HomeMy WebLinkAboutPermit M09-009 - STEADFASTSTEADFAST
1057 ANDOVER PK E
EXPIRED
08 -09 -09
M09 -009
Parcel No.: 2623049019
Address:
Suite No:
doc: I MC -10/06
1057 ANDOVER PK E TUICW
Tenant:
Name: STEADFAST
Address: 1057 ANDOVER PK E , TUKVVILA WA
Contact Person:
Name: KELVIN BATTLE
Address: 25500 74 AV S , KENT WA
Contractor:
Name: PERFORMANCE HEATING
Address: 7649 S 180 ST , KENT WA
Contractor License No: PERFOHA15ORT
Value of Mechanical: $11,245.00
Type of Fire Protection:
Furnace: <100K BTU
>100K BTU
Floor Furnace
Suspended/Wall/Floor Mounted Heater
Appliance Vent
Repair or Addition to Heat /Refrig /Cooling System....
Air Handling Unit <10,000 CFM
>10,000 CFM
Evaporator Cooler
Ventilation Fan connected to single duct
Ventilation System
Hood and Duct
Incinerator: Domestic
Commercial/Industrial
CitAbf Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
MECHANICAL PERMIT
Owner:
Name: M3 PROPERTIES LLC
Address: C/O JSH PROPERTIES INC , 555 S RENTON VILLAGE PL #100
DESCRIPTION OF WORK:
REPLACE (1) FAILING ROOF TOP UNIT WITH (1) NEW UNIT IN SAME LOCATION
EQUIPMENT TYPE AND OUANTITY
0
0
0
0
0
0
1
0
0
0
0
0
0
0
* *continued on next page **
M09 -009
Permit Number: M09 -009
Issue Date: 02/10/2009
Permit Expires On: 08/09/2009
Phone:
Phone: 425 251 -0356
Phone: 425 251 -0356
Expiration Date: 04/30/2009
Fees Collected: $315.41
International Mechanical Code Edition: 2006
Boiler Compressor:
0 -3 HP /100,000 BTU 0
3 -15 HP /500,000 BTU 0
15 -30 HP /1,000,000 BTU.. 0
30 -50 HP /1,750,000 BTU.. 0
50+ HP /1,750,000 BTU 0
Fire Damper 0
Diffuser 0
Thermostat 0
Wood/Gas Stove 0
Water Heater 0
Emergency Generator 0
Other Mechanical Equipment
Printed: 02 -10 -2009
Permit Center Authorized Signature:
Signature:
Print Name:
doc: IMC -10/06
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206-431-3665
Web site: http: / /www.ci.tukwila.wa.us
Permit Number: M09 -009
Issue Date: 02/10/2009
Permit Expires On: 08/09/2009
Date: 2-4 `t 0 - 0 9
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign and obtain this mechanical permit.
Date: --/C--10 I
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
M09 -009 Printed: 02 -10 -2009
Parcel No.: 2623049019
Address: 1057 ANDOVER PK E TUKW
Suite No:
Tenant: STEADFAST
1: ** *BUILDING DEPARTMENT CONDITIONS * **
5: Readily accessible access to roof mounted equipment is required.
doc: Cond -10/06
•
City of Tukwila
Department of Community Development
6300' Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: :206- 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
PERMIT CONDITIONS
Permit Number: M09 -009
Status: ISSUED
Applied Date: 01/30/2009
Issue Date: 02/10/2009
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center
(206/431- 3670).
4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
6: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
7: Manufacturers installation instructions shall be available on the job site at the time of inspection.
8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila
Permit Center.
9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building
Department (206- 431 - 3670).
10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the'correction of errors in the construction documents and other data.
* *continued on next page **
M09 -009 Printed: 02 -10 -2009
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and
this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work
construction or the performance of work.
•
Signature: /5z;C /..l7 i�t��l�L
Print Name: �S G • T7
• •
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
doc: Cond -10/06 M09 -009
Date: Z g 7
ordinances governing
or local laws regulating
Printed: 02 -10 -2009
SITE LOCATION
Site Address: , 1057 Andover Park East
Tenant Name: Steadfast
Name: Kelvin Battle
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http: 5vrv ty. ci. tukrvila.iva. us
Mailing Address:25500 74th Ave S
E-Mail Address: kelvin @pmghvac.com
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
Company Name: Performance Heating & Air Conditioning
Mailing Address: 25500 74th Ave S
Contact Person: Kelvin Battle
E -Mail Address: kelvin @pmghvac.com
Contractor Registration Number: PERFOHA I SORT
Company Name: BCE Engineers, Inc
Mailing Address:17924 140th Ave NE, Suite 220
Contact Person: Eric A. Dann
E -Mail Address:
Q:AApplications \Forms- Applications On LineA3 -21106 - Permit Application. doe
Re,i.sod: 1 -2006
Building Permit No.
Mechanical Permit No.
Plumbing /Gas Permit No.
Public Works Permit No.
Project No.
(For office use only)
King Co Assessor's Tax No.:0323049026
Suite Number:
New Tenant:
Floor:1st
❑ Yes No
Property Owners Name: JSH Properties
Mailing Address: 10655 NE St #300 Bellevue Wa 98004
City
State
Zip
CONTACT PERSON - who do we contact when your permit is ready to be issued
Day Telephone: 425- 251 -0356
Kent, WA
City State
Fax Number:253 -867 -5775
98032
Zip
GENERAL CONTRACTOR INFORMATION —
(Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5))
Kent, WA
City State
Day Telephone: 425- 251 -0356
Fax Number: 253- 867 -5775
Expiration Date: 4/30/09
ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record
Company Name:
Mailing Address:
City
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
State
ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record
Woodinville, Wa 98072 -4315
98032
Zip
Zip
City State
Day Telephone: 425- 814 -8448
Fax Number:
zip
Page I of 6
Unit Type:
Qty
Unit Type:
Qty
Unit Type:
Qty
Boiler /Compressor:
Qty
Furnace<100K BTU
Air Handling Unit >10,000
CFM
Fire Damper
0 -3 HP /100,000 BTU
Furnace >100K BTU
Evaporator Cooler
Diffuser
3 -15 HP /500,000 BTU
Floor Furnace
Ventilation Fan Connected
to Single Duct
Thermostat
15 -30 HP /1,000,000 BTU
Suspended /Wall /Floor
Mounted Heater
Ventilation System
Wood /Gas Stove
30 -50 HP /1,750,000 BTU
Appliance Vent
Hood and Duct
Emergency
Generator
50+ HP /1,750,000 BTU
Repair or Addition to
Heat /Refrig /Cooling
System
Incinerator - Domestic
Other Mechanical
Equipment
Air Handling Unit
<10,000 CFM
1
,.
Incinerator — Comm/1nd
Contact Person: Kelvin Battle
E -Mail Address: kelvin @pmghvac.com
Use: Residential: New .... ❑
Commercial: New .... ❑
Fuel Type: Electric
MECHANICAL PERMIT INFORMATION - 206 - 431 -3670
MECHANICAL CONTRACTOR INFORMATION
Company Name: Performance Heating and Air Conditioning
Mailing Address: 25500 74th Ave S
Contractor Registration Number:PERFOHA 15ORT
Valuation of Mechanical work (contractor's bid price): $ 11,245.00
Scope of Work (please provide detailed information): Replace (1) failing roof top unit with (1) new unit in same location.
Q.A Applications \Forms-Applications On Line \3 -2006 - permit Application.doc
Reused' 9 -2000
bh
Replacement .... ❑
Replacement .... d
Kent WA 98032
('ity State Zip
Day Telephone: 425- 2581 -0356
Fax Number: 253- 867 -5775
Expiration Date: 4/30/09
Gas....❑ Other:
Indicate type of mechanical work being installed and the quantity below:
Page 4 of 6
PERMIT APPLICATION NOTES — Applicable to all permits in this application
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRITE (UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER 0 AUTHORIZE
Signature: . ���
Mailing Address: 25500 74th Ave S
Date Application Accepted:
(x192010\
AGENT:
Q. \Applications \Forms - Applications On Line\3 -2005 - Permit Application. doe
Revised- 9 -25(15
Date Application Expires:
Kent
City
Date:
Print Name: Kelvin Battle Day Telephone: 425- 251 -0356
WA 98032
State Zip
Staff Initials:
Page 6 of 6
RECEIPT NO: R09 -00156
Initials: JEM
User ID: 1165 Total Payment: 936.72
Payee: PERFORMANCE HEATING AND AIR CONDITIONING, INC.
SET ID: 0130 SET NAME: PERFORMANCE HEATING & AIR
SET TRANSACTIONS:
Set Member Amount
EL09 -0085 76.00
M09 -008 545.31
M09 -009 315.41
TOTAL: 76.00
ACCOUNT ITEM LIST:
Description
ELECTRICAL PERMIT - NONR
MECHANICAL - 'NONRES
PLAN CHECK - NONRES
Ci. of Tukwila.
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: http: //www.ci.tukwila.wa.us
SET RECEIPT
Payment Date: 01/30/2009
TRANSACTION LIST:
Type Method Description Amount
Payment Check 51405 936.72
TOTAL: 936.72
Account Code Current Pmts
000.322.101.00.0 76.00
000.322.102.00.0 688.58
000/345.830 172.14
TOTAL: 936.72
BTL
ENGINEERING
• .7y+1y76
FILE COPY 17924 - 140th Avenue NE, Suite 220
ritOet Woodinville, WA 98072 -4315
Penult ` Phone: (425) 814 -8448
Fax: (425) 821 -2120
Plan review approval is subject to errors and omissions.
Structural Calculations
for
Steadfast
Support of Proposed HVAC Unit
July 31, 2008
EXPIRES 0923.08
�E COMPL FOR E
C
APPROVED
FEB 0 5 2009
cmfi�i u`
JAN 3 0 2009
PERMIT CENTER
WWiG'O1
BTL
ENGINEERING
17924 —140ei Avenue NE, Suite 220
Woodinville, WA 98072 -4315
Phone: (425) 814 -8448
Fax: (425) 821 -2120
Calculations
BTL
ENGINEERINNG
17924 — 140th Avenue NE, Suitc 220
Woodinville, WA 98072 -4315
Phone: (425) 814 -8448
Fax: (425) 821 -2120
Gravity Support
(1)
PARTIAL ROOF HVAC PLAN
(7 I
I
L,
Emos=s0=
ENGINEERING
RS-
M = b5
v=
rAL-Low tpcp 5
&Co (3.
- z,
.J3 V-
L/ ■Ecp = 1.13/ (LL)
L/:1110 = - 7 TN) (TL)
ei„
6
11 1. )60 N1
z6zsi
16
672. S
4
EAZ,s1, 2, x t-t Ok
R 5— 0 Z- M AIL° , S c
!mots' (lovillis
11_
M=
V =
L/360 = of66 .T.r (LL) 4
2;36
L/240 = (fl)
=
= 12,2,4 h•li-
olt-
Lts
(?-3+
6
(Si-c6;" 22,S kr"'
-- — 2,
0 oe)t-0
1ZZ "r)
4.‘
kv
Exss y
Ra—
m = k.ft
v=
L/360 (1-1)
L/2.4o = (TL)
Eireq'd
'11-. f SeN 1)'T o N-92,-03 t9.1c.L.
g t'UNTNtAti.,-, 3/v tomPi-g.s.son), To E K.P,TS4 b ItoOF 1../ki
r Po ILE g. VS 6E-0J4-1 o, ek .rAlPr247.7o1J
x /0' 119 4; 2-
GS" x t C,Was,"
Project: 6'r Ci u'r-r
Project Number: 0g-11 9
Cli
17924 - 140th Avenue NE, Suite 220
Woodinville, WA 98072-4315
Phone: 425-814-8448
Fax: 425-821-2120
Designed By: Id/3r it7 Date.
Scale. Page. 6-2"
TL
easzennilimmasissm
ENGINEERING
RE '
M= k
V =
L/360 =
(LL)
L/240 = (TL)
EI,e
e oF Th N &A) M LfrOL A/,L 4 , e G
S 5 PAT-AattIA 7 1 1 E-g-.P0 2 -1 R- -0 q DS A-00 vArTE. I
terxtdd
xio
Et 7 32 V-
=
v=
L/36o =
L/240 =
L)
x/0
KB-
34= Ic.ft
V =
L/ 360 =
L/ilo = (TL)
E'req'd =
4 441 7-
Project: 0/43.1
Project Number: °g g Client:
Designed By: AblI. Date.
Scale:
17924 - 140th Avenue NE, Suite 220
Woodinville, WA 98072-4315
Phone: 425-814-8448
Fax: 425-821-2120
Page- Co
BTL
ENGINEERING
17924 — 140th Avenue NE, Suite 220
Woodinville, WA 98072 -4315
Phone: (425) 814-8448
Fax: (425) 821 -2120
Seismic Support
Conterminous 48 States
2006 International Building Code
Latitude = 47.445
Longitude = - 122.251
Spectral Response Accelerations Ss and S1
Ss and S1 = Mapped Spectral Acceleration Values
Site Class B - Fa = 1.0 ,Fv = 1.0
Data are based on a 0.05 deg grid spacing
Period Sa
(sec) (g)
0.2 1.399 (Ss, Site Class B)
1.0 0.478 (S1, Site Class B)
Steadfast Mech'I Unit Revision Date: 7/30/2008
08- 199 -18
Occupancy Category: !II - Other Structures
Seismic Use Group: I
/E = 1.00
/s =1.00
/ W = 1.00
Site Class:
S = 1.4
5, = 0.48
1 ASCE Table 9.4.1.2
Fa = 1.00 ASCE Table 9.4.1.2.4a
F„ = 1.52 ASCE Table 9.4.1.2.4b
L D
Design Spectral Response Acceleration:
S =F
= 1.40
SDS = % SMS
= 0.93
(Seismic Factor)
(Snow Factor)
(Wind Factor)
vJ IBC Table 1604.5
S =F
= 0.73
S01 = z' SM1
= 0.49
Steadfast Mech'I:Unit
08- 199 -18
Seismic Forces
Component Operating Weight: 426 Ibs
F = 0.4 ap SDS WP [1 +2 (z/h)]
R I
F = 191 Ibs
F need not exceed:
F = 1.6 Sos Ip Wp
F = 636 Ibs
F shall not be less than:
F 0.3 SDSIpWp
F = 119 Ibs
Dimensions:
x = 44 in F
y= 52 in Z
z = 38 in w
Curb Height = 28 in Curb Height
Check Uplift:
Mar = 8970 lb-in
MRESIST = 8435 lb-in
gg1oib-;n
0PLiFT- - 2.0916 yLA
Revision Date: 7/30/2008
F.S. = 0.9 = 1.5
ASCE Eq. 9.6.1.3 -1
ASCE Eq. 9.6.1.3 -2
ASCE Eq. 9.6.1.3 -3
NOT O.K.
y
W rw. 113E gi boLve%Q
6 Y ATT'CHMeAI
TL
ENGINEERING
IV111.0011641_ 0/it/yr To LORI, AAA -PrEe.
F 1q1`
#ID S02Ey%)
U PLIFT = Z0-I' 6 Zap I b '
6.1 „ j = (Z) ► o 66,r6Ew N b s11 Q
Usrz : 1 be, $T►?4P 5
w /Lz� ' 1tJ G12'v�15 Cu Iz�v
...4,........5-.. .. ...... ....................... � � � g_5
LuRi A PTh(z- ?o e.xr. roi, 60213
t 14 SG12 .3N sosmt
scytbo TN TENsToo
U11_11=1 : Zati!b
T sifAc rid 5I-IF4 L
t ql!b
1 si "' aE
z) 4 10 .
Ir1c1 /
to- iVSGYZp_v,1
VI It'
111'7's do = E ►, 1 14 �G1���
(11,1.A) A- tiPD
Ews
15E # I 2rw5 (5) eA Sit>i - Cud Eft -o- Eu (J
STR4- P
Project: 5 ; PtOF4+s,-s U my T
17924 -140th Avenue NE, Suite 220
Woodinville, WA 98072 -4315
Phone: 425 - 814 -8448
Far. 425-821 -2120
Designed By /44 f3 Date:
0 - t qct- g
Project Number. Client Scale: page s _
17924 -140th Avenue NE, Suite 220
Woodinville, WA 98072 -4315
Phone: (425) 814 -8448
ENGINEERING: Fax: (425) 821 -2120
Details
FASTEN RTU -I TO ROOF CURB
W/ I8 -GA. STEEL STRAP.
SCREW STRAP TO ROOF
CURB 8 UNIT BASE RAIL. TWO
STRAPS EACH CORNER (8)
TOTAL.
#I4 SCREWS THROUGH CURB
ADAPTER INTO EXISTING
CURB. (5) EA. SIDE it (4)
EACH END.
ATTACHMENT DETAIL
NTS
KELVIN BATTLE
25500 74 AV S
KENT WA 98032
RE: Permit No. M09 - 009
1057 ANDOVER PK E TUKW
Dear Permit Holder:
City of Tukwila
Department of Community Development Jack Pace, Director
In reviewing our current records, the above noted permit has not received a final inspection by the City of
Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform
Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the
provisions of these codes shall expire by limitation and become null and void if the building or work authorized
by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work
authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 08/09/2009.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final
inspection. Each inspection creates a new 180 day period.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is
due to expire. Address your extension request to the Building Official and state your reason(s) for
the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is
determined that your extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and /or receive an extension prior to 08/09/2009, your permit will
become null and void and any further work on the project will require a new permit and associated fees. •
Thank you for your cooperation in this matter.
Sincerely,
Bill Rambo
Permit Technician
File: Permit File No. M09 -009
Jim Haggerton, Mayor
/Inn Cnnthrontar Rnnlavarri quite) itlnn a Tukwila Wachinotnn OR1RR a Phnna• NM-471-7157n a Far• 2fR- 21 71 -T6S
ACTIVITY NUMBER: M09 - 009
PROJECT NAME: STEADFAST
SITE ADDRESS: 1057 ANDOVER PK E
X Original Plan Submittal
Response to Correction Letter #
DATE: 01 -30 -09
Response to Incomplete Letter #
Revision # After Permit Issued
DEPARTMENTS:
w S
ilding Division
Public Works
Complete
Comments:
Approved
Notation:
REVIEWER'S INITIALS:
Documents/routing slip.doc
2 -28 -02
PERMIT COORD COPY
PLAN REVIEW /ROUTING SLIP
NIA oar
Fire Prevention
APPROVALS OR CORRECTIONS:
Structural
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
wElt
Incomplete
TUES /THURS RO TING:
Please Route Structural Review Required
REVIEWER'S INITIALS:
DUE DATE: 02 -03 -09
DATE:
DATE:
Planning Division
Permit Coordinator
Not Applicable
Permit Center Use Only
INCOMPLETE LETTER MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
LETTER OF COMPLETENESS MAILED:
No further Review Required
Approved with Conditions Not Approved (attach comments)
DUE DATE: 03-03-09
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Name
Role
Effective Date
Expiration Date
MILLER, DANIEL E
PRESIDENT
11/27/2007
Bond
Amount
ERDAHL, DARRIN
VICE PRESIDENT
11/27/2007
748802C
GOWIN, RICHARD L
VICE PRESIDENT
01/01/1980
GOWIN, CONSTANCE F
VICE PRESIDENT
01/01/1980
11/15/2007
Bond
Bond
Company
Name
Bond
Account
Number
Effective
Date
Expiration
Date
Cancel
Date
Impaired
Date
Bond
Amount
Received
Date
10
DEVELOPERS
SURETY a
INDEM CO
748802C
10/01/2007
Until
Cancelled
$12,000.0011
/27/2007
9
DEVELOPERS
SURETY
INDEM CO
853803C
04/28/2002
Until
Cancelled
12/24/2007
$12,000.0004/23
/2002
8
DEVELOPERS
SURETY a
INDEM CO
853803C
12/29/200004/28
/2002
$6,000.00
07/27/2001
7
DEVELOPERS
INS CO
853803C
12/01/200012/29
/2000
$6,000.00
11/22/2000
6
AMERICAN
BANKERS INS
CO
LPM350055
12/01/1997
Until
Cancelled
12/07/2000
$6,000.00
5
AMERICAN
BANKERS INS
LPM350055
12/01/199412/01
/1997
$6,000.00
Untitled Page
General /Specialty Contractor
A business registered as a construction contractor with Lai to perform construction work
within the scope of its specialty. A General or Specialty construction Contractor must
maintain a surety bond or assignment of account and carry general liability insurance.
Business and Licensing Information
Name
Phone
Address
Suite /Apt.
City
State
Zip
KENT
WA
98032
County KING
Business Type Corporation
Parent
Company
PERFORMANCE HEATING a
A/C INC
4252510356
25500 74TH AVE S
UBI No.
Status
License No.
License Type
Effective Date
Expiration Date
Suspend Date
Previous
License
Next License
Associated
License
Specialty 1
Specialty 2
600601386
ACTIVE
PERFOHA15ORT
CONSTRUCTION
CONTRACTOR
12/30/1985
4/30/2009
GENERAL
UNUSED
Business Owner Information
Bond Information
;,..„,,a=DTDLTnuA 1 GAD'!"
Page 1 of 2
n� /1 n /')nrlo
HVAC EQUIPMENT SCHEDULE
TAG
MANUFACTURER
DESCRIPTION
MODEL NO
NOMINAL
TONS
CAPACITY BTUH
SEER/EER
HSPF
CFM
E.S.P.
FAN HP
ELECTRICAL
SOUND
dB(A)
WEIG
WEIGHT
(LE
OUTSIDE AIR (CFM)
REMARKS
HEATING
COOLING
VOLTS
PHASE
MCA
MOCP
RTU -I
TRANE
ROOFTOP PACKAGE HEAT PUMP
2WGC3048A1000A
4
46,500
46,500
11/13
13
1600
0.6
.5
230
14)
34.6
40.0
161
WI
*
WITH FACTORY ROOF CURB $ ECONOMIZER.
BUILDING I
FASTEN RTU -I TO ROOF CURB
1A1/18-GA. STEEL STRAP.
SCREW STRAP TO ROOF
CURB 4 UNIT BASE RAIL. TWO
STRAPS EACH CORNER (&)
TOTAL.
SCALE: 1/64" = 1=0"
MINKLER BOULEVARD
NORTH It
RTU -I: 161 dB(A)
SOUTH It
SITE PLAN
BUILDING 2
BUILDING 3
- 1102 ' -0"
+1
*14 SCREWS THROUGH CURB
ADAPTER INTO EXISTING
CURB. (5) EA. SIPE $ (4)
EACH END.
fi
is
..•.d'....u.l rA?ly. � nvluG�yili
L
0
I-
PROVIDE $ INSTALL NEW 4 -TON ROOFTOP PACKAGE HEAT PUMP TO
REPLACE EXISTING FAILED 4 -TON ROOFTOP SPLIT SYSTEM HEAT PUMP.
NEW UNIT TO BE INSTALLED ON NEW FACTORY ROOF CURB. FASTEN UNIT
TO NEW CURB , FASTEN NEW CURB TO EXISTING ROOF STRUCTURE, SEE
ATTACHED STRUCTURAL AND SEISMIC CALCULATIONS FOR
RECOMMENDED FASTENING METHODS. CONNECT NEW UNIT TO EXISTING
LINE VOLTAGE $ LOW VOLTAGE UTILITIES.
vommieRCIM xCW.te,1M14:Siku3'rt!+i
. CI J� O IZX S
. cw_ '9- 0 I ZX G
iY
PARTIAL ROOF HVAC PLAN
AU0 0 9 2009
3 7pth31,
Lt ii r,d Dr:
7r)lend Dr
r R
Tu
Jr 1 I)54Andoverr Park ? I
^1[4f1CS.,
Co,, fn In! •ICPI.c, -1;19 frh.u.�rt '�r i.. �:'ra �li,f.. n11r1!lr�. tti,hr 2� I ti ip R r('rtrr.d, ,�,.II`nn_,��..nn.:, -.
szea i.
KING C1OUNTY PARCEL NO.:
262304
LEGAL DESCRIPTION:
SEPARATE PERMIT
REQUIRED FOR:
Mechanical
Iectrical
Et rnbing
Gas Piping
Oily of Tukwila
l! nING1 DIVISION
* INCLUDES ECONOMIZER, BAROMETRIC RELIEF DAMPER $ ROOF CURB.
** 320 GFM /2O CFM PER PERSON PER W.S.V.I.A.O.C. TABLE 3 -4 FOR OFFICE OCCUPANC( = lb PEOPLE
N
FOR SE 1/4 OF SE 1/4 BEG NWGOR SD SUED TH S 88 -12 -32 E 30 FTTH
GONTG 5 S8 -I2 -32 E 3W FT TH S 01 -41 -28 W 21 FT TO SLY MGN
OFMINKLER BLVD 4 TPOB THS 88 -12 -32 E 486.50 FT TO WLY
MGNAN)7OVER PARK EAST TH S 01 -41 -28 W 540. FT TH TANGENT TO
THE PRECEDING COURSE ALS ARC OF CURVETO TGT RAD 322.62 FT
GI 21 02 -23ARG LENGTH 1 18.41 FT TAP OF REV CURVATURE TH
TANGENT TO PREGEDINGGURVE ALS ARC OF CURVE TO LFT RAD382h2
FT G/A 01 -43 -06 ARC LENGTHOF 11.41 FT TH LEAVING SD WLY MGN
ANDOVER PARK EAST N 88 -12 -32 W41454 FT TH FR A TANGENT
THATBEARS N 11 -02 -43 E ALG ARC OFGURVE TO LFT RAO 300.16 FT 4
C/A 11=15 -15 ARC LENGTH 610.361 FT ~THTANGENT TO PRECEDING GURVEN
01-41-28. E 518.55 FT TO TPOB
SCO O F WORK:
PROVIDE 4 INSTALL NEW 4-TON ROOFTOP PACKAGE HEAT PUMP TO
REPLA EXISTING FAILED 4-TON ROOFTOP SPLIT SYSTEM HEAT PUMP.
NEW UNIT TO BE INSTALLED ON NEW FACTORY ROOF CURB, FASTEN UNIT
TO NEk l CURB , FASTEN NEW CURB TO EXISTING ROOF STRUCTURE. SEE
ATTACHED STRUCTURAL AND SEISMIC CALCULATIONS FOR
RECOMMENDED FASTENING METHODS. CONNECT NEW UNIT TO EXISTING
LINE VOLTAGE 4 LOW VOLTAGE UTILITIES.
REVISIONS
No changes shall b mt a to the scope
of work without Ow aa:,Nivvi vi
Tukwila 3uilding DivisiQ:3.
NOTE: Revisions will require a new plan submittal
COPE NOTES: and may include additional plan review fees.
-
I) SEAL DUCTS PER W.S.E.G. SECTION 1414.1.
2) INSULATE DUCTWORK PER W.S.E.C. TABLE I4 -6.
3) PROVIDE ECONOMIZER REQUIRED PER W.S.E.C. SECTION 1433,
4) A IIOV CONVENIENCE OUTLET SHALL BE WITHIN 25' -O" OF OUTDOOR
EQUIPMENT PER I.M.C. SECTION 306.4.1
) ROOF ACCESS TO EQUIPMENT TO ,,COMPLY WITH I .M.G. SECTION 3065.
FILE COPY
Permit
Plan review approval is
Approval of construction docurrats not ori
the violation of any adopted ordinance. Receipt
of approved Field Copy and Etna is acknowledged:
Date:
City Of Tukwila
UILDING DIVISION RECEIVED
CIV' OF TtlKWIL A
JAN 3 0 Z 0
PERMIT CENTER
MQOOi
aJ
H
U)
z
U,
w
ce
lib fOR
CODE COMPLIANCE
APPROVED
FEB 0 5 2009
D
DATE:
APPVD:
z
0
I-
L1�
0
z
lU
i
DRAWN: h 's
ENGR: MS
M1
I
JOB NUMBER:
3201 -08
SHEET 1 OF 1
n
0
N
q
t
n
0
H
z
z
x
0
0
N
t
n
P
00
00
CO