HomeMy WebLinkAboutReg 2014-09-02 Item 2C - 2015-2016 Biennial Budget Update - Tab 14: Proposed 2015-2020 Capital Improvement Program - Enterprise FundsCITY OF TUKWILA
Washington
Proposed
2015 — 2020
CAPITAL IMPROVEMENT
PROGRAM
Enterprise Funds
September 2, 2014
ATTACHMENT D
City of Tukwila
WATER ENTERPRISE FUND
2015 - 2020 Analysis in 000's
REVENUES
2012 2013 2014 2014
Actual Actual Budget Estimate
Monthly Water Charges (1)
Cascade Water Alliance (CWA)
Regular City Water
Subtotal Water
Other Miscellaneous Revenue
Interlocal Ags \PWTF \Grants
Water Connection Fees (2)
Total Revenues
EXPENDITURES
Base Base
+54
2,198 2,331 2,310 2,310
2,955 3,257 3,207 3,207
5,153 5,588 5,517 5,517
193 151 130 40
4 127 0 0
4 84 50 18
5,354 5,950 5,697 5,575
CWA Purchased Water t't 2,198 2,331 2,310 2,310
Water Operations Sr Maintenance 1,689 1,846 1,827 1,827
Debt Service (4) 555 536 555 555
Interfund Utility Tax (') 10% 518 562 565 556
Engineering Labor (') 62 64 76 75
Subtotal 5,022 5,339 5,333 5,323
Water Capital - CIP Program 191 125 1,455 1,159
Total Expenditures 5,213 5,464 6,788 6,482
FUND BALANCE
Change in Fund Balance t °�
Beginning Balance
Ending Balance
141 486 (1,091) (907)
6,043 6,078 6,786 6,542
6,184 6,564 5,695 5,635
2015 2016 2017 2018 2019 2020 Totals
+5% +5% +5% +54 +5% +5%
2,375 2,400 2,472 2,546 2,622 2,700 15,115
3,394 3,633 3,712 3,898 4,093 4,100 22,830
5,769 6,033 6,184 6,444 6,715 6,800 37,945
35 35 50 70 100 120 410
0 0 0 0 0 0 0
25 25 25 25 10 10 120
5,829 6,093 6,259 6,539 6,825 6,930 38,475
2,375 2,400 2,472 2,546 2,622 2,700 15,115
2,051 2,034 2,074 2,116 2,158 2,200 12,633
550 162 162 161 162 161 1,358
580 607 623 651 682 692 3,836
78 80 83 85 87 89 502
5,634 5,283 5,414 5,559 5,711 5,842 33,444
1,738 2,918 1,083 915 497 1,768 8,9J
7,372 8,201 6,497 6,474 6,208 7,610 42,31.
(1,543) (2,108) (238) 65 618 (680) (3,888)
5,635 4,092 1,984 1,746 1,810 2,428 5,635
4,092 1,984 1,746 1,810 2,428 1,748 1,748
Fund Balance:
Reserved "20% of revenue
1,070
1,078
1,165
1,115
1,166
1,219
1,252
1,308
1,365
1,365
Unreserved
5,494
4,617
4,471
2,977
818
527
559
1,120
383
383
Ending Balance
6,184
6,564
5,695
5,635
4,092
1,984
1,746
1,810
2,428
1,748
1,748
(°) Revenues in excess of (less than) expenditures
(b) Annual reserve balance requirement equals 20% of the prior year operating revenues.
2015 - 2020 Financial Planning Model
XXI I I 8/28/2014
ATTACHMENT E
City of Tukwila
SEWER ENTERPRISE FUND
2015 - 2020 Analysis in 000's
REVENUES
2012 2013 2014 2014
Actual Actual Budget Estimate
2015 2016 2017 2018 2019 2020 Totals
+20 °. +20% +15°. +15°.
Monthly Sewer Charges
King County Metro Sewer (1) 3,611 3,447 3,749 4,000
Regular City Sewer (2) 2,693 3,759 2,896 3,452
Subtotal Sewer Revenue 6,304 7,206 6,645 7,452
Other Misc. Revenue 200 143 150 130
Grant/ Bonds/ PWTF 2 45 705 250
Sewer Connection Fees ts] 104 249 120 150
Total Revenues 6,610 7,643 7,620 7,982
EXPENDITURES
Sewer Operations & Maintenance
King County Metro Sewer t41 3,611 3,447 3,749 4,000
Regular City Sewer (5) 1,106 1,081 1,012 1,112
Debt Service (6) 356 353 394 394
-rfund Utility Tax m 10% 647 737 680 758
- .tgineering Labor (9) 85 118 77 77
Subtotal 5,805 5,736 5,912 6,341
Sewer Capital - CIP Program 484 473 1,700 764
Total Expenditures 6,289 6,209 7,612 7,105
FUND BALANCE
Change in Fund Balance ta'
Beginning Balance
Ending Balance
321 1,434 9 877
1,890 2,199 2,259 3,595
2,211 3,633 2,268 4,472
+10: +5°e +5% +5°, +5°, +5°;
4,022 4,191 4,254 4,322 4,381 4,513 25,683
3,500 3,553 3,695 3,843 3,997 4,157 22,744
7,522 7,744 7,949 8,165 8,378 8,670 48,427
150 150 200 210 220 230 1,160
455 290 0 0 0 2,133 2,878
120 125 125 100 100 100 670
8,247 8,309 8,274 8,475 8,698 11,133 53,135
4,022 4,191 4,254 4,322 4,381 4,513 25,683
1,130 975 995 1,014 1,132 1,166 6,412
392 390 469 470 467 468 2,656
767 789 815 837 860 890 4,959
77 78 80 83 85 87 490
6,388 6,423 6,613 6,726 6,925 7,124 40,200
2,180 3,307 1,340 1,240 1,823 3,603 13,493
8,568 9,730 7,953 7,966 8,748 10,727 53,693
(321) (1,421) 321 508 (50) 406 (558)
4,472 4,151 2,729 3,050 3,559 3,509 4,472
4,151 2,729 3,050 3,559 3,509 3,914 3,914
Fund Balance:
Reserved -20% of prior year's revenue
1,322
1,104
1,520
1,520
1,558
1,604
1,655
1,695
1,740
1,740
Unreserved
2,311
1,163
2,952
2,631
1,171
1,447
1,904
1,814
2,175
2,175
Ending Balance 2,211
3,633
2,268
4,472
4,151
2,729
3,050
3,559
3,509
3,914
3,914
"" Revenues in excess of (less than) expenditures
2014 - 2019 Financial Planning Model XXV
8/28/2014
ATTACHMENT F
City of Tukwila
SURFACE WATER ENTERPRISE FUND
2015 - 2020 Analysis in 000's
REVENUES
A2012 ctual
Actual
zola
Actual
Budget
Budget
Estimate
Estimate
2015
2016
2017
2018
2019
2020
Total
+10%
+5:
+15%
+10%
+20%
+15%
1,292
+111%
+10%
+10%
+10%
Annual Billings (Current) (I)
3,669
3,845
4,217
4,222
5,066
5,825
3,987
6,408
7,049
7,754
8,529
40,631
Other Revenues
55
47
20
50
30
38
8,770
50
60
75
80
333
Grants /Bond Proceeds 121
131
27
335
355
6,165
1,105
1,243
3,495
45
95
12,148
Total Revenues
3,855
3,919
4,572
4,627
11,261
6,968
7,701
10,604
7,874
8,704
53,112
EXPENDITURES
•
Operations & Maintenance
1,445
1,556
1,752
1,752
2,030
1,912
2,061
2,143
2,332
2,426
12,904
Debt Service 131
308
315
314
315
313
312
311
310
308
307
1,861
Interfund Utility Tax 1 +1 10%
369
388
424
427
510
586
646
711
783
861
4,096
Engineering Labor f')
301
393
285
300
514
531
600
624
700
728
3,697
Subtotal
2,423
2,652
2,775
2,794
3,367
3,341
3,618
3,788
4,123
4,322
22,558
SSWVM Capital - CIP Program
1,170
1,046
3,565
3,243
7,775
3,226
3,025
5,505
2,015
1,020
22,566
Total Expenditures
3,593
3,698
6,340
6,037
11,142
6,567
6,643
9,293
6,138
5,342
45,124
FUND BALANCE
Change in Fund Balance 1a1
262
221
(1,768)
(1,410)
119
401
1,058
1,311
1,736
3,362
7,988
Beginning Balance
2,151
2,329
2,085
2,193
783
902
1,303
2,361
3,672
5,408
783
Ending Balance
2,413
2,550
317
783
902
1,303
2,361
3,672
5,408
8,770
8,770
Fund Balance:
Reserved t�120% of revenue
745
770
778
847
1,019
1,173
1,292
1,422
1,566
1,566
Unreserved
1,805
(453)
4
55
284
1,189
2,381
3,987
7,205
7,205
Ending Balance
2,413
2,550
317
783
902
1,303
2,361
3,672
5,408
8,770
8,770
1 °1 Revenues in excess of (less than) expenditures
rol Annual reserve balance requirement equals 20% of the prior year operating revenues.
2015 - 2020 Financial Planning Model XXV I
8/28/2014
ATTACHMENT G
City of Tukwila
GOLF ENTERPRISE FUND
2015 - 2020 Analysis in 000's
REVENUES
2011 2012 2013 2014 2014
Actual Actual Actual Budget Estimate 2015 2016 2017 2018 2019 2020 Total
Green Fees t1l 913 1,002 1,010 1,020 1,030 1,032 1,077 1,079 1,124 1,126 1,171 6,609
Merchandise Sales 130 140 135 137 150 150 150 150 150 150 150 900
Power Cart Rentals 159 174 185 176 176 176 177 178 179 180 180 1,070
Concession Proceeds 83 91 92 85 95 95 95 95 95 95 95 570
Other Revenue 19 42 24 24 24 24 25 26 26 27 27 155
Transfer In for Bond ('') 3,010 0 0 0 0 0 0 0 0 0 0 0
General Fund Contribution (`) 775 225 400 600 600 257 262 266 271 273 273 1,602
Total Revenues
EXPENDITURES
5,089 1,674 1,846 2,042 2,075 • 1,734 1,786 1,794 1,845 1,851 1,896 10,906
Operations & Maintenance tal 1,525 1,642 1,410 1,449 1,449 1,407 1,435 1,464 1,493 1,523 1,553 8,875
Admission Tax 54 59 60 56 56 60 60 60 60 60 60 360
Indirect Cost Allocation t'l 222 15 193 197 197 197 202 206 211 213 213 1,242
Debt Service (6) 339 0 0 0 0 0 0 0 0 0 0 0
Subtotal 2,140 1,716 1,663 1,702 1,702 1,664 1,697 1,730 1,764 1,796 1,826 10,477
Golf Capital - CIP Program 67 0 0 100 50 70 89 64 81 55 70 429
Total Expenditures 2,207 1,716 1,663 1,802 1,752 1,734 1,786 1,794 1,845 1,851 1,896 10,906
JND BALANCE
Change in Fund Balance t "l (128) (42) 183 240 323 0 0 0 0 0 0 0
Beginning Balance 280 140 404 537 610 933 933 933 933 933 933 933
Ending Balance 152 98 587 777 933 933 933 933 933 933 933 933
Fund Balance:
Reserved (b) 20% of revenue 335 369 369 415 347 357 359 369 370 379
Unreserved 252 408 564 518 586 576 574 564 563 554
Ending Balance 152 98 587 777 933 933 933 933 933 933 933 933
14 Revenues in excess of (less than) expenditures
(6) Annual reserve balance requirement equals 20% of the prior year operating revenues.
2015 - 2020 Financial Planning Model
XXIX 8/28/2014
Highline water district intertie
Water district 75 intertie
Water district #75 intertie
CIP
Page # PROJECT TITLE
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2015 - 2020
WATER ENTERPRISE FUND
401.98
* *Other After Six
2015 2016 2017 2018 2019 2020 TOTAL Sources Years
60 Interurban Water Reuse 25 25 25 25 25 25 150 0 0
61 Andover Park W /Strander New Water Main 270 0 0 0 0 0 270 0 0
62 58th Ave S Water Main Replacement 377 0 0 0 0 0 377 0 0
63 Macadam Rd S Water Upgrade 805 950 0 0 0 0 1,755 0 0
64 53rd Ave S Water Main Replacement 125 517 518 0 0 0 1,160 0 0
65 Andover Park E Water Main Replacement 136 1,426 0 0 0 1,743 3,305 0 0
66 Water Reservoir 1.5 million Gallon Capacity 0 0 500 445 0 0 945 0 4,027
67 Martin Luther King Jr Way S Water Main 0 0 40 260 117 0 417 0 0
68 Water Comprehensive Plan 0 0 0 125 125 0 250 0 0
69 Minkler Blvd Water Main Replacement 0 0 0 60 230 0 290 0 0
Crystal Springs Intertie with Highline WD 0 0 0 0 0 0 0 0 230
Southcenter Blvd Water Main Replacement 0 0 0 0 0 0 0 0 810
Minkler Blvd Water Looping 0 0 0 0 0 0 0 0 551
S 180th & W Valley Loop /Renton Turnover 0 0 0 0 0 0 0 0 1,015
Foster Area Water Upgrade 0 0 0 0 0 0 0 0 985
West Valley Hwy East Side Water Looping 0 0 0 0 0 0 0 0 1,010
West Valley Deep Water Main Replacement 0 0 0 0 0 0 0 0 380
65th Ave S Water Main Replacement 0 0 0 0 0 0 0 0 1,020
49th Ave S Water Main Replacement 0 0 0 0 0 0 0 0 770
S 180th St Water Main Replacement 0 0 0 0 0 0 0 0 462
Evans Black Dr Water Main Replacement 0 0 0 0 0 0 0 0 400
52nd Ave S Water Main Replacement 0 0 0 0 0 0 0 0 148
S 112 St Water Looping 0 0 0 0 0 0 0 0 602
S 153rd St Water Main Replacement 0 0 0 0 0 0 0 0 199
Corporate Dr S Water Main Replacement 0 0 0 0 0 0 0 0 260
Poverty Hill - Water Revitalization 0 0 0 0 0 0 0 0 380
Foster Playfield Reclaimed Water Extension 0 0 0 0 0 0 0 0 1,020
Duwamish River Crossing Reclaimed Water 0 0 0 0 0 0 0 0 193
Grand Total
1,738 2,918 1,083 915 497 1,768 8,919 0 13,249
** Denotes other funding sources, grants, or mitigation.
Chances from 2014 to 2015 CIP:
Deleted: Project sheets scheduled beyond 2020
Water Pipeline Asset Management Program, completed can be found in the City's website under
Public Works Capital Improvement Program.
2015 - 2020 Capital Improvement Program 59 8/21/2014
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Interurban Water Reuse Project No. 99240106
DESCRIPTION: Develop water reuse along the Interurban corridor with Class A treated wastewater from the Eastside
Reclamation Facility for irrigation, sewer flushing, sweeping, dust control, and other non - potable uses.
JUSTIFICATION: Using reclaimed water is an element of the City's Water Conservation Plan as well as the Cascade Water
Transmission and Supply Plan.
STATUS: These funds will be used for engineering and construction to assist potential connections to the King
County reclaimed water line.
MAINT. IMPACT: Future maintenance and operation of the new meters, tracking and preventing cross - connections.
KC Dept of Natural Resources funded the construction of additional portions for installation of the
reuse water line.
COMMENT:
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
`i Location
I�
�;
Project
litosle.
•
Design
5
25
25
25
25
25
25
25
i
114
180
Land (R/W)
,��
'V /��
fr %ris
��M��
•
��®
suo.----,_-
1%0
*tio
s,�st
0
Const. Mgmt.
6
,
..11, I
\‘.a_
2 -le ' \--gic..
5'156 St N'tiet s)41■11 ",.....----"..
St
6
Construction
111
�fG1\11l/� �, , .
111
TOTAL EXPENSES
122
25
25
25
25
25
25
25
0
297
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
122
25
25
25
25
25
25
25
0
297
TOTAL SOURCES
122
25
25
25
25
25
25
25
0
297
2015 - 2020 Capital Improvement Program
60
`i Location
I�
�;
Project
litosle.
•
‘ 1
'f
i
114
A.
•
IAN
,��
'V /��
fr %ris
��M��
•
��®
suo.----,_-
1%0
*tio
s,�st
'
kr,
m
,
..11, I
\‘.a_
2 -le ' \--gic..
5'156 St N'tiet s)41■11 ",.....----"..
St
..
•
s,eost
�fG1\11l/� �, , .
2015 - 2020 Capital Improvement Program
60
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
""ROJECT: Andover Park W /Strander New Water Main Project No. 99840105
DESCRIPTION: Design and construct 2,100 LF of a 12" pipe along Andover Park West from Tukwila Pkwy to Strander Blvd.
JUSTIFICATION: Aging cast iron pipe and deficiencies under fire flow conditions.
STATUS: Coordinated with the Transit Center and Andover Park West street improvements.
MAINT. IMPACT: Improved service would reduce maintenance liability.
COMMENT:
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
139
139
Land (R/W)
0
Const. Mgmt.
1
107
70
178
Construction
1,012
200
1,212
TOTAL EXPENSES
140
1,119
270
0
0
0
0
0
0
1,529
FUND SOURCES
Awarded Grant
0
.)posed Grant
0
iviitigation Actual
0
Mitigation Expected
0
Utility Revenue
140
1,119
270
0
0
0
0
0
0
1,529
TOTAL SOURCES
140
1,119
270
0
0
0
0
0
0
1,529
2015 - 2020 Capital Improvement Program
61
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: 58th Ave S Water Main Replacement Project No. 90540102
DESCRIPTION: Design and construct 680 LF of 8" ductile iron waterline to replace the old cast iron waterline in
58th Ave S from S 142nd St to S 144th St.
JUSTIFICATION: The existing waterline is cast iron and is subject to cracking and breaking apart with age.
STATUS: Design will be moved to the first quarter of 2015 with construction that summer.
MAINT. IMPACT: The new waterline will significantly reduce impact on crews from the risk of failure.
COMMENT:
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
60
60
Land (RNV)
0
Const. Mgmt.
45
45
Construction
272
272
TOTAL EXPENSES
0
0
377
0
0
0
0
0
0
377
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
377
0
0
0
0
0
0
377
TOTAL SOURCES
0
0
377
0
0
0
0
0
0
377
2015 - 2020 Capital Improvement Program
62
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
OROJECT: Macadam Rd S Water Upgrade Project No. 90440105
DESCRIPTION: Design and construct 4,300 LF of 10" waterline in Macadam Rd S from S 144th St to Southcenter Blvd.
JUSTIFICATION: Improve fire flow water quality to the north side of Tukwila Hill.
STATUS: Design will begin in January 2015 with construction to begin in late summer 2015 and continue into 2016.
MAINT. IMPACT: The new waterline will eliminate crew maintenance time for flushing the dead end line.
COMMENT:
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
155
155
Land (R/W)
0
Const. Mgmt.
50
150
200
Construction
600
800
1,400
TOTAL EXPENSES
0
0
805
950
0
0
0
0
0
1,755
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
,tigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
805
950
0
0
0
0
0
1,755
TOTAL SOURCES
0
0
805
950
0
0
0
0
0
1,755
2015 - 2020 Capital Improvement Program
63
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: 53rd Ave S Water Main Replacement Project No. 90540106
DESCRIPTION: Along with Residential street and surface water improvements, install approximately 3,000 LF of new
12" water line along 53rd Ave S from Interurban Ave S to S 144th St.
JUSTIFICATION: This provides a needed loop within the distribution system and will improve water service and fire
flows to the north side of Tukwila Hill.
STATUS: Design in 2015, with construction in 2016 and 2017.
MAINT. IMPACT:
COMMENT:
The water main route will be along 53rd Ave S from Interurban Ave S and 52nd Ave S to 53rd Ave S,
then along S 137th St to 53rd south to S 144th St.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
125
125
Land (R/W)
0
Const. Mgmt.
67
68
135
Construction
450
450
900
TOTAL EXPENSES
0
0
125
517
518
0
0
0
0
1,160
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
125
517
518
0
0
0
0
1,160
TOTAL SOURCES
0
0
125
517
518
0
0
0
0
1,160
2015 - 2020 Capital Improvement Program
64
4ROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
Andover Park E Water Main Replacement Project No. 99940103
Design and construct 2,000 LF of new 16" ductile iron pipe along Andover Park East from Tukwila Pkwy
to Strander Blvd and 1,100 LF of 10" DIP in Christiansen Rd.
Support future growth within this area of the CBD as aging cast iron system has suffered frequent failures.
Survey and in -house design is complete. Phase I is scheduled for 2016 and includes construction from
Strander Blvd to Baker Blvd. Phase II will be from Baker Blvd to Tukwila Parkway.
A new pipe will significantly reduce impact on crews from the risk of cataclysmic events.
A proposed PWTF was rescinded in 2014 by the State Legislature. Another application was submitted for 2015.
FINANCIAL
in $000's)
Through Estimated
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
( EXPENSES
Design 63 136 199
Land (R/W) 0
Const. Mgmt. 173 211 384
Construction 1,253 1,532 2,785
TOTAL EXPENSES 63 0 136 1,426 0 0 0 1,743 0 3,368
FUND SOURCES
Awarded Grant 0
Proposed PWTF 0
itigation Actual 0
Mitigation Expected 0
Utility Revenue 63 0 136 1,426 0 0 0 1,743 0 3,368
TOTAL SOURCES 63 0 136 1,426 0 0 0 1,743 0 3,368
Project Location
��
` � ieii`
illitliT&'8t li '1141•011W—,,,,,
e. -
A
Iii
t
sie..t
ism
1s
I
,
P il
{
* 4�
!
s
N t® ... Upland w
w4N E roam
Tr1l.nd DT
� v ` 8
/
1— %�;� //•r'
d
..
s , '' 8 180
!j 4
2015 - 2020 Capital Improvement Program
65
Project Location
��
` � ieii`
illitliT&'8t li '1141•011W—,,,,,
e. -
A
Iii
t
sie..t
ism
1s
I
,
P il
{
* 4�
!
s
N t® ... Upland w
w4N E roam
Tr1l.nd DT
� v ` 8
/
1— %�;� //•r'
d
..
s , '' 8 180
!j 4
2015 - 2020 Capital Improvement Program
65
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Water Reservoir with 1.5 million Gallon Capacity Project No. 91240102
DESCRIPTION: Design and construct a new 1.5 million gallon water storage reservoir.
JUSTIFICATION: The Department of Health is requiring that the City provide additional water storage in the 360 pressure zone.
STATUS: Siting study completed in 2013 with the optimal site located in the Manufacturing /Industrial Center (MIC).
MAINT. IMPACT: Additional staff will be needed to provide maintenance for the new reservoir.
COMMENT:
FINANCIAL Through Estimated
(in $000's)
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
23
500
523
Land (R/W)
100
100
Const. Mgmt.
45
525
570
Construction
300
3,502
3,802
TOTAL EXPENSES
23
0
0
0
500
445
0
0
4,027
4,995
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
23
0
0
0
500
445
0
0
4,027
4,995
TOTAL SOURCES
23
0
0
0
500
445
0
0
4,027
4,995
Location to be determined.
2015 - 2020 Capital Improvement Program 66
°ROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
Martin Luther King Jr Way S Water Main
Design and construct replacement of 800 LF of 12" water line and hydrants.
Project No. 90640102
During the construction of Sound Transit light rail along Martin Luther King Jr Way South, the existing
12" D.I.P. waterline was found to be heavily covered with corrosion.
Design will begin in 2017 with construction in 2018.
MAINT. IMPACT: A relined pipe will reduce the risk of failure.
COMMENT: Project will require a franchise agreement with WSDOT for existing waterline located in WSDOT right -of -way.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Project Location,
fir•
wr
Design
1
I ,,,,
viiv
40
____
, \,,,,
t
<>
..,, „....,
0 ....
i, .
41
Land (RNV)
30 St 04
Al u
0
Const. Mgmt.
25
25
50
Construction
235
92
327
TOTAL EXPENSES
1
0
0
0
40
260
117
0
0
418
FUND SOURCES
Awarded Grant
0
- -oposed Grant
0
.,,,itigation Actual
0
Mitigation Expected
0
Utility Revenue
1
0
0
0
40
260
117
0
0
418
TOTAL SOURCES
1
0
0
0
40
260
117
0
0
418
2015 - 2020 Capital Improvement Program
67
Project Location,
fir•
wr
I ,,,,
viiv
\
114,,
.
,,.. ,
____
, \,,,,
t
<>
..,, „....,
0 ....
i, .
6a s 12. _
30 St 04
Al u
2015 - 2020 Capital Improvement Program
67
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Water Comprehensive Plan Project No. 91040101
DESCRIPTION: Prepare the new Water Comprehensive Plan incorporating any regulatory or new Growth Management
Act Comprehensive Plan issues related to running the water utility.
JUSTIFICATION: Plan needs to be consistent with City's Comprehensive Plan and the Department of Health requires
the plan to be updated every 6 years.
STATUS: Current 2013 Water update was adopted in 2014. The next update is scheduled for 2020.
MAINT. IMPACT:
COMMENT:
FINANCIAL Through Estimated
(in $000's)
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
215
125
125
465
Land (RAN)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
215
0
0
0
0
125
125
0
0
465
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
215
0
0
0
0
125
125
0
0
465
TOTAL SOURCES
215
0
0
0
0
125
125
0
0
465
2015 - 2020 Capital Improvement Program
68
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
"ROJECT: Minkler Blvd Water Main Replacement Project No. 90540111
DESCRIPTION: Replace approximately 500 LF of existing 8" water line with a 12" line along Minkler Blvd, east of Industry Dr.
JUSTIFICATION: This replacement will improve fire flows to the area.
STATUS:
MAINT. IMPACT:
COMMENT:
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
60
60
Land (R/W)
0
Const. Mgmt.
30
30
Construction
200
200
TOTAL EXPENSES
0
0
0
0
0
60
230
0
0
290
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
.cigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
60
230
0
0
290
TOTAL SOURCES
0
0
0
0
0
60
230
0
0
290
2015 - 2020 Capital Improvement Program
69
2015 - 2020 Capital Improvement Program 70
CIP
Page # PROJECT TITLE
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2015 - 2020
SEWER ENTERPRISE FUND
402.98
*Other After Six
2015 2016 2017 2018 2019 2020 TOTAL Sources Years
72 Annual Sewer Repair Program
73 CBD Sanitary Sewer Rehabilitation
74 Sewer Lift Station No. 2 Upgrades
75 Sewer Repair West of Strander Blvd Bridge
76 Valley View West Hill Sewer Transfer Area
77 Andover Park East Sewer Replacement
78 GIS Inventory of Sewer System
79 53rd Ave S Sewer Rehabilitation
80 Future Sewer Lift Station No. 13
81 Southcenter Blvd Sewer Upgrade
82 Sewer Comprehensive Plan
Sewer Lift Stations Nos. 3 & 4
Sewer Replacement at 14025 Interurban Ave
Abandon Sewer Lift Station No. 9
Sewer Lift Station No. 12
APW Sewer connection to KC Metro
Sewer Repair at 14438 59th Ave S
Poverty Hill - Sewer Revitalization
Ryan Hill - Sewer Revitalization
75 200 200 200 200
1,040 1,040 1,040 1,040 1,040
545 0 0 0 0
120 0 0 0 0
110 0 0 0 0
90 1,237 0 0 0
100 100 100 0 0
100 730 0 0 0
0 0 0 0 278
0 0 0 0 180
0 0 0 0 125
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
200
0
0
0
0
1,145
0
0
2,133
0
125
0
0
0
0
0
0
0
0
1,075
5,200
545
120
110
2,472
300
830
2,411
180
250
0
0
0
0
0
0
0
0
0 200
455 0
0 7,100
0 0
0 0
290 0
0 500
0 0
2,133 0
0 1,380
0 0
0 980
0 940
0 645
0 4,400
0 150
0 200
0 1,230
0 1,143
Grand Total
Changes from 2014 to 2015 CIP:
New:
77 Andover Park East Sewer Replacement
79 53rd Ave S Sewer Rehabilitation
2,180 3,307 1,340 1,240 1,823 3,603 13,493 2,878 18,868
Denotes other funding sources, grants, or mitigation.
Project sheets scheduled beyond 2020
can be found in the City's website under
Public Works Capital Improvement Program.
Sewer Lift Station Locations
Lift Station No. 1 - Master Telemetry Panel
Lift Station No. 2 - Backup Dialer
Lift Station No. 3
Lift Station No. 4
Lift Station No. 5
Lift Station No. 6
Lift Station No. 7 - Abandoned in 2011
Lift Station No. 8
Lift Station No. 9
Lift Station No. 10
Lift Station No. 11
Lift Station No. 12
Lift Station No. 13
600 Minkler Blvd. - Shops
1105 Andover Pk W (at Minkler Blvd)
550 Minkler Blvd
6790 Todd Blvd - Southcenter South
6830 Fort Dent Way (entrance to Park)
6820 Fort Dent Way (in Park)
was at 14601 Interurban - replaced by gravity sewer
13359 56th Ave S - Foster Point (new in 2007)
12638 Interurban - Suburban Propane
12218 51st PI S - Allentown (new in 2007)
18799 Southcenter Pkwy (new in 2012)
255 Andover Park W - Key Bank parking lot at mall
Future - Tukwila Pkwy & Andover Park W
2015 - 2020 Capital Improvement Program
71 8/21/2014
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Annual Sewer Repair Program Project No. Varies
Reduce sewer line infiltration and inflow (I & I) through groundwater intrusion or storm events as a
DESCRIPTION: result of damaged deteriorating systems or unopposed connections. Include small repairs and capital
maintenance.
JUSTIFICATION: Decrease treatment, discharge, and pumping costs.
STATUS: Annual program is determined after pipeline TV inspection reports are completed.
MAINT. IMPACT: Less maintenance costs through rehabilitation of aging system.
COMMENT: Ongoing project, only one year actuals shown in first column.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
15
15
Land (R/W)
0
Const. Mgmt.
16
16
Construction
303
200
75
200
200
200
200
200
200
1,778
TOTAL EXPENSES
334
200
75
200
200
200
200
200
200
1,809
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
334
200
75
200
200
200
200
200
200
1,809
TOTAL SOURCES
334
200
75
200
200
200
200
200
200
1,809
Project Location:
Entire System
2015 - 2020 Capital Improvement Program
72
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
°ROJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and
becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal
excavation.
If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the
last five years we have had two major pipe failures on Andover Park West.
A Public Works Trust Fund loan was successfully obtained in 2012 for construction.
Reduced maintenance and repair costs.
The limits of the 2013 project is APW to APE from Minkler Blvd to S 180th St and will now include the repair
to the sewer under the railroad tracks.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
7 Project Location
•
-'
¢ �`inl ,11�,'1� -
ti 168 Bt ,A
���111
"_.
2
�..
100 et
Design
159
33
20
20
20
20
20
i
IINdar
292
Land (R/W)
ors — wo r
T'
1
•
jr a r q'
mmm
e Egil
t
0
Const. Mgmt.
87
120
120
120
120
120
687
Construction
639
900
900
900
900
900
5,139
TOTAL EXPENSES
159
759
1,040
1,040
1,040
1,040
1,040
0
0
6,118
FUND SOURCES
Awarded Grant
0
VTF /Proposed PW
45
250
455
750
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
114
509
585
1,040
1,040
1,040
1,040
0
0
5,368
TOTAL SOURCES
159
759
1,040
1,040
1,040
1,040
1,040
0
0
6,118
2015 - 2020 Capital Improvement Program
73
7 Project Location
•
-'
¢ �`inl ,11�,'1� -
ti 168 Bt ,A
���111
"_.
2
�..
100 et
m
r
. is
= J�
S '0'
e r `
∎0
i
IINdar
I
•
ors — wo r
T'
1
•
jr a r q'
mmm
e Egil
t
2015 - 2020 Capital Improvement Program
73
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
Sewer Lift Station No. 2 Upgrades Project No. 90440205
Install new pumps, motors, control system, backup generator and force main from Minkler to Strander Blvd.
The lift station upgrade will be required upon full development of Tukwila South.
Sewer lines installed in 2010 with Southcenter Pkwy Extension roadway project. Generator replacement,
concrete slab, and replacement of pump's motor control system are scheduled in 2014.
Reduce liability if the existing slab breaks the power connection.
See Tukwila South development agreement for funding and ULID requirements.
FINANCIAL
in $000's)
Through Estimated
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Project Location
A" "` ;`- ` ..
'•,6E 8T ,�,1yir�_�
"ter A,�
1
q _
B re ,
4�'. jl
i Ilrr�
as
s
lig
Design
15
65
N
Ue
'reeled Dr
7 9P3r, /r
(07 4
4
100
180
Land (RNV)
0
Const. Mgmt.
75
1,000
1,075
Construction
30
470
6,000
6,500
TOTAL EXPENSES
15
95
545
0
0
0
0
0
7,100
7,755
FUND SOURCES
Awarded Grant
0
Proposed Bond /ULID
7,100
7,100
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
15
95
545
0
0
0
0
0
0
655
TOTAL SOURCES
15
95
545
0
0
0
0
0
7,100
7,755
2015 - 2020 Capital Improvement Program
74
Project Location
A" "` ;`- ` ..
'•,6E 8T ,�,1yir�_�
"ter A,�
1
q _
B re ,
4�'. jl
i Ilrr�
as
s
lig
114.1\111Fit
N
Ue
'reeled Dr
7 9P3r, /r
(07 4
4
s I e,aoe
011
r.._ -.
2015 - 2020 Capital Improvement Program
74
OJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
Sewer Repair West of Strander Blvd Bridge
Repair cracked sewer line west of Strander Blvd bridge.
If the sewer line collapses, the sewer will back up, causing property damage.
Line was damaged during installation of storm drain in 2004.
Project No. 90840203
Project will require dewatering due to the depth of 25 ft, soils, and the proximity to the Green River.
FINANCIAL
in $000's)
Through Estimated
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
0
Land (RAW)
0
Const. Mgmt.
10
10
Construction
110
110
TOTAL EXPENSES
0
0
120
0
0
0
0
0
0
120
FUND SOURCES
Awarded Grant
0
°roposed Grant
0
,tigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
120
0
0
0
0
0
0
120
TOTAL SOURCES
0
0
120
0
0
0
0
0
0
120
2015 - 2020 Capital Improvement Program
75
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Valley View West Hill Sewer Transfer Area Project No. 81240203
DESCRIPTION: Transfer of Valley View Sewer District assets to the City of Tukwila near 52nd Ave S.
JUSTIFICATION: The Valley View Sewer District assets are located in the City of Tukwila service area and should be
owned by the City of Tukwila.
STATUS: The West Hill area includes 52nd Ave S & S 152nd St, S 151st St, and S 154th St in the Fostoria area
near Macadam Rd and S 134th St.
MAINT. IMPACT:
COMMENT: This project will clarify the service boundary issues with the Valley View Sewer District.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
0
Land (R/W)
110
110
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
0
0
110
0
0
0
0
0
0
110
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
110
0
0
0
0
0
0
110
TOTAL SOURCES
0
0
110
0
0
0
0
0
0
110
2015 - 2020 Capital Improvement Program
76
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
OJECT: Andover Park East Sewer Replacement Project No. 91440204
DESCRIPTION: Design and construct 1,600 LF of 15" and 12" sanitary sewer from Strander Blvd. to 1 -405 in Andover Park E.
JUSTIFICATION: Sewer improvement will provide additional capacity for future development along Andover Park East.
STATUS:
MAINT. IMPACT:
COMMENT:
Applied for a Public Works Trust Fund Loan (PWTF) in 2016 in conjunction with the APW Water Main Project.
Phase I is scheduled for 2016 and includes construction from Strander Blvd to Baker Blvd. Phase II will be
from Baker Blvd to Tukwila Parkway in 2020.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Project Location
.,,, ei AN,".
00 k El
et 4�
�6°
_ s i
sr
.. •
ors **ll�
4� 1! S °
�,•I�j
111171v.
Design
11.1
90
F
8
'
E
5
°
N mo
WOstE
uPi�a w
Mwi 21,
90
Land (R/W)
' i/ i,
I/
8180 S 6
;
0
Const. Mgmt.
115
141
256
Construction
1,122
1,004
2,126
TOTAL EXPENSES
0
0
90
1,237
0
0
0
1,145
0
2,472
FUND SOURCES
Awarded Grant
0
oposed PWTF /Bond
0
Mitigation Actual
0
Mitigation Expected
290
290
Utility Revenue
0
0
90
947
0
0
0
1,145
0
2,182
TOTAL SOURCES
0
0
90
1,237
0
0
0
1,145
0
2,472
2015 - 2020 Capital Improvement Program
77
Project Location
.,,, ei AN,".
00 k El
et 4�
�6°
_ s i
sr
.. •
ors **ll�
4� 1! S °
�,•I�j
111171v.
11.1
F
8
'
E
5
°
N mo
WOstE
uPi�a w
Mwi 21,
' i/ i,
I/
8180 S 6
;
2015 - 2020 Capital Improvement Program
77
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: GIS Inventory of Sewer System Project No. 90540202
80540202
DESCRIPTION: GIS (Geographic Information Systems) inventory of sanitary sewer system in the central business district
to provide better as -built drawings of the underground piping.
JUSTIFICATION: GIS mapping of the sewers will provide information on the sewer system in a format that is easily
addressable by the public.
STATUS: In 2007, the Commercial Business District (CBD) was surveyed for GIS mapping. Due to lack of funds, all
remaining GIS inventory projects are on hold.
MAINT. IMPACT: The survey will provide staff with up -to -date information on the location of manholes for the sanitary sewers.
COMMENT: Other areas of the City will follow.
FINANCIAL Through Estimated
(in $000's)
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
105
100
100
100
500
905
Land (RNV)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
105
0
100
100
100
0
0
0
500
905
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
105
0
100
100
100
0
0
0
500
905
TOTAL SOURCES
105
0
100
100
100
0
0
0
500
905
2015 - 2020 Capital Improvement Program
78
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
— ROJECT: 53rd Ave S Sewer Rehabilitation Project No. 91440205
DESCRIPTION: Rehabilitation of 2,100 LF +/- of sanitary sewer that was installed in 1972 in 53rd Ave S from S 137th St
to S 144th St. Coordinate with Street, Water, and Surface Water improvements.
JUSTIFICATION: The rehabilitation of the sanitary sewer will reduce the need to
STATUS:
MAINT. IMPACT: Expected to decrease maintenance.
COMMENT:
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
100
100
200
Land (R/W)
0
Const. Mgmt.
100
1,000
1,100
Construction
630
6,000
6,630
TOTAL EXPENSES
0
0
100
730
0
0
0
0
7,100
7,930
FUND SOURCES
Awarded Grant
0
)posed Bond /ULID
7,100
7,100
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
100
730
0
0
0
0
0
830
TOTAL SOURCES
0
0
100
730
0
0
0
0
7,100
7,930
2015 - 2020 Capital Improvement Program
79
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Future Sewer Lift Station No. 13 Project No. 99740205
DESCRIPTION: Due to utility conflicts with existing utilities, a new sewer lift station will be required near 65th Ave S and
Southcenter Blvd. A gravity sewer main is not possible under 1 -405.
JUSTIFICATION: Existing line is undersized and has a severe sag. Increased development on the North Hill exacerbates
the deficiency.
STATUS: Design will be coordinated with WSDOT and Seattle Public Utilities.
MAINT. IMPACT: Less flushing maintenance to clear debris from sag and from the improved HOV manhole alignment.
Other alternatives are being reviewed due to WSDOT requirements. Formerly known as Gravity Sewer
under 1 -405 to Tukwila Parkway.
COMMENT:
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Project Location
S.166 St ti , i-
Z
1 � ,
s leas,
..
1 I:
}
!. * 1
S
Nir
1
Design
80
upi
Mwitay oy
T„w
; i e
11 °
278
"-..Iii!A
0
ii
358
Land (R/W)
i , 4,
om.
0
Const. Mgmt.
278
278
Construction
1,855
1,855
TOTAL EXPENSES
80
0
0
0
0
0
278
2,133
0
2,491
FUND SOURCES
Awarded Grant
0
Bond /PWTF Loan
2,133
2,133
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
80
0
0
0
0
0
278
0
0
358
TOTAL SOURCES
80
0
0
0
0
0
278
2,133
0
2,491
2015 - 2020 Capital Improvement Program
80
Project Location
S.166 St ti , i-
Z
1 � ,
s leas,
..
1 I:
}
!. * 1
S
Nir
1
7
�^
N In
W ��'' 1
1
upi
Mwitay oy
T„w
; i e
11 °
"-..Iii!A
0
ii
os
S I s,eoe:
i , 4,
om.
2015 - 2020 Capital Improvement Program
80
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
''ROJECT: Southcenter Blvd Sewer Upgrade Project No. 99840202
DESCRIPTION: Upgrade 3,200 LF of 8" to a larger capacity 12" system from Macadam Rd to the 1 -405 undercrossing
on Southcenter Blvd.
JUSTIFICATION: Flows have greatly increased with additional connections to the basin from the North Hill apartment
buildings causing the system to be deficient in terms of capacity for peak discharges.
STATUS:
MAINT. IMPACT: Improved service would reduce maintenance liability.
COMMENT: Coordinate with 1 -405 improvements to Southcenter Blvd and Future Lift Station No. 13.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Project Location
, wAv ms's ,.�,:-
6768 Bt
1
wrimmii 8 1e0 en4
is
C
Design
s
,„
s
B
N im uai�J �•
w i t Mai„ ,,I "
S r
180
/I -- -vir/eY
t �4
'`�
180
Land (R/W)
0
Const. Mgmt.
180
180
Construction
1,200
1,200
TOTAL EXPENSES
0
0
0
0
0
0
180
0
1,380
1,560
FUND SOURCES
Awarded Grant
0
'nd /PWTF Loan
1,380
1,380
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
0
180
0
0
180
TOTAL SOURCES
0
0
0
0
0
0
180
0
1,380
1,560
2015 - 2020 Capital Improvement Program
81
Project Location
, wAv ms's ,.�,:-
6768 Bt
1
wrimmii 8 1e0 en4
is
C
Dr
s
,„
s
B
N im uai�J �•
w i t Mai„ ,,I "
S r
/I -- -vir/eY
t �4
'`�
T f
• as
m
2015 - 2020 Capital Improvement Program
81
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Sewer Comprehensive Plan Project No. 91040202
DESCRIPTION: Prepare new Sewer Comprehensive Plan incorporating any new or regulatory Growth Management
Act Comprehensive Plan issues related to sewer.
JUSTIFICATION: Sewer Comprehensive Plan needs to be consistent with City Comprehensive Plan, Department of
Ecology and Department of Health. Update is required every 6 years.
STATUS: 2013 Sewer update was adopted by Council on 6/2/14. Next update is scheduled for 2019.
MAINT. IMPACT:
COMMENT:
FINANCIAL Through Estimated
n $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
156
3
125
125
409
Land (RNV)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
156
3
0
0
0
0
125
125
0
409
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
156
3
0
0
0
0
125
125
0
409
TOTAL SOURCES
156
3
0
0
0
0
125
125
0
409
Project Location:
Entire System
2015 - 2020 Capital Improvement Program
82
CIP
Page #
PROJECT TITLE
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2015 - 2020
SURFACE WATER
412 Fund
**Other After Six
2015 2016 2017 2018 2019 2020 TOTAL Sources Years
82 Annual Small Drainage Program 485 685 685 685 685 685 3,910 50 685
83 Storm Water Quality Retrofit Program 110 110 110 110 110 110 660 0 110
84 NPDES Program 50 50 50 50 50 50 300 150 50
85 Chinook Wind 6,050 650 0 3,400 0 0 10,100 10,000 0
86 Gilliam Creek 42 Ave S Surface Water Culver 0 730 0 0 0 0 730 0 0
87 53rd Ave S Surface Water Drainage 200 600 664 0 0 0 1,464 878 0
88 East Marginal Wy S Stormwater Outfalls 120 271 641 0 0 0 1,032 300 0
89 East Marginal Wy S Storm Pipe Replacement 360 0 0 0 0 0 360 0 0
90 Tukwila 205 Levee Certification 400 0 0 0 0 0 400 270 0
91 Surface Water GIS Inventory 0 100 0 60 0 0 160 0 60
92 Riverton Creek Flap Gate Removal 0 30 700 0 0 0 730 500 0
93 Soils Reclamation Facility 0 0 175 1,200 0 0 1,375 0 0
94 Tukwila Pkwy /Gilliam Creek Outfalls 0 0 0 0 230 0 230 0 0
95 Northwest Gilliam Storm Drainage System 0 0 0 0 940 0 940 0 0
96 Surface Water Comprehensive Plan 0 0 0 0 0 175 175 0 0
S 146th St Pipe & 35th Ave S Drainage 0 0 0 0 0 0 0 0 882
S 143rd Street Storm Drainage System 0 0 0 0 0 0 0 0 1,096
Nelsen PI/Longacres Surface Water Phase II 0 0 0 0 0 0 0 0 345
Duwamish Rvrbk Stabilization at S 104th St 0 0 0 0 0 0 0 0 595
TUC Surface Water Conveyance 0 0 0 0 0 0 0 0 541
Gilliam Creek Fish Barrier Removal 0 0 0 0 0 0 0 0 745
Grand Total 7,775 3,226 3,025 5,505 2,015 1,020 22,566 12,148 5,109
Changes from 2014 to 2015 CIP:
New:
85 Chinook Wind
Deletions:
Surface Water Lift Station No. 15, completed in 2014.
Lower Duwamish Surface Water Conveyance, cleaning and inspection done by City staff.
Lower Gilliam Creek Channel Improvements, woody debris no longer needed in area.
Denotes other funding sources, grants, or mitigation.
Project sheets scheduled beyond 2020
can be found in the City's website under
Public Works Capital Improvement Program
Surface Water Lift Station Locations
Storm Lift Station No. 15
Storm Lift Station No. 16
Storm Lift Station No. 17
Storm Lift Station No. 18
Storm Lift Station No. 19
5910 S 180th St - Mizuki Grill
7420 S 180th St (underpass)
530 Strander Blvd - Bicentennial Park
4225 S 122nd St - Allentown
Fort Dent Park (Parks Dept.)
2015 - 2020 Capital Improvement Program
83 8/28/2014
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Annual Small Drainage Program Project No. Varies
DESCRIPTION: Select, design, and construct small drainage projects throughout the City.
JUSTIFICATION: Provide drainage corrections for existing /ongoing drainage problems throughout the City, including culvert
replacements, drain extensions, and pavement upgrades.
STATUS: Projects for this annual program are taken from Small Drainage Project List.
MAINT. IMPACT: Reduces maintenance.
Ongoing project, only one year shown in first column. Construction expenses may occur over two calendar
COMMENT: years. Budget for 2014 includes $270k for Thorndyke Safe Routes to School (S 150th St). Grants from State
Municipal Stormwater Capacity Grants.
FINANCIAL Through Estimated
n $000
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
60
80
80
80
80
80
80
80
620
Land(R/W)
0
Const. Mgmt.
70
80
80
80
80
80
80
80
630
Construction
279
270
325
525
525
525
525
525
525
4,024
TOTAL EXPENSES
409
270
485
685
685
685
685
685
685
5,274
FUND SOURCES
Awarded Grant
50
50
100,
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
409
220
485
635
685
685
685
685
685
5,174
TOTAL SOURCES
409
270
485
685
685
685
685
685
685
5,274
2015 - 2020 Capital Improvement Program
84
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
ROJECT: Storm Water Quality Retrofit Program Project No. 91241202
DESCRIPTION: Design and install water quality improvements at selected drainage locations throughout the City.
JUSTIFICATION: Most surface water is discharged directly to receiving water bodies untreated.
STATUS: Additional water quality is being added to Interurban Ave S in 2014 and 42nd Ave S in 2015.
MAINT. IMPACT: Expected to increase maintenance.
COMMENT: Combine with other CIP projects for design and construction, where feasible.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
15
15
15
15
15
15
15
15
120
Land (R/W)
0
Const. Mgmt.
15
15
15
15
15
15
15
15
120
Construction
80
80
80
80
80
80
80
80
640
TOTAL EXPENSES
0
110
110
110
110
110
110
110
110
880
FUND SOURCES
Awarded Grant
0
Jposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
110
110
110
110
110
110
110
110
880
TOTAL SOURCES
0
110
110
110
110
110
110
110
110
880
2015 2020 Capital Improvement Program
85
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: NPDES Program Project No. 99341210
Provide programmatic implementation requirements of NPDES. The Master Drainage Program specifies
DESCRIPTION: a NPDES reporting and action plan for City compliance. The services /supplies funds will also include any illicit
discharge (spill cleanup) costs that may occur in the City's right -of -way.
State NPDES requirements include an annual report, public education and outreach, illicit discharge detection
JUSTIFICATION: and illumination, approved technical standards, staff training, inspections of public and private systems, and
drainage system maps.
STATUS: All current NPDES requirements have been implemented.
MAINT. IMPACT: Additional cleaning and documentation will require added staff resources.
COMMENT:
National Pollutant Discharge Elimination System (NPDES). Additional NPDES requirements will be ongoing.
Costs shown include emergency supplies, testing equipment, DOE testing, and annual public outreach surveys.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
In -house Staff
433
433
Services /Supplies
199
50
50
50
50
50
50
50
50
599
Const. Mgmt.
0
Construction
12
12
TOTAL EXPENSES
644
50
50
50
50
50
50
50
50
1,044
FUND SOURCES
Awarded Grant
83
12
50
50
50
245
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
561
38
50
0
50
0
50
0
50
799
TOTAL SOURCES
644
50
50
50
50
50
50
50
50
1,044
2015 - 2020 Capital Improvement Program
86
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
°ROJECT: Gilliam Creek 42 Ave S Surface Water Culvert Project No. 99410303
99341208
DESCRIPTION: Design and replace the 36 -inch surface water culvert under 42 Ave S /Gilliam Creek. Combining this project
with the Residential Street Project 42nd Ave S Phase Ill.
JUSTIFICATION: The existing concrete pipe sections are separating and cracked which could erode the 42 Ave S fill and
lead to loss of roadway.
STATUS: Project is currently under design with construction scheduled in 2015.
MAINT. IMPACT: Expected to decrease maintenance.
COMMENT:
State Fish & Wildlife hydraulic project approved (HPA) permit will be required. Replacement will require
a fish passable structure.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Project Location
7 j 7_ , -
,, r ----"s0.---" l
,,to
Lek -
.t.�
:1..�
Design
77
48
Existing Incg Calvert
/',
+� _
1 }t
J/
Remove Sediment and p+Ar „fib
existing weir Ravde leg If
weirs ter grade control..
y10 r
I: ,/'
125
Land (R/W)
t
tA
_ ∎% I /
xa ' � I '
VISMS rObV !R......-+n p
0
Const. Mgmt.
100
100
Construction
8
630
638
TOTAL EXPENSES
85
48
0
730
0
0
0
0
0
863
FUND SOURCES
Awarded Grant
0
)posed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
85
48
0
730
0
0
0
0
0
863
TOTAL SOURCES
85
48
0
730
0
0
0
0
0
863
2015 - 2020 Capital Improvement Program
87
Project Location
7 j 7_ , -
,, r ----"s0.---" l
,,to
Lek -
.t.�
:1..�
...---
Existing Incg Calvert
/',
+� _
1 }t
J/
Remove Sediment and p+Ar „fib
existing weir Ravde leg If
weirs ter grade control..
y10 r
I: ,/'
ryyV/�
h
:,.//e-0,..
i ._ //Lv'm__ /L
t
tA
_ ∎% I /
xa ' � I '
VISMS rObV !R......-+n p
2015 - 2020 Capital Improvement Program
87
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
53rd Ave S Surface Water Drainage System Project No. 90341213
Replace existing storm drainage system. Provide bioswales along 53rd Ave S and a water quality structure
at the downstream end of the system to treat storm water runoff. Purchase right -of -way, if required, for
bioswale construction and provide asphalt overlay.
New conveyance system will reduce flooding on right -of -way and private property. Existing system is in poor
condition and street runoff flows onto private property.
In conjunction with Street and Water improvements.
Expected to decrease maintenance.
FINANCIAL
in $000's)
Through Estimated
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Project Location
``'- 1-
u'
�,� w `fir`:
a1��+
Design
200
200
Land (R/W)
1.
ror w,
!:'
0
Const. Mgmt.
4
5168
100
95
`�
\
�t
-
\
195
Construction
4f944%)0
om
E �'r
9155 St \,_ ��_. e ti
St�-
IIIMI
500
569
1,069
TOTAL EXPENSES
0
0
200
600
664
0
0
0
0
1,464
FUND SOURCES
Awarded Grant
0
Proposed Grant
120
360
398
878
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
80
240
266
0
0
0
0
586
TOTAL SOURCES
0
0
200
600
664
0
0
0
0
1,464
2015 - 2020 Capital Improvement Program
88
Project Location
``'- 1-
u'
�,� w `fir`:
a1��+
1.
ror w,
!:'
1
4
5168
�
`�
\
�t
-
\
}
��� �
4f944%)0
om
E �'r
9155 St \,_ ��_. e ti
St�-
IIIMI
S 160 S, t GIS
2015 - 2020 Capital Improvement Program
88
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
ROJECT: East Marginal Wy S Stormwater Outfalls Project No. 91041204
DESCRIPTION: Establish legal drainage connections from East Marginal Way South to the Duwamish River.
JUSTIFICATION: Drainage from E Marginal Wy S is discharged through outfalls owned and operated by the Boeing Co.,
Jorgensen Forge, and two King County Airport storm systems without easements.
Jorgensen Forge outfall was closed in 2011 under an order from the US EPA. The Boeing Company
STATUS: contacted the City in 2009 requesting that the City take over ownership of their storm line and outfall. A
consultant is preparing design for rerouting the Jorgensen outfall and adding water quality features.
MAINT. IMPACT: Clarifies maintenance responsibility and will ensure reliability of system.
City Attorney is working on the easements for Jorgensen's and Boeing's outfalls. Phase I: Adopt Boeing's
COMMENT: Z Line and then line lower portion of pipe in 2014. Phase II: Line pipe, add water quality device and connect
Jorgenson's drainage to Boeing's Z Line in 2015 and 2016. DOE design grant proposed in 2014.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
59
140
10
50
259
Land (R/VV)
0
Const. Mgmt.
10
30
91
131
Construction
100
191
550
841
TOTAL EXPENSES
59
140
120
271
641
0
0
0
0
1,231
FUND SOURCES
.Narded Grant
120
120
Awarded Grant
20
20
Proposed Grant
300
300
Mitigation Expected
0
Utility Revenue
59
0
120
271
341
0
0
0
0
791
TOTAL SOURCES
59
140
120
271
641
0
0
0
0
1,231
2015 - 2020 Capital Improvement Program
89
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: East Marginal Wy S Storm Pipe Replacement Project No. 91241206
DESCRIPTION: Replace a failing 30" - 36" CMP storm pipe between S 120th PI S and S 126th St.
The existing storm pipe is failing in several sections and has reached the end of its serviceable life.
JUSTIFICATION: The pipe has failed in several locations requiring spot repairs. Failure of the pipe will lead to localized
flooding and property damage.
STATUS: New project for 2014 - 2019 CIP. Project design began in 2012 as part of the EMWS Emergency Repair
11 -19 -12 Project. Construction is anticipated to begin in 2014.
MAINT. IMPACT: Reduce future maintenance and emergency repairs of existing failing pipe.
COMMENT: The storm pipe is a reach of Southgate Creek and will require both an HPA and construction within
a fish window timeframe. Existing utilities within EMWS will also require relocation.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Project Location
.8Ei PI
sa7Pi ) i:' ►1
S94 PI
1*1
th
IC
II
t.I
1
1
t
� • Lms °gym.
s i
' : ° GIS
Design
165
96
261
Land (RAN)
0
Const. Mgmt.
11
330
20
361
Construction
40
1,925
340
2,305
TOTAL EXPENSES
216
2,351
360
0
0
0
0
0
0
2,927
FUND SOURCES
Awarded Grant
0
Water District 125
57
57
Valley View Sewer
38
38
Mitigation Expected
0
Utility Revenue
216
2,256
360
0
0
0
0
0
0
2,832
TOTAL SOURCES
216
2,351
360
0
0
0
0
0
0
2,927
2015 - 2020 Capital Improvement Program
90
Project Location
.8Ei PI
sa7Pi ) i:' ►1
S94 PI
1*1
th
IC
II
t.I
1
1
t
� • Lms °gym.
s i
' : ° GIS
2015 - 2020 Capital Improvement Program
90
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
ROJECT: Tukwila 205 Levee Certification Project No. 9.1E +07
DESCRIPTION: Obtain levee certification for the Tukwila 205 Levee.
The US Army Corps of Engineers no longer provides levee certification services to federally authorized
JUSTIFICATION: levees. The existing certification expired in August of 2013. Certification is required for the Federal
Emergency Management Agency to accreditate the levee system as providing a 100 -year level of
flood protection.
STATUS: Existing levee certification expired in August 2013. Consultant hired in 2014.
MAINT. IMPACT: Certification process is expected to lead to additional levee repair projects that are required to meet the
certification criteria.
Only consultant costs for levee certification are shown. Additional construction costs may be required.
COMMENT: Certification is valid for a 10 -year period. King County Flood Control Districts Opportunity Grant program
with $45,000 per year will offset costs.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
50
400
450
Land (RNV)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
0
50
400
0
0
0
0
0
0
450
'UND SOURCES
_ing County Flood Control
90
45
45
45
45
45
45
45
405
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
(40)
355
(45)
(45)
(45)
(45)
(45)
(45)
45
TOTAL SOURCES
0
50
400
0
0
0
0
0
0
450
2015 - 2020 Capital Improvement Program
91
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Surface Water GIS Inventory Project No. 90241201
80241201
The GIS (Geographic Information Systems) inventory establishes citywide as -built drawings for the public
DESCRIPTION: drainage systems. This is an ongoing project as all CIP and development infrastructure improvements will
need to be mapped.
JUSTIFICATION: State NPDES requirements include provisions for permitted jurisdictions to compile accurate drainage
system maps for all outfalls 24" or greater.
STATUS: GIS mapping was completed citywide in 2013. Future contracts will keep maps up to date as projects
change the existing system.
MAINT. IMPACT: GIS information will allow maintenance to better track storm facility maintenance needs.
COMMENT: National Pollution Discharge Elimination System (NPDES). Department of Ecology grants for NPDES permit.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
1,421
100
60
60
1,641
Land (RNN)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
1,421
0
0
100
0
60
0
0
60
1,641
FUND SOURCES
Awarded Grant
218
218
Proposed Grant
0
Mitigation Actual
100
100
Mitigation Expected
0
Utility Revenue
1,103
0
0
100
0
60
0
0
60
1,323
TOTAL SOURCES
1,421
0
0
100
0
60
0
0
60
1,641
Project Location:
Entire System
2015 - 2020 Capital Improvement Program
92
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
OJECT: Riverton Creek Flap Gate Removal Project No. 99830103
Remove two culverts and flap gates at Duwamish River; install pipe arch, create open channel confluence,
DESCRIPTION: install trail bridge over new channel, restore /revegetate 200 feet of creek channel and 450 ft of pond
shoreline.
JUSTIFICATION: Increase available salmonid rearing habitat and increase flood refuge in lower Duwamish River. Improve
fish access to Riverton Creek and enhance salmon rearing and resting area.
STATUS: Design at 70% completion in 2011 with a Salmon Recovery Funding Board grant of $42,500 and $30,000
from People for Puget Sound. Construction is grant dependent.
MAINT. IMPACT: Expected to increase maintenance.
Proposed grants include State & Federal habitat grants. Project used as mitigation for East Marginal Way
Pipe Replacement Project and HPA Conrol #133763 -1 requires work to be completed by June 11, 2019.
COMMENT:
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Project Location
'‘ t ;
ti
\,
t
1 'im
`
*.1. F
Design
112
St m..
30
lit
,
142
Land (R/W)
= , not
Firm
!Iiii
113.1 .• 0 r. i
0
Const. Mgmt.
100
100
Construction
600
600
TOTAL EXPENSES
112
0
0
30
700
0
0
0
0
842
FUND SOURCES
awarded Grant
72
72
.posed Grant
500
500
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
40
0
0
30
200
0
0
0
0
270
TOTAL SOURCES
112
0
0
30
700
0
0
0
0
842
2015 - 2020 Capital Improvement Program
93
Project Location
'‘ t ;
ti
\,
t
1 'im
`
*.1. F
St m..
■ D
N
lit
,
co
r^
= , not
Firm
!Iiii
113.1 .• 0 r. i
2015 - 2020 Capital Improvement Program
93
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Soils Reclamation Facility Project No. 99441202
DESCRIPTION: Construct soils reclamation facility to handle, treat, dispose and /or reuse non - hazardous street sweepings
and catch basin cleanings, etc. (formerly named DrainageNactor Waste Facility).
JUSTIFICATION: To meet State NPDES regulations, the City needs facilities to treat & dispose of waste materials resulting from
cleaning /maintenance activities, including street sweepings and Vactor truck wastes.
STATUS: Temporary site is no longer an option and disposal is now being transported to a King County facility in
Renton. A site location is currently being investigated.
MAINT. IMPACT: Expected to decrease maintenance.
COMMENT: May be combined with future location of City Maintenance Facility.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
49
175
224
Land (RNV)
561
600
1,161
Const. Mgmt.
100
100
Construction
500
500
TOTAL EXPENSES
610
0
0
0
175
1,200
0
0
0
1,985
FUND SOURCES
Awarded Grant
0
Bond
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
610
0
0
0
175
1,200
0
0
0
1,985
TOTAL SOURCES
610
0
0
0
175
1,200
0
0
0
1,985
* Note: Site Location is still under consideration.
2015 - 2020 Capital Improvement Program 94
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
-`ROJECT: Tukwila Parkway /Gilliam Creek Surface Water Outfalls Project No. 91241205
Install a new 84" manhole structure on the existing 48" Andover Park W/Tukwila Parkway pipe and a
DESCRIPTION: 72" manhole structure on the 30" pipe west of Andover Park E/Tukwila Parkway and provide slide gates
with discharge ports.
The existing 48" and 30" City stormwater pipes discharge to a 108" WSDOT pipe that conveys Gilliam Creek.
JUSTIFICATION: The flow line of the WSDOT pipe is approximately 1.6 feet above that of the City pipes that discharge to it. This
results in a backwater condition within the City pipes for several hundred feet and prevents inspection and
cleaning of those pipes.
STATUS:
MAINT. IMPACT: After project completion, maintenance will be able to clean and inspect the pipes.
COMMENT: New manhole structures will include the slide gates which will control water flow during maintenance.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
30
30
Land (RNN)
0
Const. Mgmt.
25
25
Construction
175
175
TOTAL EXPENSES
0
0
0
0
0
0
230
0
0
230
FUND SOURCES
larded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
0
230
0
0
230
TOTAL SOURCES
0
0
0
0
0
0
230
0
0
230
2015 - 2020 Capital Improvement Program
95
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Northwest Gilliam Basin Storm Drainage System Project No. 90341206
DESCRIPTION: Upgrade existing storm drainage system. Provide water quality treatment manholes at the downstream
end of the retrofitted drainage systems. Provide asphalt overlay and extruded asphalt curb for all streets.
JUSTIFICATION: Reduces right -of -way and private property flooding by increasing the hydraulic capacity of the existing
storm drainage system. Water quality manholes remove sediment and oil from street runoff.
STATUS: S 146th St was completed in 2009 and S 150th is scheduled in 2014 with Thorndyke Safe Routes to School.
MAINT. IMPACT: Expected to decrease maintenance.
COMMENT: Where feasible, combine with future overlay project to reduce costs and construction impact.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
--- •, �� s:1 j ;
I -= _ ti
c
--.
Existing Storm
Drainage System
, r � + I i I _
Design
100
Replace Existing
�� x Stonn Drainage System.
M
"1
100
Land (R/W)
/
-e /
.-�- ,r r ' l I
■
BLS$)- / �! j
I C
�b
Ita -
r( 70
`
��//'
/�a�o
0
Const. Mgmt.
s
t
I
i - --
a
40
1
-
1
40
Construction
-
Provide WO
Treatment Manhole
`
OrA
.. li -, 11
�. Is 52ndst', -- )
800
•- a +w*s01_ +.asanrxxaw MAN sae a06. xm r
800
TOTAL EXPENSES
0
0
0
0
0
0
940
0
0
940
FUND SOURCES
Awarded Grant
0
Proposed Grant
C
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
0
940
0
0
940
TOTAL SOURCES
0
0
0
0
0
0
940
0
0
940
Project Location
--- •, �� s:1 j ;
I -= _ ti
c
--.
Existing Storm
Drainage System
, r � + I i I _
g
g Ji
Replace Existing
�� x Stonn Drainage System.
M
"1
•-
-
Provide WO
Treatment ManhOt
/
-e /
.-�- ,r r ' l I
■
BLS$)- / �! j
I C
�b
Ita -
r( 70
`
��//'
/�a�o
Ex1alllxgStorm
Drain m
s
t
I
i - --
a
1
-
1
a
N PACp
Replace Existing
StormDrainageSystem.
Provide Asphalt Overlay
and Extruded Cur b.
i ; 1 --, -.. ,;.: i�;-' -
`r- •
i r ^ -. rr
Provide WO
Treatment Manhole
`
OrA
.. li -, 11
�. Is 52ndst', -- )
•- a +w*s01_ +.asanrxxaw MAN sae a06. xm r
2015 - 2020 Capital Improvement Program
96
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
''ROJECT: Surface Water Comprehensive Plan Project No. 91041202
Periodically revise and update the adopted Surface Water Comprehensive Plan to: 1) Incorporate the latest
DESCRIPTION: requirements of the National Pollution Discharge Elimination System (NPDES) and Endangered Species Act
(ESA); 2) Update Capital Improvement Projects to reflect current needs and completed projects; 3) Include GIS
based basin and system maps as they become available; and 4) Revise Storm Water ordinance as needed.
JUSTIFICATION: The latest requirements from regulatory agencies as well as newly identified City needs must be included in
a regularly updated Surface Water Comprehensive Plan.
STATUS: The Surface Water Comprehensive Plan was completed in 2003 and updated in 2013. Future updates are
planned on a 7 -year cycle with the next update in 2020.
MAINT. IMPACT:
COMMENT:
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016
2017
2018
2019
2020
BEYOND TOTAL
EXPENSES
Design
163
175
338
Land(R/W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
163
0
0
0
0
0
0
175
0
338
-'1ND SOURCES
.- warded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
163
0
0
0
0
0
0
175
0
338
TOTAL SOURCES
163
0
0
0
0
0
0
175
0
338
2015 - 2020 Capital Improvement Program
97
2015 - 2020 Capital Improvement Program 98
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2015 - 2020
GOLF COURSE ENTERPRISE FUND
411
CIP * *Other
Page # PROJECT TITLE 2015 2016 2017 2018 2019 2020 TOTAL Sources
101 Foster Golf Links General Improvements
70 89 64 81 55 70 429 0
Grand Total
Changes from 2014 to 2015 CIP:
No new additions.
70 89 64 81 55 70 429 0
** Denotes other funding sources, grants, or mitigation.
2015 - 2020 Capital Improvement Program 99 8/28/2014
2015 - 2020 Capital Improvement Program 100
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
ROJECT: Foster Golf Links General Improvements Project No. Varies
DESCRIPTION: Provide annual improvements to the golf course greens, tees, drainage and irrigation as provided by golf
revenues after operation costs and debt service payments are reconciled.
JUSTIFICATION: Improvements are part of the plan to improve the playability of the course.
STATUS:
MAINT. IMPACT: Better year round play with improved course conditions, reduced maintenance, and increased safety.
COMMENT: Ongoing project, only one year actuals shown in first column. With completion of the new clubhouse,
funding provides resources for in -house labor to complete on -going major maintenance projects.
FINANCIAL Through Estimated
in $000's
2013 2014 2015
2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Engineering
0
Land (R/W)
0
Construction
0
50
70
89
64
81
55
70
75
554
TOTAL EXPENSES
0
50
70
89
64
81
55
70
75
554
FUND SOURCES
Awarded Grant
0
.oposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Golf Revenue
0
50
70
89
64
81
55
70
75
554
TOTAL SOURCES
0
50
70
89
64
81
55
70
75
554
2015 - 2020 Capital Improvement Program
101
2015 - 2020 Capital Improvement Program 102