Loading...
HomeMy WebLinkAboutPermit M09-061 - LIFEWAY CHRISTIAN STORESLIFEWAY CHRISTIAN STORES 17326 SOUTHCENTER PY 09 -061 Parcel No.: Address: Suite No: Tenant: Name: LIFEWAY CHRISTIAN STORES Address: 17326 SOUTHCENTER PY , TUKWILA WA Owner: Name: Address: 17326 SOUTHCENTER PY TUKW Contractor: Name: ROYAL SEAL CONSTRUCION INC Address: 124 MCMAKIN RD , BARTONVILLE TX Contractor License No: ROYALSC093RJ DESCRIPTION OF WORK: MINOR ALTERATIONS & UPGRADE TO EXISTING HVAC SYSTEM Value of Mechanical: $20,000.00 Type of Fire Protection: Furnace: <100K BTU 0 >100K BTU 0 Floor Furnace 0 Suspended/Wall/Floor Mounted Heater 0 Appliance Vent 0 Repair or Addition to Heat/Refrig /Cooling System.... 0 Air Handling Unit <10,000 CFM 0 >10,000 CFM 0 Evaporator Cooler 0 Ventilation Fan connected to single duct 3 Ventilation System 0 Hood and Duct 0 Incinerator: Domestic 0 Commercial/Industrial 0 doc: IMC -10/06 City Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206- 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tukwila.wa.us MECHANICAL PERMIT Contact Person: Name: KEVIN WEARE Address: 4000 DELRIDGE WAY SW, STE 300 , SEATTLE WA EQUIPMENT TYPE AND QUANTITY * * continued on next page ** M09 -061 • Permit Number: M09 -061 Issue Date: 07/09/2009 Permit Expires On: 01/05/2010 Phone: Phone: 206 795 -2629 Phone: 817 491 -6400 Expiration Date: 01/15/2010 Fees Collected: $412.21 International Mechanical Code Edition: 2006 Boiler Compressor: 0 -3 HP /100,000 BTU 0 3 -15 HP /500,000 BTU 0 15 -30 HP /1,000,000 BTU.. 0 30 -50 HP /1,750,000 BTU.. 0 50+ HP /1,750,000 BTU 0 Fire Damper 0 Diffuser 3 Thermostat 0 Wood/Gas Stove 0 Water Heater 0 Emergency Generator 0 Other Mechanical Equipment Printed: 07 -09 -2009 Permit Center Authorized Signature: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performapce f work. I am authorized to sign and obtain this mechanical permit. p Signature: Print Name: doc: IMC -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us J Permit Number: M09 -061 Issue Date: 07/09/2009 Permit Expires On: 01/05/2010 Date: Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. M09 -061 Printed: 07 -09 -2009 Parcel No.: Address: Suite No: Tenant: doc: Cond -10/06 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us 17326 SOUTHCENTER PY TUKW LIFEWAY CHRISTIAN STORES 1: ** *BUILDING DEPARTMENT CONDITIONS * ** PERMIT CONDITIONS 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. * * continued on next page ** Permit Number: M09 -061 Status: ISSUED Applied Date: 06/01/2009 Issue Date: 07/09/2009 M09 -061 Printed: 07 -09 -2009 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206- 431 -3665 Web site: http: / /www.ci.tukwila.wa.us I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work construction or the performance of work. Signature: Print Name: Vini I-J I4IM / fr doe: Cond -10/06 M09 -061 Date: 7 4 5 ordinances governing or local laws regulating Printed: 07 -09 -2009 Site Address: Property Owners Name: CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http: !/ i'ww. cri. tukwila. wa. us Tenant Name: 1'i F-ei Ay C 14Pi 5 7' Name: I EViY'1 1 I- (P A531': L-I-6 Mailing Address: 40e,e) D't 1--RiberE, s v U 'a ° 3e70 E -Mail Address: K6WIN G1?5 & C4 SettriAJ ?-1—.6 >iil Contact Person: E -Mail Address: Contractor Registration Number: Company Name: C U /sir iOPR 16 Ud 62. Mailing Address: CZ') W V))ao 1 N IA 3iAG4-1 Contact Person: 41.1 J,4 5t-L-1 -1 0 ` 1 'T E -Mail Address: Contact Person: E -Mail Address: H:\Applications \Forms- Applications On Line \2009 Applications \I -2009 - Permit Application.doc Revised: 1 -2009 Building Permit Mechanical Permi Public Project Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: 26 Z 3 04 9 I I 0 Suite Number: Floor: New Tenant: Yes ❑ .. No K i 1', 1c1iei i C ,v ki`rC O eA -rY 60124 Mailin Address: 3 3 3 if L iY'DE PARK 2! 0 i 1 L' t L W oyDI Ink NY' I 042- City State Zip CONTACT PERSON. -- who do a contact when your pertinil s ready Day Telephone: 2a" 796' 24,20 WA 9 S�ie City State Zip Fax Number:2AP 9 i 3 79 GENERAL CONTRACTOR INFORMATION' — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping to 5)) Company Name: i,4 Nh CANtJ Mailing Address: Zip State City Day Telephone: Fax Number: Expiration Date: ARCHITECT OF RECORD - All plans must b by Architect of Record NfeEFe k- k/l R tri A,J 14 2 S I Cit State Zip Day Telephone: 157 6* IL 242 Fax Number: 757 (2 2.- i 'g. ENGINEER. OF RtECORD AU plans mu be wet stamped by E near of Record Company Name: tsVA Mailing Address: City State Zip Day Telephone: Fax Number: Page 1 of 6 BUILDING PERMIT INFORIS144TION — 206 -431 -3670 Valuation of Project (contractor's bid price): $ 1 goa, t 0 Existing Building Valuation: $ Scope of Work (please provide detailed information): 1 ke't.-:- lZ i 012. T& N4K 7 - ;114 P V ire �; • j �, INLr R6ThJ 'i tNAJv'` PA Will there be new rack storage? ❑ Yes Provide AU Building s in Square I s tage Belo 1 A` Floor 2nd Floor Flog Floors th asement' Accessory Structure* Attached Gar >3E Detached Garage Attached Carport' Detached Carport Covered Deck Uncovered Deck Interior Remodel Addition to Existing Structure st p et IBrC tio Type of Occupancy per IBC PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: iff Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes itia No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications\Ponns- Applications On Line\2009 Applications \I -2009 - Permit Application.doc Revised: 1 -2009 0.. No If yes, a separate permit and plan submittal will be required. Paee 2 of 6 Unit Type: Qty Unit Type: Qty Unit Type: Qty Boiler /Compressor: Qty Furnace <100K BTU Air Handling Unit >10,000 CFM Fire Damper 0 -3 HP /100,000 BTU Furnace >100K BTU Evaporator Cooler Diffuser 3 -15 HP /500,000 BTU Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater Ventilation System Wood/Gas Stove 30 -50 HP /1,750,000 BTU Appliance Vent Hood and Duct Emergency Generator 50+ HP /1,750,000 BTU Repair or Addition to Heat/Refrig /Cooling System Incinerator - Domestic Other Mechanical Equipment Air Handling Unit <10,000 CFM Incinerator — Comm/Ind Contact Person: aviNi Me MECHANICAL PERMIT INFORMATION - 206- 431 -3670 MECHANICAL CONTRACTOR INFORMATION Company Name: 1,4: Mailing Address: City State Zip Day Telephone: ?et.' '755 24Z") ) E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Valuation of Mechanical work (contractor's bid price): $ 717,0a0 ; Scope of Work (please provide detailed information): {M I J A 1- 1 ATtcil4 iVAC 5 i EA\ Use: Residential: New .... ❑ Replacement .... ❑ Commercial: New .... ❑ Replacement .... ❑ Fuel Type: Electric ❑ Gas....❑ Other: Indicate type of mechanical work being installed and the quantity below: li:\Applications\Fotms- Applications On Line\2009 Applications \1 -2009 - Permit Application.doc Revised: 1 -2009 bh Page 4 of 6 Fixture Type: Qty Fixture Type: Qty Fixture Type: Qty ', Fixture Type: Qty Bathtub or combination bath/shower Bidet Clothes washer, domestic Dental unit, cuspidor Dishwasher, domestic, with independent drain Drinking fountain or water cooler (per head) L. Food -waste grinder, commercial Floor Drain 2. Shower, single head trap Lavatory 2 Wash fountain Receptor, indirect waste Sinks tit L Urinals Water Closet - Building sewer and each trailer park sewer Rain water system — per drain (inside building) Water heater and/or vent Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity) Grease interceptor for commercial kitchen ( >750 gallon capacity) Repair or alteration of water piping and/or water treatment equipment Repair or alteration of drainage or vent piping Medical gas piping system serving 1 -5 inlets /outlets for a specific gas Each additional medical gas inlets /outlets greater than 5 Backflow protective device other than atmospheric -type vacuum breakers 2 inch (51 mm) diameter or smaller Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Each lawn sprinkler system on any one meter including backflow protection devices Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1 -5) Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Gas piping outlets PLUMBING AND. GAS PIPING PERMIT INFORMATION — 206 -43 PLUMBING AND GAS PIPING CONTRACTOR INFORMATION Company Name: I/11\f n/1)0(f Mailing Address: City State Zip Day Telephone: t 1 9 S 2 sf' 2 -' ) E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: Contact Person: 4111 Valuation of Project (contractor's bid price): $ ZO.&C Scope of Work (please provide detailed information): IN`r, 4Z1oY ` J isJA, --- / loot?. ove -1 t' ...J't- "7 $ I I' y i rA %i , i� e4ii -° i •�' +- iecior'i FAc i w r £' a I'Yl cu e S iti - iz i eq ;Ks Cam- . fi - NO 1.401 IAL6-715-it Building Use (per Int'l Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: Sewer: Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: H:\Applications\Forms- Applications On- Line\2009 Applications \1-2009 Permit Application.doc Revised: 1.2009 bh Page 5 of 6 Date Application Accepted: ( [ D 1 Date Application Expires: I) . ( D ^ Staff Initials: 1/4 1 PERMIT APPLICATION NOTES = Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN OR AU . D AGENT: Signature: A '--- -----. Print Name: A/ /-J 4 E Mailing Address: '/06O' . i.- ,'1'6 ' Ivy 3 O Sr.Q7 rL /-1,A 9/124 H:\Applications \Forms- Applications On Line \2009 Applications \1 -2009 - Permit Application.doc Revised: 1 -2009 bh Date: ‹ Day Telephone: 7 , 5 ' ? If Da Tele hone: City State Zip Page 6 of 6 Receipt No.: R09 -01064 Payee: ROYAL SEAL CONSTRUCTION ACCOUNT ITEM LIST: Description doc: Receiot -06 MECHANICAL - NONRES PLAN CHECK - NONRES • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 7853 338.51 Authorization No. RECEIPT Account Code Current Pmts 000.322.102.00.0 329.77 000/345.830 8.74 Total: $338.51 Parcel No.: Permit Number: M09 -061 Address: 17326 SOUTHCENTER PY TUKW Status: APPROVED Suite No: Applied Date: 06/01/2009 Applicant: LIFEWAY CHRISTIAN STORES Issue Date: Payment Amount: $338.51 Initials: WER Payment Date: 07/09/2009 02:15 PM User ID: 1655 Balance: $0.00 AYMENT RECEIVE Printed: 07 -09 -2009 Parcel No.: Permit Number: M09 -061 Address: 17326 SOUTHCENTER PY TUKW Status: PENDING Suite No: Applied Date: 06/01/2009 Applicant: LIFEWAY CHRISTIAN STORES Issue Date: Receipt No.: R09 -00811 Initials: User ID: Payee: WER 1655 RRMM ARCHITECTS • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http://www.ci.tukwila.wa.us TRANSACTION LIST: Type Method Descriptio Amount Payment Check 16747 73.70 Authorization No. ACCOUNT ITEM LIST: Description PLAN CHECK - NONRES RECEIPT Account Code Current Pmts 000/345.830 73.70 Total: $73.70 Payment Amount: $73.70 Payment Date: 06/01/2009 02:25 PM Balance: $338.51 PYET E I E doc: Receiot -06 Printed: 06 -01 -2009 Project: L4 l C h lr i G14 j Type of Inspection: 1=f N A Address: 173Z10 Gad 1 i -1 Date Called: Special Instructions: Date Wanted: 2_--65' a.ir� P.m. Requester: Phone No: o2 0 Co —22(2 -- 72 09 INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (11( i-O(( PERMIT NO. (206)431 -3670 pproved per applicable codes. Corrections required prior to approval. ' COMMENTS: Date 00 REINSPECTION F REQUI D. Prior to inspection, fe must be at 6300 Southcenter : lvd., Su' a 100. Call to schedule reinspection. Rec '�t No.: 'Date: Proje /' / , %;T le 4..9/ OA,- Type o Inspection: , ,e)/ y 4 - i Address: /732 4 560 , // Date Called: Special Instructions: Date Wanted: a.m. Requester: Phone No: iv t -02-4- 72 8 INSPECTION NO. INSPECTION RECORD Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 V Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: / 45 1)- ti - Ai wevr, ,r►o A- rf -J u.✓ry — 1t//44 -- Date: or ed2 REINSPECTION FEE QUIRED. feior to inspection, fee must be at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Rec- pt No.: Date: Functional Performance Test Checklist - Single Zone Air Handling Unit For Air Handling Unit: ([1U Il 1. Functional Performance Test: Contractor shall verify operation of air handling unit as per Specification including the following: a. Ensure that a slight negative pressure exists on inboard side of the outside air dampers throughout the operation of the dampers. Modulate OA, RA, and EA dampers from fully open to fully closed positions. a. The following shall be verified when the [supply fan operating] [supply and return . fans operating] mode is initiated: (1) All dampers in normal position prior to fan start I � S (2) All valves in normal position prior to fan start les (3) System safeties allow start if safety conditions are met.10 b. Occupied mode of operation - economizer de- energized. (1) Outside air damper at minimum position. 2S (2) Return air damper open. k o (. (3) Relief air damper [at minimum position] [closed]. 1-V• (4) Chilled water control valve modulating to maintain space cooling temperature set point. Setpoint [deg F][deg Cl Actual f'4 4 - [deg F] [Deg C] (5) Hot water control valve modulating to maintain space heating temperature set point input from outside air temperature controller. c. Occupied mode of operation - economizer energized. d. Unoccupied mode of operation. (1) Observe fan starts when space temperature calls for heating /cooling YliS. (2) A11 dampers in normal position. e5 '(3) Verify low limit space t n erature is maintained as specified in sequence of operation. L (1) Outside air damper modulated to maintain mixed air temperature set point. Setpoint 55 [deg F] [deg C] Actual 5S [deg F][Deg C] 0/A damper position % Return Air Temperature 17 [deg F][Deg C] Outside Air Temperature ° [deg F][Deg C] (2) Relief air damper modulates with outside air damper according to sequence of operation. Relief air damper position Z-5 % (3) Chilled water control valve modulating to maintain space I cooling temperature set point. Setpoint [deg F][deg C] Actual // k [deg F][Deg C] Return sensor overrides to normal operation. Functional Performance Test Checklist (coat) - Single Zone Air Handling Unit e. The following shall be verified when the [supply fan off] [supply and return fans off] mode is initiated: (1) All dampers in normal position. e S (2) All valves in normal position. (3) Fan de- energizes. f. Verify cooling coil and heating coil operation by varying thermostat set point from coolin s t point to heating set point and returning to cooling set point e- g. Verify safety shut down initiated by low temperature protection thermostat sv.5 h. Verify occupancy schedule is programmed into time clock /UMCS \`/ . 2. Certification: We the undersigned have witnessed the above functional performance tests and certify that the item tested has met the performance requirements in this section of the specifi a ions. Contractor's Commissioning Specialist Contractor's Mechanical Representative U 3(00 12g 1+- 3E pg(c) C .4 pgoo ,-ggo 375 �e S 30). V 366 366 E7 A 4 371 A 30 5 ature and at 1� 4 I Functional Performance Test Checklist - Single Zone Air Handling Unit For Air Handling Unit: (1) (2) [pro 2] 1. Functional Performance Test: handling unit as per specification a. Ensure that a slight negative outside air dampers throughout the RA, and EA dampers from fully open (3) System safeties Contractor shall verify operation of air including the following: pressure exists on inboard side of the operation of the dampers. Modulate OA, to fully closed positions. a. The following shall be verified when the [supply fan operating] [supply and return fans operating] mode is initiated: All dampers in normal position prior to fan start YG S All valves in normal position prior to fan start lC S allow start if safety conditions are met.' e S b. Occupied mode of operation - economizer de- energized. (1) Outside air damper at minimum position. ZS /• (2) Return air damper open. Lc (3) Relief air damper [at minimum position] [closed]. ei P'S (4) Chilled water control valve modulating to maintain space / cooling temperature set point. Setpoint [deg F][deg C] Actual 4 l [deg F] [Deg C] (5) Hot water control valve modulating to maintain space heating temperature set point input from outside air temperature controller. /V c. Occupied mode of operation - economizer energized. (1) Outside air damper ,modulated to maintain mixed air temperature set point. Setpoint 'S [deg F][deg C] Actual `< [deg F][Deg C] 0/A damper position 2S % Return Air Temperature - 7[deg F] [Deg C] Outside Air Temperature l [deg F] [Deg C] (2) Relief air damper modulates with outside air damper according to sequence of operation. Relief air damper position 24 g (3) Chilled water control valve modulating to maintain space 1 cooling temperature set point. Setpoint [deg F][deg C] Actual [deg F][Deg C] Return sensor overrides to normal operation. d. Unoccupied mode of operation. (1) Ob��e fan starts when space temperature calls for heating /cooling 1 (2) All dampers in normal position. (3) Verify low limit space temperature is maintained as specified in sequence of operation. Functional Performance Test Checklist (cont) - Single Zone Air Handling Unit e. The following shall be verified when the [supply fan off] (supply and return fans off) mode is initiated: (1) All dampers in normal position. 6 S (2) All valves in normal position. (3) Fan de- energizes. cC f. Verify cooling coil and heating coil operation by varying thermostat set point from cooling set point to heating set point and returning to cooling set point 'S . g. Verify safety shut down initiated by low temperature protection thermostat L f'GS h. Verify occupancy schedule is programmed into time clock /UMCS ."./ -S . 2. Certification: We the undersigned have witnessed the above functional performance tests and certify that the item tested has met the performance requirements in this section of the specif' cat s. Contractor's Commissioning Specialist Contractor's Mechanical Representative A Zq r7.c ure and/ate 6 9 c , � 2 v 42 - 12-r 4 2_ w ML ,Wc Functional Performance Test Checklist - Single Zone Air Handling Unit l For Air Handling Unit: (1U3] ' �'bWQ 550(4 1. Functional Performance Test: Contractor shall verify operation of air handling unit as per specification including the following: a. Ensure that a slight negative pressure exists on inboard side of the outside air dampers throughout the operation of the dampers. Modulate OA, RA, and EA dampers from fully open to fully closed positions. a. The following shall be verified when the [supply fan operating] [supply and return fans operating] mode is initiated: (1) All dampers in normal position prior to fan start Lies . (2) All valves in normal position prior to fan start e S . (3) System safeties allow start if safety conditions are met. .saes b. Occupied mode of operation - economizer de- energized. (1) Outside air damper at minimum position. (2) Return air damper open. 4 tS (3) Relief air damper [at minimum position] [closed]. y eS (4) Chilled water control valve modulating to maintain space r cooling temperature set point. Setpoint [deg F][deg C] Actual [deg F][Deg C] (5) Hot water control valve modulating to maintain space heating temperature set point input from outside air temperature controller. c. Occupied mode of operation - economizer energized. (1) Outside air damper modulated to maintain mixed air temperature set point. Setpoint [deg F][deg C] Actual SS [deg F][Deg C] 0/A damper position Z- % Return Air Temperature $d [deg F][Deg C] Outside Air Temperature '69 [deg F][Deg C] (2) Relief air damper modulates with outsideir damper according to sequence of operation. Relief air damper position (3) Chilled water control valve modulating to maintain space / n cooling temperature set point. Setpoint (deg F][deg C] Actual /'v /r (deg F][Deg C] Return sensor overrides to normal operation. d. Unoccupied mode of operation. (1) Observe fan starts when space temperature calls for heating /cooling V. (2) All dampers in normal position. `t�S (3) Verify low limit space temperature is maintained as specified in sequence of operation. QiS C6v- -Q %op V? 2 7‘7,t1) 4 % D ; 'yep Uc" D Functional Performance. Test Checklist (cont) - Single Zone Air Handling Unit e. The following shall be verified when the [supply fan off] [supply and return fans off] mode is initiated: (1) All dampers in normal position. kte-5 (2) All valves in normal position. (3) Fan de- energizes. f. Verify cooling coil and heating coil operation by varying thermostat set point from cooling set point to heating set point and I L T / returning to cooling set point � -S . 4.,.Q (s �'T l.c,p(L4L*&)° ,.9 1 g. Verify safety shut down initiated by low temperature protection thermostat `te.-S . h. Verify occupancy schedule is programmed into time clock /DMCS 1 - 2. Certification: We the undersigned have witnessed the above functional performance tests and certify that the item tested has met the performance requirements in this section of the specif c- ions. Contractor's Commissioning Specialist Contractor's Mechanical Representative , cis tune and/ate,/ `9 9, S t'] liebv Nurker • Functional Performance Test Checklist - Single Zone Air Handling Unit For Air Handling Unit: [ 1. Functional Performance Test: Contractor shall verify operation of air handling unit as per specification including the following: a. Ensure that a slight negative pressure exists on inboard side of the outside air dampers throughout the operation of the dampers. Modulate OA, RA, and EA dampers from fully open to fully closed positions. a. The following shall be verified when the [supply fan operating] (supply and return fans operating] mode is initiated: (1) All dampers in normal position prior to fan start '165 (2) All valves in normal position prior to fan start te...f (3) System safeties allow start if safety conditions are met. l of b. Occupied mode of operation - economizer de- energized. (1) Outside air damper at minimum position. (2) Return air damper open. tv /) (3) Relief air damper [at minimum position] [closed]. (4) Chilled water control valve modulating to maintain space 4 cooling temperature set point. Setpoint [deg F][deg C] Actual V" [deg F] [Deg C] (5) Hot water control valve modulating to maintain space heating dV temperature set point input from outside air temperature controller. I c. Occupied mode of operation - economizer energized. (1) Outside air damper lated to maintain mixed air temperature set point. Setpoint [deg F][deg C] Actual S [deg F][Deg C] 0/A damper position 2-Y % Return Air Temperature F][Deg C] Outside Air Temperature I ( [deg F][Deg C] (2) Relief air damper modulates with outside air damper according to sequence of operation. Relief air damper position t (3) Chilled water control valve modulating to maintain space 1 cooling temperature set point. Setpoint (deg F][deg C] Actual [deg F][Deg C] Return sensor overrides to normal operation. d. Unoccupied mode of operation. (1) Observe fan starts when space temperature calls for heating /cooling &/. (2) 11 dampers in normal position. Lt CS (3) Verify low limit space temperature is maintained as specified in sequence of operation. e- S Functional Performance Test Checklist (cont) - Single Zone Air Handling Unit e. The following shall be verified when the [supply fan off] [supply and return fans off] mode is initiated: (1) All dampers in normal position. q." (2) All valves in normal position. 116-S (3) Fan de- energizes. f. Verify cooling coil and heating coil operation by varying thermostat set point from coolin set point to heating set point and returning to cooling set point Gt g. Verify safety shut down initiated by low temperature protection thermostat I e5 . h. Verify occupancy schedule is programmed into time clock /UMCS `es . 2. Certification: We the undersigned have witnessed the above functional performance tests and certify that the item tested has met the performance requirements in this section of the speci ations. hr Contractor's Commissioning Specialist Contractor's Mechanical Representative ature a d D -te P-- —4 'Fdd Cooling Equipment Schedule Equip. ID Brand Name' Model No. Capacity Btu /h Total CFM OSA CFM or Econo? SEER or EER IPLV Location RTU -1 Trane WCD060 63100 1800 Yes 10.5 SEER 17.4 kW Roof RTU -2 Trane WCDO60 63100 1800 Yes 10.5 SEER 17.4 kW Roof RTU -3 Trane WCD036 38100 1100 Yes 10.5 SEER 6 kW Roof RTU -4 Trane WCD048 50800 1500 Yes 10.5 SEER 12kW Roof Fan Equipment Schedule Equip. ID Brand Name' Model No. CFM Sp' HP /BHP Flow Control Location of Service Efficiency RTU -1 Trane WSC060 67200 1800 Yes 17.4 kW 17.4 kW 100.000 RTU -2 Trane WSC060 67200 1800 Yes 17.4 kW 17.4 kW 100.000 RTU -3 Trane WSCO36 34800 1100 Yes 6 kW 6 kW 100.000 RTU -4 Trane WSC048 46800 1500 Yes 12 kW 12kW 100.000 Heating Equipment Schedule Equip. ID Brand Name' Model No. Capacity Btu /h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency RTU -1 Trane WSC060 67200 1800 Yes 17.4 kW 17.4 kW 100.000 RTU -2 Trane WSC060 67200 1800 Yes 17.4 kW 17.4 kW 100.000 RTU -3 Trane WSCO36 34800 1100 Yes 6 kW 6 kW 100.000 RTU -4 Trane WSC048 46800 1500 Yes 12 kW 12kW 100.000 Project Kr ce1 �O • 20 . kO e t ° gy p!: r � c ea� b� mf r Project Address r,ifaway Christian Store Date 5/1/2009 . Parkway Supercenter For Building Dept. Use COD rY E • 3 N ll Tukwila, WA \ Name: Billy D. Oliver Applicant Address: 301 Industrial Boulevard, Tullahoma, TN 37388 Applicant Phone: 931- 454 -994o Mechanical Summary MECH -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms o l1 a.:. `e� aQQ pro Description fi r, Briefly describe mechanical system type and features. Includes Plans Compliance Option 2006 Washington State Nonresidential Energy Code Compliance Form Drawings must contain notes requireing compliance with commissioning requiremen Project included tenant change and minor HVAC upfit rewor of demising wall separating two spaces and addition of two o existing HVAC systems are to remain. t'LO9O(I Revised July 2007 Simple System Q Complex System Q Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. D FOR LANCE 'If available. 2 As tested according to Table 14 -1A through 14-1G. 3 If required. 4 COP, HSPF Combustion Efficiency, or A CGI M G I applicable. 6 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). JUN 01 2.009 PERMIT CENTER System Description See Section 1421 for full description of Simple System qualifications. If Heating /Cooling or Cooling Only: ❑ Constant vol? ❑ Split system? ❑ Air cooled? ❑ Packaged sys? ❑ <20,000 Btuh? ❑ Economizer included? If Heating Only: ❑ <5000 cfm? ❑ <70% outside air? 2006 Washington State Nonresidential Energy Code Compliance Form Mechanic Summary (back) MECH -SUM Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. otal Ca.. wo economize <240,000 Btuh or 10 %? Heating Only Reference Section 1421 Heating /Cooling or Cooling Only Simple System Allowed (section 1420) Reference Section 1423 Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. Mechanical- ;C omplex Systems Checklist MECH 2006 Washington State Nonresidential Energy Code Compliance Forms -COMP Revised July 2007 Project Address Lifeway Christian Store Date 5/1/2009 The following additional information is necessary to check a mechanical permit application for a complex mechanical system for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Use the checklist as a reference for notes added to the mechanical drawings (see the MECH- CHK checklist for additional system requirements). This information must be on the plans since this is the official record of the permit. Having this information in separate specifications alone is NOT an acceptable altarnafiva For Building Department Use Applicability (yes, no, n.a.) Code Section Component Information Required Location on Plans Building Department Notes ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY n.a. 1431.1 Field assem. sys. Provide calculations yes 1432.1 Setback & shut - off Indicate separate systems or show isolation devices on plans Ml & M2 yes 1432.2.1 Air system reset Indicate automatic reset Ml & M2 n.a. 1432.2.2 Hydronic System Indicate automatic reset, cooling tower, & heat pump loop valves yes 1433 Air Economizer Indicate economizer on equipment schedule or provide calculations to justify exemption and demonstrate 10% higher efficiency for equipment with out economizer. Note 17 ' n. a. 1433 Water Economizer Indicate water economizer and provide calculations if 1433 Exception 2 is utilized n.a. 1434 Separate air sys. Indicate separate systems on plans no 1435 Simul. htg. & clg. Indicate that simultaneous heating and cooling is prohibited, unless use of exception is justified M2, Note 17 n. a. 1436 Heat recovery Indicate heat recovery on plans; complete and attach heat recovery calculations n.a. 1437 Elec. motor effic. MECH -MOT or Equip. Schedule with hp, rpm, efficiency n.a. 1438 Variable flow sys. Indicate variable flow on fan and pump schedules n.a. 1439.1 Kitchen Hoods Indicate uncooled and unheated make -up air n.a. 1439.2 Fume Hoods Indicate VAV, unheated /uncooled or heat rec. makeup no is ctrciea for any question, provtae explanation: Decision Flowchart Use this flowchart to determine how the requirements of the Complex Systems Option apply to the project. Refer to the indicated Code sections for more complete information on the requirements. C Start Here • Section 1411.1 Equipmen Efficiency Shall Meet Tables 14-1A through 14 -1G 2006 Washington State Nonresidential Enerav Code Compliance Form as/Oil Furna input ?_ 225,000 tuh or Gas/O' ' Hea Any Fuel Furnac input? 225,000 Btuh? Air System Serving Multiple Zones? apacity of H Heating System > 00,000 Btuh Yes 1411.1 Intermittent Ignition Device & Power Venting or Damper. If input ? 225,000 Btuh then 1412.6 Modulating or Staged Combustion Controls Required Yes 1411.1 0.75% Maximum Jacket Loss Yes Section 1431.1 Calculations of Total On -Site Energy Input & Ouput Required (continued on back) Yes Section 1432.2.1 Supply Air Reset Controls Required Yes No Section 1432.2.2 Hot Water Supply Temperature Reset Required 2006 Washington State Nonresidential Energy Code Compliance Form 2006 Washington State Nonresidential Energy Code Compliance Forms Yes 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Complex Systems (back) MECH -COMP 0% Air Econ Provided? Section 1413 Total Clg Capacity w/ Water Econo <500 Tons Yes • Yes No Yeses Yes tal Cap. cono <= 480,00 Btuh or 20% of otal Cap. Yes otor Ind. I qpmt. Cov'd by Tbl 14- 1A -14- 1G? Section 1436 50% Effective Heat Recovery Required ystem or Zon w/ Simultaneous Htg. & Clg.? Application Involves Variable Flow? Section 1435 Zone Controls Must Reduce Supply Air Quantity Before Reheating/Recooling Section 1439.1 No Heating or Cooling for at Least 50% of Make -up Air 0 0 No• Section 1433 Economizer Required 1 Yes Section 1437 Motors Must Meet Efficiencies in Table 14-4 Section 1438 Variable Flow Devices Required Section 1439.2 One Required: a. 50% VAV Exhaust & Make -up b. 75% Direct Makeup w/ Tempering Only c. Heat Recovery per 1436 d. Constant Volume w/ < 50fpm Face Velocity Revised July 2007 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical 2006 Washington State Nonresidential Permit Plans Checklist Energy Code Compliance Forms MECH-CHK Revised July 2007 Project Address Lifeway Christian Store 'Date 5/1/2009 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability Code (yes, no, n.a.) Section Component Information Required I Location on Plans I Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance yes 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule M2 yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M2 yes 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans Ml yes 1412.2 Deadband control Indicate 5 degree deadband minimum M2 no 1412.3 Humidity control Indicate humidistat yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types M2 n.a . 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage n. a. 1412.4.2 Optimum Start Indicate optimum start controls yes 1412.5 Heat pump control Indicate microprocessor on thermostat schedule M2 n. a. 1412.6 Combustion htg. Indicate modulating or staged control yes 1412.7 Balancing Indicate balancing features on plans Ml 1412.8 Ventilation Control Indicate demand control ventilation for high- occupancy areas yes 1422 Thermostat interlock Indicate thermostat interlock on plans M2 yes 1423 Economizers Equipment schedule M2 1413 Air economizers yes 1413.1 Air Econo Operation Indicate 100% capability on schedule M2 n.a. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb n. a. 1413.2 Water Econo Doc Indicate clg load & water econoe & clg tower performance n.a. 1413.3 Integrated operation Indicate capability for partial cooling n.a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary M2 yes 1414.2 Duct insulation Indicate R -value of insulation on duct M2 yes 1415.1 Piping insulation Indicate R -value of insulation on piping P2 1416 Completion Requirements n.a. 1416.2.1 Commissioning Provide commissioning plan yes 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing M2 n. a. 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training n.a. 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report n.a. 1434 Separate air sys. Indicate separate systems on plans yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. yes 1441 Elec. water heater Indicate R -10 insulation under tank P2 n.a. 1442 Shut -off controls Indicate automatic shut -off yes 1443 Pipe Insulation Indicate R -value of insulation on piping P2 n.a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n.a. 1452 Heater Efficiency Indicate pool heater efficiency n.a. 1453 Pool heater controls Indicate switch and 65 degree control n.a. 1454 Pool covers Indicate vapor retardant cover n.a. 1454 Pools 90+ degrees Indicate R -12 pool cover 2006 Washington State Nonresidential Energy Code Compliance Form no is circles for any question, provlae explanation: 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed In the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an Intermittent Ignition or interrupted device (IID), and have either mechanical draft (including power venting) ore flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), Including electric furnaces, that are not located within the conditioned space shall have Jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) ore CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. Ate minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: if a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant Is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 1412.8 Ventilation Controls for High - Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception Is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following Information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water-cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum Indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 Inch W.C. or greater. 1414.2 insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating Interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include Insulation Installation, moisture control, air leakage, and building envelope Insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying EF CAE < 50 gal storage 0.58 0.71 50 to 70 gal storage 0.57 0.71 > 70 gal storage 0.55 0.70 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist MECH -CHK 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Mechanical - General Requirements 1411.1 General: Equipment shall have a minimum performance at the specified rating conditions not less than the values shown in Table 14 -1A through 14 -1G. If a nationally recognized certification program exists for a product covered in Tables 14 -1A through 14 -1G, and it includes provisions for verification and challenge of equipment efficiency ratings, then the product shall be listed In the certification program. Gas -fired and oil -fired forced air furnaces with input ratings > 225,000 Btu /h (65 kW) and all unit heaters shall also have an Intermittent Ignition or interrupted device (IID), and have either mechanical draft (including power venting) ore flue damper. A vent damper is an acceptable alternative to a flue damper for furnaces where combustion air is drawn from the conditioned space. All furnaces with input ratings > 225,000 Btu /h (65 kW), Including electric furnaces, that are not located within the conditioned space shall have Jacket losses not exceeding 0.75% of the input rating. 1411.2 Rating Conditions: Cooling equipment shall be rated at ARI test conditions and procedures when available. Where no applicable procedures exist, data shall be furnished by the equipment manufacturer. 1411.3 Combination Space and Service Water Heating: For combination space and service water heaters with a principal function of providing space heat, the Combined Annual Efficiency (CAE) may be calculated by using ASHRAE Standard 124 -1991. Storage water heaters used in combination space heat and water heat applications shall have either an Energy FActor (EF) ore CAE of not less than the following: 1411.4 Packaged Electric Heating and Coo ing Equipment: Packaged electric equipment providing both heating and cooling with a total cooling capacity greater than 20, Btu /h shall be a heat pump. Exception: Unstaffed equipment shaelters or cabinets used solely for personal wireless service facilities. 1412 Controls 1412.1 Temperature Controls: Each system shall be provided with at least one temperature control device. Each zone shall be controlled by individual thermostatic controls responding to temperature within the zone. Ate minimum, each floor of a building shall be considered as a separate zone. 1412.2 Deadband Controls: When used to control both comfort heating and cooling, zone thermostatic controls shall be capable of a deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. Exceptions: 1. Special occupancy, special usage, or code requirements where deadband controls are not appropriate. 2. Buildings complying with Section 1141.4, if in the proposed building energy analysis, heating and cooling thermostat setpoints are set to the same temperature between 70 degrees F and 75 degrees F inclusive, and assumed to be constant throughout the year. 3. Thermostats that require manual changeover between heating and cooling modes. 1412.3 Humidity Controls: if a system is equipped with a means for adding moisture, a humidistat shall be provided. 1412.4 Setback and Shut -Off: HVAC systems shall be equipped with automatic controls capable of accomplishing a reduction of energy use through control setback or equipment shutdown during periods of non -use or alternate use of the spaces served by the system. The automatic controls shall have a minimum seven -day clock and be capable of being set for seven different day types per week. It must retain programming and time for a power loss of 10 hours and include an accessible manual override of up to 2 hours. Exceptions: 1. Systems serving areas which require continuous operation at the same temperature setpoint. 2. Equipment with full load demands of 2 kW (6,826 Btu /h) or less may be controlled by readily accessible manual off-hour controls. 3. Systems controlled by an occupant sensor that is capable of shutting the system off when no occupant Is sensed for a period of up to 30 minutes. 4. Systems controlled solely by a manually operated timer capable of operating the system for no more than two hours. 1412.4.1 Dampers: Outside air intakes, exhaust outlets and relief outlets serving conditioned spaces shall be equipped with dampers which close automatically when the system is off or upon power failure. Stair shaft and elevator shaft smoke relief openings shall be equipped with normally open (fails to open upon loss of power) dampers. These dampers shall remain closed until activated by the fire alarm system or other approved smoke detection system. Exceptions: 1. Systems serving areas which require continuous operation. 2. Combustion air intakes. 3. Gravity (nonmotorized) dampers are acceptable in buildings less than 3 stories in height. 4. Gravity (nonmotorized) dampers are acceptable in exhaust and relief outlets in the first story and levels below the first story of buildings three or more stories in height. 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 1412.8 Ventilation Controls for High - Occupancy Areas: Demand control ventilation (DCV) is required for spaces that are larger than 500 ft2, have a design occupancy for ventilation of greater than 40 people for 1000 ft2 of floor area, and are served by systems with one or more of the following: a. An air -side economizer, b. Automatic modulating control of the outdoor air damper, or c. A design outdoor airflow greater than 3000 cfm. Exceptions: 1.Systems with energy recovery complying with Section 1436. 2. Multiple -zone systems without direct - digital control of individual zones communicating with a central control panel. 3. Systems with a design outdoor airflow less than 1200 cfm. 4. Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. 1413 Air Economizers 1413.1 Operation: Air economizers shall be of automatically modulating outside and return air dampers to provide 100 percent of the design supply air as outside air to reduce or eliminate the need for mechanical cooling. Water economizers shall be capable of providing the total concurrent cooling load served by the conneted terminal equipment lacking airside economizer, at outside air temperatures of 45 ° F dry- bulb /40 ° F wet -bulb and below. For this calculation, all factors including solar and internal load shall be the same as those used for peak load calculations, except for the outside temperatures. Exception: Water economizers using air - cooled heat rejection equipment may use a 35 ° F dry-bulb outside air temperature for this calculation. This exception Is limited to a maximum of 20 tons per building. 1413.2 Documentation: Water economizer plans submitted for approval shall include the following Information: 1. Maximum outside air conditions for which economizer is sized to provide full cooling. 2. Design cooling load to be provided by economizer at this outside air condition. 3. Heat rejection and terminal equipment performance data including model number, flow rate, capacity, entering and leaving temperature in full economizer cooling mode. 1413.3 Integrated Operation: Air economizers shall be capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. Exceptions: 1. Individual, direct expansion units that have a rated capacity less than 65,000 Btu /h and use nonintegrated economizer controls that preclude simultaneous operation of the economizer and mechanical cooling. 2. Water-cooled water chillers with waterside economizer. 1413.4 Humidification: If an air economizer is required on a cooling system for which humidification equipment is to be provided to maintain minimum Indoor humidity levels, then the humidifier shall be of the adiabatic type (direct evaporative media or fog atomization type). Exceptions: 1. Health care facilities where WAC 246 - 320 -525 allows only steam injection humidifiers in ductwork downstream of final filters. 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu /h shall have modulating or staged combustion control. 2. Systems with water economizer 3. 100% outside air systems with no provisions for air recirculation to the central supply fan. 4. Nonadiabatic humidifiers cumulatively serving no more than 10% of a building's air economizer capacity as measured in cfm. This refers to the system cfm serving rooms with stand alone or duct mounted humidifiers. 1414 Ducting Systems 1414.1 Sealing: Duct work which is designed to operate at pressures above 1/2 inch water column static pressure shall be sealed in accordance with Standard RS -18. Extent of sealing required is as follows: 1. Static pressure: 1/2 inch to 2 inches; seal transverse joints. 2. Static pressure: 2 inches to 3 inches; seal all transverse joints and longitudinal seams. 3. Static pressure: above 3 inches; seal all transverse joints, longitudinal seams and duct wall penetrations. Duct tape and other pressure sensitive tape shall not be used as the primary sealant where ducts are designed to operate at static pressures of 1 Inch W.C. or greater. 1414.2 insulation: Ducts and plenums that are constructed and function as part of the building envelope, by separating Interior space from exterior space, shall meet all applicable requirements of Chapter 13. These requirements include Insulation Installation, moisture control, air leakage, and building envelope Insulation levels. Unheated equipment rooms with combustion air louvers must be isolated from the conditioned space by insulating interior surfaces to a minimum of R -11 and any exterior envelope surfaces per Chapter 13. Outside air ducts serving individual supply air units with less than 2,800 cfm of total supply air capacity shall be insulated to a minimum of R -7 and are not considered building envelope. Other outside air duct runs are considered building envelope until they, 1. connect to the heating or cooling equipment, or 2. are isolated from the exterior with an automatic shut -off damper complying ' 2006 Washington State Nonresidential Energy Code Compliance Form 1412.4.2 Optimum Start Controls: Heating and cooling systems with design supply 2. are isolated from the exterior with an automatic shut -off damper complying • air capacities exceeding 10,000 cfm shall have optimum start controls. Optimum start controls shall be designed to automatically adjust the start time of an HVAC system each day to bring the space to desired occupied temperature levels immediately before scheduled occupancy. The control algorithm shall, as a minimum, be a function of the difference between space temperature and occupied setpoint and the amount of time prior to scheduled occupancy. 1412.5 Heat Pump Controls: Unitary air cooled heat pumps shall include microprocessor controls that minimize supplemental heat usage during start-up, set- up, and defrost conditions. These controls shall anticipate need for heat and use compression heating as the first stage of heat. Controls shall Indicate when supplemental heating Is being used through visual means (e.g., LED Indicators). 1412.6 Combustion Heating Equipment Controls: Combustion heating equipment with a capacity over 225,000 Btu/h shall have modulating or staged combustion control. 000 EXCEPTIONS: 1. Boilers. 2. Radiant heaters. 1412.7 Balancing: Each air supply outlet or air or water terminal device shall have a means for balancing, including but not limited to, dampers, temperature and pressure test connections and balancing valves. with Section 1412.4.1. Once outside air ducts meet the above listed requirements, any runs within conditioned space shall comply with Table 14 -5 requirements. Other ducts and plenums shall be thermally Insulated per Table 14 -5. Exceptions: 1. Within the HVAC equipment. 2. Exhaust air ducts not subject to condensation. 3. Exposed ductwork within a zone that serves that zone. 1415 Piping Systems 1415.1 Insulation: Piping shall be thermally insulated in accordance with Table 14 -6. Exception: Piping Installed within unitary HVAC equipment. Water pipes outside the conditioned space shall be insulated in accordance with Washington State Plumbing Code (WAC 51 -26) 1416 Completion Requirements (Refer to NREC Section 1416 and the Building Commissioning Guidelines, published by the Building Commissioning Association, for complete text and guidelines for building completion and commissioning requirements.) June 26, 2009 Kevin Weare CDS Assoc, LLC 4000 Delridge Way SW, S -300 Seattle, WA 98106 RE: CORRECTION LETTER #1 Mechanical Permit Application Number M09 -061 Lifeay Christian Stores —17326 Southcenter Py Dear Mr. Weare, If you have any questions, please contact me at (206) 431 -3670. Sincerely, encl File: M09 -061 all t Technician • cry of Tukwila W:\Permit Center\Correction Letters \2009W109 -061 Correction Letter #I.DOC S Jim Haggerton, Mayor Department of Community Development Jack Pace, Director This letter is to inform you of corrections that must be addressed before your mechanical permit(s) can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire Department has no comments. Building Department: Dave Larson at 206 431 -3678 if you have questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that two (2) complete sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. 6300 Southcenter Boulevard, Suite #100 0 Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Building Division Review Memo • • Date: June 5, 2009 Project Name: Lifeway Christian Stores Permit #: M09 -061 Plan Review: Dave Larson, Senior Plans Examiner Tukwila Building Division Dave Larson, Senior Plan Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 1 1x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. The storage platform above the office area in the rear of the space has been proposed to be eliminated via a phone conversation with the architect. The return air from these spaces will need to be ducted back to the unit or ducted via jumpers over the walls. Please confirm these changes with architect and modify plans as necessary. Eliminate mezzanine notes. 2. Please show location of duct smoke detectors on plans. Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. DEPARTMENTS: VL D� -i�ll`D ullding D ivision Public Works Complete Comments: REVIEWER'S INITIALS: Documents /routing slip.doc 2 -28 -02 • PLAN I? ACTIVITY NUMBER: M09 -061 DATE: 06 -30 -09 PROJECT NAME: LIFEWAY CHRISTIAN STORES SITE ADDRESS: 17326 SOUTHCENTER PY Original Plan Submittal Response to Incomplete Letter # X Response to Correction Letter # 1 Revision # After Permit Issued APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: Fire Prevention Structural Incomplete u • NG SLIP Planning Division Permit Coordinator DETERMINATION OF (Tues., Thurs.) DUE DATE: 07 -02 -09 Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS RO TING: Please Route Structural Review Required n No further Review Required DATE: DUE DATE: 07 -30 -09 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: ACTIVITY NUMBER: M09 -061 DATE: 06 -01 -09 PROJECT NAME: LIFEWAY CHRISTIAN STORES SITE ADDRESS: 17326 SOUTHCENTER PY X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENT 0.1 VS Building 'vision I • Public Works Complete Comments: Documents/routing slip.doc 2 -28 -02 REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: I 14(1)t- c Fire Prevention Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete • ING SLIP DATE: Planning Division Permit Coordinator DUE DATE: 06-02 -09 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS RO TING: Please Route Structural Review Required n No further Review Required DUE DATE: 06-30 -09 Approved n Approved with Conditions n Not Approved (attach comments) kl Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: rill i (.c Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials:�t n i REVISION SUBMITTAL i Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: (/ %9 Plan Check/Permit Number: M09 -061 ❑ Response to Incomplete Letter # ® Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Lifeway Christian Stores Project Address: 17326 Southcenter Py Contact Person: `/ /l *A Phone Number: ,zOt, 79S 2 2 Summary of Revision: SISFi 4rrAtr460 te- t4..42 Sheet Number(s): -/ 0 Z • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on tr3(} - b a k \applications \forms - applications on line \revision submittal Created: 8 -13 -2004 Revised: PFCEIVED CITY OF TUKWILA 1JUN 3 0 2009 0 E- FlAAIT CENTER Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 8 WA INTERNATIONAL INS CO 5903115903 12/05/2005 Until Cancelled 01/01/1980 $12,000.00 12/28/2005 7 MERCHANTS BONDING CO WA5418 01/10/2002 Until Cancelled 12/05/2005 $12,000.00 12/24/2001 6 FRONTIER INS CO 140883 11/19/1999 Until Cancelled 02/20/2003 $6,000.00 01/21/2003 5 AMERICAN BANKERS INS CO OF FL 360174 11/01/1997 Until Cancelled 11/19/1999 $6,000.00 4 AMERICAN BANKERS INS CO 360174 11/19/199611/19 /1998 $6,000.00 3 AMERICAN BANKERS INS 0360174 11/19/199511/19 /1996 $6,000.00 2 USFEtG CO 18011014090913 11/19/1992 11/19/1995 $6,000.00 1 USFEtG CO 18013014090913 11/19/1991 11/19/1992 $6,000.00 Name Role Effective Date Expiration Date COLLEY, KENNETH E 01/01/1980 MITCHELL, JAMES S 01/01/1980 COLLEY, ROBIN C 01/01/1980 C T CORPORATION SYSTEM AGENT 01/01/1980 Untitled Page Business Owner Information Bond Information General /Specialty Contractor A business registered as a construction contractor with LEtI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Parent Company ROYAL SEAL CONSTRUCTION INC 8174916400 124 MCMAKIN RD BARTONVILLE TX 76226 OUT OF STATE Type Corporation UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Specialty 1 Specialty 2 601234119 ACTIVE ROYALSC093RJ CONSTRUCTION CONTRACTOR 12/11/1991 1/15/2010 GENERAL UNUSED Page 1 of 2 20x12 CHURCH RESOURCES REFERENCE BIBLES BREAKR MUSIC HALLWAY MANAGER'S OFFICE WOMEN'S TOILET SCALE: I/4 I' - O" 225 AN I I I 12" NORTH 25O 250 250 1� 200 EXISTING DUCT TO REMAIN (TYF',) r -� IL— EXISTING DIFFUSERS TO REMAIN (TYP,) cam_ HALLWAY 2 CHILDREN'S 114 Ti 100 BOOKS IOq PROCESSING ROOM 108 NEW 24x12 OPEN RETURN a. STRUCTURE WITH ) " — r GALV. SCREEN �1 3�? 300 250 200 3dQ ■ l PHO \ E DOARD ABOVE POOR. (TYP) ENTRY 116 S" TO ROOF CURB 4 CAP SEPARATE PERMIT REQUIRED FOR: 0 Mechanical Electrical Plumbing Gas Piping City of Tukwila BUILDING DIVISION 1EVIEWED C FIpR ODE COMPLIANQE APPROVED JUL 08 2009 PI< City of ITiikwlla L INGDIVISION FILE COPY Permit No._ `.0 Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt approved Field Cop a,' d } nditions is acknowledged By.. Date: _2/2 City Of Tukwila BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. EN R4L ME C1-44NICAL CON IT IONS I. RTU'S ARE EXISTING SY THE LANDLORD. CONTRACTOR SHALL PROV IDE NEW FILTERS IN UN ITS AT END OF CONSTRUCT ION, 2, IN ADDITION TO THE GUARANTEE OF EQUIPMENT BY THE MANUFACTURER OF EACH PIECE OF EQUIPMENT SPECIFIED HEREIN, THE MECHANICAL CONTRACTOR SHALL ALSO GUARANTEE SUCH EQUIPMENT AND SHALL BE HELD RESPONSIBLE FOR A PERIOD OF ONE YEAR FROM FINAL ACCEPTANCE FOR NECESSARY ADJUSTMENTS AND /OR REPLACEMENTS OF ALL DEFECTIYE EQUIPMENT, MATERIALS, AND WORKMANSHIP WITHOUT EXPENSE TO L IFEWAY. 3. THE CONTRACTOR SHALL PROVIDE A REPRESENTATIVE OF HIS FIRM, THE CONTROL SYSTEM CONTRACTOR, AND THE OWNER'S REPRESENTATIVE TO RETURN TO THE JOS THE CHANGE OF SEASONS (SUMMER TO WINTER OR WINTER TO SUMMER) FOR THE FIRST YEAR ONLY, TO ADJUST THE AIR CONDITIONING SYSTEMS AND RECHECK OR RECALISRATE CONTROLS AS MAY SE REQUIRED OF THE SEASON CHANGE FROM COOLING TO HEATING OR VICE VERSA. 4, THE CONTRACTOR SHALL PROVIDE TRAINING ON THE OPERATION OF THE UNITS AND THERMOSTAT CONTROLS TO THE STORE PERSONNEL. COORDINATE WITH LIFEWAY ON TRAINING DATE. 5, CONTRACTOR AND SHALL VISIT THE SITE AND OSSERVE ALL EXISTING CONDITIONS WHICH WOULD EFFECT WORK UNDER THIS CONTRACT. CONTRACTOR SHALL EXAMINE ALL PLANS AND SPECIFICATIONS FOR THIS PROJECT, ,. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND INSPECTIONS REQUIRED TO PERTAINING TO WORK UNDER THIS CONTRACT AND PAY ALL CHARGES INCIDENTAL THERETO. DELIVER ALL CERTIFICATES OF INSPECTION ISSUED BY THE LOCAL GOVERNING AUTHORITIES, 7, SEFORE STARTING HIS WORK AND AS THE WORK PROGRESSES, MECHANICAL CONTRACTOR SHALL EXAMINE WORK AND MATERIALS INSTALLED SY OTHERS INSOFAR AS THEY APPLY TO HIS WORK AND SHALL NOTIFY THE GENERAL CONTRACTOR IMMEDIATELY EITHER IN WRITING OR THROUGH VERSAL COMMUNICATION IF CONDITIONS EXIST WHICH WILL PREVENT SATISFACTORY RESULTS IN INSTALLATION OF SYSTEM, a SHOULD MECHANICAL CONTRACTOR START HIS WORK WITHOUT SUCH NOTIFICATION, IT SHALL SE CONSTRUED AS AN ACCEPTANCE SY HIM AND ALL CLAIMS OR QUESTIONS AS TO SUITABILITY OR WORK OF OTHERS TO RECEIVE HIS WORK HE SHALL REMOVE AND REPLACE, AT HIS OWN EXPENSE, ALL WORK UNDER THIS CONTRACT WHICH MAY HAVE TO SE REMOVED ON ACCOUNT OF SUCH DEFECTS. �. R IS THE INTENT OF DRAWINGS AND SPECIFICATIONS TO OBTAIN A COMPLETE AND FULLY OPERATIONAL, AND SATISFACTORY INSTALLATION. AN ATTEMPT HAS SEEN MADE TO SEPARATE AND COMPLETELY DEFINE THE WORK UNDER THIS CONTRACT. HOWEVER, SEPARATE DIVISIONAL DRAWINGS AND SPECIFICATIONS SHALL NOT RELIEVE MECHANICAL CONTRACTOR FROM FULL RESPONSISILITY OF COMPLIANCE WITH WORK OF HIS TRADE WHICH MAY SE INDICATED ON ANY DRAWING OR IN ANY SECTION OF THE SPECIFICATIONS. 10, CONTRACTOR SHALL CAREFULLY EXAMINE ARCHITECTURAL, STRUCTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS PRIOR TO SUSMITTING SID, CONTRACTOR WILL BE REQUIRED TO FURNISH, INSTALL, AND CONNECT WttH APPROPRIATE SERVICES ALL ITEMS SHOWN ON ANY DRAWINGS WITHOUT ADDITIONAL EXPENSE TO L IFEWAY. L IFEWAY SHALL SE NOTIFIED PR IOR TO SID DATE OF ANY DISCREPANCIES, OMISSIONS, CONFLICTS OR INTERFERENCES WHICH OCCUR SETWEEN THE DRAWINGS OR SET JEEN DRAWINGS AND SPECIFICATIONS, SUBMITTAL OF SID SY CONTRACTOR SHALL INDICATE CONTRACTOR'S ACKNOWLEDGMENT AND ACCEPTANCE TO PROVIDE ALL NECESSARY EQUIPMENT, MATERIALS, AND LASOR TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IN ACCORDANCE WITH ALL CODE REQUIREMENTS. 11, ARCHITECTURAL DRAWINGS SHALL TAKE PRECEDENCE OVER MECHANICAL DRAWINGS WITH REFERENCE TO BUILDING CONSTRUCTION. MECHANICAL DRAWINGS ARE DIAGRAMMATIC SUT SHALL SE FOLLOWED AS CLOSELY AS ACTUAL CONSTRUCTION OF BUILDING AND WORK OF OTHER TRADES WILL PERMIT. WHERE LOCATIONS OF EQUIPMENT, DEVICES, OR FIXTURES ARE CONTROLLED B Y ARCHITECTURAL FEATURES, ESTASLISH SUCH LOCATIONS BY REFERRING TO DIMENSIONS ON ARCHITECTURAL AND NOT BY SCALING DRAWINGS, CHANGES FROM DRAWINGS NECESSARY TO MAKE WORK OF CONTRACTOR TO CONFORM TO SUILDING AS CONSTRUCTED AND TO FIT WORK OF OTHER TRADES OR RULES P BODIES HAVING JURISDICTION SHALL SE MADE SY THE CONTRACTOR AT HIS OWN EXPENSE. SOME DRAWINGS MAY HAVE SEEN PREPARED FROM EXISTING DRAWINGS WITH INTENT OF PROVIDING THE CONTRACTOR WITH INFORMATION CONCERNING EXISTING CONDITIONS. DATA SHOWN HAS NOT SEEN COMPLETELY VERIFIED SY ARCHITECT /ENGINEER AND NO GUARANTEE OF ACCURACY OF THE INFORMATION IS GIVEN OR INTENDED. IT SHALL SE THE RESPONSISILITY OF CONTRACTOR TO VERIFY ALL EXISTING COND IT IONS. DATA WHICH IS SHOWN SUT PROVES TO SE INCORRECT SHALL IN NO WAY RELIEVE THE CONTRACTOR FROM INSTALLING HIS WORK WITHIN THE INTENT OF THE PLANS AND SPECIFICATIONS, NO SHALL IT CONSTITUTE BASIS FOR A CHANGE ORDER UNLESS, IN THE OPINION OF THE LIFEWAY PROJECT MANAGER, IT IS DETERMINED TO SE AN EXTRA COST OVER AND ABOVE THE BASIC INTENT OF THESE PLANS AND SPECIFICATIONS. 12. CONTRACTOR SHALL SE RESPONSISLE FOR PROPER PROTECTIVE MEASURES WHEN WORKING OVERHEAD OR IN FINISHED AREAS. HE/SHE SHALL REPAIR, REPLACE, OR TOUCH -UP ALL FINISHED SURFACES WHICH MAY SE DAMAGED AS A RESULT OF HIS OPERATIONS. 13. NO STRUCTURAL MEMBERS SHALL SE CUT WITHOUT APPROVAL OF STRUCTURAL ENGINEER AND LANDLORD. CUT NO OPENINGS IN PRESTRESSED OR PRECAST MEMBERS WITHOUT SAME APPROVALS, 14, ROOF PENETRATIONS SY CONTRACTOR SHALL SE TO A MINIMUM. PENETRATIONS, FLASHING AND PATCHING OF THE ROOFING SYSTEM SHALL BE MADE BY LANDLORD'S ROOFING CONTRACTOR, SUBJECT TO LANDLORD'S PRIOR APPROVAL, AT CONTRACTOR EXPENSE. ANY STRUCTURAL FRAMING OR STRUCTURAL CALCULATIONS REQUIRED SY LANDLORD AS A RESULT OF TENANT'S ROOF PENETRATIONS SHALL SE PERFORMED AT LANDLORD'S OPTION BY LANDLORD'S CONTRACTOR, AT CONTRACTOR EXPENSE. ANY ASSOCIATED CURBS, RAILS, SKIDS, ETC. WHICH CAN IMPACT THE ROOF SYSTEM SHALL SE DESIGNED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND INSTALLED BY LANDLORD'S APPROVED ROOFING CONTRACTOR, AT CONTRACTOR EXPENSE. PV pe t e. 1 CORR-E JIONI L T M RECEIVED JN 3 n 2019 £MIT GENTEF. C .> v Q n 0 cu ,� O 0 o a) C U) 0 C Q -o U 0 0 U) 13 115 0 ci - 0 00 m ,`n N N N 0 m t , - - r- u) Q ) L. �0 0) N I z 1u 1U / 0 i n a c a x L M -I AIR DEVICE SCHEDULE MARK RTU-1 4 2 TYPE R11.1-4 MOUNTING DOWNFLOW DUTY DOWNFLOW NOMINAL TONNAGE 5,0 3.0 4.0 SUPPLY AIR DATA AIRFLOW (CFM) 1,800 1,100 1,500 EXTERNAL SP (IN WC) I ll 0.7 0.7 ao 550 c 450 COOLING TOTAL (MBH) .L' N 1St 3>6�11�1 47,5 STATIC 38,0 ENTERING AIR DRY BULB (F) 80,0 80.0 80,0 ENTERING AIR WET BULB (F) 67.0 67.0 67.0 AMBIENT AIR TEMPERATURE (F) 95.0 95.0 95,0 REFRIGERANT R -22 R -22 R -22 NUMBER OF COMPRESSORS 1.00000 1.00000 1.00000 HEATING PRESSURE 6 34.5 4613 AMBIENT AIR TEMPERATURE (F) NECK SIZE 47,0 47.0 ELECTRIC I-EATCAPACITY (KW) 17.4 6.0 MAXIMUM MISCELLANEOUS CONTROL TYPE MICRO- PROCESSOR MICRO - PROCESSOR MICRO - PROCESSOR FILTERS THROW -AWAY THROW -AWAY THROW -AWAY UNIT DATA AIR THROW DROP AT TITUS MODEL 460/3/60 ELECTRICAL MCA/MOCP 42,7/45 (INCHES) Q EER /SEER 10.5 SEER 10,5 SEER 10.5 SEER AIRFLOW (CFM) SERVICE PER GENERAL NOTES, VERIFY PROPER OPERATION OF EXISTING ECONOMIZER AND REPAIR OR REPLACE AS REQUIRED SERVICE PER GENERAL NOTES, VERIFY PROPER OPERATION OF EXISTING ECONOMIZER AND REPAIR OR REPLACE AS REQUIRED SERVICE PER GENERAL NOTES, VERIFY PROPER OPERATION OF EXISTING ECONOMIZER AND REPAIR OR REPLACE AS REQUIRED MANUFACTURER TRANE TRANE AIR PATTERN MODEL WCD060 WCD036 (FTe50 FPM) MAX CFM NUMBER MAX NC NOTES A 6 X 150 X 4 -WAY X S 0,03 TMS 20 1,3,6,8,12,16 S X 300 X 4 -WAY X S 0,03 TMS 20 1,3,6,8,11,16 ■ • . ! , 16X16 X 300 X X X - 0,05 CT700L 20 2,5,6,10 • i "� • ♦ Vi ► j' r ' ,, J .4 • / - - z. 1, STEEL 15, 24 X 12 INCH MODULE 2, ALUMINUM 16, OPPOSED BLADE DAMPER 3, WINITE FINISH 17, SQUARE TO ROUND ADAPTER AS REQUIRED (FIELD FAB OR FACTORY) 4, MILL FINISH 18, PROVIDE N GYP BOARD OR PLASTER CEILINGS PLAS I ti. FRAME 5, ARCHITECT TO SELECT COLOR V. SIGHT TIGHT CHEVRON BLADE DOOR GRILLE W /AUXILIARY FRAME 6, FIXED PATTERN 20, ADJUSTABLE COUNTERBALANCED BACKDRAFT /RELIEF DAMPER; 7, ADJUSTABLE PATTERN RUSK IN MODEL C5D -2, S, LOUVERED FACE 21, 4 INCH DRAINABLE STATIONARY LOUVER WITH BIRD SCREEN; 9, HINGED, PERFORATED FACE UNITED ENERTECH MODEL FL -D-4 10, 1/2 X 1/2 X 1/2 (NCH EGGCRATE FACE 22. 4 INCH DRAINABLE ADJUSTABLE LOUVER WITH BIRD SCREEN 11, 12 X 12 INCH MODULE AND 120V MOTORIZED OPERATOR WITH SPRING RETURN 12, 24 X 24 INCH MODULE - FULL FACE UNITED ENERTECH MODEL AFL -D -4 13, 24 X 24 INCH MODULE - FILLER PANEL 23, NON DUCTED PANEL 14, 4S X 24 NCI-4 MODULE NOTE= SUBMITTALS FOR AIR DEVICES OTHER THAN THE MANUFACTURER AND MODEL NO SPECIFIED SHALL INCLUDE ALL APPLICABLE PERFORMANCE DATA (THROW, PRESSURE DROP, NC, ETC). EXISTING ROOFTOP HEAT PUMP UNIT SCHEDULE MARK RTU-1 4 2 RTU-3 R11.1-4 CONFIGURATION DOWNFLOW DOWNFLOW DOWNFLOW NOMINAL TONNAGE 5,0 3.0 4.0 SUPPLY AIR DATA AIRFLOW (CFM) 1,800 1,100 1,500 EXTERNAL SP (IN WC) 0.8 0.7 0.7 OUTSIDE AIR (CFM) 550 350 450 COOLING TOTAL (MBH) 63.1 38.1 50.8 SENSIBLE (MBH) 47,5 28,5 38,0 ENTERING AIR DRY BULB (F) 80,0 80.0 80,0 ENTERING AIR WET BULB (F) 67.0 67.0 67.0 AMBIENT AIR TEMPERATURE (F) 95.0 95.0 95,0 REFRIGERANT R -22 R -22 R -22 NUMBER OF COMPRESSORS 1.00000 1.00000 1.00000 HEATING CAPACITY (MBl -) 6 34.5 4613 AMBIENT AIR TEMPERATURE (F) 47,0 47,0 47.0 ELECTRIC I-EATCAPACITY (KW) 17.4 6.0 12.0 MISCELLANEOUS CONTROL TYPE MICRO- PROCESSOR MICRO - PROCESSOR MICRO - PROCESSOR FILTERS THROW -AWAY THROW -AWAY THROW -AWAY UNIT DATA ELECTRICAL (VOLTS/Ph /Hz) 460/3/60 460/3/60 460/3/60 ELECTRICAL MCA/MOCP 42,7/45 18,9/20 30,1/35 EER /SEER 10.5 SEER 10,5 SEER 10.5 SEER ACCESSORIES SERVICE PER GENERAL NOTES, VERIFY PROPER OPERATION OF EXISTING ECONOMIZER AND REPAIR OR REPLACE AS REQUIRED SERVICE PER GENERAL NOTES, VERIFY PROPER OPERATION OF EXISTING ECONOMIZER AND REPAIR OR REPLACE AS REQUIRED SERVICE PER GENERAL NOTES, VERIFY PROPER OPERATION OF EXISTING ECONOMIZER AND REPAIR OR REPLACE AS REQUIRED MANUFACTURER TRANE TRANE TRANE MODEL WCD060 WCD036 WCDO48 FAN SCHEDULE MARK EF-1 4 2 SERVICE TYPE CEILING EXHAUST ROOF /WALL OPENING (INCHES) S° ROOF CAP DRIVE DIRECT MOTOR HORSEPOWER 70 WATTS AIRFLOW (CFM) 92 EXT, STATIC PRESSURE (N WC) 0,25 ELECTRICAL (VOLTS/Ph/Hz) 120/1/6;0 MANUFACTURER COOK MODEL GC-I40 ACCESSORIES INLET GRILLE, BACKDRAFT DAMPER, SPEED CONTROL, VIBRATION ISOLATORS, ROOF CAP, 277 VOLT TRANSFORMER CONTROL LIGHTS MECHA \ f CAL LEGEND NN (N.I DINO ) 100 (91 AC AFF CD CU EDH EF FD PLR GALV MFR NG NIG NTS OA PT RA RL RS SA SS STL TYP UN UNO V DEMOLITION - TO BE REMOVED INDICATES FLAG NOTE FULL RADIUS ELBOW CONCENTRIC REDUCER ECCENTRIC REDUCER FIRE PAMPER (PROVIDE ACCESS DOOR) SMOKE DAMPER (PROVIDE ACCESS DOOR) A COMBINATION FIRE /SMOKE DAMPER (PROVIDE ACCESS DOOR) --.----MANUAL VOLUME DAMPER VARIABLE AIR VOLUME (VAV) DAMPER MOTORIZED DAMPER 45° ENTRY TAKEOFF FITTING MITERED ELBOW W /TURNING VANES SD DUCT SMOKE DETECTOR INSULATED FLEX DUCT W/DAMPERED ROUND TAKEOFF FITTING WITH SCOOP DUCT SIZE IN INCHES (CLEAR INSIDE DIMENSIONS) RECTANGULAR -TO -ROUND (OR OVAL) TRANSITION 90 BRANCH 45° BRANCH FITTINGS FITTINGS I' I CONCENTRIC REDUCER ELBOW DOWN EXISTING NEW SUPPLY AIR DEVICE RETURN/EXHAUST AIR DEVICE SUPPLY AIR DUCT, UP, DOWN RETURN/EXHAUST DUCT UP, DOWN AIR PATTERN (3-WAY SHOWN, ASSUME 4-WAY IF NOT OTHERWISE INDICATED) UNDERCUT DOOR 1 -1/2" FOR RETURN AIR CONNECT TO EXISTING AIR DEVICE CALLOUT AND CFM EQUIPMENT NUMBER TAG ROOM QL41PME THERMOSTAT WITH ASSOCIATED _ ROOM SENSOR WITH ASSOCIATED EQUIPMENT NUMBER (5'f AFF) HANDICAPPED ROOM THERMOSTAT WITH ASSOCIATED EQUIPMENT NUMBER (4 AFF) EQUIPMENT I MEENT I NUMBBE 5 t ASSOCIATED P) 2 CARBON DIOXIDE SENOR WITH EQUIPMENT NUMBER (5 ± AFF) AIR CONDITIONER ABOVE FINISHED FLOOR COIL CONDENSATE DRAIN CONDENSING UNIT OR COPPER ELECTRIC DUCT HEATER EXHAUST FAN FLOOR DRAIN FLOOR GALVANIZED HEATER MANUFACTURER NATURAL GAS NOT IN CONTRACT NOT TO SCALE OUTSIDE AIR PRESSURE TREATED RETURN AIR REFRIGERANT LIQUID REFRIGERANT SUCTION SUPPLY AIR STAINLESS STEEL STEEL TYF' ICAL UNIT HEATER UNLESS NOTED OTHERWISE VARIABLE VOLUME BOX NORTH L ----- REVIEVEI F p ODE COMPLIANCE APPROVED JUL 0 8 2009 City of Tukwila ILDING DIVISION MECHANICAL ICAL NOTES 1, THESE DRAWINGS HAVE BEEN DEVELOPED FROM THE BEST AVAILABLE INFORMATION. CONTRACTOR SHALL FIELD VERIFY ALL FELD CONDITIONS, DIMENSIONS, CLEARANCES, LOCATION OF EXISTING UTILITIES, ETC, PRIOR TO BIDDING, FABRICATION, OR INSTALLATION. DO NOT SCALE FROM THESE DRAWINGS. 2, COORDINATE INSTALLATION AMONG TRADES TO AVOID INTERFERENCES. WHERE PIPING AND DUCTWORK ARE ROUTED TOGETHER, INSTALL PIPING BELOW DUCTWORK FOR MAINTENANCE ACCESSIBILITY, INSTALL ALL MECHANICAL SYSTEM COMPONENTS TO PERMIT INSTALLATION OF CEILINGS AT HEIGHTS INDICATED ON THE ARCHITECTURAL DRAWINGS, 3, INSTALL ALL HVAC EQUIPMENT PER MANUFACTURER RECOMMENDATIONS, INCLUDING REQUIRED MAINTENANCE CLEARANCES, PIPING, DUCTWORK, AND CONDUIT ROUTING SHALL NOT FLOCK REQUIRED ACCESS TO EQUIPMENT DOORS OR PANELS, 4, DESIGN BASIS FOR HVAC SYSTEMS, INCLUDING ASSOCIATED PIPING AND ELECTRICAL WORK, IS THE SCHEDULED EQUIPMENT, SUBSTITUTION OF OTHER EQUIPMENT MAY REQUIRE CHANGES N PIPING, ELECTRICAL POWER SUPPLY, MAINTENANCE CLEARANCES, STRUCTURAL SUPPORTS, ETC, ALL SUCH CHANGES SHALL BE COORDINATED THROUGHOUT ALL TRADES, AND SHALL BE PERFORMED WITH NO EXTENSION OF SCHEDULE, AND AT NO ADDITIONAL COST TO THE OWNER. 5, FABRICATE NEW DUCTWORK FROM MILL GALVANIZED STEEL SHEET, MATERIAL GAGES, FABRICATION DETAILS, INSTALLATION AND DUCT SUPPORT SHALL SE N ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS. SEAL ALL JOINTS PER SMACNA STANDARDS, 6. THE INDICATED DUCT ROUTING AND SIZES ARE DIAGRAMMATIC, DO NOT FABRICATE FROM THESE DRAWINGS, FELD VERIFY ROUTING AND AVAILABLE CLEARANCES, WHERE REQUIRED BY FIELD CONDITIONS, DUCTWORK MAY BE RE -SIZED UTILIZING ASHRAE/SMACNA EQUIVALENT SIZES, NOTIFY ENGINEER AND OBTAIN APPROVAL FOR REQUIRED ROUTING AND SIZE CHANGES PRIOR TO BEGINNING FABRICATION, 7. &MAGNA EQUIVALENT ROUND DUCT SIZES MAY BE SUBSTITUTED FOR THE RECTANGULAR DUCT SIZES INDICATED ON THE PLANS, S. EXTERNALLY INSULATE ALL RIGID DUCTWORK WITH 1 -1/2 NCI-1 THICK FLEXIBLE FIBERGLASS, MINIMUM 3/4 POUND DENSITY, WITH FACTORY APPLIED REINFORCED FOIL VAPOR BARRIER. INSULATION SHALL HAVE A FIRE SMOKE RATING OF 25/50, APPLY PER SMACNA STANDARDS. 9, PROVIDE DOUBLE THICKNESS TURNING VANES N ALL MITERED ELBOWS AND TEES. 10, INSULATED FLEXIBLE DUCT SHALL BE UL LISTED, CONSTRUCTED OF A CPE INNER LINER, COATED SPRING STEEL WIRE HELIX WITH FIBERGLASS BLANKET, AND VAPOR BARRIER EQUAL TO THERMAFLEX G-KM BY FLEXIBLE TECHNOLOGIES, INSULATION SHALL HAVE A FIRE SMOKE RATING OF 25/50. 11, MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE FIVE FEET, UNLESS OTHERWISE INDICATED. 12, SECURE FLEXIBLE DUCT CONNECTIONS WITH STAINLESS STEEL WORM GEAR CLAMPS AND DUCT TAPE, 13, NOT USED, 14. WHERE LAY -N AIR DEVICES ARE SPECIFIED N AREAS WITH PLASTER OR GYPSUM BOARD CEILINGS, PROVIDE PLASTER FRAMES, 15, SEE REFLECTED CEILING PLAN FOR FINAL LIGHT FIXTURE LOCATIONS AND DIMENSIONS, ADJUST DUCTWORK/DIFFUSER LOCATIONS AS REQUIRED TO SUIT LIGHTING ARRANGEMENT, 16. DUCT SMOKE DETECTORS SHALL BE UL LISTED, IONIZATION TYPE, WITH METAL SAMPLING TUBE; HONEYWELL, SYSTEM SENSOR, OR EQUAL, DETECTORS SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR, PROVIDE POWER FROM UNIT UNLESS OTHERWISE NOTED, COORDINATE WITH ELECTRICAL CONTRACTOR. 17. NEW PROGRAMMABLE THERMOSTATS SHALL BE HONEYWELL VISIO PRO 8000 WITH REMOTE SENSOR SERIES (NO SUBSTITUTIONS) AND SHALL BE PROGRAMMED TO PERFORM THE FOLLOWING SEQUENCES OF OPERATION WITH FIVE (5) DEGREE MINIMUM DEADBAND BETWEEN HEATING AND COOLING„ 22, UN- OCCUPIED MODE= SYSTEM SHALL CYCLE TO MAINTAIN SET - FONTS OF 80 DEGREES F COOLING AND 65 DEGREES F HEATING. OCCUPIED MODE= FAN SHALL RUN CONTINUOUSLY TO PROVIDE REQUIRED VENTILATION, SYSTEM COOLING AND HEATING SHALL CYCLE AS REQUIRED TO MAINTAIN SET- POINTS OF 74 DEGREES F COOLING AND 70 DEGREES F HEATING, ECONOMIZER CYCLE: UNITS WITH ECONOMIZERS SHALL ENTER ECONOMIZER MODE ON A CALL FOR COOLING, WHEN THE ENTHALPY OF THE RETURN AIR EXCEEDS THAT OF THE OUTDOOR AIR, COMPRESSORS SHALL BE DISABLED, AND ECONOMIZER OUTDOOR AIR AND RETURN AIR DAMPERS SHALL MODULATE AS REQUIRED TO MATCH THE LOAD. IF 100 PERCENT OUTDOOR AIR CANNOT SATISFY THE THERMOSTAT, UNIT COMPRESSORS SHALL BE ENABLED TO PROVIDE SUPPLEMENTAL COOLING. INTERLOCKS AND SAFETIES FIRE ALARM SYSTEM AND DUCT SMOKE DETECTORS SHALL SHUT DOWN THE SYSTEM F PRODUCTS OF COMBUSTION ARE DETECTED, CONNECT SMOKE DETECTORS TO THE BUILDING FIRE ALARM SYSTEM (COORDINATE WITH FIRE ALARM / ELECTRICAL CONTRACTOR). 18, COMPLETED HVAC SYSTEMS SHALL BE BALANCED BY AN INDEPENDENT, TESTING, ADJUSTING, AND BALANCING (TAB), NE515 OR AABC CERTIFIED CONTRACTOR, TAB CONTRACTOR SHALL BE CONTRACTED BY THE GENERAL CONTRACTOR AND SHALL REPORT TO THE ENGINEER /ARCHITECT ON BEHALF OF THE OWNER, PROVIDE REPORT TO LFEWAY REPRESENTATIVE , 19, NEW MECHANICAL EQUIPMENT SHALL NOT BE UTILIZED FOR SPACE CONDITIONING DURING CONSTRUCTION. EQUIPMENT SHALL BE OPERATED ONLY AS REQUIRED TO PROVIDE PROPER START -UP, CHECK -OUT, BALANCE, ETC. N ORDER TO MEET 'SUBSTANTIAL COMPLETION' GOALS AND PROVIDE A COMPLETE WORKING SYSTEM TO TURN OVER TO OWNER PROVIDE OWNER WITH REPORT, 20, COORDINATE WORK N CONJUNCTION WITH LFEWAY PROJECT MANUAL, DIVISION ONE, DIVISION 15, 21, MECHANICAL CONTRACTOR IS RESPONSIBLE FOR FULLY CONNECTING UNITS FOR OPERATION HEAT AND AIR CONDITIONING, INCLUDE NECESSARY ELECTRICAL AND GAS PIPING TO FINAL METER LOCATIONS. VERIFY SITE CONDITIONS. THE FOLLOWING MODIFICATION AND .RE- CONDITIONING EFFORTS SHALL BE ACCOMPLISHED TO THE EXISTING ROOFTOP AC UNITS BEING RE -USED, VERIFY LANDLORD WARRANTY ISSUES WITH FINAL LEASE AGREEMENT PRIOR TO START OF WORK, RTU'S CONTRACTOR SHALL SERVICE EXISTING AIR CONDITIONING SYSTEM COMPLETELY INCLUDING, BUT NOT LIMITED TO, CLEANING INTERIOR AND EXTERIOR OF ALL COMPONENTS, TOUCH UP PANTING, REPLACING AIR FILTERS, INSPECTING AND REPLACING FAN BELTS AND WORN SHEAVES (IF REQUIRED) CHECKNG EVAPORATOR AND CONDENSER FANS AND FAN MOTORS, CLEANING AND COMBING EVAPORATOR AND CONDENSER COILS, CHECKNG AND TRIMMING REFRIGERANT CHARGE AND LUBRICATION, CHECKING COMPRESSOR AMP DRAW, INSPECTING HEAT EXCHANGER AND GAS TRAIN TO VERIFY PROPER OPERATION (OR ELECTRIC HEAT AND CONTROLS AND REVERSING VALVE AS APPLICABLE), CHECKING DAMPER OPERATION AND DAMPER MOTORS, CLEANING CONDENSATE TRAP, ETC,, TO INSURE PROPER OPERATION. ADJUST FANS, SHEAVES, AND SETTINGS AS INDICATED, PROVIDE CONTROLS NEW AS INDICATED ON SCHEDULE, UNITS NOT RESTORABLE TO GOOD WORKING ORDER SHAT -I BE BROUGHT TO THE ATTENTION OF THE GENERAL CONTRACTOR, SHOULD ANY REPAIRS SE REQUIRED, CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER'S REPRESENTATIVE AND SUBMIT A WRITTEN COST PROPOSAL INCLUDING COMPLETE COST TO PLACE UNIT IN "LIKE NEW" CONDITION AND TIME ESTIMATE TO COMPLETE REPAIRS. RECEIVED JUN 302000 PERMIT CENTER DUCTWORK: DUCTWORK INDICATED TO REMAIN FOR RE -USE SHALL SE INSPECTED AND RE-SEALED OR REPAIRED AS REQUIRED WITH INSULATED GALVANIZED SHEET. DIFFUSERS 4 GRILLES: EXISTING DIFFUSERS, GRILLES, ETC, INDICATED TO REMAIN FOR RE -USE SHALL SE CLEANED AND TOUCH -UP PANT APPLIED AS REQUIRED, WHERE REQUIRED TO CLEAR NEW LIGHTING, GRILLES SHALL BE RFJ OCATED TO ADJACENT CEILING GRID AND THE DUCTWORK EXTENDED TO MATCH FXI &TINn. O9OIQ1 a E v 0 : aD 0) ,— a o a a L a) a) 0 1 0 U) 0 4- L 0 Z o. 0 v Q L C a L M-2 LEGEND, SCHEDULES, DETAILS NOTES Biblical Solutions for Life Beach Blvd.