Loading...
HomeMy WebLinkAboutPermit M09-009 - STEADFASTSTEADFAST 1057 ANDOVER PK E EXPIRED 08 -09 -09 M09 -009 Parcel No.: 2623049019 Address: Suite No: doc: I MC -10/06 1057 ANDOVER PK E TUICW Tenant: Name: STEADFAST Address: 1057 ANDOVER PK E , TUKVVILA WA Contact Person: Name: KELVIN BATTLE Address: 25500 74 AV S , KENT WA Contractor: Name: PERFORMANCE HEATING Address: 7649 S 180 ST , KENT WA Contractor License No: PERFOHA15ORT Value of Mechanical: $11,245.00 Type of Fire Protection: Furnace: <100K BTU >100K BTU Floor Furnace Suspended/Wall/Floor Mounted Heater Appliance Vent Repair or Addition to Heat /Refrig /Cooling System.... Air Handling Unit <10,000 CFM >10,000 CFM Evaporator Cooler Ventilation Fan connected to single duct Ventilation System Hood and Duct Incinerator: Domestic Commercial/Industrial CitAbf Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us MECHANICAL PERMIT Owner: Name: M3 PROPERTIES LLC Address: C/O JSH PROPERTIES INC , 555 S RENTON VILLAGE PL #100 DESCRIPTION OF WORK: REPLACE (1) FAILING ROOF TOP UNIT WITH (1) NEW UNIT IN SAME LOCATION EQUIPMENT TYPE AND OUANTITY 0 0 0 0 0 0 1 0 0 0 0 0 0 0 * *continued on next page ** M09 -009 Permit Number: M09 -009 Issue Date: 02/10/2009 Permit Expires On: 08/09/2009 Phone: Phone: 425 251 -0356 Phone: 425 251 -0356 Expiration Date: 04/30/2009 Fees Collected: $315.41 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 0 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment Printed: 02 -10 -2009 Permit Center Authorized Signature: Signature: Print Name: doc: IMC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.ci.tukwila.wa.us Permit Number: M09 -009 Issue Date: 02/10/2009 Permit Expires On: 08/09/2009 Date: 2-4 `t 0 - 0 9 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit. Date: --/C--10 I This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M09 -009 Printed: 02 -10 -2009 Parcel No.: 2623049019 Address: 1057 ANDOVER PK E TUKW Suite No: Tenant: STEADFAST 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 5: Readily accessible access to roof mounted equipment is required. doc: Cond -10/06 • City of Tukwila Department of Community Development 6300' Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: :206- 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: M09 -009 Status: ISSUED Applied Date: 01/30/2009 Issue Date: 02/10/2009 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the Cityof Tukwila Permit Center. 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the'correction of errors in the construction documents and other data. * *continued on next page ** M09 -009 Printed: 02 -10 -2009 I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. • Signature: /5z;C /..l7 i�t��l�L Print Name: �S G • T7 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us doc: Cond -10/06 M09 -009 Date: Z g 7 ordinances governing or local laws regulating Printed: 02 -10 -2009 SITE LOCATION Site Address: , 1057 Andover Park East Tenant Name: Steadfast Name: Kelvin Battle CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http: 5vrv ty. ci. tukrvila.iva. us Mailing Address:25500 74th Ave S E-Mail Address: kelvin @pmghvac.com Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** Company Name: Performance Heating & Air Conditioning Mailing Address: 25500 74th Ave S Contact Person: Kelvin Battle E -Mail Address: kelvin @pmghvac.com Contractor Registration Number: PERFOHA I SORT Company Name: BCE Engineers, Inc Mailing Address:17924 140th Ave NE, Suite 220 Contact Person: Eric A. Dann E -Mail Address: Q:AApplications \Forms- Applications On LineA3 -21106 - Permit Application. doe Re,i.sod: 1 -2006 Building Permit No. Mechanical Permit No. Plumbing /Gas Permit No. Public Works Permit No. Project No. (For office use only) King Co Assessor's Tax No.:0323049026 Suite Number: New Tenant: Floor:1st ❑ Yes No Property Owners Name: JSH Properties Mailing Address: 10655 NE St #300 Bellevue Wa 98004 City State Zip CONTACT PERSON - who do we contact when your permit is ready to be issued Day Telephone: 425- 251 -0356 Kent, WA City State Fax Number:253 -867 -5775 98032 Zip GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Kent, WA City State Day Telephone: 425- 251 -0356 Fax Number: 253- 867 -5775 Expiration Date: 4/30/09 ARCHITECT OF RECORD - All plans must be wet stamped by Architect of Record Company Name: Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: State ENGINEER OF RECORD - All plans must be wet stamped by Engineer of Record Woodinville, Wa 98072 -4315 98032 Zip Zip City State Day Telephone: 425- 814 -8448 Fax Number: zip Page I of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace<100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended /Wall /Floor Mounted Heater Ventilation System Wood /Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat /Refrig /Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM 1 ,. Incinerator — Comm/1nd Contact Person: Kelvin Battle E -Mail Address: kelvin @pmghvac.com Use: Residential: New .... ❑ Commercial: New .... ❑ Fuel Type: Electric MECHANICAL PERMIT INFORMATION - 206 - 431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: Performance Heating and Air Conditioning Mailing Address: 25500 74th Ave S Contractor Registration Number:PERFOHA 15ORT Valuation of Mechanical work (contractor's bid price): $ 11,245.00 Scope of Work (please provide detailed information): Replace (1) failing roof top unit with (1) new unit in same location. Q.A Applications \Forms-Applications On Line \3 -2006 - permit Application.doc Reused' 9 -2000 bh Replacement .... ❑ Replacement .... d Kent WA 98032 ('ity State Zip Day Telephone: 425- 2581 -0356 Fax Number: 253- 867 -5775 Expiration Date: 4/30/09 Gas....❑ Other: Indicate type of mechanical work being installed and the quantity below: Page 4 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRITE (UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER 0 AUTHORIZE Signature: . ��� Mailing Address: 25500 74th Ave S Date Application Accepted: (x192010\ AGENT: Q. \Applications \Forms - Applications On Line\3 -2005 - Permit Application. doe Revised- 9 -25(15 Date Application Expires: Kent City Date: Print Name: Kelvin Battle Day Telephone: 425- 251 -0356 WA 98032 State Zip Staff Initials: Page 6 of 6 RECEIPT NO: R09 -00156 Initials: JEM User ID: 1165 Total Payment: 936.72 Payee: PERFORMANCE HEATING AND AIR CONDITIONING, INC. SET ID: 0130 SET NAME: PERFORMANCE HEATING & AIR SET TRANSACTIONS: Set Member Amount EL09 -0085 76.00 M09 -008 545.31 M09 -009 315.41 TOTAL: 76.00 ACCOUNT ITEM LIST: Description ELECTRICAL PERMIT - NONR MECHANICAL - 'NONRES PLAN CHECK - NONRES Ci. of Tukwila. Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us SET RECEIPT Payment Date: 01/30/2009 TRANSACTION LIST: Type Method Description Amount Payment Check 51405 936.72 TOTAL: 936.72 Account Code Current Pmts 000.322.101.00.0 76.00 000.322.102.00.0 688.58 000/345.830 172.14 TOTAL: 936.72 BTL ENGINEERING • .7y+1y76 FILE COPY 17924 - 140th Avenue NE, Suite 220 ritOet Woodinville, WA 98072 -4315 Penult ` Phone: (425) 814 -8448 Fax: (425) 821 -2120 Plan review approval is subject to errors and omissions. Structural Calculations for Steadfast Support of Proposed HVAC Unit July 31, 2008 EXPIRES 0923.08 �E COMPL FOR E C APPROVED FEB 0 5 2009 cmfi�i u` JAN 3 0 2009 PERMIT CENTER WWiG'O1 BTL ENGINEERING 17924 —140ei Avenue NE, Suite 220 Woodinville, WA 98072 -4315 Phone: (425) 814 -8448 Fax: (425) 821 -2120 Calculations BTL ENGINEERINNG 17924 — 140th Avenue NE, Suitc 220 Woodinville, WA 98072 -4315 Phone: (425) 814 -8448 Fax: (425) 821 -2120 Gravity Support (1) PARTIAL ROOF HVAC PLAN (7 I I L, Emos=s0= ENGINEERING RS- M = b5 v= rAL-Low tpcp 5 &Co (3. - z, .J3 V- L/ ■Ecp = 1.13/ (LL) L/:1110 = - 7 TN) (TL) ei„ 6 11 1. )60 N1 z6zsi 16 672. S 4 EAZ,s1, 2, x t-t Ok R 5— 0 Z- M AIL° , S c !mots' (lovillis 11_ M= V = L/360 = of66 .T.r (LL) 4 2;36 L/240 = (fl) = = 12,2,4 h•li- olt- Lts (?-3+ 6 (Si-c6;" 22,S kr"' -- — 2, 0 oe)t-0 1ZZ "r) 4.‘ kv Exss y Ra— m = k.ft v= L/360 (1-1) L/2.4o = (TL) Eireq'd '11-. f SeN 1)'T o N-92,-03 t9.1c.L. g t'UNTNtAti.,-, 3/v tomPi-g.s.son), To E K.P,TS4 b ItoOF 1../ki r Po ILE g. VS 6E-0J4-1 o, ek .rAlPr247.7o1J x /0' 119 4; 2- GS" x t C,Was," Project: 6'r Ci u'r-r Project Number: 0g-11 9 Cli 17924 - 140th Avenue NE, Suite 220 Woodinville, WA 98072-4315 Phone: 425-814-8448 Fax: 425-821-2120 Designed By: Id/3r it7 Date. Scale. Page. 6-2" TL easzennilimmasissm ENGINEERING RE ' M= k V = L/360 = (LL) L/240 = (TL) EI,e e oF Th N &A) M LfrOL A/,L 4 , e G S 5 PAT-AattIA 7 1 1 E-g-.P0 2 -1 R- -0 q DS A-00 vArTE. I terxtdd xio Et 7 32 V- = v= L/36o = L/240 = L) x/0 KB- 34= Ic.ft V = L/ 360 = L/ilo = (TL) E'req'd = 4 441 7- Project: 0/43.1 Project Number: °g g Client: Designed By: AblI. Date. Scale: 17924 - 140th Avenue NE, Suite 220 Woodinville, WA 98072-4315 Phone: 425-814-8448 Fax: 425-821-2120 Page- Co BTL ENGINEERING 17924 — 140th Avenue NE, Suite 220 Woodinville, WA 98072 -4315 Phone: (425) 814-8448 Fax: (425) 821 -2120 Seismic Support Conterminous 48 States 2006 International Building Code Latitude = 47.445 Longitude = - 122.251 Spectral Response Accelerations Ss and S1 Ss and S1 = Mapped Spectral Acceleration Values Site Class B - Fa = 1.0 ,Fv = 1.0 Data are based on a 0.05 deg grid spacing Period Sa (sec) (g) 0.2 1.399 (Ss, Site Class B) 1.0 0.478 (S1, Site Class B) Steadfast Mech'I Unit Revision Date: 7/30/2008 08- 199 -18 Occupancy Category: !II - Other Structures Seismic Use Group: I /E = 1.00 /s =1.00 / W = 1.00 Site Class: S = 1.4 5, = 0.48 1 ASCE Table 9.4.1.2 Fa = 1.00 ASCE Table 9.4.1.2.4a F„ = 1.52 ASCE Table 9.4.1.2.4b L D Design Spectral Response Acceleration: S =F = 1.40 SDS = % SMS = 0.93 (Seismic Factor) (Snow Factor) (Wind Factor) vJ IBC Table 1604.5 S =F = 0.73 S01 = z' SM1 = 0.49 Steadfast Mech'I:Unit 08- 199 -18 Seismic Forces Component Operating Weight: 426 Ibs F = 0.4 ap SDS WP [1 +2 (z/h)] R I F = 191 Ibs F need not exceed: F = 1.6 Sos Ip Wp F = 636 Ibs F shall not be less than: F 0.3 SDSIpWp F = 119 Ibs Dimensions: x = 44 in F y= 52 in Z z = 38 in w Curb Height = 28 in Curb Height Check Uplift: Mar = 8970 lb-in MRESIST = 8435 lb-in gg1oib-;n 0PLiFT- - 2.0916 yLA Revision Date: 7/30/2008 F.S. = 0.9 = 1.5 ASCE Eq. 9.6.1.3 -1 ASCE Eq. 9.6.1.3 -2 ASCE Eq. 9.6.1.3 -3 NOT O.K. y W rw. 113E gi boLve%Q 6 Y ATT'CHMeAI TL ENGINEERING IV111.0011641_ 0/it/yr To LORI, AAA -PrEe. F 1q1` #ID S02Ey%) U PLIFT = Z0-I' 6 Zap I b ' 6.1 „ j = (Z) ► o 66,r6Ew N b s11 Q Usrz : 1 be, $T►?4P 5 w /Lz� ' 1tJ G12'v�15 Cu Iz�v ...4,........5-.. .. ...... ....................... � � � g_5 LuRi A PTh(z- ?o e.xr. roi, 60213 t 14 SG12 .3N sosmt scytbo TN TENsToo U11_11=1 : Zati!b T sifAc rid 5I-IF4 L t ql!b 1 si "' aE z) 4 10 . Ir1c1 / to- iVSGYZp_v,1 VI It' 111'7's do = E ►, 1 14 �G1��� (11,1.A) A- tiPD Ews 15E # I 2rw5 (5) eA Sit>i - Cud Eft -o- Eu (J STR4- P Project: 5 ; PtOF4+s,-s U my T 17924 -140th Avenue NE, Suite 220 Woodinville, WA 98072 -4315 Phone: 425 - 814 -8448 Far. 425-821 -2120 Designed By /44 f3 Date: 0 - t qct- g Project Number. Client Scale: page s _ 17924 -140th Avenue NE, Suite 220 Woodinville, WA 98072 -4315 Phone: (425) 814 -8448 ENGINEERING: Fax: (425) 821 -2120 Details FASTEN RTU -I TO ROOF CURB W/ I8 -GA. STEEL STRAP. SCREW STRAP TO ROOF CURB 8 UNIT BASE RAIL. TWO STRAPS EACH CORNER (8) TOTAL. #I4 SCREWS THROUGH CURB ADAPTER INTO EXISTING CURB. (5) EA. SIDE it (4) EACH END. ATTACHMENT DETAIL NTS KELVIN BATTLE 25500 74 AV S KENT WA 98032 RE: Permit No. M09 - 009 1057 ANDOVER PK E TUKW Dear Permit Holder: City of Tukwila Department of Community Development Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 08/09/2009. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 08/09/2009, your permit will become null and void and any further work on the project will require a new permit and associated fees. • Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. M09 -009 Jim Haggerton, Mayor /Inn Cnnthrontar Rnnlavarri quite) itlnn a Tukwila Wachinotnn OR1RR a Phnna• NM-471-7157n a Far• 2fR- 21 71 -T6S ACTIVITY NUMBER: M09 - 009 PROJECT NAME: STEADFAST SITE ADDRESS: 1057 ANDOVER PK E X Original Plan Submittal Response to Correction Letter # DATE: 01 -30 -09 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: w S ilding Division Public Works Complete Comments: Approved Notation: REVIEWER'S INITIALS: Documents/routing slip.doc 2 -28 -02 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP NIA oar Fire Prevention APPROVALS OR CORRECTIONS: Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) wElt Incomplete TUES /THURS RO TING: Please Route Structural Review Required REVIEWER'S INITIALS: DUE DATE: 02 -03 -09 DATE: DATE: Planning Division Permit Coordinator Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: No further Review Required Approved with Conditions Not Approved (attach comments) DUE DATE: 03-03-09 Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Name Role Effective Date Expiration Date MILLER, DANIEL E PRESIDENT 11/27/2007 Bond Amount ERDAHL, DARRIN VICE PRESIDENT 11/27/2007 748802C GOWIN, RICHARD L VICE PRESIDENT 01/01/1980 GOWIN, CONSTANCE F VICE PRESIDENT 01/01/1980 11/15/2007 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 10 DEVELOPERS SURETY a INDEM CO 748802C 10/01/2007 Until Cancelled $12,000.0011 /27/2007 9 DEVELOPERS SURETY INDEM CO 853803C 04/28/2002 Until Cancelled 12/24/2007 $12,000.0004/23 /2002 8 DEVELOPERS SURETY a INDEM CO 853803C 12/29/200004/28 /2002 $6,000.00 07/27/2001 7 DEVELOPERS INS CO 853803C 12/01/200012/29 /2000 $6,000.00 11/22/2000 6 AMERICAN BANKERS INS CO LPM350055 12/01/1997 Until Cancelled 12/07/2000 $6,000.00 5 AMERICAN BANKERS INS LPM350055 12/01/199412/01 /1997 $6,000.00 Untitled Page General /Specialty Contractor A business registered as a construction contractor with Lai to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip KENT WA 98032 County KING Business Type Corporation Parent Company PERFORMANCE HEATING a A/C INC 4252510356 25500 74TH AVE S UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Previous License Next License Associated License Specialty 1 Specialty 2 600601386 ACTIVE PERFOHA15ORT CONSTRUCTION CONTRACTOR 12/30/1985 4/30/2009 GENERAL UNUSED Business Owner Information Bond Information ;,..„,,a=DTDLTnuA 1 GAD'!" Page 1 of 2 n� /1 n /')nrlo HVAC EQUIPMENT SCHEDULE TAG MANUFACTURER DESCRIPTION MODEL NO NOMINAL TONS CAPACITY BTUH SEER/EER HSPF CFM E.S.P. FAN HP ELECTRICAL SOUND dB(A) WEIG WEIGHT (LE OUTSIDE AIR (CFM) REMARKS HEATING COOLING VOLTS PHASE MCA MOCP RTU -I TRANE ROOFTOP PACKAGE HEAT PUMP 2WGC3048A1000A 4 46,500 46,500 11/13 13 1600 0.6 .5 230 14) 34.6 40.0 161 WI * WITH FACTORY ROOF CURB $ ECONOMIZER. BUILDING I FASTEN RTU -I TO ROOF CURB 1A1/18-GA. STEEL STRAP. SCREW STRAP TO ROOF CURB 4 UNIT BASE RAIL. TWO STRAPS EACH CORNER (&) TOTAL. SCALE: 1/64" = 1=0" MINKLER BOULEVARD NORTH It RTU -I: 161 dB(A) SOUTH It SITE PLAN BUILDING 2 BUILDING 3 - 1102 ' -0" +1 *14 SCREWS THROUGH CURB ADAPTER INTO EXISTING CURB. (5) EA. SIPE $ (4) EACH END. fi is ..•.d'....u.l rA?ly. � nvluG�yili L 0 I- PROVIDE $ INSTALL NEW 4 -TON ROOFTOP PACKAGE HEAT PUMP TO REPLACE EXISTING FAILED 4 -TON ROOFTOP SPLIT SYSTEM HEAT PUMP. NEW UNIT TO BE INSTALLED ON NEW FACTORY ROOF CURB. FASTEN UNIT TO NEW CURB , FASTEN NEW CURB TO EXISTING ROOF STRUCTURE, SEE ATTACHED STRUCTURAL AND SEISMIC CALCULATIONS FOR RECOMMENDED FASTENING METHODS. CONNECT NEW UNIT TO EXISTING LINE VOLTAGE $ LOW VOLTAGE UTILITIES. vommieRCIM xCW.te,1M14:Siku3'rt!+i . CI J� O IZX S . cw_ '9- 0 I ZX G iY PARTIAL ROOF HVAC PLAN AU0 0 9 2009 3 7pth31, Lt ii r,d Dr: 7r)lend Dr r R Tu Jr 1 I)54Andoverr Park ? I ^1[4f1CS., Co,, fn In! •ICPI.c, -1;19 frh.u.�rt '�r i.. �:'ra �li,f.. n11r1!lr�. tti,hr 2� I ti ip R r('rtrr.d, ,�,.II`nn_,��..nn.:, -. szea i. KING C1OUNTY PARCEL NO.: 262304 LEGAL DESCRIPTION: SEPARATE PERMIT REQUIRED FOR: Mechanical Iectrical Et rnbing Gas Piping Oily of Tukwila l! nING1 DIVISION * INCLUDES ECONOMIZER, BAROMETRIC RELIEF DAMPER $ ROOF CURB. ** 320 GFM /2O CFM PER PERSON PER W.S.V.I.A.O.C. TABLE 3 -4 FOR OFFICE OCCUPANC( = lb PEOPLE N FOR SE 1/4 OF SE 1/4 BEG NWGOR SD SUED TH S 88 -12 -32 E 30 FTTH GONTG 5 S8 -I2 -32 E 3W FT TH S 01 -41 -28 W 21 FT TO SLY MGN OFMINKLER BLVD 4 TPOB THS 88 -12 -32 E 486.50 FT TO WLY MGNAN)7OVER PARK EAST TH S 01 -41 -28 W 540. FT TH TANGENT TO THE PRECEDING COURSE ALS ARC OF CURVETO TGT RAD 322.62 FT GI 21 02 -23ARG LENGTH 1 18.41 FT TAP OF REV CURVATURE TH TANGENT TO PREGEDINGGURVE ALS ARC OF CURVE TO LFT RAD382h2 FT G/A 01 -43 -06 ARC LENGTHOF 11.41 FT TH LEAVING SD WLY MGN ANDOVER PARK EAST N 88 -12 -32 W41454 FT TH FR A TANGENT THATBEARS N 11 -02 -43 E ALG ARC OFGURVE TO LFT RAO 300.16 FT 4 C/A 11=15 -15 ARC LENGTH 610.361 FT ~THTANGENT TO PRECEDING GURVEN 01-41-28. E 518.55 FT TO TPOB SCO O F WORK: PROVIDE 4 INSTALL NEW 4-TON ROOFTOP PACKAGE HEAT PUMP TO REPLA EXISTING FAILED 4-TON ROOFTOP SPLIT SYSTEM HEAT PUMP. NEW UNIT TO BE INSTALLED ON NEW FACTORY ROOF CURB, FASTEN UNIT TO NEk l CURB , FASTEN NEW CURB TO EXISTING ROOF STRUCTURE. SEE ATTACHED STRUCTURAL AND SEISMIC CALCULATIONS FOR RECOMMENDED FASTENING METHODS. CONNECT NEW UNIT TO EXISTING LINE VOLTAGE 4 LOW VOLTAGE UTILITIES. REVISIONS No changes shall b mt a to the scope of work without Ow aa:,Nivvi vi Tukwila 3uilding DivisiQ:3. NOTE: Revisions will require a new plan submittal COPE NOTES: and may include additional plan review fees. - I) SEAL DUCTS PER W.S.E.G. SECTION 1414.1. 2) INSULATE DUCTWORK PER W.S.E.C. TABLE I4 -6. 3) PROVIDE ECONOMIZER REQUIRED PER W.S.E.C. SECTION 1433, 4) A IIOV CONVENIENCE OUTLET SHALL BE WITHIN 25' -O" OF OUTDOOR EQUIPMENT PER I.M.C. SECTION 306.4.1 ) ROOF ACCESS TO EQUIPMENT TO ,,COMPLY WITH I .M.G. SECTION 3065. FILE COPY Permit Plan review approval is Approval of construction docurrats not ori the violation of any adopted ordinance. Receipt of approved Field Copy and Etna is acknowledged: Date: City Of Tukwila UILDING DIVISION RECEIVED CIV' OF TtlKWIL A JAN 3 0 Z 0 PERMIT CENTER MQOOi aJ H U) z U, w ce lib fOR CODE COMPLIANCE APPROVED FEB 0 5 2009 D DATE: APPVD: z 0 I- L1� 0 z lU i DRAWN: h 's ENGR: MS M1 I JOB NUMBER: 3201 -08 SHEET 1 OF 1 n 0 N q t n 0 H z z x 0 0 N t n P 00 00 CO