF EQUIPMENT. THE CONTRACTOR IS TO CONFIRM THAT BACKFLOW PREVENTERS SPECIFIED ARE ACCEPTABLE TO THE CODE INSPECTOR. i Date 1/22/09 Description CITY COMMENT' A 2/2/09 CITY COMMENT A A A a� 1. General Notes: Keyed Notes: 7. 'VERIFY IN FIELD" OR "EXISTING" MEANS THE CONTRACTOR IS TO CONFIRM THE ITEM SHOWN ON THE DRAWING (I.E.EQUIPMENT, DUCT, WIRE, ETC.) EXISTS AT THE SITE AND IS IN GOOD WORKING CONDITION. SHOULD THE CONTRACTOR FIND THAT THE EQUIPMENT, DUCT, WIRE, ETC. IS NOT THE EQUAL TO THAT SHOWN ON THE DRAWING, R IS TO BE REPLACED. IF THE CONTRACTOR HAS ANY QUESTION ABOUT WHETHER IT IS EQUAL TO WHAT IS SHOWN ON THE DRAWING, THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER AND TENANT'S PROJECT MANAGER FOR APPROVAL, CONTRACTOR IS TO NOTIFY TENANT'S PROJECT MANAGER AND DESIGN ENGINEER IN WRMIING OF ALL REPLACEMENT ITEMS PRIOR TO CONSTRUCTION. 2. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO THE BUILDING STRUCTURE OR BUILDING UTILMMIES CAUSED BY ANY SLAB PENETRATIONS. IT IS RECOMMENDED THE FLOOR BE X —RAYED PRIOR TO ANY SLAB PENETRATIONS. 3. THE GENERAL CONTRACTOR AND MECHANICAL SUB — CONTRACTOR SHALL VERIFY AND INCLUDE IN THEIR FINAL BID ALL LIFE SAFETY, SMOKE /FIRE ALARM SYSTEMS NEEDED TO BRING TENENTS SPACE COMPATIBLE WMMH THE LANDLORD'S SYSTEM, AND CURRENT WITH LOCAL AND STATE CODES. FAILURE TO DO SO SHALL RESULT IN NO EXPENSE TO THE TENANT. CONNECT TO EXISTING DOMESTIC WATER PIPING PROVIDED BY LANDLORD. COORDINATE EXACT LOCATION FOR STUB —UP WITH KIOSK MANUFACTUERER. PROVIDE BACKFLOW PREVENTER (BFP -1) IN ACCESSIBLE LOCATION AT SERVICE ENTRANCE. SINKS ARE PROVIDED BY KIOSK MANUFACTURER WMMI KIOSK. PLUMBING CONTRACTOR SHALL SUPPLY AND INSTALL INDIRECT WASTE AND VENT LINES. PROVIDE STUDOR TEC —VENT SIZED FULL SIZE OF VENT PIPING. PROVIDE STUDOR WALL BOX TO PROVIDE ACCESS AND AIRFLOW. STUDOR VENT MUST BE INSTALLED A MINIMUM OF 8" ABOVE FLOOD RIM OF HIGHEST FIXTURE BEING SERVED. WATER HEATER PROVIDED AND INSTALLED BY KIOSK VENDOR. PROVIDE DRAIN PAN WITH DRAIN LINE. T.G.C. SHALL VERIFY CLEARANCE REQUIREMENTS AND ADJUST LOCATION AS REQUIRED. 0 CONNECT NEW SANITARY WASTE LINE TO EXISTING LANDLORD SERVICE, COORDINATE EXACT LOCATION FOR STUB —UP WITH KIOSK MANUFACTUERER. VERIFY ELEVATIONS OF PIPE ALLOWS FOR PROPER SLOPE OF WASTE LINES. 0 VENT LINES MUST EXTEND A MINIMUM OF 6" ABOVE FLOOD RIM OF C 3— COMPARTMENT SINK BEFORE JOINING TOGETHER. N� h IWCO -1 NOTE: CONTRACTOR SHALL COORDINATE ROUTING OF ALL WASTE PIPING WITH KIOSK MANUFACTURER PRIOR TO INSTALLATION. Kiosk Sanitary Sewer Riser SCALE None ALL SANITARY SEWER PIPING j CAST IRON. DO NOT USE P.V.C, SANITARY PIPING IS TO SLOPE AT 1)4" PER FOOT, PIPING LEGEND • — HOT WATER -- — FILTERED WATER - — VENT SANITARY SEWER CONNECTION TO EXISTING COR42ECiiON COLD WATER mink vveu rut( �I ����O RECEIVED 1 1 �►�,►.� F EB � Zoos S a T &TujIa P UBLIC a W RK BUILDING OMSZQN , Kiosk Plumbing Plan SCALE 1/4" is t� P608 299 RECEIVED FEB 0 4 2009 PERMIT CENTER : p am TS .mow l"""'1� Msi'` r"..r�w..'rn'a :w21 °'w MI r or Goldman, ri dowsed r le minim r Yr u rr ■w rt w rt r oiw MWt rr irMr� er"rr"k !f rrMi rw Nar Project Address 3100 East Rondo! Mill Road Arlington, Texas 76011 817.633.4200 p • 817.633.415. Wetsel's Pretzels Southcenter 633 Southcenter Kiosk Space #9240 Seattle, WA 98188 Issue Date Revisions CJ) CD 0 D w D 0 w J 10/14/08 MICHAEL R. BLACK, AI 3100 E. RAMOL MIL ARLINGTON, TEXAS 76011 817.701.4819 WASHINGTON REGLSTRATION NO.: 1 Seal m b ICHAEL R. BLACK STATE OF WASHINGTON C9 a5 EINNINIERNEI Job Number Drawn By Appvid By Sheet Title Sheet Number REGISTERED 11CHITECT JLP DAR Plumbing Plans and Details P1 080294 T.G.C. TO CORE DRILL SLAB AS INDICATED - LOCATION TO BE COOR- DINATED W /LL,'S SITE REPRESENTATIVE, EXISTING SLAB, SEALANT FINISHED FLOOR CONCRETE SLAB TOP OF STRUCTURE AT FIRST FLOOR. NEOPRENE SEAL CLEANOUT PLUG FINISHED FLOOR WATERPROOF MEMBRANE WATERPROOF EAAl SEALANT CONCRETE SLAB TOP OF FIRST FLOOR STRUCTURE 3" CAST IRON DRAIN PIPE W/P -TRAP TO TENANT'S SANITARY SEWER. Penetration Detail SCALE: None Clean Out Detail sC.Aue: None Floor Drain Detail SCALE: None ce Bin Section Detail LEMONADE TOWER ICE BIN FILL W /SEALANT CONTINUOUS, WATERTIGHT & FIREPROOF. - SCHEDULE 40 GALV. PIPE SLEEVE - 2" MINIMUM ABOVE CONC. SLAB. PIPE OR CONDUIT. SEALANT 4" CAST IRON PIPE TO TENANT'S SANITARY SEWER 3/8" COPPER LINE TO TRAP PRIMER AIR GAP 10 GALLON REMOVABLE WASTE THE GENERAL CONDITIONS OF THE CENERAL SPECIFICATIONS, ALONG WITH ALL APPLICABLE INSTRUCTIONS TO BIDDERS, SHALL FORM A PART OF THIS SECTION OF THE SPECIFICATIONS. REFERENCE IS MADE TO REQUISITES FOR BIDDERS AND CONTRACTORS UNDER OTHER SECTIONS OF THESE SPECIFICATIONS, WHICH SHALL BE CONSIDERED BINDING, UNLESS OTHERWISE NOTED, UNDER THIS SECTION. SCOPE EACH CONTRACTOR SHALL BECOME THOROUGHLY ACQUAINTED WITH THE CONSTRUCTION DETAILS BEFORE SUBMITTING BID. NO ALLOWANCES WILL BE MADE BECAUSE OF THE CONTRACTOR'S UNFAMILIARITY WITH THESE DETAILS. ALL PERFORMANCE OF CONSTRUCTION SHALL BE AS REQUIRED BY THE PACE OF THE GENERAL CONSTRUCTION. INSPECTION OF snE PROPOSALS ARE ACCEPTED WITH THE ASSUMPTION THAT CONTRACTOR IS FAMILIAR WITH JOBSITE CONDITIONS AND UTILITY LOCATIONS, THE LACK OF SPECIFIC INFORMATION ON THE DRAWINGS SHALL NOT RELIEVE THE CONTRACTOR OF ANY RESPONSIBILITY. PEWITS ALL PERMITS AND LICENSES NECESSARY FOR THE PROPER EXECUTION OF THE WORK SHALL BE SECURED AND PAID FOR BY THE SUBCONTRACTOR INVOLVED. BODE REQUIREMENTS ALL WORK UNDER THIS CONTRACT SHALL COMPLY WITH THE PROVISIONS OF THE SPECIFICATIONS, DRAWINGS AND OWNER'S INSTRUCTIONS, AND SHALL SATISFY ALL APPLICABLE CODES, ORDINANCES, OR REGULATIONS OF THE GOVERNING BODIES, WHETHER SO SHOWN OR NOT. ALL MODIFICATIONS REQUIRED BY SUCH AUTHORITIES SHALL BE MADE BY THE CONTRACTOR WITHOUT ANY ADDITIONAL COST TO THE OWNER. MAMMALS AND WORIGAANSHP 1, ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT SHALL BE APPLIED AS RECOMMENDED BY THE MANUFACTURERS AND, UNLESS OTHERWISE SPECIFIED, SHALL BE NEW AND FREE FROM ANY DEFECTS. ALL LIKE MATERIALS USED SHALL BE OF THE SAME MANUFACTURE AND QUALITY UNLESS OTHERWISE SPECIFIED, 2. ALL WORK UNDER THIS CONTRACT SHALL BE PERFORMED BY COMPETENT WORKMEN AND EXECUTED IN A NEAT AND WORKMANLIKE MANNER.' WORK SHALL BE PROPERLY PROTECTED DURING CONSTRUCTION AND, UPON COMPLETION, THE INSTALLATION SHALL BE THOROUGHLY CLEANED AND ALL DEBRIS REMOVED FROM THE SITE, CODES AND REGLIUMOM EACH SUBCONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, RULES AND REGULATIONS BEARING ON THE CONDUCT OF THE WORK AS DRAWN OR SPECIFIED, IF A SUBCONTRACTOR OBSERVES THAT THE DRAWINGS AND SPECIFICATIONS ARE AT A VARIANCE WITH SUCH CODES, HE /SHE SHALL PROMPTLY NOTIFY THE GENERAL CONTRACTOR AND THE TENANT IN WRITING. IF ANY SUBCONTRACTOR PERFORMS ANY WORK KNOWING IT TO BE CONTRARY TO LAWS, ORDINANCES, RULES AND REGULATIONS AND WITHOUT GIVING SUCH NOTICE, THE SUBCONTRACTOR SHALL BEAR ALL COSTS ARISING THEREFROM. PROTECTION OF WORK AND PROPERTY 1. EACH SUBCONTRACTOR SHALL CONTINUOUSLY MAINTAIN ADEQUATE PROTECTION OF ALL HIS /HER WORK FROM DAMAGE AND SHALL PROTECT THE OWNER'S PROPERTY FROM INJURY OR LOSS ARISING FROM HIS /HER WORK. HE /SHE SHALL MAKE GOOD ANY SUCH DAMAGE, INJURY, OR LOSS, EXCEPT SUCH AS MAY BE DIRECTLY DUE TO CAUSES BEYOND HIS /HER CONTROL AND NOT TO HIS /HER FAULT OR NEGLIGENCE. HE /SHE SHALL ADEQUATELY PROTECT ADJACENT PROPERTY AS WELL 2. EACH SUBCONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS FOR THE SAFETY OF THEIR EMPLOYEES ON THE JOB AND SHALL COMPLY WITH ALL PROVISIONS OF FEDERAL, STATE AND LOCAL BUILDING CODES AND SAFETY LAWS TO PREVENT ACCIDENTS OR INJURY TO PERSONS ON OR ADJACENT TO THE PREMISES WHERE THE WORK IS BEING PERFORMED, EACH SUBCONTRACTOR SHALL MAINTAIN ALL INSU,',ANCE REQUIRED TO PROTECT HIMSELF /HERSELF, OWNER AND TENANT FOR THE DURATION OF THE WORK AGAINST PROPERTY DAMAGE AND PUBLIC LIABILITY. aiANGES IN 1HE WORK THE TENANT, WITHOUT INVALIDATING THE CONTRACT, MAY ORDER EXTRA WORK OR MAKE CHANGES BY ALTERING, ADDING TO OR DEDUCTING FROM THE WORK, THE CONTRACT SUM BEING ADJUSTED ACCORDINGLY. COOPERATION ALL WORK UNDER THESE SPECIFICATIONS SHALL E3E ACCOMPLISHED IN CONJUNCTION WITH OTHER CONTRACTORS AND TRADES OF THIS PROJECT IN A MANNER WHICH WILL ALLOW EACH CONTRACTOR AND TRADE ADEQUATE TIME AT THE PROPER STAGE OF CONSTRUCTION TO FULFILL HIS /HER CONTRACTS. THE OWNER SHALL BE CONSULTED TO RESOLVE ANY QUESTIONS WHICH MIGHT ARISE BETWEEN TRADES AS TO THE PLACING OF LINES, DUCTS, CONDUITS, FIXTURES, OR EQUIPMENT, OR SHOULD IT APPEAR DESIRABLE TO REMOVE ANY GENERAL CONSTRUCTION WHICH WOULD AFFECT THE APPEARANCE OF STRENGTH OF THE STRUCTURE, SUBSII WTON CF MATERAS MANUFACTURER'S NAMES ARE LISTED HEREIN TO ESTABLISH A STANDARD, THE PRODUCTS OF OTHER MANUFACTURERS WILL BE ACCEPTABLE, IF IN THE OPINION OF THE TENANT, THE SUBSTITUTE MATERIAL IS OF A QUALITY AS GOOD OR BETTER THAN THE MATERIAL SPECIFIED, AND WILL SERVE WITH EQUAL EFFICIENCY AND DEPENDABILITY, THE PURPOSE FOR WHICH THE ITEMS SPECIFIED WERE INTENDED. SHOP DRAWINGS SHOP DRAWINGS AND CATALOG DATA ON ALL MAJOR ITEMS OF EQUIPMENT AND SYSTEMS, AND SUCH OTHER ILLUSTRATIVE MATERIAL AS MAY BE CONSIDERED NECESSARY BY THE TENANT, SHALL BE SUBMITTED BY THE CONTRACTOR IN ADEQUATE TIME TO PREVENT DELAY AND CHANGES DURING CONSTRUCTION. DRAWDI SANDSPECIFICATIONS 1. THE DRAWINGS SHOW DIAGRAMMATICALLY THE LOCATIONS OF THE VARIOUS LINES, DUCTS, CONDUITS, FIXTURES, AND EQUIPMENT AND THE METHOD OF CONNECTING AND CONTROLLING THEM, IT IS NOT INTENDED TO SHOW EVERY CONNECTION IN DETAIL OR ALL FITTINGS REQUIRED FOR A COMPLETE SYSTEM, 2, SHOULD THE CONTRACTOR DEEM IT NECESSARY TO MAKE CHANGES TO ITEMS SHOWN ON CONTRACT DRAWINGS, THE SHOP DRAWINGS, DESCRIPTIONS, AND THE REASON FOR THE PROPOSED CHANGES SHALL BE SUBMITTED TO THE OWNER FOR APPROVAL. RESPONSIMUTY GUARANTEE GENERAL THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE SATISFACTORY AND COMPLETE EXECUTION OF ALL WORK INCLUDED IN HIS CONTRACT, HE /SHE SHALL PRODUCE COMPLETE FINISHED OPERATING SYSTEMS AND PROVIDE ALL INCIDENTAL ITEMS REQUIRED AS PART OF HIS /HER WORK, REGARDLESS OF WHETHER SUCH ITEM IS PARTICULARLY SPECIFIED OR INDICATED. ALL MATERIALS, EQUIPMENT, AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE (1) YEAR AFTER DATE OF ACCEPTANCE. THE COMPLETED SYSTEM SHALL BE FULLY OPERATIONAL AND ACCEPTANCE BY TENANT SHALL BE A CONDITION OF THIS CONTRACT. ALL WORK FOUND TO BE DEFECTIVE SHALL BE REPAIRED OR REPLACED BY THE SUB - CONTRACTOR WITHOUT ADDITIONAL CHARGE TO THE TENANT. MA'1I3kULS 1. SANITARY SEWER - CAST IRON OR COPPER PIPING MAY BE USED EXCEPT THAT ALL PIPING BELOW GRADE SHALL BE CAST IRON. VENTS TWO INCHES (2 ") IN SIZE AND SMALLER MAY BE EITHER SCHEDULED 40 GALVANIZED STEEL OR COPPER PIPING. 2. DOMESTIC WATER AND HOT WATER PIPING SHALL BE TYPE "L" COPPER INSULATED WITH 1" ARMAFLEX OR EQUIVALENT. 3. GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL WITH SCREWED FITTINGS. 4, CHILLED WATER SUPPLY AND RETURN PIPING SHALL BE GALVANIZED STEEL PIPE INSULATED WI H 1" TH THICK OWENS CORNING FIBERGLASS 25 ASJ /SSL OR EQUAL, MAKING UP PIPE CIFANOUT3 VALVES ROUGH-NS PLUMBING 1 SCREWED PIPE SHALL BE MADE UP WITH PIPE COMPOUND APPLIED TO HE MALE THREAD WITH NOT MORE THAN TWO THREADS LEFT EXPOSED PIPE SHALL BE REAMED AFTER THREAADING. 2. BELOW GRADE SANITARY PIPING SHALL BE CAST IRON PIPE AND SHALL BE OF THE HUB AND SPIGOT OR NO -HUB TYPE. INSTALLATION MUST MEET ALL PROVISIONS OF APPLICABLE CODE. ABOVE GRADE MAY BE PVC ONLY IF CODE AND LANDLORD ALLOW. 3, COPPER JOINTS SHALL BE MADE UP WITH 95 -5 SOLDER. (LEAD FREE) HANDERS AND SUPPORTS HORIZONTAL PIPING SHALL BE SUPPORTED AT INTERVALS NOT TO EXCEED 10' -O" WITH SWIVEL SPLIT PIPE HANGERS EQUAL TO CRANE NO. 199F OR GRINNELL NO. 104. VERTICAL PIPING SHALL BE SUPPORTED BY MEANS OF WROUGHT IRON CLAMPS SUSPENDED FROM THE UNDERSIDE OF STRUCTURE WITH HANGER RODS, CLEANOUTS SHALL BE AS MANUFACTURED BY JOSAM, ZURN MFG. CO. OR EQUAL AND SHALL BE INSTALLED AT ALL BENDS, ANGLES, AND ENDS OF ALL WASTE AND SEWER UNES, AS CALLED FOR ON THE DRAWINGS, AND AS REQUIRED BY LOCAL CODES. ALL CLEANOUTS SHALL BE BROUGHT TO GRADE, AND IN ALL CASES, SHALL BE PROVIDED WITH SUFFICIENT SPACE FOR RODDING. ALL VALVES SHALL BE BRASS AND MANUFACTURED BY CRANE, NIBCO, STOCKHAM, LUNKENHEIMER, NORDSTROM, GRINNELL OR EQUAL. FOR SECOND LEVEL STORES, THE TENANT'S GENERAL CONTRACTOR SHALL RUN ALL LINES REQUIRED FOR PLUMBING ROUGH -INS TIGHT AGAINST THE UNDERSIDE OF THE SECOND FLOOR LEVEL THE SECOND FLOOR STRUCTURAL SLAB SHALL BE CORED AS REQUIRED TO INSTALL THESE ITEMS AT THE LOCATIONS SHOWN ON THE PLANS, SPRINKLER SYSTEM 1, SHOP DRAWINGS: THE SPRINKLER CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND HYDRAULIC CALCULATIONS TO THE TENANT'S LANDLORD AND TO THE APPROPRIATE RATING BUREAU FOR THEIR APPROVAL. A COPY OF THE APPROVAL LETTER FROM THE RATING BUREAU SHALL BE FORWARDED TO THE TENANT AND TO THE LANDLORD. 2. SPRINKLER HEADS: SPRINKLER HEADS IN ENTRY AND SALES AREA SHALL BE CONCEALED TYPE WITH A WHITE CAP, STORAGE TOILET AND WORK AREAS WITH CEILINGS - BRASS PENDANT TYPE. STORAGE AND WORK AREAS WITHOUT CEILINGS - BRASS UPRIGHT TYPE. 3. ALL ADDITIONS TO OR MODIFACATIONS OF THE SPRINKLER SYSTEM SHALL BE IN ACCORDANCE WITH NFPA 13 AND LOCAL CODES. TEMPORARY SERVICES THE COMPACTOR SHALL PROVIDE THE POILOWNG MOW RIAAS OP TEMPORARY =RCM 1. TEMPORARY WATER - WATER REQUIRED IN THE PERFORMANCE OF THE CONTRACT SHALL BE PROVIDED AND PAID FOR BY THE CONTRACTOR. WATER USED FOR HUMAN CONSUMPTION SHALL CONFORM TO REQUIREMENTS OF STATE AND LOCAL AUTHORITIES FOR POTABLE WATER. 2. TEMPORARY HEAT - WHEN REQUIRED FOR PROPER INSTALLATION OR PROTECTION OF ANY PORTION OF THE WORK, THE CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY HEATING UNITS AS APPROVED BY THE LANDLORD OR LOCAL AUTHORITY. 3. COST OF LANDLORD PROVIDED UTILITY SERVICES - IF THE LANDLORD ELECTS TO PROVIDE TEMPORARY UTILITY SERVICES, THE CONTRACTOR WILL BE SO INFORMED BY THE TENANT. THE CONTRACTOR SHALL MAKE PROVISIONS OR COORDINATE WITH LANDLORD'S GENERAL CONSTRUCTOR TO PAY THE COST OF SAID TEMPORARY CONSTRUCTION AND UTIUTY SERVICES. NOTE FORM:N Wr GENERAL, CONTRACTOR: IT IS THE RESPONSIBILITY OF THE TENANTS GENERAL CONTRACTOR TO MAKE USE OF APPUCABLE NOTES & SPECIFICATIONS LISTED ON THIS SHEET AS THEY MAY PERTAIN TO THE SPECIFIC JOB, - EXISTING L - LANDLORD C - TENANTS GENERAL CONTRACTOR T - TENANT K - KJ TCHEN EQUIPMENT CONTRACTOR V - TENANT VENDOR A PLUMBING Art A B C A-2 A B C A-3 A B C M A B C M A C Ar6 APB A A.9 WATER CLOSETS WATER CLOSETS UNDERSLAB ROUGH -IN FINAL CONN. & VENTS LAVATORIES LAVATORIES UNDERSLAB ROUGH -IN FINAL CONN. & VENTS MOP SINK MOP SINK UNDERSLAB ROUGH -IN FINAL CONN. & VENTS FLOOR SINK FLOCR DRAINS UNDERSLAB ROUGH -IN FINAL CONN. & VENTS CLEANOUTS CLEANOUTS B UNDERSLAB ROUGH -IN FINAL CONN. & VENTS THREE COMPARTMENT SINK A THREE COMPARTMENT SINK B INDIRECT WASTE C FINAL CONNECTION A-7 ELECTRIC WATER HEATERS A ELECTRIC WATER HEATER B FINAL CONN. C INSULATION - HOT WATER UNE HANDWASH SINK HANDWASH SINK B INDIRECT WASTE C FINAL CONNECTION MISCELLANEOUS WATER METER DEPOSIT ONLY (IF REQUIRED) B TELE. SVC, TO /INCL. PREMISES C HOT WTR. SUP. & RET. PIPES & INSUL, D CONTROLS - CH. & HOT WTR. PIPING E AU.. TAP FEES (IF REQ'D.) A•10 SPRINKLER SYSTEM A ENGINEERING B EQUIPMENT A-11 GREASE TRAP A GREASE TRAP B UNDERSLAB ROUGH -IN C FINAL CONN. & VENTS RESPONSIBILITIES RESPONSIBILITY NOTES CODE COMPLIANCE • APPqovED 1 i 1 1 71lf-1 City Of Tukwila INDIVISION C V V V V C C C C C C C C C C C C C C V C 1. ROOF OPENINGS FOR PLUMBING AND RELATED WORK SHALL BE THE RESPONSIBILITY OF THE PLUMBING SUBCONTRACTOR. HE SHALL EMPLOY THE LANDLORD'S ROOFER FOR THIS WORK TO MAINTAIN THE ROOF BOND, 2. SANITARY SEWER AND DOMESTIC WATER, STUBBED INTO THE PREMISES BY THE LANDLORD. REFER TO SHEET P -1 FOR LOCATIONS. FIELD VERIFY LOCATIONS. 3. THE SPRINKLER CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE TENANT'S LANDLORD AND TO THE APPROPRIATE RATING BUREAU FOR APPROVAL. A COPY OF THE APPROVAL LETTER FROM THE RATING BUREAU SHALL BE FORWARDED TO THE TENANT AND LANDLORD AS LISTED ON SHEET T1. 4, THE TENANT'S GENERAL CONTRACTOR (T.G.C.) SHALL RUN PLUMBING LINES TIGHT TO THE SECOND FLOOR STRUCTURE. THE FLOOR SLAB SHALL BE CORED AS REQUIRED TO INSTALL SERVICE STUBS, FLOOR BOXES, ETC. 5. IF DRAWINGS CALL FOR THE REUSE OF EXISTING EQUIPMENT, THE TENANT'S GENERAL CONTRACTOR SHALL VERIFY THAT ALL SUCH EQUIPMENT IS IN PROPER WORKING ORDER, OR TAKE THE NECESSARY STEPS TO ACCOMPLISH SUCH, IF REPLACEMENT IS REQUIRED, USE THE EQUIPMENT AND HARDWARE AS SPECIFIED ON THESE SCHEDULES OR AS CALLED OUT IN THE SPECIFICATIONS ON THIS SHEET. ALL SUCH ITEMS MUST MEET ALL GOVERNING CODES AND STANDARDS OF PRACTICE. CITY OF TI U RECEIVED CITY DEC 1 8 7111t PERMIT CENTER P N V C C V V V V C C C C C C C C C C C C C C Seal APIYM By 3100 East Rondo! Mill Road Arlington, Texas 76011 817.633.4200 p o 817.633.4153 f This document contains information proprietary to PUNS Design Group end is furnished in confidence for the limited purpose of evaluation, bidding, review, or construction. This document or its contents moy not be used for any other purpose and may not be reproduced or disclose to others without the prior written consent of PDNS Design Croup Proled Mdrus Wetsel's Pretzels Southcenter 633 Southcenter Kiosk Space #9240 Seattle, WA 98188 Issue Dab 10/14/08 mb MICHAEL R. BLACK, AIA 3100 E. RANDOL MILL ARLINGTON, TEXAS 76011 817.701.4819 WASHINGTON REGISTRATION NO.: 92Q. 9205 Job Number Drawn By HAEL R. BLACK ATE OF WASHINGTON wasivrossossysvvrossorow Sheet Number REGISTERFO tlftC� JLP DAR cNi gi 0 0. U u CD Q V) 2 (0 080294 P51 Sheet nth Plumbing Specifications and Details >0